planing pembangunan masjid_akmaliah

Post on 28-Jan-2018

562 Views

Category:

Documents

5 Downloads

Preview:

Click to see full reader

TRANSCRIPT

RENCANA PEMBUATAN AONING

RENCANA PEMBUATAN AONING

HASIL PEMBUATAN AONING

PADA HARI JUM’AT YANG BERTEPATAN DENGAN HARI LIBUR KAPASITAS MASJID TERMASUK WINGKIRI, KANAN DAN SELASAR DEPANMASIH BELUM MENCUKUPI UNTUKMENAMPUNG PARA JAMAAH WARGABSI

KEPADATAN JAMAAH TERUTAMA PADA HARI LIBUR YANG TERJADI SAAT INI, AKAN TERUS BERTAMBAH PADAT SEIRING DENGAN PERTUMBUHAN ANAK-ANAK KITA YANG MENGINJAK USIA REMAJA SEKITAR 5 – 10 TAHUN YANG AKAN DATANG

HAL INILAH YANG MENJADI ALASAN UTAMA KENAPA RENOVASI

MASJID PERLU DILAKSANAKAN

KONDISI EKSISTING BANGUNAN MASJID

RENCANA LANTAI I , RUANG SERBAGUNA

RENCANA LANTAI II , RUANG MASJID

TAMPAK DEPAN RENCANA MASJID

TAMPAK SAMPING RENCANA MASJID

PERINCIAN BIAYA

PEKERJAAN RENOVASI MASJID JAMI AKMALIA

PERUM.BSI II-KEL.PENGASINAN-KEC,SAWANGAN-KOTA DEPOK

No. Uraian Volume Harga Satuan Jumlah Total

I PEKERJAAN PENDAHULUAN

Pek.Bongkaran dinding, beton, 1 ls 5,000,000 5,000,000

Atap, dll

Pek.pas.Galian pondasi 130 m3 150,000 19,500,000

Pek.pas.Pond.batukali 78.7 m3 450,000 35,415,000

59,915,000

II PEKERJAAN BETON

Pek.Pondasi setempat 19.8 m3 2,650,000 52,470,000

Pek.Sloop 15 m3 2,650,000 39,750,000

Pek.Kolom Struktur 50x50 20 m3 3,400,000 68,000,000

Pek.Kolom Struktur 40x40 28.2 m3 3,300,000 93,060,000

Pek.Kolom Struktur 30x30 7.56 m3 3,250,000 24,570,000

Pek.Balok Struktur 25x50 28.75 m3 3,250,000 93,437,500

Pek.Balok Struktur 20x30 14.9 m3 3,250,000 48,425,000

Pek.Plat beton 83.7 m3 3,250,000 272,025,000

Pek.Kolom Praktis 1.57 m3 2,650,000 4,160,500

Pek.Ringbalok 2.9 m3 3,250,000 9,425,000

Pek.Tangga beton 9.5 m3 2,650,000 25,175,000

730,498,000

III PEKERJAAN PASANGAN

Pek.Bata bata merah 1075 m2 115,000 123,625,000

Pek.Plesteran 2150 m2 65,000 139,750,000

Pek.acian 2150 m2 22,500 48,375,000

311,750,000

IV PEKERJAAN PLAFOND

Pek.pas.Rangka+penutup 953 m2 80,000 76,240,000

Pek.pas.Listplafond t.8 cm 510 m2 25,000 12,750,000

88,990,000

V PEKERJAAN LANTAI

Pek.ploor Lantai 465 m2 60,000 27,900,000

Pek.pas.Lantai utama 60x60 excina 595 m2 265,000 157,675,000

Pek.pas.Lantai teras 65 m2 205,000 13,325,000

Kamar mandi

.-Pek.pas.lantai 50 m2 175,000 8,750,000

.-Pek.pas.dinding 140 m2 210,000 29,400,000

Pek.pas.Plint 245 m' 65,000 15,925,000

252,975,000

VI PEKERJAAN ATAP

Pek.pas.Rangka atap baja 320 m2 325,000 104,000,000

Pek.pas.Genteng badan 320 m2 220,000 70,400,000

Pek.pas.Nok 40 m' 105,000 4,200,000

Pek.pas.Listplang 85 m' 90,000 7,650,000

186,250,000

VII PEKERJAAN INSTALASI AIR

Pek.pas.air bersih 190 m' 15,000 2,850,000

Pek.pas.air kotor/hujan/kotoran 143 m' 40,000 5,720,000

Pek.pas.Closet Jongkok 8 bh 350,000 2,800,000

Pek.Ploor drain 16 bh 100,000 1,600,000

Pek.pas.Kran biasa 24 bh 55,000 1,320,000

Pek.pas.Watertorn 1000 lt 2 bh 2,000,000 4,000,000

Pek.pas.Septictank 1 bh 4,500,000 4,500,000

22,790,000

VIII PEKERJAAN INSTALASI LISTRIK

Pek.pas.Inst.Lampu / Stp kontak 155 ttk 185,000 28,675,000

Pek.pas.Inst.stop kontak TV 2 ttk 220,000 440,000

Pek.pas.Inst.stop kontak Telpon 2 ttk 220,000 440,000

Pek.pas.Inst.stop kontak AC ttk -

Pek.pas.Inst.group MCB 24 ttk 205,000 4,920,000

ARMATURE

Pek.pas.lampu Tl 2x36 92 bh 325,000 29,900,000

Pek.pas.Downlight 33 bh 65,000 2,145,000

Pek.pas.saklar engkel 8 bh 25,000 200,000

Pek.pas.saklar serie 40 bh 40,000 1,600,000

Pek.pas.Stopkontak 30 bh 40,000 1,200,000

Pek.pas.Stopkontak TV 2 bh 75,000 150,000

Pek.pas.Stopkontak Telpon 2 bh 75,000 150,000

69,820,000

IX PEKERJAAN KUSEN

Pek.pas.Kusen kayu 6/15 kamper 2.88 m3 15,000,000 43,200,000

Pek.pas.Daun pintu panel 9 bh 1,550,000 13,950,000

Pek.pas.Daun pintu kaca 22 bh 1,350,000 29,700,000

Pek.pas.Daun jendela 44 bh 750,000 33,000,000

Pek.pas.Engsel pintu 47 pcs 75,000 3,525,000

Pek.pas.Hendle pintu 22 unt 450,000 9,900,000

Pek.pas.Engsel jendela 44 pcs 55,000 2,420,000

Pek.pas.Rambuncis jendela 44 bh 30,000 1,320,000

Pek.pas.Hak angin 44 bh 20,000 880,000

Pek.pas.Pintu PVC 8 bh 500,000 4,000,000

141,895,000

X PEKERJAAN CAT-CATAN

Pek.Cat dinding 2150 m2 25,000 53,750,000

Pek.Cat plafond 953 m2 20,000 19,060,000

Pek.Cat melamik kusen 320 m' 70,000 22,400,000

Pek.Cat melamik daun pintu 9 bh 475,000 4,275,000

Pek.Cat melamik daun pintu kaca 22 bh 375,000 8,250,000

Pek.Cat.mlk.Daun jendela 44 bh 270,000 11,880,000

Pek.Cat melamik listplang 85 m' 75,000 6,375,000

Pek.Cat Aquaproof 140 m2 50,000 7,000,000

132,990,000

Total Keseluruhan 1,997,873,000

Dibulatkan 1,997,000,000

(Terbilang : Satu milyard sembilan ratus sembilan puluh tujuh juta rupiah )

JENDELA EXISTING

RENCANA PEMASANGAN TERLIS JENDELA

top related