  • 8/16/2019 KEMAJUAN TAMBANG

    1/2

    ELEVASI KONTUR LUASAN AREA VOLUME TONASE

    120 156.50

    115 637.50 1,985.00 4,764.00

    110 2,216.00 7,133.75 17,121.00

    105 3,766.00 14,955.00 35,892.00

    100 7,181.00 27,367.50 65,682.00

    95 11,111.00 45,730.00 109,752.00

    90 16,545.00 69,140.00 165,936.00

    85 24,438.50 102,458.75 245,901.00

    80 32,230.50 141,672.50 340,014.00

    75 33,592.50 164,557.50 394,938.00

    70 44,498.50 195,227.50 468,546.00

    65 74,858.00 298,391.25 716,139.00

    60 57,880.50 331,846.25 796,431.00

    55 20,975.31 197,139.52 473,134.85

    50 71,315.00 230,725.77 553,741.85

    45 72,400.50 359,288.75 862,293.00

    40 367,185.00 881,244.00

    35 292,110.00 701,064.00

    30 201,883.50 484,520.40

    25 187,824.00 450,777.60

    20 129,128.00 309,909.60

    8,077,801.31

  • 8/16/2019 KEMAJUAN TAMBANG

    2/2

      615,113 610,349.01

    610,349 593,228.01

    593,228 557,336.01

    557,336 491,654.01

    491,654 381,902.01

    381,902 215,966.01

    215,966 (29,934.99)

      645,048 305,034.00

    305,034 (89,904.00)