  • KEGIATAN : PEMBANGUNAN PUSAT KEGIATAN P2KPB LOKASI PROYEK : KABUPATEN WAJOTAHUN ANGGARAN : 2014

    JUMLAH JUMLAHHARGA HARGA CCO HARGA TAMBAH HARGA KURANG

    A PEKERJAAN PERSIAPAN 45.721.670,20 58.221.670,20 16.000.000,00 3.500.000,00

    B PEKERJAAN LAND CLEARING - 137.366.771,52 137.366.771,52 -

    C BANGUNAN KIOS UTAMA A 1.066.924.140,69 1.076.802.689,75 68.928.317,47 59.049.768,41

    D BANGUNAN LOS KERING B 403.675.144,35 328.828.986,69 59.845.784,00 134.691.941,66

    E BANGUNAN LOS BASAH C 403.695.141,29 315.082.036,90 48.600.000,00 137.213.104,39

    F BANGUNAN KANTOR DESA 662.267.472,78 726.751.877,56 213.089.126,65 148.604.721,87

    G BANGUNAN SERBAGUNA 661.553.845,44 690.914.708,38 187.231.603,95 157.870.741,01

    H JALAN LINGKUNGAN 508.986.185,10 597.733.861,75 257.318.442,33 168.570.765,68

    I PEMBANGUNAN RTH 112.162.243,58 18.124.606,48 - 94.037.637,10

    J PEMBANGUNAN TOWER AIR 67.835.209,32 45.335.209,32 - 22.500.000,00

    K PEMBANGUNAN TUGU P2KBP 12.290.953,81 12.290.953,81 - -

    L PEMBANGUNAN PANGKALAN ANGKUTAN UMUM 175.578.887,30 150.516.387,76 144.948.492,66 170.010.992,20

    M PEMBANGUNAN POS JAGA. 43.783.280,59 43.783.280,59 - -

    N PEMBANGUNAN PAGAR KELILING 141.669.452,96 79.415.403,73 7.346.285,68 69.600.334,91

    O PEKERJAAN DUIKER - 24.975.182,98 24.975.182,98 -

    TOTAL 4.306.143.627 4.306.143.627 1.165.650.007 1.165.650.007 PPn 10% 430.614.363 430.614.363 TOTAL JUMLAH 4.736.757.990 4.736.757.990 DIBULATKAN 4.736.757.990 4.736.757.990

    Diperiksa Diperiksa Dibuat Oleh :

    Tim Teknis P2KPB Daerah Konsultan Pengawas Kontraktor Pelaksana

    Kab. Wajo P2KPB Kab. Wajo PT. RELIS SAPINDO UTAMA

    A. Said Guminta, ST Imam Permana, ST H. RUSLI PATRA

    NIP : 19790522 201001 1 007 Pengawas Lapangan Direktur

    Diperiksa Diperiksa Disetujui

    Anggota Tim Teknis P2KPB Ketua Tim Teknis P2KPB Pejabat Pembuat Komitmen

    Satker Pembinaan Penataan Satker Pembinaan Penataan (PPK) P2KPB

    Ruang Daerah Wilayah II Ruang Daerah Wilayah II

    Pandhu Wiyoso Ardono, ST, M.Eng Detty Theresia Putung, ST, MT Ir. Daldaria Hanoem, MSC

    NIP : 19810401 200604 1 003 NIP : 19671211 199103 2 014 NIP : 19581126 199103 2 001

    REKAPITULASI

    NO. Uraian Pekerjaan

    CONTRACT CHANGE ORDER (CCO)

    CCOKET

  • TGL KONTRAK : 28 April 2014No. KONTRAK : HK.02.03/PPRDW-II/2014/22

    VOL PEK TAMBAH VOL PEK KURANG

    A PEKERJAAN PERSIAPAN1 Pekerjaan Pembersihan Ls 1,00 3.500.000,00 3.500.000,00 Ls 1,00 3.500.000,00 3.500.000,00 - - - -

    2 Pasang Bouwplank dan Pengukuran Ls 1,00 3.500.000,00 3.500.000,00 Ls 1,00 3.500.000,00 3.500.000,00 - - - -

    3 Pembuatan Pagar Sementara dari Seng Asbes Gelombang Ls 1,00 3.500.000,00 3.500.000,00 Ls - 3.500.000,00 - - - 1,00 3.500.000,00

    4 Penentuan titik Acuan ( bencmarck) Ls 1,00 3.500.000,00 3.500.000,00 Ls 1,00 3.500.000,00 3.500.000,00 - - - -

    5 Pembuatan direksikit Ls 1,00 8.850.000,00 8.850.000,00 Ls 1,00 8.850.000,00 8.850.000,00 - - - -

    6 Pasang Papan Nama Kegiatan bh 1,00 371.670,20 371.670,20 Bh 1,00 371.670,20 371.670,20 - - - -

    7 Administrasi dan Dokumentasi Ls 1,00 5.000.000,00 5.000.000,00 Ls 1,00 5.000.000,00 5.000.000,00 - - - -

    8 Penyediaan air kerja dan Listrik Ls 5,00 3.500.000,00 17.500.000,00 Ls 5,00 3.500.000,00 17.500.000,00 - - - -

    9 Pengadaan Tiang Listrik Ls 2,00 6.500.000,00 13.000.000,00 2,00 13.000.000,00 - -

    10 Kabel LVTC m' 100,00 30.000,00 3.000.000,00 100,00 3.000.000,00 - -

    B PEKERJAAN LAND CLEARING1 Pekerjaan land clearing (Pembersihan/Penebangan)

    1,1 Pembabatan / Penebasan Semak Belukar m2 - - - m2 10.000,00 1.822,94 18.229.414,50 10.000,00 18.229.414,50 - -

    Penebangan / Penumbangan Pohon-pohonan

    Pemotongan / Perencekan dan Pengumpulan cabang, ranting

    2 Pekerjaan Tanah (cut and fill)

    2,1 Galian Biasa m3 - - - m3 2.649,75 27.019,51 71.594.985,43 2.649,75 71.594.985,43 - -

    2,2 Timbunan Biasa Sumber Bahan Hasil Galian Setempat m3 - - - m3 2.119,80 22.427,75 47.542.371,60 2.119,80 47.542.371,60 - -

    C PEMBANGUNAN KIOS UTAMA AI PEKERJAAN TANAH

    1,1 Urugan Tanah Timbunan m3 285,60 87.571,00 25.010.277,60 m3 285,60 87.571,00 25.010.277,60 - - - -

    1,2 Pemadatan Tanah Timbunan m3 285,60 32.065,00 9.157.764,00 m3 285,60 32.065,00 9.157.764,00 - - - -

    2 Pekerjaan Struktur

    II PEKERJAAN STRUKTUR

    2,1 Pondasi Batu Gunung

    - Galian tanah Pondasi m3 210,06 44.357,50 9.317.736,45 m3 210,06 44.357,50 9.317.736,45 - - - -

    - Pas. Batu Kosong m3 37,34 478.327,74 17.862.671,12 m3 37,34 478.327,74 17.862.671,12 - - - -

    - Urugan Pasir bawah Pondasi m3 18,67 117.007,00 2.184.754,70 m3 18,67 117.007,00 2.184.754,70 - - - -

    - Pas. Batu Gunung m3 85,77 815.259,28 69.928.457,11 m3 85,77 815.259,28 69.928.457,11 - - - -

    2,2 Rollag

    - Galian tanah Pondasi m3 17,55 44.357,50 778.474,13 m3 17,55 44.357,50 778.474,13 - - - -

    - Urugan Pasir bawah Pondasi m3 7,02 117.007,00 821.389,14 m3 7,02 117.007,00 821.389,14 - - - -

    - Pas. Bata merah 1/2 batu m2 161,46 108.115,04 17.456.254,36 m2 161,46 108.115,04 17.456.254,36 - - - -

    2,3 Sloef S1 Beton Ukuran 15x20 cm

    - Bekisting m2 93,36 64.822,27 6.051.807,13 m2 93,36 64.822,27 6.051.807,13 - - - -

    - Pembesian Polos kg 1374,14 12.579,27 17.285.709,53 kg 1374,14 12.579,27 17.285.709,53 - - - -

    - Cor Beton K225 m3 7,00 1.052.317,49 7.368.327,06 m3 7,00 1.052.317,49 7.368.327,06 - - - - 2,4 Kolom K1 Ukuran 15x30cm

    KONSULTAN PENGAWAS

    PEMBANGUNAN PUSAT KEGIATAN P2KPB APBN TAHUN ANGGARAN 2014

    KECAMATAN GILIRENG KAB. WAJO PROVINSI SULAWESI SELATAN

    KONTRAKTOR PELAKSANA

    IMAM PERMANA, ST PT. RELIS SAPINDO UTAMA

    TGL. KONTRAK : -NO. KONTRAK : -

    CONTRACT CHANGE ORDER (CCO)

    NO. URAIAN PEKERJAAN SATUAN

    Original Contract Contract Change OrderPERKIRAA

    N

    VOLUME

    HARGA SATUAN

    (Rp)

    TOTAL HARGA

    (Rp)

    PEK. KURANGPERKIRAAN

    VOLUME

    HARGA SATUAN

    (Rp)

    TOTAL HARGA

    (Rp)

    SATUAN

    SELISIH

    PEK. TAMBAH

    #- 1 -#

  • TGL KONTRAK : 28 April 2014No. KONTRAK : HK.02.03/PPRDW-II/2014/22

    VOL PEK TAMBAH VOL PEK KURANG

    KONSULTAN PENGAWAS

    PEMBANGUNAN PUSAT KEGIATAN P2KPB APBN TAHUN ANGGARAN 2014

    KECAMATAN GILIRENG KAB. WAJO PROVINSI SULAWESI SELATAN

    KONTRAKTOR PELAKSANA

    IMAM PERMANA, ST PT. RELIS SAPINDO UTAMA

    TGL. KONTRAK : -NO. KONTRAK : -

    CONTRACT CHANGE ORDER (CCO)

    NO. URAIAN PEKERJAAN SATUAN

    Original Contract Contract Change OrderPERKIRAA

    N

    VOLUME

    HARGA SATUAN

    (Rp)

    TOTAL HARGA

    (Rp)

    PEK. KURANGPERKIRAAN

    VOLUME

    HARGA SATUAN

    (Rp)

    TOTAL HARGA

    (Rp)

    SATUAN

    SELISIH

    PEK. TAMBAH

    - Bekisting m2 216,00 125.465,63 27.100.576,08 m2 216,00 125.465,63 27.100.576,08 - - - -

    - Pembesian Kg 1695,60 12.579,27 21.329.410,21 Kg 1695,60 12.579,27 21.329.410,21 - - - -

    - Cor Beton m3 8,64 1.052.317,49 9.092.023,11 m3 8,64 1.052.317,49 9.092.023,11 - - - -

    - Kolom Praktis Ukuran 11x11 Cm K225 m 160,00 75.250,34 12.040.054,40 m 160,00 75.250,34 12.040.054,40 - - - -

    2,5 Balok B1 Ukuran 15x35 Cm

    - Bekisting m2 41,48 128.820,63 5.343.479,73 m2 41,48 128.820,63 5.343.479,73 - - - -

    - Pembesian Kg 251,40 12.579,27 3.162.381,31 Kg 251,40 12.579,27 3.162.381,31 - - - -

    - Cor Beton m3 1,28 1.052.317,49 1.348.018,70 m3 1,28 1.052.317,49 1.348.018,70 - - - -

    2,6 Balok Type BL ukuran 15x20 cm

    - Bekisting m2 33,00 128.820,63 4.251.080,79 m2 33,00 128.820,63 4.251.080,79 - - - -

    - Pembesian Polos Kg 706,50 12.579,27 8.887.254,26 Kg 706,50 12.579,27 8.887.254,26 - - - -

    - Cor Beton K225 m3 3,60 1.052.317,49 3.788.342,96 m3 3,60 1.052.317,49 3.788.342,96 - - - -

    2,7 Balok Type RB

    - Bekisting m2 198,39 128.820,63 25.556.724,79 m2 198,39 128.820,63 25.556.724,79 - - - -

    - Pembesian Polos Kg 2404,75 12.579,27 30.249.991,67 Kg 2404,75 12.579,27 30.249.991,67 - - - -

    - Cor Beton K225 m3 12,25 865.252,91 10.602.376,53 m3 12,25 865.252,91 10.602.376,53 - - - -

    2,8 Atap

    - Rangka dan Penutup atap genteng metal m2 537,60 291.804,45 156.874.072,32 m2 578,00 291.804,45 168.662.972,10 40,40 11.788.899,78 - -

    - Bubungan genteng metal m 88,00 148.126,00 13.035.088,00 m 62,00 148.126,00 9.183.812,00 - - 26,00 3.851.276,00

    - Lisplank Woodplank 2 x 20 m 144,80 56.116,50 8.125.669,20 m 144,80 56.116,50 8.125.669,20 - - - -

    III PEKERJAAN FINISHING ARSITEKTUR

    3,1 Pekerjaan Lantai

    - Penimbunan pasir bawah lantai t =7 cm m3 37,04 174.432,50 6.461.677,53 m3 37,04 174.432,50 6.461.677,53 - - - -

    - Rabat Beton alas lantai t = 5 cm m3 26,46 865.252,91 22.894.592,00 m3 26,46 865.252,91 22.894.592,00 - - - -

    - Lantai Keramik Warna 40x40 m2 509,10 168.183,15 85.622.041,67 m2 430,00 168.183,15 72.318.754,50 - - 79,10 13.303.287,17

    - Lantai Keramik Warna 20x20 WC/KM m2 7,50 181.240,22 1.359.301,65 m2 7,50 181.240,22 1.359.301,65 - - - -

    3,2 Pekerjaan dinding bangunan

    - Pas. Bata merah 1/2 batu m2 460,00 104.855,19 48.233.387,40 m2 460,00 104.855,19 48.233.387,40 - - - -

    - Plesteran camp. 1 : 4 m2 920,00 41.381,23 38.070.731,60 m2 920,00 41.381,23 38.070.731,60 - - - -

    - Acian dinding m2 920,00 23.663,70 21.770.604,00 m2 920,00 23.663,70 21.770.604,00 - - - -

    - Keramik Dinding KM/WC 20x20 m2 19,00 199.864,26 3.797.420,94 m2 24,00 199.864,26 4.796.742,24 5,00 999.321,30 - -

    3,3 Pekerjaan Plafond

    - Rangka Plafond Besi Hollow + Plafond gypsumboard 9mm m2 516,60 39.492,20 20.401.670,52 m2 413,00 157.734,50 65.144.348,50 103,60 44.742.677,98 103,60 -

    - List Gypsum m 434,40 27.119,40 11.780.667,36 m 434,40 27.119,40 11.780.667,36 - - - -

    3,4 Pekerjaan Kusen Pintu + Pintu panil + Jendela

    - Pintu almunium rolling door kios m2 187,00 529.540,00 99.023.980,00 m2 187,00 529.540,00 99.023.980,00 - - - -

    3,5 Pintu Panil type P1- Pekerjaan Kosen Pintu m3 0,05 5.782.755,00 293.185,68 m3 0,15 5.782.755,00 867.413,25 0,10 574.227,57 - -

    #- 2 -#

  • TGL KONTRAK : 28 April 2014No. KONTRAK : HK.02.03/PPRDW-II/2014/22

    VOL PEK TAMBAH VOL PEK KURANG

    KONSULTAN PENGAWAS

    PEMBANGUNAN PUSAT KEGIATAN P2KPB APBN TAHUN ANGGARAN 2014

    KECAMATAN GILIRENG KAB. WAJO PROVINSI SULAWESI SELATAN

    KONTRAKTOR PELAKSANA

    IMAM PERMANA, ST PT. RELIS SAPINDO UTAMA

    TGL. KONTRAK : -NO. KONTRAK : -

    CONTRACT CHANGE ORDER (CCO)

    NO. URAIAN PEKERJAAN SATUAN

    Original Contract Contract Change OrderPERKIRAA

    N

    VOLUME

    HARGA SATUAN

    (Rp)

    TOTAL HARGA

    (Rp)

    PEK. KURANGPERKIRAAN

    VOLUME

    HARGA SATUAN

    (Rp)

    TOTAL HARGA

    (Rp)

    SATUAN

    SELISIH

    PEK. TAMBAH

    - Pekerjaan Daun Pintu m2 2,06 438.460,00 904.542,98 m2 5,67 438.460,00 2.486.068,20 3,61 1.581.525,22 - -

    - Pekerjaan Kaca m2 0,10 166.566,40 16.156,94 m2 0,27 166.566,40 45.639,19 0,18 29.482,25 - -

    - Engsel Pintu Bh 3,00 22.379,50 67.138,50 Bh 9,00 22.379,50 201.415,50 6,00 134.277,00 - -

    - Engsel Jendela Bh 2,00 20.515,00 41.030,00 Bh 6,00 20.515,00 123.090,00 4,00 82.060,00 - -

    - Kunci Pintu Bh 1,00 142.175,00 142.175,00 Bh 3,00 142.175,00 426.525,00 2,00 284.350,00 - -

    - Kait Angin Bh 2,00 15.565,00 31.130,00 Bh 6,00 15.565,00 93.390,00 4,00 62.260,00 - -

    - Grendel Jendela Bh 1,00 21.615,00 21.615,00 Bh 3,00 21.615,00 64.845,00 2,00 43.230,00 - -

    3,6 Pintu Panil type Wc/KM

    - Pekerjaan Kosen Pintu m3 0,19 5.782.755,00 1.092.940,70 m3 0,18 5.782.755,00 1.061.713,82 - - 0,01 31.226,88

    - Pekerjaan Daun Pintu m2 5,94 438.460,00 2.604.452,40 m2 4,73 438.460,00 2.071.723,50 - - 1,22 532.728,90

    - Pekerjaan Kaca m2 0,30 166.566,40 49.969,92 m2 0,37 166.566,40 60.963,30 0,07 10.993,38 - -

    - Engsel Pintu Bh 12,00 22.379,50 268.554,00 Bh 12,00 22.379,50 268.554,00 - - - -

    - Engsel Jendela Bh 8,00 20.515,00 164.120,00 Bh 8,00 20.515,00 164.120,00 - - - -

    - Kunci Pintu Bh 4,00 142.175,00 568.700,00 Bh 4,00 142.175,00 568.700,00 - - - -

    - Kait Angin Bh 8,00 15.565,00 124.520,00 Bh 8,00 15.565,00 124.520,00 - - - -

    - Grendel Jendela Bh 4,00 21.615,00 86.460,00 Bh 4,00 21.615,00 86.460,00 - - - -

    3,7 Jendela

    - Pekerjaan Kosen Jendela m3 0,07 5.782.755,00 403.347,16 m3 0,21 5.782.755,00 1.214.378,55 0,14 811.031,39 - -

    - Pekerjaan Daun Jendela m2 0,62 319.044,00 196.531,10 m2 4,02 319.044,00 1.281.599,75 3,40 1.085.068,64 - -

    - Pekerjaan Kaca m2 1,57 166.566,40 261.176,12 m2 4,02 166.566,40 669.097,23 2,45 407.921,11 - -

    - Engsel Jendela Bh 6,00 20.515,00 123.090,00 Bh 6,00 20.515,00 123.090,00 - - - -

    - Kait Angin Bh 4,00 15.565,00 62.260,00 Bh 3,00 15.565,00 46.695,00 - - 1,00 15.565,00

    - Grendel Jendela Bh 2,00 21.615,00 43.230,00 Bh 3,00 21.615,00 64.845,00 1,00 21.615,00 - -

    3,8 Ventilasi WC/KM

    - Pekerjaan Kosen Ventilasi m3 0,00 5.782.755,00 23.940,61 m3 0,04 5.782.755,00 231.310,20 0,04 207.369,59 - -

    - Pekerjaan Daun Jendela m2 0,30 319.044,00 96.989,38 m2 0,49 319.044,00 156.331,56 0,19 59.342,18 - -

    - Pekerjaan Kaca m2 0,19 166.566,40 30.981,35 m2 0,20 166.566,40 33.646,41 0,02 2.665,06 - -

    3,9 Pengecatan

    - Cat Tembok Setara Metrolite m2 920,00 21.388,40 19.677.328,00 m2 920,00 21.388,40 19.677.328,00 - - - -

    - Cat Plafond Setara Metrolite m2 951,00 21.388,40 20.340.368,40 m2 951,00 21.388,40 20.340.368,40 - - - -

    - Cat Kayu Setara Avian m2 400,41 93.757,40 37.541.497,14 m2 400,41 93.757,40 37.541.497,14 - - - -

    4 Pekerjaan Mekanikal Elektrikal & Plumbing

    4,1 Instalasi Listrik

    - Panel MCB Unit 12,00 432.709,94 5.192.519,28 Unit 12,00 432.709,94 5.192.519,28 - - - -

    - Panel Box Unit 12,00 84.078,85 1.008.946,20 Unit 12,00 84.078,85 1.008.946,20 - - - -

    - Daya KWH (Meter) Unit 12,00 750.000,00 9.000.000,00 Unit 2,00 3.500.000,00 7.000.000,00 - - 10,00 2.000.000,00

    - 1 Set Arde Ls 0,00 - - ls 1,00 1.000.000,00 1.000.000,00 1,00 1.000.000,00 - - 4,2 Instalasi Air Bersih

    #- 3 -#

  • TGL KONTRAK : 28 April 2014No. KONTRAK : HK.02.03/PPRDW-II/2014/22

    VOL PEK TAMBAH VOL PEK KURANG

    KONSULTAN PENGAWAS

    PEMBANGUNAN PUSAT KEGIATAN P2KPB APBN TAHUN ANGGARAN 2014

    KECAMATAN GILIRENG KAB. WAJO PROVINSI SULAWESI SELATAN

    KONTRAKTOR PELAKSANA

    IMAM PERMANA, ST PT. RELIS SAPINDO UTAMA

    TGL. KONTRAK : -NO. KONTRAK : -

    CONTRACT CHANGE ORDER (CCO)

    NO. URAIAN PEKERJAAN SATUAN

    Original Contract Contract Change OrderPERKIRAA

    N

    VOLUME

    HARGA SATUAN

    (Rp)

    TOTAL HARGA

    (Rp)

    PEK. KURANGPERKIRAAN

    VOLUME

    HARGA SATUAN

    (Rp)

    TOTAL HARGA

    (Rp)

    SATUAN

    SELISIH

    PEK. TAMBAH

    - Pipa PVC Dia 3/4" m 21,33 24.398,00 520.371,60 m 21,33 24.398,00 520.371,60 - - - -

    4,3 Instalasi Air Kotor

    - Pipa PVC Dia 3" m 6,91 28.853,00 199.375,90 m 6,91 28.853,00 199.375,90 - - - -

    - Pipa PVC Dia 3" Disposal Padat m 14,52 28.853,00 418.923,40 m 14,52 28.853,00 418.923,40 - - - -

    - Septictank Unit 0,00 7.467.840,66 - Unit 1,00 5.000.000,00 5.000.000,00 1,00 5.000.000,00 - -

    5 Pekerjaan Perlengkapan

    5,1 Aksesoris listrik, pintu dan jendela

    - Titik Instalasi Listrik Ruangan bh 90,00 247.500,00 22.275.000,00 Bh 27,00 247.500,00 6.682.500,00 - - 63,00 15.592.500,00

    - Lampu SL 20 watt bh 30,00 58.657,85 1.759.735,50 Bh 13,00 58.657,85 762.552,05 - - 17,00 997.183,45

    - Lampu SL 15 Watt bh 30,00 58.657,85 1.759.735,50 Bh 14,00 58.657,85 821.209,90 - - 16,00 938.525,60

    - Stop kontak 16 Amp. bh 30,00 20.091,39 602.741,70 Bh 12,00 20.091,39 241.096,68 - - 18,00 361.645,02

    - Saklar Tunggal bh 16,00 18.687,97 299.007,52 Bh 16,00 18.687,97 299.007,52 - - - -

    - Saklar Ganda bh 16,00 23.004,96 368.079,36 Bh 0,00 23.004,96 - - - 16,00 368.079,36

    - Signage Tulisan dan Logo Kabupaten ls 1,00 2.500.000,00 2.500.000,00 ls 1,00 2.500.000,00 2.500.000,00 - - - -

    5,2 Sanitary

    - Kran Air Bh 16,00 67.325,50 1.077.208,00 Bh 6,00 67.325,50 403.953,00 - - 10,00 673.255,00

    - Floor Drain Bh 10,00 67.325,50 673.255,00 Bh 4,00 67.325,50 269.302,00 - - 6,00 403.953,00

    - Kloset Jongkok Bh 8,00 572.932,36 4.583.458,88 Bh 4,00 572.932,36 2.291.729,44 - - 4,00 2.291.729,44

    6 Pekerjaan Saluran Pembuang

    6,1 Galian tanah m3 33,50 44.357,50 1.485.754,46 m3 33,50 44.357,50 1.485.754,46 - - - -

    6,2 Pasir alas t = 7 cm m3 2,68 117.007,00 313.531,96 m3 2,68 117.007,00 313.531,96 - - - -

    6,3 Pas. Bata merah 1/2 batu m2 66,99 117.007,00 7.838.298,93 m2 66,99 117.007,00 7.838.298,93 - - - -

    6,4 Plesteran Camp. 1 : 4 m2 66,99 41.381,23 2.772.128,60 m2 66,99 41.381,23 2.772.128,60 - - - -

    6,5 Acian dinding saluran m2 66,99 23.663,70 1.585.231,26 m2 66,99 23.663,70 1.585.231,26 - - - -

    6,6 Plesteran dinding pondasi Camp. 1 : 4 m2 186,00 41.381,23 7.696.908,78 m2 186,00 41.381,23 7.696.908,78 - - - -

    6,7 Acian dinding Pondasi m2 186,00 23.663,70 4.401.448,20 m2 186,00 23.663,70 4.401.448,20 - - - -

    6,8 Plat Rabat dan Rabat Beton m3 2,54 865.252,91 2.199.995,63 m3 2,54 865.252,91 2.199.995,63 - - - -

    7 Pekerjaan Perkerasan Paving

    7,1 Pemasangan Paving Blok m2 120,00 104.931,75 12.591.810,00 m2 - 104.931,75 - - - 120,00 12.591.810,00

    7,2 Pas. Batu Bata m2 30,00 104.855,19 3.145.655,70 m2 - 104.855,19 - - - 30,00 3.145.655,70

    7,3 Plesteran m2 30,00 41.381,23 1.241.436,90 m2 - 41.381,23 - - - 30,00 1.241.436,90

    7,4 Acian Kansteen m2 30,00 23.663,70 709.911,00 m2 - 23.663,70 - - - 30,00 709.911,00

    D PEMBANGUNAN LOS KERING B1 Pekerjaan Tanah

    1,1 Urugan Tanah Timbunan m3 156,00 87.571,00 13.661.076,00 m3 250,00 87.571,00 21.892.750,00 94,00 8.231.674,00 - -

    1,2 Pemadatan Tanah Timbunan m3 156,00 32.065,00 5.002.140,00 m3 250,00 32.065,00 8.016.250,00 94,00 3.014.110,00 - - 2 Pekerjaan Struktur

    #- 4 -#

  • TGL KONTRAK : 28 April 2014No. KONTRAK : HK.02.03/PPRDW-II/2014/22

    VOL PEK TAMBAH VOL PEK KURANG

    KONSULTAN PENGAWAS

    PEMBANGUNAN PUSAT KEGIATAN P2KPB APBN TAHUN ANGGARAN 2014

    KECAMATAN GILIRENG KAB. WAJO PROVINSI SULAWESI SELATAN

    KONTRAKTOR PELAKSANA

    IMAM PERMANA, ST PT. RELIS SAPINDO UTAMA

    TGL. KONTRAK : -NO. KONTRAK : -

    CONTRACT CHANGE ORDER (CCO)

    NO. URAIAN PEKERJAAN SATUAN

    Original Contract Contract Change OrderPERKIRAA

    N

    VOLUME

    HARGA SATUAN

    (Rp)

    TOTAL HARGA

    (Rp)

    PEK. KURANGPERKIRAAN

    VOLUME

    HARGA SATUAN

    (Rp)

    TOTAL HARGA

    (Rp)

    SATUAN

    SELISIH

    PEK. TAMBAH

    2,1 Pondasi Poer type P1 (1,0x1,0x0,30 m)

    - Galian Tanah Pondasi Manual m3 22,50 44.357,50 998.043,75 m3 22,50 44.357,50 998.043,75 - - - -

    - Pasir Alas t = 7 cm m3 1,58 117.007,00 184.286,03 m3 1,58 117.007,00 184.286,03 - - - -

    - Lantai Kerja K 100 m3 0,68 865.252,91 584.045,71 m3 0,68 865.252,91 584.045,71 - - - -

    - Bekisting m2 12,00 59.780,60 717.367,20 m2 12,00 59.780,60 717.367,20 - - - -

    - Pembesian Ulir Kg 706,50 13.734,27 9.703.261,76 Kg 706,50 13.734,27 9.703.261,76 - - - -

    - Cor Beton K225 m3 3,00 1.052.317,49 3.156.952,47 m3 3,00 1.052.317,49 3.156.952,47 - - - -

    2,2 Sloef Beton S1 Ukuran 20x40 cm

    - Bekisting m2 72,60 64.822,27 4.706.096,80 m2 72,60 64.822,27 4.706.096,80 - - - -

    - Pembesian Ulir Kg 1139,82 13.734,27 15.654.595,63 Kg 1139,82 13.734,27 15.654.595,63 - - - -

    - Cor Beton K225 m3 7,26 1.052.317,49 7.639.824,98 m3 7,26 1.052.317,49 7.639.824,98 - - - -

    2,3 Kolom K1 ukuran 30x30 cm

    - Bekisting m2 30,00 125.465,63 3.763.968,90 m2 30,00 125.465,63 3.763.968,90 - - - -

    - Pembesian Ulir Kg 353,25 13.734,27 4.851.630,88 Kg 353,25 13.734,27 4.851.630,88 - - - -

    - Cor Beton K225 m3 2,25 1.052.317,49 2.367.714,35 m3 2,25 1.052.317,49 2.367.714,35 - - - -

    2,4 Konstruksi Rangka Atap

    - Base Plat angkur tb. 12 mm (K1) Kg 87,50 28.108,30 2.459.476,25 Kg 87,50 28.108,30 2.459.476,25 - - - -

    - Angkur Baut d=22 p=300mm Bh 40,00 35.000,00 1.400.000,00 Bh 40,00 35.000,00 1.400.000,00 - - - -

    - Tiang Kolom IWF 200x100x5,5x8 (K1) Kg 531,20 28.108,30 14.931.128,96 Kg 531,20 28.108,30 14.931.128,96 - - - -

    - Balok pengikat IWF 150x75x5x7 Kg 672,00 28.108,30 18.888.777,60 Kg 672,00 28.108,30 18.888.777,60 - - - -

    - Pekerjaan Rangka Atap Baja Ringan m2 305,28 291.804,45 89.082.062,50 m2 0,00 291.804,45 - - - 305,28 89.082.062,50

    - Zingcromate ( Pengecatan Besi ) Kg 4930,00 1.000,00 4.930.003,57 Kg 4930,00 1.000,00 4.930.003,57 - - - -

    - Mengerjakan Pekerjaan Perakitan Kg 4930,00 858,39 4.231.865,77 Kg 4930,00 858,39 4.231.865,77 - - - -

    - Lisplank Woodplank 2x2x20 m 79,15 56.116,50 4.441.653,37 m 79,15 56.116,50 4.441.653,37 - - - -

    3 Pekerjaan Finishing Arsitektur

    3,1 Pekerjaan Lantai

    - Penimbunan Pasir bawah Lantai t = 12 cm m3 38,96 174.432,50 6.795.018,04 m3 38,96 174.432,50 6.795.018,04 - - - -

    - Rabat Beton alas Lantai t = 10 cm K100 m3 32,46 865.252,91 28.088.272,59 m3 18,17 865.252,91 15.718.086,07 - - 14,30 12.370.186,52

    - Lantai keramik warna putih 40x40 m2 363,32 168.183,15 61.103.919,95 m2 363,32 168.183,15 61.103.919,95 - - - -

    3,2 Pekerjaan Pondasi Rolag

    - Pas. Bata Merah 1/2 Batu Camp. 1 : 4 m2 83,10 104.855,19 8.713.466,29 m2 83,10 104.855,19 8.713.466,29 - - - -

    - Plesteran camp. 1 : 4 Camp 1: 4 m2 166,20 41.381,23 6.877.560,43 m2 166,20 41.381,23 6.877.560,43 - - - -

    - Acian dinding Semen m2 166,20 23.663,70 3.932.906,94 m2 166,20 23.663,70 3.932.906,94 - - - -

    3,3 Atap

    - Atap Gelombang Setara Spandek m2 346,50 75.500,00 26.160.384,11 m2 297,16 75.500,00 22.435.580,00 - - 49,34 3.724.804,11

    - Nok Atap Gelombang m 53,00 87.831,25 4.655.056,25 m 23,00 87.831,25 2.020.118,75 - - 30,00 2.634.937,50

    - Pekerjaan Gording Kanal C M' 0,00 - - M' 368,00 125.000,00 46.000.000,00 368,00 46.000.000,00 - -

    4 Pekerjaan Mekanikal Elektrikal & Plumbing4,1 Instalasi Listrik

    #- 5 -#

  • TGL KONTRAK : 28 April 2014No. KONTRAK : HK.02.03/PPRDW-II/2014/22

    VOL PEK TAMBAH VOL PEK KURANG

    KONSULTAN PENGAWAS

    PEMBANGUNAN PUSAT KEGIATAN P2KPB APBN TAHUN ANGGARAN 2014

    KECAMATAN GILIRENG KAB. WAJO PROVINSI SULAWESI SELATAN

    KONTRAKTOR PELAKSANA

    IMAM PERMANA, ST PT. RELIS SAPINDO UTAMA

    TGL. KONTRAK : -NO. KONTRAK : -

    CONTRACT CHANGE ORDER (CCO)

    NO. URAIAN PEKERJAAN SATUAN

    Original Contract Contract Change OrderPERKIRAA

    N

    VOLUME

    HARGA SATUAN

    (Rp)

    TOTAL HARGA

    (Rp)

    PEK. KURANGPERKIRAAN

    VOLUME

    HARGA SATUAN

    (Rp)

    TOTAL HARGA

    (Rp)

    SATUAN

    SELISIH

    PEK. TAMBAH

    - Panel MCB Unit 2,00 432.709,94 865.419,88 Unit 1,00 432.709,94 432.709,94 - - 1,00 432.709,94

    - Panel Box Unit 2,00 84.078,85 168.157,70 Unit 1,00 84.078,85 84.078,85 - - 1,00 84.078,85

    - Daya KWH ( Meter) Unit 2,00 950.000,00 1.900.000,00 Unit 1,00 3.500.000,00 3.500.000,00 - 1.600.000,00 1,00 -

    - Intalasi titik nyala lampu m 84,00 83.029,61 6.974.487,24 m 42,00 83.029,61 3.487.243,62 - - 42,00 3.487.243,62

    - Instalasi titik nyala stop kontak m 60,00 83.029,61 4.981.776,60 m 30,00 83.029,61 2.490.888,30 - - 30,00 2.490.888,30

    - 1 Set Arde Ls Ls 1,00 1.000.000,00 1.000.000,00 1,00 1.000.000,00 - -

    4,2 Aksesoris listrik & pintu dan jendela

    - Lampu SL 20 watt Bh 27,00 61.364 1.656.830,97 Bh 4,00 61.364,11 245.456,44 - - 23,00 1.411.374,53

    - Stop kontak 16 Amp Bh 56,00 21.134 1.183.476,56 Bh 10,00 21.133,51 211.335,10 - - 46,00 972.141,46

    - Saklar tunggal Bh 21,00 19.631 412.245,75 Bh 10,00 19.630,75 196.307,50 - - 11,00 215.938,25

    - Saklar Ganda Bh 4,00 24.191 96.762,48 Bh 0,00 24.190,62 - - - 4,00 96.762,48

    5 Pekerjaan Saluran Pembuang

    5,1 Pasir Alas t = 7 cm m3 2,80 174.432,50 487.800,49 m3 2,80 174.432,50 487.800,49 - - - -

    5,2 Pas. Bata Merah 1/2 Batu Camp. 1 : 4 m2 55,93 41.381,23 2.314.452,19 m2 55,93 41.381,23 2.314.452,19 - - - -

    5,3 Plesteran camp. 1 : 4 Camp 1: 4 m2 54,33 41.381,23 2.248.324,99 m2 54,33 41.381,23 2.248.324,99 - - - -

    5,4 Acian dinding saluran m3 54,33 23.663,70 1.285.696,15 m3 54,33 23.663,70 1.285.696,15 - - - -

    5,5 Lantai kerja alas saluran m3 2,00 865.252,91 1.728.342,69 m3 2,00 865.252,91 1.728.342,69 - - - -

    6 Pekerjaan Perkerasan Paving

    6,1 Pemasangan paving blok m2 120,00 104.931,75 12.591.810,00 m2 0,00 104.931,75 - - - 120,00 12.591.810,00

    6,2 Pas. Batu bata m2 30,00 104.855,19 3.145.655,70 m2 0,00 104.855,19 - - - 30,00 3.145.655,70

    6,3 Plesteran m2 30,00 41.381,23 1.241.436,90 m2 0,00 41.381,23 - - - 30,00 1.241.436,90

    6,4 Acian Kansteen m2 30,00 23.663,70 709.911,00 m2 0,00 23.663,70 - - - 30,00 709.911,00

    E PEMBANGUNAN LOS BASAH C1 Pekerjaan Tanah

    1,1 Urugan Tanah Timbunan m3 156,00 87.571,00 13.661.076,00 m3 135,00 87.571,00 11.822.085,00 - - 21,00 1.838.991,00

    1,2 Pemadatan Tanah Timbunan m3 156,00 32.065,00 5.002.140,00 m3 135,00 32.065,00 4.328.775,00 - - 21,00 673.365,00

    2 Pekerjaan Struktur

    2,1 Pondasi Poer type P1 (1,0x1,0x0,30 m)

    - Galian Tanah Pondasi Manual m3 22,50 44.357,50 998.043,75 m3 22,50 44.357,50 998.043,75 - - - -

    - Pasir Alas t = 7 cm m3 1,58 117.007,00 184.286,03 m3 1,58 117.007,00 184.286,03 - - - -

    - Lantai Kerja K 100 m3 0,68 865.252,91 584.045,71 m3 0,68 865.252,91 584.045,71 - - - -

    - Bekisting m2 12,00 59.780,60 717.367,20 m2 12,00 59.780,60 717.367,20 - - - -

    - Pembesian Ulir Kg 706,50 13.734,27 9.703.261,76 Kg 706,50 13.734,27 9.703.261,76 - - - -

    - Cor Beton K225 m3 3,00 1.052.317,49 3.156.952,47 m3 3,00 1.052.317,49 3.156.952,47 - - - -

    2,2 Sloef Beton S1 Ukuran 20x40 cm

    - Bekisting m2 72,60 64.822,27 4.706.096,80 m2 72,60 64.822,27 4.706.096,80 - - - - - Pembesian Ulir Kg 1139,82 13.734,27 15.654.595,63 Kg 1139,82 13.734,27 15.654.595,63 - - - -

    #- 6 -#

  • TGL KONTRAK : 28 April 2014No. KONTRAK : HK.02.03/PPRDW-II/2014/22

    VOL PEK TAMBAH VOL PEK KURANG

    KONSULTAN PENGAWAS

    PEMBANGUNAN PUSAT KEGIATAN P2KPB APBN TAHUN ANGGARAN 2014

    KECAMATAN GILIRENG KAB. WAJO PROVINSI SULAWESI SELATAN

    KONTRAKTOR PELAKSANA

    IMAM PERMANA, ST PT. RELIS SAPINDO UTAMA

    TGL. KONTRAK : -NO. KONTRAK : -

    CONTRACT CHANGE ORDER (CCO)

    NO. URAIAN PEKERJAAN SATUAN

    Original Contract Contract Change OrderPERKIRAA

    N

    VOLUME

    HARGA SATUAN

    (Rp)

    TOTAL HARGA

    (Rp)

    PEK. KURANGPERKIRAAN

    VOLUME

    HARGA SATUAN

    (Rp)

    TOTAL HARGA

    (Rp)

    SATUAN

    SELISIH

    PEK. TAMBAH

    - Cor Beton K225 m3 7,26 1.052.317,49 7.639.824,98 m3 7,26 1.052.317,49 7.639.824,98 - - - -

    2,3 Kolom K1 ukuran 30x30 cm

    - Bekisting m2 30,00 125.465,63 3.763.968,90 m2 30,00 125.465,63 3.763.968,90 - - - -

    - Pembesian Ulir Kg 353,25 13.734,27 4.851.630,88 Kg 353,25 13.734,27 4.851.630,88 - - - -

    - Cor Beton K225 m3 2,25 1.052.317,49 2.367.714,35 m3 2,25 1.052.317,49 2.367.714,35 - - - -

    2,4 Konstruksi Rangka Atap

    - Base Plat angkur tb. 12 mm (K1) Kg 87,50 28.108,30 2.459.476,25 Kg 87,50 28.108,30 2.459.476,25 - - - -

    - Angkur Baut d=22 p=300mm Bh 40,00 35.000,00 1.400.000,00 Bh 40,00 35.000,00 1.400.000,00 - - - -

    - Tiang Kolom IWF 200x100x5,5x8 (K1) Kg 531,20 28.108,30 14.931.128,96 Kg 531,20 28.108,30 14.931.128,96 - - - -

    - Balok pengikat IWF 150x75x5x7 Kg 672,00 28.108,30 18.888.777,60 Kg 672,00 28.108,30 18.888.777,60 - - - -

    - Pekerjaan Rangka Atap Baja Ringan m2 305,28 291.804,45 89.082.062,50 m2 0,00 291.804,45 - - - 305,28 89.082.062,50

    - Zingcromate ( Pengecatan Besi ) Kg 4930,00 1.000,00 4.930.003,57 Kg 4930,00 1.000,00 4.930.003,57 - - - -

    - Mengerjakan Pekerjaan Perakitan Kg 4930,00 858,39 4.231.865,77 Kg 4930,00 858,39 4.231.865,77 - - - -

    - Lisplank Woodplank 2x2x20 m 79,15 56.116,50 4.441.653,37 m 79,15 56.116,50 4.441.653,37 - - - -

    3 Pekerjaan Finishing Arsitektur

    3,1 Pekerjaan Lantai

    - Penimbunan Pasir bawah Lantai t = 12 cm m3 38,96 174.432,50 6.795.018,04 m3 38,96 174.432,50 6.795.018,04 - - - -

    - Rabat Beton alas Lantai t = 10 cm K100 m3 32,46 865.868,91 28.108.269,53 m3 18,17 865.868,91 15.729.276,28 - - 14,30 12.378.993,25

    - Lantai keramik warna putih 40x40 m2 363,32 168.183,15 61.103.919,95 m2 363,32 168.183,15 61.103.919,95 - - - -

    3,2 Pekerjaan Pondasi Rolag - -

    - Pas. Bata Merah 1/2 Batu Camp. 1 : 4 m2 83,10 104.855,19 8.713.466,29 m2 83,10 104.855,19 8.713.466,29 - - - -

    - Plesteran camp. 1 : 4 Camp 1: 4 m2 166,20 41.381,23 6.877.560,43 m2 166,20 41.381,23 6.877.560,43 - - - -

    - Acian dinding Semen m2 166,20 23.663,70 3.932.906,94 m2 166,20 23.663,70 3.932.906,94 - - - -

    3,3 Atap - -

    - Atap Gelombang Setara Spandek m2 346,50 75.500,00 26.160.384,11 m2 297,16 75.500,00 22.435.580,00 - - 49,34 3.724.804,11

    - Nok Atap Gelombang m 53,00 87.831,25 4.655.056,25 m 23,00 87.831,25 2.020.118,75 - - 30,00 2.634.937,50

    Pekerjaan Gording Kanal C 368,00 125.000,00 46.000.000,00 368,00 46.000.000,00 - -

    4 Pekerjaan Mekanikal Elektrikal & Plumbing

    4,1 Instalasi Listrik

    - Panel MCB Unit 2,00 432.709,94 865.419,88 Unit 1,00 432.709,94 432.709,94 - - 1,00 432.709,94

    - Panel Box Unit 2,00 84.078,85 168.157,70 Unit 1,00 84.078,85 84.078,85 - - 1,00 84.078,85

    - Daya KWH ( Meter) Unit 2,00 950.000,00 1.900.000,00 Unit 1,00 3.500.000,00 3.500.000,00 - 1.600.000,00 1,00 -

    - Intalasi titik nyala lampu m 84,00 83.029,61 6.974.487,24 m 42,00 83.029,61 3.487.243,62 - - 42,00 3.487.243,62

    - Instalasi titik nyala stop kontak m 60,00 83.029,61 4.981.776,60 m 30,00 83.029,61 2.490.888,30 - - 30,00 2.490.888,30

    - 1 Set Arde Ls 1,00 1.000.000,00 1.000.000,00 1,00 1.000.000,00 - -

    4,2 Aksesoris listrik & pintu dan jendela

    - Lampu SL 20 watt Bh 27,00 61.364,11 1.656.830,97 Bh 4,00 61.364,11 245.456,44 - - 23,00 1.411.374,53

    - Stop kontak 16 Amp Bh 56,00 21.133,51 1.183.476,56 Bh 10,00 21.133,51 211.335,10 - - 46,00 972.141,46

    - Saklar tunggal Bh 21,00 19.630,75 412.245,75 Bh 10,00 19.630,75 196.307,50 - - 11,00 215.938,25 - Saklar Ganda Bh 4,00 24.190,62 96.762,48 Bh 0,00 24.190,62 - - - 4,00 96.762,48

    #- 7 -#

  • TGL KONTRAK : 28 April 2014No. KONTRAK : HK.02.03/PPRDW-II/2014/22

    VOL PEK TAMBAH VOL PEK KURANG

    KONSULTAN PENGAWAS

    PEMBANGUNAN PUSAT KEGIATAN P2KPB APBN TAHUN ANGGARAN 2014

    KECAMATAN GILIRENG KAB. WAJO PROVINSI SULAWESI SELATAN

    KONTRAKTOR PELAKSANA

    IMAM PERMANA, ST PT. RELIS SAPINDO UTAMA

    TGL. KONTRAK : -NO. KONTRAK : -

    CONTRACT CHANGE ORDER (CCO)

    NO. URAIAN PEKERJAAN SATUAN

    Original Contract Contract Change OrderPERKIRAA

    N

    VOLUME

    HARGA SATUAN

    (Rp)

    TOTAL HARGA

    (Rp)

    PEK. KURANGPERKIRAAN

    VOLUME

    HARGA SATUAN

    (Rp)

    TOTAL HARGA

    (Rp)

    SATUAN

    SELISIH

    PEK. TAMBAH

    5 Pekerjaan Saluran Pembuang

    5,1 Pasir Alas t = 7 cm m3 2,80 174.432,50 487.800,49 m3 2,80 174.432,50 487.800,49 - - - -

    5,2 Pas. Bata Merah 1/2 Batu Camp. 1 : 4 m2 55,93 41.381,23 2.314.452,19 m2 55,93 41.381,23 2.314.452,19 - - - -

    5,3 Plesteran camp. 1 : 4 Camp 1: 4 m2 54,33 41.381,23 2.248.324,99 m2 54,33 41.381,23 2.248.324,99 - - - -

    5,4 Acian dinding saluran m3 54,33 23.663,70 1.285.696,15 m3 54,33 23.663,70 1.285.696,15 - - - -

    5,5 Lantai kerja alas saluran m3 2,00 865.252,91 1.728.342,69 m3 2,00 865.252,91 1.728.342,69 - - - -

    6 Pekerjaan Perkerasan Paving

    6,1 Pemasangan paving blok m2 120,00 104.931,75 12.591.810,00 m2 0,00 104.931,75 - - - 120,00 12.591.810,00

    6,2 Pas. Batu bata m2 30,00 104.855,19 3.145.655,70 m2 0,00 104.855,19 - - - 30,00 3.145.655,70

    6,3 Plesteran m2 30,00 41.381,23 1.241.436,90 m2 0,00 41.381,23 - - - 30,00 1.241.436,90

    6,4 Acian Kansteen m2 30,00 23.663,70 709.911,00 m2 0,00 23.663,70 - - - 30,00 709.911,00

    F PEMBANGUNAN KANTOR DESA1 Pekerjaan Tanah

    1,1 Urugan Tanah Timbunan m3 161,25 87.571,00 14.120.823,75 m3 161,25 87.571,00 14.120.823,75 - - - -

    1,2 Pemadatan Tanah Timbunan m3 161,25 32.065,00 5.170.481,25 m3 161,25 32.065,00 5.170.481,25 - - - -

    2 Pekerjaan Struktur

    2,1 Pondasi Btu Gunung

    - Galian Tanah Pondasi Manual m3 161,87 44.357,50 7.179.926,74 m3 161,87 44.357,50 7.179.926,74 - - - -

    - Pas. Batu Kosong m3 29,43 478.327,74 14.077.185,39 m3 29,43 478.327,74 14.077.185,39 - - - -

    - Urugan Pasir bawah pondasi Pasir Urug m3 14,72 117.007,00 1.721.758,01 m3 14,72 117.007,00 1.721.758,01 - - - -

    - Pas. Batu gunung camp. 1 : 4 m3 68,67 815.259,28 55.983.854,76 m3 68,67 815.259,28 55.983.854,76 - - - -

    2,2 Rollag

    - Galian Tanah Pondasi Manual m3 3,25 44.357,50 144.161,88 m3 3,25 44.357,50 144.161,88 - - - -

    - Urugan Pasir bawah pondasi Pasir Urug m3 1,30 117.007,00 152.109,10 m3 1,30 117.007,00 152.109,10 - - - -

    - Pas. Bata Merah 1/2 Batu Camp. 1 : 4 m2 10,40 104.855,19 1.090.493,98 m2 10,40 104.855,19 1.090.493,98 - - - -

    2,3 Sloef Beton S1 Ukuran 15x20 cm

    - Bekisting m2 65,40 64.822,27 4.239.376,46 m2 65,40 64.822,27 4.239.376,46 - - - -

    - Pembesian Polos Kg 962,61 12.579,27 12.108.883,92 Kg 962,61 12.579,27 12.108.883,92 - - - -

    - Cor Beton K225 m3 4,91 1.052.317,49 5.161.617,29 m3 4,91 1.052.317,49 5.161.617,29 - - - -

    2,4 Kolom K1 ukuran 15x30 cm

    - Bekisting m2 39,20 125.465,63 4.918.252,70 m2 39,20 125.465,63 4.918.252,70 - - - -

    - Pembesian Polos Kg 329,70 12.579,27 4.147.385,32 Kg 329,70 12.579,27 4.147.385,32 - - - -

    - Cor Beton K225 m3 1,68 1.052.317,49 1.767.893,38 m3 1,68 1.052.317,49 1.767.893,38 - - - -

    2,5 Kolom Teras Ukuran 15x40 cm

    - Bekisting m2 17,60 125.465,63 2.208.195,09 m2 17,60 125.465,63 2.208.195,09 - - - - - Pembesian Polos Kg 188,40 12.579,27 2.369.934,47 Kg 188,40 12.579,27 2.369.934,47 - - - -

    #- 8 -#

  • TGL KONTRAK : 28 April 2014No. KONTRAK : HK.02.03/PPRDW-II/2014/22

    VOL PEK TAMBAH VOL PEK KURANG

    KONSULTAN PENGAWAS

    PEMBANGUNAN PUSAT KEGIATAN P2KPB APBN TAHUN ANGGARAN 2014

    KECAMATAN GILIRENG KAB. WAJO PROVINSI SULAWESI SELATAN

    KONTRAKTOR PELAKSANA

    IMAM PERMANA, ST PT. RELIS SAPINDO UTAMA

    TGL. KONTRAK : -NO. KONTRAK : -

    CONTRACT CHANGE ORDER (CCO)

    NO. URAIAN PEKERJAAN SATUAN

    Original Contract Contract Change OrderPERKIRAA

    N

    VOLUME

    HARGA SATUAN

    (Rp)

    TOTAL HARGA

    (Rp)

    PEK. KURANGPERKIRAAN

    VOLUME

    HARGA SATUAN

    (Rp)

    TOTAL HARGA

    (Rp)

    SATUAN

    SELISIH

    PEK. TAMBAH

    - Cor Beton K225 m3 0,96 1.052.317,49 1.010.224,79 m3 0,96 1.052.317,49 1.010.224,79 - - - -

    2,6 Kolom Praktis Uuran 15x15 cm

    - Bekisting m2 69,60 125.465,63 8.732.407,85 m2 69,60 125.465,63 8.732.407,85 - - - -

    - Pembesian Polos Kg 409,77 12.579,27 5.154.607,47 Kg 409,77 12.579,27 5.154.607,47 - - - -

    - Cor Beton K225 m3 2,61 1.052.317,49 2.746.548,65 m3 2,61 1.052.317,49 2.746.548,65 - - - -

    2,7 Balok Type BL ukuran 15x20 cm

    - Bekisting m2 38,00 128.820,63 4.895.183,94 m2 38,00 128.820,63 4.895.183,94 - - - -

    - Pembesian Polos Kg 335,59 12.579,27 4.221.445,77 Kg 335,59 12.579,27 4.221.445,77 - - - -

    - Cor Beton K229 m3 2,14 1.052.317,49 2.249.328,63 m3 2,14 1.052.317,49 2.249.328,63 - - - -

    2,8 Balok Type RB

    - Bekisting m2 0,00 128.820,63 - m2 0,00 128.820,63

    - Pembesian Polos Kg 962,61 12.579,27 12.108.883,92 Kg 962,61 12.579,27 12.108.883,92 - - - -

    - Cor Beton K233 m3 4,91 1.052.317,49 5.161.617,29 m3 4,91 1.052.317,49 5.161.617,29 - - - -

    2,9 Atap

    - Rangka dan penutup atap genteng metal m2 537,60 91.514,50 49.198.195,20 m2 - 91.514,50 - - - 537,60 49.198.195,20

    - Bubungan genteng metal m 88,00 93.453,25 8.223.886,00 m 88,00 93.453,25 8.223.886,00 - - - -

    - Lisplank Woodplank 2x20 m 84,50 56.116,50 4.741.844,25 m 84,50 56.116,50 4.741.844,25 - - - -

    - Rangka Baja Ringan dan penutup atap Gelombang Setara Spandek m2 450,30 291.804,45 131.399.543,84 450,30 131.399.543,84 - -

    3 Pekerjaan Finishing Arsitektur

    3,1 Pekerjaan Lantai

    - Penimbunan Pasir bawah Lantai t = 7 cm m3 37,63 117.007,00 4.403.207,42 m3 37,63 117.007,00 4.403.207,42 - - - -

    - Rabat Beton alas Lantai t = 5 cm K100 m3 26,88 865.252,91 23.257.998,22 m3 12,48 865.252,91 10.796.193,18 - - 14,40 12.461.805,04

    - Lantai keramik warna 40x40 m2 531,60 168.183,15 89.406.162,54 m2 249,55 168.183,15 41.970.105,08 - - 282,05 47.436.057,46

    - Lantai keramik warna 20x20 WC/KM m2 6,00 181.240,22 1.087.441,32 m2 6,00 181.240,22 1.087.441,32 - - - -

    3,2 Pekerjaan dinding bangunan

    - Pas. Bata Merah 1/2 Batu Camp. 1 : 4 m2 565,93 104.855,19 59.340.697,68 m2 565,93 104.855,19 59.340.697,68 - - - -

    - Plesteran camp. 1 : 4 Camp. 1: 4 m2 1131,86 41.381,23 46.837.758,99 m2 1131,86 41.381,23 46.837.758,99 - - - -

    - Acian dinding Semen m2 1131,86 23.663,70 26.783.995,48 m2 1131,86 23.663,70 26.783.995,48 - - - -

    - Keramik dinding KM/WC 20x25 m2 21,75 199.864,26 4.347.047,66 m2 21,75 199.864,26 4.347.047,66 - - - -

    3,3 Pekerjaan Plafond

    - Rangka Plafon (Kayu) + Plafon Gipsum tbl 9 mm m2 537,60 39.492,20 21.231.006,72 m2 0,00 39.492,20 - - - 537,60 21.231.006,72

    - list Gypsum m 253,50 27.119,40 6.874.767,90 m 253,50 27.119,40 6.874.767,90 - - - -

    - Rangka Plafond besi hollow + plafond Gypsumboard 9 mm m2 330,50 157.734,50 52.131.252,25 330,50 52.131.252,25 - -

    3,4 Pekerjaan Kusen Pintu + Pintu Panil + Jendela

    - Pintu Panil Type P1

    - Pekerjaan Kosen Pintu m3 0,05 5.782.755,00 293.185,68 m3 0,69 5.782.755,00 4.011.786,28 0,64 3.718.600,60 - -

    - Pekerjaan Daun Pintu m2 2,06 438.460,00 904.542,98 m2 24,05 438.460,00 10.542.770,70 21,98 9.638.227,72 - -

    - Pekerjaan Kaca m2 0,10 166.566,40 16.156,94 m2 2,42 166.566,40 402.790,87 2,32 386.633,93 - -

    - Engsel Pintu Bh 3,00 22.379,50 67.138,50 Bh 39,00 22.379,50 872.800,50 36,00 805.662,00 - - - Engsel Jendela Bh 2,00 20.515,00 41.030,00 Bh 46,00 20.515,00 943.690,00 44,00 902.660,00 - -

    #- 9 -#

  • TGL KONTRAK : 28 April 2014No. KONTRAK : HK.02.03/PPRDW-II/2014/22

    VOL PEK TAMBAH VOL PEK KURANG

    KONSULTAN PENGAWAS

    PEMBANGUNAN PUSAT KEGIATAN P2KPB APBN TAHUN ANGGARAN 2014

    KECAMATAN GILIRENG KAB. WAJO PROVINSI SULAWESI SELATAN

    KONTRAKTOR PELAKSANA

    IMAM PERMANA, ST PT. RELIS SAPINDO UTAMA

    TGL. KONTRAK : -NO. KONTRAK : -

    CONTRACT CHANGE ORDER (CCO)

    NO. URAIAN PEKERJAAN SATUAN

    Original Contract Contract Change OrderPERKIRAA

    N

    VOLUME

    HARGA SATUAN

    (Rp)

    TOTAL HARGA

    (Rp)

    PEK. KURANGPERKIRAAN

    VOLUME

    HARGA SATUAN

    (Rp)

    TOTAL HARGA

    (Rp)

    SATUAN

    SELISIH

    PEK. TAMBAH

    - Kunci Pintu Bh 1,00 142.175,00 142.175,00 Bh 13,00 142.175,00 1.848.275,00 12,00 1.706.100,00 - -

    - Kait Angin bh 2,00 15.565,00 31.130,00 bh 19,00 15.565,00 295.735,00 17,00 264.605,00 - -

    Grendel Jendela bh 1,00 21.615,00 21.615,00 bh 19,00 21.615,00 410.685,00 18,00 389.070,00 - -

    3,5 Pintu Panil Type WC/KM

    - Pintu Panil Type P1

    - Pekerjaan Kosen Pintu m3 0,09 5.782.755,00 546.470,35 m3 0,07 5.782.755,00 404.792,85 - - 0,02 141.677,50

    - Pekerjaan Daun Pintu m2 2,97 438.460,00 1.302.226,20 m2 3,15 438.460,00 1.381.149,00 0,18 78.922,80 - -

    - Pekerjaan Kaca m2 0,15 166.566,40 24.984,96 m2 0,00 166.566,40 - - - 0,15 24.984,96

    - Engsel Pintu Bh 6,00 22.379,50 134.277,00 Bh 6,00 22.379,50 134.277,00 - - - -

    .- Engsel Jendela Bh 4,00 20.515,00 82.060,00 Bh 0,00 20.515,00 - - - 4,00 82.060,00

    - Kunci Pintu Bh 2,00 142.175,00 284.350,00 Bh 2,00 142.175,00 284.350,00 - - - -

    - Kait Angin bh 4,00 15.565,00 62.260,00 bh 0,00 15.565,00 - - - 4,00 62.260,00

    Grendel Jendela bh 2,00 21.615,00 43.230,00 bh 0,00 21.615,00 - - - 2,00 43.230,00

    3,6 Jendela

    - Pekerjaan Kosen Pintu Kayu klas I m3 0,77 5.782.755,00 4.436.818,77 m3 1,48 5.782.755,00 8.552.694,65 0,71 4.115.875,87 - -

    - Pekerjaan Daun Pintu Kayu klas I m2 6,78 319.044,00 2.161.842,14 m2 6,78 319.044,00 2.161.842,14 - - - -

    - Pekerjaan Kaca t = 5 mm m2 17,25 166.566,40 2.872.937,27 m2 34,80 166.566,40 5.796.510,72 17,55 2.923.573,45 - -

    - Engsel jendela bh 66,00 20.515,00 1.353.990,00 bh 98,00 20.515,00 2.010.470,00 32,00 656.480,00 - -

    - Kait angin bh 44,00 15.565,00 684.860,00 bh 44,00 15.565,00 684.860,00 - - - -

    - Grendel Jendela bh 22,00 21.615,00 475.530,00 bh 22,00 21.615,00 475.530,00 - - - -

    3,7 Ventilasi WC/KM

    - Pekerjaan Kosen Ventilasi Kayu klas I m3 0,00 5.782.755,00 11.970,3