ngitung

Download ngitung

If you can't read please download the document

Upload: bimo-adi-prianggoro

Post on 28-Sep-2015

221 views

Category:

Documents


5 download

DESCRIPTION

RED

TRANSCRIPT

1. aspek kuantitasRO / TO x 100 = 1 / 100 x 100 =12. aspek kualitasRK / TK x 100 = 90 / 100 x 100 =903. aspek waktu1.76 x TW RW / TW x 100 ==1.76 x 12 12 / 12 x 100 =764. aspek biaya1,76 x TB RB / TB X 100 == 1,76 x 170.395.000 - 170.395.000 / 170.395.000 x 100 =761. aspek kuantitasRO / TO x 100 =1/1 x 100 =1002. aspek kualitasRK / TK x 100 =90/100 x 100=903. aspek waktu100% - (RW/TW x 100%) =100% - (8/12 x 100%) =33.33%76-{(1,76xTW-RW/TW x 100)-100}=76-{(1,76 x 12-8 / 12 x 100)-100}=66.674. aspek biaya100% - (RB/TB x 100%) =100% - (120395000/170395000 x 100% =29.34%(1,76 x TB - RB)/TB x 100 =76-(((1,76 x 170395000 - 120395000)/170395000)x100)-1007133784.25