hybrid target r&d at kek-linac t.takahashi hiroshima university 25 septemer 2012 lcws2012,...

22
Hybrid Target R&D at KEK- LINAC T.Takahashi Hiroshima University 25 Septemer 2012 LCWS2012, Arlington, TX Collaborators: V. Strakhovenko O. Dadoun, R. Chehab, A.Variola, L. Rinolfi, O. Dadoun,T.Kamitani, T.Suwada, T.Omori, J.Urakawa,K.Furukawa, K.Umemori,M.Satoh,T.Sugimura,S.Kawada, T.Akagi, Y. Uesugi

Upload: gabriel-jackson

Post on 08-Jan-2018

222 views

Category:

Documents


0 download

DESCRIPTION

Hybrid target for positron source A away to reduce thermal load in positron targets – proposed by Chehab, Variola, Strakhovenko -> Experimental study to – accumulate data on e+ yields, heat deposit,,, Feasibility as a positron source for LCs e-e- e +, e -, g  e-e- e+e+ e+e+

TRANSCRIPT

Page 1: Hybrid Target R&D at KEK-LINAC T.Takahashi Hiroshima University 25 Septemer 2012 LCWS2012, Arlington, TX Collaborators: V. Strakhovenko O. Dadoun, R. Chehab,

Hybrid Target R&D at KEK-LINAC

T.TakahashiHiroshima University

25 Septemer 2012LCWS2012, Arlington, TX

Collaborators:V. Strakhovenko O. Dadoun, R. Chehab, A.Variola, L. Rinolfi, O. Dadoun,T.Kamitani, T.Suwada, T.Omori, J.Urakawa,K.Furukawa, K.Umemori,M.Satoh,T.Sugimura,S.Kawada, T.Akagi, Y. Uesugi

Page 2: Hybrid Target R&D at KEK-LINAC T.Takahashi Hiroshima University 25 Septemer 2012 LCWS2012, Arlington, TX Collaborators: V. Strakhovenko O. Dadoun, R. Chehab,

Contents

• Status of previous experiments• Temperature measurement 2012 January• Prospects

Page 3: Hybrid Target R&D at KEK-LINAC T.Takahashi Hiroshima University 25 Septemer 2012 LCWS2012, Arlington, TX Collaborators: V. Strakhovenko O. Dadoun, R. Chehab,

Hybrid target for positron source

• A away to reduce thermal load in positron targets– proposed by Chehab, Variola, Strakhovenko

• -> Experimental study to – accumulate data on e+ yields, heat deposit,,,

Feasibility as a positron source for LCs

e-e+, e-, g g

e-

e+

e+

Page 4: Hybrid Target R&D at KEK-LINAC T.Takahashi Hiroshima University 25 Septemer 2012 LCWS2012, Arlington, TX Collaborators: V. Strakhovenko O. Dadoun, R. Chehab,

hybrid souce for CLIC

Page 5: Hybrid Target R&D at KEK-LINAC T.Takahashi Hiroshima University 25 Septemer 2012 LCWS2012, Arlington, TX Collaborators: V. Strakhovenko O. Dadoun, R. Chehab,

Setup

8GeV e- 1mm W crystal

Sweeping Magnet0.96T 0.75m

amorphous W8 mm18 mm

Analyzing magnet5 ~ 30MeV

Page 6: Hybrid Target R&D at KEK-LINAC T.Takahashi Hiroshima University 25 Septemer 2012 LCWS2012, Arlington, TX Collaborators: V. Strakhovenko O. Dadoun, R. Chehab,

pictures

e- 8GeV

W Crystal on the goniometer

Sweeping magnet

Page 7: Hybrid Target R&D at KEK-LINAC T.Takahashi Hiroshima University 25 Septemer 2012 LCWS2012, Arlington, TX Collaborators: V. Strakhovenko O. Dadoun, R. Chehab,

pictures

movable stage

amorphoustargets

thermocoupolesattached back end

Page 8: Hybrid Target R&D at KEK-LINAC T.Takahashi Hiroshima University 25 Septemer 2012 LCWS2012, Arlington, TX Collaborators: V. Strakhovenko O. Dadoun, R. Chehab,

posit

ron

yiel

d (a

rb. u

nit)

angle of crystal  axis<111> w.r.t. beam (mr)

rot. in vertical plain

esweep mag

8 mm

Rocking curve

1

2

3.4 0.117.7 0.4

1 2

2 22 21 2

( )f A B Const

same for horizontal rotationPreliminary

factor 3 enhancement

Page 9: Hybrid Target R&D at KEK-LINAC T.Takahashi Hiroshima University 25 Septemer 2012 LCWS2012, Arlington, TX Collaborators: V. Strakhovenko O. Dadoun, R. Chehab,

e+ yield

amorphous thickness [mm]

e+ d

etec

ted

[a.u

]P=20MeV

Need simulation for analyzing the magnet collimator , detector to evaluate e+ yeilds

0 2 4 6 8 10 12 14 16 180

5

10

15

Conventional

Hybrid ON axis

Hybrid OFF axis

Page 10: Hybrid Target R&D at KEK-LINAC T.Takahashi Hiroshima University 25 Septemer 2012 LCWS2012, Arlington, TX Collaborators: V. Strakhovenko O. Dadoun, R. Chehab,

Detector acceptance• Simulation of the is in progress by Y.Uesugi

Page 11: Hybrid Target R&D at KEK-LINAC T.Takahashi Hiroshima University 25 Septemer 2012 LCWS2012, Arlington, TX Collaborators: V. Strakhovenko O. Dadoun, R. Chehab,

simulation in progress

Very Preliminary

low acceptance 0.0005e+/e- takes time for simulation

0 2 4 6 8 10 12 14 16 18 200

0.5

1

1.5

2

2.5

3

20MeVcnv

hybrid

offaxis

sim cnv

sim hybrid

sim offaxis

Target Thickness (mm)

e+ y

ield

(A.U

)

Page 12: Hybrid Target R&D at KEK-LINAC T.Takahashi Hiroshima University 25 Septemer 2012 LCWS2012, Arlington, TX Collaborators: V. Strakhovenko O. Dadoun, R. Chehab,

Temperature measurement w/ thermocouples

back plane of amorphous target thermocouple

approximately 1mm x 1mm

to fast data loggerread temperature each 10ms

bunch by bunch temperature variationPEDD information by thermocouple

temperature at equilibriumtotal energy deposit

Page 13: Hybrid Target R&D at KEK-LINAC T.Takahashi Hiroshima University 25 Septemer 2012 LCWS2012, Arlington, TX Collaborators: V. Strakhovenko O. Dadoun, R. Chehab,

Example ofTemperature Measurement

0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30202530354045505560

Temperature of the 8mm amorphous target for the hybrid case

Time from Beam On (Minutes)

Tem

pera

ture

(deg

ree

Celsi

us)

Base temp. 23.3℃

DT~32℃

Preliminary

Page 14: Hybrid Target R&D at KEK-LINAC T.Takahashi Hiroshima University 25 Septemer 2012 LCWS2012, Arlington, TX Collaborators: V. Strakhovenko O. Dadoun, R. Chehab,

T vs total energy deposit

hybrid  on axis

conventional

18mm

8mm

T at equilibrium has information for total energy deposit except for 18mm hybrid

target is thicker than shower max

hybrid off axis

T at

equ

ilibr

ium

(deg

)

(simulation)

(mea

sure

d)

Page 15: Hybrid Target R&D at KEK-LINAC T.Takahashi Hiroshima University 25 Septemer 2012 LCWS2012, Arlington, TX Collaborators: V. Strakhovenko O. Dadoun, R. Chehab,

bunch by bunch temp.• dT provides a measure of PEDD

hybrid  on axis

conventional

hybrid off axis

Simulation

Measured

Page 16: Hybrid Target R&D at KEK-LINAC T.Takahashi Hiroshima University 25 Septemer 2012 LCWS2012, Arlington, TX Collaborators: V. Strakhovenko O. Dadoun, R. Chehab,

Making thermo couple array

thermocouples

temperature distribution of amorphous targetbunch by bunch bases

design in progress at Hiroshima

Page 17: Hybrid Target R&D at KEK-LINAC T.Takahashi Hiroshima University 25 Septemer 2012 LCWS2012, Arlington, TX Collaborators: V. Strakhovenko O. Dadoun, R. Chehab,

temperature measurementJanuary 2012

Page 18: Hybrid Target R&D at KEK-LINAC T.Takahashi Hiroshima University 25 Septemer 2012 LCWS2012, Arlington, TX Collaborators: V. Strakhovenko O. Dadoun, R. Chehab,

temperature measurement

Page 19: Hybrid Target R&D at KEK-LINAC T.Takahashi Hiroshima University 25 Septemer 2012 LCWS2012, Arlington, TX Collaborators: V. Strakhovenko O. Dadoun, R. Chehab,

e+ yields v.s. PEDD ~G4~

e- s=4.0mm

hybrid (5GeV 8GeV) s=2.5mm

e- s=1.0mm

hybrid (5GeV 8GeV) s=1.0mm

PEDD on Amorphous Target(GeV/cm^3/e-)

e+/e

-(in

DR a

pert

ure)

e+/e

-(in

DR a

pert

ure)

conventional

conventional

e- s=2.5mmconventional

s: beam size on amorphous s: beam size on crystal

Page 20: Hybrid Target R&D at KEK-LINAC T.Takahashi Hiroshima University 25 Septemer 2012 LCWS2012, Arlington, TX Collaborators: V. Strakhovenko O. Dadoun, R. Chehab,

e+ yields v.s. PEDD ~G4~

e- s=4.0mm

hybrid (5GeV 8GeV) s=2.5mm

e- s=1.0mm

hybrid (5GeV 8GeV) s=1.0mm

PEDD on Amorphous Target(GeV/cm^3/e-)

e+/e

-(in

DR a

pert

ure)

e+/e

-(in

DR a

pert

ure)

conventional

conventional

e- s=2.5mmconventional

s: beam size on amorphous s: beam size on crystal

Making this plot is a purpose of this experiment, but if it is the case;

A hybrid works, why not a conventional( but worthwhile studying better crystals)

Page 21: Hybrid Target R&D at KEK-LINAC T.Takahashi Hiroshima University 25 Septemer 2012 LCWS2012, Arlington, TX Collaborators: V. Strakhovenko O. Dadoun, R. Chehab,

summary• Systematic data for hybrid target R&D

– yield from various target thickness, momentum– G4 Simulation in progress

• energy deposit/temperature– Thermocouple array works– in progress. G4 simulation is ready.– Systematic data in next experiments

–( but we need to wait for full recovery of KEKB LINAC)

Page 22: Hybrid Target R&D at KEK-LINAC T.Takahashi Hiroshima University 25 Septemer 2012 LCWS2012, Arlington, TX Collaborators: V. Strakhovenko O. Dadoun, R. Chehab,

experimental site KEKB LINAC

Switch yard

8 GeV  e-~ nc/bunchupto 25Hz single bunch

After the earthquake:beam recovered to 3GeV8 GeV operation expected later half of 2012