05.potongan melintang

Post on 06-Jul-2018

216 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

8/17/2019 05.POTONGAN MELINTANG

http://slidepdf.com/reader/full/05potongan-melintang 1/1

          2         7          9  .

          0          0

          2          6          3  .

          0          0

          2          6          3  .

          0          0

          2          9          8  .

          0          0

          2         7          9  .

          0          0

  PATOK (STA)

  JARAK TITIK (cm)

  KEMIRINGAN EXISTING (%)

  ELEVASI EXISTING

  ELEVASI RENCANA

  KEMIRINGAN RENCANA (%)

P4 (0+200)

1000

        1        0        1

  .        6        3

 A D

2%

2%

        1        0        1

  .        9        8

2%

2%

B C

        1        0        1

  .        6        3

        1        0        1

  .        7        9

        1        0        1

  .        7        9

          3          0          6  .

          0          0

          2         7          2  .

          0          0

          2         7          0  .

          0          0

          3          0          3  .

          0          0

          2          8         7  .          0

          0

  +99.00

  +101.00

  +102.00

  PATOK (STA)

  JARAK TITIK (cm)

  KEMIRINGAN EXISTING (%)

  ELEVASI EXISTING

  ELEVASI RENCANA

  KEMIRINGAN RENCANA (%)

P5 (0+250)

1000

        1        0        1  .

        7        0

 A D

2%

2%

        1        0        2  .

        0        3

2%

2%

B C

        1        0        1  .

        7        2

        1        0        2  .

        0        6

        1        0        1  .

        8        7

  +103.00

2000.00

URUGAN PILIHAN T : 20 CM

URUGAN BIASAGALIAN URUGAN PILIHAN T : 20 CM

URUGAN BIASAGALIAN

500.00 500.00

2000.00

URUGAN PILIHAN T : 20 CM

URUGAN BIASAGALIAN URUGAN PILIHAN T : 20 CM

URUGAN BIASAGALIAN

500.00 500.00

  +100.00

  +99.00

  +101.00

  +102.00

  +103.00

MUH. SAID, STDIREKTUR

JASMAN, ST

KEGIATAN

SIPIL

DRAFTER

DINAS PEKERJAAN UMUMPROVINSI SULAWESI TENGGARA

IRFAN M. MANOPPO, ST

RIJAL ANSAPUTRA, ST

SURVEYOR

PEKERJAAN

CATATAN / REVISI

KONSULTAN PERENCANA

TEAM PERENCANA

NAMA GAMBAR SKALA

NO. LEMBAR JML. LEMBAR KODE GAMBAR

08

PEJABAT PELAKSANA TEKNIS KEGIATAN (PPTK)

DINAS PEKERJAAN UMUM

PROVINSI SULAWESI TENGGARA

MENGETAHUI / MENYETUJUI

HAMKA, ST

NIP. 19770630 201001 1 010

PERENCANAAN PEMBANGUNAN DRAINASE JALANPROVINSI POROS ANDOLO - PALANGGA

(RUAS PUNGGALUKU - ALANGGA)

PEMBANGUNAN DRAINASE JALAN PROVINSI POROS

ANDOLO - PALANGGA

(RUAS PUNGGALUKU - ALANGGA)

PROFIL MELINTANG SEGMEN 3

STA. 0+200 - 0+250

05

  H = 1 : 20

  V = 1 : 10

  +100.00

top related