JADWAL WAKTU PELAKSANAAN PEKERJAAN : REHABILITASI KANTOR UPTD TK SD KECAMATAN BEKASI SELATAN LOKASI : KEL. KAYURINGIN JAYA KEC. BEKASI SELATAN SPESIFIKASI : REHAB ATAP DAN DINDING BANGUNAN 1 LANTAI TERDIRI : RUANG KANTOR, WC SUMBER BIAYA : APBD 2008 BULAN-1 BULAN-2 BULAN-3 NO URAIAN PEKERJAAN BOBOT MINGGU MINGGU MINGGU MINGGU MINGGU MINGGU MINGGU MINGGU MINGGU MINGGU MINGGU MINGGU % KE-1 KE-2 KE-3 KE-4 KE-5 KE-6 KE-7 KE-8 KE-9 KE-10 KE-11 KE-12 1 2 I PEKERJAAN PERSIAPAN 8,330,000.00 8330000.00 II PEKERJAAN GALIAN TANAH DAN URUGAN #NAME? #NAME? #NAME? #NAME? III PEKERJAAN STRUKTUR PONDASI DAN SLOOF 551,284.20 275642.10 275642.10 IV PEKERJAAN STRUKTUR BETON 502,715,430.44 ### ### ### V PEKERJAAN STRUKTUR DINDING 155,366,032.00 ### ### ### VI PEKERJAAN STRUKTUR ATAP 354,862,397.22 ### ### ### VII PEKERJAAN STRUKTUR PLAFOND 60,253,000.00 ### ### VIII PEKERJAAN LANTAI #NAME? #NAME? #NAME? #NAME? IX PEKERJAAN PINTU DAN JENDELA 35,830,000.00 7166000.00 ### ### ### ### X PEKERJAAN SANITASI 26,188,000.00 ### XI PEKERJAAN PENGECATAN 37,127,520.00 ### ### XII PEKERJAAN PENGUNCI 0.00 0.00 XIII PEKERJAAN INTALLASI #NAME? #NAME? XIV PEKERJAAN LAIN-LAIN #NAME? #NAME? JUMLAH #NAME? #NAME? #NAME? ### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME? JUMLAH KOMULATIP #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? Bekasi, 7 Mei 2008 CV. SENDIRI MUHAMMAD BAHAGIA DIREKTUR 0 2 4 6 8 10 12 0.00 20.00 40.00 60.00 80.00 100.00 Chart Title

Upload: din-wachdini-saleh

Post on 27-Jun-2015

1.177 views

Category:

Documents


9 download

TRANSCRIPT

Page 1: Anal is A

JADWAL WAKTU PELAKSANAAN

PEKERJAAN : REHABILITASI KANTOR UPTD TK SD KECAMATAN BEKASI SELATANLOKASI : KEL. KAYURINGIN JAYA KEC. BEKASI SELATANSPESIFIKASI : REHAB ATAP DAN DINDING BANGUNAN 1 LANTAITERDIRI : RUANG KANTOR, WCSUMBER BIAYA : APBD 2008

BULAN-1 BULAN-2 BULAN-3NO URAIAN PEKERJAAN BOBOT MINGGU MINGGU MINGGU MINGGU MINGGU MINGGU MINGGU MINGGU MINGGU MINGGU MINGGU MINGGU

% KE-1 KE-2 KE-3 KE-4 KE-5 KE-6 KE-7 KE-8 KE-9 KE-10 KE-11 KE-12

1 2

I PEKERJAAN PERSIAPAN 8,330,000.00 8330000.00II PEKERJAAN GALIAN TANAH DAN URUGAN #NAME? #NAME? #NAME? #NAME?III PEKERJAAN STRUKTUR PONDASI DAN SLOOF 551,284.20 275642.10 275642.10IV PEKERJAAN STRUKTUR BETON 502,715,430.44 ### ### ###V PEKERJAAN STRUKTUR DINDING 155,366,032.00 ### ### ###VI PEKERJAAN STRUKTUR ATAP 354,862,397.22 ### ### ###VII PEKERJAAN STRUKTUR PLAFOND 60,253,000.00 ### ###VIII PEKERJAAN LANTAI #NAME? #NAME? #NAME? #NAME?IX PEKERJAAN PINTU DAN JENDELA 35,830,000.00 7166000.00 ### ### ### ###X PEKERJAAN SANITASI 26,188,000.00 ###XI PEKERJAAN PENGECATAN 37,127,520.00 ### ###XII PEKERJAAN PENGUNCI 0.00 0.00XIII PEKERJAAN INTALLASI #NAME? #NAME?XIV PEKERJAAN LAIN-LAIN #NAME? #NAME?

JUMLAH #NAME? #NAME? #NAME? ### ### ### ### #NAME? #NAME? #NAME? #NAME? #NAME?JUMLAH KOMULATIP #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?

Bekasi, 7 Mei 2008CV. SENDIRI

MUHAMMAD BAHAGIADIREKTUR

0 2 4 6 8 10 12 14

0.00

20.00

40.00

60.00

80.00

100.00 Chart Title

Page 2: Anal is A

METODE PELAKSANAAN

LINGKUP PEKERJAAN 1 PEKERJAAN PERSIAPAN 2 PEKERJAAN GALIAN TANAH DAN URUGAN 3 PEKERJAAN STRUKTUR PONDASI DAN SLOOF 4 PEKERJAAN STRUKTUR BETON 5 PEKERJAAN STRUKTUR DINDING 6 PEKERJAAN STRUKTUR ATAP 7 PEKERJAAN STRUKTUR PLAFOND 8 PEKERJAAN LANTAI 9 PEKERJAAN PINTU DAN JENDELA

10 PEKERJAAN SANITASI 11 PEKERJAAN PENGECATAN 12 PEKERJAAN PENGUNCI 13 PEKERJAAN INTALLASI 14 PEKERJAAN LAIN-LAIN

METODE PELAKSANAAN 1. Pekerjaan Persiapan dan Pembongkaran

- Pengukuran dan Pemasangan Patok Patok untuk menentukan titik2 pekerjaan

2. Pekerjaan Galian-Galian dibuat untuk rencana pondasi setapak, Sloof- Penggalian dilakukan dengan tenaga orang- Hasil galian ditempatka di samping galian untuk ditimbun kembali

3. Pekerjaan Pondasi dan SloofPekerjaan Pondasi Batu Kali- Pasir alas setebal 10cm dituang dalam galian dan dipadatkan- Pada galian pondasi dipasang batu kali dengan perekat mortar 1:5- Mortar dibuat di lokasi dengan mixer beton kap 125 liter- Elevasi dan dimensi pasangan dibuat sesuai gambar

Pekerjaan sloof- Pada bagian atas pondasi batu kali dipasang tulangan besi memanjang 4 buah dia 12 mm dengan stirrup dia 6 mm s=20 cm- Dipasang papan cor dengan rencana dimensi sloof tebal 10 cm- Pengecoran Beton dibuat dengan mutu K.225- Beton dibuat di lokasi dengan mixer beton kap 125 liter

4. Pekerjaan BetonPekerjaan Kolom - Pada bagian atas pondasi setapak dipasang tulangan besi vertikal sesuai gambar mm dengan stirrup dia 6 mm s=20 cm- Dipasang papan cor dengan rencana dimensi kolom tebal 20 x 25 cm dan 20 x 20- Pengecoran Beton dibuat dengan mutu K.225- Beton dibuat di lokasi dengan mixer beton kap 125 literPekerjaan Balok dan dak- Perancah dibuat dengan papan multiplex dengan rangka kaso- Scaffolding dibuat untuk pekerjaan Pelat lantai- Besi Tulangan disusun- Pengecoran dilakukan dengan Beton K-225 - Untuk Pemadatan digunakan Vibrator- Perawatan Dilakukan dengan menutup dg karung basah selama seminggu

5. Pekerjaan Pas Bata

- Pasangan bata disusun di atas sloof dengan perekat mortar 1:5- Bentuk dan ukuran pasangan menyesuaikan gambar- Mortar dibuat di lokasi dengan mixer beton kap 125 liter- Dinding diplester 2 sisi dengan tebal min 15 mm spesifikasi mortar sesuai diminta- Acian dilakukan sestelah plesteran mengeras min 3 hari dengan pasta semen- Mortar dibuat di lokasi dengan mixer beton kap 125 liter dg perbangdingan semen dan pasir ayak 1 : 5- Permukaan pasangan bata dibasahi secukupnya- Penjidaran dilakukan persegmen diratakan dengan kayu kaso- Plesteran dibiarkan mengeras sampai 2 hari- Proses Pengacian dilakukan secara manual dengan alat tradisional- Proses perawatan dilakukan dengan membasahi dinding tiap hari

Page 3: Anal is A

6. Pekerjaan Rangka atap baja Baja ringan- Material rangka atap di ukur dan dipotong secara fabricated- Sistem sambungan dengan baut- tumpuan diikat dengan baut- Jumlah baut min 3 buah untuk kuda -kuda- Toleransi ukuan 3 mm- Bentuk sesuai dgambar rencana

7. Pekerjaan Plafond

-Rangka penggantung Plafond dibuat dengan kayu borneo 5/10 - Rangka Plafond dibuat dengan ukuran 100x50 m dengan kayu borneo 4/6-Kayu rangka plafond diserut satu muka-Plafond eternit dipasang dengan paku eternit dimulai dari tengah ruangan- List plafond dipasang dengan kayu profil 3x3 cm keliling ruangan

8. Pekerjaan lantai -lantai diratakan dengan pemadat tangan atau stamper- Dipasang lapisan pasir urug min 3 cm- Penyetelan as dan elevasi lantai dengan benang timbangan-Campuran Mortar dibuat dengan perbanding 1 pc : 4 ps-Keramik dipasang dengan nat 3mm diratakan dg waterpass-bagian tepi keramik dipotong sesuai bentuk dan ukuran tersisaBagian nat diisi dengan semen warna setelah pasangan keramik berumur 3 hari

9. Pekerjaan pnitu dan Jendela

- Pekerjaan kayu meliputi Kusen Lisplank daun Pintu maupun jendela- Kayu yang digunakan dalah sesuai spesifikasi yang ditetapkan - Toleransi ukuran ditetapkam 3 mm- Kayu kusen diserut halus dengan planner- Rangka kayu,jendela,boven dibuat sesuai gambar dengan kayu kamper singkil- kaca polos dipasang pada jendela-Pekerjaan pintu menggunakan lapisan teak wood- pada pintu KM menggunakan pelapis aluminium

10. Pekerjaan sanitasi- cukup jelas

11. Pekerjaan Pengecatan- Lapisan dinding diamplas- Diplamir dengan plamir jadi- Dicat dengan cat tembok sekualitas vinilex lapis pertama dengan cat ditambah air 10%- Setelah mengering 1 hari dicat dengan lapis kedua dengan cat ditambah air 5%

12. Pekerjaan pengunci

Cukup jelas

Page 4: Anal is A

13. Pekerjaan Installasi

- installasi menggunakan kabel NYA D 1.5 mm untuk lampu dan D2.5 mm untuk arus utama Titik lampu dipasang fitting dipasang dengan baik dan aman dari sentuhan tangan-Kabel ditanam didinding dengan pipa PVC-Sekring Box dipasang secara sistematis untuk memudahkan kontrol

14. Pekerjaan lain-lain

- cukup jelas

Bekasi, 7 Mei 2008CV. SENDIRI

MUHAMMAD BAHAGIADIREKTUR

Page 5: Anal is A

METODE PELAKSANAAN

LINGKUP PEKERJAAN 1 Pekerjaan Persiapan dan Pembongkaran 2 Pekerjaan Galian 3 Pekerjaan Bore Pile 4 Pekerjaan Pondasi Setapak 5 Pekerjaan Sloof 6 Pekerjaan Kolom 7 Pekerjaan Beton Struktur 8 pekerjaan stek tulangan 9 Penimbunan kembali bekas galian

METODE PELAKSANAAN 1. Pekerjaan Persiapan dan Pembongkaran

- Pengukuran dan Pemasangan Patok Patok untuk menentukan titik2 pekerjaan

2. Pekerjaan Bore Pile- Alat Bor Disetting pada lokasi titik bore pile- Pengeboran dilakukan dengan mata bor baja dia 40cm- Tanah hasil pengeboran dipompa keluar- Pengeboran dihentikan sampai kedalaman rencana- Tulangan bore pile dibuat fabricated dimasukkan dalam lubang extension tulangan minimal 1 m'- air dipompa keluar- Beton ready mix K.300 dituang kedalam lubang dengan bantuan talang/conrete pump- Tulangan bore pile digetarkan dengan concrete vibrator- Proses compaction dilakukan trus menerus untuk mencegah pengeroposan beton

3. Pekerjaan Galian-Galian dibuat untuk rencana pondasi setapak, Sloof- Penggalian dilakukan dengan tenaga orang- Hasil galian ditempatka di samping galian untuk ditimbun kembali

4. Pekerjaan Pondasi Setapak- Pasir alas setebal 5cm dituang dalam galian dan dipadatkan- Pada galian pondasi dipasang tulangan besi Bersilangan dua lapis sesuai gambar menyatu dg tulangan bore pile- Pengecoran Beton dilakukan dengan Beton K.225- Bagian tengah plat disiapkan stek ke kolom- Beton dibuat di lokasi dengan mixer beton kap 125 liter

5. Pekerjaan Sloof

Pada lokasi titik sloof dipasang floor alas 1:3 setebal 5 cm- Dipasang papan cor dengan rencana dimensi sloof sesuai gambar- Pengecoran Beton dibuat dengan mutu K25- Beton dibuat di lokasi dengan mixer beton kap 125 liter

6. Pekerjaan Kolom

- Pada bagian atas pondasi setapak dipasang tulangan besi vertikal sesuai gambar- Dipasang papan cor dengan rencana dimensi kolom 40/40 dan 30/40- Pengecoran Beton dibuat dengan mutu K.225- Beton dibuat di lokasi dengan mixer beton kap 125 liter

Page 6: Anal is A

7. Pekerjaan beton Struktur Balok Plat lisplank

- Perancah dibuat dengan papan multiplex dengan rangka kaso- Scaffolding dibuat untuk pekerjaan Pelat lanti- Besi Tulangan disusun- Pengecoran dilakukan dengan Beton K-225 ready mix- Untuk Pemadatan digunakan ConcreteVibrator- Perawatan Dilakukan dengan menutup dg karung basah selama seminggu

8. Pekerjaan Stek Besi

Pekerjaan beton dipersiapkan stek tulangan untuk pekerjaan lebih lanjutpanjang stek dan diameter tulangan sesuai peraturan betin min 40 D

9. Pekerjaan Timbunan

Bekas lubang galian ditimbun kembali dengan tanah setempat

Bekasi, 7 Mei 2008CV. MARISAN JAYA

SOETJI OETOMODIREKTUR

Page 7: Anal is A

115.785100072

985761496

12.9204992

9857628576550001500098576

Page 8: Anal is A

METODE PELAKSANAANNama Kegiatan :Pembangunan Prasarana dan Sarana Lingkungan Gedung, Belanja Modal Gedung Dan Pembangunan

Berupa Perbaikan Pagar Kantor Balai Irigasi

Lokasi Kegiatan Kelurahan : MargahayuKecamatan : Bekasi TimurKota : BekasiPropinsi] : Jawa BaratPenyedia Jasa : CV. SENDIRI

Pekerjaan Galian Tanah pondasi Setapak Pekerjaan cor beton K-175 untuk Pondasi Setapak

Pekerjaan Urugan Pasir Bawah Pondasi t=5 cm Pekerjaan cor beton K-175 untuk Sloof

Pekerjaan cor beton K-175 untuk Kolom Pekerjaan Urugan Tanah Kembali

Pekerjaan Besi Beton U-24

Pekerjaan Bekisting

Pekerjaan Dinding Pasangan Batu Bata 1 : 4

Pekerjaan Plesteran dan Acian Batu Bata 1 : 4

Pekerjaan Kawat Duri dengan Siku L 50.50.5

Pekerjaan tralis Besi Tempa Pekerjaan Cat Tembok

Pekerjaan Pintu Dorong Tralis Besi inc. roda Diameter 5 inch Pekerjaan Cat Kawat Duri

(Double untuk 3x2m) 2 bh Pekerjaan Cat Pintu Dorong

Keramik Granite Hitam

Huruf Timbul, Balok Stainless Steel

PEKERJAAN BONGKARAN PAGAR LAMA

Pekerjaan Galian Tanah pondasi Setapak

Pekerjaan Urugan Pasir Bawah Pondasi t=5 cm

Pekerjaan Batu Kali

Pekerjaan beton Sloof K-175

Pekerjaan beton Ring Balk K-175

Pekerjaan beton Kolom K-175 Pekerjaan Urugan Tanah Kembali

Pekerjaan besi Beton U-24

Pekerjaan Bekisting

Pekerjaan Pasangan Batu Bata 1 : 4

Pekerjaan Pasangan Plesteran 1 : 4

Pekerjaan Lubang Ventilasi Rooster Kayu 20 x 20 cm Pekerjaan Pasangan Keramik uk.30x30 cm KW I Pekerjaan Penutup atap seng lapis aluminium kotak segi jalur

Pekerjaan Pasangan Keramik wc/toilet uk20 x 20 cm KW I Plafond Gypsum 9mm

Pekerjaan Pasangan dinding Keramik wc/toilet uk20 x 20 cm Rangka Plafond 5/7 Kayu Medan

Pekerjaan Pasangan Mortar 1 : 2 Rangka Kuda-kuda/Gording 6/12 kayu medan

Pasangan Lisplang 30/30

Pekerjaan Kusen Daun Pintu + kaca grendel uk. 2.1 x 0.8 m

8mm TKH clar glass w 50/100 rangka aluminium termasuk pengecatan

Pekerjaan Kusen Daun Pintu + kaca grendel uk. 2.1 x 0.7 m

8mm TKH clar glass w 50/100 rangka aluminium termasuk pengecatan

Pekerjaan Kusen Daun Pintu + kaca grendel uk. 1.5 x1 m

8mm TKH clar glass w 50/100 rangka aluminium termasuk pengecatan

Pekerjaan Kusen Daun Pintu + kaca gendel uk. 1.1 x 1 m Pekerjaan Pasangan Kloset Jongkok Standar SNI Mutu Tinggi

8mm TKH clar glass w 50/100 rangka aluminium termasuk pengecatan Pekerjaan Pasangan Kran Air 1/2"

Pekerjaan Septic Tank 2x1.5x1.5

Pekerjaan Pemasangan Pipa Air bersih Dia 1/2 "

Pekerjaan Pemasangan Pipa Air Kotor Dia 3 "

Page 9: Anal is A

Pekerjaan Penutup atap seng lapis aluminium kotak segi jalur

Plafond Gypsum 9mm

Rangka Plafond 5/7 Kayu Medan

Rangka Kuda-kuda/Gording 6/12 kayu medan

Pasangan Lisplang 30/30

Pekerjaan Pemasangan Titik Nyala Lampu Kabel NYM 3 x 2.5 mm

Pasangan Titik Nyala Stop Kontak

Pekerjaan Pengecatan dinding Tembok

Pekerjaan Pengecatan Kayu (lisplank Kusen)

Pekerjaan Pasangan Pipa Besi Dia 2 inch di cat duco 4 lajur bentuk L

Pasangan Tembok Bata

Page 10: Anal is A

Page 10 of 54

HARGA SATUAN BAHAN DAN UPAH

NO. U r a i a n Harga satuan Satuan

1 Bahan batu1.a Batu belah/kali Rp. 154,000.00 /m3

2 Rp. 176,000.00 /m32.a Rp. 181,500.00 /m32.b Sirtu Rp. 159,500.00 /m32.c Abu Batu Rp. 203,500.00 /m32.d Batu Gunung /Quary Rp. 148,500.00 /m32.e Batu Kapur Rp. 148,500.00 /m3

Rp. - 3.a Pasir : Pasang/tras Rp. 165,000.00 /m33.b Pasir Beton Rp. 165,000.00 /m33.c Pasir Urug Rp. 121,000.00 /m3

Rp. - 4.a Batu bata klas 1 Rp. 385.00 /bh4.b Batu bata klas 2 Rp. 330.00 /bh4.c Batu bata Oven (Klinker) Rp. 550.00 /bh

05 Roster beton 20 x 20 Rp. 6,600.00 /bh

5.a Roster beton 30 x 30 Rp. 6,600.00 /bh Rp. -

6 Roster Tanah liat Rp. 5,500.00 /bh Rp. -

7 Inter block (paving block) : Rp. - 7.a Paving block ukuran 6 x 10 x 20 Rp. 22,000.00 /m27.b Paving block ukuran 8 x 10 x 20 Rp. 33,000.00 /m27.c Inter block abu - abu 4,8-44/m2 Rp. 49,500.00 /m27.d Inter block ( merah, hitam ) 4,6-44/m2 Rp. 49,500.00 /m2

Rp. - 8 Portland Cement Rp. -

8.a Semen PC : 50 kg Rp. 52,800.00 /zak8.b Semen PC Rp. 1,056.00 /kg8.c Semen Putih/Warna Rp. 132,000.00 /zak8.d Semen Putih/Warna Rp. 2,640.00 /kg9 Bahan Kayu

9.a Kamper Samarinda papan (oven) Rp. 5,940,000.00 /m39.b Kamper Samarinda balok (oven) Rp. 5,412,000.00 /m39.c Kayu Banjar papan Rp. 5,280,000.00 /m39.d Kayu Banjar balok Rp. 5,016,000.00 /m39.e Kamper Singkil papan Rp. 4,070,000.00 /m39.f Kamper Singkil balok Rp. 3,850,000.00 /m39.g Kayu Meranti papan Rp. 2,904,000.00 /m39.h Kayu Meranti balok Rp. 2,772,000.00 /m39.i Kayu Borneo Super papan Rp. 3,190,000.00 /m39.j Kayu Borneo Super balok Rp. 3,025,000.00 /m39.k Kayu Terentang papan Rp. 1,240,932.00 /m39.l Kayu Terentang Balok Rp. 992,772.00 /m3

9.m Kayu Jati Papan Rp. 16,114,560.00 /m39.n Kayu Jati Balok Rp. 15,826,800.00 /m39.o Dolken Kayu galam Rp. 19,800.00 /btg9.p Kayu Perancah Rp. 2,517,900.00 /m39.q Plywood 9 mm Rp. 198,000.00 /lbr9.r List Profil 3x3 cm Rp. 4,400.00 /m'

Batu pecah /mesin Φ 2/3 cmBatu pecah /mesin Φ 1/2 cm

Page 11: Anal is A

Page 11 of 54

10 Besi Rp. - 10.a Rp. 10,367.50 /kg10.b Rp. 10,367.50 /kg10.c Harga rata-rata U.39 Ex Jawa Rp. 11,404.25 /kg

11 kawat Rp. - 11.a Kawat Pengikat/Kawat beton Rp. 14,300.00 /kg11.b Kawat berduri/1gulung : 50 m' Rp. 2,145.00 /m'11.c Kawat nyamuk hijau Rp. 27,170.00 /m211.d Kawat nyamuk alumunium Rp. 50,050.00 /m211.e Ram kawat Rp. 16,016.00 /m2

12 Besi Siku rata-rata Rp. 11,154.00 /kg12.a Besi Plat 4' x 8' Rp. 11,154.00 12.b Harga besi plat rata2 Rp. 10,868.00 /kg12.c Harga rata-rata plat lipet chanal Rp. 10,868.00 /kg12.d Harga rata-rata IWF Rp. 10,868.00 /kg12.e Besi beton rata-rata Rp. 10,868.00 /kg

13 bahan baja ringan13.a U-75 t=0.83 mm galvalum Rp. 28,600.00 m'13.b U-75 t=0.53 mm Galvalum Rp. 24,310.00 m'13.c GD-B 0.48 galvalum Rp. 14,300.00 m'13.d Wind Bracing PS 30 galvalum Rp. 5,720.00 m'13.e Plate Diafragma Rp. 2,860.00 bh13.f SDP HWH 12x24x22 Rp. 1,001.00 bh13.g SDP waver 8x18x13 Rp. 715.00 bh

14 Bahan atap Rp. - 14.a Asbes plat datar Uk 5mm x 100 x 100 Rp. 19,140.00 /lbr14.b Asbes plat datar Uk 100 x 200 x 4 Rp. 29,700.00 /lbr

15 Seng gelombangBahan atap Seng Gelombang BJLS 28 Rp. 22,000.00 /lbrBahan atap Seng Gelombang 0.2/2.5/6/BDR 9 Rp. 20,900.00 Bahan atap Seng Gelombang 0.3 BWG 32 Rp. 36,300.00

16 Asbes 16.a Asbes Gelombang Besar 90 x 180 x 0,5 Rp. 60,500.00 /lbr16.b Asbes Gelombang Besar 90 x 180 x 0,5 Rp. 37,345.68 /m216.c Asbes Gelombang Kecil 105 x 180 x 0,4 Rp. 49,500.00 /lbr16.e Zinc Alum Gelombang Rp. 181,500.00 /m217 Plastik/ Fiber Rp. - /lbr

Plastik/Fiber warna putih Rp. 22,000.00 Fiber glass Rp. 38,500.00

18 Bahan-bahan penutup atap Rp. - 18.a -Genteng beton Rp. 3,300.00 /bh18.b -Nok genteng beton Rp. 5,500.00 /bh18.c -Genteng keramik Rp. 8,800.00 /bh18.d -Nok genteng keramik Rp. 16,500.00 /bh18.e -Atap sirap Rp. 15,400.00 /m218.f -Penutup atap genting metal rainbaouw Rp. 148,500.00 /m218.g -Nok atas parabung rainbaouw Rp. 181,500.00 /m'18.h -Genteng plentong press Ex Jatiwangi Type Morando Rp. 1,980.00 /bh18.i -Genteng Bubungan Ex Jatiwangi Type Morando Rp. 3,080.00 /bh18.j -Genteng plentong press Ex Jatiwangi Berglazur Rp. 1,980.00 /bh18.k -Bubungan Ex Jatiwangi Berglazur Rp. 12,980.00 /bh18.l -Nok pinggir rainbouw Rp. 82,720.00 /m'

18.m -Genteng Tegola Rp. 124,080.00 /m218.n -Genteng Plam Rp. 550.00 /bh

Harga rata-rata U.24 Ex Jawa Φ 6 mmHarga rata-rata U.29 Ex Jawa Φ 6 mm

Page 12: Anal is A

Page 12 of 54

Rp. - 19 Bahan plat alumunium Rp. -

19.a Plat alumunium tebal 2 mm Rp. 88,000.00 /m219.b Plat alumunium tebal 3 mm Rp. 107,250.00 /m2

Rp. - 20 Paku rata-rata Rp. 13,750.00 /kg

20.a Paku Medan 3-5 mm Rp. 13,200.00 /kg20.b Paku Triplek/eternit Rp. 22,000.00 /kg20.c Paku kaca Rp. 16,500.00 /kg

Rp. - 21 Ijuk Rp. 4,730.00 /kg

22 KeramikKramik Warna Putih

22.a Kramik sekualitas Asia Tiles (KW1) 10 x 20 cm Standar Rp. 30,800.00 /m222.b Kramik sekualitas Asia Tiles (KW1) 20 x 20 cm Standar Rp. 30,800.00 /m222.c Kramik sekualitas Asia Tiles (KW1) 30 x 30 cm standar Rp. 33,000.00 /m2

Rp. - 23 Kramik Berwarna / Anti Slip Rp. -

23.a Kramik sekualitas Asia Tiles (KW1) 10 x 20 cm Standar Rp. 30,800.00 /m223.b Kramik sekualitas Asia Tiles (KW1) 20 x 20 cm Standar Rp. 38,500.00 /m223.c Kramik sekualitas Asia Tiles (KW1) 30 x 30 cm standar Rp. 44,000.00 /m2

Rp. - 24 TEGEL Rp. -

24.a Tegel Pc 20 x 20 abu-abu Rp. 13,750.00 /m224.b Tegel Pc 20 x 20 warna Rp. 22,000.00 /m224.c Tegel Wafel 20 x 20 abu-abu Rp. 27,500.00 /m224.d Plint 20 x 20 abu-au Rp. 16,500.00 /m2

25 Bahan Loteng/Plapon25.a Triplek Ex Sankiong 25.b Uk. 1.2x2.4x3mm Rp. 38,500.00 /lbr25.c Uk. 1.2x2.4x4mm Rp. 44,000.00 /lbr25.d Uk. 1.2x2.4x6mm Rp. 66,000.00 /lbr25.e Uk. 1.2x2.4x12mm Rp. 159,500.00 /lbr25.f b. Teak wood 1,2 x 2,4 x 4 mm Rp. 82,500.00 /lbr25.g - Teakwood untuk pintu 90 x 220 x 4 mm Rp. 71,500.00 /lbr25.h c. Enternit type 1 Rp. 8,800.00 /lbr25.i - Eternit type 2 Rp. 7,700.00 /lbr25.j d. Multiplek 9 mm 120 x 240 Rp. 85,800.00 /m225.k Multiplek 12 mm 120 x 240 Rp. 154,000.00 /m225.l e. Gypsum Rp. -

25.m Gypsum 120 x 240 t = 9 mm ex DN Rp. 39,600.00 /lbr25.n Gypsum 120 x 240 t = 9 mm ex Luar Rp. 42,900.00 /lbr

26 Kran air26.a Kran Lokal Kuningan Rp. - 26.b Rp. 27,500.00 /bh26.c Rp. 27,500.00 /bh26.d Rp. 38,500.00 /bh26.e Rp. 49,500.00 /bh

Kran lokal Kuningan Φ 1/2"Kran lokal Kuningan Φ 3/4"Kran Ex luar sekualitas KIT Φ 1/2"Kran Ex luar sekualitas KIT Φ 3/4"

Page 13: Anal is A

Page 13 of 54

Rp. - 27 Bahan Pipa paralon Ex wavin Rp. -

27.a Rp. 25,300.00 /btg27.b Rp. 30,800.00 /btg27.c Rp. 37,400.00 /btg27.d Rp. 38,500.00 /btg27.e Rp. 46,200.00 /btg27.f Rp. 66,000.00 /btg27.g Rp. 93,500.00 /btg27.h Rp. 154,000.00 /btg27.i Rp. 27,500.00 /btg27.j Rp. 385,000.00 /btg

28 Penyambung pipa PVC Ex Japan28.a Soket 0 1/2" s/d 3/4" Rp. 1,650.00 /bh28.b Soket 0 1" s/d 2" Rp. 3,300.00 /bh28.c Soket 0 3" s/d 5" Rp. 7,700.00 /bh28.d Soket 0 6" Rp. 23,100.00 /bh28.e Knie 0 1/2" s/d 3/4" Rp. 1,650.00 /bh28.f Knie 0 1" s/d 2" Rp. 2,750.00 /bh28.g Knie 0 3" s/d 5" Rp. 9,350.00 /bh28.h Knie 0 6" Rp. 49,500.00 /bh28.i Pralon Listrik 0 5/8" - 4 m Rp. 38,500.00 /bh

Rp. - 29 Buis Beton Bulat: - 0 20 cm - 1 m Rp. 30,800.00 /bh

29.a - 0 30 cm - 1 m Rp. 39,600.00 /bh29.b - 0 40 cm - 1 m Rp. 49,500.00 /bh29.c - 0 50 cm - 1 m Rp. 71,500.00 /bh29.d - 0 60 cm - 1 m Rp. 104,500.00 /bh29.e - 0 80 cm - 1 m Rp. 165,000.00 /bh29.f - 0 100 cm - 1m Rp. 258,500.00 /bh

30 Readymix Beton K.300, tanpa pompa ( selang ) Rp. 575,520.00

30.a Readymix Beton K.225, tanpa pompa ( selang ) Rp. 521,400.00

30.b Readymix Beton K.175, tanpa pompa ( selang ) Rp. 508,200.00

40 Bahan Kaca Kwalitas Asahi Rp. -

40.a Kaca polos tebal 3 mm Rp. 55,000.00

40.b Kaca polos tebal 5 mm Rp. 82,500.00

40.c Kaca Rayband 5 mm Rp. 88,000.00

40.d Kaca Es t=3mm Rp. 82,500.00

40.e Kaca Es t=5mm Rp. 99,000.00 40.f Glass block 20 x 20 mm Rp. 17,600.00 /lbr

41 Kaca nako polos lengkap41.a Ukuran 14x90 Rp. 9,350.00 /dn41.b Ukuran 14x60 Rp. 7,700.00 /dn41.c Ukuran 14x50 Rp. 7,040.00 /dn

42 Penggantung dan Kunci42.a Kunci pintu tanam Rp. - 42.b Kunci jangkar standar Double Slaag Rp. 132,000.00 /Unit42.c Kunci jangkar 740 Ex RRT 2 slaag Rp. 150,700.00 /Unit

Pipa PPC (AW) Φ 1/2"-4 m Pipa PPC (AW) Φ 3/4"-4 m Pipa PPC (AW) Φ 0,1"-4 m Pipa PPC (AW) Φ 1,5"-4 m Pipa PPC (AW) Φ 2"-4 m Pipa PPC (AW) Φ 2,5"-4 m Pipa PPC (AW) Φ 0.3"-4 m Pipa PPC (AW) Φ 0,4"-4 m Pipa PPC (AW) Φ 0,5"-4 m Pipa PPC (AW) Φ 0,6"-4 m

/m3

/m3

/m3

/m2

/m2

/m2

/m2

/m2

Page 14: Anal is A

Page 14 of 54

42.d Kunci Silinder KL II Rp. 170,500.00 /Unit42.e Kunci Silinder KL I Rp. 72,600.00 /Unit42.f Kunci KM/WC Rp. 53,900.00 /Unit42.g Lain-lain Rp. - 42.h Kunci Merk 808 Rp. 17,600.00 /bh42.i Engsel Nylon Ex RRT untuk pintu Rp. 15,400.00 /bh42.j Engsel Nylon Ex RRT untuk Jendela Rp. 12,100.00 /bh42.k Espagnolet Ex RRT Rp. 41,800.00 /bh42.l Grendel jendela Rp. 8,800.00 /bh

42.m Grendel tanam pintu Rp. 36,300.00 /bh42.n Anker pintu Rp. 5,500.00 /bh

43 Bahan Finishinga. Cat kilap

43.a - Merk SE IV Rp. 33,000.00 /kg43.b - Merk ICI Rp. 72,600.00 /kg43.c - Merk AVIAN Rp. 29,700.00 /kg43.d - Merk Glotex Rp. 28,600.00 /kg

b. Cat Dasar43.e - Cat dasar kayu Rp. 22,000.00 /kg43.f - Meni kayu Rp. 22,000.00 /kg43.g - Meni besi Rp. 29,700.00 /kg

c. Cat Tembok43.h - Cat tembok Vinilex Rp. 14,410.00 /kg43.i - Cat tembok ICI Rp. 28,820.00 /kg43.j d.Cat besi Rp. 28,820.00 /kg43.j e. Amplas Kayu/Besi Rp. 2,420.00 /lbr43.k - Dempul Kayu Rp. 11,990.00 /kg43.l - Spirtus Rp. 11,990.00 /btl

43.m - Rol cat Rp. 18,040.00 /bh43.n - Plamur tembok Rp. 9,020.00 /kg43.o - Plamur kayu Rp. 11,990.00 /kg43.p - Oker Rp. 2,970.00 /kg43.q - Batu apung Rp. 18,040.00 /kg43.r - Lem kayu Rp. 19,250.00 /kg43.s - Lem Putih Rp. 19,250.00 /kg43.t - Sirlak plitur Rp. 72,160.00 /kg43.v - Kwas 3 " Rp. 11,990.00 /bh43.v - Minyak cat Rp. 11,990.00 ./ltr44 f. - Cat Tahan Asam Rp. - /kg45 - Cat anti lumut Rp. 48,070.00 /kg46 - Water proofing emulsion Ex poxtar Rp. 54,120.00 /kg47 - Water proofing Membrane Rp. 90,090.00 /kg48 Kansteen 15.25.40 cm Rp. 18,590.00 /bh49 Rp. 7,810.00 /bh50 Rp. 10,230.00 /bh51 Beton Gravel U 20 cm Rp. 8,470.00 /m52 Beton Gravel U 30 cm Rp. 10,780.00 /m53 Beton Gravel U 40 cm Rp. 16,830.00 /m54 Bahan Bakar dan Pelumas Rp. -

54.a a. Minyak tanah Rp. 5,500.00 /ltr

Beton Gravel 1/2 Φ 25 cmBeton Gravel 1/2 Φ 30 cm

Page 15: Anal is A

Page 15 of 54

54.b b. Minyak Solar Rp. 5,940.00 /ltr54.c c. Bensin/Premium Rp. 6,600.00 /ltr54.d d. Asitilin Rp. 66,000.00 /15.1 K54.e e. Minyak bekisting Rp. 8,800.00 ltr54.f f. Kawat las Rp. 11,000.00 /kg54.g g. Residu kawat las Rp. 4,400.00 /lt54.h h. Prime Coat Rp. 4,950.00 /ltr54.i I. Teac Coat Rp. 5,500.00 /ltr27 Kloset : Rp. -

Kolset jongkok Rp. 77,000.00 /bhKloset duduk lokal Rp. 1,045,000.00 /bhKloset jongkok porselin Rp. 935,000.00 /bhKloset duduk lokal setara TOTO Rp. 1,320,000.00 /bh

28 Jet Pump setara Merk Sanyo 1 unit Rp. 3,300,000.00 /unitJet Pump setara Merk Nasional 1 unit Rp. 2,640,000.00 /unit

29 Pompa Air National Type GA. 125 JBL Rp. 1,650,000.00 /unit31 Tanah Merah Rp. 66,000.00 m332 Tanah Urug Rp. 8,470.00 m333 Pagar BRC Rp. 58,190.00 /m234 Tralis Besi Rp. 241,230.00 /m235 Pipa tiang BRC dia. 2" + tutup dan baut Rp. 57,310.00 /bh

Catatan :

Bekasi, 7 Mei 2008CV. SENDIRI

MUHAMMAD BAHAGIA

DIREKTUR

Page 16: Anal is A

Page 16 of 54

1.10

140,000.00

Rp. 102,500.00 ### 160,000.00 Rp. 110,000.00 ### 165,000.00 Rp. 80,500.00 ### 145,000.00 Rp. 126,500.00 ### 185,000.00 Rp. 103,500.00 ### 135,000.00 Rp. 80,500.00 ### 135,000.00

150,000.00 150,000.00 110,000.00

Rp. 265.00 350.00 Rp. 235.00 300.00 Rp. 625.00 500.00

6,000.00 6,000.00

5,000.00

20,000.00 30,000.00 45,000.00 45,000.00

48,000.00

120,000.00

Rp. 3,600,000.00 ### 5,400,000.00 6,480,000.00 Rp. 3,500,000.00 ### 4,920,000.00 5,904,000.00 Rp. 2,250,000.00 ### 4,800,000.00 5,760,000.00 Rp. 2,050,000.00 ### 4,560,000.00 5,472,000.00 Rp. 1,955,000.00 ### 3,700,000.00 4,440,000.00 Rp. 1,840,000.00 ### 3,500,000.00 4,200,000.00 Rp. 1,495,000.00 ### 2,640,000.00 3,168,000.00 Rp. 1,380,000.00 ### 2,520,000.00 3,024,000.00 Rp. 1,150,000.00 ### 2,900,000.00 3,480,000.00 Rp. 1,035,000.00 ### 2,750,000.00 3,300,000.00 Rp. 862,500.00 ### 1,128,120.00 1,353,744.00 Rp. 690,000.00 ### 902,520.00 1,083,024.00 Rp. 11,200,000.00 ### 14,649,600.00 17,579,520.00 Rp. 11,000,000.00 ### 14,388,000.00 17,265,600.00 Rp. 575,000.00 ### 18,000.00 21,600.00 Rp. 460,000.00 ### 2,289,000.00 2,746,800.00

180,000.00 4,000.00

Page 17: Anal is A

Page 17 of 54

9,425.00 12,252.50 9,425.00 12,252.50 10,367.50 13,477.75

- - 13,000.00 16,900.00 1,950.00 2,535.00 24,700.00 32,110.00 45,500.00 59,150.00 14,560.00 18,928.00

10,140.00 13,182.00 10,140.00 13,182.00 9,880.00 12,844.00 9,880.00 12,844.00 9,880.00 12,844.00 9,880.00 12,844.00 - - - - 26,000.00 33,800.00 22,100.00 28,730.00 13,000.00 16,900.00 5,200.00 6,760.00 2,600.00 3,380.00 910.00 1,183.00 650.00 845.00

17,400.00 27,000.00

20,000.00 19,000.00 33,000.00

55,000.00

45,000.00 165,000.00

20,000.00 35,000.00

3,000.00 5,000.00 8,000.00 15,000.00 14,000.00 135,000.00 165,000.00 1,800.00 2,800.00 1,800.00 11,800.00 75,200.00 112,800.00 500.00

Page 18: Anal is A

Page 18 of 54

80,000.00 97,500.00

12,500.00 12,000.00 20,000.00 15,000.00

4,300.00

Rp. 26,450.00 28,000.00 Rp. 28,750.00 28,000.00 Rp. 32,200.00 30,000.00

Rp. 32,200.00 28,000.00 Rp. 24,500.00 35,000.00 Rp. 36,800.00 40,000.00

12,500.00 20,000.00 25,000.00 15,000.00

Rp. 36,250.00 35,000.00 Rp. 42,390.00 40,000.00 Rp. 50,200.00 60,000.00 Rp. 105,970.00 145,000.00 Rp. 33,470.00 75,000.00 Rp. 41,830.00 65,000.00 Rp. 8,920.00 8,000.00 Rp. 6,690.00 7,000.00 Rp. 29,830.00 78,000.00 Rp. 35,400.00 140,000.00

Rp. 38,700.00 36,000.00 Rp. 30,120.00 39,000.00

Rp. 30,680.00 25,000.00 Rp. 41,270.00 25,000.00 Rp. 100,400.00 35,000.00 Rp. 111,550.00 45,000.00

Page 19: Anal is A

Page 19 of 54

23,000.00 28,000.00 34,000.00 35,000.00 42,000.00 60,000.00 85,000.00 140,000.00 25,000.00 350,000.00

1,500.00 3,000.00 7,000.00 21,000.00 1,500.00 2,500.00 8,500.00 45,000.00 35,000.00

Rp. 20,220.00 28,000.00 Rp. 28,400.00 36,000.00 Rp. 36,600.00 45,000.00 Rp. 76,480.00 65,000.00 Rp. 103,790.00 95,000.00 Rp. 152,950.00 150,000.00 Rp. 174,800.00 235,000.00

Rp. 382,375.00 523,200.00 627,840.00

Rp. 355,060.00 474,000.00 568,800.00

Rp. 322,290.00 462,000.00 554,400.00

Rp. 43,700.00 50,000.00

Rp. 65,500.00 75,000.00

Rp. 81,937.00 80,000.00

Rp. 54,625.00 75,000.00

Rp. 71,020.00 90,000.00 Rp. 38,240.00 16,000.00

Rp. 6,560.00 8,500.00 Rp. 5,460.00 7,000.00 Rp. 4,600.00 6,400.00

Rp. 120,175.00 120,000.00 Rp. 136,560.00 137,000.00

Page 20: Anal is A

Page 20 of 54

Rp. 155,325.00 155,000.00 Rp. 65,550.00 66,000.00 Rp. 49,160.00 49,000.00

Rp. 16,390.00 16,000.00 Rp. 13,650.00 14,000.00 Rp. 10,925.00 11,000.00 Rp. 38,240.00 38,000.00 Rp. 8,190.00 8,000.00 Rp. 32,775.00 33,000.00 Rp. 5,460.00 5,000.00

Rp. 29,500.00 30,000.00 Rp. 65,550.00 66,000.00 Rp. 27,310.00 27,000.00 Rp. 26,220.00 26,000.00

Rp. 19,665.00 20,000.00 Rp. 19,665.00 20,000.00 Rp. 27,320.00 27,000.00

Rp. 13,100.00 13,100.00 Rp. 26,220.00 26,200.00 Rp. 26,220.00 26,200.00 Rp. 2,185.00 2,200.00 Rp. 10,925.00 10,900.00 Rp. 10,925.00 10,900.00 Rp. 16,390.00 16,400.00 Rp. 8,190.00 8,200.00 Rp. 10,925.00 10,900.00 Rp. 2,730.00 2,700.00 Rp. 16,390.00 16,400.00 Rp. 17,480.00 17,500.00 Rp. 17,480.00 17,500.00 Rp. 65,550.00 65,600.00 Rp. 10,925.00 10,900.00 Rp. 10,925.00 10,900.00 Rp. - Rp. 43,700.00 43,700.00 Rp. 49,160.00 49,200.00 Rp. 81,940.00 81,900.00 Rp. 16,900.00 16,900.00 Rp. 7,100.00 7,100.00 Rp. 9,290.00 9,300.00 Rp. 7,650.00 7,700.00 Rp. 9,840.00 9,800.00 Rp. 15,295.00 15,300.00

Rp. 620.00 5,000.00

Page 21: Anal is A

Page 21 of 54

Rp. 920.00 5,400.00 Rp. 1,380.00 6,000.00 Rp. 65,060.00 60,000.00

#NAME? 8,000.00 #NAME? 10,000.00

Rp. 2,185.00 4,000.00 Rp. 2,470.00 4,500.00 Rp. 2,090.00 5,000.00

Rp. 136,500.00 70,000.00 Rp. 1,311,000.00 950,000.00 Rp. 137,750.00 850,000.00 Rp. 1,282,500.00 1,200,000.00 Rp. 6,555,000.00 3,000,000.00 Rp. 6,555,000.00 2,400,000.00 Rp. 855,000.00 1,500,000.00 Rp. 43,000.00 60,000.00 Rp. 7,000.00 7,700.00 Rp. 46,170.00 52,900.00 Rp. 191,190.50 219,300.00 Rp. 45,460.50 52,100.00

Page 22: Anal is A

DAFTAR : SATUAN UPAH KERJA1

No. U r a i a n Upah Orang/hari

Upah Kerja

1 Pekerja Rp 50,000.00 /orang/hari/8 jam2 Pekerja Setengah Trampil Rp 56,250.00 /orang/hari/8 jam3 Pekerja Trampil Rp 68,750.00 /orang/hari/8 jam4 Mandor Rp 93,750.00 /orang/hari/8 jam5 Tukang kayu setengah trampil Rp 68,750.00 /orang/hari/8 jam6 Tukang kayu trampil Rp 75,000.00 /orang/hari/8 jam7 Kepala tukang kayu Rp 81,250.00 /orang/hari/8 jam8 Tukang besi beton setengah trampil Rp 56,250.00 /orang/hari/8 jam9 Tukang besi beton trampil Rp 62,500.00 /orang/hari/8 jam

10 Tukang besi IWF/Profil setengah trampil Rp 56,250.00 /orang/hari/8 jam11 Tukang besi IWF/Profil trampil Rp 62,500.00 /orang/hari/8 jam12 Kepala tukang besi beton Rp 75,000.00 /orang/hari/8 jam13 Kepala tukang besi konstruksi/profil Rp 75,000.00 /orang/hari/8 jam14 Tukang batu setengah trampil Rp 62,500.00 /orang/hari/8 jam15 Tukang batu trampil Rp 68,750.00 /orang/hari/8 jam16 Kepala tukang batu Rp 75,000.00 /orang/hari/8 jam17 Tukang cat Rp 62,500.00 /orang/hari/8 jam18 Kepala tukang cat Rp 68,750.00 /orang/hari/8 jam19 Tukang politur Rp 62,500.00 /orang/hari/8 jam20 Operator alat besar Rp 100,000.00 /orang/hari/8 jam21 Pembantu operator Rp 68,750.00 /orang/hari/8 jam22 Supir truck Rp 81,250.00 /orang/hari/8 jam23 Kernet truck Rp 56,250.00 /orang/hari/8 jam24 Penjaga malam Rp 62,500.00 /orang/hari/8 jam25 Buruh lapangan tak terlatih Rp 43,750.00 /orang/hari/8 jam26 Buruh lapangan kurang terlatih Rp 50,000.00 /orang/hari/8 jam27 Buruh lapangan terlatih Rp 56,250.00 /orang/hari/8 jam28 Mekanik Rp 68,750.00 /orang/hari/8 jam29 Pembantu Mekanik Rp 61,875.00 /orang/hari/8 jam

Staf Pelaksana Proyek Rp 93,750.00 /orang/hari/8 jam

Bekasi, 7 Mei 2008CV. SENDIRI

MUHAMMAD BAHAGIA

DIREKTUR

Page 23: Anal is A

45,000.00 50,000.00 60,000.00 65,000.00 50,000.00 65,000.00 65,000.00 50,000.00 60,000.00 55,000.00 70,000.00 75,000.00 75,000.00 55,000.00 65,000.00 65,000.00 50,000.00 55,000.00 90,000.00 50,000.00 50,000.00 45,000.00 50,000.00 40,000.00 45,000.00 45,000.00 75,000.00 50,000.00 75,000.00

Page 24: Anal is A

RENCANA ANGGARAN BIAYA 1

KEGI : LANJUTAN PEMBANGUNAN GEDUNG LAPAS BEKASIPEKE : PEMBANGUNAN GEDUNG HUNIAN LAPAS KELAS II A BEKASILOKAS: JL. PAHLAWAN NO 1 BEKASISPESI : BANGUNAN BERTINGKATTERDI :SUMBE: APBD KOTA BEKASI TAHUN ANGGARAN 2009

HARGA SUBNO JENIS PEKERJAAN VOLUME SATUAN SATUAN JUMLAH TOTAL

rrRp. Rp. Rp.

1 2 3 4 5 6 7

I PEKERJAAN PENDAHULUAN

1 Pengukuran dan Pemasangan Bowplank 120.00 m' Rp 20,000.00 Rp 2,400,000.00

2 48.00 m' Rp 85,000.00 Rp 4,080,000.00

3 0.00 ls Rp 300,000.00 Rp -

4 Listrik dan air kerja 1.00 ls Rp 1,600,000.00 Rp 1,600,000.00

5 Pasang Papan Nama Proyek 1.00 ls Rp 250,000.00 Rp 250,000.00

JUMLAH Rp 8,330,000.00 8,330,000.00

II PEKERJAAN TANAH DAN PONDASI

1 Pek. Galian Tanah Pondasi dan sloof 21.12 m3 Rp 26,100.00 Rp 551,284.20

2 Urugan Pasir bawah pondasi m3 Rp 177,300.00 Rp -

3 Pas. Lantai kerja Pondasi dan Sloof m3 Rp 470,100.00 Rp -

4 Pasangan Batu kosong/Anstampeng m3 Rp 322,800.00 Rp -

5 Pasangan Pondasi Batu Kali 1 pc : 5 ps m3 Rp 539,600.00 Rp -

6 Urugan Kembali Tanah Galian m3 Rp 19,600.00 Rp -

JUMLAH Rp 551,284.20 551,284.20

III PEKERJAAN STRUKTUR BETON

2 Pek. Pas. Pondasi Tapak Beton K.300 - Besi 125 kg/m3 G.38a 0.70 m3 Rp 2,629,600.00 Rp 1,840,720.00

3 Pek. Pas. Pondasi Tapak Beton K.300 - Besi 125 kg/m3 G.39 m3 Rp 3,008,900.00 Rp -

4 Pas. Sloof Beton 30/50 (S2) K300-125kg/m3 m3 Rp 2,777,700.00 Rp -

5 Pas. Sloof Beton 15/20 (S3) K175-150kg/m3 m3 Rp 3,081,300.00 Rp -

6 Pas. Kolom beton tipe 30/40 (K1) K.225 -220kg/m3 18.24 m3 Rp 4,993,500.00 Rp 91,081,440.00

7 Pas. Kolom beton 15/25 (K3) K.175 - 145 kg/m3 2.40 m3 Rp 4,090,700.00 Rp 9,817,680.00

8 Pas. . Kolom 15/35 (KK) K.175-150kg/m3 3.36 m3 Rp 3,736,700.00 Rp 12,555,312.00 91,854.00

9 Pas. Kolom Praktis 15/15 (Kp) K175-150kg/m3 2.88 m3 Rp 4,082,400.00 Rp 11,757,312.00

10 Pas. Balok Portal 30/50 (B1) K225-195kg/m3 12.75 m3 Rp 5,951,800.00 Rp 75,885,450.00

11 Pas. Balok Portal 30/40 (B2) K225-175kg/m3 7.68 m3 Rp 5,793,800.00 Rp 44,496,384.00

12 Pas. Beton Tangga termasuk bordes K225-190kg/m3 8.06 m3 Rp 7,088,600.00 Rp 57,134,116.00

13 Pas. Balok anak 20/40 (B4) K225-195kg/m3 7.20 m3 Rp 6,283,000.00 Rp 45,237,600.00

14 Pas. Balok Portal 30/100 (B5) K225-195kg/m3 m3 Rp 5,761,700.00 Rp -

15 Pas. Balok lintel 15/25 (BL) K175-120kg/m3 m3 Rp 6,072,700.00 Rp -

16 Pas. Ring balk 15/15 K175-150kg/m3 1.49 m3 Rp 2,943,600.00 Rp 4,371,246.00

17 Pas. Plat Lantai Beton T=12 cm K225-125kg/m3 28.63 m3 Rp 4,893,900.00 Rp 140,110,399.44

18 Pasang Dak Canopy beton T=10 cm K225-100kg/m3 2.72 m3 Rp 3,095,600.00 Rp 8,427,771.00

19 Pas. Stek besi balok dan plat lantai kg Rp 13,800.00 Rp -

JUMLAH Rp 502,715,430.44 502,715,430.44

IV PEKERJAAN DINDING

1 Pas. Dinding bata merah 1 : 5 ( 1 bata) 428.20 m2 Rp 144,800.00 Rp 62,003,360.00

2 Pas. Dinding bata merah 1 : 5 ( 1/2 bata) 270.04 m2 Rp 72,400.00 Rp 19,550,896.00

3 Pas. Dinding bata merah 1 : 3 ( 1/2 bata) 128.00 m3 Rp 76,900.00 Rp 9,843,200.00

4 Pek. Plesteran dan Acian 1 : 5 1,396.48 m2 Rp 38,700.00 Rp 54,043,776.00

5 Plesteran dan acian dinding adukan 1pc : 3ps 256.00 m2 Rp 35,600.00 Rp 9,113,600.00

6 Pas. Glass Box 20 x 20 cm 12.48 m2 Rp 65,000.00 Rp 811,200.00

JUMLAH Rp 155,366,032.00 155,366,032.00

V PEKERJAAN LANTAI

1 Pas. Keramik tangga 77.20 m3 Rp -

2 Plesteran & Pengacian lantai 1 : 3 192.00 m3 Rp 76,900.00 Rp 14,764,800.00

3 Pas. Plat Lantai Beton T=8 cm K175-80 kg/m3 m2 Rp 72,400.00 Rp -

4 Pas. Plat beton Tempat tidur T=8 cm K175-80kg/m3 208.00 m2 Rp 55,000.00 Rp 11,440,000.00

5 Pas. Floor Hardenner warna 96.00 m2 Rp 38,700.00 Rp 3,715,200.00

6 Pas. Floor Rabat selasar T=7 cm m3 Rp 84,200.00 Rp -

JUMLAH Rp 29,920,000.00 29,920,000.00

VI PEKERJAAN KUSEN PINTU DAN JENDELA

1 Pas. Pintu tralis (Type P1) + kunci gembok 15.12 m2 Rp 890,000.00 Rp 13,456,800.00

2 Pas. Pintu tralis (Type P2) + kunci gembok m2 Rp 979,000.00 Rp -

3 Pas. Pintu PVC Kamar mandi + Kunci silinder 16.00 unit Rp 485,000.00 Rp 7,760,000.00

4 Pas. Pintu Shap-engsel+handel+kunci 0.00 unit Rp 76,900.00 Rp -

5 Pas. Tralis Jendela (Type J) 38.40 m2 Rp 700,000.00 Rp 26,880,000.00

6 Pas. Tralis Jendela (Type BV) 28.56 m2 Rp 680,000.00 Rp 19,420,800.00

JUMLAH Rp 67,517,600.00 67,517,600.00

Page 25: Anal is A

VII PEKERJAAN STRUKTUR ATAP

1 Pasang rangka atap baja SIKU 10,033.00 kg Rp 17,500.00 Rp 175,577,500.00

2 Erection Kuda-kuda 10,033.00 kg Rp 836.64 Rp 8,394,037.34

3 Pasang Angkur 16.00 titik Rp 290,000.00 Rp 4,640,000.00

4 Pasang Gording 3,555.00 kg Rp 15,700.00 Rp 55,813,500.00

5 Pasang Zinc Aluminium gelombang 375.04 m2 Rp 230,500.00 Rp 86,446,720.00

6 Pasang Nok dan jurai 57.80 m1 Rp 55,000.00 Rp 3,179,000.00

7 Pasang lisplank kayu kamper singkil 3/20 dan 3/10 profil (su 74.00 m1 Rp 75,000.00 Rp 5,550,000.00

8 Pasang roof drain 10.00 bh Rp 35,000.00 Rp 350,000.00

9 Pasang talang jurai seng aluminium 74.00 m1 Rp 201,508.65 Rp 14,911,639.88

JUMLAH Rp 354,862,397.22 354,862,397.22

VIII PEKERJAAN STRUKTUR PLAFOND

1 Pas. Tralis Plafond D-8mm 272.00 m2 Rp 110,000.00 Rp 29,920,000.00

2 Pas. Plafond eternit asbes + rangka kayu borneo super 272.00 m2 Rp 101,900.00 Rp 27,716,800.00

3 Pas. List berprofil kayu kamper .3x3 cm 206.00 m1 Rp 12,700.00 Rp 2,616,200.00

JUMLAH Rp 60,253,000.00 60,253,000.00

IX PEKERJAAN INTALLASI PLUMBING

A. PEMIPAAN DAN SARANA AIR BERSIH

1 50.00 m' Rp 60,000.00 Rp 3,000,000.00

2 44.00 m' Rp 48,000.00 Rp 2,112,000.00

3 128.00 m' Rp 29,000.00 Rp 3,712,000.00

4 Pas. Hanger Pipa 32.00 m' Rp 20,000.00 Rp 640,000.00

5 Pas. Gate Valve 8.00 bh Rp 320,000.00 Rp 2,560,000.00

B. PEMIPAAN DAN SARANA AIR KOTOR

1 0.00 m' Rp 185,000.00 Rp -

2 71.60 m' Rp 110,000.00 Rp 7,876,000.00

3 42.00 m' Rp 35,000.00 Rp 1,470,000.00

C. PEKERJAAN FIXTURE

1 Pas. Kloset Jongkok standar INA 16.00 bh Rp 520,000.00 Rp 8,320,000.00

2 Pas. Kran air Stander San Ei 32.00 bh Rp 65,000.00 Rp 2,080,000.00

3 Pas. Stop Kran air Shower dinding 20.00 bh Rp 55,000.00 Rp 1,100,000.00

4 Pas. Shower dinding lokal 20.00 unit Rp 125,000.00 Rp 2,500,000.00

5 Pas. Floor Drain 16.00 bh Rp 20,000.00 Rp 320,000.00

6 Pas. Roof Drain 4.00 bh Rp 25,000.00 Rp 100,000.00

7 4.00 bh Rp 10,000.00 Rp 40,000.00

D. UTILITAS

1 Pek. Bor Sumur Pompa jet pump + pipa casing ls Rp - Rp -

2 Pas. Pompa jet pump 250 watt bh Rp - Rp -

3 Pas. Tangki air 1000 ltr + otomatis unit Rp - Rp -

4 Pek. Septic Taqnk unit Rp - Rp -

5 Pek. Rembesan unit Rp - Rp -

6 Pek. Saluran Grevel 1/2 20 cm unit Rp - Rp -

JUMLAH Rp 35,830,000.00 35,830,000.00

X PEKERJAAN MEKANIKAL ELEKTRIKAL

1 Pas. Instalasi titik lampu /cahaya 32.00 ttk Rp 140,000.00 Rp 4,480,000.00

2 Pas. Instalasi titik stop kontak 12.00 ttk Rp 154,000.00 Rp 1,848,000.00

3 Pas. Penyambungan kabel NYY 4 x 2.5mm 80.00 m' Rp 135,000.00 Rp 10,800,000.00

4 Pas. Box Panel lokal 1.00 unit Rp 4,000,000.00 Rp 4,000,000.00

5 Pas. Lampu TL Balok 1 x 36 watt 24.00 bh Rp 165,000.00 Rp 3,960,000.00

6 Pas. Lampu pijar SL 1 x 18 watt 8.00 bh Rp 65,000.00 Rp 520,000.00

7 Pas. Saklar Tunggal ex Broco 4.00 bh Rp 20,000.00 Rp 80,000.00

8 Pas. Saklar ganda ex Broco 8.00 bh Rp 25,000.00 Rp 200,000.00

9 Pas. Stop Kontak ex Broco 12.00 bh Rp 25,000.00 Rp 300,000.00

JUMLAH Rp 26,188,000.00 Rp 26,188,000.00 26,188,000.00

XI PEKERJAAN PENGECATAN

1 Pek. Cat Dinding sek. Vinilex 1,396.48 m2 Rp 15,500.00 Rp 21,645,440.00

2 Pek. Cat minyak dinding sek. SEIV 256.00 m2 Rp 28,000.00 Rp 7,168,000.00

3 Pek. Cat Plafond sek. Vinilex 272.00 m2 Rp 15,500.00 Rp 4,216,000.00

4 Pek. Cat kayu list profil plafond sek. SEIV 12.36 m2 Rp 28,000.00 Rp 346,080.00

5 Pek. Cat Besi kusen pintu dan jendela tralis sek SEIV 134.00 m2 Rp 28,000.00 Rp 3,752,000.00

JUMLAH Rp 37,127,520.00 37,127,520.00

Pipa GIP class M f 1 1/4 " (35mm)

Pipa GIP class M f 3/4 " (20mm)

Pipa GIP class M f 1/2 " (15mm)

Pipa PVC class AW f 6" (150mm)

Pipa PVC class AW f 4" (100mm)

Pipa PVC class AW f 3" (80mm)

Pas. Dop Pipa PVC f 4"

Page 26: Anal is A

XII PEKERJAAN PERAPIHAN DAN PERBAIKAN

1 Pas. Dinding bata merah 1 : bekas bongkar pagar m2 Rp - Rp -

2 Pek. Plesteran dan acian 1 ; 5 m2 Rp - Rp -

3 Pek. Cat dinding pagar sek. Vinilex m2 Rp - Rp -

4 Pas. Kembali pagar tralis pengaman ls Rp - Rp -

5 Pek. Cat besi Pagar Tralis sek. SEIV m2 Rp - Rp -

6 Pek. Perbaikan jalan masuk lokasi m2 Rp - Rp -

JUMLAH Rp - -

JUMLAH I - XIV Rp 1,278,661,263.86 1,278,753,117.86

PPN 10 % Rp 127,866,126.39

JUMLAH TOTAL BIAYA FISIK Rp 1,406,527,390.25

BIAYA PERENCANAAN

BIAYA PENGAWASAN Rp 49,228,458.66

BIAYA UMUM PENGELOLAAN

JUMLAH TOTAL BIAYA FISIK Rp 1,455,755,848.90

Terbilang : DIBULATKAN Rp 1,455,760,000.00

Satu milyar empat ratus dua puluh sembilan juta lima ratus enam puluh ribu rupiah

Bekasi, 10 November 2008

MENGETAHUI/MENYETUJUI DISUSUN :

KEPALA LEMBAGA PEMASYARAKATAN PERENCANA

KELAS II A BEKASI

Drs. H. DEDDY SYAMSUDIN. Bc.IP. MH Ir.H. A. ARDIANSYAH

NIP 040.030.751

Page 27: Anal is A

20000

85000

300000

1600000

250000

Page 28: Anal is A

54.4

272

331.9907

74697907

150000

20000

17500

320000

600000

1200000

2000000

1500000

6500

7000

17500

14000

Page 29: Anal is A

112500

35000

27500

12500

4000

3500

Page 30: Anal is A

ANALISA BIAYA KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN

KODE URAIAN PEKERJAAN koefisien SATUAN HARGA SATUAN ( Rp) JUMLAH HARGA (Rp)

G.35.b 1 M3 Membuat beton dengan mutu k.225 ready mix) I Bahan

30.a Readymix Beton K.225, tanpa pompa ( selang ) 1.00 m3 521,400.00 Rp 521,400.00

Jumlah (1) Rp 521,400.00

II Tenaga 1 Pekerja 2.50 oh 50,000.00 Rp 125,000.00 15 Tukang batu trampil 0.25 oh 68,750.00 Rp 17,187.50 29 Pembantu Mekanik 0.10 oh 61,875.00 Rp 6,187.50 4 Mandor 0.30 oh 93,750.00 Rp 28,125.00

Jumlah (2) Rp 176,500.00

Jumlah (1) + (2) Rp 697,900.00 Keuntungan 10% Rp 69,790.00

Jumlah Rp 767,690.00 Kode Membuat beton dengan mutu k.300 ready mix) Rp 767,700.00 G.35.b

KODE URAIAN PEKERJAAN koefisien SATUAN HARGA SATUAN ( Rp) JUMLAH HARGA (Rp)

G.25 1 kg Pembesian dengan Besi Polos atau ulir I Bahan

12e Besi beton rata-rata 1.05 m3 10,868.00 Rp 11,411.40

Jumlah (1) Rp 11,411.40

II Tenaga 1 Pekerja 0.01 oh 50,000.00 Rp 350.00 9 Tukang besi beton trampil 0.01 oh 62,500.00 Rp 437.50 12 Kepala tukang besi beton 0.00 oh 75,000.00 Rp 52.50 4 Mandor 0.00 oh 93,750.00 Rp 281.25

Jumlah (2) Rp 1,121.25

Jumlah (1) + (2) Rp 12,532.65 Keuntungan 10% Rp 1,253.27

Jumlah Rp 13,785.91 Kode Pembesian dengan Besi Polos atau ulir Rp 13,800.00 G.25

KODE URAIAN PEKERJAAN koefisien SATUAN HARGA SATUAN ( Rp) JUMLAH HARGA (Rp)

G.36 m' Membuat Beton struktur Bor Pile D-50 cm K.300 Besi 25 Kg/m3

1 pekerjaan Pengeboran 1.00 m' 275,000.00 Rp 275,000.00 2 Membuat beton dengan mutu k.300 9ready mix) 0.24 m3 767,700.00 Rp 181,177.20 3 Pembesian dengan Besi Polos atau ulir 25.00 kg 13,800.00 Rp 345,000.00

Jumlah Rp 801,177.20 Kode Membuat Beton struktur Bor Pile D-50 cm K.300 Besi 20 Kg/m3 Rp 801,200.00 G.36

Page 31: Anal is A

KODE URAIAN PEKERJAAN koefisien SATUAN HARGA SATUAN ( Rp) JUMLAH HARGA (Rp)

G.32 1 m2 Pasang Bekisting Untuk Lantai I Bahan

9.K Kayu Terentang papan 0.04 m3 Rp 1,240,932.00 Rp 49,637.28 20.a Paku Medan 3-5 mm 0.40 kg Rp 13,200.00 Rp 5,280.00 54.e e. Minyak bekisting 0.20 ltr Rp 8,800.00 Rp 1,760.00

9.j Kayu Borneo Super balok 0.02 m3 Rp 3,025,000.00 Rp 45,375.00 9.q Plywood 9 mm 0.35 lbr Rp 198,000.00 Rp 69,300.00 9.o Dolken Kayu galam 3.00 btg Rp 19,800.00 Rp 59,400.00

Jumlah (1) Rp 230,752.28

II Tenaga 1 Pekerja 0.32 oh 50,000.00 Rp 16,000.00 6 Tukang kayu trampil 0.33 oh 75,000.00 Rp 24,750.00 7 Kepala tukang kayu 0.03 oh 81,250.00 Rp 2,681.25 4 Mandor 0.01 oh 93,750.00 Rp 562.50

Jumlah (2) Rp 43,993.75

Jumlah (1) + (2) Rp 274,746.03 Keuntungan 10% Rp 27,474.60

Jumlah Rp 302,220.63 Kode Pasang Bekisting Untuk Lantai Rp 302,200.00 G.32

KODE URAIAN PEKERJAAN koefisien SATUAN HARGA SATUAN ( Rp) JUMLAH HARGA (Rp)

G.31 1 m2 Pasang Bekisting Untuk Balok I Bahan

9.k Kayu Terentang papan 0.04 m3 Rp 1,240,932.00 Rp 49,637.28 20.a Paku Medan 3-5 mm 0.40 kg Rp 13,200.00 Rp 5,280.00 54.e e. Minyak bekisting 0.20 ltr Rp 8,800.00 Rp 1,760.00

9.j Kayu Borneo Super balok 0.02 m3 Rp 3,025,000.00 Rp 54,450.00 9.q Plywood 9 mm 0.35 lbr Rp 198,000.00 Rp 69,300.00 9.o Dolken Kayu galam 1.00 btg Rp 19,800.00 Rp 19,800.00

Jumlah (1) Rp 200,227.28

II Tenaga 1 Pekerja 0.32 oh 50,000.00 Rp 16,000.00 6 Tukang kayu trampil 0.33 oh 75,000.00 Rp 24,750.00 7 Kepala tukang kayu 0.03 oh 81,250.00 Rp 2,681.25 4 Mandor 0.01 oh 93,750.00 Rp 562.50

Jumlah (2) Rp 43,993.75

Jumlah (1) + (2) Rp 244,221.03 Keuntungan 10% Rp 24,422.10

Jumlah Rp 268,643.13 Kode Pasang Bekisting Untuk Balok Rp 268,600.00 G.31

KODE URAIAN PEKERJAAN koefisien SATUAN HARGA SATUAN ( Rp) JUMLAH HARGA (Rp)

G.30 1 m2 Pasang Bekisting Untuk Kolom I Bahan

9.k Kayu Terentang papan 0.05 m3 Rp 1,240,932.00 Rp 55,841.94 20.a Paku Medan 3-5 mm 0.40 kg Rp 13,200.00 Rp 5,280.00 54.e e. Minyak bekisting 0.20 ltr Rp 8,800.00 Rp 1,760.00

9.j Kayu Borneo Super balok 0.02 m3 Rp 3,025,000.00 Rp 45,375.00 9.q Plywood 9 mm 0.35 lbr Rp 198,000.00 Rp 69,300.00 9.o Dolken Kayu galam 1.00 btg Rp 19,800.00 Rp 19,800.00

Jumlah (1) Rp 197,356.94

II Tenaga 1 Pekerja 0.30 oh 50,000.00 Rp 15,000.00 6 Tukang kayu trampil 0.33 oh 75,000.00 Rp 24,750.00 7 Kepala tukang kayu 0.03 oh 81,250.00 Rp 2,681.25 4 Mandor 0.01 oh 93,750.00 Rp 562.50

Jumlah (2) Rp 42,993.75

Jumlah (1) + (2) Rp 240,350.69 Keuntungan 10% Rp 24,035.07

Jumlah Rp 264,385.76 Kode Pasang Bekisting Untuk Kolom Rp 264,400.00 G.30

KODE URAIAN PEKERJAAN koefisien SATUAN HARGA SATUAN ( Rp) JUMLAH HARGA (Rp)

G29 1 m2 Pasang Bekisting Untuk Sloof I Bahan

9.k Kayu Terentang papan 0.03 m3 Rp 1,240,932.00 Rp 37,227.96 20.a Paku Medan 3-5 mm 0.20 kg Rp 13,200.00 Rp 2,640.00 54.e e. Minyak bekisting 0.10 ltr Rp 8,800.00 Rp 880.00

Page 32: Anal is A

Jumlah (1) Rp 40,747.96

II Tenaga 1 Pekerja 0.30 oh 50,000.00 Rp 15,000.00 6 Tukang kayu trampil 0.26 oh 75,000.00 Rp 19,500.00 7 Kepala tukang kayu 0.03 oh 81,250.00 Rp 2,112.50 4 Mandor 0.01 oh 93,750.00 Rp 468.75

Jumlah (2) Rp 37,081.25

Jumlah (1) + (2) Rp 77,829.21 Keuntungan 10% Rp 7,782.92

Jumlah Rp 85,612.13 Kode Pasang Bekisting Untuk Sloof Rp 85,600.00 G29

KODE URAIAN PEKERJAAN koefisien SATUAN HARGA SATUAN ( Rp) JUMLAH HARGA (Rp)

G.35 1 M3 Membuat beton dengan mutu k.225 Site mix I Bahan

8.b Semen PC 350.00 kg Rp 1,056.00 Rp 369,600.00 3.b Pasir Beton 0.65 m3 Rp 165,000.00 Rp 107,250.00 2.a Batu pecah /mesin Φ 1/2 cm 0.65 m3 Rp 181,500.00 Rp 117,975.00

Jumlah (1) Rp 594,825.00

II Tenaga 1 Pekerja 2.50 oh 50,000.00 Rp 125,000.00 6 Tukang kayu trampil 0.25 oh 75,000.00 Rp 18,750.00 7 Kepala tukang kayu 0.10 oh 81,250.00 Rp 8,125.00 4 Mandor 0.30 oh 93,750.00 Rp 28,125.00

Jumlah (2) Rp 180,000.00

Jumlah (1) + (2) Rp 774,825.00 Keuntungan 10% Rp 77,482.50

Jumlah Rp 852,307.50 Kode Membuat beton dengan mutu k.225 Site mix Rp 852,300.00 G.35

KODE URAIAN PEKERJAAN koefisien SATUAN HARGA SATUAN ( Rp) JUMLAH HARGA (Rp)

1 M3 Membuat beton dengan mutu k.175 Site mix I Bahan

8.b Semen PC 225.00 kg Rp 1,056.00 Rp 237,600.00 3.b Pasir Beton 0.69 m3 Rp 165,000.00 Rp 113,850.00 2.a Batu pecah /mesin Φ 1/2 cm 0.71 m3 Rp 181,500.00 Rp 128,865.00

Jumlah (1) Rp 480,315.00

II Tenaga 1 Pekerja 2.50 oh 50,000.00 Rp 125,000.00 6 Tukang kayu trampil 0.25 oh 75,000.00 Rp 18,750.00 7 Kepala tukang kayu 0.10 oh 81,250.00 Rp 8,125.00 4 Mandor 0.30 oh 93,750.00 Rp 28,125.00

Jumlah (2) Rp 180,000.00

Jumlah (1) + (2) Rp 660,315.00 Keuntungan 10% Rp 66,031.50

Jumlah Rp 726,346.50 Kode Membuat beton dengan mutu k.225 Site mix Rp 726,300.00 G.35

KODE URAIAN PEKERJAAN koefisien SATUAN HARGA SATUAN ( Rp) JUMLAH HARGA (Rp)

G.35.a 1 M3 Membuat beton dengan mutu k.225 ready mix) I Bahan

30.a Readymix Beton K.225, tanpa pompa ( selang ) 1.00 m3 Rp 521,400.00 Rp 521,400.00

Jumlah (1) Rp 521,400.00

II Tenaga 1 Pekerja 2.50 oh 50,000.00 Rp 125,000.00 6 Tukang kayu trampil 0.25 oh 75,000.00 Rp 18,750.00 7 Kepala tukang kayu 0.10 oh 81,250.00 Rp 8,125.00 4 Mandor 0.30 oh 93,750.00 Rp 28,125.00

Jumlah (2) Rp 180,000.00

Jumlah (1) + (2) Rp 701,400.00 Keuntungan 10% Rp 70,140.00

Jumlah Rp 771,540.00 Kode Membuat beton dengan mutu k.225 ready mix) Rp 771,500.00 G.35.a

Page 33: Anal is A

KODE URAIAN PEKERJAAN koefisien SATUAN HARGA SATUAN ( Rp) JUMLAH HARGA (Rp)

G28 1 m2 Pasang Bekisting Untuk Pondasi I Bahan

9.k Kayu Terentang papan 0.03 m3 Rp 1,240,932.00 Rp 37,227.96 20.a Paku Medan 3-5 mm 0.30 kg Rp 13,200.00 Rp 3,960.00 54.e e. Minyak bekisting 0.10 ltr Rp 8,800.00 Rp 880.00

Jumlah (1) Rp 42,067.96

II Tenaga 1 Pekerja 0.30 oh 50,000.00 Rp 15,000.00 6 Tukang kayu trampil 0.26 oh 75,000.00 Rp 19,500.00 7 Kepala tukang kayu 0.03 oh 81,250.00 Rp 2,112.50 4 Mandor 0.01 oh 93,750.00 Rp 468.75

Jumlah (2) Rp 37,081.25

Jumlah (1) + (2) Rp 79,149.21 Keuntungan 10% Rp 7,914.92

Jumlah Rp 87,064.13 Kode Pasang Bekisting Untuk Pondasi Rp 87,100.00 G28

KODE URAIAN PEKERJAAN koefisien SATUAN HARGA SATUAN ( Rp) JUMLAH HARGA (Rp)

G.38a 1 m3 Pek. Pas. Pondasi Tapak Beton K.300 - Besi 125 kg/m3

1 Pas Bekisting Pondasi (G28) 0.60 m2 87,100.00 Rp 52,260.00 2 Membuat beton dengan mutu k.300 ready mix (G35b) 1.00 m3 852,300.00 Rp 852,300.00 3 Pembesian dengan Besi Polos atau ulir (G25) 125.00 kg 13,800.00 Rp 1,725,000.00

Jumlah Rp 2,629,560.00 Kode Pek. Pas. Pondasi Tapak Beton K.300 - Besi 125 kg/m3 Rp 2,629,600.00 G.38a

KODE URAIAN PEKERJAAN koefisien SATUAN HARGA SATUAN ( Rp) JUMLAH HARGA (Rp)

G.39 1 m3 Pas. Sloof Beton 30/50 (S1) K300-150kg/m3

1 Pas Bekisting Sloof (G29) 2.00 m2 85,600.00 Rp 171,200.00 2 Membuat beton dengan mutu k.300 site mix (G35) 1.00 m3 767,700.00 Rp 767,700.00 3 Pembesian dengan Besi Polos atau ulir (G25) 150.00 kg 13,800.00 Rp 2,070,000.00

Jumlah Rp 3,008,900.00 Kode Pas. Sloof Beton 30/50 (S1) K300-150kg/m3 Rp 3,008,900.00 G.39

Page 34: Anal is A

KODE URAIAN PEKERJAAN koefisien SATUAN HARGA SATUAN ( Rp) JUMLAH HARGA (Rp)

G.39c 1 m3 Pas. Sloof Beton 30/50 (S2) K300-125kg/m3

1 Pas Bekisting Sloof (G29) 3.33 m2 85,600.00 Rp 285,048.00 2 Membuat beton dengan mutu k.300 site mix (G35) 1.00 m3 767,700.00 Rp 767,700.00 3 Pembesian dengan Besi Polos atau ulir (G25) 125.00 kg 13,800.00 Rp 1,725,000.00

Jumlah Rp 2,777,748.00 Kode Pas. Sloof Beton 30/50 (S2) K300-125kg/m3 Rp 2,777,700.00 G.39c

KODE URAIAN PEKERJAAN koefisien SATUAN HARGA SATUAN ( Rp) JUMLAH HARGA (Rp)

1 m3 Pas. Sloof Beton 15/20 (S3) K175-150kg/m3

1 Pas Bekisting Sloof (G29) 3.33 m2 85,600.00 Rp 285,048.00 2 Membuat beton dengan mutu k.175 site mix (G35) 1.00 m3 726,300.00 Rp 726,300.00 3 Pembesian dengan Besi Polos atau ulir (G25) 150.00 kg 13,800.00 Rp 2,070,000.00

Jumlah Rp 3,081,348.00 Kode Pas. Sloof Beton 15/20 (S3) K175-150kg/m3 Rp 3,081,300.00 -

Page 35: Anal is A

KODE URAIAN PEKERJAAN koefisien SATUAN HARGA SATUAN ( Rp) JUMLAH HARGA (Rp)

G.40.I 1 m3 Pas. Kolom beton tipe 30/40 (K1) K.225 -220kg/m3

1 Pas Bekisting Kolom (G30) 4.50 m2 264,400.00 Rp 1,189,800.00 2 Membuat beton dengan mutu k.225 site mix (G35) 1.00 m3 767,700.00 Rp 767,700.00 3 Pembesian dengan Besi Polos atau ulir (G25) 220.00 kg 13,800.00 Rp 3,036,000.00

Jumlah Rp 4,993,500.00 Kode Pas. Kolom beton tipe 30/40 (K1) K.225 -220kg/m3 Rp 4,993,500.00 G.40.I

KODE URAIAN PEKERJAAN koefisien SATUAN HARGA SATUAN ( Rp) JUMLAH HARGA (Rp)

G.40.i 1 m3 Pas. Kolom beton 15/25 (K3) K.175 - 145 kg/m3

1 Pas Bekisting Kolom (G30) 5.00 m2 264,400.00 Rp 1,322,000.00 2 Membuat beton dengan mutu k.225 site mix (G35) 1.00 m3 767,700.00 Rp 767,700.00 3 Pembesian dengan Besi Polos atau ulir (G25) 145.00 kg 13,800.00 Rp 2,001,000.00

Jumlah Rp 4,090,700.00 Kode Pas. Kolom beton 15/25 (K3) K.175 - 145 kg/m3 Rp 4,090,700.00 G.40.i

KODE URAIAN PEKERJAAN koefisien SATUAN HARGA SATUAN ( Rp) JUMLAH HARGA (Rp)

G.40.g 1 m3 Pas. . Kolom 15/35 (KK) K.175-150kg/m3

1 Pas Bekisting Kolom (G30) 3.33 m2 268,600.00 Rp 895,243.80 2 Membuat beton dengan mutu k.225 site mix (G35) 1.00 m3 771,500.00 Rp 771,500.00 3 Pembesian dengan Besi Polos atau ulir (G25) 150.00 kg 13,800.00 Rp 2,070,000.00

Jumlah Rp 3,736,743.80 Kode Pas. . Kolom 15/35 (KK) K.175-150kg/m3 Rp 3,736,700.00 G.40.g

KODE URAIAN PEKERJAAN koefisien SATUAN HARGA SATUAN ( Rp) JUMLAH HARGA (Rp)

1 m3 Pas. Kolom Praktis 15/15 (Kp) K175-150kg/m3

1 Pas Bekisting Kolom (G30) 4.62 m2 268,600.00 Rp 1,240,932.00 2 Membuat beton dengan mutu k.225 site mix (G35) 1.00 m3 771,500.00 Rp 771,500.00 3 Pembesian dengan Besi Polos atau ulir (G25) 150.00 kg 13,800.00 Rp 2,070,000.00

Jumlah Rp 4,082,432.00 Kode Pas. Kolom Praktis 15/15 (Kp) K175-150kg/m3 Rp 4,082,400.00 -

Page 36: Anal is A

KODE URAIAN PEKERJAAN koefisien SATUAN HARGA SATUAN ( Rp) JUMLAH HARGA (Rp)

G.42.b 1 m3 Pas. Balok lintel 15/25 (BL) K175-120kg/m3

1 Pas Bekisting Balok (G31) 13.57 m2 268,600.00 Rp 3,645,170.60 2 Membuat beton dengan mutu k.225 ready mix (G35a) 1.00 m3 771,500.00 Rp 771,500.00 3 Pembesian dengan Besi Polos atau ulir (G25) 120.00 kg 13,800.00 Rp 1,656,000.00

Jumlah Rp 6,072,670.60 Kode Pas. Balok lintel 15/25 (BL) K175-120kg/m3 Rp 6,072,700.00 G.42.b

KODE URAIAN PEKERJAAN koefisien SATUAN HARGA SATUAN ( Rp) JUMLAH HARGA (Rp)

G.42g 1 m3 Pas. Plat Lantai T=12 cm K.225 -Besi 125 kg/m3

1 Pas Bekisting Plat (G32) 7.93 m2 302,200.00 Rp 2,397,352.60 2 Membuat beton dengan mutu k.225 ready mix (G35a) 1.00 m3 771,500.00 Rp 771,500.00 3 Pembesian dengan Besi Polos atau ulir (G25) 125.00 kg 13,800.00 Rp 1,725,000.00

Jumlah Rp 4,893,852.60 Kode Pas. Plat Lantai T=12 cm K.225 -Besi 130 kg/m3 Rp 4,893,900.00 G.42g

KODE URAIAN PEKERJAAN koefisien SATUAN HARGA SATUAN ( Rp) JUMLAH HARGA (Rp)

G.46.b 1 m3 Pasang Dak Canopy beton T=10 cm K225-100kg/m3

1 Pas Bekisting Plat (G31) 3.21 m2 268,600.00 Rp 863,280.40 2 Membuat beton dengan mutu k.225 site mix (G35) 1.00 m3 852,300.00 Rp 852,300.00 3 Pembesian dengan Besi Polos atau ulir (G25) 100.00 kg 13,800.00 Rp 1,380,000.00

Jumlah Rp 3,095,580.40 Kode Pasang Dak Canopy beton T=10 cm K225-100kg/m3 Rp 3,095,600.00 G.46.b

KODE URAIAN PEKERJAAN koefisien SATUAN HARGA SATUAN ( Rp) JUMLAH HARGA (Rp)

1 m3 Pas. Ring balk 15/15 K175-150kg/m3

1 Pas Bekisting Plat (G32) 7.93 m2 2,681.25 Rp 21,270.36 2 Membuat beton dengan mutu k.225 ready mix (G35a) 1.00 m3 852,300.00 Rp 852,300.00 3 Pembesian dengan Besi Polos atau ulir (G25) 150.00 kg 13,800.00 Rp 2,070,000.00

Jumlah Rp 2,943,570.36 Kode Pas. Ring balk 15/15 K175-150kg/m3 Rp 2,943,600.00

Page 37: Anal is A

KODE URAIAN PEKERJAAN koefisien SATUAN HARGA SATUAN ( Rp) JUMLAH HARGA (Rp)

1 m3 Pas. Balok Portal 30/50 (B1) K225-195kg/m3

1 Pas Bekisting Balok 8.97 m2 268,600.00 Rp 2,408,536.20 2 Membuat beton dengan mutu k.225 ready mix (G35a) 1.00 m3 852,300.00 Rp 852,300.00 3 Pembesian dengan Besi Polos atau ulir (G25) 195.00 kg 13,800.00 Rp 2,691,000.00

Jumlah Rp 5,951,836.20 Kode Pas. Balok Portal 30/50 (B1) K225-195kg/m3 Rp 5,951,800.00

KODE URAIAN PEKERJAAN koefisien SATUAN HARGA SATUAN ( Rp) JUMLAH HARGA (Rp)

1 m3 Pas. Balok Portal 30/40 (B2) K225-175kg/m3

1 Pas Bekisting Balok 9.41 m2 268,600.00 Rp 2,526,532.18 2 Membuat beton dengan mutu k.225 ready mix (G35a) 1.00 m3 852,300.00 Rp 852,300.00 3 Pembesian dengan Besi Polos atau ulir (G25) 175.00 kg 13,800.00 Rp 2,415,000.00

Jumlah Rp 5,793,832.18 Kode Pas. Balok Portal 30/40 (B2) K225-175kg/m3 Rp 5,793,800.00

KODE URAIAN PEKERJAAN koefisien SATUAN HARGA SATUAN ( Rp) JUMLAH HARGA (Rp)

1 m3 Pas. Balok Portal 20/30 (B3) K225-190kg/m3

1 Pas Bekisting Balok 13.46 m2 268,600.00 Rp 3,614,281.60 2 Membuat beton dengan mutu k.225 ready mix (G35a) 1.00 m3 852,300.00 Rp 852,300.00 3 Pembesian dengan Besi Polos atau ulir (G25) 190.00 kg 13,800.00 Rp 2,622,000.00

Jumlah Rp 7,088,581.60 Kode Pas. Balok Portal 20/30 (B3) K225-190kg/m3 Rp 7,088,600.00

KODE URAIAN PEKERJAAN koefisien SATUAN HARGA SATUAN ( Rp) JUMLAH HARGA (Rp)

1 m3 Pas. Balok Portal 20/50 (B4) K225-195kg/m3

1 Pas Bekisting Balok 10.20 m2 268,600.00 Rp 2,739,720.00 2 Membuat beton dengan mutu k.225 ready mix (G35a) 1.00 m3 852,300.00 Rp 852,300.00 3 Pembesian dengan Besi Polos atau ulir (G25) 195.00 kg 13,800.00 Rp 2,691,000.00

Jumlah Rp 6,283,020.00 Kode Pas. Balok Portal 20/50 (B4) K225-195kg/m3 Rp 6,283,000.00 -

Page 38: Anal is A

KODE URAIAN PEKERJAAN koefisien SATUAN HARGA SATUAN ( Rp) JUMLAH HARGA (Rp)

1 m3 Pas. Balok Portal 30/100 (B5) K225-195kg/m3

1 Pas Bekisting Balok 8.26 m2 268,600.00 Rp 2,218,367.40 2 Membuat beton dengan mutu k.225 ready mix (G35a) 1.00 m3 852,300.00 Rp 852,300.00 3 Pembesian dengan Besi Polos atau ulir (G25) 195.00 kg 13,800.00 Rp 2,691,000.00

Jumlah Rp 5,761,667.40 Kode Pas. Balok Portal 30/100 (B5) K225-195kg/m3 Rp 5,761,700.00

KODE URAIAN PEKERJAAN koefisien SATUAN HARGA SATUAN ( Rp) JUMLAH HARGA (Rp)

D12 1m2 Pas. Dinding bata merah 1 : 5 ( 1/2 bata)

I Bahan 4.b Batu bata klas 2 70.00 bh Rp 330.00 Rp 23,100.00 8.b Semen PC 9.68 kg Rp 1,056.00 Rp 10,222.08 3.a Pasir : Pasang/tras 0.05 m3 Rp 165,000.00 Rp 7,425.00

Jumlah (1) Rp 40,747.08

II Tenaga 1 Pekerja 0.32 oh 50,000.00 Rp 16,000.00 15 Tukang batu trampil 0.10 oh 68,750.00 Rp 6,875.00 16 Kepala tukang batu 0.01 oh 75,000.00 Rp 750.00 4 Mandor 0.02 oh 93,750.00 Rp 1,406.25

Jumlah (2) Rp 25,031.25

Jumlah (1) + (2) Rp 65,778.33 Keuntungan 10% Rp 6,577.83

Jumlah Rp 72,356.16 Kode Pas. Dinding bata merah 1 : 5 ( 1/2 bata) Rp 72,400.00 D12

KODE URAIAN PEKERJAAN koefisien SATUAN HARGA SATUAN ( Rp) JUMLAH HARGA (Rp)

B.1 1 M3 Pek. Galian Tanah Pondasi dan Sloof I Bahan

- - Rp -

Jumlah (1) Rp -

II Tenaga 1 Pekerja 0.40 oh 50,000.00 Rp 20,000.00 15 Tukang batu trampil - oh 68,750.00 Rp - 16 Kepala tukang batu - oh 75,000.00 Rp - 4 Mandor 0.04 oh 93,750.00 Rp 3,750.00

Jumlah (2) Rp 23,750.00

Jumlah (1) + (2) Rp 23,750.00 Keuntungan 10% Rp 2,375.00

Jumlah Rp 26,125.00 Kode Pek. Galian Tanah Pondasi dan Sloof Rp 26,100.00 B.1

Page 39: Anal is A

KODE URAIAN PEKERJAAN koefisien SATUAN HARGA SATUAN ( Rp) JUMLAH HARGA (Rp)

B.11 1 M3 Pek. Urugan Pasir bawah pondasi/lantai I Bahan

3.c Pasir Urug 1.20 m3 Rp 121,000.00 Rp 145,200.00

Jumlah (1) Rp 145,200.00

II Tenaga 1 Pekerja 0.30 oh 50,000.00 Rp 15,000.00 15 Tukang batu trampil - oh 68,750.00 Rp - 16 Kepala tukang batu - oh 75,000.00 Rp - 4 Mandor 0.01 oh 93,750.00 Rp 937.50

Jumlah (2) Rp 15,937.50

Jumlah (1) + (2) Rp 161,137.50 Keuntungan 10% Rp 16,113.75

Jumlah Rp 177,251.25 Kode Pek. Urugan Pasir bawah pondasi T=5 cm Rp 177,300.00 B.11

KODE URAIAN PEKERJAAN koefisien SATUAN HARGA SATUAN ( Rp) JUMLAH HARGA (Rp)

E.5. 1 M2 Pek. Plesteran dan Acian 1 : 5

I Bahan

8.b Semen PC 8.71 kg Rp 1,056.00 Rp 9,199.87 3.a Pasir : Pasang/tras 0.02 m3 Rp 165,000.00 Rp 3,630.00

Jumlah (1) Rp 12,829.87

II Tenaga 1 Pekerja 0.20 oh 50,000.00 Rp 10,000.00 15 Tukang batu trampil 0.15 oh 68,750.00 Rp 10,312.50 16 Kepala tukang batu 0.02 oh 75,000.00 Rp 1,125.00 4 Mandor 0.01 oh 93,750.00 Rp 937.50

Jumlah (2) Rp 22,375.00

Jumlah (1) + (2) Rp 35,204.87 Keuntungan 10% Rp 3,520.49

Jumlah Rp 38,725.36 Kode Pek. Plesteran dan Acian 1 : 5 Rp 38,700.00 E.5.

KODE URAIAN PEKERJAAN koefisien SATUAN HARGA SATUAN ( Rp) JUMLAH HARGA (Rp)

B.9 1 M3 Pek. Urugan kembali bekas Galian I Bahan

Jumlah (1) Rp -

II Tenaga 1 Pekerja 0.32 oh 50,000.00 Rp 16,000.00 15 Tukang batu trampil - oh 68,750.00 Rp - 16 Kepala tukang batu - oh 75,000.00 Rp - 4 Mandor 0.02 oh 93,750.00 Rp 1,781.25

Jumlah (2) Rp 17,781.25

Jumlah (1) + (2) Rp 17,781.25 Keuntungan 10% Rp 1,778.13

Jumlah Rp 19,559.38 Kode Pek. Urugan kembali bekas Galian Rp 19,600.00 B.9

Page 40: Anal is A

KODE URAIAN PEKERJAAN koefisien SATUAN HARGA SATUAN ( Rp) JUMLAH HARGA (Rp)

E.2 1 M2 Plesteran dan acian topian,kolom beton adukan 1pc : 2 ps

I Bahan

8.b Semen PC 8.52 kg Rp 1,056.00 Rp 8,997.12 3.a Pasir : Pasang/tras 0.02 m3 Rp 165,000.00 Rp 2,805.00

Jumlah (1) Rp 11,802.12

II Tenaga 1 Pekerja 0.20 oh 50,000.00 Rp 10,000.00 15 Tukang batu trampil 0.15 oh 68,750.00 Rp 10,312.50 16 Kepala tukang batu 0.02 oh 75,000.00 Rp 1,125.00 4 Mandor 0.01 oh 93,750.00 Rp 937.50

Jumlah (2) Rp 22,375.00

Jumlah (1) + (2) Rp 34,177.12 Keuntungan 10% Rp 3,417.71

Jumlah Rp 37,594.83 Kode Plesteran dan acian topian,kolom beton adukan 1pc : 2 ps Rp 37,600.00 E.2

KODE URAIAN PEKERJAAN koefisien SATUAN HARGA SATUAN ( Rp) JUMLAH HARGA (Rp)

D10 1m2 Pasangan dinding 1/2 batu bata kamar mandi/WC 1 pc : 3ps t=1.6

I Bahan 4.b Batu bata klas 2 70.00 bh Rp 330.00 Rp 23,100.00 8.b Semen PC 14.37 kg Rp 1,056.00 Rp 15,174.72 3.a Pasir : Pasang/tras 0.04 m3 Rp 165,000.00 Rp 6,600.00

Jumlah (1) Rp 44,874.72

II Tenaga 1 Pekerja 0.32 oh 50,000.00 Rp 16,000.00 15 Tukang batu trampil 0.10 oh 68,750.00 Rp 6,875.00 16 Kepala tukang batu 0.01 oh 75,000.00 Rp 750.00 4 Mandor 0.02 oh 93,750.00 Rp 1,406.25

Jumlah (2) Rp 25,031.25

Jumlah (1) + (2) Rp 69,905.97 Keuntungan 10% Rp 6,990.60

Jumlah Rp 76,896.57 Kode Pasangan dinding 1/2 batu bata kamar mandi/WC 1 pc : 3ps t=1.6 Rp 76,900.00 D10

KODE URAIAN PEKERJAAN koefisien SATUAN HARGA SATUAN ( Rp) JUMLAH HARGA (Rp)

E.3 1 M2 Plesteran dan acian dinding adukan 1pc : 3ps

I Bahan

8.b Semen PC 6.48 kg Rp 1,056.00 Rp 6,842.88 3.a Pasir : Pasang/tras 0.02 m3 Rp 165,000.00 Rp 3,135.00

Jumlah (1) Rp 9,977.88

II Tenaga 1 Pekerja 0.20 oh 50,000.00 Rp 10,000.00 15 Tukang batu trampil 0.15 oh 68,750.00 Rp 10,312.50 16 Kepala tukang batu 0.02 oh 75,000.00 Rp 1,125.00 4 Mandor 0.01 oh 93,750.00 Rp 937.50

Jumlah (2) Rp 22,375.00

Jumlah (1) + (2) Rp 32,352.88 Keuntungan 10% Rp 3,235.29

Jumlah Rp 35,588.17 Kode Plesteran dan acian dinding adukan 1pc : 3ps Rp 35,600.00 E.3

KODE URAIAN PEKERJAAN koefisien SATUAN HARGA SATUAN ( Rp) JUMLAH HARGA (Rp)

K.26 1 M2 Pasang rangka atap baja ringan galvanized (G.550)U.75 t=0.83 top chord, U.75 t=0.53 bottom chord dan web memberGDB t=0.48 mm reng, foot plate, wind bracing,lat diapragma

I Bahan 13.a U-75 t=0.83 mm galvalum 1.10 m' Rp 28,600.00 Rp 31,460.00 13.b U-75 t=0.53 mm Galvalum 2.70 m' Rp 24,310.00 Rp 65,637.00 13.c GD-B 0.48 galvalum 4.40 m' Rp 14,300.00 Rp 62,920.00 13.d Wind Bracing PS 30 galvalum 0.80 m' Rp 5,720.00 Rp 4,576.00 13.e Plate Diafragma 5.00 bh Rp 2,860.00 Rp 14,300.00 13.f SDP HWH 12x24x22 16.00 bh Rp 1,001.00 Rp 16,016.00

13.g SDP waver 8x18x13 32.00 bh Rp 715.00 Rp 22,880.00

Jumlah (1) Rp 217,789.00

II Tenaga 1 Pekerja 0.10 oh 50,000.00 Rp 5,000.00 15 Tukang batu trampil 0.20 oh 68,750.00 Rp 13,750.00 16 Kepala tukang batu 0.02 oh 75,000.00 Rp 1,500.00 4 Mandor 0.01 oh 93,750.00 Rp 937.50

Jumlah (2) Rp 21,187.50

Jumlah (1) + (2) Rp 238,976.50 Keuntungan 10% Rp 23,897.65

Jumlah Rp 262,874.15

Page 41: Anal is A

Kode Pasang rangka atap baja ringan galvanized (G.550) Rp 262,900.00 K.26

KODE URAIAN PEKERJAAN koefisien SATUAN HARGA SATUAN ( Rp) JUMLAH HARGA (Rp)

H.3.b 1 M2 Pasang Zinc Aluminium gelombang

I Bahan 18.h -Genteng plentong press Ex Jatiwangi Type Morando 18.00 buah Rp 1,980.00 Rp 35,640.00

Jumlah (1) Rp 35,640.00

II Tenaga 1 Pekerja 0.15 oh 50,000.00 Rp 7,500.00 15 Tukang batu trampil 0.06 oh 68,750.00 Rp 4,125.00 16 Kepala tukang batu 0.01 oh 75,000.00 Rp 450.00 4 Mandor 0.01 oh 93,750.00 Rp 750.00

Jumlah (2) Rp 12,825.00

Jumlah (1) + (2) Rp 48,465.00 Keuntungan 10% Rp 4,846.50

Jumlah Rp 53,311.50 Kode Pasang Zinc Aluminium gelombang Rp 53,300.00 H.3.b

KODE URAIAN PEKERJAAN koefisien SATUAN HARGA SATUAN ( Rp) JUMLAH HARGA (Rp)

H.6.a 1 M2 Pasang Nok dan jurai

I Bahan 18.i -Genteng Bubungan Ex Jatiwangi Type Morando 5.00 buah Rp 3,080.00 Rp 15,400.00 8.b Semen PC 8.00 kg Rp 1,056.00 Rp 8,448.00 3.a Pasir : Pasang/tras 0.03 m3 Rp 165,000.00 Rp 5,280.00

Jumlah (1) Rp 29,128.00

II Tenaga 1 Pekerja 0.40 oh 50,000.00 Rp 20,000.00 15 Tukang batu trampil 0.20 oh 68,750.00 Rp 13,750.00 16 Kepala tukang batu 0.02 oh 75,000.00 Rp 1,500.00 4 Mandor 0.00 oh 93,750.00 Rp 187.50

Jumlah (2) Rp 35,437.50

Jumlah (1) + (2) Rp 64,565.50 Keuntungan 10% Rp 6,456.55

Jumlah Rp 71,022.05 Kode Pasang Nok dan jurai Rp 71,000.00 H.6.a

KODE URAIAN PEKERJAAN koefisien SATUAN HARGA SATUAN ( Rp) JUMLAH HARGA (Rp)

F.50.a 1 M2 Pasang lisplank kayu kamper singkil 3/20 dan 3/10 profil (susun)

I Bahan 9.e Kamper Singkil papan 0.01 m3 Rp 4,070,000.00 Rp 44,770.00

20 Paku rata-rata 0.05 kg Rp 13,750.00 Rp 687.50

Jumlah (1) Rp 45,457.50

II Tenaga 1 Pekerja 0.11 oh 50,000.00 Rp 5,500.00 15 Tukang batu trampil 0.22 oh 68,750.00 Rp 15,125.00 16 Kepala tukang batu 0.02 oh 75,000.00 Rp 1,650.00 4 Mandor 0.01 oh 93,750.00 Rp 468.75

Jumlah (2) Rp 22,743.75

Jumlah (1) + (2) Rp 68,201.25 Keuntungan 10% Rp 6,820.13

Jumlah Rp 75,021.38 Kode Pasang lisplank kayu kamper singkil 3/20 dan 3/10 profil (susun) Rp 75,000.00 F.50.a

KODE URAIAN PEKERJAAN koefisien SATUAN HARGA SATUAN ( Rp) JUMLAH HARGA (Rp)

I.20 1 M2 Pas. Plafond eternit asbes + rangka kayu borneo super

I Bahan 9.j Kayu Borneo Super balok 0.01 m3 Rp 3,025,000.00 Rp 36,358.17

14.a Asbes plat datar Uk 5mm x 100 x 100 1.10 bh Rp 19,140.00 Rp 21,054.00 20 Paku rata-rata 0.06 kg Rp 13,750.00 Rp 825.00

20.b Paku Triplek/eternit 0.01 kg Rp 22,000.00 Rp 198.00

Jumlah (1) Rp 58,435.17

II Tenaga 1 Pekerja 0.18 oh 50,000.00 Rp 9,000.00 15 Tukang batu trampil 0.32 oh 68,750.00 Rp 22,000.00 16 Kepala tukang batu 0.03 oh 75,000.00 Rp 2,400.00 4 Mandor 0.01 oh 93,750.00 Rp 843.75

Jumlah (2) Rp 34,243.75

Jumlah (1) + (2) Rp 92,678.92 Keuntungan 10% Rp 9,267.89

Page 42: Anal is A

Jumlah Rp 101,946.82 Kode Pas. Plafond eternit asbes + rangka kayu borneo super Rp 101,900.00 I.20

KODE URAIAN PEKERJAAN koefisien SATUAN HARGA SATUAN ( Rp) JUMLAH HARGA (Rp)

I.19 1 M2 Pas. List berprofil kayu kamper .3x3 cm

I Bahan 9.r List Profil 3x3 cm 1.10 m3 Rp 4,400.00 Rp 4,840.00

20 Paku rata-rata 0.01 kg Rp 13,750.00 Rp 137.50

Jumlah (1) Rp 4,977.50

II Tenaga 1 Pekerja 0.05 oh 50,000.00 Rp 2,500.00 15 Tukang batu trampil 0.05 oh 68,750.00 Rp 3,437.50 16 Kepala tukang batu 0.01 oh 75,000.00 Rp 375.00 4 Mandor 0.00 oh 93,750.00 Rp 281.25

Jumlah (2) Rp 6,593.75

Jumlah (1) + (2) Rp 11,571.25 Keuntungan 10% Rp 1,157.13

Jumlah Rp 12,728.38 Kode Pas. List berprofil kayu kamper .3x3 cm Rp 12,700.00 I.19

KODE URAIAN PEKERJAAN koefisien SATUAN HARGA SATUAN ( Rp) JUMLAH HARGA (Rp)

F.41.a 1 M2 Gantungan plafond kayu 5/10 borneo super

I Bahan 9.j Kayu Borneo Super balok 1.05 m3 Rp 3,025,000.00 Rp 3,176,250.00

20 Paku rata-rata 0.75 kg Rp 13,750.00 Rp 10,312.50

Jumlah (1) Rp 3,186,562.50

II Tenaga 1 Pekerja 0.20 oh 50,000.00 Rp 10,000.00 15 Tukang batu trampil 0.30 oh 68,750.00 Rp 20,625.00 16 Kepala tukang batu 0.03 oh 75,000.00 Rp 2,250.00 4 Mandor 0.01 oh 93,750.00 Rp 937.50

Jumlah (2) Rp 33,812.50

Jumlah (1) + (2) Rp 3,220,375.00 Keuntungan 10% Rp 322,037.50

Jumlah Rp 3,542,412.50 Kode Gantungan plafond kayu 5/10 borneo super Rp 3,542,400.00 F.41.a

KODE URAIAN PEKERJAAN koefisien SATUAN HARGA SATUAN ( Rp) JUMLAH HARGA (Rp)

C.14 1 M2 Pasangan Batu kosong/Anstampeng

I Bahan 1.a Batu belah/kali 1.20 m3 Rp 154,000.00 Rp 184,800.00 3.c Pasir Urug 0.30 m3 Rp 121,000.00 Rp 36,300.00

Jumlah (1) Rp 221,100.00

II Tenaga 1 Pekerja 0.78 oh 50,000.00 Rp 39,000.00 15 Tukang batu trampil 0.39 oh 68,750.00 Rp 26,812.50 16 Kepala tukang batu 0.04 oh 75,000.00 Rp 2,925.00 4 Mandor 0.04 oh 93,750.00 Rp 3,656.25

Jumlah (2) Rp 72,393.75

Jumlah (1) + (2) Rp 293,493.75 Keuntungan 10% Rp 29,349.38

Jumlah Rp 322,843.13 Kode Pasangan Batu kosong/Anstampeng Rp 322,800.00 C.14

KODE URAIAN PEKERJAAN koefisien SATUAN HARGA SATUAN ( Rp) JUMLAH HARGA (Rp)

C.6 1 M3 Pasangan Pondasi Batu Kali 1 pc : 5 ps

I Bahan 1.a Batu belah/kali 1.20 m3 Rp 154,000.00 Rp 184,800.00 3.a Pasir : Pasang/tras 0.54 m3 Rp 165,000.00 Rp 89,760.00 8.b Semen PC 136.00 kg Rp 1,056.00 Rp 143,616.00

Jumlah (1) Rp 418,176.00

II Tenaga 1 Pekerja 0.78 oh 50,000.00 Rp 39,000.00 15 Tukang batu trampil 0.39 oh 68,750.00 Rp 26,812.50 16 Kepala tukang batu 0.04 oh 75,000.00 Rp 2,925.00 4 Mandor 0.04 oh 93,750.00 Rp 3,656.25

Jumlah (2) Rp 72,393.75

Jumlah (1) + (2) Rp 490,569.75

Page 43: Anal is A

Keuntungan 10% Rp 49,056.98

Jumlah Rp 539,626.73 Kode Pasangan Pondasi Batu Kali 1 pc : 5 ps Rp 539,600.00 C.6

KODE URAIAN PEKERJAAN koefisien SATUAN HARGA SATUAN ( Rp) JUMLAH HARGA (Rp)

M.47.a 1 M2 Pasang lantai keramik putih polos 30/30 KW.1

I Bahan 22.c Kramik sekualitas Asia Tiles (KW1) 30 x 30 cm standar 1.00 m2 Rp 33,000.00 Rp 33,000.00 8.b Semen PC 11.38 kg Rp 1,056.00 Rp 12,017.28 3.a Pasir : Pasang/tras 0.04 m3 Rp 165,000.00 Rp 6,930.00 8.d Semen Putih/Warna 1.50 kg Rp 2,640.00 Rp 3,960.00

Jumlah (1) Rp 55,907.28

II Tenaga 1 Pekerja 0.25 oh 50,000.00 Rp 12,500.00 15 Tukang batu trampil 0.12 oh 68,750.00 Rp 8,250.00 16 Kepala tukang batu 0.01 oh 75,000.00 Rp 900.00 4 Mandor 0.01 oh 93,750.00 Rp 1,171.88

Jumlah (2) Rp 22,821.88

Jumlah (1) + (2) Rp 78,729.16 Keuntungan 10% Rp 7,872.92

Jumlah Rp 86,602.07 Kode Pasang lantai keramik putih polos 30/30 KW.1 Rp 86,600.00 M.47.a

KODE URAIAN PEKERJAAN koefisien SATUAN HARGA SATUAN ( Rp) JUMLAH HARGA (Rp)

G.1 1 M2 Plesteran & Pengacian lantai 1 : 3

I Bahan

8.b Semen PC 218.00 kg Rp 1,056.00 Rp 230,208.00 3.b Pasir Beton 0.52 m3 Rp 165,000.00 Rp 85,800.00 8.d Semen Putih/Warna 0.87 m3 Rp 2,640.00 Rp 2,296.80

Jumlah (1) Rp 318,304.80

II Tenaga 1 Pekerja 1.65 oh 50,000.00 Rp 82,500.00 15 Tukang batu trampil 0.25 oh 68,750.00 Rp 17,187.50 16 Kepala tukang batu 0.03 oh 75,000.00 Rp 1,875.00 4 Mandor 0.08 oh 93,750.00 Rp 7,500.00

Jumlah (2) Rp 109,062.50

Jumlah (1) + (2) Rp 427,367.30 Keuntungan 10% Rp 42,736.73

Jumlah Rp 470,104.03 Kode Plesteran & Pengacian lantai 1 : 3 Rp 470,100.00 G.1

KODE URAIAN PEKERJAAN koefisien SATUAN HARGA SATUAN ( Rp) JUMLAH HARGA (Rp)

M.44.a 1 M2 Pasang lantai KM/WC, keramik anti slip warna 20/20 KW 1

I Bahan 23.a Kramik sekualitas Asia Tiles (KW1) 10 x 20 cm Standar 1.00 m2 Rp 30,800.00 Rp 30,800.00

8.b Semen PC 11.38 kg Rp 1,056.00 Rp 12,017.28 3.a Pasir : Pasang/tras 0.04 m3 Rp 165,000.00 Rp 6,930.00 8.d Semen Putih/Warna 1.50 kg Rp 2,640.00 Rp 3,960.00

Jumlah (1) Rp 53,707.28

II Tenaga 1 Pekerja 0.25 oh 50,000.00 Rp 12,500.00 15 Tukang batu trampil 0.12 oh 68,750.00 Rp 8,250.00 16 Kepala tukang batu 0.01 oh 75,000.00 Rp 900.00 4 Mandor 0.01 oh 93,750.00 Rp 1,171.88

Jumlah (2) Rp 22,821.88

Jumlah (1) + (2) Rp 76,529.16 Keuntungan 10% Rp 7,652.92

Jumlah Rp 84,182.07 Kode Pasang lantai KM/WC, keramik anti slip warna 20/20 KW 1 Rp 84,200.00 M.44.a

KODE URAIAN PEKERJAAN koefisien SATUAN HARGA SATUAN ( Rp) JUMLAH HARGA (Rp)

#NAME? 1 M2 #NAME?

I Bahan 23.b Kramik sekualitas Asia Tiles (KW1) 20 x 20 cm Standar 1.00 m2 Rp 38,500.00 Rp 38,500.00

8.b Semen PC 19.52 kg Rp 1,056.00 Rp 20,613.12 3.a Pasir : Pasang/tras 0.02 m3 Rp 165,000.00 Rp 2,970.00 8.d Semen Putih/Warna 1.50 kg Rp 2,640.00 Rp 3,960.00

Jumlah (1) Rp 66,043.12

II Tenaga 1 Pekerja 0.60 oh 50,000.00 Rp 30,000.00 15 Tukang batu trampil 0.10 oh 68,750.00 Rp 6,875.00 16 Kepala tukang batu 0.05 oh 75,000.00 Rp 3,375.00 4 Mandor 0.03 oh 93,750.00 Rp 2,812.50

Jumlah (2) Rp 43,062.50

Page 44: Anal is A

Jumlah (1) + (2) Rp 109,105.62 Keuntungan 10% Rp 10,910.56

Jumlah Rp 120,016.18 Kode #NAME? Rp 120,000.00

#NAME?

KODE URAIAN PEKERJAAN koefisien SATUAN HARGA SATUAN ( Rp) JUMLAH HARGA (Rp)

F.2.a 1 M2 Pas. Gate Valve

I Bahan 9.f Kamper Singkil balok 1.20 m3 Rp 3,850,000.00 Rp 4,620,000.00

Jumlah (1) Rp 4,620,000.00

II Tenaga 1 Pekerja 6.00 oh 50,000.00 Rp 300,000.00 15 Tukang batu trampil 18.00 oh 68,750.00 Rp 1,237,500.00 16 Kepala tukang batu 2.00 oh 75,000.00 Rp 150,000.00 4 Mandor 0.30 oh 93,750.00 Rp 28,125.00

Jumlah (2) Rp 1,715,625.00

Jumlah (1) + (2) Rp 6,335,625.00 Keuntungan 10% Rp 633,562.50

Jumlah Rp 6,969,187.50 Kode Pas. Gate Valve Rp 6,969,200.00 F.2.a

KODE URAIAN PEKERJAAN koefisien SATUAN HARGA SATUAN ( Rp) JUMLAH HARGA (Rp)

F.20.a 1 M2 Pipa PVC class AW f 3" (80mm)

I Bahan 9.e Kamper Singkil papan 0.02 m3 Rp 4,070,000.00 Rp 79,772.00

20 Paku rata-rata 0.30 kg Rp 13,750.00 Rp 4,125.00 43.r - Lem kayu 0.30 ltr Rp 19,250.00 Rp 5,775.00 25.f b. Teak wood 1,2 x 2,4 x 4 mm 1.00 lbr Rp 82,500.00 Rp 82,500.00

Jumlah (1) Rp 172,172.00

II Tenaga 1 Pekerja 0.60 oh 50,000.00 Rp 30,000.00 15 Tukang batu trampil 2.00 oh 68,750.00 Rp 137,500.00 16 Kepala tukang batu 0.20 oh 75,000.00 Rp 15,000.00 4 Mandor 0.03 oh 93,750.00 Rp 2,812.50

Jumlah (2) Rp 185,312.50

Jumlah (1) + (2) Rp 357,484.50 Keuntungan 10% Rp 35,748.45

Jumlah Rp 393,232.95 Kode Pipa PVC class AW f 3" (80mm) Rp 393,200.00 F.20.a

KODE URAIAN PEKERJAAN koefisien SATUAN HARGA SATUAN ( Rp) JUMLAH HARGA (Rp)

F.10.a 1 M2 Pas. Roof Drain

I Bahan 9.e Kamper Singkil papan 0.04 m3 Rp 4,070,000.00 Rp 142,450.00

Jumlah (1) Rp 142,450.00

II Tenaga 1 Pekerja 0.80 oh 50,000.00 Rp 40,000.00 15 Tukang batu trampil 2.00 oh 68,750.00 Rp 137,500.00 16 Kepala tukang batu 0.20 oh 75,000.00 Rp 15,000.00 4 Mandor 0.04 oh 93,750.00 Rp 3,750.00

Jumlah (2) Rp 196,250.00

Jumlah (1) + (2) Rp 338,700.00 Keuntungan 10% Rp 33,870.00

Jumlah Rp 372,570.00 Kode Pas. Roof Drain Rp 372,600.00 F.10.a

KODE URAIAN PEKERJAAN koefisien SATUAN HARGA SATUAN ( Rp) JUMLAH HARGA (Rp)

L.17 1 M2 Pek. Saluran Grevel 1/2 20 cm

I Bahan 40.b Kaca polos tebal 5 mm 1.10 m2 Rp 82,500.00 Rp 90,750.00

Jumlah (1) Rp 90,750.00

II Tenaga 1 Pekerja 0.02 oh 50,000.00 Rp 750.00 15 Tukang batu trampil 0.15 oh 68,750.00 Rp 10,312.50 16 Kepala tukang batu 0.02 oh 75,000.00 Rp 1,125.00 4 Mandor 0.00 oh 93,750.00 Rp 70.31

Jumlah (2) Rp 12,257.81

Page 45: Anal is A

Jumlah (1) + (2) Rp 103,007.81 Keuntungan 10% Rp 10,300.78

Jumlah Rp 113,308.59 Kode Pek. Saluran Grevel 1/2 20 cm Rp 113,300.00 L.17

KODE URAIAN PEKERJAAN koefisien SATUAN HARGA SATUAN ( Rp) JUMLAH HARGA (Rp)

1 KG Pasang rangka atap baja SIKU

I Bahan 12 Besi Siku rata-rata 1.03 kg Rp 11,154.00 Rp 11,432.85

Peralatan 1.00 ls 1,000.00 Rp 1,000.00

Jumlah (1) Rp 12,432.85

II Tenaga 1 Pekerja 0.0600 oh 50,000.00 Rp 3,000.00 15 Tukang batu trampil 0.0040 oh 68,750.00 Rp 275.00 16 Kepala tukang batu 0.0010 oh 75,000.00 Rp 75.00 4 Mandor 0.0010 93,750.00 Rp 93.75

Jumlah (2) Rp 3,443.75

Jumlah (1) + (2) Rp 15,876.60 Keuntungan 10% Rp 1,587.66

Jumlah Rp 17,464.26 Kode Pasang rangka atap baja SIKU Rp 17,500.00

KODE URAIAN PEKERJAAN koefisien SATUAN HARGA SATUAN ( Rp) JUMLAH HARGA (Rp)

1000 KG Erection Kuda-kuda

I Bahan 1 Sewa alat Crane mini 2.5000 jam 250,000.00 Rp 625,000.00

54.b b. Minyak Solar 15.0000 lt Rp 5,940.00 Rp 89,100.00 Rp -

Alat Bantu 1.0000 ls 25,000.00 Rp 25,000.00 Rp -

Jumlah (1) Rp 739,100.00 II Pekerja 2 Pekerja Setengah Trampil 1.00 oh 56,250.00 Rp 56,250.00 11 Tukang besi IWF/Profil trampil 0.2500 oh 62,500.00 Rp 15,625.00 13 Kepala tukang besi konstruksi/profil 0.2500 oh 75,000.00 Rp 18,750.00 4 Mandor 0.1000 oh 93,750.00 Rp 9,375.00 20 Operator alat besar 0.3125 oh 100,000.00 Rp 31,250.00 21 Pembantu operator 0.3125 oh 68,750.00 Rp 21,484.38

Jumlah (1) + (2) Rp 760,584.38 Keuntungan 10% Rp 76,058.44

Jumlah Rp 836,642.81 Kode Erection kuda2 / kg Rp 836.64

Page 46: Anal is A

KODE URAIAN PEKERJAAN koefisien SATUAN HARGA SATUAN ( Rp) JUMLAH HARGA (Rp)

1 KG Pas. Gording Lip Channel

I Bahan 12.c Harga rata-rata plat lipet chanal 1.03 kg Rp 10,868.00 Rp 11,139.70

Peralatan 1.00 ls 1,000.00 Rp 1,000.00

Jumlah (1) Rp 12,139.70 II Tenaga 2 Tenaga 1 Pekerja 0.0350 oh 50,000.00 Rp 1,750.00 11 Tukang besi IWF/Profil trampil 0.0040 oh 62,500.00 Rp 250.00 13 Kepala tukang besi konstruksi/profil 0.0010 oh 75,000.00 Rp 75.00 4 Mandor 0.0010 oh 93,750.00 Rp 93.75

Jumlah (2) Rp 2,168.75

Jumlah (1) + (2) Rp 14,308.45 Keuntungan 10% Rp 1,430.85

Jumlah Rp 15,739.29 Kode Pas. Gording Lip Channel Rp 15,700.00

URAIAN PEKERJAAN koefisien SATUAN HARGA SATUAN ( Rp) JUMLAH HARGA (Rp)

1 m2 Pas. Zinc Alum Gelombang

I Bahan 16.e Zinc Alum Gelombang 1.06 m2 Rp 181,500.00 Rp 192,390.00

Aksessoris 1.00 ls 6,000.00 Rp 6,000.00

Jumlah (1) Rp 198,390.00

II Tenaga 1 Pekerja 0.0800 oh 50,000.00 Rp 4,000.00 11 Tukang besi IWF/Profil trampil 0.0500 oh 62,500.00 Rp 3,125.00 13 Kepala tukang besi konstruksi/profil 0.0500 oh 75,000.00 Rp 3,750.00 4 Mandor 0.0030 oh 93,750.00 Rp 281.25

Jumlah (2) Rp 11,156.25

Jumlah (1) + (2) Rp 209,546.25 Keuntungan 10% Rp 20,954.63

Jumlah Rp 230,500.88 Kode Pas. Zinc Alum Gelombang Rp 230,500.00

Page 47: Anal is A

0 Rp 767,700.00

0 Rp 13,800.00

0 Rp 801,200.00

Page 48: Anal is A

0 Rp 302,200.00

Rp 268,600.00

Rp 264,400.00

Rp 85,600.00

Page 49: Anal is A

Rp 852,300.00

Rp 726,300.00

Rp 771,500.00

Page 50: Anal is A

Rp 87,100.00

0.7 Rp 2,629,600.00

0 Rp 3,008,900.00

0

Page 51: Anal is A

Rp 2,777,700.00

Rp 3,081,300.00

Page 52: Anal is A

Rp 4,993,500.00

Rp 4,090,700.00

Rp 3,736,700.00

Rp 4,082,400.00

Page 53: Anal is A

Rp 6,072,700.00

Rp 4,893,900.00

Rp 3,095,600.00

Rp 2,943,600.00

Page 54: Anal is A

Rp 5,951,800.00

Rp 5,793,800.00

Rp 7,088,600.00