Pak Tris,Saya sudah cek JSEA untuk Geotechnical Survey-nya, namun ada beberapa hal yangperlu saya konfirmasikan sebagai berikut:
Sequence Jobs Potential Hazard RecommendedActions
Comments
2. SiteInvestigation,AllPre-GroundDisturbanceClearanceActivities includingSite Inspection,SubsurfaceFeatures Mark-out,Removal of Surface Cover andGround Clearance
2.2 Slips, Trips, Falls 2.2.1 Doing geologyobservation,geomorphology, andentrance condition forheavy equipmentstransportation
Seharusnya sbb:
Keep work area free ofexcess material anddebris
Remove all trip hazardsby keeping
materials/objectsorganized and out ofwalkways
Keep work surfaces drywhen possible
Wear appropriate PPEincluding non-slip rubberboots if working on wet orslick surfaces
Install rough work surfacecovers where possible
Stay aware of footing anddo not run
Menurut sayarecommended actionyang dilakukan disinikurang nyambungdengan potentialhazard-nya. Jika sayayang salah, mohonuntuk dijelaskan.
Ok sudah sayasesuaikan
2.3 Heat/Cold Stress 2.3.1 Always observe the
traffic regulation
during the
construction
Seharusnya sbb :
Take breaks if feelingfaint or overexerted
Consume adequatefood/beverages (water,sports drinks)
If possible, adjust workschedule to avoidtemperature extremes
Sama juga dengan yangdi atas, recomm actiontidak mengatasiproblem akibat potentialhazards. Heat/coldstress ini apakahdisebabkan oleh cuacaatau bagaimana? Mohonuntuk dijelaskan.Ok sudah sayasesuaikan
-
7/28/2019 Review JSE
2/3
2.4 Biological Hazards:Insects, Snakes,Wildlife, Vegetation
2.4.1 Consider the steepslope, erosion, floodelevation,entrance of boringlocation, equipment store,and security.
Perbaikannya sbb:
Inspect work areas whenarrive at site to identifyhazard(s)
Use insect repellant ifobservemosquitoes/gnats
Survey site for presenceof biological hazards andmaintain safe distance
Wear appropriate PPEincluding leather gloves,long sleeves and pants,and snake chaps aswarranted by siteconditions
Idem dengan yang diatas. Recommactionsnya kurangmengena. Recommactionsnya mungkin
lebih mengena di bagian5.2.1 5.2.4 denganpotential hazards yangsama. Please check andcorrect me if Im wrong.
Ok sudah sayasesuaikan
3. Breaking-Up andRemoving hardsoil/ Asphalt/Concrete Cover bySaw Cutting orwith Equipment
3.1 Suspended Loads 3.1.1 Do not walk
under suspended
loads
3.1.2 Wear
appropriate PPE
including hard hat
Menurut sayasuspended loadsadalah penyebab, bukanhazard yang bisaditimbulkan. Bisa lebihdispesifik-kan apapotential hazardnya,apakah tersandung,tertimpa suspended
solids, atau bagaimana.
Suspended yangdimaksudkan ketika adapenggalian atau cuttingpada aspalt/concreateatau area yang keras,akan ada padatan,bongkahan dan tanahyang tercecer dsb
4. Solid Waste
Management/Disposal
4.1 Vapors and Airborne
Particulates
4.1.1 Stop work if
hazardous conditions
(explosive
atmosphere, O2
deficient atmosphere)
identified until
precautions are taken
4.1.2 Wear
appropriate PPE
Vapors and airborne
particulates karenasolid managementdisposal? Apakah adabahan chemical yangdipakai? Solid wasteyang dimaksud disiniapa ya pak?Dan terjadi duplikasidengan point no. 8(mengenai solid /liquid
-
7/28/2019 Review JSE
3/3
including safety
glasses with side
shields, dust masks
and respirators
4.1.3 Stay upwind
(use flagging or
similar device to
indicate wind
direction)
waste managementdisposal, mohon untukdicek.
Tidak ada bahan kimia,adalah ketikapelaksanaan ada
beberapa tanah keringdi area investigasi yangkemungkinan bisabeterbangan karenaangin, intinyamenghindari tebarantanah.( sebaiknya di deleted )
5. Boring Activities Tambahan :
Biological Hazards: Insects,Snakes, Wildlife,Vegetation
Traffic (includingpedestrian)
Inspect work areas whenarrive at site to identifyhazard(s)
Use insect repellant ifobserve
mosquitoes/gnats
Open enclosures slowly
Survey site for presenceof biological hazards andmaintain safe distance
Wear appropriate PPEincluding leather gloves,long sleeves and pants,and snake chaps aswarranted by siteconditions
Notify attendant or siteowner/manager of workactivities and location
Use cones, signs, flags orother traffic controldevices as outlined in theTraffic Control Plan
Set up exclusion zonesurrounding work areausing cones, signs, flags
or other traffic controldevices
Wear appropriate PPEincluding high visibilityclothing such as reflectivevest
Apakah tidak adahazard sepertitumpahan dan air yangkeruh? Tindakan sepertiapa yang akandilakukan? Mohon agarbisa dimasukkan kedalam JSEA ini.
Ok sudah disesuaikan