Page 1: PAPARAN PUBLIK 2018 · 1 Nava Park Phase 1 86,98 BSD City, Tangerang PT Bumi Parama Wisesa Nava Park Phase 2 PT 145,65 BSD City, ... RESUME KINERJA PER JANUARI 2017 FOTO PROGRESS
Page 2: PAPARAN PUBLIK 2018 · 1 Nava Park Phase 1 86,98 BSD City, Tangerang PT Bumi Parama Wisesa Nava Park Phase 2 PT 145,65 BSD City, ... RESUME KINERJA PER JANUARI 2017 FOTO PROGRESS

PAPARAN PUBLIK 2018

(PUBLIC EXPOSE 2018)

PT NUSA KONSTRUKSI ENJINIRING Tbk

Kantor Pusat NKE, 21 Desember 2018

1

Page 3: PAPARAN PUBLIK 2018 · 1 Nava Park Phase 1 86,98 BSD City, Tangerang PT Bumi Parama Wisesa Nava Park Phase 2 PT 145,65 BSD City, ... RESUME KINERJA PER JANUARI 2017 FOTO PROGRESS

Visi Misi Perseroan

2

Page 4: PAPARAN PUBLIK 2018 · 1 Nava Park Phase 1 86,98 BSD City, Tangerang PT Bumi Parama Wisesa Nava Park Phase 2 PT 145,65 BSD City, ... RESUME KINERJA PER JANUARI 2017 FOTO PROGRESS

Nilai Perseroan

3

DIPASTIKAN NILAI-NILAI PERUSAHAAN INI DAPAT MENJADI BOOSTER UNTUK KEMAJUAN “NKE BARU”

SEHINGGA DIHARAPKAN NKE DAPAT MENJADI KEBANGGAAN INDONESIA

Page 5: PAPARAN PUBLIK 2018 · 1 Nava Park Phase 1 86,98 BSD City, Tangerang PT Bumi Parama Wisesa Nava Park Phase 2 PT 145,65 BSD City, ... RESUME KINERJA PER JANUARI 2017 FOTO PROGRESS

Portfolio Perseroan (Pekerjaan Gedung)

4

GRAND INDONESIA, JAKARTA APARTEMEN BOTANICA, JAKARTA SKYLINE OFFICE, SURABAYA

KALLA TOWER, MAKASSAR IBIS HOTEL TRANS STUDIO, BANDUNG AMANKILA HOTEL, BALI

Page 6: PAPARAN PUBLIK 2018 · 1 Nava Park Phase 1 86,98 BSD City, Tangerang PT Bumi Parama Wisesa Nava Park Phase 2 PT 145,65 BSD City, ... RESUME KINERJA PER JANUARI 2017 FOTO PROGRESS

Portfolio Perseroan (Pekerjaan Infrastruktur)

5

AMBARAWA RING ROAD

CENTRAL JAVA BRIDGE, TIMOR LESTE SERMO DAM, YOGYAKARTA

JETTY, KALIMANTAN MARTABE GOLD MINING, NORTH

SUMATERA HASANUDDIN AIRPORT, MAKASSAR

Page 7: PAPARAN PUBLIK 2018 · 1 Nava Park Phase 1 86,98 BSD City, Tangerang PT Bumi Parama Wisesa Nava Park Phase 2 PT 145,65 BSD City, ... RESUME KINERJA PER JANUARI 2017 FOTO PROGRESS

Strategi Diversifikasi

6

•PT Nusa Konstruksi Enjiniring Tbk

•PT Duta Graha Living (Interior) Konstruksi

•PT Inti Duta Energi Energi

•PT Macmahon Mining Services Pertambangan

•PT Duta Buana Permata Real

Estate/Properti

Page 8: PAPARAN PUBLIK 2018 · 1 Nava Park Phase 1 86,98 BSD City, Tangerang PT Bumi Parama Wisesa Nava Park Phase 2 PT 145,65 BSD City, ... RESUME KINERJA PER JANUARI 2017 FOTO PROGRESS

Sertifikasi dan Penghargaan

7

Manajemen

Keselamatan &

Kesehatan Kerja, 2018

Environmental

Management System,

2011

Quality Management

System, 2011

Occupational Health &

Safety Management

System, 2011

Membership from green building

council Indonesia, 2011

CHESM Certificate (A Rating)

from Chevron , 2012

Free LTI Manhours from

G Resources Martabe, 2012

Page 9: PAPARAN PUBLIK 2018 · 1 Nava Park Phase 1 86,98 BSD City, Tangerang PT Bumi Parama Wisesa Nava Park Phase 2 PT 145,65 BSD City, ... RESUME KINERJA PER JANUARI 2017 FOTO PROGRESS

Dewan Komisaris dan Direksi

Bambang Sulistomo President Commissioner

(Independent)

Soehandjono, SH Commissioner

Independent

Rony N. Hendropriyono Commissioner

Djoko Eko Soeprastowo President Director

Budi Susilo

Director

Dwi Sihono Raharjo Independent Director

Drs. Ganda Kusuma

Director

Roy Edison Maningkas

Commissioner

Page 10: PAPARAN PUBLIK 2018 · 1 Nava Park Phase 1 86,98 BSD City, Tangerang PT Bumi Parama Wisesa Nava Park Phase 2 PT 145,65 BSD City, ... RESUME KINERJA PER JANUARI 2017 FOTO PROGRESS

Susunan Pemegang Saham (per 30 November 2018)

9

No. Nama Pemegang Saham Lembar Saham yang dimiliki

Prosentase Kepemilikan (%)

1 PT Lintas Kebayoran Kota 1,830,170,000 33,03

2 PT Lokasindo Aditama 407,500,000 7,35

3 Hudson River Group 614,958,200 11,10

4 PT Rezeki Segitiga Emas 500,000,000 9,02

5 PT Limex Indonesia 296,651,000 5,35

6 Djoko Eko Suprastowo (Diretur Utama)

50,000 0,01

7 Ganda Kusuma (Direktur) 8,426,100 0,15

8 Publik 1,883,409,700 33,99

TOTAL SAHAM BEREDAR 5,541,165,000 100

Page 11: PAPARAN PUBLIK 2018 · 1 Nava Park Phase 1 86,98 BSD City, Tangerang PT Bumi Parama Wisesa Nava Park Phase 2 PT 145,65 BSD City, ... RESUME KINERJA PER JANUARI 2017 FOTO PROGRESS

Tata Kelola Perusahaan

10

Manajemen Risiko

Komite Remunerasi dan Nominasi

Keterbukaan Informasi

Tanggung Jawab Sosial Perusahaan

Komite Audit

Rapat Umum Pemegang Saham

Page 12: PAPARAN PUBLIK 2018 · 1 Nava Park Phase 1 86,98 BSD City, Tangerang PT Bumi Parama Wisesa Nava Park Phase 2 PT 145,65 BSD City, ... RESUME KINERJA PER JANUARI 2017 FOTO PROGRESS

Tata Kelola Perusahaan

11

BOARD

MANUAL CODE OF

CONDUCT CODE OF

GCG WHISTLEBLO-

WING SYSTEM

Page 13: PAPARAN PUBLIK 2018 · 1 Nava Park Phase 1 86,98 BSD City, Tangerang PT Bumi Parama Wisesa Nava Park Phase 2 PT 145,65 BSD City, ... RESUME KINERJA PER JANUARI 2017 FOTO PROGRESS

PEROLEHAN KONTRAK BARU

PER NOVEMBER 2018

No Nama Proyek Pemilik Proyek

Nilai Kontrak (dalam

Milyar Rupiah)

-termasuk PPN

Keterangan

1 Universitas Mulawarman,

Samarinda

Universitas

Mulawarman,

Samarinda

356.529.800.000 NKE

2 Tunnel Road Chevron Indonesia PT Chevron Indonesia 15.606.800.000 NKE

3 - - - -

TOTAL PEROLEHAN KESELURUAN KONTRAK BARU PER

SEPTEMBER 2018

372.136.600.000

TOTAL PEROLEHAN KONTRAK BARU NKE PER SEPTEMBER 2018

372.136.600.000

Page 14: PAPARAN PUBLIK 2018 · 1 Nava Park Phase 1 86,98 BSD City, Tangerang PT Bumi Parama Wisesa Nava Park Phase 2 PT 145,65 BSD City, ... RESUME KINERJA PER JANUARI 2017 FOTO PROGRESS

Proyek yang Sedang Berjalan (Proyek Gedung)

13

No. Nama Proyek Nilai Proyek

(Miliar Rp) Lokasi Nama Pemberi Kerja

1 Nava Park Phase 1 86,98 BSD City, Tangerang PT Bumi Parama Wisesa

Nava Park Phase 2 145,65 BSD City, Tangerang PT Bumi Parama Wisesa

2 Ciputra International 263,45 Puri Indah, Jakarta PT Ciputra Puri Trisula

3 Gaia Hotel Bandung 189.61 Lembang, Bandung PT Gaia Kencana

4 World Capital Tower 681,89 Mega Kuningan, Jakarta PT Mega Kuningan Pinnacle

5 Embarcadero Apartemen 47,01 Bintaro, Tangerang Selatan PT. Gunung Halimun Elok

6 Holland Village 272,07 Cempaka Putih, Jakarta PT Trimitra Multi Sukses

7 Gubeng Mixed Use 165,00 Gubeng, Surabaya PT. Saputra Karya

8 Cinere Mixed Use 75,00 Cinere, Depok PT. Diagram Healtcare

Indonesia

TOTAL NILAI PROYEK BERJALAN 2.503,66

Page 15: PAPARAN PUBLIK 2018 · 1 Nava Park Phase 1 86,98 BSD City, Tangerang PT Bumi Parama Wisesa Nava Park Phase 2 PT 145,65 BSD City, ... RESUME KINERJA PER JANUARI 2017 FOTO PROGRESS

Proyek yang Sedang Berjalan (Proyek Infrastruktur)

14

Page 16: PAPARAN PUBLIK 2018 · 1 Nava Park Phase 1 86,98 BSD City, Tangerang PT Bumi Parama Wisesa Nava Park Phase 2 PT 145,65 BSD City, ... RESUME KINERJA PER JANUARI 2017 FOTO PROGRESS

Proyek yang Sedang Berjalan (Proyek KSO)

15

No. Nama Proyek Nilai Proyek

(Miliar Rp) Lokasi Nama Pemberi Kerja Keterangan

P R O Y E K I N F R A S T R U K T U R

1 Sarana Pengaman Pantai Tiku 44,387 Padang Kementerian PUPR Dirjen

SDA

JO with PT.APL

(Porsi NKE 55 %)

2 Sarana Pengendalian Batang

Agam 55,781 Padang

Kementerian PUPR Dirjen

SDA

JO with PT.WIKA (Porsi

NKE 32.5 %)

3 Irigasi Lambunu 38,470 Palu, Sulawesi Tengah Kementerian PUPR Dirjen

SDA

JO with PT.ADHI (Porsi

NKE 30 %)

TOTAL KONTRAK BERJALAN 138,638

Notes: Nilai Kontrak yang ditampilkan adalah porsi NKE

P R O Y E K G E D U N G

1 GNCM Hotel Shangrila

513,068 Jl.KH Mas Mansyur,

Jakarta

PT. Griyacerya

Nusamekar

JO with Hyundai (Porsi

NKE 35%)

2 Sudirman 7.8 91,393 Jl. Jenderal Sudirman,

Jaksel

KSO SMKCCB JO with CSCEC (Porsi

NKE 41%)

3 The Element 294,000 Jl. Epicentrum Tengah,

Setiabudi

PT. BSD JO with Hyundai

(Porsi NKE 30%)

4 Chadstone 382,000 Cikarang, Pasirsari,

Bekasi, Jawa Barat

PT. Pollux Aditama

Kencana

JO with CNQC (Porsi

NKE 40%)

5 PLTU Batang

157,083 Jawa Barat Sumitomo Corporation JO with TOA Cons.

(Porsi NKE 40 %)

TOTAL KONTRAK BERJALAN 1437,544 Notes: Nilai Kontrak yang ditampilkan adalah porsi NKE

Page 17: PAPARAN PUBLIK 2018 · 1 Nava Park Phase 1 86,98 BSD City, Tangerang PT Bumi Parama Wisesa Nava Park Phase 2 PT 145,65 BSD City, ... RESUME KINERJA PER JANUARI 2017 FOTO PROGRESS

RESUME KINERJA PER JANUARI 2017

FOTO PROGRESS PROYEK

(Proyek GAIA Bandung)

FOTO PROGRESS PROYEK

(Proyek World Capital Tower)

RESUME KINERJA PER JANUARI 2017

FOTO PROGRESS PROYEK

(Proyek Holland Village)

FOTO PROGRESS PROYEK

(Proyek Nava Park)

Page 18: PAPARAN PUBLIK 2018 · 1 Nava Park Phase 1 86,98 BSD City, Tangerang PT Bumi Parama Wisesa Nava Park Phase 2 PT 145,65 BSD City, ... RESUME KINERJA PER JANUARI 2017 FOTO PROGRESS

RESUME KINERJA PER JANUARI 2017

FOTO PROGRESS PROYEK

(Proyek Ciputra Internasional)

FOTO PROGRESS PROYEK

(Proyek Embarcadero)

RESUME KINERJA PER JANUARI 2017

FOTO PROGRESS PROYEK

(Proyek Gubeng Mix Use)

FOTO PROGRESS PROYEK

(Proyek Cinere Mix Use)

Page 19: PAPARAN PUBLIK 2018 · 1 Nava Park Phase 1 86,98 BSD City, Tangerang PT Bumi Parama Wisesa Nava Park Phase 2 PT 145,65 BSD City, ... RESUME KINERJA PER JANUARI 2017 FOTO PROGRESS

RESUME KINERJA PER JANUARI 2017

FOTO PROGRESS PROYEK

(Proyek The Element)

FOTO PROGRESS PROYEK

(Proyek Sudirman 7.8)

RESUME KINERJA PER JANUARI 2017

FOTO PROGRESS PROYEK

(Proyek Chadstone)

FOTO PROGRESS PROYEK

(Proyek PLTU Batang)

Page 20: PAPARAN PUBLIK 2018 · 1 Nava Park Phase 1 86,98 BSD City, Tangerang PT Bumi Parama Wisesa Nava Park Phase 2 PT 145,65 BSD City, ... RESUME KINERJA PER JANUARI 2017 FOTO PROGRESS

RESUME KINERJA PER JANUARI 2017

(Y 350 Roads Cons Chevron)

RESUME KINERJA PER JANUARI 2017

(Y 350 Roads Cons Chevron)

(Y 350 Roads Cons Chevron) (Y 350 Roads Cons Chevron)

Page 21: PAPARAN PUBLIK 2018 · 1 Nava Park Phase 1 86,98 BSD City, Tangerang PT Bumi Parama Wisesa Nava Park Phase 2 PT 145,65 BSD City, ... RESUME KINERJA PER JANUARI 2017 FOTO PROGRESS

RESUME KINERJA PER JANUARI 2017

(Y 351 Cirebon Soil Improvement)

RESUME KINERJA PER JANUARI 2017

RESUME KINERJA PER JANUARI 2017 RESUME KINERJA PER JANUARI 2017

(Y 351 Cirebon Soil Improvement)

(Y 351 Cirebon Soil Improvement) (Y 351 Cirebon Soil Improvement)

Page 22: PAPARAN PUBLIK 2018 · 1 Nava Park Phase 1 86,98 BSD City, Tangerang PT Bumi Parama Wisesa Nava Park Phase 2 PT 145,65 BSD City, ... RESUME KINERJA PER JANUARI 2017 FOTO PROGRESS

RESUME KINERJA PER JANUARI 2017

(Y 354 Bandara Banjarmasin)

(Y 354 Bandara Banjarmasin)

Page 23: PAPARAN PUBLIK 2018 · 1 Nava Park Phase 1 86,98 BSD City, Tangerang PT Bumi Parama Wisesa Nava Park Phase 2 PT 145,65 BSD City, ... RESUME KINERJA PER JANUARI 2017 FOTO PROGRESS

RESUME KINERJA PER JANUARI 2017

(Y 356 Rehab DAM Batubesi VALE)

RESUME KINERJA PER JANUARI 2017

RESUME KINERJA PER JANUARI 2017 RESUME KINERJA PER JANUARI 2017

(Y 356 Rehab DAM Batubesi VALE)

(Y 356 Rehab DAM Batubesi VALE) (Y 356 Rehab DAM Batubesi VALE)

Page 24: PAPARAN PUBLIK 2018 · 1 Nava Park Phase 1 86,98 BSD City, Tangerang PT Bumi Parama Wisesa Nava Park Phase 2 PT 145,65 BSD City, ... RESUME KINERJA PER JANUARI 2017 FOTO PROGRESS

RESUME KINERJA PER JANUARI 2017

(Y 358 Jembatan Bailley Sentekan)

RESUME KINERJA PER JANUARI 2017

RESUME KINERJA PER JANUARI 2017 RESUME KINERJA PER JANUARI 2017

(Y 358 Jembatan Bailley Sentekan)

(Y 358 Jembatan Bailley Sentekan) (Y 358 Jembatan Bailley Sentekan)

Page 25: PAPARAN PUBLIK 2018 · 1 Nava Park Phase 1 86,98 BSD City, Tangerang PT Bumi Parama Wisesa Nava Park Phase 2 PT 145,65 BSD City, ... RESUME KINERJA PER JANUARI 2017 FOTO PROGRESS

RESUME KINERJA PER JANUARI 2017

(Y 477 Pengaman Pantai Pandeglang)

RESUME KINERJA PER JANUARI 2017

RESUME KINERJA PER JANUARI 2017 RESUME KINERJA PER JANUARI 2017

(Y 477 Pengaman Pantai Pandeglang)

(Y 477 Pengaman Pantai Pandeglang) (Y 477 Pengaman Pantai Pandeglang)

Page 26: PAPARAN PUBLIK 2018 · 1 Nava Park Phase 1 86,98 BSD City, Tangerang PT Bumi Parama Wisesa Nava Park Phase 2 PT 145,65 BSD City, ... RESUME KINERJA PER JANUARI 2017 FOTO PROGRESS

RESUME KINERJA PER JANUARI 2017

(Y 776 Sarana Pengaman Pantai Tiku)

RESUME KINERJA PER JANUARI 2017

RESUME KINERJA PER JANUARI 2017 RESUME KINERJA PER JANUARI 2017

(Y 776 Sarana Pengaman Pantai Tiku)

(Y 776 Sarana Pengaman Pantai Tiku) (Y 776 Sarana Pengaman Pantai Tiku)

Page 27: PAPARAN PUBLIK 2018 · 1 Nava Park Phase 1 86,98 BSD City, Tangerang PT Bumi Parama Wisesa Nava Park Phase 2 PT 145,65 BSD City, ... RESUME KINERJA PER JANUARI 2017 FOTO PROGRESS

RESUME KINERJA PER JANUARI 2017

(Y 777 Sarana Pengendalian Batang Agam)

RESUME KINERJA PER JANUARI 2017

RESUME KINERJA PER JANUARI 2017 RESUME KINERJA PER JANUARI 2017

(Y 777 Sarana Pengendalian Batang Agam)

(Y 777 Sarana Pengendalian Batang Agam) (Y 777 Sarana Pengendalian Batang Agam)

Page 28: PAPARAN PUBLIK 2018 · 1 Nava Park Phase 1 86,98 BSD City, Tangerang PT Bumi Parama Wisesa Nava Park Phase 2 PT 145,65 BSD City, ... RESUME KINERJA PER JANUARI 2017 FOTO PROGRESS

RESUME KINERJA PER JANUARI 2017

(Y 778 Irigasi Lambunu)

RESUME KINERJA PER JANUARI 2017

RESUME KINERJA PER JANUARI 2017 RESUME KINERJA PER JANUARI 2017

(Y 778 Irigasi Lambunu)

(Y 778 Irigasi Lambunu) (Y 778 Irigasi Lambunu)

Page 29: PAPARAN PUBLIK 2018 · 1 Nava Park Phase 1 86,98 BSD City, Tangerang PT Bumi Parama Wisesa Nava Park Phase 2 PT 145,65 BSD City, ... RESUME KINERJA PER JANUARI 2017 FOTO PROGRESS

Laba Rugi Perseroan (dalam Miliar Rupiah)

28

Page 30: PAPARAN PUBLIK 2018 · 1 Nava Park Phase 1 86,98 BSD City, Tangerang PT Bumi Parama Wisesa Nava Park Phase 2 PT 145,65 BSD City, ... RESUME KINERJA PER JANUARI 2017 FOTO PROGRESS

Posisi Keuangan Perseroan (dalam Miliar Rupiah)

Page 31: PAPARAN PUBLIK 2018 · 1 Nava Park Phase 1 86,98 BSD City, Tangerang PT Bumi Parama Wisesa Nava Park Phase 2 PT 145,65 BSD City, ... RESUME KINERJA PER JANUARI 2017 FOTO PROGRESS

Perkembangan Kasus Perseroan dengan KPK

30

Direktur Utama Perseroan telah menandatangani Berita Acara SP21 yang menandakan bahwa kasus korporasi NKE akan masuk pada persidangan

NKE telah menerima surat dakwaan lengkap dari KPK

28 September 2018

2 October 2018

Dimulainya proses persidangan kasus korporasi

(tuntutan, eksepsi, saksi) 11 Oktober 2018

Rencana sidang putusan untuk kasus korporasi Awal Januari 2019

Perkiraan selesainya kasus korporasi NKE dengan sudah berkekuatan hukum tetap (incracht)

Akhir Februari 2019- Awal Maret 2019

Page 32: PAPARAN PUBLIK 2018 · 1 Nava Park Phase 1 86,98 BSD City, Tangerang PT Bumi Parama Wisesa Nava Park Phase 2 PT 145,65 BSD City, ... RESUME KINERJA PER JANUARI 2017 FOTO PROGRESS

31

Kontak Perusahaan :

Almanda Pohan Sekretaris Perusahaan

Email: [email protected]

Website: www.nusakonstruksi.com