document1

1
JUDUL PEKERJAAN : CALIFORNIA BEARING RATIO LOKASI PEKERJAAN : E3-LAB. MAKANIKA TANAH JURUSAN TEKNIK SIPIL SUMBER MATERIAL : SP 1 TANGGAL PENGUJIAN : 3 JUNI 2014 DIUJI OLEH : KELOMPOK 3 ROMBEL 2 DATA CBR 10 Pukulan 25 Pukulan 56 Pukulan 10 Pukulan 25 Pukulan 56 Pukulan Tinggi Mold, t mold (cm) 17.5 17.5 17.5 17.5 17.5 17.5 Diamater Mold, D mold (cm) 15.5 15.5 15.5 15.5 15.5 15.5 Volume Mold (cm 3 ) 3300.43 3300.43 3300.43 3300.43 3300.43 3300.43 Berat Mold, W mold (gr) 3876 4311 5665 4383.5 4443 5664.5 SEBELUM PENGUJIAN 10 Pukulan 25 Pukulan 56 Pukulan 10 Pukulan 25 Pukulan 56 Pukulan Berat Mold+Tanah Basah (gr) 8443.5 9505 11250.5 9388 10008.5 11345.5 Berat Tanah Basah (gr) 4567.5 5194 5585.5 5004.5 5565.5 5681 Berat isi, ɣ (gr/cm 3 ) 1.38 1.57 1.69 1.52 1.69 1.72 UJI CALIFORNIA BEARING RATIO (CBR) ASTM D1883 METODE PEMADATAN UNSOAKED SOAKED METODE PEMADATAN UNSOAKED SOAKED

Upload: evi-kristianingrum

Post on 06-Nov-2015

220 views

Category:

Documents


0 download

DESCRIPTION

cbr

TRANSCRIPT

  • JUDUL PEKERJAAN : CALIFORNIA BEARING RATIO

    LOKASI PEKERJAAN : E3-LAB. MAKANIKA TANAH JURUSAN TEKNIK SIPIL

    SUMBER MATERIAL : SP 1

    TANGGAL PENGUJIAN : 3 JUNI 2014

    DIUJI OLEH : KELOMPOK 3 ROMBEL 2

    DATA CBR

    10 Pukulan 25 Pukulan 56 Pukulan 10 Pukulan 25 Pukulan 56 Pukulan

    Tinggi Mold, t mold (cm) 17.5 17.5 17.5 17.5 17.5 17.5

    Diamater Mold, D mold (cm) 15.5 15.5 15.5 15.5 15.5 15.5

    Volume Mold (cm3) 3300.43 3300.43 3300.43 3300.43 3300.43 3300.43

    Berat Mold, W mold (gr) 3876 4311 5665 4383.5 4443 5664.5

    SEBELUM PENGUJIAN

    10 Pukulan 25 Pukulan 56 Pukulan 10 Pukulan 25 Pukulan 56 Pukulan

    Berat Mold+Tanah Basah (gr) 8443.5 9505 11250.5 9388 10008.5 11345.5

    Berat Tanah Basah (gr) 4567.5 5194 5585.5 5004.5 5565.5 5681

    Berat isi, (gr/cm3) 1.38 1.57 1.69 1.52 1.69 1.72

    UJI CALIFORNIA BEARING RATIO (CBR) ASTM D1883

    METODE PEMADATANUNSOAKED SOAKED

    METODE PEMADATANUNSOAKED SOAKED