PELATIHAN DIGITAL GOVERNOR CONTROL POKJA HAR APPI BANDUNG, 5 - 9 APRIL 2010 505E WOODWARD DIGITAL GOVERNOR CONTROL By : Ismail PT PUPUK KALTIM BONTANG

Upload: sutikno-blank

Post on 13-Apr-2015

67 views

Category:

Documents


13 download

DESCRIPTION

DIgital Speed Turbine Control

TRANSCRIPT

Page 1: GOV 505E Update

PELATIHAN DIGITAL GOVERNOR CONTROLPOKJA HAR APPI BANDUNG, 5 - 9 APRIL 2010

505E WOODWARD DIGITAL GOVERNOR CONTROL

By : IsmailPT PUPUK KALTIM BONTANG

Page 2: GOV 505E Update

505E DIGITAL GOVERNOR UNTUK EXTRACTION STEAM TURBINE

Berbasis 32 bit Microprocessor

Dapat di program , Satu desain

Berdiri sendiri / di hubungkan dengan alat lain

Umum

PELATIHAN DIGITAL GOVERNOR CONTROLPOKJA HAR APPI BANDUNG, 5 - 9 APRIL 2010

Page 3: GOV 505E Update

PELATIHAN DIGITAL GOVERNOR CONTROLPOKJA HAR APPI BANDUNG, 5 - 9 APRIL 2010

Serial

Serial atau Hard wire

Komputer untuk konfigurasi

Serial

Page 4: GOV 505E Update

Integrated dalam satu paket

2 Line (masing-masing 24 karakter )

30 fungsi tombol

Operator Control Panel ( OCP )

PELATIHAN DIGITAL GOVERNOR CONTROLPOKJA HAR APPI BANDUNG, 5 - 9 APRIL 2010

Page 5: GOV 505E Update

Speed ( Load )

Extraction/Admission Pressure ( Flow )

Turbine Control Parameter

2 Modbus Port (RS 232, 422, 485)

Hardwire Connection

Komunikasi

PELATIHAN DIGITAL GOVERNOR CONTROLPOKJA HAR APPI BANDUNG, 5 - 9 APRIL 2010

Page 6: GOV 505E Update

First Out Trip

Critical speed (2 speed Band)

Auto Start Seq. (Hot & Cold)

Peak Speed Indikasi (Overspeed trip)

Fitur Tambahan

PELATIHAN DIGITAL GOVERNOR CONTROLPOKJA HAR APPI BANDUNG, 5 - 9 APRIL 2010

Page 7: GOV 505E Update

Program Mode

Run Mode

Service Mode

Normal Operating Mode

PELATIHAN DIGITAL GOVERNOR CONTROLPOKJA HAR APPI BANDUNG, 5 - 9 APRIL 2010

Password

Program Mode : 1113

Service Mode : 1111

Page 8: GOV 505E Update

Program Mode

PELATIHAN DIGITAL GOVERNOR CONTROLPOKJA HAR APPI BANDUNG, 5 - 9 APRIL 2010

Program Mode digunakan untuk memilih opsi-opsi yang diperlukan untuk mengkonfigurasi control spesifik turbin aplikasi.

Page 9: GOV 505E Update

Run Mode

PELATIHAN DIGITAL GOVERNOR CONTROLPOKJA HAR APPI BANDUNG, 5 - 9 APRIL 2010

Run Mode digunakan untuk memonitor parameter parameter operasional saat turbine beroperasi dari start-up dan proses shutdown.

Service Mode

Service Mode digunakan untuk meningkatkan kinerja sistem operasi sementara unit sedang berjalan.

Page 10: GOV 505E Update

2 Speed Input

6 Analog Input

12 Contact Input

4 Function Key

Control Input

Terminasi

PELATIHAN DIGITAL GOVERNOR CONTROLPOKJA HAR APPI BANDUNG, 5 - 9 APRIL 2010

Dedicated

Page 11: GOV 505E Update

Dua Actuator Output

Enam 4 – 20 mA Output

Enam Relay Output

Control Output

PELATIHAN DIGITAL GOVERNOR CONTROLPOKJA HAR APPI BANDUNG, 5 - 9 APRIL 2010

Page 12: GOV 505E Update

Service Panel dan Key Pad

PELATIHAN DIGITAL GOVERNOR CONTROLPOKJA HAR APPI BANDUNG, 5 - 9 APRIL 2010

Page 13: GOV 505E Update

Tombol Scroll

PELATIHAN DIGITAL GOVERNOR CONTROLPOKJA HAR APPI BANDUNG, 5 - 9 APRIL 2010

Page 14: GOV 505E Update

Tombol Select

PELATIHAN DIGITAL GOVERNOR CONTROLPOKJA HAR APPI BANDUNG, 5 - 9 APRIL 2010

Page 15: GOV 505E Update

Tombol Adjust

Tombol Run

Sebagai perintah start ketika unit dalam kondisi Ready to Start

PELATIHAN DIGITAL GOVERNOR CONTROLPOKJA HAR APPI BANDUNG, 5 - 9 APRIL 2010

Page 16: GOV 505E Update

Tombol Stop

Tombol Reset

Untuk mereset Run Mode alarm dan shutdown. Denganmenekan ini akan mengembalikan control ke status (Controlling Parameter/Push Run or Program) saat shutdown

Memberi perintah control turbine shutdown (Run Mode), Perintah stop dapat di disable melalui Setting Service Mode (dibawah key option)

PELATIHAN DIGITAL GOVERNOR CONTROLPOKJA HAR APPI BANDUNG, 5 - 9 APRIL 2010

Page 17: GOV 505E Update

Tombol 2/ACTR (Actuator)

Memasukan angka 2 atau posisi actuator (Run Mode)

PELATIHAN DIGITAL GOVERNOR CONTROLPOKJA HAR APPI BANDUNG, 5 - 9 APRIL 2010

Page 18: GOV 505E Update

Tombol 3/CONT (Control)

Memasukan angka 3 atau menampilkan parameter yang sedang di kontrol (Run Mode)

PELATIHAN DIGITAL GOVERNOR CONTROLPOKJA HAR APPI BANDUNG, 5 - 9 APRIL 2010

Page 19: GOV 505E Update

Tombol 4/CAS (Cascade)

Memasukan angka 4 atau menampilkan informasi Cascade kontrol (Run Mode)

PELATIHAN DIGITAL GOVERNOR CONTROLPOKJA HAR APPI BANDUNG, 5 - 9 APRIL 2010

Page 20: GOV 505E Update

Tombol 5/RMT (Remote)

Memasukan angka 5 atau menampilkan informasi Remote Speed Setpoint (Run Mode)

PELATIHAN DIGITAL GOVERNOR CONTROLPOKJA HAR APPI BANDUNG, 5 - 9 APRIL 2010

Page 21: GOV 505E Update

Tombol 6/LMTR (Limiter)

Memasukan angka 6 atau menampilkan informasi valve limiter (Run Mode)

PELATIHAN DIGITAL GOVERNOR CONTROLPOKJA HAR APPI BANDUNG, 5 - 9 APRIL 2010

Page 22: GOV 505E Update

Tombol 7/SPEED

Memasukan angka 7 atau menampilkan informasi speed control (Run Mode)

PELATIHAN DIGITAL GOVERNOR CONTROLPOKJA HAR APPI BANDUNG, 5 - 9 APRIL 2010

Page 23: GOV 505E Update

Tombol 8/AUX (Auxiliary)

Memasukan angka 8 atau menampilkan informasi auxiliary control (Run Mode)

PELATIHAN DIGITAL GOVERNOR CONTROLPOKJA HAR APPI BANDUNG, 5 - 9 APRIL 2010

Page 24: GOV 505E Update

Tombol 9/KW (Load)

Memasukan angka 9 atau menampilkan KW/Load atauinformasi first stage pressure (Run Mode)

PELATIHAN DIGITAL GOVERNOR CONTROLPOKJA HAR APPI BANDUNG, 5 - 9 APRIL 2010

Page 25: GOV 505E Update

Tombol CLEAR

Untuk Masuk atau Keluar ke/dari suatu Mode

PELATIHAN DIGITAL GOVERNOR CONTROLPOKJA HAR APPI BANDUNG, 5 - 9 APRIL 2010

Page 26: GOV 505E Update

Tombol ENTER

Memasukan nilai baru dalam program mode, danmemasukan secara langsung spesifik nilai setpoint dalan run mode

PELATIHAN DIGITAL GOVERNOR CONTROLPOKJA HAR APPI BANDUNG, 5 - 9 APRIL 2010

Page 27: GOV 505E Update

Tombol DYNAMIC (+/-)

Mengakses dynamic setting kontrol parameter dalam posisiRun Mode

PELATIHAN DIGITAL GOVERNOR CONTROLPOKJA HAR APPI BANDUNG, 5 - 9 APRIL 2010

Page 28: GOV 505E Update

Tombol ALARM (F1)

Menampilkan sebuah kondisi alarm ketika indikator LED tombol menyala (tekan tombol scroll untuk melihat alarm lainnya)

PELATIHAN DIGITAL GOVERNOR CONTROLPOKJA HAR APPI BANDUNG, 5 - 9 APRIL 2010

Page 29: GOV 505E Update

Tombol OVERSPEED TEST ENABLE (F2)

Mengijinkan speed reference di naikan melebihi maksimumkontrol speed setpoint untuk melakukan test electrical ataumekanikal overspeed test.

PELATIHAN DIGITAL GOVERNOR CONTROLPOKJA HAR APPI BANDUNG, 5 - 9 APRIL 2010

Page 30: GOV 505E Update

Tombol F3 dan F4 (Function Key)

Tombol yang dapat diprogram untuk fungsi yang lain

Tombol EMERGENCY SHUTDOWN

Memberikan perintah Emergency Shutdown ke Kontrol

PELATIHAN DIGITAL GOVERNOR CONTROLPOKJA HAR APPI BANDUNG, 5 - 9 APRIL 2010

Page 31: GOV 505E Update

KOLOM KONFIGURASI UTAMA

Turbine Start – Start mode, Idle/rated,Auto start sequenceSpeed Control – MPU dan Speed control dynamic settingSpeed Setpoint Value – Speed setpoint, overspeed Trip setpoint, Remote setpoint dan Critical bandOperating Parameter – Aplikasi generator, Local/RemoteExtraction/Adm Cntrl. – Extraction/adm ControlDriver Configuration – Driver Output (ACT)Turbine Performance Value – Ratio/Limiter, Steam MapAnalog Input – Analog Input OptionContact Input – Contact input option

Worksheet

PELATIHAN DIGITAL GOVERNOR CONTROLPOKJA HAR APPI BANDUNG, 5 - 9 APRIL 2010

Page 32: GOV 505E Update

KOLOM KONFIGURASI TAMBAHAN

Function Key – F3 dan F4 Function KeyAuxiliary Control – Auxiliary ControlCascade Control – Cascade controlRead Outs – Analog Read Out Relay – Relay FunctionCommunication – Modbus Comminication

Worksheet

PELATIHAN DIGITAL GOVERNOR CONTROLPOKJA HAR APPI BANDUNG, 5 - 9 APRIL 2010

Page 33: GOV 505E Update

RESTROKE ACTUATOR

Syarat

Control harus kondisi shutdown (Emergency shutdown swicth close)

Yakinkan TTV harus kondisi Close

PELATIHAN DIGITAL GOVERNOR CONTROLPOKJA HAR APPI BANDUNG, 5 - 9 APRIL 2010

Page 34: GOV 505E Update

RESTROKE ACTUATOR

Ketentuan

Arus Maksimum actuator tidak dapat di adjust di bawahdari pada arus minimum actuator

Arus Minimum actuator tidak dapat di adjust lebih besardari pada arus maksimum actuator.

Driver 20-160 mA range 4-20 mA range

Over current 217 mA 26 mA

Under Current 5 mA 0.6 mA

Max Output Current range 10-200 mA 2-24 mA

Max Output Impedance 45 ohms 360 ohms

Min Stop Adjust Range 10-80 mA 2-20 mA

Max Stop Adjust Range 100-200 mA 10-24 mA

Restroke

PELATIHAN DIGITAL GOVERNOR CONTROLPOKJA HAR APPI BANDUNG, 5 - 9 APRIL 2010

Page 35: GOV 505E Update

TURBINE START MODE

Manual start mode

Semi automatic start mode

Automatic start mode

PELATIHAN DIGITAL GOVERNOR CONTROLPOKJA HAR APPI BANDUNG, 5 - 9 APRIL 2010

STRAT PERMISSIVE

Sebuah contact input dapat diprogram sebagai sebuahStart permissive bila diperlukan

Setelah di tekan RUN maka contact start permissive tidakdiperlukan lagi

Biasanya diambil dari contact limit switch TTV

Page 36: GOV 505E Update

ZERO SPEED SIGNAL OVERRIDE

505E dapat di konfigurasi manual atau auto

Bila auto maka lamanya zero override berdasarkan timer

Status logic zero override dapat ditampilkan di service mode

PELATIHAN DIGITAL GOVERNOR CONTROLPOKJA HAR APPI BANDUNG, 5 - 9 APRIL 2010

Page 37: GOV 505E Update

START TURBINE

PELATIHAN DIGITAL GOVERNOR CONTROLPOKJA HAR APPI BANDUNG, 5 - 9 APRIL 2010

Contact external shutdown harus close

Contact permissive start harus close (bila di konfigurasi)

Page 38: GOV 505E Update

TURBINE START MODE

Mode Manual Start

PELATIHAN DIGITAL GOVERNOR CONTROLPOKJA HAR APPI BANDUNG, 5 - 9 APRIL 2010

Page 39: GOV 505E Update

TURBINE START MODE

Mode semi Auto Start

PELATIHAN DIGITAL GOVERNOR CONTROLPOKJA HAR APPI BANDUNG, 5 - 9 APRIL 2010

Page 40: GOV 505E Update

TURBINE START MODE

Mode Auto Start

PELATIHAN DIGITAL GOVERNOR CONTROLPOKJA HAR APPI BANDUNG, 5 - 9 APRIL 2010

Page 41: GOV 505E Update

Critical Speed Avoidance

PELATIHAN DIGITAL GOVERNOR CONTROLPOKJA HAR APPI BANDUNG, 5 - 9 APRIL 2010

2 range critical speed

Speed setpoint tidak dapat di stop bila ada di critical speed

Idle / Rated

Setpoint akan ramp ke nilai idle speed set point

Setpoint akan ramp ke rated speed setpoint jika perintahrated di berikan

Page 42: GOV 505E Update

AUTOMATIC START SEQUENCE

PELATIHAN DIGITAL GOVERNOR CONTROLPOKJA HAR APPI BANDUNG, 5 - 9 APRIL 2010

Page 43: GOV 505E Update

AUTOMATIC START SEQUENCE

PELATIHAN DIGITAL GOVERNOR CONTROLPOKJA HAR APPI BANDUNG, 5 - 9 APRIL 2010

Hot start ramp rate dan Hold time di pakai jika perintah RUN diberikan dan turbine telah shutdown dengan waktu lebih kecildari setting waktu HOT START

Cold start ramp rate dan Hold time dipakai jika perintah RUN diberikan dan turbine telah shutdown dengan waktu lebih lama dari setting waktu COLD START

Bila perintah RUN di berikan dan lamanya shutdown di antarasetting waktu HOT START dan COLD START, maka kontrol akanmenetukan starting rate dan hold time diluar setting

Work sheet

Page 44: GOV 505E Update

AUTOMATIC START SEQUENCE

PELATIHAN DIGITAL GOVERNOR CONTROLPOKJA HAR APPI BANDUNG, 5 - 9 APRIL 2010

Cold Start ( > xx HRS ) = 22 HRSHot Start ( < xx HRS ) = 2 HRSLow Idle Setpt = 1000 RPMLow Idle Delay ( Cold ) = 30 MINLow Idle Delay ( Hot ) = 10 MINHi Idle Stpt = 2000 RPMRate To Hi Idle ( Cold ) = 5 RPM/SECRate To Hi Idle ( Hot ) = 15 RPM/SECHi Idle Delay Time ( Cold ) = 30 MINHi Idle Delay Time ( Hot ) = 20 MINRate To Rated ( Cold ) = 10 RPMRate To Rated ( Hot ) = 20 RPMRated Setpt = 3400 RPM

Page 45: GOV 505E Update

AUTOMATIC START SEQUENCE

PELATIHAN DIGITAL GOVERNOR CONTROLPOKJA HAR APPI BANDUNG, 5 - 9 APRIL 2010

Apabila unit telah trip selama 12 Jam, 505E akan menambah parameter diantara Hot dan Cold dan memakai rate dan delay seperti berikut ini :

Low Idle Delay = 20 MINRate To Hi Idle = 10 RPM/SECHi Idle Delay = 10 MINRate To Rated = 15 RPM/SECHours Since Trip ( HRS ) = 12 HRS

Page 46: GOV 505E Update

Speed Control

PELATIHAN DIGITAL GOVERNOR CONTROLPOKJA HAR APPI BANDUNG, 5 - 9 APRIL 2010

Page 47: GOV 505E Update

Extraction Control

PELATIHAN DIGITAL GOVERNOR CONTROLPOKJA HAR APPI BANDUNG, 5 - 9 APRIL 2010

Page 48: GOV 505E Update

Mengaktifkan Extraction Control

PELATIHAN DIGITAL GOVERNOR CONTROLPOKJA HAR APPI BANDUNG, 5 - 9 APRIL 2010

Manual Enable/Disable

Automatic Enable/Disable

Page 49: GOV 505E Update

TURBINE START

PELATIHAN DIGITAL GOVERNOR CONTROLPOKJA HAR APPI BANDUNG, 5 - 9 APRIL 2010

Page 50: GOV 505E Update

STEAM MAP

Steam map adalah sebuah bentuk grafik yang mewakiliuntuk range operasi dan pembatas pada sebuah ekstraksidan atau Admission steam turbin.

Saat turbin normal operasi dia harus berada didalamgaris steam amplop.

Ketentuan

Sebuah Map harus linear (semua garis harus lurus)

Garis ekstraksi/admission flow = 0% danekstaksi/admission flow = 100% harus di parallel, dangaris LP valve = 0% dan LP valve 100% harus diparallel.

PELATIHAN DIGITAL GOVERNOR CONTROLPOKJA HAR APPI BANDUNG, 5 - 9 APRIL 2010

Page 51: GOV 505E Update

PELATIHAN DIGITAL GOVERNOR CONTROLPOKJA HAR APPI BANDUNG, 5 - 9 APRIL 2010

RATIONING / LIMITER

HP = K1.S + K2.P + K3

LP = K4.S + K5.P + K6

Typical extraction steam map

Page 52: GOV 505E Update

PELATIHAN DIGITAL GOVERNOR CONTROLPOKJA HAR APPI BANDUNG, 5 - 9 APRIL 2010

Nilai MAX POWER adalah beban dimana S = 100 garis silang pada sumbu S (sekitar 13498 KW dalam contoh gambar diatas.

Nilai MAX HP FLOW adalah flow dimana HP = 100 garis silang pada sumbu HP (sekitar 95 T/H).

Titik A adalah dimana perpotongan garis P = 0 dan LP = 100 (MAX POWER @ MIN EXTRACTION ; HP FLOW @ MIN EXTRACTION).

Titik B adalah dimana perpotongan garis LP = 0 dan P = 100 (MIN POWER @ MAX EXTRACTION ; HP FLOW @ MAX EXTRACTION).

Titik C adalah dimana perpotongan garis LP = 0 dan P = 0 (MIN POWER @ MIN EXTRACTION ; MIN HP FLOW @ MIN EXTRACTION ).

Page 53: GOV 505E Update

PELATIHAN DIGITAL GOVERNOR CONTROLPOKJA HAR APPI BANDUNG, 5 - 9 APRIL 2010

PENGETESAN STEAM MAP

Page 54: GOV 505E Update

PELATIHAN DIGITAL GOVERNOR CONTROLPOKJA HAR APPI BANDUNG, 5 - 9 APRIL 2010

A : Input S = and P = HP = LP =

B : Input S = and P =HP = LP =

C : Input S = and P =HP = LP =

D : Input S = and P =HP = LP =

E : Input S = and P =HP = LP =

F : Input S = and P =HP = LP =

G : Input S = and P =HP = LP =

H : Input S = and P =HP = LP =