KEGIATAN : PEMANTAUAN KUALITAS LINGKUNGAN PEKERJAAN : Pembangunan Instalasi Pengolah Air Limbah (IPAL) Medik untuk Puskesmas Rawat lnap LOKASI : PUSKESMAS NEGARA KECAMATAN DAHA UTARA KAB. HSS PROVINSI : KALIMANTAN SELATAN 1 4 5 6 I. PEKERJAAN PERSIAPAN 1. Pembersihan Lokasi - Unit 1.000 2. Pengukuran - M2 1.000 4. Papan Nama Proyek - Bh 1.000 5. Pemasangan Bowplank - Unit 1.000 SUB TOTAL II. PEKERJAAN TANAH DAN PASIR 1. Pek. Galian Tanah 1 M3 4.050 2. Pek. Urugan Pasir Bawah Pondasi Poer 3 M3 0.825 SUB TOTAL III. PEKERJAAN LANTAI DUDUKAN REAKTOR 1. Pek. Beton Bertulang 1 : 2 : 3 - Kolom 30/30 10 M3 0.810 - Balok Lantai 30/30 10 M3 2.610 - Pondasi Poer 10 M3 1.800 - Plat Lantai tebal 12 cm 8 M3 4.080 2. Pek. Pancangan Galam Dia. 10 mm Panjang 4 m - Pot 54.000 SUB TOTAL IV. PEKERJAAN EQUALIZING TANK 1. Pek. Beton Bertulang 1 : 2 : 3 - Dinding Beton Bertulang Tebal 15/15 8 M3 2.250 - Lantai Beton Bertulang Tebal 15/15 8 M3 0.338 2. Pek. Pancangan Galam Dia. 10 mm Panjang 2 m - Pot 25.000 SUB TOTAL RENCANA ANGGARAN BIAYA 2 3 Satuan Jumlah Harga (Rp) Harga Satuan (Rp) Volume No. Analisa dan Uraian Pekerjaan No.

Upload: cakemus

Post on 24-Dec-2015

161 views

Category:

Documents


19 download

TRANSCRIPT

Page 1: Tambahan RAB IPAL Puskesmas Rawat Inap Kosongan.pdf

KEGIATAN : PEMANTAUAN KUALITAS LINGKUNGAN

PEKERJAAN : Pembangunan Instalasi Pengolah Air Limbah (IPAL) Medik untuk Puskesmas Rawat lnapLOKASI : PUSKESMAS NEGARA KECAMATAN DAHA UTARA KAB. HSS

PROVINSI : KALIMANTAN SELATAN

1 4 5 6

I. PEKERJAAN PERSIAPAN

1. Pembersihan Lokasi - Unit 1.000

2. Pengukuran - M2 1.000

4. Papan Nama Proyek - Bh 1.000

5. Pemasangan Bowplank - Unit 1.000

SUB TOTAL

II. PEKERJAAN TANAH DAN PASIR

1. Pek. Galian Tanah 1 M3 4.050

2. Pek. Urugan Pasir Bawah Pondasi Poer 3 M3 0.825

SUB TOTAL

III. PEKERJAAN LANTAI DUDUKAN REAKTOR

1. Pek. Beton Bertulang 1 : 2 : 3

- Kolom 30/30 10 M3 0.810

- Balok Lantai 30/30 10 M3 2.610

- Pondasi Poer 10 M3 1.800

- Plat Lantai tebal 12 cm 8 M3 4.080

2. Pek. Pancangan Galam Dia. 10 mm Panjang 4 m - Pot 54.000

SUB TOTAL

IV. PEKERJAAN EQUALIZING TANK

1. Pek. Beton Bertulang 1 : 2 : 3

- Dinding Beton Bertulang Tebal 15/15 8 M3 2.250

- Lantai Beton Bertulang Tebal 15/15 8 M3 0.338

2. Pek. Pancangan Galam Dia. 10 mm Panjang 2 m - Pot 25.000

SUB TOTAL

RENCANA ANGGARAN BIAYA

2 3

SatuanJumlah Harga (Rp)Harga Satuan (Rp)Volume

No. Analisa danUraian PekerjaanNo.

Page 2: Tambahan RAB IPAL Puskesmas Rawat Inap Kosongan.pdf

1 4 5 6

V PENGADAAN REAKTOR IPAL KAPASITAS 8,0 M³/H - Unit 1.000

SPESIFIKASI

1. Box Shield

Dimension : 1500mmX800mmX900mm

Material : Mild steel

Coating Powder Coating

2. Oxidator Generator BART O2 2 unit

Oksigen Flow rate 1 - 5 L/min

Oxidator concentration 28 - 65 Mg/L

Oxidator output 3.9 - 5.04 g/hr

Power 0.05 kW

cooling Air Cooled

Ambient temperature maks 35.0

C

Fitting Size :

1. Inner Diameter 7.0 mm

2. Outer Diameter 11.0 mm

Output Frequency 42,186.0 Khz

Mounting holes foot print of power supply 190.5 x 75 mm

Dew Point (45.0)

C

Adjustable range 20 - 100 %

Ox tube dimension 250x105x125 mm

Power Supply Dimension 200 x 75 x 83 mm

Oxidator generator tube weight 0.53 kg

Power supply weight 1.2 kg

Tubing PTFE

Working condition Ambient temperature maksimum 35

C , air cooled

3. Supply Oxidator BART O2 Genarator 2 unit

Oksigen output 3.0 L/min

Oksigen concentration 40 - 93 %

Power 0.3 kW

Pressure (inlet) 0.18 - 0.2 Mpa

Pressure (outlet) 0.06 - 0.08 Mpa

Relative Humidity ≤ 85%

Noise ≤ 55 Db

Rate speed 1,400 rpm

4. Ventury BART VENT 0503 2 unit

material PVDF

water flow rate up to 1 ton / hr

inlet and outlet 1/2"

flexible hose 1/4"

length 100 mm

5. Cooling system Fan Cooling

Power 0.125 kW

Forced condenser air cooling system

OXIDATOR GENERATOR UNIT

No. Uraian Pekerjaan Volume Harga Satuan (Rp) Jumlah Harga (Rp)dan Satuan

2 3

Spesifikasi

Page 3: Tambahan RAB IPAL Puskesmas Rawat Inap Kosongan.pdf

1 4 5 6

1. Material Stainless Steel SUS 304 grade 8% 1,600 mm

Dimension High 382.0 mm

Diameter minimal 2 unit

Quantity 2 unit

Flow meter in line type Carbon

Odour removal upper location

With frame support made of UNP 100 Mild steel and others

1. Intake Pump Power 0.2 kW

Quantity 2 set

ON/OFF with WLC system

2. Circulation Pump Power 0.3 kW

Quantity 2 set

1. UV Filtering Capacity 8 GPM

Quantity 2 Set

1. Filter Tank Material FRP 10"

Capacity 4 m3/h

1. Frame Mild steel square pipe

Wall high 1000 mm made of Plate mild steel

Finishing Powder coating

Dimension all 2400x2400x3200

1. Pipeline PVC AW

2. Outlet Control Pond

1 lot

SUB TOTAL

EQUALIZER DAN OUTLET

Jumlah Harga (Rp)dan Satuan

2 3

REACTOR TOWER

Harga Satuan (Rp)

CIRCULATION PUMP SYSTEM

DISTRUCTED OXIDATOR SYSTEM

FILTERING SYSTEM

SHIELDING ALL SYSTEM

No. Uraian PekerjaanSpesifikasi

Volume