39
DAFTAR HARGA SATUAN PEKERJAAN TAHUN 2011 NO. URAIAN PEKERJAAN HARGA SATUAN SATUAN HARGA RP. RP. 1 2 3 4 5 A PEKERJAAN PERSIAPAN 1 PENGUKURAN & PEMASANGAN BOUWPLANK 1 M' B104 0.012 Kayu Usuk Meranti M3 4,125,000.00 49,500.00 B172 0.020 Paku Usuk Kg 16,500.00 330.00 B102 0.007 Kayu Papan Meranti M3 4,675,000.00 32,725.00 u10 0.100 Tukang Kayu OH 55,000.00 5,500.00 u04 0.010 Kepala Tukang Kayu OH 60,000.00 600.00 U16 0.100 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 3,100.00 u01 0.005 Mandor Lapangan OH 66,000.00 330.00 92,085.00 B PEKERJAAN PEMBONGKARAN, TANAH DAN TANAMAN RUMPUT 2 PEMBONGKARAN BETON BERTULANG 1 M3 U16 6.667 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 206,677.00 u01 0.333 Mandor Lapangan OH 66,000.00 21,978.00 228,655.00 3 PEMBONGKARAN DINDING BATA MERAH 1 M3 U16 6.667 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 206,677.00 u01 0.033 Mandor Lapangan OH 66,000.00 2,178.00 208,855.00 4 GALIAN TANAH BIASA SEDALAM 1 M' 1 M3 U16 0.400 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 12,400.00 u01 0.040 Mandor Lapangan OH 66,000.00 2,640.00 15,040.00 5 GALIAN TANAH BIASA SEDALAM 2 M' 1 M3 U16 0.526 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 16,306.00 U01 0.052 Mandor Lapangan OH 66,000.00 3,432.00 19,738.00 6 GALIAN TANAH BIASA SEDALAM 3 M' 1 M3 U16 0.735 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 22,785.00 U01 0.073 Mandor Lapangan OH 66,000.00 4,818.00 27,603.00 7 GALIAN TANAH KERAS SEDALAM 1 M' 1 M3 U16 0.625 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 19,375.00 U01 0.062 Mandor Lapangan OH 66,000.00 4,092.00 23,467.00 8 GALIAN TANAH CADAS SEDALAM 1 M' 1 M3 U16 1.250 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 38,750.00 U01 0.125 Mandor Lapangan OH 66,000.00 8,250.00 47,000.00 9 GALIAN TANAH LUMPUR SEDALAM 1 M' 1 M3 U16 0.823 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 25,513.00 U01 0.083 Mandor Lapangan OH 66,000.00 5,478.00 30,991.00 10 GALIAN TANAH DIANGKUT SEJAUH 30 M' 1 M3 U16 0.330 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 10,230.00 U01 0.010 Mandor Lapangan OH 66,000.00 660.00 10,890.00 11 PEMBUANGAN TANAH SEJAUH 150 METER 1 M3 U16 0.516 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 15,996.00 U01 0.050 Mandor Lapangan OH 66,000.00 3,300.00 19,296.00 12 PEKERJAAN STRIPPING SETINGGI 1 METER 1 M2 U16 0.050 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 1,550.00 U01 0.005 Mandor Lapangan OH 66,000.00 330.00 1,880.00 13 MEMBONGKAR s.d.a. DINDING TEMBOK YANG TIPIS 10 M2 TERHITUNG DENGAN MEMBERSIHKAN BATAS-BATASNYA U16 2.000 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 62,000.00 U01 0.100 Mandor Lapangan OH 66,000.00 6,600.00 68,600.00 M2 6,860.00 14 MEMBONGKAR LANTAI YANG LAMA BERIKUT PEKERJAAN 10 M2 MEMBERSIHKAN BATA-BATA ATAU LAIN-LAIN YANG DIBONGKAR U16 1.000 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 31,000.00 U01 0.100 Mandor Lapangan OH 66,000.00 6,600.00 37,600.00 M2 3,760.00

Upload: kelvin-eriko

Post on 01-Feb-2016

227 views

Category:

Documents


1 download

DESCRIPTION

j

TRANSCRIPT

Page 1: Analisa 2011

DAFTAR HARGA SATUAN PEKERJAANTAHUN 2011

NO. URAIAN PEKERJAANHARGA

SATUAN SATUAN HARGARP. RP.

1 2 3 4 5

A PEKERJAAN PERSIAPAN

1 PENGUKURAN & PEMASANGAN BOUWPLANK 1 M'B104 0.012 Kayu Usuk Meranti M3 4,125,000.00 49,500.00 B172 0.020 Paku Usuk Kg 16,500.00 330.00 B102 0.007 Kayu Papan Meranti M3 4,675,000.00 32,725.00 u10 0.100 Tukang Kayu OH 55,000.00 5,500.00 u04 0.010 Kepala Tukang Kayu OH 60,000.00 600.00 U16 0.100 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 3,100.00 u01 0.005 Mandor Lapangan OH 66,000.00 330.00

92,085.00

B PEKERJAAN PEMBONGKARAN, TANAH DAN TANAMAN RUMPUT

2 PEMBONGKARAN BETON BERTULANG 1 M3U16 6.667 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 206,677.00 u01 0.333 Mandor Lapangan OH 66,000.00 21,978.00

228,655.00

3 PEMBONGKARAN DINDING BATA MERAH 1 M3U16 6.667 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 206,677.00 u01 0.033 Mandor Lapangan OH 66,000.00 2,178.00

208,855.00

4 GALIAN TANAH BIASA SEDALAM 1 M' 1 M3U16 0.400 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 12,400.00 u01 0.040 Mandor Lapangan OH 66,000.00 2,640.00

15,040.00

5 GALIAN TANAH BIASA SEDALAM 2 M' 1 M3U16 0.526 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 16,306.00 U01 0.052 Mandor Lapangan OH 66,000.00 3,432.00

19,738.00

6 GALIAN TANAH BIASA SEDALAM 3 M' 1 M3U16 0.735 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 22,785.00 U01 0.073 Mandor Lapangan OH 66,000.00 4,818.00

27,603.00

7 GALIAN TANAH KERAS SEDALAM 1 M' 1 M3U16 0.625 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 19,375.00 U01 0.062 Mandor Lapangan OH 66,000.00 4,092.00

23,467.00

8 GALIAN TANAH CADAS SEDALAM 1 M' 1 M3U16 1.250 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 38,750.00 U01 0.125 Mandor Lapangan OH 66,000.00 8,250.00

47,000.00

9 GALIAN TANAH LUMPUR SEDALAM 1 M' 1 M3U16 0.823 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 25,513.00 U01 0.083 Mandor Lapangan OH 66,000.00 5,478.00

30,991.00

10 GALIAN TANAH DIANGKUT SEJAUH 30 M' 1 M3U16 0.330 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 10,230.00 U01 0.010 Mandor Lapangan OH 66,000.00 660.00

10,890.00 11 PEMBUANGAN TANAH SEJAUH 150 METER 1 M3

U16 0.516 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 15,996.00 U01 0.050 Mandor Lapangan OH 66,000.00 3,300.00

19,296.00 12 PEKERJAAN STRIPPING SETINGGI 1 METER 1 M2

U16 0.050 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 1,550.00 U01 0.005 Mandor Lapangan OH 66,000.00 330.00

1,880.00

13 MEMBONGKAR s.d.a. DINDING TEMBOK YANG TIPIS 10 M2TERHITUNG DENGAN MEMBERSIHKAN BATAS-BATASNYA

U16 2.000 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 62,000.00 U01 0.100 Mandor Lapangan OH 66,000.00 6,600.00

68,600.00 M2 6,860.00

14 MEMBONGKAR LANTAI YANG LAMA BERIKUT PEKERJAAN 10 M2MEMBERSIHKAN BATA-BATA ATAU LAIN-LAIN YANG DIBONGKAR

U16 1.000 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 31,000.00 U01 0.100 Mandor Lapangan OH 66,000.00 6,600.00

37,600.00 M2 3,760.00

Page 2: Analisa 2011

NO. URAIAN PEKERJAANHARGA

SATUAN SATUAN HARGARP. RP.

1 2 3 4 5

15 MENGUPAS PLESTERAN YANG LAMA 10 M2U16 0.500 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 15,500.00 U01 0.025 Mandor Lapangan OH 66,000.00 1,650.00

17,150.00 M2 1,715.00

16 MENURUNKAN ATAP GENTENG ATAU SIRAP JIKA GENTENG 10 M2ATAU SIRAP DIPAKAI LAGI

U16 0.200 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 6,200.00 U01 0.100 Mandor Lapangan OH 66,000.00 6,600.00

12,800.00 M2 1,280.00

17 MENURUNKAN ATAP SENG 10 M2U09 0.500 Tukang Besi OH 55,000.00 27,500.00 U16 0.100 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 3,100.00

30,600.00 M2 3,060.00

18 MENURUNKAN RANGKA ATAP DARI KAYU JIKA KAYU 10 M2BONGKARAN DIPAKAI LAGI

U10 0.250 Tukang Kayu OH 55,000.00 13,750.00 U04 0.025 Kepala Tukang Kayu OH 60,000.00 1,500.00 U16 0.050 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 1,550.00

16,800.00 M2 1,680.00

19 MEMBONGKAR LANTAI 2 DARI KAYU, DINDING LUAR, LANTAI 10 M2JEMBATAN (LAPISAN ATAU DARI BAWAH DIHITUNG TERPISAH)

U10 0.600 Tukang Kayu OH 55,000.00 33,000.00 U04 0.060 Kepala Tukang Kayu OH 60,000.00 3,600.00 U16 2.000 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 62,000.00 U01 0.100 Mandor Lapangan OH 66,000.00 6,600.00

105,200.00 M2 10,520.00

20 MEMBONGKAR KAYU DARI BALOK LANTAI 2, KUDA-KUDA, 10 M2GELEGAR JEMBATAN DAN SEBAGAINYA (KAYU DIPAKAI LAGI)

U10 6.000 Tukang Kayu OH 55,000.00 330,000.00 U04 0.600 Kepala Tukang Kayu OH 60,000.00 36,000.00 U16 4.000 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 124,000.00 U01 0.200 Mandor Lapangan OH 66,000.00 13,200.00

503,200.00 M2 50,320.00

21 PEKERJAAN MENANAM RUMPUT 1 M2U16 0.050 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 1,550.00 U01 0.005 Mandor Lapangan OH 66,000.00 330.00

1.000 Tanaman Rumput M2 16,500.00 16,500.00 18,380.00

22 PENGANGKUTAN BAHAN KE LOKASI 1 M3

SEJAUH RATA - RATA 200 M' k = a / 275 ( L + 75 ) k = ongkos angkut, a = upah pekerja L = jarak angkut

U16 1.000 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 31,000.00 31,000.00

23 URUGAN KEMBALI 1 M3U16 0.192 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 5,952.00 U01 0.019 Mandor Lapangan OH 66,000.00 1,254.00

7,206.00

24 PEKERJAAN URUGAN PASIR 1 M3B013 1.200 Pasir Urug M3 110,000.00 132,000.00 U16 0.300 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 9,300.00 U01 0.010 Mandor Lapangan OH 66,000.00 660.00

141,960.00

25 PEMADATAN TANAH 1 M3U16 0.500 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 15,500.00 U01 0.050 Mandor Lapangan OH 66,000.00 3,300.00

18,800.00

26 URUGAN TANAH 1 M3B016 1.200 Tanah Urug M3 82,500.00 99,000.00 U16 0.250 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 7,750.00 U01 0.010 Mandor Lapangan OH 66,000.00 660.00

107,410.00 27 URUGAN SIRTU 1 M3

B014 1.2000 Sirtu M3 72,500.00 87,000.00 U16 0.2500 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 7,750.00 U01 0.0250 Mandor Lapangan OH 66,000.00 1,650.00

96,400.00

Page 3: Analisa 2011

NO. URAIAN PEKERJAANHARGA

SATUAN SATUAN HARGARP. RP.

1 2 3 4 5

C PEKERJAAN PASANGAN

28 PASANGAN BATU KALI ( 1 : 3 ) 1 M3B001 1.100 Batu Kali M3 126,500.00 139,150.00 B037 202.000 Semen Kg 1,150.00 232,300.00 B011 0.485 Pasir Pasang M3 129,500.00 62,807.50 U08 0.600 Tukang Batu OH 49,500.00 29,700.00 U03 0.060 Kepala Tukang Batu OH 60,000.00 3,600.00 U16 1.500 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 46,500.00 U01 0.075 Mandor Lapangan OH 66,000.00 4,950.00

519,007.50

29 PASANGAN BATU KALI ( 1 : 4 ) 1 M3B001 1.100 Batu Kali M3 126,500.00 139,150.00 B037 163.000 Semen Kg 1,150.00 187,450.00 B011 0.520 Pasir Pasang M3 129,500.00 67,340.00 U08 0.600 Tukang Batu OH 49,500.00 29,700.00 U03 0.060 Kepala Tukang Batu OH 60,000.00 3,600.00 U16 1.500 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 46,500.00 U01 0.075 Mandor Lapangan OH 66,000.00 4,950.00

478,690.00 30 PASANGAN BATU KALI ( 1 : 5 ) 1 M3

B001 1.100 Batu Kali M3 126,500.00 139,150.00 B037 136.000 Semen Kg 1,150.00 156,400.00 B011 0.544 Pasir Pasang M3 129,500.00 70,448.00 U08 0.600 Tukang Batu OH 49,500.00 29,700.00 U03 0.060 Kepala Tukang Batu OH 60,000.00 3,600.00 U16 1.500 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 46,500.00 U01 0.075 Mandor Lapangan OH 66,000.00 4,950.00

450,748.00 31 PASANGAN BATU KALI ( 1 : 6 ) 1 M3

B001 1.100 Batu Kali M3 126,500.00 139,150.00 B037 117.000 Semen Kg 1,150.00 134,550.00 B011 0.561 Pasir Pasang M3 129,500.00 72,649.50 U08 0.600 Tukang Batu OH 49,500.00 29,700.00 U03 0.060 Kepala Tukang Batu OH 60,000.00 3,600.00 U16 1.500 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 46,500.00 U01 0.075 Mandor Lapangan OH 66,000.00 4,950.00

431,099.50

32 PASANGAN BATU KOSONG 1 M3B001 1.200 Batu Kali M3 126,500.00 151,800.00 B013 0.300 Pasir Urug M3 110,000.00 33,000.00 U08 0.390 Tukang Batu OH 49,500.00 19,305.00 U03 0.039 Kepala Tukang Batu OH 60,000.00 2,340.00 U16 0.780 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 24,180.00 U01 0.039 Mandor Lapangan OH 66,000.00 2,574.00

233,199.00 33 PASANG PONDASI SUMURAN DIAMETER 100 CM 1 M3

B001 0.450 Batu Kali M3 126,500.00 56,925.00 B037 280.000 Semen Kg 1,150.00 322,000.00 B012 0.450 Pasir Beton M3 125,000.00 56,250.00 B010 0.670 Koral Beton / Kerikil M3 132,000.00 88,440.00 U08 0.300 Tukang Batu OH 49,500.00 14,850.00 U03 0.030 Kepala Tukang Batu OH 60,000.00 1,800.00 U16 2.380 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 73,780.00 U01 0.080 Mandor Lapangan OH 66,000.00 5,280.00

619,325.00 34 PAS. BATA MERAH TEBAL 1/2 BATA, ( 1 PC : 2 PSR ) 1 M2

B018 70.000 Bata Merah Tebal 5 cm Bj 1,300.00 91,000.00 B037 18.950 Semen Kg 1,150.00 21,792.50 B011 0.038 Pasir Pasang M3 129,500.00 4,921.00 U08 0.100 Tukang Batu OH 49,500.00 4,950.00 U03 0.010 Kepala Tukang Batu OH 60,000.00 600.00 U16 0.320 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 9,920.00 U01 0.015 Mandor Lapangan OH 66,000.00 990.00

134,173.50

35 PAS. BATA MERAH TEBAL 1/2 BATA, ( 1 PC : 5 PSR ) 1 M2b018 70.000 Bata Merah Tebal 5 cm Bj 1,300.00 91,000.00 b037 9.680 Semen Kg 1,150.00 11,132.00 b011 0.045 Pasir Pasang M3 129,500.00 5,827.50 u08 0.100 Tukang Batu OH 49,500.00 4,950.00 u03 0.010 Kepala Tukang Batu OH 60,000.00 600.00 u16 0.320 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 9,920.00 u01 0.015 Mandor Lapangan OH 66,000.00 990.00

124,419.50 36 PAS. BATA MERAH TEBAL 1/2 BATA, ( 1 PC : 6 PSR ) 1 M2

b018 70.000 Bata Merah Tebal 5 cm Bj 1,300.00 91,000.00 b037 8.320 Semen Kg 1,150.00 9,568.00 b011 0.049 Pasir Pasang M3 129,500.00 6,345.50 u08 0.100 Tukang Batu OH 49,500.00 4,950.00 u03 0.010 Kepala Tukang Batu OH 60,000.00 600.00

Page 4: Analisa 2011

NO. URAIAN PEKERJAANHARGA

SATUAN SATUAN HARGARP. RP.

1 2 3 4 5u16 0.320 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 9,920.00 u01 0.015 Mandor Lapangan OH 66,000.00 990.00

123,373.50

37 PASANGAN BATAKO ( 1 PC : 5 PSR) 1 M2B026 13.000 Batako Bj 1,850.00 24,050.00 B037 3.000 Semen Kg 1,150.00 3,450.00 B011 0.013 Pasir Pasang M3 129,500.00 1,683.50 u08 0.031 Tukang Batu OH 49,500.00 1,534.50 u03 0.003 Kepala Tukang Batu OH 60,000.00 180.00 u16 0.099 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 3,069.00 u01 0.004 Mandor Lapangan OH 66,000.00 264.00

34,231.00 38 PASANGAN BATA GOSOK 1 M2

60.0000 Batu Gosok Bh 5,500.00 330,000.00 B037 0.3110 Semen ( 40 Kg ) Zak 46,000.00 14,306.00 u13 2.0000 Tukang Paras Bali OH 55,000.00 110,000.00 U06 0.4000 Kepala Tukang Paras Bali OH 60,000.00 24,000.00 u16 2.0000 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 62,000.00 u01 0.1000 Mandor Lapangan OH 66,000.00 6,600.00

546,906.00

38 PASANGAN PARAS SILAKARANG 1 M2B023 1.050 Paras Silakarang M2 137,500.00 144,375.00 B037 11.750 Semen Kg 1,150.00 13,512.50 U13 2.000 Tukang Paras Bali OH 55,000.00 110,000.00 U06 0.400 Kepala Tukang Paras Bali OH 60,000.00 24,000.00 U16 2.000 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 62,000.00 U01 0.100 Mandor Lapangan OH 66,000.00 6,600.00

360,487.50

39 PASANGAN PARAS KEROBOKAN 1 M2B024 1.050 Paras Krobokan M2 137,500.00 144,375.00 B037 11.750 Semen Kg 1,150.00 13,512.50 U13 2.000 Tukang Paras Bali OH 55,000.00 110,000.00 U06 0.400 Kepala Tukang Paras Bali OH 60,000.00 24,000.00 U16 2.000 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 62,000.00 U01 0.100 Mandor Lapangan OH 66,000.00 6,600.00

360,487.50

40 PASANGAN TEGEL DENGAN SPESI 1 M2B011 0.023 Pasir Pasang M2 129,500.00 2,978.50 B037 0.036 Semen Zak 46,000.00 1,656.00

1.000 Tegel 30 x 30 TB PC M2 50,000.00 50,000.00 U08 0.250 Tukang Batu OH 49,500.00 12,375.00 U03 0.025 Kepala Tukang Batu OH 60,000.00 1,500.00 U16 0.500 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 15,500.00 U01 0.025 Mandor Lapangan OH 66,000.00 1,650.00

85,659.50

41 PASANGAN TEGEL WARNA KUNING DENGAN SPESI 1 M2B011 0.023 Pasir Pasang M2 129,500.00 2,978.50 B037 0.036 Semen Zak 46,000.00 1,656.00

1.000 Tegel 30 x 30 TB PC Kuning M2 88,000.00 88,000.00 U08 0.250 Tukang Batu OH 49,500.00 12,375.00 U03 0.025 Kepala Tukang Batu OH 60,000.00 1,500.00 U16 0.500 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 15,500.00 U01 0.025 Mandor Lapangan OH 66,000.00 1,650.00

123,659.50

42 PASANGAN TEGEL WARNA MERAH DENGAN SPESI 1 M2B011 0.023 Pasir Pasang M2 129,500.00 2,978.50 B037 0.036 Semen Zak 46,000.00 1,656.00

1.000 Tegel 30 x 30 Warna Merah M2 69,000.00 69,000.00 U08 0.250 Tukang Batu OH 49,500.00 12,375.00 U03 0.025 Kepala Tukang Batu OH 60,000.00 1,500.00 U16 0.500 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 15,500.00 U01 0.025 Mandor Lapangan OH 66,000.00 1,650.00

104,659.50

D PEKERJAAN PLESTERAN

43 PLESTERAN PC ( 1 : 2 ) t = 15 mm 1 M2B037 8.520 Semen Kg 1,150.00 9,798.00 B011 0.017 Pasir Pasang M3 129,500.00 2,201.50 u08 0.150 Tukang Batu OH 49,500.00 7,425.00 u03 0.015 Kepala Tukang Batu OH 60,000.00 900.00 u16 0.200 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 6,200.00 u01 0.010 Mandor Lapangan OH 66,000.00 660.00

27,184.50 44 PLESTERAN PC ( 1 : 3 ) t = 15 mm 1 M2

B037 6.480 Semen Kg 1,150.00 7,452.00 B011 0.019 Pasir Pasang M3 129,500.00 2,460.50

Page 5: Analisa 2011

NO. URAIAN PEKERJAANHARGA

SATUAN SATUAN HARGARP. RP.

1 2 3 4 5u08 0.150 Tukang Batu OH 49,500.00 7,425.00 u03 0.015 Kepala Tukang Batu OH 60,000.00 900.00 u16 0.200 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 6,200.00 u01 0.010 Mandor Lapangan OH 66,000.00 660.00

25,097.50

45 PLESTERAN PC ( 1 : 5 ) t = 15 mm 1 M2B037 4.320 Semen Kg 1,150.00 4,968.00 B011 0.022 Pasir Pasang M3 129,500.00 2,849.00 U08 0.150 Tukang Batu OH 49,500.00 7,425.00 U03 0.015 Kepala Tukang Batu OH 60,000.00 900.00 U16 0.200 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 6,200.00 U01 0.010 Mandor Lapangan OH 66,000.00 660.00

23,002.00 46 PLESTERAN PC ( 1 : 6 ) t = 15 mm 1 M2

B037 3.680 Semen Zak 1,150.00 4,232.00 B011 0.023 Pasir Pasang M3 129,500.00 2,978.50 U08 0.150 Tukang Batu OH 49,500.00 7,425.00 U03 0.015 Kepala Tukang Batu OH 60,000.00 900.00 U16 0.200 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 6,200.00 U01 0.010 Mandor Lapangan OH 66,000.00 660.00

22,395.50 47 BERAPEN ( 1 : 5 ) t = 15 mm 1 M2

B037 5.670 Semen Kg 1,150.00 6,520.50 B011 0.023 Pasir Pasang M3 129,500.00 2,978.50 U08 0.070 Tukang Batu OH 49,500.00 3,465.00 U03 0.007 Kepala Tukang Batu OH 60,000.00 420.00 U16 0.150 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 4,650.00 U01 0.008 Mandor Lapangan OH 66,000.00 528.00

18,562.00 48 PEKERJAAN ACIAN 1 M2

B037 10.480 Semen Kg 1,150.00 12,052.00 U08 0.010 Tukang Batu OH 49,500.00 495.00 U03 0.001 Kepala Tukang Batu OH 60,000.00 60.00 U01 0.060 Mandor Lapangan OH 66,000.00 3,960.00

16,567.00 49 PLESTERAN BETON 1 PC : 2 PSR ( t : 15 MM ) 1 M2

B037 9.300 Semen Kg 1,150.00 10,695.00 B011 0.018 Pasir Pasang M3 129,500.00 2,331.00 U08 0.200 Tukang Batu OH 49,500.00 9,900.00 U03 0.020 Kepala Tukang Batu OH 60,000.00 1,200.00 U16 0.260 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 8,060.00 U01 0.013 Mandor Lapangan OH 66,000.00 858.00

33,044.00 50 PLESTERAN BETON 1 PC : 3 PSR ( t : 15 MM ) 1 M2

B037 7.070 Semen Kg 1,150.00 8,130.50 B011 0.021 Pasir Pasang M3 129,500.00 2,719.50 U08 0.200 Tukang Batu OH 49,500.00 9,900.00 U03 0.020 Kepala Tukang Batu OH 60,000.00 1,200.00 U16 0.260 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 8,060.00 U01 0.013 Mandor Lapangan OH 66,000.00 858.00

30,868.00 51 PLESTERAN SIAR ADUKAN ( 1PC : 2PS ) 1 M2

B037 4.320 Semen Kg 1,150.00 4,968.00 B011 0.016 Pasir Pasang M3 129,500.00 2,072.00 U08 0.070 Tukang Batu OH 49,500.00 3,465.00 U03 0.007 Kepala Tukang Batu OH 60,000.00 420.00 U16 0.150 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 4,650.00 U01 0.008 Mandor Lapangan OH 66,000.00 528.00

16,103.00

E PEKERJAAN BETON 52 MEMBUAT BETON NON STRUKTUR KLAS K.125

B012 0.5000 Pasir Beton M3 125,000.00 62,500.00 B037 6.6667 PC. Gresik 40 Kg Zak 46,000.00 306,666.67 B010 0.8333 Koral Beton / Kerikil M3 132,000.00 110,000.00 B111 0.0333 Papan Bakesting setarap Meranti M3 2,112,000.00 70,400.00 U01 0.1667 Mandor Lapangan OH 66,000.00 11,000.00 U08 0.1667 Tukang Batu OH 49,500.00 8,250.00 U15 0.3333 Pekerja Semi Terlatih OH 33,000.00 11,000.00 U16 2.0000 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 62,000.00 U43 0.1000 Alat Bantu Kerja Set 66,000.00 6,600.00

0.8333 Concrete Vibrator ( 4 HP ) (E.089) Jam 9,342.00 7,785.00 0.8333 Conc. Mixer 0,125 M3 / 6 HP (E.251) Jam 9,292.00 7,743.33 0.8333 Pump Water 30 M3 / hr ( 8 HP ) (E.341) Jam 11,860.00 9,883.33

673,828.33 53 MEMBUAT BETON TUMBUK ( 1 PC : 3 PS : 5 KR ) 1 M3

B037 218.000 Semen Kg 1,150.00 250,700.00 B012 0.520 Pasir Beton M3 125,000.00 65,000.00 B010 0.870 Koral Beton / Kerikil M3 132,000.00 114,840.00 U08 0.250 Tukang Batu OH 49,500.00 12,375.00 U03 0.025 Kepala Tukang Batu OH 60,000.00 1,500.00 U16 1.650 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 51,150.00

Page 6: Analisa 2011

NO. URAIAN PEKERJAANHARGA

SATUAN SATUAN HARGARP. RP.

1 2 3 4 5U01 0.080 Mandor Lapangan OH 66,000.00 5,280.00

500,845.00 54 MEMBUAT BETON BERTULANG CAMPURAN (1PC : 2PS : 3KR) 1 M3

B037 336.000 PC. Gresik 40 Kg Kg 1,150.00 386,400.00 B012 0.540 Pasir Beton M3 125,000.00 67,500.00 B010 0.810 Koral Beton M3 132,000.00 106,920.00 U08 0.350 Tukang Batu OH 49,500.00 17,325.00 U03 0.035 Kepala Tukang Batu OH 60,000.00 2,100.00 U16 2.000 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 62,000.00 U01 1.000 Mandor Lapangan OH 66,000.00 66,000.00

708,245.00

MEMBUAT BETON BERTULANG CAMPURAN (1PC : 1,5PS : 2,5 KR) 1 M355 B037 400.000 PC. Gresik 40 Kg Kg 1,150.00 460,000.00

B012 0.4800 Pasir Beton M3 125,000.00 60,000.00 B010 0.8000 Koral Beton M3 132,000.00 105,600.00 U08 0.3500 Tukang Batu OH 49,500.00 17,325.00 U03 0.0350 Kepala Tukang Batu OH 60,000.00 2,100.00 U16 2.0000 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 62,000.00 U01 1.0000 Mandor Lapangan OH 66,000.00 66,000.00

773,025.00 56 MEMBUAT BETON DENGAN MUTU K 225 1 M3

B037 388.000 PC. Gresik 40 Kg Kg 1,150.00 446,200.00 B012 0.650 Pasir Beton M3 125,000.00 81,250.00 B010 0.650 Koral Beton / Kerikil M3 132,000.00 85,800.00 U08 1.000 Tukang Batu OH 49,500.00 49,500.00 U03 0.100 Kepala Tukang Batu OH 60,000.00 6,000.00 U16 6.000 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 186,000.00 U01 0.300 Mandor Lapangan OH 66,000.00 19,800.00

874,550.00 57 MEMBUAT BETON DENGAN MUTU K 275 1 M3

B037 400.000 PC. Gresik 40 Kg Kg 1,150.00 460,000.00 B012 0.400 Pasir Beton M3 125,000.00 50,000.00 B010 0.820 Koral Beton / Kerikil M3 132,000.00 108,240.00 U08 1.000 Tukang Batu OH 49,500.00 49,500.00 U03 0.100 Kepala Tukang Batu OH 60,000.00 6,000.00 U16 6.000 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 186,000.00 U01 0.300 Mandor Lapangan OH 66,000.00 19,800.00

879,540.00 58 MEMBUAT BETON CYCLOOF CAMPURAN 40% BETON 1 M3

BERTULANG 1PC:2PS:3KR + 60% BATU KALI 0.4000 Beton 1 Pc : 2 Ps : 3 Kr M3 708,245.00 283,298.00 0.6000 Batu Kali M3 126,500.00 75,900.00

359,198.00 59 KORAL SIKAT M2

3.0000 Koral Sikat Zak 44,000.00 132,000.00 B037 0.3940 Semen PC. ( 40 Kg ) Zak 46,000.00 18,124.00 B011 0.0230 Pasir Pasang M3 129,500.00 2,978.50 U01 0.0310 Mandor Lapangan OH 66,000.00 2,046.00 U16 0.6250 Pekerja / Pekerja Tak Terlatih OH 31,000.00 19,375.00 U03 0.1500 Kepala Tukang Batu OH 60,000.00 9,000.00 U08 1.5000 Tukang Batu OH 49,500.00 74,250.00

257,773.50 60 PEK. PENULANGAN / BESI BETON 1 Kg

B153 1.050 Besi Beton U24 Kg 11,000.00 11,550.00 B157 0.015 Kawat Beton Kg 13,000.00 195.00 u09 0.007 Tukang Besi OH 55,000.00 385.00 u02 0.0007 Kepala Tukang Besi OH 66,000.00 46.20 u16 0.007 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 217.00 u01 0.0003 Mandor Lapangan OH 66,000.00 19.80

12,413.00 61 PEK. PENULANGAN / BESI BETON U32 1 Kg

B154 1.050 Besi Beton Ulir U 32 Kg 12,000.00 12,600.00 B157 0.015 Kawat Beton Kg 13,000.00 195.00 u09 0.007 Tukang Besi OH 55,000.00 385.00 u02 0.0007 Kepala Tukang Besi OH 66,000.00 46.20 u16 0.007 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 217.00 u01 0.0003 Mandor Lapangan OH 66,000.00 19.80

13,463.00 62 PASANG BEKISTING UNTUK PONDASI 1 M2

B103 0.040 Kayu Terentang M3 4,400,000.00 176,000.00 B172 0.300 Paku Usuk Kg 16,500.00 4,950.00 B115 0.100 Minyak Begesting Ltr 22,000.00 2,200.00 U10 0.260 Tukang Kayu OH 55,000.00 14,300.00 U04 0.026 Kepala Tukang Kayu OH 60,000.00 1,560.00 U16 0.300 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 9,300.00 U01 0.005 Mandor Lapangan OH 66,000.00 330.00

208,640.00 63 PASANG BEKISTING UNTUK SLOOP 1 M2

B103 0.045 Kayu Terentang M3 4,400,000.00 198,000.00 B172 0.300 Paku Usuk Kg 16,500.00 4,950.00 B115 0.100 Minyak Begesting Ltr 22,000.00 2,200.00 U10 0.260 Tukang Kayu OH 55,000.00 14,300.00 U04 0.026 Kepala Tukang Kayu OH 60,000.00 1,560.00 U16 0.300 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 9,300.00 U01 0.005 Mandor Lapangan OH 66,000.00 330.00

Page 7: Analisa 2011

NO. URAIAN PEKERJAANHARGA

SATUAN SATUAN HARGARP. RP.

1 2 3 4 5 230,640.00

64 PASANG BEKESTING UNTUK KOLOM 1 M2B103 0.040 Kayu Terentang M3 4,400,000.00 176,000.00 B109a 2.000 Btg 88,000.00 176,000.00 B184 0.350 Playwood 9 mm Lbr 105,000.00 36,750.00 B172 0.400 Paku Biasa 2'-5' Kg 16,500.00 6,600.00 B115 0.200 Minyak Begesting Ltr 22,000.00 4,400.00 B103 0.015 Kayu Balok Meranti M3 4,400,000.00 66,000.00 U10 0.330 Tukang Kayu OH 55,000.00 18,150.00

U04 0.033 Kepala Tukang Kayu OH 60,000.00 1,980.00 U16 0.300 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 9,300.00 U01 0.006 Mandor Lapangan OH 66,000.00 396.00

495,576.00

65 PASANG BEKESTING UNTUK BALOK 1 M2B103 0.040 Kayu Meranti M3 4,400,000.00 176,000.00 B109a 2.000 Btg 88,000.00 176,000.00 B184 0.350 Playwood 9 mm Lbr 105,000.00 36,750.00 B172 0.400 Paku Usuk Kg 16,500.00 6,600.00 B115 0.200 Minyak Begesting Ltr 22,000.00 4,400.00 B103 0.018 Kayu Balok Meranti M3 4,400,000.00 79,200.00 U10 0.330 Tukang Kayu OH 55,000.00 18,150.00 U04 0.033 Kepala Tukang Kayu OH 60,000.00 1,980.00 U16 0.320 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 9,920.00 U01 0.006 Mandor Lapangan OH 66,000.00 396.00

509,396.00 66 PASANG BEKESTING UNTUK LANTAI 1 M2

B104 0.040 Kayu Perentang M3 4,125,000.00 165,000.00 B109a 6.000 Btg 88,000.00 528,000.00 B184 0.350 Playwood 9 mm Lbr 105,000.00 36,750.00 B172 0.400 Paku Usuk Kg 16,500.00 6,600.00 B115 0.200 Minyak Begesting Ltr 22,000.00 4,400.00 B103 0.015 Kayu Balok Meranti M3 4,400,000.00 66,000.00 U10 0.330 Tukang Kayu OH 55,000.00 18,150.00 U04 0.033 Kepala Tukang Kayu OH 60,000.00 1,980.00 U16 0.320 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 9,920.00 U01 0.006 Mandor Lapangan OH 66,000.00 396.00

837,196.00 67 PASANG BEKESTING UNTUK TANGGA 1 M2

B104 0.030 Kayu Perentang M3 4,125,000.00 123,750.00 B109a 2.000 Dolken Kayu ø 8-10/4m Btg 88,000.00 176,000.00 B184 0.350 Playwood 9 mm Lbr 105,000.00 36,750.00 B172 0.400 Paku Usuk Kg 16,500.00 6,600.00 B115 0.150 Minyak Begesting Ltr 22,000.00 3,300.00 B103 0.015 Kayu Balok Meranti M3 4,400,000.00 66,000.00 U10 0.330 Tukang Kayu OH 55,000.00 18,150.00 U04 0.033 Kepala Tukang Kayu OH 60,000.00 1,980.00 U16 0.320 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 9,920.00 U01 0.006 Mandor Lapangan OH 66,000.00 396.00

442,846.00 68 PASANG BUIS BETON 1/2 DIAMETER 50 CM 1 M'

1.0000 Buis Beton 1/2 diameter 50 BJ 35,000.00 35,000.00 B037 0.0030 PC. Gresik 40 Kg Zak 46,000.00 138.00 B011 0.0130 Pasir Pasang M3 129,500.00 1,683.50 U08 0.0750 Tukang Batu OH 49,500.00 3,712.50 U03 0.0075 Kepala Tukang Batu OH 60,000.00 450.00 U16 0.2000 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 6,200.00 U01 0.0200 Mandor Lapangan OH 66,000.00 1,320.00

48,504.00 69 PASANG BUIS BETON DIAMETER 25 CM 1 M'

1.0000 Buis Beton diameter 25 Bj 40,000.00 40,000.00 B037 0.0030 PC. Gresik 40 Kg Zak 46,000.00 138.00 B011 0.0130 Pasir Pasang M3 129,500.00 1,683.50 U08 0.0750 Tukang Batu OH 49,500.00 3,712.50 U03 0.0075 Kepala Tukang Batu OH 60,000.00 450.00 U16 0.2000 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 6,200.00 U01 0.0200 Mandor Lapangan OH 66,000.00 1,320.00

53,504.00 70 PASANG BUIS BETON DIAMETER 80 CM 1 M'

2.0000 Buis Beton diameter 80 Bj 90,000.00 180,000.00 B037 0.0030 PC. Gresik 40 Kg Zak 46,000.00 138.00 B011 0.0130 Pasir Pasang M3 129,500.00 1,683.50 U08 0.0750 Tukang Batu OH 49,500.00 3,712.50 U03 0.0075 Kepala Tukang Batu OH 60,000.00 450.00 U16 0.2000 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 6,200.00 U01 0.0200 Mandor Lapangan OH 66,000.00 1,320.00

193,504.00 71 MEMBUAT BRONJONG DENGAN KAWAT GALVANIS M3

Untuk Kawat 3 MM 8.3333 Kawat Bronjong menganyam Kg 33,000.00 274,998.90 1.0000 Batu Quari / Batu Bulat Besar M3 126,500.00 126,500.00

U01 0.0517 Mandor Lapangan OH 66,000.00 3,412.20 U09 0.7333 Tukang Besi OH 55,000.00 40,331.50 U16 2.1000 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 65,100.00

510,342.60

Dolken Kayu ø 8-10/4m

Dolken Kayu ø 8-10/4m

Dolken Kayu ø 8-10/4m

Page 8: Analisa 2011

NO. URAIAN PEKERJAANHARGA

SATUAN SATUAN HARGARP. RP.

1 2 3 4 572 MEMBUAT BRONJONG DENGAN KAWAT GALVANIS M3

Untuk Kawat 4 MM 15.0000 Kawat Bronjong menganyam Kg 33,000.00 495,000.00 1.0000 Batu Quari / Batu Bulat Besar M3 126,500.00 126,500.00

U01 0.0517 Mandor Lapangan OH 66,000.00 3,412.20 U09 0.7333 Tukang Besi OH 55,000.00 40,331.50 U16 2.1000 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 65,100.00

730,343.70 73 KISDAM SETINGGI 1 M DARI KARUNG PLASTIK DIISI TANAH

DENGAN TANAH EKS GALIAN 19.0000 Karung Plastik Bh 5,500.00 104,500.00

B016 0.8000 Tanah Urug M3 82,500.00 66,000.00 U16 3.0880 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 95,728.00 U16 0.1520 Mandor Lapangan OH 66,000.00 10,032.00

276,260.00 Untuk 3 x pakai 92,086.67

PEKERJAAN JALAN 74 PENYEDIAAN KERIKIL SUNGAI (TIDAK DISARING) M3

(Menggunakan Alat)B010 1.0000 Kerikil Sungai M3 132,000.00 132,000.00 U01 0.0063 Mandor Lapangan OH 66,000.00 415.80 U30 0.0125 Operator - Trampil OH 49,500.00 618.75 U27 0.0500 Sopir Trampil OH 44,000.00 2,200.00 U16 0.0063 Pekerja / Pekerja Tak Terlatih OH 31,000.00 195.30 U43 0.0025 Alat Bantu Kerja Set 66,000.00 165.00

0.0188 Bulldoser ( 110 HP ) (E.001) Jam 370,459.00 6,964.63 0.0375 Loader Wheeled (115 HP ) (E.052) Jam 293,311.00 10,999.16 0.3000 Dump Truck 5 T ( 145 HP ) (E.212) Jam 177,892.00 53,367.60

206,926.24

75 PRODUKSI BATU PECAH TERSARING MENGGUNAKAN M3KERIKIL SUNGAI (Menggunakan Alat)

B010 1.3333 Kerikil Sungai M3 132,000.00 175,995.60 U01 0.0167 Mandor Lapangan OH 66,000.00 1,102.20 U30 0.0500 Operator - Trampil OH 49,500.00 2,475.00 U31 0.0333 Operator - Semi Trampil OH 44,000.00 1,465.20 U27 0.0667 Sopir Trampil OH 44,000.00 2,934.80 U16 0.0667 Pekerja / Pekerja Tak Terlatih OH 31,000.00 2,067.70 U15 0.0667 Pekerja Semi Terlatih OH 33,000.00 2,201.10 U43 0.0033 Alat Bantu Kerja Set 66,000.00 217.80

0.1000 Bulldoser ( 110 HP ) (E.001) Jam 370,459.00 37,045.90 0.1000 Crusser / SCR ( 140 HP ) (E.031) Jam 463,615.00 46,361.50 0.1000 Loader Wheeled (115 HP ) (E.052) Jam 293,311.00 29,331.10 0.4000 Dump Truck 5 T ( 145 HP ) (E.212) Jam 177,892.00 71,156.80

372,354.70

76 MEMPRODUKSI CAMPURAN ASPAL BETON UNTUK LAPIS TonPONDASI LASTON ATAS / ATB (Menggunakan Alat)

B012 0.2500 Pasir Ayak u' Beton M3 125,000.00 31,250.00 B342 59.0000 Bitumen / Asphalt Curah Kg 11,000.00 649,000.00

0.4700 Batu Sungai Pecah Tersaring M3 372,354.70 175,006.71 U01 0.0200 Mandor Lapangan OH 66,000.00 1,320.00 U34 0.0100 Mekanik - Trampil OH 38,500.00 385.00 U30 0.0400 Operator - Trampil OH 49,500.00 1,980.00 U31 0.0300 Operator - Semi Trampil OH 44,000.00 1,320.00 U27 0.0600 Sopir Trampil OH 44,000.00 2,640.00 U16 0.0700 Pekerja / Pekerja Tak Terlatih OH 31,000.00 2,170.00 U15 0.0700 Pekerja Semi Terlatih OH 33,000.00 2,310.00 U43 0.0020 Alat Bantu Kerja Set 66,000.00 132.00

0.0400 Bulldoser ( 110 HP ) (E.001) Jam 370,459.00 14,818.36 0.0500 Asphalt Mixing Plant 30 T/H ( 125 HP ) (E.155) Jam 692,588.00 34,629.40 0.0400 Crusser / SCR ( 140 HP ) (E.031) Jam 463,615.00 18,544.60 0.0900 Loader Wheeled (115 HP ) (E.052) Jam 293,311.00 26,397.99 0.3500 Dump Truck 5 T ( 145 HP ) (E.212) Jam 177,892.00 62,262.20

1,024,166.26

77 PENGHAMPARAN LAPIS PONDASI ATAS ASPAL BETON / ATB M3(Menggunakan Alat)

B342 3.0000 Bitumen / Aspalt Curah Kg 11,000.00 33,000.00 B346 2.0000 Kerosin / Minyak Tanah Industri Ltr 6,000.00 12,000.00

2.2222 A T B ( Laston Atas ) Ton 1,024,166.26 2,275,902.26 U01 0.0222 Mandor Lapangan OH 66,000.00 1,465.20 U30 0.0889 Operator - Trampil OH 49,500.00 4,400.55 U14 0.1778 Pekerja Terlatih OH 38,500.00 6,845.30 U16 0.2667 Pekerja / Pekerja Tak Terlatih OH 31,000.00 8,267.70 U43 0.0111 Alat Bantu Kerja Set 66,000.00 732.60

0.1111 Roller 3 Wheeled 8 - 10 T ( 51 HP ) (E.080) Jam 135,153.00 15,015.50 0.1111 Roller Pneumatic 8 - 15 T ( 95 HP ) (E.084) Jam 265,722.00 29,521.71 0.0667 Sprayer Selfpropelled ( 1000 L, 25 HP ) (E.153) Jam 85,617.00 5,710.65 0.1111 Asphalt Finisher ( 30 HP ) (E.157) Jam 119,797.00 13,309.45 0.0889 Compressor Air ( 20 HP ) (E.301) Jam 68,652.00 6,103.16

2,412,274.09 78 MEMPRODUKSI LAPIS TIPIS ASPAL BETON (LATASTON) Ton

/ HRS (Menggunakan Alat)

Page 9: Analisa 2011

NO. URAIAN PEKERJAANHARGA

SATUAN SATUAN HARGARP. RP.

1 2 3 4 5B012 0.3800 Pasir Ayak u' Beton M3 125,000.00 47,500.00 B342 90.0000 Bitumen / Asphalt Curah Kg 11,000.00 990,000.00

40.0000 Filler ( Bahan Pengisi ) Kg 1,350.00 54,000.00 0.1400 Batu Sungai Pecah Tersaring M3 372,354.70 52,129.66

U01 0.0100 Mandor Lapangan OH 66,000.00 660.00 U34 0.0100 Mekanik - Trampil OH 38,500.00 385.00 U30 0.0300 Operator - Trampil OH 49,500.00 1,485.00 U31 0.0200 Operator - Semi Trampil OH 44,000.00 880.00 U27 0.0500 Sopir Trampil OH 44,000.00 2,200.00 U16 0.0500 Pekerja / Pekerja Tak Terlatih OH 31,000.00 1,550.00 U15 0.0600 Pekerja Semi Terlatih OH 33,000.00 1,980.00 U43 0.0020 Alat Bantu Kerja Set 66,000.00 132.00

0.0100 Bulldoser ( 110 HP ) (E.001) Jam 370,459.00 3,704.59 0.0500 Asphalt Mixing Plant 30 T/H ( 125 HP ) (E.155) Jam 692,588.00 34,629.40 0.0100 Crusser / SCR ( 140 HP ) (E.031) Jam 463,615.00 4,636.15 0.0600 Loader Wheeled (115 HP ) (E.052) Jam 293,311.00 17,598.66 0.2800 Dump Truck 5 T ( 145 HP ) (E.212) Jam 177,892.00 49,809.76

1,263,280.22

79 PENGHAMPARAN DAN PEMADATAN LAPIS TIPIS ASPAL M2BETON (LATASTON) / HRS (Menggunakan Alat) t = 3 Cm

B342 0.3000 Bitumen / Aspalt Curah Kg 11,000.00 3,300.00 B346 0.2000 Kerosin / Minyak Tanah Industri Ltr 6,000.00 1,200.00

0.0667 HRS ( Lataston ) Ton 1,263,280.22 84,260.79 U01 0.0007 Mandor Lapangan OH 66,000.00 46.20 U30 0.0027 Operator - Trampil OH 49,500.00 133.65 U14 0.0053 Pekerja Terlatih OH 38,500.00 204.05 U16 0.0080 Pekerja / Pekerja Tak Terlatih OH 31,000.00 248.00 U43 0.0003 Alat Bantu Kerja Set 66,000.00 19.80

0.0033 Roller Tandem 6 - 10 T ( 40 HP ) (E.081) Jam 138,884.00 458.32 0.0033 Roller Pneumatic 8 - 15 T ( 95 HP ) (E.084) Jam 265,722.00 876.88 0.0033 Sprayer Selfpropelled ( 1000 L, 25 HP ) (E.153) Jam 85,617.00 282.54 0.0033 Asphalt Finisher ( 30 HP ) (E.157) Jam 119,797.00 395.33 0.0027 Compressor Air ( 20 HP ) (E.301) Jam 68,652.00 185.36

91,610.92 80 MEMPRODUKSI DAN MENGANGKUT ASPAL BETON / AC Ton

(Menggunakan Alat AMP)B012 0.3000 Pasir Ayak u' Beton M3 125,000.00 37,500.00 B342 63.3000 Bitumen / Asphalt Curah Kg 11,000.00 696,300.00

40.0000 Filler ( Bahan Pengisi ) Kg 1,350.00 54,000.00 0.3350 Batu Sungai Pecah Tersaring M3 372,354.70 124,738.82

U01 0.0200 Mandor Lapangan OH 66,000.00 1,320.00 U34 0.0100 Mekanik - Trampil OH 38,500.00 385.00 U30 0.0300 Operator - Trampil OH 49,500.00 1,485.00 U31 0.0300 Operator - Semi Trampil OH 44,000.00 1,320.00 U27 0.0600 Sopir Trampil OH 44,000.00 2,640.00 U16 0.0600 Pekerja / Pekerja Tak Terlatih OH 31,000.00 1,860.00 U15 0.0700 Pekerja Semi Terlatih OH 33,000.00 2,310.00 U43 0.0020 Alat Bantu Kerja Set 66,000.00 132.00

0.0200 Bulldoser ( 110 HP ) (E.001) Jam 370,459.00 7,409.18 0.0500 Asphalt Mixing Plant 30 T/H ( 125 HP ) (E.155) Jam 692,588.00 34,629.40 0.0200 Crusser / SCR ( 140 HP ) (E.031) Jam 463,615.00 9,272.30 0.0700 Loader Wheeled (115 HP ) (E.052) Jam 293,311.00 20,531.77 0.3400 Dump Truck 5 T ( 145 HP ) (E.212) Jam 177,892.00 60,483.28

1,056,316.75 81 PENGHAMPARAN DAN PEMADATAN ASPAL BETON M2

(LASTON) / AC (Menggunakan Alat) t = 5 CmB342 0.3889 Bitumen / Aspalt Curah Kg 11,000.00 4,277.90 B346 0.3333 Kerosin / Minyak Tanah Industri Ltr 6,000.00 1,999.80

0.1111 Aspal Beton ( Laston ) / AC Ton 1,056,316.75 117,356.79 U01 0.0011 Mandor Lapangan OH 66,000.00 72.60 U30 0.0044 Operator - Trampil OH 49,500.00 217.80 U14 0.0089 Pekerja Terlatih OH 38,500.00 342.65 U16 0.0133 Pekerja / Pekerja Tak Terlatih OH 31,000.00 412.30 U43 0.0009 Alat Bantu Kerja Set 66,000.00 59.40

0.0056 Roller Tandem 8 - 10 T ( 51 HP ) (E.080) Jam 135,153.00 756.86 0.0056 Roller Tandem 6 - 10 T ( 40 HP ) (E.081) Jam 138,884.00 777.75 0.0056 Roller Pneumatic 8 - 15 T ( 95 HP ) (E.084) Jam 265,722.00 1,488.04 0.0033 Sprayer Selfpropelled ( 1000 L, 25 HP ) (E.153) Jam 85,617.00 282.54 0.0056 Asphalt Finisher ( 30 HP ) (E.157) Jam 119,797.00 670.86 0.0044 Compressor Air ( 20 HP ) (E.301) Jam 68,652.00 302.07

129,017.36 Penghamparan dan Pemadatan AC t = 4 Cm' 103,213.89

82 PENGUPASAN TANAH DAN PEMBERSIHAN SEMAK PADA DAMIJA M2(Menggunakan Buruh)

U01 0.0011 Mandor Lapangan OH 66,000.00 72.60 U16 0.0400 Pekerja / Pekerja Tak Terlatih OH 31,000.00 1,240.00 U43 0.0017 Alat Bantu Kerja Set 66,000.00 112.20

1,424.80 83 PENGUPASAN TANAH DAN PEMBERSIHAN SEMAK PADA DAMIJA M2

(Menggunakan Alat)U01 0.0004 Mandor Lapangan OH 66,000.00 26.40 U30 0.0004 Operator - Trampil OH 49,500.00 19.80

Page 10: Analisa 2011

NO. URAIAN PEKERJAANHARGA

SATUAN SATUAN HARGARP. RP.

1 2 3 4 5U16 0.0008 Pekerja / Pekerja Tak Terlatih OH 31,000.00 24.80 U43 0.0004 Alat Bantu Kerja Set 66,000.00 26.40

0.0021 Bulldoser ( 110 HP ) (E.001) Jam 370,459.00 777.96 875.36

84 PEMADATAN TANAH DASAR ( Menggunakan Buruh ) M2U01 0.0006 Mandor Lapangan OH 66,000.00 39.60 U30 0.0003 Operator - Trampil OH 49,500.00 14.85 U16 0.0206 Pekerja / Pekerja Tak Terlatih OH 31,000.00 638.60 U43 0.0001 Alat Bantu Kerja Set 66,000.00 6.60

0.0016 Roller 3 Wheeled 8 - 10 T ( 51 HP ) (E.080) Jam 135,153.00 216.24 915.89

85 PEMADATAN TANAH DASAR ( Menggunakan Alat ) M2U01 0.0003 Mandor Lapangan OH 66,000.00 19.80 U30 0.0005 Operator - Trampil OH 49,500.00 24.75 U16 0.0010 Pekerja / Pekerja Tak Terlatih OH 31,000.00 31.00 U43 0.0000 Alat Bantu Kerja Set 66,000.00 -

0.0015 Motor Grader ( 115 HP ) (E.010) Jam 328,506.00 492.76 0.0015 Roller 3 Wheeled 8 - 10 T ( 51 HP ) (E.080) Jam 135,153.00 202.73

771.04

86 LAPIS PONDASI BAWAH (LPB) KLAS A M3(Menggunakan Alat)

B004 0.3000 Batu Pecah 3 - 5 Cm M3 187,000.00 56,100.00 B005 0.1533 Batu Pecah 2 - 3 Cm M3 154,000.00 23,608.20 B006 0.0867 Batu Pecah Mesin 1 - 2 Cm M3 159,500.00 13,828.65 B007 0.1800 Batu Pecah Mesin 0,5 - 1 Cm M3 165,000.00 29,700.00 B013 0.4800 Bahan Timbunan / Pasir Urug M3 110,000.00 52,800.00 U01 0.0067 Mandor Lapangan OH 66,000.00 442.20 U30 0.0133 Operator - Trampil OH 49,500.00 658.35 U27 0.0067 Sopir - Trampil OH 44,000.00 294.80 U16 0.0267 Pekerja / Pekerja Tak Terlatih OH 31,000.00 827.70 U43 0.0067 Alat Bantu Kerja Set 66,000.00 442.20

0.0333 Motor Grader (E.010) Jam 328,506.00 10,939.25 0.0333 Roller 3 Wheeled 8 - 10 T ( 51 HP ) (E.080) Jam 135,153.00 4,500.59 0.0267 Water Tank Truck (115 HP ) (E.182) Jam 160,356.00 4,281.51

198,423.45

87 LAPIS PONDASI BAWAH (LPB) KLAS A M3(Menggunakan Buruh)

B004 0.3000 Batu Pecah 3 - 5 Cm M3 187,000.00 56,100.00 B005 0.1500 Batu Pecah 2 - 3 Cm M3 154,000.00 23,100.00 B006 0.1000 Batu Pecah Mesin 1 - 2 Cm M3 159,500.00 15,950.00 B007 0.1667 Batu Pecah Mesin 0,5 - 1 Cm M3 165,000.00 27,505.50 B013 0.4833 Bahan Timbunan / Pasir Urug M3 110,000.00 53,163.00 U02 0.0167 Mandor Lapangan OH 66,000.00 1,102.20 U30 0.0167 Operator - Trampil OH 49,500.00 826.65 U27 0.0167 Sopir - Trampil OH 44,000.00 734.80 U16 1.1000 Pekerja / Pekerja Tak Terlatih OH 31,000.00 34,100.00 U43 0.0133 Alat Bantu Kerja Set 66,000.00 877.80

0.0833 Roller 3 Wheeled 8 - 10 T ( 51 HP ) (E.080) Jam 135,153.00 11,258.24 0.0667 Water Tank Truck (115 HP ) (E.182) Jam 160,356.00 10,695.75

235,413.94

88 LAPIS PONDASI BAWAH (LPB) KLAS B M3(Menggunakan Alat)

B013 0.4333 Bahan Timbunan / Pasir Urug M3 110,000.00 47,663.00 B010 0.8333 Kerikil Sungai Tersaring / Halus M3 132,000.00 109,995.60 U01 0.0067 Mandor Lapangan OH 66,000.00 442.20 U30 0.0133 Operator - Trampil OH 49,500.00 658.35 U27 0.0067 Sopir - Trampil OH 44,000.00 294.80 U16 0.0267 Pekerja / Pekerja Tak Terlatih OH 31,000.00 827.70 U43 0.0013 Alat Bantu Kerja Set 66,000.00 85.80

0.0333 Motor Grader (E.010) Jam 328,506.00 10,939.25 0.0333 Roller 3 Wheeled 8 - 10 T ( 51 HP ) (E.080) Jam 135,153.00 4,500.59 0.0333 Water Tank Truck (115 HP ) (E.182) Jam 160,356.00 5,339.85

180,747.15 89 LAPIS PONDASI BAWAH (LPB) KLAS B M3

(Menggunakan Buruh)0.5417 Bahan Timbunan / Pasir Urug M3 110,000.00 59,587.00

B010 0.6583 Kerikil Sungai Tersaring / Halus M3 132,000.00 86,895.60 U01 0.0333 Mandor Lapangan OH 66,000.00 2,197.80 U30 0.0167 Operator - Trampil OH 49,500.00 826.65 U27 0.0167 Sopir - Trampil OH 44,000.00 734.80 U16 1.1000 Pekerja / Pekerja Tak Terlatih OH 31,000.00 34,100.00 U43 0.0200 Alat Bantu Kerja Set 66,000.00 1,320.00

0.0833 Roller 3 Wheeled 8 - 10 T ( 51 HP ) (E.080) Jam 135,153.00 11,258.24 0.0667 Water Tank Truck (115 HP ) (E.182) Jam 160,356.00 10,695.75 0.0833 Roller Pneumatic 8 - 15 T ( 95 HP ) (E.084) Jam 265,722.00 22,134.64

229,750.48 90 LAPIS PONDASI BAWAH (LPB) KLAS C ( SIRTU ) M3

(Menggunakan Alat)B014 1.3333 Sirtu / Saringan M3 72,500.00 96,664.25

Page 11: Analisa 2011

NO. URAIAN PEKERJAANHARGA

SATUAN SATUAN HARGARP. RP.

1 2 3 4 5U01 0.0083 Mandor Lapangan OH 66,000.00 547.80 U30 0.0167 Operator - Trampil OH 49,500.00 826.65 U27 0.0083 Sopir - Trampil OH 44,000.00 365.20 U16 0.0500 Pekerja / Pekerja Tak Terlatih OH 31,000.00 1,550.00 U43 0.0017 Alat Bantu Kerja Set 66,000.00 112.20

0.0417 Motor Grader (E.010) Jam 328,506.00 13,698.70 0.0417 Roller Vibrator Sheel (E.082) Jam 145,961.00 6,086.57 0.0417 Water Tank Truck (115 HP ) (E.182) Jam 160,356.00 6,686.85

126,538.22 91 LAPIS PONDASI BAWAH (LPB) KLAS C ( SIRTU ) M3

(Menggunakan Buruh)B014 1.2500 Sirtu / Saringan M3 72,500.00 90,625.00 U01 0.0500 Mandor Lapangan OH 66,000.00 3,300.00 U30 0.0167 Operator - Trampil OH 49,500.00 826.65 U27 0.0167 Sopir - Trampil OH 44,000.00 734.80 U16 1.0000 Pekerja / Pekerja Tak Terlatih OH 31,000.00 31,000.00 U43 0.0417 Alat Bantu Kerja Set 66,000.00 2,752.20

0.0833 Roller 3 Wheeled 8 - 10 T ( 51 HP ) (E.080) Jam 135,153.00 11,258.24 0.0833 Water Tank Truck (115 HP ) (E.182) Jam 160,356.00 13,357.65

153,854.55

92 LAPIS PONDASI BAWAH (LPB) KLAS C' ( LIMESTONE ) M3(Menggunakan Alat)

B017 1.2500 Limestone M3 110,000.00 137,500.00 U01 0.0083 Mandor Lapangan OH 66,000.00 547.80 U30 0.0167 Operator - Trampil OH 49,500.00 826.65 U27 0.0083 Sopir - Trampil OH 44,000.00 365.20 U16 0.0500 Pekerja / Pekerja Tak Terlatih OH 31,000.00 1,550.00 U43 0.0017 Alat Bantu Kerja Set 66,000.00 112.20

0.0417 Motor Grader (E.010) Jam 328,506.00 13,698.70 0.0417 Roller Vibrator Sheel (E.082) Jam 145,961.00 6,086.57 0.0417 Water Tank Truck (115 HP ) (E.182) Jam 160,356.00 6,686.85

167,373.97 93 LAPIS PONDASI BAWAH (LPB) KLAS C' ( LIMESTONE ) M3

(Menggunakan Buruh)B017 1.2500 Limestone M3 110,000.00 137,500.00 U01 0.0500 Mandor Lapangan OH 66,000.00 3,300.00 U30 0.0167 Operator - Trampil OH 49,500.00 826.65 U27 0.0167 Sopir - Trampil OH 44,000.00 734.80 U16 1.0000 Pekerja / Pekerja Tak Terlatih OH 31,000.00 31,000.00 U43 0.0417 Alat Bantu Kerja Set 66,000.00 2,752.20

0.0833 Roller 3 Wheeled 8 - 10 T ( 51 HP ) (E.080) Jam 135,153.00 11,258.24 0.0833 Water Tank Truck (115 HP ) (E.182) Jam 160,356.00 13,357.65

200,729.55 94 MEMBENTUK BADAN JALAN / SUBGRADE DG PASIR URUG M3

(Menggunakan Buruh)B013 0.1333 Pasir Urug M3 82,500.00 10,997.25 U01 0.0036 Mandor Lapangan OH 66,000.00 237.60 U30 0.0018 Operator - Trampil OH 49,500.00 89.10 U27 0.0018 Sopir - Trampil OH 44,000.00 79.20 U16 0.0853 Pekerja / Pekerja Tak Terlatih OH 31,000.00 2,644.30 U43 0.0024 Alat Bantu Kerja Set 66,000.00 158.40

0.0089 Roller Pneumatic 8 - 15 T ( 95 HP ) (E.084) Jam 265,722.00 2,364.93 0.0071 Water Tank Truck (115 HP ) (E.182) Jam 160,356.00 1,138.53

17,709.30

95 MEMOTONG BAHU JALAN TINGGI (Menggunakan Buruh) M3U01 0.0208 Mandor Lapangan OH 66,000.00 1,372.80 U27 0.0833 Sopir - Trampil OH 44,000.00 3,665.20 U16 0.8333 Pekerja / Pekerja Tak Terlatih OH 31,000.00 25,832.30 U43 0.0333 Alat Bantu Kerja Set 66,000.00 2,197.80

0.4167 Dump Truck 3,5 T ( 106 HP ) (E.221) Jam 129,531.00 53,975.57 87,043.67

96 MEMOTONG BAHU JALAN TINGGI (Menggunakan Alat) M3U01 0.0067 Mandor Lapangan OH 66,000.00 442.20 U30 0.0133 Operator - Trampil OH 49,500.00 658.35 U27 0.0267 Sopir - Trampil OH 44,000.00 1,174.80 U16 0.0400 Pekerja / Pekerja Tak Terlatih OH 31,000.00 1,240.00 U43 0.0013 Alat Bantu Kerja Set 66,000.00 85.80

0.0333 Motor Grader ( 115 HP ) (E.010) Jam 328,506.00 10,939.25 0.0333 Roller Vibrator Ped ( 7 HP ) (E.087) Jam 38,344.00 1,276.86 0.1333 Dump Truck 5 T ( 145 HP ) (E.212) Jam 177,892.00 23,713.00

39,530.26

97 PEMELIHARAAN BAHU JALAN (Menggunakan Buruh) M3U01 0.0104 Mandor Lapangan OH 66,000.00 686.40 U27 0.0104 Sopir - Trampil OH 44,000.00 457.60 U33 0.0104 Pembantu Sopir OH 38,500.00 400.40 U14 0.0208 Pekerja Terlatih OH 38,500.00 800.80 U16 0.8333 Pekerja / Pekerja Tak Terlatih OH 31,000.00 25,832.30

Page 12: Analisa 2011

NO. URAIAN PEKERJAANHARGA

SATUAN SATUAN HARGARP. RP.

1 2 3 4 5U43 0.0120 Alat Bantu Kerja Set 66,000.00 792.00

0.0521 Dump Truck 3,5 T ( 106 HP ) (E.221) Jam 129,531.00 6,748.57 35,718.07

98 PEMBERSIHAN RUMPUT DAN TANAMAN DI BAHU JALAN M2(Menggunakan Buruh)

U01 0.0007 Mandor Lapangan OH 66,000.00 46.20 U16 0.0167 Pekerja / Pekerja Tak Terlatih OH 31,000.00 517.70 U43 0.0007 Alat Bantu Kerja Set 66,000.00 46.20

610.10

99 PEMBERSIHAN PARIT ( Menggunakan Buruh ) M3U01 0.0020 Mandor Lapangan OH 66,000.00 132.00 U27 0.0040 Sopir - Trampil OH 44,000.00 176.00 U16 0.0720 Pekerja / Pekerja Tak Terlatih OH 31,000.00 2,232.00 U43 0.0024 Alat Bantu Kerja Set 66,000.00 158.40

0.0200 Dump Truck 3,5 T ( 106 HP ) (E.221) Jam 129,531.00 2,590.62 5,289.02

100 LABURAN ASPAL SATU LAPIS (BURTU) M2(Menggunakan Alat)

B341 2.0806 Bitumen (Asphalt) dengan Drum Kg 8,500.00 17,685.10 B346 0.3222 Kerosin / Minyak Tanah Industri Ltr 6,000.00 1,933.20 B009 0.0200 Seplit Halus Bersih M3 198,000.00 3,960.00 U01 0.0017 Mandor Lapangan OH 66,000.00 112.20 U30 0.0050 Operator - Trampil OH 49,500.00 247.50 U27 0.0033 Sopir - Trampil OH 44,000.00 145.20 U15 0.0033 Pekerja Semi Terlatih OH 33,000.00 108.90 U14 0.0033 Pekerja Terlatih OH 38,500.00 127.05 U16 0.0167 Pekerja / Pekerja Tak Terlatih OH 31,000.00 517.70 U43 0.0008 Alat Bantu Kerja Set 66,000.00 52.80

0.0083 Tractor Equipment ETC (HP) (E.401) Jam 54,948.00 456.07 0.0083 Roller Pneumatic 8 - 15 T ( 95 HP ) (E.084) Jam 265,722.00 2,205.49 0.0083 Sprayer Selfpropelled (1000 L, 25HP) (E.153) Jam 85,617.00 710.62 0.0167 Dump Truck 3,5 T (106 HP) (E.221) Jam 129,531.00 2,163.17 0.0083 Tractor Wheeled (60 HP) 3 T (E.053) Jam 104,940.00 871.00 0.0167 Chip Spreader 3 T (E.130) Jam 19,863.00 331.71

31,627.71 101 LABURAN ASPAL SATU LAPIS (BURTU) M2

(Menggunakan Buruh)B341 2.0806 Bitumen (Asphalt) dengan Drum Kg 8,500.00 17,685.10 B346 0.3222 Kerosin / Minyak Tanah Industri Ltr 6,000.00 1,933.20 B009 0.0200 Seplit Halus Bersih M3 198,000.00 3,960.00 U01 0.0017 Mandor Lapangan OH 66,000.00 112.20 U30 0.0050 Operator - Trampil OH 49,500.00 247.50 U27 0.0033 Sopir - Trampil OH 44,000.00 145.20 U15 0.0033 Pekerja Semi Terlatih OH 33,000.00 108.90 U14 0.0033 Pekerja Terlatih OH 38,500.00 127.05 U16 0.0167 Pekerja / Pekerja Tak Terlatih OH 31,000.00 517.70 U43 0.0008 Alat Bantu Kerja Set 66,000.00 52.80

0.0083 Roller Pneumatic 8 - 15 T ( 95 HP ) (E.084) Jam 265,722.00 2,205.49 0.0167 Dump Truck 3,5 T ( 106 HP ) (E.221) Jam 129,531.00 2,163.17

29,258.31 102 LABURAN ASPAL DUA LAPIS (BURDA) M2

(Menggunakan Alat)B341 2.5000 Bitumen (Asphalt) dengan Drum Kg 8,500.00 21,250.00 B346 0.7056 Kerosin / Minyak Tanah Industri Ltr 6,000.00 4,233.60 B008 0.0178 Seplit Kasar Bersih M3 130,500.00 2,322.90 B009 0.0089 Seplit Halus Bersih M3 198,000.00 1,762.20 U01 0.0022 Mandor Lapangan OH 66,000.00 145.20 U30 0.0067 Operator - Trampil OH 49,500.00 331.65 U27 0.0044 Sopir - Trampil OH 44,000.00 193.60 U15 0.0044 Pekerja Terlatih OH 38,500.00 169.40 U14 0.0044 Pekerja SemiTerlatih OH 33,000.00 145.20 U16 0.0222 Pekerja / Pekerja Tak Terlatih OH 31,000.00 688.20 U43 0.0014 Alat Bantu Kerja Set 66,000.00 92.40

0.0111 Tractor Equipment ETC (HP) (E.401) Jam 54,948.00 609.92 0.0111 Roller Pneumatic 8 - 15 T ( 95 HP ) (E.084) Jam 265,722.00 2,949.51 0.0111 Sprayer Selfpropelled (1000 L, 25HP) (E.153) Jam 85,617.00 950.35 0.0222 Dump Truck 3,5 T (106 HP) (E.221) Jam 129,531.00 2,875.59 0.0111 Tractor Wheeled (60 HP) 3 T (E.053) Jam 104,940.00 1,164.83 0.0222 Chip Spreader 3 T (E.130) Jam 19,863.00 440.96

40,325.52 103 LABURAN ASPAL DUA LAPIS (BURDA)

(Menggunakan Buruh)

Page 13: Analisa 2011

NO. URAIAN PEKERJAANHARGA

SATUAN SATUAN HARGARP. RP.

1 2 3 4 5B341 2.5000 Bitumen (Asphalt) dengan Drum Kg 8,500.00 21,250.00 B346 0.7056 Kerosin / Minyak Tanah Industri Ltr 6,000.00 4,233.60 B008 0.0178 Seplit Kasar Bersih M3 130,500.00 2,322.90 B009 0.0089 Seplit Halus Bersih M3 198,000.00 1,762.20 U01 0.0017 Mandor Lapangan OH 66,000.00 112.20 U30 0.0017 Operator - Trampil OH 49,500.00 84.15 U32 0.0017 Pembantu Operator OH 38,500.00 65.45 U27 0.0017 Sopir - Trampil OH 44,000.00 74.80 U15 0.0017 Pembantu Sopir OH 38,500.00 65.45 U14 0.0033 Pekerja Terlatih OH 38,500.00 127.05 U16 0.0267 Pekerja / Pekerja Tak Terlatih OH 31,000.00 827.70 U43 0.0008 Alat Bantu Kerja Set 66,000.00 52.80

0.0083 Roller Pneumatic 8 - 15 T ( 95 HP ) (E.084) Jam 265,722.00 2,205.49 0.0083 Flat Bed Truck 4,0 T ( 80 HP ) (E.211) Jam 110,128.00 914.06

34,097.86 104 LAPIS PENETRASI MACADAM 5 CM (LAPEN) M2

(Menggunakan Buruh)B004 0.0400 Batu Pecah 3 - 4 Cm M3 187,000.00 7,480.00 B005 0.0221 Batu Pecah 2 - 3 Cm M3 154,000.00 3,403.40 B006 0.0111 Batu Pecah Mesin 1 - 2 Cm M3 159,500.00 1,770.45 B012 0.0025 Pasir Ayak u' Beton M3 125,000.00 312.50 B341 4.5000 Bitumen (Asphalt) dengan Drum Kg 8,500.00 38,250.00 B346 0.3214 Kerosin / Minyak Tanah Industri Ltr 6,000.00 1,928.40 U01 0.0043 Mandor Lapangan OH 66,000.00 283.80 U30 0.0043 Operator - Trampil OH 49,500.00 212.85 U27 0.0021 Sopir - Trampil OH 44,000.00 92.40 U14 0.0043 Pekerja Terlatih OH 38,500.00 165.55 U16 0.1414 Pekerja / Pekerja Tak Terlatih OH 31,000.00 4,383.40 U43 0.0058 Alat Bantu Kerja Set 66,000.00 382.80

0.0107 Roller 3 Wheeled 8 - 10 T ( 51 HP ) (E.080) Jam 135,153.00 1,446.14 0.0107 Asp. Sprayer Towed ( 6 HP ) (E.154) Jam 29,563.00 316.32 0.0107 Dump Truck 3,5 T ( 106 HP ) (E.221) Jam 129,531.00 1,385.98

61,813.99

105 LAPIS PENETRASI MACADAM 5 CM (LAPEN) M2(Menggunakan Buruh)

B004 0.0400 Batu Pecah 3 - 5 Cm M3 187,000.00 7,480.00 B005 0.0221 Batu Pecah 2 - 3 Cm M3 154,000.00 3,403.40 B008 0.0111 Seplit Kasar Bersih M3 130,500.00 1,448.55 B009 0.0025 Seplit Halus M3 198,000.00 495.00 B341 4.5000 Bitumen (Asphalt) dengan Drum Kg 8,500.00 38,250.00 B346 0.3214 Kerosin / Minyak Tanah Industri Ltr 6,000.00 1,928.40 U01 0.0043 Mandor Lapangan OH 66,000.00 283.80 U30 0.0043 Operator - Trampil OH 49,500.00 212.85 U27 0.0021 Sopir - Trampil OH 44,000.00 92.40 U14 0.0043 Pekerja Terlatih OH 38,500.00 165.55 U16 0.1414 Pekerja / Pekerja Tak Terlatih OH 31,000.00 4,383.40 U43 0.0058 Alat Bantu Kerja Set 66,000.00 382.80

0.0107 Roller 3 Wheeled 8 - 10 T ( 51 HP ) (E.080) Jam 135,153.00 1,446.14 0.0107 Asp. Sprayer Towed ( 6 HP ) (E.154) Jam 29,563.00 316.32 0.0107 Dump Truck 3,5 T ( 106 HP ) (E.221) Jam 129,531.00 1,385.98

61,674.59 106 LAPIS PENETRASI MACADAM 3 CM (LAPEN) M2

(Menggunakan Buruh)B005 0.0221 Batu Pecah 2 - 3 Cm M3 154,000.00 3,403.40 B006 0.0111 Seplit Kasar Bersih M3 130,500.00 1,448.55 B009 0.0025 Seplit Halus M3 198,000.00 495.00 B341 3.1000 Bitumen (Asphalt) dengan Drum Kg 8,500.00 26,350.00 B346 0.1929 Kerosin / Minyak Tanah Industri Ltr 6,000.00 1,157.40 U01 0.0029 Mandor Lapangan OH 66,000.00 191.40 U30 0.0029 Operator - Trampil OH 49,500.00 143.55 U27 0.0014 Sopir - Trampil OH 44,000.00 61.60 U14 0.0029 Pekerja Terlatih OH 38,500.00 111.65 U16 0.0943 Pekerja / Pekerja Tak Terlatih OH 31,000.00 2,923.30 U43 0.0032 Alat Bantu Kerja Set 66,000.00 211.20

0.0071 Roller 3 Wheeled 8 - 10 T ( 51 HP ) (E.080) Jam 135,153.00 959.59 0.0043 Asp. Sprayer Towed ( 6 HP ) (E.154) Jam 29,563.00 127.12 0.0071 Dump Truck 3,5 T ( 106 HP ) (E.221) Jam 129,531.00 919.67

38,503.43 107 PENAMBALAN / PATCHING JALAN ASPAL M2

(Menggunakan Buruh)0.0200 Pasir Bersih M3 129,500.00 2,590.00

B341 3.4000 Bitumen (Asphalt) dengan Drum Kg 8,500.00 28,900.00 B346 0.3000 Kerosin / Minyak Tanah Industri Ltr 6,000.00 1,800.00 B005 0.1750 Batu Pecah 2 - 3 Cm M3 154,000.00 26,950.00 B008 0.1300 Seplit Kasar Bersih M3 130,500.00 16,965.00 U01 0.0300 Mandor Lapangan OH 66,000.00 1,980.00 U27 0.0300 Sopir - Trampil OH 44,000.00 1,320.00 U14 0.0600 Pekerja Terlatih OH 38,500.00 2,310.00 U16 0.2400 Pekerja / Pekerja Tak Terlatih OH 31,000.00 7,440.00 U43 0.0120 Alat Bantu Kerja Set 66,000.00 792.00

0.1200 Roller Vibrator Ped ( 7 HP ) (E.087) Jam 38,344.00 4,601.28 0.0900 Asp. Sprayer Towed ( 6 HP ) (E.154) Jam 29,563.00 2,660.67 0.1500 Dump Truck 3,5 T ( 106 HP ) (E.221) Jam 129,531.00 19,429.65

117,738.60 108 LAPIS PENETRASI MACADAM 5 CM (LAPEN) M2

U01 0.0185 Mandor Lapangan M3 66,000.00 1,221.00

Page 14: Analisa 2011

NO. URAIAN PEKERJAANHARGA

SATUAN SATUAN HARGARP. RP.

1 2 3 4 5U27 0.0556 Operator Terampil M3 49,500.00 2,752.20 U30 0.0185 Sopir - Terampil M3 44,000.00 814.00 U34 0.0185 Mekanik - Terampil Kg 38,500.00 712.25 U16 0.2037 Pekerja / Pekerja Tidak Terlatih Ltr 31,000.00 6,314.70 B004 0.0570 Batu Pecah 3/4 cm OH 187,000.00 10,659.00 B006 0.0200 Batu Pecah Mesin 1 - 2 cm OH 159,500.00 3,190.00 B007 0.0081 Agregat Penutup 0,5 - 1 cm OH 165,000.00 1,336.50

6.2500 Aspal Emulsi OH 8,000.00 50,000.00 B348 0.9259 Solar Industri OH 5,500.00 5,092.45 B350 0.0370 Pelumas Set 30,500.00 1,128.50 U43 1.0000 Suku Cadang / Alat Bantu Jam 66,000.00 66,000.00

149,220.60

- Dump Truck - Baby Roller - Air Compressor - Pavement Breaker - Alat Bantu : Skop, Gerobak dorong, Ceret Aspal - Rambu Kerja

109 LABURAN ASPAL DUA LAPIS (BURDA) M2U01 0.0017 Mandor Lapangan M3 66,000.00 112.20 U27 0.0067 Operator Terampil M3 49,500.00 331.65 U30 0.0033 Sopir - Terampil M3 44,000.00 145.20 U34 0.0017 Mekanik - Terampil Kg 38,500.00 65.45 U16 0.0333 Pekerja / Pekerja Tidak Terlatih Ltr 31,000.00 1,032.30 B008 0.0253 Split Kasar OH 130,500.00 3,301.65 B009 0.0037 Split Halus OH 198,000.00 732.60

1.4700 Aspal Emulsi OH 8,000.00 11,760.00 B348 0.6500 Solar Industri OH 5,500.00 3,575.00 B350 0.0267 Pelumas OH 30,500.00 814.35 U43 1.0000 Suku Cadang / Alat Bantu Jam 66,000.00 66,000.00

87,870.40

- Dump Truck - Baby Roller - Air Compressor - Aspal Emulsion Sprayer - Alat Bantu : Skop, Garu - Rambu Kerja

110 LABURAN ASPAL SATU LAPIS (BURTU) M2U01 0.0008 Mandor Lapangan M3 66,000.00 52.80 U27 0.0033 Operator Terampil M3 49,500.00 163.35 U30 0.0017 Sopir - Terampil M3 44,000.00 74.80 U34 0.0008 Mekanik - Terampil Kg 38,500.00 30.80 U16 0.0167 Pekerja / Pekerja Tidak Terlatih Ltr 31,000.00 517.70 B008 0.0180 Split Kasar OH 130,500.00 2,349.00 B007 0.0000 Agregat Penutup 0,5 - 1 cm OH 165,000.00 -

0.8400 Aspal Emulsi OH 8,000.00 6,720.00 B348 0.4042 Solar Industri OH 5,500.00 2,223.10 B350 0.0167 Pelumas OH 30,500.00 509.35 U43 1.0000 Suku Cadang / Alat Bantu Jam 66,000.00 66,000.00

78,640.90

- Dump Truck - Baby Roller - Air Compressor - Aspal Emulsion Sprayer - Alat Bantu : Skop, Garu - Rambu Kerja

111 LABURAN ASPAL (BURAS) M2U01 0.0011 Mandor Lapangan M3 66,000.00 72.60 U27 0.0033 Operator Terampil M3 49,500.00 163.35 U30 0.0011 Sopir - Terampil M3 44,000.00 48.40 U34 0.0011 Mekanik - Terampil Kg 38,500.00 42.35 U16 0.0156 Pekerja / Pekerja Tidak Terlatih Ltr 31,000.00 483.60 B009 0.0050 Split Halus OH 198,000.00 990.00

1.2900 Aspal Emulsi OH 8,000.00 10,320.00 B348 0.0667 Solar Industri OH 5,500.00 366.85 B350 0.0033 Pelumas OH 30,500.00 100.65 U43 1.0000 Suku Cadang / Alat Bantu Jam 66,000.00 66,000.00

78,587.80

- Dump Truck - Baby Roller - Air Compressor - Aspal Emulsion Sprayer - Alat Bantu : Skop, Garu

Peralatan yang dibutuhkan

Peralatan yang dibutuhkan

Peralatan yang dibutuhkan

Peralatan yang dibutuhkan

Page 15: Analisa 2011

NO. URAIAN PEKERJAANHARGA

SATUAN SATUAN HARGARP. RP.

1 2 3 4 5 - Rambu Kerja

112 PENAMBALAN LOBANG ( PATCHING ) M2U01 0.0167 Mandor Lapangan M3 66,000.00 1,102.20 U27 0.0333 Operator Terampil M3 49,500.00 1,648.35 U30 0.0167 Sopir - Terampil M3 44,000.00 734.80 U34 0.0167 Mekanik - Terampil Kg 38,500.00 642.95 U16 0.2333 Pekerja / Pekerja Tidak Terlatih Ltr 31,000.00 7,232.30 B004 0.0600 Batu Pecah 3/4 cm OH 187,000.00 11,220.00 B006 0.0120 Batu Pecah Mesin 1 - 2 cm OH 159,500.00 1,914.00 B009 0.0120 Split Halus OH 198,000.00 2,376.00

5.2500 Aspal Emulsi OH 8,000.00 42,000.00 B348 0.8333 Solar Industri OH 5,500.00 4,583.15 B350 0.0333 Pelumas OH 30,500.00 1,015.65 U43 1.0000 Suku Cadang / Alat Bantu Jam 66,000.00 66,000.00

140,469.40

- Dump Truck - Vibrator Plate Tamper - Air Compressor - Pavement Breaker - Alat Bantu : Skop, Garu - Rambu Kerja

113 PERAWATAN DAMIJA (DILUAR DAMAJA) M2U01 0.0010 Mandor Lapangan M3 66,000.00 66.00 U27 0.0010 Operator Terampil M3 49,500.00 49.50 U30 0.0070 Pekerja / Pekerja Tidak Terlatih M3 31,000.00 217.00 B349 0.0050 Premium OH 4,500.00 22.50

355.00

- Grease Cutter - Alat Bantu : Cangkul, Sekop dan Parang

114 MARKA JALAN (Menggunakan Buruh ) M24.5000 Cat Marka Thermoplastic Kg 16,500.00 74,250.00 1.0000 Glass Beads Kg 17,000.00 17,000.00 0.1800 Gas Elpiji Kg 5,500.00 990.00 0.0050 Mandor Lapangan OH 66,000.00 330.00 0.0050 Sopir - Trampil OH 44,000.00 220.00 0.0150 Pekerja Terlatih OH 38,500.00 577.50 0.0350 Pekerja / Pekerja Tak Terlatih OH 31,000.00 1,085.00 0.0050 Alat Bantu Kerja Set 66,000.00 330.00 0.0350 Mesin Cat Marka Jam 30,800.00 1,078.00 0.0250 Flat Bed Truck 4,0 T ( 80 HP ) (E.211) Jam 110,128.00 2,753.20

98,613.70

F PEKERJAAN KAYU KUSEN, KUDA-KUDA, KAP / ATAP DAN PLAFOND

115 PASANG KUSEN PINTU / JENDELA KAMPER 1 M3B095 1.200 Kayu Kamper Balok M3 6,600,000.00 7,920,000.00 U10 18.000 Tukang Kayu OH 55,000.00 990,000.00 U04 2.000 Kepala Tukang Kayu OH 60,000.00 120,000.00 U16 6.000 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 186,000.00 U01 0.300 Mandor Lapangan OH 66,000.00 19,800.00

9,235,800.00 116 PASANG KUSEN PINTU / JENDELA KAYU JATI 1 M3

B091 1.100 Kayu Jati Balok Bojonogoro M3 49,500,000.00 54,450,000.00 U10 20.000 Tukang Kayu OH 55,000.00 1,100,000.00 U04 2.000 Kepala Tukang Kayu OH 60,000.00 120,000.00 U16 6.000 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 186,000.00 U01 0.300 Mandor Lapangan OH 66,000.00 19,800.00

55,875,800.00 117 PASANG PINTU PANEL KAYU KAMPER 1 M2

B094 0.040 Kayu Kamper Papan M3 7,150,000.00 286,000.00 U10 2.500 Tukang Kayu OH 55,000.00 137,500.00 U04 0.250 Kepala Tukang Kayu OH 60,000.00 15,000.00 U16 1.000 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 31,000.00 U01 0.050 Mandor Lapangan OH 66,000.00 3,300.00

472,800.00 118 PASANG PINTU PANEL KAYU JATI 1 M2

B090 0.040 Kayu Jati Papan Bojonogoro M3 60,500,000.00 2,420,000.00 U10 2.500 Tukang Kayu OH 55,000.00 137,500.00 U04 0.250 Kepala Tukang Kayu OH 60,000.00 15,000.00 U16 1.000 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 31,000.00 U01 0.050 Mandor Lapangan OH 66,000.00 3,300.00

2,606,800.00 119 PASANG PINTU / JENDELA KACA KAYU KAMPER 1 M2

B077 0.800 Kaca 5 mm Bening M2 83,000.00 66,400.00 B094 0.035 Kayu Kamper Papan M3 7,150,000.00 250,250.00

Peralatan yang dibutuhkan

Peralatan yang dibutuhkan

Page 16: Analisa 2011

NO. URAIAN PEKERJAANHARGA

SATUAN SATUAN HARGARP. RP.

1 2 3 4 5U10 2.000 Tukang Kayu OH 55,000.00 110,000.00 U04 0.200 Kepala Tukang Kayu OH 60,000.00 12,000.00 U16 0.800 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 24,800.00 U01 0.040 Mandor Lapangan OH 66,000.00 2,640.00

466,090.00 120 PASANG PINTU PLAYWOOD RANGKAP, RANGKA KAYU 1 M2

KAMPER B094 0.0196 Kayu Kamper Papan M3 7,150,000.00 140,140.00 B172 0.030 Paku Kg 16,500.00 495.00 B116 0.300 Lem Kayu Ltr 36,300.00 10,890.00 B182 1.000 Playwood 3 mm Lbr 46,500.00 46,500.00 U10 2.000 Tukang Kayu OH 55,000.00 110,000.00 U04 0.200 Kepala Tukang Kayu OH 60,000.00 12,000.00 U16 0.600 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 18,600.00 U01 0.030 Mandor Lapangan OH 66,000.00 1,980.00

340,605.00 121 PASANG PINTU TEAKWOOD RANGKAP, RANGKA KAYU 1 M2

KAMPER B094 0.0196 Kayu Kamper Papan M3 7,150,000.00 140,140.00 B116 0.300 Lem Kayu Ltr 36,300.00 10,890.00 B172 0.030 Paku 1/2" - 1" Kg 16,500.00 495.00 B186 1.000 Teakwood Lbr 86,500.00 86,500.00 U10 2.000 Tukang Kayu OH 55,000.00 110,000.00 U04 0.200 Kepala Tukang Kayu OH 60,000.00 12,000.00 U16 0.600 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 18,600.00 U01 0.030 Mandor Lapangan OH 66,000.00 1,980.00

380,605.00

122 PASANG KONSTRUKSI KUDA - KUDA KAYU KAMPER 1 M3B095 1.100 Kayu Kamper Balok M3 6,600,000.00 7,260,000.00 B178 15.000 Besi Strip Kg 9,350.00 140,250.00 B172 0.800 Paku 1/2" - 1" Kg 16,500.00 13,200.00 U10 12.000 Tukang Kayu OH 55,000.00 660,000.00 U04 1.200 Kepala Tukang Kayu OH 60,000.00 72,000.00 U16 4.000 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 124,000.00 U01 0.200 Mandor Lapangan OH 66,000.00 13,200.00

8,282,650.00

123 PASANG KONSTRUKSI KUDA - KUDA KAYU KRUING 1 M3B099 1.100 Kayu Kruing Balok M3 4,950,000.00 5,445,000.00 B178 15.000 Besi Strip Kg 9,350.00 140,250.00 B172 0.800 Paku Usuk Kg 16,500.00 13,200.00 U10 12.000 Tukang Kayu OH 55,000.00 660,000.00 U04 1.200 Kepala Tukang Kayu OH 60,000.00 72,000.00 U16 4.000 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 124,000.00 U01 0.200 Mandor Lapangan OH 66,000.00 13,200.00

6,467,650.00 124 PASANG USUK + RENG GENTENG KODOK KAYU KAMPER 1 M2

B095 0.012 Kayu Usuk Kamper M3 7,040,000.00 84,480.00 B172 0.150 Paku 2" - 5" Kg 16,500.00 2,475.00 U10 0.100 Tukang Kayu OH 55,000.00 5,500.00 U04 0.010 Kepala Tukang Kayu OH 60,000.00 600.00 U16 0.100 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 3,100.00 U01 0.005 Mandor Lapangan OH 66,000.00 330.00

96,485.00 125 PASANG LISTPLANK ( 3 X 20 ) CM KAYU KAMPER 1 M'

B094 0.0072 Kayu Kamper Papan M3 7,150,000.00 51,480.00 B172 0.050 Paku Usuk Kg 16,500.00 825.00 U10 0.200 Tukang Kayu OH 55,000.00 11,000.00 U04 0.020 Kepala Tukang Kayu OH 60,000.00 1,200.00 U16 0.100 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 3,100.00 U01 0.005 Mandor Lapangan OH 66,000.00 330.00

67,935.00 UNTUK 1 M2 PASANG LISPLANK KAYU KAMPER 339,675.00

126 PASANG LISTPLANK 2 X ( 2 X 20 ) CM KAYU KAMPER 1 M'B094 0.0086 Kayu Kamper Papan M3 7,150,000.00 61,490.00 B172 0.060 Paku Usuk Kg 16,500.00 990.00 U10 0.100 Tukang Kayu OH 55,000.00 5,500.00 U04 0.010 Kepala Tukang Kayu OH 60,000.00 600.00 U16 0.100 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 3,100.00 U01 0.050 Mandor Lapangan OH 66,000.00 3,300.00

74,980.00 UNTUK 1 M2 PASANG LISPLANK KAYU KAMPER 374,900.00

127 PASANG DINDING PEMISAH PLAYWOOD RANGKAP, 1 M2 RANGKA KAMPER

B095 0.0195 Kayu Kamper Balok M3 6,600,000.00 128,700.00 B094 0.007 Kayu Kamper Papan M3 7,150,000.00 50,050.00 B172 0.100 Paku 2" - 5" Kg 16,500.00 1,650.00 B116 0.560 Lem Kayu Ltr 36,300.00 20,328.00 B182 1.000 Playwood 3 mm Lbr 46,500.00 46,500.00

Page 17: Analisa 2011

NO. URAIAN PEKERJAANHARGA

SATUAN SATUAN HARGARP. RP.

1 2 3 4 5U10 0.600 Tukang Kayu OH 55,000.00 33,000.00 U04 0.060 Kepala Tukang Kayu OH 60,000.00 3,600.00 U16 0.200 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 6,200.00 U01 0.010 Mandor Lapangan OH 66,000.00 660.00

290,688.00

128 PASANG DINDING PEMISAH TEAKWOOD RANGKAP, 1 M2 RANGKA KAMPER

B095 0.0195 Kayu Kamper Balok M3 6,600,000.00 128,700.00 B094 0.007 Kayu Kamper Papan M3 7,150,000.00 50,050.00 B172 0.100 Paku 2" - 5" Kg 16,500.00 1,650.00 B116 0.560 Lem Kayu Ltr 36,300.00 20,328.00 B185 1.000 Teakwood ( 1,20 x 2,40) m2 3 mm Lbr 82,500.00 82,500.00 U10 0.450 Tukang Kayu OH 55,000.00 24,750.00 U04 0.045 Kepala Tukang Kayu OH 60,000.00 2,700.00 U16 0.150 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 4,650.00 U01 0.075 Mandor Lapangan OH 66,000.00 4,950.00

320,278.00 129 PASANG DINDING PLAYWOOD 4 MM 1 M2

B172 0.050 Paku 1/2" - 1" Kg 16,500.00 825.00 B183 0.400 Playwood 4 mm Lbr 62,500.00 25,000.00 U10 0.075 Tukang Kayu OH 55,000.00 4,125.00 U04 0.0075 Kepala Tukang Kayu OH 60,000.00 450.00 U16 0.025 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 775.00 U01 0.0013 Mandor Lapangan OH 66,000.00 85.80

31,260.80 130 PASANG ATAP GENTENG PLENTONG KECIL 1 M2

B044 25.000 Genteng Plentong Bj 1,650.00 41,250.00 U10 0.075 Tukang Kayu OH 55,000.00 4,125.00 U04 0.008 Kepala Tukang Kayu OH 60,000.00 480.00 U16 0.150 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 4,650.00 U01 0.008 Mandor Lapangan OH 66,000.00 528.00

51,033.00 131 PASANG ATAP GENTENG BUBUNGAN PLENTONG 1 M'

B053 5.000 Bubungan Plentong Jatiwangi Bj 10,500.00 52,500.00 B037 8.000 Semen Kg 1,150.00 9,200.00 B011 0.032 Pasir Pasang M3 129,500.00 4,144.00 U10 0.200 Tukang Kayu OH 55,000.00 11,000.00 U04 0.020 Kepala Tukang Kayu OH 60,000.00 1,200.00 U16 0.400 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 12,400.00 U01 0.002 Mandor Lapangan OH 66,000.00 132.00

90,576.00

132 PLAFOND ASBES / ETERNIT, RANGKA KAYU KRUING 1 M2B100 0.012 Kayu Usuk Kruing M3 4,620,000.00 55,440.00 B196 1.100 Asbes / Eternit Lbr 27,000.00 29,700.00 B172 0.060 Paku Usuk Kg 16,500.00 990.00 U10 0.320 Tukang Kayu OH 55,000.00 17,600.00 U04 0.032 Kepala Tukang Kayu OH 60,000.00 1,920.00 U16 0.180 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 5,580.00 U01 0.077 Mandor Lapangan OH 66,000.00 5,049.00

116,279.00 133 PLAFOND PLAYWOOD, RANGKA KAYU KRUING 1 M2

b100 0.023 Kayu Usuk Kruing M3 4,620,000.00 106,260.00 b172 0.060 Paku Usuk Kg 16,500.00 990.00 b182 0.390 Playwood 3 mm Lbr 46,500.00 18,135.00 U10 0.400 Tukang Kayu OH 55,000.00 22,000.00 U04 0.040 Kepala Tukang Kayu OH 60,000.00 2,400.00 U16 0.270 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 8,370.00 U01 0.0135 Mandor Lapangan OH 66,000.00 891.00

159,046.00 134 PLAFOND KALSIBOARD / GYPSUM, RANGKA KAYU 1 M2

b197 0.364 Gypsum Board / Kalsiboard Lbr 62,500.00 22,750.00 b100 0.023 Kayu Usuk Kruing M3 4,620,000.00 106,260.00 b172 0.260 Paku Usuk Kg 16,500.00 4,290.00 U10 0.350 Tukang Kayu OH 55,000.00 19,250.00 U04 0.035 Kepala Tukang Kayu OH 60,000.00 2,100.00 U16 0.300 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 9,300.00 U01 0.0150 Mandor Lapangan OH 66,000.00 990.00

164,940.00 135 PEKERJAAN ATAP SIRAP 1 M2

b057 60.000 Sirap Lbr 3,850.00 231,000.00 b174 0.200 Paku 1/2" - 1" Kg 16,500.00 3,300.00 U10 0.250 Tukang Kayu OH 55,000.00 13,750.00 U04 0.025 Kepala Tukang Kayu OH 60,000.00 1,500.00 U16 0.166 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 5,146.00 U01 0.008 Mandor Lapangan OH 66,000.00 528.00

255,224.00 136 PEKERJAAN ATAP ASBES GELOMBANG 1 M2

b067 0.750 Asbes Gelombang ( 1,80 X 0,80) m2 lbr 27,500.00 20,625.00 b173 0.120 Paku Seng kg 16,500.00 1,980.00 u10 0.070 Tukang Kayu OH 55,000.00 3,850.00 u04 0.007 Kepala Tukang Kayu OH 60,000.00 420.00 u16 0.140 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 4,340.00

Page 18: Analisa 2011

NO. URAIAN PEKERJAANHARGA

SATUAN SATUAN HARGARP. RP.

1 2 3 4 5u01 0.007 Mandor Lapangan OH 66,000.00 462.00

31,677.00 137 PEKERJAAN ATAP SENG GELOMBANG 1 M2

b058 0.700 Seng BJLS 0,18 gelombang lbr 49,500.00 34,650.00 b173 0.020 Paku Seng kg 16,500.00 330.00 u10 0.060 Tukang Kayu OH 55,000.00 3,300.00 u04 0.006 Kepala Tukang Kayu OH 60,000.00 360.00 u16 0.120 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 3,720.00 u01 0.006 Mandor Lapangan OH 66,000.00 396.00

42,756.00 138 PEKERJAAN ALUMINIUM FOIL 1 M2

b063 1.050 Aluminium Foil ( 1,25 x 60,00 ) m2 M2 346,500.00 363,825.00 u10 0.050 Tukang Kayu OH 55,000.00 2,750.00 u04 0.005 Kepala Tukang Kayu OH 60,000.00 300.00 u16 0.150 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 4,650.00 u01 0.008 Mandor Lapangan OH 66,000.00 528.00

372,053.00 139 PEKERJAAN BUBUNGAN STEL GELOMBANG 1 M'

b068 2.400 Asbes Bubungan Bj 27,500.00 66,000.00 b173 6.000 Paku Seng Kg 16,500.00 99,000.00 u10 0.125 Tukang Kayu OH 55,000.00 6,875.00 u04 0.013 Kepala Tukang Kayu OH 60,000.00 780.00 u16 0.084 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 2,604.00 u01 0.004 Mandor Lapangan OH 66,000.00 264.00

175,523.00 140 PEKERJAAN ATAP ALANG - ALANG 1 M2

b072 6.500 Ikatan Alang -alang panjang 3 m M1 11,000.00 71,500.00 b392 0.500 Tali Pengikat Kg 22,000.00 11,000.00 u16 0.100 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 3,100.00 u01 0.0050 Mandor Lapangan OH 66,000.00 330.00

85,930.00 141 PEKERJAAN PASANG MURDA/BENTALA IKUT CELEDU 1 BH

b032 1.000 Murda / Puntal Paras Bh 176,000.00 176,000.00 b037 0.520 Semen Kg 1,150.00 598.00 u16 0.100 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 3,100.00 u01 0.0050 Mandor Lapangan OH 66,000.00 330.00

180,028.00

142 PEKERJAAN TALANG PATAHAN ATAP 1 M'b061 0.500 Seng Plat Lbr 30,000.00 15,000.00 b172 0.015 Paku Kg 16,500.00 247.50 b094 0.019 Kayu Kruing Papan M3 5,720,000.00 108,680.00 u10 0.400 Tukang Kayu OH 55,000.00 22,000.00 u04 0.025 Kepala Tukang Kayu OH 60,000.00 1,500.00 u16 0.040 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 1,240.00 u01 0.0013 Mandor Lapangan OH 66,000.00 82.50

148,750.00

143 PASANGAN LIST PLAFOND 1 M'b117 1.050 List Kayu Profil M' 22,000.00 23,100.00 b172 0.010 Paku Usuk Kg 16,500.00 165.00 u10 0.021 Tukang Kayu OH 55,000.00 1,155.00 u04 0.002 Kepala Tukang Kayu OH 60,000.00 120.00 u16 0.021 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 651.00 u01 0.0010 Mandor Lapangan OH 66,000.00 66.00

25,257.00 144 PASANGAN KREPYAK JARO 1 M2

b094 0.0225 Kayu Kamper Papan M3 7,150,000.00 160,875.00 u10 2.250 Tukang Kayu OH 55,000.00 123,750.00 u04 0.225 Kepala Tukang Kayu OH 60,000.00 13,500.00 u16 0.750 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 23,250.00 u01 0.0375 Mandor Lapangan OH 66,000.00 2,475.00

323,850.00 145 PASANG PINTU PINTU PLAYWOOD + ALUMINIUM 1 M2

b094 0.015 Kayu Kamper Papan M3 7,150,000.00 107,250.00 b182 0.390 Playwood 3 mm Lbr 46,500.00 18,135.00 b193 0.390 Playwood aluminium Lbr 176,000.00 68,640.00 b234 0.125 Lem Aica Aibon Kg 47,500.00 5,937.50 b174 0.100 Paku List Kg 16,500.00 1,650.00 u10 3.000 Tukang Kayu OH 55,000.00 165,000.00 u04 0.300 Kepala Tukang Kayu OH 60,000.00 18,000.00 u16 1.250 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 38,750.00 u01 0.063 Mandor Lapangan OH 66,000.00 4,158.00

427,520.50

G PEKERJAAN SANITAIR DAN BESI 146 MEMASANG 1 BUAH KLOSET DUDUK / MONOBLOK 1 BH

1.060 Kloset Duduk+Perlengkapan Bh 990,000.00 1,049,400.00 u08 1.100 Tukang Batu OH 49,500.00 54,450.00 u03 0.001 Kepala Tukang Batu OH 60,000.00 60.00 u16 3.300 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 102,300.00 u01 0.160 Mandor Lapangan OH 66,000.00 10,560.00

1,216,770.00 147 MEMASANG 1 BUAH KLOSET JONGKOK PORSELIN 1 BH

b300 1.000 Kloset Jongkok Porselin Bh 192,500.00 192,500.00 B037 6.000 Semen Kg 1,150.00 6,900.00

Page 19: Analisa 2011

NO. URAIAN PEKERJAANHARGA

SATUAN SATUAN HARGARP. RP.

1 2 3 4 5B011 0.010 Pasir Pasang M3 129,500.00 1,295.00 U08 1.500 Tukang Batu OH 49,500.00 74,250.00 U03 1.500 Kepala Tukang Batu OH 60,000.00 90,000.00 U16 1.000 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 31,000.00 U01 0.160 Mandor Lapangan OH 66,000.00 10,560.00

406,505.00

148 MEMASANG 1 BUAH URINOIR 1 BHb304 1.300 Urinoir+Perlengkapannya Bh 2,090,000.00 2,717,000.00 b037 6.000 Semen Kg 1,150.00 6,900.00 B011 0.010 Pasir Pasang M3 129,500.00 1,295.00 U08 1.000 Tukang Batu OH 49,500.00 49,500.00 U03 0.100 Kepala Tukang Batu OH 60,000.00 6,000.00 U16 1.000 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 31,000.00 U01 0.100 Mandor Lapangan OH 66,000.00 6,600.00

2,818,295.00

149 MEMASANG 1 BUAH WASTAFEL 1 BHb308 1.120 Wastafel + perlengkapannya Bh 825,000.00 924,000.00 b041 6.000 Semen Kg 1,150.00 6,900.00 B011 0.010 Pasir Pasang M3 129,500.00 1,295.00 U08 1.450 Tukang Batu OH 49,500.00 71,775.00 U03 0.150 Kepala Tukang Batu OH 60,000.00 9,000.00 U16 1.200 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 37,200.00 U01 0.100 Mandor Lapangan OH 66,000.00 6,600.00

1,056,770.00 150 PASANG UBIN PC WARNA 20 X 20 CM 1 M2

B151 26.500 Ubin PC Warna Bj 2,200.00 58,300.00 B037 8.760 Semen Kg 1,150.00 10,074.00 B011 0.023 Pasir Pasang M3 129,500.00 2,978.50 B041 0.900 Semen Warna Kg 13,000.00 11,700.00 U08 0.130 Tukang Batu OH 49,500.00 6,435.00 U03 0.013 Kepala Tukang Batu OH 60,000.00 780.00 U16 0.270 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 8,370.00 U01 0.01350 Mandor Lapangan OH 66,000.00 891.00

99,528.50 151 MEMASANG LANTAI KERAMIK 1 M2

b140 1.000 Keramik KIA 30/30 cm warna tua M2 51,000.00 51,000.00 b037 11.380 Semen Kg 1,150.00 13,087.00 B041 1.500 Semen Warna Kg 13,000.00 19,500.00 B011 0.042 Pasir Pasang M3 129,500.00 5,439.00 U08 0.350 Tukang Batu OH 49,500.00 17,325.00 U03 0.035 Kepala Tukang Batu OH 60,000.00 2,100.00 U16 0.620 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 19,220.00 U01 0.0300 Mandor Lapangan OH 66,000.00 1,980.00

129,651.00

152 MEMASANG PLINT KERAMIK 10 X 20 CM 1 M2B129 5.000 Keramik IKAD 10/20 cm ( DK warna muda) M1 61,000.00 305,000.00 b037 1.650 Semen Kg 1,150.00 1,897.50 B041 0.100 Semen Warna Kg 13,000.00 1,300.00 B011 0.0032 Pasir Pasang M3 129,500.00 414.40 U08 0.090 Tukang Batu OH 49,500.00 4,455.00 U03 0.009 Kepala Tukang Batu OH 60,000.00 540.00 U16 0.090 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 2,790.00 U01 0.0045 Mandor Lapangan OH 66,000.00 297.00

316,693.90 153 MEMASANG DINDING KERAMIK 5 X 20 CM 1 M2

b129 1.000 Keramik IKAD 10/20 cm ( DK warna muda) M2 61,000.00 61,000.00 b037 9.300 Semen Kg 1,150.00 10,695.00 B041 1.500 Semen Warna Kg 13,000.00 19,500.00 B011 0.018 Pasir Pasang M3 129,500.00 2,331.00 U08 0.450 Tukang Batu OH 49,500.00 22,275.00 U03 0.045 Kepala Tukang Batu OH 60,000.00 2,700.00 U16 0.600 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 18,600.00 U01 0.0300 Mandor Lapangan OH 66,000.00 1,980.00

139,081.00 154 MEMASANG DINDING KERAMIK 20 X 20 CM 1 M2

b125 1.000 Keramik IKAD 20/20 cm (warna muda) M2 41,500.00 41,500.00 b037 9.300 Semen Kg 1,150.00 10,695.00 B041 1.500 Semen Warna Kg 13,000.00 19,500.00 B011 0.018 Pasir Pasang M3 129,500.00 2,331.00 U08 0.100 Tukang Batu OH 49,500.00 4,950.00 U03 0.045 Kepala Tukang Batu OH 60,000.00 2,700.00 U16 0.600 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 18,600.00 U01 0.0300 Mandor Lapangan OH 66,000.00 1,980.00

102,256.00

155 PASANG ROLLING DOOR 1 M2b258 1.000 Rolling Door M2 623,000.00 623,000.00 u09 1.500 Tukang Besi OH 55,000.00 82,500.00

Page 20: Analisa 2011

NO. URAIAN PEKERJAANHARGA

SATUAN SATUAN HARGARP. RP.

1 2 3 4 5u02 0.105 Kepala Tukang Besi OH 66,000.00 6,930.00 u16 1.050 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 32,550.00 u01 0.0052 Mandor Lapangan OH 66,000.00 343.20

745,323.20 PEKERJAAN KONSTRUKSI BAJA 1 KG

156 b164 1.100 Baja Kg 16,500.00 18,150.00 b202 0.080 Meni Besi Kg 27,500.00 2,200.00 u09 0.006 Tukang Besi OH 55,000.00 330.00 u02 0.006 Kepala Tukang Besi OH 66,000.00 396.00 u16 0.060 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 1,860.00 u01 0.0003 Mandor Lapangan OH 66,000.00 19.80

22,955.80

H PEKERJAAN CAT / FINISHING 157 PEKERJAAN PENGECATAN BIDANG KAYU LAMA 1 M2

b209 0.170 Cat Dasar Kg 33,000.00 5,610.00 b221 0.150 Plamur Kayu Kg 20,500.00 3,075.00 b206 0.170 Cat Emco Lux Biasa Bh 44,000.00 7,480.00 u11 0.075 Tukang Cat OH 49,500.00 3,712.50 u05 0.0075 Kepala Tukang Cat OH 60,000.00 450.00 u16 0.070 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 2,170.00 u01 0.0025 Mandor Lapangan OH 66,000.00 165.00

17,052.50 158 PEK. PENGECATAN BIDANG KAYU BARU 1 LAPIS PLAMIR 1 M2

1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP b204 0.200 Cat Menie Kg 31,000.00 6,200.00 b221 0.150 Plamur Kayu Kg 20,500.00 3,075.00 b209 0.170 Cat Dasar Kg 33,000.00 5,610.00 b206 0.260 Cat Emco Lux Biasa Kg 44,000.00 11,440.00 u11 0.009 Tukang Cat OH 49,500.00 445.50 u05 0.0060 Kepala Tukang Cat OH 60,000.00 360.00 u16 0.070 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 2,170.00 u01 0.0025 Mandor Lapangan OH 66,000.00 165.00

29,465.50 159 PELABURAN BIDANG KAYU DENGAN POLITUR 1 M2

b216 0.150 Politur Ltr 56,000.00 8,400.00 b214 0.320 Politur Jadi Ltr 27,500.00 8,800.00 b233 2.000 Amplas Lbr 3,800.00 7,600.00 u11 0.060 Tukang Cat OH 49,500.00 2,970.00 u05 0.016 Kepala Tukang Cat OH 60,000.00 960.00 u16 - Pekerja / Pekerja Tidak Terlatih OH 31,000.00 - u01 0.0025 Mandor Lapangan OH 66,000.00 165.00

28,895.00 160 PELABURAN BIDANG KAYU DENGAN VERNIS 1 M2

b215 0.150 Politur Vernis Ltr 37,000.00 5,550.00 B221 0.050 Plamur Kayu Ltr 20,500.00 1,025.00 b233 0.100 Amplas Lbr 3,800.00 380.00 b237 0.010 Kuas Bh 5,500.00 55.00 u11 0.160 Tukang Cat OH 49,500.00 7,920.00 u05 0.016 Kepala Tukang Cat OH 60,000.00 960.00 u16 0.160 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 4,960.00 u01 0.0025 Mandor Lapangan OH 66,000.00 165.00

21,015.00

161 PENGECATAN TEMBOK BARU (1 LAPIS PLAMIR, 1 LAPIS CAT 1 M2 DASAR, 2 LAPIS CAT PENUTUP

b222 0.100 Plamur Tembok Kg 11,000.00 1,100.00 b209 0.100 Cat Dasar Kg 33,000.00 3,300.00 b206 0.260 Cat Emco Lux Kg 44,000.00 11,440.00 u11 0.063 Tukang Cat OH 49,500.00 3,118.50 u05 0.0063 Kepala Tukang Cat OH 60,000.00 378.00 u16 0.020 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 620.00 u01 0.0025 Mandor Lapangan OH 66,000.00 165.00

20,121.50 162 PENGECATAN TEMBOK LAMA (1 LAPIS CAT DASAR, 1 M2

2 LAPIS CAT PENUTUP) b209 0.120 Cat Dasar Kg 33,000.00 3,960.00 b206 0.180 Cat Emco Lux Biasa Kg 44,000.00 7,920.00 u11 0.042 Tukang Cat OH 49,500.00 2,079.00 u05 0.0042 Kepala Tukang Cat OH 60,000.00 252.00 u16 0.028 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 868.00 u01 0.0025 Mandor Lapangan OH 66,000.00 165.00

15,244.00 163 PENGECATAN PERMUKAAN BAJA DENGAN MENI BESI 1 M2

b202 0.100 Cat Menie besi Kg 27,500.00 2,750.00 b237 0.010 Kuas Lbr 5,500.00 55.00 u11 0.200 Tukang Cat OH 49,500.00 9,900.00 u05 0.020 Kepala Tukang Cat OH 60,000.00 1,200.00 u16 0.020 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 620.00 u01 0.0100 Mandor Lapangan OH 66,000.00 660.00

15,185.00

I PEKERJAAN ENGSEL DAN KUNCI 164 PAS. ENGSEL UNTUK JENDELA 1 BH

Page 21: Analisa 2011

NO. URAIAN PEKERJAANHARGA

SATUAN SATUAN HARGARP. RP.

1 2 3 4 5b255 1.000 Engsel Kuningan (Nylon) Ps 31,500.00 31,500.00 u10 0.100 Tukang Kayu OH 55,000.00 5,500.00 u04 0.010 Kepala Tukang Kayu OH 60,000.00 600.00 u16 0.010 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 310.00 u01 0.00050 Mandor Lapangan OH 66,000.00 33.00

37,943.00 165 PAS. ENGSEL KUNINGAN UNTUK PINTU 1 BH

b254 1.000 Engsel Kuningan (Nylon) Ps 38,500.00 38,500.00 u10 0.150 Tukang Kayu OH 55,000.00 8,250.00 u04 0.015 Kepala Tukang Kayu OH 60,000.00 900.00 u16 0.015 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 465.00 u01 0.00075 Mandor Lapangan OH 66,000.00 49.50

48,164.50 166 PASANG GRENDEL TANAM 1 BH

b252 1.000 Grendel Tanam Bh 31,500.00 31,500.00 u10 0.340 Tukang Kayu OH 55,000.00 18,700.00 u16 0.100 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 3,100.00 u01 0.0005 Mandor Lapangan OH 66,000.00 33.00

53,333.00 167 PASANG KUNCI TANAM ANTIK 1 BH

b247 1.000 Kunci Tanam Besar Setara Yale Bh 192,500.00 192,500.00 u10 0.600 Tukang Kayu OH 55,000.00 33,000.00 u16 0.060 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 1,860.00 u04 0.060 Kepala Tukang Kayu OH 60,000.00 3,600.00 u01 0.003 Mandor Lapangan OH 66,000.00 198.00

231,158.00 168 PASANG KUNCI TANAM BIASA 1 BH

b240 1.000 Kunci Tanam Besar setara Kuda Bh 66,000.00 66,000.00 u10 0.500 Tukang Kayu OH 55,000.00 27,500.00 u16 0.010 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 310.00 u04 0.010 Kepala Tukang Kayu OH 60,000.00 600.00 u01 0.005 Mandor Lapangan OH 66,000.00 330.00

94,740.00 169 PASANG KAIT ANGIN 1 BH

b249 1.000 Kait Angin Bh 22,000.00 22,000.00 u10 0.150 Tukang Kayu OH 55,000.00 8,250.00 u16 0.015 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 465.00 u04 0.015 Kepala Tukang Kayu OH 60,000.00 900.00 u01 0.00075 Mandor Lapangan OH 66,000.00 49.50

31,664.50 170 PASANGAN PAVINGSTONE TEBAL 6 CM M2

u01 0.0250 Mandor Lapangan OH 66,000.00 1,650.00 u08 0.2500 Tukang Batu OH 49,500.00 12,375.00 u16 0.5000 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 15,500.00 b359 1.0000 Paving 20 x 20 cm tebal 6 Cm setara Orient M2 48,000.00 48,000.00

77,525.00

171 PASANGAN PAVINGSTONE TEBAL 8 CM M2u01 0.0250 Mandor Lapangan OH 66,000.00 1,650.00 u08 0.2500 Tukang Batu OH 49,500.00 12,375.00 u16 0.5000 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 15,500.00 b359 1.0000 Paving 20 x 20 cm tebal 8 Cm setara Orient M2 60,000.00 60,000.00

89,525.00

1 PLAFOND KALSIBOARD / GYPSUM, RANGKA KAYU 1 M2b197 0.364 Gypsum Board / Kalsiboard Lbr - - b100 0.023 Paving 20 x 20 cm tebal 8 Cm setara Orient M3 4,620,000.00 106,260.00 b172 0.260 Paku Usuk Kg 16,500.00 4,290.00 U10 0.350 Tukang Kayu OH 55,000.00 19,250.00 U04 0.035 Kepala Tukang Kayu OH 60,000.00 2,100.00 U16 0.300 Pekerja / Pekerja Tidak Terlatih OH 31,000.00 9,300.00 U01 0.0150 Mandor Lapangan OH 66,000.00 990.00

142,190.00

Page 22: Analisa 2011

DAFTAR HARGA BAHAN BANGUNAN TAHUN 2011DINAS PEKERJAAN UMUM KOTA DENPASAR

NO NAMA BAHAN SATUAN HARGA SATUAN KETERANGAN (RP)

1 2 3 4 5

BATU KALI1 B001 Batu Kali M3 126,500.00 2 B002 Batu Pecah Besar 15/25 cm M3 137,500.00 3 B003 Batu Pecah 5/7 cm M3 137,500.00 4 B004 Batu Pecah 3/4 cm M3 187,000.00 5 B005 Batu Pecah 2/3 cm M3 154,000.00 6 B006 Batu Pecah Mesin 1 - 2 cm M3 159,500.00 7 B007 Batu Pecah 0,5 - 1 M3 165,000.00 8 B008 Split kasar M3 130,500.00 9 B009 Split Halus M3 198,000.00

10 B010 Koral Beton / Kerikil M3 132,000.00 Koral Sikat Zak 44,000.00

11 B011 Pasir Pasang M3 129,500.00 12 B012 Pasir Beton M3 125,000.00 13 B013 Pasir Urug M3 110,000.00 14 B014 Sirtu M3 72,500.00 15 B015 Batu Karang Bukit M3 116,000.00 16 B016 Tanah Urug M3 82,500.00 17 B017 Limestone M3 110,000.00 18 B018 Bata Merah Klas I Bj 1,300.00 19 B019 Bata Merah Klas II Bj 1,100.00 20 B020 Bata Merah Klas III Bj 850.00 21 B021 Bata Merah Super ( Pripian ) Bj 2,300.00 22 B022 Paras Ukir Silakarang Klas I Tipis (3x15x40) Bj 118,500.00 23 B023 Paras Ukir Silakarang Klas I Tebal (4x15x40) Bh 137,500.00 24 B024 Paras Krobokan Bh 137,500.00 25 B025 Batako Lubang Bj 1,700.00 26 B026 Batako Padat Bj 1,850.00 27 B027 Bentala Exs Kapal Bj 55,400.00 28 B028 Ikut Celedu Bj 165,000.00 29 B029 Batu Tabas Eks Karangasem (3x15x40) Bj 17,000.00 30 B030 Karung Plastik Bh 5,500.00 31 B031 Batu Gosok Bh 5,500.00 32 B032 Murda / Puntal Paras Bh 176,000.00 33 B033 Filler Kg 1,350.00

B034 SEMEN34 B035 PC. Tiga Roda 50 Kg Zak 56,650.00 35 B036 PC. Tonasa 50 Kg / Busoa 50 Kg Zak 55,000.00 36 B037 PC. Gresik 40 Kg Zak 46,000.00 37 B038 PC. Gresik 50 Kg Zak 57,500.00 38 B039 PC Tiga Roda 40 Kg Zak 45,320.00 39 B040 PC Tonasa 40 Kg Zak 44,000.00 40 B041 Semen Warna Kg 13,000.00

B042 BAHAN ATAP41 B043 Genteng Pejaten Mini Bj 1,400.00 42 B044 Genteng Plentong Pejaten / Darmasaba Bj 1,650.00 43 B045 Genteng Bambe Kecil Bj 4,200.00 44 B046 Genteng Plentong Pejaten / Jatiwangi / Surabaya Bj 3,300.00 45 B047 Genteng Bambe Karang Pilang Bj 3,850.00 46 B048 Genteng Kodok Lokal Bj 2,200.00 47 B049 Genteng Kodok Karang Pilang (Surabaya) Bj 3,300.00 48 B050 Genteng Gerard Polos M2 187,500.00 49 B051 Bubungan Bambe Kecil Bj 4,400.00 50 B052 Bubungan Karang Pilang Bj 13,750.00 51 B053 Bubungan Plentong Jatiwangi Bj 10,500.00 52 B054 Bubungan Besar Bj 4,400.00 53 B055 Bubungan Kecil Bj 2,750.00 54 B056 Bubungan Gerad Lbr 49,500.00 55 B057 Sirap Lbr 3,850.00 56 B058 Seng BJLS 0,18 gelombang Lbr 49,500.00 57 B059 Seng BJLS 0,22 gelombang Lbr 57,000.00 58 B060 Seng BJLS 0,30 gelombang Lbr 68,000.00 59 B061 Seng Plat Lebar 0,90 M Lbr 30,000.00 60 B062 Seng Plat Aluminium Lbr 82,500.00 61 B063 Aluminium Foil ( 1,25 x 60,00 ) m2 Roll 346,500.00

Page 23: Analisa 2011

NO NAMA BAHAN SATUAN HARGA SATUAN KETERANGAN (RP)

1 2 3 4 5

62 B064 Asbes Gelombang ( 1,80 X 1,05) m2 Lbr 36,300.00 63 B065 Asbes Gelombang ( 2,10 X 1,05) m2 Lbr 58,300.00 64 B066 Asbes Gelombang ( 2,40 X 1,05) m2 Lbr 57,750.00 65 B067 Asbes Gelombang ( 1,80 X 0,80) m2 Lbr 27,500.00 66 B068 Asbes Bubungan Bj 27,500.00 67 B069 Fiberglas (1,80 X 0,80) m2 Lbr 38,500.00 68 B070 Ijuk Bersih Kg 3,850.00 69 B071 Ijuk Lampung Kg 2,750.00 70 B072 Ikatan Alang -alang panjang 3 m M1 11,000.00 71 B073 Tali Pengikat Ikat 11,000.00

B074 KACA 72 B075 Kaca 3 mm Bening M2 74,000.00 73 B076 Kaca 2 mm Bening M2 47,000.00 74 B077 Kaca 5 mm Bening M2 83,000.00 75 B078 Kaca es / kapur 3 mm M2 110,000.00 76 B079 Kaca es / kapur 5 mm M2 121,000.00 77 B080 Kaca rayben 3 mm M2 90,000.00 78 B081 Kaca rayben 5 mm M2 104,500.00 79 B082 Kaca Cermin 3m M2 127,500.00 80 B083 Kaca Cermin 5 mm M2 170,000.00 81 B084 Bingkai nako Silver Daun 19,500.00 82 B085 Bingkai nako Coklat Daun 16,500.00 83 B086 Kaca Nako Bening M2 79,000.00 84 B087 Kaca Nako rayben M2 97,500.00 85 B088 Glas Block Bh 22,000.00

B089 KAYU86 B090 Kayu Jati Papan Bojonogoro M3 60,500,000.00 87 B091 Kayu Jati Balok Bojonogoro M3 49,500,000.00 88 B092 Kayu Jati Usuk Bojonogoro M3 49,500,000.00 89 B093 Kayu Reng Jati Bojonogoro M3 49,500,000.00 90 B094 Kayu Kamper Papan M3 7,150,000.00 91 B095 Kayu Kamper Balok M3 6,600,000.00 92 B096 Kayu Usuk Kamper M3 7,040,000.00 93 B097 Kayu Reng Kamper M3 5,500,000.00 94 B098 Kayu Kruing Papan M3 5,720,000.00 95 B099 Kayu Kruing Balok M3 4,950,000.00 96 B100 Kayu Usuk Kruing M3 4,620,000.00 97 B101 Kayu Reng Kruing M3 4,510,000.00 98 B102 Kayu Papan Meranti M3 4,675,000.00 99 B103 Kayu Balok Meranti M3 4,400,000.00

100 B104 Kayu Usuk Meranti M3 4,125,000.00 101 B105 Kayu Reng Meranti M3 3,850,000.00 102 B106 Kayu Bangkirai Papan M3 8,580,000.00 103 B107 Kayu Bangkirai Balok M3 7,700,000.00 104 B108 Seseh Dolken Btg 99,000.00 105 B109 Seseh Balok M1 22,000.00 106 B109a Btg 88,000.00 106 B110 Kayu Bakar M3 451,000.00 107 B111 Papan Bakesting setarap Meranti M3 2,112,000.00 108 B112 Bambu Bt 7,700.00 109 B113 Gedeg Kulit Klas I M2 22,000.00 110 B114 Gedeg Kulit Klas II M2 19,250.00 111 B115 Minyak Begesting Ltr 22,000.00 112 B116 Lem Kayu Ltr 36,300.00 113 B117 List Kayu Profil M' 22,000.00

B118 LANTAI114 B119 Tegel PC abu - abu 20/20 cm M2 30,500.00 115 B120 Tegel PC Warna 20/20 cm M2 38,500.00 116 B121 Tegel PC Warna 20/20 cm M2 61,500.00 117 B122 Tegel PC Warna 30/30 cm M2 61,500.00 118 B123 Tegel Wafel 20/20 cm warna M2 52,500.00 119 B124 Tegel mozaik Porselint 30/30 cm M2 165,000.00 120 B125 Keramik IKAD 20/20 cm (warna muda) M2 41,500.00 121 B126 Keramik IKAD 20/20 cm (warna tua) M2 41,000.00 122 B127 Keramik IKAD 30/30 cm (warna putih) M2 41,000.00 123 B128 Keramik IKAD 30/30 cm (warna tua) M2 44,000.00

Dolken Kayu ø 8-10/4m

Page 24: Analisa 2011

NO NAMA BAHAN SATUAN HARGA SATUAN KETERANGAN (RP)

1 2 3 4 5

124 B129 Keramik IKAD 10/20 cm ( DK warna muda) M2 61,000.00 1,220.00 125 B130 Keramik IKAD 10/20 cm ( DK warna tua) M2 65,500.00 126 B131 Keramik DIAMOND 10/20 cm (warna muda) M2 52,000.00 127 B132 Keramik DIAMOND 20/20 cm ( klas I warna tua) M2 47,500.00 128 B133 Keramik DIAMOND 30/30 cm ( Klas I warna muda) M2 50,000.00 129 B134 Keramik DIAMOND 10/20 cm (warna tua) M2 65,500.00 130 B135 Keramik DIAMOND 20/20 cm ( Klas I warna tua) M2 48,500.00 131 B136 Keramik DIAMOND 30/30 cm ( Klas I warna tua) M2 50,000.00 132 B137 Keramik KIA 30/30 cm warna muda M2 46,500.00 133 B138 Keramik KIA 20/20 cm warna muda M2 45,000.00 134 B139 Keramik KIA 20/20 cm warna tua M2 46,000.00 135 B140 Keramik KIA 30/30 cm warna tua M2 51,000.00 136 B141 Keramik ROMAN 20/20 cm M2 33,000.00 137 B142 Keramik ROMAN 30/30 cm M2 43,500.00 138 B143 Keramik ASIA TILE 20/20 cm M2 44,000.00 139 B144 Keramik ASIA TILE 30/30 cm M2 44,500.00 140 B145 Keramik MULIA (warna putih) M2 34,000.00 141 B146 Keramik MULIA (warna tua) M2 36,500.00 142 B147 Keramik ARWANA ( warna putih) M2 46,000.00 143 B148 Keramik ARWANA ( warna tua) M2 44,500.00 144 B149 Batu Lahar 30/30 Bh 19,000.00 145 B150 Porselint 11/11 cm Bj 3,400.00 146 B151 Ubin PC Warna Bj 2,200.00

B152147 B153 Besi Beton U24 Kg 11,000.00 148 B154 Besi Beton Ulir U 32 Kg 12,000.00 149 B155 Besi Plat Kg 13,500.00 150 B156 Silicon Kg 40,000.00 151 B157 Kawat Beton Kg 13,000.00 152 B158 Kawat Nyamuk M2 14,500.00 153 B159 Kawat Harmonika 3 X 3 cm M2 18,000.00 154 B160 Kawat Ayak /Kuasa 5 X 5 cm M2 14,500.00 155 B161 Beugel penguat /plaat Kg 38,500.00 156 B162 Besi plat 3 X 6 tebal 1,2 mm Bt 117,000.00 157 B163 Besi plat 4 X 8 tebal 1,8 mm Bt 262,500.00 158 B164 Besi / Baja profil Kg 16,500.00 159 B165 Besi Baja WF 200 x 100 x 4,5 x 7 Kg 14,300.00 160 B166 Besi Baja WF 250 x 125 x 5 x 7 Kg 14,300.00 161 B167 Besi Baja C 100 x 50 x 3,2 Kg 14,300.00 162 B168 Besi Siku L 60 x 60 x 6 / L50 x 50 x 5 Kg 14,300.00 163 B169 Elektrode 0,6 % Bh 110,000.00 164 B170 Elektrode 2 % Bh 121,000.00 165 B171 Besi Pipa Galvanis Lonjor 660,000.00 166 B172 Paku Usuk Kg 16,500.00 167 B173 Paku Reng Kg 16,500.00 168 B174 Paku List Kg 16,500.00 169 B175 Paku Seng Ulir BH 550.00 170 B176 Paku Beton Dos 33,000.00 171 B177 Kawat Bronjong Kg 33,000.00 172 B178 Besi Strip Kg 9,350.00

B179173 B180 Enternit 1 x 1 m2 M2 15,000.00 174 B181 Acustik 30/30 cm M2 66,000.00 175 B182 Playwood 3 mm Lbr 46,500.00 176 B183 Playwood 4 mm Lbr 62,500.00 177 B184 Playwood 9 mm Lbr 105,000.00 178 B185 Teakwood ( 1,20 x 2,40) m2 3 mm Lbr 82,500.00 179 B186 Teakwood ( 1,20 x 2,40) m2 4 mm Lbr 86,500.00 180 B187 Teakwood ( 0,90 x 2,00 ) m2 Lbr 57,000.00 181 B188 Jabar Wood 4 mm Lbr 87,500.00 182 B189 Celling board Teak Lbr 78,500.00 183 B190 Formika Putih Lbr 165,000.00 184 B191 Formika Jati Lbr 167,000.00 185 B192 Formika Hitam Lbr 181,500.00 186 B193 Playwood aluminium Lbr 176,000.00 187 B194 Multiplek 9mm Lbr 168,000.00 188 B195 Kayu Acuan / Multiplek 6 mm Lbr 137,500.00 189 B196 Asbes / Eternit Lbr 27,000.00 190 B197 Gypsum Board / Kalsiboard Lbr 62,500.00

B198

BESI

JENIS TRIPLEK

Page 25: Analisa 2011

NO NAMA BAHAN SATUAN HARGA SATUAN KETERANGAN (RP)

1 2 3 4 5

B199 C A T191 B200 Cat Marka Jalan Kg 16,500.00 192 B201 Glas Bit Kg 17,000.00 193 B202 Cat Menie besi Kg 27,500.00 194 B203 Cat Menie Fako Kg 31,000.00 195 B204 Cat Menie Kg 31,000.00 196 B205 Cat Menie Altek Kg 31,000.00 197 B206 Cat Emco Lux Biasa Kg 44,000.00 198 B207 Cat Emco Lux Warna Kg 49,500.00 199 B208 Cat Emco Lux Warna Tua Kg 55,000.00 200 B209 Cat Dasar Kg 33,000.00 201 B210 Cat Galvanis Kg 48,000.00 202 B211 Tinner Spesial Ltr 30,500.00 203 B212 Dempul / Plamur Kg 22,000.00 204 B213 Dempul / Plamur Altik Kg 23,000.00 205 B214 Politur Jadi Kg 27,500.00 206 B215 Politur Vernis Ltr 37,000.00 207 B216 Politur Ltr 56,000.00 208 B217 Politur tua Ltr 62,500.00 209 B218 Teack Oil Ltr 49,500.00 210 B219 Wood Filer Ltr 23,000.00 211 B220 Sending Seaker Ltr 55,000.00 212 B221 Plamur Kayu Kg 20,500.00 213 B222 Plamur Tembok Kg 11,000.00 214 B223 Oker / Veap Kg 22,000.00 215 B224 Melamine lack Ltr 34,000.00 216 B225 Cat Tembok ( Vinilex) Kg 22,000.00 217 B226 Cat Tembok ( Docolit ) Kg 26,500.00 218 B227 Cat Tembok ( Paragon ) Kg 18,500.00 219 B228 Cat Tembok ( Vinipaint ) Kg 13,500.00 220 B229 Cat Tembok ( Bintang ) Kg 23,500.00 221 B230 Cat Tembok ( Sunlex ) Gln 247,500.00 222 B231 Residu / Teer Gln 42,300.00 223 B232 Minyak Cat Afduner Ltr 9,500.00 224 B233 Amplas Ltr 3,800.00 225 B234 Lem Aica Aibon Kg 47,500.00 226 B235 Lem Fox Gln 121,000.00 227 B236 Politur Ultran Kg 46,000.00 228 B237 Kuas Bh 5,500.00

B238 K U N C I229 B239 Kunci kuda 1 x putar Bh 55,000.00 230 B240 Kunci kuda 2 x putar Bh 66,000.00 231 B241 Kunci shang hae 2 x putar Bh 121,000.00 232 B242 Kunci lif 1 x putar Bh 93,500.00 233 B243 Kunci lif 2 x putar Bh 104,500.00 234 B244 Kunci alfa bundar 2 x putar Bh 110,000.00 235 B245 Kunci Union 1 x putar Bh 137,500.00 236 B246 Kunci Union 2 x putar Bh 148,500.00 237 B247 Kunci Yale 2 x putar Bh 192,500.00 238 B248 Kait angin lipat Bh 38,500.00 239 B249 Kait angin biasa Bh 22,000.00 240 B250 Kait angin tarik Bh 33,000.00 241 B251 Grendel Biasa Bh 13,200.00 242 B252 Grendel tanam Bh 31,500.00 243 B253 Engsel H Ps 16,500.00 244 B254 Engsel pintu nylon Ps 38,500.00 245 B255 Engsel jendela nylon Ps 31,500.00 246 B256 Espanolet Bh 66,000.00 247 B257 Rolling door plaat M2 81,500.00 248 B258 Rolling door aluminium M2 623,000.00

B259 K A B E L250 B260 Kabel NYM 2 x 1 1/2 mm M1 7,700.00 251 B261 Kabel NYM 2 x 2 1/2 mm M1 8,800.00 252 B262 Kabel NYM 3 x 2 1/2 mm M1 11,000.00 253 B263 Kabel NYM 2 x 1 1/2 mm warna hitam M1 7,700.00 254 B264 Kabel NYM 3 x 1 1/2 mm warna hitam M1 11,000.00 255 B265 Kabel NYM 3 x 2 1/2 mm warna hitam M1 13,200.00 256 B266 Kabel Twisteed 2 x 16 mm M' 68,200.00 257 B267 Kabel NYY 2 x 2,5 mm M' 11,200.00

Page 26: Analisa 2011

NO NAMA BAHAN SATUAN HARGA SATUAN KETERANGAN (RP)

1 2 3 4 5

258 B268 Presing Clem Bh 34,000.00 259 B269 Lampu pijar 10 watt Philips Bh 7,700.00 260 B270 Lampu pijar 25 watt Philips Bh 7,700.00 261 B271 Lampu pijar 40 watt Philips Bh 7,700.00 262 B272 Lampu pijar 60 watt Philips Bh 8,800.00 263 B273 TL 20 watt komplit ( Ballast Philips ) Bh 115,500.00 264 B274 TL 40 watt komplit ( Ballast Philips ) Bh 154,000.00 265 B275 SL 18 w komplit Bh 44,000.00 266 B276 Stop kontak Bh 30,500.00 267 B277 Stop kontak khusus ( kedap air ) Bh 41,500.00 268 B278 Saklar tunggal Bh 21,400.00 269 B279 Figting lampu pijar Bh 14,300.00 270 B280 Saklar ganda Bh 26,400.00 271 B281 Instalasi dalam gedung Titik 154,000.00 272 B282 Instansi listrik halaman Titik 346,500.00 273 B283 Panel MDP Unit 220,000.00 274 B284 Panel SDP Unit 275,000.00 275 B285 Lampu Markuri ( halaman ) Bh 374,000.00 276 B286 Lampu Son 70 Watt Bh 537,900.00 277 B287 Lampu Son 150 Watt Bh 148,500.00 278 B288 Lampu Mercury 125 Watt Bh 1,713,000.00 279 B289 Lampu Mercury 250 Watt Bh 3,264,000.00 280 B290 Lampu Mercury 400 Watt Bh 4,142,000.00 281 B291 Pegangan Kabel Pc 13,500.00 282 B292 Magnet Contactor 80 A Bh 880,000.00 283 B293 Time Switch Bh 686,000.00 284 B294 MCB 3 phase 63 A Bh 882,500.00 285 B295 MCB 3 phase 40 A Bh 449,500.00 286 B296 Box Panel (3 mm) Bh 825,000.00 287 B297 T Foring Bh 5,500.00

B298 KLOSET DAN WASTAFEL288 B299 Kloset porselin jongkok KIA ( putih ) Bh 192,500.00 289 B300 Kloset porselin jongkok KIA ( tua ) Bh 192,500.00 290 B301 Kloset porselin jongkok KIA ( warna ) Bh 203,500.00 291 B302 Kloset duduk putih Bh 880,000.00 292 B303 Kloset duduk warna Bh 990,000.00 293 B304 Urinoir KIA ( std) Bh 2,090,000.00 294 B305 Urinoir TOTO ( std) Bh 1,980,000.00 295 B306 Wastafel TOTO ( putih ) Bh 616,000.00 296 B307 Wastafel KIA ( putih ) Bh 495,000.00 297 B308 Wastafel TOTO ( warna ) Bh 825,000.00 298 B309 Wastafel KIA ( warna ) Bh 770,000.00 299 B310 Dudukan Kloset dan Perlengkapannya set 1,040,700.00

P I P A299 B311 Paralon maspion D 1/2" Lj 1,144,500.00 300 B312 Paralon PVC 1/2" Lj 21,000.00 301 B313 Paralon PVC 3/4" Lj 23,000.00 302 B314 Paralon PVC 1" Lj 28,000.00 303 B315 Paralon PVC 2" Lj 35,000.00 304 B316 Paralon PVC 3" Lj 66,000.00 305 B317 Paralon PVC 4" Lj 104,000.00 306 B318 Paralon Maspion AW 1/2" Lj 155,000.00 307 B319 Paralon Maspion AW 3/4" Lj 35,000.00 308 B320 Paralon Maspion AW 1" Lj 38,500.00 309 B321 Paralon Maspion AW 2" Lj 47,000.00 310 B322 Paralon Maspion AW 3" Lj 97,500.00 311 B323 Paralon Maspion AW 4" Lj 155,000.00 312 B324 Pipa Galvanis 1/2" BSA Lj 258,500.00 313 B325 Pipa Galvanis 1,25" BSA Lj 159,500.00 314 B326 Pipa Galvanis 1" BSA Lj 418,000.00 315 B327 Pipa Galvanis 1,5" BSA Lj 313,500.00 316 B328 Pipa Galvanis 2" BSA Lj 484,000.00 317 B329 Pipa Galvanis 3" BSA Lj 665,500.00 318 B330 Pipa Galvanis 4" BSA Lj 1,105,000.00 319 B331 Pipa / selang spiral sel kran M1 1,595,000.00 320 B332 Pipa Galvanis dia 1,5 M' 18,500.00 321 B333 Tiang Khusus 5,4,3,9 M Bh 49,000.00 322 B334 Tiang Khusus 12 M Bh 2,766,500.00 323 B335 Tiang Khusus 6 M Bh 3,798,500.00 324 B336 Tiang Galvanis 4 M Bh 1,779,500.00

Page 27: Analisa 2011

NO NAMA BAHAN SATUAN HARGA SATUAN KETERANGAN (RP)

1 2 3 4 5

B337 T A L A N G325 B338 Talang Karet L = 0,50 M1 11,000.00 326 B339 Talang Karet L = 0,90 M1 18,500.00

B340 ASPAL, BBM DAN PELUMAS327 B341 Aspal Penetrasi 60/70 Kg 8,500.00 328 B342 Aspal Curah Kg 7,500.00 329 B343 Aspal RC Ltr 7,500.00

Aspal Emulsi Ltr 8,000.00 330 B344 Minyak Aspal ( fluck oil ) Ltr 14,000.00 331 B345 Minyak Tanah Ltr 6,000.00 332 B346 Minyak Tanah Industri Ltr 6,000.00 333 B347 Solar Ltr 4,500.00 334 B348 Solar Industri Ltr 5,500.00 335 B349 Premium Ltr 4,500.00 336 B350 Pelumas ( olie ) Ltr 30,500.00 337 B351 Kayu Api M3 275,000.00 338 B352 Gas elpiji Kg 6,500.00 339

B354 LAIN - LAIN340 B355 Kansteen Bh 50,500.00 341 B356 Kansteen Pendek Bh 40,000.00 342 B357 Paving stone tebal 8 cm warna 10/20 Orient M2 64,000.00 343 B358 Paving stone tebal 8 cm polos 10/20 Orient M2 60,000.00 344 B359 Paving stone tebal 8 cm polos 20/20 Orient M2 60,000.00 345 B360 Paving stone tebal 8 cm warna 20/20 Orient M2 64,000.00 346 B361 Paving stone tebal 6 cm warna 10/20 Orient M2 54,500.00 347 B362 Paving stone tebal 6 cm polos 10/20 Orient M2 51,000.00 348 B363 Paving stone tebal 6 cm warna 20/20 Orient M2 54,000.00 349 B364 Paving stone tebal 6 cm polos 20/20 Orient M2 48,000.00

Tegel 30 x 30 TB PC M2 50,000.00 Tegel 30 x 30 TB PC Kuning M2 88,000.00 Tegel 30 x 30 Warna Merah M2 69,000.00 Tegel 20 x 20 TB Merah M2 50,000.00 Tegel 20 x 20 TB PC M2 37,500.00 Tegel Bata 20 x 20 Merah M2 50,000.00 Tegel Bata 20 x 20 PC M2 37,500.00 Tegel B/TB 20 x 20 Kuning M2 63,000.00 Ubin PC Warna 20/20 cm M2 55,000.00

350 B365 Beton Cetak Greas Blok Bj 60,500.00 351 B366 Buis Beton diameter 80 cm BJ 90,000.00 352 B367 Buis Beton diameter 25 cm BJ 40,000.00

Buis Beton 1/2 diameter 50 cm BJ 35,000.00 353 B368 Kran SAN EI Bh 104,500.00 354 B369 Stop kran biasa Bh 9,900.00 355 B370 Kran 1/2" Bh 16,500.00 356 B371 Floor drain Bh 10,500.00 357 B372 Baut lengkap Bh 29,500.00 358 B373 List profil 2/4 M1 18,500.00 359 B374 Ompreng Bh 18,500.00 360 B375 Ember Bh 10,500.00 361 B376 Skop Bh 52,500.00 362 B377 Cangkul Bh 55,000.00 363 B378 Sikat baja Bh 19,000.00 364 B379 Sapu lidi Ikat 3,300.00 365 B380 Siffon wasser 41,500.00 366 B381 Keni 2" Bh 14,300.00 367 B382 T.B.A Rol 3,600.00 368 B383 Water mur Bh 15,400.00 369 B384 Bak Cuci Aluminium Bh 181,500.00 370 B385 Bak Mandi Fiber Bh 203,500.00 371 B386 Speakeer Bh 1,200,000.00 372 B387 Instalasi Tata Suara Titik 267,000.00 373 B388 Alat Cetak bh 68,000.00 374 B389 Gerinding bh 451,000.00

Page 28: Analisa 2011

NO NAMA BAHAN SATUAN HARGA SATUAN KETERANGAN (RP)

1 2 3 4 5

375 B390 Linggis bh 41,500.00 376 B391 Anyaman Alang - Alang Lbr 8,500.00 377 B392 Tali Pengikat Kg 22,000.00 378 B393 Panyong bh 71,500.00 379 B394 Sabit bh 33,000.00 380 B395 Hammer 3 Kg bh 49,500.00 381 B396 Pisau Mesin Potong Rumput bh 159,500.00 382 B397 Sangket Besi Panjang 3 m ( viva galvanis dia. 3/4) di cat bh 88,000.00 383 B398 Keranjang Sampah bh 9,000.00 384 B399 Sangket Biasa bh 9,000.00 385 B400 Cangkul Gigi bh 39,000.00 386 B401 Jaring Penutup Sampah Truck bh 550,000.00 387 B402 Jas Hujan bh 33,000.00 388 B403 Sepatu Karet bh 71,500.00 389 B404 Masker bh 11,000.00 390 B405 Helm Proyek bh 44,000.00 391 B406

392 B407 ALAT PEMADAM KEBAKARAN393 B408 Instalasi pipa induk BS 3" Sch M' 166,000.00 394 B409 Intalasi pipa distribusi BS 2" Sch M' 110,000.00 395 B410 Seamesi conection Bh 1,557,000.00 396 B411 Box hidran dengan kelengkapannya Bh 2,178,000.00 397 B412 Selang pemadam 30 m Bh 2,772,000.00 398 B413 Pemadam api ringan 6 kg Bh 3,900.00 399

Denpasar,

Kepala Dinas Pekerjaan UmumKota Denpasar

Ir. I Ketut WinartaPembina Utama Muda

NIP. 19571231 198803 1 103

Page 29: Analisa 2011

DAFTAR HARGA UPAH PEKERJA TAHUN 2011DINAS PEKERJAAN UMUM KOTA DENPASAR

NO PEKERJA HARGA SATUAN KETERANGAN (RP) SATUAN

1 2 3 4 5

1 U01 Mandor Lapangan 66,000.00 OH2 U02 Kepala Tukang Besi 66,000.00 OH3 U03 Kepala Tukang Batu 60,000.00 OH4 U04 Kepala Tukang Kayu 60,000.00 OH5 U05 Kepala Tukang Cat 60,000.00 OH6 U06 Kepala Tukang Paras Bali 60,000.00 OH7 U07 Kepala Tukang Ukir 77,000.00 OH8 U08 Tukang Batu 49,500.00 OH9 U09 Tukang Besi 55,000.00 OH

10 U10 Tukang Kayu 55,000.00 OH11 U11 Tukang Cat 49,500.00 OH12 U12 Tukang Ukir 60,000.00 OH13 U13 Tukang Paras Bali 55,000.00 OH14 U14 Pekerja Terlatih 38,500.00 OH15 U15 Pekerja Semi Terlatih 33,000.00 OH15 U16 Pekerja / Pekerja Tidak Terlatih 31,000.00 OH16 U17 Tukang Bongkar Bekesting 31,000.00 OH17 U18 Tukang Gali 46,000.00 OH18 U19 Tukang Listrik 49,500.00 OH19 U20 Tukang Ledeng 49,500.00 OH20 U21 Kepala Tukang Ledeng 55,000.00 OH21 U22 Tukang Las 44,000.00 OH22 U23 Tukang Masak Aspal 44,000.00 OH23 U24 Tukang Cor Aspal 44,000.00 OH24 U25 Pekerja Pembantu Tukang Aspal 27,500.00 OH25 U26 Penjaga Api 27,500.00 OH26 U27 Sopir SIM. A 44,000.00 OH27 U28 Sopir SIM. B1 44,000.00 OH28 U29 Sopir SIM. B2 44,000.00 OH29 U30 Operator Terampil 49,500.00 OH30 U31 Operator Semi Trampil 44,000.00 OH30 U32 Pembantu Operator 38,500.00 OH31 U33 Pembantu Sopir 38,500.00 OH32 U34 Mekanik Trampil 38,500.00 OH32 U35 Masinis 49,500.00 OH33 U36 Pembantu Masinis 38,500.00 OH34 U37 Sewa Wales 198,000.00 OH35 U38 Ongkos Kerja Pemasangan dan Pengelasan 11,500.00 OH36 U39 Ongkos Potong Besi 11,500.00 OH37 U40 Wheel Loader 198,000.00 Jam38 U41 Dump Truck 110,000.00 Jam39 U42 Aspal Apayer 60,000.00 Jam40 U43 Alat Bantu 66,000.00 Set41 U44 Ongkos Pemasangan Lampu 220,000.00 Ls42 U45 Ongkos Pemasangan Panel 275,000.00 Ls

Denpasar,

Kepala Dinas Pekerjaan UmumKota Denpasar

Ir. I Ketut WinartaPembina Utama MudaNIP. 19571231 198803 1 103

UPAH KERJA

Page 30: Analisa 2011

DAFTAR HARGA SEWA ALAT TAHUN 2011DINAS PEKERJAAN UMUM KOTA DENPASAR

NO KODE JENIS PERALATAN KAPASITAS BIAYA ALAT/JAM( Rp.)

1 A01 E.001 BULLDOZER 110 HP 110 HP 370,459.00 2 A02 E.010 MOTOR GRADER 115 HP 328,506.00 3 A03 E.031 CRUSER / SCR 140 HP 463,615.00 4 A04 E.032 CRUSER / SCR 20t/h 95 HP 335,019.00 5 A05 E.040 SCREENING PLANT 80 HP 80 HP 224,831.00 6 A06 E.052 LOADER WHEELED 115 HP 293,311.00 7 A07 E.053 TRACTOR WHEELED 60 HP 60 HP 104,940.00 8 A08 E.080 ROLLER, 3 WHEELED 8-10 T 51 HP 135,153.00 9 A09 E.081 ROOLER, TANDEM 6-10 T 40 HP 138,884.00

10 A10 E.082 ROOLER, VIBRATOR , SELF 10 T 35 HP 145,961.00 11 A11 E.084 ROLLER, PNEUMATIC 8-15 T 95 HP 265,722.00 12 A12 E.087 ROLLER, VIBR. PED 7 HP 38,344.00 13 A13 E.088 TAMPER, VINR. PLATE 4 HP 4 HP 10,126.00 14 A14 E.089 CONCREATE VIBRATOR 4 HP 4 HP 9,342.00 15 A15 E.130 CHIP SPREADER 3 TONNE HP 19,863.00 16 A16 E.152 SPRAYER, SELFPROPELLED 38 HP 105,791.00 17 A17 E.153 SPRAYER, SELFPROPELLED 1000L 25 HP 85,617.00 18 A18 E.154 ASP. SPRAYER, TOWED 6 HP 29,563.00 19 A19 E.155 ASPHALT MIXING PLANT 30T/H 125 HP 692,588.00 20 A20 E.157 ASPHALT FINISHER 30 HP 119,797.00 21 A21 E.182 WATER TANK TRUCK 115 HP 160,356.00 22 A22 E.211 FLAT BED TRUCK 4,0 T 80 HP 110,128.00 23 A23 E.212 DUMP TRUCK 5T 145 HP 177,892.00 24 A24 E.221 DUMP TRUCK 3,5T 106 HP 129,531.00 25 A25 E.251 CONC. MIXER 0.125 M3/6HP 6 HP 9,292.00 26 A26 E.252 CONC. MIXER 0.25 M3/10HP 10 HP 22,987.00 27 A27 E.253 CONC. MIXER 0.5 M3/20HP 20 HP 47,071.00 28 A28 E.301 COMPRESSOR, AIR 20 HP 68,652.00 29 A29 E.341 PUMP, WATER (5CM) 30 M3/HR 8 HP 11,860.00 30 A30 E.401 TRACTOR EQUIPMENT ETC HP 54,948.00 31 A31 MESIN CAT MARKA HP 30,800.00

Harga Belum Termasuk PPNDenpasar,

Kepala Dinas Pekerjaan UmumKota Denpasar

Ir. I Ketut WinartaPembina Utama Muda

NIP. 19571231 198803 1 103

Page 31: Analisa 2011

18400000