kuliah 10 ku sumur ah

Upload: last-winter

Post on 04-Oct-2015

239 views

Category:

Documents


0 download

DESCRIPTION

Komplesi

TRANSCRIPT

  • Kuliah 10Kuliah-10

    K j UlKerja Ulang

    D I A d H li MMDosen : Ir. Andry Halim, MMUniversitas Trisakti - Jakarta

    2012

  • Objective/Sasaran Konsep Dasar Komplesi Konsep Dasar Komplesi Konsep Kerja Ulangp j g

  • Daftar Pustaka

    Allen S.O. and Robert A.P. Production Operation, Vol. I Oil and Gas Consultant International Inc.

    Peter E. Clark,Well Completions : Stimulation and Work Over. Pertamina Hulu, Teknik Produksi, Jakarta, 2003 H.K. Van Poolen,Well Completion and Stimulations Program. Peter E. Clark,Well Completions : Stimulation and Work Over., p Jonathan Billary,Well Completions Design, PetroleumElsevier,

    2009 Semua buku perihal Komplesi dan uji Sumur Semua Jurnal tentang Komplesi dan uji Sumur

  • Konsep Dasar Komplesi

    Well Completion atau penyelesaian sumur adalah Pekerjaan setelah pemboran, logging dan

    pemasangan casing dan flanged sudah dilakukan. Komplesi dapat dilakukan dengan rig yang samaKomplesi dapat dilakukan dengan rig yang sama

    atau diganti dengan snubbing unit atau unit lain yang lebih murah.

  • Konsep Dasar KomplesiKonsep Dasar Komplesi

  • Kerja Ulang SumurKerja Ulang Sumur

  • Kerja Ulang Sumurj g

  • Kerja Ulang Sumurj g

  • Kerja Ulang Sumur

  • Kerja Ulang Sumurj g

  • Kerja Ulang Sumurj g

  • Kerja Ulang Sumurj g

  • Kerja Ulang Sumurj g

  • Kerja Ulang Sumurj g

  • Kerja Ulang Sumurj g

  • Kerja Ulang Sumurj gThe image cannot be displayed. Your computer may not have enough memory to open the image, or the image may have been corrupted. Restart your computer, and then open the file again. If the red x still appears, you may have to delete the image and then insert it again.

  • Materi terkaitMateri terkait komplesi sumurp

  • PERFORATING

    Indonesia Business Unit

  • OPTIMIZING FLUID FLOW

    Casing

    Cement

    Damaged Zone(Permeability kd)

    Undisturbed Formation(Permeability ku)

    Goal : to establish effective (Permeability kd)

    Crushed Zone(Permeability kc)

    communication between the wellbore and the reservoir

    Factors that influence fluid flow through the perforations :Factors that influence fluid flow through the perforations :- Perforating Geometry- Damaged zones around the wellbore- Crushed zones around the perforation

    Diff ti l th t i t h f ti

    Indonesia Business Unit

    - Differential pressure that exist when perforating

  • PERFORATING GEOMETRY

    Perforating geometry involves : Gun Phasing Shot density Perforation diameter Penetration depth

    Perforation Diameter

    PenetrationGun Phasing0.1 ent. hole PenetrationGun Phasing2.5 penetration

    Cement

    7 Casing

    Indonesia Business Unit

    7 Casing

    Bore hole0.3 ent. hole6.0 penetration

  • FORMATION FRACTURING

    OBJECTIVES

    The objective of hydraulic fracturing for well stimulation is to increase well productivity by creating a highly conductive path (compare to reservoir permeability) some distance away from wellbore into the p y) yformation.

    Fracture InitiationA hydraulic fracture treatment is accomplished by pumping a suitable fluid into the formation at a rate faster than the fluid can leak off into the rock. Fluid pressure is built up sufficient to overcome the earth compressive stress holding the rock material together. The rock thencompressive stress holding the rock material together. The rock then parts or fractures along a plane perpendicular to the minimum compressive stress in the formation matrix.

    Indonesia Business Unit

  • Fracture ExtensionAs injection of frac fluid continues, the fracture tends to grow in width

    fl id i th f t t d th f t f kas fluid pressure in the fracture, exerted on the fracture face, works against the elasticity of the rock material. After sufficient frac fluid pad has been injected to open the fracture wide enough to accept proppant, sand is added to the frac fluid and is carried into the fracture p pp ,to hold it open after the job.

    The growth upward or downward may be stopped by a barrier formation; downward growth may also be stopped by fallout of sand to ; g y pp ythe bottom of the fracture. The growth outward away from the wellbore will be stopped when the rate of frac fluid leakoff through the face of the fracture into the formation equals the rate of fluid injection into the fracture at the wellborefracture at the wellbore.

    Indonesia Business Unit

  • Mechanics of Fracturing vRegional Rock Stresses

    h2v = Total vertical stress, psih1

    Total vertical stress, psi= 0.007 D= average rock density, lb/ft= depth, ft

    D

    = 0.007 D Pr= formation pore pressure, psiPr

    v h1 = Maximum principal horizontal matrix stressh2 = Maximum principal horizontal matrix stress

    Horizontal Matrix stress depend on rock properties and pore pressure.

    Indonesia Business Unit

  • ZONE ISOLATION SQUEEZE CEMENTINGPACKERS

    Indonesia Business Unit

  • Squeeze Cementing - DefinitionSqueeze Cementing Definition

    Injection of Cement Slurryinto the voids behind theinto the voids behind thecasing

    Dehydration of cementyrequires: fluid fluid-loss, porous(permeable) matrix,differential pressure, time.

    Injection below or abovefracture pressure

    Indonesia Business Unit

  • PACKERS

    Objectives

    All k ill tt i f th f ll i bj ti h thAll packers will attain one or more of the following objectives when they are functioning properly :

    1. Isolate well fluids and pressure.p

    2. Keep gas mixed with liquids, by using gas energy for natural flow.

    3 Separate producing zones preventing fluid and pressure contamination3. Separate producing zones, preventing fluid and pressure contamination.

    4. Aid in forming the annular volume (casing/tubing/packer) required for gas lift or subsurface hydraulic pumping systems.

    5. Limit well control to the tubing at the surface, for safety purposes.

    6 Hold well servicing fluids (kill fluids packer fluids) in casing annulus

    Indonesia Business Unit

    6. Hold well servicing fluids (kill fluids, packer fluids) in casing annulus.

  • Questions ?

  • PR-101. Sebutkan faktor-faktoryang berpengaruh terhadap

    ilih k l ipemilihan komplesi2. Apa yang dimaksud dengan well service dan work over3. Apa yang dimaksud dengan swabbing dan apa tujuan 3. pa ya g d a sud de ga swabb g da apa tujua

    dilakukan swabbing serta perlatan yang digunakan utk operassi swabbing

    4 Sebutkan metoda untuk melakukan WO (kerja ulang)4. Sebutkan metoda untuk melakukan WO (kerja ulang)5. Sebutkan peralatan untuk mendeteksi kebocoran

    penyemenan ulang dan uraikan.6. Sebutkan metoda untuk isolasi lapisan dan mengapa hal tsb

    perlu dilakukan