hpp process costing 'binder jeans' skala home industri

4
“Tugas Akuntansi Biaya” Kelompok : ENDANG HIDAYAT (123010075) DITA KRESAWULANDARI (123010078) TAVIANA PRIHATINI MAHARANI (123010084) RAMDAN KUSUMA TRIYANTO (123010096) IDHAM KARISMANSYAH (123010107)

Upload: endang-hidayat

Post on 27-Dec-2014

75 views

Category:

Marketing


3 download

DESCRIPTION

OPC HPP Process Costing produk 'Binder Jeans' skala home industri

TRANSCRIPT

Page 1: HPP Process Costing 'Binder Jeans' skala home industri

“Tugas Akuntansi

Biaya”

Kelompok :ENDANG HIDAYAT (123010075)

DITA KRESAWULANDARI (123010078)

TAVIANA PRIHATINI MAHARANI (123010084)

RAMDAN KUSUMA TRIYANTO (123010096)

IDHAM KARISMANSYAH (123010107)

Page 2: HPP Process Costing 'Binder Jeans' skala home industri

S-01Cover Depan

(Jeans) (40 x 24 cm)

Q = 1

DiukurM.Ukur

(Penggaris)O-1

O-2Dipola

(Cardboard patern)

O-3Dipotong

Msn. Potong

O-7

S-02Isi Cover

(Kertas Duplek)(18 X 22,5 cm)

Q = 2

DiukurM.Ukur

(Penggaris)

O-5

O-6Dipotong

Msn. Potong

Assembling 1(Ass S-01 & S-02)

M Assembling

Lem

S-03Bagian Dalam

(Jeans)(18 X 22,5 cm))

Q = 1

0-8DiukurM.Ukur

(Penggaris)

O-9Dipola

(Cardboard pattern)

Dipola(Cardboard

Pattern)

O-10 DipotongMsn. Potong

S-05Sampul Pengunci

(Jeans)(2 x 5 cm)

Q = 2

O-14DiukurM.Ukur

(Penggaris)

O-15Dipola

(Cardboard Pattern)

O-16Dipotong

Msn. Potong

O-20

Lem

Assembling 2M. Assembling

I-1Periksa

M. Periksa

O-11DiukurM.Ukur

(Penggaris)

O-12

O-13 DipotongMsn. Potong

Dipola(Cardboard

Pattern)

S-04Penutup Samping

(Jeans)(12 X 22,5 cm)

Q = 2

30"

60"

60"

20"

40"

30"

120"

15"

30"

30"

15"

30"

30"

10"

20"

20"

120"

Ring Binder

60"

O-4

Lem

O-17Dijahit

Msn. Jahit

120"

Magnet Pengunci

O-18Dijahit

Msn. Jahit

120"

30"

Kertas Pembatas

Magnet Pengunci

Sekrup Pengunci

O-19Pressing

Msn. Press

Kertas Isi

OPERATION

PROCESS CHART

Page 3: HPP Process Costing 'Binder Jeans' skala home industri

Tabel Biaya Bahan Produksi & Tenaga Kerja

Nomor Nama Komponen Harga Total Harga1 Kain Jeans 4 roll 1.350.000Rp 5.400.000Rp 2 Kertas Duplek 1 rim 150.000Rp 150.000Rp

5.550.000Rp

Nomor Nama Komponen Harga Satuan Total Harga1 Benang 5 gross 150.000Rp 750.000Rp 2 Mistar Ukur 8 pcs 5.000Rp 40.000Rp 3 Pensil Pola 8 pcs 2.000Rp 16.000Rp 4 Lem Kain 5 kg 60.000Rp 300.000Rp 5 Kuas 5 buah 3.000Rp 15.000Rp 6 Magnet Pengunci 1000 pasang 1.500Rp 1.500.000Rp 7 Ring Binder 1000 pcs 4.000Rp 4.000.000Rp 8 Sekrup Pengunci 2000 pcs 250Rp 500.000Rp 9 Kertas Pembatas 1000 pcs 2.000Rp 2.000.000Rp

10 Kertas Isi 10000 lembar 100Rp 1.000.000Rp 11 Dus 100 per lusin 8.000Rp 800.000Rp 12 Plastik 100 per lusin 2.000Rp 200.000Rp

11.121.000Rp

Bahan Baku 5.550.000Rp Bahan Tambahan 11.121.000Rp Jumlah 16.671.000Rp

Total Biaya Bahan Baku

Jumlah

Jumlah

JML / STD

JML / STD

Bahan Tambahan

Bahan Baku

Jabatan Operator Upah/Kegiatan Banyak Kegiatan Upah/Produk Upah/PerBulan Banyak Pekerja JumlahOperator Meja Ukur 200Rp 5 1.000Rp 1.000.000Rp 2 2.000.000Rp Operator Meja Pola 200Rp 5 1.000Rp 1.000.000Rp 2 2.000.000Rp Operator Mesin Potong 200Rp 5 1.000Rp 1.000.000Rp 3 3.000.000Rp Operator Mesin Press Ring 500Rp 2 1.000Rp 1.000.000Rp 1 1.000.000Rp Operator Mesin Jahit 1.250Rp 1 1.250Rp 1.250.000Rp 1 1.250.000Rp Operator Mesin jahit assembling 1.250Rp 1 1.250Rp 1.250.000Rp 1 1.250.000Rp Operator Mesin Assembling 1 500Rp 2 1.000Rp 1.000.000Rp 1 1.000.000Rp Operator Mesin Assembling 2 500Rp 2 1.000Rp 1.000.000Rp 1 1.000.000Rp Operator Meja Periksa 500Rp 2 1.000Rp 1.000.000Rp 1 1.000.000Rp Operator Meja Packaging 500Rp 2 1.000Rp 1.000.000Rp 1 1.000.000Rp

Total 14 14.500.000Rp

Jabatan Upah/Hari Upah/Minggu Upah/Bulan Tenaga Kerja Biaya Tenaga KerjaDirektur Utama 500.000Rp 2.500.000Rp 10.000.000Rp 1 10.000.000Rp Sekertaris 150.000Rp 750.000Rp 3.000.000Rp 1 3.000.000Rp Manajer Produksi 200.000Rp 1.000.000Rp 4.000.000Rp 1 4.000.000Rp Manajer Logistik 185.000Rp 925.000Rp 3.700.000Rp 1 3.700.000Rp Manajer Administrasi&keuangan 175.000Rp 875.000Rp 3.500.000Rp 1 3.500.000Rp Manajer Pemasaran&Inovasi 175.000Rp 875.000Rp 3.500.000Rp 1 3.500.000Rp Supervisor 125.000Rp 625.000Rp 2.500.000Rp 1 2.500.000Rp Kepala Bagian Divisi 100.000Rp 500.000Rp 2.000.000Rp 3 6.000.000Rp Staf 75.000Rp 375.000Rp 1.500.000Rp 2 3.000.000Rp Receptionist 50.000Rp 250.000Rp 1.000.000Rp 1 1.000.000Rp

13 40.200.000Rp

Tenaga Kerja Tidak Langsung

Total Biaya Tenaga Kerja Perkantoran Perbulan

Tenaga Kerja Langsung

14.500.000Rp 40.200.000Rp 54.700.000Rp

TOTAL BIAYA TENAGA KERJA

Jumlah

Tenaga Kerja LangsungTenaga Kerja Tidak Langsung

Page 4: HPP Process Costing 'Binder Jeans' skala home industri

Tabel Hitungan Investasi & Depresiasi serta Harga Produk

NO JENIS AKTIVA JUMLAH/STD UMUR/BULAN HARGA N.SISA TOTAL HARGA NILAI SISA TOTAL DEPRESIASI1 Sewa Ruang Usaha 1 12 30.000.000Rp -Rp 30.000.000Rp -Rp 2.500.000Rp

1 Meja Ukur 2 unit 36 450.000,00Rp 45.000,00Rp 900.000,00Rp 90.000,00Rp 22.500,00Rp 2 Meja Pola 2 unit 60 450.000,00Rp 45.000,00Rp 900.000,00Rp 90.000,00Rp 13.500,00Rp 3 Mesin Potong 2 unit 60 1.750.000,00Rp 175.000,00Rp 3.500.000,00Rp 350.000,00Rp 52.500,00Rp 4 Mesin Press Ring 1 unit 60 1.800.000,00Rp 180.000,00Rp 1.800.000,00Rp 180.000,00Rp 27.000,00Rp 5 Meja Jahit 1 1 unit 60 2.000.000,00Rp 200.000,00Rp 2.000.000,00Rp 200.000,00Rp 30.000,00Rp 6 Mesin Jahit ass 1 unit 60 2.200.000,00Rp 220.000,00Rp 2.200.000,00Rp 220.000,00Rp 33.000,00Rp 7 Meja Packaging 1 unit 36 1.000.000,00Rp 100.000,00Rp 1.000.000,00Rp 100.000,00Rp 25.000,00Rp 8 Meja Periksa 1 unit 36 1.000.000,00Rp 100.000,00Rp 1.000.000,00Rp 100.000,00Rp 25.000,00Rp 9 Storage 2 unit 60 350.000,00Rp 35.000,00Rp 700.000,00Rp 70.000,00Rp 10.500,00Rp

TOTAL 14 44.000.000,00Rp 1.400.000,00Rp 2.739.000,00Rp

Total Investasi 44.000.000Rp Total Depresiasi 2.739.000Rp

Harga Jual = HPP + ProfitProfit = (00 % x HPP)(70%xHPP) Rp 53.942.000 Harga Jual (Penjualan) Rp 131.002.000

Harga Pokok Penjualan/ Unit = HPP : Jumlah ProduksiJumlah Produksi 1.000 Harga Pokok Penjualan / unit Rp 77.060

Harga Jual / unit = Harga Jual : Jumlah ProduksiHarga Jual / unit Rp 131.002

Deskripsi Total1 Bahan Produksi Rp 16.671.000 2 Tenaga Kerja Rp 54.700.000 3 Overhead Pabrik

Listrik dan Penerangan Rp 150.000 Listrik Mesin Rp 450.000 Maintenance Rp 1.000.000 Telepon Rp 350.000 Lain-Lain Rp 1.000.000 Depresiasi Rp 2.739.000 HARGA POKOK PRODUKSI Rp 77.060.000