rab lab smpn

Upload: jerri-tambun

Post on 07-Feb-2018

237 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/21/2019 Rab Lab Smpn

    1/132

    NO. URAIAN HARGA UPAH HARGA SATUAN

    1 Pekerja @Rp. 65,000.00 Org/Hari

    2 Mandor @Rp. 75,000.00 OH

    3 Tukang Batu @Rp. 95,000.00 OH4 Tukang Kayu @Rp. 95,000.00 OH

    5 Tukang Besi @Rp. 95,000.00 OH

    6 Tukang Keramik @Rp. 95,000.00 OH

    7 Tukang Plafond @Rp. 95,000.00 OH

    8 Tukang Pasang Pipa @Rp. 95,000.00 OH

    9 Tukang Cat @Rp. 95,000.00 OH

    10 Tukang Las @Rp. 95,000.00 OH

    11 Tukang Sumur Bor @Rp. 95,000.00 OH

    12 Pembantu Ahli Bor @Rp. 75,000.00 OH

    13 Operator terampil @Rp. 75,000.00 OH

    14 Kepala Tukang @Rp. 110,000.00 OH

    15 Jaga Malam @Rp. 70,000.00 OM

    URAIAN HARGA BAHAN HARGA SATUAN

    TIMBUNAN / GALIAN

    1 Tanah Timbun @Rp. 82,400.00 M3

    2 Pasir Timbun / urug @Rp. 105,200.00 M3

    3 Pasir @Rp. 118,800.00 M3

    4 Pasir Beton @Rp. 132,400.00 M3

    5 S i r t u @Rp. 141,500.00 M3

    6 Tanah Humus @Rp. 250,000.00 M3

    B. BAHAN PEREKAT

    1 Semen PPC @Rp. 1,300.00 Kg

    2 Cement Putih/ Warna @Rp. 2,250.00 Kg

    3 Lem Kayu @Rp. 40,000.00 Kg4 Lem Vinyl / Karet @Rp. 45,000.00 Kg

    5 Perekat Kaca @Rp. 85,000.00 Kg

    6 Waterproof @Rp. 60,000.00 Kg

    7 Lem pipa @Rp. 78,000.00 Kg

    8 Lem pipa @Rp. 12,000.00 tube

    9 Seal tape @Rp. 3,100.00 roll

    10 Air kerja @Rp. 35.00 Ltr

    C. BATU / BATU CETAKAN

    1 Batu Kerikil @Rp. 300,400.00 M3

    2 Batu kali @Rp. 255,100.00 M3

    3 Batu Pecah 1 - 2 cm @Rp. 288,800.00 M3

    4 Batu Pecah 2 - 3 cm @Rp. 285,200.00 M35 Batu Pecah 3 - 5 cm @Rp. 276,200.00 M3

    6 Batu Pecah 5 - 7 cm @Rp. 268,900.00 M3

    7 Batu Pecah 7 - 10 cm @Rp. 231,000.00 M3

    8 Batu pecah 15 - 20 cm @Rp. 203,100.00 M3

    9 Batu pecah 10 - 15 cm @Rp. 213,100.00 M3

    10 Batu Kacang/jagung 0,5 - 1 cm @Rp. 230,000.00 M3

    11 Batu Bata 5x10x20 cm @Rp. 500.00 Bh

    12 Batu Bataco 10x20x40 cm @Rp. 3,800.00 Bh

    13 Batu Bataco 9x18x36 cm @Rp. 3,600.00 Bh

    14 Batu Krawang 10x10x20 cm @Rp. 5,000.00 Bh

    DAFTAR HARGA SATUAN BAHAN DAN UPAH

  • 7/21/2019 Rab Lab Smpn

    2/132

    NO. URAIAN HARGA UPAH HARGA SATUAN

    15 Batu Krawang 12x11x24 cm @Rp. 5,500.00 Bh

    16 Bondbeam/Kanstin 60x30x20 cm @Rp. 40,000.00 Bh

    17 Paving Blok beton tbl 6 cm @Rp. 2,000.00 Bh

    18 Cob stone uk 10 x 20 x 40 cm @Rp. 13,800.00 Bh

    19 Con Block Warna type Uni Pave tbl 6 cm @Rp. 1,600.00 Bh

    20 Con Block Warna type Dosex Six tbl 6 cm @Rp. 1,600.00 Bh21 Con Block Warna type Hexagon tbl 6 cm @Rp. 1,600.00 Bh

    22 Con Block K 125 @Rp. 2,200.00 Bh

    23 Con Block K 175 @Rp. 2,500.00 Bh

    24 Bodem 30cm @Rp. 27,000.00 Bh

    D. KAYU / LANGIT-LANGIT

    1 Balok Kayu Damar Laut / Kelas I @Rp. 10,370,400.00 M3

    2 Papan Kayu Damar Laut / Kelas I @Rp. 10,370,000.00 M3

    3 Balok Kayu Meranti / Kelas II @Rp. 6,814,800.00 M3

    4 Papan Kayu Meranti / Kelas II @Rp. 7,037,000.00 M3

    5 Kayu Sembarang Keras / Kelas III @Rp. 5,000,000.00 M3

    6 Kayu Bekisting @Rp. 3,833,300.00 M3

    7 Papan Sembarang @Rp. 80,700.00 Kpg8 Kayu Lat Asbes 5x30x400 mm @Rp. 7,400.00 Btg

    9 Kayu Dolken / kayu laut 7,5 - 10 @Rp. 52,000.00 Btg

    10 Bambu 6 - 8 / 600 cm @Rp. 13,800.00 Btg

    11 Bilik bambu @Rp. 14,000.00 M2

    12 Kayu Profil 1" @Rp. 6,500.00 M'

    13 Kayu Profil 2" @Rp. 12,500.00 M'

    14 Kayu Profil 3" @Rp. 18,800.00 M'

    15 Kayu Profil 4" @Rp. 25,100.00 M'

    16 Profil Gypsum 2" @Rp. 4,600.00 M'

    17 Profil Gypsum 3" @Rp. 5,400.00 M'

    18 Profil Gypsum 4" @Rp. 6,700.00 M'

    19 Profil Gypsum 6" @Rp. 8,500.00 M'

    20 Plywood 120 x 240 tbl. 9 mm @Rp. 135,000.00 Lbr21 Plywood 120 x 240 tbl. 6 mm @Rp. 95,000.00 Lbr

    22 Plywood 120 x 240 tbl. 4 mm @Rp. 65,000.00 Lbr

    23 Teakwood 120 x 240 tbl. 3 mm @Rp. 50,000.00 Lbr

    24 Triplek Jati 120 x 240 tbl. 3 mm @Rp. 120,000.00 Lbr

    25 Triplek Sungkai 120 x 240 tbl.3 mm @Rp. 120,000.00 Lbr

    26 Formica 120 x 240 cm @Rp. 74,300.00 Lbr

    27 Gypsum 120 x 240 tbl. 6 mm @Rp. 60,000.00 Lbr

    28 Gypsum 120 x 240 tbl. 9 mm @Rp. 71,500.00 Lbr

    29 Gypsum 120 x 240 tbl.12 mm @Rp. 93,500.00 Lbr

    30 Beeding gypsum @Rp. 7,000.00 Btg

    31 Tepung gypsum @Rp. 10,400.00 Kg

    32 Asbes Lokal 100 x 100 cm @Rp. 14,000.00 Lbr

    33 Asbes Atrisco 100 x 100 cm t= 4 mm @Rp. 15,000.00 Lbr34 Akustik 30 x 30 cm @Rp. 8,500.00 Lbr

    35 Akustik 30 x 60 cm @Rp. 17,100.00 Lbr

    36 Akustik 60 x 120 cm @Rp. 68,300.00 Lbr

    37 Rangka Furing Ceiling Gypsum @Rp. 50,000.00 M2

    38 Rangka Furing Dinding Gypsum @Rp. 60,000.00 M2

    39 Tepung Dempul @Rp. 10,500.00 Kg

    40 Kain Kasa/Paper Tape @Rp. 60,000.00 Roll

  • 7/21/2019 Rab Lab Smpn

    3/132

    NO. URAIAN HARGA UPAH HARGA SATUAN

    E. BESI / KAWAT / ALLUMINIUM

    1 Besi Beton Polos @Rp. 15,000.00 Kg

    2 Besi Beton Ulir @Rp. 16,000.00 Kg

    3 Besi Profil WF/INP @Rp. 17,300.00 Kg

    4 Besi CNP @Rp. 17,250.00 Kg5 Besi Plat Strip @Rp. 17,250.00 Kg

    6 Kawat Beton @Rp. 18,700.00 Kg

    7 Kawat Licin / seng polos @Rp. 22,500.00 Kg

    8 Kawat Duri @Rp. 4,500.00 M'

    9 Kawat Nyamuk @Rp. 19,000.00 M2

    10 Kawat Kasa @Rp. 13,000.00 M2

    11 Kawat Harmonika # 1" @Rp. 25,000.00 M2

    12 Kawat Burung @Rp. 15,000.00 M2

    13 Kawat Las @Rp. 45,000.00 Kg

    14 Pagar Kawat BRC 120 polos @Rp. 250,000.00 Lbr

    15 Pintu Besi @Rp. 820,000.00 M2

    16 Pintu Gulung Besi @Rp. 830,000.00 M2

    17 Pintu Lipat Besi @Rp. 840,000.00 M218 Pintu Rolling Door @Rp. 467,000.00 M2

    19 Pintu lipat (folding door) bahan plastik/PVC @Rp. 467,000.00 M2

    20 Jerajak Besi Bermotif @Rp. 382,030.00 M2

    21 Jerajak Besi Strip @Rp. 350,000.00 M2

    22 Kosen Pintu Alluminium ( 80 x 210 ) Coklat @Rp. 450,000.00 Bh

    23 Kosen Pintu Alluminium ( 80 x 210 ) putih @Rp. 420,000.00 Bh

    24 Kosen Jendela Alluminium ( 120 x 60 ) coklat @Rp. 350,000.00 Bh

    25 Kosen Jendela Alluminium ( 120 x 60 ) putih @Rp. 320,000.00 Bh

    26 Pintu Alluminium ( 80 x 210 ) Coklat @Rp. 750,000.00 Bh

    27 Pintu Alluminium ( 80 x 210 ) putih @Rp. 650,000.00 Bh

    28 Profil Alluminium T @Rp. 8,500.00 M'

    29 Profil rangka pintu aluminium @Rp. 132,000.00 M'

    30 Almunium strip @Rp. 30,000.00 M'31 Kosen Pintu / jendela aluminium coklat @Rp. 90,000.00 M'

    32 Kosen Pintu / jendela aluminium putih @Rp. 85,000.00 M'

    33 Vention Blinds @Rp. 175,000.00 M2

    34 Verticals Blinds @Rp. 185,000.00 M2

    35 Bingkai Naco Niki hitam @Rp. 195,000.00 M2

    36 Bingkai Naco Niki putih @Rp. 165,000.00 M2

    37 Paku Beton 0,5 - 2" @Rp. 300.00 Bh

    38 Paku Beton 2" - 5" @Rp. 500.00 Bh

    39 Paku Biasa 0,5 - 2" @Rp. 17,000.00 Kg

    40 Paku Biasa 2 - 5" @Rp. 17,000.00 Kg

    41 Paku seng @Rp. 250.00 Bh

    42 Sekrup macam Ukuran @Rp. 21,200.00 Kg

    43 Sekrup 0,5 - 2" @Rp. 300.00 Bh44 Sekrup fisher @Rp. 400.00 Bh

    45 Bout 5/8" - 8" @Rp. 20,000.00 Bh

    46 Bout Angker 3/4" - 10" @Rp. 45,400.00 Bh

    47 Bout Ramset @Rp. 1,500.00 Bh

    48 Rangka Atap Twin light @Rp. 300,000.00 M2

    49 Wiremesh M6 (2,1 x 5,4) @Rp. 352,000.00 M2

    50 Wiremesh M8 (2,1 x 5,4) @Rp. 605,000.00 M2

    51 Furing untuk rangka utama @Rp. 34,100.00 Btg

    52 Furing untuk rangka pembagi @Rp. 34,800.00 Btg

  • 7/21/2019 Rab Lab Smpn

    4/132

    NO. URAIAN HARGA UPAH HARGA SATUAN

    53 Furing untuk rangka ke dinding @Rp. 8,300.00 Btg

    54 Pengikat rangka furing @Rp. 1,000.00 set

    55 Kawat penggantung+klipper rangka furing @Rp. 13,200.00 set

    F. PENUTUP LANTAI DAN DINDING

    1 Ubin granito 30 x 30 cm @Rp. 26,300.00 Bh2 Ubin granito 40 x 40 cm @Rp. 46,600.00 Bh

    3 Ubin granito 60 x 60 cm @Rp. 104,700.00 Bh

    4 Ubin Mosaik 30 x 30 cm @Rp. 15,290.00 Bh

    5 Ubin Marmer Ex.DN @Rp. 330,000.00 M2

    6 Ubin teralux marmer 30 x 30 cm @Rp. 27,200.00 Bh

    7 Ubin teralux marmer 40 x 40 cm @Rp. 48,400.00 Bh

    8 Ubin teralux marmer 60 x 60 cm @Rp. 109,500.00 Bh

    9 Keramik Standart 60 x 60 cm @Rp. 33,000.00 Bh

    10 Ubin keramik 10 x 20 cm @Rp. 1,300.00 Bh

    11 Ubin keramik 20 x 20 cm @Rp. 2,600.00 Bh

    12 Ubin keramik 20 x 25 cm @Rp. 3,250.00 Bh

    13 Ubin keramik 25 x 25 cm @Rp. 3,750.00 Bh

    14 Ubin keramik 30 x 30 cm @Rp. 5,910.00 Bh15 Ubin keramik 30 x 30 cm anti slip @Rp. 6,800.00 Bh

    16 Ubin keramik 33 x 33 cm @Rp. 6,500.00 Bh

    17 Ubin keramik 40 x 40 cm @Rp. 12,000.00 Bh

    18 Ubin keramik artistik 5 x 20 cm @Rp. 5,000.00 Bh

    19 Ubin keramik artistik timbul 5 x 20 cm @Rp. 15,000.00 Bh

    20 Ubin keramik artistik timbul 10 x 10 cm @Rp. 15,000.00 Bh

    21 Ubin keramik artistik timbul 10 x 20 cm @Rp. 22,000.00 Bh

    22 Ubin keramik Essenza 30 x 30 cm @Rp. 21,200.00 Bh

    23 Ubin keramik Essenza 40 x 40 cm @Rp. 37,600.00 Bh

    24 Porselin 11 x 11 cm putih @Rp. 1,200.00 Bh

    25 Porselin 11 x 11 cm, warna @Rp. 1,500.00 Bh

    26 Porselin 15 x 15 cm, putih @Rp. 2,300.00 Bh

    27 Porselin 15 x 15 cm, warna @Rp. 2,500.00 Bh28 Plint ubin teralux marmer 10 x 30 cm @Rp. 10,000.00 Bh

    29 Plint ubin teralux marmer 10 x 40 cm @Rp. 13,000.00 Bh

    30 Plint ubin teralux marmer 10 x 60 cm @Rp. 20,000.00 Bh

    31 Plint ubin granito 10 x 30 cm @Rp. 28,000.00 Bh

    32 Plint ubin granito 10 x 40 cm @Rp. 62,800.00 Bh

    33 Plint ubin granito 10 x 60 cm @Rp. 157,200.00 Bh

    34 Plint ubin keramik 10 x 30 cm @Rp. 4,200.00 Bh

    35 Plint ubin keramik 10 x 40 cm @Rp. 5,600.00 Bh

    36 Plint ubin keramik 10 x 60 cm @Rp. 8,400.00 Bh

    37 Plint ubin keramik 15 x 30 cm @Rp. 6,300.00 Bh

    38 Plint ubin keramik 15 x 40 cm @Rp. 8,400.00 Bh

    39 Plint ubin keramik 15 x 60 cm @Rp. 12,600.00 Bh

    40 Batu Lapis Dinding 7x3x24 @Rp. 1,818.00 Bh41 Batu kacang @Rp. 40,000.00 M2

    42 Batu tempel hitam @Rp. 104,500.00 M2

    43 Batu Poros @Rp. 140,000.00 M2

    44 Karpet biasa @Rp. 20,000.00 M2

    45 Carpet 80 % wool, 20 % nylon @Rp. 90,000.00 M2

    46 Feltex carpet 100 % wool-T-21 @Rp. 90,000.00 M2

    47 Underlyer tebal 6 mm / rubber corrugated @Rp. 110,000.00 M2

    48 Vynil asbes 30 x 30 cm @Rp. 8,200.00 Bh

    49 Vynil karet 30 x 30 cm KL I @Rp. 9,800.00 Bh

  • 7/21/2019 Rab Lab Smpn

    5/132

    NO. URAIAN HARGA UPAH HARGA SATUAN

    50 Vynil karet 30 x 30 cm KL II @Rp. 9,100.00 Bh

    51 Vynil motif kembang ex DN 30 x 30 cm @Rp. 9,400.00 Bh

    52 Vynil wall covering lebar 50 cm @Rp. 65,000.00 M2

    53 Paku Pancing 60 - 230 @Rp. 700.00 Bh

    54 Wallpaper @Rp. 33,600.00 M2

    55 Sekrup 3,5" @Rp. 20,400.00 Kg56 Perquet Jati @Rp. 368,500.00 M2

    57 Gymfloor @Rp. 79,800.00 M2

    G. PENUTUP ATAP

    1 Atap Genteng Beton @Rp. 6,000.00 Bh

    2 Atap Genteng Keramik @Rp. 20,000.00 Bh

    3 Atap Sirap @Rp. 940.00 Bh

    4 Atap Genteng Metal/Multi Roof ( 4 tingkat ) @Rp. 65,000.00 Lbr

    5 Atap Genteng Asbes Cement 0,32 @Rp. 66,000.00 Lbr

    6 Atap Aluminium gelombang tebal 0,55 @Rp. 98,200.00 Lbr

    7 Atap Seng Alumi Zinc warna 0,35 @Rp. 69,240.00 M2

    8 Atap Twin Light @Rp. 90,000.00 M2

    9 Atap Seng gelombang 6' bjls @Rp. 48,000.00 Lbr10 Atap Seng gelombang 7' bjls @Rp. 56,000.00 Lbr

    11 Atap Seng gelombang 8' bjls @Rp. 61,000.00 Lbr

    12 Atap Seng Super Deck 3' x 6' tbl.0,30 @Rp. 68,800.00 Lbr

    13 Roof light fibreglass gelombang 180 x 90 cm @Rp. 46,400.00 Lbr

    14 Atap Asbes gelombang 2,1 x 1,05 tbl.4 mm @Rp. 38,000.00 Lbr

    15 Genteng bubung palentong @Rp. 9,400.00 Bh

    16 Genteng bubung palentong super @Rp. 12,700.00 Bh

    17 Genteng bubung kodok @Rp. 9,600.00 Bh

    18 Atap tylux @Rp. 50,000.00 Lbr

    19 Nok genteng Beton @Rp. 12,200.00 Bh

    20 Nok genteng Keramik @Rp. 35,000.00 Bh

    21 Nok sudut genteng Keramik @Rp. 105,000.00 Bh

    22 Nok genteng Asbes gelombang Cement 0,35 @Rp. 25,000.00 Lbr23 Nok Alluminium standart 40 cm 18 swg 22 @Rp. 52,200.00 M2

    24 Rabung tylux @Rp. 38,000.00 Lbr

    25 Rabung seng 7" @Rp. 20,000.00 Lbr

    26 Rabung/ Nok genteng @Rp. 4,000.00 Bh

    27 Rabung/ Nok genteng warna @Rp. 5,000.00 Bh

    28 Rabung genteng metal @Rp. 25,000.00 Bh

    29 Rabung Alumi Zinc warna @Rp. 23,100.00 Bh

    30 Rangka atap baja ringan sederhana (siap pasang) @Rp. 120,000.00 M2

    31 Rangka atap baja ringan (siap pasang) @Rp. 140,000.00 M2

    32 Seng plat bjls 32 @Rp. 75,000.00 Lbr

    33 Seng plat bjls 30 @Rp. 70,000.00 Lbr

    34 Seng plat bjls 28 @Rp. 68,000.00 Lbr

    35 Sisalation / aluminium foil @Rp. 20,000.00 M236 Paku Seng + Ring karet @Rp. 25,000.00 Kg

    37 Paku Seng + Ring karet @Rp. 350.00 Bh

    38 Paku hak panjang 15 cm @Rp. 30,500.00 Kg

  • 7/21/2019 Rab Lab Smpn

    6/132

    NO. URAIAN HARGA UPAH HARGA SATUAN

    H. KUNCI DAN KACA

    1 Kunci tanam antik @Rp. 225,000.00 Bh

    2 Kunci tanam biasa @Rp. 85,000.00 Bh

    3 Kunci tanam kamar mandi @Rp. 50,000.00 Bh

    4 Kunci silinder @Rp. 40,000.00 Bh5 Kunci selot @Rp. 35,000.00 Bh

    6 Kunci lemari @Rp. 12,500.00 Bh

    7 Engsel pintu 4" @Rp. 15,000.00 Bh

    8 Engsel jendela 3" @Rp. 11,000.00 Bh

    9 Engsel angin @Rp. 25,000.00 Bh

    10 Kait angin @Rp. 15,000.00 Bh

    11 Rel pintu dorong @Rp. 225,000.00 Bh

    12 Sealent @Rp. 40,000.00 Kg

    13 Spring knip @Rp. 9,100.00 Bh

    14 Door closer @Rp. 110,000.00 Bh

    15 Door handle @Rp. 115,000.00 Bh

    16 Door stop @Rp. 40,000.00 Bh

    17 Espanyolet @Rp. 88,500.00 Bh18 Kaca Block 20 x 20 cm @Rp. 30,000.00 Bh

    19 Kaca Polos tbl. 3 mm @Rp. 80,000.00 M2

    20 Kaca Polos tbl. 5 mm @Rp. 130,000.00 M2

    21 Kaca Polos tbl. 8 mm @Rp. 215,000.00 M2

    22 Kaca Reyben tbl. 5 mm @Rp. 156,000.00 M2

    23 Kaca Reyben tbl. 8 mm @Rp. 265,000.00 M2

    24 Kaca buram tbl.3 mm @Rp. 96,000.00 M2

    25 Kaca buram tbl.5 mm @Rp. 120,000.00 M2

    26 Kaca buram tbl.8 mm @Rp. 265,000.00 M2

    27 Kaca cermin tebal 5 mm @Rp. 175,000.00 M2

    28 Kaca cermin tebal 6 mm @Rp. 210,000.00 M2

    29 Kaca cermin tebal 8 mm @Rp. 280,000.00 M2

    30 Kaca patri @Rp. 275,000.00 M231 Kaca wireglass @Rp. 151,300.00 M2

    32 Rangka daun naco (1 daun) @Rp. 17,000.00 Set

    33 Rangka daun naco (8 daun) @Rp. 146,000.00 Set

    34 Rangka daun naco (5 daun) @Rp. 60,000.00 Set

    35 Rangka daun naco (10 daun) @Rp. 170,000.00 Set

    36 Kaca Reyben Naco 30 x 60 cm tbl.5 mm @Rp. 13,500.00 Lbr

    37 Kaca Polos Naco tbl.5 mm @Rp. 11,500.00 kaki

    I. CAT / MINYAK

    1 Cat Dasar @Rp. 22,300.00 Kg

    2 Cat Tembok setara Vinilex @Rp. 22,700.00 Kg

    3 Cat Tembok setara ICI @Rp. 110,000.00 Kg

    4 Cat Minyak @Rp. 59,100.00 Kg5 Cat Menie Kayu @Rp. 43,000.00 Kg

    6 Cat Menie Besi @Rp. 43,000.00 Kg

    7 Cat Sending @Rp. 60,000.00 Kg

    8 Cat Melamix @Rp. 65,000.00 Kg

    9 Cat Vernis Jadi @Rp. 50,000.00 Kg

    10 Cat genteng @Rp. 55,000.00 Kg

    11 Plamir @Rp. 15,700.00 Kg

    12 Dempul Gypsum @Rp. 10,400.00 Kg

    13 Dempul Cat @Rp. 31,600.00 Kg

  • 7/21/2019 Rab Lab Smpn

    7/132

    NO. URAIAN HARGA UPAH HARGA SATUAN

    14 Minyak Cat @Rp. 15,000.00 Kg

    15 Minyak Bekisting @Rp. 6,300.00 Ltr

    16 Residu / Kolter @Rp. 6,700.00 Ltr

    17 Soda Api @Rp. 12,100.00 Kg

    18 Sabun @Rp. 10,300.00 Kg

    19 Kuas kecil @Rp. 15,000.00 Bh20 Ampelas/Kertas Pasir @Rp. 1,800.00 Lbr

    21 Solar @Rp. 4,500.00 Ltr

    22 Minyak pelumas @Rp. 44,000.00 Ltr

    J. SANITASI / PIPA

    1 Kloset duduk / monoblok Lengkap tangki @Rp. 2,050,000.00 Bh

    2 Kloset duduk / monoblok tanpa tangki @Rp. 1,350,000.00 Bh

    3 Kloset jongkok biasa @Rp. 165,000.00 Bh

    4 Bakkif Porselen @Rp. 2,750,000.00 Bh

    5 Wastafel warna (standard) @Rp. 425,000.00 Bh

    6 Urinoir @Rp. 522,500.00 Bh

    7 Kran air 1/2" - 3/4" @Rp. 27,300.00 Bh

    8 Kran air leher angsa 1/2" @Rp. 77,200.00 Bh9 Kran Shower @Rp. 50,000.00 Bh

    10 Kran Cebok @Rp. 114,000.00 Bh

    11 Bak fibre 0,3 M3 @Rp. 400,000.00 Bh

    12 Bak fibre 1 M3 @Rp. 591,000.00 Bh

    13 Bak cuci piring steinless 2 Lobang @Rp. 475,000.00 Bh

    14 Bak cuci piring teraso 2 Lobang @Rp. 247,500.00 Bh

    15 Tempat sabun keramik @Rp. 45,000.00 Bh

    16 Floor Drain 4" standard @Rp. 25,000.00 Bh

    17 Tutup Bak air 1" Kuningan @Rp. 13,800.00 Bh

    18 Instalasi air Bersih @Rp. 100,000.00 Ttk

    19 Instalasi air Kotor/Limbah @Rp. 125,000.00 Ttk

    20 Buis Beton 1/2 15 cm @Rp. 11,300.00 M'

    21 Buis Beton 1/2 20 cm @Rp. 17,800.00 M'22 Buis Beton 1/2 30 cm @Rp. 33,000.00 M'

    23 Buis Beton 15 cm @Rp. 20,000.00 M'

    24 Buis Beton 20 cm @Rp. 30,000.00 M'

    25 Buis Beton 30 cm @Rp. 50,000.00 M'

    26 Buis Beton 40 cm @Rp. 80,000.00 M'

    27 Buis Beton 50 cm @Rp. 90,000.00 M'

    28 Buis Beton 60 cm @Rp. 176,000.00 M'

    29 Buis Beton 80 cm @Rp. 242,000.00 M'

    30 Buis Beton 100 cm @Rp. 360,000.00 M'

    31 Bodem pracetak 1/2 30 cm @Rp. 33,000.00 Bh

    32 Pipa PVC Tipe AW 1/2" @Rp. 2,300.00 M'

    33 Pipa PVC Tipe AW 3/4" @Rp. 3,632.00 M'

    34 Pipa PVC Tipe AW 1" @Rp. 5,615.00 M'35 Pipa PVC Tipe AW 11/4" @Rp. 8,864.00 M'

    36 Pipa PVC Tipe AW 11/2" @Rp. 14,260.00 M'

    37 Pipa PVC Tipe AW 2" @Rp. 20,495.00 M'

    38 Pipa PVC Tipe AW 21/2" @Rp. 29,306.00 M'

    39 Pipa PVC Tipe AW 3" @Rp. 42,499.00 M'

    40 Pipa PVC Tipe AW 4" @Rp. 62,790.00 M'

    41 Pipa PVC Tipe AW 5" @Rp. 86,920.00 M'

    mailto:=@round(+O236*1,1;-1)mailto:=@round(+O236*1,1;-1)mailto:=@round(+O236*1,1;-1)mailto:=@round(+O236*1,1;-1)mailto:=@round(+O236*1,1;-1)mailto:=@round(+O236*1,1;-1)mailto:=@round(+O236*1,1;-1)mailto:=@round(+O236*1,1;-1)mailto:=@round(+O236*1,1;-1)mailto:=@round(+O236*1,1;-1)
  • 7/21/2019 Rab Lab Smpn

    8/132

    NO. URAIAN HARGA UPAH HARGA SATUAN

    42 Pipa PVC Tipe AW 6" @Rp. 134,007.00 M'

    43 Pipa PVC Tipe AW 8" @Rp. 213,703.00 M'

    44 Pipa PVC Tipe AW 10" @Rp. 320,600.00 M'

    45 Pipa PVC Tipe AW 12" @Rp. 509,795.00 M'

    46 Pipa PVC Tipe D 2" @Rp. 11,500.00 M'

    47 Pipa PVC Tipe D 3" @Rp. 23,700.00 M'48 Pipa PVC Tipe D 4" @Rp. 34,000.00 M'

    49 Pipa Besi Hitam 1/2" @Rp. 14,800.00 M'

    50 Pipa Besi Hitam 3/4" @Rp. 20,100.00 M'

    51 Pipa Besi Hitam 1" @Rp. 29,500.00 M'

    52 Pipa Besi Hitam 11/2" @Rp. 37,600.00 M'

    53 Pipa Besi Hitam 2" @Rp. 47,600.00 M'

    54 Pipa Besi Hitam 21/2" @Rp. 50,200.00 M'

    55 Pipa besi (mustang) @Rp. 230,000.00 btg

    56 Pipa Galvanis 1/2" @Rp. 14,810.00 M'

    57 Pipa Galvanis 3/4" @Rp. 21,780.00 M'

    58 Pipa Galvanis 1" @Rp. 27,870.00 M'

    59 Pipa Galvanis 11/4" @Rp. 34,500.00 M'

    60 Pipa Galvanis 11/2" @Rp. 54,270.00 M'61 Pipa Galvanis 2" @Rp. 78,580.00 M'

    62 Pipa Galvanis 21/2" @Rp. 102,800.00 M'

    63 Pipa Galvanis 4" @Rp. 154,770.00 M'

    64 Pipa Galvanis 5" @Rp. 240,000.00 M'

    65 Pipa Galvanis 6" @Rp. 327,250.00 M'

    66 Elbow GIP 1 1/4" @Rp. 19,250.00 Bh

    67 Elbow GIP 1 1/2" @Rp. 19,250.00 Bh

    68 Stop kran 1 1/4" @Rp. 267,850.00 Bh

    69 Stop kran 1 1/2" @Rp. 267,850.00 Bh

    70 Tee GIP 1 1/2" @Rp. 22,000.00 Bh

    71 Dop GIP 1 1/4" @Rp. 8,250.00 Bh

    72 Dop GIP 1 1/2" @Rp. 8,250.00 Bh

    73 Socket GIP 3/4" @Rp. 9,625.00 Bh74 Socket GIP 2" @Rp. 35,000.00 Bh

    75 Socket GIP 3" @Rp. 70,000.00 Bh

    76 Socket GIP 4" @Rp. 110,000.00 Bh

    77 Socket GIP 6" @Rp. 225,000.00 Bh

    78 Gate Valve 6" @Rp. 1,800,000.00 Bh

    79 Gate Valve 4" @Rp. 850,000.00 Bh

    80 Gate Valve 3" @Rp. 726,000.00 Bh

    81 Collar 6" @Rp. 500,000.00 Bh

    82 Collar 4" @Rp. 350,000.00 Bh

    83 Collar 3" @Rp. 250,000.00 Bh

    84 Tee PVC 6 x 6" @Rp. 435,600.00 Bh

    85 Tee PVC 6 x 4" @Rp. 405,000.00 Bh

    86 Tee PVC 6 x 3" @Rp. 381,150.00 Bh87 Tee PVC 6 x 2" @Rp. 326,700.00 Bh

    88 Tee PVC 4 x 3" @Rp. 105,700.00 Bh

    89 Tee PVC 4 x 2" @Rp. 105,700.00 Bh

    90 Tee PVC 3 x 2" @Rp. 58,900.00 Bh

    91 Tee PVC 3 x 3" @Rp. 58,900.00 Bh

    92 Pig busa 6" @Rp. 846,660.00 Bh

    93 Pig busa 4" @Rp. 632,440.00 Bh

    94 Pig busa 3" @Rp. 495,950.00 Bh

    95 Pig busa 2" @Rp. 390,000.00 Bh

    mailto:=@round(+O236*1,1;-1)mailto:=@round(+O236*1,1;-1)
  • 7/21/2019 Rab Lab Smpn

    9/132

    NO. URAIAN HARGA UPAH HARGA SATUAN

    96 Cup 4" @Rp. 58,000.00 Bh

    97 Cup 3" @Rp. 29,000.00 Bh

    98 Cup 2" @Rp. 16,500.00 Bh

    99 Valve Cover CI @Rp. 190,000.00 Bh

    100 Long bend PVC 6" x 90 @Rp. 320,000.00 Bh

    101 Long bend PVC 6" x 45 @Rp. 265,000.00 Bh102 Long bend PVC 6" x 22,5 @Rp. 215,000.00 Bh

    103 Long bend PVC 4" x 90 @Rp. 120,000.00 Bh

    104 Long bend PVC 4" x 45 @Rp. 107,000.00 Bh

    105 Long bend PVC 3" x 90 @Rp. 82,000.00 Bh

    106 Long bend PVC 3" x 22.5 @Rp. 71,000.00 Bh

    107 Reduser PVC 4" x 3" @Rp. 47,500.00 Bh

    108 Reduser PVC 4" x 2" @Rp. 44,000.00 Bh

    109 Reduser PVC 6" x 4" @Rp. 114,000.00 Bh

    110 Reduser PVC 6" x 3" @Rp. 99,000.00 Bh

    111 Single Air Valve 4" @Rp. 2,750,000.00 Bh

    112 Single Air Valve 6" @Rp. 4,680,000.00 Bh

    113 Flange Steel 6" @Rp. 390,000.00 Bh

    114 Flange Steel 4" @Rp. 196,730.00 Bh115 Flange Steel 3" @Rp. 152,330.00 Bh

    116 Bend Steel 6"x45 @Rp. 570,000.00 Bh

    117 Bend Steel 4"x45 @Rp. 380,000.00 Bh

    118 Wall Flange 4" @Rp. 72,600.00 Bh

    119 Flange Spigot 3" @Rp. 145,000.00 Bh

    120 Flange Spigot 4" @Rp. 255,000.00 Bh

    121 Flange Spigot 6" @Rp. 500,000.00 Bh

    122 TY Steel 4" @Rp. 400,000.00 Bh

    123 Elbow steel 110 x 90 @Rp. 418,800.00 Bh

    124 Elbow PVC 110 x 90 @Rp. 191,440.00 Bh

    125 Rubber Packing t : 3 mm @Rp. 94,000.00 m2

    126 Solvent Cement @Rp. 78,000.00 kg

    127 Bolt & Nut 5/8 x 3" @Rp. 5,500.00 bh128 Pelampung 1 1/4" @Rp. 262,000.00 Bh

    129 Water meter 1/2'' @Rp. 295,000.00 Bh

    130 Cleam sadle 1/2" @Rp. 81,250.00 Bh

    131 Pipa GIP 1/2" @Rp. 14,810.00 M

    132 Elbow GIP 1/2" @Rp. 14,500.00 Bh

    133 Plengking 1/2" @Rp. 15,625.00 Bh

    134 Double naple 1/2" @Rp. 11,000.00 Bh

    135 Stop derat 1/2" @Rp. 46,875.00 Bh

    136 Seal tape @Rp. 3,125.00 rol

    137 Elbow derat 1/2" @Rp. 14,500.00 Bh

    138 Sewa Pompa @Rp. 100,000.00 Hari

    139 Bak air alumunium kap. 1000 Liter @Rp. 2,700,000.00 Unit

    140 Pelampung 1 1/4" @Rp. 262,000.00 Bh141 Sewa mesin pompa air @Rp. 100,000.00 Hari

    142 Sewa pipa shawn 40 (20 batang) @Rp. 50,000.00 Hari

    143 Alat bantu mesin sumur bor @Rp. 20,000.00 Hari

    144 Bak fiber kap. 3000 Liter @Rp. 3,900,000.00 Unit

    145 Gravel pack @Rp. 146,000.00 M3

    146 Bentonite @Rp. 20,000.00 Kg

    147 Pompa submersible 1 Ltr/det @Rp. 13,000,000.00 Unit

    148 Kabel pompa 1 phase @Rp. 15,000.00 Bh

    149 Panel on/off + stabilisator 170 - 220 Vlt @Rp. 4,350,000.00 Set

    mailto:=@round(+O236*1,1;-1)mailto:=@round(+O236*1,1;-1)
  • 7/21/2019 Rab Lab Smpn

    10/132

    NO. URAIAN HARGA UPAH HARGA SATUAN

    150 Elektrikal magnetic kontrol pompa @Rp. 900,000.00 Set

    151 Fitting Knee AW 1" @Rp. 5,200.00 Bh

    152 Fitting Tee AW 1" @Rp. 7,200.00 Bh

    153 Fitting Socht AW 1" @Rp. 4,700.00 Bh

    154 Bocht LL-D 1" @Rp. 24,800.00 Bh

    155 Union Socht 1" @Rp. 7,400.00 Bh156 D-Nipple 1" @Rp. 18,200.00 Bh

    K. LISTRIK / ACSESORIES

    1 Lampu TL 1 x 20 W Lengkap kotak @Rp. 54,400.00 Set

    2 Lampu TL 1 x 40 W Lengkap kotak @Rp. 60,500.00 Set

    3 Lampu TL 2 x 20 W Lengkap kotak @Rp. 163,400.00 Set

    4 Lampu TL 2 x 40 W Lengkap kotak @Rp. 183,900.00 Set

    5 Lampu TL 2 x 20 W + sarang sisir @Rp. 365,000.00 Set

    6 Lampu TL 2 x 40 W + sarang sisir @Rp. 435,000.00 Set

    7 Lampu TL Bambu 1 x 20 W Lengkap @Rp. 108,900.00 Set

    8 Lampu TL Bambu 1 x 40 W Lengkap @Rp. 123,400.00 Set

    9 Lampu XL 5 W @Rp. 25,400.00 Set

    10 Lampu XL10 W @Rp. 29,000.00 Set11 Lampu XL18 W @Rp. 33,900.00 Set

    12 Lampu XL24 W @Rp. 38,700.00 Set

    13 Lampu Downlight 5 W Lengkap @Rp. 54,500.00 Set

    14 Fitting lampu pijar @Rp. 7,500.00 Set

    15 Fitting lampu XL biasa @Rp. 10,000.00 Set

    16 Fitting lampu downlight 3" @Rp. 33,000.00 Set

    17 Fitting lampu downlight 4" @Rp. 40,000.00 Set

    18 Lampu Pijar 5 w @Rp. 7,500.00 Set

    19 Lampu Pijar 10 w @Rp. 8,000.00 Set

    20 Lampu Pijar 15 w @Rp. 8,500.00 Set

    21 Lampu Pijar 20 w @Rp. 9,000.00 Set

    22 Lampu Pijar 25 w @Rp. 9,500.00 Set

    23 Lampu Pijar 40 w @Rp. 10,500.00 Set24 Stop Kontak Tanam @Rp. 9,200.00 Bh

    25 Saklar Tunggal @Rp. 16,400.00 Bh

    26 Saklar Ganda @Rp. 21,800.00 Bh

    27 Saklar Triple @Rp. 24,200.00 Bh

    28 Zekring box 1 grup @Rp. 26,600.00 Unt

    29 Zekring box 2 grup @Rp. 31,400.00 Unt

    30 Zekring box 3 grup @Rp. 38,500.00 Unt

    31 Zekring box 4 grup @Rp. 46,200.00 Unt

    32 MCB 2 Ampere @Rp. 32,000.00 Unt

    33 MCB 4 Ampere @Rp. 35,455.00 Unt

    34 MCB 6 Ampere @Rp. 44,627.00 Unt

    35 MCB 8 Ampere @Rp. 90,182.00 Unt

    36 Kabel Listrik NYA 1,5 mm @Rp. 1,270.00 M'37 Kabel Listrik NYA 2,5 mm @Rp. 2,160.00 M'

    38 Kabel Listrik NYA 4 mm @Rp. 3,420.00 M'

    39 Kabel Listrik NYM 2 1,5 mm @Rp. 4,920.00 M'

    40 Kabel Listrik NYM 2 2,5 mm @Rp. 9,540.00 M'

    41 Kabel Listrik NYM 2 4 mm @Rp. 10,340.00 M'

    42 Instalasi listrik titik api / Lampu Nyala @Rp. 90,000.00 Ttk

    mailto:=@round(+O236*1,1;-1)mailto:=@round(+O236*1,1;-1)mailto:=@round(+O236*1,1;-1)mailto:=@round(+O236*1,1;-1)mailto:=@round(+O236*1,1;-1)mailto:=@round(+O236*1,1;-1)mailto:=@round(+O236*1,1;-1)mailto:=@round(+O236*1,1;-1)mailto:=@round(+O236*1,1;-1)mailto:=@round(+O236*1,1;-1)mailto:=@round(+O236*1,1;-1)mailto:=@round(+O236*1,1;-1)mailto:=@round(+O236*1,1;-1)mailto:=@round(+O236*1,1;-1)mailto:=@round(+O236*1,1;-1)mailto:=@round(+O236*1,1;-1)mailto:=@round(+O236*1,1;-1)mailto:=@round(+O236*1,1;-1)mailto:=@round(+O236*1,1;-1)mailto:=@round(+O236*1,1;-1)mailto:=@round(+O236*1,1;-1)mailto:=@round(+O236*1,1;-1)mailto:=@round(+O236*1,1;-1)mailto:=@round(+O236*1,1;-1)mailto:=@round(+O236*1,1;-1)mailto:=@round(+O236*1,1;-1)mailto:=@round(+O236*1,1;-1)mailto:=@round(+O236*1,1;-1)mailto:=@round(+O236*1,1;-1)mailto:=@round(+O236*1,1;-1)mailto:=@round(+O236*1,1;-1)mailto:=@round(+O236*1,1;-1)mailto:=@round(+O236*1,1;-1)mailto:=@round(+O236*1,1;-1)mailto:=@round(+O236*1,1;-1)mailto:=@round(+O236*1,1;-1)mailto:=@round(+O236*1,1;-1)mailto:=@round(+O236*1,1;-1)mailto:=@round(+O236*1,1;-1)mailto:=@round(+O236*1,1;-1)mailto:=@round(+O236*1,1;-1)mailto:=@round(+O236*1,1;-1)mailto:=@round(+O236*1,1;-1)mailto:=@round(+O236*1,1;-1)mailto:=@round(+O236*1,1;-1)mailto:=@round(+O236*1,1;-1)mailto:=@round(+O236*1,1;-1)mailto:=@round(+O236*1,1;-1)mailto:=@round(+O236*1,1;-1)mailto:=@round(+O236*1,1;-1)mailto:=@round(+O236*1,1;-1)mailto:=@round(+O236*1,1;-1)mailto:=@round(+O236*1,1;-1)mailto:=@round(+O236*1,1;-1)mailto:=@round(+O236*1,1;-1)mailto:=@round(+O236*1,1;-1)mailto:=@round(+O236*1,1;-1)mailto:=@round(+O236*1,1;-1)mailto:=@round(+O236*1,1;-1)mailto:=@round(+O236*1,1;-1)mailto:=@round(+O236*1,1;-1)mailto:=@round(+O236*1,1;-1)mailto:=@round(+O236*1,1;-1)mailto:=@round(+O236*1,1;-1)mailto:=@round(+O236*1,1;-1)mailto:=@round(+O236*1,1;-1)mailto:=@round(+O236*1,1;-1)mailto:=@round(+O236*1,1;-1)mailto:=@round(+O236*1,1;-1)mailto:=@round(+O236*1,1;-1)mailto:=@round(+O236*1,1;-1)mailto:=@round(+O236*1,1;-1)mailto:=@round(+O236*1,1;-1)mailto:=@round(+O236*1,1;-1)mailto:=@round(+O236*1,1;-1)mailto:=@round(+O236*1,1;-1)mailto:=@round(+O236*1,1;-1)mailto:=@round(+O236*1,1;-1)mailto:=@round(+O236*1,1;-1)mailto:=@round(+O236*1,1;-1)mailto:=@round(+O236*1,1;-1)mailto:=@round(+O236*1,1;-1)mailto:=@round(+O236*1,1;-1)mailto:=@round(+O236*1,1;-1)
  • 7/21/2019 Rab Lab Smpn

    11/132

    11

    SNI 03-2835-2002 PEKERJAAN PERSIAPAN

    PA 6.2. Pagar sementara 1 m' dari seng gelombang tinggi 2 meter

    SNI 03-2835-2002 / 6.2

    Bahan Kayu dolken 1.2500 Btg x Rp 52,000.00 = Rp 65,000.00

    Semen PPC 2.5000 Kg x Rp 1,300.00 = Rp 3,250.00

    Seng gelombang 1.2000 Lbr x Rp 48,000.00 = Rp 57,600.00

    Pasir 0.0050 M3 x Rp 118,800.00 = Rp 594.00

    Koral beton 0.0090 M3 x Rp 300,400.00 = Rp 2,703.60

    Kayu 5/7 0.0720 M3 x Rp 3,833,300.00 = Rp 275,997.60

    Paku biasa 2" - 5" 0.0600 Kg x Rp 17,000.00 = Rp 1,020.00

    Jumlah (1) = Rp 406,165.20

    Upah Tukang kayu 0.2000 Oh x Rp 95,000.00 = Rp 19,000.00

    Pekerja 0.4000 Oh x Rp 65,000.00 = Rp 26,000.00Kepala tukang 0.0200 Oh x Rp 110,000.00 = Rp 2,200.00

    Mandor 0.0200 Oh x Rp 75,000.00 = Rp 1,500.00

    Jumlah (2) = Rp 48,700.00

    Jumlah (1) + (2) = Rp 454,865.20

    = Rp 454,865.00

    PA 6.4 Pengukuran dan Pemasangan bouwplank 1 m'

    SNI 03-2835-2002 / 6.4

    Bahan Kayu 5/7 0.0120 M3 x Rp 3,833,300.00 = Rp 45,999.60

    Paku biasa 2" - 5" 0.0200 Kg x Rp 17,000.00 = Rp 340.00

    Kayu papan 3/10 0.0070 M3 x Rp 3,833,300.00 = Rp 26,833.10

    Jumlah (1) = Rp 73,172.70

    Upah Tukang kayu 0.1000 Oh x Rp 95,000.00 = Rp 9,500.00

    Pekerja 0.1000 Oh x Rp 65,000.00 = Rp 6,500.00

    Kepala tukang 0.0100 Oh x Rp 110,000.00 = Rp 1,100.00

    Mandor 0.0050 Oh x Rp 75,000.00 = Rp 375.00

    Jumlah (2) = Rp 17,475.00

    Jumlah (1) + (2) = Rp 90,647.70

    = Rp 90,647.00

    PA 6.5 Pembuatan Gudang Semen dan Alat-Alat 1 M2

    SNI 03-2835-2002 / 6.5

    Bahan Dolken Kayu dia. 8-10/400 cm 1.7000 btg x Rp 52,000.00 = Rp 88,400.00

    Kayu 0.2100 m3 x Rp 3,833,300.00 = Rp 804,993.00Paku Biasa 0.3000 kg x Rp 17,000.00 = Rp 5,100.00

    Semen PPC 10.5000 kg x Rp 1,300.00 = Rp 13,650.00

    Pasir 0.0300 m3 x Rp 118,800.00 = Rp 3,564.00

    Kerikil 0.0500 m3 x Rp 300,400.00 = Rp 15,020.00

    Seng Gelombang bjls 1.5000 lbr x Rp 48,000.00 = Rp 72,000.00

    Jumlah (1) = Rp 1,002,727.00

    DINAS CIPTA KARYA DAN PERTAMBANGAN

    KAB. DELI SERDANG

    DAFTAR ANALISA BIAYA KONSTRUKSI TAHUN 2012

    Dibulatkan

    Dibulatkan

  • 7/21/2019 Rab Lab Smpn

    12/132

    12

    Upah Tukang kayu 2.0000 Oh x Rp 95,000.00 = Rp 190,000.00

    Pekerja 1.0000 Oh x Rp 65,000.00 = Rp 65,000.00

    Kepala tukang 0.2000 Oh x Rp 110,000.00 = Rp 22,000.00

    Mandor 0.0500 Oh x Rp 75,000.00 = Rp 3,750.00

    Jumlah (2) = Rp 280,750.00

    Jumlah (1) + (2) = Rp 1,283,477.00

    = Rp 1,283,477.00

    PA 6.8 Membersihkan lapangan dan perataan 1 m

    SNI 03-2835-2002 / 6.8

    Upah Pekerja 0.1000 Oh x Rp 65,000.00 = Rp 6,500.00

    Mandor 0.0050 Oh x Rp 75,000.00 = Rp 375.00

    Jumlah = Rp 6,875.00

    PA 6.13 Bongkaran beton betulang 1 m

    SNI 03-2835-2002 / 6.13

    Upah Pekerja 6.6670 Oh x Rp 65,000.00 = Rp 433,355.00

    Mandor 0.3330 Oh x Rp 75,000.00 = Rp 24,975.00

    Jumlah = Rp 458,330.00

    PA 6.14 Bongkaran dinding tembok bata merah 1m

    SNI 03-2835-2002 / 6.14

    Upah Pekerja 5.0000 Oh x Rp 65,000.00 = Rp 325,000.00

    Mandor 0.2500 Oh x Rp 75,000.00 = Rp 18,750.00

    Jumlah = Rp 343,750.00

    PA 6.15 Pasangan pagar 1m kawat jaring galvanis, tinggi 1.00 m

    SNI 03-2835-2002 / 6.15

    Bahan Kawat jaring galvanis/BRC 0.4340 Lbr x Rp 250,000.00 = Rp 108,500.00

    Jumlah (1) = Rp 108,500.00

    Upah Pekerja 0.0420 Oh x Rp 65,000.00 = Rp 2,730.00

    Kepala tukang 0.0040 Oh x Rp 110,000.00 = Rp 440.00

    Tukang 0.0420 Oh x Rp 95,000.00 = Rp 3,990.00

    Mandor 0.0020 Oh x Rp 75,000.00 = Rp 150.00

    Jumlah (2) = Rp 7,310.00

    Jumlah (1) + (2) = Rp 115,810.00

    SNI 2835:2008 HARGA SATUAN PEKERJAAN TANAH

    PT 6.1. Menggali 1 m3 tanah biasa sedalam 1 meter

    SNI 2835:2008 / 6.1

    Upah Pekerja 0.7500 Oh x Rp. 65,000.00 = Rp. 48,750.00

    Mandor 0.0250 Oh x Rp. 75,000.00 = Rp. 1,875.00Jumlah (1) = Rp. 50,625.00

    PT 6.2. Menggali 1 m3 tanah biasa sedalam 2 meter

    SNI 2835:2008 / 6.2

    Upah Pekerja 0.9000 Oh x Rp. 65,000.00 = Rp. 58,500.00

    Mandor 0.0450 Oh x Rp. 75,000.00 = Rp. 3,375.00

    Jumlah (1) = Rp. 61,875.00

    Dibulatkan

  • 7/21/2019 Rab Lab Smpn

    13/132

    13

    PT 6.4. Menggali 1 m3 tanah keras sedalam 1 meter

    SNI 2835:2008 / 6.4

    Upah Pekerja 1.0000 Oh x Rp. 65,000.00 = Rp. 65,000.00

    Mandor 0.0320 Oh x Rp. 75,000.00 = Rp. 2,400.00

    Jumlah = Rp. 67,400.00

    PT 6.5. Menggali 1 m3 tanah cadas sedalam 1 meterSNI 2835:2008 / 6.5

    Upah Pekerja 1.5000 Oh x Rp. 65,000.00 = Rp. 97,500.00

    Mandor 0.0600 Oh x Rp. 75,000.00 = Rp. 4,500.00

    Jumlah = Rp. 102,000.00

    PT 6.6. Menggali tanah lumpur sedalam 1 meter

    SNI 2835:2008 / 6.6

    Upah Pekerja 1.2000 Oh x Rp. 65,000.00 = Rp. 78,000.00

    Mandor 0.0450 Oh x Rp. 75,000.00 = Rp. 3,375.00

    Jumlah = Rp. 81,375.00

    PT 6.7. Mengerjakan 1 m2 stripping tebing setinggi 1 meter

    SNI 2835:2008 / 6.7

    Upah Pekerja 0.0500 Oh x Rp. 65,000.00 = Rp. 3,250.00

    Mandor 0.0050 Oh x Rp. 75,000.00 = Rp. 375.00

    Jumlah = Rp. 3,625.00

    PT 6.8. Membuang 1 m3 tanah sejauh 15 meter

    SNI 2835:2008 / 6.8

    Upah Pekerja 0.3300 Oh x Rp. 65,000.00 = Rp. 21,450.00

    Mandor 0.0100 Oh x Rp. 75,000.00 Rp. 750.00

    Jumlah = Rp. 22,200.00

    PT 6.9. Mengurug kembali 1m3 galian

    SNI 2835:2008 / 6.9

    Mengurug kembali 1m3 galian dihitung dari 1/3 kali dari indeks pekerjaan galian

    0.3330 Oh x Rp. 50,625.00 = Rp. 16,858.13

    Dibulatkan = Rp. 16,858.00

    PT 6.10. Memadatkan kembali 1 m3 tanah (per 20 cm)

    SNI 2835:2008 / 6.10

    Upah Pekerja 0.5000 Oh x Rp. 65,000.00 = Rp. 32,500.00

    Mandor 0.0500 Oh x Rp. 75,000.00 = Rp. 3,750.00

    Jumlah = Rp. 36,250.00

    PT 6.11. Mengurug 1 m3 pasir urug

    SNI 2835:2008 / 6.11

    Bahan Pasir urug 1.2000 M x Rp. 105,200.00 = Rp. 126,240.00Jumlah (1) = Rp. 126,240.00

    Upah Pekerja 0.3000 Oh x Rp. 65,000.00 = Rp. 19,500.00

    Mandor 0.0100 Oh x Rp. 75,000.00 = Rp. 750.00

    Jumlah (2) = Rp. 20,250.00

    Jumlah (1) + (2) = Rp. 146,490.00

  • 7/21/2019 Rab Lab Smpn

    14/132

    14

    PT 6.12. Memasang 1 m3 Lapisan pudel camp. 1KP:3PP:7TL untuk stabilisasi tanah

    SNI 2835:2008 / 6.12

    Bahan Kerikil 0.1350 M x Rp. 300,400.00 = Rp. 40,554.00

    Pasir urug 0.4000 M x Rp. 105,200.00 = Rp. 42,080.00

    Tanah liat 0.9480 M x Rp. 82,400.00 = Rp. 78,115.20

    Jumlah (1) = Rp. 160,749.20

    Upah Pekerja 0.8000 Oh x Rp. 65,000.00 = Rp. 52,000.00

    Tukang batu 0.4000 Oh x Rp. 95,000.00 = Rp. 38,000.00

    Kepala tukang 0.0400 Oh x Rp. 110,000.00 = Rp. 4,400.00

    Mandor 0.0800 Oh x Rp. 75,000.00 = Rp. 6,000.00

    Jumlah (2) = Rp. 100,400.00

    Jumlah (1) + (2) = Rp. 261,149.20

    = Rp 261,149.00

    PT 6.13 Memasang 1 m3 Lapisan pudel camp. 1KP:5TL untuk stabilisasi tanah

    SNI 2835:2008 / 6.13

    Bahan Kerikil 0.2480 M x Rp. 300,400.00 = Rp. 74,499.20

    Tanah liat 1.2400 M x Rp. 82,400.00 = Rp. 102,176.00

    Jumlah (1) = Rp. 176,675.20

    Upah Pekerja 0.8000 Oh x Rp. 65,000.00 = Rp. 52,000.00

    Tukang batu 0.4000 Oh x Rp. 95,000.00 = Rp. 38,000.00

    Kepala tukang 0.0400 Oh x Rp. 110,000.00 = Rp. 4,400.00

    Mandor 0.0800 Oh x Rp. 75,000.00 = Rp. 6,000.00

    Jumlah (2) = Rp. 100,400.00

    Jumlah (1) + (2) = Rp. 277,075.20

    = Rp 277,075.00

    PT 6.15. Mengurug 1 m3 sirtu padat

    SNI 2835:2008 / 6.15

    Bahan Sirtu 1.2000 M x Rp. 141,500.00 = Rp. 169,800.00

    Jumlah (1) = Rp. 169,800.00

    Upah Pekerja 0.2500 Oh x Rp. 65,000.00 = Rp. 16,250.00

    Mandor 0.0250 Oh x Rp. 75,000.00 = Rp. 1,875.00

    Jumlah (2) = Rp. 18,125.00

    Jumlah (1) + (2) = Rp. 187,925.00

    PT 6.15a Menimbun 1 m3 tanah

    SNI 2835:2008 / 6.15a

    Bahan Tanah timbun 1.2000 M x Rp. 82,400.00 = Rp. 98,880.00

    Jumlah (1) = Rp. 98,880.00

    Upah Pekerja 0.2500 Oh x Rp. 65,000.00 = Rp. 16,250.00Mandor 0.0250 Oh x Rp. 75,000.00 = Rp. 1,875.00

    Jumlah (2) = Rp. 18,125.00

    Jumlah (1) + (2) = Rp. 117,005.00

    Dibulatkan

    Dibulatkan

  • 7/21/2019 Rab Lab Smpn

    15/132

    15

    SNI 2835:2008 HARGA SATUAN PEKERJAAN PONDASI

    PP 6.1. Memasang 1 M pondasi batu belah/kali, 1 PC : 3 PP

    SNI 2835:2008 / 6.1

    Bahan Batu kali 15/20 cm 1.2000 M x Rp. 255,100.00 = Rp. 306,120.00

    Semen PPC 202.0000 Kg x Rp. 1,300.00 = Rp. 262,600.00

    Pasir pasang 0.4850 M x Rp. 118,800.00 = Rp. 57,618.00Jumlah (1) = Rp. 626,338.00

    Upah Pekerja 1.5000 Oh x Rp. 65,000.00 = Rp. 97,500.00

    Tukang batu 0.7500 Oh x Rp. 95,000.00 = Rp. 71,250.00

    Kepala tukang 0.0750 Oh x Rp. 110,000.00 = Rp. 8,250.00

    Mandor 0.0750 Oh x Rp. 75,000.00 = Rp. 5,625.00

    Jumlah (2) = Rp. 182,625.00

    Jumlah (1) + (2) = Rp. 808,963.00

    PP 6.2. Memasang 1 M pondasi batu belah/kali, 1 PC : 4 PP

    SNI 2835:2008 / 6.2

    Bahan Batu kali 15/20 cm 1.2000 M x Rp. 255,100.00 = Rp. 306,120.00

    Semen PPC 163.0000 Kg x Rp. 1,300.00 = Rp. 211,900.00

    Pasir Pasang 0.5200 M x Rp. 118,800.00 = Rp. 61,776.00

    Jumlah (1) = Rp. 579,796.00

    Upah Pekerja 1.5000 Oh x Rp. 65,000.00 = Rp. 97,500.00

    Tukang batu 0.7500 Oh x Rp. 95,000.00 = Rp. 71,250.00

    Kepala tukang 0.0750 Oh x Rp. 110,000.00 = Rp. 8,250.00

    Mandor 0.0750 Oh x Rp. 75,000.00 = Rp. 5,625.00

    Jumlah (2) = Rp. 182,625.00

    Jumlah (1) +(2) = Rp. 762,421.00

    PP 6.3. Memasang 1 M pondasi batu belah/kali, 1 PC : 5 PP

    SNI 2835:2008 / 6.3

    Bahan Batu kali 15/20 cm 1.2000 M x Rp. 255,100.00 = Rp. 306,120.00

    Semen PPC 136.0000 Kg x Rp. 1,300.00 = Rp. 176,800.00

    Pasir Pasang 0.5440 M x Rp. 118,800.00 = Rp. 64,627.20

    Jumlah (1) = Rp. 547,547.20

    Upah Pekerja 1.5000 Oh x Rp. 65,000.00 = Rp. 97,500.00

    Tukang batu 0.7500 Oh x Rp. 95,000.00 = Rp. 71,250.00

    Kepala tukang 0.0750 Oh x Rp. 110,000.00 = Rp. 8,250.00

    Mandor 0.0750 Oh x Rp. 75,000.00 = Rp. 5,625.00

    Jumlah (2) = Rp. 182,625.00

    Jumlah (1) +(2) = Rp. 730,172.20

    = Rp 730,172.00

    PP 6.4. Memasang 1 M pondasi batu belah/kali, 1 PC : 6 PP

    SNI 2835:2008 / 6.4

    Bahan Batu kali 15/20 cm 1.2000 M x Rp. 255,100.00 = Rp. 306,120.00

    Semen PPC 117.0000 Kg x Rp. 1,300.00 = Rp. 152,100.00

    Pasir Pasang 0.5610 M x Rp. 118,800.00 = Rp. 66,646.80

    Jumlah (1) = Rp. 524,866.80

    Dibulatkan

  • 7/21/2019 Rab Lab Smpn

    16/132

    16

    Upah Pekerja 1.5000 Oh x Rp. 65,000.00 = Rp. 97,500.00

    Tukang batu 0.7500 Oh x Rp. 95,000.00 = Rp. 71,250.00

    Kepala tukang 0.0750 Oh x Rp. 110,000.00 = Rp. 8,250.00

    Mandor 0.0750 Oh x Rp. 75,000.00 = Rp. 5,625.00

    Jumlah (2) = Rp. 182,625.00

    Jumlah (1) +(2) = Rp. 707,491.80

    = Rp 707,491.00

    PP 6.5. Memasang 1 M pondasi batu belah/kali, 1 PC :8 PP

    SNI 2835:2008 / 6.5

    Bahan Batu kali 15/20 cm 1.2000 M x Rp. 255,100.00 = Rp. 306,120.00

    Semen PPC 91.0000 Kg x Rp. 1,300.00 = Rp. 118,300.00

    Pasir Pasang 0.5840 M x Rp. 118,800.00 = Rp. 69,379.20

    Jumlah (1) = Rp. 493,799.20

    Upah Pekerja 1.5000 Oh x Rp. 65,000.00 = Rp. 97,500.00

    Tukang batu 0.7500 Oh x Rp. 95,000.00 = Rp. 71,250.00

    Kepala tukang 0.0750 Oh x Rp. 110,000.00 = Rp. 8,250.00

    Mandor 0.0750 Oh x Rp. 75,000.00 = Rp. 5,625.00

    Jumlah (2) = Rp. 182,625.00

    Jumlah (1) +(2) = Rp. 676,424.20

    = Rp 676,424.00

    PP 6.9. Memasang 1m3 batu kosong (anstamping)

    SNI 2835:2008 / 6.9

    Bahan Batu kali 15/20 cm 1.2000 M x Rp. 255,100.00 = Rp. 306,120.00

    Pasir urug 0.4320 M x Rp. 105,200.00 = Rp. 45,446.40

    Jumlah (1) = Rp. 351,566.40

    Upah Pekerja 0.7800 Oh x Rp. 65,000.00 = Rp. 50,700.00

    Tukang batu 0.3900 Oh x Rp. 95,000.00 = Rp. 37,050.00

    Kepala tukang 0.0390 Oh x Rp. 110,000.00 = Rp. 4,290.00

    Mandor 0.0390 Oh x Rp. 75,000.00 = Rp. 2,925.00

    Jumlah (2) = Rp. 94,965.00

    Jumlah (1) +(2) = Rp. 446,531.40

    = Rp 446,531.00

    PP 6.10. Memasang 1 M pondasi siklop, 60% beton camp. 1PC:2PB:3KR dan 40% batu belah/kali

    SNI 2835:2008 / 6.10

    Bahan Batu kali 15/20 cm 0.4800 M x Rp. 255,100.00 = Rp. 122,448.00

    Besi beton 126.0000 Kg x Rp. 15,000.00 = Rp. 1,890,000.00

    Semen PPC 194.0000 Kg x Rp. 1,300.00 = Rp. 252,200.00

    Pasir 0.3120 M x Rp. 118,800.00 = Rp. 37,065.60

    Kerikil 0.4680 M x Rp. 300,400.00 = Rp. 140,587.20

    Kawat beton 1.8000 Kg x Rp. 18,700.00 = Rp. 33,660.00Jumlah (1) = Rp. 2,475,960.80

    Upah Pekerja 3.4000 Oh x Rp. 65,000.00 = Rp. 221,000.00

    Tukang batu 0.8500 Oh x Rp. 95,000.00 = Rp. 80,750.00

    Kepala tukang 0.0850 Oh x Rp. 110,000.00 = Rp. 9,350.00

    Mandor 0.1700 Oh x Rp. 75,000.00 = Rp. 12,750.00

    Jumlah (2) = Rp. 323,850.00

    Jumlah (1) +(2) = Rp. 2,799,810.80

    = Rp 2,799,810.00

    Dibulatkan

    Dibulatkan

    Dibulatkan

    Dibulatkan

  • 7/21/2019 Rab Lab Smpn

    17/132

    17

    PP 6.11. Memasang 1 M3 pondasi sumuran diameter 100 Cm

    SNI 2835:2008 / 6.11

    Bahan Batu kali 15/20 cm 0.4500 M x Rp. 255,100.00 = Rp. 114,795.00

    Semen PPC 194.0000 Kg x Rp. 1,300.00 = Rp. 252,200.00

    Pasir 0.3120 M x Rp. 118,800.00 = Rp. 37,065.60

    Kerikil 0.4680 M x Rp. 300,400.00 = Rp. 140,587.20

    Jumlah (1) = Rp. 544,647.80

    Upah Pekerja 2.4000 Oh x Rp. 65,000.00 = Rp. 156,000.00

    Tukang batu 0.8000 Oh x Rp. 95,000.00 = Rp. 76,000.00

    Kepala tukang 0.0800 Oh x Rp. 110,000.00 = Rp. 8,800.00

    Mandor 0.1190 Oh x Rp. 75,000.00 = Rp. 8,925.00

    Jumlah (2) = Rp. 249,725.00

    Jumlah (1) +(2) = Rp. 794,372.80

    = Rp 794,372.00

    SNI 6897:2008 PEKERJAAN DINDING

    PD 6.1 Memasang 1m2 dinding bata merah tebal 1 bata, camp. 1PC : 2 PP

    SNI 6897:2008 / 6.1

    Bahan Bata merah 140.0000 Bh x Rp. 500.00 = Rp 70,000.00

    Semen PPC 43.5000 Kg x Rp. 1,300.00 = Rp 56,550.00

    Pasir pasang 0.0800 M x Rp. 118,800.00 = Rp 9,504.00

    Jumlah (1) = Rp 136,054.00

    Upah Pekerja 0.6000 Oh x Rp. 65,000.00 = Rp 39,000.00

    Tukang batu 0.2000 Oh x Rp. 95,000.00 = Rp 19,000.00

    Kepala tukang 0.0200 Oh x Rp. 110,000.00 = Rp 2,200.00

    Mandor 0.0300 Oh x Rp. 75,000.00 = Rp 2,250.00

    Jumlah (2) = Rp 62,450.00

    Jumlah (1) + (2) = Rp 198,504.00

    = Rp 198,504.00

    PD 6.2 Memasang 1m2 dinding bata merah tebal 1 bata, camp. 1PC : 3 PP

    SNI 6897:2008 / 6.2

    Bahan Bata merah 140.0000 Bh x Rp. 500.00 = Rp 70,000.00

    Semen PPC 32.9500 Kg x Rp. 1,300.00 = Rp 42,835.00

    Pasir pasang 0.0910 M x Rp. 118,800.00 = Rp 10,810.80

    Jumlah (1) = Rp 123,645.80

    Upah Pekerja 0.6000 Oh x Rp. 65,000.00 = Rp 39,000.00

    Tukang batu 0.2000 Oh x Rp. 95,000.00 = Rp 19,000.00

    Kepala tukang 0.0200 Oh x Rp. 110,000.00 = Rp 2,200.00

    Mandor 0.0300 Oh x Rp. 75,000.00 = Rp 2,250.00

    Jumlah (2) = Rp 62,450.00Jumlah (1) + (2) = Rp 186,095.80

    = Rp 186,095.00

    Dibulatkan

    Dibulatkan

    Dibulatkan

  • 7/21/2019 Rab Lab Smpn

    18/132

    18

    PD 6.4 Memasang 1m2 dinding bata merah tebal 1 bata, camp. 1PC : 4 PP

    SNI 6897:2008 / 6.4

    Bahan Bata merah 140.0000 Bh x Rp. 500.00 = Rp 70,000.00

    Semen PPC 26.5500 Kg x Rp. 1,300.00 = Rp 34,515.00

    Pasir pasang 0.0930 M x Rp. 118,800.00 = Rp 11,048.40

    Jumlah (1) = Rp 115,563.40

    Upah Pekerja 0.6000 Oh x Rp. 65,000.00 = Rp 39,000.00

    Tukang batu 0.2000 Oh x Rp. 95,000.00 = Rp 19,000.00

    Kepala tukang 0.0200 Oh x Rp. 110,000.00 = Rp 2,200.00

    Mandor 0.0300 Oh x Rp. 75,000.00 = Rp 2,250.00

    Jumlah (2) = Rp 62,450.00

    Jumlah (1) + (2) = Rp 178,013.40

    = Rp 178,013.00

    PD 6.7. Memasang 1m2 dinding bata merah tebal 1/2 bata, camp. 1PC : 2 PP

    SNI 6897:2008 / 6.7

    Bahan Bata merah 70.0000 Bh x Rp. 500.00 = Rp 35,000.00

    Semen PPC 18.9500 Kg x Rp. 1,300.00 = Rp 24,635.00

    Pasir pasang 0.0380 M x Rp. 118,800.00 = Rp 4,514.40

    Jumlah (1) = Rp 64,149.40

    Upah Pekerja 0.3000 Oh x Rp. 65,000.00 = Rp 19,500.00

    Tukang batu 0.1000 Oh x Rp. 95,000.00 = Rp 9,500.00

    Kepala tukang 0.0100 Oh x Rp. 110,000.00 = Rp 1,100.00

    Mandor 0.0150 Oh x Rp. 75,000.00 = Rp 1,125.00

    Jumlah (2) = Rp 31,225.00

    Jumlah (1) + (2) = Rp 95,374.40

    = Rp 95,374.00

    PD 6.8. Memasang 1m2 dinding bata merah tebal 1/2 bata, camp. 1PC : 3 PP

    SNI 6897:2008 / 6.8

    Bahan Bata merah 70.0000 Bh x Rp. 500.00 = Rp 35,000.00

    Semen PPC 14.3700 Kg x Rp. 1,300.00 = Rp 18,681.00

    Pasir pasang 0.0400 M x Rp. 118,800.00 = Rp 4,752.00

    Jumlah (1) = Rp 58,433.00

    Upah Pekerja 0.3000 Oh x Rp. 65,000.00 = Rp 19,500.00

    Tukang batu 0.1000 Oh x Rp. 95,000.00 = Rp 9,500.00

    Kepala tukang 0.0100 Oh x Rp. 110,000.00 = Rp 1,100.00

    Mandor 0.0150 Oh x Rp. 75,000.00 = Rp 1,125.00

    Jumlah (2) = Rp 31,225.00

    Jumlah (1) + (2) = Rp 89,658.00

    = Rp 89,658.00

    PD 6.9. Memasang 1m2 dinding bata merah tebal 1/2 bata, camp. 1PC : 4 PP

    SNI 6897:2008 / 6.9

    Bahan Bata merah 70.0000 Bh x Rp. 500.00 = Rp 35,000.00

    Semen PPC 11.5000 Kg x Rp. 1,300.00 = Rp 14,950.00

    Pasir pasang 0.0430 M x Rp. 118,800.00 = Rp 5,108.40

    Jumlah (1) = Rp 55,058.40

    Dibulatkan

    Dibulatkan

    Dibulatkan

  • 7/21/2019 Rab Lab Smpn

    19/132

    19

    Upah Pekerja 0.3000 Oh x Rp. 65,000.00 = Rp 19,500.00

    Tukang batu 0.1000 Oh x Rp. 95,000.00 = Rp 9,500.00

    Kepala tukang 0.0100 Oh x Rp. 110,000.00 = Rp 1,100.00

    Mandor 0.0150 Oh x Rp. 75,000.00 = Rp 1,125.00

    Jumlah (2) = Rp 31,225.00

    Jumlah (1) + (2) = Rp 86,283.40

    = Rp 86,283.00

    PD 6.9.a Memasang 1m2 dinding batako, camp. 1PC : 4 PP

    SNI 6897:2008 / 6.9.a

    Bahan Batako 9x18x38 15.0000 Bh x Rp. 3,600.00 = Rp 54,000.00

    Semen PPC 5.7500 Kg x Rp. 1,300.00 = Rp 7,475.00

    Pasir pasang 0.0200 M x Rp. 118,800.00 = Rp 2,376.00

    Jumlah (1) = Rp 63,851.00

    Upah Pekerja 0.3000 Oh x Rp. 65,000.00 = Rp 19,500.00

    Tukang batu 0.1000 Oh x Rp. 95,000.00 = Rp 9,500.00

    Kepala tukang 0.0100 Oh x Rp. 110,000.00 = Rp 1,100.00

    Mandor 0.0150 Oh x Rp. 75,000.00 = Rp 1,125.00

    Jumlah (2) = Rp 31,225.00

    Jumlah (1) + (2) = Rp 95,076.00

    = Rp 95,076.00

    PD 6.10 Memasang 1m2 dinding bata merah tebal 1/2 bata, camp. 1PC : 5 PP

    SNI 6897:2008 / 6.10

    Bahan Bata merah 70.0000 Bh x Rp. 500.00 = Rp 35,000.00

    Semen PPC 9.6800 Kg x Rp. 1,300.00 = Rp 12,584.00

    Pasir pasang 0.0450 M x Rp. 118,800.00 = Rp 5,346.00

    Jumlah (1) = Rp 52,930.00

    Upah Pekerja 0.3000 Oh x Rp. 65,000.00 = Rp 19,500.00

    Tukang batu 0.1000 Oh x Rp. 95,000.00 = Rp 9,500.00

    Kepala tukang 0.0100 Oh x Rp. 110,000.00 = Rp 1,100.00

    Mandor 0.0150 Oh x Rp. 75,000.00 = Rp 1,125.00

    Jumlah (2) = Rp 31,225.00

    Jumlah (1) + (2) = Rp 84,155.00

    PD 6.30. 1 m3 Pasangan dinding batu kali, 1Pc : 4 Ps

    SNI 2002 / 6.30

    Bahan Batu kali 15/20 1.2000 M x Rp. 255,100.00 = Rp 306,120.00

    Semen PPC 163.0000 Kg x Rp. 1,300.00 = Rp 211,900.00

    Pasir pasang 0.5200 M x Rp. 118,800.00 = Rp 61,776.00

    Jumlah (1) = Rp 579,796.00

    Upah Pekerja 3.6000 Oh x Rp. 65,000.00 = Rp 234,000.00Tukang batu 1.2000 Oh x Rp. 95,000.00 = Rp 114,000.00

    Kepala tukang 0.1200 Oh x Rp. 110,000.00 = Rp 13,200.00

    Mandor 0.1800 Oh x Rp. 75,000.00 = Rp 13,500.00

    Jumlah (2) = Rp 374,700.00

    Jumlah (1) + (2) = Rp 954,496.00

    Dibulatkan

    Dibulatkan

  • 7/21/2019 Rab Lab Smpn

    20/132

    20

    PD 7.10 3m3- Pekerjaan pembangunan penempatan bronjong termasuk penyediaan batu dan kawat

    Bronjong diameter 4 mm untuk anyaman

    Bahan Kawat anyaman 4 mm 45.0000 Kg x Rp. 22,500.00 = Rp 1,012,500.00

    Batu kali 3.0000 Kg x Rp. 255,100.00 = Rp 765,300.00

    Jumlah (1) = Rp 1,777,800.00

    Upah a. PenganyamPekerja 1.8000 Oh x Rp. 65,000.00 = Rp 117,000.00

    Mandor 0.0800 Oh x Rp. 75,000.00 = Rp 6,000.00

    b. Pengisian dan penempatan

    Pekerja 4.5000 Oh x Rp. 65,000.00 = Rp 292,500.00

    Mandor 0.0750 Oh x Rp. 75,000.00 = Rp 5,625.00

    Jumlah (2) = Rp 421,125.00

    Jumlah (1) + (2) = Rp 2,198,925.00

    Pekerjaan bronjong 1 m3

    0.3333 x 2,198,925.00 = Rp. 732,975.00

    Dibulatkan = Rp 732,975.00

    SNI 2837:2008 HARGA SATUAN PEKERJAAN PLESTERAN

    PPL 6.1. Memasang 1 m2 Plesteran 1 PC : 1 PP, tebal 15 mm

    SNI 2837:2008 / 6.1

    Bahan Semen PPC 15.5040 Kg x Rp. 1,300.00 = Rp. 20,155.20

    Pasir pasang 0.0160 M x Rp. 118,800.00 = Rp. 1,900.80

    Jumlah (1) = Rp. 22,056.00

    Upah Pekerja 0.3000 Oh x Rp. 65,000.00 = Rp. 19,500.00

    Tukang batu 0.1500 Oh x Rp. 95,000.00 = Rp. 14,250.00

    Kepala tukang 0.0150 Oh x Rp. 110,000.00 = Rp. 1,650.00

    Mandor 0.0150 Oh x Rp. 75,000.00 = Rp. 1,125.00

    Jumlah (2) = Rp. 36,525.00

    Jumlah (1) + (2) = Rp. 58,581.00

    = Rp 58,581.00

    PPL 6.2. Memasang 1 m2 Plesteran 1 PC : 2 PP, tebal 15 mm

    SNI 2837:2008 / 6.2

    Bahan Semen PPC 10.2240 Kg x Rp. 1,300.00 = Rp. 13,291.20

    Pasir pasang 0.0200 M x Rp. 118,800.00 = Rp. 2,376.00

    Jumlah (1) = Rp. 15,667.20

    Upah Pekerja 0.3000 Oh x Rp. 65,000.00 = Rp. 19,500.00

    Tukang batu 0.1500 Oh x Rp. 95,000.00 = Rp. 14,250.00

    Kepala tukang 0.0150 Oh x Rp. 110,000.00 = Rp. 1,650.00

    Mandor 0.0150 Oh x Rp. 75,000.00 = Rp. 1,125.00

    Jumlah (2) = Rp. 36,525.00

    Jumlah (1) + (2) = Rp. 52,192.20

    = Rp 52,192.00

    PPL 6.3. Memasang 1 m2 Plesteran 1 PC : 3 PP, tebal 15 mm

    SNI 2837:2008 / 6.3

    Bahan Semen PPC 7.7760 Kg x Rp. 1,300.00 = Rp. 10,108.80

    Pasir pasang 0.0230 M x Rp. 118,800.00 = Rp. 2,732.40

    Jumlah (1) = Rp. 12,841.20

    Dibulatkan

    Dibulatkan

  • 7/21/2019 Rab Lab Smpn

    21/132

    21

    Upah Pekerja 0.3000 Oh x Rp. 65,000.00 = Rp. 19,500.00

    Tukang batu 0.1500 Oh x Rp. 95,000.00 = Rp. 14,250.00

    Kepala tukang 0.0150 Oh x Rp. 110,000.00 = Rp. 1,650.00

    Mandor 0.0150 Oh x Rp. 75,000.00 = Rp. 1,125.00

    Jumlah (2) = Rp. 36,525.00

    Jumlah (1) + (2) = Rp. 49,366.20

    = Rp 49,366.00

    PPL 6.4. Memasang 1 m2 Plesteran 1 PC : 4 PP, tebal 15 mm

    SNI 2837:2008 / 6.4

    Bahan Semen PPC 6.2400 Kg x Rp. 1,300.00 = Rp. 8,112.00

    Pasir pasang 0.0240 M x Rp. 118,800.00 = Rp. 2,851.20

    Jumlah (1) = Rp. 10,963.20

    Upah Pekerja 0.3000 Oh x Rp. 65,000.00 = Rp. 19,500.00

    Tukang batu 0.1500 Oh x Rp. 95,000.00 = Rp. 14,250.00

    Kepala tukang 0.0150 Oh x Rp. 110,000.00 = Rp. 1,650.00

    Mandor 0.0150 Oh x Rp. 75,000.00 = Rp. 1,125.00

    Jumlah (2) = Rp. 36,525.00

    Jumlah (1) + (2) = Rp. 47,488.20

    = Rp 47,488.00

    PPL 6.13. Memasang 1 m2 Plesteran 1 PC : 2 PP, tebal 20 mm

    SNI 2837:2008 / 6.13

    Bahan Semen PPC 13.6320 Kg x Rp. 1,300.00 = Rp. 17,721.60

    Pasir pasang 0.0270 M x Rp. 118,800.00 = Rp. 3,207.60

    Jumlah (1) = Rp. 20,929.20

    Upah Pekerja 0.4000 Oh x Rp. 65,000.00 = Rp. 26,000.00

    Tukang batu 0.2000 Oh x Rp. 95,000.00 = Rp. 19,000.00

    Kepala tukang 0.0200 Oh x Rp. 110,000.00 = Rp. 2,200.00

    Mandor 0.0220 Oh x Rp. 75,000.00 = Rp. 1,650.00

    Jumlah (2) = Rp. 48,850.00

    Jumlah (1) + (2) = Rp. 69,779.20

    = Rp 69,779.00

    PPL 6.14. Memasang 1 m2 Plesteran 1 PC : 3 PP, tebal 20 mm

    SNI 2837:2008 / 6.14

    Bahan Semen PPC 10.3680 Kg x Rp. 1,300.00 = Rp. 13,478.40

    Pasir pasang 0.0310 M x Rp. 118,800.00 = Rp. 3,682.80

    Jumlah (1) = Rp. 17,161.20

    Upah Pekerja 0.4000 Oh x Rp. 65,000.00 = Rp. 26,000.00

    Tukang batu 0.2000 Oh x Rp. 95,000.00 = Rp. 19,000.00

    Kepala tukang 0.0200 Oh x Rp. 110,000.00 = Rp. 2,200.00Mandor 0.0220 Oh x Rp. 75,000.00 = Rp. 1,650.00

    Jumlah (2) = Rp. 48,850.00

    Jumlah (1) + (2) = Rp. 66,011.20

    = Rp 66,011.00Dibulatkan

    Dibulatkan

    Dibulatkan

    Dibulatkan

  • 7/21/2019 Rab Lab Smpn

    22/132

    22

    PPL 6.15. Memasang 1 m2 Plesteran 1 PC : 4 PP, tebal 20 mm

    SNI 2837:2008 / 6.15

    Bahan Semen PPC 8.3200 Kg x Rp. 1,300.00 = Rp. 10,816.00

    Pasir pasang 0.0320 M x Rp. 118,800.00 = Rp. 3,801.60

    Jumlah (1) = Rp. 14,617.60

    Upah Pekerja 0.4000 Oh x Rp. 65,000.00 = Rp. 26,000.00Tukang batu 0.2000 Oh x Rp. 95,000.00 = Rp. 19,000.00

    Kepala tukang 0.0200 Oh x Rp. 110,000.00 = Rp. 2,200.00

    Mandor 0.0220 Oh x Rp. 75,000.00 = Rp. 1,650.00

    Jumlah (2) = Rp. 48,850.00

    Jumlah (1) + (2) = Rp. 63,467.60

    = Rp 63,467.00

    PPL 6.16. Memasang 1 m2 Plesteran 1 PC : 5 PP, tebal 20 mm

    SNI 2837:2008 / 6.16

    Bahan Semen PPC 6.9120 Kg x Rp. 1,300.00 = Rp. 8,985.60

    Pasir pasang 0.0350 M x Rp. 118,800.00 = Rp. 4,158.00

    Jumlah (1) = Rp. 13,143.60

    Upah Pekerja 0.4000 Oh x Rp. 65,000.00 = Rp. 26,000.00

    Tukang batu 0.2000 Oh x Rp. 95,000.00 = Rp. 19,000.00

    Kepala tukang 0.0200 Oh x Rp. 110,000.00 = Rp. 2,200.00

    Mandor 0.0220 Oh x Rp. 75,000.00 = Rp. 1,650.00

    Jumlah (2) = Rp. 48,850.00

    Jumlah (1) + (2) = Rp. 61,993.60

    = Rp 61,993.00

    PPL 6.23. Memasang 1 m2 Plesteran Ciprat

    SNI 2837:2008 / 6.23

    Bahan Semen PPC 4.3200 Kg x Rp. 1,300.00 = Rp. 5,616.00

    Pasir pasang 0.0060 M x Rp. 118,800.00 = Rp. 712.80

    Jumlah (1) = Rp. 6,328.80

    Upah Pekerja 0.3000 Oh x Rp. 65,000.00 = Rp. 19,500.00

    Tukang batu 0.1000 Oh x Rp. 95,000.00 = Rp. 9,500.00

    Kepala tukang 0.0100 Oh x Rp. 110,000.00 = Rp. 1,100.00

    Mandor 0.0150 Oh x Rp. 75,000.00 = Rp. 1,125.00

    Jumlah (2) = Rp. 31,225.00

    Jumlah (1) + (2) = Rp. 37,553.80

    = Rp 37,553.00

    PPL 6.26. Memasang 1 m2 finishing Siar pas. Batu kali adukan 1 PC : 2 PP

    SNI 2837:2008 / 6.26

    Bahan Semen PPC 6.3400 Kg x Rp. 1,300.00 = Rp. 8,242.00Pasir pasang 0.0120 M x Rp. 118,800.00 = Rp. 1,425.60

    Jumlah (1) = Rp. 9,667.60

    Dibulatkan

    Dibulatkan

    Dibulatkan

  • 7/21/2019 Rab Lab Smpn

    23/132

    23

    Upah Pekerja 0.3000 Oh x Rp. 65,000.00 = Rp. 19,500.00

    Tukang batu 0.1500 Oh x Rp. 95,000.00 = Rp. 14,250.00

    Kepala tukang 0.0150 Oh x Rp. 110,000.00 = Rp. 1,650.00

    Mandor 0.0150 Oh x Rp. 75,000.00 = Rp. 1,125.00

    Jumlah (2) = Rp. 36,525.00

    Jumlah (1) + (2) = Rp. 46,192.60

    = Rp 46,192.00

    PPL 6.27. Memasang 1 m2 Acian

    SNI 2837:2008 / 6.27

    Bahan Semen PPC 3.2500 Kg x Rp. 1,300.00 = Rp. 4,225.00

    Jumlah (1) = Rp. 4,225.00

    Upah Pekerja 0.1000 Oh x Rp. 65,000.00 = Rp. 6,500.00

    Tukang batu 0.0500 Oh x Rp. 95,000.00 = Rp. 4,750.00

    Kepala tukang 0.0050 Oh x Rp. 110,000.00 = Rp. 550.00

    Mandor 0.0050 Oh x Rp. 75,000.00 = Rp. 375.00

    Jumlah (2) = Rp. 12,175.00

    Jumlah (1) + (2) = Rp. 16,400.00

    = Rp 16,400.00

    SNI 3434:2008 HARGA SATUAN PEKERJAAN KAYU

    PK 6.1. Membuat dan memasang 1m3 kusen pintu dan jendela, kayu kelas I:

    SNI 3434:2008 / 6.1

    Bahan Balok kayu 1.1000 M x Rp. 10,370,400.00 = Rp. 11,407,440.00

    Paku 10cm 1.2500 Kg x Rp. 17,000.00 = Rp. 21,250.00

    Lem Kayu 1.0000 Kg x Rp. 40,000.00 = Rp. 40,000.00

    Jumlah (1) = Rp. 11,468,690.00

    Upah Pekerja 7.0000 Oh x Rp. 65,000.00 = Rp. 455,000.00

    Tukang kayu 21.0000 Oh x Rp. 95,000.00 = Rp. 1,995,000.00

    Kepala tukang 2.1000 Oh x Rp. 110,000.00 = Rp. 231,000.00

    Mandor 0.3500 Oh x Rp. 75,000.00 = Rp. 26,250.00

    Jumlah (2) = Rp. 2,707,250.00

    Jumlah (1) +(2) = Rp. 14,175,940.00

    PK 6.2. Membuat dan memasang 1m3 kusen pintu dan jendela, kayu kelas II:

    SNI 3434:2008 / 6.2

    Bahan Balok Kayu 1.2000 M x Rp. 6,814,800.00 = Rp. 8,177,760.00

    Paku 10cm 1.2500 Kg x Rp. 17,000.00 = Rp. 21,250.00

    Lem Kayu 1.0000 Kg x Rp. 40,000.00 = Rp. 40,000.00

    Jumlah (1) = Rp. 8,239,010.00

    Upah Pekerja 6.0000 Oh x Rp. 65,000.00 = Rp. 390,000.00

    Tukang kayu 18.0000 Oh x Rp. 95,000.00 = Rp. 1,710,000.00Kepala tukang 1.8000 Oh x Rp. 110,000.00 = Rp. 198,000.00

    Mandor 0.3000 Oh x Rp. 75,000.00 = Rp. 22,500.00

    Jumlah (2) = Rp. 2,320,500.00

    Jumlah (1) +(2) = Rp. 10,559,510.00

    Dibulatkan

    Dibulatkan

  • 7/21/2019 Rab Lab Smpn

    24/132

    24

    PK 6.2a. Membuat dan memasang 1m3 kusen pintu dan jendela, kayu kelas III:

    SNI 3434:2008 / 6.2a

    Bahan Balok Kayu 1.2000 M x Rp. 5,000,000.00 = Rp. 6,000,000.00

    Paku 10cm 1.2500 Kg x Rp. 17,000.00 = Rp. 21,250.00

    Lem Kayu 1.0000 Kg x Rp. 40,000.00 = Rp. 40,000.00

    Jumlah (1) = Rp. 6,061,250.00

    Upah Pekerja 6.0000 Oh x Rp. 65,000.00 = Rp. 390,000.00

    Tukang kayu 18.0000 Oh x Rp. 95,000.00 = Rp. 1,710,000.00

    Kepala tukang 1.8000 Oh x Rp. 110,000.00 = Rp. 198,000.00

    Mandor 0.3000 Oh x Rp. 75,000.00 = Rp. 22,500.00

    Jumlah (2) = Rp. 2,320,500.00

    Jumlah (1) +(2) = Rp. 8,381,750.00

    PK 6.3. Membuat dan memasang 1m2 pintu klamp standar , kayu kelas II:

    SNI 3434:2008 / 6.3

    Bahan Papan Kayu 0.0400 M x Rp. 7,037,000.00 = Rp. 281,480.00

    Paku 5 cm - 7cm 0.0500 Kg x Rp. 17,000.00 = Rp. 850.00

    Jumlah (1) = Rp. 282,330.00

    Upah Pekerja 0.3500 Oh x Rp. 65,000.00 = Rp. 22,750.00

    Tukang kayu 1.0500 Oh x Rp. 95,000.00 = Rp. 99,750.00

    Kepala tukang 0.1050 Oh x Rp. 110,000.00 = Rp. 11,550.00

    Mandor 0.0180 Oh x Rp. 75,000.00 = Rp. 1,350.00

    Jumlah (2) = Rp. 135,400.00

    Jumlah (1) +(2) = Rp. 417,730.00

    PK 6.4. Membuat dan memasang 1 m2 pintu klamp sederhana, kayu kelas III :

    SNI 3434:2008 / 6.4

    Bahan Papan Kayu 0.0400 M x Rp. 5,000,000.00 = Rp. 200,000.00

    Paku biasa 2" - 5" 0.0500 Kg x Rp. 17,000.00 = Rp. 850.00

    Jumlah (1) = Rp. 200,850.00

    Upah Pekerja 0.3500 Oh x Rp. 65,000.00 = Rp. 22,750.00

    Tukang kayu 1.0500 Oh x Rp. 95,000.00 = Rp. 99,750.00

    Kepala tukang 0.1050 Oh x Rp. 110,000.00 = Rp. 11,550.00

    Mandor 0.0180 Oh x Rp. 75,000.00 = Rp. 1,350.00

    Jumlah (2) = Rp. 135,400.00

    Jumlah (1) +(2) = Rp. 336,250.00

    PK 6.5. Membuat dan memasang 1m2 pintu panel, kayu kelas II:

    SNI 3434:2008 / 6.5

    Bahan Papan Kayu 0.0400 M x Rp. 7,037,000.00 = Rp. 281,480.00

    Lem Kayu 0.5000 Kg x Rp. 40,000.00 = Rp. 20,000.00

    Jumlah (1) 301,480.00

    Upah Pekerja 1.0000 Oh x Rp. 65,000.00 = Rp. 65,000.00

    Tukang kayu 3.0000 Oh x Rp. 95,000.00 = Rp. 285,000.00

    Kepala tukang 0.3000 Oh x Rp. 110,000.00 = Rp. 33,000.00

    Mandor 0.0500 Oh x Rp. 75,000.00 = Rp. 3,750.00

    Jumlah (2) = Rp. 386,750.00

    Jumlah (1) +(2) = Rp. 688,230.00

  • 7/21/2019 Rab Lab Smpn

    25/132

    25

    PK 6.5a Membuat dan memasang 1m2 pintu panel, kayu kelas III :

    SNI 3434:2008 / 6.5a

    Bahan Papan Kayu 0.0400 M x Rp. 5,000,000.00 = Rp. 200,000.00

    Lem Kayu 0.5000 Kg x Rp. 40,000.00 = Rp. 20,000.00

    Jumlah (1) = Rp. 220,000.00

    Upah Pekerja 1.0000 Oh x Rp. 65,000.00 = Rp. 65,000.00Tukang kayu 3.0000 Oh x Rp. 95,000.00 = Rp. 285,000.00

    Kepala tukang 0.3000 Oh x Rp. 110,000.00 = Rp. 33,000.00

    Mandor 0.0500 Oh x Rp. 75,000.00 = Rp. 3,750.00

    Jumlah (2) = Rp. 386,750.00

    Jumlah (1) +(2) = Rp. 606,750.00

    PK 6.6. Membuat dan memasang 1 m2 pintu dan jendela kaca, kayu kelas II:

    SNI 3434:2008 / 6.6

    Bahan Papan Kayu 0.0240 M3 x Rp. 7,037,000.00 = Rp. 168,888.00

    Kaca polos 5 mm 0.6500 M2 x Rp. 130,000.00 = Rp. 84,500.00

    Lem Kayu 0.8000 Kg x Rp. 40,000.00 = Rp. 32,000.00

    Jumlah (1) = Rp. 285,388.00

    Upah Pekerja 0.8000 Oh x Rp. 65,000.00 = Rp. 52,000.00

    Tukang kayu 2.4000 Oh x Rp. 95,000.00 = Rp. 228,000.00

    Kepala tukang 0.2400 Oh x Rp. 110,000.00 = Rp. 26,400.00

    Mandor 0.0400 Oh x Rp. 75,000.00 = Rp. 3,000.00

    Jumlah (2) = Rp. 309,400.00

    Jumlah (1) +(2) = Rp. 594,788.00

    PK 6.6a. Membuat dan memasang 1 m2 pintu dan jendela kaca, kayu kelas III:

    SNI 3434:2008 / 6.6a

    Bahan Kayu SK 0.0240 M3 x Rp. 5,000,000.00 = Rp. 120,000.00

    Kaca polos 5 mm 0.6500 M2 x Rp. 130,000.00 = Rp. 84,500.00

    Lem Kayu 0.8000 Kg x Rp. 40,000.00 = Rp. 32,000.00

    Jumlah (1) = Rp. 236,500.00

    Upah Pekerja 0.8000 Oh x Rp. 65,000.00 = Rp. 52,000.00

    Tukang kayu 2.4000 Oh x Rp. 95,000.00 = Rp. 228,000.00

    Kepala tukang 0.2400 Oh x Rp. 110,000.00 = Rp. 26,400.00

    Mandor 0.0400 Oh x Rp. 75,000.00 = Rp. 3,000.00

    Jumlah (2) = Rp. 309,400.00

    Jumlah (1) +(2) = Rp. 545,900.00

    PK 6.7. Membuat dan memasang 1 m2 pintu dan jendela jalusi kayu kelas II:

    SNI 3434:2008 / 6.7

    Bahan Papan Kayu 0.0640 M x Rp. 7,037,000.00 = Rp. 450,368.00

    Lem Kayu 0.5000 Kg x Rp. 40,000.00 = Rp. 20,000.00 Jumlah (1) = Rp. 470,368.00

    Upah Pekerja 1.0000 Oh x Rp. 65,000.00 = Rp. 65,000.00

    Tukang kayu 3.0000 Oh x Rp. 95,000.00 = Rp. 285,000.00

    Kepala tukang 0.3000 Oh x Rp. 110,000.00 = Rp. 33,000.00

    Mandor 0.0500 Oh x Rp. 75,000.00 = Rp. 3,750.00

    Jumlah (2) = Rp. 386,750.00

    Jumlah (1) +(2) = Rp. 857,118.00

  • 7/21/2019 Rab Lab Smpn

    26/132

    26

    PK 6.7a Membuat dan memasang 1 m2 pintu dan jendela jalusi kayu kelas III:

    SNI 3434:2008 / 6.7a

    Bahan Papan Kayu 0.0640 M x Rp. 5,000,000.00 = Rp. 320,000.00

    Lem Kayu 0.5000 Kg x Rp. 40,000.00 = Rp. 20,000.00

    Jumlah (1) = Rp. 340,000.00

    Upah Pekerja 1.0000 Oh x Rp. 65,000.00 = Rp. 65,000.00Tukang kayu 3.0000 Oh x Rp. 95,000.00 = Rp. 285,000.00

    Kepala tukang 0.3000 Oh x Rp. 110,000.00 = Rp. 33,000.00

    Mandor 0.0500 Oh x Rp. 75,000.00 = Rp. 3,750.00

    Jumlah (2) = Rp. 386,750.00

    Jumlah (1) +(2) = Rp. 726,750.00

    PK 6.8. Membuat 1 m2 daun pintu plywood rangkap, rangka tertutup, kayu kelas II (lbr sd 90cm):

    SNI 3434:2008 / 6.8

    Bahan Papan kayu 0.0250 M x Rp. 7,037,000.00 = Rp. 175,925.00

    Paku 1cm - 2,5cm 0.0300 Kg x Rp. 17,000.00 = Rp. 510.00

    Lem kayu 0.5000 Kg x Rp. 40,000.00 = Rp. 20,000.00

    Plywood tbl 4mm 1.0000 Lbr x Rp. 65,000.00 = Rp. 65,000.00

    Jumlah (1) = Rp. 261,435.00

    Upah Pekerja 0.7000 Oh x Rp. 65,000.00 = Rp. 45,500.00

    Tukang kayu 2.1000 Oh x Rp. 95,000.00 = Rp. 199,500.00

    Kepala tukang 0.2100 Oh x Rp. 110,000.00 = Rp. 23,100.00

    Mandor 0.0350 Oh x Rp. 75,000.00 = Rp. 2,625.00

    Jumlah (2) = Rp. 270,725.00

    Jumlah (1) +(2) = Rp. 532,160.00

    PK 6.8a. Membuat 1 m2 daun pintu plywood rangkap, rangka tertutup,kayu kelas III (lbr sd 90cm):

    SNI 3434:2008 / 6.8a

    Bahan Papan kayu 0.0250 M x Rp. 5,000,000.00 = Rp. 125,000.00

    Paku 1cm - 2,5cm 0.0300 Kg x Rp. 17,000.00 = Rp. 510.00

    Lem kayu 0.5000 Kg x Rp. 40,000.00 = Rp. 20,000.00

    Plywood tbl 4mm 1.0000 Lbr x Rp. 65,000.00 = Rp. 65,000.00

    Jumlah (1) = Rp. 210,510.00

    Upah Pekerja 0.7000 Oh x Rp. 65,000.00 = Rp. 45,500.00

    Tukang kayu 2.1000 Oh x Rp. 95,000.00 = Rp. 199,500.00

    Kepala tukang 0.2100 Oh x Rp. 110,000.00 = Rp. 23,100.00

    Mandor 0.0350 Oh x Rp. 75,000.00 = Rp. 2,625.00

    Jumlah (2) = Rp. 270,725.00

    Jumlah (1) +(2) = Rp. 481,235.00

    = Rp 481,235.00

    PK 6.10. Memasang 1m2 jalusi kusen, kayu kelas II :SNI 3434:2008 / 6.10

    Bahan Papan kayu 0.0600 M x Rp. 7,037,000.00 = Rp. 422,220.00

    Paku 1cm - 2,5cm 0.1500 Kg x Rp. 17,000.00 = Rp. 2,550.00

    Jumlah (1) = Rp. 424,770.00

    Dibulatkan

  • 7/21/2019 Rab Lab Smpn

    27/132

    27

    Upah Pekerja 0.6700 Oh x Rp. 65,000.00 = Rp. 43,550.00

    Tukang kayu 2.0000 Oh x Rp. 95,000.00 = Rp. 190,000.00

    Kepala tukang 0.2000 Oh x Rp. 110,000.00 = Rp. 22,000.00

    Mandor 0.3350 Oh x Rp. 75,000.00 = Rp. 25,125.00

    Jumlah (2) = Rp. 280,675.00

    Jumlah (1) +(2) = Rp. 705,445.00

    PK 6.10a. Memasang 1m2 jalusi kusen, kayu kelas III :

    SNI 3434:2008 / 6.10a

    Bahan Papan kayu 0.0600 M x Rp. 5,000,000.00 = Rp. 300,000.00

    Paku 1cm - 2,5cm 0.1500 Kg x Rp. 17,000.00 = Rp. 2,550.00

    Jumlah (1) = Rp. 302,550.00

    Upah Pekerja 0.6700 Oh x Rp. 65,000.00 = Rp. 43,550.00

    Tukang kayu 2.0000 Oh x Rp. 95,000.00 = Rp. 190,000.00

    Kepala tukang 0.2000 Oh x Rp. 110,000.00 = Rp. 22,000.00

    Mandor 0.3350 Oh x Rp. 75,000.00 = Rp. 25,125.00

    Jumlah (2) = Rp. 280,675.00

    Jumlah (1) +(2) = Rp. 583,225.00

    PK 6.11. Memasang 1m2 teakwood rangkap, rangka expose kayu kelas II:

    SNI 3434:2008 / 6.11

    Bahan Papan kayu 0.0250 M x Rp. 7,037,000.00 = Rp. 175,925.00

    Paku 1cm - 2,5cm 0.0300 Kg x Rp. 17,000.00 = Rp. 510.00

    Lem kayu 0.3000 Lt x Rp. 40,000.00 = Rp. 12,000.00

    Teakwood (120 x 240 x 3 mm) 1.0000 Lbr x Rp. 50,000.00 = Rp. 50,000.00

    Jumlah (1) = Rp. 238,435.00

    Upah Pekerja 0.8000 Oh x Rp. 65,000.00 = Rp. 52,000.00

    Tukang kayu 2.4000 Oh x Rp. 95,000.00 = Rp. 228,000.00

    Kepala tukang 0.2400 Oh x Rp. 110,000.00 = Rp. 26,400.00

    Mandor 0.0400 Oh x Rp. 75,000.00 = Rp. 3,000.00

    Jumlah (2) = Rp. 309,400.00

    Jumlah (1) +(2) = Rp. 547,835.00

    PK 6.11a. Memasang 1m2 teakwood rangkap, rangka expose kayu kelas III:

    SNI 3434:2008 / 6.11a

    Bahan Papan kayu 0.0250 M x Rp. 5,000,000.00 = Rp. 125,000.00

    Paku 1cm - 2,5cm 0.0300 Kg x Rp. 17,000.00 = Rp. 510.00

    Lem kayu 0.3000 Lt x Rp. 40,000.00 = Rp. 12,000.00

    Teakwood (120 x 240 x 3 mm) 1.0000 Lbr x Rp. 50,000.00 = Rp. 50,000.00

    Jumlah (1) = Rp. 187,510.00

    Upah Pekerja 0.8000 Oh x Rp. 65,000.00 = Rp. 52,000.00

    Tukang kayu 2.4000 Oh x Rp. 95,000.00 = Rp. 228,000.00Kepala tukang 0.2400 Oh x Rp. 110,000.00 = Rp. 26,400.00

    Mandor 0.0400 Oh x Rp. 75,000.00 = Rp. 3,000.00

    Jumlah (2) = Rp. 309,400.00

    Jumlah (1) +(2) = Rp. 496,910.00

    Dibulatkan = Rp 496,910.00

  • 7/21/2019 Rab Lab Smpn

    28/132

    28

    PK 6.13. Memasang 1m3 konstruksi kuda-kuda konvensional, kayu kelas I:

    SNI 3434:2008 / 6.13

    Bahan Balok kayu 1.1000 M x Rp. 10,370,400.00 = Rp. 11,407,440.00

    Besi strip 15.0000 Kg x Rp. 17,250.00 = Rp. 258,750.00

    Paku 12 cm 5.6000 Kg x Rp. 17,000.00 = Rp. 95,200.00

    Jumlah (1) = Rp. 11,761,390.00

    Upah Pekerja 4.0000 Oh x Rp. 65,000.00 = Rp. 260,000.00

    Tukang kayu 12.0000 Oh x Rp. 95,000.00 = Rp. 1,140,000.00

    Kepala tukang 1.2000 Oh x Rp. 110,000.00 = Rp. 132,000.00

    Mandor 0.2000 Oh x Rp. 75,000.00 = Rp. 15,000.00

    Jumlah (2) = Rp. 1,547,000.00

    Jumlah (1) +(2) = Rp. 13,308,390.00

    PK 6.13a Memasang 1m3 konstruksi kuda-kuda konvensional, kayu kelas II:

    SNI 3434:2008 / 6.13a

    Bahan Balok kayu 1.1000 M x Rp. 6,814,800.00 = Rp. 7,496,280.00

    Besi strip 15.0000 Kg x Rp. 17,250.00 = Rp. 258,750.00

    Paku 12 cm 5.6000 Kg x Rp. 17,000.00 = Rp. 95,200.00

    Jumlah (1) = Rp. 7,850,230.00

    Upah Pekerja 4.0000 Oh x Rp. 65,000.00 = Rp. 260,000.00

    Tukang kayu 12.0000 Oh x Rp. 95,000.00 = Rp. 1,140,000.00

    Kepala tukang 1.2000 Oh x Rp. 110,000.00 = Rp. 132,000.00

    Mandor 0.2000 Oh x Rp. 75,000.00 = Rp. 15,000.00

    Jumlah (2) = Rp. 1,547,000.00

    Jumlah (1) +(2) = Rp. 9,397,230.00

    PK 6.13b. Memasang 1m3 konstruksi kuda-kuda konvensional, kayu kelas III:

    SNI 3434:2008 / 6.13b

    Bahan Balok kayu 1.1000 M x Rp. 5,000,000.00 = Rp. 5,500,000.00

    Besi strip 15.0000 Kg x Rp. 17,250.00 = Rp. 258,750.00

    Paku 12 cm 5.6000 Kg x Rp. 17,000.00 = Rp. 95,200.00

    Jumlah (1) = Rp. 5,853,950.00

    Upah Pekerja 4.0000 Oh x Rp. 65,000.00 = Rp. 260,000.00

    Tukang kayu 12.0000 Oh x Rp. 95,000.00 = Rp. 1,140,000.00

    Kepala tukang 1.2000 Oh x Rp. 110,000.00 = Rp. 132,000.00

    Mandor 0.2000 Oh x Rp. 75,000.00 = Rp. 15,000.00

    Jumlah (2) = Rp. 1,547,000.00

    Jumlah (1) +(2) = Rp. 7,400,950.00

    PK 6.15. Memasang 1 m3 konstruksi gordeng, kayu kelas I :

    SNI 3434:2008 / 6.15

    Bahan Balok Kayu 1.1000 M x Rp. 10,370,400.00 = Rp. 11,407,440.00Paku 12 cm 3.0000 Kg x Rp. 17,000.00 = Rp. 51,000.00

    Jumlah (1) = Rp. 11,458,440.00

    Upah Pekerja 2.4000 Oh x Rp. 65,000.00 = Rp. 156,000.00

    Tukang kayu 7.2000 Oh x Rp. 95,000.00 = Rp. 684,000.00

    Kepala tukang 0.7200 Oh x Rp. 110,000.00 = Rp. 79,200.00

    Mandor 0.1200 Oh x Rp. 75,000.00 = Rp. 9,000.00

    Jumlah (2) = Rp. 928,200.00

    Jumlah (1) +(2) = Rp. 12,386,640.00

  • 7/21/2019 Rab Lab Smpn

    29/132

    29

    PK 6.15a Memasang 1 m3 konstruksi gordeng, kayu kelas II :

    SNI 3434:2008 / 6.15a

    Bahan Balok Kayu 1.1000 M x Rp. 6,814,800.00 = Rp. 7,496,280.00

    Paku 12 cm 3.0000 Kg x Rp. 17,000.00 = Rp. 51,000.00

    Jumlah (1) = Rp. 7,547,280.00

    Upah Pekerja 2.4000 Oh x Rp. 65,000.00 = Rp. 156,000.00

    Tukang kayu 7.2000 Oh x Rp. 95,000.00 = Rp. 684,000.00

    Kepala tukang 0.7200 Oh x Rp. 110,000.00 = Rp. 79,200.00

    Mandor 0.1200 Oh x Rp. 75,000.00 = Rp. 9,000.00

    Jumlah (2) = Rp. 928,200.00

    Jumlah (1) +(2) = Rp. 8,475,480.00

    PK 6.16. Memasang 1m2 rangka atap genteng keramik, kayu kelas I :

    SNI 3434:2008 / 6.16

    Bahan Kaso-kaso (5x7)cm 0.0140 M x Rp. 10,370,400.00 = Rp. 145,185.60

    Reng (2x3) cm 0.0036 M x Rp. 10,370,400.00 = Rp. 37,333.44

    Paku 5cm dan 10cm 0.2500 Kg x Rp. 17,000.00 = Rp. 4,250.00

    Jumlah (1) = Rp. 186,769.04

    Upah Pekerja 0.1000 Oh x Rp. 65,000.00 = Rp. 6,500.00

    Tukang kayu 0.1000 Oh x Rp. 95,000.00 = Rp. 9,500.00

    Kepala tukang 0.0100 Oh x Rp. 110,000.00 = Rp. 1,100.00

    Mandor 0.0050 Oh x Rp. 75,000.00 = Rp. 375.00

    Jumlah (2) = Rp. 17,475.00

    Jumlah (1) +(2) = Rp. 204,244.04

    Dibulatkan = Rp 204,244.00

    PK 6.16.a Memasang 1m2 rangka atap genteng keramik, kayu kelas II :

    SNI 3434:2008 / 6.16a

    Bahan Kaso-kaso (5x7)cm 0.0140 M x Rp. 6,814,800.00 = Rp. 95,407.20

    Reng (2x3) cm 0.0036 M x Rp. 6,814,800.00 = Rp. 24,533.28

    Paku 5cm dan 10cm 0.2500 Kg x Rp. 17,000.00 = Rp. 4,250.00

    Jumlah (1) = Rp. 124,190.48

    Upah Pekerja 0.1000 Oh x Rp. 65,000.00 = Rp. 6,500.00

    Tukang kayu 0.1000 Oh x Rp. 95,000.00 = Rp. 9,500.00

    Kepala tukang 0.0100 Oh x Rp. 110,000.00 = Rp. 1,100.00

    Mandor 0.0050 Oh x Rp. 75,000.00 = Rp. 375.00

    Jumlah (2) = Rp. 17,475.00

    Jumlah (1) +(2) = Rp. 141,665.48

    Dibulatkan = Rp 141,665.00

    PK 6.17. memasang rangka atap genteng beton, kayu kelas II 1 m2 :SNI 3434:2008 / 6.17

    Bahan Kaso-kaso (5x7)cm 0.0140 M x Rp. 6,814,800.00 = Rp. 95,407.20

    Reng (3x4) cm 0.0072 M x Rp. 6,814,800.00 = Rp. 49,066.56

    Paku 5cm dan 10cm 0.2500 Kg x Rp. 17,000.00 = Rp. 4,250.00

    Jumlah (1) = Rp. 148,723.76

  • 7/21/2019 Rab Lab Smpn

    30/132

    30

    Upah Pekerja 0.1000 Oh x Rp. 65,000.00 = Rp. 6,500.00

    Tukang kayu 0.1000 Oh x Rp. 95,000.00 = Rp. 9,500.00

    Kepala tukang 0.0100 Oh x Rp. 110,000.00 = Rp. 1,100.00

    Mandor 0.0050 Oh x Rp. 75,000.00 = Rp. 375.00

    Jumlah (2) = Rp. 17,475.00

    Jumlah (1) +(2) = Rp. 166,198.76

    Dibulatkan = Rp 166,198.00

    PK 6.18. memasang rangka atap sirap, kayu kelas II 1 m2:

    SNI 3434:2008 / 6.18

    Bahan Kayu kelas II 0.1650 M x Rp. 6,814,800.00 = Rp. 1,124,442.00

    Paku 5cm dan 10cm 0.2000 Kg x Rp. 17,000.00 = Rp. 3,400.00

    Jumlah (1) = Rp. 1,127,842.00

    Upah Pekerja 0.1200 Oh x Rp. 65,000.00 = Rp. 7,800.00

    Tukang kayu 0.1200 Oh x Rp. 95,000.00 = Rp. 11,400.00

    Kepala tukang 0.0120 Oh x Rp. 110,000.00 = Rp. 1,320.00

    Mandor 0.0060 Oh x Rp. 75,000.00 = Rp. 450.00

    Jumlah (2) = Rp. 20,970.00

    Jumlah (1) +(2) = Rp. 1,148,812.00

    PK 6.19. Pasang rangka langit-langit (0.50 x 1.00) m, kayu kelas III 1 m2 :

    SNI 3434:2008 / 6.19

    Bahan Kaso-kaso (5x7) cm 0.0154 M x Rp. 5,000,000.00 = Rp. 77,000.00

    Paku 7cm dan 10cm 0.2000 Kg x Rp. 17,000.00 = Rp. 3,400.00

    Jumlah (1) = Rp. 80,400.00

    Upah Pekerja 0.1500 Oh x Rp. 65,000.00 = Rp. 9,750.00

    Tukang kayu 0.3000 Oh x Rp. 95,000.00 = Rp. 28,500.00

    Kepala tukang 0.0300 Oh x Rp. 110,000.00 = Rp. 3,300.00

    Mandor 0.0750 Oh x Rp. 75,000.00 = Rp. 5,625.00

    Jumlah (2) = Rp. 47,175.00

    Jumlah (1) +(2) = Rp. 127,575.00

    Dibulatkan = Rp 127,575.00

    PK 6.20. Pasang rangka langit-langit (0.60 x 0.60) m, kayu kelas III 1 m2 :

    SNI 3434:2008 / 6.20

    Bahan Kaso-kaso (5x7) cm 0.0163 M x Rp. 5,000,000.00 = Rp. 81,500.00

    Paku 7cm dan 10cm 0.2500 Kg x Rp. 17,000.00 = Rp. 4,250.00

    Jumlah (1) = Rp. 85,750.00

    Upah Pekerja 0.2000 Oh x Rp. 65,000.00 = Rp. 13,000.00

    Tukang kayu 0.3000 Oh x Rp. 95,000.00 = Rp. 28,500.00

    Kepala tukang 0.0300 Oh x Rp. 110,000.00 = Rp. 3,300.00

    Mandor 0.0100 Oh x Rp. 75,000.00 = Rp. 750.00Jumlah (2) = Rp. 45,550.00

    Jumlah (1) +(2) = Rp. 131,300.00

    Dibulatkan = Rp 131,300.00

    PK 6.21. Memasang 1 m' lisplank ukuran (3 x 20) cm, kayu kelas II :

    SNI 3434:2008 / 6.21

    Bahan Papan Kayu 0.0072 M x Rp. 7,037,000.00 = Rp. 50,666.40

    Paku 5cm dan 7cm 0.1000 Kg x Rp. 17,000.00 = Rp. 1,700.00

    Jumlah (1) = Rp. 52,366.40

  • 7/21/2019 Rab Lab Smpn

    31/132

    31

    Upah Pekerja 0.1000 Oh x Rp. 65,000.00 = Rp. 6,500.00

    Tukang kayu 0.2000 Oh x Rp. 95,000.00 = Rp. 19,000.00

    Kepala tukang 0.0200 Oh x Rp. 110,000.00 = Rp. 2,200.00

    Mandor 0.0050 Oh x Rp. 75,000.00 = Rp. 375.00

    Jumlah (2) = Rp. 28,075.00

    Jumlah (1) +(2) = Rp. 80,441.40Dibulatkan = Rp 80,441.00

    PK 6.21a. Memasang 1 m' lisplank ukuran (3 x 20) cm, kayu kelas III :

    SNI 3434:2008 / 6.21a

    Bahan Papan Kayu 0.0072 M x Rp. 5,000,000.00 = Rp. 36,000.00

    Paku 5cm dan 7cm 0.1000 Kg x Rp. 17,000.00 = Rp. 1,700.00

    Jumlah (1) = Rp. 37,700.00

    Upah Pekerja 0.1000 Oh x Rp. 65,000.00 = Rp. 6,500.00

    Tukang kayu 0.2000 Oh x Rp. 95,000.00 = Rp. 19,000.00

    Kepala tukang 0.0200 Oh x Rp. 110,000.00 = Rp. 2,200.00

    Mandor 0.0050 Oh x Rp. 75,000.00 = Rp. 375.00

    Jumlah (2) = Rp. 28,075.00

    Jumlah (1) +(2) = Rp. 65,775.00

    Dibulatkan = Rp 65,775.00

    PK 6.22. Memasang 1 m' lisplank ukuran (3 x 30) cm, kayu kelas II :

    SNI 3434:2008 / 6.22

    Bahan Papan Kayu 0.0110 M x Rp. 7,037,000.00 = Rp. 77,407.00

    Paku 5cm dan 7cm 0.0500 Kg x Rp. 17,000.00 = Rp. 850.00

    Jumlah (1) = Rp. 78,257.00

    Upah Pekerja 0.1000 Oh x Rp. 65,000.00 = Rp. 6,500.00

    Tukang kayu 0.2000 Oh x Rp. 95,000.00 = Rp. 19,000.00

    Kepala tukang 0.0200 Oh x Rp. 110,000.00 = Rp. 2,200.00

    Mandor 0.0050 Oh x Rp. 75,000.00 = Rp. 375.00

    Jumlah (2) = Rp. 28,075.00

    Jumlah (1) +(2) = Rp. 106,332.00

    PK 6.23. Memasang 1 m2 rangka dinding pemisah (60 x 120)cm , kayu kelas III :

    SNI 3434:2008 / 6.23

    Bahan kayu SK, balok 5/7 0.0280 M x Rp. 5,000,000.00 = Rp. 140,000.00

    Paku 5cm dan 7cm 0.1500 Kg x Rp. 17,000.00 = Rp. 2,550.00

    Jumlah (1) = Rp. 142,550.00

    Upah Pekerja 0.1500 Oh x Rp. 65,000.00 = Rp. 9,750.00

    Tukang kayu 0.4500 Oh x Rp. 95,000.00 = Rp. 42,750.00

    Kepala tukang 0.0450 Oh x Rp. 110,000.00 = Rp. 4,950.00Mandor 0.0080 Oh x Rp. 75,000.00 = Rp. 600.00

    Jumlah (2) = Rp. 58,050.00

    Jumlah (1) +(2) = Rp. 200,600.00

  • 7/21/2019 Rab Lab Smpn

    32/132

    32

    PK 6.25. Memasang 1 m2 dinding pemisah plywood rangkap, rangka kayu kelas III:

    SNI 3434:2008 / 6.25

    Bahan Balok kayu (6x12) cm 0.0280 M x Rp. 5,000,000.00 = Rp. 140,000.00

    Paku 5cm dan 10cm 0.1500 Kg x Rp. 17,000.00 = Rp. 2,550.00

    Lem kayu 0.5600 Lt x Rp. 40,000.00 = Rp. 22,400.00

    Plywood (120 x 240 x 4 mm) 0.8600 Lbr x Rp. 65,000.00 = Rp. 55,900.00

    Jumlah (1) = Rp. 220,850.00

    Upah Pekerja 0.2000 Oh x Rp. 65,000.00 = Rp. 13,000.00

    Tukang kayu 0.6000 Oh x Rp. 95,000.00 = Rp. 57,000.00

    Kepala tukang 0.0600 Oh x Rp. 110,000.00 = Rp. 6,600.00

    Mandor 0.0100 Oh x Rp. 75,000.00 = Rp. 750.00

    Jumlah (2) = Rp. 77,350.00

    Jumlah (1) +(2) = Rp. 298,200.00

    PK 6.27. Memasang 1 m2 dinding lambrizing dari plywood :

    SNI 3434:2008 / 6.27

    Bahan Plywood (120 x 240 x 4 mm) 0.4000 Lbr x Rp. 65,000.00 = Rp. 26,000.00

    Paku 1 cm dan 2,5 cm 0.0500 Kg x Rp. 17,000.00 = Rp. 850.00

    Jumlah (1) = Rp. 26,850.00

    Upah Pekerja 0.0250 Oh x Rp. 65,000.00 = Rp. 1,625.00

    Tukang kayu 0.0750 Oh x Rp. 95,000.00 = Rp. 7,125.00

    Kepala tukang 0.0080 Oh x Rp. 110,000.00 = Rp. 880.00

    Mandor 0.0010 Oh x Rp. 75,000.00 = Rp. 75.00

    Jumlah (2) = Rp. 9,705.00

    Jumlah (1) +(2) = Rp. 36,555.00

    PK 6.28. Memasang 1 m2 dinding bilik bambu, kayu kelas III :

    SNI 3434:2008 / 6.28

    Bahan Bilik bambu (1,8 x 1,8)m 1.5000 M2 x Rp. 14,000.00 = Rp. 21,000.00

    Kaso (5x7) cm 0.0140 M3 x Rp. 5,000,000.00 = Rp. 70,000.00

    Paku 0.0120 Kg x Rp. 17,000.00 = Rp. 204.00

    List kayu 2/4 0.0030 M3 x Rp. 5,000,000.00 = Rp. 15,000.00

    Jumlah (1) = Rp. 106,204.00

    Upah Pekerja 0.1000 Oh x Rp. 65,000.00 = Rp. 6,500.00

    Tukang kayu 0.0500 Oh x Rp. 95,000.00 = Rp. 4,750.00

    Kepala tukang 0.0050 Oh x Rp. 110,000.00 = Rp. 550.00

    Mandor 0.0050 Oh x Rp. 75,000.00 = Rp. 375.00

    Jumlah (2) = Rp. 12,175.00

    Jumlah (1) +(2) = Rp. 118,379.00

    Dibulatkan = Rp 118,379.00

    PK 6.38. Memasang 1 m2 rangka langit-langit (1.00x1.00)m, kayu kelas III :SNI 03-3435:1994 / 6.38

    Bahan Kayu kelas III 0.0120 M3 x Rp. 5,000,000.00 = Rp. 60,000.00

    Paku 5cm dan 10cm 0.1000 Kg x Rp. 17,000.00 = Rp. 1,700.00

    Jumlah (1) = Rp. 61,700.00

  • 7/21/2019 Rab Lab Smpn

    33/132

    33

    Upah Pekerja 0.1500 Oh x Rp. 65,000.00 = Rp. 9,750.00

    Tukang kayu 0.2500 Oh x Rp. 95,000.00 = Rp. 23,750.00

    Kepala tukang 0.0250 Oh x Rp. 110,000.00 = Rp. 2,750.00

    Mandor 0.0750 Oh x Rp. 75,000.00 = Rp. 5,625.00

    Jumlah (2) = Rp. 41,875.00

    Jumlah (1) +(2) = Rp. 103,575.00

    SNI 7394:2008 PEKERJAAN BETON

    catatan :

    Bobot isi pasir = 1.400kg/m3, Bobot isi kerikil = 1.350 kg/m3, bukling factor = 20%

    . . em uat m eton mutu c = , a , s ump cm, w c = ,

    SNI 7394:2 8 / 6.1

    Bahan Semen PPC 247. Kg x Rp. 1,3 . = Rp. 321,1 .Pasir 869. Kg x Rp. 95. = Rp. 82,555.Kerikil (maksimum 3 mm) 999. Kg x Rp. 223. = Rp. 222,777.

    r . tr x p. . = p. , .Jumlah (1) = Rp. 633,957.

    Upah Pekerja 1.6 Oh x Rp. 65, . = Rp. 1 4, .

    Tukang batu .275 Oh x Rp. 95, . = Rp. 26,125.Kepala tukang . 28 Oh x Rp. 11 , . = Rp. 3, 8 .Mandor . 83 Oh x Rp. 75, . = Rp. 6,225.

    Jumlah (2) = Rp. 139,43 .Jumlah (1) +(2) = Rp. 773,387.

    PB 6.2. Membuat 1 m3 beton mutu fc = 9,8 MPa (K 125), slump (12 2) cm, w/c = ,78

    SNI 7394:2 8 / 6.2

    Bahan Semen PPC 276. Kg x Rp. 1,3 . = Rp. 358,8 .Pasir 828. Kg x Rp. 95. = Rp. 78,66 .er ma s mum mm . g x p. . = p. , .

    Air 215. Ltr x Rp. 35. = Rp. 7,525.Jumlah (1) = Rp. 67 ,661.

    Upah Pekerja 1.6 Oh x Rp. 65, . = Rp. 1 4, .

    Tukang batu .275 Oh x Rp. 95, . = Rp. 26,125.Kepala tukang . 28 Oh x Rp. 11 , . = Rp. 3, 8 .Mandor . 83 Oh x Rp. 75, . = Rp. 6,225.

    Jumlah (2) = Rp. 139,43 .um a + = p. , .

    PB 6.3. Membuat 1 m3 beton mutu fc = 12,2 MPa (K 15 ), slump (C1216) cm, w/c = ,72

    SNI 7394:2 8 / 6.3

    Bahan Semen PPC 299. Kg x Rp. 1,3 . = Rp. 388,7 .as r . g x p. . = p. , .

    Kerikil (maksimum 3 mm) 1 17. Kg x Rp. 223. = Rp. 226,791.Air 215. Ltr x Rp. 35. = Rp. 7,525.

    Jumlah (1) = Rp. 698,921.

    Upah Pekerja 1.65 Oh x Rp. 65, . = Rp. 1 7,25 .

    Tukang batu .275 Oh x Rp. 95, . = Rp. 26,125.Kepala tukang . 28 Oh x Rp. 11 , . = Rp. 3, 8 .Mandor . 83 Oh x Rp. 75, . = Rp. 6,225.

    um a = p. , .Jumlah (1) +(2) = Rp. 841,6 1.

  • 7/21/2019 Rab Lab Smpn

    34/132

    34

    PB 6.4. Membuat 1 m3 lantai kerja beton mutu fc = 7,4 MPa (K 1 ), slump (3-6)cm, w/c = ,87

    SNI 7394:2 8 / 6.4

    Bahan Semen PPC 23 . Kg x Rp. 1,3 . = Rp. 299, .Pasir 893. Kg x Rp. 95. = Rp. 84,835.Kerikil (maksimum 3 mm) 1 27. Kg x Rp. 223. = Rp. 229, 21.Air 2 . Ltr x Rp. 35. = Rp. 7, .

    Jumlah (1) = Rp. 619,856.

    Upah Pekerja 1.2 Oh x Rp. 65, . = Rp. 78, .Tukang batu .2 Oh x Rp. 95, . = Rp. 19, .Kepala tukang . 2 Oh x Rp. 11 , . = Rp. 2,2 .Mandor . 6 Oh x Rp. 75, . = Rp. 4,5 .

    um a = p. , .Jumlah (1) +(2) = Rp. 723,556.

    PB 6.5. Membuat 1 m3 beton mutu fc = 14,5 MPa (K 175), slump (12 2)cm, w/c = ,66

    SNI 7394:2 8 / 6.5

    a an emen . g x p. , . = p. , .Pasir 76 . Kg x Rp. 95. = Rp. 72,2 .Kerikil (maksimum 3 mm) 1 29. Kg x Rp. 223. = Rp. 229,467.Air 215. Ltr x Rp. 35. = Rp. 7,525.

    um a = p. , .

    Upah Pekerja 1.65 Oh x Rp. 65, . = Rp. 1 7,25 .Tukang batu .275 Oh x Rp. 95, . = Rp. 26,125.Kepala tukang . 28 Oh x Rp. 11 , . = Rp. 3, 8 .

    an or . x p. , . = p. , .Jumlah (2) = Rp. 142,68 .Jumlah (1) +(2) = Rp. 875,672.

    PB 6.5.a Membuat dan menghampar 1 m3 mutu beton fc = 14,5 MPa (K 175), slump (122)cm, w/c= ,66

    : , - . . a

    Bahan Semen PPC 326. Kg x Rp. 1,3 . = Rp. 423,8 .Pasir 76 . Kg x Rp. 95. = Rp. 72,2 .Kerikil (maksimum 3 mm) 1 29. Kg x Rp. 223. = Rp. 229,467.Air 215. Ltr x Rp. 35. = Rp. 7,525.

    Jumlah (1) 732,992.

    Upah Pekerja 4.95 Oh x Rp. 65, . = Rp. 321,75 .Tukang batu .825 Oh x Rp. 95, . = Rp. 78,375.epa a tu ang . x p. , . = p. , .

    Mandor .249 Oh x Rp. 75, . = Rp. 18,675.Jumlah (2) = Rp. 428, 4 .Jumlah (1) +(2) = Rp. 1,161, 32.

    . . em uat m eton mutu c = , a , s ump cm, w c = ,

    SNI 7394:2 8 / 6.6

    Bahan Semen PPC 352. Kg x Rp. 1,3 . = Rp. 457,6 .Pasir 731. Kg x Rp. 95. = Rp. 69,445.Kerikil (maksimum 3 mm) 1 31. Kg x Rp. 223. = Rp. 229,913.Air 215. Ltr x Rp. 35. = Rp. 7,525.

    Jumlah (1) = Rp. 764,483.

    Upah Pekerja 1.65 Oh x Rp. 65, . = Rp. 1 7,25 .u ang atu . x p. , . = p. , .

    Kepala tukang . 28 Oh x Rp. 11 , . = Rp. 3, 8 .Mandor . 83 Oh x Rp. 75, . = Rp. 6,225.

    Jumlah (2) = Rp. 142,68 .Jumlah (1) +(2) = Rp. 9 7,163.

  • 7/21/2019 Rab Lab Smpn

    35/132

    35

    PB 6.7. Membuat 1 m3 beton mutu fc = 19,3 MPa (K 225), slump (12 2)cm, w/c = ,58

    SNI 7394:2 8 / 6.7

    Bahan Semen PPC 371. Kg x Rp. 1,3 . = Rp. 482,3 .Pasir 698. Kg x Rp. 95. = Rp. 66,31 .Kerikil (maksimum 3 mm) 1 47. Kg x Rp. 223. = Rp. 233,481.Air 215. Ltr x Rp. 35. = Rp. 7,525.

    Jumlah (1) = Rp. 789,616.

    Upah Pekerja 1.65 Oh x Rp. 65, . = Rp. 1 7,25 .Tukang batu .275 Oh x Rp. 95, . = Rp. 26,125.Kepala tukang . 28 Oh x Rp. 11 , . = Rp. 3, 8 .Mandor . 83 Oh x Rp. 75, . = Rp. 6,225.

    um a = p. , .Jumlah (1) +(2) = Rp. 932,296.

    PB 6.8. Membuat 1 m3 beton mutu fc = 21,7 MPa (K 25 ), slump (12 2) cm, w/c = ,56

    SNI 7394:2 8 / 6.8

    a an emen . g x p. , . = p. , .Pasir 692. Kg x Rp. 95. = Rp. 65,74 .Kerikil (maksimum 3 mm) 1 39. Kg x Rp. 223. = Rp. 231,697.Air 215. Ltr x Rp. 35. = Rp. 7,525.

    um a = p. , .

    Upah Pekerja 1.65 Oh x Rp. 65, . = Rp. 1 7,25 .Tukang batu .275 Oh x Rp. 95, . = Rp. 26,125.Kepala tukang . 28 Oh x Rp. 11 , . = Rp. 3, 8 .

    an or . x p. , . = p. , .Jumlah (2) = Rp. 142,68 .Jumlah (1) +(2) = Rp. 946,842.

    PB 6.9. Membuat 1 m3 beton mutu fc = 24, MPa (K 275), slump (12 2) cm, w/c = ,53

    : .

    Bahan Semen PPC 4 6. Kg x Rp. 1,3 . = Rp. 527,8 .Pasir 684. Kg x Rp. 95. = Rp. 64,98 .Kerikil (maksimum 3 mm) 1 26. Kg x Rp. 223. = Rp. 228,798.Air 215. Ltr x Rp. 35. = Rp. 7,525.

    Jumlah (1) = Rp. 829,1 3.

    Upah Pekerja 1.65 Oh x Rp. 65, . = Rp. 1 7,25 .Tukang batu .275 Oh x Rp. 95, . = Rp. 26,125.epa a tu ang . x p. , . = p. , .

    Mandor . 83 Oh x Rp. 75, . = Rp. 6,225.Jumlah (2) = Rp. 142,68 .Jumlah (1) +(2) = Rp. 971,783.

    . . em uat m eton mutu c = , a , s ump cm, w c = ,

    SNI 7394:2 8 / 6.1

    Bahan Semen PPC 413. Kg x Rp. 1,3 . = Rp. 536,9 .Pasir 681. Kg x Rp. 95. = Rp. 64,695.Kerikil (maksimum 3 mm) 1 21. Kg x Rp. 223. = Rp. 227,683.Air 215. Ltr x Rp. 35. = Rp. 7,525.

    Jumlah (1) = Rp. 836,8 3.

    Upah Pekerja 1.65 Oh x Rp. 65, . = Rp. 1 7,25 .u ang atu . x p. , . = p. , .

    Kepala tukang . 28 Oh x Rp. 11 , . = Rp. 3, 8 .Mandor . 83 Oh x Rp. 75, . = Rp. 6,225.

    Jumlah (2) = Rp. 142,68 .Jumlah (1) +(2) = Rp. 979,483.

  • 7/21/2019 Rab Lab Smpn

    36/132

    36

    PB 6.11. Membuat 1 m3 beton mutu fc = 28,8 MPa (K 325), slump (12 2) cm, w/c = ,49

    SNI 7394:2 8 / 6.11

    Bahan Semen PPC 439. Kg x Rp. 1,3 . = Rp. 57 ,7 .Pasir 67 . Kg x Rp. 95. = Rp. 63,65 .Kerikil (maksimum 3 mm) 1 6. Kg x Rp. 223. = Rp. 224,338.Air 215. Ltr x Rp. 35. = Rp. 7,525.

    Jumlah (1) = Rp. 866,213.

    Upah Pekerja 2.1 Oh x Rp. 65, . = Rp. 136,5 .Tukang batu .35 Oh x Rp. 95, . = Rp. 33,25 .Kepala tukang . 35 Oh x Rp. 11 , . = Rp. 3,85 .Mandor .1 5 Oh x Rp. 75, . = Rp. 7,875.

    um a = p. , .Jumlah (1) +(2) = Rp. 1, 47,688.

    PB 6.12. Membuat 1 m3 beton mutu fc = 31,2 MPa (K 35 ), slump (12 2) cm, w/c = ,48

    SNI 7394:2 8 / 6.12

    a an emen . g x p. , . = p. , .Pasir 667. Kg x Rp. 95. = Rp. 63,365.Kerikil (maksimum 3 mm) 1 . Kg x Rp. 223. = Rp. 223, .Air 215. Ltr x Rp. 35. = Rp. 7,525.

    um a = p. , .

    Upah Pekerja 2.1 Oh x Rp. 65, . = Rp. 136,5 .Tukang batu .35 Oh x Rp. 95, . = Rp. 33,25 .Kepala tukang . 35 Oh x Rp. 11 , . = Rp. 3,85 .

    an or . x p. , . = p. , .Jumlah (2) = Rp. 181,475.Jumlah (1) +(2) = Rp. 1, 57,765.

    PB 6.17 Pembesian 10 kg dengan besi beton

    SNI 7394:2008 / 6.17

    Bahan Besi beton 10.5000 Kg x Rp. 15,000.00 = Rp. 157,500.00

    Kawat beton 0.1500 Kg x Rp. 18,700.00 = Rp. 2,805.00

    Jumlah (1) = Rp. 160,305.00

    Upah Pekerja 0.0700 Oh x Rp. 65,000.00 = Rp. 4,550.00

    Tukang besi 0.0700 Oh x Rp. 95,000.00 = Rp. 6,650.00

    Kepala tukang 0.0070 Oh x Rp. 110,000.00 = Rp. 770.00

    Mandor 0.0040 Oh x Rp. 75,000.00 = Rp. 300.00

    Jumlah (2) = Rp. 12,270.00

    Jumlah (1) + (2) = Rp. 172,575.00

    Pembesian 1 kg besi beton 0.1000 x 172,575.00 = Rp. 17,257.50

    Dibulatkan = Rp 17,257.00

    PB 6.20. Memasang 1 m2 bekisting untuk pondasi

    SNI 7394:2008 / 6.20

    Bahan Kayu Bekisting 0.0400 M x Rp. 3,833,300.00 = Rp. 153,332.00

    Paku 5 cm - 10 cm 0.3000 Kg x Rp. 17,000.00 = Rp. 5,100.00Minyak bekisting 0.1000 Ltr x Rp. 6,300.00 = Rp. 630.00

    Jumlah (1) = Rp. 159,062.00

    Bahan