update memjmv

69
pertamina Bangkitkan Energi Negeri ME-MJ-MV

Upload: madhan-agista

Post on 07-Feb-2017

42 views

Category:

Documents


5 download

TRANSCRIPT

Page 1: UPDATE MEMJMV

pertamina

Bangkitkan Energi Negeri

ME-MJ-MV

Page 2: UPDATE MEMJMV

1P 2P 2P RiskedME 1.60 11.30 6.29 25 1.57

MJ-29 - - - -MJ-32 0.24 2.03 1.11 39 0.43MJ-36 0.99 8.40 4.60 39 1.79

MV-27A 0.44 2.40 1.38 20 0.10MV-27B 0.22 0.68 0.43 20 0.03

MMC - - - -TOTAL 3.92

TOTAL (ONWJ only) 3.61

SKK Migas GuidanceOOIP, MMSTB

Structure/Zone

RF Oil,%Oil Reserve,

MMSTB

1P 2P 2P RiskedME 144 0.23 1.63 0.91 25 0.2

MJ-29 - 1.79 5.10 3.27 70 2.29MJ-32 1311 0.31 2.66 1.46 39 0.57MJ-36 1400 1.39 11.76 6.43 39 2.51

MV-27A 350 0.15 0.84 0.48 20 0.10MV-27B 350 0.08 0.24 0.15 20 0.03

MMC - 0.35 0.41 0.35 70 0.24TOTAL 5.96

TOTAL (ONWJ only) 5.91

Gas Reserve,

BSCF

Structure/Zone

SKK Migas Guidance

Rs, scf/stb

OGIP, BSCF

RF Gas,%

OOIP and OGIP

OIL

GAS

Page 3: UPDATE MEMJMV

pertaminaME

Page 4: UPDATE MEMJMV

Analog Data for ME-MXMX ME Remarks

Zone MMC MMCPr, psi 1163 1120Pb, psi 1096 1090

Rsi, scf/stb 167 144API 23 17.8

ME-1 and MX-1

Page 5: UPDATE MEMJMV

Capillary Pressure

Page 6: UPDATE MEMJMV

Relative Permeability (Kr-Sw)

RT 1

RT 2RT 3

RT 4RT 6 RT 5

Page 7: UPDATE MEMJMV

Relative Permeability (Kr-Sg)RT 1

RT 2

RT 3

RT 4 RT 5 & RT 6

Page 8: UPDATE MEMJMV

Fluid Model

Page 9: UPDATE MEMJMV

Simulasi Reservoir

Page 10: UPDATE MEMJMV

11

SPESIFIKASI MODEL SIMULASI ME

Simulator Type : Black OilStart Date : 24/09/1981System : 3-D & 3 PhaseGrid Type : Cartesian Corner PointGrid Dimension : 117 x 176 x 228 (I x J x K)Total number of cells: 213859Grid Size : 100 m x 100 m x 1 ft

Page 11: UPDATE MEMJMV

12

DST MATCHING

• Struktur ME memiliki 3 DST namun hanya DST-2 dan DST-3A yang memiliki data.• Konstrain yang digunakan adalah liquid.• Hanya terdapat 1 sumur (ME-1) pada Struktur ME

DSTProduksi Kumulatif

Diff, %Observed

STB, MSCFSimulatorSTB, MSCF

DST-3A Oil 103 103 0.00Gas 16 15 6.25

DST-2 Oil 190 190 0Gas 39 39.5 1.28

Page 12: UPDATE MEMJMV

13

DST-2 Matching

Oil Rate

Gas Cumulative

Gas Rate

BHP

Page 13: UPDATE MEMJMV

1 10 100 1000 100000

200

400

600

800

1000

1200

1400

ME_DST-2

Time (Minute)

Pres

sure

(Psig

)

IHPISIP

First Flow Initial Shut in Period 2nd Flow Rig Up for Swab2nd Flow

Flow before acidizing

Flow after acidizing (3rd Flow initial)Rig up for Swab (2 runs)

3rd Flow Final

Pull Packer loose

Final Hydrostatic pressure

No oil flow before acidizing that is why clean up period is same with final period. The period is 8 hours

Final Flow

DST-2 Pressure

Page 14: UPDATE MEMJMV

23/09/1981• 08.05 : Tool open, very weak bubble• 09.20 : Medium bubble• 09.50 : Commence swabbing• 18.00 : Finish swab, waiting to acidize24/09/1981• 01.00 : Acidizing• 02.06 : Well open to burner• 02.35 : Well dead• 05.50 : Commence swabbing• 08.30 : 516 BOPD, 300 scf/stb,33.6 bwpd,Cl- 32000 • 16.00 : 634 BOPD, 134 scf/stb, 50 bwpd, FTP 61 psi

Sequence DST-2 ME-1

Page 15: UPDATE MEMJMV

DST-3A Matching

Oil Rate

Gas Cumulative

Gas Rate

Page 16: UPDATE MEMJMV

Sequence DST-3A ME-1

25/9/1981 • 18.50 : First, only medium blow choke @

choke 1/2• 20.40 : Change choke to 3/4 @ then slight

blow• 05.30 : Rig up to swab @ and• 05.41 : commence swabbing @ Lost swap cup

in tubing and POOH tubing26/9/1981• 16.20 : Open tool• 16.24 : Close tool for ISIP• 17.32 : Open tool for final flow• 17.41 : Commence to swab• 18.00 : Strong blow27/9/1981• 05.00 : Commence to swab• 17.30 : Strong blow• 19.30 : Commence acidizing• 21.05 : Open well to burner, diesel to surface• 21.30 : No indication till 04.30

28/9/1981

• 05.00 : Commence to swabbing

• 05.40 : Oil to surface

• 06.00 : Well heading (40-50 psi) 60% Oil, 40% water 80000 ppm

• 18.32 : Shut in well; wellhead 40-50 psi ; oil 65%,BSW 35%

• 19.13 : Finish pumping acid

• 19.22 : Open well; no flow

29/9/1981

• 01.39 : Slight blow to surface

• 07.29 : Shut in on wellhead

• 08.30 : Open well ½” choke

• 10.30 : 272 BOPD, 178 scf/stb GOR, 186 bwpd CL- 38000, FTP 40 psi

• 18.00 : 268 BOPD, 192 scf/stb, 276 BWPD, Cl- 26000

• 18.00 : Shut in well

Page 17: UPDATE MEMJMV

OIL (MMSTB)P1 1.632P 11.3OOIP 6.39

Ket.rP1 = rterluar = 390 m r2P = 2.5 x rP1 = 975 mOOIP = 90% P1 + 50% P2

OOIP

Well Static, MMSTBDynamic, MMSTB Diff, %

ME-1 6.29 6.29 0

INISIALISASI

Page 18: UPDATE MEMJMV

20

PREDICTION

Skenario Pengembangan (semua case disimulasikan 1 Jan 2021 – 1 Jan 2035)

Skenario : 1. 1 (satu) sumur directional + ESP2. 2 (dua) sumur directional + ESP

Constraint BHP Min 180 psiOil rate Max 700 bopd Water cut Max 0.98 Oil rate Min 25 bopd Field oil rate Min 25 x Jumlah well

Constraints:

Page 19: UPDATE MEMJMV

PREDICTION

Exploration well : ME-1Proposed Development Well : MEA-1, MEA-2

Page 20: UPDATE MEMJMV

MEA-2 MEA-1

Page 21: UPDATE MEMJMV

Well Intersection

MEA-1 MEA-2

Page 22: UPDATE MEMJMV

Skenario : 1 (satu) Sumur Directional + ESP

Page 23: UPDATE MEMJMV

• Produksi kumulatif :

Skenario : 1 (satu) Sumur Directional + ESP

Jumlah Well Field Type

p (psi) Np (STB) WC akhir

(fraksi) Wp (STB) Gp (Mscf) RF (%) Awal Akhir

1 ME High Deviated 1120 881 938.1 0.83 1596 116.9 20.1

Page 24: UPDATE MEMJMV

Skenario : 2 (dua) Sumur Directional + ESP

Page 25: UPDATE MEMJMV

• Produksi kumulatif :

Jumlah Well Well Type Np (MSTB) WC akhir

(fraksi) Wp (MSTB) Gp (MMscf)

2MEA-1 High Deviated 558 0.91 957.6 72.3

MEA-2 High Deviated 984.7 0.83 969.7 121.3

MEA-1

MEA-2

MEA-1

MEA-2

Skenario : 2 (dua) Sumur Directional + ESP

Page 26: UPDATE MEMJMV

• Produksi kumulatif :

Jumlah Well Field

p (psi) Np (MSTB) WC akhir

(fraksi) Wp (MSTB) Gp (MMscf) RF (%) Awal Akhir

2 ME 1120 776 1542.7 0.87 1927.3 193.6 33.2

Skenario : 2 (dua) Sumur Directional + ESP

Page 27: UPDATE MEMJMV

pertaminaMJ

Page 28: UPDATE MEMJMV

Analog Data for MJMJ Remarks

Zone MJ-29Pr, psi 1340Pb, psi -

Rsi, scf/stb -SG gas 0.662

MM MJ RemarksZone MM-33 MJ-32Pr, psi 1428 1450Pb, psi 1428 1450

Rsi, scf/stb 932 1311API 40 45

MM MJ RemarksZone MM-35 MJ-36Pr, psi 1533 1580Pb, psi 1533 1580

Rsi, scf/stb 375 1400API 39.5 45

MJ-1

MJ-1 and MM-2

MJ RemarksZone MJ-29Pr, psi 1340Pb, psi -

Rsi, scf/stb -SG gas 0.662

MM MJ RemarksZone MM-33 MJ-32Pr, psi 1428 1450Pb, psi 1428 1450

Rsi, scf/stb 932 1311API 40 45

MM MJ RemarksZone MM-35 MJ-36Pr, psi 1533 1580Pb, psi 1533 1580

Rsi, scf/stb 375 1400API 39.5 45

MJ-1 and MM-2

MJ-1 and MM-2

Page 29: UPDATE MEMJMV

Capillary Pressure

Page 30: UPDATE MEMJMV

Relative Permeability

Page 31: UPDATE MEMJMV

Relative Permeability

Page 32: UPDATE MEMJMV

Fluid Model

Page 33: UPDATE MEMJMV

Simulasi Reservoir

Page 34: UPDATE MEMJMV

38

SPESIFIKASI MODEL SIMULASI MJSimulator Type : Black OilStart Date : 23/07/1981System : 3-D & 3 PhaseGrid Type : Cartesian Corner PointGrid Dimension : 37 x 72 x 90 (I x J x K)Total number of cells: 239760Grid Size : 100 m x 100 m X 1 ft

Page 35: UPDATE MEMJMV

39

DST MATCHING

• Struktur MJ memiliki 3 DST yaitu DST-1, DST-3A dan DST-4.• Untuk DST-1 dan DST-3A, konstrain yang digunakan adalah liquid.• Untuk DST-4, konstrain yang digunakan adalah gas.• Hanya terdapat 1 sumur (MJ-1) pada Struktur MJ.

DSTProduksi Kumulatif

Diff, % Observed Simulator STB, MSCF STB, MSCF

DST-1 Oil 1024 1024 0Gas 2440 2370 2.8

DST-3A Oil 108 108 0Gas 3045 3001 6

DST-4 Gas 2207 2207 0

Page 36: UPDATE MEMJMV

40

DST-1 Matching

BHP Oil

Gas

Page 37: UPDATE MEMJMV

41

DST-1 Cumulative Matching

Oil

Gas

Page 38: UPDATE MEMJMV

1 10 100 1000 100000

200

400

600

800

1000

1200

1400

1600

1800MJ_DST-1

Time (Minute)

Pres

sure

(Psig

)

First Flow Initial Shut in Period 2nd Flow

IHP Final Hydrostatic pressure

DST-1 Presssure

Page 39: UPDATE MEMJMV

Choke ½”

Choke3/4 ”

DST-1 Rate

Page 40: UPDATE MEMJMV

44

DST-3A Matching

BHP Oil

Gas

Page 41: UPDATE MEMJMV

DST-3A Cumulative Matching

Oil

Gas

Page 42: UPDATE MEMJMV

1 10 100 10000

200

400

600

800

1000

1200

1400

1600

1800

MJ_DST-3A

Time (Minute)

Pres

sure

(Psig

)

Flow Final

Final Hydrostatic pressure (1535 psi)

DST-3A Pressure

IHP

Page 43: UPDATE MEMJMV

DST-3A Rate

Choke ¾”

Page 44: UPDATE MEMJMV

DST-4 Matching

BHP

Gas

Page 45: UPDATE MEMJMV

30/07/198106.17 : Tool open; flow water and gas08.15 : Trimmed to separator08.30 : Flow 8 MMSCFD gas, FTP 575 psi, choke ¾”15.30 : End test; Gas rate 6.9 MMSCFD FTP 496 psi, choke ¾”

DST-4 Squence

Page 46: UPDATE MEMJMV

• Perhitungan In Place pada struktur MJ menggunakan persamaan 90% P1 + 50% P2• Untuk penentuan P1 dan P2 didasarkan pada radius pengurasan sumur pada sumur MRA-4 yang kemudian diaplikasikan ke struktur MJ• Perhitungan cadangan MJ-32 & MJ-36 mengacu sumur MRA-4 dengan radius investigasi 250 m dan MJ-29 750 m

INISIALISASI

Zona1P 2P Deterministik

OIL (MMSTB) GAS(BSCF) OIL (MMSTB) GAS(BSCF) OIL (MMSTB) GAS(BSCF)MJ-29 0.00 1.79 0.00 5.10 0.00 3.27MJ-32 0.24 0.31 2.03 2.66 1.11 1.46MJ-36 0.99 1.39 8.41 11.76 4.60 6.43

STATIK DINAMIK

OIL (MMSTB) GAS(BSCF) OIL (MMSTB) GAS(BSCF)0 3.27 0 3.33

1.11 1.46 1.1 1.54.6 6.43 4.55 6.34

Page 47: UPDATE MEMJMV

PETA OOIP MJ

MJ-36 MJ-32 MJ-29

Page 48: UPDATE MEMJMV

52

PREDIKSI

Constraint

Minimum BHP 800 psiNatural

flow500 psi Gas lift

Maximum Oil rate 1000 bopd Natural flow/Gas

liftMaximum water cut 0.98Minimum oil rate 25 bopdMinimum field oil rate 25 bopd x Jumlah well

Constraints:

Skenario Pengembangan (case disimulasikan selama tahun (2021-2035)

Skenario 1 : Dua sumur deviated yang masing-masing memproduksikan minyak pada lapisan MJ-36 dan MJ-32 secara commingle

Skenario 2 : Skenario 1 + pengangkatan buatan (gas lift), dengan penambahan satu string pada salah satu sumur untuk memproduksikan gas pada lapisan MJ-29

Page 49: UPDATE MEMJMV

MJ-1

MJ-1

MJ-1

MJ-29

MJ-32

MJ-36

SKENARIO

Page 50: UPDATE MEMJMV

PROPOSED WELL

MJ-36 MJ-32 MJ-29

Page 51: UPDATE MEMJMV

MJ-36 MJ-32 MJ-29

PROPOSED WELL

Page 52: UPDATE MEMJMV

MJA-1MJ-1

MJA-2

PROPOSED WELL

Page 53: UPDATE MEMJMV

Jumlah Well

Field Typep (psi) Np

(MSTB) WC akhir (fraksi)

Wp (MSTB)

Gp (MMscf) RF (%)

REMARKAwal Akhir

2 MJ Natural Flow 1461 1150 2124.6 0.18 162.4 3516.6 37.6 SHUT

2025

SKENARIO (Natural Flow)

Page 54: UPDATE MEMJMV

SKENARIO (Natural Flow)Performa Sumur MJA-1 :

Performa Sumur MJA-2 :

Page 55: UPDATE MEMJMV

Jumlah Well

Field Typep (psi) Np

(MSTB) WC akhir (fraksi)

Wp (MSTB)

Gp (MMscf) RF (%)

REMARKAwal Akhir

2 MJ Gas Lift 1461 725 2613 0.59 394.7 6324.7 46.3 SHUT 2026

SKENARIO (Gas lift)

Page 56: UPDATE MEMJMV

SKENARIO (Gas lift)Performa Sumur MJA-1(Oil string) :

Performa Sumur MJA-1 (Gas string) :

Page 57: UPDATE MEMJMV

Performa Sumur MJA-2 (Oil string) :

SKENARIO (Gas lift)

Performa Sumur MJA-2 (Gas string) :

Page 58: UPDATE MEMJMV

pertaminaMV

Page 59: UPDATE MEMJMV

Capillary Pressure

(MV-27a) (MV-27b)

(MMC)

RT-1 RT-2RT-1 RT-2

RT-1 RT-2

Page 60: UPDATE MEMJMV

Relative Permeability

RT-1

RT-2

RT-1

RT-2

RT-1

RT-2

(MV-27a) (MV-27b)

(MMC)

Page 61: UPDATE MEMJMV

Fluid Model: Oil

Fluid Data:Gas Gravity: 0.6Oil API: 26 APIPb: 1300 psiRsi: 0.1534 MSCF/STB

Page 62: UPDATE MEMJMV

Fluid Model: Gas

Page 63: UPDATE MEMJMV

Model aquifer

Page 64: UPDATE MEMJMV

Model aquifer

Aquifer Model: FetkovichVolume Aquifer: 22.89 MMSTB Productivity Index: 500 STB/d/psi

Page 65: UPDATE MEMJMV

Simulasi Reservoir

Page 66: UPDATE MEMJMV

71

SPESIFIKASI MODEL SIMULASI MV

Simulator Type : Black OilStart Date : 31/08/1980System : 3-D & 3 PhaseGrid Type : Cartesian Corner PointGrid Dimension : 126 x 137 x 409 (I x J x K)Total number of cells: 7060158Grid Size : 100 m x 100 m

Page 67: UPDATE MEMJMV

72

CADANGAN

• Perhitungan In Place pada struktur MV mengunakan persamaan 90%P1 + 50% P2

• Dalam perhitungan cadangannya, struktur MV menerapkan radius pengurasan sebesar 250 m (untuk oil) dan 750 m (untuk gas)

• Dengan jumlah In Place tersebut struktur MV dikategorikan sebagai lapangan yang tidak/belum komersil untuk dikembangkan.

Cadangan Zona Oil(MMSTB)

Gas(MMSCF)

P1

MV-27A 0.44 -

MV-27B 0.22 33

MMC - 359

2P

MV-27A 2.4 -

MV-27B 0.68 48

MMC - 417

In Place

MV-27A 1.38 -

MV-27B 0.43 37.2

MMC - 352.1

Total 1.81 389.3

Page 68: UPDATE MEMJMV

CADANGAN

Page 69: UPDATE MEMJMV

TERIMA KASIH