cv_yds

7
CURRICULUM VITAE Yadi Suryadi, ST P ersonal D ata Place and Date of Birth : Bandung, July 20 th , 1981 Address : Perum. Taman Sentosa, Blok F3/17, Pasir Sari, Cikarang Selatan, Bekasi, 17530, Indonesia Telephone : (mobile) +6281 220 559 998 E-mail : [email protected] Sex : Male Marital Status : Married Nationality : Indonesian Religion : Moslem A bout M e Hard worker, able to work under pressure, team player and independent as well, nice personality, interpersonal and communication skill and interest of challenge. F ormal E ducation 1999 - 2004 Institut Teknologi, Bandung Bachelor Degree of Mechanical Engineering, majoring in Automation and Robotics. GPA 3.16 out of 4. 1996 1999 SMAN 1, Sumedang Major in Physics Science (A1) 1

Upload: yadi-suryadi

Post on 12-Apr-2017

204 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CV_YDS

CURRICULUM VITAE

Yadi Suryadi, ST

Personal Data

Place and Date of Birth : Bandung, July 20th, 1981

Address : Perum. Taman Sentosa, Blok F3/17, Pasir Sari, Cikarang Selatan, Bekasi, 17530, Indonesia

Telephone : (mobile) +6281 220 559 998 E-mail : [email protected] : MaleMarital Status : MarriedNationality : IndonesianReligion : Moslem

About Me

Hard worker, able to work under pressure, team player and independent as well, nice personality, interpersonal and communication skill and interest of challenge.

Formal Education

1999 - 2004 Institut Teknologi, BandungBachelor Degree of Mechanical Engineering, majoring in Automation and Robotics.GPA 3.16 out of 4.

1996 – 1999 SMAN 1, SumedangMajor in Physics Science (A1)

1

Page 2: CV_YDS

Working Experience

2

Page 3: CV_YDS

Senior Engineering & Maintenance Supervisor

PT. Tempo Scan Pacific, Tbk – Pharmaceutical Company

Built up & takes responsibility in maintenance strategy activity for all factory utility equipment.

Perform and aim the production planning and utility needs on efficient portion, for achieving Company’s Monthly KPI target.

Built up & takes responsibility in maintenance strategy activity for all production line machineries from weighing to secondary packaging.

Perform to make machineries monthly reports consist of breakdown summary (PARETO, PICA, MTBF, MTTR), preventive maintenance, people, overtime, OPEX, CAPEX and so on.

Perform Utilities Equipment Commissioning to ensure all appropriate with USR.

Perform Production Machineries Equipment Commissioning to ensure all appropriate with USR.

Responsibility in machineries spare parts warehouse stock keeping activity.

Responsibility for nonconformity products regarding to change parts used and machines used.

Take a role in production equipment procurement process.

Observing, finding ideas & planning to rise up all strategy in engineering and maintenance. At the end, support the company to reach the goals.

Oct 2007 – Now

Process Engineering Supervisor

PT. AISIN Indonesia – Automotive Company

Responsibility in new project strategy activity for body parts section, e.g. PPAP, Part List, GDES, APQP, QCPC, Production Line Capacity Study, PFMEA, SPC, Time Study, WIS, HVPT, etc.

Responsibility in body part section monthly reports consist of quality, cost reduction, improvement, production line capacity, human resources development, new product preparation, environment and safety, documentation and so on.

Take the lead role in ECI (Engineering Change Instruction) realization, for all product line. In advance issuing the parts change into all customers by email also tagging on the first delivery packing.

Responsibility for nonconformity body part products. Being an active supporting in all company

development project. Observing body parts line productivity, CT vs TT.

Oct 2005 – Oct 2007

Training

2014 PT. EBA, “Training Kalibrasi Thermometer & Pressure Gauge”. 2011 PT. Sapta Automation, “SIEMENS SIMATIC S7 Programming”.

3

Page 4: CV_YDS

2010 PQM, “Supervisory Management : Enhancing Managerial Skills & Leadership”.

2010 ISFI Millenium, “CPOB Training – Production Process Validation”.2009 GREAT, “Leadership Training”.2006 INNOVA, “Internal Auditor Trainning – ISO/TS16949:2002”.

Project Experiences

PT. Tempo Scan Pacific, Tbk – Pharmaceutical Company

Natural Gas piping to power house, employing for Boiler Installation and Commisioning New Production Line

Machineries (Neo Rheumacyl Production Line), Total 11 New Machines

Conduct FAT (Factory Acceptance Test), Installation and Commisioning of New Blister Machine UPS 1040 at Ulm Germany

Conduct FAT (Factory Acceptance Test), Installation and Commisioning of New Monoblock Filling & Capping Machine CVCF1204-L at Taichung Taiwan

Installation and Commisioning Mediseal CP-400e, Blister Machine

Conduct FAT (Factory Acceptance Test) of New Blister Machine IWKA BP20i at Karlsruhe Germany

Installation and Commissioning Thai Coater 55” (Special), Tablet Coating Machine

Installation and Commissioning Fabrima Vertopac VP-120, Cartoner Machine

Installation and Commisioning Mediseal CP400e, Blister Machine

Installation and Commissioning Diosna P400B, Mixer Machine

Installation and Commissioning Fabrima Hi Pro2, Blister Machine

Installation and Commissioning Fette P3200i Segmented, Tablet Press Machine

Istallation and Commissioning Beijing Gylongli PG26, Tablet Press Machine

Installation and Commisioning Yenchen YC-EP-150, Fluidized Bed Dryer Machine

2007-2015

PT. AISIN Indonesia -Automotive Company

PT. AISIN Indonesia -Automotive Company

CAMRY(043L) – Body Parts New Project Preparation ECI (Engineering Change Intruction) Monitoring Board &

ECI Procedure Built Up Conduct ISO/TS 16949 Both Internal & External Audit

Passed Surveillance – Body Part Component Conduct an Enginering Department Project for ISO 14001

Activity – Reduce Grease Consumption Conduct SPC Tools for Quality Level Up on Door Lock

Production Line Participate on SOC Free Activity for Grobal Part New AVANZA/XENIA (D16D) – Body Part New Project

Preparation New TARUNA/TERIOS (D99B) – Body Part New Project

Preparation NEW ZEBRA/GRAND MAX (D40D) – Body Part New

Project Preparation Participation on Astra International Kaizen Competition – “One

Piece Flow - Speed Up CT for Door Lock Mechanic Sub

2005-2007

2005-2007

4

Page 5: CV_YDS

Assembly Line” Conduct PFMEA (Potential Failure Measure and Effect

Analysis) Implementation on Door Lock Assy Production Line

Other Competencies

1. Computer OS : Microsoft Window 9x/2000/XP/Win7 Application : MS Office (Outlook, Excel, Word, Power Point, Acces),

AUTO CAD, Mechanical Desktop, Solidwork, Nastran/Cosmo, CV AVR, Keil uVision, Adobe Photoshop, Protel, Visio Technical

Programming : C, C++ Hardware : Standard PC

2. Microcontroller : ATMEL 89 series, ATMEL AVR series

3. PLC : SIEMENS S7

4. Language Indonesian Language as mother language and good in English

5. Others : New Project Preparation ISO/TS 16949 Internal Audit & Tools OHSAS 18001 Advance Instrumentation Know How PCB Designing (single or double layer) Tools & Machinery Testing Data Acquisition Program Making System Analyze Pharmaceutical Process Machineries Knowledge Ink Jet Printing Device Knowledge Vacuum Conveying System Knowledge Pharmaceutical Machineries Qualification Knowledge

Interest

Mecatronics, music, movie, automotive and travelling.

Certification

5

Page 6: CV_YDS

I, the undersigned, certify that, to the best of my knowledge and belief, this bio data correctly describes my-self and my qualifications and my experiences.

Signature : Yadi Suryadi

6