PEKERJAAN : LOKASI : RINCIAN BIAYA LANGSUNG PERSONIL A. BIAYA LANGSUNG PERSONIL I 1 Team Leader 1 x 45 OH 2 Koordinator Lapangan 1 x 30 OH 3Surveyor Pelacakan 1 x 10 OH 4Surveyor Penanaman Pilar 1 x 10 OH 5Surveyor Pengukuran 2 x 10 OH II Supporting Staff 1 Tenaga Lokal Pelacakan 3 x 10 OH 2 Tenaga Lokal Penanaman Pilar 6 x 10 OH 3 Tenaga Lokal Pengukuran 4 x 10 OH 4Sekretaris 1 x 30 OH 5 Pihak Satuan Pengamanan 1 x 30 OH 6 Pawang Binatang 1 x 30 OH 7 uru Gambar 1 x 15 OH Biaya Tenaga Ahli (Profesional Staff) Sub Total I BILL OF QUANTITY (BOQ) PELACAKAN, PEMASANGAN (PEM BA NG UN AN ), PENGUKURAN PILAR BATAS U TA MA (PBU) D AN PEMETAAN BATAS ANTARA BATAS KABUPATEN ACEH SELATAN DENGAN KABUPATEN ACEH BARAT DAYA BATAS ANTARA KABUPATEN ACEH SELATAN DENGAN KABUPATEN ACEH BARAT DAYA NO. URAIAN VOLUME SATUAN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)  8 Cad Operator 2 x 30 OH RINCIAN BIAYA LANGSUNG NON PERSONIL B. BIAYA LANGSUNG NON PERSONIL I Sewa Peralatan/Base Camp 1GPS Navigasi 1 x 30 UH 2GPS Geodetik pekerjaan pengukuran 1 x 10 UH 3 Akomodasi Lapangan OH 7 x 10 OH 10 x 10 OH 9 x 10 OH 4Sewa Base Camp 1 x 30 UH 5 Komputer/Laptop + Softwer 2 x 45 UH 6 Plotter 1 x 15 UH 7 Printer A3 dan A4 2 x 45 UH 8 Kamera Digital 1 x 30 UH 9 Radio HT 2 x 30 UH 10 Batu Baterai Alkalin buah II Biaya ATK dan Habis Pakai 1 ATK / Fotocopy Kantor Pusat 1 LS 2 ATK / Fotocopy Lapangan 1 LS I II Biaya Transportasi 1Sewa Kendaraan Roda 4 (Team Leader) 1 x 45 UH 1Sewa Kendaraan Roda 4 la an an 1 x 30 UH Sub Total II JUMLAH HARGA (Rp) a. Kegiatan Pelacakan b. Kegiatan Penanaman Pilar c. Kegiatan Pengukuran 30 Sub Total I Sub Total II TOTAL BIAYA LANGSUNG PERSONIL ( I + II ) NO. URAIAN VOLUME SATUAN HARG A S ATUA N (Rp)  2Sewa Kendaraan Roda 2 (lapangan) 2 x 30 UH IV Biaya Kantor/Perusahaan 1Sewa Kantor 1 LS 2 Rekening Listrik, Telp, Air, Fax, Internet 1 LS V Biaya Pelacakan Pemasangan Pilar 1 Patok Sementara 10 Pcs 2 Pemasangan Pilar 10 Pilar Sub Total III Sub Total IV Sub Total V

Upload: muhammad-sabena

Post on 09-Jan-2016

218 views

Category:

Documents


0 download

TRANSCRIPT

7/17/2019 DKH 4 XXIV.pdf

http://slidepdf.com/reader/full/dkh-4-xxivpdf 1/3

PEKERJAAN :

LOKASI :

RINCIAN BIAYA LANGSUNG PERSONIL

A. BIAYA LANGSUNG PERSONIL

I

1 Team Leader 1 x 45 OH

2 Koordinator Lapangan 1 x 30 OH

3 Surveyor Pelacakan 1 x 10 OH

4 Surveyor Penanaman Pilar 1 x 10 OH

5 Surveyor Pengukuran 2 x 10 OH

I I S up po rting Sta ff

1 Tenaga Lokal Pelacakan 3 x 10 OH

2 Tenaga Lokal Penanaman Pilar 6 x 10 OH

3 Tenaga Lokal Pengukuran 4 x 10 OH

4 Sekretaris 1 x 30 OH

5 Pihak Satuan Pengamanan 1 x 30 OH

6 Pawang Binatang 1 x 30 OH

7 uru Gambar 1 x 15 OH

Biaya Tenaga Ahli

(Profesional Staff)

Sub Total I

BILL OF QUANTITY (BOQ)

PELA CA KAN , PEM ASAN GAN (PEM BA NG UN AN ), PEN GU KU RA N PILA R B ATA S U TA MA (PB U) D AN

PEMETAAN BATAS ANTARA BATAS KABUPATEN ACEH SELATAN DENGAN KABUPATEN

ACEH BARAT DAYA

BATAS ANTARA KABUPATEN ACEH SELATAN DENGAN KABUPATEN ACEH BARAT DAYA

NO. URAIAN VOLUME SATUAN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

 

8 Cad Operator 2 x 30 OH

RINCIAN BIAYA LANGSUNG NON PERSONIL

B. BIAYA LANGSUNG NON PERSONIL

I S ew a Pe ra la tan/ Base C am p

1 GPS Navigasi 1 x 30 UH

2 GPS Geodetik pekerjaan pengukuran 1 x 10 UH

3 Akomodasi Lapangan OH

7 x 10 OH

10 x 10 OH

9 x 10 OH

4 Sewa Base Camp 1 x 30 UH

5 Komputer/Laptop + Softwer 2 x 45 UH

6 Plotter 1 x 15 UH

7 Printer A3 dan A4 2 x 45 UH8 Kamera Digital 1 x 30 UH

9 Radio HT 2 x 30 UH

10 Batu Baterai Alkalin buah

I I B iaya ATK dan Habis Pakai

1 ATK / Fotocopy Kantor Pusat 1 LS

2 ATK / Fotocopy Lapangan 1 LS

I II B iaya Transportas i

1 Sewa Kendaraan Roda 4 (Team Leader) 1 x 45 UH

1 Sewa Kendaraan Roda 4 la an an 1 x 30 UH

Sub Total II

JUMLAH HARGA (Rp)

a. Kegiatan Pelacakan

b. Kegiatan Penanaman Pilar

c. Kegiatan Pengukuran

30

Sub Total I

Sub Total II

TOTAL BIAYA LANGSUN G PERSONIL ( I + II )

NO. URAIAN VOLUME SATUAN HARGA SATUAN (Rp)

 

2 Sewa Kendaraan Roda 2 (lapangan) 2 x 30 UH

IV B iaya Kan tor/Perusahaan

1 Sewa Kantor 1 LS

2 Rekening Listrik, Telp, Air, Fax, Internet 1 LS

V Biaya Pe lacakan Pemasangan Pilar

1 Patok Sementara 10 Pcs

2 Pemasangan Pilar 10 Pilar

Sub Total III

Sub Total IV

Sub Total V

7/17/2019 DKH 4 XXIV.pdf

http://slidepdf.com/reader/full/dkh-4-xxivpdf 2/3

VI Biaya Mobilisasi dan Demobil isasi

1 Mobilisasi Personil (5 org x 1 kali) 5 x 1 OT

2 Demobilisasi Personil (5 org x 1 kali) 5 x 1 OT

VII Sos ia li sasi

1 Sosialisasi di kab. selama pelacakan 1 Keg.

VII I B iaya Laporan

1 Laporan Pendahuluan 6 Eks

2 Laporan Akhir + CD + Album Foto 6 Eks

CV./PT . ........

NAMA

DIREKTUR

JUMLAH HARGA (Rp)

Sub Total VI

Sub Total VIII

Sub Total II

TOTAL BIAYA LANGSUNG NON PERSONIL

( I + II + III + IV + V + VI + VII + V III )

NO. URAIAN VOLUME SATUAN HARGA SATUAN (Rp)

7/17/2019 DKH 4 XXIV.pdf

http://slidepdf.com/reader/full/dkh-4-xxivpdf 3/3

PEKERJAAN :

LOKASI :

BIAYA LANGSUNG PERSONIL

I

II SUPPORTING STAFF  

BIAYA LANGSUNG NON PERSONIL

I SEWA PERALATAN/BASE CAMP 

II BIAYA ATK DAN HABIS PAKAI

III BIAYA TRANSPORTASI

A

BIAYA TENAGA AHLI

(PROFESIONAL STAFF)

SUB TOT L

B

REKAPITULASI BILL OF QUAN TITY (BOQ)

PELA CA KAN , PEM ASAN GAN (PEM BA NG UN AN ), PEN GU KU RA N PILA R B ATA S U TA MA (PB U) D AN

PEMETAAN BATAS ANTARA BATAS KABUPATEN ACEH SELATAN DENGAN KABUPATEN

ACEH BARAT DAYA

BATAS ANTARA KABUPATEN ACEH SELATAN DENGAN KABUPATEN ACEH BARAT DAYA

NO. URAIAN JUMLAH HARGA (Rp)

 

IV BIAYA KANTOR/PERUSAHAAN

V BIAYA PELACAKAN & PEMASANGAN PILAR 

VI BIAYA MOBILISASI DAN DEMOBILISASI

VII SOSIALISASI

VIII BIAYA LAPORAN

CV./PT . ........

NAMA

DIREKTUR

PP n

JUMLAH

TERBILANG

SUB TOT L B