RENCANA ANGGARAN BIAYA PROYEK : PEMBANGUNAN TOKO "H. SHOLEH" LOKASI : KEDUNGWUNI - PEKALONGAN HARGA JUMLAH NO URAIAN PEKERJAAN VOLUME SATUAN HARGA (Rp.) (Rp.) 1 2 3 4 5 = (3x4) I. PEKERJAAN PERSIAPAN 1 Pek. Pengukuran dan pemasangan bowplank 1.000 ls 250,000.00 250,000.00 2 Pek. Air kerja dan listrik kerja 1.000 ls 250,000.00 250,000.00 II. PEKERJAAN TANAH 1 Pek. Galian tanah 61.200 m3 35,000.00 2,142,000.00 2 Pek. Urugan tanah kembali 30.600 m3 18,000.00 550,800.00 3 Pek. Urugan tanah peninggian peil 39.000 m3 55,000.00 2,145,000.00 4 Pek. Urugan pasir bawah pondasi 2.374 m3 130,000.00 308,620.00 5 Pek. Urugan pasir bawah lantai 7.500 m3 130,000.00 975,000.00 III. PEKERJAAN PASANGAN DAN PLESTERAN 1 Pek. Aanstamping 7.425 m3 220,000.00 1,633,500.00 2 Pek. Pas. Batu kali 1 : 8 15.593 m3 490,000.00 7,640,325.00 3 Pek. Pas. Batu bata 1 : 4 tebal 1/2 bata 297.500 m2 87,000.00 ### 4 Pek. Plesteran 1 : 6 386.750 m2 30,000.00 ### 5 Pek. Acian 386.750 m2 18,000.00 6,961,500.00 6 Pek. Sponengan 26.000 m' 20,000.00 520,000.00 IV. PEKERJAAN BETON 1 Pek. Beton Footplat 100x100x20 cm ~ Bekisting 7.680 m2 75,000.00 576,000.00 ~ Besi Beton 230.400 kg 11,600.00 2,672,640.00 ~ Beton Cor (Mutu beton K-175) 1.536 m3 825,000.00 1,267,200.00 2 Pek. Beton Sloof 15/30 cm ~ Bekisting 35.400 m2 75,000.00 2,655,000.00 ~ Besi Beton 440.001 kg 11,600.00 5,104,007.66 ~ Beton Cor (Mutu beton K-175) 2.655 m3 825,000.00 2,190,375.00 3 Pek. Beton Kolom Struktur 30/30 cm ~ Bekisting 93.600 m2 75,000.00 7,020,000.00 ~ Besi Beton 775.594 kg 11,600.00 8,996,894.85 ~ Beton Cor (Mutu beton K-175) 7.020 m3 825,000.00 5,791,500.00 4 Pek. Beton Kolom praktis 12/12 cm ~ Bekisting 3.600 m2 75,000.00 270,000.00 ~ Besi Beton 56.228 kg 11,600.00 652,247.41 ~ Beton Cor (Mutu beton K-175) 0.216 m3 825,000.00 178,200.00 5 Pek. Beton Ring Balok Struktur 15/30 cm ~ Bekisting 52.500 m2 75,000.00 3,937,500.00 ~ Besi Beton 522.035 kg 11,600.00 6,055,602.30 ~ Beton Cor (Mutu beton K-175) 3.150 m3 825,000.00 2,598,750.00 6 Pek. Beton Balok Latei 15/30 cm ~ Bekisting 7.500 m2 75,000.00 562,500.00 ~ Besi Beton 82.034 kg 11,600.00 951,594.65 ~ Beton Cor (Mutu beton K-175) 0.495 m3 825,000.00 408,375.00 7 Pek. Beton Talang 15 cm ~ Bekisting 28.600 m2 75,000.00 2,145,000.00 ~ Besi Beton 312.000 kg 11,600.00 3,619,200.00 ~ Beton Cor (Mutu beton K-175) 3.120 m3 825,000.00 2,574,000.00 8 Pek. Beton Ring balk 12/18 cm ~ Bekisting 20.160 m2 75,000.00 1,512,000.00 ~ Besi Beton 278.418 kg 11,600.00 3,229,654.56 ~ Beton Cor (Mutu beton K-175) 1.210 m3 825,000.00 997,920.00 9 Pek. Rabat beton (Mutu beton K-100) 1.000 m3 700,000.00 700,000.00 10 Pek. Lantai kerja bawah keramik (Mutu beton K-100) 13.000 m3 700,000.00 9,100,000.00 V. PEKERJAAN PENUTUP LANTAI 1 Pek. Lantai Keramik 40 x 40 cm 150.000 m2 120,000.00 ### 2 Pek. Lantai Keramik KM/WC 20 x 20 cm 3.000 m2 110,000.00 330,000.00 3 Pek. Dinding Keramik KM/WC 20 x 25 cm 13.000 m2 125,000.00 1,625,000.00

Upload: ikhsanudin-st

Post on 16-Jan-2016

87 views

Category:

Documents


34 download

DESCRIPTION

RAB Penawaran Borongan Toko

TRANSCRIPT

Page 1: RAB Toko H Sholeh

RENCANA ANGGARAN BIAYA

PROYEK : PEMBANGUNAN TOKO "H. SHOLEH"LOKASI : KEDUNGWUNI - PEKALONGAN

HARGA JUMLAHNO URAIAN PEKERJAAN VOLUME SATUAN HARGA

(Rp.) (Rp.)1 2 3 4 5 = (3x4)

I. PEKERJAAN PERSIAPAN1 Pek. Pengukuran dan pemasangan bowplank 1.000 ls 250,000.00 250,000.00 2 Pek. Air kerja dan listrik kerja 1.000 ls 250,000.00 250,000.00

II. PEKERJAAN TANAH1 Pek. Galian tanah 61.200 m3 35,000.00 2,142,000.00 2 Pek. Urugan tanah kembali 30.600 m3 18,000.00 550,800.00 3 Pek. Urugan tanah peninggian peil 39.000 m3 55,000.00 2,145,000.00 4 Pek. Urugan pasir bawah pondasi 2.374 m3 130,000.00 308,620.00 5 Pek. Urugan pasir bawah lantai 7.500 m3 130,000.00 975,000.00

III. PEKERJAAN PASANGAN DAN PLESTERAN1 Pek. Aanstamping 7.425 m3 220,000.00 1,633,500.00 2 Pek. Pas. Batu kali 1 : 8 15.593 m3 490,000.00 7,640,325.00 3 Pek. Pas. Batu bata 1 : 4 tebal 1/2 bata 297.500 m2 87,000.00 25,882,500.00 4 Pek. Plesteran 1 : 6 386.750 m2 30,000.00 11,602,500.00 5 Pek. Acian 386.750 m2 18,000.00 6,961,500.00 6 Pek. Sponengan 26.000 m' 20,000.00 520,000.00

IV. PEKERJAAN BETON1 Pek. Beton Footplat 100x100x20 cm

~ Bekisting 7.680 m2 75,000.00 576,000.00 ~ Besi Beton 230.400 kg 11,600.00 2,672,640.00 ~ Beton Cor (Mutu beton K-175) 1.536 m3 825,000.00 1,267,200.00

2 Pek. Beton Sloof 15/30 cm~ Bekisting 35.400 m2 75,000.00 2,655,000.00 ~ Besi Beton 440.001 kg 11,600.00 5,104,007.66 ~ Beton Cor (Mutu beton K-175) 2.655 m3 825,000.00 2,190,375.00

3 Pek. Beton Kolom Struktur 30/30 cm~ Bekisting 93.600 m2 75,000.00 7,020,000.00 ~ Besi Beton 775.594 kg 11,600.00 8,996,894.85 ~ Beton Cor (Mutu beton K-175) 7.020 m3 825,000.00 5,791,500.00

4 Pek. Beton Kolom praktis 12/12 cm~ Bekisting 3.600 m2 75,000.00 270,000.00 ~ Besi Beton 56.228 kg 11,600.00 652,247.41 ~ Beton Cor (Mutu beton K-175) 0.216 m3 825,000.00 178,200.00

5 Pek. Beton Ring Balok Struktur 15/30 cm~ Bekisting 52.500 m2 75,000.00 3,937,500.00 ~ Besi Beton 522.035 kg 11,600.00 6,055,602.30 ~ Beton Cor (Mutu beton K-175) 3.150 m3 825,000.00 2,598,750.00

6 Pek. Beton Balok Latei 15/30 cm~ Bekisting 7.500 m2 75,000.00 562,500.00 ~ Besi Beton 82.034 kg 11,600.00 951,594.65 ~ Beton Cor (Mutu beton K-175) 0.495 m3 825,000.00 408,375.00

7 Pek. Beton Talang 15 cm~ Bekisting 28.600 m2 75,000.00 2,145,000.00 ~ Besi Beton 312.000 kg 11,600.00 3,619,200.00 ~ Beton Cor (Mutu beton K-175) 3.120 m3 825,000.00 2,574,000.00

8 Pek. Beton Ring balk 12/18 cm

Page 2: RAB Toko H Sholeh

HARGA JUMLAHNO URAIAN PEKERJAAN VOLUME SATUAN HARGA

(Rp.) (Rp.)1 2 3 4 5 = (3x4)

~ Bekisting 20.160 m2 75,000.00 1,512,000.00 ~ Besi Beton 278.418 kg 11,600.00 3,229,654.56 ~ Beton Cor (Mutu beton K-175) 1.210 m3 825,000.00 997,920.00

9 Pek. Rabat beton (Mutu beton K-100) 1.000 m3 700,000.00 700,000.00 10 Pek. Lantai kerja bawah keramik (Mutu beton K-100) 13.000 m3 700,000.00 9,100,000.00

V. PEKERJAAN PENUTUP LANTAI1 Pek. Lantai Keramik 40 x 40 cm 150.000 m2 120,000.00 18,000,000.00 2 Pek. Lantai Keramik KM/WC 20 x 20 cm 3.000 m2 110,000.00 330,000.00 3 Pek. Dinding Keramik KM/WC 20 x 25 cm 13.000 m2 125,000.00 1,625,000.00

VI. PEKERJAAN PLAFOND1 Pek. Plafond gypsum board tbl 9 mm + Rangka kayu 130.000 m2 120,000.00 15,600,000.00 2 Pek. List langit-langit Gypsum profil 10 cm 53.000 m' 25,000.00 1,325,000.00

VII. PEKERJAAN PINTU DAN JENDELA1 Pek. Pintu PVC KM/WC 1.000 bh 450,000.00 450,000.00 2 Pek. Pintu besi lipat 32.200 m2 1,000,000.00 32,200,000.00

VIII. PEKERJAAN ATAP 1 Pek. Kuda-kuda Baja Ringan 143.000 m2 140,000.00 20,020,000.00 2 Pek. Genteng Press JTW Glazuur 143.000 m2 77,000.00 11,011,000.00 3 Pek. Genteng Bubungan Press JTW Glazuur 13.000 m' 77,000.00 1,001,000.00 4 Pek. Listplank 2/20 kayu Kampas 26.000 m' 70,000.00 1,820,000.00

IX. PEKERJAAN INSTALASI LISTRIK1 Pek. Lampu Downlight + SL 18 Watt 11.000 bh 125,000.00 1,375,000.00 2 Pek. Stop kontak (Broco) 3.000 bh 25,000.00 75,000.00 3 Pek. Saklar Tunggal (Broco) 1.000 bh 25,000.00 25,000.00 4 Pek. Saklar Ganda (Broco) 5.000 bh 25,000.00 125,000.00 5 Pek. Outlet AC 2.000 bh 80,000.00 160,000.00 6 Pek. Outlet TV + instalasi 1.000 bh 350,000.00 350,000.00 7 Pek. Instalasi Listrik 16.000 ttk 95,000.00 1,520,000.00 8 Pek. Panel listrik 1.000 unit 500,000.00 500,000.00

X. PEKERJAAN SANITASI1 Pek. Instalasi pipa air bersih 3/4" PVC AW 16.000 m' 16,000.00 256,000.00 2 Pek. Instalasi air kotor 3" PVC D 16.000 m' 35,000.00 560,000.00 3 Pek. Instalasi air bekas 4" PVC D 16.000 m' 60,000.00 960,000.00 4 Pek. Instalasi air hujan 3" PVC D 87.000 m' 35,000.00 3,045,000.00 5 Pek. Kloset Duduk lengkap assesories setara Toto 1.000 unit 2,000,000.00 2,000,000.00 6 Pek. Kran air standard 1/2" 1.000 bh 25,000.00 25,000.00 7 Pek. Shower air standard 1/2" 1.000 bh 200,000.00 200,000.00 8 Pek. Tempat sabun 1.000 bh 35,000.00 35,000.00 9 Pek. Floor drain 1.000 bh 25,000.00 25,000.00

XI. PEKERJAAN PENGECATAN1 Pek. Cat dinding 386.750 m2 16,000.00 6,188,000.00 2 Pek. Cat plafond 130.000 m2 16,000.00 2,080,000.00

XII. PEKERJAAN LAIN-LAIN1 Pek. Septicktank kecil + resapan 1.000 unit 3,500,000.00 3,500,000.00 2 Pek. Canopy Besi Plat + Zincalum 20.000 m2 450,000.00 9,000,000.00

Page 3: RAB Toko H Sholeh

HARGA JUMLAHNO URAIAN PEKERJAAN VOLUME SATUAN HARGA

(Rp.) (Rp.)1 2 3 4 5 = (3x4)

JUMLAH KESELURUHAN 272,013,906.43 JUMLAH KESELURUHAN (DIBULATKAN) 272,000,000.00

TERBILANG : "TIGA RATUS ENAM BELAS JUTA RUPIAH"

Pekalongan, 23 Februari 2014

Penawar,

IKHSANUDIN, ST