72125046-analisa-sni-2002-2008-dck-bln-januari-2011

173
PERHITUNGAN BESI NO JENIS BESI UKURAN KOEFISIEN PANJANG 1 PANJANG 2 PANJANG 3 1 BAJA BULAT 6 0.22 12 8 0.393 12 12 10 0.62 12 12 12 0.887 12 12 13 1.034 12 14 1.209 15 1.37 16 1.578 2 BATANG ULIR 10 0.56 13 0.995 0 12 16 1.56 0 12 19 2.25 0 12 22 3.04 25 3.98 29 5.04 HARGA RATA-RATA PER KG

Upload: andri-kwin

Post on 11-Aug-2015

98 views

Category:

Documents


10 download

TRANSCRIPT

Page 1: 72125046-Analisa-Sni-2002-2008-Dck-Bln-Januari-2011

PERHITUNGAN BESI BETON

NO JENIS BESI UKURAN KOEFISIEN PANJANG 1 PANJANG 2 PANJANG 3 HARGA 1

1 BAJA BULAT 6 0.22 12 Rp 22,500 8 0.393 12 12 Rp 35,500 10 0.62 12 12 Rp 52,000 12 0.887 12 12 Rp 77,500 13 1.034 12 Rp 79,000 14 1.20915 1.3716 1.578

2 BATANG ULIR 10 0.5613 0.995 0 12 Rp - 16 1.56 0 12 Rp - 19 2.25 0 12 Rp - 22 3.0425 3.9829 5.04

HARGA RATA-RATA PER KG

Page 2: 72125046-Analisa-Sni-2002-2008-Dck-Bln-Januari-2011

PERHITUNGAN BESI BETON

HARGA 2 HARGA 3 HARGA PER KG

Rp 8,523 Rp 40,100 Rp 8,015 Rp 62,000 Rp 7,661 Rp 89,250 Rp 7,833

Rp 6,367

Rp 107,350 Rp 8,991 Rp 162,650 Rp 8,689 Rp 229,000 Rp 8,481

HARGA RATA-RATA PER KG Rp 8,070

Page 3: 72125046-Analisa-Sni-2002-2008-Dck-Bln-Januari-2011

Harga Barang dan Upah Hal. 3

DAFTAR HARGA SATUAN BAHAN DAN UPAHBULAN JANUARI TAHUN 2011

A. Harga Satuan Bahan

NO NAMA BARANG SATUAN HARGA 1 HARGA 2 HARGA 3

1 2 3

FINISHING1 Amplas lbr2 Cat besi kg3 Cat dasar kg4 Cat emco kg5 Cat menie besi kg6 Cat menie kayu kg7 Cat tembok Decolith kg8 Cat tembok Dulux kg9 Cat tembok Emco kg

10 Cat tembok Paragon kg11 Cat tembok Toyopaint kg12 Cat tembok Vinilex kg13 Cat tembok Vinippaint kg14 Dempul ltr15 Kuas bh16 Mild zak17 Minyak cat ltr18 Plamir kayu kg19 Plamir tembok kg20 Politur ultra ltr21 Politur vernis ltr22 Thiner A Bonanza ltr23 Thiner B Spesial ltr

PENUTUP ATAP24 Alang-alang panjang 2,4 meter lbr25 Alluminium foil m226 Asbes Bubungan lbr27 Asbes Gelombang 1,80 m x 0,80 m x 5 mm lbr28 Asbes Gelombang 2,4 m x 1,05 m x 4 mm lbr29 Asbes Rata 2 m x 1 m x 4 mm lbr28 Atap metal Toratora 1 x 4 Extra m229 Atap metal Toratora 1 x 4 Premium m230 Atap metal Toratora 2 x 4 Extra m231 Atap metal Toratora 2 x 4 Premium m232 Atap metal Toratora 3 x 4 Extra m233 Atap metal Toratora 3 x 4 Premium m234 Atap metal Toratora 4 x 4 Extra m235 Atap metal Toratora 4 x 4 Premium m236 Bentala paras bh37 Bentala tanah liat bh38 Besi profil WF kg39 Besi strip kg40 Bubungan Biasa bj41 Bubungan Karang Pilang (glazur) isi 3,5/m bj42 Bubungan Karang Pilang isi 3,5/m bj43 Bubungan Ngalayur isi 3,5/m bj44 Bubungan Plentong bj45 Bubungan Utama isi 3,5/m bj46 Genteng Kanmuri (glazur) isi 14/m2 bj47 Genteng Kodok Karang Pilang (Bambe) isi 20/m2 bj48 Genteng Kodok Karang Pilang (Bisma) isi 20/m2 bj49 Genteng Kodok Karang Pilang (Good Year) isi 20/m2 bj50 Genteng Morando Abadi isi 18/m2 bj51 Genteng Morando Jatiwangi isi 18/m2 bj52 Genteng Morando Ngalayur isi 20/m2 bj53 Genteng Plentong bj54 Genteng plentong dicat bj55 Genteng Plentong Jatiwangi isi 24/m2 bj56 Ijuk kg57 Ikut celedu paras bh58 Ikut celedu tanah liat bh59 Murda paras bh

Page 4: 72125046-Analisa-Sni-2002-2008-Dck-Bln-Januari-2011

Harga Barang dan Upah Hal. 4

NO NAMA BARANG SATUAN HARGA 1 HARGA 2 HARGA 3

1 2 360 Murda tanah liat bh61 Seng BJLS 0,20 gelombang lbr62 Seng BJLS 0,25 gelombang lbr63 Seng BJLS 0,28 gelombang lbr64 Seng BJLS 0,32 gelombang lbr65 Seng Plat 3" x 6" BJLS 28 lbr66 Sirap Jati bh67 Tali Ijuk kg68 Tali pengikat alang-alang ikat

PENGGANTUNG69 Engsel kupu-kupu ps70 Engsel nylon ps71 Espagnoleth set72 Grendel biasa bh73 Grendel hararo bh74 Kaca 3 mm bening m275 Kaca 5 mm bening m276 Kaca 6 mm bening m277 Kaca 8 mm bening m278 Kaca 10 mm bening m279 Kaca 12 mm bening m280 Kaca Es/Kapur 3 mm m281 Kaca Es/Kapur 5 mm m282 Kaca nako daun83 Kaca nako teralis bening m284 Kaca ryben 3 mm m285 Kaca ryben 5 mm m286 Kait angin biasa bh87 Kunci pintu TOP bh88 Kunci pintu Union bh89 Kunci pintu Vanesa bh90 Kunci pintu Yale bh91 Kunci pintu YURI bh92 Kunci slot bh93 Kunci tanam 2 slag bh

KAYU DAN PLAFOND94 Bambu besar btg95 Bambu sedang btg96 Bambu kecil btg97 Celling teak (0,62 x 2,40) m2 lbr98 Eternit lbr99 Formika lbr

100 Gedeg kulit kelas I m2101 Gypsum Old lbr102 Hard board MDF lbr103 Kalsiboard 4,5 mm lbr104 Kayu bekesting m3105 Kayu bingkirai m3106 Kayu bingkirai papan m3107 Kayu dolken (pekerjaan sementara) btg108 Kayu jati m3109 Kayu jati papan m3110 Kayu kamper balok m3111 Kayu kamper usuk/reng m3112 Kayu kamper papan m3113 Kayu kruing balok m3114 Kayu kruing usuk/reng m3115 Kayu kruing papan m3116 Kayu meranti balok m3117 Kayu meranti usuk/reng m3118 Kayu meranti papan m3119 Kayu merbau m3120 Kayu merbau papan m3121 Kayu profil m1122 Kayu seseh balok m3123 Kayu seseh dolken m3124 Lem Aibond kg125 Lem Kayu ltr126 List Gypsum standar m'

Page 5: 72125046-Analisa-Sni-2002-2008-Dck-Bln-Januari-2011

Harga Barang dan Upah Hal. 5

NO NAMA BARANG SATUAN HARGA 1 HARGA 2 HARGA 3

1 2 3127 Minyak bekisting ltr128 Multiplek 12 mm lbr129 Multiplek 18 mm lbr130 Multiplek 6 mm lbr131 Multiplek 9 mm lbr132 Plywood 12 mm lbr133 Plywood 3 mm lbr134 Plywood 4 mm lbr135 Plywood 6 mm lbr136 Plywood 9 mm lbr137 Plywood aluminium lbr138 Teak wood (0,9x2,00) m2 lbr139 Teak wood (1,20x2,40) m2 lbr

KERAMIKIKAD

140 Ikad (Keramik) Kw. I 10 x 20 cm m2141 Ikad (Keramik) Kw. I 20 x 20 cm m2142 Ikad (Keramik) Kw. I 20 x 30 cm m2143 Ikad (Keramik) Kw. I 30 x 30 cm m2144 Ikad (Keramik) Kw. I 40 x 40 cm m2145 Ikad (Keramik) Kw. II 10 x 20 cm m2146 Ikad (Keramik) Kw. II 20 x 20 cm m2147 Ikad (Keramik) Kw. II 20 x 30 cm m2148 Ikad (Keramik) Kw. II 30 x 30 cm m2149 Ikad (Keramik) Kw. II 40 x 40 cm m2

INESA150 Keramik 30 x 30 Kelas I (Onyx Phyrus Ruby Jade, P) m2151 Keramik 30 x 30 Kelas I (Onyx Phyrus Ruby Jade, UP) m2152 Keramik 30 x 30 Kelas I (Pearl Ghita Cat Eye, P) m2153 Keramik 30 x 30 Kelas I (Pearl Ghita Cat Eye, UP) m2154 Keramik 30 x 30 Kelas I (Sand Wheat Spruce Clay Charcoal, R) m2155 Keramik 40 x 40 Kelas I (Corypha Roystonea Raphia, P) m2156 Keramik 40 x 40 Kelas I (Onyx Phyrus Ruby Jade, P) m2157 Keramik 40 x 40 Kelas I (Onyx Phyrus Ruby Jade, UP) m2158 Keramik 40 x 40 Kelas I (Pearl Ghita Cat Eye, P) m2159 Keramik 40 x 40 Kelas I (Pearl Ghita Cat Eye, UP) m2160 Keramik 60 x 60 Kelas I (Corypha Roystonea Raphia, P) m2

ESSENZA161 Keramik 30 x 30 Kelas I (Black Orchid, Coral Bell, P) m2162 Keramik 30 x 30 Kelas I (Black Orchid, Coral Bell, UP) m2163 Keramik 30 x 30 Kelas I (Pepper Grey Price Rubert Silver star, P) m2164 Keramik 30 x 30 Kelas I (Pepper Grey Price Rubert Silver star, UP) m2165 Keramik 40 x 40 Kelas I (Pepper Grey Price Rubert Silver star, P) m2166 Keramik 40 x 40 Kelas I (Pepper Grey Price Rubert Silver star, UP) m2167 Keramik 60 x 60 Kelas I (Pepper Grey Price Rubert Silver star, P) m2168 Keramik Kelas I Domus m2169 Keramik Kelas I Granity Imperiali m2170 Keramik Kelas I Lavagna m2171 Keramik Kelas I Mountain Peak m2

GARUDA172 Keramik 20 x 20 kelas I Emboss Dasar Muda m2173 Keramik 20 x 20 kelas I Emboss Dasar Tua m2174 Keramik 20 x 20 kelas I Tesia m2175 Keramik 20 x 20 kelas II Emboss Dasar Muda m2176 Keramik 20 x 20 kelas II Emboss Dasar Tua m2177 Keramik 20 x 20 kelas II Tesia m2178 Keramik 20 x 25 kelas I Motif Dasar Medium m2179 Keramik 20 x 25 kelas I Motif Dasar Muda m2180 Keramik 20 x 25 kelas I Nuri Dark m2181 Keramik 20 x 25 kelas I Polos m2182 Keramik 30 x 30 kelas I Granity m2183 Keramik 30 x 30 kelas I Motif Embose m2184 Keramik 30 x 30 kelas II Granity m2185 Keramik 30 x 30 kelas II Motif Embose m2186 Keramik 40 x 40 kelas I Motif Dasar Muda m2187 Keramik 40 x 40 kelas I Motif Dasar Muda m2

Page 6: 72125046-Analisa-Sni-2002-2008-Dck-Bln-Januari-2011

Harga Barang dan Upah Hal. 6

NO NAMA BARANG SATUAN HARGA 1 HARGA 2 HARGA 3

1 2 3188 Keramik 40 x 40 kelas I Motif Embose m2189 Keramik 40 x 40 kelas I Motif Granity Tua m2190 Keramik 40 x 40 kelas I Motif Medium Color m2191 Keramik 40 x 40 kelas I Motif Spesial Color m2192 Keramik 50 x 50 kelas I m2

ASIA193 Keramik 10 x 20 kelas I warna muda m2194 Keramik 20 x 20 kelas I warna muda m2195 Keramik 20 x 20 kelas I warna tua m2196 Keramik 20 x 25 kelas I warna tua m2197 Keramik 20 x 30 kelas I warna muda m2198 Keramik 30 x 30 kelas I warna muda m2199 Keramik 30 x 30 kelas I warna tua m2200 Keramik 40 x 40 kelas I warna muda m2201 Keramik 10 x 20 kelas II m2202 Keramik 20 x 20 kelas II m2203 Keramik 20 x 30 kelas II m2204 Keramik 30 x 30 kelas II m2205 Keramik 40 x 40 kelas II m2

MULIA206 Keramik 10 x 20 cm kelas I m2207 Keramik 20 x 20 cm kelas I m2208 Keramik 20 x 30 cm kelas I m2209 Keramik 30 x 30 cm kelas I m2210 Keramik 40 x 40 cm kelas I m2211 Keramik 10 x 20 cm kelas II m2212 Keramik 20 x 20 cm kelas II m2213 Keramik 20 x 30 cm kelas II m2214 Keramik 30 x 30 cm kelas II m2215 Keramik 40 x 40 cm kelas II m2

SANITAIR201 Bak mandi fibre glass 70x70x66 cm bh202 Bak mandi keramik bh203 Floor Drain " TOTO TypeTx 1 Bv 1 " Square Flange " bh204 Floor drain plastik bh205 Floor drain stainless bh206 Kloset duduk INA bh207 Kloset duduk Amerika Standar bh208 Kloset duduk " TOTO Type AVANTE CW 821 PJ / SW 821JP COMPLIT bh209 Kloset duduk " TOTO Type AVANTE CW 821J"/ SW 821JP COMPLIT bh210 Kloset duduk " TOTO Type AVANTE CW 823 J bh211 Kloset duduk " TOTO Type CW 660J bh212 Kloset duduk " TOTO Type CW 660J / SW 660J COMPLIT bh213 Kloset duduk " TOTO Type CW 660J / SW 660J COMPLIT WARNA bh214 Kloset duduk " TOTO Type CW 660J WARNA COMPLIT bh215 Kloset duduk " TOTO Type CW 661JT1 BODI COMPLIT bh216 Kloset duduk " TOTO Type CW 661JT1" / SW 661JP COMPLIT bh217 Kloset duduk " TOTO Type CW 661JT1" / SW 784JP COMPLIT bh218 Kloset jongkok " TOTO Type CE 6 COMPLIT bh219 Kloset jongkok " TOTO Type CE 7 COMPLIT bh220 Kloset porselin jongkok Kia (standar) bh221 Kloset porselin jongkok Ina (standar) bh222 Kran biasa bh223 Kran SunEi bh224 Kran TOTO T 205 LCSC bh225 Kran TOTO T 205 MC bh226 Kran TOTO T 23 B13 bh227 Kran TOTO T 23 B13V7N bh228 Kran TOTO T 26 - 13 bh229 Kran TOTO TX 109 LH bh230 Penyekat Urinoir " TOTO " Type A 100 " bh231 Shower Spray " TOTO Tx 403SPIV ( Pastel Ivory ) bh232 Soap holder " TOTO " Type S 6 N " bh233 Seal tape bh234 Urinoir " TOTO U 57 M bh235 Urinoir " TOTO U 57 M BODI bh236 Urinoir " TOTO UW 447 JT 1 " bh237 Urinoir " TOTO UW 447 JT 1 BODI bh

Page 7: 72125046-Analisa-Sni-2002-2008-Dck-Bln-Januari-2011

Harga Barang dan Upah Hal. 7

NO NAMA BARANG SATUAN HARGA 1 HARGA 2 HARGA 3

1 2 3238 Urinoir " TOTO UW 447 JT 1,M " bh239 Urinoir " TOTO UW 447 JT 1,M "BODI bh240 Wastagel KIA Standard bh241 Wastagel KIA Warna bh242 Wastafel Komplit " TOTO Tx " Type L 521V1A " bh243 Wastafel Komplit top Counter" TOTO " Type CERABO LW 523 " bh

PAKU244 Paku 10 cm kg245 Paku kalsiboard kg246 Paku list SQ kg247 Paku pancing 60 x 230 kg248 Paku reng/usuk SQ kg249 Paku seng kg250 Paku seng import bj251 Paku skrup 1/2" kg252 Paku skrup 2" kg253 Paku skrup 3.5" kg254 Paku sumbat 1/2" kg

PASIR, BATU, KERIKIL, BATA DAN PARAS255 Bata gosok ex Tulikup bj256 Bata pasang klas I bj257 Batako kelas I bj258 Batu kali m3259 Batu karang m3260 Batu lahar Singaraja m3261 Batu pecah 5-7 cm (manual) m3262 Batu pipih Singaraja m3263 Glass block bj264 Kerawang bh265 Koral Beton m3266 Limestone m3267 Paras Batik bh268 Paras Buahan bh269 Paras Karang Bukit bh270 Paras Kerobokan bh271 Paras Malem bh272 Paras Putih Bukit bh273 Paras Silakarang tebal bh274 Paras Silakarang tipis bh275 Paras untuk pondasi bh276 Pasir beton m3277 Pasir pasang m3278 Pasir urug m3279 Sirtu m3280 Tanah urug m3

PIPA281 Pipa Galvanis 1/2" m1282 Pipa Galvanis 3/4" m1283 Pipa Galvanis 1 1/4" m1284 Pipa Galvanis 1 1/2" m1285 Pipa Galvanis 1" m1286 Pipa Galvanis 1,5 BSA m1287 Pipa Galvanis 2" m1288 Pipa Galvanis 3" m1289 Pipa Maspion AW 1 ljr290 Pipa Maspion AW 1/2 ljr291 Pipa Maspion AW 10 ljr292 Pipa Maspion AW 1-1/2 ljr293 Pipa Maspion AW 1-1/4 ljr294 Pipa Maspion AW 12 ljr295 Pipa Maspion AW 14 ljr296 Pipa Maspion AW 16 ljr297 Pipa Maspion AW 2 ljr298 Pipa Maspion AW 2-1/2 ljr299 Pipa Maspion AW 3 ljr300 Pipa Maspion AW 3/4 ljr301 Pipa Maspion AW 4 ljr302 Pipa Maspion AW 5 ljr

Page 8: 72125046-Analisa-Sni-2002-2008-Dck-Bln-Januari-2011

Harga Barang dan Upah Hal. 8

NO NAMA BARANG SATUAN HARGA 1 HARGA 2 HARGA 3

1 2 3303 Pipa Maspion AW 6 ljr304 Pipa Maspion AW 8 ljr305 Pipa Maspion C 1 ljr306 Pipa Maspion C 1-1/2 ljr307 Pipa Maspion C 1-1/4 ljr308 Pipa Maspion C 2 ljr309 Pipa Maspion C 2-1/2 ljr310 Pipa Maspion C 3 ljr311 Pipa Maspion C 3/4 ljr312 Pipa Maspion C 4 ljr313 Pipa Maspion C 5/8 ljr314 Pipa Maspion D 10 ljr315 Pipa Maspion D 1-1/2 ljr316 Pipa Maspion D 1-1/4 ljr317 Pipa Maspion D 12 ljr318 Pipa Maspion D 14 ljr319 Pipa Maspion D 16 ljr320 Pipa Maspion D 2 ljr321 Pipa Maspion D 2-1/2 ljr322 Pipa Maspion D 3 ljr323 Pipa Maspion D 4 ljr324 Pipa Maspion D 5 ljr325 Pipa Maspion D 6 ljr326 Pipa Maspion D 8 ljr

SEMEN327 Semen Bosowa 50 kg zak328 Semen Gresik 40 kg zak329 Semen Gresik 50 kg zak330 Semen Tiga Roga 50 kg zak331 Semen Tonasa 50 kg zak332 Semen warna/semen grouting kg

BESI BETON DAN PAGAR333 Besi beton kg334 Kawat berduri roll335 Kawat beton RRT kg336 Pagar BRC asli T.120 diameter 6mm m'337 Pagar BRC asli T.150 diameter 6mm m'338 Pagar BRC asli T.175 diameter 7mm m'339 Pagar BRC asli T.190 diameter 7mm m'340 Pagar BRC asli T.90 diameter 6mm m'341 Pagar HotDip Galvanized T.120 diameter 6mm m'342 Pagar HotDip Galvanized T.150 diameter 7mm m'343 Pagar HotDip Galvanized T.175 diameter 7mm m'344 Pagar HotDip Galvanized T.190 diameter 7mm m'345 Pagar HotDip Galvanized T.90 diameter 6mm m'346 Tiang BRC asli T. 120 diameter 1 1/2" bh347 Tiang BRC asli T. 150 diameter 2" bh348 Tiang BRC asli T. 175 diameter 2" bh349 Tiang BRC asli T. 190 diameter 2" bh350 Tiang BRC asli T. 90 diameter 1 1/2" bh351 Tiang HotDip Galvanized T. 120 diameter 1 1/2" bh352 Tiang HotDip Galvanized T. 150 diameter 2" bh353 Tiang HotDip Galvanized T. 175 diameter 2" bh354 Tiang HotDip Galvanized T. 190 diameter 2" bh355 Tiang HotDip Galvanized T. 90 diameter 1 1/2" bh

BAHAN LISTRIK356 Saklar (Broco) bh357 Stop Kontak bh358 Fitting bh359 Steker bh360 Coaxial cable 5C - 75 ohm commscof m1361 Kabel NYM 3 x 2.5 mm ex. Supreme m1362 Kabel NYM 4 mm m1363 Kabel telephone m1364 Lampu pijar 10 Watt (Philip) bh365 Lampu pijar 15 Watt (Philip) bh366 Lampu pijar 25 Watt (Philip) bh367 Lampu TL 10 Watt (10 Watt) bh

Page 9: 72125046-Analisa-Sni-2002-2008-Dck-Bln-Januari-2011

Harga Barang dan Upah Hal. 9

NO NAMA BARANG SATUAN HARGA 1 HARGA 2 HARGA 3

1 2 3368 Lampu TL 20 Watt (10 Watt) bh369 Lampu TL 25 Watt (10 Watt) bh370 Pipa clipsal 20 mm bt371 Pipa flexible clipsal 20 mm m1372 Sock clipsal 20 mm bj373 Tee dos clipsal 20 mm bh374 Klem clipsal 20 mm bj375 Inbow dos plastik clipsal E 157 P bj

BUIS BETON376 Buis beton 10 x 75 bh377 Buis beton 15 x 75 bh378 Buis beton 20 x 75 bh379 Buis beton 25 x 75 bh380 Buis beton 30 x 75 bh381 Buis beton 50 x 75 bh

PAVING382 Paving 10 x 20 cm tebal 6 cm K225 m2383 Paving 10 x 20 cm tebal 6 cm K300 m2384 Paving 10 x 20 cm tebal 6 cm standard m2385 Paving 10 x 20 cm tebal 8 cm K225 m2386 Paving 10 x 20 cm tebal 8 cm K300 m2387 Paving 10 x 20 cm tebal 8 cm standard m2388 Paving Tiga Berlian tebal 6 cm K225 m2389 Paving Tiga Berlian tebal 8 cm K225 m2390 Kanstein Bulat 15x20x50 cm K225 m1391 Kanstein Jumbo 15x30x50 cm K225 m1392 Kanstein Super 17x25x60 cm K225 m1393 Grass Block m2394 Koral sikat zak

LAIN-LAIN395 Dugul batu hitam 50 x 50 x 200 unit396 Dugul batu hitam 60 x 70 x 250 unit397 Dugul batu hitam 70 x 70 x 250 unit398 Padmasari batu hitam 50 x 50 x 200 unit399 Padmasari batu hitam 70 x 70 x 250 unit400 Padmasari batu hitam 65 x 75 x 225 unit

Denpasar, April 2010Kepala Dinas Cipta Karya

Kabupaten Badung

Ir. I Dewa Made Apramana, MMPembina Tk. I

NIP. 195904211987111002

Page 10: 72125046-Analisa-Sni-2002-2008-Dck-Bln-Januari-2011

Harga Barang dan Upah Hal. 10

DAFTAR HARGA SATUAN BAHAN DAN UPAHBULAN JANUARI TAHUN 2011

HARGA 4 HARGA 5 RATA-RATA

4

Page 11: 72125046-Analisa-Sni-2002-2008-Dck-Bln-Januari-2011

Harga Barang dan Upah Hal. 11

HARGA 4 HARGA 5 RATA-RATA

4

Page 12: 72125046-Analisa-Sni-2002-2008-Dck-Bln-Januari-2011

Harga Barang dan Upah Hal. 12

HARGA 4 HARGA 5 RATA-RATA

4

Page 13: 72125046-Analisa-Sni-2002-2008-Dck-Bln-Januari-2011

Harga Barang dan Upah Hal. 13

HARGA 4 HARGA 5 RATA-RATA

4

Page 14: 72125046-Analisa-Sni-2002-2008-Dck-Bln-Januari-2011

Harga Barang dan Upah Hal. 14

HARGA 4 HARGA 5 RATA-RATA

4

Page 15: 72125046-Analisa-Sni-2002-2008-Dck-Bln-Januari-2011

Harga Barang dan Upah Hal. 15

HARGA 4 HARGA 5 RATA-RATA

4

Page 16: 72125046-Analisa-Sni-2002-2008-Dck-Bln-Januari-2011

Harga Barang dan Upah Hal. 16

HARGA 4 HARGA 5 RATA-RATA

4

Page 17: 72125046-Analisa-Sni-2002-2008-Dck-Bln-Januari-2011

Harga Barang dan Upah Hal. 17

DAFTAR HARGA SATUAN BAHAN DAN UPAHBULAN JANUARI TAHUN 2011

A. Harga Satuan Bahan

NO NAMA BARANG SATUAN HARGA SATUAN

1 2 3 4

FINISHING1 Amplas lbr 3,000.00 2 Cat besi kg 43,000.00 3 Cat dasar kg 25,000.00 4 Cat emco kg 45,000.00 5 Cat menie besi kg 18,500.00 6 Cat menie kayu kg 18,500.00 7 Cat tembok Decolith kg 25,000.00 8 Cat tembok Dulux kg 22,620.00 9 Cat tembok Emco kg 36,680.00

10 Cat tembok Paragon kg 18,000.00 11 Cat tembok Toyopaint kg 16,500.00 12 Cat tembok Vinilex kg 15,600.00 13 Cat tembok Vinippaint kg 16,500.00 14 Dempul ltr 26,235.00 15 Kuas bh 6,000.00 16 Mild zak 10,000.00 17 Minyak cat ltr 17,000.00 18 Plamir kayu kg 19,000.00 19 Plamir tembok kg 28,000.00 20 Politur ultra ltr 43,000.00 21 Politur vernis ltr 39,000.00 22 Thiner A Bonanza ltr 20,000.00 23 Thiner B Spesial ltr 7,000.00

PENUTUP ATAP24 Alang-alang panjang 2,4 meter lbr 9,000.00 25 Alluminium foil m2 27,500.00 26 Asbes Bubungan lbr 23,667.00 27 Asbes Gelombang 1,80 m x 0,80 m x 5 mm lbr 28,000.00 28 Asbes Gelombang 2,4 m x 1,05 m x 4 mm lbr 35,000.00 29 Asbes Rata 2 m x 1 m x 4 mm lbr 15,000.00 28 Atap metal Toratora 1 x 4 Extra m2 82,368.00 29 Atap metal Toratora 1 x 4 Premium m2 120,120.00 30 Atap metal Toratora 2 x 4 Extra m2 72,930.00 31 Atap metal Toratora 2 x 4 Premium m2 107,250.00 32 Atap metal Toratora 3 x 4 Extra m2 69,784.00 33 Atap metal Toratora 3 x 4 Premium m2 102,960.00 34 Atap metal Toratora 4 x 4 Extra m2 68,640.00 35 Atap metal Toratora 4 x 4 Premium m2 100,386.00 36 Bentala paras bh 66,000.00 37 Bentala tanah liat bh 49,500.00 38 Besi profil WF kg 13,750.00 39 Besi strip kg 6,050.00 40 Bubungan Biasa bj 2,500.00 41 Bubungan Karang Pilang (glazur) isi 3,5/m bj 20,000.00 42 Bubungan Karang Pilang isi 3,5/m bj 10,000.00 43 Bubungan Ngalayur isi 3,5/m bj 6,000.00 44 Bubungan Plentong bj 6,000.00 45 Bubungan Utama isi 3,5/m bj 4,000.00 46 Genteng Kanmuri (glazur) isi 14/m2 bj 6,500.00 47 Genteng Kodok Karang Pilang (Bambe) isi 20/m2 bj 2,700.00 48 Genteng Kodok Karang Pilang (Bisma) isi 20/m2 bj 2,650.00 49 Genteng Kodok Karang Pilang (Good Year) isi 20/m2 bj 2,800.00 50 Genteng Morando Abadi isi 18/m2 bj 2,700.00 51 Genteng Morando Jatiwangi isi 18/m2 bj 2,700.00 52 Genteng Morando Ngalayur isi 20/m2 bj 2,700.00 53 Genteng Plentong bj 1,200.00 54 Genteng plentong dicat bj 1,125.00 55 Genteng Plentong Jatiwangi isi 24/m2 bj 1,125.00 56 Ijuk kg 1,500.00 57 Ikut celedu paras bh 55,000.00 58 Ikut celedu tanah liat bh 45,000.00 59 Murda paras bh 75,000.00

Page 18: 72125046-Analisa-Sni-2002-2008-Dck-Bln-Januari-2011

Harga Barang dan Upah Hal. 18

NO NAMA BARANG SATUAN HARGA SATUAN

1 2 3 460 Murda tanah liat bh 60,000.00 61 Seng BJLS 0,20 gelombang lbr 40,000.00 62 Seng BJLS 0,25 gelombang lbr 38,000.00 63 Seng BJLS 0,28 gelombang lbr 40,000.00 64 Seng BJLS 0,32 gelombang lbr 45,000.00 65 Seng Plat 3" x 6" BJLS 28 lbr 45,000.00 66 Sirap Jati bh 7,900.00 67 Tali Ijuk kg 33,000.00 68 Tali pengikat alang-alang ikat 7,700.00

PENGGANTUNG69 Engsel kupu-kupu ps 15,000.00 70 Engsel nylon ps 13,000.00 71 Espagnoleth set 35,000.00 72 Grendel biasa bh 9,350.00 73 Grendel hararo bh 18,425.00 74 Kaca 3 mm bening m2 70,000.00 75 Kaca 5 mm bening m2 90,000.00 76 Kaca 6 mm bening m2 120,000.00 77 Kaca 8 mm bening m2 185,000.00 78 Kaca 10 mm bening m2 250,000.00 79 Kaca 12 mm bening m2 300,000.00 80 Kaca Es/Kapur 3 mm m2 75,000.00 81 Kaca Es/Kapur 5 mm m2 105,000.00 82 Kaca nako daun 12,500.00 83 Kaca nako teralis bening m2 113,300.00 84 Kaca ryben 3 mm m2 100,000.00 85 Kaca ryben 5 mm m2 110,000.00 86 Kait angin biasa bh 16,000.00 87 Kunci pintu TOP bh 40,000.00 88 Kunci pintu Union bh 65,000.00 89 Kunci pintu Vanesa bh 107,000.00 90 Kunci pintu Yale bh 112,500.00 91 Kunci pintu YURI bh 125,000.00 92 Kunci slot bh 88,000.00 93 Kunci tanam 2 slag bh 104,500.00

KAYU DAN PLAFOND94 Bambu besar Ukuran 4 m btg 8,500.00 95 Bambu sedang Ukuran 4 m btg 8,000.00 96 Bambu kecil Ukuran 4 m btg 7,000.00 97 Celling teak (0,62 x 2,40) m2 lbr 65,000.00 98 Eternit lbr 47,000.00 99 Formika lbr 80,000.00

100 Gedeg kulit kelas I m2 19,000.00 101 Gypsum Old lbr 62,500.00 102 Hard board MDF lbr 105,000.00 103 Kalsiboard 4,5 mm lbr 70,000.00 104 Kayu bekesting m3 2,000,000.00 105 Kayu bingkirai m3 9,000,000.00 106 Kayu bingkirai papan m3 10,000,000.00 107 Kayu dolken (pekerjaan sementara) btg 90,000.00 108 Kayu jati m3 20,000,000.00 109 Kayu jati papan m3 30,000,000.00 110 Kayu kamper balok m3 7,700,000.00 111 Kayu kamper usuk/reng m3 5,700,000.00 112 Kayu kamper papan m3 7,900,000.00 113 Kayu kruing balok m3 4,200,000.00 114 Kayu kruing usuk/reng m3 4,000,000.00 115 Kayu kruing papan m3 6,000,000.00 116 Kayu meranti balok m3 2,000,000.00 117 Kayu meranti usuk/reng m3 1,700,000.00 118 Kayu meranti papan m3 4,000,000.00 119 Kayu merbau m3 9,700,000.00 120 Kayu merbau papan m3 10,000,000.00 121 Kayu profil m1 12,250.00 122 Kayu seseh balok m3 2,264,750.00 123 Kayu seseh dolken m3 2,750,000.00 124 Lem Aibond kg 33,000.00 125 Lem Kayu ltr 12,500.00 126 List Gypsum standar m' 17,000.00

Page 19: 72125046-Analisa-Sni-2002-2008-Dck-Bln-Januari-2011

Harga Barang dan Upah Hal. 19

NO NAMA BARANG SATUAN HARGA SATUAN

1 2 3 4127 Minyak bekisting ltr 15,000.00 128 Multiplek 12 mm lbr 126,000.00 129 Multiplek 18 mm lbr 172,000.00 130 Multiplek 6 mm lbr 58,000.00 131 Multiplek 9 mm lbr 82,000.00 132 Plywood 12 mm lbr 126,000.00 133 Plywood 3 mm lbr 35,000.00 134 Plywood 4 mm lbr 46,000.00 135 Plywood 6 mm lbr 66,550.00 136 Plywood 9 mm lbr 105,250.00 137 Plywood aluminium lbr 74,000.00 138 Teak wood (0,9x2,20) m2 lbr 55,000.00 139 Teak wood (1,20x2,40) m2 lbr 61,000.00

KERAMIKIKAD

140 Ikad (Keramik) Kw. I 10 x 20 cm m2 51,480.00 141 Ikad (Keramik) Kw. I 20 x 20 cm m2 41,900.00 142 Ikad (Keramik) Kw. I 20 x 30 cm m2 51,800.00 143 Ikad (Keramik) Kw. I 30 x 30 cm m2 39,500.00 144 Ikad (Keramik) Kw. I 40 x 40 cm m2 47,900.00 145 Ikad (Keramik) Kw. II 10 x 20 cm m2 37,500.00 146 Ikad (Keramik) Kw. II 20 x 20 cm m2 39,500.00 147 Ikad (Keramik) Kw. II 20 x 30 cm m2 46,500.00 148 Ikad (Keramik) Kw. II 30 x 30 cm m2 37,500.00 149 Ikad (Keramik) Kw. II 40 x 40 cm m2 45,900.00

INESA150 Keramik 30 x 30 Kelas I (Onyx Phyrus Ruby Jade, P) m2 190,696.00 151 Keramik 30 x 30 Kelas I (Onyx Phyrus Ruby Jade, UP) m2 153,367.50 152 Keramik 30 x 30 Kelas I (Pearl Ghita Cat Eye, P) m2 179,080.00 153 Keramik 30 x 30 Kelas I (Pearl Ghita Cat Eye, UP) m2 142,175.00 154 Keramik 30 x 30 Kelas I (Sand Wheat Spruce Clay Charcoal, R) m2 164,560.00 155 Keramik 40 x 40 Kelas I (Corypha Roystonea Raphia, P) m2 208,846.00 156 Keramik 40 x 40 Kelas I (Onyx Phyrus Ruby Jade, P) m2 208,846.00 157 Keramik 40 x 40 Kelas I (Onyx Phyrus Ruby Jade, UP) m2 159,720.00 158 Keramik 40 x 40 Kelas I (Pearl Ghita Cat Eye, P) m2 196,504.00 159 Keramik 40 x 40 Kelas I (Pearl Ghita Cat Eye, UP) m2 148,467.00 160 Keramik 60 x 60 Kelas I (Corypha Roystonea Raphia, P) m2 248,171.00

ESSENZA161 Keramik 30 x 30 Kelas I (Black Orchid, Coral Bell, P) m2 165,000.00 162 Keramik 30 x 30 Kelas I (Black Orchid, Coral Bell, UP) m2 122,100.00 163 Keramik 30 x 30 Kelas I (Pepper Grey Price Rubert Silver star, P) m2 150,700.00 164 Keramik 30 x 30 Kelas I (Pepper Grey Price Rubert Silver star, UP) m2 107,800.00 165 Keramik 40 x 40 Kelas I (Pepper Grey Price Rubert Silver star, P) m2 222,900.00 166 Keramik 40 x 40 Kelas I (Pepper Grey Price Rubert Silver star, UP) m2 194,900.00 167 Keramik 60 x 60 Kelas I (Pepper Grey Price Rubert Silver star, P) m2 273,500.00 168 Keramik Kelas I Domus m2 286,500.00 169 Keramik Kelas I Granity Imperiali m2 262,500.00 170 Keramik Kelas I Lavagna m2 249,900.00 171 Keramik Kelas I Mountain Peak m2 337,000.00

GARUDA172 Keramik 20 x 20 kelas I Emboss Dasar Muda m2 43,000.00 173 Keramik 20 x 20 kelas I Emboss Dasar Tua m2 45,000.00 174 Keramik 20 x 20 kelas I Tesia m2 45,000.00 175 Keramik 20 x 20 kelas II Emboss Dasar Muda m2 43,000.00 176 Keramik 20 x 20 kelas II Emboss Dasar Tua m2 44,000.00 177 Keramik 20 x 20 kelas II Tesia m2 43,000.00 178 Keramik 20 x 25 kelas I Motif Dasar Medium m2 46,000.00 179 Keramik 20 x 25 kelas I Motif Dasar Muda m2 46,000.00 180 Keramik 20 x 25 kelas I Nuri Dark m2 48,000.00 181 Keramik 20 x 25 kelas I Polos m2 40,000.00 182 Keramik 30 x 30 kelas I Granity m2 45,000.00 183 Keramik 30 x 30 kelas I Motif Embose m2 45,000.00 184 Keramik 30 x 30 kelas II Granity m2 43,000.00 185 Keramik 30 x 30 kelas II Motif Embose m2 43,000.00 186 Keramik 40 x 40 kelas I Motif Dasar Muda m2 48,000.00 187 Keramik 40 x 40 kelas I Motif Dasar Muda m2 48,000.00

Page 20: 72125046-Analisa-Sni-2002-2008-Dck-Bln-Januari-2011

Harga Barang dan Upah Hal. 20

NO NAMA BARANG SATUAN HARGA SATUAN

1 2 3 4188 Keramik 40 x 40 kelas I Motif Embose m2 50,050.00 189 Keramik 40 x 40 kelas I Motif Granity Tua m2 55,000.00 190 Keramik 40 x 40 kelas I Motif Medium Color m2 45,000.00 191 Keramik 40 x 40 kelas I Motif Spesial Color m2 44,550.00 192 Keramik 50 x 50 kelas I m2 70,000.00

Page 21: 72125046-Analisa-Sni-2002-2008-Dck-Bln-Januari-2011

Harga Barang dan Upah Hal. 21

NO NAMA BARANG SATUAN HARGA SATUAN

1 2 3 4ASIA

193 Keramik 10 x 20 kelas I warna muda m2 49,500.00 194 Keramik 20 x 20 kelas I warna muda m2 34,500.00 195 Keramik 20 x 20 kelas I warna tua m2 36,500.00 196 Keramik 20 x 25 kelas I warna tua m2 39,000.00 197 Keramik 20 x 30 kelas I warna muda m2 55,000.00 198 Keramik 30 x 30 kelas I warna muda m2 34,500.00 199 Keramik 30 x 30 kelas I warna tua m2 38,500.00 200 Keramik 40 x 40 kelas I warna muda m2 40,500.00 201 Keramik 10 x 20 kelas II m2 44,440.00 202 Keramik 20 x 20 kelas II m2 34,500.00 203 Keramik 20 x 30 kelas II m2 36,500.00 204 Keramik 30 x 30 kelas II m2 36,500.00 205 Keramik 40 x 40 kelas II m2 39,500.00

MULIA206 Keramik 10 x 20 cm kelas I m2 40,000.00 207 Keramik 20 x 20 cm kelas I m2 42,500.00 208 Keramik 20 x 30 cm kelas I m2 55,000.00 209 Keramik 30 x 30 cm kelas I m2 38,500.00 210 Keramik 40 x 40 cm kelas I m2 47,500.00 211 Keramik 10 x 20 cm kelas II m2 38,000.00 212 Keramik 20 x 20 cm kelas II m2 39,500.00 213 Keramik 20 x 30 cm kelas II m2 52,000.00 214 Keramik 30 x 30 cm kelas II m2 36,500.00 215 Keramik 40 x 40 cm kelas II m2 45,500.00

SANITAIR201 Bak mandi fibre glass 70x70x66 cm bh 225,000.00 202 Bak mandi keramik 50x50 bh 165,000.00 203 Floor Drain " TOTO TypeTx 1 Bv 1 " Square Flange " bh 222,900.00 204 Floor drain plastik bh 12,500.00 205 Floor drain stainless bh 35,000.00 206 Kloset duduk INA Komplit bh 1,100,000.00 207 Kloset duduk Amerika Standar bh 890,000.00 208 Kloset duduk " TOTO Type AVANTE CW 821 PJ / SW 821JP COMPLIT bh 1,420,000.00 209 Kloset duduk " TOTO Type AVANTE CW 821J"/ SW 821JP COMPLIT bh 5,610,000.00 210 Kloset duduk " TOTO Type AVANTE CW 823 J bh 5,600,000.00 211 Kloset duduk " TOTO Type CW 660J bh 602,800.00 212 Kloset duduk " TOTO Type CW 660J / SW 660J COMPLIT bh 1,365,000.00 213 Kloset duduk " TOTO Type CW 660J / SW 660J COMPLIT WARNA bh 1,491,000.00 214 Kloset duduk " TOTO Type CW 660J WARNA COMPLIT bh 653,000.00 215 Kloset duduk " TOTO Type CW 661JT1 BODI COMPLIT bh 2,796,200.00 216 Kloset duduk " TOTO Type CW 661JT1" / SW 661JP COMPLIT bh 2,190,000.00 217 Kloset duduk " TOTO Type CW 661JT1" / SW 784JP COMPLIT bh 1,734,700.00 218 Kloset jongkok " TOTO Type CE 6 COMPLIT bh 345,000.00 219 Kloset jongkok " TOTO Type CE 7 COMPLIT bh 153,900.00 220 Kloset porselin jongkok Kia (standar) bh 135,300.00 221 Kloset porselin jongkok Ina (standar) bh 125,000.00 222 Kran biasa bh 13,000.00 223 Kran SunEi bh 99,000.00 224 Kran TOTO T 205 LCSC bh 220,500.00 225 Kran TOTO T 205 MC bh 156,900.00 226 Kran TOTO T 23 B13 bh 134,500.00 227 Kran TOTO T 23 B13V7N bh 140,500.00 228 Kran TOTO T 26 - 13 bh 183,900.00 229 Kran TOTO TX 109 LH bh 407,900.00 230 Penyekat Urinoir " TOTO " Type A 100 " bh 832,000.00 231 Shower Spray " TOTO Tx 403SPIV ( Pastel Ivory ) bh 233,500.00 232 Soap holder " TOTO " Type S 6 N " bh 45,900.00 233 Seal tape bh 2,000.00 234 Urinoir " TOTO U 57 M bh 1,052,000.00 235 Urinoir " TOTO U 57 M BODI bh 849,000.00 236 Urinoir " TOTO UW 447 JT 1 " bh - 237 Urinoir " TOTO UW 447 JT 1 BODI bh - 238 Urinoir " TOTO UW 447 JT 1,M " bh - 239 Urinoir " TOTO UW 447 JT 1,M "BODI bh - 240 Wastagel KIA Standard bh 181,800.00 241 Wastagel KIA Warna bh 228,900.00 242 Wastafel Komplit " TOTO Tx " Type L 521V1A " bh 1,130,000.00 243 Wastafel Komplit top Counter" TOTO " Type CERABO LW 523 " bh 728,000.00

Page 22: 72125046-Analisa-Sni-2002-2008-Dck-Bln-Januari-2011

Harga Barang dan Upah Hal. 22

NO NAMA BARANG SATUAN HARGA SATUAN

1 2 3 4

Page 23: 72125046-Analisa-Sni-2002-2008-Dck-Bln-Januari-2011

Harga Barang dan Upah Hal. 23

NO NAMA BARANG SATUAN HARGA SATUAN

1 2 3 4

PAKU244 Paku 10 cm kg 12,000.00 245 Paku kalsiboard kg 19,000.00 246 Paku list SQ kg 15,000.00 247 Paku pancing 60 x 230 kg 18,750.00 248 Paku reng/usuk SQ kg 12,000.00 249 Paku seng kg 17,500.00 250 Paku seng import bj 45,000.00 251 Paku skrup 1/2" kg 16,500.00 252 Paku skrup 2" kg 16,500.00 253 Paku skrup 3.5" kg 24,167.00 254 Paku sumbat 1/2" kg 13,750.00

PASIR, BATU, KERIKIL, BATA DAN PARAS255 Bata gosok ex Tulikup bj 1,980.00 256 Bata Merah 5 x 11 x 22 cm bj 1,250.00 257 Batako kelas I bj 1,800.00 258 Batu kali /batu bulat 15/20 cm m3 118,000.00 259 Batu karang m3 110,000.00 260 Batu lahar Singaraja m3 138,000.00 261 Batu pecah 5-7 cm (manual) m3 120,000.00 262 Batu pipih Singaraja m3 150,000.00 263 Glass block bj 17,500.00 264 Roster Keramik bh 48,000.00 265 Koral Beton m3 120,000.00 266 Limestone m3 79,000.00 267 Paras Batik bh 15,000.00 268 Paras Buahan bh 6,600.00 269 Paras Karang Bukit bh 7,700.00 270 Paras Kerobokan Tebal 5 bh 8,000.00 271 Paras sarwagenep bh 8,500.00 272 Paras Jogya Putih bh 10,000.00 273 Paras Malem bh 12,870.00 274 Paras Putih Bukit bh 3,300.00 275 Paras Silakarang tebal bh 13,860.00 276 Paras Silakarang tipis bh 11,000.00 277 Paras untuk pondasi bh 12,000.00 278 Pasir beton m3 110,000.00 279 Pasir pasang m3 125,000.00 280 Pasir urug m3 80,000.00 281 Sirtu m3 100,000.00 282 Tanah urug m3 70,000.00

PIPA283 Pipa Galvanis 1/2" m1 23,000.00 284 Pipa Galvanis 3/4" m1 27,000.00 285 Pipa Galvanis 1 1/4" m1 46,000.00 286 Pipa Galvanis 1 1/2" m1 61,000.00 287 Pipa Galvanis 1" m1 38,000.00 288 Pipa Galvanis 1,5 BSA m1 - 289 Pipa Galvanis 2" m1 69,000.00 290 Pipa Galvanis 3" m1 175,000.00 291 Pipa Maspion AW 1 ljr 32,000.00 292 Pipa Maspion AW 1/2 ljr 22,000.00 293 Pipa Maspion AW 10 ljr 109,200.00 294 Pipa Maspion AW 1-1/2 ljr 56,000.00 295 Pipa Maspion AW 1-1/4 ljr 43,000.00 296 Pipa Maspion AW 12 ljr 1,550,000.00 297 Pipa Maspion AW 14 ljr 1,900,000.00 298 Pipa Maspion AW 16 ljr 2,400,000.00 299 Pipa Maspion AW 2 ljr 89,000.00 300 Pipa Maspion AW 2-1/2 ljr 103,000.00 301 Pipa Maspion AW 3 ljr 140,000.00 302 Pipa Maspion AW 3/4 ljr 25,000.00 303 Pipa Maspion AW 4 ljr 225,000.00 304 Pipa Maspion AW 5 ljr 373,000.00 305 Pipa Maspion AW 6 ljr 494,000.00 306 Pipa Maspion AW 8 ljr 768,000.00 307 Pipa Maspion C 1 ljr 14,700.00 308 Pipa Maspion C 1-1/2 ljr 19,500.00 309 Pipa Maspion C 1-1/4 ljr 16,500.00

Page 24: 72125046-Analisa-Sni-2002-2008-Dck-Bln-Januari-2011

Harga Barang dan Upah Hal. 24

NO NAMA BARANG SATUAN HARGA SATUAN

1 2 3 4310 Pipa Maspion C 2 ljr 35,000.00 311 Pipa Maspion C 2-1/2 ljr 45,000.00 312 Pipa Maspion C 3 ljr 50,000.00 313 Pipa Maspion C 3/4 ljr 10,000.00 314 Pipa Maspion C 4 ljr 63,000.00 315 Pipa Maspion C 5/8 ljr 5,500.00 316 Pipa Maspion D 10 ljr 784,000.00 317 Pipa Maspion D 1-1/2 ljr 32,000.00 318 Pipa Maspion D 1-1/4 ljr 28,000.00 319 Pipa Maspion D 12 ljr 1,877,568.00 320 Pipa Maspion D 14 ljr 1,270,000.00 321 Pipa Maspion D 16 ljr 1,650,000.00 322 Pipa Maspion D 2 ljr 42,000.00 323 Pipa Maspion D 2-1/2 ljr 62,000.00 324 Pipa Maspion D 3 ljr 86,000.00 325 Pipa Maspion D 4 ljr 120,000.00 326 Pipa Maspion D 5 ljr 209,000.00 327 Pipa Maspion D 6 ljr 254,000.00 328 Pipa Maspion D 8 ljr 449,000.00

SEMEN329 Semen Bosowa 50 kg zak 50,000.00 330 Semen Gresik 40 kg zak 43,000.00 331 Semen Gresik 50 kg zak 51,500.00 332 Semen Tiga Roga 50 kg zak 51,000.00 333 Semen Tonasa 50 kg zak 49,000.00 334 Semen warna/semen grouting kg 8,500.00

BESI BETON DAN PAGAR335 Besi beton kg 7,111.00 336 Kawat berduri roll 80,000.00 337 Kawat beton RRT kg 15,000.00 338 Pagar BRC asli T.120 diameter 6mm m' 161,700.00 339 Pagar BRC asli T.150 diameter 6mm m' 172,000.00 340 Pagar BRC asli T.175 diameter 7mm m' 249,000.00 341 Pagar BRC asli T.190 diameter 7mm m' 267,000.00 342 Pagar BRC asli T.90 diameter 6mm m' 134,000.00 343 Pagar HotDip Galvanized T.120 diameter 6mm m' 136,000.00 344 Pagar HotDip Galvanized T.150 diameter 7mm m' 187,000.00 345 Pagar HotDip Galvanized T.175 diameter 7mm m' 203,000.00 346 Pagar HotDip Galvanized T.190 diameter 7mm m' 218,000.00 347 Pagar HotDip Galvanized T.90 diameter 6mm m' 118,000.00 348 Tiang BRC asli T. 120 diameter 1 1/2" bh 160,000.00 349 Tiang BRC asli T. 150 diameter 2" bh 209,000.00 350 Tiang BRC asli T. 175 diameter 2" bh 240,000.00 351 Tiang BRC asli T. 190 diameter 2" bh 246,000.00 352 Tiang BRC asli T. 90 diameter 1 1/2" bh 136,000.00 353 Tiang HotDip Galvanized T. 120 diameter 1 1/2" bh 142,000.00 354 Tiang HotDip Galvanized T. 150 diameter 2" bh 169,000.00 355 Tiang HotDip Galvanized T. 175 diameter 2" bh 185,000.00 356 Tiang HotDip Galvanized T. 190 diameter 2" bh 197,000.00 357 Tiang HotDip Galvanized T. 90 diameter 1 1/2" bh 123,000.00

BAHAN LISTRIK358 Saklar (Broco) bh 12,500.00 359 Stop Kontak bh 15,500.00 360 Fitting bh 4,500.00 361 Steker bh 5,500.00 362 Coaxial cable 5C - 75 ohm commscof m1 5,700.00 361 Kabel NYM 3 x 2.5 mm ex. Supreme m1 11,500.00 362 Kabel NYM 4 mm m1 5,500.00 363 Kabel telephone m1 3,500.00 364 Lampu pijar 10 Watt (Philip) bh 4,500.00 365 Lampu pijar 15 Watt (Philip) bh 5,500.00 366 Lampu pijar 25 Watt (Philip) bh 6,000.00 367 Lampu TL 10 Watt (10 Watt) bh 27,500.00 368 Lampu TL 20 Watt (10 Watt) bh 34,000.00 369 Lampu TL 25 Watt (10 Watt) bh 31,900.00 370 Pipa clipsal 20 mm bt 10,000.00 371 Pipa flexible clipsal 20 mm m1 9,000.00 372 Sock clipsal 20 mm bj 1,500.00

Page 25: 72125046-Analisa-Sni-2002-2008-Dck-Bln-Januari-2011

Harga Barang dan Upah Hal. 25

NO NAMA BARANG SATUAN HARGA SATUAN

1 2 3 4373 Tee dos clipsal 20 mm bh 6,000.00 374 Klem clipsal 20 mm bj 650.00 375 Inbow dos plastik clipsal E 157 P bj 9,000.00

Page 26: 72125046-Analisa-Sni-2002-2008-Dck-Bln-Januari-2011

Harga Barang dan Upah Hal. 26

NO NAMA BARANG SATUAN HARGA SATUAN

1 2 3 4

BUIS BETON376 Buis beton 10 x 75 bh 27,500.00 377 Buis beton 15 x 75 bh 35,000.00 378 Buis beton 20 x 75 bh 37,500.00 379 Buis beton 25 x 75 bh 40,000.00 380 Buis beton 30 x 75 bh 50,000.00 381 Buis beton 50 x 75 bh 72,500.00

PAVING382 Paving 10 x 20 cm tebal 6 cm K225 m2 46,000.00 383 Paving 10 x 20 cm tebal 6 cm K350 m2 54,500.00 384 Paving 10 x 20 cm tebal 8 cm K225 m2 53,500.00 385 Paving 10 x 20 cm tebal 8 cm K350 m2 60,000.00 386 Paving 10 x 20 cm tebal 8 cm K425 m2 69,500.00 387 Paving 20 x 20 cm tebal 6 cm K225 m2 46,000.00 388 Paving 20 x 20 cm tebal 6 cm K350 m2 54,500.00 389 Paving 20 x 20 cm tebal 8 cm K225 m2 53,500.00 389 Paving 20 x 20 cm tebal 8 cm K350 m2 60,000.00 390 Paving 20 x 20 cm tebal 8 cm K425 m2 69,500.00 391 Paving 20 x 20 cm tebal 10 cm K225 m2 60,500.00 392 Paving 20 x 20 cm tebal 10 cm K350 m2 70,000.00 393 Paving 20 x 20 cm tebal 10 cm K425 m2 79,000.00 394 Paving Tiga Berlian tebal 6 cm K225 m2 47,000.00 395 Kanstein Bulat (P:50,T:30,La:10,Lb:16 cm K225) m1 52,000.00 396 Kanstein Jumbo (P:50,L:15,T:30 cm K225) m1 58,000.00 397 Kanstein Segi Lima Jumbo (P:50,L:15, T:40 cm K225) m1 62,000.00 398 Grass Block 36 X 54 cm tebal 9 cm K 225 m2 47,500.00 399 Koral Sikat zak/10 kg 30,000.00

LAIN-LAINDugul batu hitam 50 x 50 x 200 unit 2,725,000.00

1 Dugul batu hitam 60 x 70 x 250 unit 3,550,000.00 2 Dugul batu hitam 70 x 70 x 250 unit 3,650,000.00 3 Padmasari batu hitam 50 x 50 x 200 unit 2,675,000.00 4 Padmasari batu hitam 70 x 70 x 250 unit 3,275,000.00 5 Padmasari batu hitam 65 x 75 x 225 unit 2,550,000.00

Mangupura, Januari 2011Kepala Dinas Cipta Karya

Kabupaten Badung

Ir. Ni Luh Putu Dessy Dharmayanty, M.TPembina

NIP. 196110101994032001

Page 27: 72125046-Analisa-Sni-2002-2008-Dck-Bln-Januari-2011

DAFTAR HARGA SATUAN UPAHBULAN JANUARI TAHUN 2011

NO NAMA BARANG SPESIFIKASI SATUANHARGA

(Rp.)1 2 3 4 5

1 Mandor Hari 60,000.00

2 Kepala Tukang Hari 55,000.00

3 Tukang Politur Hari 42,000.00

4 Tukang Batu Hari 45,000.00

5 Tukang kayu Hari 53,000.00

6 Tukang Besi Hari 50,000.00

7 Tukang cat Hari 40,000.00

8 Tukang gali Hari 40,000.00

9 Tukang Listrik Hari 45,000.00

10 Tukang Pipa/ Tukang Ledeng Hari 50,000.00

11 Tukang Aspal Hari 43,000.00

12 Tukang masak Aspal Hari 44,000.00

13 Pekerja Hari 35,000.00

14 Tukang Ukir Hari 75,000.00

15 Operator Hari 50,000.00

16 Pembantu Operator Hari 40,000.00

17 Mekanik Hari 50,000.00

18 Pembantu Mekanik Hari 45,000.00

19 Pasang Atap Alang-Alang Hari 45,000.00

20 Pasang Bata Gosok Dua Muka M2 270,000.00

21 Pasang Bata Gosok Satu Muka M2 145,000.00

22 Pasang Batu Paras Diukir M2 288,500.00

23 Pasang Patu Paras Siap Diukir M2 250,000.00

24 Tukang Bongkar Begesting Hari 35,000.00

Catatan :1. Harga - harga belum termasuk PPn 10 %;2. Harga - harga hanya sebagai pedoman / pendukung

dalam perhitungan konstruksi ( tidak mengikat ).

Mangupura, Januari 2011Kepala Dinas Cipta Karya

Kabupaten Badung

Ir. Ni Luh Putu Dessy Dharmayanty, M.TPembina

NIP. 196110101994032001

Page 28: 72125046-Analisa-Sni-2002-2008-Dck-Bln-Januari-2011

DAFTAR ANALISA PEKERJAANBULAN JANUARI TAHUN 2011

NO URAIANHARGA HARGA HARGA HARGASATUAN UPAH BAHAN JUMLAH

(Rp) (Rp) (Rp) (Rp)1 2 3 4 5 6

I PEKERJAAN PERSIAPAN (SNI 03-2835-2002)1

1.2500 btg Bambu Sedang 8,000.00 10,000.00 2.5000 kg Semen Portland 1,030.00 2,575.00 1.2000 lbr Seng gelombang 3" - 5" 40,000.00 48,000.00 0.0050 m3 Pasir Beton 110,000.00 550.00 0.0090 m3 Koral beton 120,000.00 1,080.00 0.0720 m3 Kayu Meranti Usuk 5/7 1,700,000.00 122,400.00 0.0600 kg Paku biasa 2" - 5" 12,000.00 720.00 0.4500 kg Meni Besi 18,500.00 8,325.00 0.2000 oh Tukang Kayu 53,000.00 10,600.00 0.4000 oh Pekerja 35,000.00 14,000.00 0.0200 oh Kepala Tukang 55,000.00 1,100.00 0.0200 oh Mandor 60,000.00 1,200.00

Total : 26,900.00 193,650.00 220,550.00

2 1 M1 PENGUKURAN DAN PEMASANGAN BOWPLANK 0.0120 m3 Kayu Usuk Meranti 5/7 1,700,000.00 20,400.00 0.0200 kg Paku Biasa 2" - 5" 12,000.00 240.00 0.0070 m3 Kayu Papan Meranti 3/20 4,000,000.00 28,000.00 0.1000 oh Tukang Kayu 53,000.00 5,300.00 0.1000 oh Pekerja 35,000.00 3,500.00 0.0100 oh Kepala Tukang 55,000.00 550.00 0.0050 oh Mandor 60,000.00 300.00

Total : 9,650.00 48,640.00 58,290.00

3

1.2500 btg Dolken Kayu Ø 8 - 10/4m 90,000.00 112,500.00 0.1800 m3 Kayu Meranti 2,000,000.00 360,000.00 0.8500 kg Paku Biasa 2" - 5" 12,000.00 10,200.00 1.1000 kg Besi Strip 6,050.00 6,655.00 35.0000 kg Semen Portland 1,030.00 36,050.00 0.1500 m3 Pasir Pasang 125,000.00 18,750.00 0.1000 m3 Pasir Beton 110,000.00 11,000.00 0.1500 m3 Koral Beton 120,000.00 18,000.00 30.0000 bh Bata Merah 1,250.00 37,500.00 0.2500 lbr Seng Plat 45,000.00 11,250.00 2.0000 bh Jendela Nako 12,500.00 25,000.00 0.0800 m2 Kaca Polos 90,000.00 7,200.00 0.1500 bh Kunci Tanam 104,500.00 15,675.00 0.0600 lbr Plywood 4 mm 46,000.00 2,760.00 2.0000 oh Tukang Kayu 53,000.00 106,000.00 1.0000 oh Tukang Batu 45,000.00 45,000.00 2.0000 oh Pekerja 35,000.00 70,000.00 0.3000 oh Kepala Tukang 55,000.00 16,500.00 0.0500 oh Mandor 60,000.00 3,000.00

Total : 240,500.00 672,540.00 913,040.00

4 1 M2 PEMBUATAN GUDANG SEMEN DAN ALAT-ALAT 1.7000 btg Bambu Sedang 8,000.00 13,600.00 0.2100 m3 Kayu Meranti 2,000,000.00 420,000.00 0.3000 kg Paku Biasa 2" - 5" 12,000.00 3,600.00 10.5000 kg Semen Portland 1,030.00 10,815.00 0.0300 m3 Pasir Beton 110,000.00 3,300.00 0.0500 m3 Koral Beton 120,000.00 6,000.00 1.5000 lbr Seng gelombang BJLS 28 40,000.00 60,000.00 2.0000 oh Tukang Kayu 53,000.00 106,000.00 1.0000 oh Pekerja 35,000.00 35,000.00 0.2000 oh Kepala Tukang 55,000.00 11,000.00 0.0500 oh Mandor 60,000.00 3,000.00

Total : 155,000.00 517,315.00 672,315.00

5 1 M2 PEMBUATAN RUMAH JAGA/KONSTRUKSI KAYU 3.0000 btg Bambu Sedang 8,000.00 24,000.00 0.2760 m3 Kayu Meranti 2,000,000.00 552,000.00 0.7000 kg Paku biasa 2" - 5" 12,000.00 8,400.00 1.5000 lbr Seng gelombang BJLS 28 40,000.00 60,000.00 1.5000 oh Tukang Kayu 53,000.00 79,500.00 1.0000 oh Pekerja 35,000.00 35,000.00 0.1500 oh Kepala Tukang 55,000.00 8,250.00 0.0500 oh Mandor 60,000.00 3,000.00

Total : 125,750.00 644,400.00 770,150.00

1 M1 PAGAR SEMENTARA DARI SENG GELOMBANG TINGGI 2 METER

1 M2 PEMBUATAN KANTOR SEMENTARA, DENGAN LANTAI PLESTERAN

Page 29: 72125046-Analisa-Sni-2002-2008-Dck-Bln-Januari-2011

NO URAIANHARGA HARGA HARGA HARGASATUAN UPAH BAHAN JUMLAH

(Rp) (Rp) (Rp) (Rp)1 2 3 4 5 6

6 1 M2 MEMBERSIHKAN LAPANGAN DAN PERATAAN 0.1000 oh Pekerja 35,000.00 3,500.00 0.0500 oh Mandor 60,000.00 3,000.00

Total : 6,500.00 6,500.00

7 1 M2 PEMBUATAN BEDENG BURUH 1.2500 btg Bambu Sedang 8,000.00 10,000.00 0.1860 m3 Kayu Meranti 2,000,000.00 372,000.00 0.3000 kg Paku Biasa 2" - 5" 12,000.00 3,600.00 18.0000 kg Semen Portland 1,030.00 18,540.00 0.0300 m3 Pasir Beton 110,000.00 3,300.00 0.0500 m3 Koral Beton 120,000.00 6,000.00 1.5000 lbr Seng gelombang BJLS 28 40,000.00 60,000.00 1.3500 lbr Plywood 4 mm 46,000.00 62,100.00 2.0000 oh Tukang Kayu 53,000.00 106,000.00 1.0000 oh Pekerja 35,000.00 35,000.00 0.2000 oh Kepala Tukang 55,000.00 11,000.00 0.0500 oh Mandor 60,000.00 3,000.00

Total : 155,000.00 535,540.00 690,540.00

8 1 M2 PEMBUATAN BAK ADUKAN UKURAN (40X50X20) CM 0.0360 m3 Kayu Terentang 2,000,000.00 72,000.00 0.0800 kg Paku Biasa 2" - 5" 12,000.00 960.00 1.0000 btg Kaso 5/7 56,000.00 56,000.00 0.3000 oh Tukang kayu 53,000.00 15,900.00 0.0015 oh Mandor 60,000.00 90.00

Total : 15,990.00 128,960.00 144,950.00

9 1 M2 PEMBUATAN STEGGER DARI BAMBU 1.0000 btg Bambu 7,000.00 7,000.00 0.2500 kg Tali Ijuk 33,000.00 8,250.00 0.0170 oh Tukang Kayu 53,000.00 901.00 0.0020 oh Pekerja 35,000.00 70.00 0.2500 oh Kepala Tukang 55,000.00 13,750.00 0.0130 oh Mandor 60,000.00 780.00

15,501.00 15,250.00 30,751.00

10 1 M2 PEMBUATAN JALAN SEMENTARA 0.1500 m3 Batu Kali / Batu Bulat 15/20 118,000.00 17,700.00 0.0900 m3 Batu Pecah 5 - 7 120,000.00 10,800.00 0.0100 m3 Pasir Pasang 125,000.00 1,250.00 1.0000 oh Pekerja 35,000.00 35,000.00 0.0500 oh Mandor 60,000.00 3,000.00

Total : 38,000.00 29,750.00 67,750.00

11 1 M3 BONGKARAN BETON BERTULANG 6.6670 oh Pekerja 35,000.00 233,345.00 0.3330 oh Mandor 60,000.00 19,980.00

Total : 253,325.00 253,325.00

12 1 M3 BONGKARAN DINDING TEMBOK BATA MERAH 6.6670 oh Pekerja 35,000.00 233,345.00 0.0330 oh Mandor 60,000.00 1,980.00

Total : 235,325.00 235,325.00

II PEKERJAAN TANAH (SNI 2835 : 2008)

1 1 M3 GALIAN TANAH BIASA DALAM 1 METER 0.7500 oh Pekerja 35,000.00 26,250.00 0.0250 oh Mandor 60,000.00 1,500.00

Total : 27,750.00 27,750.00 2 1 M3 GALIAN TANAH BIASA DALAM 2 METER

0.9000 oh Pekerja 35,000.00 31,500.00 0.0450 oh Mandor 60,000.00 2,700.00

Total : 34,200.00 34,200.00

3 1 M3 GALIAN TANAH BIASA DALAM 3 METER 1.0500 oh Pekerja 35,000.00 36,750.00 0.0670 oh Mandor 60,000.00 4,020.00

Total : 40,770.00 40,770.00

4 1 M3 GALIAN TANAH KERAS DALAM 1METER 1.0000 oh Pekerja 35,000.00 35,000.00 0.0320 oh Mandor 60,000.00 1,920.00

Total : 36,920.00 36,920.00

5 1 M3 GALIAN TANAH CADAS DALAM 1 METER 1.5000 oh Pekerja 35,000.00 52,500.00 0.0600 oh Mandor 60,000.00 3,600.00

Total : 56,100.00 56,100.00

Page 30: 72125046-Analisa-Sni-2002-2008-Dck-Bln-Januari-2011

NO URAIANHARGA HARGA HARGA HARGASATUAN UPAH BAHAN JUMLAH

(Rp) (Rp) (Rp) (Rp)1 2 3 4 5 6

6 1 M3 GALIAN TANAH LUMPUR DALAM 1 METER 1.2000 oh Pekerja 35,000.00 42,000.00 0.0450 oh Mandor 60,000.00 2,700.00

Total : 44,700.00 44,700.00

7 1 M2 PEKERJAAN STRIPPING SETINGGI 1 METER 0.0500 oh Pekerja 35,000.00 1,750.00 0.0050 oh Mandor 60,000.00 300.00

Total : 2,050.00 2,050.00

8 1 M3 PEMBUANGAN TANAH SEJAUH 15 METER 0.3300 oh Pekerja 35,000.00 11,550.00 0.0100 oh Mandor 60,000.00 600.00

Total : 12,150.00 12,150.00

9 1 M3 URUGAN KEMBALI Mengurug Kembali 1 m3 galian dihitung dari 1/3 kali dari indeks pekerjaan galian

10 1 M3 PEMADATAN TANAH ( Per 20 Cm ) 0.5000 oh Pekerja 35,000.00 17,500.00 0.0500 oh Mandor 60,000.00 3,000.00

Total : 20,500.00 20,500.00

11 1 M3 URUGAN PASIR 1.2000 m3 Pasir Urug 80,000.00 96,000.00 0.3000 oh Pekerja 35,000.00 10,500.00 0.0100 oh Mandor 60,000.00 600.00

Total : 11,100.00 96,000.00 107,100.00

12 1 M3 PEMASANGAN LAPISAN IJUK TEBAL 10 CM 6.0000 m3 Ijuk 1,500.00 9,000.00 0.1500 oh Pekerja 35,000.00 5,250.00 0.0150 oh Mandor 60,000.00 900.00

Total : 6,150.00 9,000.00 15,150.00

13 1 M3 URUGAN SIRTU PADAT Untuk Peninggian Lantai Bangunan 1.2000 m3 Sirtu 100,000.00 120,000.00 0.2500 oh Pekerja 35,000.00 8,750.00 0.0250 oh Mandor 60,000.00 1,500.00

Total : 10,250.00 120,000.00 130,250.00

14 1 M3 URUGAN TANAH PILIHAN DIPADATKAN 1.2000 m3 Tanah Urug 70,000.00 84,000.00 0.5000 oh Pekerja 35,000.00 17,500.00 0.0500 oh Mandor 60,000.00 3,000.00

Total : 20,500.00 84,000.00 104,500.00 15 1 M3 URUGAN LIMESTONE PADAT

1.2000 m3 Limestone 79,000.00 94,800.00 0.2500 oh Pekerja 35,000.00 8,750.00 0.0250 oh Mandor 60,000.00 1,500.00

Total : 10,250.00 94,800.00 105,050.00

III PEKERJAAN PONDASI (SNI 2836 : 2008)

1 1 M3 BATU KALI CAMP. 1 PC : 3 PS 1.2000 m3 Batu Kali / Batu Bulat 15/20 118,000.00 141,600.00 202.0000 kg Semen Portland 1,030.00 208,060.00 0.4850 m3 Pasir Pasang 125,000.00 60,625.00 1.5000 oh Pekerja 35,000.00 52,500.00 0.7500 oh Tukang Batu 45,000.00 33,750.00 0.0750 oh Kepala Tukang 55,000.00 4,125.00 0.0750 oh Mandor 60,000.00 4,500.00

Total : 94,875.00 410,285.00 505,160.00

2 1 M3 BATU KALI CAMP. 1 PC : 4 PS 1.2000 m3 Batu Kali / Batu Bulat 15/20 118,000.00 141,600.00 163.0000 kg Semen Portland 1,030.00 167,890.00 0.5200 m3 Pasir Pasang 125,000.00 65,000.00 1.5000 oh Pekerja 35,000.00 52,500.00 0.7500 oh Tukang Batu 45,000.00 33,750.00 0.0750 oh Kepala Tukang 55,000.00 4,125.00 0.0750 oh Mandor 60,000.00 4,500.00

Total : 94,875.00 374,490.00 469,365.00

Page 31: 72125046-Analisa-Sni-2002-2008-Dck-Bln-Januari-2011

NO URAIANHARGA HARGA HARGA HARGASATUAN UPAH BAHAN JUMLAH

(Rp) (Rp) (Rp) (Rp)1 2 3 4 5 6

3 1 M3 BATU KALI CAMP. 1 PC : 5 PS 1.2000 m3 Batu Kali / Batu Bulat 15/20 118,000.00 141,600.00 136.0000 kg Semen Portland 1,030.00 140,080.00 0.5440 m3 Pasir Pasang 125,000.00 68,000.00 1.5000 oh Pekerja 35,000.00 52,500.00 0.7500 oh Tukang Batu 45,000.00 33,750.00 0.0750 oh Kepala Tukang 55,000.00 4,125.00 0.0750 oh Mandor 60,000.00 4,500.00

Total : 94,875.00 349,680.00 444,555.00

4 1 M3 BATU KALI CAMP. 1 PC : 6 PS 1.2000 m3 Batu Kali / Batu Bulat 15/20 118,000.00 141,600.00 117.0000 kg Semen Portland 1,030.00 120,510.00 0.5610 m3 Pasir Pasang 125,000.00 70,125.00 1.5000 oh Pekerja 35,000.00 52,500.00 0.7500 oh Tukang Batu 45,000.00 33,750.00 0.0750 oh Kepala Tukang 55,000.00 4,125.00 0.0750 oh Mandor 60,000.00 4,500.00

Total : 94,875.00 332,235.00 427,110.00

5 1 M3 BATU KALI CAMP. 1 PC : 8 PS 1.2000 m3 Batu Kali / Batu Bulat 15/20 118,000.00 141,600.00 91.0000 kg Semen Portland 1,030.00 93,730.00 0.5840 m3 Pasir Pasang 125,000.00 73,000.00 1.5000 oh Pekerja 35,000.00 52,500.00 0.7500 oh Tukang Batu 45,000.00 33,750.00 0.0750 oh Kepala Tukang 55,000.00 4,125.00 0.0750 oh Mandor 60,000.00 4,500.00

Total : 94,875.00 308,330.00 403,205.00

6 1 M3 PASANGAN PONDASI SIKLOP, 40% BATU KALI 0.4800 m3 Batu Kali / Batu Bulat 15/20 118,000.00 56,640.00 194.0000 kg Semen Portland 1,030.00 199,820.00 0.3120 m3 Pasir Beton 110,000.00 34,320.00 0.4680 m3 Koral Beton 120,000.00 56,160.00 126.0000 kg Besi Beton 7,111.00 895,986.00 1.8000 kg Kawat Beton 15,000.00 27,000.00 3.4000 oh Pekerja 35,000.00 119,000.00 0.8500 oh Tukang Batu 45,000.00 38,250.00 0.0850 oh Kepala Tukang 55,000.00 4,675.00 0.1700 oh Mandor 60,000.00 10,200.00

172,125.00 1,269,926.00 1,442,051.00

7 1 M3 PASANGAN PONDASI SUMURAN DIAMETER 1 M 0.4500 m3 Batu Kali / Batu Bulat 15/20 118,000.00 53,100.00 194.0000 kg Semen Portland 1,030.00 199,820.00 0.3120 m3 Pasir Beton 110,000.00 34,320.00 0.4680 m3 Koral Beton 120,000.00 56,160.00 2.4000 oh Pekerja 35,000.00 84,000.00 0.8000 oh Tukang Batu 45,000.00 36,000.00 0.0800 oh Kepala Tukang 55,000.00 4,400.00 0.1190 oh Mandor 60,000.00 7,140.00

Total : 131,540.00 343,400.00 474,940.00

8 1 M3 PASANGAN BATU KOSONG 1.2000 m3 Batu Kali / Batu Bulat 15/20 15/20 118,000.00 141,600.00 0.4320 m3 Pasir Urug 80,000.00 34,560.00 0.7800 oh Pekerja 35,000.00 27,300.00 0.3900 oh Tukang Batu 45,000.00 17,550.00 0.0390 oh Kepala Tukang 55,000.00 2,145.00 0.0390 oh Mandor 60,000.00 2,340.00

Total : 49,335.00 176,160.00 225,495.00

IV PEKERJAAN DINDING (SNI 6897 : 2008)

11 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 2 PS

140.0000 bh Bata Merah 5 x 11 x 22 cm 1,250.00 175,000.00 43.5000 kg Semen Portland 1,030.00 44,805.00 0.0800 m3 Pasir Pasang 125,000.00 10,000.00 0.6000 oh Pekerja 35,000.00 21,000.00 0.2000 oh Tukang Batu 45,000.00 9,000.00 0.0200 oh Kepala Tukang 55,000.00 1,100.00 0.0300 oh Mandor 60,000.00 1,800.00

32,900.00 229,805.00 262,705.00

Page 32: 72125046-Analisa-Sni-2002-2008-Dck-Bln-Januari-2011

NO URAIANHARGA HARGA HARGA HARGASATUAN UPAH BAHAN JUMLAH

(Rp) (Rp) (Rp) (Rp)1 2 3 4 5 6

2 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 3 PS 140.0000 bh Bata Merah 5 x 11 x 22 cm 1,250.00 175,000.00 32.9500 kg Semen Portland 1,030.00 33,938.50 0.0910 m3 Pasir Pasang 125,000.00 11,375.00 0.6000 oh Pekerja 35,000.00 21,000.00 0.2000 oh Tukang Batu 45,000.00 9,000.00 0.0200 oh Kepala Tukang 55,000.00 1,100.00 0.0300 oh Mandor 60,000.00 1,800.00

32,900.00 220,313.50 253,213.50

3 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 4 PS 140.0000 bh Bata Merah 5 x 11 x 22 cm 1,250.00 175,000.00 26.5500 kg Semen Portland 1,030.00 27,346.50 0.0930 m3 Pasir Pasang 125,000.00 11,625.00 0.6000 oh Pekerja 35,000.00 21,000.00 0.2000 oh Tukang Batu 45,000.00 9,000.00 0.0200 oh Kepala Tukang 55,000.00 1,100.00 0.0300 oh Mandor 60,000.00 1,800.00

32,900.00 213,971.50 246,871.50

4 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 5 PS 140.0000 bh Bata Merah 5 x 11 x 22 cm 1,250.00 175,000.00 22.2000 kg Semen Portland 1,030.00 22,866.00 0.1020 m3 Pasir Pasang 125,000.00 12,750.00 0.6000 oh Pekerja 35,000.00 21,000.00 0.2000 oh Tukang Batu 45,000.00 9,000.00 0.0200 oh Kepala Tukang 55,000.00 1,100.00 0.0300 oh Mandor 60,000.00 1,800.00

32,900.00 210,616.00 243,516.00

5 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 6 PS 140.0000 bh Bata Merah 5 x 11 x 22 cm 1,250.00 175,000.00 18.5000 kg Semen Portland 1,030.00 19,055.00 0.1220 m3 Pasir Pasang 125,000.00 15,250.00 0.6000 oh Pekerja 35,000.00 21,000.00 0.2000 oh Tukang Batu 45,000.00 9,000.00 0.0200 oh Kepala Tukang 55,000.00 1,100.00 0.0300 oh Mandor 60,000.00 1,800.00

32,900.00 209,305.00 242,205.00

6 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 2 PS 70.0000 bh Bata Merah 5 x 11 x 22 cm 1,250.00 87,500.00 18.9500 kg Semen Portland 1,030.00 19,518.50 0.0380 m3 Pasir Pasang 125,000.00 4,750.00 0.3000 oh Pekerja 35,000.00 10,500.00 0.1000 oh Tukang Batu 45,000.00 4,500.00 0.0100 oh Kepala Tukang 55,000.00 550.00 0.0150 oh Mandor 60,000.00 900.00

16,450.00 111,768.50 128,218.50

7 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 3 PS 70.0000 bh Bata Merah 5 x 11 x 22 cm 1,250.00 87,500.00 14.3700 kg Semen Portland 1,030.00 14,801.10 0.0400 m3 Pasir Pasang 125,000.00 5,000.00 0.3000 oh Pekerja 35,000.00 10,500.00 0.1000 oh Tukang Batu 45,000.00 4,500.00 0.0100 oh Kepala Tukang 55,000.00 550.00 0.0150 oh Mandor 60,000.00 900.00

Total : 16,450.00 107,301.10 123,751.10

8 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 4 PS 70.0000 bh Bata Merah 5 x 11 x 22 cm 1,250.00 87,500.00 11.5000 kg Semen Portland 1,030.00 11,845.00 0.0430 m3 Pasir Pasang 125,000.00 5,375.00 0.3000 oh Pekerja 35,000.00 10,500.00 0.1000 oh Tukang Batu 45,000.00 4,500.00 0.0100 oh Kepala Tukang 55,000.00 550.00 0.0150 oh Mandor 60,000.00 900.00

Total : 16,450.00 104,720.00 121,170.00

9 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 5 PS 70.0000 bh Bata Merah 5 x 11 x 22 cm 1,250.00 87,500.00 9.6800 kg Semen Portland 1,030.00 9,970.40 0.0450 m3 Pasir Pasang 125,000.00 5,625.00 0.3000 oh Pekerja 35,000.00 10,500.00 0.1000 oh Tukang Batu 45,000.00 4,500.00 0.0100 oh Kepala Tukang 55,000.00 550.00 0.0150 oh Mandor 60,000.00 900.00

Total : 16,450.00 103,095.40 119,545.40

Page 33: 72125046-Analisa-Sni-2002-2008-Dck-Bln-Januari-2011

NO URAIANHARGA HARGA HARGA HARGASATUAN UPAH BAHAN JUMLAH

(Rp) (Rp) (Rp) (Rp)1 2 3 4 5 6

10 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 6 PS 70.0000 bh Bata Merah 5 x 11 x 22 cm 1,250.00 87,500.00 8.3200 kg Semen Portland 1,030.00 8,569.60 0.0490 m3 Pasir Pasang 125,000.00 6,125.00 0.3000 oh Pekerja 35,000.00 10,500.00 0.1000 oh Tukang Batu 45,000.00 4,500.00 0.0100 oh Kepala Tukang 55,000.00 550.00 0.0150 oh Mandor 60,000.00 900.00

Total : 16,450.00 102,194.60 118,644.60

11 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 8 PS 70.0000 bh Bata Merah 5 x 11 x 22 cm 1,250.00 87,500.00 6.5000 kg Semen Portland 1,030.00 6,695.00 0.0500 m3 Pasir Pasang 125,000.00 6,250.00 0.3000 oh Pekerja 35,000.00 10,500.00 0.1000 oh Tukang Batu 45,000.00 4,500.00 0.0100 oh Kepala Tukang 55,000.00 550.00 0.0150 oh Mandor 60,000.00 900.00

Total : 16,450.00 100,445.00 116,895.00

12 1 M2 PASANGAN DINDING HOLLOWBLOCK (HB. 10) 12.5000 bh Batako 1,800.00 22,500.00 7.5000 kg Semen Portland 1,030.00 7,725.00 0.0270 m3 Pasir Pasang 125,000.00 3,375.00 1.9500 kg Besi Beton 8 mm 7,111.00 13,866.45 0.3200 oh Pekerja 35,000.00 11,200.00 0.1000 oh Tukang Batu 45,000.00 4,500.00 0.0100 oh Kepala Tukang 55,000.00 550.00 0.0150 oh Mandor 60,000.00 900.00

Total : 17,150.00 47,466.45 64,616.45

13 1 M2 PASANGAN DINDING HOLLOWBLOCK (HB. 10) TANPA BESI 12.5000 bh Batako 1,800.00 22,500.00 7.5000 kg Semen Portland 1,030.00 7,725.00 0.0270 m3 Pasir Pasang 125,000.00 3,375.00 0.3200 oh Pekerja 35,000.00 11,200.00 0.1000 oh Tukang Batu 45,000.00 4,500.00 0.0100 oh Kepala Tukang 55,000.00 550.00 0.0150 oh Mandor 60,000.00 900.00

Total : 17,150.00 33,600.00 50,750.00

14 1 M2 PASANGAN DINDING Terawang/Roster (12 x 11 x 24) CM 30.0000 bh Roster Keramik 48,000.00 1,440,000.00 11.0000 kg Semen Portland 1,030.00 11,330.00 0.0350 m3 Pasir Pasang 125,000.00 4,375.00 0.3000 oh Pekerja 35,000.00 10,500.00 0.1000 oh Tukang Batu 45,000.00 4,500.00 0.0100 oh Kepala Tukang 55,000.00 550.00 0.0150 oh Mandor 60,000.00 900.00

Total : 16,450.00 1,455,705.00 1,472,155.00

15 1 M2 PASANGAN DINDING BEDEG, RANGKA KAYU 1.5000 m2 Bedeg/Bilik Bambu Kelas I 19,000.00 28,500.00 0.0140 m3 Kayu kamper usuk/reng 5,700,000.00 79,800.00 0.0120 kg Paku Biasa 12,000.00 144.00 0.0030 m3 List Kayu 2/4 5,700,000.00 17,100.00 0.1000 oh Pekerja 35,000.00 3,500.00 0.0500 oh Tukang Kayu 53,000.00 2,650.00 0.0050 oh Kepala Tukang 55,000.00 275.00 0.0020 oh Mandor 60,000.00 120.00

Total : 6,545.00 125,544.00 132,089.00

V PEKERJAAN PLESTERAN (SNI 2837 : 2008)

1 1 M2 PLESTERAN CAMP. 1 PC : 1 PS TEBAL 15 MM 15.5040 kg Semen Portland 1,030.00 15,969.12 0.0160 m3 Pasir Pasang 125,000.00 2,000.00 0.3000 oh Pekerja 35,000.00 10,500.00 0.1500 oh Tukang Batu 45,000.00 6,750.00 0.0150 oh Kepala Tukang 55,000.00 825.00 0.0150 oh Mandor 60,000.00 900.00

Total : 18,975.00 17,969.12 36,944.12 2 1 M2 PLESTERAN CAMP. 1 PC : 2 PS TEBAL 15 MM

10.2240 kg Semen Portland 1,030.00 10,530.72 0.0200 m3 Pasir Pasang 125,000.00 2,500.00 0.3000 oh Pekerja 35,000.00 10,500.00 0.1500 oh Tukang Batu 45,000.00 6,750.00 0.0150 oh Kepala Tukang 55,000.00 825.00 0.0150 oh Mandor 60,000.00 900.00

Total : 18,975.00 13,030.72 32,005.72

Page 34: 72125046-Analisa-Sni-2002-2008-Dck-Bln-Januari-2011

NO URAIANHARGA HARGA HARGA HARGASATUAN UPAH BAHAN JUMLAH

(Rp) (Rp) (Rp) (Rp)1 2 3 4 5 6

3 1 M2 PLESTERAN CAMP. 1 PC : 3 PS TEBAL 15 MM 7.7760 kg Semen Portland 1,030.00 8,009.28 0.0230 m3 Pasir Pasang 125,000.00 2,875.00 0.3000 oh Pekerja 35,000.00 10,500.00 0.1500 oh Tukang Batu 45,000.00 6,750.00 0.0150 oh Kepala Tukang 55,000.00 825.00 0.0150 oh Mandor 60,000.00 900.00

Total : 18,975.00 10,884.28 29,859.28

4 1 M2 PLESTERAN CAMP. 1 PC : 4 PS TEBAL 15 MM 6.2400 kg Semen Portland 1,030.00 6,427.20 0.0240 m3 Pasir Pasang 125,000.00 3,000.00 0.3000 oh Pekerja 35,000.00 10,500.00 0.1500 oh Tukang Batu 45,000.00 6,750.00 0.0150 oh Kepala Tukang 55,000.00 825.00 0.0150 oh Mandor 60,000.00 900.00

Total : 18,975.00 9,427.20 28,402.20

5 1 M2 PLESTERAN CAMP. 1 PC : 5 PS TEBAL 15 MM 5.1840 kg Semen Portland 1,030.00 5,339.52 0.0260 m3 Pasir Pasang 125,000.00 3,250.00 0.3000 oh Pekerja 35,000.00 10,500.00 0.1500 oh Tukang Batu 45,000.00 6,750.00 0.0150 oh Kepala Tukang 55,000.00 825.00 0.0150 oh Mandor 60,000.00 900.00

Total : 18,975.00 8,589.52 27,564.52

6 1 M2 PLESTERAN CAMP. 1 PC : 6 PS TEBAL 15 MM 4.4160 kg Semen Portland 1,030.00 4,548.48 0.0270 m3 Pasir Pasang 125,000.00 3,375.00 0.3000 oh Pekerja 35,000.00 10,500.00 0.1500 oh Tukang Batu 45,000.00 6,750.00 0.0150 oh Kepala Tukang 55,000.00 825.00 0.0150 oh Mandor 60,000.00 900.00

Total : 18,975.00 7,923.48 26,898.48

7 1 M2 PLESTERAN CAMP. 1 PC : 8 PS TEBAL 15 MM 3.4560 kg Semen Portland 1,030.00 3,559.68 0.0290 m3 Pasir Pasang 125,000.00 3,625.00 0.3000 oh Pekerja 35,000.00 10,500.00 0.1500 oh Tukang Batu 45,000.00 6,750.00 0.0150 oh Kepala Tukang 55,000.00 825.00 0.0150 oh Mandor 60,000.00 900.00

Total : 18,975.00 7,184.68 26,159.68

8 1 M2 PLESTERAN CAMP. 1 PC : 2 PS TEBAL 20 MM 13.6320 kg Semen Portland 1,030.00 14,040.96 0.0270 m3 Pasir Pasang 125,000.00 3,375.00 0.4000 oh Pekerja 35,000.00 14,000.00 0.2000 oh Tukang Batu 45,000.00 9,000.00 0.0200 oh Kepala Tukang 55,000.00 1,100.00 0.0220 oh Mandor 60,000.00 1,320.00

Total : 25,420.00 17,415.96 42,835.96

9 1 M2 PLESTERAN CAMP. 1 PC : 3 PS TEBAL 20 MM 10.3680 kg Semen Portland 1,030.00 10,679.04 0.0310 m3 Pasir Pasang 125,000.00 3,875.00 0.4000 oh Pekerja 35,000.00 14,000.00 0.2000 oh Tukang Batu 45,000.00 9,000.00 0.0200 oh Kepala Tukang 55,000.00 1,100.00 0.0220 oh Mandor 60,000.00 1,320.00

Total : 25,420.00 14,554.04 39,974.04

10 1 M2 PLESTERAN CAMP. 1 PC : 4 PS TEBAL 20 MM 8.3200 kg Semen Portland 1,030.00 8,569.60 0.0320 m3 Pasir Pasang 125,000.00 4,000.00 0.4000 oh Pekerja 35,000.00 14,000.00 0.2000 oh Tukang Batu 45,000.00 9,000.00 0.0200 oh Kepala Tukang 55,000.00 1,100.00 0.0220 oh Mandor 60,000.00 1,320.00

Total : 25,420.00 12,569.60 37,989.60 11 1 M2 PLESTERAN CAMP. 1 PC : 5 PS TEBAL 20 MM

6.9120 kg Semen Portland 1,030.00 7,119.36 0.0350 m3 Pasir Pasang 125,000.00 4,375.00 0.4000 oh Pekerja 35,000.00 14,000.00 0.2000 oh Tukang Batu 45,000.00 9,000.00 0.0200 oh Kepala Tukang 55,000.00 1,100.00 0.0220 oh Mandor 60,000.00 1,320.00

Total : 25,420.00 11,494.36 36,914.36

Page 35: 72125046-Analisa-Sni-2002-2008-Dck-Bln-Januari-2011

NO URAIANHARGA HARGA HARGA HARGASATUAN UPAH BAHAN JUMLAH

(Rp) (Rp) (Rp) (Rp)1 2 3 4 5 6

12 1 M2 PLESTERAN CAMP. 1 PC : 6 PS TEBAL 20 MM 5.8880 kg Semen Portland 1,030.00 6,064.64 0.0360 m3 Pasir Pasang 125,000.00 4,500.00 0.4000 oh Pekerja 35,000.00 14,000.00 0.2000 oh Tukang Batu 45,000.00 9,000.00 0.0200 oh Kepala Tukang 55,000.00 1,100.00 0.0220 oh Mandor 60,000.00 1,320.00

Total : 25,420.00 10,564.64 35,984.64

13 1 M2 PLESTERAN SKONING 1 PC : 2 PS, TEBAL 10 MM 0.5000 kg Semen Portland 1,030.00 515.00 0.0130 m3 Pasir Pasang 125,000.00 1,625.00 0.0800 oh Pekerja 35,000.00 2,800.00 0.4000 oh Tukang Batu 45,000.00 18,000.00 0.0400 oh Kepala Tukang 55,000.00 2,200.00 0.0040 oh Mandor 60,000.00 240.00

Total : 23,240.00 2,140.00 25,380.00

14 1 M2 PLESTERAN CIPRAT 1 PC : 2 PS 4.3200 kg Semen Portland 1,030.00 4,449.60 0.0060 m3 Pasir Pasang 125,000.00 750.00 0.3000 oh Pekerja 35,000.00 10,500.00 0.1000 oh Tukang Batu 45,000.00 4,500.00 0.0100 oh Kepala Tukang 55,000.00 550.00 0.0150 oh Mandor 60,000.00 900.00

Total : 16,450.00 5,199.60 21,649.60

15

3.1080 kg Semen Portland 1,030.00 3,201.24 0.1500 oh Pekerja 35,000.00 5,250.00 0.0750 oh Tukang Batu 45,000.00 3,375.00 0.0080 oh Kepala Tukang 55,000.00 440.00 0.0080 oh Mandor 60,000.00 480.00

Total : 9,545.00 3,201.24 12,746.24

16

1.6000 kg Semen Portland 1,030.00 1,648.00 0.0700 oh Pekerja 35,000.00 2,450.00 0.0350 oh Tukang Batu 45,000.00 1,575.00 0.0040 oh Kepala Tukang 55,000.00 220.00 0.0040 oh Mandor 60,000.00 240.00

Total : 4,485.00 1,648.00 6,133.00

171 M2 FINISHING SIAR PASANGAN BATU KALI ADUKAN 1PC : 2 PS

6.3400 kg Semen Portland 1,030.00 6,530.20 0.0120 m3 Pasir Pasang 125,000.00 1,500.00 0.3000 oh Pekerja 35,000.00 10,500.00 0.1500 oh Tukang Batu 45,000.00 6,750.00 0.0150 oh Kepala Tukang 55,000.00 825.00 0.0150 oh Mandor 60,000.00 900.00

Total : 18,975.00 8,030.20 27,005.20

18 1 M2 PEKERJAAN ACIAN 3.2500 zak Semen Portland 50 Kg 1,030.00 3,347.50 0.2000 oh Pekerja 35,000.00 7,000.00 0.1000 oh Tukang Labur/Cat 40,000.00 4,000.00 0.0100 oh Kepala Tukang 55,000.00 550.00 0.0100 oh Mandor 60,000.00 600.00

Total : 5,150.00 3,347.50 8,497.50

VI PEKERJAAN KAYU (SNI 3434 : 2008)

1

1.1000 m3 Balok Kayu Kamper 7,700,000.00 8,470,000.00 1.2500 Kg Paku 10 Cm 12,000.00 15,000.00 1.0000 Kg Lem Kayu 12,500.00 12,500.00 7.0000 oh Pekerja 35,000.00 245,000.00 21.0000 oh Tukang Kayu 53,000.00 1,113,000.00 2.1000 oh Kepala Tukang 55,000.00 115,500.00 0.3500 oh Mandor 60,000.00 21,000.00

Total : 1,494,500.00 8,497,500.00 9,992,000.00

1 M2 FINISHING SIAR PASANGAN DINDING BATA MERAH (=20 M')

1 M2 FINISHING SIAR PASANGAN DINDING CONBLOCK EKSPOSE (= 8 M')

MEMBUAT DAN MEMASANG 1 M3 KUSEN PINTU DAN JENDELA KAYU KELAS I

Page 36: 72125046-Analisa-Sni-2002-2008-Dck-Bln-Januari-2011

NO URAIANHARGA HARGA HARGA HARGASATUAN UPAH BAHAN JUMLAH

(Rp) (Rp) (Rp) (Rp)1 2 3 4 5 6

2

1.2000 m3 Balok Kayu kruing 4,200,000.00 5,040,000.00 1.2500 Kg Paku 10 Cm 12,000.00 15,000.00 1.0000 Kg Lem Kayu 12,500.00 12,500.00 6.0000 oh Pekerja 35,000.00 210,000.00 18.0000 oh Tukang Kayu 53,000.00 954,000.00 1.8000 oh Kepala Tukang 55,000.00 99,000.00 0.3000 oh Mandor 60,000.00 18,000.00

Total : 1,281,000.00 5,067,500.00 6,348,500.00

3

0.0400 m3 Papan Kayu Kamper 7,900,000.00 316,000.00 0.0500 Kg Paku 5-7 Cm 12,000.00 600.00 0.3500 oh Pekerja 35,000.00 12,250.00 1.0500 oh Tukang Kayu 53,000.00 55,650.00 0.1050 oh Kepala Tukang 55,000.00 5,775.00 0.0180 oh Mandor 60,000.00 1,080.00

Total : 74,755.00 316,600.00 391,355.00

4

0.0400 m3 Papan Kayu Kruing 6,000,000.00 240,000.00 0.0500 Kg Paku 5-7 Cm 12,000.00 600.00 0.3500 oh Pekerja 35,000.00 12,250.00 1.0500 oh Tukang Kayu 53,000.00 55,650.00 0.1050 oh Kepala Tukang 55,000.00 5,775.00 0.0180 oh Mandor 60,000.00 1,080.00

Total : 74,755.00 240,600.00 315,355.00

5

0.0400 m3 Papan Kayu Kamper 7,900,000.00 316,000.00 0.5000 Kg Lem Kayu 12,500.00 6,250.00 1.0000 oh Pekerja 35,000.00 35,000.00 3.0000 oh Tukang Kayu 53,000.00 159,000.00 0.3000 oh Kepala Tukang 55,000.00 16,500.00 0.0500 oh Mandor 60,000.00 3,000.00

Total : 213,500.00 322,250.00 535,750.00

6

0.0240 m3 Papan Kayu Kamper 7,900,000.00 189,600.00 0.3000 Kg Lem Kayu 12,500.00 3,750.00 0.8000 oh Pekerja 35,000.00 28,000.00 2.4000 oh Tukang Kayu 53,000.00 127,200.00 0.2400 oh Kepala Tukang 55,000.00 13,200.00 0.0400 oh Mandor 60,000.00 2,400.00

Total : 170,800.00 193,350.00 364,150.00

7

0.0640 m3 Papan Kayu Kamper 7,900,000.00 505,600.00 0.5000 Kg Lem Kayu 12,500.00 6,250.00 1.0000 oh Pekerja 35,000.00 35,000.00 3.0000 oh Tukang Kayu 53,000.00 159,000.00 0.3000 oh Kepala Tukang 55,000.00 16,500.00 0.0500 oh Mandor 60,000.00 3,000.00

Total : 213,500.00 511,850.00 725,350.00

8

0.0250 m3 Papan Kayu Kamper 7,900,000.00 197,500.00 0.0300 Kg Paku 1-2,5 Cm 12,000.00 360.00 0.5000 Kg Lem Kayu 12,500.00 6,250.00 1.0000 Lbr Plywood 4 mm 46,000.00 46,000.00 1.0000 oh Pekerja 35,000.00 35,000.00 3.0000 oh Tukang Kayu 53,000.00 159,000.00 0.3000 oh Kepala Tukang 55,000.00 16,500.00 0.0500 oh Mandor 60,000.00 3,000.00

Total : 213,500.00 250,110.00 463,610.00

MEMBUAT DAN MEMASANG 1 M3 KUSEN PINTU DAN JENDELA KAYU KELAS II/III

MEMBUAT DAN MEMASANG 1 M2 PINTU KLAMP STANDAR KAYU KELAS II

MEMBUAT DAN MEMASANG 1 M2 PINTU KLAMP SEDERHANA KAYU KELAS III

MEMBUAT DAN MEMASANG 1 M2 DAUN PINTU PANEL KAYU KELAS I/II

MEMBUAT DAN MEMASANG 1 M2 PINTU DAN JENDELA KACA, KAYU KELAS I/II

MEMBUAT DAN MEMASANG 1 M2 PINTU DAN JENDELA JALUSI, KAYU KELAS I/II

MEMBUAT 1 M2 DAUN PINTU PLYWOOD RANGKAP RANGKA TERTUTUP, KAYU KELAS II (Lebar Sampai 90 Cm)

Page 37: 72125046-Analisa-Sni-2002-2008-Dck-Bln-Januari-2011

NO URAIANHARGA HARGA HARGA HARGASATUAN UPAH BAHAN JUMLAH

(Rp) (Rp) (Rp) (Rp)1 2 3 4 5 6

9

0.0256 m3 Papan Kayu Kamper 7,900,000.00 202,240.00 0.0300 Kg Paku 1-2,5 Cm 12,000.00 360.00 0.5000 Kg Lem Kayu 12,500.00 6,250.00 1.0000 Lbr Plywood 4 mm 46,000.00 46,000.00 0.8000 oh Pekerja 35,000.00 28,000.00 2.4000 oh Tukang Kayu 53,000.00 127,200.00 0.2400 oh Kepala Tukang 55,000.00 13,200.00 0.0400 oh Mandor 60,000.00 2,400.00

Total : 170,800.00 254,850.00 425,650.00

10 MEMASANG 1 M2 JALUSI KUSEN, KAYU KELAS I/II

0.0600 m3 Papan Kayu Kamper 7,900,000.00 474,000.00 0.1500 Kg Paku 1-2,5 Cm 12,000.00 1,800.00 0.6700 oh Pekerja 35,000.00 23,450.00 2.0000 oh Tukang Kayu 53,000.00 106,000.00 0.2000 oh Kepala Tukang 55,000.00 11,000.00 0.3350 oh Mandor 60,000.00 20,100.00

Total : 160,550.00 475,800.00 636,350.00

11

0.0256 m3 Papan Kayu Kamper 7,900,000.00 202,240.00 0.0300 Kg Paku 1-2,5 Cm 12,000.00 360.00 0.5000 Kg Lem Kayu 12,500.00 6,250.00 1.0000 Lbr Teakwood 4 mm uk 90x220 cm 55,000.00 55,000.00 0.8000 oh Pekerja 35,000.00 28,000.00 2.4000 oh Tukang Kayu 53,000.00 127,200.00 0.2400 oh Kepala Tukang 55,000.00 13,200.00 0.0400 oh Mandor 60,000.00 2,400.00

Total : 170,800.00 263,850.00 434,650.00

12

0.0250 m3 Papan Kayu Kamper 7,900,000.00 197,500.00 0.0300 Kg Paku 1-2,5 Cm 12,000.00 360.00 0.8000 Kg Lem Kayu 12,500.00 10,000.00 1.0000 Lbr Teakwood 4 mm uk 90x220 cm 55,000.00 55,000.00 0.5000 Lbr Formika 80,000.00 40,000.00 0.8000 oh Pekerja 35,000.00 28,000.00 2.4000 oh Tukang Kayu 53,000.00 127,200.00 0.2400 oh Kepala Tukang 55,000.00 13,200.00 0.0400 oh Mandor 60,000.00 2,400.00

Total : 170,800.00 302,860.00 473,660.00

13

1.1000 m3 Balok Kayu Kamper 7,700,000.00 8,470,000.00 15.0000 Kg Besi Strip Tebal 5 cm 6,050.00 90,750.00 5.6000 Kg Paku 12 Cm 12,000.00 67,200.00 4.0000 oh Pekerja 35,000.00 140,000.00 12.0000 oh Tukang Kayu 53,000.00 636,000.00 1.2000 oh Kepala Tukang 55,000.00 66,000.00 0.2000 oh Mandor 60,000.00 12,000.00

Total : 854,000.00 8,627,950.00 9,481,950.00

14

1.2000 m3 Balok Kayu Kamper 7,700,000.00 9,240,000.00 15.0000 Kg Besi Strip Tebal 5 cm 6,050.00 90,750.00 5.6000 Kg Paku 12 Cm 12,000.00 67,200.00 6.7000 oh Pekerja 35,000.00 234,500.00 20.1000 oh Tukang Kayu 53,000.00 1,065,300.00 2.0100 oh Kepala Tukang 55,000.00 110,550.00 0.3350 oh Mandor 60,000.00 20,100.00

Total : 1,430,450.00 9,397,950.00 10,828,400.00

15 MEMASANG 1 M3 KONSTRUKSI GORDENG, KAYU KELAS II

1.1000 m3 Balok Kayu Kamper 7,700,000.00 8,470,000.00 15.0000 Kg Besi Strip Tebal 5 cm 6,050.00 90,750.00 3.0000 Kg Paku 12 Cm 12,000.00 36,000.00 2.4000 oh Pekerja 35,000.00 84,000.00 7.2000 oh Tukang Kayu 53,000.00 381,600.00 0.7200 oh Kepala Tukang 55,000.00 39,600.00 0.1200 oh Mandor 60,000.00 7,200.00

Total : 512,400.00 8,596,750.00 9,109,150.00

MEMBUAT 1 M2 DAUN PINTU PLYWOOD RANGKAP RANGKA EXPOSE, KAYU KELAS I/II

MEMBUAT 1 M2 TEAKWOOD RANGKAP RANGKA EXPOSE, KAYU KELAS I

MEMBUAT 1 M2 TEAKWOOD RANGKAP LAPIS FORMIKA RANGKA EXPOSE, KAYU KELAS II

MEMASANG 1 M3 KONSTRUKSI KUDA-KUDA KONVENSIONAL, KAYU KELAS I,II,III Bentang 6 M'

MEMASANG 1 M3 KONSTRUKSI KUDA-KUDA EXPOSE, KAYU KELAS I

Page 38: 72125046-Analisa-Sni-2002-2008-Dck-Bln-Januari-2011

NO URAIANHARGA HARGA HARGA HARGASATUAN UPAH BAHAN JUMLAH

(Rp) (Rp) (Rp) (Rp)1 2 3 4 5 6

16

0.0140 m3 Kaso-Kaso ( 5 x 7 ) Cm 1,700,000.00 23,800.00 0.0036 m3 Reng ( 2 x 3 ) Cm 5,700,000.00 20,520.00 0.2500 Kg Paku 5 Cm dan 10 Cm 12,000.00 3,000.00 0.1000 oh Pekerja 35,000.00 3,500.00 0.1000 oh Tukang Kayu 53,000.00 5,300.00 0.0100 oh Kepala Tukang 55,000.00 550.00 0.0050 oh Mandor 60,000.00 300.00

Total : 9,650.00 47,320.00 56,970.00

17

0.0140 m3 Kaso-Kaso ( 5 x 7 ) Cm 1,700,000.00 23,800.00 0.0072 m3 Reng ( 2 x 3 ) Cm 5,700,000.00 41,040.00 0.2500 Kg Paku 5 Cm dan 10 Cm 12,000.00 3,000.00 0.1000 oh Pekerja 35,000.00 3,500.00 0.1000 oh Tukang Kayu 53,000.00 5,300.00 0.0100 oh Kepala Tukang 55,000.00 550.00 0.0050 oh Mandor 60,000.00 300.00

Total : 9,650.00 67,840.00 77,490.00

18 MEMASANG 1 M2 RANGKA ATAP SIRAP, KAYU KELAS II

0.1650 m3 Balok Kayu Kamper 7,700,000.00 1,270,500.00 0.2000 Kg Paku 5 Cm dan 10 Cm 12,000.00 2,400.00 0.1200 oh Pekerja 35,000.00 4,200.00 0.1200 oh Tukang Kayu 53,000.00 6,360.00 0.0120 oh Kepala Tukang 55,000.00 660.00 0.0060 oh Mandor 60,000.00 360.00

Total : 11,580.00 1,272,900.00 1,284,480.00

19

0.0154 m3 Kaso-Kaso ( 5 x 7 ) Cm 1,700,000.00 26,180.00 0.2000 Kg Paku 7 Cm dan 10 Cm 12,000.00 2,400.00 0.1500 oh Pekerja 35,000.00 5,250.00 0.3000 oh Tukang Kayu 53,000.00 15,900.00 0.0300 oh Kepala Tukang 55,000.00 1,650.00 0.0750 oh Mandor 60,000.00 4,500.00

Total : 27,300.00 28,580.00 55,880.00

20

0.0163 m3 Kaso-Kaso ( 5 x 7 ) Cm 1,700,000.00 27,710.00 0.2500 Kg Paku 7 Cm dan 10 Cm 12,000.00 3,000.00 0.2000 oh Pekerja 35,000.00 7,000.00 0.3000 oh Tukang Kayu 53,000.00 15,900.00 0.0300 oh Kepala Tukang 55,000.00 1,650.00 0.0100 oh Mandor 60,000.00 600.00

Total : 25,150.00 30,710.00 55,860.00

21

0.0108 m3 Papan Kayu Kamper 7,900,000.00 85,320.00 0.1000 Kg Paku 5 Cm dan 7 Cm 12,000.00 1,200.00 0.1000 oh Pekerja 35,000.00 3,500.00 0.2000 oh Tukang Kayu 53,000.00 10,600.00 0.0200 oh Kepala Tukang 55,000.00 1,100.00 0.0050 oh Mandor 60,000.00 300.00

Total : 15,500.00 86,520.00 102,020.00

22

0.0110 m3 Papan Kayu Kamper 7,900,000.00 86,900.00 0.0500 Kg Paku 5 Cm dan 7 Cm 12,000.00 600.00 0.1000 oh Pekerja 35,000.00 3,500.00 0.2000 oh Tukang Kayu 53,000.00 10,600.00 0.0200 oh Kepala Tukang 55,000.00 1,100.00 0.0050 oh Mandor 60,000.00 300.00

Total : 15,500.00 87,500.00 103,000.00

MEMASANG 1 M2 RANGKA ATAP GENTENG KERAMIK, KAYU KELAS II

MEMASANG 1 M2 RANGKA ATAP GENTENG BETON, KAYU KELAS II

MEMASANG 1 M2 RANGKA LANGIT-LANGIT (50 X 100), KAYU KELAS II/III

MEMASANG 1 M2 RANGKA LANGIT-LANGIT (60 X 60) CM, KAYU KELAS II/III

MEMASANG 1 M' LISPLANK UKURAN (3 X 20) CM, KAYU KELAS I/II

MEMASANG 1 M' LISPLANK UKURAN (3 X 30) CM, KAYU KELAS I/II

Page 39: 72125046-Analisa-Sni-2002-2008-Dck-Bln-Januari-2011

NO URAIANHARGA HARGA HARGA HARGASATUAN UPAH BAHAN JUMLAH

(Rp) (Rp) (Rp) (Rp)1 2 3 4 5 6

23

0.0280 m3 Balok Kayu Kamper 7,700,000.00 215,600.00 0.1500 Kg Paku 5 Cm dan 7 Cm 12,000.00 1,800.00 0.1500 oh Pekerja 35,000.00 5,250.00 0.4500 oh Tukang Kayu 53,000.00 23,850.00 0.0450 oh Kepala Tukang 55,000.00 2,475.00 0.0080 oh Mandor 60,000.00 480.00

Total : 32,055.00 217,400.00 249,455.00

24

0.0280 m3 Balok Kayu Kamper 7,700,000.00 215,600.00 0.1500 Kg Paku 5 Cm dan 7 Cm 12,000.00 1,800.00 0.8600 Lbr Teakwood 4 mm uk 90x220 cm 55,000.00 47,300.00 0.5600 Kg Lem Kayu 12,500.00 7,000.00 0.1500 oh Pekerja 35,000.00 5,250.00 0.4500 oh Tukang Kayu 53,000.00 23,850.00 0.0450 oh Kepala Tukang 55,000.00 2,475.00 0.0080 oh Mandor 60,000.00 480.00

Total : 32,055.00 271,700.00 303,755.00

25

0.0280 m3 Balok Kayu Kamper 7,700,000.00 215,600.00 0.1500 Kg Paku 5 Cm dan 7 Cm 12,000.00 1,800.00 0.8600 Lbr Plywood tebal 4 mm uk 120 x 240 cm 46,000.00 39,560.00 0.5600 Kg Lem Kayu 12,500.00 7,000.00 0.2000 oh Pekerja 35,000.00 7,000.00 0.6000 oh Tukang Kayu 53,000.00 31,800.00 0.0600 oh Kepala Tukang 55,000.00 3,300.00 0.0100 oh Mandor 60,000.00 600.00

Total : 42,700.00 263,960.00 306,660.00

26 MEMASANG 1 M2 LAMBRIZIRING DARI PAPAN KAYU KELAS I

0.0070 m3 Papan Kayu Kamper 7,900,000.00 55,300.00 0.1000 Kg Paku 5 Cm dan 10 Cm 12,000.00 1,200.00 0.1500 Kg Paku Skrup 10 cm 16,500.00 2,475.00 0.6000 oh Pekerja 35,000.00 21,000.00 1.8000 oh Tukang Kayu 53,000.00 95,400.00 0.1800 oh Kepala Tukang 55,000.00 9,900.00 0.0300 oh Mandor 60,000.00 1,800.00

Total : 128,100.00 58,975.00 187,075.00

26.a MEMASANG 1 M2 LAMBRIZIRING DARI SESEH KELAS I 0.0070 m3 Seseh 2,264,750.00 15,853.25 0.1000 Kg Paku 5 Cm dan 10 Cm 12,000.00 1,200.00 0.1500 Kg Paku Skrup 10 cm 16,500.00 2,475.00 0.6000 oh Pekerja 35,000.00 21,000.00 1.8000 oh Tukang Kayu 53,000.00 95,400.00 0.1800 oh Kepala Tukang 55,000.00 9,900.00 0.0300 oh Mandor 60,000.00 1,800.00

Total : 128,100.00 19,528.25 147,628.25

27

0.4000 Lbr Plywood tebal 4 mm uk 120 x 240 cm 46,000.00 18,400.00 0.0500 Kg Paku 1 Cm dan 2.5 Cm 12,000.00 600.00 0.0250 oh Pekerja 35,000.00 875.00 0.0750 oh Tukang Kayu 53,000.00 3,975.00 0.0080 oh Kepala Tukang 55,000.00 440.00 0.0010 oh Mandor 60,000.00 60.00

Total : 5,350.00 19,000.00 24,350.00

VII PEKERJAAN BETON ( SNI 7394:2008)1 1 M3 MEMBUAT BETON 1 PC : 3 PS : 5 KR

218.0000 kg Semen Portland 1,030.00 224,540.00 0.5200 m3 Pasir Beton 110,000.00 57,200.00 0.8700 m3 Koral Beton 120,000.00 104,400.00 1.6500 oh Pekerja 35,000.00 57,750.00 0.2500 oh Tukang Batu 45,000.00 11,250.00 0.0250 oh Kepala Tukang 55,000.00 1,375.00 0.0800 oh Mandor 60,000.00 4,800.00

75,175.00 386,140.00 461,315.00

MEMASANG 1 M2 RANGKA DINDING PEMISAH (60 X 120) CM, KAYU KELAS II/III

MEMASANG 1 M2 RANGKA DINDING PEMISAH TEAKWOOD RANGKAP, RANGKA KAYU KELAS II

MEMASANG 1 M2 RANGKA DINDING PEMISAH PLYWOOD RANGKAP, RANGKA KAYU KELAS II

MEMASANG 1 M2 LAMBRIZIRING DARI PLYWOOD UKURAN (120 X 240) CM

Page 40: 72125046-Analisa-Sni-2002-2008-Dck-Bln-Januari-2011

NO URAIANHARGA HARGA HARGA HARGASATUAN UPAH BAHAN JUMLAH

(Rp) (Rp) (Rp) (Rp)1 2 3 4 5 62 1 M3 MEMBUAT BETON 1 PC : 2 PS : 4 KR

232.0000 kg Semen Portland 1,030.00 238,960.00 0.5200 m3 Pasir Beton 110,000.00 57,200.00 0.7800 m3 Koral Beton 120,000.00 93,600.00 1.6500 oh Pekerja 35,000.00 57,750.00 0.2500 oh Tukang Batu 45,000.00 11,250.00 0.0250 oh Kepala Tukang 55,000.00 1,375.00 0.0800 oh Mandor 60,000.00 4,800.00

Total : 75,175.00 389,760.00 464,935.00

Page 41: 72125046-Analisa-Sni-2002-2008-Dck-Bln-Januari-2011

NO URAIANHARGA HARGA HARGA HARGASATUAN UPAH BAHAN JUMLAH

(Rp) (Rp) (Rp) (Rp)1 2 3 4 5 6

3 1 M3 MEMBUAT BETON 1 PC : 2 PS : 3 KR 280.0000 kg Semen Portland 1,030.00 288,400.00 0.4500 m3 Pasir Beton 110,000.00 49,500.00 0.9000 m3 Koral Beton 120,000.00 108,000.00 1.6500 oh Pekerja 35,000.00 57,750.00 0.2500 oh Tukang Batu 45,000.00 11,250.00 0.0250 oh Kepala Tukang 55,000.00 1,375.00 0.0800 oh Mandor 60,000.00 4,800.00

Total : 75,175.00 445,900.00 521,075.00

4 PEMBESIAN 10 KG DENGAN BESI POLOS ATAU BESI ULIR 10.0000 kg Besi Beton (Polos/ Ulir) 7,111.00 71,110.00 0.1500 kg Kawat Beton 15,000.00 2,250.00 0.0700 oh Pekerja 35,000.00 2,450.00 0.0700 oh Tukang Besi 50,000.00 3,500.00 0.0070 oh Kepala Tukang 55,000.00 385.00 0.0040 oh Mandor 60,000.00 240.00

Total : 6,575.00 73,360.00 79,935.00 4.a PEMBESIAN 1 KG DENGAN BESI POLOS ATAU BESI ULIR Total : 657.50 7,336.00 7,993.50

5 1 M2 PASANG BEKISTING UNTUK PONDASI 0.0400 m3 Kayu Kelas III 2,000,000.00 80,000.00 0.3000 kg Paku Biasa 5' - 10' 12,000.00 3,600.00 0.1000 ltr Minyak Bekisting 15,000.00 1,500.00 0.5200 oh Pekerja 35,000.00 18,200.00 0.2600 oh Tukang Kayu 53,000.00 13,780.00 0.0260 oh Kepala Tukang 55,000.00 1,430.00 0.0260 oh Mandor 60,000.00 1,560.00

Total : 34,970.00 85,100.00 120,070.00

6 1 M2 PASANG BEKISTING UNTUK SLOOF 0.0400 m3 Kayu Kelas III 2,000,000.00 80,000.00 0.3000 kg Paku Biasa 5' - 10' 12,000.00 3,600.00 0.1000 ltr Minyak Bekisting 15,000.00 1,500.00 0.5200 oh Pekerja 35,000.00 18,200.00 0.2600 oh Tukang Kayu 53,000.00 13,780.00 0.0260 oh Kepala Tukang 55,000.00 1,430.00 0.0260 oh Mandor 60,000.00 1,560.00

Total : 34,970.00 85,100.00 120,070.00

7 1 M2 PASANG BEKISTING UNTUK KOLOM 0.0400 m3 Kayu Kelas III 2,000,000.00 80,000.00 0.4000 kg Paku Biasa 5' - 12' 12,000.00 4,800.00 0.2000 ltr Minyak Bekisting 15,000.00 3,000.00 0.0150 m3 Kayu Usuk 4/6 4,000,000.00 60,000.00 0.3500 lbr Plywood 9 mm 105,250.00 36,837.50 2.0000 btg Dolken Kayu 8" - 10"/4 m 90,000.00 180,000.00 0.6600 oh Pekerja 35,000.00 23,100.00 0.3300 oh Tukang Kayu 53,000.00 17,490.00 0.0330 oh Kepala Tukang 55,000.00 1,815.00 0.0330 oh Mandor 60,000.00 1,980.00

Total : 44,385.00 364,637.50 409,022.50

7.a 1 M2 PASANG BEKISTING UNTUK KOLOM 0.0400 m3 Kayu Kelas III 2,000,000.00 80,000.00 0.4000 kg Paku Biasa 5' - 12' 12,000.00 4,800.00 0.2000 ltr Minyak Bekisting 15,000.00 3,000.00 0.0150 m3 Kayu Usuk 4/6 4,000,000.00 60,000.00 0.3500 lbr Plywood 9 mm 105,250.00 36,837.50 0.6600 oh Pekerja 35,000.00 23,100.00 0.3300 oh Tukang Kayu 53,000.00 17,490.00 0.0330 oh Kepala Tukang 55,000.00 1,815.00 0.0330 oh Mandor 60,000.00 1,980.00

Total : 44,385.00 184,637.50 229,022.50

8 1 M2 PASANG BEKISTING UNTUK BALOK 0.0400 m3 Kayu Kelas III 2,000,000.00 80,000.00 0.4000 kg Paku Biasa 5' - 12' 12,000.00 4,800.00 0.2000 ltr Minyak Bekisting 15,000.00 3,000.00 0.0180 m3 Kayu Usuk 4/6 4,000,000.00 72,000.00 0.3500 lbr Plywood 9 mm 105,250.00 36,837.50 2.0000 btg Dolken Kayu 8" - 10"/4m 90,000.00 180,000.00 0.6600 oh Pekerja 35,000.00 23,100.00 0.3300 oh Tukang Kayu 53,000.00 17,490.00 0.0330 oh Kepala Tukang 55,000.00 1,815.00 0.0330 oh Mandor 60,000.00 1,980.00

Total : 44,385.00 376,637.50 421,022.50

8.a 1 M2 PASANG BEKISTING UNTUK BALOK

Page 42: 72125046-Analisa-Sni-2002-2008-Dck-Bln-Januari-2011

NO URAIANHARGA HARGA HARGA HARGASATUAN UPAH BAHAN JUMLAH

(Rp) (Rp) (Rp) (Rp)1 2 3 4 5 6

0.0400 m3 Kayu Kelas III 2,000,000.00 80,000.00 0.4000 kg Paku Biasa 5' - 12' 12,000.00 4,800.00 0.2000 ltr Minyak Bekisting 15,000.00 3,000.00 0.0180 m3 Kayu Usuk 4/6 4,000,000.00 72,000.00 0.3500 lbr Plywood 9 mm 105,250.00 36,837.50 0.3100 m2 Scafolding 40,000.00 12,400.00 0.6600 oh Pekerja 35,000.00 23,100.00 0.3300 oh Tukang Kayu 53,000.00 17,490.00 0.0330 oh Kepala Tukang 55,000.00 1,815.00 0.0330 oh Mandor 60,000.00 1,980.00

Total : 44,385.00 209,037.50 253,422.50

9 1 M2 PASANG BEKISTING UNTUK LANTAI 0.0400 m3 Kayu Kelas III 2,000,000.00 80,000.00 0.4000 kg Paku Biasa 5' - 12' 12,000.00 4,800.00 0.2000 ltr Minyak Bekisting 15,000.00 3,000.00 0.0150 m3 Kayu Usuk 4/6 4,000,000.00 60,000.00 0.3500 lbr Plywood 9 mm 105,250.00 36,837.50 6.0000 btg Dolken Kayu 8" - 10"/4m 90,000.00 540,000.00

0.6600 oh Pekerja 35,000.00 23,100.00 0.3300 oh Tukang Kayu 53,000.00 17,490.00 0.0330 oh Kepala Tukang 55,000.00 1,815.00 0.0330 oh Mandor 60,000.00 1,980.00

Total : 44,385.00 724,637.50 769,022.50

9.a 1 M2 PASANG BEKISTING UNTUK LANTAI 0.0400 m3 Kayu Kelas III 2,000,000.00 80,000.00 0.4000 kg Paku Biasa 5' - 12' 12,000.00 4,800.00 0.2000 ltr Minyak Bekisting 15,000.00 3,000.00 0.0150 m3 Kayu Usuk 4/6 4,000,000.00 60,000.00 0.3500 lbr Plywood 9 mm 105,250.00 36,837.50 1.0000 m2 Scafolding 40,000.00 40,000.00 0.6600 oh Pekerja 35,000.00 23,100.00 0.3300 oh Tukang Kayu 53,000.00 17,490.00 0.0330 oh Kepala Tukang 55,000.00 1,815.00 0.0330 oh Mandor 60,000.00 1,980.00

Total : 44,385.00 224,637.50 269,022.50

9.b 1 M2 PASANG BEKISTING UNTUK PLAT PARAFET/MEJA PANTRY 0.0400 m3 Kayu Kelas III 2,000,000.00 80,000.00 0.4000 kg Paku Biasa 5' - 12' 12,000.00 4,800.00 0.2000 ltr Minyak Bekisting 15,000.00 3,000.00 0.0150 m3 Kayu Usuk 4/6 4,000,000.00 60,000.00 0.3500 lbr Plywood 9 mm 105,250.00 36,837.50 0.6600 oh Pekerja 35,000.00 23,100.00 0.3300 oh Tukang Kayu 53,000.00 17,490.00 0.0330 oh Kepala Tukang 55,000.00 1,815.00 0.0330 oh Mandor 60,000.00 1,980.00

Total : 44,385.00 184,637.50 229,022.50

Page 43: 72125046-Analisa-Sni-2002-2008-Dck-Bln-Januari-2011

NO URAIANHARGA HARGA HARGA HARGASATUAN UPAH BAHAN JUMLAH

(Rp) (Rp) (Rp) (Rp)1 2 3 4 5 6

10 1 M2 PASANG BEKISTING UNTUK DINDING

0.0300 Kayu Kelas III 2,000,000.00 60,000.00 0.4000 Kg Paku Biasa 5' - 12' 12,000.00 4,800.00 0.2000 Ltr Minyak Bekisting 15,000.00 3,000.00

0.0200 Kayu Usuk 4/6 4,000,000.00 80,000.00 0.3500 Lbr Plywood 9 mm 105,250.00 36,837.50 3.0000 Btng Dolken Kayu 8" - 10"/4m 90,000.00 270,000.00 4.0000 Bh Formite/penjaga jarak bekisting/spacer 2,000.00 8,000.00 0.6600 Oh Pekerja 35,000.00 23,100.00 0.3300 Oh Tukang Kayu 53,000.00 17,490.00 0.0330 Oh Kepala Tukang 55,000.00 1,815.00 0.0330 Oh Mandor 60,000.00 1,980.00

44,385.00 462,637.50 507,022.50

11 1 M2 PASANG BEKISTING UNTUK TANGGA 0.0300 m3 Kayu Kelas III 2,000,000.00 60,000.00 0.4000 kg Paku Biasa 5' - 12' 12,000.00 4,800.00 0.1500 ltr Minyak Bekisting 15,000.00 2,250.00 0.0150 m3 Kayu Usuk 4/6 4,000,000.00 60,000.00 0.3500 lbr Plywood 9 mm 105,250.00 36,837.50 2.0000 btg Dolken Kayu 8" - 10"/4m 90,000.00 180,000.00 0.6600 oh Pekerja 35,000.00 23,100.00 0.3300 oh Tukang Kayu 53,000.00 17,490.00 0.0330 oh Kepala Tukang 55,000.00 1,815.00 0.0330 oh Mandor 60,000.00 1,980.00

Total : 44,385.00 343,887.50 388,272.50

11.a 1 M2 PASANG BEKISTING UNTUK TANGGA 0.0300 m3 Kayu Kelas III 2,000,000.00 60,000.00 0.4000 kg Paku Biasa 5' - 12' 12,000.00 4,800.00 0.1500 ltr Minyak Bekisting 15,000.00 2,250.00 0.0150 m3 Kayu Usuk 4/6 4,000,000.00 60,000.00 0.3500 lbr Plywood 9 mm 105,250.00 36,837.50 1.0000 m2 Scafolding 40,000.00 40,000.00 0.6600 oh Pekerja 35,000.00 23,100.00 0.3300 oh Tukang Kayu 53,000.00 17,490.00 0.0330 oh Kepala Tukang 55,000.00 1,815.00 0.0330 oh Mandor 60,000.00 1,980.00

Total : 44,385.00 203,887.50 248,272.50

12 1 M2 PASANG JEMBATAN UNTUK PENGECORAN BETON 0.0264 m3 Kayu Kelas III (Papan) 2,000,000.00 52,800.00 0.6000 kg Paku Biasa 5' - 12' 12,000.00 7,200.00 0.5000 btg Dolken Kayu 8" - 10"/4m 90,000.00 45,000.00 0.1500 oh Pekerja 35,000.00 5,250.00 0.0500 oh Tukang Kayu 53,000.00 2,650.00 0.0050 oh Kepala Tukang 55,000.00 275.00 0.0080 oh Mandor 60,000.00 480.00

Total : 8,655.00 105,000.00 113,655.00

13 1 M3 MEMBUAT PONDASI BETON BERTULANG (150 KG BESI + BEKISTING) 0.2000 m3 Kayu Kelas III 2,000,000.00 400,000.00 1.5000 kg Paku Biasa 5' - 12' 12,000.00 18,000.00 0.4000 ltr Minyak Bekisting 15,000.00 6,000.00 157.0000 kg Besi Beton 7,111.00 1,116,427.00 2.2500 kg Kawat Beton 15,000.00 33,750.00 336.0000 kg Semen Portland 1,030.00 346,080.00 0.5400 m3 Pasir Beton 110,000.00 59,400.00 0.8100 m3 Koral Beton 120,000.00 97,200.00 5.3000 oh Pekerja 35,000.00 185,500.00 0.2750 oh Tukang Batu 45,000.00 12,375.00 1.3000 oh Tukang Kayu 53,000.00 68,900.00 1.0500 oh Tukang Besi 50,000.00 52,500.00 0.2620 oh Kepala Tukang 55,000.00 14,410.00 0.2650 oh Mandor 60,000.00 15,900.00

Total : 349,585.00 2,076,857.00 2,426,442.00

14 1 M3 MEMBUAT SLOOF BETON BERTULANG (200 KG + BEKISTING) 0.2700 m3 Kayu Kelas III 2,000,000.00 540,000.00 2.0000 kg Paku Biasa 5' - 12' 12,000.00 24,000.00 0.6000 ltr Minyak Bekisting 15,000.00 9,000.00 210.0000 kg Besi Beton 7,111.00 1,493,310.00 3.0000 kg Kawat Beton 15,000.00 45,000.00 336.0000 kg Semen Portland 1,030.00 346,080.00 0.5400 m3 Pasir Beton 110,000.00 59,400.00 0.8100 m3 Koral Beton 120,000.00 97,200.00 5.6500 oh Pekerja 35,000.00 197,750.00 0.2750 oh Tukang Batu 45,000.00 12,375.00 1.5600 oh Tukang Kayu 53,000.00 82,680.00 1.4000 oh Tukang Besi 50,000.00 70,000.00

M3

M3

Page 44: 72125046-Analisa-Sni-2002-2008-Dck-Bln-Januari-2011

NO URAIANHARGA HARGA HARGA HARGASATUAN UPAH BAHAN JUMLAH

(Rp) (Rp) (Rp) (Rp)1 2 3 4 5 6

0.3230 oh Kepala Tukang 55,000.00 17,765.00 0.2830 oh Mandor 60,000.00 16,980.00

Total : 397,550.00 2,613,990.00 3,011,540.00

Page 45: 72125046-Analisa-Sni-2002-2008-Dck-Bln-Januari-2011

NO URAIANHARGA HARGA HARGA HARGASATUAN UPAH BAHAN JUMLAH

(Rp) (Rp) (Rp) (Rp)1 2 3 4 5 6

15

0.4000 m3 Kayu Kelas III 2,000,000.00 800,000.00 4.0000 kg Paku Biasa 5' - 12' 12,000.00 48,000.00 2.0000 ltr Minyak Bekisting 15,000.00 30,000.00 315.0000 kg Besi Beton 7,111.00 2,239,965.00 4.5000 kg Kawat Beton 15,000.00 67,500.00 336.0000 kg Semen Portland 1,030.00 346,080.00 0.5400 m3 Pasir Beton 110,000.00 59,400.00 0.8100 m3 Koral Beton 120,000.00 97,200.00 0.1500 m3 Kayu Kelas II balok 4,200,000.00 630,000.00 3.5000 lbr Plywood 9 mm 105,250.00 368,375.00 20.0000 btg Dolken Kayu 8" /4 m 90,000.00 1,800,000.00 7.0500 oh Pekerja 35,000.00 246,750.00 0.2750 oh Tukang Batu 45,000.00 12,375.00 1.6500 oh Tukang Kayu 53,000.00 87,450.00 2.1000 oh Tukang Besi 50,000.00 105,000.00 0.4030 oh Kepala Tukang 55,000.00 22,165.00 0.3530 oh Mandor 60,000.00 21,180.00

Total : 494,920.00 6,486,520.00 6,981,440.00

16

0.3200 m3 Kayu Kelas III 2,000,000.00 640,000.00 3.2000 kg Paku Biasa 5' - 12' 12,000.00 38,400.00 1.6000 ltr Minyak Bekisting 15,000.00 24,000.00 210.0000 kg Besi Beton 7,111.00 1,493,310.00 3.0000 kg Kawat Beton 15,000.00 45,000.00 336.0000 kg Semen Portland 1,030.00 346,080.00 0.5400 m3 Pasir Beton 110,000.00 59,400.00 0.8100 m3 Koral Beton 120,000.00 97,200.00 0.1400 m3 Kayu Kelas II balok 4,200,000.00 588,000.00 2.8000 lbr Plywood 9 mm 105,250.00 294,700.00 16.0000 btg Dolken Kayu 8" /4 m 90,000.00 1,440,000.00 6.3500 oh Pekerja 35,000.00 222,250.00 0.2750 oh Tukang Batu 45,000.00 12,375.00 1.6500 oh Tukang Kayu 53,000.00 87,450.00 1.4000 oh Tukang Besi 50,000.00 70,000.00 0.3330 oh Kepala Tukang 55,000.00 18,315.00 0.3180 oh Mandor 60,000.00 19,080.00

Total : 429,470.00 5,066,090.00 5,495,560.00

17

0.3200 m3 Kayu Kelas III 2,000,000.00 640,000.00 3.2000 kg Paku Biasa 5' - 12' 12,000.00 38,400.00 1.6000 ltr Minyak Bekisting 15,000.00 24,000.00 157.5000 kg Besi Beton 7,111.00 1,119,982.50 2.2500 kg Kawat Beton 15,000.00 33,750.00 336.0000 kg Semen Portland 1,030.00 346,080.00 0.5400 m3 Pasir Beton 110,000.00 59,400.00 0.8100 m3 Koral Beton 120,000.00 97,200.00 0.1200 m3 Kayu Kelas II balok 4,200,000.00 504,000.00 2.8000 lbr Plywood 9 mm 105,250.00 294,700.00 32.0000 btg Dolken Kayu 8" /4 m 90,000.00 2,880,000.00 5.3000 oh Pekerja 35,000.00 185,500.00 0.2750 oh Tukang Batu 45,000.00 12,375.00 1.3000 oh Tukang Kayu 53,000.00 68,900.00 1.0500 oh Tukang Besi 50,000.00 52,500.00 0.2650 oh Kepala Tukang 55,000.00 14,575.00 0.2650 oh Mandor 60,000.00 15,900.00

349,750.00 6,037,512.50 6,387,262.50

18

0.2400 m3 Kayu Kelas III 2,000,000.00 480,000.00 3.2000 kg Paku Biasa 5' - 12' 12,000.00 38,400.00 1.6000 ltr Minyak Bekisting 15,000.00 24,000.00 157.0000 kg Besi Beton 7,111.00 1,116,427.00 2.2500 kg Kawat Beton 15,000.00 33,750.00 336.0000 kg Semen Portland 1,030.00 346,080.00 0.5400 m3 Pasir Beton 110,000.00 59,400.00 0.8100 m3 Koral Beton 120,000.00 97,200.00 0.1600 m3 Kayu Kelas II balok 4,200,000.00 672,000.00 2.8000 lbr Plywood 9 mm 105,250.00 294,700.00 24.0000 btg Dolken Kayu 8" /4 m 90,000.00 2,160,000.00 5.3000 oh Pekerja 35,000.00 185,500.00 0.2750 oh Tukang Batu 45,000.00 12,375.00 1.3000 oh Tukang Kayu 53,000.00 68,900.00 1.0500 oh Tukang Besi 50,000.00 52,500.00 0.2620 oh Kepala Tukang 55,000.00 14,410.00 0.2650 oh Mandor 60,000.00 15,900.00

1 M3 MEMBUAT KOLOM BETON BERTULANG (300 KG BESI + BEKISTING)

1 M3 MEMBUAT BALOK BETON BERTULANG (200 KG BESI + BEKISTING)

1 M3 MEMBUAT PLAT BETON BERTULANG (150 KG BESI + BEKISTING

1 M3 MEMBUAT DINDING BETON BERTULANG (150 KG BESI + BEKISTING)

Page 46: 72125046-Analisa-Sni-2002-2008-Dck-Bln-Januari-2011

NO URAIANHARGA HARGA HARGA HARGASATUAN UPAH BAHAN JUMLAH

(Rp) (Rp) (Rp) (Rp)1 2 3 4 5 6

349,585.00 5,321,957.00 5,671,542.00

Page 47: 72125046-Analisa-Sni-2002-2008-Dck-Bln-Januari-2011

NO URAIANHARGA HARGA HARGA HARGASATUAN UPAH BAHAN JUMLAH

(Rp) (Rp) (Rp) (Rp)1 2 3 4 5 6

19

0.2500 m3 Kayu Kelas III 2,000,000.00 500,000.00 3.0000 kg Paku Biasa 5' - 12' 12,000.00 36,000.00 1.2000 ltr Minyak Bekisting 15,000.00 18,000.00 210.0000 kg Besi Beton 7,111.00 1,493,310.00 3.0000 kg Kawat Beton 15,000.00 45,000.00 336.0000 kg Semen Portland 1,030.00 346,080.00 0.5400 m3 Pasir Beton 110,000.00 59,400.00 0.8100 m3 Koral Beton 120,000.00 97,200.00 0.1050 m3 Kayu Kelas II balok 4,200,000.00 441,000.00 2.5000 lbr Plywood 9 mm 105,250.00 263,125.00 14.0000 btg Dolken Kayu 8" /4 m 90,000.00 1,260,000.00 5.6500 oh Pekerja 35,000.00 197,750.00 0.2750 oh Tukang Batu 45,000.00 12,375.00 1.5600 oh Tukang Kayu 53,000.00 82,680.00 1.4000 oh Tukang Besi 50,000.00 70,000.00 0.3230 oh Kepala Tukang 55,000.00 17,765.00 0.2830 oh Mandor 60,000.00 16,980.00

397,550.00 4,559,115.00 4,956,665.00

20

0.0020 m3 Kayu Kelas III 2,000,000.00 4,000.00 0.0100 kg Paku Biasa 5' - 12' 12,000.00 120.00 3.0000 kg Besi Beton 7,111.00 21,333.00 0.0450 kg Kawat Beton 15,000.00 675.00 4.0000 kg Semen Portland 1,030.00 4,120.00 0.0060 m3 Pasir Beton 110,000.00 660.00 0.0090 m3 Koral Beton 120,000.00 1,080.00 0.1800 oh Pekerja 35,000.00 6,300.00 0.0200 oh Tukang Batu 45,000.00 900.00 0.0200 oh Tukang Kayu 53,000.00 1,060.00 0.0200 oh Tukang Besi 50,000.00 1,000.00 0.0060 oh Kepala Tukang 55,000.00 330.00 0.0090 oh Mandor 60,000.00 540.00

Total : 10,130.00 31,988.00 42,118.00

21

0.0030 m3 Kayu Kelas III 2,000,000.00 6,000.00 0.0200 kg Paku Biasa 5' - 12' 12,000.00 240.00 3.6000 kg Besi Beton 7,111.00 25,599.60 0.0500 kg Kawat Beton 15,000.00 750.00 5.5000 kg Semen Portland 1,030.00 5,665.00 0.0090 m3 Pasir Beton 110,000.00 990.00 0.0150 m3 Koral Beton 120,000.00 1,800.00 0.2970 oh Pekerja 35,000.00 10,395.00 0.0330 oh Tukang Batu 45,000.00 1,485.00 0.0330 oh Tukang Kayu 53,000.00 1,749.00 0.0330 oh Tukang Besi 50,000.00 1,650.00 0.0100 oh Kepala Tukang 55,000.00 550.00 0.0150 oh Mandor 60,000.00 900.00

Total : 16,729.00 41,044.60 57,773.60

VIII PEKERJAAN PENUTUP ATAP (SNI 03-3436-2002)

1 1 M2 PEKERJAAN ATAP GENTENG PLENTONG 25.0000 bh Genteng Plentong 1,200.00 30,000.00 20.0000 bh Genteng Kodok Karang Pilang (Bisma) 2,650.00 53,000.00 0.1500 oh Pekerja 35,000.00 5,250.00 0.0600 oh Tukang Kayu 53,000.00 3,180.00 0.0060 oh Kepala Tukang 55,000.00 330.00 0.0080 oh Mandor 60,000.00 480.00

Total : 9,240.00 30,000.00 39,240.00 1.a 1 M2 PEKERJAAN ATAP GENTENG KODOK KARANG PILANG Total : 9,240.00 53,000.00 62,240.00

2 1 M2 PEKERJAAN ATAP GENTENG PLENTONG DI CAT 25.0000 bh Genteng Plentong Dicat 1,125.00 28,125.00 0.1500 oh Pekerja 35,000.00 5,250.00 0.0600 oh Tukang Kayu 53,000.00 3,180.00 0.0060 oh Kepala Tukang 55,000.00 330.00 0.0080 oh Mandor 60,000.00 480.00

Total : 9,240.00 28,125.00 37,365.00

3 1 M1 PASANG BUBUNGAN GENTENG PLENTONG 5.0000 bh Bubungan Plentong 6,000.00 30,000.00 8.0000 kg Semen Portland 1,030.00 8,240.00 0.0320 m3 Pasir Pasang 125,000.00 4,000.00 0.4000 oh Pekerja 35,000.00 14,000.00 0.2000 oh Tukang Kayu 53,000.00 10,600.00 0.0200 oh Kepala Tukang 55,000.00 1,100.00

1 M3 MEMBUAT DINDING BETON BERTULANG (200 KG BESI + BEKISTING)

1 M1 MEMBUAT KOLOM PENGUAT BETON BERTULANG (11 X 11 CM)

1 M1 MEMBUAT KOLOM PENGUAT BETON BERTULANG (10 X 15 CM)

Page 48: 72125046-Analisa-Sni-2002-2008-Dck-Bln-Januari-2011

NO URAIANHARGA HARGA HARGA HARGASATUAN UPAH BAHAN JUMLAH

(Rp) (Rp) (Rp) (Rp)1 2 3 4 5 6

0.0020 oh Mandor 60,000.00 120.00 Total : 25,820.00 42,240.00 68,060.00

Page 49: 72125046-Analisa-Sni-2002-2008-Dck-Bln-Januari-2011

NO URAIANHARGA HARGA HARGA HARGASATUAN UPAH BAHAN JUMLAH

(Rp) (Rp) (Rp) (Rp)1 2 3 4 5 64 1 M2 PASANG ATAP GENTENG ASBES GELOMBANG 1.8 M X 0.92 M X 5 MM

0.7500 lbr Asbes Gelombang 1.8 mx0.92mx5mm 28,000.00 21,000.00 0.1200 kg Paku Pancing 60 x 230 18,750.00 2,250.00 0.1400 oh Pekerja 35,000.00 4,900.00 0.0700 oh Tukang Kayu 53,000.00 3,710.00 0.0070 oh Kepala Tukang Kayu 55,000.00 385.00 0.0070 oh Mandor 60,000.00 420.00

Total : 9,415.00 23,250.00 32,665.00

5 1 M1 PASANG BUBUNGAN STEL GELOMBANG 0.92 M 2.4000 lbr Bubungan Stel Gelombang 23,667.00 56,800.80 6.0000 kg Paku Skrup 3,5" 24,167.00 145,002.00 0.0840 oh Pekerja 35,000.00 2,940.00 0.1250 oh Tukang Kayu 53,000.00 6,625.00 0.0130 oh Kepala Tukang 55,000.00 715.00 0.0040 oh Mandor 60,000.00 240.00

Total : 10,520.00 201,802.80 212,322.80 6 1 M2 PEKERJAAN ATAP SIRAP

60.0000 bh Genteng Sirap 7,900.00 474,000.00 0.2000 kg Paku Biasa 1/2" - 1" 12,000.00 2,400.00 0.1660 oh Pekerja 35,000.00 5,810.00 0.2500 oh Tukang Kayu 53,000.00 13,250.00 0.0250 oh Kepala Tukang 55,000.00 1,375.00 0.0080 oh Mandor 60,000.00 480.00

Total : 20,915.00 476,400.00 497,315.00

7 1 M2 PEKERJAAN ATAP NOK SIRAP 0.4000 lbr Seng plat 3" x 6" BJLS 28 45,000.00 18,000.00 0.0600 kg Paku biasa 1/2" - 1" 12,000.00 720.00 0.0500 kg Paku biasa 2" - 5" 12,000.00 600.00 0.0040 m3 Kayu papan 3 cm 7,900,000.00 31,600.00 0.1250 oh Pekerja 35,000.00 4,375.00 0.2500 oh Tukang kayu 53,000.00 13,250.00 0.0250 oh Kepala Tukang 55,000.00 1,375.00 0.0080 oh Mandor 60,000.00 480.00

Total : 19,480.00 50,920.00 70,400.00

8 1 M2 PASANG ATAP ALANG-ALANG 3 M1 6.5000 lbr Alang - alang 9,000.00 58,500.00 0.5000 glg Tali pengikat 7,700.00 3,850.00 0.2000 oh Pekerja 35,000.00 7,000.00 0.0100 oh Mandor 60,000.00 600.00

Total : 7,600.00 62,350.00 69,950.00

9 1 M2 PEKERJAAN ATAP SENG GELOMBANG 0.7000 lbr Seng Gelombang 3" x 6" BJLS 28 40,000.00 28,000.00 0.0200 kg Paku Biasa 1/2" - 1" 12,000.00 240.00 0.1200 oh Pekerja 35,000.00 4,200.00 0.0600 oh Tukang Kayu 53,000.00 3,180.00 0.0060 oh Kepala Tukang 55,000.00 330.00 0.0060 oh Mandor 60,000.00 360.00

Total : 8,070.00 28,240.00 36,310.00

10 1 M2 PASANGAN LAPISANG ALUMINIUM FOIL 1.0500 m2 Aluminium Foil 27,500.00 28,875.00 0.1500 oh Pekerja 35,000.00 5,250.00 0.0500 oh Tukang Kayu 53,000.00 2,650.00 0.0050 oh Kepala Tukang 55,000.00 275.00 0.0080 oh Mandor 60,000.00 480.00

Total : 8,655.00 28,875.00 37,530.00

11 1 M1 PASANG NOK SENG GELOMBANG 0.3000 lbr Seng Plat 3" x 6" BJLS 28 45,000.00 13,500.00 0.0400 kg Paku biasa 1/2" - 1" 12,000.00 480.00 0.1500 oh Pekerja 35,000.00 5,250.00 0.0700 oh Tukang Kayu 53,000.00 3,710.00 0.0080 oh Kepala Tukang 55,000.00 440.00 0.0060 oh Mandor 60,000.00 360.00

Total : 9,760.00 13,980.00 23,740.00

IX PEKERJAAN LANGIT - LANGIT (SNI 2839-2008)

1

1.1000 lbr Asbes semen 47,000.00 51,700.00 0.0100 kg Paku Biasa 1/2" - 1" 12,000.00 120.00 0.0300 oh Pekerja 35,000.00 1,050.00 0.0700 oh Tukang Kayu 53,000.00 3,710.00 0.0070 oh Kepala Tukang 55,000.00 385.00 0.0040 oh Mandor 60,000.00 240.00

Total : 5,385.00 51,820.00 57,205.00

MEMASANG 1 M2 LANGIT-LANGIT ASBES SEMEN, TEBAL 4 MM, 5 MM DAN 6 MM

Page 50: 72125046-Analisa-Sni-2002-2008-Dck-Bln-Januari-2011

NO URAIANHARGA HARGA HARGA HARGASATUAN UPAH BAHAN JUMLAH

(Rp) (Rp) (Rp) (Rp)1 2 3 4 5 6

2 1 M2 PASANG LANGIT-LANGIT TRIPLEKS 120X240 CM/6MM 0.3750 lbr TRIPLEKS 46,000.00 17,250.00 0.0300 kg Paku Biasa 1/2" - 1" 12,000.00 360.00 0.1000 oh Pekerja 35,000.00 3,500.00 0.1000 oh Tukang Kayu 53,000.00 5,300.00 0.0100 oh Kepala Tukang 55,000.00 550.00 0.0050 oh Mandor 60,000.00 300.00

Total : 9,650.00 17,610.00 27,260.00

3 1 M2 PASANG LANGIT-LANGIT LAMBRIZIRING 0.0150 m3 Kayu Papan 7,900,000.00 118,500.00 0.0100 kg Paku Biasa 1/2" - 1" 12,000.00 120.00 0.8000 oh Pekerja 35,000.00 28,000.00 0.8000 oh Tukang Kayu 53,000.00 42,400.00 0.0800 oh Kepala Tukang 55,000.00 4,400.00 0.0400 oh Mandor 60,000.00 2,400.00

Total : 77,200.00 118,620.00 195,820.00

4 1 M1 PASANG LIST LANGIT-LANGIT KAYU PROFIL 1.0500 m1 List Kayu Profil 12,250.00 12,862.50 0.1000 kg Paku list SQ 15,840.00 1,584.00 0.0500 oh Pekerja 35,000.00 1,750.00 0.0500 oh Tukang Kayu 53,000.00 2,650.00 0.0050 oh Kepala Tukang 55,000.00 275.00 0.0030 oh Mandor 60,000.00 180.00

Total : 4,855.00 14,446.50 19,301.50

5 1 M2 PASANG LANGIT-LANGIT ASBES + RANGKA 0.0120 m3 Kamper Usuk 4/6 cm 7,900,000.00 94,800.00 0.0600 kg Paku Biasa 2" - 5" 15,840.00 950.40 1.1000 lbr Asbes 47,000.00 51,700.00 0.1800 oh Pekerja 35,000.00 6,300.00 0.3200 oh Tukang Kayu 53,000.00 16,960.00 0.0320 oh Kepala Tukang 55,000.00 1,760.00 0.0090 oh Mandor 60,000.00 540.00

Total : 25,560.00 147,450.40 173,010.40

6 1 M2 PASANG LANGIT-LANGIT GYPSUM BOARD UKURAN (1200X2400X9) MM 0.1100 kg Paku Sekrup 16,500.00 1,815.00 0.3640 lbr Gypsum Board (120x240x9) 62,500.00 22,750.00 0.1000 oh Pekerja 35,000.00 3,500.00 0.0500 oh Tukang Kayu 53,000.00 2,650.00 0.0050 oh Kepala Tukang 55,000.00 275.00 0.0050 oh Mandor 60,000.00 300.00

Total : 6,725.00 24,565.00 31,290.00 2.4000 m' Metal Furring 13,500.00 32,400.00 3.3000 m' Cross tee white 11,250.00 37,125.00

69,525.00 69,525.00 6.a 1 M2 PASANG LANGIT-LANGIT GYPSUM BOARD UKURAN (1200X2400X9) MM RANGKA METAL FURRING 100,815.00

7 1 M2 PASANG LANGIT-LANGIT KALSIBOARD 4.5 MM 0.1100 kg Paku Sekrup 16,500.00 1,815.00 0.3640 lbr Kalsiboard 4.5 mm 70,000.00 25,480.00 0.1000 oh Pekerja 35,000.00 3,500.00 0.0500 oh Tukang Kayu 53,000.00 2,650.00 0.0050 oh Kepala Tukang 55,000.00 275.00 0.0050 oh Mandor 60,000.00 300.00

Total : 6,725.00 27,295.00 34,020.00

8 1 M1 PASANG LIST PLAFOND GYPSUM 1.1000 m1 List Plapond Gypsum 4/8 15,000.00 16,500.00 0.0020 kg Paku Gypsum 19,000.00 38.00 0.0200 oh Tukang Kayu 53,000.00 1,060.00 0.0020 oh Kepala Tukang Kayu 55,000.00 110.00 0.0500 oh Pekerja 35,000.00 1,750.00 0.0050 oh Mandor 60,000.00 300.00

Total : 3,220.00 16,538.00 19,758.00

X PEKERJAAN SANITASI ( SNI 2002 )1 MEMASANG 1 BUAH KLOSET DUDUK/MONOBLOK

1.0000 bh Kloset duduk/ monoblok 1,365,000.00 1,365,000.00 6% x harga kloset Perlengkapan 81,900.00 3.3000 oh Pekerja 35,000.00 115,500.00 1.1000 oh Tukang batu 45,000.00 49,500.00 0.0010 oh Kepala Tukang 55,000.00 55.00 0.1600 oh Mandor 60,000.00 9,600.00

Total : 174,655.00 1,446,900.00 1,621,555.00

2 MEMASANG 1 BUAH KLOSET JONGKOK PORSELIN 1.0000 bh Kloset jongkok porselen 125,000.00 125,000.00

Page 51: 72125046-Analisa-Sni-2002-2008-Dck-Bln-Januari-2011

NO URAIANHARGA HARGA HARGA HARGASATUAN UPAH BAHAN JUMLAH

(Rp) (Rp) (Rp) (Rp)1 2 3 4 5 6

6.0000 kg Semen Portland 1,030.00 6,180.00 0.0100 m3 Pasir Pasang 125,000.00 1,250.00 1.0000 oh Pekerja 35,000.00 35,000.00 1.5000 oh Tukang batu 45,000.00 67,500.00 1.5000 oh Kepala Tukang 55,000.00 82,500.00 0.1600 oh Mandor 60,000.00 9,600.00

Total : 194,600.00 132,430.00 327,030.00

Page 52: 72125046-Analisa-Sni-2002-2008-Dck-Bln-Januari-2011

NO URAIANHARGA HARGA HARGA HARGASATUAN UPAH BAHAN JUMLAH

(Rp) (Rp) (Rp) (Rp)1 2 3 4 5 6

3 MEMASANG 1 BUAH URINOIR 1.0000 bh Urinoir 1,052,000.00 1,052,000.00 6% x harga Urin Perlengkapan 63,120.00 6.0000 kg Semen Portland 1,030.00 6,180.00 0.0100 m3 Pasir Pasang 125,000.00 1,250.00 1.0000 oh Pekerja 35,000.00 35,000.00 1.0000 oh Tukang batu 45,000.00 45,000.00 0.1000 oh Kepala Tukang 55,000.00 5,500.00 0.1000 oh Mandor 60,000.00 6,000.00

Total : 91,500.00 1,122,550.00 1,214,050.00

4 MEMASANG 1 BUAH WASHTAFEL KIA 1.0000 bh Washtafel 181,800.00 181,800.00 12% x harga wast Perlengkapan 21,816.00 6.0000 kg Semen Portland 1,030.00 6,180.00 0.0100 m3 Pasir Pasang 125,000.00 1,250.00 1.2000 oh Pekerja 35,000.00 42,000.00 1.4500 oh Tukang batu 45,000.00 65,250.00 0.1500 oh Kepala Tukang 55,000.00 8,250.00 0.1000 oh Mandor 60,000.00 6,000.00

Total : 121,500.00 211,046.00 332,546.00

5 MEMASANG 1 BUAH BAK MANDI FIBREGLASS, VOLUME 0,30 M3 1.0000 bh Bak Fibreglass 225,000.00 225,000.00 18% x harga wast Perlengkapan 40,500.00 1.8000 oh Pekerja 35,000.00 63,000.00 2.7000 oh Tukang batu 45,000.00 121,500.00 0.5400 oh Kepala Tukang 55,000.00 29,700.00 0.1100 oh Mandor 60,000.00 6,600.00

Total : 220,800.00 265,500.00 486,300.00

6 1.2000 m1 Pipa galvanis 38,000.00 45,600.00 35% x harga pipa Perlengkapan 13,300.00 0.0540 oh Pekerja 35,000.00 1,890.00 0.0900 oh Tukang Pipa 50,000.00 4,500.00 0.0090 oh Kepala Tukang 55,000.00 495.00 0.0270 oh Mandor 60,000.00 1,620.00

Total : 8,505.00 58,900.00 67,405.00

7 1.2000 M' Pipa galvanis 175,000.00 210,000.00 35% x harga pipa Perlengkapan 61,250.00 0.1080 Oh Pekerja 35,000.00 3,780.00 0.1800 Oh Tukang Pipa 50,000.00 9,000.00 0.0180 Oh Kepala Tukang 55,000.00 990.00 0.0054 Oh Mandor 60,000.00 324.00

Total : 14,094.00 271,250.00 285,344.00

8 1.2000 m1 Pipa PVC 0,5" 5,500.00 6,600.00 35% x harga pipa Perlengkapan 1,925.00 0.0360 oh Pekerja 35,000.00 1,260.00 0.0600 oh Tukang Pipa 50,000.00 3,000.00 0.0060 oh Kepala Tukang 55,000.00 330.00 0.0018 oh Mandor 60,000.00 108.00

Total : 4,698.00 8,525.00 13,223.00

8.a 1.2000 m1 Pipa PVC 0,75" 6,250.00 7,500.00 35% x harga pipa Perlengkapan 2,187.50 0.0360 oh Pekerja 35,000.00 1,260.00 0.0600 oh Tukang Pipa 50,000.00 3,000.00 0.0060 oh Kepala Tukang 55,000.00 330.00 0.0018 oh Mandor 60,000.00 108.00

Total : 4,698.00 9,687.50 14,385.50

8.b 1.2000 m1 Pipa PVC 1" 8,000.00 9,600.00 35% x harga pipa Perlengkapan 2,800.00 0.0360 oh Pekerja 35,000.00 1,260.00 0.0600 oh Tukang Pipa 50,000.00 3,000.00 0.0060 oh Kepala Tukang 55,000.00 330.00 0.0018 oh Mandor 60,000.00 108.00

Total : 4,698.00 12,400.00 17,098.00

9 1.2000 m1 Pipa PVC 2" 22,250.00 26,700.00 35% x harga pipa Perlengkapan 7,787.50 0.0540 oh Pekerja 35,000.00 1,890.00

MEMASANG 1 M1 PIPA GALVANIS f 0,5" - 1 "

MEMASANG 1 M1 PIPA GALVANIS f 1,5" - 3"

MEMASANG 1 M1 PIPA PVC TYPE AW f 0,5"

MEMASANG 1 M1 PIPA PVC TYPE AW f 0,75"

MEMASANG 1 M1 PIPA PVC TYPE AW f 1"

MEMASANG 1 M1 PIPA PVC TYPE AW f 2"

Page 53: 72125046-Analisa-Sni-2002-2008-Dck-Bln-Januari-2011

NO URAIANHARGA HARGA HARGA HARGASATUAN UPAH BAHAN JUMLAH

(Rp) (Rp) (Rp) (Rp)1 2 3 4 5 6

0.0900 oh Tukang Pipa 50,000.00 4,500.00 0.0090 oh Kepala Tukang 55,000.00 495.00 0.0027 oh Mandor 60,000.00 162.00

Total : 7,047.00 34,487.50 41,534.50

10 1.2000 m1 Pipa PVC 3" 35,000.00 42,000.00 35% x harga pipa Perlengkapan 12,250.00 0.0810 oh Pekerja 35,000.00 2,835.00 0.1350 oh Tukang Pipa 50,000.00 6,750.00 0.0135 oh Kepala Tukang 55,000.00 742.50 0.0041 oh Mandor 60,000.00 246.00

Total : 10,573.50 54,250.00 64,823.50

10.a 1.2000 m1 Pipa PVC 4" 56,250.00 67,500.00 35% x harga pipa Perlengkapan 19,687.50 0.0810 oh Pekerja 35,000.00 2,835.00 0.1350 oh Tukang Pipa 50,000.00 6,750.00 0.0135 oh Kepala Tukang 55,000.00 742.50 0.0041 oh Mandor 60,000.00 246.00

Total : 10,573.50 87,187.50 97,761.00

MEMASANG 1 M1 PIPA PVC TYPE AW f 3"

MEMASANG 1 M1 PIPA PVC TYPE AW f 4"

Page 54: 72125046-Analisa-Sni-2002-2008-Dck-Bln-Januari-2011

NO URAIANHARGA HARGA HARGA HARGASATUAN UPAH BAHAN JUMLAH

(Rp) (Rp) (Rp) (Rp)1 2 3 4 5 6

11 1.0000 bh Kran air 13,000.00 13,000.00 0.0250 bh Seal tape 2,000.00 50.00 0.0100 oh Pekerja 35,000.00 350.00 0.1000 oh Tukang Pipa 50,000.00 5,000.00 0.0100 oh Kepala Tukang 55,000.00 550.00 0.0050 oh Mandor 60,000.00 300.00

Total : 6,200.00 13,050.00 19,250.00

XI

1 1 KG PASANG RANGKA ATAP BAJA 1.1500 kg Besi Profil WF 13,750.00 15,812.50 0.0060 oh Pekerja 35,000.00 210.00 0.0600 oh Tukang besi 50,000.00 3,000.00 0.0060 oh Kepala Tukang 55,000.00 330.00 0.0003 oh Mandor 60,000.00 18.00

Total : 3,558.00 15,812.50 19,370.50

2 1 M2 PASANG JENDELA NAKO 1.1000 m2 Rangka + Kaca Nako 113,300.00 124,630.00 10.0000 bh Paku biasa 1 cm - 2,5 cm 16,500.00 165,000.00 7.0000 m' Besi strip 6,050.00 42,350.00 0.2000 oh Pekerja 35,000.00 7,000.00 0.2000 oh Tukang besi 50,000.00 10,000.00 0.0200 oh Kepala Tukang 55,000.00 1,100.00 0.0010 oh Mandor 60,000.00 60.00

Total : 18,160.00 331,980.00 350,140.00

3 1 M1 PASANG TALANG DATAR, SENG BJLS 28 1.0500 lbr Seng plat 45,000.00 47,250.00 0.0150 kg Paku biasa 0,5" - 1" 16,500.00 247.50 0.0190 m3 Kayu papan kelas II/III 7,900,000.00 150,100.00 0.1500 oh Pekerja 35,000.00 5,250.00 0.4000 oh Tukang besi 50,000.00 20,000.00 0.0250 oh Kepala Tukang 55,000.00 1,375.00 0.0013 oh Mandor 60,000.00 78.00

Total : 26,703.00 197,597.50 224,300.50

XII PEKERJAAN KUNCI DAN KACA (SNI 2002)1 1 BH PASANG KUNCI TANAM BIASA

1.0000 bh Kunci tanam biasa 104,500.00 104,500.00 0.0100 oh Pekerja 35,000.00 350.00 0.5000 oh Tukang besi 50,000.00 25,000.00 0.0100 oh Kepala Tukang 55,000.00 550.00 0.0050 oh Mandor 60,000.00 300.00

Total : 26,200.00 104,500.00 130,700.00

2 1 PS PASANG ENGSEL PINTU 1.0000 ps Engsel pintu 13,000.00 13,000.00 0.0150 oh Pekerja 35,000.00 525.00 0.1500 oh Tukang besi 50,000.00 7,500.00 0.0150 oh Kepala Tukang 55,000.00 825.00 0.0008 oh Mandor 60,000.00 48.00

Total : 8,898.00 13,000.00 21,898.00

3 1 PS PASANG ENGSEL JENDELA KUPU-KUPU 1.0000 ps Engsel jendela 15,000.00 15,000.00 0.0100 oh Pekerja 35,000.00 350.00 0.1000 oh Tukang besi 50,000.00 5,000.00 0.0100 oh Kepala Tukang 55,000.00 550.00 0.0005 oh Mandor 60,000.00 30.00

Total : 5,930.00 15,000.00 20,930.00

4 1 BH PASANG KAIT ANGIN 1.0000 ps Kait angin 16,000.00 16,000.00 0.0150 oh Pekerja 35,000.00 525.00 0.1500 oh Tukang besi 50,000.00 7,500.00 0.0150 oh Kepala Tukang 55,000.00 825.00 0.0008 oh Mandor 60,000.00 48.00

Total : 8,898.00 16,000.00 24,898.00

5 1 BH PASANG KUNCI SLOT 1.0000 bh Kunci slot 88,000.00 88,000.00 0.0200 oh Pekerja 35,000.00 700.00 0.2000 oh Tukang besi 50,000.00 10,000.00 0.0200 oh Kepala Tukang 55,000.00 1,100.00 0.0010 oh Mandor 60,000.00 60.00

Total : 11,860.00 88,000.00 99,860.00

MEMASANG 1 BUAH KRAN f 0,75" ATAU 0,5"

PEKERJAAN BESI DAN ALUMINIUM (SNI 7393:2008)

Page 55: 72125046-Analisa-Sni-2002-2008-Dck-Bln-Januari-2011

NO URAIANHARGA HARGA HARGA HARGASATUAN UPAH BAHAN JUMLAH

(Rp) (Rp) (Rp) (Rp)1 2 3 4 5 6

6 1 M2 PASANG KACA, TEBAL 5 MM 1.1000 bh Kaca 5 mm 90,000.00 99,000.00 0.0150 oh Pekerja 35,000.00 525.00 0.1500 oh Tukang besi 50,000.00 7,500.00 0.0150 oh Kepala Tukang 55,000.00 825.00 0.0008 oh Mandor 60,000.00 48.00

Total : 8,898.00 99,000.00 107,898.00

6.a 1 M2 PASANG KACA ES, TEBAL 5 MM 1.1000 bh Kaca es 5 mm 105,000.00 115,500.00 0.0150 oh Pekerja 35,000.00 525.00 0.1500 oh Tukang besi 50,000.00 7,500.00 0.0150 oh Kepala Tukang 55,000.00 825.00 0.0008 oh Mandor 60,000.00 48.00

Total : 8,898.00 115,500.00 124,398.00

XIII

1 1 M2 PASANG LANTAI KERAMIK 30 X 30 CM 11.8700 bh Keramik 30 x 30 cm (warna muda) 3,136.36 37,228.64 10.0000 kg Semen Portland 1,030.00 10,300.00 0.0450 m3 Pasir Pasang 125,000.00 5,625.00 1.5000 kg Semen warna/semen grouting 8,500.00 12,750.00 0.7000 oh Pekerja 35,000.00 24,500.00 0.3500 oh Tukang batu 45,000.00 15,750.00 0.0350 oh Kepala Tukang 55,000.00 1,925.00 0.0350 oh Mandor 60,000.00 2,100.00

Total : 44,275.00 65,903.64 110,178.64

2 1 M2 PASANG LANTAI KERAMIK 20 X 20 CM 26.5000 bh Keramik 20 x 20 cm 1,380.00 36,570.00 10.4000 kg Semen Portland 1,030.00 10,712.00 0.0450 m3 Pasir Pasang 125,000.00 5,625.00 1.6200 kg Semen warna/semen grouting 8,500.00 13,770.00 0.7000 oh Pekerja 35,000.00 24,500.00 0.3500 oh Tukang batu 45,000.00 15,750.00 0.0350 oh Kepala Tukang 55,000.00 1,925.00 0.0350 oh Mandor 60,000.00 2,100.00

Total : 44,275.00 66,677.00 110,952.00

3 1 M1 PASANG PLIN KERAMIK 10 X 30 CM 3.3300 bh Keramik 30 x 30 cm 3,136.36 10,444.09 1.1400 kg Semen Portland 1,030.00 1,174.20 0.0030 m3 Pasir Pasang 125,000.00 375.00 0.1000 kg Semen warna/semen grouting 8,500.00 850.00 0.0900 oh Pekerja 35,000.00 3,150.00 0.0900 oh Tukang batu 45,000.00 4,050.00 0.0090 oh Kepala Tukang 55,000.00 495.00 0.0050 oh Mandor 60,000.00 300.00

Total : 7,995.00 12,843.29 20,838.29 4 1 M2 PASANG DINDING KERAMIK 20 X 20 CM

26.5000 bh Keramik 20 x 20 cm 1,380.00 36,570.00 20.0000 bh Keramik 20 x 25 cm 1,950.00 39,000.00 9.3000 kg Semen Portland 1,030.00 9,579.00 0.0180 m3 Pasir Pasang 125,000.00 2,250.00 1.9400 kg Semen warna/semen grouting 8,500.00 16,490.00 0.9000 oh Pekerja 35,000.00 31,500.00 0.4500 oh Tukang batu 45,000.00 20,250.00 0.0450 oh Kepala Tukang 55,000.00 2,475.00 0.0450 oh Mandor 60,000.00 2,700.00

Total : 56,925.00 64,889.00 121,814.00 4.a 1 M2 PASANG DINDING KERAMIK 20 X 25 CM Total : 56,925.00 67,319.00 124,244.00

5 1 M1 PASANG PLIN KAYU 2 X 10 CM 0.0030 m3 Papan Kayu Kelas II 7,900,000.00 23,700.00 0.0500 kg Paku sekrup 3,5' 24,167.00 1,208.35 0.1200 oh Pekerja 35,000.00 4,200.00 0.1200 oh Tukang kayu 53,000.00 6,360.00 0.0120 oh Kepala Tukang 55,000.00 660.00 0.0060 oh Mandor 60,000.00 360.00

Total : 11,580.00 24,908.35 36,488.35

XIV PEKERJAAN PENGECATAN (SNI 2002)1 1 M2 PENGECATAN BIDANG KAYU BARU (1 LAPIS PLAMIR,

1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP) 0.2000 kg Cat meni 18,500.00 3,700.00 0.1500 kg Dempul 26,235.00 3,935.25 0.1700 kg Cat dasar 25,000.00 4,250.00

PEK. PENUTUP LANTAI DAN DINDING (SNI 7395:2008)

Page 56: 72125046-Analisa-Sni-2002-2008-Dck-Bln-Januari-2011

NO URAIANHARGA HARGA HARGA HARGASATUAN UPAH BAHAN JUMLAH

(Rp) (Rp) (Rp) (Rp)1 2 3 4 5 6

0.2600 kg Cat Penutup 2x 45,000.00 11,700.00 0.0700 oh Pekerja 35,000.00 2,450.00 0.0090 oh Tukang cat 40,000.00 360.00 0.0060 oh Kepala Tukang 55,000.00 330.00 0.0025 oh Mandor 60,000.00 150.00

Total : 3,290.00 23,585.25 26,875.25

Page 57: 72125046-Analisa-Sni-2002-2008-Dck-Bln-Januari-2011

NO URAIANHARGA HARGA HARGA HARGASATUAN UPAH BAHAN JUMLAH

(Rp) (Rp) (Rp) (Rp)1 2 3 4 5 6

2 1 M2 PENGECATAN BIDANG KAYU DENGAN VERNIS 0.1500 kg Vernis 39,000.00 5,850.00 0.0500 kg Dempul 26,235.00 1,311.75 0.1000 lbr Amplas 3,000.00 300.00 0.0100 bh Kuas 6,000.00 60.00 0.1600 oh Pekerja 35,000.00 5,600.00 0.1600 oh Tukang cat 40,000.00 6,400.00 0.0160 oh Kepala Tukang 55,000.00 880.00 0.0025 oh Mandor 60,000.00 150.00

Total : 13,030.00 7,521.75 20,551.75 3 1 M2 PENGECATAN TEMBOK BARU (1 LAPIS PLAMIR,

1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP) 0.1000 kg Plamir 28,000.00 2,800.00 0.1000 kg Cat dasar 25,000.00 2,500.00 0.2600 kg Cat Penutup 2x 15,600.00 4,056.00 0.0200 oh Pekerja 35,000.00 700.00 0.0630 oh Tukang cat 40,000.00 2,520.00 0.0063 oh Kepala Tukang 55,000.00 346.50 0.0025 oh Mandor 60,000.00 150.00

Total : 3,716.50 9,356.00 13,072.50

4 1 M2 PENGECATAN TEMBOK LAMA (1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP) 0.1200 kg Cat dasar 25,000.00 3,000.00 0.1800 kg Cat Penutup 2x 15,600.00 2,808.00 0.0280 oh Pekerja 35,000.00 980.00 0.0420 oh Tukang cat 40,000.00 1,680.00 0.0042 oh Kepala Tukang 55,000.00 231.00 0.0025 oh Mandor 60,000.00 150.00

Total : 3,041.00 5,808.00 8,849.00

5 1 M2 PENGECATAN PERMUKAAN BAJA DENGAN MENI BESI 0.1000 kg Meni besi 18,500.00 1,850.00 0.0100 lbr Kuas 6,000.00 60.00 0.0200 oh Pekerja 35,000.00 700.00 0.2000 oh Tukang cat 40,000.00 8,000.00 0.0200 oh Kepala Tukang 55,000.00 1,100.00 0.0100 oh Mandor 60,000.00 600.00

Total : 10,400.00 1,910.00 12,310.00

6 1 M2 PENGECATAN PERMUKAAN BAJA, 1 LAPIS DENGAN CAT BESI 0.3000 kg Cat besi 43,000.00 12,900.00 0.0060 oh Pekerja 35,000.00 210.00 0.0600 oh Tukang cat 40,000.00 2,400.00 0.0120 oh Kepala Tukang 55,000.00 660.00 0.0060 oh Mandor 60,000.00 360.00

Total : 3,630.00 12,900.00 16,530.00

7 1 M2 PELABURAN BIDANG KAYU DENGAN POLITUR 0.5220 ltr Politur 43,000.00 22,446.00 2.0000 lbr Amplas 3,000.00 6,000.00 0.0600 oh Pekerja 35,000.00 2,100.00 0.0600 oh Tukang cat 40,000.00 2,400.00 0.0160 oh Kepala Tukang 55,000.00 880.00 0.0025 oh Mandor 60,000.00 150.00

Total : 5,530.00 28,446.00 33,976.00

XV PEKERJAAN TETEMPELAN STYLE BALI

1 1 M2 PASANGAN BATA GOSOK 2 MUKA 110.0000 bh Bata Gosok 1,980.00 217,800.00 8.4000 kg Semen 50 Kg 1,030.00 8,652.00

Upah Kerja ( Lumpsum) 270,000.00 270,000.00 Total : 270,000.00 226,452.00 496,452.00

2 1 M2 PASANGAN PARAS KEROBOKAN 1 MUKA 13.7500 bh Paras Kerobokan 8,000.00 110,000.00 8.4000 kg Semen 50 Kg 1,030.00 8,652.00

Upah Kerja ( Lumpsum) 145,000.00 145,000.00 Total : 145,000.00 118,652.00 263,652.00

2.a 1 M2 PASANGAN PARAS SARWA GENEP 1 MUKA 13.7500 bh Paras Sarwa Genep 8,500.00 116,875.00 8.4000 kg Semen 50 Kg 1,030.00 8,652.00

Upah Kerja ( Lumpsum) 145,000.00 145,000.00 Total : 145,000.00 125,527.00 270,527.00

2.b 1 M2 PASANGAN PARAS JOGYA PUTIH 1 MUKA 13.7500 bh Paras Jogya Putih 10,000.00 137,500.00 8.4000 kg Semen 50 Kg 1,030.00 8,652.00

Page 58: 72125046-Analisa-Sni-2002-2008-Dck-Bln-Januari-2011

NO URAIANHARGA HARGA HARGA HARGASATUAN UPAH BAHAN JUMLAH

(Rp) (Rp) (Rp) (Rp)1 2 3 4 5 6

Upah Kerja ( Lumpsum) 145,000.00 145,000.00 Total : 145,000.00 146,152.00 291,152.00

3 1 M2 PASANGAN BATA GOSOK 1 MUKA 55.0000 bh Paras Kerobokan 1,980.00 108,900.00 4.2000 kg Semen 50 Kg 1,030.00 4,326.00

Upah Kerja ( Lumpsum) 145,000.00 145,000.00 Total : 145,000.00 113,226.00 258,226.00

4 1 M2 PASANGAN PARAS 1 MUKA 18.3333 bh Batu paras 11,000.00 201,666.67 4.2000 kg Semen 50 Kg 1,030.00 4,326.00

Upah Kerja ( Lumpsum) 145,000.00 145,000.00 Total : 145,000.00 205,992.67 350,992.67

Page 59: 72125046-Analisa-Sni-2002-2008-Dck-Bln-Januari-2011

NO URAIANHARGA HARGA HARGA HARGASATUAN UPAH BAHAN JUMLAH

(Rp) (Rp) (Rp) (Rp)1 2 3 4 5 6

5 1 M2 PASANGAN PARAS + BATA GOSOK 1 MUKA 55.0000 bh Bata gosok 1,980.00 108,900.00 4.4917 bh Batu paras 11,000.00 49,408.33 5.2500 kg Semen 50 Kg 1,030.00 5,407.50

Upah Kerja ( Lumpsum) 145,000.00 145,000.00 Total : 145,000.00 163,715.83 308,715.83

6 1 M2 PASANGAN BATA GOSOK DIUKIR 55.0000 bh Bata gosok 1,980.00 108,900.00 4.2000 kg Semen 50 Kg 1,030.00 4,326.00

Upah Kerja ( Lumpsum) 288,500.00 288,500.00 Total : 288,500.00 113,226.00 401,726.00

7 1 M2 PASANGAN PARAS DIUKIR 18.3333 bh Batu paras 11,000.00 201,666.67 4.2000 kg Semen 50 Kg 1,030.00 4,326.00

Upah Kerja ( Lumpsum) 288,500.00 288,500.00 Total : 288,500.00 205,992.67 494,492.67

8 1 M2 PASANGAN PARAS + BATA GOSOK DIUKIR 55.0000 bh Bata gosok 1,980.00 108,900.00 4.4917 bh Batu paras 11,000.00 49,408.33 5.2500 kg Semen 50 Kg 1,030.00 5,407.50

Upah Kerja ( Lumpsum) 280,000.00 280,000.00 Total : 280,000.00 163,715.83 443,715.83

9 1 UNIT PEMBUATAN PAPAN NAMA KANTOR LURAH (TIDAK TERMASUK FRAME) 3.2470 m2 Granit hitam 500,000.00 1,623,500.00 3.2470 m2 Ongkos kerja (memotong dan memahat) 1,900,000.00 6,169,300.00 1.0000 ls Ongkos pasang 500,000.00 500,000.00

Total : 6,669,300.00 1,623,500.00 8,292,800.00

XVI PEKERJAAN LANDSCAPE

1 1 M2 PASANGAN PAVING BETON 10/20 CM TEBAL 6 CM K 225 1.0000 m2 Paving 10 x 20 cm tebal 8 cm K225 46,000.00 46,000.00 0.2500 oh Tukang Batu 45,000.00 11,250.00 0.0250 oh Kepala Tukang 55,000.00 1,375.00 0.5000 oh Pekerja 35,000.00 17,500.00 0.0250 oh Mandor 60,000.00 1,500.00

Total : 31,625.00 46,000.00 77,625.00 2 Paving 10 x 20 cm tebal 6 cm K350 54,500.00 31,625.00 54,500.00 86,125.00 4 Paving 10 x 20 cm tebal 8 cm K225 53,500.00 31,625.00 53,500.00 85,125.00 5 Paving 10 x 20 cm tebal 8 cm K350 60,000.00 31,625.00 60,000.00 91,625.00 5 Paving 10 x 20 cm tebal 8 cm K425 69,500.00 31,625.00 69,500.00 101,125.00 7 Paving 20 x 20 cm tebal 6 cm K225 46,000.00 31,625.00 46,000.00 77,625.00 8 Paving 20 x 20 cm tebal 6 cm K350 54,500.00 31,625.00 54,500.00 86,125.00 10 Paving 20 x 20 cm tebal 8 cm K225 53,500.00 31,625.00 53,500.00 85,125.00 11 Paving 20 x 20 cm tebal 8 cm K350 60,000.00 31,625.00 60,000.00 91,625.00 12 Paving 20 x 20 cm tebal 8 cm K425 69,500.00 31,625.00 69,500.00 101,125.00 14 Paving 20 x 20 cm tebal 10 cm K225 60,500.00 31,625.00 60,500.00 92,125.00 15 Paving 20 x 20 cm tebal 10 cm K350 70,000.00 31,625.00 70,000.00 101,625.00 16 Paving 20 x 20 cm tebal 10 cm K425 79,000.00 31,625.00 79,000.00 110,625.00 18 Paving Tiga Berlian tebal 6 cm K225 47,000.00 31,625.00 47,000.00 78,625.00

20 1 M2 PASANGAN GRASS BLOCK 1.0000 m2 Grass Block 47,500.00 47,500.00 0.0690 m3 Pasir Urug 80,000.00 5,520.00 0.5000 oh Tukang Batu 45,000.00 22,500.00 0.0500 oh Kepala Tukang 55,000.00 2,750.00 1.0000 oh Pekerja 35,000.00 35,000.00 0.0500 oh Mandor 60,000.00 3,000.00

Total : 63,250.00 53,020.00 116,270.00

21 1 M2 PASANGAN KORAL SIKAT 1.2000 zak Koral Sikat 30,000.00 36,000.00 9.2800 zak Semen 1,030.00 9,558.40 0.2000 m3 Pasir pasang 125,000.00 25,000.00 0.2500 oh Tukang Batu 45,000.00 11,250.00 0.0100 oh Kepala Tukang 55,000.00 550.00 0.6250 oh Pekerja 35,000.00 21,875.00 0.0310 oh Mandor 60,000.00 1,860.00

Total : 35,535.00 70,558.40 106,093.40 22 1 M1 KANSTEIN BULAT (50 x 30 x 10 ) CM K225

1.0000 m1 Kanstein Bulat(P:50,T:30,La:10,Lb:16 cm K225 62,000.00 62,000.00 0.4500 zak Semen 50 Kg 1,030.00 463.50 0.0023 m3 Pasir Pasang 125,000.00 287.50 0.3500 oh Tukang Batu 45,000.00 15,750.00 0.0350 oh Kepala Tukang 55,000.00 1,925.00

Page 60: 72125046-Analisa-Sni-2002-2008-Dck-Bln-Januari-2011

NO URAIANHARGA HARGA HARGA HARGASATUAN UPAH BAHAN JUMLAH

(Rp) (Rp) (Rp) (Rp)1 2 3 4 5 6

0.9500 oh Pekerja 35,000.00 33,250.00 0.0950 oh Mandor 60,000.00 5,700.00

Total : 56,625.00 62,751.00 119,376.00 23 Kanstein Jumbo (P:50,L:15,T:30 cm K225) 47,500.00 56,625.00 82,058.40 138,683.40 24 Kanstein Segi Lima Jumbo (P:50,L:15, T:40 cm K225) 62,000.00 56,625.00 96,558.40 153,183.40

Page 61: 72125046-Analisa-Sni-2002-2008-Dck-Bln-Januari-2011

NO URAIANHARGA HARGA HARGA HARGASATUAN UPAH BAHAN JUMLAH

(Rp) (Rp) (Rp) (Rp)1 2 3 4 5 6

25 1 M2 PENGECATAN KANSTEIN 0.2840 kg Cat 43,000.00 12,212.00 0.0710 kg Thiner 7,000.00 497.00 0.0300 oh Tukang Cat 40,000.00 1,200.00 0.0030 oh Kep. Tukang 55,000.00 165.00 0.1500 oh Pekerja 35,000.00 5,250.00 0.0150 oh Mandor 60,000.00 900.00

Total : 7,515.00 12,709.00 20,224.00

XVII PEKERJAAN ELEKTRIKAL

1 1 TITIK INSTALASI STOP KONTAK, LAMPU, EXHAUST FAN DAN CEILING FAN 8.0000 m1 Kabel NYM 3 x 2.5 mm ex. Supreme 11,500.00 92,000.00 3.0000 bt Pipa Clipsal 20 mm hitam 10,000.00 30,000.00 2.0000 bh Tee dos clipsal 20 mm hitam 6,000.00 12,000.00 15.0000 bj Klem clipsal 20 mm hitam 650.00 9,750.00 3.0000 bj Sock clipsal 20 mm hitam 1,500.00 4,500.00 1.0000 bj Inbow dos plastik clipsal E 157 P 9,000.00 9,000.00 1.0000 ttk Biaya pasang 25,000.00 25,000.00

Total : 25,000.00 157,250.00 182,250.00

2 1 TITIK INSTALASI AC 10.0000 m1 Kabel NYM 3 x 2.5 mm ex. Supreme 11,500.00 115,000.00 3.0000 bt Pipa Clipsal 20 mm hitam 10,000.00 30,000.00 1.0000 bh Tee dos clipsal 20 mm hitam 6,000.00 6,000.00 15.0000 bj Klem clipsal 20 mm hitam 650.00 9,750.00 4.0000 bj Sock clipsal 20 mm hitam 1,500.00 6,000.00 1.0000 bj Inbow dos plastik clipsal E 157 P 9,000.00 9,000.00 1.0000 m1 Pipa flexible clipsal 20 mm hitam 9,000.00 9,000.00 1.0000 ttk Biaya pasang 25,000.00 25,000.00 25,000.00

Total : 25,000.00 209,750.00 234,750.00

3 1 TITIK INSTALASI TELEPHONE 25.0000 m1 Kabel telephone 3,500.00 87,500.00 8.0000 bt Pipa Clipsal 20 mm putih 10,000.00 80,000.00 1.0000 bh Tee dos clipsal 20 mm putih 6,000.00 6,000.00 25.0000 bj Klem clipsal 20 mm putih 650.00 16,250.00 5.0000 bj Sock clipsal 20 mm putih 1,500.00 7,500.00 1.0000 bj Inbow dos plastik clipsal E 157 P 9,000.00 9,000.00 1.0000 ttk Biaya pasang 25,000.00 25,000.00

Total : 25,000.00 206,250.00 231,250.00

4 1 TITIK INSTALASI MATV 20.0000 m1 Coaxial cable 5C-75 ohm commscof 5,700.00 114,000.00 6.0000 bt Pipa Clipsal 20 mm putih 10,000.00 60,000.00 2.0000 bh Tee dos clipsal 20 mm putih 6,000.00 12,000.00 20.0000 bj Klem clipsal 20 mm putih 650.00 13,000.00 6.0000 bj Sock clipsal 20 mm putih 1,500.00 9,000.00 1.0000 bj Inbow dos plastik clipsal E 157 P 9,000.00 9,000.00 1.0000 ttk Biaya pasang 25,000.00 25,000.00

Total : 25,000.00 217,000.00 242,000.00

5 1 UNIT INSTALASI PENANGKAL PETIR (1 BLITZEM + 3 TOMBAK)4.0000 bh Blacksem 1" 51,850.00 207,400.0000 3.0000 bh Sok Galvanis 1" 9,350.00 28,050.0000 2.0000 bt GIP Galvanis 1" 152,000.00 304,000.0000

47.5500 m1 Kawat BC 50 mm2 51,000.00 2,425,050.0000

6.0000 bh Klem Begel 1" 5,950.00 35,700.0000 3.0000 bh Klem sisir 50 mm2 11,050.00 33,150.0000 1.0000 bh Kotak Kontrol 10 cm x 15 cm 68,000.00 68,000.0000 1.0000 bh Perluv sok 1" 12,750.00 12,750.0000

10.0000 bt Pipa Conduit PVC 3/4" 25,000.00 250,000.0000 1.0000 ls Biaya pasang instalasi 1,020,000.00 1,020,000.0000

6.0000 m1 Biaya pengeboran 59,500.00 357,000.0000 Total : 1,377,000.00 3,364,100.00 4,741,100.00

Kepala Dinas Cipta KaryaKabupaten Badung

Ir. Ni Luh Putu Dessy Dharmayanty, M.TPembina

NIP. 196110101994032001

Page 62: 72125046-Analisa-Sni-2002-2008-Dck-Bln-Januari-2011

REKAPITULASI DAFTAR HARGA SATUAN PEKERJAANBULAN JANUARI TAHUN 2011

NO URAIAN PEKERJAAN HARGA

1 2 3

I PEKERJAAN PERSIAPAN (SNI 03-2835-2002)

1 1 M1 PAGAR SEMENTARA DARI SENG GELOMBANG TINGGI 2 METER Rp. 220,550.00

2 1 M1 PENGUKURAN DAN PEMASANGAN BOWPLANK Rp. 58,290.00

3 1 M2 PEMBUATAN KANTOR SEMENTARA, DENGAN LANTAI PLESTERAN Rp. 913,040.00

4 1 M2 PEMBUATAN GUDANG SEMEN DAN ALAT-ALAT Rp. 672,315.00

5 1 M2 PEMBUATAN RUMAH JAGA/KONSTRUKSI KAYU Rp. 770,150.00

6 1 M2 MEMBERSIHKAN LAPANGAN DAN PERATAAN Rp. 6,500.00

7 1 M2 PEMBUATAN BEDENG BURUH Rp. 690,540.00

8 1 M2 PEMBUATAN BAK ADUKAN UKURAN (40X50X20) CM Rp. 144,950.00

9 1 M2 PEMBUATAN STEGGER DARI BAMBU Rp. 30,751.00

10 1 M2 PEMBUATAN JALAN SEMENTARA Rp. 67,750.00

11 1 M3 BONGKARAN BETON BERTULANG Rp. 253,325.00

12 1 M3 BONGKARAN DINDING TEMBOK BATA MERAH Rp. 235,325.00

II PEKERJAAN TANAH (SNI 2835 : 2008)

1 1 M3 GALIAN TANAH BIASA DALAM 1 METER Rp. 27,750.00

2 1 M3 GALIAN TANAH BIASA DALAM 2 METER Rp. 34,200.00

3 1 M3 GALIAN TANAH BIASA DALAM 3 METER Rp. 40,770.00

4 1 M3 GALIAN TANAH KERAS DALAM 1METER Rp. 36,920.00

5 1 M3 GALIAN TANAH CADAS DALAM 1 METER Rp. 56,100.00

6 1 M3 GALIAN TANAH LUMPUR DALAM 1 METER Rp. 44,700.00

7 1 M2 PEKERJAAN STRIPPING SETINGGI 1 METER Rp. 2,050.00

8 1 M3 PEMBUANGAN TANAH SEJAUH 15 METER Rp. 12,150.00

9 1 M3 URUGAN KEMBALI Rp. -

10 1 M3 PEMADATAN TANAH ( Per 20 Cm ) Rp. 20,500.00

11 1 M3 URUGAN PASIR Rp. 107,100.00

12 1 M3 PEMASANGAN LAPISAN IJUK TEBAL 10 CM Rp. 15,150.00

13 1 M3 URUGAN SIRTU PADAT Untuk Peninggian Lantai Bangunan Rp. 130,250.00

14 1 M3 URUGAN TANAH PILIHAN DIPADATKAN Rp. 104,500.00

15 1 M3 URUGAN LIMESTONE PADAT Rp. 105,050.00

III PEKERJAAN PONDASI (SNI 2836 : 2008)

1 1 M3 BATU KALI CAMP. 1 PC : 3 PS Rp. 505,160.00

2 1 M3 BATU KALI CAMP. 1 PC : 4 PS Rp. 469,365.00

3 1 M3 BATU KALI CAMP. 1 PC : 5 PS Rp. 444,555.00

4 1 M3 BATU KALI CAMP. 1 PC : 6 PS Rp. 427,110.00

5 1 M3 BATU KALI CAMP. 1 PC : 8 PS Rp. 403,205.00

6 1 M3 PASANGAN PONDASI SIKLOP, 40% BATU KALI Rp. 1,442,051.00

7 1 M3 PASANGAN PONDASI SUMURAN DIAMETER 1 M Rp. 474,940.00

8 1 M3 PASANGAN BATU KOSONG Rp. 225,495.00

IV PEKERJAAN DINDING (SNI 6897 : 2008)

1 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 2 PS Rp. 262,705.00

2 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 3 PS Rp. 253,213.50

3 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 4 PS Rp. 246,871.50

4 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 5 PS Rp. 243,516.00

Page 63: 72125046-Analisa-Sni-2002-2008-Dck-Bln-Januari-2011

NO URAIAN PEKERJAAN HARGA

1 2 3

5 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 6 PS Rp. 242,205.00

6 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 2 PS Rp. 128,218.50

7 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 3 PS Rp. 123,751.10

8 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 4 PS Rp. 121,170.00

9 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 5 PS Rp. 119,545.40

10 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 6 PS Rp. 118,644.60

11 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 8 PS Rp. 116,895.00

12 1 M2 PASANGAN DINDING HOLLOWBLOCK (HB. 10) Rp. 64,616.45

13 1 M2 PASANGAN DINDING HOLLOWBLOCK (HB. 10) TANPA BESI Rp. 50,750.00

14 1 M2 PASANGAN DINDING Terawang/Roster (12 x 11 x 24) CM Rp. 1,472,155.00

15 1 M2 PASANGAN DINDING BEDEG, RANGKA KAYU Rp. 132,089.00

V PEKERJAAN PLESTERAN (SNI 2837 : 2008)

1 1 M2 PLESTERAN CAMP. 1 PC : 1 PS TEBAL 15 MM Rp. 36,944.12

2 1 M2 PLESTERAN CAMP. 1 PC : 2 PS TEBAL 15 MM Rp. 32,005.72

3 1 M2 PLESTERAN CAMP. 1 PC : 3 PS TEBAL 15 MM Rp. 29,859.28

4 1 M2 PLESTERAN CAMP. 1 PC : 4 PS TEBAL 15 MM Rp. 28,402.20

5 1 M2 PLESTERAN CAMP. 1 PC : 5 PS TEBAL 15 MM Rp. 27,564.52

6 1 M2 PLESTERAN CAMP. 1 PC : 6 PS TEBAL 15 MM Rp. 26,898.48

7 1 M2 PLESTERAN CAMP. 1 PC : 8 PS TEBAL 15 MM Rp. 26,159.68

8 1 M2 PLESTERAN CAMP. 1 PC : 2 PS TEBAL 20 MM Rp. 42,835.96

9 1 M2 PLESTERAN CAMP. 1 PC : 3 PS TEBAL 20 MM Rp. 39,974.04

10 1 M2 PLESTERAN CAMP. 1 PC : 4 PS TEBAL 20 MM Rp. 37,989.60

11 1 M2 PLESTERAN CAMP. 1 PC : 5 PS TEBAL 20 MM Rp. 36,914.36

12 1 M2 PLESTERAN CAMP. 1 PC : 6 PS TEBAL 20 MM Rp. 35,984.64

13 1 M2 PLESTERAN SKONING 1 PC : 2 PS, TEBAL 10 MM Rp. 25,380.00

14 1 M2 PLESTERAN CIPRAT 1 PC : 2 PS Rp. 21,649.60

15 1 M2 FINISHING SIAR PASANGAN DINDING BATA MERAH (=20 M') Rp. 12,746.24

16 1 M2 FINISHING SIAR PASANGAN DINDING CONBLOCK EKSPOSE (= 8 M') Rp. 6,133.00

17 1 M2 FINISHING SIAR PASANGAN BATU KALI ADUKAN 1PC : 2 PS Rp. 27,005.20

18 1 M2 PEKERJAAN ACIAN Rp. 8,497.50

VI PEKERJAAN KAYU (SNI 3434 : 2008)

1 MEMBUAT DAN MEMASANG 1 M3 KUSEN PINTU DAN JENDELA KAYU KELAS I Rp. 9,992,000.00

2 MEMBUAT DAN MEMASANG 1 M3 KUSEN PINTU DAN JENDELA KAYU KELAS II/III Rp. 6,348,500.00

3 MEMBUAT DAN MEMASANG 1 M2 PINTU KLAMP STANDAR KAYU KELAS II Rp. 391,355.00

4 MEMBUAT DAN MEMASANG 1 M2 PINTU KLAMP SEDERHANA KAYU KELAS III Rp. 315,355.00

5 MEMBUAT DAN MEMASANG 1 M2 DAUN PINTU PANEL KAYU KELAS I/II Rp. 535,750.00

6 MEMBUAT DAN MEMASANG 1 M2 PINTU DAN JENDELA KACA, KAYU KELAS I/II Rp. 364,150.00

7 MEMBUAT DAN MEMASANG 1 M2 PINTU DAN JENDELA JALUSI, KAYU KELAS I/II Rp. 725,350.00

8Rp. 463,610.00

9

Rp. 425,650.00

10 MEMASANG 1 M2 JALUSI KUSEN, KAYU KELAS I/II Rp. 636,350.00

11 MEMBUAT 1 M2 TEAKWOOD RANGKAP RANGKA EXPOSE, KAYU KELAS I Rp. 434,650.00

12Rp. 473,660.00

13

Rp. 9,481,950.00

MEMBUAT 1 M2 DAUN PINTU PLYWOOD RANGKAP RANGKA TERTUTUP, KAYU KELAS II (Lebar Sampai 90 Cm)

MEMBUAT 1 M2 DAUN PINTU PLYWOOD RANGKAP RANGKA EXPOSE, KAYU KELAS I/II

MEMBUAT 1 M2 TEAKWOOD RANGKAP LAPIS FORMIKA RANGKA EXPOSE, KAYU KELAS II

MEMASANG 1 M3 KONSTRUKSI KUDA-KUDA KONVENSIONAL, KAYU KELAS I,II,III Bentang 6 M'

Page 64: 72125046-Analisa-Sni-2002-2008-Dck-Bln-Januari-2011

NO URAIAN PEKERJAAN HARGA

1 2 3

14 MEMASANG 1 M3 KONSTRUKSI KUDA-KUDA EXPOSE, KAYU KELAS I Rp. 10,828,400.00

15 MEMASANG 1 M3 KONSTRUKSI GORDENG, KAYU KELAS II Rp. 9,109,150.00

16 MEMASANG 1 M2 RANGKA ATAP GENTENG KERAMIK, KAYU KELAS II Rp. 56,970.00

17 MEMASANG 1 M2 RANGKA ATAP GENTENG BETON, KAYU KELAS II Rp. 77,490.00

18 MEMASANG 1 M2 RANGKA ATAP SIRAP, KAYU KELAS II Rp. 1,284,480.00

19 MEMASANG 1 M2 RANGKA LANGIT-LANGIT (50 X 100), KAYU KELAS II/III Rp. 55,880.00

20 MEMASANG 1 M2 RANGKA LANGIT-LANGIT (60 X 60) CM, KAYU KELAS II/III Rp. 55,860.00

21 MEMASANG 1 M' LISPLANK UKURAN (3 X 20) CM, KAYU KELAS I/II Rp. 102,020.00

22 MEMASANG 1 M' LISPLANK UKURAN (3 X 30) CM, KAYU KELAS I/II Rp. 103,000.00

23 MEMASANG 1 M2 RANGKA DINDING PEMISAH (60 X 120) CM, KAYU KELAS II/III Rp. 249,455.00

24 Rp. 303,755.00

25 Rp. 306,660.00

26 MEMASANG 1 M2 LAMBRIZIRING DARI PAPAN KAYU KELAS I Rp. 187,075.00

27 MEMASANG 1 M2 LAMBRIZIRING DARI PLYWOOD UKURAN (120 X 240) CM Rp. 24,350.00

VII PEKERJAAN BETON ( SNI 7394:2008)

1 1 M3 MEMBUAT BETON 1 PC : 3 PS : 5 KR Rp. 461,315.00

2 1 M3 MEMBUAT BETON 1 PC : 2 PS : 4 KR Rp. 464,935.00

3 1 M3 MEMBUAT BETON 1 PC : 2 PS : 3 KR Rp. 521,075.00

4 PEMBESIAN 10 KG DENGAN BESI POLOS ATAU BESI ULIR Rp. 79,935.00

5 1 M2 PASANG BEKISTING UNTUK PONDASI Rp. 120,070.00

6 1 M2 PASANG BEKISTING UNTUK SLOOF Rp. 120,070.00

7 1 M2 PASANG BEKISTING UNTUK KOLOM Rp. 409,022.50

8 1 M2 PASANG BEKISTING UNTUK BALOK Rp. 421,022.50

9 1 M2 PASANG BEKISTING UNTUK LANTAI Rp. 769,022.50

10 1 M2 PASANG BEKISTING UNTUK DINDING Rp. 507,022.50

11 1 M2 PASANG BEKISTING UNTUK TANGGA Rp. 388,272.50

12 1 M2 PASANG JEMBATAN UNTUK PENGECORAN BETON Rp. 113,655.00

13 1 M3 MEMBUAT PONDASI BETON BERTULANG (150 KG BESI + BEKISTING) Rp. 2,426,442.00

14 1 M3 MEMBUAT SLOOF BETON BERTULANG (200 KG + BEKISTING) Rp. 3,011,540.00

15 1 M3 MEMBUAT KOLOM BETON BERTULANG (300 KG BESI + BEKISTING) Rp. 6,981,440.00

16 1 M3 MEMBUAT BALOK BETON BERTULANG (200 KG BESI + BEKISTING) Rp. 5,495,560.00

17 1 M3 MEMBUAT PLAT BETON BERTULANG (150 KG BESI + BEKISTING Rp. 6,387,262.50

18 1 M3 MEMBUAT DINDING BETON BERTULANG (150 KG BESI + BEKISTING) Rp. 5,671,542.00

19 1 M3 MEMBUAT DINDING BETON BERTULANG (200 KG BESI + BEKISTING) Rp. 4,956,665.00

20 1 M1 MEMBUAT KOLOM PENGUAT BETON BERTULANG (11 X 11 CM) Rp. 42,118.00

21 1 M1 MEMBUAT KOLOM PENGUAT BETON BERTULANG (10 X 15 CM) Rp. 57,773.60

VIII PEKERJAAN PENUTUP ATAP (SNI 03-3436-2002)

1 1 M2 PEKERJAAN ATAP GENTENG PLENTONG Rp. 39,240.00

2 1 M2 PEKERJAAN ATAP GENTENG PLENTONG DI CAT Rp. 37,365.00

3 1 M1 PASANG BUBUNGAN GENTENG PLENTONG Rp. 68,060.00

4 1 M2 PASANG ATAP GENTENG ASBES GELOMBANG 1.8 M X 0.92 M X 5 MM Rp. 32,665.00

5 1 M1 PASANG BUBUNGAN STEL GELOMBANG 0.92 M Rp. 212,322.80

6 1 M2 PEKERJAAN ATAP SIRAP Rp. 497,315.00

7 1 M2 PEKERJAAN ATAP NOK SIRAP Rp. 70,400.00

8 1 M2 PASANG ATAP ALANG-ALANG 3 M1 Rp. 69,950.00

9 1 M2 PEKERJAAN ATAP SENG GELOMBANG Rp. 36,310.00

MEMASANG 1 M2 RANGKA DINDING PEMISAH TEAKWOOD RANGKAP, RANGKA KAYU KELAS II

MEMASANG 1 M2 RANGKA DINDING PEMISAH PLYWOOD RANGKAP, RANGKA KAYU KELAS II

Page 65: 72125046-Analisa-Sni-2002-2008-Dck-Bln-Januari-2011

NO URAIAN PEKERJAAN HARGA

1 2 3

10 1 M2 PASANGAN LAPISANG ALUMINIUM FOIL Rp. 37,530.00

11 1 M1 PASANG NOK SENG GELOMBANG Rp. 23,740.00

IX PEKERJAAN LANGIT - LANGIT (SNI 2839-2008)

1 MEMASANG 1 M2 LANGIT-LANGIT ASBES SEMEN, TEBAL 4 MM, 5 MM DAN 6 MM Rp. 57,205.00

2 1 M2 PASANG LANGIT-LANGIT TRIPLEKS 120X240 CM/6MM Rp. 27,260.00

3 1 M2 PASANG LANGIT-LANGIT LAMBRIZIRING Rp. 195,820.00

4 1 M1 PASANG LIST LANGIT-LANGIT KAYU PROFIL Rp. 19,301.50

5 1 M2 PASANG LANGIT-LANGIT ASBES + RANGKA Rp. 173,010.40

6 1 M2 PASANG LANGIT-LANGIT GYPSUM BOARD UKURAN (1200X2400X9) MM Rp. 31,290.00

7 1 M2 PASANG LANGIT-LANGIT KALSIBOARD 4.5 MM Rp. 34,020.00

X PEKERJAAN SANITASI ( SNI 2002 )

1 MEMASANG 1 BUAH KLOSET DUDUK/MONOBLOK Rp. 1,621,555.00

2 MEMASANG 1 BUAH KLOSET JONGKOK PORSELIN Rp. 327,030.00

3 MEMASANG 1 BUAH URINOIR Rp. 1,214,050.00

4 MEMASANG 1 BUAH WASHTAFEL KIA Rp. 332,546.00

5 MEMASANG 1 BUAH BAK MANDI FIBREGLASS, VOLUME 0,30 M3 Rp. 486,300.00

6 MEMASANG 1 M1 PIPA GALVANIS f 0,5" - 1 " Rp. 67,405.00

7 MEMASANG 1 M1 PIPA GALVANIS f 1,5" - 3" Rp. 285,344.00

8 MEMASANG 1 M1 PIPA PVC TYPE AW f 0,5" Rp. 13,223.00

9 MEMASANG 1 M1 PIPA PVC TYPE AW f 2" Rp. 41,534.50

10 MEMASANG 1 M1 PIPA PVC TYPE AW f 3" Rp. 64,823.50

11 MEMASANG 1 BUAH KRAN f 0,75" ATAU 0,5" Rp. 19,250.00

XI PEKERJAAN BESI DAN ALUMINIUM (SNI 7393:2008)

1 1 KG PASANG RANGKA ATAP BAJA Rp. 19,370.50

2 1 M2 PASANG JENDELA NAKO Rp. 350,140.00

3 1 M1 PASANG TALANG DATAR, SENG BJLS 28 Rp. 224,300.50

XII PEKERJAAN KUNCI DAN KACA (SNI 2002)

1 1 BH PASANG KUNCI TANAM BIASA Rp. 130,700.00

2 1 PS PASANG ENGSEL PINTU Rp. 21,898.00

3 1 PS PASANG ENGSEL JENDELA KUPU-KUPU Rp. 20,930.00

4 1 BH PASANG KAIT ANGIN Rp. 24,898.00

5 1 BH PASANG KUNCI SLOT Rp. 99,860.00

6 1 M2 PASANG KACA, TEBAL 5 MM Rp. 107,898.00

XIII PEK. PENUTUP LANTAI DAN DINDING (SNI 7395:2008)

1 1 M2 PASANG LANTAI KERAMIK 30 X 30 CM Rp. 110,178.64

2 1 M2 PASANG LANTAI KERAMIK 20 X 20 CM Rp. 110,952.00

3 1 M1 PASANG PLIN KERAMIK 10 X 30 CM Rp. 20,838.29

4 1 M2 PASANG DINDING KERAMIK 20 X 20 CM Rp. 121,814.00

5 1 M1 PASANG PLIN KAYU 2 X 10 CM Rp. 36,488.35

XIV PEKERJAAN PENGECATAN (SNI 2002)

1 1 M2 PENGECATAN BIDANG KAYU BARU (1 LAPIS PLAMIR, Rp. 26,875.25

1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP)

2 1 M2 PENGECATAN BIDANG KAYU DENGAN VERNIS Rp. 20,551.75

Page 66: 72125046-Analisa-Sni-2002-2008-Dck-Bln-Januari-2011

NO URAIAN PEKERJAAN HARGA

1 2 3

3 1 M2 PENGECATAN TEMBOK BARU (1 LAPIS PLAMIR, Rp. 13,072.50

1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP)

4 1 M2 PENGECATAN TEMBOK LAMA (1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP Rp. 8,849.00

5 1 M2 PENGECATAN PERMUKAAN BAJA DENGAN MENI BESI Rp. 12,310.00

6 1 M2 PENGECATAN PERMUKAAN BAJA, 1 LAPIS DENGAN CAT BESI Rp. 16,530.00

7 1 M2 PELABURAN BIDANG KAYU DENGAN POLITUR Rp. 33,976.00

Page 67: 72125046-Analisa-Sni-2002-2008-Dck-Bln-Januari-2011

NO URAIAN PEKERJAAN HARGA

1 2 3

XV PEKERJAAN TETEMPELAN STYLE BALI

1 1 M2 PASANGAN BATA GOSOK 2 MUKA Rp. 496,452.00

2 1 M2 PASANGAN PARAS KEROBOKAN 1 MUKA Rp. 263,652.00

3 1 M2 PASANGAN BATA GOSOK 1 MUKA Rp. 258,226.00

4 1 M2 PASANGAN PARAS 1 MUKA Rp. 350,992.67

5 1 M2 PASANGAN PARAS + BATA GOSOK 1 MUKA Rp. 308,715.83

6 1 M2 PASANGAN BATA GOSOK DIUKIR Rp. 401,726.00

7 1 M2 PASANGAN PARAS DIUKIR Rp. 494,492.67

8 1 M2 PASANGAN PARAS + BATA GOSOK DIUKIR Rp. 443,715.83

XVI PEKERJAAN LANDSCAPE

1 1 M2 PASANGAN PAVING BETON 10/20 CM TEBAL 6 CM K 225 Rp. 77,625.00

2 Paving 10 x 20 cm tebal 6 cm K350 Rp. 86,125.00

3 Paving 10 x 20 cm tebal 8 cm K225 Rp. 85,125.00

4 Paving 10 x 20 cm tebal 8 cm K350 Rp. 91,625.00

5 Paving 20 x 20 cm tebal 6 cm K225 Rp. 77,625.00

6 Paving 20 x 20 cm tebal 6 cm K350 Rp. 86,125.00

7 Paving 20 x 20 cm tebal 8 cm K225 Rp. 85,125.00

8 Paving 20 x 20 cm tebal 8 cm K350 Rp. 91,625.00

9 Paving 20 x 20 cm tebal 8 cm K425 Rp. 101,125.00

10 Paving 20 x 20 cm tebal 10 cm K225 Rp. 92,125.00

11 Paving 20 x 20 cm tebal 10 cm K350 Rp. 101,625.00

12 Paving 20 x 20 cm tebal 10 cm K425 Rp. 110,625.00

13 Paving Tiga Berlian tebal 6 cm K225 Rp. 78,625.00

14 1 M2 PASANGAN GRASS BLOCK Rp. 116,270.00

15 1 M2 PASANGAN KORAL SIKAT Rp. 106,093.40

16 1 M1 KANSTEIN BULAT (50 x 30 x 10 ) CM K225 Rp. 119,376.00

17 Kanstein Jumbo (P:50,L:15,T:30 cm K225) Rp. 138,683.40

18 Kanstein Segi Lima Jumbo (P:50,L:15, T:40 cm K225) Rp. 153,183.40

19 1 M2 PENGECATAN KANSTEIN Rp. 20,224.00

XVII PEKERJAAN ELEKTRIKAL

1 1 TITIK INSTALASI STOP KONTAK, LAMPU, EXHAUST FAN DAN CEILING FAN Rp. 182,250.00

2 1 TITIK INSTALASI AC Rp. 234,750.00

3 1 TITIK INSTALASI TELEPHONE Rp. 231,250.00

4 1 TITIK INSTALASI MATV Rp. 242,000.00

Kepala Dinas Cipta Karya

Kabupaten Badung

Ir. Ni Luh Putu Dessy Dharmayanty, M.T

Pembina

NIP. 196110101994032001

Page 68: 72125046-Analisa-Sni-2002-2008-Dck-Bln-Januari-2011

DAFTAR ANALISA PEKERJAAN SWAKLOLABULAN JANUARI TAHUN 2011

NO URAIANHARGA HARGA HARGA HARGASATUAN UPAH BAHAN JUMLAH

(Rp) (Rp) (Rp) (Rp)1 2 3 4 5 6

I PEKERJAAN PERSIAPAN (SNI 03-2835-2002)1

1.2500 btg Bambu Sedang 8,000.00 10,000.00 2.5000 kg Semen Portland 1,030.00 2,575.00 1.2000 lbr Seng gelombang 3" - 5" 40,000.00 48,000.00 0.0050 m3 Pasir Beton 110,000.00 550.00 0.0090 m3 Koral beton 120,000.00 1,080.00 0.0720 m3 Kayu Meranti Usuk 5/7 1,700,000.00 122,400.00 0.0600 kg Paku biasa 2" - 5" 12,000.00 720.00 0.4500 kg Meni Besi 18,500.00 8,325.00 0.2000 oh Tukang Kayu 53,000.00 10,600.00 0.4000 oh Pekerja 35,000.00 14,000.00

Total : 24,600.00 193,650.00 218,250.00

2 1 M1 PENGUKURAN DAN PEMASANGAN BOWPLANK 0.0120 m3 Kayu Usuk Meranti 5/7 1,700,000.00 20,400.00 0.0200 kg Paku Biasa 2" - 5" 12,000.00 240.00 0.0070 m3 Kayu Papan Meranti 3/20 4,000,000.00 28,000.00 0.1000 oh Tukang Kayu 53,000.00 5,300.00 0.1000 oh Pekerja 35,000.00 3,500.00

Total : 8,800.00 48,640.00 57,440.00

3

1.2500 btg Dolken Kayu Ø 8 - 10/4m 90,000.00 112,500.00 0.1800 m3 Kayu Meranti 2,000,000.00 360,000.00 0.8500 kg Paku Biasa 2" - 5" 12,000.00 10,200.00 1.1000 kg Besi Strip 6,050.00 6,655.00 35.0000 kg Semen Portland 1,030.00 36,050.00 0.1500 m3 Pasir Pasang 125,000.00 18,750.00 0.1000 m3 Pasir Beton 110,000.00 11,000.00 0.1500 m3 Koral Beton 120,000.00 18,000.00 30.0000 bh Bata Merah 1,250.00 37,500.00 0.2500 lbr Seng Plat 45,000.00 11,250.00 2.0000 bh Jendela Nako 12,500.00 25,000.00 0.0800 m2 Kaca Polos 90,000.00 7,200.00 0.1500 bh Kunci Tanam 104,500.00 15,675.00 0.0600 lbr Plywood 4 mm 46,000.00 2,760.00 2.0000 oh Tukang Kayu 53,000.00 106,000.00 1.0000 oh Tukang Batu 45,000.00 45,000.00 2.0000 oh Pekerja 35,000.00 70,000.00

Total : 221,000.00 672,540.00 893,540.00

4 1 M2 PEMBUATAN GUDANG SEMEN DAN ALAT-ALAT 1.7000 btg Bambu Sedang 8,000.00 13,600.00 0.2100 m3 Kayu Meranti 2,000,000.00 420,000.00 0.3000 kg Paku Biasa 2" - 5" 12,000.00 3,600.00 10.5000 kg Semen Portland 1,030.00 10,815.00 0.0300 m3 Pasir Beton 110,000.00 3,300.00 0.0500 m3 Koral Beton 120,000.00 6,000.00 1.5000 lbr Seng gelombang BJLS 28 40,000.00 60,000.00 2.0000 oh Tukang Kayu 53,000.00 106,000.00 1.0000 oh Pekerja 35,000.00 35,000.00

Total : 141,000.00 517,315.00 658,315.00

5 1 M2 PEMBUATAN RUMAH JAGA/KONSTRUKSI KAYU 3.0000 btg Bambu Sedang 8,000.00 24,000.00 0.2760 m3 Kayu Meranti 2,000,000.00 552,000.00 0.7000 kg Paku biasa 2" - 5" 12,000.00 8,400.00 1.5000 lbr Seng gelombang BJLS 28 40,000.00 60,000.00 1.5000 oh Tukang Kayu 53,000.00 79,500.00 1.0000 oh Pekerja 35,000.00 35,000.00

Total : 114,500.00 644,400.00 758,900.00

6 1 M2 MEMBERSIHKAN LAPANGAN DAN PERATAAN 0.1000 oh Pekerja 35,000.00 3,500.00

Total : 3,500.00 3,500.00

7 1 M2 PEMBUATAN BEDENG BURUH 1.2500 btg Bambu Sedang 8,000.00 10,000.00 0.1860 m3 Kayu Meranti 2,000,000.00 372,000.00 0.3000 kg Paku Biasa 2" - 5" 12,000.00 3,600.00 18.0000 kg Semen Portland 1,030.00 18,540.00 0.0300 m3 Pasir Beton 110,000.00 3,300.00 0.0500 m3 Koral Beton 120,000.00 6,000.00 1.5000 lbr Seng gelombang BJLS 28 40,000.00 60,000.00 1.3500 lbr Plywood 4 mm 46,000.00 62,100.00 2.0000 oh Tukang Kayu 53,000.00 106,000.00 1.0000 oh Pekerja 35,000.00 35,000.00

Total : 141,000.00 535,540.00 676,540.00

1 M1 PAGAR SEMENTARA DARI SENG GELOMBANG TINGGI 2 METER

1 M2 PEMBUATAN KANTOR SEMENTARA, DENGAN LANTAI PLESTERAN

Page 69: 72125046-Analisa-Sni-2002-2008-Dck-Bln-Januari-2011

NO URAIANHARGA HARGA HARGA HARGASATUAN UPAH BAHAN JUMLAH

(Rp) (Rp) (Rp) (Rp)1 2 3 4 5 6

8 1 M2 PEMBUATAN BAK ADUKAN UKURAN (40X50X20) CM 0.0360 m3 Kayu Terentang 2,000,000.00 72,000.00 0.0800 kg Paku Biasa 2" - 5" 12,000.00 960.00 1.0000 btg Kaso 5/7 56,000.00 56,000.00 0.3000 oh Tukang kayu 53,000.00 15,900.00

Total : 15,900.00 128,960.00 144,860.00

9 1 M2 PEMBUATAN STEGGER DARI BAMBU 1.0000 btg Bambu 7,000.00 7,000.00 0.2500 kg Tali Ijuk 33,000.00 8,250.00 0.0170 oh Tukang Kayu 53,000.00 901.00 0.0020 oh Pekerja 35,000.00 70.00

971.00 15,250.00 16,221.00

10 1 M2 PEMBUATAN JALAN SEMENTARA 0.1500 m3 Batu Kali / Batu Bulat 15/20 118,000.00 17,700.00 0.0900 m3 Batu Pecah 5 - 7 120,000.00 10,800.00 0.0100 m3 Pasir Pasang 125,000.00 1,250.00 1.0000 oh Pekerja 35,000.00 35,000.00

Total : 35,000.00 29,750.00 64,750.00

11 1 M3 BONGKARAN BETON BERTULANG 6.6670 oh Pekerja 35,000.00 233,345.00

Total : 233,345.00 233,345.00

12 1 M3 BONGKARAN DINDING TEMBOK BATA MERAH 6.6670 oh Pekerja 35,000.00 233,345.00

Total : 233,345.00 233,345.00

II PEKERJAAN TANAH (SNI 2835 : 2008)

1 1 M3 GALIAN TANAH BIASA DALAM 1 METER 0.7500 oh Pekerja 35,000.00 26,250.00

Total : 26,250.00 26,250.00 2 1 M3 GALIAN TANAH BIASA DALAM 2 METER

0.9000 oh Pekerja 35,000.00 31,500.00 Total : 31,500.00 31,500.00

3 1 M3 GALIAN TANAH BIASA DALAM 3 METER 1.0500 oh Pekerja 35,000.00 36,750.00

Total : 36,750.00 36,750.00

4 1 M3 GALIAN TANAH KERAS DALAM 1METER 1.0000 oh Pekerja 35,000.00 35,000.00

Total : 35,000.00 35,000.00

5 1 M3 GALIAN TANAH CADAS DALAM 1 METER 1.5000 oh Pekerja 35,000.00 52,500.00

Total : 52,500.00 52,500.00

6 1 M3 GALIAN TANAH LUMPUR DALAM 1 METER 1.2000 oh Pekerja 35,000.00 42,000.00

Total : 42,000.00 42,000.00

7 1 M2 PEKERJAAN STRIPPING SETINGGI 1 METER 0.0500 oh Pekerja 35,000.00 1,750.00

Total : 1,750.00 1,750.00

8 1 M3 PEMBUANGAN TANAH SEJAUH 15 METER 0.3300 oh Pekerja 35,000.00 11,550.00

Total : 11,550.00 11,550.00

9 1 M3 URUGAN KEMBALI Mengurug Kembali 1 m3 galian dihitung dari 1/3 kali dari indeks pekerjaan galian

10 1 M3 PEMADATAN TANAH ( Per 20 Cm ) 0.5000 oh Pekerja 35,000.00 17,500.00

Total : 17,500.00 17,500.00

11 1 M3 URUGAN PASIR 1.2000 m3 Pasir Urug 80,000.00 96,000.00 0.3000 oh Pekerja 35,000.00 10,500.00

Total : 10,500.00 96,000.00 106,500.00

12 1 M3 PEMASANGAN LAPISAN IJUK TEBAL 10 CM 6.0000 m3 Ijuk 1,500.00 9,000.00 0.1500 oh Pekerja 35,000.00 5,250.00

Total : 5,250.00 9,000.00 14,250.00

13 1 M3 URUGAN SIRTU PADAT Untuk Peninggian Lantai Bangunan 1.2000 m3 Sirtu 100,000.00 120,000.00 0.2500 oh Pekerja 35,000.00 8,750.00

Total : 8,750.00 120,000.00 128,750.00

Page 70: 72125046-Analisa-Sni-2002-2008-Dck-Bln-Januari-2011

NO URAIANHARGA HARGA HARGA HARGASATUAN UPAH BAHAN JUMLAH

(Rp) (Rp) (Rp) (Rp)1 2 3 4 5 6

Page 71: 72125046-Analisa-Sni-2002-2008-Dck-Bln-Januari-2011

NO URAIANHARGA HARGA HARGA HARGASATUAN UPAH BAHAN JUMLAH

(Rp) (Rp) (Rp) (Rp)1 2 3 4 5 6

14 1 M3 URUGAN TANAH PILIHAN DIPADATKAN 1.2000 m3 Tanah Urug 70,000.00 84,000.00 0.5000 oh Pekerja 35,000.00 17,500.00

Total : 17,500.00 84,000.00 101,500.00

14 1 M3 URUGAN LIMESTONE PADAT 1.2000 m3 Limestone 79,000.00 94,800.00 0.2500 oh Pekerja 35,000.00 8,750.00

Total : 8,750.00 94,800.00 103,550.00

III PEKERJAAN PONDASI (SNI 2836 : 2008)

1 1 M3 BATU KALI CAMP. 1 PC : 3 PS 1.2000 m3 Batu Kali / Batu Bulat 15/20 118,000.00 141,600.00 202.0000 kg Semen Portland 1,030.00 208,060.00 0.4850 m3 Pasir Pasang 125,000.00 60,625.00 1.5000 oh Pekerja 35,000.00 52,500.00 0.7500 oh Tukang Batu 45,000.00 33,750.00

Total : 86,250.00 410,285.00 496,535.00

2 1 M3 BATU KALI CAMP. 1 PC : 4 PS 1.2000 m3 Batu Kali / Batu Bulat 15/20 118,000.00 141,600.00 163.0000 kg Semen Portland 1,030.00 167,890.00 0.5200 m3 Pasir Pasang 125,000.00 65,000.00 1.5000 oh Pekerja 35,000.00 52,500.00 0.7500 oh Tukang Batu 45,000.00 33,750.00

Total : 86,250.00 374,490.00 460,740.00

3 1 M3 BATU KALI CAMP. 1 PC : 5 PS 1.2000 m3 Batu Kali / Batu Bulat 15/20 118,000.00 141,600.00 136.0000 kg Semen Portland 1,030.00 140,080.00 0.5440 m3 Pasir Pasang 125,000.00 68,000.00 1.5000 oh Pekerja 35,000.00 52,500.00 0.7500 oh Tukang Batu 45,000.00 33,750.00

Total : 86,250.00 349,680.00 435,930.00

4 1 M3 BATU KALI CAMP. 1 PC : 6 PS 1.2000 m3 Batu Kali / Batu Bulat 15/20 118,000.00 141,600.00 117.0000 kg Semen Portland 1,030.00 120,510.00 0.5610 m3 Pasir Pasang 125,000.00 70,125.00 1.5000 oh Pekerja 35,000.00 52,500.00 0.7500 oh Tukang Batu 45,000.00 33,750.00

Total : 86,250.00 332,235.00 418,485.00

5 1 M3 BATU KALI CAMP. 1 PC : 8 PS 1.2000 m3 Batu Kali / Batu Bulat 15/20 118,000.00 141,600.00 91.0000 kg Semen Portland 1,030.00 93,730.00 0.5840 m3 Pasir Pasang 125,000.00 73,000.00 1.5000 oh Pekerja 35,000.00 52,500.00 0.7500 oh Tukang Batu 45,000.00 33,750.00

Total : 86,250.00 308,330.00 394,580.00

6 1 M3 PASANGAN PONDASI SIKLOP, 40% BATU KALI 0.4800 m3 Batu Kali / Batu Bulat 15/20 118,000.00 56,640.00 194.0000 kg Semen Portland 1,030.00 199,820.00 0.3120 m3 Pasir Beton 110,000.00 34,320.00 0.4680 m3 Koral Beton 120,000.00 56,160.00 126.0000 kg Besi Beton 7,111.00 895,986.00 1.8000 kg Kawat Beton 15,000.00 27,000.00 3.4000 oh Pekerja 35,000.00 119,000.00 0.8500 oh Tukang Batu 45,000.00 38,250.00

157,250.00 1,269,926.00 1,427,176.00

7 1 M3 PASANGAN PONDASI SUMURAN DIAMETER 1 M 0.4500 m3 Batu Kali / Batu Bulat 15/20 118,000.00 53,100.00 194.0000 kg Semen Portland 1,030.00 199,820.00 0.3120 m3 Pasir Beton 110,000.00 34,320.00 0.4680 m3 Koral Beton 120,000.00 56,160.00 2.4000 oh Pekerja 35,000.00 84,000.00 0.8000 oh Tukang Batu 45,000.00 36,000.00

Total : 120,000.00 343,400.00 463,400.00

8 1 M3 PASANGAN BATU KOSONG 1.2000 m3 Batu Kali / Batu Bulat 15/20 15/20 118,000.00 141,600.00 0.4320 m3 Pasir Urug 80,000.00 34,560.00 0.7800 oh Pekerja 35,000.00 27,300.00 0.3900 oh Tukang Batu 45,000.00 17,550.00

Total : 44,850.00 176,160.00 221,010.00

Page 72: 72125046-Analisa-Sni-2002-2008-Dck-Bln-Januari-2011

NO URAIANHARGA HARGA HARGA HARGASATUAN UPAH BAHAN JUMLAH

(Rp) (Rp) (Rp) (Rp)1 2 3 4 5 6

IV PEKERJAAN DINDING (SNI 6897 : 2008)

11 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 2 PS

140.0000 bh Bata Merah 5 x 11 x 22 cm 1,250.00 175,000.00 43.5000 kg Semen Portland 1,030.00 44,805.00 0.0800 m3 Pasir Pasang 125,000.00 10,000.00 0.6000 oh Pekerja 35,000.00 21,000.00 0.2000 oh Tukang Batu 45,000.00 9,000.00

30,000.00 229,805.00 259,805.00

2 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 3 PS 140.0000 bh Bata Merah 5 x 11 x 22 cm 1,250.00 175,000.00 32.9500 kg Semen Portland 1,030.00 33,938.50 0.0910 m3 Pasir Pasang 125,000.00 11,375.00 0.6000 oh Pekerja 35,000.00 21,000.00 0.2000 oh Tukang Batu 45,000.00 9,000.00

30,000.00 220,313.50 250,313.50

3 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 4 PS 140.0000 bh Bata Merah 5 x 11 x 22 cm 1,250.00 175,000.00 26.5500 kg Semen Portland 1,030.00 27,346.50 0.0930 m3 Pasir Pasang 125,000.00 11,625.00 0.6000 oh Pekerja 35,000.00 21,000.00 0.2000 oh Tukang Batu 45,000.00 9,000.00

30,000.00 213,971.50 243,971.50

4 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 5 PS 140.0000 bh Bata Merah 5 x 11 x 22 cm 1,250.00 175,000.00 22.2000 kg Semen Portland 1,030.00 22,866.00 0.1020 m3 Pasir Pasang 125,000.00 12,750.00 0.6000 oh Pekerja 35,000.00 21,000.00 0.2000 oh Tukang Batu 45,000.00 9,000.00

30,000.00 210,616.00 240,616.00

5 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 6 PS 140.0000 bh Bata Merah 5 x 11 x 22 cm 1,250.00 175,000.00 18.5000 kg Semen Portland 1,030.00 19,055.00 0.1220 m3 Pasir Pasang 125,000.00 15,250.00 0.6000 oh Pekerja 35,000.00 21,000.00 0.2000 oh Tukang Batu 45,000.00 9,000.00

30,000.00 209,305.00 239,305.00

6 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 2 PS 70.0000 bh Bata Merah 5 x 11 x 22 cm 1,250.00 87,500.00 18.9500 kg Semen Portland 1,030.00 19,518.50 0.0380 m3 Pasir Pasang 125,000.00 4,750.00 0.3000 oh Pekerja 35,000.00 10,500.00 0.1000 oh Tukang Batu 45,000.00 4,500.00

15,000.00 111,768.50 126,768.50

7 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 3 PS 70.0000 bh Bata Merah 5 x 11 x 22 cm 1,250.00 87,500.00 14.3700 kg Semen Portland 1,030.00 14,801.10 0.0400 m3 Pasir Pasang 125,000.00 5,000.00 0.3000 oh Pekerja 35,000.00 10,500.00 0.1000 oh Tukang Batu 45,000.00 4,500.00

Total : 15,000.00 107,301.10 122,301.10

8 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 4 PS 70.0000 bh Bata Merah 5 x 11 x 22 cm 1,250.00 87,500.00 11.5000 kg Semen Portland 1,030.00 11,845.00 0.0430 m3 Pasir Pasang 125,000.00 5,375.00 0.3000 oh Pekerja 35,000.00 10,500.00 0.1000 oh Tukang Batu 45,000.00 4,500.00

Total : 15,000.00 104,720.00 119,720.00

9 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 5 PS 70.0000 bh Bata Merah 5 x 11 x 22 cm 1,250.00 87,500.00 9.6800 kg Semen Portland 1,030.00 9,970.40 0.0450 m3 Pasir Pasang 125,000.00 5,625.00 0.3000 oh Pekerja 35,000.00 10,500.00 0.1000 oh Tukang Batu 45,000.00 4,500.00

Total : 15,000.00 103,095.40 118,095.40 10 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 6 PS

70.0000 bh Bata Merah 5 x 11 x 22 cm 1,250.00 87,500.00 8.3200 kg Semen Portland 1,030.00 8,569.60 0.0490 m3 Pasir Pasang 125,000.00 6,125.00 0.3000 oh Pekerja 35,000.00 10,500.00 0.1000 oh Tukang Batu 45,000.00 4,500.00

Total : 15,000.00 102,194.60 117,194.60

Page 73: 72125046-Analisa-Sni-2002-2008-Dck-Bln-Januari-2011

NO URAIANHARGA HARGA HARGA HARGASATUAN UPAH BAHAN JUMLAH

(Rp) (Rp) (Rp) (Rp)1 2 3 4 5 6

11 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 8 PS 70.0000 bh Bata Merah 5 x 11 x 22 cm 1,250.00 87,500.00 6.5000 kg Semen Portland 1,030.00 6,695.00 0.0500 m3 Pasir Pasang 125,000.00 6,250.00 0.3000 oh Pekerja 35,000.00 10,500.00 0.1000 oh Tukang Batu 45,000.00 4,500.00

Total : 15,000.00 100,445.00 115,445.00

12 1 M2 PASANGAN DINDING HOLLOWBLOCK (HB. 10) 12.5000 bh Batako 1,800.00 22,500.00 7.5000 kg Semen Portland 1,030.00 7,725.00 0.0270 m3 Pasir Pasang 125,000.00 3,375.00 1.9500 kg Besi Beton 8 mm 7,111.00 13,866.45 0.3200 oh Pekerja 35,000.00 11,200.00 0.1000 oh Tukang Batu 45,000.00 4,500.00

Total : 15,700.00 47,466.45 63,166.45

13 1 M2 PASANGAN DINDING HOLLOWBLOCK (HB. 10) TANPA BESI 12.5000 bh Batako 1,800.00 22,500.00 7.5000 kg Semen Portland 1,030.00 7,725.00 0.0270 m3 Pasir Pasang 125,000.00 3,375.00 0.3200 oh Pekerja 35,000.00 11,200.00 0.1000 oh Tukang Batu 45,000.00 4,500.00

Total : 15,700.00 33,600.00 49,300.00

14 1 M2 PASANGAN DINDING Terawang/Roster (12 x 11 x 24) CM 30.0000 bh Roster Keramik 48,000.00 1,440,000.00 11.0000 kg Semen Portland 1,030.00 11,330.00 0.0350 m3 Pasir Pasang 125,000.00 4,375.00 0.3000 oh Pekerja 35,000.00 10,500.00 0.1000 oh Tukang Batu 45,000.00 4,500.00

Total : 15,000.00 1,455,705.00 1,470,705.00

15 1 M2 PASANGAN DINDING BEDEG, RANGKA KAYU 1.5000 m2 Bedeg/Bilik Bambu Kelas I 19,000.00 28,500.00 0.0140 m3 Kayu kamper usuk/reng 5,700,000.00 79,800.00 0.0120 kg Paku Biasa 12,000.00 144.00 0.0030 m3 List Kayu 2/4 5,700,000.00 17,100.00 0.1000 oh Pekerja 35,000.00 3,500.00 0.0500 oh Tukang Kayu 53,000.00 2,650.00

Total : 6,150.00 125,544.00 131,694.00

V PEKERJAAN PLESTERAN (SNI 2837 : 2008)

1 1 M2 PLESTERAN CAMP. 1 PC : 1 PS TEBAL 15 MM 15.5040 kg Semen Portland 1,030.00 15,969.12 0.0160 m3 Pasir Pasang 125,000.00 2,000.00 0.3000 oh Pekerja 35,000.00 10,500.00 0.1500 oh Tukang Batu 45,000.00 6,750.00

Total : 17,250.00 17,969.12 35,219.12 2 1 M2 PLESTERAN CAMP. 1 PC : 2 PS TEBAL 15 MM

10.2240 kg Semen Portland 1,030.00 10,530.72 0.0200 m3 Pasir Pasang 125,000.00 2,500.00 0.3000 oh Pekerja 35,000.00 10,500.00 0.1500 oh Tukang Batu 45,000.00 6,750.00

Total : 17,250.00 13,030.72 30,280.72

3 1 M2 PLESTERAN CAMP. 1 PC : 3 PS TEBAL 15 MM 7.7760 kg Semen Portland 1,030.00 8,009.28 0.0230 m3 Pasir Pasang 125,000.00 2,875.00 0.3000 oh Pekerja 35,000.00 10,500.00 0.1500 oh Tukang Batu 45,000.00 6,750.00

Total : 17,250.00 10,884.28 28,134.28

4 1 M2 PLESTERAN CAMP. 1 PC : 4 PS TEBAL 15 MM 6.2400 kg Semen Portland 1,030.00 6,427.20 0.0240 m3 Pasir Pasang 125,000.00 3,000.00 0.3000 oh Pekerja 35,000.00 10,500.00 0.1500 oh Tukang Batu 45,000.00 6,750.00

Total : 17,250.00 9,427.20 26,677.20

5 1 M2 PLESTERAN CAMP. 1 PC : 5 PS TEBAL 15 MM 5.1840 kg Semen Portland 1,030.00 5,339.52 0.0260 m3 Pasir Pasang 125,000.00 3,250.00 0.3000 oh Pekerja 35,000.00 10,500.00 0.1500 oh Tukang Batu 45,000.00 6,750.00

Total : 17,250.00 8,589.52 25,839.52

6 1 M2 PLESTERAN CAMP. 1 PC : 6 PS TEBAL 15 MM 4.4160 kg Semen Portland 1,030.00 4,548.48 0.0270 m3 Pasir Pasang 125,000.00 3,375.00 0.3000 oh Pekerja 35,000.00 10,500.00 0.1500 oh Tukang Batu 45,000.00 6,750.00

Page 74: 72125046-Analisa-Sni-2002-2008-Dck-Bln-Januari-2011

NO URAIANHARGA HARGA HARGA HARGASATUAN UPAH BAHAN JUMLAH

(Rp) (Rp) (Rp) (Rp)1 2 3 4 5 6

Total : 17,250.00 7,923.48 25,173.48

Page 75: 72125046-Analisa-Sni-2002-2008-Dck-Bln-Januari-2011

NO URAIANHARGA HARGA HARGA HARGASATUAN UPAH BAHAN JUMLAH

(Rp) (Rp) (Rp) (Rp)1 2 3 4 5 6

7 1 M2 PLESTERAN CAMP. 1 PC : 8 PS TEBAL 15 MM 3.4560 kg Semen Portland 1,030.00 3,559.68 0.0290 m3 Pasir Pasang 125,000.00 3,625.00 0.3000 oh Pekerja 35,000.00 10,500.00 0.1500 oh Tukang Batu 45,000.00 6,750.00

Total : 17,250.00 7,184.68 24,434.68

8 1 M2 PLESTERAN CAMP. 1 PC : 2 PS TEBAL 20 MM 13.6320 kg Semen Portland 1,030.00 14,040.96 0.0270 m3 Pasir Pasang 125,000.00 3,375.00 0.4000 oh Pekerja 35,000.00 14,000.00 0.2000 oh Tukang Batu 45,000.00 9,000.00

Total : 23,000.00 17,415.96 40,415.96

9 1 M2 PLESTERAN CAMP. 1 PC : 3 PS TEBAL 20 MM 10.3680 kg Semen Portland 1,030.00 10,679.04 0.0310 m3 Pasir Pasang 125,000.00 3,875.00 0.4000 oh Pekerja 35,000.00 14,000.00 0.2000 oh Tukang Batu 45,000.00 9,000.00

Total : 23,000.00 14,554.04 37,554.04

10 1 M2 PLESTERAN CAMP. 1 PC : 4 PS TEBAL 20 MM 8.3200 kg Semen Portland 1,030.00 8,569.60 0.0320 m3 Pasir Pasang 125,000.00 4,000.00 0.4000 oh Pekerja 35,000.00 14,000.00 0.2000 oh Tukang Batu 45,000.00 9,000.00

Total : 23,000.00 12,569.60 35,569.60 11 1 M2 PLESTERAN CAMP. 1 PC : 5 PS TEBAL 20 MM

6.9120 kg Semen Portland 1,030.00 7,119.36 0.0350 m3 Pasir Pasang 125,000.00 4,375.00 0.4000 oh Pekerja 35,000.00 14,000.00 0.2000 oh Tukang Batu 45,000.00 9,000.00

Total : 23,000.00 11,494.36 34,494.36

12 1 M2 PLESTERAN CAMP. 1 PC : 6 PS TEBAL 20 MM 5.8880 kg Semen Portland 1,030.00 6,064.64 0.0360 m3 Pasir Pasang 125,000.00 4,500.00 0.4000 oh Pekerja 35,000.00 14,000.00 0.2000 oh Tukang Batu 45,000.00 9,000.00

Total : 23,000.00 10,564.64 33,564.64

13 1 M2 PLESTERAN SKONING 1 PC : 2 PS, TEBAL 10 MM 0.5000 kg Semen Portland 1,030.00 515.00 0.0130 m3 Pasir Pasang 125,000.00 1,625.00 0.0800 oh Pekerja 35,000.00 2,800.00 0.4000 oh Tukang Batu 45,000.00 18,000.00

Total : 20,800.00 2,140.00 22,940.00

14 1 M2 PLESTERAN CIPRAT 1 PC : 2 PS 4.3200 kg Semen Portland 1,030.00 4,449.60 0.0060 m3 Pasir Pasang 125,000.00 750.00 0.3000 oh Pekerja 35,000.00 10,500.00 0.1000 oh Tukang Batu 45,000.00 4,500.00

Total : 15,000.00 5,199.60 20,199.60

15

3.1080 kg Semen Portland 1,030.00 3,201.24 0.1500 oh Pekerja 35,000.00 5,250.00 0.0750 oh Tukang Batu 45,000.00 3,375.00

Total : 8,625.00 3,201.24 11,826.24

16

1.6000 kg Semen Portland 1,030.00 1,648.00 0.0700 oh Pekerja 35,000.00 2,450.00 0.0350 oh Tukang Batu 45,000.00 1,575.00

Total : 4,025.00 1,648.00 5,673.00

171 M2 FINISHING SIAR PASANGAN BATU KALI ADUKAN 1PC : 2 PS

6.3400 kg Semen Portland 1,030.00 6,530.20 0.0120 m3 Pasir Pasang 125,000.00 1,500.00 0.3000 oh Pekerja 35,000.00 10,500.00 0.1500 oh Tukang Batu 45,000.00 6,750.00

Total : 17,250.00 8,030.20 25,280.20

18 1 M2 PEKERJAAN ACIAN 3.2500 zak Semen Portland 50 Kg 1,030.00 3,347.50 0.2000 oh Pekerja 35,000.00 7,000.00 0.1000 oh Tukang Labur/Cat 40,000.00 4,000.00

Total : 4,000.00 3,347.50 7,347.50

1 M2 FINISHING SIAR PASANGAN DINDING BATA MERAH (=20 M')

1 M2 FINISHING SIAR PASANGAN DINDING CONBLOCK EKSPOSE (= 8 M')

Page 76: 72125046-Analisa-Sni-2002-2008-Dck-Bln-Januari-2011

NO URAIANHARGA HARGA HARGA HARGASATUAN UPAH BAHAN JUMLAH

(Rp) (Rp) (Rp) (Rp)1 2 3 4 5 6

VI PEKERJAAN KAYU (SNI 3434 : 2008)

1

1.1000 m3 Balok Kayu Kamper 7,700,000.00 8,470,000.00 1.2500 Kg Paku 10 Cm 12,000.00 15,000.00 1.0000 Kg Lem Kayu 12,500.00 12,500.00 7.0000 oh Pekerja 35,000.00 245,000.00 21.0000 oh Tukang Kayu 53,000.00 1,113,000.00

Total : 1,358,000.00 8,497,500.00 9,855,500.00

2

1.2000 m3 Balok Kayu kruing 4,200,000.00 5,040,000.00 1.2500 Kg Paku 10 Cm 12,000.00 15,000.00 1.0000 Kg Lem Kayu 12,500.00 12,500.00 6.0000 oh Pekerja 35,000.00 210,000.00 18.0000 oh Tukang Kayu 53,000.00 954,000.00

Total : 1,164,000.00 5,067,500.00 6,231,500.00

3

0.0400 m3 Papan Kayu Kamper 7,900,000.00 316,000.00 0.0500 Kg Paku 5-7 Cm 12,000.00 600.00 0.3500 oh Pekerja 35,000.00 12,250.00 1.0500 oh Tukang Kayu 53,000.00 55,650.00

Total : 67,900.00 316,600.00 384,500.00

4

0.0400 m3 Papan Kayu Kruing 6,000,000.00 240,000.00 0.0500 Kg Paku 5-7 Cm 12,000.00 600.00 0.3500 oh Pekerja 35,000.00 12,250.00 1.0500 oh Tukang Kayu 53,000.00 55,650.00

Total : 67,900.00 240,600.00 308,500.00

5

0.0400 m3 Papan Kayu Kamper 7,900,000.00 316,000.00 0.5000 Kg Lem Kayu 12,500.00 6,250.00 1.0000 oh Pekerja 35,000.00 35,000.00 3.0000 oh Tukang Kayu 53,000.00 159,000.00

Total : 194,000.00 322,250.00 516,250.00

6

0.0240 m3 Papan Kayu Kamper 7,900,000.00 189,600.00 0.3000 Kg Lem Kayu 12,500.00 3,750.00 0.8000 oh Pekerja 35,000.00 28,000.00 2.4000 oh Tukang Kayu 53,000.00 127,200.00

Total : 155,200.00 193,350.00 348,550.00

7

0.0640 m3 Papan Kayu Kamper 7,900,000.00 505,600.00 0.5000 Kg Lem Kayu 12,500.00 6,250.00 1.0000 oh Pekerja 35,000.00 35,000.00 3.0000 oh Tukang Kayu 53,000.00 159,000.00

Total : 194,000.00 511,850.00 705,850.00

8

0.0250 m3 Papan Kayu Kamper 7,900,000.00 197,500.00 0.0300 Kg Paku 1-2,5 Cm 12,000.00 360.00 0.5000 Kg Lem Kayu 12,500.00 6,250.00 1.0000 Lbr Plywood 4 mm 46,000.00 46,000.00 1.0000 oh Pekerja 35,000.00 35,000.00 3.0000 oh Tukang Kayu 53,000.00 159,000.00

Total : 194,000.00 250,110.00 444,110.00

9

0.0256 m3 Papan Kayu Kamper 7,900,000.00 202,240.00 0.0300 Kg Paku 1-2,5 Cm 12,000.00 360.00 0.5000 Kg Lem Kayu 12,500.00 6,250.00 1.0000 Lbr Plywood 4 mm 46,000.00 46,000.00 0.8000 oh Pekerja 35,000.00 28,000.00 2.4000 oh Tukang Kayu 53,000.00 127,200.00

Total : 155,200.00 254,850.00 410,050.00

10 MEMASANG 1 M2 JALUSI KUSEN, KAYU KELAS I/II

0.0600 m3 Papan Kayu Kamper 7,900,000.00 474,000.00 0.1500 Kg Paku 1-2,5 Cm 12,000.00 1,800.00 0.6700 oh Pekerja 35,000.00 23,450.00

MEMBUAT DAN MEMASANG 1 M3 KUSEN PINTU DAN JENDELA KAYU KELAS I

MEMBUAT DAN MEMASANG 1 M3 KUSEN PINTU DAN JENDELA KAYU KELAS II/III

MEMBUAT DAN MEMASANG 1 M2 PINTU KLAMP STANDAR KAYU KELAS II

MEMBUAT DAN MEMASANG 1 M2 PINTU KLAMP SEDERHANA KAYU KELAS III

MEMBUAT DAN MEMASANG 1 M2 DAUN PINTU PANEL KAYU KELAS I/II

MEMBUAT DAN MEMASANG 1 M2 PINTU DAN JENDELA KACA, KAYU KELAS I/II

MEMBUAT DAN MEMASANG 1 M2 PINTU DAN JENDELA JALUSI, KAYU KELAS I/II

MEMBUAT 1 M2 DAUN PINTU PLYWOOD RANGKAP RANGKA TERTUTUP, KAYU KELAS II (Lebar Sampai 90 Cm)

MEMBUAT 1 M2 DAUN PINTU PLYWOOD RANGKAP RANGKA EXPOSE, KAYU KELAS I/II

Page 77: 72125046-Analisa-Sni-2002-2008-Dck-Bln-Januari-2011

NO URAIANHARGA HARGA HARGA HARGASATUAN UPAH BAHAN JUMLAH

(Rp) (Rp) (Rp) (Rp)1 2 3 4 5 6

2.0000 oh Tukang Kayu 53,000.00 106,000.00 Total : 129,450.00 475,800.00 605,250.00

Page 78: 72125046-Analisa-Sni-2002-2008-Dck-Bln-Januari-2011

NO URAIANHARGA HARGA HARGA HARGASATUAN UPAH BAHAN JUMLAH

(Rp) (Rp) (Rp) (Rp)1 2 3 4 5 6

11

0.0256 m3 Papan Kayu Kamper 7,900,000.00 202,240.00 0.0300 Kg Paku 1-2,5 Cm 12,000.00 360.00 0.5000 Kg Lem Kayu 12,500.00 6,250.00 1.0000 Lbr Teakwood 4 mm uk 90x220 cm 55,000.00 55,000.00 0.8000 oh Pekerja 35,000.00 28,000.00 2.4000 oh Tukang Kayu 53,000.00 127,200.00

Total : 155,200.00 263,850.00 419,050.00

12

0.0250 m3 Papan Kayu Kamper 7,900,000.00 197,500.00 0.0300 Kg Paku 1-2,5 Cm 12,000.00 360.00 0.8000 Kg Lem Kayu 12,500.00 10,000.00 1.0000 Lbr Teakwood 4 mm uk 90x220 cm 55,000.00 55,000.00 0.5000 Lbr Formika 80,000.00 40,000.00 0.8000 oh Pekerja 35,000.00 28,000.00 2.4000 oh Tukang Kayu 53,000.00 127,200.00

Total : 155,200.00 302,860.00 458,060.00

13

1.1000 m3 Balok Kayu Kamper 7,700,000.00 8,470,000.00 15.0000 Kg Besi Strip Tebal 5 cm 6,050.00 90,750.00 5.6000 Kg Paku 12 Cm 12,000.00 67,200.00 4.0000 oh Pekerja 35,000.00 140,000.00 12.0000 oh Tukang Kayu 53,000.00 636,000.00

Total : 776,000.00 8,627,950.00 9,403,950.00

14

1.2000 m3 Balok Kayu Kamper 7,700,000.00 9,240,000.00 15.0000 Kg Besi Strip Tebal 5 cm 6,050.00 90,750.00 5.6000 Kg Paku 12 Cm 12,000.00 67,200.00 6.7000 oh Pekerja 35,000.00 234,500.00 20.1000 oh Tukang Kayu 53,000.00 1,065,300.00

Total : 1,299,800.00 9,397,950.00 10,697,750.00

15 MEMASANG 1 M3 KONSTRUKSI GORDENG, KAYU KELAS II

1.1000 m3 Balok Kayu Kamper 7,700,000.00 8,470,000.00 15.0000 Kg Besi Strip Tebal 5 cm 6,050.00 90,750.00 3.0000 Kg Paku 12 Cm 12,000.00 36,000.00 2.4000 oh Pekerja 35,000.00 84,000.00 7.2000 oh Tukang Kayu 53,000.00 381,600.00

Total : 465,600.00 8,596,750.00 9,062,350.00

16

0.0140 m3 Kaso-Kaso ( 5 x 7 ) Cm 1,700,000.00 23,800.00 0.0036 m3 Reng ( 2 x 3 ) Cm 5,700,000.00 20,520.00 0.2500 Kg Paku 5 Cm dan 10 Cm 12,000.00 3,000.00 0.1000 oh Pekerja 35,000.00 3,500.00 0.1000 oh Tukang Kayu 53,000.00 5,300.00

Total : 8,800.00 47,320.00 56,120.00

17

0.0140 m3 Kaso-Kaso ( 5 x 7 ) Cm 1,700,000.00 23,800.00 0.0072 m3 Reng ( 2 x 3 ) Cm 5,700,000.00 41,040.00 0.2500 Kg Paku 5 Cm dan 10 Cm 12,000.00 3,000.00 0.1000 oh Pekerja 35,000.00 3,500.00 0.1000 oh Tukang Kayu 53,000.00 5,300.00

Total : 8,800.00 67,840.00 76,640.00

18 MEMASANG 1 M2 RANGKA ATAP SIRAP, KAYU KELAS II

0.1650 m3 Balok Kayu Kamper 7,700,000.00 1,270,500.00 0.2000 Kg Paku 5 Cm dan 10 Cm 12,000.00 2,400.00 0.1200 oh Pekerja 35,000.00 4,200.00 0.1200 oh Tukang Kayu 53,000.00 6,360.00

Total : 10,560.00 1,272,900.00 1,283,460.00

19

0.0154 m3 Kaso-Kaso ( 5 x 7 ) Cm 1,700,000.00 26,180.00 0.2000 Kg Paku 7 Cm dan 10 Cm 12,000.00 2,400.00 0.1500 oh Pekerja 35,000.00 5,250.00 0.3000 oh Tukang Kayu 53,000.00 15,900.00

Total : 21,150.00 28,580.00 49,730.00

MEMBUAT 1 M2 TEAKWOOD RANGKAP RANGKA EXPOSE, KAYU KELAS I

MEMBUAT 1 M2 TEAKWOOD RANGKAP LAPIS FORMIKA RANGKA EXPOSE, KAYU KELAS II

MEMASANG 1 M3 KONSTRUKSI KUDA-KUDA KONVENSIONAL, KAYU KELAS I,II,III Bentang 6 M'

MEMASANG 1 M3 KONSTRUKSI KUDA-KUDA EXPOSE, KAYU KELAS I

MEMASANG 1 M2 RANGKA ATAP GENTENG KERAMIK, KAYU KELAS II

MEMASANG 1 M2 RANGKA ATAP GENTENG BETON, KAYU KELAS II

MEMASANG 1 M2 RANGKA LANGIT-LANGIT (50 X 100), KAYU KELAS II/III

Page 79: 72125046-Analisa-Sni-2002-2008-Dck-Bln-Januari-2011

NO URAIANHARGA HARGA HARGA HARGASATUAN UPAH BAHAN JUMLAH

(Rp) (Rp) (Rp) (Rp)1 2 3 4 5 6

20

0.0163 m3 Kaso-Kaso ( 5 x 7 ) Cm 1,700,000.00 27,710.00 0.2500 Kg Paku 7 Cm dan 10 Cm 12,000.00 3,000.00 0.2000 oh Pekerja 35,000.00 7,000.00 0.3000 oh Tukang Kayu 53,000.00 15,900.00

Total : 22,900.00 30,710.00 53,610.00

21

0.0108 m3 Papan Kayu Kamper 7,900,000.00 85,320.00 0.1000 Kg Paku 5 Cm dan 7 Cm 12,000.00 1,200.00 0.1000 oh Pekerja 35,000.00 3,500.00 0.2000 oh Tukang Kayu 53,000.00 10,600.00

Total : 14,100.00 86,520.00 100,620.00

22

0.0110 m3 Papan Kayu Kamper 7,900,000.00 86,900.00 0.0500 Kg Paku 5 Cm dan 7 Cm 12,000.00 600.00 0.1000 oh Pekerja 35,000.00 3,500.00 0.2000 oh Tukang Kayu 53,000.00 10,600.00

Total : 14,100.00 87,500.00 101,600.00

23

0.0280 m3 Balok Kayu Kamper 7,700,000.00 215,600.00 0.1500 Kg Paku 5 Cm dan 7 Cm 12,000.00 1,800.00 0.1500 oh Pekerja 35,000.00 5,250.00 0.4500 oh Tukang Kayu 53,000.00 23,850.00

Total : 29,100.00 217,400.00 246,500.00

24

0.0280 m3 Balok Kayu Kamper 7,700,000.00 215,600.00 0.1500 Kg Paku 5 Cm dan 7 Cm 12,000.00 1,800.00 0.8600 Lbr Teakwood 4 mm uk 90x220 cm 55,000.00 47,300.00 0.5600 Kg Lem Kayu 12,500.00 7,000.00 0.1500 oh Pekerja 35,000.00 5,250.00 0.4500 oh Tukang Kayu 53,000.00 23,850.00

Total : 29,100.00 271,700.00 300,800.00

25

0.0280 m3 Balok Kayu Kamper 7,700,000.00 215,600.00 0.1500 Kg Paku 5 Cm dan 7 Cm 12,000.00 1,800.00 0.8600 Lbr Plywood tebal 4 mm uk 120 x 240 cm 46,000.00 39,560.00 0.5600 Kg Lem Kayu 12,500.00 7,000.00 0.2000 oh Pekerja 35,000.00 7,000.00 0.6000 oh Tukang Kayu 53,000.00 31,800.00

Total : 38,800.00 263,960.00 302,760.00

26 MEMASANG 1 M2 LAMBRIZIRING DARI PAPAN KAYU KELAS I

0.0070 m3 Papan Kayu Kamper 7,900,000.00 55,300.00 0.1000 Kg Paku 5 Cm dan 10 Cm 12,000.00 1,200.00 0.1500 Kg Paku Skrup 10 cm 16,500.00 2,475.00 0.6000 oh Pekerja 35,000.00 21,000.00 1.8000 oh Tukang Kayu 53,000.00 95,400.00

Total : 116,400.00 58,975.00 175,375.00

27

0.4000 Lbr Plywood tebal 4 mm uk 120 x 240 cm 46,000.00 18,400.00 0.0500 Kg Paku 1 Cm dan 2.5 Cm 12,000.00 600.00 0.0250 oh Pekerja 35,000.00 875.00 0.0750 oh Tukang Kayu 53,000.00 3,975.00

Total : 4,850.00 19,000.00 23,850.00

VII PEKERJAAN BETON ( SNI 7394:2008)1 1 M3 MEMBUAT BETON 1 PC : 3 PS : 5 KR

218.0000 kg Semen Portland 1,030.00 224,540.00 0.5200 m3 Pasir Beton 110,000.00 57,200.00 0.8700 m3 Koral Beton 120,000.00 104,400.00 1.6500 oh Pekerja 35,000.00 57,750.00 0.2500 oh Tukang Batu 45,000.00 11,250.00

69,000.00 386,140.00 455,140.00

MEMASANG 1 M2 RANGKA LANGIT-LANGIT (60 X 60) CM, KAYU KELAS II/III

MEMASANG 1 M' LISPLANK UKURAN (3 X 20) CM, KAYU KELAS I/II

MEMASANG 1 M' LISPLANK UKURAN (3 X 30) CM, KAYU KELAS I/II

MEMASANG 1 M2 RANGKA DINDING PEMISAH (60 X 120) CM, KAYU KELAS II/III

MEMASANG 1 M2 RANGKA DINDING PEMISAH TEAKWOOD RANGKAP, RANGKA KAYU KELAS II

MEMASANG 1 M2 RANGKA DINDING PEMISAH PLYWOOD RANGKAP, RANGKA KAYU KELAS II

MEMASANG 1 M2 LAMBRIZIRING DARI PLYWOOD UKURAN (120 X 240) CM

Page 80: 72125046-Analisa-Sni-2002-2008-Dck-Bln-Januari-2011

NO URAIANHARGA HARGA HARGA HARGASATUAN UPAH BAHAN JUMLAH

(Rp) (Rp) (Rp) (Rp)1 2 3 4 5 6

2 1 M3 MEMBUAT BETON 1 PC : 2 PS : 4 KR 232.0000 kg Semen Portland 1,030.00 238,960.00 0.5200 m3 Pasir Beton 110,000.00 57,200.00 0.7800 m3 Koral Beton 120,000.00 93,600.00 1.6500 oh Pekerja 35,000.00 57,750.00 0.2500 oh Tukang Batu 45,000.00 11,250.00

Total : 69,000.00 389,760.00 458,760.00

3 1 M3 MEMBUAT BETON 1 PC : 2 PS : 3 KR 280.0000 kg Semen Portland 1,030.00 288,400.00 0.4500 m3 Pasir Beton 110,000.00 49,500.00 0.9000 m3 Koral Beton 120,000.00 108,000.00 1.6500 oh Pekerja 35,000.00 57,750.00 0.2500 oh Tukang Batu 45,000.00 11,250.00

Total : 69,000.00 445,900.00 514,900.00

4 PEMBESIAN 10 KG DENGAN BESI POLOS ATAU BESI ULIR 10.5000 kg Besi Beton (Polos/ Ulir) 7,111.00 74,665.50 0.1500 kg Kawat Beton 15,000.00 2,250.00 0.0700 oh Pekerja 35,000.00 2,450.00 0.0700 oh Tukang Besi 50,000.00 3,500.00

Total : 5,950.00 76,915.50 82,865.50

5 1 M2 PASANG BEKISTING UNTUK PONDASI 0.0400 m3 Kayu Kelas III 2,000,000.00 80,000.00 0.3000 kg Paku Biasa 5' - 10' 12,000.00 3,600.00 0.1000 ltr Minyak Bekisting 15,000.00 1,500.00 0.5200 oh Pekerja 35,000.00 18,200.00 0.2600 oh Tukang Kayu 53,000.00 13,780.00

Total : 31,980.00 85,100.00 117,080.00

6 1 M2 PASANG BEKISTING UNTUK SLOOF 0.0400 m3 Kayu Kelas III 2,000,000.00 80,000.00 0.3000 kg Paku Biasa 5' - 10' 12,000.00 3,600.00 0.1000 ltr Minyak Bekisting 15,000.00 1,500.00 0.5200 oh Pekerja 35,000.00 18,200.00 0.2600 oh Tukang Kayu 53,000.00 13,780.00

Total : 31,980.00 85,100.00 117,080.00

7 1 M2 PASANG BEKISTING UNTUK KOLOM 0.0400 m3 Kayu Kelas III 2,000,000.00 80,000.00 0.4000 kg Paku Biasa 5' - 12' 12,000.00 4,800.00 0.2000 ltr Minyak Bekisting 15,000.00 3,000.00 0.0150 m3 Kayu Usuk 4/6 4,000,000.00 60,000.00 0.3500 lbr Plywood 9 mm 105,250.00 36,837.50 2.0000 btg Dolken Kayu 8" - 10"/4 m 90,000.00 180,000.00 0.6600 oh Pekerja 35,000.00 23,100.00 0.3300 oh Tukang Kayu 53,000.00 17,490.00

Total : 40,590.00 364,637.50 405,227.50

8 1 M2 PASANG BEKISTING UNTUK BALOK 0.0400 m3 Kayu Kelas III 2,000,000.00 80,000.00 0.4000 kg Paku Biasa 5' - 12' 12,000.00 4,800.00 0.2000 ltr Minyak Bekisting 15,000.00 3,000.00 0.0180 m3 Kayu Usuk 4/6 4,000,000.00 72,000.00 0.3500 lbr Plywood 9 mm 105,250.00 36,837.50 2.0000 btg Dolken Kayu 8" - 10"/4m 90,000.00 180,000.00 0.6600 oh Pekerja 35,000.00 23,100.00 0.3300 oh Tukang Kayu 53,000.00 17,490.00

Total : 40,590.00 376,637.50 417,227.50

9 1 M2 PASANG BEKISTING UNTUK LANTAI 0.0400 m3 Kayu Kelas III 2,000,000.00 80,000.00 0.4000 kg Paku Biasa 5' - 12' 12,000.00 4,800.00 0.2000 ltr Minyak Bekisting 15,000.00 3,000.00 0.0150 m3 Kayu Usuk 4/6 4,000,000.00 60,000.00 0.3500 lbr Plywood 9 mm 105,250.00 36,837.50 6.0000 btg Dolken Kayu 8" - 10"/4m 90,000.00 540,000.00

0.6600 oh Pekerja 35,000.00 23,100.00 0.3300 oh Tukang Kayu 53,000.00 17,490.00

Total : 40,590.00 724,637.50 765,227.50

10 1 M2 PASANG BEKISTING UNTUK DINDING

0.0300 Kayu Kelas III 2,000,000.00 60,000.00 0.4000 Kg Paku Biasa 5' - 12' 12,000.00 4,800.00 0.2000 Ltr Minyak Bekisting 15,000.00 3,000.00

0.0200 Kayu Usuk 4/6 4,000,000.00 80,000.00 0.3500 Lbr Plywood 9 mm 105,250.00 36,837.50 3.0000 Btng Dolken Kayu 8" - 10"/4m 90,000.00 270,000.00 4.0000 Bh Formite/penjaga jarak bekisting/spacer 2,000.00 8,000.00 0.6600 Oh Pekerja 35,000.00 23,100.00 0.3300 Oh Tukang Kayu 53,000.00 17,490.00

40,590.00 462,637.50 503,227.50

M3

M3

Page 81: 72125046-Analisa-Sni-2002-2008-Dck-Bln-Januari-2011

NO URAIANHARGA HARGA HARGA HARGASATUAN UPAH BAHAN JUMLAH

(Rp) (Rp) (Rp) (Rp)1 2 3 4 5 6

11 1 M2 PASANG BEKISTING UNTUK TANGGA 0.0300 m3 Kayu Kelas III 2,000,000.00 60,000.00 0.4000 kg Paku Biasa 5' - 12' 12,000.00 4,800.00 0.1500 ltr Minyak Bekisting 15,000.00 2,250.00 0.0150 m3 Kayu Usuk 4/6 4,000,000.00 60,000.00 0.3500 lbr Plywood 9 mm 105,250.00 36,837.50 2.0000 btg Dolken Kayu 8" - 10"/4m 90,000.00 180,000.00 0.6600 oh Pekerja 35,000.00 23,100.00 0.3300 oh Tukang Kayu 53,000.00 17,490.00

Total : 40,590.00 343,887.50 384,477.50

12 1 M2 PASANG JEMBATAN UNTUK PENGECORAN BETON 0.0264 m3 Kayu Kelas III (Papan) 2,000,000.00 52,800.00 0.6000 kg Paku Biasa 5' - 12' 12,000.00 7,200.00 0.5000 btg Dolken Kayu 8" - 10"/4m 90,000.00 45,000.00 0.1500 oh Pekerja 35,000.00 5,250.00 0.0500 oh Tukang Kayu 53,000.00 2,650.00

Total : 7,900.00 105,000.00 112,900.00

13 1 M3 MEMBUAT PONDASI BETON BERTULANG (150 KG BESI + BEKISTING) 0.2000 m3 Kayu Kelas III 2,000,000.00 400,000.00 1.5000 kg Paku Biasa 5' - 12' 12,000.00 18,000.00 0.4000 ltr Minyak Bekisting 15,000.00 6,000.00 157.0000 kg Besi Beton 7,111.00 1,116,427.00 2.2500 kg Kawat Beton 15,000.00 33,750.00 336.0000 kg Semen Portland 1,030.00 346,080.00 0.5400 m3 Pasir Beton 110,000.00 59,400.00 0.8100 m3 Koral Beton 120,000.00 97,200.00 5.3000 oh Pekerja 35,000.00 185,500.00 0.2750 oh Tukang Batu 45,000.00 12,375.00 1.3000 oh Tukang Kayu 53,000.00 68,900.00 1.0500 oh Tukang Besi 50,000.00 52,500.00

Total : 319,275.00 2,076,857.00 2,396,132.00

14 1 M3 MEMBUAT SLOOF BETON BERTULANG (200 KG + BEKISTING) 0.2700 m3 Kayu Kelas III 2,000,000.00 540,000.00 2.0000 kg Paku Biasa 5' - 12' 12,000.00 24,000.00 0.6000 ltr Minyak Bekisting 15,000.00 9,000.00 210.0000 kg Besi Beton 7,111.00 1,493,310.00 3.0000 kg Kawat Beton 15,000.00 45,000.00 336.0000 kg Semen Portland 1,030.00 346,080.00 0.5400 m3 Pasir Beton 110,000.00 59,400.00 0.8100 m3 Koral Beton 120,000.00 97,200.00 5.6500 oh Pekerja 35,000.00 197,750.00 0.2750 oh Tukang Batu 45,000.00 12,375.00 1.5600 oh Tukang Kayu 53,000.00 82,680.00 1.4000 oh Tukang Besi 50,000.00 70,000.00

Total : 362,805.00 2,613,990.00 2,976,795.00

15

0.4000 m3 Kayu Kelas III 2,000,000.00 800,000.00 4.0000 kg Paku Biasa 5' - 12' 12,000.00 48,000.00 2.0000 ltr Minyak Bekisting 15,000.00 30,000.00 315.0000 kg Besi Beton 7,111.00 2,239,965.00 4.5000 kg Kawat Beton 15,000.00 67,500.00 336.0000 kg Semen Portland 1,030.00 346,080.00 0.5400 m3 Pasir Beton 110,000.00 59,400.00 0.8100 m3 Koral Beton 120,000.00 97,200.00 0.1500 m3 Kayu Kelas II balok 4,200,000.00 630,000.00 3.5000 lbr Plywood 9 mm 105,250.00 368,375.00 20.0000 btg Dolken Kayu 8" /4 m 90,000.00 1,800,000.00 7.0500 oh Pekerja 35,000.00 246,750.00 0.2750 oh Tukang Batu 45,000.00 12,375.00 1.6500 oh Tukang Kayu 53,000.00 87,450.00 2.1000 oh Tukang Besi 50,000.00 105,000.00

Total : 451,575.00 6,486,520.00 6,938,095.00

16

0.3200 m3 Kayu Kelas III 2,000,000.00 640,000.00 3.2000 kg Paku Biasa 5' - 12' 12,000.00 38,400.00 1.6000 ltr Minyak Bekisting 15,000.00 24,000.00 210.0000 kg Besi Beton 7,111.00 1,493,310.00 3.0000 kg Kawat Beton 15,000.00 45,000.00 336.0000 kg Semen Portland 1,030.00 346,080.00 0.5400 m3 Pasir Beton 110,000.00 59,400.00 0.8100 m3 Koral Beton 120,000.00 97,200.00 0.1400 m3 Kayu Kelas II balok 4,200,000.00 588,000.00 2.8000 lbr Plywood 9 mm 105,250.00 294,700.00 16.0000 btg Dolken Kayu 8" /4 m 90,000.00 1,440,000.00 6.3500 oh Pekerja 35,000.00 222,250.00 0.2750 oh Tukang Batu 45,000.00 12,375.00 1.6500 oh Tukang Kayu 53,000.00 87,450.00

1 M3 MEMBUAT KOLOM BETON BERTULANG (300 KG BESI + BEKISTING)

1 M3 MEMBUAT BALOK BETON BERTULANG (200 KG BESI + BEKISTING)

Page 82: 72125046-Analisa-Sni-2002-2008-Dck-Bln-Januari-2011

NO URAIANHARGA HARGA HARGA HARGASATUAN UPAH BAHAN JUMLAH

(Rp) (Rp) (Rp) (Rp)1 2 3 4 5 6

1.4000 oh Tukang Besi 50,000.00 70,000.00 Total : 392,075.00 5,066,090.00 5,458,165.00

Page 83: 72125046-Analisa-Sni-2002-2008-Dck-Bln-Januari-2011

NO URAIANHARGA HARGA HARGA HARGASATUAN UPAH BAHAN JUMLAH

(Rp) (Rp) (Rp) (Rp)1 2 3 4 5 6

17

0.3200 m3 Kayu Kelas III 2,000,000.00 640,000.00 3.2000 kg Paku Biasa 5' - 12' 12,000.00 38,400.00 1.6000 ltr Minyak Bekisting 15,000.00 24,000.00 157.5000 kg Besi Beton 7,111.00 1,119,982.50 2.2500 kg Kawat Beton 15,000.00 33,750.00 336.0000 kg Semen Portland 1,030.00 346,080.00 0.5400 m3 Pasir Beton 110,000.00 59,400.00 0.8100 m3 Koral Beton 120,000.00 97,200.00 0.1200 m3 Kayu Kelas II balok 4,200,000.00 504,000.00 2.8000 lbr Plywood 9 mm 105,250.00 294,700.00 32.0000 btg Dolken Kayu 8" /4 m 90,000.00 2,880,000.00 5.3000 oh Pekerja 35,000.00 185,500.00 0.2750 oh Tukang Batu 45,000.00 12,375.00 1.3000 oh Tukang Kayu 53,000.00 68,900.00 1.0500 oh Tukang Besi 50,000.00 52,500.00

319,275.00 6,037,512.50 6,356,787.50

18

0.2400 m3 Kayu Kelas III 2,000,000.00 480,000.00 3.2000 kg Paku Biasa 5' - 12' 12,000.00 38,400.00 1.6000 ltr Minyak Bekisting 15,000.00 24,000.00 157.0000 kg Besi Beton 7,111.00 1,116,427.00 2.2500 kg Kawat Beton 15,000.00 33,750.00 336.0000 kg Semen Portland 1,030.00 346,080.00 0.5400 m3 Pasir Beton 110,000.00 59,400.00 0.8100 m3 Koral Beton 120,000.00 97,200.00 0.1600 m3 Kayu Kelas II balok 4,200,000.00 672,000.00 2.8000 lbr Plywood 9 mm 105,250.00 294,700.00 24.0000 btg Dolken Kayu 8" /4 m 90,000.00 2,160,000.00 5.3000 oh Pekerja 35,000.00 185,500.00 0.2750 oh Tukang Batu 45,000.00 12,375.00 1.3000 oh Tukang Kayu 53,000.00 68,900.00 1.0500 oh Tukang Besi 50,000.00 52,500.00

319,275.00 5,321,957.00 5,641,232.00

19

0.2500 m3 Kayu Kelas III 2,000,000.00 500,000.00 3.0000 kg Paku Biasa 5' - 12' 12,000.00 36,000.00 1.2000 ltr Minyak Bekisting 15,000.00 18,000.00 210.0000 kg Besi Beton 7,111.00 1,493,310.00 3.0000 kg Kawat Beton 15,000.00 45,000.00 336.0000 kg Semen Portland 1,030.00 346,080.00 0.5400 m3 Pasir Beton 110,000.00 59,400.00 0.8100 m3 Koral Beton 120,000.00 97,200.00 0.1050 m3 Kayu Kelas II balok 4,200,000.00 441,000.00 2.5000 lbr Plywood 9 mm 105,250.00 263,125.00 14.0000 btg Dolken Kayu 8" /4 m 90,000.00 1,260,000.00 5.6500 oh Pekerja 35,000.00 197,750.00 0.2750 oh Tukang Batu 45,000.00 12,375.00 1.5600 oh Tukang Kayu 53,000.00 82,680.00 1.4000 oh Tukang Besi 50,000.00 70,000.00

362,805.00 4,559,115.00 4,921,920.00

20

0.0020 m3 Kayu Kelas III 2,000,000.00 4,000.00 0.0100 kg Paku Biasa 5' - 12' 12,000.00 120.00 3.0000 kg Besi Beton 7,111.00 21,333.00 0.0450 kg Kawat Beton 15,000.00 675.00 4.0000 kg Semen Portland 1,030.00 4,120.00 0.0060 m3 Pasir Beton 110,000.00 660.00 0.0090 m3 Koral Beton 120,000.00 1,080.00 0.1800 oh Pekerja 35,000.00 6,300.00 0.0200 oh Tukang Batu 45,000.00 900.00 0.0200 oh Tukang Kayu 53,000.00 1,060.00 0.0200 oh Tukang Besi 50,000.00 1,000.00

Total : 9,260.00 31,988.00 41,248.00

21

0.0030 m3 Kayu Kelas III 2,000,000.00 6,000.00 0.0200 kg Paku Biasa 5' - 12' 12,000.00 240.00 3.6000 kg Besi Beton 7,111.00 25,599.60 0.0500 kg Kawat Beton 15,000.00 750.00 5.5000 kg Semen Portland 1,030.00 5,665.00 0.0090 m3 Pasir Beton 110,000.00 990.00 0.0150 m3 Koral Beton 120,000.00 1,800.00 0.2970 oh Pekerja 35,000.00 10,395.00 0.0330 oh Tukang Batu 45,000.00 1,485.00 0.0330 oh Tukang Kayu 53,000.00 1,749.00 0.0330 oh Tukang Besi 50,000.00 1,650.00

Total : 15,279.00 41,044.60 56,323.60

1 M3 MEMBUAT PLAT BETON BERTULANG (150 KG BESI + BEKISTING

1 M3 MEMBUAT DINDING BETON BERTULANG (150 KG BESI + BEKISTING)

1 M3 MEMBUAT DINDING BETON BERTULANG (200 KG BESI + BEKISTING)

1 M1 MEMBUAT KOLOM PENGUAT BETON BERTULANG (11 X 11 CM)

1 M1 MEMBUAT KOLOM PENGUAT BETON BERTULANG (10 X 15 CM)

Page 84: 72125046-Analisa-Sni-2002-2008-Dck-Bln-Januari-2011

NO URAIANHARGA HARGA HARGA HARGASATUAN UPAH BAHAN JUMLAH

(Rp) (Rp) (Rp) (Rp)1 2 3 4 5 6

VIII PEKERJAAN PENUTUP ATAP (SNI 03-3436-2002)

1 1 M2 PEKERJAAN ATAP GENTENG PLENTONG 25.0000 bh Genteng Plentong 1,200.00 30,000.00 0.1500 oh Pekerja 35,000.00 5,250.00 0.0600 oh Tukang Kayu 53,000.00 3,180.00

Total : 8,430.00 30,000.00 38,430.00

2 1 M2 PEKERJAAN ATAP GENTENG PLENTONG DI CAT 25.0000 bh Genteng Plentong Dicat 1,125.00 28,125.00 0.1500 oh Pekerja 35,000.00 5,250.00 0.0600 oh Tukang Kayu 53,000.00 3,180.00

Total : 8,430.00 28,125.00 36,555.00

3 1 M1 PASANG BUBUNGAN GENTENG PLENTONG 5.0000 bh Bubungan Plentong 6,000.00 30,000.00 8.0000 kg Semen Portland 1,030.00 8,240.00 0.0320 m3 Pasir Pasang 125,000.00 4,000.00 0.4000 oh Pekerja 35,000.00 14,000.00 0.2000 oh Tukang Kayu 53,000.00 10,600.00

Total : 24,600.00 42,240.00 66,840.00 4 1 M2 PASANG ATAP GENTENG ASBES GELOMBANG 1.8 M X 0.92 M X 5 MM

0.7500 lbr Asbes Gelombang 1.8 mx0.92mx5mm 28,000.00 21,000.00 0.1200 kg Paku Pancing 60 x 230 18,750.00 2,250.00 0.1400 oh Pekerja 35,000.00 4,900.00 0.0700 oh Tukang Kayu 53,000.00 3,710.00

Total : 8,610.00 23,250.00 31,860.00

5 1 M1 PASANG BUBUNGAN STEL GELOMBANG 0.92 M 2.4000 lbr Bubungan Stel Gelombang 23,667.00 56,800.80 6.0000 kg Paku Skrup 3,5" 24,167.00 145,002.00 0.0840 oh Pekerja 35,000.00 2,940.00 0.1250 oh Tukang Kayu 53,000.00 6,625.00

Total : 9,565.00 201,802.80 211,367.80 6 1 M2 PEKERJAAN ATAP SIRAP

60.0000 bh Genteng Sirap 7,900.00 474,000.00 0.2000 kg Paku Biasa 1/2" - 1" 12,000.00 2,400.00 0.1660 oh Pekerja 35,000.00 5,810.00 0.2500 oh Tukang Kayu 53,000.00 13,250.00

Total : 19,060.00 476,400.00 495,460.00

7 1 M2 PEKERJAAN ATAP NOK SIRAP 0.4000 lbr Seng plat 3" x 6" BJLS 28 45,000.00 18,000.00 0.0600 kg Paku biasa 1/2" - 1" 12,000.00 720.00 0.0500 kg Paku biasa 2" - 5" 12,000.00 600.00 0.0040 m3 Kayu papan 3 cm 7,900,000.00 31,600.00 0.1250 oh Pekerja 35,000.00 4,375.00 0.2500 oh Tukang kayu 53,000.00 13,250.00

Total : 17,625.00 50,920.00 68,545.00

8 1 M2 PASANG ATAP ALANG-ALANG 3 M1 6.5000 lbr Alang - alang 9,000.00 58,500.00 0.5000 glg Tali pengikat 7,700.00 3,850.00 0.2000 oh Pekerja 35,000.00 7,000.00

Total : 7,000.00 62,350.00 69,350.00

9 1 M2 PEKERJAAN ATAP SENG GELOMBANG 0.7000 lbr Seng Gelombang 3" x 6" BJLS 28 40,000.00 28,000.00 0.0200 kg Paku Biasa 1/2" - 1" 12,000.00 240.00 0.1200 oh Pekerja 35,000.00 4,200.00 0.0600 oh Tukang Kayu 53,000.00 3,180.00

Total : 7,380.00 28,240.00 35,620.00

10 1 M2 PASANGAN LAPISANG ALUMINIUM FOIL 1.0500 m2 Aluminium Foil 27,500.00 28,875.00 0.1500 oh Pekerja 35,000.00 5,250.00 0.0500 oh Tukang Kayu 53,000.00 2,650.00

Total : 7,900.00 28,875.00 36,775.00

11 1 M1 PASANG NOK SENG GELOMBANG 0.3000 lbr Seng Plat 3" x 6" BJLS 28 45,000.00 13,500.00 0.0400 kg Paku biasa 1/2" - 1" 12,000.00 480.00 0.1500 oh Pekerja 35,000.00 5,250.00 0.0700 oh Tukang Kayu 53,000.00 3,710.00

Total : 8,960.00 13,980.00 22,940.00

IX PEKERJAAN LANGIT - LANGIT (SNI 2839-2008)

1

1.1000 lbr Asbes semen 47,000.00 51,700.00 0.0100 kg Paku Biasa 1/2" - 1" 12,000.00 120.00 0.0300 oh Pekerja 35,000.00 1,050.00 0.0700 oh Tukang Kayu 53,000.00 3,710.00

Total : 4,760.00 51,820.00 56,580.00

MEMASANG 1 M2 LANGIT-LANGIT ASBES SEMEN, TEBAL 4 MM, 5 MM DAN 6 MM

Page 85: 72125046-Analisa-Sni-2002-2008-Dck-Bln-Januari-2011

NO URAIANHARGA HARGA HARGA HARGASATUAN UPAH BAHAN JUMLAH

(Rp) (Rp) (Rp) (Rp)1 2 3 4 5 6

2 1 M2 PASANG LANGIT-LANGIT TRIPLEKS 120X240 CM/6MM 0.3750 lbr TRIPLEKS 46,000.00 17,250.00 0.0300 kg Paku Biasa 1/2" - 1" 12,000.00 360.00 0.1000 oh Pekerja 35,000.00 3,500.00 0.1000 oh Tukang Kayu 53,000.00 5,300.00

Total : 8,800.00 17,610.00 26,410.00

3 1 M2 PASANG LANGIT-LANGIT LAMBRIZIRING 0.0150 m3 Kayu Papan 7,900,000.00 118,500.00 0.0100 kg Paku Biasa 1/2" - 1" 12,000.00 120.00 0.8000 oh Pekerja 35,000.00 28,000.00 0.8000 oh Tukang Kayu 53,000.00 42,400.00

Total : 70,400.00 118,620.00 189,020.00

4 1 M1 PASANG LIST LANGIT-LANGIT KAYU PROFIL 1.0500 m1 List Kayu Profil 12,250.00 12,862.50 0.1000 kg Paku list SQ 15,840.00 1,584.00 0.0500 oh Pekerja 35,000.00 1,750.00 0.0500 oh Tukang Kayu 53,000.00 2,650.00

Total : 4,400.00 14,446.50 18,846.50

5 1 M2 PASANG LANGIT-LANGIT ASBES + RANGKA 0.0120 m3 Kamper Usuk 4/6 cm 7,900,000.00 94,800.00 0.0600 kg Paku Biasa 2" - 5" 15,840.00 950.40 1.1000 lbr Asbes 47,000.00 51,700.00 0.1800 oh Pekerja 35,000.00 6,300.00 0.3200 oh Tukang Kayu 53,000.00 16,960.00

Total : 23,260.00 147,450.40 170,710.40

6 1 M2 PASANG LANGIT-LANGIT GYPSUM BOARD UKURAN (1200X2400X9) MM 0.1100 kg Paku Sekrup 16,500.00 1,815.00 0.3640 lbr Gypsum Board (120x240x9) 62,500.00 22,750.00 0.1000 oh Pekerja 35,000.00 3,500.00 0.0500 oh Tukang Kayu 53,000.00 2,650.00

Total : 6,150.00 24,565.00 30,715.00

7 1 M2 PASANG LANGIT-LANGIT KALSIBOARD 4.5 MM 0.1100 kg Paku Sekrup 16,500.00 1,815.00 0.3640 lbr Kalsiboard 4.5 mm 70,000.00 25,480.00 0.1000 oh Pekerja 35,000.00 3,500.00 0.0500 oh Tukang Kayu 53,000.00 2,650.00

Total : 6,150.00 27,295.00 33,445.00

X PEKERJAAN SANITASI ( SNI 2002 )1 MEMASANG 1 BUAH KLOSET DUDUK/MONOBLOK

1.0000 bh Kloset duduk/ monoblok 1,365,000.00 1,365,000.00 6% x harga kloset Perlengkapan 81,900.00 3.3000 oh Pekerja 35,000.00 115,500.00 1.1000 oh Tukang batu 45,000.00 49,500.00

Total : 165,000.00 1,446,900.00 1,611,900.00

2 MEMASANG 1 BUAH KLOSET JONGKOK PORSELIN 1.0000 bh Kloset jongkok porselen 125,000.00 125,000.00 6.0000 kg Semen Portland 1,030.00 6,180.00 0.0100 m3 Pasir Pasang 125,000.00 1,250.00 1.0000 oh Pekerja 35,000.00 35,000.00 1.5000 oh Tukang batu 45,000.00 67,500.00

Total : 102,500.00 132,430.00 234,930.00

3 MEMASANG 1 BUAH URINOIR 1.0000 bh Urinoir 1,052,000.00 1,052,000.00 6% x harga Urin Perlengkapan 63,120.00 6.0000 kg Semen Portland 1,030.00 6,180.00 0.0100 m3 Pasir Pasang 125,000.00 1,250.00 1.0000 oh Pekerja 35,000.00 35,000.00 1.0000 oh Tukang batu 45,000.00 45,000.00

Total : 80,000.00 1,122,550.00 1,202,550.00

4 MEMASANG 1 BUAH WASHTAFEL KIA 1.0000 bh Washtafel 181,800.00 181,800.00 12% x harga wast Perlengkapan 21,816.00 6.0000 kg Semen Portland 1,030.00 6,180.00 0.0100 m3 Pasir Pasang 125,000.00 1,250.00 1.2000 oh Pekerja 35,000.00 42,000.00 1.4500 oh Tukang batu 45,000.00 65,250.00

Total : 107,250.00 211,046.00 318,296.00

5 MEMASANG 1 BUAH BAK MANDI FIBREGLASS, VOLUME 0,30 M3 1.0000 bh Bak Fibreglass 225,000.00 225,000.00 18% x harga wast Perlengkapan 40,500.00 1.8000 oh Pekerja 35,000.00 63,000.00 2.7000 oh Tukang batu 45,000.00 121,500.00

Total : 184,500.00 265,500.00 450,000.00

Page 86: 72125046-Analisa-Sni-2002-2008-Dck-Bln-Januari-2011

NO URAIANHARGA HARGA HARGA HARGASATUAN UPAH BAHAN JUMLAH

(Rp) (Rp) (Rp) (Rp)1 2 3 4 5 6

6 1.2000 m1 Pipa galvanis 38,000.00 45,600.00 35% x harga pipa Perlengkapan 13,300.00 0.0540 oh Pekerja 35,000.00 1,890.00 0.0900 oh Tukang Pipa 50,000.00 4,500.00

Total : 6,390.00 58,900.00 65,290.00

7 1.2000 M' Pipa galvanis 175,000.00 210,000.00 35% x harga pipa Perlengkapan 61,250.00 0.1080 Oh Pekerja 35,000.00 3,780.00 0.1800 Oh Tukang Pipa 50,000.00 9,000.00

Total : 12,780.00 271,250.00 284,030.00

8 1.2000 m1 Pipa PVC 14,000.00 16,800.00 35% x harga pipa Perlengkapan 4,900.00 0.0360 oh Pekerja 35,000.00 1,260.00 0.0600 oh Tukang Pipa 50,000.00 3,000.00

Total : 4,260.00 21,700.00 25,960.00

9 1.2000 m1 Pipa PVC 22,250.00 26,700.00 35% x harga pipa Perlengkapan 7,787.50 0.0540 oh Pekerja 35,000.00 1,890.00 0.0900 oh Tukang Pipa 50,000.00 4,500.00

Total : 6,390.00 34,487.50 40,877.50

10 1.2000 m1 Pipa PVC 56,250.00 67,500.00 35% x harga pipa Perlengkapan 19,687.50 0.0810 oh Pekerja 35,000.00 2,835.00 0.1350 oh Tukang Pipa 50,000.00 6,750.00

Total : 9,585.00 87,187.50 96,772.50

11 1.0000 bh Kran air 13,000.00 13,000.00 0.0250 bh Seal tape 2,000.00 50.00 0.0100 oh Pekerja 35,000.00 350.00 0.1000 oh Tukang Pipa 50,000.00 5,000.00

Total : 5,350.00 13,050.00 18,400.00

XI

1 1 KG PASANG RANGKA ATAP BAJA 1.1500 kg Besi Profil WF 13,750.00 15,812.50 0.0060 oh Pekerja 35,000.00 210.00 0.0600 oh Tukang besi 50,000.00 3,000.00

Total : 3,210.00 15,812.50 19,022.50

2 1 M2 PASANG JENDELA NAKO 1.1000 m2 Rangka + Kaca Nako 113,300.00 124,630.00 10.0000 bh Paku biasa 1 cm - 2,5 cm 16,500.00 165,000.00 7.0000 m' Besi strip 6,050.00 42,350.00 0.2000 oh Pekerja 35,000.00 7,000.00 0.2000 oh Tukang besi 50,000.00 10,000.00

Total : 17,000.00 331,980.00 348,980.00

3 1 M1 PASANG TALANG DATAR, SENG BJLS 28 1.0500 lbr Seng plat 45,000.00 47,250.00 0.0150 kg Paku biasa 0,5" - 1" 16,500.00 247.50 0.0190 m3 Kayu papan kelas II/III 7,900,000.00 150,100.00 0.1500 oh Pekerja 35,000.00 5,250.00 0.4000 oh Tukang besi 50,000.00 20,000.00

Total : 25,250.00 197,597.50 222,847.50

XII PEKERJAAN KUNCI DAN KACA (SNI 2002)1 1 BH PASANG KUNCI TANAM BIASA

1.0000 bh Kunci tanam biasa 104,500.00 104,500.00 0.0100 oh Pekerja 35,000.00 350.00 0.5000 oh Tukang besi 50,000.00 25,000.00

Total : 25,350.00 104,500.00 129,850.00

2 1 PS PASANG ENGSEL PINTU 1.0000 ps Engsel pintu 13,000.00 13,000.00 0.0150 oh Pekerja 35,000.00 525.00 0.1500 oh Tukang besi 50,000.00 7,500.00

Total : 8,025.00 13,000.00 21,025.00

MEMASANG 1 M1 PIPA GALVANIS f 0,5" - 1 "

MEMASANG 1 M1 PIPA GALVANIS f 1,5" - 3"

MEMASANG 1 M1 PIPA PVC TYPE AW f 0,5" - 1,5"

MEMASANG 1 M1 PIPA PVC TYPE AW f 2"

MEMASANG 1 M1 PIPA PVC TYPE AW f 3" - 4"

MEMASANG 1 BUAH KRAN f 0,75" ATAU 0,5"

PEKERJAAN BESI DAN ALUMINIUM (SNI 7393:2008)

Page 87: 72125046-Analisa-Sni-2002-2008-Dck-Bln-Januari-2011

NO URAIANHARGA HARGA HARGA HARGASATUAN UPAH BAHAN JUMLAH

(Rp) (Rp) (Rp) (Rp)1 2 3 4 5 6

3 1 PS PASANG ENGSEL JENDELA KUPU-KUPU 1.0000 ps Engsel jendela 15,000.00 15,000.00 0.0100 oh Pekerja 35,000.00 350.00 0.1000 oh Tukang besi 50,000.00 5,000.00

Total : 5,350.00 15,000.00 20,350.00

4 1 BH PASANG KAIT ANGIN 1.0000 ps Kait angin 16,000.00 16,000.00 0.0150 oh Pekerja 35,000.00 525.00 0.1500 oh Tukang besi 50,000.00 7,500.00

Total : 8,025.00 16,000.00 24,025.00

5 1 BH PASANG KUNCI SLOT 1.0000 bh Kunci slot 88,000.00 88,000.00 0.0200 oh Pekerja 35,000.00 700.00 0.2000 oh Tukang besi 50,000.00 10,000.00

Total : 10,700.00 88,000.00 98,700.00

6 1 M2 PASANG KACA, TEBAL 3 - 5 MM 1.1000 bh Kaca 90,000.00 99,000.00 0.0150 oh Pekerja 35,000.00 525.00 0.1500 oh Tukang besi 50,000.00 7,500.00

Total : 8,025.00 99,000.00 107,025.00

XIII

1 1 M2 PASANG LANTAI KERAMIK 30 X 30 CM 11.8700 bh Keramik 30 x 30 cm 3,500.00 41,545.00 10.0000 kg Semen Portland 1,030.00 10,300.00 0.0450 m3 Pasir Pasang 125,000.00 5,625.00 1.5000 kg Semen warna/semen grouting 8,500.00 12,750.00 0.7000 oh Pekerja 35,000.00 24,500.00 0.3500 oh Tukang batu 45,000.00 15,750.00

Total : 40,250.00 70,220.00 110,470.00

2 1 M2 PASANG LANTAI KERAMIK 20 X 20 CM 26.5000 bh Keramik 20 x 20 cm 1,380.00 36,570.00 10.4000 kg Semen Portland 1,030.00 10,712.00 0.0450 m3 Pasir Pasang 125,000.00 5,625.00 1.6200 kg Semen warna/semen grouting 8,500.00 13,770.00 0.7000 oh Pekerja 35,000.00 24,500.00 0.3500 oh Tukang batu 45,000.00 15,750.00

Total : 40,250.00 66,677.00 106,927.00

3 1 M1 PASANG PLIN KERAMIK 10 X 30 CM 3.3300 bh Keramik 30 x 30 cm 3,500.00 11,655.00 1.1400 kg Semen Portland 1,030.00 1,174.20 0.0030 m3 Pasir Pasang 125,000.00 375.00 0.1000 kg Semen warna/semen grouting 8,500.00 850.00 0.0900 oh Pekerja 35,000.00 3,150.00 0.0900 oh Tukang batu 45,000.00 4,050.00

Total : 7,200.00 14,054.20 21,254.20 4 1 M2 PASANG DINDING KERAMIK 20 X 20 CM

26.5000 bh Keramik 20 x 20 cm 1,380.00 36,570.00 9.3000 kg Semen Portland 1,030.00 9,579.00 0.0180 m3 Pasir Pasang 125,000.00 2,250.00 1.9400 kg Semen warna/semen grouting 8,500.00 16,490.00 0.9000 oh Pekerja 35,000.00 31,500.00 0.4500 oh Tukang batu 45,000.00 20,250.00

Total : 51,750.00 64,889.00 116,639.00

5 1 M1 PASANG PLIN KAYU 2 X 10 CM 0.0030 m3 Papan Kayu Kelas II 7,900,000.00 23,700.00 0.0500 kg Paku sekrup 3,5' 24,167.00 1,208.35 0.1200 oh Pekerja 35,000.00 4,200.00 0.1200 oh Tukang kayu 53,000.00 6,360.00

Total : 10,560.00 24,908.35 35,468.35

XIV PEKERJAAN PENGECATAN (SNI 2002)1 1 M2 PENGECATAN BIDANG KAYU BARU (1 LAPIS PLAMIR,

1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP) 0.2000 kg Cat meni 18,500.00 3,700.00 0.1500 kg Dempul 26,235.00 3,935.25 0.1700 kg Cat dasar 25,000.00 4,250.00 0.2600 kg Cat Penutup 2x 45,000.00 11,700.00 0.0700 oh Pekerja 35,000.00 2,450.00 0.0090 oh Tukang cat 40,000.00 360.00

Total : 2,810.00 23,585.25 26,395.25

PEK. PENUTUP LANTAI DAN DINDING (SNI 7395:2008)

Page 88: 72125046-Analisa-Sni-2002-2008-Dck-Bln-Januari-2011

NO URAIANHARGA HARGA HARGA HARGASATUAN UPAH BAHAN JUMLAH

(Rp) (Rp) (Rp) (Rp)1 2 3 4 5 6

2 1 M2 PENGECATAN BIDANG KAYU DENGAN VERNIS 0.1500 kg Vernis 39,000.00 5,850.00 0.0500 kg Dempul 26,235.00 1,311.75 0.1000 lbr Amplas 3,000.00 300.00 0.0100 bh Kuas 6,000.00 60.00 0.1600 oh Pekerja 35,000.00 5,600.00 0.1600 oh Tukang cat 40,000.00 6,400.00

Total : 12,000.00 7,521.75 19,521.75 3 1 M2 PENGECATAN TEMBOK BARU (1 LAPIS PLAMIR,

1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP) 0.1000 kg Plamir 28,000.00 2,800.00 0.1000 kg Cat dasar 25,000.00 2,500.00 0.2600 kg Cat Penutup 2x 15,600.00 4,056.00 0.0200 oh Pekerja 35,000.00 700.00 0.0630 oh Tukang cat 40,000.00 2,520.00

Total : 3,220.00 9,356.00 12,576.00

4 1 M2 PENGECATAN TEMBOK LAMA (1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP) 0.1200 kg Cat dasar 25,000.00 3,000.00 0.1800 kg Cat Penutup 2x 15,600.00 2,808.00 0.0280 oh Pekerja 35,000.00 980.00 0.0420 oh Tukang cat 40,000.00 1,680.00

Total : 2,660.00 5,808.00 8,468.00

5 1 M2 PENGECATAN PERMUKAAN BAJA DENGAN MENI BESI 0.1000 kg Meni besi 18,500.00 1,850.00 0.0100 lbr Kuas 6,000.00 60.00 0.0200 oh Pekerja 35,000.00 700.00 0.2000 oh Tukang cat 40,000.00 8,000.00

Total : 8,700.00 1,910.00 10,610.00

6 1 M2 PENGECATAN PERMUKAAN BAJA, 1 LAPIS DENGAN CAT BESI 0.3000 kg Cat besi 43,000.00 12,900.00 0.0060 oh Pekerja 35,000.00 210.00 0.0600 oh Tukang cat 40,000.00 2,400.00

Total : 2,610.00 12,900.00 15,510.00

7 1 M2 PELABURAN BIDANG KAYU DENGAN POLITUR 0.5220 ltr Politur 43,000.00 22,446.00 2.0000 lbr Amplas 3,000.00 6,000.00 0.0600 oh Pekerja 35,000.00 2,100.00 0.0600 oh Tukang cat 40,000.00 2,400.00

Total : 4,500.00 28,446.00 32,946.00

XV PEKERJAAN TETEMPELAN STYLE BALI

1 1 M2 PASANGAN BATA GOSOK 2 MUKA 110.0000 bh Bata Gosok 1,980.00 217,800.00 8.4000 kg Semen 50 Kg 1,030.00 8,652.00

Upah Kerja ( Lumpsum) 270,000.00 270,000.00 Total : 270,000.00 226,452.00 496,452.00

2 1 M2 PASANGAN PARAS KEROBOKAN 1 MUKA 13.7500 bh Paras Kerobokan 8,000.00 110,000.00 8.4000 kg Semen 50 Kg 1,030.00 8,652.00

Upah Kerja ( Lumpsum) 145,000.00 145,000.00 Total : 145,000.00 118,652.00 263,652.00

3 1 M2 PASANGAN BATA GOSOK 1 MUKA 55.0000 bh Paras Kerobokan 1,980.00 108,900.00 4.2000 kg Semen 50 Kg 1,030.00 4,326.00

Upah Kerja ( Lumpsum) 145,000.00 145,000.00 Total : 145,000.00 113,226.00 258,226.00

4 1 M2 PASANGAN PARAS 1 MUKA 18.3333 bh Batu paras 11,000.00 201,666.67 4.2000 kg Semen 50 Kg 1,030.00 4,326.00

Upah Kerja ( Lumpsum) 145,000.00 145,000.00 Total : 145,000.00 205,992.67 350,992.67

5 1 M2 PASANGAN PARAS + BATA GOSOK 1 MUKA 55.0000 bh Bata gosok 1,980.00 108,900.00 4.4917 bh Batu paras 11,000.00 49,408.33 5.2500 kg Semen 50 Kg 1,030.00 5,407.50

Upah Kerja ( Lumpsum) 145,000.00 145,000.00 Total : 145,000.00 163,715.83 308,715.83

6 1 M2 PASANGAN BATA GOSOK DIUKIR 55.0000 bh Bata gosok 1,980.00 108,900.00 4.2000 kg Semen 50 Kg 1,030.00 4,326.00

Upah Kerja ( Lumpsum) 288,500.00 288,500.00 Total : 288,500.00 113,226.00 401,726.00

Page 89: 72125046-Analisa-Sni-2002-2008-Dck-Bln-Januari-2011

NO URAIANHARGA HARGA HARGA HARGASATUAN UPAH BAHAN JUMLAH

(Rp) (Rp) (Rp) (Rp)1 2 3 4 5 6

7 1 M2 PASANGAN PARAS DIUKIR 18.3333 bh Batu paras 11,000.00 201,666.67 4.2000 kg Semen 50 Kg 1,030.00 4,326.00

Upah Kerja ( Lumpsum) 288,500.00 288,500.00 Total : 288,500.00 205,992.67 494,492.67

8 1 M2 PASANGAN PARAS + BATA GOSOK DIUKIR 55.0000 bh Bata gosok 1,980.00 108,900.00 4.4917 bh Batu paras 11,000.00 49,408.33 5.2500 kg Semen 50 Kg 1,030.00 5,407.50

Upah Kerja ( Lumpsum) 280,000.00 280,000.00 Total : 280,000.00 163,715.83 443,715.83

XVI PEKERJAAN LANDSCAPE

1 1 M2 PASANGAN PAVING BETON 10/20 CM TEBAL 6 CM K 225 1.0000 m2 Paving 10 x 20 cm tebal 8 cm K225 53,500.00 53,500.00 0.2500 oh Tukang Batu 45,000.00 11,250.00 0.5000 oh Pekerja 35,000.00 17,500.00

Total : 28,750.00 53,500.00 82,250.00 2 Paving 10 x 20 cm tebal 6 cm K350 54,500.00 28,750.00 54,500.00 83,250.00 3 Paving 10 x 20 cm tebal 6 cm standard #REF! 28,750.00 #REF! #REF!4 Paving 10 x 20 cm tebal 8 cm K225 53,500.00 28,750.00 53,500.00 82,250.00 5 Paving 10 x 20 cm tebal 8 cm K350 60,000.00 28,750.00 60,000.00 88,750.00 6 Paving 10 x 20 cm tebal 8 cm standard #REF! 28,750.00 #REF! #REF!7 Paving 20 x 20 cm tebal 6 cm K225 46,000.00 28,750.00 46,000.00 74,750.00 8 Paving 20 x 20 cm tebal 6 cm K350 54,500.00 28,750.00 54,500.00 83,250.00 9 Paving 20 x 20 cm tebal 6 cm standard #REF! 28,750.00 #REF! #REF!10 Paving 20 x 20 cm tebal 8 cm K225 60,000.00 28,750.00 60,000.00 88,750.00 11 Paving 20 x 20 cm tebal 8 cm K350 #REF! 28,750.00 #REF! #REF!12 Paving 20 x 20 cm tebal 8 cm K425 60,500.00 28,750.00 60,500.00 89,250.00 13 Paving 20 x 20 cm tebal 8 cm standard #REF! 28,750.00 #REF! #REF!14 Paving 20 x 20 cm tebal 10 cm K225 70,000.00 28,750.00 70,000.00 98,750.00 15 Paving 20 x 20 cm tebal 10 cm K350 79,000.00 28,750.00 79,000.00 107,750.00 16 Paving 20 x 20 cm tebal 10 cm K425 47,000.00 28,750.00 47,000.00 75,750.00 17 Paving 20 x 20 cm tebal 10 cm standard #REF! 28,750.00 #REF! #REF!18 Paving Tiga Berlian tebal 6 cm K225 52,000.00 28,750.00 52,000.00 80,750.00 19 Paving Tiga Berlian tebal 6 cm Standar 58,000.00 28,750.00 58,000.00 86,750.00

20 1 M2 PASANGAN GRASS BLOCK 1.0000 m2 Grass Block #REF! #REF! 0.0690 m3 Pasir Urug 80,000.00 5,520.00 0.5000 oh Tukang Batu 45,000.00 22,500.00 1.0000 oh Pekerja 35,000.00 35,000.00

Total : 57,500.00 #REF! #REF!

21 1 M2 PASANGAN KORAL SIKAT 1.2000 zak Koral Sikat 30,000.00 36,000.00 9.2800 zak Semen 1,030.00 9,558.40 0.2000 m3 Pasir pasang 125,000.00 25,000.00 0.2500 oh Tukang Batu 45,000.00 11,250.00 0.6250 oh Pekerja 35,000.00 21,875.00

Total : 33,125.00 70,558.40 103,683.40 22 1 M1 KANSTEIN BULAT (50 x 30 x 10 ) CM K225

1.0000 m1 Kanstein Bulat(P:50,T:30,La:10,Lb:16 cm K225 62,000.00 62,000.00 0.4500 zak Semen 50 Kg 1,030.00 463.50 0.0023 m3 Pasir Pasang 125,000.00 287.50 0.3500 oh Tukang Batu 45,000.00 15,750.00 0.9500 oh Pekerja 35,000.00 33,250.00

Total : 49,000.00 62,751.00 111,751.00 23 Kanstein Jumbo (P:50,L:15,T:30 cm K225) 47,500.00 49,000.00 82,058.40 131,058.40 24 Kanstein Segi Lima Jumbo (P:50,L:15, T:40 cm K225) #REF! 49,000.00 #REF! #REF!

25 1 M2 PENGECATAN KANSTEIN 0.2840 kg Cat 43,000.00 12,212.00 0.0710 kg Thiner 7,000.00 497.00 0.0300 oh Tukang Cat 40,000.00 1,200.00 0.1500 oh Pekerja 35,000.00 5,250.00

Total : 6,450.00 12,709.00 19,159.00

Page 90: 72125046-Analisa-Sni-2002-2008-Dck-Bln-Januari-2011

NO URAIANHARGA HARGA HARGA HARGASATUAN UPAH BAHAN JUMLAH

(Rp) (Rp) (Rp) (Rp)1 2 3 4 5 6

XVII PEKERJAAN ELEKTRIKAL

1 1 TITIK INSTALASI STOP KONTAK, LAMPU, EXHAUST FAN DAN CEILING FAN 8.0000 m1 Kabel NYM 3 x 2.5 mm ex. Supreme 11,500.00 92,000.00 3.0000 bt Pipa Clipsal 20 mm hitam 10,000.00 30,000.00 2.0000 bh Tee dos clipsal 20 mm hitam 6,000.00 12,000.00 15.0000 bj Klem clipsal 20 mm hitam 650.00 9,750.00 3.0000 bj Sock clipsal 20 mm hitam 1,500.00 4,500.00 1.0000 bj Inbow dos plastik clipsal E 157 P 9,000.00 9,000.00 1.0000 ttk Biaya pasang 25,000.00 25,000.00

Total : 25,000.00 157,250.00 182,250.00

2 1 TITIK INSTALASI AC 10.0000 m1 Kabel NYM 3 x 2.5 mm ex. Supreme 11,500.00 115,000.00 3.0000 bt Pipa Clipsal 20 mm hitam 10,000.00 30,000.00 1.0000 bh Tee dos clipsal 20 mm hitam 6,000.00 6,000.00 15.0000 bj Klem clipsal 20 mm hitam 650.00 9,750.00 4.0000 bj Sock clipsal 20 mm hitam 1,500.00 6,000.00 1.0000 bj Inbow dos plastik clipsal E 157 P 9,000.00 9,000.00 1.0000 m1 Pipa flexible clipsal 20 mm hitam 9,000.00 9,000.00 1.0000 ttk Biaya pasang 25,000.00 25,000.00 25,000.00

Total : 25,000.00 209,750.00 234,750.00

3 1 TITIK INSTALASI TELEPHONE 25.0000 m1 Kabel telephone 3,500.00 87,500.00 8.0000 bt Pipa Clipsal 20 mm putih 10,000.00 80,000.00 1.0000 bh Tee dos clipsal 20 mm putih 6,000.00 6,000.00 25.0000 bj Klem clipsal 20 mm putih 650.00 16,250.00 5.0000 bj Sock clipsal 20 mm putih 1,500.00 7,500.00 1.0000 bj Inbow dos plastik clipsal E 157 P 9,000.00 9,000.00 1.0000 ttk Biaya pasang 25,000.00 25,000.00

Total : 25,000.00 206,250.00 231,250.00

4 1 TITIK INSTALASI MATV 20.0000 m1 Coaxial cable 5C-75 ohm commscof 5,700.00 114,000.00 6.0000 bt Pipa Clipsal 20 mm putih 10,000.00 60,000.00 2.0000 bh Tee dos clipsal 20 mm putih 6,000.00 12,000.00 20.0000 bj Klem clipsal 20 mm putih 650.00 13,000.00 6.0000 bj Sock clipsal 20 mm putih 1,500.00 9,000.00 1.0000 bj Inbow dos plastik clipsal E 157 P 9,000.00 9,000.00 1.0000 ttk Biaya pasang 25,000.00 25,000.00

Total : 25,000.00 217,000.00 242,000.00

Mengetahui

Kepala Dinas Cipta Karya

Kabupaten Badung

Ir. Dewa Made Apramana, MM

Pembina Utama Muda

NIP. 195904211987111002

Page 91: 72125046-Analisa-Sni-2002-2008-Dck-Bln-Januari-2011

REKAPITULASI DAFTAR HARGA SATUAN PEKERJAAN SWAKLOLABULAN JANUARI TAHUN 2011

NO URAIAN PEKERJAAN HARGA

1 2 3

I PEKERJAAN PERSIAPAN (SNI 03-2835-2002)

1 1 M1 PAGAR SEMENTARA DARI SENG GELOMBANG TINGGI 2 METER Rp. 218,250.00

2 1 M1 PENGUKURAN DAN PEMASANGAN BOWPLANK Rp. 57,440.00

3 1 M2 PEMBUATAN KANTOR SEMENTARA, DENGAN LANTAI PLESTERAN Rp. 893,540.00

4 1 M2 PEMBUATAN GUDANG SEMEN DAN ALAT-ALAT Rp. 658,315.00

5 1 M2 PEMBUATAN RUMAH JAGA/KONSTRUKSI KAYU Rp. 758,900.00

6 1 M2 MEMBERSIHKAN LAPANGAN DAN PERATAAN Rp. 3,500.00

7 1 M2 PEMBUATAN BEDENG BURUH Rp. 676,540.00

8 1 M2 PEMBUATAN BAK ADUKAN UKURAN (40X50X20) CM Rp. 144,860.00

9 1 M2 PEMBUATAN STEGGER DARI BAMBU Rp. 16,221.00

10 1 M2 PEMBUATAN JALAN SEMENTARA Rp. 64,750.00

11 1 M3 BONGKARAN BETON BERTULANG Rp. 233,345.00

12 1 M3 BONGKARAN DINDING TEMBOK BATA MERAH Rp. 233,345.00

II PEKERJAAN TANAH (SNI 2835 : 2008)

1 1 M3 GALIAN TANAH BIASA DALAM 1 METER Rp. 26,250.00

2 1 M3 GALIAN TANAH BIASA DALAM 2 METER Rp. 31,500.00

3 1 M3 GALIAN TANAH BIASA DALAM 3 METER Rp. 36,750.00

4 1 M3 GALIAN TANAH KERAS DALAM 1METER Rp. 35,000.00

5 1 M3 GALIAN TANAH CADAS DALAM 1 METER Rp. 52,500.00

6 1 M3 GALIAN TANAH LUMPUR DALAM 1 METER Rp. 42,000.00

7 1 M2 PEKERJAAN STRIPPING SETINGGI 1 METER Rp. 1,750.00

8 1 M3 PEMBUANGAN TANAH SEJAUH 15 METER Rp. 11,550.00

9 1 M3 URUGAN KEMBALI Rp. -

10 1 M3 PEMADATAN TANAH ( Per 20 Cm ) Rp. 106,500.00

11 1 M3 URUGAN PASIR Rp. 106,500.00

12 1 M3 PEMASANGAN LAPISAN IJUK TEBAL 10 CM Rp. 14,250.00

13 1 M3 URUGAN SIRTU PADAT Untuk Peninggian Lantai Bangunan Rp. 128,750.00

14 1 M3 URUGAN TANAH PILIHAN DIPADATKAN Rp. 101,500.00

15 1 M3 URUGAN LIMESTONE PADAT Rp. 103,550.00

III PEKERJAAN PONDASI (SNI 2836 : 2008)

1 1 M3 BATU KALI CAMP. 1 PC : 3 PS Rp. 496,535.00

2 1 M3 BATU KALI CAMP. 1 PC : 4 PS Rp. 460,740.00

3 1 M3 BATU KALI CAMP. 1 PC : 5 PS Rp. 435,930.00

4 1 M3 BATU KALI CAMP. 1 PC : 6 PS Rp. 418,485.00

5 1 M3 BATU KALI CAMP. 1 PC : 8 PS Rp. 394,580.00

6 1 M3 PASANGAN PONDASI SIKLOP, 40% BATU KALI Rp. 1,427,176.00

7 1 M3 PASANGAN PONDASI SUMURAN DIAMETER 1 M Rp. 463,400.00

8 1 M3 PASANGAN BATU KOSONG Rp. 221,010.00

IV PEKERJAAN DINDING (SNI 6897 : 2008)

1 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 2 PS Rp. 259,805.00

2 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 3 PS Rp. 250,313.50

3 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 4 PS Rp. 243,971.50

4 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 5 PS Rp. 240,616.00

Page 92: 72125046-Analisa-Sni-2002-2008-Dck-Bln-Januari-2011

NO URAIAN PEKERJAAN HARGA

1 2 3

5 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 6 PS Rp. 239,305.00

6 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 2 PS Rp. 126,768.50

7 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 3 PS Rp. 122,301.10

8 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 4 PS Rp. 119,720.00

9 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 5 PS Rp. 118,095.40

10 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 6 PS Rp. 117,194.60

11 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 8 PS Rp. 115,445.00

12 1 M2 PASANGAN DINDING HOLLOWBLOCK (HB. 10) Rp. 63,166.45

13 1 M2 PASANGAN DINDING HOLLOWBLOCK (HB. 10) TANPA BESI Rp. 49,300.00

14 1 M2 PASANGAN DINDING Terawang/Roster (12 x 11 x 24) CM Rp. 1,470,705.00

15 1 M2 PASANGAN DINDING BEDEG, RANGKA KAYU Rp. 131,694.00

V PEKERJAAN PLESTERAN (SNI 2837 : 2008)

1 1 M2 PLESTERAN CAMP. 1 PC : 1 PS TEBAL 15 MM Rp. 35,219.12

2 1 M2 PLESTERAN CAMP. 1 PC : 2 PS TEBAL 15 MM Rp. 30,280.72

3 1 M2 PLESTERAN CAMP. 1 PC : 3 PS TEBAL 15 MM Rp. 28,134.28

4 1 M2 PLESTERAN CAMP. 1 PC : 4 PS TEBAL 15 MM Rp. 26,677.20

5 1 M2 PLESTERAN CAMP. 1 PC : 5 PS TEBAL 15 MM Rp. 25,839.52

6 1 M2 PLESTERAN CAMP. 1 PC : 6 PS TEBAL 15 MM Rp. 25,173.48

7 1 M2 PLESTERAN CAMP. 1 PC : 8 PS TEBAL 15 MM Rp. 24,434.68

8 1 M2 PLESTERAN CAMP. 1 PC : 2 PS TEBAL 20 MM Rp. 40,415.96

9 1 M2 PLESTERAN CAMP. 1 PC : 3 PS TEBAL 20 MM Rp. 37,554.04

10 1 M2 PLESTERAN CAMP. 1 PC : 4 PS TEBAL 20 MM Rp. 35,569.60

11 1 M2 PLESTERAN CAMP. 1 PC : 5 PS TEBAL 20 MM Rp. 34,494.36

12 1 M2 PLESTERAN CAMP. 1 PC : 6 PS TEBAL 20 MM Rp. 33,564.64

13 1 M2 PLESTERAN SKONING 1 PC : 2 PS, TEBAL 10 MM Rp. 22,940.00

14 1 M2 PLESTERAN CIPRAT 1 PC : 2 PS Rp. 20,199.60

15 1 M2 FINISHING SIAR PASANGAN DINDING BATA MERAH (=20 M') Rp. 11,826.24

16 1 M2 FINISHING SIAR PASANGAN DINDING CONBLOCK EKSPOSE (= 8 M') Rp. 5,673.00

17 1 M2 FINISHING SIAR PASANGAN BATU KALI ADUKAN 1PC : 2 PS Rp. 25,280.20

18 1 M2 PEKERJAAN ACIAN Rp. 7,347.50

VI PEKERJAAN KAYU (SNI 3434 : 2008)

1 MEMBUAT DAN MEMASANG 1 M3 KUSEN PINTU DAN JENDELA KAYU KELAS I Rp. 9,855,500.00

2 MEMBUAT DAN MEMASANG 1 M3 KUSEN PINTU DAN JENDELA KAYU KELAS II/III Rp. 6,231,500.00

3 MEMBUAT DAN MEMASANG 1 M2 PINTU KLAMP STANDAR KAYU KELAS II Rp. 384,500.00

4 MEMBUAT DAN MEMASANG 1 M2 PINTU KLAMP SEDERHANA KAYU KELAS III Rp. 308,500.00

5 MEMBUAT DAN MEMASANG 1 M2 DAUN PINTU PANEL KAYU KELAS I/II Rp. 516,250.00

6 MEMBUAT DAN MEMASANG 1 M2 PINTU DAN JENDELA KACA, KAYU KELAS I/II Rp. 348,550.00

7 MEMBUAT DAN MEMASANG 1 M2 PINTU DAN JENDELA JALUSI, KAYU KELAS I/II Rp. 705,850.00

8Rp. 444,110.00

9

Rp. 410,050.00

10 MEMASANG 1 M2 JALUSI KUSEN, KAYU KELAS I/II Rp. 605,250.00

11 MEMBUAT 1 M2 TEAKWOOD RANGKAP RANGKA EXPOSE, KAYU KELAS I Rp. 419,050.00

12Rp. 458,060.00

13

Rp. 9,403,950.00

MEMBUAT 1 M2 DAUN PINTU PLYWOOD RANGKAP RANGKA TERTUTUP, KAYU KELAS II (Lebar Sampai 90 Cm)

MEMBUAT 1 M2 DAUN PINTU PLYWOOD RANGKAP RANGKA EXPOSE, KAYU KELAS I/II

MEMBUAT 1 M2 TEAKWOOD RANGKAP LAPIS FORMIKA RANGKA EXPOSE, KAYU KELAS II

MEMASANG 1 M3 KONSTRUKSI KUDA-KUDA KONVENSIONAL, KAYU KELAS I,II,III Bentang 6 M'

Page 93: 72125046-Analisa-Sni-2002-2008-Dck-Bln-Januari-2011

NO URAIAN PEKERJAAN HARGA

1 2 3

14 MEMASANG 1 M3 KONSTRUKSI KUDA-KUDA EXPOSE, KAYU KELAS I Rp. 10,697,750.00

15 MEMASANG 1 M3 KONSTRUKSI GORDENG, KAYU KELAS II Rp. 9,062,350.00

16 MEMASANG 1 M2 RANGKA ATAP GENTENG KERAMIK, KAYU KELAS II Rp. 56,120.00

17 MEMASANG 1 M2 RANGKA ATAP GENTENG BETON, KAYU KELAS II Rp. 76,640.00

18 MEMASANG 1 M2 RANGKA ATAP SIRAP, KAYU KELAS II Rp. 1,283,460.00

19 MEMASANG 1 M2 RANGKA LANGIT-LANGIT (50 X 100), KAYU KELAS II/III Rp. 49,730.00

20 MEMASANG 1 M2 RANGKA LANGIT-LANGIT (60 X 60) CM, KAYU KELAS II/III Rp. 53,610.00

21 MEMASANG 1 M' LISPLANK UKURAN (3 X 20) CM, KAYU KELAS I/II Rp. 100,620.00

22 MEMASANG 1 M' LISPLANK UKURAN (3 X 30) CM, KAYU KELAS I/II Rp. 101,600.00

23 MEMASANG 1 M2 RANGKA DINDING PEMISAH (60 X 120) CM, KAYU KELAS II/III Rp. 246,500.00

24 Rp. 300,800.00

25 Rp. 302,760.00

26 MEMASANG 1 M2 LAMBRIZIRING DARI PAPAN KAYU KELAS I Rp. 175,375.00

27 MEMASANG 1 M2 LAMBRIZIRING DARI PLYWOOD UKURAN (120 X 240) CM Rp. 23,850.00

VII PEKERJAAN BETON ( SNI 7394:2008)

1 1 M3 MEMBUAT BETON 1 PC : 3 PS : 5 KR Rp. 455,140.00

2 1 M3 MEMBUAT BETON 1 PC : 2 PS : 4 KR Rp. 458,760.00

3 1 M3 MEMBUAT BETON 1 PC : 2 PS : 3 KR Rp. 514,900.00

4 PEMBESIAN 10 KG DENGAN BESI POLOS ATAU BESI ULIR Rp. 82,865.50

5 1 M2 PASANG BEKISTING UNTUK PONDASI Rp. 117,080.00

6 1 M2 PASANG BEKISTING UNTUK SLOOF Rp. 117,080.00

7 1 M2 PASANG BEKISTING UNTUK KOLOM Rp. 405,227.50

8 1 M2 PASANG BEKISTING UNTUK BALOK Rp. 417,227.50

9 1 M2 PASANG BEKISTING UNTUK LANTAI Rp. 765,227.50

10 1 M2 PASANG BEKISTING UNTUK DINDING Rp. 503,227.50

11 1 M2 PASANG BEKISTING UNTUK TANGGA Rp. 384,477.50

12 1 M2 PASANG JEMBATAN UNTUK PENGECORAN BETON Rp. 112,900.00

13 1 M3 MEMBUAT PONDASI BETON BERTULANG (150 KG BESI + BEKISTING) Rp. 2,396,132.00

14 1 M3 MEMBUAT SLOOF BETON BERTULANG (200 KG + BEKISTING) Rp. 2,976,795.00

15 1 M3 MEMBUAT KOLOM BETON BERTULANG (300 KG BESI + BEKISTING) Rp. 6,938,095.00

16 1 M3 MEMBUAT BALOK BETON BERTULANG (200 KG BESI + BEKISTING) Rp. 5,458,165.00

17 1 M3 MEMBUAT PLAT BETON BERTULANG (150 KG BESI + BEKISTING Rp. 6,356,787.50

18 1 M3 MEMBUAT DINDING BETON BERTULANG (150 KG BESI + BEKISTING) Rp. 5,641,232.00

19 1 M3 MEMBUAT DINDING BETON BERTULANG (200 KG BESI + BEKISTING) Rp. 4,921,920.00

20 1 M1 MEMBUAT KOLOM PENGUAT BETON BERTULANG (11 X 11 CM) Rp. 41,248.00

21 1 M1 MEMBUAT KOLOM PENGUAT BETON BERTULANG (10 X 15 CM) Rp. 56,323.60

VIII PEKERJAAN PENUTUP ATAP (SNI 03-3436-2002)

1 1 M2 PEKERJAAN ATAP GENTENG PLENTONG Rp. 38,430.00

2 1 M2 PEKERJAAN ATAP GENTENG PLENTONG DI CAT Rp. 38,430.00

3 1 M1 PASANG BUBUNGAN GENTENG PLENTONG Rp. 66,840.00

4 1 M2 PASANG ATAP GENTENG ASBES GELOMBANG 1.8 M X 0.92 M X 5 MM Rp. 31,860.00

5 1 M1 PASANG BUBUNGAN STEL GELOMBANG 0.92 M Rp. 211,367.80

6 1 M2 PEKERJAAN ATAP SIRAP Rp. 495,460.00

7 1 M2 PEKERJAAN ATAP NOK SIRAP Rp. 68,545.00

8 1 M2 PASANG ATAP ALANG-ALANG 3 M1 Rp. 69,350.00

9 1 M2 PEKERJAAN ATAP SENG GELOMBANG Rp. 35,620.00

MEMASANG 1 M2 RANGKA DINDING PEMISAH TEAKWOOD RANGKAP, RANGKA KAYU KELAS II

MEMASANG 1 M2 RANGKA DINDING PEMISAH PLYWOOD RANGKAP, RANGKA KAYU KELAS II

Page 94: 72125046-Analisa-Sni-2002-2008-Dck-Bln-Januari-2011

NO URAIAN PEKERJAAN HARGA

1 2 3

10 1 M2 PASANGAN LAPISANG ALUMINIUM FOIL Rp. 36,775.00

11 1 M1 PASANG NOK SENG GELOMBANG Rp. 22,940.00

IX PEKERJAAN LANGIT - LANGIT (SNI 2839-2008)

1 MEMASANG 1 M2 LANGIT-LANGIT ASBES SEMEN, TEBAL 4 MM, 5 MM DAN 6 MM Rp. 56,580.00

2 1 M2 PASANG LANGIT-LANGIT TRIPLEKS 120X240 CM/6MM Rp. 26,410.00

3 1 M2 PASANG LANGIT-LANGIT LAMBRIZIRING Rp. 189,020.00

4 1 M1 PASANG LIST LANGIT-LANGIT KAYU PROFIL Rp. 18,846.50

5 1 M2 PASANG LANGIT-LANGIT ASBES + RANGKA Rp. 170,710.40

6 1 M2 PASANG LANGIT-LANGIT GYPSUM BOARD UKURAN (1200X2400X9) MM Rp. 30,715.00

7 1 M2 PASANG LANGIT-LANGIT KALSIBOARD 4.5 MM Rp. 33,445.00

X PEKERJAAN SANITASI ( SNI 2002 )

1 MEMASANG 1 BUAH KLOSET DUDUK/MONOBLOK Rp. 1,611,900.00

2 MEMASANG 1 BUAH KLOSET JONGKOK PORSELIN Rp. 234,930.00

3 MEMASANG 1 BUAH URINOIR Rp. 1,202,550.00

4 MEMASANG 1 BUAH WASHTAFEL KIA Rp. 318,296.00

5 MEMASANG 1 BUAH BAK MANDI FIBREGLASS, VOLUME 0,30 M3 Rp. 450,000.00

6 MEMASANG 1 M1 PIPA GALVANIS f 0,5" - 1 " Rp. 65,290.00

7 MEMASANG 1 M1 PIPA GALVANIS f 1,5" - 3" Rp. 284,030.00

8 MEMASANG 1 M1 PIPA PVC TYPE AW f 0,5" Rp. 25,960.00

9 MEMASANG 1 M1 PIPA PVC TYPE AW f 2" Rp. 40,877.50

10 MEMASANG 1 M1 PIPA PVC TYPE AW f 3" Rp. 96,772.50

11 MEMASANG 1 BUAH KRAN f 0,75" ATAU 0,5" Rp. 18,400.00

XI PEKERJAAN BESI DAN ALUMINIUM (SNI 7393:2008)

1 1 KG PASANG RANGKA ATAP BAJA Rp. 19,022.50

2 1 M2 PASANG JENDELA NAKO Rp. 348,980.00

3 1 M1 PASANG TALANG DATAR, SENG BJLS 28 Rp. 222,847.50

XII PEKERJAAN KUNCI DAN KACA (SNI 2002)

1 1 BH PASANG KUNCI TANAM BIASA Rp. 129,850.00

2 1 PS PASANG ENGSEL PINTU Rp. 21,025.00

3 1 PS PASANG ENGSEL JENDELA KUPU-KUPU Rp. 20,350.00

4 1 BH PASANG KAIT ANGIN Rp. 24,025.00

5 1 BH PASANG KUNCI SLOT Rp. 98,700.00

6 1 M2 PASANG KACA, TEBAL 5 MM Rp. 107,025.00

XIII PEK. PENUTUP LANTAI DAN DINDING (SNI 7395:2008)

1 1 M2 PASANG LANTAI KERAMIK 30 X 30 CM Rp. 110,470.00

2 1 M2 PASANG LANTAI KERAMIK 20 X 20 CM Rp. 106,927.00

3 1 M1 PASANG PLIN KERAMIK 10 X 30 CM Rp. 21,254.20

4 1 M2 PASANG DINDING KERAMIK 20 X 20 CM Rp. 116,639.00

5 1 M1 PASANG PLIN KAYU 2 X 10 CM Rp. 35,468.35

XIV PEKERJAAN PENGECATAN (SNI 2002)

1 1 M2 PENGECATAN BIDANG KAYU BARU (1 LAPIS PLAMIR, Rp. 26,395.25

1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP)

2 1 M2 PENGECATAN BIDANG KAYU DENGAN VERNIS Rp. 19,521.75

Page 95: 72125046-Analisa-Sni-2002-2008-Dck-Bln-Januari-2011

NO URAIAN PEKERJAAN HARGA

1 2 3

3 1 M2 PENGECATAN TEMBOK BARU (1 LAPIS PLAMIR, Rp. 12,576.00

1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP)

4 1 M2 PENGECATAN TEMBOK LAMA (1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP Rp. 8,468.00

5 1 M2 PENGECATAN PERMUKAAN BAJA DENGAN MENI BESI Rp. 10,610.00

6 1 M2 PENGECATAN PERMUKAAN BAJA, 1 LAPIS DENGAN CAT BESI Rp. 15,510.00

7 1 M2 PELABURAN BIDANG KAYU DENGAN POLITUR Rp. 32,946.00

XV PEKERJAAN TETEMPELAN STYLE BALI

1 1 M2 PASANGAN BATA GOSOK 2 MUKA Rp. 496,452.00

2 1 M2 PASANGAN PARAS KEROBOKAN 1 MUKA Rp. 263,652.00

3 1 M2 PASANGAN BATA GOSOK 1 MUKA Rp. 258,226.00

4 1 M2 PASANGAN PARAS 1 MUKA Rp. 350,992.67

5 1 M2 PASANGAN PARAS + BATA GOSOK 1 MUKA Rp. 308,715.83

6 1 M2 PASANGAN BATA GOSOK DIUKIR Rp. 401,726.00

7 1 M2 PASANGAN PARAS DIUKIR Rp. 494,492.67

8 1 M2 PASANGAN PARAS + BATA GOSOK DIUKIR Rp. 443,715.83

XVI PEKERJAAN LANDSCAPE

1 1 M2 PASANGAN PAVING BETON 10/20 CM TEBAL 6 CM K 225 Rp. 82,250.00

2 Paving 10 x 20 cm tebal 6 cm K350 Rp. 83,250.00

3 ### Rp. #REF!

4 Paving 10 x 20 cm tebal 8 cm K225 Rp. 82,250.00

5 Paving 10 x 20 cm tebal 8 cm K350 Rp. 88,750.00

6 ### Rp. #REF!

7 Paving 20 x 20 cm tebal 6 cm K225 Rp. 74,750.00

8 Paving 20 x 20 cm tebal 6 cm K350 Rp. 83,250.00

9 ### Rp. #REF!

10 Paving 20 x 20 cm tebal 8 cm K225 Rp. 88,750.00

11 Paving 20 x 20 cm tebal 8 cm K350 Rp. #REF!

12 Paving 20 x 20 cm tebal 8 cm K425 Rp. 89,250.00

13 ### Rp. #REF!

14 Paving 20 x 20 cm tebal 10 cm K225 Rp. 98,750.00

15 Paving 20 x 20 cm tebal 10 cm K350 Rp. 107,750.00

16 Paving 20 x 20 cm tebal 10 cm K425 Rp. 75,750.00

17 ### Rp. #REF!

18 Paving Tiga Berlian tebal 6 cm K225 Rp. 80,750.00

19 ### Rp. 86,750.00

20 1 M2 PASANGAN GRASS BLOCK Rp. #REF!

21 1 M2 PASANGAN KORAL SIKAT Rp. 103,683.40

22 1 M1 KANSTEIN BULAT (50 x 30 x 10 ) CM K225 Rp. 111,751.00

23 Kanstein Jumbo (P:50,L:15,T:30 cm K225) Rp. 131,058.40

24 Kanstein Segi Lima Jumbo (P:50,L:15, T:40 cm K225) Rp. #REF!

25 1 M2 PENGECATAN KANSTEIN Rp. 19,159.00

XVII PEKERJAAN ELEKTRIKAL

1 1 TITIK INSTALASI STOP KONTAK, LAMPU, EXHAUST FAN DAN CEILING FAN Rp. 182,250.00

2 1 TITIK INSTALASI AC Rp. 234,750.00

3 1 TITIK INSTALASI TELEPHONE Rp. 231,250.00

4 1 TITIK INSTALASI MATV Rp. 242,000.00

Page 96: 72125046-Analisa-Sni-2002-2008-Dck-Bln-Januari-2011

NO URAIAN PEKERJAAN HARGA

1 2 3

Kepala Dinas Cipta Karya

Kabupaten Badung

Ir. I Made Apramana, MM

Pembina Utama Muda

NIP. 195904211987111002

Page 97: 72125046-Analisa-Sni-2002-2008-Dck-Bln-Januari-2011

Harga Barang dan Upah Hal. 97

DAFTAR HARGA SATUAN BAHAN TAMBAHANBULAN APRIL TAHUN 2010

A. Harga Satuan Bahan

NO NAMA BARANG SATUAN HARGA SATUAN

1 2 3 4

BATUBatu Candi

1 20x20x2 m2 78,000.00 2 15x30x2 m2 78,000.00 3 20x30x2 m2 78,000.00 4 20x40x2 m2 80,000.00 5 30x30x2 m2 80,000.00 6 40x40x2 m2 105,000.00 7 30x60x2 m2 115,000.00 8 20x40x3 m2 135,000.00 9 30x30x3 m2 135,000.00

10 30x30x5 m2 165,000.00 11 40x40x5 m2 185,000.00

Palimanan putih1 20x20x2 m2 65,000.00 2 20x30x2 m2 67,000.00 3 20x40x2 m2 68,000.00 4 20x40x3 m2 110,000.00 5 30x30x3 m2 110,000.00

Palimanan Serat Kuning1 20x30 m2 75,000.00 2 20x40 m2 75,000.00 3 15x30 m2 75,000.00

Palimanan Cirebon1 15x30x2 m2 72,000.00 2 20x30x2 m2 73,000.00 3 20x40x2 m2 75,000.00 4 30x30x2 m2 80,000.00

Alur Bali Green Lurus1 20x30 m2 105,000.00 2 20x40 m2 105,000.00

Alur Bali Green Cukil1 20x30 m2 105,000.00 2 20x40 m2 105,000.00 3 20x20 m2 105,000.00

Batu Bali Green1 15x30 m2 75,000.00 2 20x30 m2 75,000.00 3 20x40 m2 75,000.00 4 40x40 m2 80,000.00

PARASParas Kerobokan

1 20x40x3 Bj 6,000.00 2 20x40x5 Bj 8,000.00

Paras Kelating1 20x40x3 Bj 6,000.00 2 20x40x5 Bj 8,000.00

Alur Andesit Lurus1 20x40 m3 135,000.00 2 30x60 m3 140,000.00

Alur and cukil1 20x40 m2 135,000.00 2 15x30 m2 135,000.00

Page 98: 72125046-Analisa-Sni-2002-2008-Dck-Bln-Januari-2011

Harga Barang dan Upah Hal. 98

NO NAMA BARANG SATUAN HARGA SATUAN

1 2 3 4Alur And Gelombang m2 140,000.00 Alur And Gelombang lurus m2 140,000.00

Random Singaraja m2 25,000.00 Random Cirebon m2 65,000.00 Random Jember m2 45,000.00

Page 99: 72125046-Analisa-Sni-2002-2008-Dck-Bln-Januari-2011

LAMPIRAN

SUMBER DATA

NO KABUPATEN SUMBER DATA ALAMAT

1 Badung Utara - UD. Ubud Sari Jaya Jl. Raya Sangeh Petang- UD. Surya Br. Plakan Sibang Kaja- Dwi Putri Jl. Darmasaba - Lukluk

2 Badung Tengah - UD. Ron Anyar Jl. Raya Canggu, Kerobokan- Mitra 10 Jl. Gatsu Barat- PT. Budi Aluh Jl. Raya Kapal- CV. Mertanadi Br. Perang Sempidi- Karya Indah Jl. Raya Kapal

3 Badung Selatan - Indah Jaya Jl. Bay Pass Nusa Dua No. 69- Dewa Brata Jl. Raya Kuta- Mekar Abadi Bangunan Jl. Bay Pass Nusa Dua

Page 100: 72125046-Analisa-Sni-2002-2008-Dck-Bln-Januari-2011

DAFTAR HARGA SATUAN BAHAN BANGUNANTAHUN 2009

NO NAMA BARANG SATUAN HARGA1 2 4 5

1 Gedeg Klas I m2

2 Genteng Beton bj

3 Genteng Bubungan Lokal bj

4 Genteng Bubungan Beton bj

5 Genteng Bubungan Karang Pilang bj

6 Genteng Bubungan Plentong bj

7 Genteng Kaca bj

8 Genteng Kodok bj

9 Genteng Lokal bj

10 Genteng Plentong bj

11 Genteng Plentong Dicat bj

12 Batu Bata Pasangan Kelas I bh

13 Batu Belah 15-30 cm m3

14 Batu Karang m3

15 Batu Lahar Merah Singaraja m3

16 Batu Padas bh

17 Batu Pipih Singaraja m3

18 Batu Pecah 0.5 - 1 cm m3

19 Batu Pecah 1 - 2 cm m3

20 Batu Pecah 2 - 3 cm (Manual, Mesin) m3

21 Batu Pecah 3 - 5 cm (Manual, Mesin) m3

22 Batu Pecah 5 - 7 cm (Manual) m3

23 Batu Pecah 7 - 10 cm m3

24 Besi Beton kg

25 Kayu Albesia Balok m3

26 Kayu Albesia Papan / Usuk m3

27 Kayu Bingkirai Balok m3

28 Kayu Bingkirai Papan / Usuk / Reng m3

29 Kayu Dolken (Pekerjaan Sementara) btg

30 Kayu Jati Balok m3

31 Kayu Jati Papan m3

32 Kayu Kamper Balok m3

33 Kayu Kamper Papan/ Usuk / Reng m3

34 Kayu Kruing Balok m3

35 Kayu Kruing Papan / Usuk / Reng m3

36 Kayu Meranti Balok m3

37 Kayu Meranti Papan / Usuk / Reng m3

38 Kayu Merbau Balok m3

39 Kayu Merbau Papan m3

40 Kayu Perancah / Begesting m3

41 Kayu Profil m1

42 Pasir Beton m3

43 Pasir Pasang m3

44 Pasir Urug m3

45 Semen PC 40 Kg kg

Page 101: 72125046-Analisa-Sni-2002-2008-Dck-Bln-Januari-2011

46 Semen PC 50 Kg kg

47 Semen warna/semen grouting kg

Page 102: 72125046-Analisa-Sni-2002-2008-Dck-Bln-Januari-2011

14819005400000

28000000399400

1890000534000

37,705,300

5400