PENGOLAHAN DATA SEISMIK
By : Ardian Novianto
STRIPPING:
TG= - U + TS
ELVS - D - ELVB
VNS
TS = - and
Where VNS = kecepatan rata-rata dari bottom lubang ke base horizon
U = pengukuran uphole time
D = kedalaman shot
ELVDAT - ELVB
VRTR = + *2REPLACEMENT:
T = TS+ TG+ TRTOTAL:
Where VR= Kecepatan pengganti
(replacement velocity)
-
8/8/2019 koreksi statik2
2/5
2
PENGOLAHAN DATA SEISMIK
By : Ardian Novianto
Quis
-
-
-
8/8/2019 koreksi statik2
3/5
3
PENGOLAHAN DATA SEISMIK
By : Ardian Novianto
LOCATION UHT SHOT TO
DATUM TIME
SURFACE TO
DATUM TIME
A 0.024 0.008 Sec 0.032 Sec
B 0.030 0.005 Sec 0.035 Sec
C 0.036
D 0.022
E 0.014
A 135B 110
C 95D 65
E 20
0.024
0.0300.036
0.022
0.014LVL
Surface Elevation
7270 80
6560 shot Depth
LVL
DATUM
SEA LEVEL
Shot Location Geophone
location
Static Corrections
B A - (0.005 + 0.032) = - 0.037
C A - (0.002 + 0.032) = ?
D B
E C
E D
-
8/8/2019 koreksi statik2
4/5
4
PENGOLAHAN DATA SEISMIK
By : Ardian Novianto
1. Perhitungan Shot to datum Time :
Shot to Datum Time = Elevation Shot depth
Datum Velocity
Diketahui besarnya Datum Velocity = 8000/sec.
- Titik A : Shot To Datum time = 135 72
8000
= 0.0079 Sec- Titik B : Shot To Datum time = 110 70
8000
= 0.005 Sec
2. Perhitungan Surface to datum Time :
Surface to datum Time = UHT + Shot to Datum Time
- Titik A : 0.024 + 0.008 = 0.032 Sec
- Titik B : 0.030 + 0.005 = 0.035 Sec
-
8/8/2019 koreksi statik2
5/5
5
PENGOLAHAN DATA SEISMIK
By : Ardian Novianto
3. Perhitungan Static Corecctions
Static Correction = - (Shot to Datum Time + Surface to Datum Time)
Tanda Minus disini merupakan koreksi terhadap posisi datumnya dengan asumsi
bahwa terdapat kelebihan waktu diatas posisi datum sehingga harus dikurangkan.
- Shot Location B dan Geophone Location A
= - (Shot to Datum Time B + Surface to Datum Time A)
= - (0.005 + 0.032)
= - 0.037 Sec
- Shot Location C dan Geophone Location A
= - (Shot to Datum Time C + Surface to Datum Time A)
= ??