Lembar 1 BACK UP DATA PENGUKURAN TIMBUNAN KEGIATAN : PENINGKATAN SARANA DAN PRASARANA APARATUR PEKERJAAN : : LOKASI : KABUPATEN BENGKALIS TAHUN ANGGARAN : 2015 No Panjang Lebar Tinggi Luas Volume M M M M2 M3 1 1.000 ### 0.700 1.000 0.700 2 1.000 5.700 0.950 5.700 5.415 3 2.100 3.300 0.950 6.930 6.584 4 1.000 5.700 0.950 5.700 5.415 5 1.000 2.100 0.950 2.100 1.995 6 3.300 1.000 0.900 3.300 2.970 7 3.300 5.700 0.980 18.810 18.434 8 3.300 ### 0.850 10.890 9.257 9 3.300 5.700 1.200 18.810 22.572 10 3.300 2.150 1.050 7.095 7.450 11 3.350 0.960 0.900 3.216 2.894 12 3.350 5.700 1.050 19.095 20.050 13 3.350 3.300 0.950 11.055 10.502 14 3.350 5.700 1.100 19.095 21.005 15 3.350 2.150 1.000 7.203 7.203 16 3.420 0.950 0.900 3.249 2.924 17 3.420 5.700 1.050 19.494 20.469 18 3.420 3.300 0.980 11.286 11.060 19 3.420 5.700 0.850 19.494 16.570 20 3.420 2.150 0.850 7.353 6.250 21 3.350 0.950 0.900 3.183 2.864 22 3.350 5.700 0.920 19.095 17.567 23 3.350 3.300 0.950 11.055 10.502 24 3.350 5.700 0.920 19.095 17.567 25 3.350 2.150 0.980 7.203 7.058 26 3.320 1.000 0.900 3.320 2.988 27 3.320 5.700 0.850 18.924 16.085 28 3.320 3.300 0.820 10.956 8.984 SUB TOTAL 293.705 283.334 Diperiksa Oleh : Dibuat Oleh : KONSULTAN PENGAWAS KONTRAKTOR PELA CV. MULTY DESEKO PT. TIGA PUTRA W LANJUTAN PEMBANGUNAN GEDUNG SEKOLAH TINGG EKONOMI (STIE) SYARIAH KAB. BENGKALIS s

Upload: abdul-rasyid

Post on 13-Apr-2016

108 views

Category:

Documents


15 download

DESCRIPTION

ax

TRANSCRIPT

Page 1: Draft Addendum Cco Ok

Lembar 1

BACK UP DATA PENGUKURAN TIMBUNAN

KEGIATAN : PENINGKATAN SARANA DAN PRASARANA APARATUR

PEKERJAAN :

:

LOKASI : KABUPATEN BENGKALIS

TAHUN ANGGARAN: 2015

NoPanjang Lebar Tinggi Luas Volume

M M M M2 M3

1 1.000 ### 0.700 1.000 0.700

2 1.000 5.700 0.950 5.700 5.415

3 2.100 3.300 0.950 6.930 6.584

4 1.000 5.700 0.950 5.700 5.415

5 1.000 2.100 0.950 2.100 1.995

6 3.300 1.000 0.900 3.300 2.970

7 3.300 5.700 0.980 18.810 18.434

8 3.300 ### 0.850 10.890 9.257

9 3.300 5.700 1.200 18.810 22.572

10 3.300 2.150 1.050 7.095 7.450

11 3.350 0.960 0.900 3.216 2.894

12 3.350 5.700 1.050 19.095 20.050

13 3.350 3.300 0.950 11.055 10.502

14 3.350 5.700 1.100 19.095 21.005

15 3.350 2.150 1.000 7.203 7.203

16 3.420 0.950 0.900 3.249 2.924

17 3.420 5.700 1.050 19.494 20.469

18 3.420 3.300 0.980 11.286 11.060

19 3.420 5.700 0.850 19.494 16.570

20 3.420 2.150 0.850 7.353 6.250

21 3.350 0.950 0.900 3.183 2.864

22 3.350 5.700 0.920 19.095 17.567

23 3.350 3.300 0.950 11.055 10.502

24 3.350 5.700 0.920 19.095 17.567

25 3.350 2.150 0.980 7.203 7.058

26 3.320 1.000 0.900 3.320 2.988

27 3.320 5.700 0.850 18.924 16.085

28 3.320 3.300 0.820 10.956 8.984

SUB TOTAL 293.705 283.334

Diperiksa Oleh : Dibuat Oleh :

KONSULTAN PENGAWAS KONTRAKTOR PELAKSANACV. MULTY DESEKO PT. TIGA PUTRA WIJAYA

LANJUTAN PEMBANGUNAN GEDUNG SEKOLAH TINGGI ILMU EKONOMI (STIE) SYARIAH KAB. BENGKALIS

Kuantitas ( N )

Page 2: Draft Addendum Cco Ok

Lembar 2

ADE DESRY KURNIAWAN, A.Md MUSMULYADIInspector Pelaksana Lapangan

Page 3: Draft Addendum Cco Ok

Lembar 3

BACK UP DATA PENGUKURAN TIMBUNAN

KEGIATAN : PENINGKATAN SARANA DAN PRASARANA APARATUR

PEKERJAAN :

:

LOKASI : KECAMATAN BENGKALIS

TAHUN ANGGARAN: 2015

NoPanjang Lebar Tinggi Luas Volume

M M M M2 M3

29 3.320 5.700 0.800 18.924 15.139

30 3.320 2.150 0.780 7.138 5.568

31 2.130 0.900 0.550 1.917 1.054

32 2.130 5.700 0.580 12.141 7.042

33 2.130 3.300 0.800 7.029 5.623

34 2.130 5.700 0.850 12.141 10.320

35 2.130 3.360 0.670 7.157 4.795

36 3.350 0.900 0.450 3.015 1.357

37 3.350 5.700 0.450 19.095 8.593

38 3.350 3.300 0.450 11.055 4.975

39 3.350 5.700 0.650 19.095 12.412

40 3.350 0.900 0.520 3.015 1.568

41 3.350 2.250 0.600 7.538 4.523

42 3.400 3.300 0.550 11.220 6.171

43 3.400 2.100 0.480 7.140 3.427

44 3.400 3.300 0.480 11.220 5.386

45 3.400 0.900 0.500 3.060 1.530

46 3.400 2.250 0.500 7.650 3.825

47 3.400 3.300 0.520 11.220 5.834

48 3.400 2.250 0.550 7.650 4.208

49 3.400 3.300 0.550 11.220 6.171

50 3.400 0.900 0.500 3.060 1.530

51 3.400 2.250 0.500 7.650 3.825

52 3.400 0.930 0.600 3.162 1.897

53 3.400 5.700 0.550 19.380 10.659

54 3.400 3.300 0.650 11.220 7.293

55 3.400 5.700 0.500 19.380 9.690

56 - -

SUB TOTAL 263.491 154.413

Diperiksa Oleh : Dibuat Oleh :

KONSULTAN PENGAWAS KONTRAKTOR PELAKSANACV. MULTY DESEKO PT. TIGA PUTRA WIJAYA

LANJUTAN PEMBANGUNAN GEDUNG SEKOLAH TINGGI ILMU EKONOMI (STIE) SYARIAH KAB. BENGKALIS

Kuantitas ( N )

Page 4: Draft Addendum Cco Ok

Lembar 4

ADE DESRY KURNIAWAN, A.Md MUSMULYADIInspector Pelaksana Lapangan

Page 5: Draft Addendum Cco Ok

Lembar 5

BACK UP DATA PENGUKURAN TIMBUNAN

KEGIATAN : PENINGKATAN SARANA DAN PRASARANA APARATUR

PEKERJAAN :

:

LOKASI : KECAMATAN BENGKALIS

TAHUN ANGGARAN: 2015

NoPanjang Lebar Tinggi Luas Volume

M M M M2 M3

57 3.400 0.900 0.560 3.060 1.714

58 3.400 2.250 0.550 7.650 4.208

59 2.150 0.900 0.580 1.935 1.122

60 2.150 5.700 0.450 12.255 5.515

61 2.150 3.300 0.450 7.095 3.193

62 2.150 5.700 0.540 12.255 6.618

63 2.150 0.900 0.450 1.935 0.871

64 2.150 2.250 0.450 4.838 2.177

65 3.350 0.950 0.600 3.183 1.910

66 3.350 5.700 0.500 19.095 9.548

67 3.350 3.300 0.500 11.055 5.528

68 3.350 5.700 0.600 19.095 11.457

69 3.350 2.150 0.450 7.203 3.241

70 3.350 0.900 0.750 3.015 2.261

71 3.350 5.700 0.550 19.095 10.502

72 3.350 3.300 0.570 11.055 6.301

73 3.350 5.700 0.600 19.095 11.457

74 3.350 2.150 0.530 7.203 3.817

75 3.400 0.900 0.580 3.060 1.775

76 3.400 5.700 0.550 19.380 10.659

77 3.400 3.300 0.480 11.220 5.386

78 3.400 5.700 0.550 19.380 10.659

79 3.400 2.150 0.450 7.310 3.290

80 3.400 0.950 0.500 3.230 1.615

81 3.400 5.700 0.600 19.380 11.628

82 3.400 3.300 0.600 11.220 6.732

83 3.400 5.700 0.550 19.380 10.659

84 3.400 2.150 0.400 7.310 2.924

SUB TOTAL 290.985 156.764

Diperiksa Oleh : Dibuat Oleh :

KONSULTAN PENGAWAS KONTRAKTOR PELAKSANACV. MULTY DESEKO PT. TIGA PUTRA WIJAYA

LANJUTAN PEMBANGUNAN GEDUNG SEKOLAH TINGGI ILMU EKONOMI (STIE) SYARIAH KAB. BENGKALIS

Kuantitas ( N )

Page 6: Draft Addendum Cco Ok

Lembar 6

ADE DESRY KURNIAWAN, A.Md MUSMULYADIInspector Pelaksana Lapangan

Page 7: Draft Addendum Cco Ok

Lembar 7

BACK UP DATA PENGUKURAN TIMBUNAN

KEGIATAN : PENINGKATAN SARANA DAN PRASARANA APARATUR

PEKERJAAN :

:

LOKASI : KECAMATAN BENGKALIS

TAHUN ANGGARAN: 2015

NoPanjang Lebar Tinggi Luas Volume

M M M M2 M3

85 3.350 0.950 0.450 3.183 1.432

86 3.350 5.700 0.500 19.095 9.548

87 3.350 3.300 0.500 11.055 5.528

88 3.350 5.700 0.450 19.095 8.593

89 3.350 2.150 0.400 7.203 2.881

90 1.000 0.970 0.550 0.970 0.534

91 1.000 5.700 0.450 5.700 2.565

92 2.160 3.300 0.400 7.128 2.851

93 0.980 5.700 0.460 5.586 2.570

94 0.970 2.150 0.450 2.086 0.938

95 6.980 6.950 0.480 48.511 23.285

96 6.980 5.700 0.520 39.786 20.689

SUB TOTAL 169.397 81.413

JUMLAH TOTAL TIMBUNAN ### 675.92

Diperiksa Oleh : Dibuat Oleh :

KONSULTAN PENGAWAS KONTRAKTOR PELAKSANACV. MULTY DESEKO PT. TIGA PUTRA WIJAYA

LANJUTAN PEMBANGUNAN GEDUNG SEKOLAH TINGGI ILMU EKONOMI (STIE) SYARIAH KAB. BENGKALIS

Kuantitas ( N )

Page 8: Draft Addendum Cco Ok

Lembar 8

ADE DESRY KURNIAWAN, A.Md MUSMULYADIInspector Pelaksana Lapangan

Page 9: Draft Addendum Cco Ok

Lembar 9

BACK UP DATA PENGUKURAN TIMBUNAN

PENINGKATAN SARANA DAN PRASARANA APARATUR

Keterangan

KONTRAKTOR PELAKSANAPT. TIGA PUTRA WIJAYA

LANJUTAN PEMBANGUNAN GEDUNG SEKOLAH TINGGI ILMU EKONOMI (STIE) SYARIAH KAB. BENGKALIS

Page 10: Draft Addendum Cco Ok

Lembar 10

MUSMULYADIPelaksana Lapangan

Page 11: Draft Addendum Cco Ok

Lembar 11

BACK UP DATA PENGUKURAN TIMBUNAN

PENINGKATAN SARANA DAN PRASARANA APARATUR

Keterangan

Salah Cat

KONTRAKTOR PELAKSANAPT. TIGA PUTRA WIJAYA

LANJUTAN PEMBANGUNAN GEDUNG SEKOLAH TINGGI ILMU EKONOMI (STIE) SYARIAH KAB. BENGKALIS

Page 12: Draft Addendum Cco Ok

Lembar 12

MUSMULYADIPelaksana Lapangan

Page 13: Draft Addendum Cco Ok

Lembar 13

BACK UP DATA PENGUKURAN TIMBUNAN

PENINGKATAN SARANA DAN PRASARANA APARATUR

Keterangan

KONTRAKTOR PELAKSANAPT. TIGA PUTRA WIJAYA

LANJUTAN PEMBANGUNAN GEDUNG SEKOLAH TINGGI ILMU EKONOMI (STIE) SYARIAH KAB. BENGKALIS

Page 14: Draft Addendum Cco Ok

Lembar 14

MUSMULYADIPelaksana Lapangan

Page 15: Draft Addendum Cco Ok

Lembar 15

BACK UP DATA PENGUKURAN TIMBUNAN

PENINGKATAN SARANA DAN PRASARANA APARATUR

Keterangan

KONTRAKTOR PELAKSANAPT. TIGA PUTRA WIJAYA

LANJUTAN PEMBANGUNAN GEDUNG SEKOLAH TINGGI ILMU EKONOMI (STIE) SYARIAH KAB. BENGKALIS

M3

Page 16: Draft Addendum Cco Ok

Lembar 16

MUSMULYADIPelaksana Lapangan

Page 17: Draft Addendum Cco Ok

R E K A P I T U L A S IRENCANA ANGGARAN BIAYA (RAB)

KEGIATAN : PENINGKATAN SARANA DAN PRASARANA APARATUR PEKERJAAN :

NO. PAKET : 5/ULP/POKJA I/DINASPU/V/2015 LOKASI : KABUPATEN BENGKALIS TAHUN ANGGARAN : 2015

NO. URAIAN PEKERJAAN

A. LANTAI I ( SATU )

I PEKERJAAN PENDAHULUANII PEKERJAAN TANAH/ PASIRIII PEKERJAAN STRUKTUR

JUMLAH PEKERJAAN LANTAI - I -

B. LANTAI II ( DUA )

I PEKERJAAN STRUKTUR

JUMLAH PEKERJAAN LANTAI - II -

C. LANTAI III ( TIGA )

I PEKERJAAN STRUKTUR

JUMLAH PEKERJAAN LANTAI - III -

( A ) JUMLAH HARGA

( D ) DIBULATKAN

Terbilang :

LANJUTAN PEMBANGUNAN GEDUNG SEKOLAH TINGGI ILMU EKONOMI (STIE) SYARIAH KAB. BENGKALIS

( B ) PAJAK PERTAMBAHAN NILAI ( PPn ) = 10 % x ( A )( C ) JUMLAH TOTAL HARGA PEKERJAAN = ( A ) + ( B )

Page 18: Draft Addendum Cco Ok
Page 19: Draft Addendum Cco Ok

R E K A P I T U L A S IRENCANA ANGGARAN BIAYA (RAB)

PENINGKATAN SARANA DAN PRASARANA APARATUR

JUMLAH HARGAPEKERJAAN

( Rp )

34,637,355.10 397,044.00 570,757,500.41

605,791,899.51

1,358,357,925.39

1,358,357,925.39

694,889,627.68

694,889,627.68

2,659,039,452.57

265,903,945.26

2,924,943,397.83

2,924,943,000.00

Bengkalis, 18 Mei 2015 Penawar,

LANJUTAN PEMBANGUNAN GEDUNG SEKOLAH TINGGI ILMU EKONOMI (STIE) SYARIAH KAB. BENGKALIS

Page 20: Draft Addendum Cco Ok

PT. TIGA PUTRA WIJAYA

SUDIRMAN, STKepala Cabang

Page 21: Draft Addendum Cco Ok

DAFTAR KUANTITAS DAN HARGARencana Anggaran Biaya ( RAB )

KEGIATAN : PENINGKATAN SARANA DAN PRASARANA APARATUR

PEKERJAAN :

NO. PAKET : 5/ULP/POKJA I/DINASPU/V/2015

LOKASI : KABUPATEN BENGKALIS

TAHUN ANGGARAN : 2015

NO. URAIAN PEKERJAAN SATUAN VOL

1 2 3 4

A. LANTAI I (SATU)

I PEKERJAAN PENDAHULUAN

1 Pek. Pembersihan Lokasi M2 826.97

2 Pek. Papan Nama Proyek Ls 1.00

3 Pek. Pembuatan Direksi Keet M2 20.00

II PEKERJAAN TANAH/ PASIR

1 Pek. Galian Tanah Pondasi M3 8.07

III PEKERJAAN STRUKTUR

1 Pek. Cor Balok Sloof ( 1S4 - 15/20 ) Beton + Tulangan + Bekisting ( K 250 ) M3 0.59 2 Pek. Cor Kolom Teras ( K9 ) Beton K 250 + Tulangan + Bekisting M3 3.91 3 Pek. Cor Kolom Lantai 1 Beton K 250 + Tulangan + Bekisting M3 71.59 4 Pek. Cor Kozen Pintu Utama Beton K 225 + Tulangan + Bekisting M3 1.50 5 Pek. Cor Balok Latey Selasar (B4 - 20/30) Beton K 225 + Tulangan + Bekisting Elv. + 2.25 m M3 8.78 6 Pek. Cor Plat Canopy Selasar T = 10 cm, Beton K 225 + Tulangan + Bekisting M3 4.77 7 Pek. Kepala Tiang Selasar 50/80, T = 10 cm, Beton K 225 + Tulangan + Bekisting M3 1.64

B. LANTAI II ( DUA )

I PEKERJAAN STRUKTUR

1 Pek. Cor Balok Lantai (2B6 30/60) Beton K 225 + Tulangan + Bekisting M3 3.89

2 Pek. Cor Balok Lantai ( 2B1 25/45 ) Beton K 225 + Tulangan + Bekisting M3 32.74

3 Pek. Cor Balok Lantai ( 2B2 25/45 ) Beton K 225 + Tulangan + Bekisting M3 4.05

4 Pek. Cor Balok Lantai ( 2B2 25/40 ) Beton K 225 + Tulangan + Bekisting M3 20.52

5 Pek. Cor Balok Lantai ( 2B4 20/35 ) Beton K 225 + Tulangan + Bekisting M3 16.38

LANJUTAN PEMBANGUNAN GEDUNG SEKOLAH TINGGI ILMU EKONOMI (STIE) SYARIAH KAB. BENGKALIS

Page 22: Draft Addendum Cco Ok

NO. URAIAN PEKERJAAN SATUAN VOL

1 2 3 4

6 Pek. Cor Balok Lantai ( 2B5 15/20 ) Beton K 225 + Tulangan + Bekisting M3 2.86

7 Pek. Cor Balok Lantai ( 2B7 - 20/30 ) Beton K 225 + Tulangan + Bekisting M3 2.86

8 Pek. Cor Balok Latey Teras (2B1 25/45) Beton K 225 + Tulangan + Bekisting Elv, +3,35 cm M3 2.43

9 Pek. Cor Ring Balok Teras (3B1 25/45) Beton K 225 + Tulangan + Bekisting Elv, + 6.85 cm M3 2.43

10 Pek. Cor List Plank Teras T = 10 cm, Beton K 225 + Tulangan + Bekisting M3 4.54

11 Pek. Cor Plat Lantai K 225 + Tulangan + Bekisting M3 79.19

12 Pek. Cor Plat Daag Selasar T = 10 cm, Beton K 225 + Tulangan + Bekisting M3 18.81

13 Pek. Cor Kolom Lantai 2 Beton K 250 + Tulangan + Bekisting M3 34.34

14 Pek. Cor Kolom Pedastal 1 Elv + 4.00 s/d Elv + 5.00 Beton K 225 + Tulangan + Bekisting M3 0.54

15 Pek. Cor Ring Balok (RB3 20/30 ) Beton K 225 + Tulangan + Bekisting Elv. + 5.00 M3 3.00

Page 23: Draft Addendum Cco Ok

NO. URAIAN PEKERJAAN SATUAN VOL

1 2 3 4

C. LANTAI III ( TIGA )

I PEKERJAAN STRUKTUR

1 Pek. Cor Balok Lantai (3B6 30/60) Beton K 225 + Tulangan + Bekisting M3 3.89

2 Pek. Cor Balok Lantai ( 3B1 25/45 ) Beton K 225 + Tulangan + Bekisting M3 20.39

3 Pek. Cor Balok Lantai ( 3B2 25/45 ) Beton K 225 + Tulangan + Bekisting M3 10.53

4 Pek. Cor Balok Lantai ( 3B3 25/40 ) Beton K 225 + Tulangan + Bekisting M3 18.24

5 Pek. Cor Balok Lantai ( 3B5 15/20 ) Beton K 225 + Tulangan + Bekisting M3 2.09

6 Pek. Cor Balok Lantai ( 3B7 20/30 ) Beton K 225 + Tulangan + Bekisting M3 1.58

7 Pek. Cor Plat Lantai K 225 + Tulangan + Bekisting M3 60.09

Bengkalis, 18 Mei 2015

PT. TIGA PUTRA WIJAYA

SUDIRMAN, ST

Kepala Cabang

Page 24: Draft Addendum Cco Ok

DAFTAR KUANTITAS DAN HARGARencana Anggaran Biaya ( RAB )

HARGA SATUAN JUMLAH HARGA

(Rp) ( Rp)

5 6

1,830.00 1,513,355.10

350,000.00 350,000.00

1,638,700.00 32,774,000.00

Sub Jumlah 34,637,355.10

49,200.00 397,044.00

Sub Jumlah 397,044.00

5,982,884.80 3,529,902.03 6,278,226.85 24,547,866.98 6,278,226.85 449,458,260.19 6,278,226.85 9,417,340.28 5,253,897.60 46,129,220.93 5,591,616.34 26,672,009.94 6,709,085.40 11,002,900.06

Sub Jumlah 570,757,500.41

6,161,662.95 23,968,868.88

6,212,807.70 203,407,324.10

6,125,313.00 24,807,517.65

6,709,085.40 137,670,432.41

5,938,726.80 97,276,344.98

LANJUTAN PEMBANGUNAN GEDUNG SEKOLAH TINGGI ILMU EKONOMI (STIE) SYARIAH KAB. BENGKALIS

Page 25: Draft Addendum Cco Ok

HARGA SATUAN JUMLAH HARGA

(Rp) ( Rp)

5 6

6,252,135.00 17,881,106.10

5,253,897.60 15,026,147.14

6,212,807.70 15,097,122.71

6,212,807.70 15,097,122.71

5,591,616.34 25,385,938.18

5,591,616.34 442,800,097.95

5,591,616.34 105,178,303.35

6,278,226.85 215,594,310.03

6,306,660.00 3,405,596.40

5,253,897.60 15,761,692.80

Sub Jumlah 1,358,357,925.39

Page 26: Draft Addendum Cco Ok

HARGA SATUAN JUMLAH HARGA

(Rp) ( Rp)

5 6

6,161,662.95 23,968,868.88

6,212,807.70 126,679,149.00

6,125,313.00 64,499,545.89

6,709,085.40 122,373,717.70

6,252,135.00 13,066,962.15

5,253,897.60 8,301,158.21

5,591,616.34 336,000,225.86

Sub Jumlah 694,889,627.68

Bengkalis, 18 Mei 2015

Penawar,

PT. TIGA PUTRA WIJAYA

SUDIRMAN, ST

Kepala Cabang

Page 27: Draft Addendum Cco Ok

DAFTAR ANALISA HARGA SATUAN PEKERJAAN

KEGIATAN : PENINGKATAN SARANA DAN PRASARANA APARATURPEKERJAAN :

NO. PAKET : 5/ULP/POKJA I/DINASPU/V/2015LOKASI : KABUPATEN BENGKALISTAHUN ANGGARAN : 2015

No. Jenis Pekerjaan (Rp)

1 1 M2 MEMBERSIHKAN LOKASI DAN LAPANGAN

TENAGA Pekerja 0.0100 Oh 108,000.00 Mandor 0.0050 Oh 150,000.00

Jumlah

2 1 M2 PEK. KANTOR DIREKSI KEET, DEGAN LANTAI PLESTERAN

BAHAN Dolken Kayu Ø 8 - 10 / 400 cm 1.2500 Btg 30,000.00 Kayu Balok 0.0900 M3 2,750,000.00 Paku 0.6500 Kg 25,000.00 Besi Strip 1.1000 Kg 20,000.00 Semen Portland 35.0000 Kg 1,700.00 Pasir Pasang 0.1500 M3 425,000.00 Pasir Beton 0.1000 M3 465,000.00 Koral Beton 0.1300 M3 575,000.00 Bata Merah Kelas I 30.0000 Bh 1,200.00 Seng Plat 0.2500 Lbr 65,000.00 Jendela Nako 2.0000 Bh 185,000.00 Kaca Polos 0.0800 M2 95,000.00 Kunci Tanam 0.1500 Bh 110,000.00 Plywood 4 mm 0.0600 Lbr 95,000.00

TENAGA Tukang Kayu 2.0000 Oh 118,000.00 Tukang Batu 1.0000 Oh 118,000.00 Pekerja 2.0000 Oh 108,000.00 Kepala Tukang 0.3000 Oh 138,000.00 Mandor 0.0500 Oh 150,000.00

Jumlah

3 1 M2 PEMBUATAN BEDENG BURUH

BAHAN Dolken Kayu Ø 8 - 10 / 400 cm 1.2500 Btg 30,000.00 Kayu Balok 0.1860 M3 2,750,000.00 Paku 0.3000 Kg 25,000.00 Semen Portland 18.0000 Kg 1,700.00 Pasir Beton 0.0300 M3 465,000.00 Koral Beton 0.0500 M3 575,000.00 Seng Gelombang BJLS 32 0.2000 Lbr 110,000.00 Plywood 4 mm 1.3500 Lbr 95,000.00

TENAGA

LANJUTAN PEMBANGUNAN GEDUNG SEKOLAH TINGGI ILMU EKONOMI (STIE) SYARIAH KAB. BENGKALIS

Indeks dan Satuan

Harga Bahan dan Upah

Page 28: Draft Addendum Cco Ok

No. Jenis Pekerjaan (Rp)

Indeks dan Satuan

Harga Bahan dan Upah

Tukang Kayu 2.0000 Oh 118,000.00 Pekerja 1.0000 Oh 108,000.00 Kepala Tukang 0.2000 Oh 138,000.00 Mandor 0.0500 Oh 150,000.00

Jumlah

4 1 M2 PENGUPASAN HUMUS TANAH

TENAGA Pekerja 0.1400 Oh 108,000.00 Mandor 0.0070 Oh 150,000.00

Jumlah

Page 29: Draft Addendum Cco Ok

No. Jenis Pekerjaan (Rp)

Indeks dan Satuan

Harga Bahan dan Upah

5 1 M2 PENGUKURAN DAN PEMASANGAN BOWPLANK

BAHAN Kayu 5/7 0.0012 M3 2,200,000.00 Paku Biasa 2 - 5" 0.0200 Kg 25,000.00 Papan 3/20 0.0007 M3 1,800,000.00

TENAGA Tukang Kayu 0.1000 Oh 118,000.00 Pekerja 0.1000 Oh 108,000.00 Kepala Tukang 0.0100 Oh 138,000.00 Mandor 0.0050 Oh 150,000.00

Jumlah

6 1 M3 GALIAN TANAH SEDALAM 1 M

TENAGA Pekerja 0.4000 Oh 108,000.00 Mandor 0.0400 Oh 150,000.00

Jumlah

7 1 M3 URUGAN KEMBALI

TENAGA Pekerja 0.1920 Oh 108,000.00 Mandor 0.0400 Oh 150,000.00

Jumlah

8 1 M3 PEMADATAN ( PAKAI ALAT )

TENAGA Pekerja 0.5000 Oh 108,000.00 Mandor 0.0400 Oh 150,000.00

ALAT Jump Stamper 0.0500 Jam 150,000.00

Jumlah

9 1 M3 URUGAN TANAH BIASA

BAHAN Tanah Timbunan 1.2000 M3 165,000.00

TENAGA Pekerja 0.3300 Oh 108,000.00 Mandor 0.0100 Oh 150,000.00

Jumlah

10 1 M3 URUGAN TANAH PILIHAN

BAHAN Tanah Urugan Pilihan 1.2000 M3 350,000.00

TENAGA Pekerja 0.3000 Oh 108,000.00 Mandor 0.0100 Oh 150,000.00

ALAT

Page 30: Draft Addendum Cco Ok

No. Jenis Pekerjaan (Rp)

Indeks dan Satuan

Harga Bahan dan Upah

Wheel Loader 0.0178 Jam 560,000.00 Dump Truck 0.2289 Jam 385,000.00 Vibro Roller 0.0100 Jam 485,000.00 Water Tanker 0.0070 Jam 278,000.00 Alat Bnatu 1.0000 Ls 5,000.00

Jumlah

Page 31: Draft Addendum Cco Ok

No. Jenis Pekerjaan (Rp)

Indeks dan Satuan

Harga Bahan dan Upah

11 1 M3 TIMBUNAN PASIR URUG

BAHAN Pasir Urug 1.2000 M3 415,000.00

TENAGA Pekerja 0.3000 Oh 108,000.00 Mandor 0.0100 Oh 150,000.00

Jumlah

12 1 M3 TIMBUNAN AGREGRAT KELAS A

BAHAN Agregrat Kelas A 1.2000 M3 850,000.00

TENAGA Pekerja 0.0625 Oh 108,000.00 Mandor 0.0089 Oh 150,000.00

ALAT Wheel Loader 0.0089 Jam 560,000.00 Dump Truck 0.0284 Jam 385,000.00 Vibro Roller 0.0117 Jam 485,000.00 Water Tanker 0.0214 Jam 278,000.00 Alat Bnatu 1.0000 Ls 5,000.00

Jumlah

13 1 M3 URUGAN / RABAT KERIKIL

BAHAN Kerikil 1.2000 M3 575,000.00

TENAGA Pekerja 0.3000 Oh 108,000.00 Mandor 0.0100 Oh 150,000.00

Jumlah

14 1 M2 PEMADATAN ( PAKAI ALAT )

TENAGA Pekerja 0.5000 Oh 108,000.00 Mandor 0.0400 Oh 150,000.00

ALAT Jump Stamper 0.0500 Jam 150,000.00

Jumlah

15 1 M3 BETON COR 1:3:5

BAHAN Kerikil 0.8700 M3 575,000.00 Pasir Beton 0.5200 M3 465,000.00 Semen Porltand 218.0000 Kg 1,700.00

TENAGA Pekerja 1.6500 Oh 108,000.00 Tukang Batu 0.2500 Oh 118,000.00 Kepala Tukang 0.0250 Oh 138,000.00

Page 32: Draft Addendum Cco Ok

No. Jenis Pekerjaan (Rp)

Indeks dan Satuan

Harga Bahan dan Upah

Mandor 0.0800 Oh 150,000.00

Jumlah

Page 33: Draft Addendum Cco Ok

No. Jenis Pekerjaan (Rp)

Indeks dan Satuan

Harga Bahan dan Upah

16 1 Kg PEMBESIAN DENGAN BESI POLOS DAN ULIR

BAHAN Besi Beton 1.0500 Kg 14,000.00 Kawat Ikat Beton 0.0150 Kg 45,000.00

TENAGA Pekerja 0.0070 Oh 108,000.00 Tukang Besi 0.0070 Oh 118,000.00 Kepala Tukang 0.0070 Oh 138,000.00 Mandor 0.0030 Oh 150,000.00

Jumlah

17 1 Lbr WIRE MESH 5,4 x 2,1 TYPE M8 - 150

BAHAN Wire Mesh 5,4 x 2,1 Type M8 - 150 1.1000 Lbr 850,500.00 Kawat Ikat Beton 0.2500 Lbr 45,000.00

TENAGA Pekerja 0.1342 Oh 108,000.00 Tukang Besi 0.0070 Oh 118,000.00 Kepala Tukang 0.0070 Oh 138,000.00 Mandor 0.0178 Oh 150,000.00

Jumlah

18 1 M2 PEKERJAAN BEKISTING PLAT LANTAI

BAHAN Paku 2" - 5" 0.0400 Kg 25,000.00 Minyak Bekisting 0.2000 Ltr 25,000.00 Kayu 0.0144 M3 2,750,000.00 Plywood tebal 9 mm 0.3500 Lbr 140,000.00 Kayu Dolken 6.0000 Btg 30,000.00

TENAGA Pekerja 0.3200 Oh 108,000.00 Tukang Kayu 0.3300 Oh 118,000.00 Kepala Tukang 0.0330 Oh 138,000.00 Mandor 0.0060 Oh 150,000.00

Jumlah

19 1 M3 BETON COR 1:2:3

BAHAN Kerikil 0.8200 M3 575,000.00 Pasir Beton 0.5400 M3 465,000.00 Semen Porltand 340.0000 Kg 1,700.00

TENAGA Pekerja 1.6500 Oh 108,000.00 Tukang Batu 0.2500 Oh 118,000.00 Kepala Tukang 0.0250 Oh 138,000.00 Mandor 0.0800 Oh 150,000.00

Jumlah

20 1 M3 BETON COR K-250

Page 34: Draft Addendum Cco Ok

No. Jenis Pekerjaan (Rp)

Indeks dan Satuan

Harga Bahan dan Upah

BAHAN Kerikil 0.5000 M3 575,000.00 Pasir Beton 0.4900 M3 465,000.00 Semen Porltand 352.5000 Kg 1,700.00

TENAGA Pekerja 1.6500 Oh 108,000.00 Tukang Batu 0.2500 Oh 118,000.00 Kepala Tukang 0.0250 Oh 138,000.00 Mandor 0.0800 Oh 150,000.00

Jumlah

Page 35: Draft Addendum Cco Ok

No. Jenis Pekerjaan (Rp)

Indeks dan Satuan

Harga Bahan dan Upah

21 1 M3 MEMBUAT PONDASI BETON BERTULANG + BEKISTING

BAHAN Kayu Terentang 0.2000 M3 2,750,000.00 Paku Biasa 2" - 5" 1.5000 Kg 25,000.00 Minyak Bekisting 0.4000 Ltr 25,000.00 Besi Beton Ulir 202.7274 Kg 16,500.00 Kawat Beton 3.0000 Kg 45,000.00 Kerikil 0.5000 M3 575,000.00 Pasir Beton 0.4900 M3 465,000.00 Semen Porltand 352.5000 Kg 1,700.00

TENAGA Pekerja 3.9000 Oh 108,000.00 Tukang Batu 0.3500 Oh 118,000.00 Tukang Kayu 1.0400 Oh 118,000.00 Tukang Besi 1.0500 Oh 118,000.00 Kepala Tukang 0.2450 Oh 138,000.00 Mandor 0.1650 Oh 150,000.00

Jumlah

22 1 M3 MEMBUAT SLOOF 30 x 60 CM BETON BERTULANG K 225 + BEKISTING

BAHAN Kayu Terentang 0.1875 M3 2,750,000.00 Paku Biasa 2" - 5" 2.0000 Kg 25,000.00 Minyak Bekisting 0.6000 Ltr 25,000.00 Besi Beton 156.5977 Kg 16,500.00 Kawat Beton 3.0000 Kg 45,000.00 Kerikil 0.5000 M3 575,000.00 Pasir Beton 0.4900 M3 465,000.00 Semen Porltand 352.5000 Kg 1,700.00

TENAGA Pekerja 4.8500 Oh 108,000.00 Tukang Batu 0.3500 Oh 118,000.00 Tukang Kayu 1.5600 Oh 118,000.00 Tukang Besi 1.4000 Oh 118,000.00 Kepala Tukang 0.3310 Oh 138,000.00 Mandor 0.1700 Oh 150,000.00

Jumlah

23 1 M3 MEMBUAT SLOOF 25 x 45 CM BETON BERTULANG + BEKISTING

BAHAN Kayu Terentang 0.1875 M3 2,750,000.00 Paku Biasa 2" - 5" 2.0000 Kg 25,000.00 Minyak Bekisting 0.6000 Ltr 25,000.00 Besi Beton 190.1593 Kg 16,500.00 Kawat Beton 2.8524 Kg 45,000.00 Kerikil 0.5000 M3 575,000.00 Pasir Beton 0.4900 M3 465,000.00 Semen Porltand 352.5000 Kg 1,700.00

TENAGA Pekerja 4.8500 Oh 108,000.00 Tukang Batu 0.3500 Oh 118,000.00 Tukang Kayu 1.5600 Oh 118,000.00 Tukang Besi 1.4000 Oh 118,000.00

Page 36: Draft Addendum Cco Ok

No. Jenis Pekerjaan (Rp)

Indeks dan Satuan

Harga Bahan dan Upah

Kepala Tukang 0.3310 Oh 138,000.00 Mandor 0.1700 Oh 150,000.00

Jumlah

Page 37: Draft Addendum Cco Ok

No. Jenis Pekerjaan (Rp)

Indeks dan Satuan

Harga Bahan dan Upah

24 1 M3 MEMBUAT SLOOF 25 x 40 CM BETON BERTULANG + BEKISTING

BAHAN Kayu Terentang 0.1875 M3 2,750,000.00 Paku Biasa 2" - 5" 2.0000 Kg 25,000.00 Minyak Bekisting 0.6000 Ltr 25,000.00 Besi Beton 198.3391 Kg 16,500.00 Kawat Beton 2.9751 Kg 45,000.00 Kerikil 0.5000 M3 575,000.00 Pasir Beton 0.4900 M3 465,000.00 Semen Porltand 352.5000 Kg 1,700.00

TENAGA Pekerja 4.8500 Oh 108,000.00 Tukang Batu 0.3500 Oh 118,000.00 Tukang Kayu 1.5600 Oh 118,000.00 Tukang Besi 1.4000 Oh 118,000.00 Kepala Tukang 0.3310 Oh 138,000.00 Mandor 0.1700 Oh 150,000.00

Jumlah

25 1 M3 MEMBUAT SLOOF 20 x 30 CM BETON BERTULANG + BEKISTING

BAHAN Kayu Terentang 0.1875 M3 2,750,000.00 Paku Biasa 2" - 5" 2.0000 Kg 25,000.00 Minyak Bekisting 0.6000 Ltr 25,000.00 Besi Beton 199.6569 Kg 16,500.00 Kawat Beton 2.9949 Kg 45,000.00 Kerikil 0.5000 M3 575,000.00 Pasir Beton 0.4900 M3 465,000.00 Semen Porltand 352.5000 Kg 1,700.00

TENAGA Pekerja 4.8500 Oh 108,000.00 Tukang Batu 0.3500 Oh 118,000.00 Tukang Kayu 1.5600 Oh 118,000.00 Tukang Besi 1.4000 Oh 118,000.00 Kepala Tukang 0.3310 Oh 138,000.00 Mandor 0.1700 Oh 150,000.00

Jumlah

26 1 M3 MEMBUAT SLOOF 15 x 20 CM BETON BERTULANG + BEKISTING

BAHAN Kayu Terentang 0.1875 M3 2,750,000.00 Paku Biasa 2" - 5" 2.0000 Kg 25,000.00 Minyak Bekisting 0.6000 Ltr 25,000.00 Besi Beton 192.2622 Kg 16,500.00 Kawat Beton 2.8839 Kg 45,000.00 Kerikil 0.5000 M3 575,000.00 Pasir Beton 0.4900 M3 465,000.00 Semen Porltand 352.5000 Kg 1,700.00

TENAGA Pekerja 4.8500 Oh 108,000.00 Tukang Batu 0.3500 Oh 118,000.00 Tukang Kayu 1.5600 Oh 118,000.00 Tukang Besi 1.4000 Oh 118,000.00

Page 38: Draft Addendum Cco Ok

No. Jenis Pekerjaan (Rp)

Indeks dan Satuan

Harga Bahan dan Upah

Kepala Tukang 0.3310 Oh 138,000.00 Mandor 0.1700 Oh 150,000.00

Jumlah

Page 39: Draft Addendum Cco Ok

No. Jenis Pekerjaan (Rp)

Indeks dan Satuan

Harga Bahan dan Upah

27 1 M3 MEMBUAT KOLOM 40 x 40 CM BETON BERTULANG K 250 + BEKISTING

BAHAN Kayu Terentang 0.0393 M3 2,750,000.00 Paku Biasa 2" - 5" 4.0000 Kg 25,000.00 Minyak Bekisting 0.6000 Ltr 25,000.00 Besi Beton 195.9389 Kg 16,500.00 Kawat Beton 3.0000 Kg 45,000.00 Kerikil 0.5000 M3 575,000.00 Pasir Beton 0.4900 M3 465,000.00 Semen Porltand 352.5000 Kg 1,700.00

TENAGA Pekerja 7.3000 Oh 108,000.00 Tukang Batu 0.3500 Oh 118,000.00 Tukang Kayu 3.3000 Oh 118,000.00 Tukang Besi 2.1000 Oh 118,000.00 Kepala Tukang 0.5700 Oh 138,000.00 Mandor 0.1800 Oh 150,000.00

Jumlah

28 1 M3 MEMBUAT KOLOM 35 x 35 CM BETON BERTULANG + BEKISTING

BAHAN Kayu Terentang 0.1667 M3 2,750,000.00 Paku Biasa 2" - 5" 4.0000 Kg 25,000.00 Minyak Bekisting 0.6000 Ltr 25,000.00 Besi Beton 195.9389 Kg 16,500.00 Kawat Beton 3.0000 Kg 45,000.00 Kerikil 0.5000 M3 575,000.00 Pasir Beton 0.4900 M3 465,000.00 Semen Porltand 352.5000 Kg 1,700.00

TENAGA Pekerja 7.3000 Oh 108,000.00 Tukang Batu 0.3500 Oh 118,000.00 Tukang Kayu 3.3000 Oh 118,000.00 Tukang Besi 2.1000 Oh 118,000.00 Kepala Tukang 0.5700 Oh 138,000.00 Mandor 0.1800 Oh 150,000.00

Jumlah

29 1 M3 MEMBUAT KOLOM PEDESTEL 30 x 30 CM BETON BERTULANG + BEKISTING

BAHAN Kayu Terentang 0.4000 M3 2,750,000.00 Paku Biasa 2" - 5" 4.0000 Kg 25,000.00 Minyak Bekisting 0.6000 Ltr 25,000.00 Besi Beton 140.0000 Kg 16,500.00 Kawat Beton 2.1000 Kg 45,000.00 Kerikil 0.5000 M3 575,000.00 Pasir Beton 0.4900 M3 465,000.00 Semen Porltand 352.5000 Kg 1,700.00

TENAGA Pekerja 7.3000 Oh 108,000.00 Tukang Batu 0.3500 Oh 118,000.00 Tukang Kayu 3.3000 Oh 118,000.00 Tukang Besi 2.1000 Oh 118,000.00

Page 40: Draft Addendum Cco Ok

No. Jenis Pekerjaan (Rp)

Indeks dan Satuan

Harga Bahan dan Upah

Kepala Tukang 0.5700 Oh 138,000.00 Mandor 0.1800 Oh 150,000.00

Jumlah

Page 41: Draft Addendum Cco Ok

No. Jenis Pekerjaan (Rp)

Indeks dan Satuan

Harga Bahan dan Upah

30 1 M3 MEMBUAT KOLOM 25 x 25 CM BETON BERTULANG + BEKISTING

BAHAN Kayu Terentang 0.3333 M3 2,750,000.00 Paku Biasa 2" - 5" 4.0000 Kg 25,000.00 Minyak Bekisting 0.6000 Ltr 25,000.00 Besi Beton 208.0000 Kg 16,500.00 Kawat Beton 3.1200 Kg 45,000.00 Kerikil 0.5000 M3 575,000.00 Pasir Beton 0.4900 M3 465,000.00 Semen Porltand 352.5000 Kg 1,700.00

TENAGA Pekerja 7.3000 Oh 108,000.00 Tukang Batu 0.3500 Oh 118,000.00 Tukang Kayu 3.3000 Oh 118,000.00 Tukang Besi 2.1000 Oh 118,000.00 Kepala Tukang 0.5700 Oh 138,000.00 Mandor 0.1800 Oh 150,000.00

Jumlah

31 1 M3 MEMBUAT KOLOM 20 x 20 CM BETON BERTULANG + BEKISTING

BAHAN Kayu Terentang 0.6666 M3 2,750,000.00 Paku Biasa 2" - 5" 4.0000 Kg 25,000.00 Minyak Bekisting 0.6000 Ltr 25,000.00 Besi Beton 244.0000 Kg 16,500.00 Kawat Beton 3.6600 Kg 45,000.00 Kerikil 0.5000 M3 575,000.00 Pasir Beton 0.4900 M3 465,000.00 Semen Porltand 352.5000 Kg 1,700.00

TENAGA Pekerja 7.3000 Oh 108,000.00 Tukang Batu 0.3500 Oh 118,000.00 Tukang Kayu 3.3000 Oh 118,000.00 Tukang Besi 2.1000 Oh 118,000.00 Kepala Tukang 0.5700 Oh 138,000.00 Mandor 0.1800 Oh 150,000.00

Jumlah

32 1 M3 MEMBUAT KOLOM 11 x 15 CM BETON BERTULANG + BEKISTING

BAHAN Kayu Terentang 0.6666 M3 2,750,000.00 Paku Biasa 2" - 5" 4.0000 Kg 25,000.00 Minyak Bekisting 0.6000 Ltr 25,000.00 Besi Beton 115.0000 Kg 16,500.00 Kawat Beton 1.7250 Kg 45,000.00 Kerikil 0.5000 M3 575,000.00 Pasir Beton 0.4900 M3 465,000.00 Semen Porltand 275.0000 Kg 1,700.00

TENAGA Pekerja 7.3000 Oh 108,000.00 Tukang Batu 0.3500 Oh 118,000.00 Tukang Kayu 3.3000 Oh 118,000.00 Tukang Besi 2.1000 Oh 118,000.00

Page 42: Draft Addendum Cco Ok

No. Jenis Pekerjaan (Rp)

Indeks dan Satuan

Harga Bahan dan Upah

Kepala Tukang 0.5700 Oh 138,000.00 Mandor 0.1800 Oh 150,000.00

Jumlah

Page 43: Draft Addendum Cco Ok

No. Jenis Pekerjaan (Rp)

Indeks dan Satuan

Harga Bahan dan Upah

33 1 M3 MEMBUAT KOLOM Ø 40 CM BETON BERTULANG + BEKISTING

BAHAN Kayu Terentang 0.6666 M3 2,750,000.00 Paku Biasa 2" - 5" 4.0000 Kg 25,000.00 Minyak Bekisting 0.6000 Ltr 25,000.00 Besi Beton 181.0000 Kg 16,500.00 Kawat Beton 2.7150 Kg 45,000.00 Kerikil 0.5000 M3 575,000.00 Pasir Beton 0.4900 M3 465,000.00 Semen Porltand 352.5000 Kg 1,700.00

TENAGA Pekerja 7.3000 Oh 108,000.00 Tukang Batu 0.3500 Oh 118,000.00 Tukang Kayu 3.3000 Oh 118,000.00 Tukang Besi 2.1000 Oh 118,000.00 Kepala Tukang 0.5700 Oh 138,000.00 Mandor 0.1800 Oh 150,000.00

Jumlah

34 1 M3 MEMBUAT KOLOM Ø 35 CM BETON BERTULANG + BEKISTING

BAHAN Kayu Terentang 0.6666 M3 2,750,000.00 Paku Biasa 2" - 5" 4.0000 Kg 25,000.00 Minyak Bekisting 0.6000 Ltr 25,000.00 Besi Beton 231.0000 Kg 16,500.00 Kawat Beton 3.4650 Kg 45,000.00 Kerikil 0.5000 M3 575,000.00 Pasir Beton 0.4900 M3 465,000.00 Semen Porltand 352.5000 Kg 1,700.00

TENAGA Pekerja 7.3000 Oh 108,000.00 Tukang Batu 0.3500 Oh 118,000.00 Tukang Kayu 3.3000 Oh 118,000.00 Tukang Besi 2.1000 Oh 118,000.00 Kepala Tukang 0.5700 Oh 138,000.00 Mandor 0.1800 Oh 150,000.00

Jumlah

35 1 M3 MEMBUAT KOLOM Ø 30 CM BETON BERTULANG + BEKISTING

BAHAN Kayu Terentang 0.6666 M3 2,750,000.00 Paku Biasa 2" - 5" 4.0000 Kg 25,000.00 Minyak Bekisting 0.6000 Ltr 25,000.00 Besi Beton 227.0000 Kg 16,500.00 Kawat Beton 3.4050 Kg 45,000.00 Kerikil 0.5000 M3 575,000.00 Pasir Beton 0.4900 M3 465,000.00 Semen Porltand 352.5000 Kg 1,700.00

TENAGA Pekerja 7.3000 Oh 108,000.00 Tukang Batu 0.3500 Oh 118,000.00 Tukang Kayu 3.3000 Oh 118,000.00 Tukang Besi 2.1000 Oh 118,000.00

Page 44: Draft Addendum Cco Ok

No. Jenis Pekerjaan (Rp)

Indeks dan Satuan

Harga Bahan dan Upah

Kepala Tukang 0.5700 Oh 138,000.00 Mandor 0.1800 Oh 150,000.00

Jumlah

Page 45: Draft Addendum Cco Ok

No. Jenis Pekerjaan (Rp)

Indeks dan Satuan

Harga Bahan dan Upah

36 1 M3 MEMBUAT KOLOM Ø 20 CM BETON BERTULANG + BEKISTING

BAHAN Kayu Terentang 0.6666 M3 2,750,000.00 Paku Biasa 2" - 5" 4.0000 Kg 25,000.00 Minyak Bekisting 0.6000 Ltr 25,000.00 Besi Beton 292.0000 Kg 16,500.00 Kawat Beton 4.3800 Kg 45,000.00 Kerikil 0.5000 M3 575,000.00 Pasir Beton 0.4900 M3 465,000.00 Semen Porltand 352.5000 Kg 1,700.00

TENAGA Pekerja 7.3000 Oh 108,000.00 Tukang Batu 0.3500 Oh 118,000.00 Tukang Kayu 3.3000 Oh 118,000.00 Tukang Besi 2.1000 Oh 118,000.00 Kepala Tukang 0.5700 Oh 138,000.00 Mandor 0.1800 Oh 150,000.00

Jumlah

37 1 M3 MEMBUAT BALOK 30 x 60 CM BETON BERTULANG + BEKISTING

BAHAN Kayu Terentang 0.1785 M3 2,750,000.00 Paku Biasa 2" - 5" 3.2000 Kg 25,000.00 Minyak Bekisting 1.6000 Ltr 25,000.00 Besi Beton 166.7323 Kg 16,500.00 Kawat Beton 2.5010 Kg 45,000.00 Kerikil 0.5000 M3 575,000.00 Pasir Beton 0.4900 M3 465,000.00 Semen Porltand 352.5000 Kg 1,700.00

TENAGA Pekerja 7.3000 Oh 108,000.00 Tukang Batu 0.3500 Oh 118,000.00 Tukang Kayu 3.3000 Oh 118,000.00 Tukang Besi 2.1000 Oh 118,000.00 Kepala Tukang 0.5700 Oh 138,000.00 Mandor 0.1800 Oh 150,000.00

Jumlah

38 1 M3 MEMBUAT BALOK 1, 25 x 45 CM BETON BERTULANG + BEKISTING

BAHAN Kayu Terentang 0.1785 M3 2,750,000.00 Paku Biasa 2" - 5" 3.2000 Kg 25,000.00 Minyak Bekisting 1.6000 Ltr 25,000.00 Besi Beton 169.7098 Kg 16,500.00 Kawat Beton 2.5458 Kg 45,000.00 Kerikil 0.5000 M3 575,000.00 Pasir Beton 0.4900 M3 465,000.00 Semen Porltand 352.5000 Kg 1,700.00

TENAGA Pekerja 7.3000 Oh 108,000.00 Tukang Batu 0.3500 Oh 118,000.00 Tukang Kayu 3.3000 Oh 118,000.00 Tukang Besi 2.1000 Oh 118,000.00

Page 46: Draft Addendum Cco Ok

No. Jenis Pekerjaan (Rp)

Indeks dan Satuan

Harga Bahan dan Upah

Kepala Tukang 0.5700 Oh 138,000.00 Mandor 0.1800 Oh 150,000.00

Jumlah

Page 47: Draft Addendum Cco Ok

No. Jenis Pekerjaan (Rp)

Indeks dan Satuan

Harga Bahan dan Upah

39 1 M3 MEMBUAT BALOK 2, 25 x 45 CM BETON BERTULANG + BEKISTING

BAHAN Kayu Terentang 0.1785 M3 2,750,000.00 Paku Biasa 2" - 5" 3.2000 Kg 25,000.00 Minyak Bekisting 1.6000 Ltr 25,000.00 Besi Beton 164.6160 Kg 16,500.00 Kawat Beton 2.4692 Kg 45,000.00 Kerikil 0.5000 M3 575,000.00 Pasir Beton 0.4900 M3 465,000.00 Semen Porltand 352.5000 Kg 1,700.00

TENAGA Pekerja 7.3000 Oh 108,000.00 Tukang Batu 0.3500 Oh 118,000.00 Tukang Kayu 3.3000 Oh 118,000.00 Tukang Besi 2.1000 Oh 118,000.00 Kepala Tukang 0.5700 Oh 138,000.00 Mandor 0.1800 Oh 150,000.00

Jumlah

40 1 M3 MEMBUAT BALOK 25 x 40 CM BETON BERTULANG + BEKISTING

BAHAN Kayu Terentang 0.1785 M3 2,750,000.00 Paku Biasa 2" - 5" 3.2000 Kg 25,000.00 Minyak Bekisting 1.6000 Ltr 25,000.00 Besi Beton 197.4966 Kg 16,500.00 Kawat Beton 3.3857 Kg 45,000.00 Kerikil 0.5000 M3 575,000.00 Pasir Beton 0.4900 M3 465,000.00 Semen Porltand 352.5000 Kg 1,700.00

TENAGA Pekerja 7.3000 Oh 108,000.00 Tukang Batu 0.3500 Oh 118,000.00 Tukang Kayu 3.3000 Oh 118,000.00 Tukang Besi 2.1000 Oh 118,000.00 Kepala Tukang 0.5700 Oh 138,000.00 Mandor 0.1800 Oh 150,000.00

Jumlah

41 1 M3 MEMBUAT BALOK 20 x 60 CM BETON BERTULANG + BEKISTING

BAHAN Kayu Terentang 0.1785 M3 2,750,000.00 Paku Biasa 2" - 5" 3.2000 Kg 25,000.00 Minyak Bekisting 1.6000 Ltr 25,000.00 Besi Beton 169.0000 Kg 16,500.00 Kawat Beton 2.5350 Kg 45,000.00 Kerikil 0.5000 M3 575,000.00 Pasir Beton 0.4900 M3 465,000.00 Semen Porltand 352.5000 Kg 1,700.00

TENAGA Pekerja 7.3000 Oh 108,000.00 Tukang Batu 0.3500 Oh 118,000.00 Tukang Kayu 3.3000 Oh 118,000.00 Tukang Besi 2.1000 Oh 118,000.00

Page 48: Draft Addendum Cco Ok

No. Jenis Pekerjaan (Rp)

Indeks dan Satuan

Harga Bahan dan Upah

Kepala Tukang 0.5700 Oh 138,000.00 Mandor 0.1800 Oh 150,000.00

Jumlah

Page 49: Draft Addendum Cco Ok

No. Jenis Pekerjaan (Rp)

Indeks dan Satuan

Harga Bahan dan Upah

42 1 M3 MEMBUAT BALOK 20 x 40 CM BETON BERTULANG + BEKISTING

BAHAN Kayu Terentang 0.1785 M3 2,750,000.00 Paku Biasa 2" - 5" 3.2000 Kg 25,000.00 Minyak Bekisting 1.6000 Ltr 25,000.00 Besi Beton 187.0000 Kg 16,500.00 Kawat Beton 2.8050 Kg 45,000.00 Kerikil 0.5000 M3 575,000.00 Pasir Beton 0.4900 M3 465,000.00 Semen Porltand 352.5000 Kg 1,700.00

TENAGA Pekerja 7.3000 Oh 108,000.00 Tukang Batu 0.3500 Oh 118,000.00 Tukang Kayu 3.3000 Oh 118,000.00 Tukang Besi 2.1000 Oh 118,000.00 Kepala Tukang 0.5700 Oh 138,000.00 Mandor 0.1800 Oh 150,000.00

Jumlah

43 1 M3 MEMBUAT BALOK 20 x 35 CM BETON BERTULANG + BEKISTING

BAHAN Kayu Terentang 0.1785 M3 2,750,000.00 Paku Biasa 2" - 5" 3.2000 Kg 25,000.00 Minyak Bekisting 1.6000 Ltr 25,000.00 Besi Beton 152.2692 Kg 16,500.00 Kawat Beton 2.8500 Kg 45,000.00 Kerikil 0.5000 M3 575,000.00 Pasir Beton 0.4900 M3 465,000.00 Semen Porltand 352.5000 Kg 1,700.00

TENAGA Pekerja 7.3000 Oh 108,000.00 Tukang Batu 0.3500 Oh 118,000.00 Tukang Kayu 3.3000 Oh 118,000.00 Tukang Besi 2.1000 Oh 118,000.00 Kepala Tukang 0.5700 Oh 138,000.00 Mandor 0.1800 Oh 150,000.00

Jumlah

44 1 M3 MEMBUAT BALOK 20 x 30 CM BETON BERTULANG + BEKISTING

BAHAN Kayu Terentang 0.1785 M3 2,750,000.00 Paku Biasa 2" - 5" 3.2000 Kg 25,000.00 Minyak Bekisting 1.6000 Ltr 25,000.00 Besi Beton 113.8784 Kg 16,500.00 Kawat Beton 1.7082 Kg 45,000.00 Kerikil 0.5000 M3 575,000.00 Pasir Beton 0.4900 M3 465,000.00 Semen Porltand 352.5000 Kg 1,700.00

TENAGA Pekerja 7.3000 Oh 108,000.00 Tukang Batu 0.3500 Oh 118,000.00 Tukang Kayu 3.3000 Oh 118,000.00 Tukang Besi 2.1000 Oh 118,000.00

Page 50: Draft Addendum Cco Ok

No. Jenis Pekerjaan (Rp)

Indeks dan Satuan

Harga Bahan dan Upah

Kepala Tukang 0.5700 Oh 138,000.00 Mandor 0.1800 Oh 150,000.00

Jumlah

Page 51: Draft Addendum Cco Ok

No. Jenis Pekerjaan (Rp)

Indeks dan Satuan

Harga Bahan dan Upah

45 1 M3 MEMBUAT BALOK 15 x 20 CM BETON BERTULANG + BEKISTING

BAHAN Kayu Terentang 0.1785 M3 2,750,000.00 Paku Biasa 2" - 5" 3.2000 Kg 25,000.00 Minyak Bekisting 1.6000 Ltr 25,000.00 Besi Beton 172.0000 Kg 16,500.00 Kawat Beton 2.5800 Kg 45,000.00 Kerikil 0.5000 M3 575,000.00 Pasir Beton 0.4900 M3 465,000.00 Semen Porltand 352.5000 Kg 1,700.00

TENAGA Pekerja 7.3000 Oh 108,000.00 Tukang Batu 0.3500 Oh 118,000.00 Tukang Kayu 3.3000 Oh 118,000.00 Tukang Besi 2.1000 Oh 118,000.00 Kepala Tukang 0.5700 Oh 138,000.00 Mandor 0.1800 Oh 150,000.00

Jumlah

46 1 M3 MEMBUAT TANGGA BETON BERTULANG (170 Kg + BEKISTING )

BAHAN Kayu Terentang 0.2500 M3 2,750,000.00 Paku Biasa 2" - 5" 3.0000 Kg 25,000.00 Minyak Bekisting 1.2000 Ltr 25,000.00 Besi Beton 170.0000 Kg 16,500.00 Kawat Beton 3.0000 Kg 45,000.00 Kerikil 0.7800 M3 575,000.00 Pasir Beton 0.5200 M3 465,000.00 Semen Porltand 323.0000 Kg 1,700.00 Plywood 9 mm 2.5000 Lbr 140,000.00 Dolken Ø 8 / 4 m 14.0000 Btg 30,000.00

TENAGA Pekerja 5.6000 Oh 108,000.00 Tukang Batu 0.3500 Oh 118,000.00 Tukang Kayu 2.3000 Oh 118,000.00 Tukang Besi 1.4000 Oh 118,000.00 Kepala Tukang 0.4050 Oh 138,000.00 Mandor 0.2020 Oh 150,000.00

Jumlah

47 1 M3 MEMBUAT PLAT DAAG BETON BERTULANG + BEKISTING

Beton 1.0000 M3 1,337,750.00 Besi Tulangan 120.4534 Kg 18,373.00 Bekisting 8.3000 M2 353,554.00

Jumlah

48 1 M3 MEMBUAT PLAT CANOPY BETON BERTULANG + BEKISTING

Beton 1.0000 M3 1,337,750.00 Besi Tulangan 196.7890 Kg 18,373.00 Bekisting 7.6820 M2 83,085.40

Jumlah

Page 52: Draft Addendum Cco Ok

No. Jenis Pekerjaan (Rp)

Indeks dan Satuan

Harga Bahan dan Upah

49 1 M' SALURAN KELILING PAS. BATA 1/2 BATU

Pas. Bata 1/2 Batu 1 : 4 0.5000 M2 149,570.00 Plesteran 1 : 2 1.0000 M2 80,300.80 Cor Beton 1 : 3 : 5 0.0225 M3 1,335,800.00 Besi Gril Ø 19 mm + Besi Siku 1.0000 M' 115,000.00

Jumlah

Page 53: Draft Addendum Cco Ok

No. Jenis Pekerjaan (Rp)

Indeks dan Satuan

Harga Bahan dan Upah

50 1 M2 PEKERJAAN BEKISTING LIST PLANK BETON

BAHAN Paku 2" - 5" 0.0400 Kg 25,000.00 Minyak Bekisting 0.2000 Ltr 25,000.00 Kayu 0.0072 M3 2,750,000.00 Plywood tebal 9 mm 0.3470 Lbr 140,000.00

TENAGA Pekerja 0.0320 Oh 108,000.00 Tukang Kayu 0.0330 Oh 118,000.00 Kepala Tukang 0.0033 Oh 138,000.00 Mandor 0.0060 Oh 150,000.00

Jumlah

51 1 M2 PAS. DINDING BATU BATA 1/2 BATU 1 : 4

BAHAN Batu Bata 80.0000 Bh 1,200.00 Semen 0.4500 Kg 1,700.00 Pasir Pasang 0.0450 M3 425,000.00

TENAGA Pekerja 0.0400 Oh 108,000.00 Tukang Batu 0.2000 Oh 118,000.00 Kepala Tukang 0.0200 Oh 138,000.00 Mandor 0.0200 Oh 150,000.00

Jumlah

52 1 M2 PAS. DINDING BATU BATA 1/2 BATU 1 : 2

BAHAN Batu Bata 80.0000 Bh 1,200.00 Semen 0.5000 Kg 1,700.00 Pasir Pasang 0.0500 M3 425,000.00

TENAGA Pekerja 0.0400 Oh 108,000.00 Tukang Batu 0.2000 Oh 118,000.00 Kepala Tukang 0.0200 Oh 138,000.00 Mandor 0.0200 Oh 150,000.00

Jumlah

53 1 M2 PLESTERAN 1 : 2

BAHAN Semen 10.2240 Kg 1,700.00 Pasir Pasang 0.0200 M3 425,000.00

TENAGA Pekerja 0.3000 Oh 108,000.00 Tukang Batu 0.1500 Oh 118,000.00 Kepala Tukang 0.0150 Oh 138,000.00 Mandor 0.0150 Oh 150,000.00

Jumlah

54 1 M2 PAS. PONDASI BATU BATA 1 BATU 1:4

Page 54: Draft Addendum Cco Ok

No. Jenis Pekerjaan (Rp)

Indeks dan Satuan

Harga Bahan dan Upah

BAHAN Batu Bata 140.000 Bh 1,200.00 Semen 26.5500 Kg 1,700.00 Pasir Pasang 0.0930 M3 425,000.00

TENAGA Pekerja 0.6500 Oh 108,000.00 Tukang Batu 0.2000 Oh 118,000.00 Kepala Tukang 0.0200 Oh 138,000.00 Mandor 0.0300 Oh 150,000.00

Jumlah

Page 55: Draft Addendum Cco Ok

DAFTAR ANALISA HARGA SATUAN PEKERJAAN

PENINGKATAN SARANA DAN PRASARANA APARATUR

Jumlah Harga

(Rp)

1 M2 MEMBERSIHKAN LOKASI DAN LAPANGAN

1,080.00 750.00

1,830.00

1 M2 PEK. KANTOR DIREKSI KEET, DEGAN LANTAI PLESTERAN

37,500.00 247,500.00 16,250.00 22,000.00 59,500.00 63,750.00 46,500.00 74,750.00 36,000.00 16,250.00 370,000.00 7,600.00 16,500.00 5,700.00

236,000.00 118,000.00 216,000.00 41,400.00 7,500.00

1,638,700.00

1 M2 PEMBUATAN BEDENG BURUH

37,500.00 511,500.00 7,500.00 30,600.00 13,950.00 28,750.00 22,000.00 128,250.00

LANJUTAN PEMBANGUNAN GEDUNG SEKOLAH TINGGI ILMU EKONOMI (STIE) SYARIAH KAB. BENGKALIS

Page 56: Draft Addendum Cco Ok

Jumlah Harga

(Rp)

236,000.00 108,000.00 27,600.00 7,500.00

1,159,150.00

1 M2 PENGUPASAN HUMUS TANAH

15,120.00 1,050.00

16,170.00

Page 57: Draft Addendum Cco Ok

Jumlah Harga

(Rp)

1 M2 PENGUKURAN DAN PEMASANGAN BOWPLANK

2,640.00 500.00 1,260.00

11,800.00 10,800.00 1,380.00 750.00

29,130.00

1 M3 GALIAN TANAH SEDALAM 1 M

43,200.00 6,000.00

49,200.00

1 M3 URUGAN KEMBALI

20,736.00 6,000.00

26,736.00

1 M3 PEMADATAN ( PAKAI ALAT )

54,000.00 6,000.00

7,500.00

67,500.00

1 M3 URUGAN TANAH BIASA

198,000.00

35,640.00 1,500.00

235,140.00

1 M3 URUGAN TANAH PILIHAN

420,000.00

32,400.00 1,500.00

Page 58: Draft Addendum Cco Ok

Jumlah Harga

(Rp)

9,968.00 88,126.50 4,850.00 1,946.00 5,000.00

563,790.50

Page 59: Draft Addendum Cco Ok

Jumlah Harga

(Rp)

1 M3 TIMBUNAN PASIR URUG

498,000.00

32,400.00 1,500.00

531,900.00

1 M3 TIMBUNAN AGREGRAT KELAS A

1,020,000.00

6,750.00 1,335.00

4,984.00 10,934.00 5,674.50 5,949.20 5,000.00

1,060,626.70

1 M3 URUGAN / RABAT KERIKIL

690,000.00

32,400.00 1,500.00

723,900.00

1 M2 PEMADATAN ( PAKAI ALAT )

54,000.00 6,000.00

7,500.00

67,500.00

1 M3 BETON COR 1:3:5

500,250.00 241,800.00 370,600.00

178,200.00 29,500.00 3,450.00

Page 60: Draft Addendum Cco Ok

Jumlah Harga

(Rp)

12,000.00

1,335,800.00

Page 61: Draft Addendum Cco Ok

Jumlah Harga

(Rp)

14,700.00 675.00

756.00 826.00 966.00 450.00

18,373.00

935,550.00 11,250.00

14,493.60 826.00 966.00 2,670.00

965,755.60

1,000.00 5,000.00 39,600.00 49,000.00 180,000.00

34,560.00 38,940.00 4,554.00 900.00

353,554.00

1 M3 BETON COR 1:2:3

471,500.00 251,100.00 578,000.00

178,200.00 29,500.00 3,450.00 12,000.00

1,523,750.00

1 M3 BETON COR K-250

Page 62: Draft Addendum Cco Ok

Jumlah Harga

(Rp)

287,500.00 227,850.00 599,250.00

178,200.00 29,500.00 3,450.00 12,000.00

1,337,750.00

Page 63: Draft Addendum Cco Ok

Jumlah Harga

(Rp)

1 M3 MEMBUAT PONDASI BETON BERTULANG + BEKISTING

550,000.00 37,500.00 10,000.00 3,345,002.10 135,000.00 287,500.00 227,850.00 599,250.00

421,200.00 41,300.00 122,720.00 123,900.00 33,810.00 24,750.00

5,959,782.10

1 M3 MEMBUAT SLOOF 30 x 60 CM BETON BERTULANG K 225 + BEKISTING

515,625.00 50,000.00 15,000.00 2,583,862.05 135,000.00 287,500.00 227,850.00 599,250.00

523,800.00 41,300.00 184,080.00 165,200.00 45,678.00 25,500.00

5,399,645.05

1 M3 MEMBUAT SLOOF 25 x 45 CM BETON BERTULANG + BEKISTING

515,625.00 50,000.00 15,000.00 3,137,628.45 128,358.00 287,500.00 227,850.00 599,250.00

523,800.00 41,300.00 184,080.00 165,200.00

Page 64: Draft Addendum Cco Ok

Jumlah Harga

(Rp)

45,678.00 25,500.00

5,946,769.45

Page 65: Draft Addendum Cco Ok

Jumlah Harga

(Rp)

1 M3 MEMBUAT SLOOF 25 x 40 CM BETON BERTULANG + BEKISTING

515,625.00 50,000.00 15,000.00 3,272,595.15 133,879.50 287,500.00 227,850.00 599,250.00

523,800.00 41,300.00 184,080.00 165,200.00 45,678.00 25,500.00

6,087,257.65

1 M3 MEMBUAT SLOOF 20 x 30 CM BETON BERTULANG + BEKISTING

515,625.00 50,000.00 15,000.00 3,294,338.85 134,770.50 287,500.00 227,850.00 599,250.00

523,800.00 41,300.00 184,080.00 165,200.00 45,678.00 25,500.00

6,109,892.35

1 M3 MEMBUAT SLOOF 15 x 20 CM BETON BERTULANG + BEKISTING

515,625.00 50,000.00 15,000.00 3,172,326.30 129,775.50 287,500.00 227,850.00 599,250.00

523,800.00 41,300.00 184,080.00 165,200.00

Page 66: Draft Addendum Cco Ok

Jumlah Harga

(Rp)

45,678.00 25,500.00

5,982,884.80

Page 67: Draft Addendum Cco Ok

Jumlah Harga

(Rp)

1 M3 MEMBUAT KOLOM 40 x 40 CM BETON BERTULANG K 250 + BEKISTING

108,075.00 100,000.00 15,000.00 3,232,991.85 135,000.00 287,500.00 227,850.00 599,250.00

788,400.00 41,300.00 389,400.00 247,800.00 78,660.00 27,000.00

6,278,226.85

1 M3 MEMBUAT KOLOM 35 x 35 CM BETON BERTULANG + BEKISTING

458,425.00 100,000.00 15,000.00 3,232,991.85 135,000.00 287,500.00 227,850.00 599,250.00

788,400.00 41,300.00 389,400.00 247,800.00 78,660.00 27,000.00

6,628,576.85

1 M3 MEMBUAT KOLOM PEDESTEL 30 x 30 CM BETON BERTULANG + BEKISTING

1,100,000.00 100,000.00 15,000.00 2,310,000.00 94,500.00 287,500.00 227,850.00 599,250.00

788,400.00 41,300.00 389,400.00 247,800.00

Page 68: Draft Addendum Cco Ok

Jumlah Harga

(Rp)

78,660.00 27,000.00

6,306,660.00

Page 69: Draft Addendum Cco Ok

Jumlah Harga

(Rp)

1 M3 MEMBUAT KOLOM 25 x 25 CM BETON BERTULANG + BEKISTING

916,575.00 100,000.00 15,000.00 3,432,000.00 140,400.00 287,500.00 227,850.00 599,250.00

788,400.00 41,300.00 389,400.00 247,800.00 78,660.00 27,000.00

7,291,135.00

1 M3 MEMBUAT KOLOM 20 x 20 CM BETON BERTULANG + BEKISTING

1,833,150.00 100,000.00 15,000.00 4,026,000.00 164,700.00 287,500.00 227,850.00 599,250.00

788,400.00 41,300.00 389,400.00 247,800.00 78,660.00 27,000.00

8,826,010.00

1 M3 MEMBUAT KOLOM 11 x 15 CM BETON BERTULANG + BEKISTING

1,833,150.00 100,000.00 15,000.00 1,897,500.00 77,625.00 287,500.00 227,850.00 467,500.00

788,400.00 41,300.00 389,400.00 247,800.00

Page 70: Draft Addendum Cco Ok

Jumlah Harga

(Rp)

78,660.00 27,000.00

6,478,685.00

Page 71: Draft Addendum Cco Ok

Jumlah Harga

(Rp)

1 M3 MEMBUAT KOLOM Ø 40 CM BETON BERTULANG + BEKISTING

1,833,150.00 100,000.00 15,000.00 2,986,500.00 122,175.00 287,500.00 227,850.00 599,250.00

788,400.00 41,300.00 389,400.00 247,800.00 78,660.00 27,000.00

7,743,985.00

1 M3 MEMBUAT KOLOM Ø 35 CM BETON BERTULANG + BEKISTING

1,833,150.00 100,000.00 15,000.00 3,811,500.00 155,925.00 287,500.00 227,850.00 599,250.00

788,400.00 41,300.00 389,400.00 247,800.00 78,660.00 27,000.00

8,602,735.00

1 M3 MEMBUAT KOLOM Ø 30 CM BETON BERTULANG + BEKISTING

1,833,150.00 100,000.00 15,000.00 3,745,500.00 153,225.00 287,500.00 227,850.00 599,250.00

788,400.00 41,300.00 389,400.00 247,800.00

Page 72: Draft Addendum Cco Ok

Jumlah Harga

(Rp)

78,660.00 27,000.00

8,534,035.00

Page 73: Draft Addendum Cco Ok

Jumlah Harga

(Rp)

1 M3 MEMBUAT KOLOM Ø 20 CM BETON BERTULANG + BEKISTING

1,833,150.00 100,000.00 15,000.00 4,818,000.00 197,100.00 287,500.00 227,850.00 599,250.00

788,400.00 41,300.00 389,400.00 247,800.00 78,660.00 27,000.00

9,650,410.00

1 M3 MEMBUAT BALOK 30 x 60 CM BETON BERTULANG + BEKISTING

490,875.00 80,000.00 40,000.00 2,751,082.95 112,545.00 287,500.00 227,850.00 599,250.00

788,400.00 41,300.00 389,400.00 247,800.00 78,660.00 27,000.00

6,161,662.95

1 M3 MEMBUAT BALOK 1, 25 x 45 CM BETON BERTULANG + BEKISTING

490,875.00 80,000.00 40,000.00 2,800,211.70 114,561.00 287,500.00 227,850.00 599,250.00

788,400.00 41,300.00 389,400.00 247,800.00

Page 74: Draft Addendum Cco Ok

Jumlah Harga

(Rp)

78,660.00 27,000.00

6,212,807.70

Page 75: Draft Addendum Cco Ok

Jumlah Harga

(Rp)

1 M3 MEMBUAT BALOK 2, 25 x 45 CM BETON BERTULANG + BEKISTING

490,875.00 80,000.00 40,000.00 2,716,164.00 111,114.00 287,500.00 227,850.00 599,250.00

788,400.00 41,300.00 389,400.00 247,800.00 78,660.00 27,000.00

6,125,313.00

1 M3 MEMBUAT BALOK 25 x 40 CM BETON BERTULANG + BEKISTING

490,875.00 80,000.00 40,000.00 3,258,693.90 152,356.50 287,500.00 227,850.00 599,250.00

788,400.00 41,300.00 389,400.00 247,800.00 78,660.00 27,000.00

6,709,085.40

1 M3 MEMBUAT BALOK 20 x 60 CM BETON BERTULANG + BEKISTING

490,875.00 80,000.00 40,000.00 2,788,500.00 114,075.00 287,500.00 227,850.00 599,250.00

788,400.00 41,300.00 389,400.00 247,800.00

Page 76: Draft Addendum Cco Ok

Jumlah Harga

(Rp)

78,660.00 27,000.00

6,200,610.00

Page 77: Draft Addendum Cco Ok

Jumlah Harga

(Rp)

1 M3 MEMBUAT BALOK 20 x 40 CM BETON BERTULANG + BEKISTING

490,875.00 80,000.00 40,000.00 3,085,500.00 126,225.00 287,500.00 227,850.00 599,250.00

788,400.00 41,300.00 389,400.00 247,800.00 78,660.00 27,000.00

6,509,760.00

1 M3 MEMBUAT BALOK 20 x 35 CM BETON BERTULANG + BEKISTING

490,875.00 80,000.00 40,000.00 2,512,441.80 128,250.00 287,500.00 227,850.00 599,250.00

788,400.00 41,300.00 389,400.00 247,800.00 78,660.00 27,000.00

5,938,726.80

1 M3 MEMBUAT BALOK 20 x 30 CM BETON BERTULANG + BEKISTING

490,875.00 80,000.00 40,000.00 1,878,993.60 76,869.00 287,500.00 227,850.00 599,250.00

788,400.00 41,300.00 389,400.00 247,800.00

Page 78: Draft Addendum Cco Ok

Jumlah Harga

(Rp)

78,660.00 27,000.00

5,253,897.60

Page 79: Draft Addendum Cco Ok

Jumlah Harga

(Rp)

1 M3 MEMBUAT BALOK 15 x 20 CM BETON BERTULANG + BEKISTING

490,875.00 80,000.00 40,000.00 2,838,000.00 116,100.00 287,500.00 227,850.00 599,250.00

788,400.00 41,300.00 389,400.00 247,800.00 78,660.00 27,000.00

6,252,135.00

1 M3 MEMBUAT TANGGA BETON BERTULANG (170 Kg + BEKISTING )

687,500.00 75,000.00 30,000.00 2,805,000.00 135,000.00 448,500.00 241,800.00 549,100.00 350,000.00 420,000.00

604,800.00 41,300.00 271,400.00 165,200.00 55,890.00 30,300.00

6,910,790.00

1 M3 MEMBUAT PLAT DAAG BETON BERTULANG + BEKISTING

1,337,750.00 2,213,090.32 2,934,498.20

6,485,338.52

1 M3 MEMBUAT PLAT CANOPY BETON BERTULANG + BEKISTING

1,337,750.00 3,615,604.30 638,262.04

5,591,616.34

Page 80: Draft Addendum Cco Ok

Jumlah Harga

(Rp)

1 M' SALURAN KELILING PAS. BATA 1/2 BATU

74,785.00 80,300.80 30,055.50 115,000.00

300,141.30

Page 81: Draft Addendum Cco Ok

Jumlah Harga

(Rp)

1 M2 PEKERJAAN BEKISTING LIST PLANK BETON

1,000.00 5,000.00 19,800.00 48,580.00

3,456.00 3,894.00 455.40 900.00

83,085.40

1 M2 PAS. DINDING BATU BATA 1/2 BATU 1 : 4

96,000.00 765.00 19,125.00

4,320.00 23,600.00 2,760.00 3,000.00

149,570.00

1 M2 PAS. DINDING BATU BATA 1/2 BATU 1 : 2

96,000.00 850.00 21,250.00

4,320.00 23,600.00 2,760.00 3,000.00

151,780.00

1 M2 PLESTERAN 1 : 2

17,380.80 8,500.00

32,400.00 17,700.00 2,070.00 2,250.00

80,300.80

1 M2 PAS. PONDASI BATU BATA 1 BATU 1:4

Page 82: Draft Addendum Cco Ok

Jumlah Harga

(Rp)

168,000.00 45,135.00 39,525.00

70,200.00 23,600.00 2,760.00 4,500.00

353,720.00

Page 83: Draft Addendum Cco Ok

DAFTAR HARGA SATUAN UPAH DAN BAHANKECAMATAN BENGKALIS

TAHUN ANGGARAN 2015

KEGIATAN : PENINGKATAN SARANA DAN PRASARANA APARATURPEKERJAAN :

NO. PAKET : 5/ULP/POKJA I/DINASPU/V/2015LOKASI : KABUPATEN BENGKALISTAHUN ANGGARAN: 2015

JENIS NO UPAH DAN BAHAN SATUAN

1 2 3 4

A. BAHAN PASANGAN 1 Agregrat Kelas A M32 Agregrat Kelas B M33 Agregrat Kelas C M34 Aspal Kg5 Batu Bata Bh6 Batu Kali M37 Filler Kg8 Kerikil / Koral M39 Material Pilihan ( Sirtu ) M3

10 Pasir Pasang M311 Pasir Beton M312 Pasir Plester M313 Pasir Urug M314 Semen Portland @ 50 Kg Zak15 Semen Portland Kg16 Semen Putih Zak17 Semen Putih Kg18 Teer Kg19 Tiang Pancang 20 x 20 x 6 M'20 Tanah Timbunan M321 Tanah Urug Pilihan M3

B. BAHAN KAYU 1 Balok Kayu Kelas II / Meranti M32 Balok Kayu Kelas I / Punak M33 Btg4 Btg5 Kayu Dolken Btg6 Kayu Bakar M37 Papan 3/4" Lembar8 Papan Bekisting M39 Papan Bekisting M2

10 Papan Bouwplank Lembar11 Plywood 4 mm Lembar12 Plywood 9 mm Lembar13 M'14 Kayu 5/7 M3

LANJUTAN PEMBANGUNAN GEDUNG SEKOLAH TINGGI ILMU EKONOMI (STIE) SYARIAH KAB. BENGKALIS

Cerocok Kayu Ø 12 - 15" Pjg. 6 MCerocok Kayu Ø 4 - 6" Pjg. 6 M

Tiang Kayu Ø 15 - 20 cm Pjg. 6 M

Page 84: Draft Addendum Cco Ok

C. BANAH BESI, MINYA 1 Baut dan Mur Btg DAN LAIN - LAIN 2 Besi Beton Polos Kg

3 Besi Beton Ulir Kg4 Wire Mesh 5,4 x 2,1 Type M8 Lembar5 Besi Baut Steinless Steel Bh6 Besi Angkur Bh7 Bh8 Oksigen Tbg9 Acetelin Tbg

10 Kawat Las Kg11 M'12 Pipa Baja Ø 2" ( Tebal 1,5 mm ) M'13 Pipa Besi Galvanis Ø 4" ( Tebal 2,3 mm M'14 Pipa Besi galvanis Ø 2,5" ( Tebal 1,5 mm M'15 Pipa Besi Galvanis Ø 2" ( Tebal 1,5 mm ) M'16 Pipa Besi Galvanis Ø 1,5" ( Tebl 1.5 mm M'17 Pipa Besi Ø 1 1/4" (Tebal 1,5 mm ) M'18 Pipa Besi Ø 1" ( Tebal 1 mm ) M'19 Besi Strip Kg20 Mesin Las Jam21 M'22 Kawat Ikat Beton Kg23 Paku Beton Kotak24 Paku Putih/ Jembatan Kg25 Paku Biasa 1-5" Kg26 Paku Biasa Halus kg27 Paku Sekrup kg28 Paku Seng Kg29 Minyak Bensin Ltr30 Minyak Pelumas Olie Ltr31 Minyak Solar Ltr32 Minyak Tanah Ltr33 Minyak Bekisting Ltr34 Plastik Alas M235 Paku Alumunium Kg36 Seng Plat Lembar37 Kaca Polos M238 Jendela Nako Bh39 Seng Gelombang BJLS 32 Lembar40 Kunci Tanam Bh

D. TENAGA KERJA 1 Kepala Tukang Orang / Hari2 Tukang Batu Orang / Hari3 Tukang Kayu Orang / Hari4 Tukang Cat Orang / Hari5 Tukang Besi Orang / Hari6 Mandor Orang / Hari7 Pekerja Orang / Hari

Plat Galvanis Ø 20 cm

Pipa Baja Ø 2,5" ( Tebal 1,5 mm )

Besi Grill Ø 19 mm + Besi Siku

Page 85: Draft Addendum Cco Ok
Page 86: Draft Addendum Cco Ok

DAFTAR HARGA SATUAN UPAH DAN BAHANKECAMATAN BENGKALIS

TAHUN ANGGARAN 2015

PENINGKATAN SARANA DAN PRASARANA APARATUR

HARGA SATUAN( Rp )

5

850,000.00 720,000.00 680,000.00 17,000.00 1,200.00 450,000.00 2,000.00 575,000.00 525,000.00 425,000.00 465,000.00 415,000.00 415,000.00 85,000.00 1,700.00 65,000.00 1,300.00 17,000.00 280,000.00 165,000.00 350,000.00

2,750,000.00 3,600,000.00 35,000.00 15,000.00 30,000.00 450,000.00 85,000.00 1,800,000.00 6,500.00 65,000.00 95,000.00 140,000.00 35,000.00 2,200,000.00

LANJUTAN PEMBANGUNAN GEDUNG SEKOLAH TINGGI ILMU EKONOMI (STIE) SYARIAH KAB. BENGKALIS

Page 87: Draft Addendum Cco Ok

5,000.00 14,000.00 16,500.00 850,500.00 8,000.00 15,000.00 2,700,000.00 1,200,000.00 1,200,000.00 75,000.00 275,000.00 165,000.00 450,000.00 280,000.00 170,000.00 130,000.00 97,000.00 85,000.00 20,000.00 157,000.00 115,000.00 45,000.00 35,000.00 26,000.00 25,000.00 25,000.00 30,000.00 25,000.00 12,000.00 35,000.00 15,000.00 13,000.00 25,000.00 7,000.00 45,000.00 65,000.00 95,000.00 185,000.00 110,000.00 110,000.00

138,000.00 118,000.00 118,000.00 118,000.00 118,000.00 150,000.00 108,000.00

Page 88: Draft Addendum Cco Ok
Page 89: Draft Addendum Cco Ok

TIME SCHEDULE

KEGIATAN : PENINGKATAN SARANA DAN PRASARANA APARATUR

PEKERJAAN : LANJUTAN PEMBANGUNAN GEDUNG SEKOLAH TINGGI ILMU EKONOMI (STIE) SYARIAH KAB. BENGKALIS

NO. PAKET : 5/ULP/POKJA I/DINASPU/V/2015

LOKASI : KABUPATEN BENGKALIS

T. A : 2015

NO. URAIAN PEKERJAANBOBOT

WAKTU PELAKSANAAN 150 HARI

BULAN I BULAN II BULAN III BULAN IV BULAN V

% 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 I II III IV V VI

100%

A. LANTAI I ( SATU ) -

I PEKERJAAN PENDAHULUAN 1.30 1.30

II PEKERJAAN TANAH/ PASIR 0.01 0.01

III PEKERJAAN STRUKTUR 21.46 1.82 5.07 5.99 5.43 0.87 1.87 0.41

B. LANTAI II ( DUA )

I PEKERJAAN STRUKTUR 51.08 5.16 6.46 8.35 8.87 7.37 2.62 2.03 2.16 2.59 2.26 2.74 0.48

C. LANTAI III ( TIGA )

I PEKERJAAN STRUKTUR 26.13 4.02 5.98 6.22 6.08 3.83

0%

Jumlah Rencana 100.00 3.14 5.07 5.99 5.43 5.16 6.46 8.35 8.87 7.37 3.49 3.90 2.57 2.59 4.02 5.98 6.22 6.08 6.10 2.74 0.48

Komulatif Rencana 0.00 3.14 8.21 14.21 19.63 24.79 31.25 39.59 48.47 55.84 59.33 63.23 65.79 68.39 72.41 78.39 84.61 90.69 96.78 99.52 100.0

Jumlah RealisasiKomulatif RealisasiDeviasi

Bengkalis, 18 Mei 2015Penawar,

PT. TIGA PUTRA WIJAYA

SUDIRMAN, STKepala Cabang

MASA PEMELIHARAAN 180 HARI KALENDER SKALA

KURVA

Page 90: Draft Addendum Cco Ok

JADWAL WAKTU PELAKSANAAN S/D PHO

KEGIATAN : PENINGKATAN SARANA DAN PRASARANA APARATURPEKERJAAN : LANJUTAN PEMBANGUNAN GEDUNG SEKOLAH TINGGI ILMU EKONOMI (STIE) SYARIAH KAB. BENGKALISNO. PAKET : 5/ULP/POKJA I/DINASPU/V/2015LOKASI : KABUPATEN BENGKALIST. A : 2015

NO. URAIAN PEKERJAAN BOBOT WAKTU PELAKSANAAN 150 HARI BULAN I BULAN II BULAN III BULAN IV BULAN V

% 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 I II III IV V VI

A. LANTAI I (SATU) 100%I PEKERJAAN PENDAHULUAN1 Pek. Pembersihan Lokasi 0.06 0.062 Pek. Papan Nama Proyek 0.01 0.013 Pek. Pembuatan Direksi Keet 1.23 1.23

II PEKERJAAN TANAH/ PASIR1 Pek. Galian Tanah Pondasi 0.01 0.01

III PEKERJAAN STRUKTUR1 Pek. Cor Balok Sloof ( 1S4 - 15/20 ) Beton + Tulangan + Bekisting ( K 250 ) 0.13 0.132 Pek. Cor Kolom Teras ( K9 ) Beton K 250 + Tulangan + Bekisting 0.92 0.923 Pek. Cor Kolom Lantai 1 Beton K 250 + Tulangan + Bekisting 16.90 1.69 5.07 5.07 5.074 Pek. Cor Kozen Pintu Utama Beton K 225 + Tulangan + Bekisting 0.35 0.355 Pek. Cor Balok Latey Selasar (B4 - 20/30) Beton K 225 + Tulangan + Bekisting Elv. + 2 1.73 0.87 0.876 Pek. Cor Plat Canopy Selasar T = 10 cm, Beton K 225 + Tulangan + Bekisting 1.00 1.007 Pek. Kepala Tiang Selasar 50/80, T = 10 cm, Beton K 225 + Tulangan + Bekisting 0.41 0.41

B. LANTAI II ( DUA )I PEKERJAAN STRUKTUR1 Pek. Cor Balok Lantai (2B6 30/60) Beton K 225 + Tulangan + Bekisting 0.90 0.30 0.30 0.302 Pek. Cor Balok Lantai ( 2B1 25/45 ) Beton K 225 + Tulangan + Bekisting 7.65 1.53 1.53 1.53 1.53 1.533 Pek. Cor Balok Lantai ( 2B2 25/45 ) Beton K 225 + Tulangan + Bekisting 0.93 0.934 Pek. Cor Balok Lantai ( 2B2 25/40 ) Beton K 225 + Tulangan + Bekisting 5.18 1.29 1.29 1.29 1.295 Pek. Cor Balok Lantai ( 2B4 20/35 ) Beton K 225 + Tulangan + Bekisting 3.66 1.22 1.22 1.226 Pek. Cor Balok Lantai ( 2B5 15/20 ) Beton K 225 + Tulangan + Bekisting 0.67 0.677 Pek. Cor Balok Lantai ( 2B7 - 20/30 ) Beton K 225 + Tulangan + Bekisting 0.57 0.578 Pek. Cor Balok Latey Teras (2B1 25/45) Beton K 225 + Tulangan + Bekisting Elv, +3,3 0.57 0.579 Pek. Cor Ring Balok Teras (3B1 25/45) Beton K 225 + Tulangan + Bekisting Elv, + 6.8 0.57 0.28 0.2810 Pek. Cor List Plank Teras T = 10 cm, Beton K 225 + Tulangan + Bekisting 0.95 0.48 0.4811 Pek. Cor Plat Lantai K 225 + Tulangan + Bekisting 16.65 3.33 3.33 3.33 3.33 3.3312 Pek. Cor Plat Daag Selasar T = 10 cm, Beton K 225 + Tulangan + Bekisting 3.96 1.98 1.9813 Pek. Cor Kolom Lantai 2 Beton K 250 + Tulangan + Bekisting 8.11 2.03 2.03 2.03 2.0314 Pek. Cor Kolom Pedastal 1 Elv + 4.00 s/d Elv + 5.00 Beton K 225 + Tulangan + Bekisti 0.13 0.1315 Pek. Cor Ring Balok (RB3 20/30 ) Beton K 225 + Tulangan + Bekisting Elv. + 5.00 0.59 0.59

C. LANTAI III ( TIGA )I PEKERJAAN STRUKTUR1 Pek. Cor Balok Lantai (3B6 30/60) Beton K 225 + Tulangan + Bekisting 0.90 0.30 0.30 0.302 Pek. Cor Balok Lantai ( 3B1 25/45 ) Beton K 225 + Tulangan + Bekisting 4.76 1.19 1.19 1.19 1.193 Pek. Cor Balok Lantai ( 3B2 25/45 ) Beton K 225 + Tulangan + Bekisting 2.43 0.81 0.81 0.814 Pek. Cor Balok Lantai ( 3B3 25/40 ) Beton K 225 + Tulangan + Bekisting 4.60 1.15 1.15 1.15 1.155 Pek. Cor Balok Lantai ( 3B5 15/20 ) Beton K 225 + Tulangan + Bekisting 0.49 0.25 0.256 Pek. Cor Balok Lantai ( 3B7 20/30 ) Beton K 225 + Tulangan + Bekisting 0.31 0.16 0.167 Pek. Cor Plat Lantai K 225 + Tulangan + Bekisting 12.64 2.53 2.53 2.53 2.53 2.53

D. Pre Hand Over ( P H O ) 0.00 0%

Jumlah Rencana 100.00 3.14 5.07 5.99 5.43 5.16 6.46 8.35 8.87 7.37 3.49 3.90 2.57 2.59 4.02 5.98 6.22 6.08 6.10 2.74 0.48

Komulatif Rencana 0 3.14 8.21 14.21 19.63 24.79 31.25 39.59 48.47 55.84 59.33 63.23 65.79 68.39 72.41 78.39 84.61 90.69 96.78 99.52 100.00

Jumlah RealisasiKomulatif RealisasiDeviasi

Bengkalis, 18 Mei 2015Penawar,

PT. TIGA PUTRA WIJAYA

SUDIRMAN, STKepala Cabang

MASA PEMELIHARAAN 180 HARI KALENDER SKALA

KURVA

Page 91: Draft Addendum Cco Ok

LAMPIRAN BERITA ACARA RAPAT PEMBAHASAN ADDENDUM TAMBAH KURANG PEKERJAAN

KEGIATAN : PENINGKATAN SARANA DAN PRASARANA APARATUR

PEKERJAAN : LANJUTAN PEMBANGUNAN GEDUNG SEKOLAH TINGGI ILMU EKONOMI (STIE) SYARIAH KAB. BENGKALIS

LOKASI : KABUPATEN BENGKALIS

TAHUN ANGGARAN: 2015

NO. URAIAN PEKERJAAN

KONTRAK AWAL KONTRAK ADDENDUM

SATUAN VOLUME

HARGA JUMLAH

SATUAN VOLUMESATUAN HARGA

( Rp ) ( Rp )

1 2 3 4 5 6 7 8

A. LANTAI I (SATU)

I PEKERJAAN PENDAHULUAN

1 Pek. Pembersihan Lokasi M2 826.97 1,830.00 1,513,355.10 M2 826.97

2 Pek. Papan Nama Proyek Ls 1.00 350,000.00 350,000.00 Ls 1.00

3 Pek. Pembuatan Direksi Keet M2 20.00 ### 32,774,000.00 M2 20.00

II PEKERJAAN TANAH/ PASIR

1 Pek. Galian Tanah Pondasi M3 8.07 49,200.00 397,044.00 M3 8.07

2 Pek. Urugan Tanah Pilihan Bawah Lantai M3 - - - M3 675.92

3 Pek. Urugan Pasir Bawah Lantai M3 - - - M3 59.25

4 Pek. Cor Lantai Beton Camp. 1 : 3 : 5 M3 - - - M3 118.49

5 Pek. Pasangan Wire Mesh M6-150 M2 - - - M2 ###

6 Pek. Urugan Tanah Pilihan Bawah Rabat Beton M3 - - - M3 80.84

7 Pek. Urugan Pasir Bawah Rabat Beton M3 - - - M3 13.47

8 Pek. Cor Rabat Beton Camp. 1 : 3 : 5 M3 - - - M3 21.56

9 Pek. Cor Saluran Keliling Bangunan M3 - - - M3 16.71

III PEKERJAAN STRUKTUR

1 Pek. Cor Balok Sloof ( 1S4 - 15/20 ) Beton + Tulangan + Bekisting ( K 250 ) M3 0.59 ### 3,529,902.03 M3 1.31

2 Pek. Cor Lantai Kerja Beton Camp. 1:3:5 M3 - - - M3 4.37

3 Pek. Cor Balok Sloof ( 1S2 - 25/40 ) Beton + Tulangan + Bekisting ( K 250 ) M3 - - - M3 1.09

Page 92: Draft Addendum Cco Ok

NO. URAIAN PEKERJAAN

KONTRAK AWAL KONTRAK ADDENDUM

SATUAN VOLUME

HARGA JUMLAH

SATUAN VOLUMESATUAN HARGA

( Rp ) ( Rp )

1 2 3 4 5 6 7 8

4 Pek. Cor Balok Sloof ( 1S3 - 20/30 ) Beton + Tulangan + Bekisting ( K 250 ) M3 - - - M3 4.29

5 Pek. Cor Kolom Teras ( K9 ) Beton K 250 + Tulangan + Bekisting M3 3.91 ### 24,547,866.98 M3 3.91

6 Pek. Cor Kolom Lantai 1 Beton K 250 + Tulangan + Bekisting M3 71.59 ### 449,458,260.19 M3 71.59

7 Pek. Cor Kozen Pintu Utama Beton K 225 + Tulangan + Bekisting M3 1.50 ### 9,417,340.28 M3 1.50

8 Pek. Cor Balok Latey Selasar (B4 - 20/30) Beton K 225 + Tulangan + Bekisting M3 8.78 ### 46,129,220.93 M3 8.78

9 Pek. Cor Plat Canopy Selasar T = 10 cm, Beton K 225 + Tulangan + Bekisting M3 4.77 ### 26,672,009.94 M3 4.77

10 Pek. Kepala Tiang Selasar 50/80, T = 10 cm, Beton K 225 + Tulangan + Bekisti M3 1.64 ### 11,002,900.06 M3 1.64

SUB TOTAL PEKERJAAN A. LANTAI I (SATU) 605,791,899.51

B. LANTAI II ( DUA )

I PEKERJAAN STRUKTUR

1 Pek. Cor Balok Lantai (2B6 30/60) Beton K 225 + Tulangan + Bekisting M3 3.89 ### 23,968,868.88 M3 3.89

2 Pek. Cor Balok Lantai ( 2B1 25/45 ) Beton K 225 + Tulangan + Bekisting M3 32.74 ### 203,407,324.10 M3 32.74

3 Pek. Cor Balok Lantai ( 2B2 25/45 ) Beton K 225 + Tulangan + Bekisting M3 4.05 ### 24,807,517.65 M3 4.05

4 Pek. Cor Balok Lantai ( 2B2 25/40 ) Beton K 225 + Tulangan + Bekisting M3 20.52 ### 137,670,432.41 M3 20.52

5 Pek. Cor Balok Lantai ( 2B4 20/35 ) Beton K 225 + Tulangan + Bekisting M3 16.38 ### 97,276,344.98 M3 16.38

6 Pek. Cor Balok Lantai ( 2B5 15/20 ) Beton K 225 + Tulangan + Bekisting M3 2.86 ### 17,881,106.10 M3 2.86

7 Pek. Cor Balok Lantai ( 2B7 - 20/30 ) Beton K 225 + Tulangan + Bekisting M3 2.86 ### 15,026,147.14 M3 2.86

8 Pek. Cor Balok Latey Teras (2B1 25/45) Beton K 225 + Tulangan + Bekisting El M3 2.43 ### 15,097,122.71 M3 2.43

9 Pek. Cor Ring Balok Teras (3B1 25/45) Beton K 225 + Tulangan + Bekisting El M3 2.43 ### 15,097,122.71 M3 2.43

10 Pek. Cor List Plank Teras T = 10 cm, Beton K 225 + Tulangan + Bekisting M3 4.54 ### 25,385,938.18 M3 4.54

11 Pek. Cor Plat Lantai K 225 + Tulangan + Bekisting M3 79.19 ### 442,800,097.95 M3 79.19

Page 93: Draft Addendum Cco Ok

NO. URAIAN PEKERJAAN

KONTRAK AWAL KONTRAK ADDENDUM

SATUAN VOLUME

HARGA JUMLAH

SATUAN VOLUMESATUAN HARGA

( Rp ) ( Rp )

1 2 3 4 5 6 7 8

12 Pek. Cor Plat Daag Selasar T = 10 cm, Beton K 225 + Tulangan + Bekisting M3 18.81 ### 105,178,303.35 M3 18.81

13 Pek. Cor Kolom Lantai 2 Beton K 250 + Tulangan + Bekisting M3 34.34 ### 215,594,310.03 M3 34.34

14 Pek. Cor Kolom Pedastal 1 Elv + 4.00 s/d Elv + 5.00 Beton K 225 + Tulangan + M3 0.54 ### 3,405,596.40 M3 0.54

15 Pek. Cor Ring Balok (RB3 20/30 ) Beton K 225 + Tulangan + Bekisting Elv. + 5. M3 3.00 ### 15,761,692.80 M3 3.00

SUB TOTAL PEKERJAAN B. LANTAI II ( DUA ) ###

C. LANTAI III ( TIGA )

I PEKERJAAN STRUKTUR

1 Pek. Cor Balok Lantai (3B6 30/60) Beton K 225 + Tulangan + Bekisting M3 3.89 ### 23,968,868.88 M3 -

2 Pek. Cor Balok Lantai ( 3B1 25/45 ) Beton K 225 + Tulangan + Bekisting M3 20.39 ### 126,679,149.00 M3 -

3 Pek. Cor Balok Lantai ( 3B2 25/45 ) Beton K 225 + Tulangan + Bekisting M3 10.53 ### 64,499,545.89 M3 -

4 Pek. Cor Balok Lantai ( 3B3 25/40 ) Beton K 225 + Tulangan + Bekisting M3 18.24 ### 122,373,717.70 M3 -

5 Pek. Cor Balok Lantai ( 3B5 15/20 ) Beton K 225 + Tulangan + Bekisting M3 2.09 ### 13,066,962.15 M3 -

6 Pek. Cor Balok Lantai ( 3B7 20/30 ) Beton K 225 + Tulangan + Bekisting M3 1.58 ### 8,301,158.21 M3 -

7 Pek. Cor Plat Lantai K 225 + Tulangan + Bekisting M3 60.09 ### 336,000,225.86 M3 -

SUB TOTAL PEKERJAAN C. LANTAI III ( TIGA ) 694,889,627.68

JUMLAH TOTAL ( A + B + C ) ###

PAJAK PERTAMBAHAN NILAI ( PPn ) 10% 265,903,945.26

JUMLAH HARGA PEKERJAAN ###

JUMLAH DIBULATKAN ###

Page 94: Draft Addendum Cco Ok

NO. URAIAN PEKERJAAN

KONTRAK AWAL KONTRAK ADDENDUM

SATUAN VOLUME

HARGA JUMLAH

SATUAN VOLUMESATUAN HARGA

( Rp ) ( Rp )

1 2 3 4 5 6 7 8

Page 95: Draft Addendum Cco Ok

LAMPIRAN BERITA ACARA RAPAT PEMBAHASAN ADDENDUM TAMBAH KURANG PEKERJAAN

NO. KONTRAK : 05-NK/SP/KPA/PU-CK/VII/2015

LANJUTAN PEMBANGUNAN GEDUNG SEKOLAH TINGGI ILMU EKONOMI (STIE) SYARIAH KAB. BENGKALIS TANGGAL KONTRAK : 08 JULI 2015

NO. SURAT :

TANGGAL SURAT :

KONTRAK ADDENDUM

KETERANGANHARGA JUMLAH

SATUAN HARGA

( Rp ) ( Rp ) (+) (-) ( Rp ) ( Rp )

9 10 11 12 13 13 14

1,830.00 1,513,355.10 - - - - Tetap

350,000.00 350,000.00 - - - - Tetap

1,638,700.00 32,774,000.00 - - - - Tetap

49,200.00 397,044.00 - - - - Tetap

458,900.00 310,181,459.81 675.92 - 310,181,459.81 - Pekerjaan Bertambah

531,900.00 31,512,960.70 59.25 - 31,512,960.70 - Pekerjaan Bertambah

1,335,800.00 158,281,680.39 118.49 - 158,281,680.39 - Pekerjaan Bertambah

47,751.70 56,581,963.85 1,184.92 - 56,581,963.85 - Pekerjaan Bertambah

458,900.00 37,098,279.08 80.84 37,098,279.08 Pekerjaan Bertambah

531,900.00 7,166,621.14 13.47 7,166,621.14 Pekerjaan Bertambah

1,335,800.00 28,796,909.24 21.56 28,796,909.24 Pekerjaan Bertambah

1,335,800.00 22,319,009.92 16.71 22,319,009.92 Pekerjaan Bertambah

5,982,884.80 7,807,664.66 0.72 - 4,277,762.63 - Volume Bertambah

1,335,800.00 5,831,501.69 4.37 - 5,831,501.69 - Pekerjaan Bertambah

6,087,257.65 6,635,110.84 1.09 - 6,635,110.84 Pekerjaan Bertambah

PEKERJAAN TAMBAH

PEKERJAAN KURANG

HARGA TAMBAH

HARGA KURANG

Page 96: Draft Addendum Cco Ok

KONTRAK ADDENDUM

KETERANGANHARGA JUMLAH

SATUAN HARGA

( Rp ) ( Rp ) (+) (-) ( Rp ) ( Rp )

9 10 11 12 13 13 14

PEKERJAAN TAMBAH

PEKERJAAN KURANG

HARGA TAMBAH

HARGA KURANG

6,109,892.35 26,182,110.70 4.29 - 26,182,110.70 Pekerjaan Bertambah

6,278,226.85 24,547,866.98 - - - - Tetap

6,278,226.85 449,458,260.19 - - - - Tetap

6,278,226.85 9,417,340.28 - - - - Tetap

5,253,897.60 46,129,220.93 - - - - Tetap

5,591,616.34 26,672,009.94 - - - - Tetap

6,709,085.40 11,002,900.06 - - - - Tetap

### ### -

Tetap

6,161,662.95 23,968,868.88 - - - - Tetap

6,212,807.70 203,407,324.10 - - - - Tetap

6,125,313.00 24,807,517.65 - - - - Tetap

6,709,085.40 137,670,432.41 - - - - Tetap

5,938,726.80 97,276,344.98 - - - - Tetap

6,252,135.00 17,881,106.10 - - - - Tetap

5,253,897.60 15,026,147.14 - - - - Tetap

6,212,807.70 15,097,122.71 - - - - Tetap

6,212,807.70 15,097,122.71 - - - - Tetap

5,591,616.34 25,385,938.18 - - - - Tetap

5,591,616.34 442,800,097.95 - - - - Tetap

Page 97: Draft Addendum Cco Ok

KONTRAK ADDENDUM

KETERANGANHARGA JUMLAH

SATUAN HARGA

( Rp ) ( Rp ) (+) (-) ( Rp ) ( Rp )

9 10 11 12 13 13 14

PEKERJAAN TAMBAH

PEKERJAAN KURANG

HARGA TAMBAH

HARGA KURANG

5,591,616.34 105,178,303.35 - - - - Tetap

6,278,226.85 215,594,310.03 - - - - Tetap

6,306,660.00 3,405,596.40 - - - - Tetap

5,253,897.60 15,761,692.80 - - - - Tetap

### - -

6,161,662.95 - - 3.89 - 23,968,868.88 Pekerjaan Berkurang

6,212,807.70 - - 20.39 - 126,679,149.00 Pekerjaan Berkurang

6,125,313.00 - - 10.53 - 64,499,545.89 Pekerjaan Berkurang

6,709,085.40 - - 18.24 - 122,373,717.70 Pekerjaan Berkurang

6,252,135.00 - - 2.09 - 13,066,962.15 Pekerjaan Berkurang

5,253,897.60 - - 1.58 - 8,301,158.21 Pekerjaan Berkurang

5,591,616.34 - - 60.09 - 336,000,225.86 Pekerjaan Berkurang

- - ###

### ### ###

265,901,519.49 SELISIH 24,257.70

###

###

Page 98: Draft Addendum Cco Ok

KONTRAK ADDENDUM

KETERANGANHARGA JUMLAH

SATUAN HARGA

( Rp ) ( Rp ) (+) (-) ( Rp ) ( Rp )

9 10 11 12 13 13 14

PEKERJAAN TAMBAH

PEKERJAAN KURANG

HARGA TAMBAH

HARGA KURANG

Page 99: Draft Addendum Cco Ok

DAFTAR LAMPIRAN ANALISA HARGA SATUAN PEKERJAAN( ADDENDUM TAMBAH KURANG PEKERJAAN )

KEGIATAN : PENINGKATAN SARANA DAN PRASARANA APARATURPEKERJAAN :

LOKASI : KABUPATEN BENGKALISTAHUN ANGGARAN : 2015

No. Jenis Pekerjaan (Rp)

1 1 M3 URUGAN TANAH PILIHAN

BAHAN Tanah Urugan Pilihan 1.2000 M3 350,000.00

TENAGA Pekerja 0.3000 Oh 108,000.00 Mandor 0.0100 Oh 150,000.00

ALAT Alat Bantu 1.0000 Ls 5,000.00

Jumlah

2 1 M2 PASANGAN GEOTEKSTIL

BAHAN Geotekstil 1.0500 M2 29,000.00

TENAGA Pekerja 0.1556 Oh 108,000.00 Mandor 0.0778 Oh 150,000.00

Jumlah

3 1 M3 BETON COR 1:3:5

BAHAN Kerikil 0.8700 M3 575,000.00 Pasir Beton 0.5200 M3 465,000.00 Semen Porltand 218.0000 Kg 1,700.00

TENAGA Pekerja 1.6500 Oh 108,000.00 Tukang Batu 0.2500 Oh 118,000.00 Kepala Tukang 0.0250 Oh 138,000.00 Mandor 0.0800 Oh 150,000.00

Jumlah

4 1 M3 MEMBUAT SLOOF 20 x 30 CM BETON BERTULANG + BEKISTING

BAHAN Kayu Terentang 0.1875 M3 2,750,000.00 Paku Biasa 2" - 5" 2.0000 Kg 25,000.00 Minyak Bekisting 0.6000 Ltr 25,000.00 Besi Beton 199.6569 Kg 16,500.00 Kawat Beton 2.9949 Kg 45,000.00

LANJUTAN PEMBANGUNAN GEDUNG SEKOLAH TINGGI ILMU EKONOMI (STIE) SYARIAH KAB. BENGKALIS

Indeks dan Satuan

Harga Bahan dan Upah

Page 100: Draft Addendum Cco Ok

No. Jenis Pekerjaan (Rp)

Indeks dan Satuan

Harga Bahan dan Upah

Kerikil 0.5000 M3 575,000.00 Pasir Beton 0.4900 M3 465,000.00 Semen Porltand 352.5000 Kg 1,700.00

TENAGA Pekerja 4.8500 Oh 108,000.00 Tukang Batu 0.3500 Oh 118,000.00 Tukang Kayu 1.5600 Oh 118,000.00 Tukang Besi 1.4000 Oh 118,000.00 Kepala Tukang 0.3310 Oh 138,000.00 Mandor 0.1700 Oh 150,000.00

Jumlah

Page 101: Draft Addendum Cco Ok

No. Jenis Pekerjaan (Rp)

Indeks dan Satuan

Harga Bahan dan Upah

5 1 M3 MEMBUAT SLOOF 25 x 40 CM BETON BERTULANG + BEKISTING

BAHAN Kayu Terentang 0.1875 M3 2,750,000.00 Paku Biasa 2" - 5" 2.0000 Kg 25,000.00 Minyak Bekisting 0.6000 Ltr 25,000.00 Besi Beton 198.3391 Kg 16,500.00 Kawat Beton 2.9751 Kg 45,000.00 Kerikil 0.5000 M3 575,000.00 Pasir Beton 0.4900 M3 465,000.00 Semen Porltand 352.5000 Kg 1,700.00

TENAGA Pekerja 4.8500 Oh 108,000.00 Tukang Batu 0.3500 Oh 118,000.00 Tukang Kayu 1.5600 Oh 118,000.00 Tukang Besi 1.4000 Oh 118,000.00 Kepala Tukang 0.3310 Oh 138,000.00 Mandor 0.1700 Oh 150,000.00

Jumlah

6 1 M3 MEMBUAT SLOOF 25 x 40 CM BETON BERTULANG + BEKISTING

BAHAN Kayu Terentang 0.1875 M3 2,750,000.00 Paku Biasa 2" - 5" 2.0000 Kg 25,000.00 Minyak Bekisting 0.6000 Ltr 25,000.00 Besi Beton 198.3391 Kg 16,500.00 Kawat Beton 2.9751 Kg 45,000.00 Kerikil 0.5000 M3 575,000.00 Pasir Beton 0.4900 M3 465,000.00 Semen Porltand 352.5000 Kg 1,700.00

TENAGA Pekerja 4.8500 Oh 108,000.00 Tukang Batu 0.3500 Oh 118,000.00 Tukang Kayu 1.5600 Oh 118,000.00 Tukang Besi 1.4000 Oh 118,000.00 Kepala Tukang 0.3310 Oh 138,000.00 Mandor 0.1700 Oh 150,000.00

Jumlah

Page 102: Draft Addendum Cco Ok

No. Jenis Pekerjaan (Rp)

Indeks dan Satuan

Harga Bahan dan Upah

7 1 M2 WIRE MESH M6-150

BAHAN Wire Mesh M6-150 1.0500 M2 20,282.19 Kawat Ikat Beton 0.1000 Kg 45,000.00

TENAGA Pekerja 0.1400 Oh 108,000.00 Tukang Besi 0.0467 Oh 118,000.00 Kepala Tukang 0.0046 Oh 138,000.00 Mandor 0.0046 Oh 150,000.00

Jumlah

8 1 M3 TIMBUNAN PASIR URUG

BAHAN Pasir Urug 1.2000 M3 415,000.00

TENAGA Pekerja 0.3000 Oh 108,000.00 Mandor 0.0100 Oh 150,000.00

Jumlah

Page 103: Draft Addendum Cco Ok

DAFTAR LAMPIRAN ANALISA HARGA SATUAN PEKERJAAN( ADDENDUM TAMBAH KURANG PEKERJAAN )

PENINGKATAN SARANA DAN PRASARANA APARATUR

Jumlah Harga

(Rp)

1 M3 URUGAN TANAH PILIHAN

420,000.00

32,400.00 1,500.00

5,000.00

458,900.00

1 M2 PASANGAN GEOTEKSTIL

30,450.00

16,800.00 11,666.67

58,916.67

1 M3 BETON COR 1:3:5

500,250.00 241,800.00 370,600.00

178,200.00 29,500.00 3,450.00 12,000.00

1,335,800.00

1 M3 MEMBUAT SLOOF 20 x 30 CM BETON BERTULANG + BEKISTING

515,625.00 50,000.00 15,000.00 3,294,338.85 134,770.50

LANJUTAN PEMBANGUNAN GEDUNG SEKOLAH TINGGI ILMU EKONOMI (STIE) SYARIAH KAB. BENGKALIS

Page 104: Draft Addendum Cco Ok

Jumlah Harga

(Rp)

287,500.00 227,850.00 599,250.00

523,800.00 41,300.00 184,080.00 165,200.00 45,678.00 25,500.00

6,109,892.35

Page 105: Draft Addendum Cco Ok

Jumlah Harga

(Rp)

1 M3 MEMBUAT SLOOF 25 x 40 CM BETON BERTULANG + BEKISTING

515,625.00 50,000.00 15,000.00 3,272,595.15 133,879.50 287,500.00 227,850.00 599,250.00

523,800.00 41,300.00 184,080.00 165,200.00 45,678.00 25,500.00

6,087,257.65

1 M3 MEMBUAT SLOOF 25 x 40 CM BETON BERTULANG + BEKISTING

515,625.00 50,000.00 15,000.00 3,272,595.15 133,879.50 287,500.00 227,850.00 599,250.00

523,800.00 41,300.00 184,080.00 165,200.00 45,678.00 25,500.00

6,087,257.65

Page 106: Draft Addendum Cco Ok

Jumlah Harga

(Rp)

21,296.30 4,500.00

15,120.00 5,510.60 634.80 690.00

47,751.70

1 M3 TIMBUNAN PASIR URUG

498,000.00

32,400.00 1,500.00

531,900.00

Page 107: Draft Addendum Cco Ok

DAFTAR HARGA SATUAN UPAH DAN BAHAN( ADDENDUM TAMBAH KURANG PEKERJAAN )

KEGIATAN : PENINGKATAN SARANA DAN PRASARANA APARATURPEKERJAAN :

LOKASI : KABUPATEN BENGKALISTAHUN ANGGARAN: 2015

JENIS NO UPAH DAN BAHAN SATUAN

1 2 3 4

A. BAHAN PASANGAN 1 Agregrat Kelas A M32 Agregrat Kelas B M33 Agregrat Kelas C M34 Aspal Kg5 Batu Bata Bh6 Batu Kali M37 Filler Kg8 Kerikil / Koral M39 Material Pilihan ( Sirtu ) M3

10 Pasir Pasang M311 Pasir Beton M312 Pasir Plester M313 Pasir Urug M314 Semen Portland @ 50 Kg Zak15 Semen Portland Kg16 Semen Putih Zak17 Semen Putih Kg18 Teer Kg19 Tanah Timbunan M320 Tanah Urug Pilihan M3

LANJUTAN PEMBANGUNAN GEDUNG SEKOLAH TINGGI ILMU EKONOMI (STIE) SYARIAH KAB. BENGKALIS

Page 108: Draft Addendum Cco Ok

B. BANAH BESI, MINYA 1 Minyak Bensin Ltr DAN LAIN - LAIN 2 Minyak Pelumas Olie Ltr

3 Minyak Solar Ltr4 Minyak Tanah Ltr5 Minyak Bekisting Ltr6 Plastik Alas M27 Geotekstil M28 Wire Mesh M6-150 M29 Kawat Ikat Beton Kg

D. TENAGA KERJA 1 Kepala Tukang Orang / Hari2 Tukang Batu Orang / Hari3 Tukang Kayu Orang / Hari4 Tukang Cat Orang / Hari5 Tukang Besi Orang / Hari6 Mandor Orang / Hari7 Pekerja Orang / Hari8 Operator/Supir Jam9 Pembantu Operator/Pembantu Supir Jam

Page 109: Draft Addendum Cco Ok

DAFTAR HARGA SATUAN UPAH DAN BAHAN( ADDENDUM TAMBAH KURANG PEKERJAAN )

PENINGKATAN SARANA DAN PRASARANA APARATUR

HARGA SATUAN( Rp )

5

850,000.00 720,000.00 680,000.00 17,000.00 1,200.00 450,000.00 2,000.00 575,000.00 525,000.00 425,000.00 465,000.00 415,000.00 415,000.00 85,000.00 1,700.00 65,000.00 1,300.00 17,000.00 165,000.00 350,000.00

LANJUTAN PEMBANGUNAN GEDUNG SEKOLAH TINGGI ILMU EKONOMI (STIE) SYARIAH KAB. BENGKALIS

Page 110: Draft Addendum Cco Ok

12,000.00 35,000.00 15,000.00 13,000.00 25,000.00 7,000.00 29,000.00 20,282.19 45,000.00

138,000.00 118,000.00 118,000.00 118,000.00 118,000.00 150,000.00 108,000.00 14,750.00 13,500.00

Page 111: Draft Addendum Cco Ok

LAMPIRAN URAIAN ANALISA HARGA SATUAN

JENIS PEKERJAAN : PAS. GEOTEKSTILSATUAN PEMBAYARAN : M2

No. U R A I A N KODE KOEF.

I. ASUMSI1 Pekerjaan dilakukan secara manual2 Lokasi pekerjaan : sepanjang jalan3 Kondisi Jalan terpengaruh oleh aliran air tanah4 Jam kerja efektif per-hari Tk 7.00

II. URUTAN KERJA1 Material geoteksil diterima dilokasi pekerjaan2 Pemasangan dilaksanakan sesuai dengan prosedur

yang direkomendasikan oleh pabriknya3 Pekerjaan galian dibayar tersendiri

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA 1. BAHAN

Kebutuhan Geotekstil/ M2 (M23) 1.0500

2. ALAT2.b. ALAT BANTU

Diperlukan alat-alat bantu kecil : alat potong dan jahit 1.00

3. TENAGAProduksi yang dapat diselesaikan / hari Qt 90.00 Kebutuhan tenaga :

- Pekerja P 2.00 - Mandor M 1.00

Koefisien tenaga / M2- Pekerja = (Tk x P) : Qt (L01) 0.1556 - Mandor = (Tk x M) : Qt (L03) 0.0778

4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALATLihat lampiran.

5. ANALISA HARGA SATUAN PEKERJAANDidapat Harga Satuan Pekerjaan :

Rp. 58,916.67 / M2

Page 112: Draft Addendum Cco Ok

LAMPIRAN URAIAN ANALISA HARGA SATUAN

JENIS PEKERJAAN : URUGAN TANAH PILIHANSATUAN PEMBAYARAN : M3

No. U R A I A N KODE KOEF.

I. ASUMSI1 Pekerjaan dilakukan secara mekanis2 Jam kerja efektif per-hari Tk 7.00 3 Faktor pengembangan bahan Fk 1.20 4 Tebal hamparan padat t 0.15 5 Berat volume bahan (lepas) D 1.60

II. URUTAN KERJA1 Excavator menggali dan memuat ke dalam pick up2 Pick up mengangkut ke lapangan dengan jarak

quari ke lapangan L 15.00 3 Material diratakan dengan tenaga manusia4 Material dipadatkan menggunakan stamper

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA 1. BAHAN1.a. Bahan timbunan = 1 x Fk 1.20

2. ALAT2.a. EXCAVATOR

Kapasitas Bucket V 0.80 Faktor Bucket Fb 1.00 Faktor Efisiensi Alat Fa 0.83 Faktor Konversi Fv 0.90 Waktu sklus Ts1- Muat T1 4.10 Waktu Siklus = T1 x Fv Ts1 3.69

Kapasitas Produksi / Jam =V x Fb x Fa x 60 Q1 9.00 Fk x Ts1

Koefisien alat / M = 1 : Q1 0.1111

2.b.Kecepatan v 1.00 Efisiensi alat Fa 0.83 Lebar pemadatan Lb 0.50 Banyak lintasan n 22 Jumlah lapisan timbunan N 4 Tebal lapis rata-rata tp 0.30 Kap. Prod. / Jam =v x 1000 x Fa x Lb x tp Q1 1.18

n x N x (M-09)Koefisien Alat / m = 1 : Q1 0.8482

2.c. ALAT BANTUDiperlukan alat-alat bantu kecil 1.00- Sekop = 3 buah

3. TENAGAProduksi menentukan : EXCAVATOR Q1 9.00 Produksi Timbunan / hari = Tk x Q1 Qt 62.98 Kebutuhan tenaga :

TAMPER (pemadatan timbunan)

Page 113: Draft Addendum Cco Ok

- Pekerja P 2.00 - Mandor M 1.00

Koefisien tenaga / M3 :- Pekerja = (Tk x P) : Qt 0.2223 - Mandor = (Tk x M) : Qt 0.0556

4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALATLihat lampiran.

5. ANALISA HARGA SATUAN PEKERJAANDidapat Harga Satuan Pekerjaan :

Rp. Err:509 / M3

Page 114: Draft Addendum Cco Ok

LAMPIRAN URAIAN ANALISA HARGA SATUAN

SATUAN KETERANGAN

Jam

M2

Ls Lump Sump

M2

orangorang

JamJam

Page 115: Draft Addendum Cco Ok

LAMPIRAN URAIAN ANALISA HARGA SATUAN

SATUAN KETERANGAN

Jam-M

Ton/M3

Km

M3

M3--

menitmenit

M3

Jam

Km / Jam-M

lintasanlintasan

MM3 / Jam

jam

Ls Lump Sump

M3/JamM3

Page 116: Draft Addendum Cco Ok

orangorang

JamJam

Page 117: Draft Addendum Cco Ok

LAMPIRAN URAIAN ANALISA ALAT

No. U R A I A N KODE

A. URAIAN PERALATAN1. Jenis Peralatan EXCAVATOR 80-140 HP2. Tenaga Pw3. Kapasitas Cp4. Alat Baru : a. Umur Ekonomis A

b. Jam Kerja Dalam 1 Tahun W c. Harga Alat B

B. BIAYA PASTI PER JAM KERJA1. Nilai Sisa Alat = 10 % x B C

2. Faktor Angsuran Modal = i x (1 + i)^A D(1 + i)^A - 1

3. Biaya Pasti per Jam :a. Biaya Pengembalian Modal = ( B - C ) x D E

W

b. Asuransi, dll = 0.002 x B FW

Biaya Pasti per Jam = ( E + F ) G

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H

2. Pelumas = (2.5%-3%) x Pw x Mp I

Biaya bengkel (6.25% dan 8.75%) x B J W

3. Perawatan dan (12,5 % - 17,5 %) x B K perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M

Biaya Operasi per Jam = (H+I+K+L+M) P

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S

E. LAIN - LAIN1. Tingkat Suku Bunga i2. Upah Operator / Sopir U13. Upah Pembantu Operator / Pmb.Sopir U2

Page 118: Draft Addendum Cco Ok

4. Bahan Bakar Bensin Mb5. Bahan Bakar Solar Ms6. Minyak Pelumas Mp

Page 119: Draft Addendum Cco Ok

LAMPIRAN URAIAN ANALISA ALAT

No. U R A I A N KODE

A. URAIAN PERALATAN1. Jenis Peralatan TAMPER2. Tenaga Pw3. Kapasitas Cp4. Alat Baru : a. Umur Ekonomis A

b. Jam Kerja Dalam 1 Tahun W c. Harga Alat B

B. BIAYA PASTI PER JAM KERJA1. Nilai Sisa Alat = 10 % x B C

2. Faktor Angsuran Modal = i x (1 + i)^A D(1 + i)^A - 1

3. Biaya Pasti per Jam :a. Biaya Pengembalian Modal = ( B - C ) x D E

W

b. Asuransi, dll = 0.002 x B FW

Biaya Pasti per Jam = ( E + F ) G

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H

2. Pelumas = (2.5%-3%) x Pw x Mp I

Biaya bengkel (6.25% dan 8.75%) x B J W

3. Perawatan dan (12,5 % - 17,5 %) x B K perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M

Biaya Operasi per Jam = (H+I+K+L+M) P

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S

E. LAIN - LAIN1. Tingkat Suku Bunga i2. Upah Operator / Sopir U13. Upah Pembantu Operator / Pmb.Sopir U2

Page 120: Draft Addendum Cco Ok

4. Bahan Bakar Bensin Mb5. Bahan Bakar Solar Ms6. Minyak Pelumas Mp

Page 121: Draft Addendum Cco Ok

LAMPIRAN URAIAN ANALISA ALAT

KOEF. SATUAN KET.

EXCAVATOR 80-140 HP110.0 HP

0.80 M35.0 Tahun

2,000.0 Jam850,000,000 Rupiah

85,000,000 Rupiah

0.29832 -

114,105.70 Rupiah

850.00 Rupiah

114,955.70 Rupiah

198,000.00 Rupiah

96,250.00 Rupiah

37,188 Rupiah

53,125.00 Rupiah

14,750.00 Rupiah13,500.00 Rupiah

412,812.50 Rupiah

527,768.20 Rupiah

15.00 % / Tahun14,750.00 Rp./Jam13,500.00 Rp./Jam

Page 122: Draft Addendum Cco Ok

12,000.00 Liter15,000.00 Liter35,000.00 Liter

Page 123: Draft Addendum Cco Ok

LAMPIRAN URAIAN ANALISA ALAT

KOEF. SATUAN KET.

TAMPER5.0 HP

17.300 kN4.0 Tahun

1,000.0 Jam17,000,000 Rupiah

1,700,000 Rupiah

0.35027 -

5,359.06 Rupiah

0.00 Rupiah

5,359.06 Rupiah

9,000.00 Rupiah

4,375.00 Rupiah

1,063 Rupiah

2,125.00 Rupiah

14,750.00 Rupiah13,500.00 Rupiah

44,812.50 Rupiah

50,171.56 Rupiah

15.00 % / Tahun14,750.00 Rp./Jam13,500.00 Rp./Jam

Page 124: Draft Addendum Cco Ok

12,000.00 Liter15,000.00 Liter35,000.00 Liter

Page 125: Draft Addendum Cco Ok

Lembar 125

BACK UP DATA PENGUKURAN TIMBUNAN

KEGIATAN : PENINGKATAN SARANA DAN PRASARANA APARATUR

PEKERJAAN :

:

LOKASI : KABUPATEN BENGKALIS

TAHUN ANGGARAN: 2015

NoPanjang Lebar Tinggi Luas Volume

M M M M2 M3

1 1.000 ### 0.700 1.000 0.700

2 1.000 5.700 0.950 5.700 5.415

3 2.100 3.300 0.950 6.930 6.584

4 1.000 5.700 0.950 5.700 5.415

5 1.000 2.100 0.950 2.100 1.995

6 3.300 1.000 0.900 3.300 2.970

7 3.300 5.700 0.980 18.810 18.434

8 3.300 ### 0.850 10.890 9.257

9 3.300 5.700 1.200 18.810 22.572

10 3.300 2.150 1.050 7.095 7.450

11 3.350 0.960 0.900 3.216 2.894

12 3.350 5.700 1.050 19.095 20.050

13 3.350 3.300 0.950 11.055 10.502

14 3.350 5.700 1.100 19.095 21.005

15 3.350 2.150 1.000 7.203 7.203

16 3.420 0.950 0.900 3.249 2.924

17 3.420 5.700 1.050 19.494 20.469

18 3.420 3.300 0.980 11.286 11.060

19 3.420 5.700 0.850 19.494 16.570

20 3.420 2.150 0.850 7.353 6.250

21 3.350 0.950 0.900 3.183 2.864

22 3.350 5.700 0.920 19.095 17.567

23 3.350 3.300 0.950 11.055 10.502

24 3.350 5.700 0.920 19.095 17.567

25 3.350 2.150 0.980 7.203 7.058

26 3.320 1.000 0.900 3.320 2.988

27 3.320 5.700 0.850 18.924 16.085

28 3.320 3.300 0.820 10.956 8.984

SUB TOTAL 293.705 283.334

Diperiksa Oleh : Dibuat Oleh :

KONSULTAN PENGAWAS KONTRAKTOR PELAKSANACV. MULTY DESEKO PT. TIGA PUTRA WIJAYA

LANJUTAN PEMBANGUNAN GEDUNG SEKOLAH TINGGI ILMU EKONOMI (STIE) SYARIAH KAB. BENGKALIS

Kuantitas ( N )

Page 126: Draft Addendum Cco Ok

Lembar 126

ADE DESRY KURNIAWAN, A.Md MUSMULYADIInspector Pelaksana Lapangan

Page 127: Draft Addendum Cco Ok

Lembar 127

BACK UP DATA PENGUKURAN TIMBUNAN

KEGIATAN : PENINGKATAN SARANA DAN PRASARANA APARATUR

PEKERJAAN :

:

LOKASI : KECAMATAN BENGKALIS

TAHUN ANGGARAN: 2015

NoPanjang Lebar Tinggi Luas Volume

M M M M2 M3

29 3.320 5.700 0.800 18.924 15.139

30 3.320 2.150 0.780 7.138 5.568

31 2.130 0.900 0.550 1.917 1.054

32 2.130 5.700 0.580 12.141 7.042

33 2.130 3.300 0.800 7.029 5.623

34 2.130 5.700 0.850 12.141 10.320

35 2.130 3.360 0.670 7.157 4.795

36 3.350 0.900 0.450 3.015 1.357

37 3.350 5.700 0.450 19.095 8.593

38 3.350 3.300 0.450 11.055 4.975

39 3.350 5.700 0.650 19.095 12.412

40 3.350 0.900 0.520 3.015 1.568

41 3.350 2.250 0.600 7.538 4.523

42 3.400 3.300 0.550 11.220 6.171

43 3.400 2.100 0.480 7.140 3.427

44 3.400 3.300 0.480 11.220 5.386

45 3.400 0.900 0.500 3.060 1.530

46 3.400 2.250 0.500 7.650 3.825

47 3.400 3.300 0.520 11.220 5.834

48 3.400 2.250 0.550 7.650 4.208

49 3.400 3.300 0.550 11.220 6.171

50 3.400 0.900 0.500 3.060 1.530

51 3.400 2.250 0.500 7.650 3.825

52 3.400 0.930 0.600 3.162 1.897

53 3.400 5.700 0.550 19.380 10.659

54 3.400 3.300 0.650 11.220 7.293

55 3.400 5.700 0.500 19.380 9.690

56 - -

SUB TOTAL 263.491 154.413

Diperiksa Oleh : Dibuat Oleh :

KONSULTAN PENGAWAS KONTRAKTOR PELAKSANACV. MULTY DESEKO PT. TIGA PUTRA WIJAYA

LANJUTAN PEMBANGUNAN GEDUNG SEKOLAH TINGGI ILMU EKONOMI (STIE) SYARIAH KAB. BENGKALIS

Kuantitas ( N )

Page 128: Draft Addendum Cco Ok

Lembar 128

ADE DESRY KURNIAWAN, A.Md MUSMULYADIInspector Pelaksana Lapangan

Page 129: Draft Addendum Cco Ok

Lembar 129

BACK UP DATA PENGUKURAN TIMBUNAN

KEGIATAN : PENINGKATAN SARANA DAN PRASARANA APARATUR

PEKERJAAN :

:

LOKASI : KECAMATAN BENGKALIS

TAHUN ANGGARAN: 2015

NoPanjang Lebar Tinggi Luas Volume

M M M M2 M3

57 3.400 0.900 0.560 3.060 1.714

58 3.400 2.250 0.550 7.650 4.208

59 2.150 0.900 0.580 1.935 1.122

60 2.150 5.700 0.450 12.255 5.515

61 2.150 3.300 0.450 7.095 3.193

62 2.150 5.700 0.540 12.255 6.618

63 2.150 0.900 0.450 1.935 0.871

64 2.150 2.250 0.450 4.838 2.177

65 3.350 0.950 0.600 3.183 1.910

66 3.350 5.700 0.500 19.095 9.548

67 3.350 3.300 0.500 11.055 5.528

68 3.350 5.700 0.600 19.095 11.457

69 3.350 2.150 0.450 7.203 3.241

70 3.350 0.900 0.750 3.015 2.261

71 3.350 5.700 0.550 19.095 10.502

72 3.350 3.300 0.570 11.055 6.301

73 3.350 5.700 0.600 19.095 11.457

74 3.350 2.150 0.530 7.203 3.817

75 3.400 0.900 0.580 3.060 1.775

76 3.400 5.700 0.550 19.380 10.659

77 3.400 3.300 0.480 11.220 5.386

78 3.400 5.700 0.550 19.380 10.659

79 3.400 2.150 0.450 7.310 3.290

80 3.400 0.950 0.500 3.230 1.615

81 3.400 5.700 0.600 19.380 11.628

82 3.400 3.300 0.600 11.220 6.732

83 3.400 5.700 0.550 19.380 10.659

84 3.400 2.150 0.400 7.310 2.924

SUB TOTAL 290.985 156.764

Diperiksa Oleh : Dibuat Oleh :

KONSULTAN PENGAWAS KONTRAKTOR PELAKSANACV. MULTY DESEKO PT. TIGA PUTRA WIJAYA

LANJUTAN PEMBANGUNAN GEDUNG SEKOLAH TINGGI ILMU EKONOMI (STIE) SYARIAH KAB. BENGKALIS

Kuantitas ( N )

Page 130: Draft Addendum Cco Ok

Lembar 130

ADE DESRY KURNIAWAN, A.Md MUSMULYADIInspector Pelaksana Lapangan

Page 131: Draft Addendum Cco Ok

Lembar 131

BACK UP DATA PENGUKURAN TIMBUNAN

KEGIATAN : PENINGKATAN SARANA DAN PRASARANA APARATUR

PEKERJAAN :

:

LOKASI : KECAMATAN BENGKALIS

TAHUN ANGGARAN: 2015

NoPanjang Lebar Tinggi Luas Volume

M M M M2 M3

85 3.350 0.950 0.450 3.183 1.432

86 3.350 5.700 0.500 19.095 9.548

87 3.350 3.300 0.500 11.055 5.528

88 3.350 5.700 0.450 19.095 8.593

89 3.350 2.150 0.400 7.203 2.881

90 1.000 0.970 0.550 0.970 0.534

91 1.000 5.700 0.450 5.700 2.565

92 2.160 3.300 0.400 7.128 2.851

93 0.980 5.700 0.460 5.586 2.570

94 0.970 2.150 0.450 2.086 0.938

95 6.980 6.950 0.480 48.511 23.285

96 6.980 5.700 0.520 39.786 20.689

SUB TOTAL 169.397 81.413

JUMLAH TOTAL TIMBUNAN ### 675.92

Diperiksa Oleh : Dibuat Oleh :

KONSULTAN PENGAWAS KONTRAKTOR PELAKSANACV. MULTY DESEKO PT. TIGA PUTRA WIJAYA

LANJUTAN PEMBANGUNAN GEDUNG SEKOLAH TINGGI ILMU EKONOMI (STIE) SYARIAH KAB. BENGKALIS

Kuantitas ( N )

Page 132: Draft Addendum Cco Ok

Lembar 132

ADE DESRY KURNIAWAN, A.Md MUSMULYADIInspector Pelaksana Lapangan

Page 133: Draft Addendum Cco Ok

Lembar 133

BACK UP DATA PENGUKURAN TIMBUNAN

PENINGKATAN SARANA DAN PRASARANA APARATUR

Keterangan

KONTRAKTOR PELAKSANAPT. TIGA PUTRA WIJAYA

LANJUTAN PEMBANGUNAN GEDUNG SEKOLAH TINGGI ILMU EKONOMI (STIE) SYARIAH KAB. BENGKALIS

Page 134: Draft Addendum Cco Ok

Lembar 134

MUSMULYADIPelaksana Lapangan

Page 135: Draft Addendum Cco Ok

Lembar 135

BACK UP DATA PENGUKURAN TIMBUNAN

PENINGKATAN SARANA DAN PRASARANA APARATUR

Keterangan

Salah Cat

KONTRAKTOR PELAKSANAPT. TIGA PUTRA WIJAYA

LANJUTAN PEMBANGUNAN GEDUNG SEKOLAH TINGGI ILMU EKONOMI (STIE) SYARIAH KAB. BENGKALIS

Page 136: Draft Addendum Cco Ok

Lembar 136

MUSMULYADIPelaksana Lapangan

Page 137: Draft Addendum Cco Ok

Lembar 137

BACK UP DATA PENGUKURAN TIMBUNAN

PENINGKATAN SARANA DAN PRASARANA APARATUR

Keterangan

KONTRAKTOR PELAKSANAPT. TIGA PUTRA WIJAYA

LANJUTAN PEMBANGUNAN GEDUNG SEKOLAH TINGGI ILMU EKONOMI (STIE) SYARIAH KAB. BENGKALIS

Page 138: Draft Addendum Cco Ok

Lembar 138

MUSMULYADIPelaksana Lapangan

Page 139: Draft Addendum Cco Ok

Lembar 139

BACK UP DATA PENGUKURAN TIMBUNAN

PENINGKATAN SARANA DAN PRASARANA APARATUR

Keterangan

KONTRAKTOR PELAKSANAPT. TIGA PUTRA WIJAYA

LANJUTAN PEMBANGUNAN GEDUNG SEKOLAH TINGGI ILMU EKONOMI (STIE) SYARIAH KAB. BENGKALIS

M3

Page 140: Draft Addendum Cco Ok

Lembar 140

MUSMULYADIPelaksana Lapangan

Page 141: Draft Addendum Cco Ok

BACK UP DATA PENGUKURAN LANTAI KERJA

KEGIATAN : PENINGKATAN SARANA DAN PRASARANA APARATUR

PEKERJAAN :

LOKASI : KABUPATEN BENGKALIS

TAHUN ANGGARAN: 2015

TipePanjang Lebar Tinggi

m m m

4 2.300 0.500 0.250

4 2.600 0.550 0.230

9 2.300 0.550 0.260

9 4.400 0.550 0.210

10 3.200 0.550 0.240

14 2.400 0.550 0.220

15 3.100 0.550 0.230

15 2.800 0.500 0.190

15 2.000 0.550 0.210

18 3.000 0.550 0.230

18 1.400 0.550 0.220

19 4.400 0.550 0.210

23 2.000 0.550 0.230

TOTAL

Diperiksa Oleh : Dibuat Oleh :KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA

LANJUTAN PEMBANGUNAN GEDUNG SEKOLAH TINGGI ILMU EKONOMI (STIE) SYARIAH KAB. BENGKALIS

Kuantitas ( N )

Page 142: Draft Addendum Cco Ok

CV. MULTY DESEKO PT. TIGA PUTRA WIJAYA

ADE DESRY KURNIAWAN, A.Md MUSMULYADIInspector Pelaksana Lapangan

Page 143: Draft Addendum Cco Ok

BACK UP DATA PENGUKURAN LANTAI KERJA

KEGIATAN : PENINGKATAN SARANA DAN PRASARANA APARATUR

PEKERJAAN :

LOKASI : KABUPATEN BENGKALIS

TAHUN ANGGARAN: 2015

LAMPIRAN

Diperiksa Oleh : Dibuat Oleh :KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA

LANJUTAN PEMBANGUNAN GEDUNG SEKOLAH TINGGI ILMU EKONOMI (STIE) SYARIAH KAB. BENGKALIS

Page 144: Draft Addendum Cco Ok

CV. MULTY DESEKO PT. TIGA PUTRA WIJAYA

ADE DESRY KURNIAWAN, A.Md MUSMULYADIInspector Pelaksana Lapangan

Page 145: Draft Addendum Cco Ok

BACK UP DATA PENGUKURAN LANTAI KERJA

PENINGKATAN SARANA DAN PRASARANA APARATUR

Volume

m3

0.288

0.329

0.329

0.508

0.422

0.290

0.392

0.266

0.231

0.380

0.169

0.508

0.253

4.366

Dibuat Oleh :KONTRAKTOR PELAKSANA

LANJUTAN PEMBANGUNAN GEDUNG SEKOLAH TINGGI ILMU EKONOMI (STIE) SYARIAH KAB. BENGKALIS

Page 146: Draft Addendum Cco Ok

PT. TIGA PUTRA WIJAYA

MUSMULYADIPelaksana Lapangan

Page 147: Draft Addendum Cco Ok

BACK UP DATA PENGUKURAN LANTAI KERJA

PENINGKATAN SARANA DAN PRASARANA APARATUR

LAMPIRAN

Dibuat Oleh :KONTRAKTOR PELAKSANA

LANJUTAN PEMBANGUNAN GEDUNG SEKOLAH TINGGI ILMU EKONOMI (STIE) SYARIAH KAB. BENGKALIS

Page 148: Draft Addendum Cco Ok

PT. TIGA PUTRA WIJAYA

MUSMULYADIPelaksana Lapangan

Page 149: Draft Addendum Cco Ok

BACK UP DATA HITUNGAN PEKERJAAN SLOOF

KEGIATAN : PENINGKATAN SARANA DAN PRASARANA APARATUR

PEKERJAAN :

LOKASI : KABUPATEN BENGKALIS

TAHUN ANGGARAN : 2015

Panjang Lebar Tinggi Volume

M M M M3

1S2 ( 25 x 40 ) Detail C 3.350 0.250 0.400 2.000 0.670

1S2 ( 25 x 40 ) Detail C 2.100 0.250 0.400 2.000 0.420

Jumlah Total Volume 1.090

1S3 ( 20 x 30 ) Detail A 3.350 0.200 0.300 3.000 0.603

1S3 ( 20 x 30 ) Detail A 3.975 0.200 0.300 2.000 0.477

1S3 ( 20 x 30 ) Detail B 2.150 0.200 0.300 1.000 0.129

1S3 ( 20 x 30 ) Detail C 1.270 0.200 0.300 4.000 0.305

1S3 ( 20 x 30 ) Detail C 3.320 0.200 0.300 2.000 0.398

1S3 ( 20 x 30 ) Detail C 2.190 0.200 0.300 2.000 0.263

1S3 ( 20 x 30 ) Detail C 4.060 0.200 0.300 2.000 0.487

1S3 ( 20 x 30 ) Detail C 1.340 0.200 0.300 2.000 0.161

1S3 ( 20 x 30 ) Detail C 1.410 0.200 0.300 2.000 0.169

1S3 ( 20 x 30 ) Detail C 5.750 0.200 0.300 2.000 0.690

1S3 ( 20 x 30 ) Detail D 3.350 0.200 0.300 1.000 0.201

1S3 ( 20 x 30 ) Detail E 3.350 0.200 0.300 2.000 0.402

Jumlah Total Volume 4.285

1S4 ( 15 x 20 ) Detail A 1.580 0.150 0.200 4.000 0.190

1S4 ( 15 x 20 ) Detail B 3.350 0.150 0.200 4.000 0.402

1S4 ( 15 x 20 ) Detail B 2.250 0.150 0.200 2.000 0.135

1S4 ( 15 x 20 ) Detail B 0.400 0.150 0.200 2.000 0.024

1S4 ( 15 x 20 ) Detail D 6.440 0.150 0.200 1.000 0.193

1S4 ( 15 x 20 ) Detail D 1.750 0.150 0.200 1.000 0.053

1S4 ( 15 x 20 ) Detail E 1.580 0.150 0.200 1.000 0.047

1S4 ( 15 x 20 ) Detail E 3.980 0.150 0.200 1.000 0.119

1S4 ( 15 x 20 ) Detail F 2.150 0.150 0.200 1.000 0.065

1S4 ( 15 x 20 ) Detail G 2.580 0.150 0.200 1.000 0.077

Jumlah Total Volume 1.305

Diperiksa Oleh : Dibuat Oleh :KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA

CV. MULTY DESEKO PT. TIGA PUTRA WIJAYA

ADE DESRY KURNIAWAN, A.Md MUSMULYADIInspector Pelaksana Lapangan

LANJUTAN PEMBANGUNAN GEDUNG SEKOLAH TINGGI ILMU EKONOMI (STIE) SYARIAH KAB. BENGKALIS

Tipe Balok Sloof

Posisi Digambar

Kuantitas

( N )

Page 150: Draft Addendum Cco Ok

PEMERINTAH KABUPATEN BENGKALISDINAS PEKERJAAN UMUM

Jalan Pertanian No. Telp. (0766) 80010002 Fax. (0766) 80010002

BENGKALIS

KEGIATAN

PENINGKATAN SARANA DAN PRASARANA APARATUR

LAPORAN HARIANPELAKSANAAN PEKERJAAN

PEKERJAAN :

NOMOR KONTRAK : 05 - NK/SP/KPA/PU-CK/VIII/2015

TANGGAL : 08 JULI 2015

ADDENDUM I : -

TANGGAL : -

LOKASI : KABUPATEN BENGKALIS

NILAI KONTRAK : Rp. 2,924,943,000.00

PELAKSANA : PT. TIGA PUTRA WIJAYA

KONSULTAN PENGAWAS : CV. MULTY DESEKO

LANJUTAN PEMBANGUNAN GEDUNG SEKOLAH TINGGI ILMU EKONOMI (STIE) SYARIAH KAB. BENGKALIS

Page 151: Draft Addendum Cco Ok

LAPORAN HARIAN PEKERJAAN PEMERINTAH KABUPATEN BENGKALISDINAS PEKERJAAN UMUM

KEGIATAN : PENINGKATAN SARANA DAN PRASARANA APARATU

PEKERJAAN : KONTRAKTOR PELAKSANA

PT. TIGA PUTRA WIJAYAKONTRAK : 05 - NK/SP/KPA/PU-CK/VIII/2015

TANGGAL : 08 JULI 2015 KONSULTAN PENGAWAS

LOKASI : KABUPATEN BENGKALISCV. MULTY DESEKO

T. A. : 2015

JANGKA WAKTU

WAKTU PELAKSANAA 150 Hari : Mulai Tanggal : 08 Juli 2015

MENURUT KONTRAK Hari Kalender Tanggal : September 20 Sampai dengan Tanggal:

A. CUACA

WAKTU

J A M

KETERANGAN7.00 9.00 11.00 1.00 3.00 5.00

8.00 10.00 12.00 2.00 4.00 6.00

S I A N G B = BAIK

M A L A M H = HUJAN

B. TENAGA KERJA C. BAHAN - BAHAN YANG DIMASUKKAN

NO. URAIAN JUMLAH NO. JENIS BAHAN VOLUME

1 Pelaksana Lapangan Org 1

2 Adm Lapangan Org 2

3 Kep. Kerja / Mandor Org 3

4 Kepala Tukang Org 4

5 Tukang Batu Org 5

6 Tukang Besi Org 6

7 Tukang Kayu Org 7

8 Pekerja Org 8

9 Keamanan Org 9

10

T O T A L Org 11

D. PEKERJAAN YANG DILAKSANAKAN

NO. URAIAN PEKERJAAN VOLUME KETERANGAN

1.

2.

3.

4.

5.

6.

Bengkalis, September 20Diperiksa Oleh : Dibuat oleh :

KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA CV. MULTY DESEKO PT. TIGA PUTRA WIJAYA

ADE DESRY KURNIAWAN, A.Md MUSMULYADIInspector Pelaksana Lapangan

LANJUTAN PEMBANGUNAN GEDUNG SEKOLAH TINGGI ILMU EKONOMI (STIE) SYARIAH KAB. BENGKALIS

04 Desember 2015