analisa pdam 2010

421

Click here to load reader

Upload: bachtiar-119

Post on 29-Dec-2015

136 views

Category:

Documents


14 download

TRANSCRIPT

Page 1: Analisa PDAM 2010

Proses Penyusunan

DAFTAR UPAH

PEKERJAAN PERSIAPAN

DAFTAR HARGA BAHAN

PEKERJAAN TANAH

REKAP ANALISA

PEKERJAAN PONDASI

PEKERJAAN DINDING

PEKERJAAN PLESTERAN

PEKERJAAN KAYU

PEKERJAAN BETON

PEKERJAAN ATAP

PEKERJAAN BESI & ALUMINIUM

PEKERJAAN LANGIT-LANGIT

PEKERJAAN KUNCI & KACA

PEKERJAAN SANITASI

PEKERJAAN LANTAI & DINDING

PEKERJAAN PENGECATAN

PEKERJAAN BAJA

PEKERJAAN LISTRIK

PEKERJAAN PERPIPAAN

PEKERJAAN IRIGASI

PEKERJAAN LAIN-LAIN

Page 2: Analisa PDAM 2010

PEKERJAAN BESI & ALUMINIUM

PEKERJAAN LANGIT-LANGIT

PEKERJAAN KUNCI & KACA

PEKERJAAN SANITASI

PEKERJAAN LANTAI & DINDING

PEKERJAAN PENGECATAN

PEKERJAAN BAJA

PEKERJAAN LISTRIK

PEKERJAAN PERPIPAAN

PEKERJAAN IRIGASI

PEKERJAAN LAIN-LAIN

Page 3: Analisa PDAM 2010

TEKAN "Ctrl G "&

MASUKKAN KODE ANALISA

MENU UTAMA

Page 4: Analisa PDAM 2010

Bas ic Pr ice 1. Upah (U) 2. Bahan (U)

Uraian Analis a Pe k e r jaan 1. A sumsi / Faktor (E) 2. Methode Pelaksanaan 3. Bahan 4. A lat 5. Upah (E)

Analis a Harga Satuan 1. Koef . Upah 2. Koef . Bahan 3. Koef . A lat 4. Overhead + Prof it 5. Harga Pekerjaan

REKAPITULASI

1. Judul Proyek (E) 2. Jumlah Harga 3. Total Harga

Daftar Kuantitas & Harga(BOQ)

1. Perkiraan kuantitas (E) 2. Harga Satuan 3. Jumlah Harga

Uraian Analis a Pe k e r jaan

1. Mobilis as i Kontraktor 2. Mobilis as i Direks i 3. Dan lain-lain

CE T AK CHE CK

S E LE S AI

TIDA K

OK

S T A RT

TIDA K

CHE CK

Page 5: Analisa PDAM 2010

MENU UTAMA

Bas ic Pr ice 1. Upah (U) 2. Bahan (U)

Uraian Analis a Pe k e r jaan 1. A sumsi / Faktor (E) 2. Methode Pelaksanaan 3. Bahan 4. A lat 5. Upah (E)

Analis a Harga Satuan 1. Koef . Upah 2. Koef . Bahan 3. Koef . A lat 4. Overhead + Prof it 5. Harga Pekerjaan

REKAPITULASI

1. Judul Proyek (E) 2. Jumlah Harga 3. Total Harga

Daftar Kuantitas & Harga(BOQ)

1. Perkiraan kuantitas (E) 2. Harga Satuan 3. Jumlah Harga

Uraian Analis a Pe k e r jaan

1. Mobilis as i Kontraktor 2. Mobilis as i Direks i 3. Dan lain-lain

CE T AK CHE CK

S E LE S AI

TIDA K

OK

S T A RT

TIDA K

CHE CK

Page 6: Analisa PDAM 2010

DAFTAR UPAH

TAHUN ANGGARAN 2010

UPAHKODE URAIAN SATUAN KETERANGAN

L01 Mandor Org/hr 80,000.00

L02 Kepala Tukang Batu Org/hr 70,000.00

L03 Kepala Tukang Kayu Org/hr 47,000.00

L04 Kepala Tukang Besi Org/hr 47,000.00

L05 Kepala Tukang Cat Org/hr 47,000.00

L06 Kepala Tukang Listrik Org/hr 47,000.00

L07 Tukang Batu Org/hr 60,000.00

L08 Tukang Kayu Org/hr 60,000.00

L09 Tukang Besi/Baja Org/hr 60,000.00

L10 Tukang Cat Org/hr 60,000.00

L11 Tukang Listrik Org/hr 60,000.00

L12 Tukang Pipa Org/hr 60,000.00

L13 Tukang Plitur Org/hr 60,000.00

L14 Tukang Taman Org/hr 60,000.00

L15 Tukang Aspal Org/hr 60,000.00

L16 Pembantu Tukang Org/hr 45,000.00

L17 Pekerja Biasa Org/hr 45,000.00

L18 Penjaga Malam Org/hr 35,000.00

L19 Sopir Org/hr 42,500.00

L20 Operator Org/hr 47,500.00

L21 Mekanik Org/hr 47,500.00

L22 Pembantu Sopir Org/hr 37,500.00

L23 Pembantu Operator Org/hr 40,000.00

L24 Pembantu Mekanik Org/hr 37,500.00

L25 Juru Ukur Org/hr 135,000.00

L26 Engineer dan Crew Ls 450,000.00

L27 Tenaga Ahli Geolistrik Org/hr 575,000.00

L28 Tenaga Ahli Geofisika Org/hr 475,000.00

MALANG,

KEPALA DINAS PEKERJAAN UMUM

KOTA MALANG

Ir. HADI SANTOSO

Pembina Utama Muda

NIP. 19610615 198903 1 017

Page 7: Analisa PDAM 2010

DAFTAR PERALATAN

TAHUN ANGGARAN 2010

HARGAKODE URAIAN SATUAN KETERANGAN

E01 Sewa Mesin Bor hari 1,350,000.00

E02 Sewa Kompresor hari 2,400,000.00

E03 Sewa Genset hari 1,000,000.00

E04 Sewa Pompa Tes hari 4,000,000.00

E05 Sewa Mesin Las hari 400,000.00

E06 Sewa Alat Geolistrik hari 1,750,000.00

E07 Sewa Alat Geofisikal, Elektrikal, Logging hari 1,750,000.00

E08 Sewa Mud Pump Jam 60,000.00

E09 Sewa Alat Sandblasting hari 1,100,000.00

E10 Sewa Excavator hari 1,600,000.00

E11 Sewa Whell Loader hari 2,400,000.00

E12 Sewa Motor Grader hari 2,400,000.00

E13 Sewa Vibro Roller hari 1,750,000.00

E14 Sewa Water Tanker hari 1,000,000.00

E15 Pesawat ukur Unit/hr 100,000.00

E16 Meteran bh 100,000.00

E17 Palu bh 25,000.00

E18 Keranjang bh 10,000.00

E19 Ganco bh 75,000.00

E20 Alat pelancip/pisau besar bh 25,000.00

E21 Palu besar/bodem bh 100,000.00

E22 Timbris Unit 30,000.00

E23 Kereta Dorong Unit 100,000.00

E24 Jack Hammer bh 100,000.00

E25 Molen Unit/hr 100,000.00

E26 Ember bh 5,000.00

E27 Kotak adukan bh 25,000.00

E28 Cetok bh 10,000.00

E29 Kuas bh 10,000.00

E30 Kasut kayu bh 10,000.00

E31 Tang Pemotong Kawat bh 50,000.00

E32 Viberator Unit/hr 100,000.00

E33 Gergaji bh 50,000.00

E34 Gunting pemotong besi bh 50,000.00

E35 Kunci pembengkok tulangan bh 25,000.00

E36 Bor Besi bh 100,000.00

E37 Stamper Unit/hr 160,000.00

Page 8: Analisa PDAM 2010

DAFTAR HARGA BAHAN BANGUNANTAHUN ANGGARAN 2005

BAHAN BANGUNAN HARGA NO. KODE SATUAN KET.

I. TANAH DAN PASIR1 M001 Pasir Urug 1 96,600.00

2 M002 Pasir Pasang 1 60,000.00

3 M003 Pasir Hitam 1 114,000.00

4 M004 Pasir Cor 1 110,000.00

5 M005 Pasir Silika 1 Err:509

6 M006 Tanah Urug 1 50,000.00

7 M007 Sirtu 1 103,400.00

8 M008 Tanah Urug Taman/Katel 1 62,500.00

9 M009 Tanah Liat 1 45,000.00

II. BATU, BATA DAN BETON BLOCK1 M010 Batu Belah Gunung 1 99,500.00

2 M011 Batu Belah Kali 1 115,700.00

3 M012 Batu Kali 1 110,800.00

4 M013 Stenslah/batu pecah tangan 1/2 1 164,450.00

5 M014 Stenslah/batu pecah tangan 2/3 1 156,975.00

6 M015 Stenslah/batu pecah tangan 3/5 1 141,910.00

7 M016 Stenslah/batu pecah tangan 4/6 - 5/7 1 129,375.00

8 M017 Batu pecah mesin 1/1 1 207,900.00

9 M018 Batu pecah mesin 1/2 1 182,160.00

10 M019 Batu pecah mesin 2/3 1 100,000.00

11 M020 Batu pecah mesin 3/5 1 157,500.00

12 M021 Batu pecah mesin 4/6 - 5/7 1 144,900.00

13 M022 Bata Merah 1 bh 250.00

M022.a Batu Bata Tahan Api 1 bh Err:509

14 M023 Bata Berongga 1 bh Err:509

15 M024 Batako 1 bh Err:509

16 M025 Rooster 1 bh 8,650.00

17 M026 Batu Granito 1 kg Err:509

18 M027 Batu Teraso 1 kg Err:509

19 M028 Batu Palimanan 1 71,650.00

20 M029 Batu Tempel Hitam 1 67,500.00

21 M030 Hollow Block (HB. 20) 1 bh Err:509

22 M031 Hollow Block (HB. 15) 1 bh Err:509

23 M032 Hollow Block (HB. 10) 1 bh Err:509

24 M033 Paving Block Segi Empat biasa 1 bh 895.00

25 M034 Paving Block Segi Empat warna 1 bh 1,075.00

26 M035 Paving Block Segi Enam biasa 1 bh 1,450.00

27 M036.a Paving Block Segi Enam warna 1 bh 1,700.00

28 M036.b Paving Block Tiga Berlian biasa 1 bh 1,225.00

29 M036.c Paving Block Tiga Berlian warna 1 bh 1,450.00

III. SEMEN1 M037 Portland Cement (PC) 1 kg 900.00

M037.a Portland Cement (PC) Tahan Api 1 kg Err:509

2 M038 Portland Cement (PC) Putih 1 kg 2,300.00

3 M039 Portland Cement (PC) Warna 1 kg 6,500.00

4 M040 Portland Cement (PC) Grouting 1 kg Err:509

5 M041 Kapur 1 1,300,000.00

6 M042 Gamping 1 kg 840.00

7 M043 Semen Merah 1 165,000.00

V. BUIS BETON1 M044 Buis Beton Dia 0.20 m 1 bh 32,500.00

2 M045 Buis Beton Dia 0.30 m 1 bh 40,890.00

3 M046 Buis Beton Dia 0.40 m 1 bh 51,000.00

4 M047 Buis Beton Dia 0.50 m 1 bh 67,500.00

5 M048 Buis Beton Dia 0.60 m 1 bh 91,840.00

6 M049 Buis Beton Dia 0.80 m 1 bh 157,540.00

7 M050 Buis Beton Dia 0.90 m 1 bh 183,780.00

8 M051 Buis Beton Dia 1.00 m 1 bh 207,460.00

9 M052 Buis Beton U Dia 0.20 m 1 bh 30,000.00

10 M053 Buis Beton U Dia 0.30 m 1 bh 35,000.00

VIII. KAYU

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m2

m2

m3

m3

MENU UTAMA

Page 9: Analisa PDAM 2010

Kayu Borneo

1 M054 Reng : 2/3, 3/5 1 Err:509

2 M055 Usuk : 5/7 1 Err:509

3 M056 Balok 1 Err:509

4 M057 Papan (2x20) cm 1 Err:509

5 M058 Papan (3x20) cm 1 Err:509

6 M059 Papan (3x30) cm 1 Err:509Kayu Meranti -

7 M060 Reng : 2/3, 3/5 1 4,500,000.00

8 M061 Usuk : 5/7 1 4,500,000.00

9 M062 Balok 1 5,040,000.00

10 M063 Papan (2x20) cm 1 6,030,000.00

11 M064 Papan (3x20) cm 1 6,030,000.00

12 M065 Papan (3x30) cm 1 6,030,000.00 Kayu Kruing -

13 M066 Reng : 2/3, 3/5 1 5,400,000.00

14 M067 Usuk : 5/7 1 5,400,000.00

15 M068 Balok 1 5,400,000.00

16 M069 Papan (2x20) cm 1 6,120,000.00

17 M070 Papan (3x20) cm 1 6,120,000.00

18 M071 Papan (3x30) cm 1 6,120,000.00 Kayu Bengkirai Err:509

19 M072 Reng : 2/3, 3/5 1 Err:509

20 M073 Usuk : 5/7 1 Err:509

21 M074 Balok 1 Err:509

22 M075 Papan (2x20) cm 1 Err:509

23 M076 Papan (3x20) cm 1 Err:509

24 M077 Papan (3x30) cm 1 Err:509Kayu Kamper -

25 M078 Reng : 2/3, 3/5 1 1,450,000.00

26 M079 Usuk : 5/7 1 1,450,000.00

27 M080 Balok 1 9,000,000.00

28 M081 Papan (2x20) cm 1 10,800,000.00

29 M082 Papan (3x20) cm 1 10,800,000.00

30 M083 Papan (3x30) cm 1 10,800,000.00 Kayu Lain-lain -

31 M084 Balok Kayu Kelas III 1 3,000,000.00

32 M085 Papan Kayu kelas III 1 1,100,000.00

33 M086 Kayu Albasiah 1 Err:509

34 M087 Kayu Ramin 1 Err:509

35 M088 Bambu Dia 10 cm 1 btg 20,700.00

36 M089 Dolken Kayu Dia 8 cm 1 btg 25,000.00

37 M090 List Kayu Profil 1 m1 6,900.00

38 M091 List Kayu 2/4 1 m3 3,105,000.00

39 M092 Gedeg (2.00 x 3.00) m 1 lbr 34,500.00

40 M093 Bilik Bambu 1 69,000.00 Kayu Jati Ex. Malang Err:509

41 M094 Reng : 2/3, 3/5 1 Err:509

42 M095 Usuk : 5/7 1 Err:509

43 M096 Balok 1 Err:509

44 M097 Papan (2x20) cm 1 Err:509

45 M098 Papan (3x20) cm 1 Err:509

46 M099 Papan (3x30) cm 1 Err:509Kayu Jati Ex. Madiun/Ngawi Err:509

47 M100 Reng : 2/3, 3/5 1 Err:509

48 M101 Usuk : 5/7 1 Err:509

49 M102 Balok 1 Err:509

50 M103 Papan (2x20) cm 1 Err:509

51 M104 Papan (3x20) cm 1 Err:509

52 M105 Papan (3x30) cm 1 Err:509Kayu Jati Ex. Bojonegoro Err:509

53 M106 Reng : 2/3, 3/5 1 Err:509

54 M107 Usuk : 5/7 1 Err:509

55 M108 Balok 1 Err:509

56 M109 Papan (2x20) cm 1 Err:509

57 M110 Papan (3x20) cm 1 Err:509

58 M111 Papan (3x30) cm 1 Err:509

IV. BESI DAN ALUMINIUM1 M112 Besi Beton Polos 1 kg 8,500.00

2 M113 Besi Beton Ulir 1 kg 17,085.00

3 M114 Besi Strip 1 kg 8,500.00

4 M115 Besi Beugel/Kawel 1 kg 8,500.00

5 M116 Baja Profil 1 kg 18,750.00

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m2

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

Page 10: Analisa PDAM 2010

M116.a Plat Baja 1 kg 18,750.00

6 M117 Angker Bar 1 kg 15,000.00

7 M118 Kabel prestressed 1 kg 26,000.00

8 M119 Pintu Besi Baja 1 645,750.00

9 M120 Pintu Gulung Besi 1 1,775,810.00

10 M121 Pintu Lipat 1 1,452,930.00

11 M122 Rolling Door 1 1,076,250.00

12 M123 Pagar Besi 1 538,120.00

13 M124 Pintu Pagar besi 1 618,840.00

M124.a Pagar Model BRC tinggi 1 m 1 282,510.00

M124.b Pintu Pagar Model BRC tinggi 1 m 1 361,616.00

14 M125 Profil Aluminium Putih 1 78,020.00

15 M126 Profil Aluminium Coklat 1 93,670.00

16 M127 Sunscream Aluminium 1 269,060.00

17 M128 Pintu Fiber KM 1 Unit 300,000.00

18 M129 Atap Aluminium 1 88,150.00

19 M130 Bubung Atap Aluminium 1 86,100.00

20 M131 Aluminium Foil/Sesalation 1 26,900.00

M132 Baja Ringan 1 kg 35,175.00

22 M133 Kawat Galvanis 2 mm 1 kg 37,660.00

23 M134 Kawat Galvanis 3 mm 1 kg 62,420.00

24 M135 Kawat Beton/Bendrat RRT 1 kg 7,500.00

25 M136 Kawat Harmonika Gas 1 8,500.00

26 M137 Kawat Duri 1 kg 17,000.00

27 M138 Kawat Nyamuk 1 15,660.00

28 M139 Kawat Nyamuk/Kasa Plastik 1 9,680.00

29 M140 Paku Kayu Segala Ukuran 1 kg 17,500.00

30 M141 Paku Seng Segala Ukuran 1 kg 20,000.00

31 M142 Paku Asbes Segala Ukuran 1 bh 460.00

32 M143 Paku Sumbat Segala Ukuran 1 bh 710.00

33 M144 Paku Kait Segala Ukuran 1 bh 510.00

34 M145 Sekrup Segala Ukuran 1 bh 410.00

35 M146 Baut Segala Ukuran 1 kg 16,750.00

36 M147 Paku Keling 1 bh 2,660.00

37 M148 Kawel 1 kg 18,500.00

38 M148.a Wire Mesh 1 kg 15,000.00

39 M148.b Sealant 1 tube 25,000.00

41 M148.c Aluminium Strip 1 15,000.00

42 M148.d Profil Kaca 1 10,000.00

43 M148.e Venetion blinds dan vertical blinds (tirai) 1 500,000.00

44 M148.f Atap Seng Galvalum 1 99,550.00

45 M148.g Bubung Atap Seng Galvalum 1 96,860.00 XVI. ATAP GENTENG

1 M149 Genteng Biasa ex. Malang 1 bh 850.00

2 M150 Genteng Press ex. Trenggalek 1 bh 990.00

3 M151 Genteng Karang Pilang ex. Malang 1 bh 1,140.00

4 M152 Genteng Karang Pilang ex. Trenggalek 1 bh 400.00

5 M153 Genteng Karang Pilang ex. Surabaya 1 bh 1,410.00

6 M154 Genteng Beton 1 bh 3,370.00

7 M155 Genteng Kaca 1 bh 11,280.00

8 M156 Bubung Genteng Biasa ex. Malang 1 bh 1,870.00

9 M157 Bubung Genteng Press ex. Trenggalek 1 bh 2,240.00

10 M158 Bubung Genteng Karang Pilang ex. Malang 1 bh 4,030.00

11 M159 Bubung Genteng Karang Pilang ex. Trengg 1 bh 4,430.00

12 M160 Bubung Genteng Karang Pilang ex. Surab 1 bh 4,880.00

13 M161 Bubung Genteng Beton 1 bh 6,760.00

14 M162 Genteng Palentong Kecil 1 bh Err:509

15 M163 Genteng Kodok Glazuur 1 bh Err:509

16 M164 Genteng Palentong Super/Besar 1 bh Err:509

17 M165 Bubung Genteng Palentong Kecil 1 bh Err:509

18 M166 Bubung Genteng Kodok Glazuur 1 bh Err:509

19 M167 Bubung Genteng Palentong Super/Besar 1 bh Err:509

20 M168 Genteng Aspal 1 lbr Err:509

21 M169 Genteng Metal 1 lbr Err:509

22 M170 Atap Sirap 1 bh Err:509

23 M171 Bubung Genteng Aspal 1 bh Err:509

24 M172 Bubung Genteng Metal 1 bh Err:509

25 M173 Bubung Atap Sirap 1 bh Err:509

26 M173.a Plastik Aerator 1 bh Err:509

XV. ATAP SENG/ASBES1 M174 Seng plat BJLS 30 L = 0.45 M 1 m' 30,100.00

2 M175 Seng plat BJLS 30 L = 0.60 M 1 m' 34,300.00

m2

m2

m2

m2

m2

m2

m1

m1

m1

m1

m2

m2

m2

m2

m2

m2

m2

m1

m1

m2

m2

m2

Page 11: Analisa PDAM 2010

3 M176 Seng plat BJLS 30 L = 0.90 M 1 m' 43,100.00

4 M177 Seng plat BJLS 28 (90 x 180) cm lbr Err:509

5 M178 Atap Seng Gelombang 1 lbr 71,950.00

6 M179 Bubung Seng Gelombang lbr 66,010.00

7 M180 Roof Light Fibreglass 1 69,290.00

8 M181 Atap Polycarbonat 1 101,270.00

9 M182 Asbes Gelombang (3.00 x 1.05) m x 4 mm 1 lbr 99,700.00

10 M183 Asbes Gelombang (2.70 x 1.05) m x 4 mm 1 lbr 92,000.00

11 M184 Asbes Gelombang (2.40 x 1.05) m x 4 mm 1 lbr 79,700.00

12 M185 Asbes Gelombang (2.10 x 1.05) m x 4 mm 1 lbr 70,500.00

13 M186 Asbes Gelombang (1.50 x 1.05) m x 4 mm 1 lbr 53,600.00

14 M187 Asbes Gelombang (2.50 x 0.92) m x 5 mm 1 lbr 101,200.00

15 M188 Asbes Gelombang (2.25 x 0.92) m x 5 mm 1 lbr 87,600.00

16 M189 Asbes Gelombang (2.00 x 0.92) m x 5 mm 1 lbr 77,600.00

17 M190 Asbes Gelombang (1.80 x 0.92) m x 5 mm 1 lbr 59,000.00

18 M191 Asbes Gelombang (3.00 x 1.08) m x 6 mm 1 lbr 119,600.00

19 M192 Asbes Gelombang (2.70 x 1.08) m x 6 mm 1 lbr 110,400.00

20 M193 Asbes Gelombang (2.10 x 1.08) m x 6 mm 1 lbr 84,700.00

21 M194 Asbes Gelombang (1.80 x 1.08) m x 6 mm 1 lbr 64,400.00

22 M195 Bubung Stel Gelombang 0.92 m 1 lbr 40,000.00

23 M196 Bubung Stel Gelombang 1.05 m 1 lbr 44,000.00

24 M197 Bubung Stel Gelombang 1.08 m 1 lbr 42,840.00

25 M198 Bubung Paten 0.92 m 1 lbr 41,000.00

26 M199 Bubung Paten 1.05 m 1 lbr 37,310.00

27 M200 Bubung Paten 1.08 m 1 lbr 40,180.00

28 M201 Bubung Stel Rata 0.92 m 1 lbr 40,000.00

29 M202 Bubung Stel Rata 1.05 m 1 lbr 34,640.00

30 M203 Asbes (1,00 x 1,00) m x 6 mm 1 lbr 16,500.00

31 M204 Asbes (1,00 x 1,00) m x 5 mm 1 lbr 15,600.00

32 M205 Asbes (1,00 x 1,00) m x 4 mm 1 lbr 15,000.00

33 M206 Asbes (1,00 x 1,00) m x 3,5 mm 1 lbr 14,400.00

34 M207 Akustik (30 x 30) cm 1 lbr Err:509

35 M208 Akustik (30 x 60) cm 1 lbr Err:509

36 M209 Akustik (60 x 120) cm 1 lbr Err:509

37 M210 Harplek 4 mm 1 Err:509

38 M211 List Gypsum 1 m' 18,040.00

39 M212 Soft Board 1 lbr Err:509

40 M213 Gypsum Board 1 lbr 58,630.00

IX. KAYU OLAHAN1 M214 Triplek 3 mm 1 47,970.00

2 M215 Triplek 4 mm 1 63,960.00

3 M216 Multiplek 6 mm 1 76,670.00

4 M217 Multiplek 9 mm 1 117,260.00

5 M218 Multiplek 10 mm 1 133,250.00

6 M219 Multiplek 12 mm 1 165,230.00

7 M220 Multiplek 18 mm 1 229,190.00

8 M221 Plywood Lapis Aluminium 1 lbr 79,950.00

9 M222 Plywood (30 x 60) cm x 4 mm 1 lbr 6,350.00

10 M223 Plywood (30 x 60) cm x 6 mm 1 lbr 9,020.00

11 M224 Plywood (60 x 120) cm x 4 mm 1 lbr 21,010.00

12 M225 Plywood (60 x 120) cm x 6 mm 1 lbr 25,010.00

13 M226 Plywood (120 x 240) cm x 4 mm 1 lbr 85,000.00

13 M227 Teakwood (30 x 60) cm x 4 mm 1 lbr 6,860.00

14 M228 Teakwood (60 x 120) cm x 4 mm 1 lbr 24,490.00

15 M229 Teakwood (120 x 240) cm x 4 mm 1 lbr 82,610.00

X. PERLENGKAPAN KAMAR MANDI1 M230 Kloset Jongkok Porselin Kw. A 1 Unit 133,250.00

2 M231 Kloset Duduk Porselin Kw. A 1 Unit 1,332,500.00

3 M232 Kloset Jongkok Lux 1 Unit 266,500.00

4 M233 Kloset Duduk Lux 1 Unit 1,385,800.00

5 M234 Kloset Jongkok Teraso 1 bh 53,300.00

6 M235 Kran Air 1/2 " 1 bh 33,470.00

7 M236 Kran Air 3/4 " 1 bh 37,310.00

8 M237 Bak Mandi Teraso 1 bh 120,820.00

9 M238 Bak Mandi Fibre 1 bh 293,150.00

10 M239 Bak Mandi Plastik 1 bh 184,470.00

11 M240 Bak Mandi Porselin 1 bh 1,865,500.00

12 M241 Kran Bathub Panas dan dingin 1 bh 377,780.00

13 M242 Bak Cuci Piring Teraso 1 bh 186,550.00

14 M243 Bak Cuci Piring Stainless 1 bh 265,800.00

15 M244 Badkip Porselen 1 bh 799,500.00

16 M245 Urinoir Porselin 1 bh 932,750.00

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

Page 12: Analisa PDAM 2010

17 M246 Urinoir Keramik 1 bh 959,400.00

18 M247 Wastafel Komplit (Kran + Sipon ) Lux 1 Unit 1,172,600.00

19 M248 Wastafel Komplit (Kran + Sipon ) Kw. A 1 Unit 387,450.00

20 M249 Tempat Sabun Keramik 1 bh 26,650.00

21 M250 Afor Stainless 1 bh 45,300.00

22 M251 Afor Plastic 1 bh 13,320.00

23 M252 Kaca Wastafel 1 bh 53,300.00

XII. ALAT-ALAT PENGGANTUNG1 M253 Kunci Tanam Antik 1 bh 80,710.00

2 M254 Kunci Tanam 1 bh 97,900.00

3 M255 Kunci Pintu Kamar Mandi 1 bh 78,410.00

4 M256 Kunci Silinder 1 bh 129,150.00

5 M257 Engsel Pintu 1 bh 27,160.00

6 M258 Engsel Jendela 1 bh 21,210.00

7 M259 Hak Angin 1 bh 16,790.00

8 M260 Spring Knip 10,600.00

9 M261 Kait Angin 1 bh 8,200.00

10 M262 Grendel Pintu 1 bh 18,960.00

11 M263 Grendel Jendela 1 bh 10,600.00

12 M264 Door Closer 1 bh 150,670.00

13 M265 Slot/Kunci Pintu 1 bh 118,400.00

14 M266 Door Holder 1 bh 107,650.00

15 M267 Door Stop 1 bh 31,850.00

16 M268 Rel Pintu Dorong 1 bh 116,250.00

17 M269 Kunci Lemari 1 bh 10,250.00

VII KACA1 M270 Kaca Polos tebal 3 mm 1 m2 61,500.00

2 M271 Kaca Polos tebal 5 mm 1 m2 101,470.00

3 M272 Kaca Polos tebal 8 mm 1 m2 145,550.00

4 M273 Kaca Polos tebal 12 mm 1 m2 201,660.00

5 M274 Kaca Buram tebal 3 mm 1 m2 75,330.00

6 M275 Kaca Buram tebal 5 mm 1 m2 119,920.00

7 M276 Kaca Buram tebal 8 mm 1 m2 177,320.00

8 M277 Kaca Buram tebal 12 mm 1 m2 241,900.00

9 M278 Kaca Cermin tebal 5 mm 1 m2 123,760.00

10 M279 Kaca Cermin tebal 6 mm 1 m2 145,290.00

11 M280 Kaca Cermin tebal 8 mm 1 m2 193,720.00

12 M281 Kaca Rayben tebal 3 mm 1 m2 111,020.00

13 M282 Kaca Rayben tebal 5 mm 1 m2 150,670.00

14 M283 Kaca Rayben tebal 8 mm 1 m2 177,320.00

15 M284 Kaca Rayben tebal 12 mm 1 m2 226,520.00

16 M285 Jendela Nako + accessories 1 m2 210,450.00

17 M286 Glass Block 1 biji 19,440.00

18 M287 Painting Glass 1 m2 376,680.00

19 M288 Kaca "Wireglass" 5 mm 1 m2 538,120.00

20 M289 Kaca Patri 5 mm 1 m2 807,180.00

XI. PERLENGKAPAN LANTAI1 M290 Ubin pc abu-abu 40 x 40 cm 1 bh Err:509

2 M291 Ubin pc abu-abu 30 x 30 cm 1 bh Err:509

3 M292 Ubin pc abu-abu 20 x 20 cm 1 bh Err:509

4 M293 Ubin pc warna 40 x 40 cm 1 bh Err:509

5 M294 Ubin pc warna 30 x 30 cm 1 bh Err:509

6 M295 Ubin pc warna 20 x 20 cm 1 bh Err:509

7 M296 Ubin Terasso 40 x 40 cm 1 bh Err:509

8 M297 Ubin Terasso 30 x 30 cm 1 bh Err:509

9 M298 Ubin Granito 40 x 40 cm 1 bh Err:509

10 M299 Ubin Granito 30 x 30 cm 1 bh Err:509

M299A Ubin Teralux kerang 40 x 40 cm 1 bh 35,000.00

M299B Ubin Teralux kerang30 x 30 cm 1 bh 30,000.00

M299C Ubin Teralux marmer 60 x 60 cm 1 bh 60,000.00

M299D Ubin Teralux marmer 40 x 40 cm 1 bh 45,000.00

M299E Ubin Teralux marmer 30 x 30 cm 1 bh 40,000.00

11 M300 Plint ubin pc abu-abu 15 x 20 cm 1 bh Err:509

12 M301 Plint ubin pc abu-abu 10 x 30 cm 1 bh Err:509

13 M302 Plint ubin pc abu-abu 10 x 40 cm 1 bh Err:509

14 M303 Plint ubin pc warna 10 x 20 cm 1 bh Err:509

15 M304 Plint ubin pc warna 10 x 30 cm 1 bh Err:509

16 M305 Plint ubin pc warna 10 x 40 cm 1 bh Err:509

17 M306 Plint Ubin Terasso 10 x 30 cm 1 bh Err:509

18 M307 Plint Ubin Terasso 10 x 40 cm 1 bh Err:509

19 M308 Plint Ubin Granito 10 x 40 cm 1 bh Err:509

20 M309 Plint Ubin Granito 10 x 30 cm 1 bh Err:509

Page 13: Analisa PDAM 2010

21 M310 Lantai keramik artistik 10 x 20 1 bh Err:509

22 M311 Lantai keramik artistik 10 x 10 1 bh Err:509

23 M312 Lantai keramik artistik 5 x 20 1 bh Err:509

24 M313 Plint keramik artistik 10 x 20 1 bh Err:509

25 M314 Plint keramik artistik 10 x 10 1 bh Err:509

26 M315 Plint keramik artistik 5 x 20 1 bh Err:509

27 M316 Internal cove 5 x 5 x 20 cm 1 bh Err:509

M316.a Bahan Teraso Cor 1 Err:509

28 M317 Keramik Lantai 40 x 40 cm putih 1 bh 11,270.00

29 M318 Keramik Lantai 40 x 40 cm warna/motif 1 bh 12,300.00

30 M319 Keramik Lantai 30 x 30 cm putih 1 bh 4,610.00

31 M320 Keramik Lantai 30 x 30 cm warna/motif 1 bh 5,120.00

32 M321 Keramik Lantai 20 x 20 cm putih 1 bh 1,380.00

33 M322 Keramik Lantai 20 x 20 cm warna/motif 1 bh 1,530.00

34 M323 Keramik Lantai KM 20 x 20 cm 1 bh 1,790.00

35 M324 Plint Keramik Lantai 10 x 20 cm 1 bh 4,100.00

36 M325 Plint Keramik Lantai 10 x 30 cm 1 bh 7,680.00

37 M326 Plint Keramik Lantai 10 x 40 cm 1 bh 14,350.00

38 M327 Keramik Dinding 20 x 25 cm 1 bh 3,580.00

39 M328 Keramik Dinding 20 x 20 cm 1 bh 2,560.00

40 M329 Porselin 15 x 15 cm putih 1 bh 820.00

41 M330 Porselin 15 x 15 cm warna 1 bh 920.00

42 M331 Porselin 10 x 20 cm warna 1 bh 870.00

43 M332 Porselin 20 x 20 cm warna 1 bh 1,790.00

44 M333 Gymflour 1 m2 205,000.00

45 M333.a Parquet 1 m2 Err:509

46 M333.b Karpet 1 m2 Err:509

47 M333.c Marmer 100 x 100 cm 1 m2 Err:509

48 M333.d Porselin 11 x 11 cm putih 1 m2 750.00

49 M333.e Porselin 11x 11 cm warna 1 m2 850.00

50 M333.f Wall Paper 1 Err:509

XIII. PERPIPAAN1 M334 Pipa PVC tipe AW Dia 1/2 " 1 Ljr 28,700.00

2 M335 Pipa PVC tipe AW Dia 3/4 " 1 Ljr 42,790.00

3 M336 Pipa PVC tipe AW Dia 1" 1 Ljr 56,110.00

4 M337 Pipa PVC tipe AW Dia 1.5 " 1 Ljr 75,330.00

5 M338 Pipa PVC tipe AW Dia 2 " 1 Ljr 95,830.00

6 M339 Pipa PVC tipe AW Dia 2.5 " 1 Ljr 123,000.00

7 M340 Pipa PVC tipe AW Dia 3 " 1 Ljr 173,730.00

8 M341 Pipa PVC tipe AW Dia 4 " 1 Ljr 271,360.00

8 M342 Pipa PVC tipe AW Dia 6 " 1 Ljr 472,780.00

8 M343 Pipa PVC tipe AW Dia 8 " 1 Ljr 722,436.00

9 M344 Pipa PVC tipe D Dia 1/2 " 1 Ljr 14,350.00

10 M345 Pipa PVC tipe D Dia 3/4 " 1 Ljr 21,520.00

11 M346 Pipa PVC tipe D Dia 1" 1 Ljr 28,180.00

12 M347 Pipa PVC tipe D Dia 1.5 " 1 Ljr 37,660.00

13 M348 Pipa PVC tipe D Dia 2 " 1 Ljr 46,120.00

14 M349 Pipa PVC tipe D Dia 2.5 " 1 Ljr 67,130.00

15 M350 Pipa PVC tipe D Dia 3 " 1 Ljr 97,370.00

16 M351 Pipa PVC tipe D Dia 4 " 1 Ljr 137,090.00

17 M352 Pipa PVC tipe C Dia 1/2 " 1 Ljr 10,860.00

18 M353 Pipa PVC tipe C Dia 3/4 " 1 Ljr 16,090.00

19 M354 Pipa PVC tipe C Dia 1" 1 Ljr 21,110.00

20 M355 Pipa PVC tipe C Dia 1.5 " 1 Ljr 28,290.00

21 M356 Pipa PVC tipe C Dia 2 " 1 Ljr 38,130.00

22 M357 Pipa PVC tipe C Dia 2.5 " 1 Ljr 48,480.00

23 M358 Pipa PVC tipe C Dia 3 " 1 Ljr 57,290.00

24 M359 Pipa PVC tipe C Dia 4 " 1 Ljr 72,980.00

25 M360 Shock PVC Dia 1/2 " 1 bh 1,280.00

26 M361 Shock PVC Dia 3/4 " 1 bh 2,050.00

27 M362 Shock PVC Dia 1 " 1 bh 2,560.00

28 M363 Shock PVC Dia 1.5 " 1 bh 5,120.00

29 M364 Shock PVC Dia 2 " 1 bh 7,060.00

30 M365 Shock PVC Dia 2.5 " 1 bh 10,250.00

31 M366 Shock PVC Dia 3 " 1 bh 11,530.00

32 M367 Shock PVC Dia 4 " 1 bh 14,090.00

33 M368 Knee PVC Dia 1/2 " 1 bh 1,790.00

34 M369 Knee PVC Dia 3/4 " 1 bh 2,300.00

35 M370 Knee PVC Dia 1 " 1 bh 3,330.00

36 M371 Knee PVC Dia 1.5 " 1 bh 6,660.00

37 M372 Knee PVC Dia 2 " 1 bh 9,990.00

m3

m2

Page 14: Analisa PDAM 2010

38 M373 Knee PVC Dia 2.5 " 1 bh 11,530.00

39 M374 Knee PVC Dia 3 " 1 bh 12,810.00

40 M375 Knee PVC Dia 4 " 1 bh 16,140.00

41 M376 Pipa Galvanis Ø 1/2 ", tebal 1.8 mm 1 Ljr 127,500.00 35000

42 M377 Pipa Galvanis Ø 3/4 ", tebal 1.8 mm 1 Ljr 165,000.00

43 M378 Pipa Galvanis Ø 1", tebal 2 mm 1 Ljr 225,000.00

44 M379 Pipa Galvanis Ø 1.5 ", tebal 2 mm 1 Ljr 330,000.00

45 M380 Pipa Galvanis Ø 2 ", tebal 2.3 mm 1 Ljr 472,500.00

46 M381 Pipa Galvanis Ø 2.5 ", tebal 2.5 mm 1 Ljr 660,000.00 229,000.00

47 M382 Pipa Galvanis Ø 3 ", tebal 2.5 mm 1 Ljr 750,000.00

48 M383 Pipa Galvanis Ø 4 ", tebal 2.8 mm 1 Ljr 1,102,500.00

49 M384 Shock Galvanis Dia 1/2 " 1 bh 3,500.00

50 M385 Shock Galvanis Dia 3/4 " 1 bh 4,610.00

51 M386 Shock Galvanis Dia 1 " 1 bh 6,500.00

52 M387 Shock Galvanis Dia 1.5 " 1 bh 12,000.00

53 M388 Shock Galvanis Dia 2 " 1 bh 19,060.00

54 M389 Shock Galvanis Dia 2.5 " 1 bh 23,060.00 12,500.00

55 M390 Shock Galvanis Dia 3 " 1 bh 26,130.00

56 M391 Shock Galvanis Dia 4 " 1 bh 31,770.00

57 M392 Knee Galvanis Dia 1/2 " 1 bh 4,100.00

58 M393 Knee Galvanis Dia 3/4 " 1 bh 5,380.00

59 M394 Knee Galvanis Dia 1 " 1 bh 7,680.00

60 M395 Knee Galvanis Dia 1.5 " 1 bh 15,110.00

61 M396 Knee Galvanis Dia 2 " 1 bh 22,550.00

62 M397 Knee Galvanis Dia 2.5 " 1 bh 26,130.00 17,000.00

63 M398 Knee Galvanis Dia 3 " 1 bh 29,720.00

64 M399 Knee Galvanis Dia 4 " 1 bh 37,150.00

65 M400 Pipa Screen PVC tipe AW Dia 6 " 1 ljr 577,840.00

66 M400.a Pipa PVC tipe AW Ø 5 " 1 Ljr 372,840.00

67 M400.b Pipa Screen PVC tipe AW Ø 5 " 1 Ljr 476,110.00

68 M400.c 1 Ljr 145,320.00

69 M400.d 1 Ljr 187,840.00

70 M400.e 1 Ljr 262,420.00

71 M400.f 1 Ljr 391,530.00

72 M400.g 1 Ljr 813,050.00

73 M400.h 1 Ljr 1,322,730.00

74 M400.i 1 Ljr 108,500.00

75 M400.j 1 Ljr 151,200.00

76 M400.k 1 Ljr 225,300.00

77 M400.l 1 Ljr 330,700.00

78 M400.m 1 Ljr 714,500.00

79 M400.n 1 Ljr 1,157,100.00

VI. PLITUR & CAT 1 M401 Kertas Gosok 1 Lbr 10,000.00

2 M402 Plamir Kayu 1 kg 16,760.00

3 M403 Plamir Tembok 1 kg 45,000.00

4 M404 Plamir Besi 1 Kg 30,350.00

5 M405 Dempul Jadi 1 kg 28,700.00

6 M406 Minyak Cat 1 Ltr 16,100.00

7 M407 Spiritus 1 Ltr 10,310.00

8 M408 Sirlak 1 kg 144,240.00

9 M409 Cat meni kayu 1 kg 20,840.00

10 M410 Cat meni besi 1 kg 27,920.00

11 M411 Cat Dasar Kayu 1 kg 28,700.00

12 M412 Cat Dasar Tembok 1 kg 4,190.00

13 M413 Cat Dasar Besi 1 kg 33,880.00

14 M414 Cat Kayu 1 kg 64,570.00

15 M415 Cat Tembok 1 kg 17,500.00

16 M416 Cat Besi 1 kg 68,160.00

17 M417 Cat Genting 1 kg 10,000.00

18 M418 Waterproofing 1 kg 128,890.00

19 M419 Vernis 1 Ltr 28,700.00

20 M420 Politur Jadi 1 Ltr 64,570.00

21 M421 Kuas 1 bh 10,760.00

22 M422 Lem Kayu 1 Ltr 25,040.00

23 M423 Lem Pipa PVC 1 kg 28,700.00

24 M424 Lem vinyl 1 kg 50,220.00

25 M425 Residu atau Teer 1 Ltr 24,600.00

26 M426 Teak oli 1 Ltr 1,790.00

27 M427 Kalkarium 1 kg 7,170.00

28 M428 Kapur Sirih 1 kg 3,920.00

29 M429 Soda api 1 kg 21,520.00

Pipa PVC RRJ 6 m S - 10 Ø 2"Pipa PVC RRJ 6 m S - 10 Ø 2,5"Pipa PVC RRJ 6 m S - 10 Ø 3"Pipa PVC RRJ 6 m S - 10 Ø 4"Pipa PVC RRJ 6 m S - 10 Ø 6"Pipa PVC RRJ 6 m S - 10 Ø 8"Pipa PVC moof 6 m S - 12,5 Ø 2"Pipa PVC moof 6 m S - 12,5 Ø 2,5"Pipa PVC moof 6 m S - 12,5 Ø 3"Pipa PVC moof 6 m S - 12,5 Ø 4"Pipa PVC moof 6 m S - 12,5 Ø 6"Pipa PVC moof 6 m S - 12,5 Ø 8"

Page 15: Analisa PDAM 2010

30 M430 Sabun 1 kg 28,700.00

31 M430.a Vinyl (30x30)cm 1 kg Err:509

M430.b Batu Apung 1 kg Err:509

M430.c Alang-Alang 1 ikat Err:509XVIII. PERALATAN AIR BERSIH

1 M431 Tandon Air PVC V = 0.5 m3 1 bh 555,000.00

2 M432 Tandon Air PVC V = 1.0 m3 1 bh 1,000,000.00

3 M433 Tandon Air Stainless V = 0.5 m3 1 bh 1,500,000.00

4 M434 Tandon Air Stainless V = 1.0 m3 1 bh 2,500,000.00

5 M435 Sumur Pompa Tangan Lengkap 1 Unit 165,280.00

6 M436 Pompa Air 1 Unit 661,120.00 XX. INSTALASI LISTRIK

1 M437 Kabel NYA 2.5 mm 1 3,650.00

2 M438 Kabel NYA 4.0 mm 1 6,175.00

3 M439 Stop Kontak 1 bh 23,060.00

4 M440 Saklar Broco Tunggal 1 bh 28,180.00

M440.a Saklar Broco Ganda 1 bh 32,280.00

5 M441 Las doof 1 bh 400.00

6 M442 Isolator 1 550.00

7 M443 T dos PVC 1 bh 700.00

8 M444 Pipa PVC 5/8" 1 Ljr 7,360.00

9 M445 Fiting Flafond 1 bh 7,680.00

10 M446 Zekering Kast Lokal 1 Group 1 Unit 56,370.00

11 M447 Zekering Kast Lokal 2 Group 1 Unit 82,000.00

12 M448 Zekering Kast Lokal 3 Group 1 Unit 112,750.00

13 M449 Lampu TL Komplit 20 Watt 1 bh 53,810.00

14 M450 Lampu TL Komplit 40 Watt 1 bh 79,690.00

15 M451 Lampu XL (Lilin) 5 Watt 1 bh 24,080.00

16 M452 Lampu XL (Lilin) 8 Watt 1 bh 24,080.00

17 M453 Lampu XL (Lilin) 14 Watt 1 bh 26,650.00

18 M454 Lampu XL (Lilin) 18 Watt 1 bh 29,210.00

19 M455 Lampu XL (Lilin) 23 Watt 1 bh 30,230.00

20 M456 Lampu Pijar 5 - 40 Watt 1 bh 15,370.00

21 M457 Lampu Pijar 50 - 100 Watt 1 bh 25,620.00

22 M458 Tambah Daya 2200 Watt 1 Ls 2,306,250.00 2200 watt

23 M459 Pasang Baru PLN 1 Ls 2,818,750.00

24 M460 Pipa Arde 1 m' 92,250.00

M460.a Splits Dia 1 " 1 bh 64,570.00

M460.b Timah 1 kg 365,920.00

M460.c Kawat BC 1 37,660.00

M460.d Klemp 1 bh 1,610.00 XXII. LAIN - LAIN

1 M461 Rumput Lamur 1 m2 18,830.00

2 M462 Rumput Manila 1 m2 16,140.00

3 M463 Semak Hias 1 m2 10,760.00

4 M464 Pohon Pelindung 1 btg 161,430.00

M464.a Gebalan rumput 1 16,140.00

5 M465 Tali ijuk 1 kg 16,140.00

6 M466 Ijuk 1 m3 129,150.00

7 M467 Waterstop Lebar 150 mm 1 m' 26,900.00

8 M468 Waterstop Lebar 200 mm 1 m' 48,430.00

9 M469 Waterstop Lebar 230 mm 1 m' 56,500.00

13 M473 Elektroda 1 kg 75,000.00

14 M474 Minyak bekisting 1 ltr 2,690.00

15 M475 Formika (90 x 120) cm 1 lbr 53,810.00

16 M476 Strorox 100 1 kg 69,950.00

17 M477 Formtie 1 bh 5,910.00

18 M478 Batacote 1 kg 5,380.00

19 M479 Rapidrant 1 Gln 26,900.00

20 M480 Puzzdith - 100 XR 1 Ltr 53,810.00

21 M481 Seal Tape / TBA 1 bh 2,150.00

22 M482 Bensin 1 ltr 5,421.00

23 M483 Solar 1 ltr 5,151.00

24 M484 Minyak Pelumas 1 ltr 35,000.00

25 M485 Grease 1 kg 13,450.00

26 M486 Air Bersih 1 ltr 25.00

m1

m1

m1

m1

m2

Page 16: Analisa PDAM 2010
Page 17: Analisa PDAM 2010

MENU UTAMA

Page 18: Analisa PDAM 2010

4800

Page 19: Analisa PDAM 2010

24,000.00 - 0.50

35,000.00 - 0.75

- 1

- 1.5

48,000.00 - 2.00

- 2.50

134,000.00 - 3.00

195,000.00 - 4.00

- 5.00

- 6.00 600,000.00

- 7.00

- 8.00

-

Page 20: Analisa PDAM 2010

0.50

0.75

1

1.5

2.00

2.50

3.00

4.00

5.00

6.00

7.00

8.00

Page 21: Analisa PDAM 2010

DAFTAR HARGA BAHAN BANGUNAN

BAHAN BANGUNAN HARGA NO. KODE SATUAN KET.

I. TANAH DAN PASIR

1 M001 Pasir Urug 1 96,600.00

2 M002 Pasir Pasang 1 60,000.00

3 M003 Pasir Hitam 1 114,000.00

4 M004 Pasir Cor 1 110,000.00

6 M006 Tanah Urug 1 50,000.00

7 M007 Sirtu 1 103,400.00

8 M008 Tanah Urug Taman/Katel 1 62,500.00

9 M009 Tanah Liat 1 45,000.00

II. BATU, BATA DAN BETON BLOCK

1 M010 Batu Belah Gunung 1 99,500.00

2 M011 Batu Belah Kali 1 115,700.00

3 M012 Batu Kali 1 110,800.00

4 M013 Stenslah/batu pecah tangan 1/2 1 164,450.00

5 M014 Stenslah/batu pecah tangan 2/3 1 156,975.00

6 M015 Stenslah/batu pecah tangan 3/5 1 141,910.00

7 M016 Stenslah/batu pecah tangan 4/6 - 5/7 1 129,375.00

8 M017 Batu pecah mesin 1/1 1 207,900.00

9 M018 Batu pecah mesin 1/2 1 182,160.00

10 M019 Batu pecah mesin 2/3 1 100,000.00

11 M020 Batu pecah mesin 3/5 1 157,500.00

12 M021 Batu pecah mesin 4/6 - 5/7 1 144,900.00

13 M022 Bata Merah 1 bh 250.00

17 M025 Rooster 1 bh 8,650.00

20 M028 Batu Palimanan 1 71,650.00

21 M029 Batu Tempel Hitam 1 67,500.00

25 M033 Paving Block Segi Empat biasa 1 bh 895.00 per meter isi 45

26 M034 Paving Block Segi Empat warna 1 bh 1,075.00 per meter isi 45

27 M035 Paving Block Segi Enam biasa 1 bh 1,450.00 per meter isi 28

28 M036.a Paving Block Segi Enam warna 1 bh 1,700.00 per meter isi 28

29 M036.b Paving Block Tiga Berlian biasa 1 bh 1,225.00 per meter isi 33

30 M036.c Paving Block Tiga Berlian warna 1 bh 1,450.00 per meter isi 33

III. SEMEN

1 M037 Portland Cement (PC) 1 kg 900.00

3 M038 Portland Cement (PC) Putih 1 kg 2,300.00

4 M039 Portland Cement (PC) Warna 1 kg 6,500.00

6 M041 Kapur 1 1,300,000.00

7 M042 Gamping 1 kg 840.00

8 M043 Semen Merah 1 165,000.00

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m2

m2

m3

m3

Page 22: Analisa PDAM 2010

BAHAN BANGUNAN HARGANO. KODE SATUAN KET.

IV. BUIS BETON

1 M044 1 bh 32,500.00

2 M045 1 bh 40,890.00

3 M046 Buis Beton Ø 0.40 m 1 bh 51,000.00

4 M047 Buis Beton Ø 0.50 m 1 bh 67,500.00

5 M048 Buis Beton Ø 0.60 m 1 bh 91,840.00

6 M049 Buis Beton Ø 0.80 m 1 bh 157,540.00

7 M050 Buis Beton Ø 0.90 m 1 bh 183,780.00

8 M051 Buis Beton Ø 1.00 m 1 bh 207,460.00

9 M052 Buis Beton U Ø 0.20 m 1 bh 30,000.00

10 M053 Buis Beton U Ø 0.30 m 1 bh 35,000.00

V. KAYU

Kayu Meranti

7 M060 Reng : 2/3, 3/5 1 4,500,000.00

8 M061 Usuk : 5/7 1 4,500,000.00

9 M062 Balok 1 5,040,000.00

10 M063 Papan (2x20) cm 1 6,030,000.00

11 M064 Papan (3x20) cm 1 6,030,000.00

12 M065 Papan (3x30) cm 1 6,030,000.00

Kayu Kruing

13 M066 Reng : 2/3, 3/5 1 5,400,000.00

14 M067 Usuk : 5/7 1 5,400,000.00

15 M068 Balok 1 5,400,000.00

16 M069 Papan (2x20) cm 1 6,120,000.00

17 M070 Papan (3x20) cm 1 6,120,000.00

18 M071 Papan (3x30) cm 1 6,120,000.00

Kayu Kamper

25 M078 Reng : 2/3, 3/5 1 1,450,000.00

26 M079 Usuk : 5/7 1 1,450,000.00

27 M080 Balok 1 9,000,000.00

28 M081 Papan (2x20) cm 1 10,800,000.00

29 M082 Papan (3x20) cm 1 10,800,000.00

30 M083 Papan (3x30) cm 1 10,800,000.00

Kayu Lain-lain

31 M084 Balok Kayu Kelas III 1 3,000,000.00

32 M085 Papan Kayu kelas III 1 1,100,000.00

35 M088 Bambu Ø 10 cm 1 btg 20,700.00

36 M089 Dolken Kayu Ø 8 cm 1 btg 25,000.00

37 M090 List Kayu Profil 1 6,900.00

38 M091 List Kayu 2/4 1 3,105,000.00

39 M092 Gedeg (2.00 x 3.00) m 1 lbr 34,500.00

40 M093 Bilik Bambu 1 69,000.00

Buis Beton Ø 0.20 m

Buis Beton Ø 0.30 m

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m1

m3

m2

Page 23: Analisa PDAM 2010

BAHAN BANGUNAN HARGANO. KODE SATUAN KET.

VI. BESI DAN ALUMINIUM

1 M112 Besi Beton Polos 1 kg 8,500.00

2 M113 Besi Beton Ulir 1 kg 17,085.00

3 M114 Besi Strip 1 kg 8,500.00

4 M115 Besi Beugel/Kawel 1 kg 8,500.00

5 M116 Baja Profil 1 kg 18,750.00

6 M116.a Plat Baja 1 kg 18,750.00

7 M117 Angker Bar 1 kg 15,000.00

8 M118 Kabel prestressed 1 kg 26,000.00

9 M119 Pintu Besi Baja 1 645,750.00

10 M120 Pintu Gulung Besi 1 1,775,810.00

11 M121 Pintu Lipat 1 1,452,930.00

12 M122 Rolling Door 1 1,076,250.00

13 M123 Pagar Besi 1 538,120.00

14 M124 Pintu Pagar besi 1 618,840.00

15 M124.a Pagar Model BRC tinggi 1 m 1 282,510.00

16 M124.b Pintu Pagar Model BRC tinggi 1 m 1 361,616.00

17 M125 Profil Aluminium Putih 1 78,020.00

18 M126 Profil Aluminium Coklat 1 93,670.00

19 M127 Sunscream Aluminium 1 269,060.00

20 M128 Pintu Fiber KM 1 Unit 300,000.00

21 M129 Atap Aluminium 1 88,150.00

22 M130 Bubung Atap Aluminium 1 86,100.00

23 M131 Aluminium Foil/Sesalation 1 26,900.00

24 M132 Baja Ringan 1 kg 35,175.00

25 M133 Kawat Galvanis 2 mm 1 kg 37,660.00

26 M134 Kawat Galvanis 3 mm 1 kg 62,420.00

27 M135 Kawat Beton/Bendrat RRT 1 kg 7,500.00

28 M136 Kawat Harmonika Gas 1 8,500.00

29 M137 Kawat Duri 1 kg 17,000.00

30 M138 Kawat Nyamuk 1 15,660.00

31 M139 Kawat Nyamuk/Kasa Plastik 1 9,680.00

32 M140 Paku Kayu Segala Ukuran 1 kg 17,500.00

33 M141 Paku Seng Segala Ukuran 1 kg 20,000.00

34 M142 Paku Asbes Segala Ukuran 1 bh 460.00

35 M143 Paku Sumbat Segala Ukuran 1 bh 710.00

36 M144 Paku Kait Segala Ukuran 1 bh 510.00

37 M145 Sekrup Segala Ukuran 1 bh 410.00

38 M146 Baut Segala Ukuran 1 kg 16,750.00

m2

m2

m2

m2

m2

m2

m1

m1

m1

m1

m2

m2

m2

m2

m2

m2

m2

Page 24: Analisa PDAM 2010

BAHAN BANGUNAN HARGANO. KODE SATUAN KET.

39 M147 Paku Keling 1 bh 2,660.00

40 M148 Paku Beton 1 kg 18,500.00

41 M148.a Wire Mesh 1 kg 15,000.00

42 M148.b Sealant 1 tube 25,000.00

43 M148.c Aluminium Strip 1 15,000.00

44 M148.d Profil Kaca 1 10,000.00

45 M148.e Venetion blinds dan vertical blinds (tirai) 1 500,000.00

46 M148.f Atap Seng Galvalum 1 99,550.00

47 M148.g Bubung Atap Seng Galvalum 1 96,860.00

VII. ATAP GENTENG

1 M149 Genteng Biasa ex. Malang 1 bh 850.00

2 M150 Genteng Press ex. Trenggalek 1 bh 990.00

3 M151 Genteng Karang Pilang ex. Malang 1 bh 1,140.00

4 M152 Genteng Karang Pilang ex. Trenggalek 1 bh 400.00

5 M153 Genteng Karang Pilang ex. Surabaya 1 bh 1,410.00

6 M154 Genteng Beton 1 bh 3,370.00

7 M155 Genteng Kaca 1 bh 11,280.00

8 M156 Bubung Genteng Biasa ex. Malang 1 bh 1,870.00

9 M157 Bubung Genteng Press ex. Trenggalek 1 bh 2,240.00

10 M158 Bubung Genteng Karang Pilang ex. Malang 1 bh 4,030.00

11 M159 Bubung Genteng Karang Pilang ex. Trenggalek 1 bh 4,430.00

12 M160 Bubung Genteng Karang Pilang ex. Surabaya 1 bh 4,880.00

13 M161 Bubung Genteng Beton 1 bh 6,760.00

VIII. ATAP SENG/ASBES

1 M174 Seng plat BJLS 30 L = 0.45 M 1 m' 30,100.00

2 M175 Seng plat BJLS 30 L = 0.60 M 1 m' 34,300.00

3 M176 Seng plat BJLS 30 L = 0.90 M 1 m' 43,100.00

5 M178 Atap Seng Gelombang 1 lbr 71,950.00 3.00 m

6 M179 Bubung Seng Gelombang 1 lbr 66,010.00

7 M180 Roof Light Fibreglass 1 69,290.00

8 M181 Atap Polycarbonat 1 101,270.00

9 M182 Asbes Gelombang (3.00 x 1.05) m x 4 mm 1 lbr 99,700.00

10 M183 Asbes Gelombang (2.70 x 1.05) m x 4 mm 1 lbr 92,000.00

11 M184 Asbes Gelombang (2.40 x 1.05) m x 4 mm 1 lbr 79,700.00

12 M185 Asbes Gelombang (2.10 x 1.05) m x 4 mm 1 lbr 70,500.00

13 M186 Asbes Gelombang (1.50 x 1.05) m x 4 mm 1 lbr 53,600.00

14 M187 Asbes Gelombang (2.50 x 0.92) m x 5 mm 1 lbr 101,200.00

15 M188 Asbes Gelombang (2.25 x 0.92) m x 5 mm 1 lbr 87,600.00

16 M189 Asbes Gelombang (2.00 x 0.92) m x 5 mm 1 lbr 77,600.00

17 M190 Asbes Gelombang (1.80 x 0.92) m x 5 mm 1 lbr 59,000.00

18 M191 Asbes Gelombang (3.00 x 1.08) m x 6 mm 1 lbr 119,600.00

19 M192 Asbes Gelombang (2.70 x 1.08) m x 6 mm 1 lbr 110,400.00

20 M193 Asbes Gelombang (2.10 x 1.08) m x 6 mm 1 lbr 84,700.00

21 M194 Asbes Gelombang (1.80 x 1.08) m x 6 mm 1 lbr 64,400.00

m1

m1

m2

m2

m2

m2

m2

Page 25: Analisa PDAM 2010

BAHAN BANGUNAN HARGANO. KODE SATUAN KET.

22 M195 Bubung Stel Gelombang 0.92 m 1 lbr 40,000.00

23 M196 Bubung Stel Gelombang 1.05 m 1 lbr 44,000.00

24 M197 Bubung Stel Gelombang 1.08 m 1 lbr 42,840.00

25 M198 Bubung Paten 0.92 m 1 lbr 41,000.00

26 M199 Bubung Paten 1.05 m 1 lbr 37,310.00

27 M200 Bubung Paten 1.08 m 1 lbr 40,180.00

28 M201 Bubung Stel Rata 0.92 m 1 lbr 40,000.00

29 M202 Bubung Stel Rata 1.05 m 1 lbr 34,640.00

30 M203 Asbes (1,00 x 1,00) m x 6 mm 1 lbr 16,500.00

31 M204 Asbes (1,00 x 1,00) m x 5 mm 1 lbr 15,600.00

32 M205 Asbes (1,00 x 1,00) m x 4 mm 1 lbr 15,000.00

33 M206 Asbes (1,00 x 1,00) m x 3,5 mm 1 lbr 14,400.00

38 M211 List Gypsum 1 m' 18,040.00

40 M213 Gypsum Board 1 lbr 58,630.00 200,000.00

IX. KAYU OLAHAN

1 M214 Triplek 3 mm 1 47,970.00

2 M215 Triplek 4 mm 1 63,960.00

3 M216 Multiplek 6 mm 1 76,670.00

4 M217 Multiplek 9 mm 1 117,260.00

5 M218 Multiplek 10 mm 1 133,250.00

6 M219 Multiplek 12 mm 1 165,230.00

7 M220 Multiplek 18 mm 1 229,190.00

8 M221 Plywood Lapis Aluminium 1 lbr 79,950.00

9 M222 Plywood (30 x 60) cm x 4 mm 1 lbr 6,350.00

10 M223 Plywood (30 x 60) cm x 6 mm 1 lbr 9,020.00

11 M224 Plywood (60 x 120) cm x 4 mm 1 lbr 21,010.00

12 M225 Plywood (60 x 120) cm x 6 mm 1 lbr 25,010.00

13 M226 Plywood (120 x 240) cm x 4 mm 1 lbr 85,000.00

13 M227 Teakwood (30 x 60) cm x 4 mm 1 lbr 6,860.00

14 M228 Teakwood (60 x 120) cm x 4 mm 1 lbr 24,490.00

15 M229 Teakwood (120 x 240) cm x 4 mm 1 lbr 82,610.00

X. PERLENGKAPAN KAMAR MANDI

1 M230 Kloset Jongkok Porselin Kw. A 1 Unit 133,250.00

2 M231 Kloset Duduk Porselin Kw. A 1 Unit 1,332,500.00

3 M232 Kloset Jongkok Lux 1 Unit 266,500.00

4 M233 Kloset Duduk Lux 1 Unit 1,385,800.00

5 M234 Kloset Jongkok Teraso 1 bh 53,300.00

6 M235 Kran Air 1/2 " 1 bh 33,470.00

7 M236 Kran Air 3/4 " 1 bh 37,310.00

8 M237 Bak Mandi Teraso 1 bh 120,820.00

9 M238 Bak Mandi Fibre 1 bh 293,150.00

10 M239 Bak Mandi Plastik 1 bh 184,470.00

11 M240 Bak Mandi Porselin 1 bh 1,865,500.00

12 M241 Kran Bathub Panas dan dingin 1 bh 377,780.00

13 M242 Bak Cuci Piring Teraso 1 bh 186,550.00

14 M243 Bak Cuci Piring Stainless 1 bh 265,800.00

15 M244 Badkip Porselen 1 bh 799,500.00

16 M245 Urinoir Porselin 1 bh 932,750.00

17 M246 Urinoir Keramik 1 bh 959,400.00

18 M247 Wastafel Komplit (Kran + Sipon ) Lux 1 Unit 1,172,600.00

19 M248 Wastafel Komplit (Kran + Sipon ) Kw. A 1 Unit 387,450.00

20 M249 Tempat Sabun Keramik 1 bh 26,650.00

21 M250 Afor Stainless 1 bh 45,300.00

22 M251 Afor Plastic 1 bh 13,320.00

23 M252 Kaca Wastafel 1 bh 53,300.00

m2

m2

m2

m2

m2

m2

m2

Page 26: Analisa PDAM 2010

BAHAN BANGUNAN HARGANO. KODE SATUAN KET.

XI. ALAT-ALAT PENGGANTUNG

1 M253 Kunci Tanam Antik 1 bh 80,710.00

2 M254 Kunci Tanam 1 bh 97,900.00

3 M255 Kunci Pintu Kamar Mandi 1 bh 78,410.00

4 M256 Kunci Silinder 1 bh 129,150.00

5 M257 Engsel Pintu 1 bh 27,160.00

6 M258 Engsel Jendela 1 bh 21,210.00

7 M259 Hak Angin 1 bh 16,790.00

8 M260 Spring Knip 1 bh 10,600.00

9 M261 Kait Angin 1 bh 8,200.00

10 M262 Grendel Pintu 1 bh 18,960.00

11 M263 Grendel Jendela 1 bh 10,600.00

12 M264 Door Closer 1 bh 150,670.00

13 M265 Slot/Kunci Pintu 1 bh 118,400.00

14 M266 Door Holder 1 bh 107,650.00

15 M267 Door Stop 1 bh 31,850.00

16 M268 Rel Pintu Dorong 1 bh 116,250.00

17 M269 Kunci Lemari 1 bh 10,250.00

XII. KACA

1 M270 Kaca Polos tebal 3 mm 1 61,500.00

2 M271 Kaca Polos tebal 5 mm 1 101,470.00

3 M272 Kaca Polos tebal 8 mm 1 145,550.00

4 M273 Kaca Polos tebal 12 mm 1 201,660.00

5 M274 Kaca Buram tebal 3 mm 1 75,330.00

6 M275 Kaca Buram tebal 5 mm 1 119,920.00

7 M276 Kaca Buram tebal 8 mm 1 177,320.00

8 M277 Kaca Buram tebal 12 mm 1 241,900.00

9 M278 Kaca Cermin tebal 5 mm 1 123,760.00

10 M279 Kaca Cermin tebal 6 mm 1 145,290.00

11 M280 Kaca Cermin tebal 8 mm 1 193,720.00

12 M281 Kaca Rayben tebal 3 mm 1 111,020.00

13 M282 Kaca Rayben tebal 5 mm 1 150,670.00

14 M283 Kaca Rayben tebal 8 mm 1 177,320.00

15 M284 Kaca Rayben tebal 12 mm 1 226,520.00

16 M285 Jendela Nako + accessories 1 210,450.00

17 M286 Glass Block 1 bh 19,440.00

18 M287 Painting Glass 1 376,680.00

19 M288 Kaca "Wireglass" 5 mm 1 538,120.00

20 M289 Kaca Patri 5 mm 1 807,180.00

XIII. PERLENGKAPAN LANTAI

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

Page 27: Analisa PDAM 2010

BAHAN BANGUNAN HARGANO. KODE SATUAN KET.

29 M317 Keramik Lantai 40 x 40 cm putih 1 bh 11,270.00

30 M318 Keramik Lantai 40 x 40 cm warna/motif 1 bh 12,300.00

31 M319 Keramik Lantai 30 x 30 cm putih 1 bh 4,610.00

32 M320 Keramik Lantai 30 x 30 cm warna/motif 1 bh 5,120.00

33 M321 Keramik Lantai 20 x 20 cm putih 1 bh 1,380.00

34 M322 Keramik Lantai 20 x 20 cm warna/motif 1 bh 1,530.00

35 M323 Keramik Lantai KM 20 x 20 cm 1 bh 1,790.00

36 M324 Plint Keramik Lantai 10 x 20 cm 1 bh 4,100.00

37 M325 Plint Keramik Lantai 10 x 30 cm 1 bh 7,680.00

38 M326 Plint Keramik Lantai 10 x 40 cm 1 bh 14,350.00

39 M327 Keramik Dinding 20 x 25 cm 1 bh 3,580.00

40 M328 Keramik Dinding 20 x 20 cm 1 bh 2,560.00

41 M329 Porselin 15 x 15 cm putih 1 bh 820.00

42 M330 Porselin 15 x 15 cm warna 1 bh 920.00

43 M331 Porselin 10 x 20 cm warna 1 bh 870.00

44 M332 Porselin 20 x 20 cm warna 1 bh 1,790.00

45 M333 Gymflour 1 205,000.00

49 M333.d Porselin 11 x 11 cm putih 1 750.00

50 M333.e Porselin 11 x 11 cm warna 1 850.00

XIV. PERPIPAAN

1 M334 Pipa PVC tipe AW Ø 1/2 " 1 Ljr 28,700.00

2 M335 Pipa PVC tipe AW Ø 3/4 " 1 Ljr 42,790.00

3 M336 Pipa PVC tipe AW Ø 1" 1 Ljr 56,110.00

4 M337 Pipa PVC tipe AW Ø 1.5 " 1 Ljr 75,330.00

5 M338 Pipa PVC tipe AW Ø 2 " 1 Ljr 95,830.00

6 M339 Pipa PVC tipe AW Ø 2.5 " 1 Ljr 123,000.00

7 M340 Pipa PVC tipe AW Ø 3 " 1 Ljr 173,730.00

8 M341 Pipa PVC tipe AW Ø 4 " 1 Ljr 271,360.00

8 M342 Pipa PVC tipe AW Ø 6 " 1 Ljr 472,780.00

8 M343 Pipa PVC tipe AW Ø 8 " 1 Ljr 722,436.00

9 M344 Pipa PVC tipe D Ø 1/2 " 1 Ljr 14,350.00

10 M345 Pipa PVC tipe D Ø 3/4 " 1 Ljr 21,520.00

11 M346 Pipa PVC tipe D Ø 1" 1 Ljr 28,180.00

12 M347 Pipa PVC tipe D Ø 1.5 " 1 Ljr 37,660.00

13 M348 Pipa PVC tipe D Ø 2 " 1 Ljr 46,120.00

14 M349 Pipa PVC tipe D Ø 2.5 " 1 Ljr 67,130.00

15 M350 Pipa PVC tipe D Ø 3 " 1 Ljr 97,370.00

16 M351 Pipa PVC tipe D Ø 4 " 1 Ljr 137,090.00

17 M352 Pipa PVC tipe C Ø 1/2 " 1 Ljr 10,860.00

18 M353 Pipa PVC tipe C Ø 3/4 " 1 Ljr 16,090.00

19 M354 Pipa PVC tipe C Ø 1" 1 Ljr 21,110.00

m2

m2

m2

Page 28: Analisa PDAM 2010

BAHAN BANGUNAN HARGANO. KODE SATUAN KET.

20 M355 Pipa PVC tipe C Ø 1.5 " 1 Ljr 28,290.00

21 M356 Pipa PVC tipe C Ø 2 " 1 Ljr 38,130.00

22 M357 Pipa PVC tipe C Ø 2.5 " 1 Ljr 48,480.00

23 M358 Pipa PVC tipe C Ø 3 " 1 Ljr 57,290.00

24 M359 Pipa PVC tipe C Ø 4 " 1 Ljr 72,980.00

25 M360 Shock PVC Ø 1/2 " 1 bh 1,280.00

26 M361 Shock PVC Ø 3/4 " 1 bh 2,050.00

27 M362 Shock PVC Ø 1 " 1 bh 2,560.00

28 M363 Shock PVC Ø 1.5 " 1 bh 5,120.00

29 M364 Shock PVC Ø 2 " 1 bh 7,060.00

30 M365 Shock PVC Ø 2.5 " 1 bh 10,250.00

31 M366 Shock PVC Ø 3 " 1 bh 11,530.00

32 M367 Shock PVC Ø 4 " 1 bh 14,090.00

33 M368 Knee PVC Ø 1/2 " 1 bh 1,790.00

34 M369 Knee PVC Ø 3/4 " 1 bh 2,300.00

35 M370 Knee PVC Ø 1 " 1 bh 3,330.00

36 M371 Knee PVC Ø 1.5 " 1 bh 6,660.00

37 M372 Knee PVC Ø 2 " 1 bh 9,990.00

38 M373 Knee PVC Ø 2.5 " 1 bh 11,530.00

39 M374 Knee PVC Ø 3 " 1 bh 12,810.00

40 M375 Knee PVC Ø 4 " 1 bh 16,140.00

41 M376 Pipa Galvanis Ø 1/2 ", tebal 1.8 mm 1 Ljr 127,500.00

42 M377 Pipa Galvanis Ø 3/4 ", tebal 1.8 mm 1 Ljr 165,000.00

43 M378 Pipa Galvanis Ø 1", tebal 2 mm 1 Ljr 225,000.00

44 M379 Pipa Galvanis Ø 1.5 ", tebal 2 mm 1 Ljr 330,000.00

45 M380 Pipa Galvanis Ø 2 ", tebal 2.3 mm 1 Ljr 472,500.00

46 M381 Pipa Galvanis Ø 2.5 ", tebal 2.5 mm 1 Ljr 660,000.00

47 M382 Pipa Galvanis Ø 3 ", tebal 2.5 mm 1 Ljr 750,000.00

48 M383 Pipa Galvanis Ø 4 ", tebal 2.8 mm 1 Ljr 1,102,500.00

49 M384 Shock Galvanis Ø 1/2 " 1 bh 3,500.00

50 M385 Shock Galvanis Ø 3/4 " 1 bh 4,610.00

51 M386 Shock Galvanis Ø 1 " 1 bh 6,500.00

52 M387 Shock Galvanis Ø 1.5 " 1 bh 12,000.00

53 M388 Shock Galvanis Ø 2 " 1 bh 19,060.00

54 M389 Shock Galvanis Ø 2.5 " 1 bh 23,060.00

55 M390 Shock Galvanis Ø 3 " 1 bh 26,130.00

56 M391 Shock Galvanis Ø 4 " 1 bh 31,770.00

57 M392 Knee Galvanis Ø 1/2 " 1 bh 4,100.00

58 M393 Knee Galvanis Ø 3/4 " 1 bh 5,380.00

59 M394 Knee Galvanis Ø 1 " 1 bh 7,680.00

60 M395 Knee Galvanis Ø 1.5 " 1 bh 15,110.00

61 M396 Knee Galvanis Ø 2 " 1 bh 22,550.00

62 M397 Knee Galvanis Ø 2.5 " 1 bh 26,130.00

63 M398 Knee Galvanis Ø 3 " 1 bh 29,720.00

64 M399 Knee Galvanis Ø 4 " 1 bh 37,150.00

65 M400 Pipa Screen PVC tipe AW Ø 6 " 1 ljr 577,840.00

66 M400.a Pipa PVC tipe AW Ø 5 " 1 Ljr 372,840.00

67 M400.b Pipa Screen PVC tipe AW Ø 5 " 1 Ljr 476,110.00

68 M400.c 1 Ljr 145,320.00

69 M400.d 1 Ljr 187,840.00

70 M400.e 1 Ljr 262,420.00

71 M400.f 1 Ljr 391,530.00

72 M400.g 1 Ljr 813,050.00

73 M400.h 1 Ljr 1,322,730.00

74 M400.i 1 Ljr 108,500.00

75 M400.j 1 Ljr 151,200.00

76 M400.k 1 Ljr 225,300.00

77 M400.l 1 Ljr 330,700.00

78 M400.m 1 Ljr 714,500.00

79 M400.n 1 Ljr 1,157,100.00

Pipa PVC RRJ 6 m S - 10 Ø 2"

Pipa PVC RRJ 6 m S - 10 Ø 2,5"

Pipa PVC RRJ 6 m S - 10 Ø 3"

Pipa PVC RRJ 6 m S - 10 Ø 4"

Pipa PVC RRJ 6 m S - 10 Ø 6"

Pipa PVC RRJ 6 m S - 10 Ø 8"

Pipa PVC moof 6 m S - 12,5 Ø 2"

Pipa PVC moof 6 m S - 12,5 Ø 2,5"

Pipa PVC moof 6 m S - 12,5 Ø 3"

Pipa PVC moof 6 m S - 12,5 Ø 4"

Pipa PVC moof 6 m S - 12,5 Ø 6"

Pipa PVC moof 6 m S - 12,5 Ø 8"

Page 29: Analisa PDAM 2010

BAHAN BANGUNAN HARGANO. KODE SATUAN KET.

XV. PLITUR & CAT

1 M401 Kertas Gosok 1 Lbr 10,000.00

2 M402 Plamir Kayu 1 kg 16,760.00

3 M403 Plamir Tembok 1 kg 45,000.00

4 M404 Plamir Besi 1 Kg 30,350.00

5 M405 Dempul Jadi 1 kg 28,700.00

6 M406 Minyak Cat 1 Ltr 16,100.00

7 M407 Spiritus 1 Ltr 10,310.00

8 M408 Sirlak 1 kg 144,240.00

9 M409 Cat meni kayu 1 kg 20,840.00

10 M410 Cat meni besi 1 kg 27,920.00

11 M411 Cat Dasar Kayu 1 kg 28,700.00

12 M412 Cat Dasar Tembok 1 kg 4,190.00

13 M413 Cat Dasar Besi 1 kg 33,880.00

14 M414 Cat Kayu 1 kg 64,570.00

15 M415 Cat Tembok 1 kg 17,500.00

16 M416 Cat Besi 1 kg 68,160.00

17 M417 Cat Genting 1 kg 10,000.00

18 M418 Waterproofing 1 kg 128,890.00

19 M419 Vernis 1 Ltr 28,700.00

20 M420 Politur Jadi 1 Ltr 64,570.00

21 M421 Kuas 1 bh 10,760.00

22 M422 Lem Kayu 1 Ltr 25,040.00

23 M423 Lem Pipa PVC 1 kg 28,700.00

24 M424 Lem vinyl 1 kg 50,220.00

25 M425 Residu atau Teer 1 Ltr 24,600.00

26 M426 Teak oli 1 Ltr 1,790.00

27 M427 Kalkarium 1 kg 7,170.00

28 M428 Kapur Sirih 1 kg 3,920.00

29 M429 Soda api 1 kg 21,520.00

30 M430 Sabun 1 kg 28,700.00

XVI. PERALATAN AIR BERSIH

1 M431 Tandon Air PVC V = 0.5 m3 1 bh 555,000.00

2 M432 Tandon Air PVC V = 1.0 m3 1 bh 1,000,000.00

3 M433 Tandon Air Stainless V = 0.5 m3 1 bh 1,500,000.00

4 M434 Tandon Air Stainless V = 1.0 m3 1 bh 2,500,000.00

5 M435 Sumur Pompa Tangan Lengkap 1 Unit 165,280.00

6 M436 Pompa Air 1 Unit 661,120.00

XVII. INSTALASI LISTRIK

1 M437 Kabel NYA 2.5 mm 1 3,650.00

2 M438 Kabel NYA 4.0 mm 1 6,175.00

3 M439 Stop Kontak 1 bh 23,060.00

4 M440 Saklar Broco Tunggal 1 bh 28,180.00

5 M440.a Saklar Broco Ganda 1 bh 32,280.00

6 M441 Las doof 1 bh 400.00

7 M442 Isolator 1 550.00

8 M443 T dos PVC 1 bh 700.00

9 M444 Pipa PVC 5/8" 1 Ljr 7,360.00

10 M445 Fiting Flafond 1 bh 7,680.00

m1

m1

m1

Page 30: Analisa PDAM 2010

BAHAN BANGUNAN HARGANO. KODE SATUAN KET.

11 M446 Zekering Kast Lokal 1 Group 1 Unit 56,370.00

12 M447 Zekering Kast Lokal 2 Group 1 Unit 82,000.00

13 M448 Zekering Kast Lokal 3 Group 1 Unit 112,750.00

14 M449 Lampu TL Komplit 20 Watt 1 bh 53,810.00

15 M450 Lampu TL Komplit 40 Watt 1 bh 79,690.00

16 M451 Lampu XL (Lilin) 5 Watt 1 bh 24,080.00

17 M452 Lampu XL (Lilin) 8 Watt 1 bh 24,080.00

18 M453 Lampu XL (Lilin) 14 Watt 1 bh 26,650.00

19 M454 Lampu XL (Lilin) 18 Watt 1 bh 29,210.00

20 M455 Lampu XL (Lilin) 23 Watt 1 bh 30,230.00

21 M456 Lampu Pijar 5 - 40 Watt 1 bh 15,370.00

22 M457 Lampu Pijar 50 - 100 Watt 1 bh 25,620.00

23 M458 Tambah Daya 2200 Watt 1 Ls 2,306,250.00 2200 watt

24 M459 Pasang Baru PLN 1 Ls 2,818,750.00

25 M460 Pipa Arde 1 92,250.00

26 M460.a Splits Dia 1 " 1 bh 64,570.00

27 M460.b Timah 1 kg 365,920.00

28 M460.c Kawat BC 1 37,660.00

29 M460.d Klemp 1 bh 1,610.00

XVIII. LAIN - LAIN

1 M461 Rumput Lamur 1 18,830.00

2 M462 Rumput Manila 1 16,140.00

3 M463 Semak Hias 1 10,760.00

4 M464 Pohon Pelindung 1 btg 161,430.00

5 M464.a Gebalan rumput 1 16,140.00

6 M465 Tali ijuk 1 kg 16,140.00

7 M466 Ijuk 1 129,150.00

8 M467 Waterstop Lebar 150 mm 1 26,900.00

9 M468 Waterstop Lebar 200 mm 1 48,430.00

10 M469 Waterstop Lebar 230 mm 1 56,500.00

11 M473 Elektroda 1 kg 75,000.00

12 M474 Minyak bekisting 1 ltr 2,690.00

13 M475 Formika (90 x 120) cm 1 lbr 53,810.00

14 M476 Strorox 100 1 kg 69,950.00

15 M477 Formtie 1 bh 5,910.00

16 M478 Batacote 1 kg 5,380.00

17 M479 Rapidrant 1 Gln 26,900.00

18 M480 Puzzdith - 100 XR 1 Ltr 53,810.00

19 M481 Seal Tape / TBA 1 bh 2,150.00

20 M482 Bensin Industri 1 ltr 5,421.00

21 M482.a Bensin Umum 1 ltr 4,500.00

22 M483 Solar Industri 1 ltr 5,151.00

23 M483.a Solar Umum 1 ltr 4,500.00

24 M484 Minyak Pelumas 1 ltr 35,000.00

25 M485 Grease 1 kg 13,450.00

26 M486 Air Bersih 1 ltr 25.00

MALANG,

KEPALA DINAS PEKERJAAN UMUM

KOTA MALANG

Ir. HADI SANTOSO

Pembina Utama Muda

NIP. 19610615 198903 1 017

m1

m1

m2

m2

m2

m2

m3

m1

m1

m1

Page 31: Analisa PDAM 2010

DAFTAR HARGA SATUAN PEKERJAAN KONSTRUKSI (HSPK)DINAS PEKERJAAN UMUM KOTA MALANG

BIDANG CIPTA KARYATAHUN ANGGARAN 2010

KODEJENIS PEKERJAAN SATUAN

HARGA

ANALISA (Rp.)

1 2 3 4

I. PEKERJAAN PERSIAPAN

A.001 Pagar sementara dari kayu, tinggi 2 meter 402,892.78

A.002 Pagar sementara dari seng gelombang, tinggi 2 meter 491,956.78

A.003 Pagar sementara dari kawat duri, tinggi 1.8 meter 482,852.78

A.004 Pasang pagar kawat jaring galvanis, tinggi 1 m 14,108.00

A.005 Pengukuran dan pemasangan bouwplank 107,930.00

A.006 Pembuatan kantor sementara 1,491,325.00

A.007 Pembuatan gudang semen dan alat-alat 1,528,734.25

A.008 Pembuatan rumah jaga/konstruksi kayu 1,364,093.75

A.009 Membersihkan lapangan dan perataan 8,500.00

A.010 Pembuatan bedeng buruh 1,544,518.00

A.011 Pembuatan bak adukan, ukuran (40x50x20) cm bh 304,100.00

A.012 Pembuatan jalan sementara 78,598.75

A.013 Bongkar pasang kayu kuda-kuda / kusen / loteng 573,000.00

A.014 Bongkaran beton bertulang 326,655.00

A.015 Bongkaran tembok bata merah 302,655.00

A.016 Bongkaran atap 53,500.00

A.017 Bongkaran lantai 9,800.00

A.018 Bongkaran plafon 13,682.00

II. PEKERJAAN TANAH

B.001 Galian tanah biasa sedalam 1 m 35,750.00

B.002 Galian tanah biasa sedalam 2 m 44,100.00

B.003 Galian tanah biasa sedalam 3 m 52,610.00

B.004 Galian tanah keras sedalam 1 m 47,560.00

B.005 Galian tanah cadas sedalam 1 m 72,300.00

B.006 Galian tanah lumpur sedalam 1 m 57,600.00

B.007 Pekerjaan striping setinggi 1 m 2,650.00

B.008 Pembuangan tanah sejauh 30 m 15,650.00

B.009 Urugan kembali 14,700.00

B.010 Pemadatan tanah 26,500.00

B.011 Urugan pasir 130,220.00

B.012 Lapisan Pudel Campuran 1 Kp : 3 Ps : 7 TL 326,000.00

B.013 Lapisan Pudel Campuran 1 Kp : 5 TL 447,400.00

B.014 Pasangan lapisan ijuk tebal 10 cm 782,850.00

B.015 Urugan sirtu 137,330.00

B.016 Cut and fill 114,070.00

B.017 Galian tanah keras sedalam > 5 m 92,697.33 B.018 Galian tanah keras sedalam > 10 m 230,660.62

III. PEKERJAAN PONDASI

C.001 Pasang pondasi batu kali 1 Pc : 3 Ps 463,440.00

C.002 Pasang pondasi batu kali 1 Pc : 4 Ps 430,440.00

C.003 Pasang pondasi batu kali 1 Pc : 5 Ps 407,580.00

C.004 Pasang pondasi batu kali 1 Pc : 6 Ps 391,500.00

C.005 Pasang pondasi batu kali 1 Pc : 8 Ps 369,480.00

C.006 Pasang pondasi batu kali 1 Kp : 1 Sm : 2 Ps 521,990.00

C.007 Pasang pondasi batu kali 1 Pc : 3 Kp : 10 Ps 528,060.00

C.008 Pasang pondasi batu kali 1/4 Pc : 1 Kp : 4 Ps 491,120.00

C.009 Pasang pondasi batu kosong 244,921.20

C.010 Pasang pondasi siklop, 40% batu kali 1,599,706.00

C.011 Pasang pondasi sumuran, diameter 100 cm 441,385.00

m1

m1

m1

m1

m1

m2

m2

m2

m2

m2

m2

m3

m3

m3

m2

m2

m2

m3

m3

m3

m3

m3

m3

m2

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

Page 32: Analisa PDAM 2010

KODEJENIS PEKERJAAN SATUAN

HARGA

ANALISA (Rp.)

1 2 3 4

IV. PEKERJAAN DINDING

D.001 Pasangan bata merah tebal 1 bata, 1 Pc : 2 Ps 121,750.00

D.002 Pasangan bata merah tebal 1 bata, 1 Pc : 3 Ps 112,915.00

D.003 Pasangan bata merah tebal 1 bata, 1 Pc : 4 Ps 107,275.00

D.004 Pasangan bata merah tebal 1 bata, 1 Pc : 5 Ps 103,900.00

D.005 Pasangan bata merah tebal 1 bata, 1 Pc : 6 Ps 101,770.00

D.006 Pasangan bata merah tebal 1 bata, 1 Pc : 3 Kp : 10 Ps 128,172.00

D.007 Pasangan bata merah tebal 1/2 bata, 1 Pc : 2 Ps 58,235.00

D.008 Pasangan bata merah tebal 1/2 bata, 1 Pc : 3 Ps 54,233.00

D.009 Pasangan bata merah tebal 1/2 bata, 1 Pc : 4 Ps 51,830.00

D.010 Pasangan bata merah tebal 1/2 bata, 1 Pc : 5 Ps 50,312.00

D.011 Pasangan bata merah tebal 1/2 bata, 1 Pc : 6 Ps 49,328.00

D.012 Pasangan bata merah tebal 1/2 bata, 1 Pc : 8 Ps 47,750.00

D.013 Pasangan bata merah tebal 1/2 bata, 1 Pc : 3 Kp : 10 Ps 65,450.00

D.014 Pasangan bata merah tebal 1/2 bata, 1 Kp : 1 Sm : 1 Ps 66,350.00

D.015 Pasangan bata merah tebal 1/2 bata, 1 Kp : 1 Sm : 2 Ps 61,090.00

D.016 Pasangan dinding hollowblock (HB) 20, campuran spesi 1 PC : 3 Ps Err:509

D.017 Pasangan dinding hollowblock (HB) 20, campuran spesi 1 PC : 4 Ps Err:509

D.018 Pasangan dinding hollowblock (HB) 15, campuran spesi 1 PC : 3 Ps Err:509

D.019 Pasangan dinding hollowblock (HB) 15, campuran spesi 1 PC : 4 Ps Err:509

D.020 Pasangan dinding hollowblock (HB) 10, campuran spesi 1 PC : 3 Ps Err:509

D.021 Pasangan dinding hollowblock (HB) 10, campuran spesi 1 PC : 4 Ps Err:509

D.023 Pasang dinding roster/terawang (12 x 11 x 24) cm, campuran spesi 1 PC : 3 Ps 295,420.00

D.024 Pasang dinding roster/terawang (12 x 11 x 24) cm, campuran spesi 1 PC : 4 Ps 292,900.00

D.025 Pasang bata berongga (5 x 11 x 24) cm, campuran spesi 1 PC : 3 Ps Err:509

V. PEKERJAAN PLESTERAN

E.001 Plesteran 1 Pc : 1 Ps tebal 15 mm 34,763.60

E.002 Plesteran 1 Pc : 2 Ps tebal 15 mm 30,251.60

E.003 Plesteran 1 Pc : 3 Ps tebal 15 mm 28,228.40

E.004 Plesteran 1 Pc : 4 Ps tebal 15 mm 26,906.00

E.005 Plesteran 1 Pc : 5 Ps tebal 15 mm 26,075.60

E.006 Plesteran 1 Pc : 6 Ps tebal 15 mm 25,444.40

E.007 Plesteran 1 Pc : 7 Ps tebal 15 mm 25,072.40

E.008 Plesteran 1 Pc : 8 Ps tebal 15 mm 24,700.40

E.009 Plesteran 1 Pc : 0.5 Kp : 3 Ps tebal 15 mm 28,684.00

E.010 Plesteran 1 Pc : 2 Kp : 8 Ps tebal 15 mm 26,200.00

E.011 Plesteran 1 Kp : 1 Sm : 1 Ps tebal 15 mm 32,545.00

E.012 Plesteran 1 Kp : 1 Sm : 2 Ps tebal 15 mm 29,975.00

E.013 Plesteran 1 Pc : 2 Ps tebal 20 mm 40,028.80

E.014 Plesteran 1 Pc : 3 Ps tebal 20 mm 37,331.20

E.015 Plesteran 1 Pc : 4 Ps tebal 20 mm 35,548.00

E.016 Plesteran 1 Pc : 5 Ps tebal 20 mm 34,460.80

E.017 Plesteran 1 Pc : 6 Ps tebal 20 mm 33,599.20

E.018 Plesteran 1 Kp : 1 Sm : 2 Ps tebal 20 mm 42,995.00

E.019 Berapen 1 Pc : 5 Ps, tebal 15 mm 18,305.60

E.020 Plesteran skoning 1 Pc : 2 Ps tebal 10 mm 29,495.00

E.021 Plesteran granito 1 Pc warna : 2 granito tebal 10 mm Err:509

E.022 Plesteran teraso 1 Pc warna : 2 batu teraso, tebal 10 mm Err:509

E.023 Plesteran ciprat 1 Pc : 2 Ps 23,238.00

E.024 Plesteran siar pasangan batu kali adukan 1 Pc : 2 Ps 30,506.00

E.025 Benangan 14,310.00

E.026 Acian 17,015.00

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m1

m2

Page 33: Analisa PDAM 2010

KODEJENIS PEKERJAAN SATUAN

HARGA

ANALISA (Rp.)

1 2 3 4

VI. PEKERJAAN KAYU

F.001 Pasang kusen pintu dan jendela kayu jati Err:509

F.002 Pasang kusen pintu dan jendela kayu kamper 12,314,915.00

F.003 Pasang kusen pintu dan jendela kayu borneo Err:509

F.004 Pasang kusen pintu dan jendela kayu meranti 7,562,915.00

F.005 Pasang pintu klamp kayu jati Err:509

F.006 Pasang pintu klamp kayu kamper 518,000.00

F.007 Pasang pintu klamp kayu borneo Err:509

F.008 Pasang pintu klamp kayu meranti 327,200.00

F.009 Pasang pintu panel kayu jati Err:509

F.010 Pasang pintu panel kayu kamper 655,270.00

F.011 Pasang pintu panel kayu borneo Err:509

F.012 Pasang pintu panel kayu meranti 464,470.00

F.013 Pasang pintu dan jendela kaca kayu jati Err:509

F.014 Pasang pintu dan jendela kaca kayu kamper 435,312.00

F.015 Pasang pintu dan jendela kaca kayu borneo Err:509

F.016 Pasang pintu dan jendela kaca kayu meranti 320,832.00

F.017 Pasang pintu dan jendela jalusi kayu jati Err:509

F.018 Pasang pintu dan jendela jalusi kayu kamper 946,820.00

F.019 Pasang pintu dan jendela jalusi kayu borneo Err:509

F.020 Pasang pintu dan jendela jalusi kayu meranti 641,540.00

F.021 Pasang pintu plywood rangkap, rangka kayu jati Err:509

F.022 Pasang pintu plywood rangkap, rangka kayu kamper 526,845.00

F.023 Pasang pintu plywood rangkap, rangka kayu borneo Err:509

F.024 Pasang pintu plywood rangkap, rangka kayu meranti 407,595.00

F.025 Pasang jalusi mati kusen kayu jati Err:509

F.026 Pasang jalusi mati kusen kayu kamper 804,525.00

F.027 Pasang jalusi mati kusen kayu borneo Err:509

F.028 Pasang jalusi mati kusen kayu meranti 518,325.00

F.029 Pasang pintu teakwood rangkap, rangka kayu jati Err:509

F.030 Pasang pintu teakwood rangkap, rangka kayu kamper 529,247.00

F.031 Pasang pintu teakwood rangkap, rangka kayu borneo Err:509

F.032 Pasang pintu teakwood rangkap, rangka kayu meranti 409,997.00

F.033 Pasang pintu plywood dan formika, rangka kayu jati Err:509

F.034 Pasang pintu plywood dan formika, rangka kayu kamper 603,412.00

F.035 Pasang pintu plywood dan formika, rangka kayu borneo Err:509

F.036 Pasang pintu plywood dan formika, rangka kayu meranti 484,162.00

F.037 Pasang pintu teakwood dan formika, rangka kayu jati Err:509

F.038 Pasang pintu teakwood dan formika, rangka kayu borneo (divernis) Err:509

F.039 Pasang pintu teakwood dan formika, rangka kayu meranti (divernis) 496,122.00

F.040 Pasang konstruksi kuda-kuda kayu jati Err:509

F.041 Pasang konstruksi kuda-kuda kayu kamper 11,097,900.00

F.042 Pasang konstruksi kuda-kuda kayu borneo Err:509

F.043 Pasang konstruksi kuda-kuda kayu bengkirai Err:509

F.044 Pasang konstruksi kuda-kuda kayu kruing 7,137,900.00

F.045 Pasang konstruksi kuda-kuda kayu meranti 6,741,900.00

F.046 Pasang konstruksi kuda-kuda ekspose kayu jati Err:509

F.047 Pasang konstruksi kuda-kuda ekspose kayu kamper 12,613,500.00

F.048 Pasang konstruksi gording kayu kamper 10,663,440.00

F.049 Pasang konstruksi gording kayu meranti 6,307,440.00

m3

m3

m3

m3

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

Page 34: Analisa PDAM 2010

KODEJENIS PEKERJAAN SATUAN

HARGA

ANALISA (Rp.)

1 2 3 4

F.050 Pasang kaso 5/7 + reng 3/5 genteng biasa kayu jati Err:509

F.051 Pasang kaso 5/7 + reng 3/5 genteng biasa kayu kamper 88,245.00

F.052 Pasang kaso 5/7 + reng 3/5 genteng biasa kayu borneo Err:509

F.053 Pasang kaso 5/7 + reng 3/5 genteng biasa kayu bengkirai Err:509

F.054 Pasang kaso 5/7 + reng 3/5 genteng biasa kayu kruing 285,745.00

F.055 Pasang kaso 5/7 + reng 3/5 genteng biasa kayu meranti 240,745.00

F.056 Pasang kaso 5/7 + reng 3/5 genteng karangpilang kayu jati Err:509

F.057 Pasang kaso 5/7 + reng 3/5 genteng karangpilang kayu kamper 88,245.00

F.058 Pasang kaso 5/7 + reng 3/5 genteng karangpilang kayu borneo Err:509

F.059 Pasang kaso 5/7 + reng 3/5 genteng karangpilang kayu bengkirai Err:509

F.060 Pasang kaso 5/7 + reng 3/5 genteng karangpilang kayu kruing 285,745.00

F.061 Pasang kaso 5/7 + reng 3/5 genteng karangpilang kayu meranti 240,745.00

F.062 Pasang kaso 5/7 + reng 3/5 genteng beton kayu jati Err:509

F.063 Pasang kaso 5/7 + reng 3/5 genteng beton kayu kamper 118,695.00

F.064 Pasang kaso 5/7 + reng 3/5 genteng beton kayu borneo Err:509

F.065 Pasang kaso 5/7 + reng 3/5 genteng beton kayu bengkirai Err:509

F.066 Pasang kaso 5/7 + reng 3/5 genteng beton kayu kruing 399,145.00

F.067 Pasang kaso 5/7 + reng 3/5 genteng beton kayu meranti 335,245.00

F.068 Pasang kaso 5/7 + reng 3/5 atap sirap kayu jati Err:509

F.069 Pasang kaso 5/7 + reng 3/5 atap sirap kayu kamper 41,069.00

F.070 Pasang kaso 5/7 + reng 3/5 atap sirap kayu borneo Err:509

F.071 Pasang kaso 5/7 + reng 3/5 atap sirap kayu bengkirai Err:509

F.072 Pasang kaso 5/7 + reng 3/5 atap sirap kayu kruing 106,244.00

F.073 Pasang kaso 5/7 + reng 3/5 atap sirap kayu meranti 91,394.00

F.074 Pasang rangka langit-langit (0.5 x 1.0) m, kayu jati Err:509

F.075 Pasang rangka langit-langit (0.5 x 1.0) m, kayu kamper 54,755.00

F.076 Pasang rangka langit-langit (0.5 x 1.0) m, kayu borneo Err:509

F.077 Pasang rangka langit-langit (0.5 x 1.0) m, kayu bengkirai Err:509

F.078 Pasang rangka langit-langit (0.5 x 1.0) m, kayu kruing 115,585.00

F.079 Pasang rangka langit-langit (0.5 x 1.0) m, kayu meranti 101,725.00

F.080 Pasang lisplang ukuran (3 x 20) cm, kayu jati Err:509

F.081 Pasang lisplang ukuran (3 x 20) cm, kayu kamper 136,465.00

F.082 Pasang lisplang ukuran (3 x 20) cm, kayu borneo Err:509

F.083 Pasang lisplang ukuran (3 x 20) cm, kayu bengkirai Err:509

F.084 Pasang lisplang ukuran (3 x 20) cm, kayu kruing 85,921.00

F.085 Pasang lisplang ukuran (3 x 20) cm, kayu meranti 84,949.00

F.086 Pasang lisplang ukuran (3 x 30) cm, kayu jati Err:509

F.087 Pasang lisplang ukuran (3 x 30) cm, kayu kamper 137,515.00

F.088 Pasang lisplang ukuran (3 x 30) cm, kayu borneo Err:509

F.089 Pasang lisplang ukuran (3 x 30) cm, kayu bengkirai Err:509

F.090 Pasang lisplang ukuran (3 x 30) cm, kayu kruing 86,035.00

F.091 Pasang lisplang ukuran (3 x 30) cm, kayu meranti 85,045.00

F.092 Pasang rangka dinding pemisah kayu jati Err:509

F.093 Pasang rangka dinding pemisah kayu kamper 291,130.00

F.094 Pasang rangka dinding pemisah kayu borneo Err:509

F.095 Pasang rangka dinding pemisah kayu meranti 180,250.00

F.096 Pasang rangka dinding pemisah teakwood rangkap, rangka kayu jati Err:509

F.097 Pasang rangka dinding pemisah teakwood rangkap, rangka kayu kamper 376,197.00

F.098 Pasang rangka dinding pemisah teakwood rangkap, rangka kayu borneo Err:509

F.099 Pasang rangka dinding pemisah teakwood rangkap, rangka kayu meranti 265,317.00

F.100 Pasang rangka dinding pemisah plywood rangkap, rangka kayu jati Err:509

F.101 Pasang rangka dinding pemisah plywood rangkap, rangka kayu kamper 390,367.40

F.102 Pasang rangka dinding pemisah plywood rangkap, rangka kayu borneo Err:509

F.103 Pasang rangka dinding pemisah plywood rangkap, rangka kayu meranti 279,487.40

F.104 Pasang dinding lambriziring dari papan jati Err:509

F.105 Pasang dinding lambriziring dari papan kamper 227,310.00

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

Page 35: Analisa PDAM 2010

KODEJENIS PEKERJAAN SATUAN

HARGA

ANALISA (Rp.)

1 2 3 4

VII. PEKERJAAN BETON

G.001 Beton mutu fc'=7,4 Mpa (K100) slump (12 ± 2) cm, w/c = 0,87 469,303.57

G.002 Beton mutu fc'=9,8 Mpa (K125) slump (12 ± 2) cm, w/c = 0,78 493,145.11

G.003 Beton mutu fc'=12,2 Mpa (K150) slump (12 ± 2) cm, w/c = 0,72 511,936.90

G.004 Lantai kerja beton mutu fc'=7,4 Mpa (K100) slump (3 - 6) cm, w/c = 0,87 430,813.36

G.005 Beton mutu fc'=14,5 Mpa (K175) slump (12 ± 2) cm, w/c = 0,66 534,061.51

G.006 Beton mutu fc'=16,9 Mpa (K200) slump (12 ± 2) cm, w/c = 0,61 555,331.08

G.007 Beton mutu fc'=19,3 Mpa (K225) slump (12 ± 2) cm, w/c = 0,58 571,023.41

G.008 Beton mutu fc'=24,0 Mpa (K275) slump (12 ± 2) cm, w/c = 0,53 599,867.86

G.009 Beton mutu fc'=21,7 Mpa (K250) slump (12 ± 2) cm, w/c = 0,56 581,659.39

G.010 Beton mutu fc'=26,4 Mpa (K300) slump (12 ± 2) cm, w/c = 0,52 605,561.77

G.011 Beton mutu fc'=28,8 Mpa (K325) slump (12 ± 2) cm, w/c = 0,49 653,986.38

G.012 Beton mutu fc'=31,2 Mpa (K350) slump (12 ± 2) cm, w/c = 0,48 661,406.22

G.013 Beton kedap air dengan strorox - 100 703,090.00

G.014 Pasang PVC Waterstop lebar 150 mm 33,195.00

G.015 Pasang PVC Waterstop lebar 200 mm 56,941.50

G.016 Pasang PVC Waterstop lebar 230 mm ~ 320 mm 65,925.00

G.017 Pembesian dengan besi polos kg 9,853.50

G.018 Pembesian dengan besi ulir kg 18,867.75

G.019 Kabel prestressed polos/strands kg 27,959.00

G.020 Memasang 1 kg jaring kawat baja / wire mesh kg 15,783.00

G.021 Pasang bekisting untuk pondasi 91,821.00

G.022 Pasang bekisting untuk sloof 97,321.00

G.023 Pasang bekisting untuk kolom 241,270.00

G.024 Pasang bekisting untuk balok 250,270.00

G.025 Pasang bekisting untuk plat lantai 341,270.00

G.026 Pasang bekisting untuk dinding 293,910.00

G.027 Pasang bekisting untuk tangga 230,135.50

G.028 Pasang jembatan cor / Talang Cor 112,940.00

G.029 Pondasi beton bertulang (150 kg besi + bekisting) 2,861,291.00

G.030 Sloof beton bertulang (200 kg besi + bekisting) 3,077,514.00

G.031 Kolom beton bertulang (150 kg besi + bekisting) 4,134,807.00

G.032 Kolom beton bertulang (300 kg besi + bekisting) 5,645,040.00

G.033 Balok beton bertulang (200 kg besi + bekisting) 4,344,932.00

G.034 Dinding beton bertulang (150 kg besi + bekisting) 3,966,597.00

G.035 Dinding beton bertulang (200 kg besi + bekisting) 4,197,778.00

G.036 Kolom penguat beton bertulang (11 x 11) cm 49,250.00

G.037 Ring balok beton bertulang (10 x 15) cm 63,270.00

G.038 Sloof beton bertulang (10 x 15) cm 62,280.00

VIII. PEKERJAAN PENUTUP ATAP

H.001 Pasang atap genteng biasa ex. Malang 33,516.00

H.002 Pasang atap genteng press ex.Trenggalek 37,016.00

H.003 Pasang atap genteng karangpilang ex. Malang 40,766.00

H.004 Pasang atap genteng karangpilang ex. Trenggalek 22,266.00

H.005 Pasang atap genteng karangpilang ex. Surabaya 47,516.00

H.006 Pasang bubung genteng biasa ex. Malang 49,570.00

H.007 Pasang bubung genteng press ex. Trenggalek 51,420.00

H.008 Pasang bubung genteng karangpilang ex. Malang 60,370.00

H.009 Pasang bubung genteng karangpilang ex. Trenggalek 62,370.00

H.010 Pasang bubung genteng karangpilang ex. Surabaya 64,620.00

H.011 Pasang atap genteng palentong kecil Err:509

H.012 Pasang atap genteng kodok glazuur Err:509

H.013 Pasang atap genteng palentong super / besar Err:509

H.014 Pasang atap genteng beton 53,865.00

H.015 Pasang atap genteng aspal Err:509

H.016 Pasang atap genteng metal Err:509

H.017 Pasang atap sirap Err:509

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m1

m1

m1

m2

m2

m2

m2

m2

m2

m2

m2

m3

m3

m3

m3

m3

m3

m3

m1

m1

m1

m2

m2

m2

m2

m2

m1

m1

m1

m1

m1

m2

m2

m2

m2

m2

m2

m2

Page 36: Analisa PDAM 2010

KODEJENIS PEKERJAAN SATUAN

HARGA

ANALISA (Rp.)

1 2 3 4

H.018 Pasang bubung genteng palentong kecil Err:509

H.019 Pasang bubung genteng kodok glazuur Err:509

H.020 Pasang bubung genteng palentong super / besar Err:509

H.021 Pasang bubung genteng beton 73,775.00

H.022 Pasang bubung genteng aspal Err:509

H.023 Pasang bubung genteng metal Err:509

H.024 Pasang bubung atap sirap Err:509

H.025 Pasang atap asbes gelombang (3.00 x 1.05 m) x 4 mm 48,684.00

H.026 Pasang atap asbes gelombang (2.70 x 1.05 m) x 4 mm 52,429.00

H.027 Pasang atap asbes gelombang (2.40 x 1.05 m) x 4 mm 48,677.00

H.028 Pasang atap asbes gelombang (2.10 x 1.05 m) x 4 mm 49,564.00

H.029 Pasang atap asbes gelombang (1.50 x 1.05 m) x 4 mm 48,449.00

H.030 Pasang atap asbes gelombang (2.50 x 0.92 m) x 5 mm 64,816.00

H.031 Pasang atap asbes gelombang (2.25 x 0.92 m) x 5 mm 66,776.00

H.032 Pasang atap asbes gelombang (2.00 x 0.92 m) x 5 mm 60,349.00

H.033 Pasang atap asbes gelombang (1.80 x 0.92 m) x 5 mm 58,039.00

H.034 Pasang atap asbes gelombang (3.00 x 1.08 m) x 6 mm 97,329.00

H.035 Pasang atap asbes gelombang (2.70 x 1.08 m) x 6 mm 55,561.00

H.036 Pasang atap asbes gelombang (2.10 x 1.08 m) x 6 mm 55,112.00

H.037 Pasang atap asbes gelombang (1.80 x 1.08 m) x 6 mm 50,317.00

H.038 Pasang nok stel gelombang 0.92 m 110,671.00

H.039 Pasang nok stel gelombang 1.05 m 107,071.00

H.040 Pasang nok stel gelombang 1.08 m 102,493.00

H.041 Pasang nok paten 0.92 m 63,871.00

H.042 Pasang nok paten 1.05 m 59,443.00

H.043 Pasang nok paten 1.08 m 62,887.00

H.044 Pasang nok stel rata 0.92 m 58,671.00

H.045 Pasang nok stel rata 1.05 m 52,775.00

H.046 Pasang atap seng gelombang 60,527.00

H.047 Pasang bubung seng gelombang 32,409.00

H.048 Pasang Atap Aluminium 145,563.50

H.049 Pasang Bubung Atap Aluminium 169,890.00

H.050 Pasang Lapisan Aluminium Foil/Sesalation 38,870.00

H.051 Pasang roof light fibreglass 88,428.00

H.052 Pasang atap polycarbonat 129,706.00

H.053 Pasang Atap Seng Galvalum 157,533.50

H.054 Pasang Bubung Atap Seng Galvalum 182,802.00

IX. PEKERJAAN LANGIT - LANGIT

I.001 Langit-langit asbes (1,0 x 1,0) m, tebal 6 mm 24,364.00

I.002 Langit-langit asbes (1,0 x 1,0) m, tebal 5 mm 23,374.00

I.003 Langit-langit asbes (1,0 x 1,0) m, tebal 4 mm 22,714.00

I.004 Langit-langit asbes (1,0 x 1,0) m, tebal 3.50 mm 22,054.00

I.005 Langit-langit akustik (30 x 30) cm Err:509

I.006 Langit-langit akustik (30 x 60) cm Err:509

I.007 Langit-langit akustik (60 x 120) cm Err:509

I.008 Langit-langit plywood (30 x 60) cm, tebal 4 mm 12,711.00

I.009 Langit-langit plywood (30 x 60) cm, tebal 6 mm 13,182.20

I.010 Langit-langit plywood (60 x 120) cm, tebal 4 mm 18,303.75

I.011 Langit-langit plywood (60 x 120) cm, tebal 6 mm 19,803.75

I.012 Langit-langit teakwood (30 x 60) cm, tebal 4 mm 12,894.60

I.013 Langit-langit teakwood (60 x 120) cm, tebal 4 mm 19,608.75

m1

m1

m1

m1

m1

m1

m1

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m1

m1

m1

m1

m1

m1

m1

m1

m2

m1

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

Page 37: Analisa PDAM 2010

KODEJENIS PEKERJAAN SATUAN

HARGA

ANALISA (Rp.)

1 2 3 4

I.014 Langit-langit lat kayu jati Err:509

I.015 Langit-langit lat kayu ramin Err:509

I.016 Langit-langit lat kayu kamper 312,915.00

I.017 Langit-langit soft board Err:509

I.018 Langit-langit akustik (60 x 120) cm + rangka aluminium Err:509

I.019 Langit-langit asbes (1,00 x 1,00) m x 3,5 mm + rangka kayu jati Err:509

I.020 Langit-langit asbes (1,00 x 1,00) m x 3,5 mm + rangka kayu kamper 63,814.00

I.021 Langit-langit asbes (1,00 x 1,00) m x 3,5 mm + rangka kayu borneo Err:509

I.022 Langit-langit asbes (1,00 x 1,00) m x 3,5 mm + rangka kayu bengkirai Err:509

I.023 Langit-langit asbes (1,00 x 1,00) m x 3,5 mm + rangka kayu kruing 111,214.00

I.024 Langit-langit asbes (1,00 x 1,00) m x 3,5 mm + rangka kayu meranti 100,414.00

I.025 Langit-langit plywood 4 mm + rangka kayu jati Err:509

I.026 Langit-langit plywood 4 mm + rangka kayu kamper 106,660.00

I.027 Langit-langit plywood 4 mm + rangka kayu borneo Err:509

I.028 Langit-langit plywood 4 mm + rangka kayu bengkirai Err:509

I.029 Langit-langit plywood 4 mm + rangka kayu kruing 197,510.00

I.030 Langit-langit plywood 4 mm + rangka kayu meranti 176,810.00

I.031 Langit-langit akustik (30 x 60) cm + rangka kayu jati Err:509

I.032 Langit-langit akustik (30 x 60) cm + rangka kayu kamper Err:509

I.033 Langit-langit akustik (30 x 60) cm + rangka kayu borneo Err:509

I.034 Langit-langit akustik (30 x 60) cm + rangka kayu bengkirai Err:509

I.035 Langit-langit akustik (30 x 60) cm + rangka kayu kruing Err:509

I.036 Langit-langit akustik (30 x 60) cm + rangka kayu meranti Err:509

I.037 Langit-langit akustik (30 x 30) cm + rangka kayu jati Err:509

I.038 Langit-langit akustik (30 x 30) cm + rangka kayu kamper Err:509

I.039 Langit-langit akustik (30 x 30) cm + rangka kayu borneo Err:509

I.040 Langit-langit akustik (30 x 30) cm + rangka kayu bengkirai Err:509

I.041 Langit-langit akustik (30 x 30) cm + rangka kayu kruing Err:509

I.042 Langit-langit akustik (30 x 30) cm + rangka kayu meranti Err:509

I.043 Langit-langit gypsum board (120x240x9) mm, tebal 9 mm 33,166.32

I.044 List langit-langit kayu profil 13,145.00

I.045 List langit-langit gypsum 26,821.00

X. PEKERJAAN SANITASI

J.001 Pasang kloset jongkok teraso bh 225,850.00

J.002 Pasang kloset jongkok porselin kw. A bh 392,050.00

J.003 Pasang kloset jongkok lux bh 525,300.00

J.004 Pasang kloset duduk porselin kw. A bh 1,564,667.00

J.005 Pasang kloset duduk lux bh 1,618,158.88

J.006 Pasang buah urinoir bh 1,171,746.00

J.007 Pasang wastafel kw. A bh 558,529.28

J.008 Pasang wastafel lux bh 1,354,985.44

J.009 Pasang tempat sabun keramik bh 34,200.00

J.010 Pasang bak mandi teraso volume 0.3 m3 bh 280,020.00

J.011 Pasang bak mandi fibreglass volume 0.3 m3 bh 592,248.06

J.012 Pasang bak mandi batu bata volume 0.3 m3 bh 851,500.00

J.013 Pasang badkip porselen bh 876,500.00

J.014 Pasang bak beton volume 1.0 m3 bh Err:509

J.015 Pasang pipa penyalur air limbah jenis pipa tanah, diameter 15 cm 133,439.27

J.016 Pasang pipa penyalur air limbah jenis pipa tanah, diameter 20 cm 202,465.00

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m1

m1

m1

m1

Page 38: Analisa PDAM 2010

KODEJENIS PEKERJAAN SATUAN

HARGA

ANALISA (Rp.)

1 2 3 4

J.017 Pasang pipa beton Ø 20 cm 59,543.90

J.018 Pasang pipa beton Ø 30 cm 100,770.12

J.019 Pasang pipa beton Ø 40 cm 120,038.16

J.020 Pasang pipa beton Ø 50 cm 146,335.20

J.021 Pasang pipa beton Ø 60 cm 181,256.24

J.022 Pasang pipa beton Ø 80 cm 269,820.32

J.023 Pasang pipa beton Ø 90 cm 306,831.36

J.024 Pasang pipa beton Ø 100 cm 341,026.40

J.025 Pasang pipa beton U Ø 20 cm 56,793.90

J.026 Pasang pipa beton U Ø 30 cm 110,585.20

J.027 Pasang bak kontrol pasangan batu bata (30 x 30 x 35) cm bh 167,710.75

J.028 Pasang bak kontrol pasangan batu bata (45 x 45 x 60) cm bh 241,614.50

J.029 Pasang bak kontrol pasangan batu bata (60 x 60 x 65) cm bh 369,062.68

J.030 Pasang pipa galvanis Ø 1/2" 64,488.75

J.031 Pasang pipa galvanis Ø 3/4" 80,332.50

J.032 Pasang pipa galvanis Ø 1" 105,682.50

J.033 Pasang pipa galvanis Ø 1 1/2" 156,777.00

J.034 Pasang pipa galvanis Ø 2" 216,983.25

J.035 Pasang pipa galvanis Ø 2 1/2" 296,202.00

J.036 Pasang pipa galvanis Ø 3" 334,227.00

J.037 Pasang pipa galvanis Ø 4" 487,500.25

J.038 Pasang pipa PVC tipe AW Ø 1/2" 17,909.75

J.039 Pasang pipa PVC tipe AW Ø 3/4" 23,862.77

J.040 Pasang pipa PVC tipe AW Ø 1" 29,490.48

J.041 Pasang pipa PVC tipe AW Ø 1 1/2" 37,610.93

J.042 Pasang pipa PVC tipe AW Ø 2" 49,164.18

J.043 Pasang pipa PVC tipe AW Ø 2.5" 60,643.50

J.044 Pasang pipa PVC tipe AW Ø 3" 86,418.92

J.045 Pasang pipa PVC tipe AW Ø 4" 127,667.60

J.046 Pasang pipa PVC tipe AW Ø 6" 219,280.05

J.047 Pasang pipa PVC tipe AW Ø 8" 334,521.46

J.048 Pasang pipa PVC tipe D Ø 1/2" 11,846.88

J.049 Pasang pipa PVC tipe D Ø 3/4" 14,876.20

J.050 Pasang pipa PVC tipe D Ø 1" 17,690.05

J.051 Pasang pipa PVC tipe D Ø 1 1/2" 21,695.35

J.052 Pasang pipa PVC tipe D Ø 2" 28,161.70

J.053 Pasang pipa PVC tipe D Ø 2.5" 37,038.43

J.054 Pasang pipa PVC tipe D Ø 3" 54,156.83

J.055 Pasang pipa PVC tipe D Ø 4" 70,938.53

J.056 Pasang pipa PVC tipe C Ø 1/2" 10,372.35

J.057 Pasang pipa PVC tipe C Ø 3/4" 12,582.03

J.058 Pasang pipa PVC tipe C Ø 1" 14,702.97

J.059 Pasang pipa PVC tipe C Ø 1 1/2" 17,736.53

J.060 Pasang pipa PVC tipe C Ø 2" 24,785.93

J.061 Pasang pipa PVC tipe C Ø 2.5" 29,158.80

J.062 Pasang pipa PVC tipe C Ø 3" 37,223.03

J.063 Pasang pipa PVC tipe C Ø 4" 43,852.05

J.064 Pasang bak cuci piring stainles steel bh 287,370.00

J.065 Pasang bak cuci piring teraso bh 222,500.00

J.066 Pasang kran Ø 1/2" bh 41,073.75

J.067 Pasang kran Ø 3/4" bh 44,913.75

J.068 Pasang Afor Stainless Steel bh 52,850.00

J.069 Pasang Afor Plastik bh 20,870.00

J.070 Pasang Kaca Wastafel 146,921.00

J.071 Pasang pipa screen PVC tipe AW Ø 3" 94,350.17

J.072 Pasang pipa screen PVC tipe AW Ø 4" 135,598.85

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m2

m1

m1

Page 39: Analisa PDAM 2010

KODEJENIS PEKERJAAN SATUAN

HARGA

ANALISA (Rp.)

1 2 3 4

XI. PEKERJAAN BESI DAN ALUMINIUM

K.001 Pasang besi profil kg 35,378.50

K.002 Pasang rangka kuda-kuda baja WF kg 35,378.50

K.003 Pemasangan Baut Anker Baja kg 18,450.00

K.004 Ikatan Angin/Trekstang kg 22,741.00

K.005 Plendes kg 35,378.50

K.006 Pasang pintu plat baja tebal 2 mm rangkap, rangka baja siku 1,019,345.00

K.007 Pengelasan dengan las listrik cm 11,679.93

K.008 Pasang pintu gulung besi (rolling door) 1,910,690.00

K.009 Pasang pintu lipat (folding door) 1,587,810.00

K.010 Pasang sunscream alluminium 324,740.00

K.011 Pasang Rolling door Aluminium 1,189,950.00

K.012 Pasang Kusen Alluminium Coklat 110,242.10

K.013 Pasang pintu Alluminium coklat strip lebar 8 cm 640,808.50

K.014 Pasang Pintu Kaca Rangka Aluminium Coklat 473,519.00

K.015 Pasang venetion blinds dan vertical blinds (tirai) 539,835.00

K.016 Pasang teralis besi (2 x 3) mm 468,684.50

K.017 Pasang kawat nyamuk 173,176.02

K.018 Pasang jendela nako & trails 317,575.00

K.019 Pasang pintu fiber KM Unit 360,880.00

K.020 Pasang talang datar, seng bjls 30 L = 0.60 m 185,677.50

K.021 Pasang talang datar, seng bjls 30 L = 0.90 m 194,917.50

K.022 Pasang talang miring, seng bjls 30 L = 0.60 m 185,677.50

K.023 Pasang talang miring, seng bjls 30 L = 0.90 m 194,917.50

K.024 52,177.50

K.025 63,580.00

K.026 Pasang talang 1/2 lingkaran D-15 cm bjls 30, L = 45 cm 63,440.00

K.027 Pasang pagar BRC tinggi 1 m 298,340.10

K.028 Pasang tiang pagar BRC Dia 2" tinggi 1 m 193,017.60

K.029 Pasang pintu pagar BRC tinggi 1 m 526,628.20

K.030 Pasang pagar besi 602,925.63

K.031 Pasang pintu pagar besi 813,101.04

K.032 Pasang Atap Baja Ringan untuk Penutup Atap Genteng 273,171.14

K.033 Pasang Atap Baja Ringan untuk Penutup Atap Asbes Gelombang 246,407.75

XII. PEKERJAAN KUNCI DAN KACA

L.001 Pasang kunci tanam antik bh 122,470.00

L.002 Pasang kunci tanam biasa bh 129,220.00

L.003 Pasang kunci tanam kamar mandi bh 109,070.00

L.004 Pasang kunci silinder bh 159,630.00

L.005 Pasang kunci selot bh 132,320.00

L.006 Pasang kunci lemari bh 27,650.00

L.007 Pasang engsel pintu bh 37,600.00

L.008 Pasang engsel jendela bh 28,170.00

L.009 Pasang grendel pintu bh 29,400.00

L.010 Pasang grendel jendela bh 17,560.00

L.011 Pasang hak angin bh 31,430.00

L.012 Pasang spring knip bh 21,040.00

L.013 Pasang kait angin bh 15,160.00

L.014 Pasang door closer bh 185,470.00

L.015 Pasang pegangan pintu/door holder bh 142,450.00

L.016 Pasang door stop bh 137,515.00

L.017 Pasang rel pintu dorong bh 158,010.00

m2

m2

m2

m2

m2

m1

m2

m2

m2

m2

m2

m2

m1

m1

m1

m1

Pasang talang tegak pipa PVC Ø 3" m1

Pasang talang tegak pipa PVC Ø 4" m1

m1

m1

m1

m1

m1

m1

m1

m1

Page 40: Analisa PDAM 2010

KODEJENIS PEKERJAAN SATUAN

HARGA

ANALISA (Rp.)

1 2 3 4

L.018 Pasang kaca polos, tebal 3 mm 78,090.00

L.019 Pasang kaca polos, tebal 5 mm 122,057.00

L.020 Pasang kaca polos, tebal 8 mm 170,545.00

L.021 Pasang kaca polos, tebal 12 mm 232,266.00

L.022 Pasang kaca buram, tebal 3 mm 100,263.00

L.023 Pasang kaca buram, tebal 5 mm 149,312.00

L.024 Pasang kaca buram, tebal 8 mm 213,502.00

L.025 Pasang kaca buram, tebal 12 mm 284,540.00

L.026 Pasang kaca cermin, tebal 5 mm 146,576.00

L.027 Pasang kaca cermin, tebal 6 mm 170,259.00

L.028 Pasang kaca cermin, tebal 8 mm 224,574.00

L.029 Pasang kaca rayben, tebal 3 mm 132,562.00

L.030 Pasang kaca rayben, tebal 5 mm 176,177.00

L.031 Pasang kaca rayben, tebal 8 mm 206,534.00

L.032 Pasang kaca rayben, tebal 12 mm 260,654.00

L.033 Pasang kaca " wireglass", tebal 5 mm 602,372.00

L.034 Pasang kaca patri, tebal 5 mm 898,338.00

L.035 Pasang glass block bh 31,824.00

L.036 Pasang kaca painting glass 424,788.00

XIII. PEKERJAAN LANTAI DAN DINDING

M.001 Pasang lantai ubin pc abu-abu ukuran 40 x 40 cm Err:509

M.002 Pasang lantai ubin pc abu-abu ukuran 30 x 30 cm Err:509

M.003 Pasang lantai ubin pc abu-abu ukuran 20 x 20 cm Err:509

M.004 Pasang lantai ubin pc warna ukuran 40 x 40 cm Err:509

M.005 Pasang lantai ubin pc warna ukuran 30 x 30 cm Err:509

M.006 Pasang lantai ubin pc warna ukuran 20 x 20 cm Err:509

M.007 Pasang lantai ubin teraso ukuran 40 x 40 cm Err:509

M.008 Pasang lantai ubin teraso ukuran 30 x 30 cm Err:509

M.009 Pasang lantai ubin granito ukuran 40 x 40 cm Err:509

M.010 Pasang lantai ubin granito ukuran 30 x 30 cm Err:509

M.011 Pasang lantai ubin teralux kerang ukuran 40 x 40 cm 272,720.00

M.012 Pasang lantai ubin teralux kerang ukuran 30 x 30 cm 398,700.00

M.013 Pasang lantai ubin teralux marmer ukuran 60 x 60 cm 227,420.00

M.014 Pasang lantai ubin teralux marmer ukuran 40 x 40 cm 338,470.00

M.015 Pasang lantai ubin teralux marmer ukuran 30 x 30 cm 576,750.00

M.016 Pasang plint ubin pc abu-abu ukuran 15 x 20 cm Err:509

M.017 Pasang plint ubin pc abu-abu ukuran 10 x 30 cm Err:509

M.018 Pasang plint ubin pc abu-abu ukuran 10 x 40 cm Err:509

M.019 Pasang plint ubin pc warna ukuran 10 x 20 cm Err:509

M.020 Pasang plint ubin pc warna ukuran 10 x 30 cm Err:509

M.021 Pasang plint ubin pc warna ukuran 10 x 40 cm Err:509

M.022 Pasang plint ubin teraso ukuran 10 x 30 cm Err:509

M.023 Pasang plint ubin teraso ukuran 10 x 40 cm Err:509

M.024 Pasang plint ubin granito ukuran 10 x 40 cm Err:509

M.025 Pasang plint ubin granito ukuran 10 x 30 cm Err:509

M.026 Pasang teraso cor di tempat, tebal 3cm Err:509

M.027 Pasang lantai keramik artistik 10 x 20 cm Err:509

M.028 Pasang lantai keramik artistik 10 x 10 cm Err:509

M.029 Pasang lantai keramik artistik 5 x 20 cm Err:509

M.030 Pasang dinding keramik artistik 10 x 20 cm Err:509

M.031 Pasang dinding keramik artistik 5 x 20 cm Err:509

M.032 Pasang plint keramik artistik 10 x 20 cm Err:509

M.033 Pasang plint keramik artistik 10 x 10 cm Err:509

M.034 Pasang plint keramik artistik 5 x 20 cm Err:509

M.035 Pasang internal cove artistik (5 x 5 x 20) cm Err:509

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m2

m2

m2

m2

m2

m2

m1

m1

m1

m2

Page 41: Analisa PDAM 2010

KODEJENIS PEKERJAAN SATUAN

HARGA

ANALISA (Rp.)

1 2 3 4

M.036 Pasang gymflour 300,722.00

M.037 Pasang parquet Err:509

M.038 Pasang karpet Err:509

M.039 Pasang lantai keramik ukuran 20 x 20 cm putih 112,910.00

M.040 Pasang lantai keramik ukuran 20 x 20 cm warna/motif 116,885.00

M.041 Pasang lantai keramik KM ukuran 20 x 20 cm 121,012.00

M.042 Pasang lantai keramik ukuran 30 x 30 cm putih 130,700.70

M.043 Pasang lantai keramik ukuran 30 x 30 cm warna/motif 136,754.40

M.044 Pasang lantai keramik ukuran 40 x 40 cm putih 146,161.10

M.045 Pasang lantai keramik ukuran 40 x 40 cm warna/motif 153,299.00

M.046 Pasang lantai marmer ukuran (100x100)cm Err:509

M.047 Pasang plint ubin keramik lantai ukuran 10 x 20 cm 33,578.50

M.048 Pasang plint ubin keramik lantai ukuran 10 x 30 cm 74,791.40

M.049 Pasang plint ubin keramik lantai ukuran 10 x 40 cm 85,092.00

M.050 Pasang dinding porselin ukuran 15 x 15 cm, putih 115,650.00

M.051 Pasang dinding porselin ukuran 11 x 11 cm, putih 147,500.00

M.052 Pasang dinding porselin ukuran 11 x 11 cm, warna 156,100.00

M.053 Pasang dinding porselin ukuran 15 x 15 cm, warna 120,150.00

M.054 Pasang dinding porselin ukuran 10 x 20 cm, warna 132,985.00

M.055 Pasang dinding porselin ukuran 20 x 20 cm, warna 129,045.00

M.056 Pasang dinding keramik ukuran 20 x 20 cm 149,450.00

M.057 Pasang dinding keramik ukuran 20 x 25 cm 129,350.00

M.058 Pasang dinding batu tempel hitam 140,675.00

M.059 Pasang lantai vinyl ukuran (30x30) cm Klas I Err:509

M.060 Pasang wallpaper Err:509

M.061 Pasang dinding batu palimanan 141,657.50

M.062 Pasang dinding batu granito Err:509

M.063 Pasang dinding marmer ukuran (100x100)cm Err:509

M.064 Pasang dinding batu teraso Err:509

M.065 Pasang paving stone (blok) segi empat biasa 83,625.00

M.066 Pasang paving stone (blok) segi empat warna 91,725.00

M.067 Pasang paving stone (blok) segi enam biasa 83,950.00

M.068 Pasang paving stone (blok) segi enam warna 90,950.00

M.069 Pasang paving stone (blok) tiga berlian berlian biasa 83,775.00

M.070 Pasang paving stone (blok) tiga berlian berlian warna 91,200.00

XIV. PEKERJAAN PENGECATAN

N.001 Mengikis/mengerok permukaan cat lama 8,026.00

N.002 Mencuci bidang permukaan cat tembok lama 8,385.00

N.003 Mengerok karat cat lama permukaan baja dengan cara manual 8,385.00

N.004 Menyabun permukaan tembok lama 8,385.00

N.005 Mengerok karat/cat lama permukaan baja dengan pancar pasir Err:509

N.006 Mendempul dan menggosok kayu Err:509

N.007 Pengecatan kayu lama 26,572.40

N.008 Pengecatan kayu baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup) 32,521.20

N.009 Pengecatan kayu baru (1 lapis plamir, 1 lapis cat dasar, 3 lapis cat penutup) 43,998.50

N.010 Pelaburan kayu dengan teak oil 9,585.40

N.011 Pelaburan kayu dengan politur 60,065.50

N.012 Pelaburan kayu dengan cat residu dan ter 13,590.00

N.013 Pelaburan kayu dengan vernis 24,599.60

N.014 Pengecatan tembok baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup) 14,645.10

N.015 Pengecatan tembok lama (1 lapis cat dasar, 2 lapis cat penutup) 7,830.20

N.016 Melabur tembok dengan kalkarium 4,894.40

N.017 Melabur tembok dengan kapur sirih Err:509

N.018 Melabur tembok lama dengan kapur sirih (untuk pemeliharaan) 12,499.50

N.019 Pengecatan plafon (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup) 14,645.10

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m1

m1

m1

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

Page 42: Analisa PDAM 2010

KODEJENIS PEKERJAAN SATUAN

HARGA

ANALISA (Rp.)

1 2 3 4

N.020 Pengecatan permukaan baja dengan meni besi 17,539.60

N.021 Pengecatan permukaan baja dengan meni besi dan perancah Err:509

N.022 Pengecatan permukaan baja lapis seng (galbani) secara manual, 1 lapis 25,362.00

N.023 Pengecatan permukaan baja lapis seng (galbani) secara manual, 3 lapis 114,883.60

N.024 Pengecatan permukaan baja lapis seng (galbani) secara semprot, 1 lapis 95,564.00

N.025 Pekerjaan Waterproofing 51,576.50

XVI. PEKERJAAN INSTALASI LISTRIK

P.001 Pemasangan Stop Kontak Titik 125,094.00

P.002 Pemasangan Saklar Tunggal Titik 115,214.00

P.003 Pemasangan Saklar Ganda Titik 134,314.00

P.004 Pemasangan titik lampu pijar 5 - 40 watt Titik 91,975.00

P.005 Pemasangan titik lampu pijar 50 - 100 watt Titik 102,225.00

P.006 Pemasangan titik lampu TL 20 Watt (komplit) Titik 122,735.00

P.007 Pemasangan titik lampu TL 40 Watt (komplit) Titik 148,615.00

P.008 Pemasangan titik lampu XL 5 Watt Titik 100,685.00

P.009 Pemasangan titik lampu XL 8 Watt Titik 100,685.00

P.010 Pemasangan titik lampu XL 14 Watt Titik 103,255.00

P.011 Pemasangan titik lampu XL 18 Watt Titik 105,815.00

P.012 Pemasangan titik lampu XL 23 Watt Titik 106,835.00

P.013 Pemasangan Sekering 1 Group Unit 120,812.00

P.014 Pemasangan Sekering 2 Group Unit 195,776.50

P.015 Pemasangan Sekering 3 Group Unit 275,797.50

P.016 Pemasangan Penangkal Petir Unit 2,780,530.00

XVII. PEKERJAAN AIR BERSIH

Q.001 Penyetelan mesin bor dan buat bak sirkulasi Unit 3,300,000.00

Q.002 Geolistrik Ls 3,475,000.00

Q.003 Pemboran pilot hole Ø 8 3/4" kedalaman 0 - 25 m 291,651.67

Q.004 Pemboran pilot hole Ø 8 3/4" kedalaman 25 - 50 m 364,564.58

Q.005 Pemboran pilot hole Ø 8 3/4" kedalaman 50 - 75 m 437,477.50

Q.006 Pemboran pilot hole Ø 8 3/4" kedalaman 75 - 100 m 546,846.88

Q.007 Pemboran pilot hole Ø 8 3/4" kedalaman 100 - 125 m 729,129.17

Q.008 Pemboran pilot hole Ø 8 3/4" kedalaman 125 - 175 m 1,093,693.75

Q.009 Pemboran pilot hole Ø 8 3/4" kedalaman 175 - 225 m 1,458,258.33

Q.010 Pemboran pilot hole Ø 8 3/4" kedalaman 225 - 275 m 2,187,387.50

Q.011 Geofisikal, Elektrikal, Logging 15,818.18

Q.012 Pumping test open hole Ls 7,230,570.00

Q.013 Pembesaran lubang bor Ø 8 3/4" - Ø 12" kedalaman 0 - 25 m 215,265.28

Q.014 Pembesaran lubang bor Ø 8 3/4" - Ø 12" kedalaman 25 - 50 m 258,318.33

Q.015 Pembesaran lubang bor Ø 8 3/4" - Ø 12" kedalaman 50 - 75 m 322,897.92

Q.016 Pembesaran lubang bor Ø 8 3/4" - Ø 12" kedalaman 75 - 100 m 430,530.56

Q.017 Pembesaran lubang bor Dia 8 3/4" - Ø 12" kedalaman 100 - 125 m 553,539.29

Q.018 Pembesaran lubang bor Ø 8 3/4" - Ø 12" kedalaman 125 - 175 m 774,955.00

Q.019 Pembesaran lubang bor Ø 8 3/4" - Ø 12" kedalaman 175 - 225 m 1,291,591.67

Q.020 Pengadaan dan pemasangan pipa jambang PVC-AW Ø 150 mm 313,195.00

Q.021 Pengadaan dan pemasangan pipa buta PVC-AW Ø 150 mm 313,195.00

Q.022 Pengadaan dan pemasangan pipa screen PVC-AW Ø 150 mm 339,460.00

Q.023 Pengadaan dan pemasangan pipa jambang PVC-AW Ø 125 mm 267,210.00

Q.024 Pengadaan dan pemasangan pipa buta PVC-AW Ø 125 mm 267,210.00

Q.025 Pengadaan dan pemasangan pipa screen PVC-AW Ø 125 mm 293,027.50

Q.026 Pengadaan dan pemasangan pipa sounding PVC-AW Ø 2.50" m1 45,750.00

Q.027 Pengadaan dan pemasangan pipa sounding SWL PVC-AW Ø 1" m1 29,027.50

Q.028 Pengisian gravel pack Ø 5 mm - 10 mm m3 374,940.00

Q.029 Beton Mortar 1 pc : 1 ps 587,332.14

Q.030 Pencucian sumur bor, kedalaman < 200 m Titik 8,353,750.00

Q.031 Pencucian sumur bor, kedalaman > 200 m Titik 13,107,500.00

Q.032 Pumping test dan test nonstop 24 jam Jam 309,458.91

m2

m2

m2

m2

m2

m2

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m3

Page 43: Analisa PDAM 2010

KODEJENIS PEKERJAAN SATUAN

HARGA

ANALISA (Rp.)

1 2 3 4

Q.033 Pasang pipa PVC RRJ 6 m S-10 Ø 2" m1 55,541.70

Q.034 Pasang pipa PVC RRJ 6 m S-10 Ø 2,5" m1 69,254.40

Q.035 Pasang pipa PVC RRJ 6 m S-10 Ø 3" m1 97,648.45

Q.036 Pasang pipa PVC RRJ 6 m S-10 Ø 4" m1 139,286.43

Q.037 Pasang pipa PVC RRJ 6 m S-10 Ø 6" m1 281,739.13

Q.038 Pasang pipa PVC RRJ 6 m S-10 Ø 8" m1 455,872.67

Q.039 Pasang pipa RRJ S-10 Ø 2" lintas jalan m1 126,571.89

Q.040 Pasang pipa RRJ S-10 Ø 3" lintas jalan m1 164,336.64

Q.041 Pasang pipa RRJ S-10 Ø 4" lintas jalan m1 205,974.61

Q.042 Pasang pipa PVC Moof 6 m S-12.5 Ø 2" m1 43,667.25

Q.043 Pasang pipa PVC Moof 6 m S-12.5 Ø 2,5" m1 57,438.00

Q.044 Pasang pipa PVC Moof 6 m S-12.5 Ø 3" m1 85,677.25

Q.045 Pasang pipa PVC Moof 6 m S-12.5 Ø 4" m1 119,668.75

Q.046 Pasang pipa PVC Moof 6 m S-12.5 Ø 6" m1 249,956.75

Q.047 Pasang pipa PVC Moof 6 m S-12.5 Ø 8" m1 402,457.00

Q.048 m1 114,697.44

Q.049 m1 152,365.44

Q.050 m1 186,356.94

Q.051 Pasang pompa air Unit 767,838.00

Q.052 Pasang tandon air PVC V = 0.5 m3 Unit 597,500.00

Q.053 Pasang tandon air PVC V = 1.0 m3 Unit 1,183,750.00

Q.054 Pasang tandon air stainless V = 0.5 m3 Unit 1,753,125.00

Q.055 Pasang tandon air stainless V = 1.0 m3 Unit 2,920,000.00

XVIII. PEKERJAAN PENUNJANG IRIGASI

R.001 Pengukuran bendung untuk MC bh 569,125.80

R.002 Pengukuran saluran untuk MC 804,125.80

R.003 Pengukuran bangunan untuk MC bh 104,841.80

R.004 Pendongkelan rumpun bambu 69,315.00

R.005 Pembuatan dan pembongkaran kisdam > 1 m 128,380.40

R.006 Galian tanah biasa diangkut > 1 m dibuang 46,050.00

R.007 Galian tanah biasa diangkut > 50 m dibuang 55,800.00

R.008 Galian tanah berbatu diangkut > 1 m dibuang 85,460.00

R.009 Galian tanah berbatu diangkut > 50 m dibuang 85,565.00

R.010 Galian tanah keras/cadas diangkut > 1 m dibuang 78,120.00

R.011 Galian tanah keras/cadas diangkut > 50 m dibuang 84,760.00

R.012 Galian tanah biasa langsung untuk timbunan / dibuang 34,820.00

R.013 Pemadatan tanah timbunan & dirapikan 15,225.00

R.014 Timbunan tanah kembali dipadatkan dan dirapikan (manual) 36,810.00

R.015 Timbunan tanah dari luar dipadatkan dan dirapikan (manual) 86,585.00

R.016 Bongkaran pasangan batu kali 110,390.00

R.017 Pasangan batu kali dengan spesi 1 pc ; 4 ps 430,440.00

R.018 Siaran dengan spesi 1 pc ; 2 ps 30,506.00

R.019 Plesteran tebal 1,5 cm dengan spesi 1 pc ; 3 ps 28,228.40

R.020 Bronjong kawat galvanis d = 4 mm (0.50 x 1.00 x 2.00) 967,090.00

R.021 Beton K-125 492,501.11

R.022 Beton K-175 534,061.51

R.023 Bekisting kayu termasuk pembongkaran 121,191.00

R.024 Besi Tulangan Ulir kg 18,867.75

R.025 Besi Tulangan Polos kg 9,853.50

R.026 Kisi-Kisi 567,700.74

R.027 Pintu Air Type A Plat bh 62,926,000.00

R.028 Pintu Air Type C - 2 bh 10,953,000.00

R.029 Pintu Air Type C - 3 bh 7,132,000.00

R.030 Pintu Air Type C - 3 bh 7,586,000.00

R.031 Pintu Air Type C - 3 bh 9,372,000.00

R.032 Pintu Air Type C - 5 bh 9,372,000.00

Pasang pipa Moof S-12.5 Ø 2" lintas jalan

Pasang pipa Moof S-12.5 Ø 3" lintas jalan

Pasang pipa Moof S-12.5 Ø 4" lintas jalan

Km1

m2

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m2

m2

m3

m3

m3

m2

m2

Page 44: Analisa PDAM 2010

KODEJENIS PEKERJAAN SATUAN

HARGA

ANALISA (Rp.)

1 2 3 4

XIX. PEKERJAAN LAIN - LAIN

S.001 Menanam rumput lamur 28,630.00

S.002 Menanam rumput manila 25,940.00

S.003 Menanam semak hias 31,360.00

S.004 Menanam pohon pelindung btg 187,030.00

S.005 Pengisian koral sumur resapan 167,795.00

S.006 Menanam gebalan rumput 26,740.00 S.007 Pasang papan kayu jembatan gantung, kayu kamper 12,993,900.00

Catatan : Harga belum termasuk PPn 10 %

MALANG,

KEPALA DINAS PEKERJAAN UMUM

KOTA MALANG

Ir. HADI SANTOSO

Pembina Utama Muda

NIP. 19610615 198903 1 017

m2

m2

m2

m3

m2

m3

Page 45: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : A.001JENIS PEKERJAAN : Pagar sementara dari kayu tinggi 2 mSATUAN PEMBAYARAN : m'

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.4000 45,000.00 18,000.00 2 Tukang Kayu L08 Org/hr 0.2000 60,000.00 12,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0200 47,000.00 940.00 4 Mandor L01 Org/hr 0.0200 80,000.00 1,600.00

JUMLAH HARGA TENAGA 32,540.00

B BAHAN

1 Dolken Kayu Dia 8 cm M089 btg 1.2500 25,000.00 31,250.00 2 Portland Cement (PC) M037 kg 2.5000 900.00 2,250.00 3 Pasir Cor M004 m3 0.0050 110,000.00 550.00 4 Stenslah/batu pecah tangan 2/3 M014 m3 0.0090 156,975.00 1,412.77 5 Usuk : 5/7 M061 m3 0.0720 4,500,000.00 324,000.00 6 Paku Kayu Segala Ukuran M140 kg 0.0600 17,500.00 1,050.00 7 Residu atau Teer M425 Ltr 0.4000 24,600.00 9,840.00

JUMLAH HARGA BAHAN 370,352.78

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 402,892.78

Page 46: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : A.002JENIS PEKERJAAN : Pagar sementara dari seng gelombang tinggi 2 mSATUAN PEMBAYARAN : m'

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.4000 45,000.00 18,000.00 2 Tukang Kayu L08 Org/hr 0.2000 60,000.00 12,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0200 47,000.00 940.00 4 Mandor L01 Org/hr 0.0200 80,000.00 1,600.00

JUMLAH HARGA TENAGA 32,540.00

B BAHAN

1 Dolken Kayu Dia 8 cm M089 btg 1.2500 25,000.00 31,250.00 2 Portland Cement (PC) M037 kg 2.5000 900.00 2,250.00 3 Atap Seng Gelombang M178 lbr 1.2000 71,950.00 86,340.00 4 Pasir Cor M004 m3 0.0050 110,000.00 550.00 5 Stenslah/batu pecah tangan 2/3 M014 m3 0.0090 156,975.00 1,412.77 6 Usuk : 5/7 M061 m3 0.0720 4,500,000.00 324,000.00 7 Paku Kayu Segala Ukuran M140 kg 0.0600 17,500.00 1,050.00 8 Cat meni besi M410 kg 0.4500 27,920.00 12,564.00

JUMLAH HARGA BAHAN 459,416.78

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 491,956.78

Page 47: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : A.003JENIS PEKERJAAN : Pagar sementara dari kawat duri tinggi 1.8 mSATUAN PEMBAYARAN : m'

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.3000 45,000.00 13,500.00 2 Tukang Kayu L08 Org/hr 0.2000 60,000.00 12,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0200 47,000.00 940.00 4 Mandor L01 Org/hr 0.0200 80,000.00 1,600.00

JUMLAH HARGA TENAGA 28,040.00

B BAHAN

1 Dolken Kayu Dia 8 cm M089 btg 1.0000 25,000.00 25,000.00 2 Portland Cement (PC) M037 kg 2.0000 900.00 1,800.00 3 Kawat Duri M137 kg 25.0000 17,000.00 425,000.00 4 Pasir Cor M004 m3 0.0050 110,000.00 550.00 5 Stenslah/batu pecah tangan 2/3 M014 m3 0.0090 156,975.00 1,412.77 6 Paku Kayu Segala Ukuran M140 kg 0.0600 17,500.00 1,050.00

JUMLAH HARGA BAHAN 454,812.78

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 482,852.78

Page 48: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : A.004JENIS PEKERJAAN : Pagar kawat jaring galvanis, tinggi 1,0 mSATUAN PEMBAYARAN : m'

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0420 45,000.00 1,890.00 2 Tukang Kayu L08 Org/hr 0.0420 60,000.00 2,520.00 3 Kepala Tukang Kayu L03 Org/hr 0.0040 47,000.00 188.00 4 Mandor L01 Org/hr 0.0020 80,000.00 160.00

JUMLAH HARGA TENAGA 4,758.00

B BAHAN

1 Kawat Harmonika Gas M136 m2 1.1000 8,500.00 9,350.00

JUMLAH HARGA BAHAN 9,350.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 14,108.00

ANALISA HARGA SATUAN

KODE ANALISA : A.005JENIS PEKERJAAN : Pengukuran dan pemasangan bouwplankSATUAN PEMBAYARAN : m'

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1000 45,000.00 4,500.00 2 Tukang Kayu L08 Org/hr 0.1000 60,000.00 6,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0100 47,000.00 470.00 4 Mandor L01 Org/hr 0.0050 80,000.00 400.00

JUMLAH HARGA TENAGA 11,370.00

B BAHAN

1 Usuk : 5/7 M061 m3 0.0120 4,500,000.00 54,000.00 2 Paku Kayu Segala Ukuran M140 kg 0.0200 17,500.00 350.00 3 Papan (3x20) cm M064 m3 0.0070 6,030,000.00 42,210.00

JUMLAH HARGA BAHAN 96,560.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 107,930.00

Page 49: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : A.006JENIS PEKERJAAN : Pembuatan kantor sementara, dengan lantai plesteranSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 2.0000 45,000.00 90,000.00 2 Tukang Kayu L08 Org/hr 1.0000 60,000.00 60,000.00 3 Tukang Batu L07 Org/hr 1.0000 60,000.00 60,000.00 4 Kepala Tukang Kayu L03 Org/hr 0.3000 47,000.00 14,100.00 5 Mandor L01 Org/hr 0.0500 80,000.00 4,000.00

JUMLAH HARGA TENAGA 228,100.00

B BAHAN

1 Balok M062 m3 0.1800 5,040,000.00 907,200.00 2 Paku Kayu Segala Ukuran M140 kg 0.3000 17,500.00 5,250.00 2 Portland Cement (PC) M037 kg 35.0000 900.00 31,500.00 3 Pasir Pasang M002 m3 0.1500 60,000.00 9,000.00 4 Pasir Cor M004 m3 0.1000 110,000.00 11,000.00 5 Stenslah/batu pecah tangan 2/3 M014 m3 0.1500 156,975.00 23,546.25 6 Bata Merah M022 bh 30.0000 250.00 7,500.00 7 Atap Seng Gelombang M178 lbr 0.5000 71,950.00 35,975.00 8 Jendela Nako + accessories M285 m2 0.0750 210,450.00 15,783.75 9 Kaca Polos tebal 3 mm M270 m2 0.1500 61,500.00 9,225.00

11 Multiplek 6 mm M216 m2 1.5000 76,670.00 115,005.00 12 Grendel Pintu M262 bh 2.0000 18,960.00 37,920.00 13 Engsel Pintu M257 bh 2.0000 27,160.00 54,320.00

JUMLAH HARGA BAHAN 1,263,225.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 1,491,325.00

: m2

Page 50: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : A.007JENIS PEKERJAAN : Pembuatan gudang semen dan alat-alatSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 2.0000 45,000.00 90,000.00 2 Tukang Kayu L08 Org/hr 1.0000 60,000.00 60,000.00 3 Tukang Batu L07 Org/hr 1.0000 60,000.00 60,000.00 4 Kepala Tukang Kayu L03 Org/hr 0.3000 47,000.00 14,100.00 5 Mandor L01 Org/hr 0.0500 80,000.00 4,000.00

JUMLAH HARGA TENAGA 228,100.00

B BAHAN

1 Balok M062 m3 0.2100 5,040,000.00 1,058,400.00 2 Paku Kayu Segala Ukuran M140 kg 0.3000 17,500.00 5,250.00 3 Portland Cement (PC) M037 kg 10.5000 900.00 9,450.00 4 Pasir Cor M004 m3 0.0300 110,000.00 3,300.00 5 Stenslah/batu pecah tangan 2/3 M014 m3 0.0500 156,975.00 7,848.75 6 Atap Seng Gelombang M178 lbr 0.5000 71,950.00 35,975.00 7 Multiplek 6 mm M216 m2 1.1500 76,670.00 88,170.50 8 Grendel Pintu M262 bh 2.0000 18,960.00 37,920.00 9 Engsel Pintu M257 bh 2.0000 27,160.00 54,320.00

JUMLAH HARGA BAHAN 1,300,634.25

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 1,528,734.25

: m2

Page 51: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : A.008JENIS PEKERJAAN : Pembuatan rumah jaga/konstruksi kayuSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 2.0000 45,000.00 90,000.00 2 Tukang Kayu L08 Org/hr 1.0000 60,000.00 60,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.3000 47,000.00 14,100.00 4 Mandor L01 Org/hr 0.0500 80,000.00 4,000.00

JUMLAH HARGA TENAGA 168,100.00

B BAHAN

1 Balok M062 m3 0.1800 5,040,000.00 907,200.00 2 Paku Kayu Segala Ukuran M140 kg 0.3000 17,500.00 5,250.00 2 Portland Cement (PC) M037 kg 35.0000 900.00 31,500.00 3 Pasir Pasang M002 m3 0.1500 60,000.00 9,000.00 4 Pasir Cor M004 m3 0.1000 110,000.00 11,000.00 5 Stenslah/batu pecah tangan 2/3 M014 m3 0.1500 156,975.00 23,546.25 6 Bata Merah M022 bh 30.0000 250.00 7,500.00 7 Atap Seng Gelombang M178 lbr 0.5000 71,950.00 35,975.00 8 Jendela Nako + accessories M285 m2 0.1500 210,450.00 31,567.50 9 Kaca Polos tebal 3 mm M270 m2 0.3000 61,500.00 18,450.00

11 Multiplek 6 mm M216 m2 1.5000 76,670.00 115,005.00

JUMLAH HARGA BAHAN 1,195,993.75

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 1,364,093.75

: m2

Page 52: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : A.009JENIS PEKERJAAN : Membersihkan lapangan dan perataanSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1000 45,000.00 4,500.00 2 Tukang Kayu L08 Org/hr - 60,000.00 - 3 Kepala Tukang Kayu L03 Org/hr - 47,000.00 - 4 Mandor L01 Org/hr 0.0500 80,000.00 4,000.00

JUMLAH HARGA TENAGA 8,500.00

B BAHAN

JUMLAH HARGA BAHAN -

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 8,500.00

: m2

Page 53: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : A.010JENIS PEKERJAAN : Pembuatan bedeng buruhSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 2.0000 45,000.00 90,000.00 2 Tukang Kayu L08 Org/hr 1.0000 60,000.00 60,000.00 3 Tukang Batu L07 Org/hr 1.0000 60,000.00 60,000.00 4 Kepala Tukang Kayu L03 Org/hr 0.3000 47,000.00 14,100.00 5 Mandor L01 Org/hr 0.0500 80,000.00 4,000.00

JUMLAH HARGA TENAGA 228,100.00

B BAHAN

1 Balok M062 m3 0.2100 5,040,000.00 1,058,400.00 2 Paku Kayu Segala Ukuran M140 kg 0.3000 17,500.00 5,250.00 3 Portland Cement (PC) M037 kg 10.5000 900.00 9,450.00 4 Pasir Cor M004 m3 0.0300 110,000.00 3,300.00 5 Stenslah/batu pecah tangan 2/3 M014 m3 0.0500 156,975.00 7,848.75 6 Atap Seng Gelombang M178 lbr 0.5000 71,950.00 35,975.00 7 Jendela Nako + accessories M285 m2 0.0750 210,450.00 15,783.75 8 Multiplek 6 mm M216 m2 1.1500 76,670.00 88,170.50 9 Grendel Pintu M262 bh 2.0000 18,960.00 37,920.00

10 Engsel Pintu M257 bh 2.0000 27,160.00 54,320.00

JUMLAH HARGA BAHAN 1,316,418.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 1,544,518.00

: m2

Page 54: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : A.011JENIS PEKERJAAN : Pembuatan bak adukan ukuran (40 x 50 x 20) cmSATUAN PEMBAYARAN : bh

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr - 45,000.00 - 2 Tukang Kayu L08 Org/hr 0.3000 60,000.00 18,000.00 3 Kepala Tukang Kayu L03 Org/hr - 47,000.00 - 4 Mandor L01 Org/hr 0.0015 80,000.00 120.00

JUMLAH HARGA TENAGA 18,120.00

B BAHAN

1 Papan (2x20) cm M063 m3 0.0360 6,030,000.00 217,080.00 2 Paku Kayu Segala Ukuran M140 kg 0.0800 17,500.00 1,400.00 3 Usuk : 5/7 M061 m3 0.0150 4,500,000.00 67,500.00

JUMLAH HARGA BAHAN 285,980.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 304,100.00

ANALISA HARGA SATUAN

KODE ANALISA : A.012JENIS PEKERJAAN : Pembuatan jalan sementaraSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 1.0000 45,000.00 45,000.00 2 Tukang Kayu L08 Org/hr - 60,000.00 - 3 Kepala Tukang Kayu L03 Org/hr - 47,000.00 - 4 Mandor L01 Org/hr 0.0500 80,000.00 4,000.00

JUMLAH HARGA TENAGA 49,000.00

B BAHAN

1 Batu Belah Kali M011 m3 0.1500 115,700.00 17,355.00 2 Stenslah/batu pecah tangan 4/6 - 5/7 M016 m3 0.0900 129,375.00 11,643.75 3 Pasir Pasang M002 m3 0.0100 60,000.00 600.00

JUMLAH HARGA BAHAN 29,598.75

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 78,598.75

: m2

Page 55: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : A.013JENIS PEKERJAAN : Bongkar pasang kayu kuda-kuda / kusen / loteng SATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 4.0000 45,000.00 180,000.00 2 Tukang Kayu L08 Org/hr 6.0000 60,000.00 360,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.6000 47,000.00 28,200.00 4 Mandor L01 Org/hr 0.0600 80,000.00 4,800.00

JUMLAH HARGA TENAGA 573,000.00

B BAHAN

JUMLAH HARGA BAHAN -

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 573,000.00

ANALISA HARGA SATUAN

KODE ANALISA : A.014JENIS PEKERJAAN : Bongkaran beton bertulangSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 6.6670 45,000.00 300,015.00 2 Tukang Kayu L08 Org/hr - 60,000.00 - 3 Kepala Tukang Kayu L03 Org/hr - 47,000.00 - 4 Mandor L01 Org/hr 0.3330 80,000.00 26,640.00

JUMLAH HARGA TENAGA 326,655.00

B BAHAN

JUMLAH HARGA BAHAN -

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 326,655.00

: m3

: m3

Page 56: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : A.015JENIS PEKERJAAN : Bongkaran tembok bata merahSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 6.6670 45,000.00 300,015.00 2 Tukang Kayu L08 Org/hr - 60,000.00 - 3 Kepala Tukang Kayu L03 Org/hr - 47,000.00 - 4 Mandor L01 Org/hr 0.0330 80,000.00 2,640.00

JUMLAH HARGA TENAGA 302,655.00

B BAHAN

JUMLAH HARGA BAHAN -

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 302,655.00

ANALISA HARGA SATUAN

KODE ANALISA : A.016JENIS PEKERJAAN : Bongkaran atapSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 1.1000 45,000.00 49,500.00 2 Tukang Kayu L08 Org/hr - 60,000.00 - 3 Kepala Tukang Kayu L03 Org/hr - 47,000.00 - 4 Mandor L01 Org/hr 0.0500 80,000.00 4,000.00

JUMLAH HARGA TENAGA 53,500.00

B BAHAN

JUMLAH HARGA BAHAN -

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 53,500.00

: m3

: m2

Page 57: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : A.017JENIS PEKERJAAN : Bongkaran lantaiSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.2000 45,000.00 9,000.00 2 Tukang Kayu L08 Org/hr - 60,000.00 - 3 Kepala Tukang Kayu L03 Org/hr - 47,000.00 - 4 Mandor L01 Org/hr 0.0100 80,000.00 800.00

JUMLAH HARGA TENAGA 9,800.00

B BAHAN

JUMLAH HARGA BAHAN -

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 9,800.00

ANALISA HARGA SATUAN

KODE ANALISA : A.018JENIS PEKERJAAN : Bongkaran plafonSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.2000 45,000.00 9,000.00 2 Tukang Kayu L08 Org/hr 0.0600 60,000.00 3,600.00 3 Kepala Tukang Kayu L03 Org/hr 0.0060 47,000.00 282.00 4 Mandor L01 Org/hr 0.0100 80,000.00 800.00

JUMLAH HARGA TENAGA 13,682.00

B BAHAN

JUMLAH HARGA BAHAN -

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 13,682.00

: m2

: m2

Page 58: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : B.001 JENIS PEKERJAAN : Galian tanah biasa sedalam 1 mSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.7500 45,000.00 33,750.00 2 Tukang Batu L07 Org/hr - 60,000.00 - 3 Kepala Tukang Batu L02 Org/hr - 70,000.00 - 4 Mandor L01 Org/hr 0.0250 80,000.00 2,000.00

JUMLAH HARGA TENAGA 35,750.00

B BAHAN

JUMLAH HARGA BAHAN -

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 35,750.00

ANALISA HARGA SATUAN

KODE ANALISA : B.002JENIS PEKERJAAN : Galian tanah biasa sedalam 2 mSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.9000 45,000.00 40,500.00 2 Tukang Batu L07 Org/hr - 60,000.00 - 3 Kepala Tukang Batu L02 Org/hr - 70,000.00 - 4 Mandor L01 Org/hr 0.0450 80,000.00 3,600.00

JUMLAH HARGA TENAGA 44,100.00

B BAHAN

JUMLAH HARGA BAHAN -

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 44,100.00

: m3

: m3

Page 59: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : B.003JENIS PEKERJAAN : Galian tanah biasa sedalam 3 mSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 1.0500 45,000.00 47,250.00 2 Tukang Batu L07 Org/hr - 60,000.00 - 3 Kepala Tukang Batu L02 Org/hr - 70,000.00 - 4 Mandor L01 Org/hr 0.0670 80,000.00 5,360.00

JUMLAH HARGA TENAGA 52,610.00

B BAHAN

JUMLAH HARGA BAHAN -

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 52,610.00

ANALISA HARGA SATUAN

KODE ANALISA : B.004JENIS PEKERJAAN : Galian tanah keras sedalam 1 mSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 1.0000 45,000.00 45,000.00 2 Tukang Batu L07 Org/hr - 60,000.00 - 3 Kepala Tukang Batu L02 Org/hr - 70,000.00 - 4 Mandor L01 Org/hr 0.0320 80,000.00 2,560.00

JUMLAH HARGA TENAGA 47,560.00

B BAHAN

JUMLAH HARGA BAHAN -

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 47,560.00

: m3

: m3

Page 60: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : B.005JENIS PEKERJAAN : Galian tanah cadas sedalam 1 mSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 1.5000 45,000.00 67,500.00 2 Tukang Batu L07 Org/hr - 60,000.00 - 3 Kepala Tukang Batu L02 Org/hr - 70,000.00 - 4 Mandor L01 Org/hr 0.0600 80,000.00 4,800.00

JUMLAH HARGA TENAGA 72,300.00

B BAHAN

JUMLAH HARGA BAHAN -

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 72,300.00

ANALISA HARGA SATUAN

KODE ANALISA : B.006JENIS PEKERJAAN : Galian tanah lumpur sedalam 1 mSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 1.2000 45,000.00 54,000.00 2 Tukang Batu L07 Org/hr - 60,000.00 - 3 Kepala Tukang Batu L02 Org/hr - 70,000.00 - 4 Mandor L01 Org/hr 0.0450 80,000.00 3,600.00

JUMLAH HARGA TENAGA 57,600.00

B BAHAN

JUMLAH HARGA BAHAN -

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 57,600.00

: m3

: m3

Page 61: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : B.007JENIS PEKERJAAN : Pekerjaan stripping setinggi 1 mSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0500 45,000.00 2,250.00 2 Tukang Batu L07 Org/hr - 60,000.00 - 3 Kepala Tukang Batu L02 Org/hr - 70,000.00 - 4 Mandor L01 Org/hr 0.0050 80,000.00 400.00

JUMLAH HARGA TENAGA 2,650.00

B BAHAN

JUMLAH HARGA BAHAN -

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 2,650.00

ANALISA HARGA SATUAN

KODE ANALISA : B.008JENIS PEKERJAAN : Pembuangan tanah sejauh 30 mSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.3300 45,000.00 14,850.00 2 Tukang Batu L07 Org/hr - 60,000.00 - 3 Kepala Tukang Batu L02 Org/hr - 70,000.00 - 4 Mandor L01 Org/hr 0.0100 80,000.00 800.00

JUMLAH HARGA TENAGA 15,650.00

B BAHAN

JUMLAH HARGA BAHAN -

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 15,650.00

: m2

: m3

Page 62: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : B.009JENIS PEKERJAAN : Urugan kembaliSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.3000 45,000.00 13,500.00 2 Tukang Batu L07 Org/hr - 60,000.00 - 3 Kepala Tukang Batu L02 Org/hr - 70,000.00 - 4 Mandor L01 Org/hr 0.0150 80,000.00 1,200.00

JUMLAH HARGA TENAGA 14,700.00

B BAHAN

JUMLAH HARGA BAHAN -

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 14,700.00

ANALISA HARGA SATUAN

KODE ANALISA : B.010JENIS PEKERJAAN : Pemadatan tanah (per 20 cm)SATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.5000 45,000.00 22,500.00 2 Tukang Batu L07 Org/hr - 60,000.00 - 3 Kepala Tukang Batu L02 Org/hr - 70,000.00 - 4 Mandor L01 Org/hr 0.0500 80,000.00 4,000.00

JUMLAH HARGA TENAGA 26,500.00

B BAHAN

JUMLAH HARGA BAHAN -

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 26,500.00

: m3

: m3

Page 63: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : B.011JENIS PEKERJAAN : Urugan pasirSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.3000 45,000.00 13,500.00 2 Tukang Batu L07 Org/hr - 60,000.00 - 3 Kepala Tukang Batu L02 Org/hr - 70,000.00 - 4 Mandor L01 Org/hr 0.0100 80,000.00 800.00

JUMLAH HARGA TENAGA 14,300.00

B BAHAN

1 Pasir Urug M001 m3 1.2000 96,600.00 115,920.00

JUMLAH HARGA BAHAN 115,920.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 130,220.00

ANALISA HARGA SATUAN

KODE ANALISA : B.012JENIS PEKERJAAN : Lapisan Pudel Campuran 1 Kp : 3 Ps : 7 TLSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.8000 45,000.00 36,000.00 2 Tukang Batu L07 Org/hr 0.4000 60,000.00 24,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0400 70,000.00 2,800.00 4 Mandor L01 Org/hr 0.0800 80,000.00 6,400.00

JUMLAH HARGA TENAGA 69,200.00

B BAHAN

1 Pasir Urug M001 m3 0.4000 96,600.00 38,640.00 2 Kapur M041 m3 0.1350 1,300,000.00 175,500.00 3 Tanah Liat M009 m3 0.9480 45,000.00 42,660.00

JUMLAH HARGA BAHAN 256,800.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 326,000.00

: m3

: m3

Page 64: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : B.013JENIS PEKERJAAN : Lapisan Pudel Campuran 1 Kp : 5 TLSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.8000 45,000.00 36,000.00 2 Tukang Batu L07 Org/hr 0.4000 60,000.00 24,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0400 70,000.00 2,800.00 4 Mandor L01 Org/hr 0.0800 80,000.00 6,400.00

JUMLAH HARGA TENAGA 69,200.00

B BAHAN

1 Kapur M041 m3 0.2480 1,300,000.00 322,400.00 2 Tanah Liat M009 m3 1.2400 45,000.00 55,800.00

JUMLAH HARGA BAHAN 378,200.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 447,400.00

ANALISA HARGA SATUAN

KODE ANALISA : B.014JENIS PEKERJAAN : Pemasangan lapisan ijuk (tebal 10 cm)SATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1500 45,000.00 6,750.00 2 Tukang Batu L07 Org/hr - 60,000.00 - 3 Kepala Tukang Batu L02 Org/hr - 70,000.00 - 4 Mandor L01 Org/hr 0.0150 80,000.00 1,200.00

JUMLAH HARGA TENAGA 7,950.00

B BAHAN

1 Ijuk M466 kg 6.0000 129,150.00 774,900.00

JUMLAH HARGA BAHAN 774,900.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 782,850.00

: m3

: m2

Page 65: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : B.015JENIS PEKERJAAN : Urugan sirtu padat untuk peninggian lantai bangunanSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.2500 45,000.00 11,250.00 2 Tukang Batu L07 Org/hr - 60,000.00 - 3 Kepala Tukang Batu L02 Org/hr - 70,000.00 - 4 Mandor L01 Org/hr 0.0250 80,000.00 2,000.00

JUMLAH HARGA TENAGA 13,250.00

B BAHAN

1 Sirtu M007 m3 1.2000 103,400.00 124,080.00

JUMLAH HARGA BAHAN 124,080.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 137,330.00

ANALISA HARGA SATUAN

KODE ANALISA : B.016JENIS PEKERJAAN : Cut and fill SATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 1.0500 45,000.00 47,250.00 2 Tukang Batu L07 Org/hr - 60,000.00 - 3 Kepala Tukang Batu L02 Org/hr - 70,000.00 - 4 Mandor L01 Org/hr 0.0350 80,000.00 2,800.00

JUMLAH HARGA TENAGA 50,050.00

B BAHAN

JUMLAH HARGA BAHAN -

C PERALATAN

1 Sewa Excavator E10 hari 0.0126 1,600,000.00 20,160.00 2 Sewa Whell Loader E11 hari 0.0075 2,400,000.00 18,000.00 3 Sewa Motor Grader E12 hari 0.0059 2,400,000.00 14,160.00 4 Sewa Vibro Roller E13 hari 0.0064 1,750,000.00 11,200.00 5 Sewa Water Tanker E14 hari 0.0005 1,000,000.00 500.00

JUMLAH HARGA PERALATAN 64,020.00

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 114,070.00

: m3

: m3

Page 66: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : B.017JENIS PEKERJAAN : Galian tanah keras sedalam > 5 mSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 1.7490 45,000.00 78,705.28 2 Tukang Batu L07 Org/hr - 60,000.00 - 3 Kepala Tukang Batu L02 Org/hr - 70,000.00 - 4 Mandor L01 Org/hr 0.1749 80,000.00 13,992.05

JUMLAH HARGA TENAGA 92,697.33

B BAHAN

JUMLAH HARGA BAHAN -

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 92,697.33

ANALISA HARGA SATUAN

KODE ANALISA : B.018JENIS PEKERJAAN : Galian tanah keras sedalam > 10 mSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 4.3521 45,000.00 195,843.93 2 Tukang Batu L07 Org/hr - 60,000.00 - 3 Kepala Tukang Batu L02 Org/hr - 70,000.00 - 4 Mandor L01 Org/hr 0.4352 80,000.00 34,816.70

JUMLAH HARGA TENAGA 230,660.62

B BAHAN

JUMLAH HARGA BAHAN -

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 230,660.62

: m3

: m3

Page 67: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : C.001JENIS PEKERJAAN : Pasang pondasi batu kali, 1 Pc : 3 PsSATUAN PEMBAYARAN : m3

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 1.5000 45,000.00 67,500.00 2 Tukang Batu L07 Org/hr 0.6000 60,000.00 36,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0600 70,000.00 4,200.00 4 Mandor L01 Org/hr 0.0750 80,000.00 6,000.00

JUMLAH HARGA TENAGA 113,700.00

B BAHAN

1 Batu Belah Kali M011 m3 1.2000 115,700.00 138,840.00 2 Portland Cement (PC) M037 kg 202.0000 900.00 181,800.00 3 Pasir Pasang M002 m3 0.4850 60,000.00 29,100.00

JUMLAH HARGA BAHAN 349,740.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 463,440.00

ANALISA HARGA SATUAN

KODE ANALISA : C.002JENIS PEKERJAAN : Pasang pondasi batu kali, 1 Pc : 4 PsSATUAN PEMBAYARAN : m3

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 1.5000 45,000.00 67,500.00 2 Tukang Batu L07 Org/hr 0.6000 60,000.00 36,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0600 70,000.00 4,200.00 4 Mandor L01 Org/hr 0.0750 80,000.00 6,000.00

JUMLAH HARGA TENAGA 113,700.00

B BAHAN

1 Batu Belah Kali M011 m3 1.2000 115,700.00 138,840.00 2 Portland Cement (PC) M037 kg 163.0000 900.00 146,700.00 3 Pasir Pasang M002 m3 0.5200 60,000.00 31,200.00

JUMLAH HARGA BAHAN 316,740.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 430,440.00

Page 68: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : C.003JENIS PEKERJAAN : Pasang pondasi batu kali, 1 Pc : 5 PsSATUAN PEMBAYARAN : m3

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 1.5000 45,000.00 67,500.00 2 Tukang Batu L07 Org/hr 0.6000 60,000.00 36,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0600 70,000.00 4,200.00 4 Mandor L01 Org/hr 0.0750 80,000.00 6,000.00

JUMLAH HARGA TENAGA 113,700.00

B BAHAN

1 Batu Belah Kali M011 m3 1.2000 115,700.00 138,840.00 2 Portland Cement (PC) M037 kg 136.0000 900.00 122,400.00 3 Pasir Pasang M002 m3 0.5440 60,000.00 32,640.00

JUMLAH HARGA BAHAN 293,880.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 407,580.00

ANALISA HARGA SATUAN

KODE ANALISA : C.004JENIS PEKERJAAN : Pasang pondasi batu kali, 1 Pc : 6 PsSATUAN PEMBAYARAN : m3

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 1.5000 45,000.00 67,500.00 2 Tukang Batu L07 Org/hr 0.6000 60,000.00 36,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0600 70,000.00 4,200.00 4 Mandor L01 Org/hr 0.0750 80,000.00 6,000.00

JUMLAH HARGA TENAGA 113,700.00

B BAHAN

1 Batu Belah Kali M011 m3 1.2000 115,700.00 138,840.00 2 Portland Cement (PC) M037 kg 117.0000 900.00 105,300.00 3 Pasir Pasang M002 m3 0.5610 60,000.00 33,660.00

JUMLAH HARGA BAHAN 277,800.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 391,500.00

Page 69: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : C.005JENIS PEKERJAAN : Pasang pondasi batu kali, 1 Pc : 8 PsSATUAN PEMBAYARAN : m3

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 1.5000 45,000.00 67,500.00 2 Tukang Batu L07 Org/hr 0.6000 60,000.00 36,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0600 70,000.00 4,200.00 4 Mandor L01 Org/hr 0.0750 80,000.00 6,000.00

JUMLAH HARGA TENAGA 113,700.00

B BAHAN

1 Batu Belah Kali M011 m3 1.2000 115,700.00 138,840.00 2 Portland Cement (PC) M037 kg 91.0000 900.00 81,900.00 3 Pasir Pasang M002 m3 0.5840 60,000.00 35,040.00

JUMLAH HARGA BAHAN 255,780.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 369,480.00

ANALISA HARGA SATUAN

KODE ANALISA : C.006JENIS PEKERJAAN : Pasang pondasi batu kali, 1 Kp : 1 Sm : 2 PsSATUAN PEMBAYARAN : m3

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 1.5000 45,000.00 67,500.00 2 Tukang Batu L07 Org/hr 0.6000 60,000.00 36,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0600 70,000.00 4,200.00 4 Mandor L01 Org/hr 0.0750 80,000.00 6,000.00

JUMLAH HARGA TENAGA 113,700.00

B BAHAN

1 Batu Belah Kali M011 m3 1.2000 115,700.00 138,840.00 2 Kapur M041 m3 0.1700 1,300,000.00 221,000.00 3 Semen Merah M043 m3 0.1700 165,000.00 28,050.00 4 Pasir Pasang M002 m3 0.3400 60,000.00 20,400.00

JUMLAH HARGA BAHAN 408,290.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 521,990.00

Page 70: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : C.007JENIS PEKERJAAN : Pasang pondasi batu kali, 1 Pc : 3 Kp : 10 PsSATUAN PEMBAYARAN : m3

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 1.5000 45,000.00 67,500.00 2 Tukang Batu L07 Org/hr 0.6000 60,000.00 36,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0600 70,000.00 4,200.00 4 Mandor L01 Org/hr 0.0750 80,000.00 6,000.00

JUMLAH HARGA TENAGA 113,700.00

B BAHAN

1 Batu Belah Kali M011 m3 1.2000 115,700.00 138,840.00 2 Portland Cement (PC) M037 kg 61.0000 900.00 54,900.00 3 Kapur M041 m3 0.1470 1,300,000.00 191,100.00 4 Pasir Pasang M002 m3 0.4920 60,000.00 29,520.00

JUMLAH HARGA BAHAN 414,360.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 528,060.00

ANALISA HARGA SATUAN

KODE ANALISA : C.008JENIS PEKERJAAN : Pasang pondasi batu kali, 1/4 Pc : 1 Kp : 4 PsSATUAN PEMBAYARAN : m3

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 1.5000 45,000.00 67,500.00 2 Tukang Batu L07 Org/hr 0.6000 60,000.00 36,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0600 70,000.00 4,200.00 4 Mandor L01 Org/hr 0.0750 80,000.00 6,000.00

JUMLAH HARGA TENAGA 113,700.00

B BAHAN

1 Batu Belah Kali M011 m3 1.2000 115,700.00 138,840.00 2 Portland Cement (PC) M037 kg 41.0000 900.00 36,900.00 3 Kapur M041 m3 0.1310 1,300,000.00 170,300.00 4 Pasir Pasang M002 m3 0.5230 60,000.00 31,380.00

JUMLAH HARGA BAHAN 377,420.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 491,120.00

Page 71: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : C.009JENIS PEKERJAAN : Pasang pondasi batu kosongSATUAN PEMBAYARAN : m3

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.7800 45,000.00 35,100.00 2 Tukang Batu L07 Org/hr 0.3900 60,000.00 23,400.00 3 Kepala Tukang Batu L02 Org/hr 0.0390 70,000.00 2,730.00 4 Mandor L01 Org/hr 0.0390 80,000.00 3,120.00

JUMLAH HARGA TENAGA 64,350.00

B BAHAN

1 Batu Belah Kali M011 m3 1.2000 115,700.00 138,840.00 2 Pasir Urug M001 m3 0.4320 96,600.00 41,731.20

JUMLAH HARGA BAHAN 180,571.20

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 244,921.20

ANALISA HARGA SATUAN

KODE ANALISA : C.010

JENIS PEKERJAAN SATUAN PEMBAYARAN : m3

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 3.0000 45,000.00 135,000.00 2 Tukang Batu L07 Org/hr 0.8500 60,000.00 51,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0850 70,000.00 5,950.00 4 Mandor L01 Org/hr 0.1500 80,000.00 12,000.00

JUMLAH HARGA TENAGA 203,950.00

B BAHAN

1 Besi Beton Polos M112 kg 126.0000 8,500.00 1,071,000.00 2 Portland Cement (PC) M037 kg 194.0000 900.00 174,600.00 3 Pasir Cor M004 m3 0.3120 110,000.00 34,320.00 4 Batu pecah mesin 2/3 M019 m3 0.4680 100,000.00 46,800.00 5 Kawat Beton/Bendrat RRT M135 kg 1.8000 7,500.00 13,500.00 6 Batu belah 15 cm/20 cm M011 m3 0.4800 115,700.00 55,536.00

JUMLAH HARGA BAHAN 1,395,756.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 1,599,706.00

: Pasang pondasi siklop, 60% beton campuran 1 PC : 2 PB : 3 KR dan 40% batu kali

Page 72: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : C.011JENIS PEKERJAAN : Pasang pondasi sumuran diameter 100 cmSATUAN PEMBAYARAN : m3

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 2.3800 45,000.00 107,100.00 2 Tukang Batu L07 Org/hr 0.3000 60,000.00 18,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0300 70,000.00 2,100.00 4 Mandor L01 Org/hr 0.0800 80,000.00 6,400.00

JUMLAH HARGA TENAGA 133,600.00

B BAHAN

1 Batu Belah Kali M011 m3 0.4500 115,700.00 52,065.00 2 Portland Cement (PC) M037 kg 194.0000 900.00 174,600.00 3 Pasir Cor M004 m3 0.3120 110,000.00 34,320.00 4 Batu pecah mesin 2/3 M019 m3 0.4680 100,000.00 46,800.00

JUMLAH HARGA BAHAN 307,785.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 441,385.00

Page 73: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : D.001JENIS PEKERJAAN : Pasangan bata merah tebal 1 bata, 1 Pc : 2 PsSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.6000 45,000.00 27,000.00 2 Tukang Batu L07 Org/hr 0.2000 60,000.00 12,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0200 70,000.00 1,400.00 4 Mandor L01 Org/hr 0.0300 80,000.00 2,400.00

JUMLAH HARGA TENAGA 42,800.00

B BAHAN

1 Bata Merah M022 bh 140.0000 250.00 35,000.00 2 Portland Cement (PC) M037 kg 43.5000 900.00 39,150.00 3 Pasir Pasang M002 m3 0.0800 60,000.00 4,800.00

JUMLAH HARGA BAHAN 78,950.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 121,750.00

ANALISA HARGA SATUAN

KODE ANALISA : D.002JENIS PEKERJAAN : Pasangan bata merah tebal 1 bata, 1 Pc : 3 PsSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.6000 45,000.00 27,000.00 2 Tukang Batu L07 Org/hr 0.2000 60,000.00 12,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0200 70,000.00 1,400.00 4 Mandor L01 Org/hr 0.0300 80,000.00 2,400.00

JUMLAH HARGA TENAGA 42,800.00

B BAHAN

1 Bata Merah M022 bh 140.0000 250.00 35,000.00 2 Portland Cement (PC) M037 kg 32.9500 900.00 29,655.00 3 Pasir Pasang M002 m3 0.0910 60,000.00 5,460.00

JUMLAH HARGA BAHAN 70,115.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 112,915.00

Page 74: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : D.003JENIS PEKERJAAN : Pasangan bata merah tebal 1 bata, 1 Pc : 4 PsSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.6000 45,000.00 27,000.00 2 Tukang Batu L07 Org/hr 0.2000 60,000.00 12,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0200 70,000.00 1,400.00 4 Mandor L01 Org/hr 0.0300 80,000.00 2,400.00

JUMLAH HARGA TENAGA 42,800.00

B BAHAN

1 Bata Merah M022 bh 140.0000 250.00 35,000.00 2 Portland Cement (PC) M037 kg 26.5500 900.00 23,895.00 3 Pasir Pasang M002 m3 0.0930 60,000.00 5,580.00

JUMLAH HARGA BAHAN 64,475.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 107,275.00

ANALISA HARGA SATUAN

KODE ANALISA : D.004JENIS PEKERJAAN : Pasangan bata merah tebal 1 bata, 1 Pc : 5 PsSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.6000 45,000.00 27,000.00 2 Tukang Batu L07 Org/hr 0.2000 60,000.00 12,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0200 70,000.00 1,400.00 4 Mandor L01 Org/hr 0.0300 80,000.00 2,400.00

JUMLAH HARGA TENAGA 42,800.00

B BAHAN

1 Bata Merah M022 bh 140.0000 250.00 35,000.00 2 Portland Cement (PC) M037 kg 22.2000 900.00 19,980.00 3 Pasir Pasang M002 m3 0.1020 60,000.00 6,120.00

JUMLAH HARGA BAHAN 61,100.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 103,900.00

Page 75: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : D.005JENIS PEKERJAAN : Pasangan bata merah tebal 1 bata, 1 Pc : 6 PsSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.6000 45,000.00 27,000.00 2 Tukang Batu L07 Org/hr 0.2000 60,000.00 12,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0200 70,000.00 1,400.00 4 Mandor L01 Org/hr 0.0300 80,000.00 2,400.00

JUMLAH HARGA TENAGA 42,800.00

B BAHAN

1 Bata Merah M022 bh 140.0000 250.00 35,000.00 2 Portland Cement (PC) M037 kg 18.5000 900.00 16,650.00 3 Pasir Pasang M002 m3 0.1220 60,000.00 7,320.00

JUMLAH HARGA BAHAN 58,970.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 101,770.00

ANALISA HARGA SATUAN

KODE ANALISA : D.006JENIS PEKERJAAN : Pasangan bata merah tebal 1 bata, 1 Pc : 3 Kp : 10 PsSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.6000 45,000.00 27,000.00 2 Tukang Batu L07 Org/hr 0.2000 60,000.00 12,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0200 70,000.00 1,400.00 4 Mandor L01 Org/hr 0.0300 80,000.00 2,400.00

JUMLAH HARGA TENAGA 42,800.00

B BAHAN

1 Bata Merah M022 bh 140.0000 250.00 35,000.00 2 Portland Cement (PC) M037 kg 10.0800 900.00 9,072.00 3 Pasir Pasang M002 m3 0.0925 60,000.00 5,550.00 4 Kapur M041 m3 0.0275 1,300,000.00 35,750.00

JUMLAH HARGA BAHAN 85,372.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 128,172.00

Page 76: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : D.007JENIS PEKERJAAN : Pasangan bata merah tebal 1/2 bata, 1 Pc : 2 PsSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.3000 45,000.00 13,500.00 2 Tukang Batu L07 Org/hr 0.1000 60,000.00 6,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0100 70,000.00 700.00 4 Mandor L01 Org/hr 0.0150 80,000.00 1,200.00

JUMLAH HARGA TENAGA 21,400.00

B BAHAN

1 Bata Merah M022 bh 70.0000 250.00 17,500.00 2 Portland Cement (PC) M037 kg 18.9500 900.00 17,055.00 3 Pasir Pasang M002 m3 0.0380 60,000.00 2,280.00

JUMLAH HARGA BAHAN 36,835.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 58,235.00

ANALISA HARGA SATUAN

KODE ANALISA : D.008JENIS PEKERJAAN : Pasangan bata merah tebal 1/2 bata, 1 Pc : 3 PsSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.3000 45,000.00 13,500.00 2 Tukang Batu L07 Org/hr 0.1000 60,000.00 6,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0100 70,000.00 700.00 4 Mandor L01 Org/hr 0.0150 80,000.00 1,200.00

JUMLAH HARGA TENAGA 21,400.00

B BAHAN

1 Bata Merah M022 bh 70.0000 250.00 17,500.00 2 Portland Cement (PC) M037 kg 14.3700 900.00 12,933.00 3 Pasir Pasang M002 m3 0.0400 60,000.00 2,400.00

JUMLAH HARGA BAHAN 32,833.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 54,233.00

Page 77: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : D.009JENIS PEKERJAAN : Pasangan bata merah tebal 1/2 bata, 1 Pc : 4 PsSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.3000 45,000.00 13,500.00 2 Tukang Batu L07 Org/hr 0.1000 60,000.00 6,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0100 70,000.00 700.00 4 Mandor L01 Org/hr 0.0150 80,000.00 1,200.00

JUMLAH HARGA TENAGA 21,400.00

B BAHAN

1 Bata Merah M022 bh 70.0000 250.00 17,500.00 2 Portland Cement (PC) M037 kg 11.5000 900.00 10,350.00 3 Pasir Pasang M002 m3 0.0430 60,000.00 2,580.00

JUMLAH HARGA BAHAN 30,430.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 51,830.00

ANALISA HARGA SATUAN

KODE ANALISA : D.010JENIS PEKERJAAN : Pasangan bata merah tebal 1/2 bata, 1 Pc : 5 PsSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.3000 45,000.00 13,500.00 2 Tukang Batu L07 Org/hr 0.1000 60,000.00 6,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0100 70,000.00 700.00 4 Mandor L01 Org/hr 0.0150 80,000.00 1,200.00

JUMLAH HARGA TENAGA 21,400.00

B BAHAN

1 Bata Merah M022 bh 70.0000 250.00 17,500.00 2 Portland Cement (PC) M037 kg 9.6800 900.00 8,712.00 3 Pasir Pasang M002 m3 0.0450 60,000.00 2,700.00

JUMLAH HARGA BAHAN 28,912.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 50,312.00

Page 78: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : D.011JENIS PEKERJAAN : Pasangan bata merah tebal 1/2 bata, 1 Pc : 6 PsSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.3000 45,000.00 13,500.00 2 Tukang Batu L07 Org/hr 0.1000 60,000.00 6,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0100 70,000.00 700.00 4 Mandor L01 Org/hr 0.0150 80,000.00 1,200.00

JUMLAH HARGA TENAGA 21,400.00

B BAHAN

1 Bata Merah M022 bh 70.0000 250.00 17,500.00 2 Portland Cement (PC) M037 kg 8.3200 900.00 7,488.00 3 Pasir Pasang M002 m3 0.0490 60,000.00 2,940.00

JUMLAH HARGA BAHAN 27,928.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 49,328.00

ANALISA HARGA SATUAN

KODE ANALISA : D.012JENIS PEKERJAAN : Pasangan bata merah tebal 1/2 bata, 1 Pc : 8 PsSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.3000 45,000.00 13,500.00 2 Tukang Batu L07 Org/hr 0.1000 60,000.00 6,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0100 70,000.00 700.00 4 Mandor L01 Org/hr 0.0150 80,000.00 1,200.00

JUMLAH HARGA TENAGA 21,400.00

B BAHAN

1 Bata Merah M022 bh 70.0000 250.00 17,500.00 2 Portland Cement (PC) M037 kg 6.5000 900.00 5,850.00 3 Pasir Pasang M002 m3 0.0500 60,000.00 3,000.00

JUMLAH HARGA BAHAN 26,350.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 47,750.00

Page 79: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : D.013JENIS PEKERJAAN : Pasangan bata merah tebal 1/2 bata, 1 Pc : 3 Kp : 10 PsSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.3000 45,000.00 13,500.00 2 Tukang Batu L07 Org/hr 0.1000 60,000.00 6,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0100 70,000.00 700.00 4 Mandor L01 Org/hr 0.0150 80,000.00 1,200.00

JUMLAH HARGA TENAGA 21,400.00

B BAHAN

1 Bata Merah M022 bh 70.0000 250.00 17,500.00 2 Portland Cement (PC) M037 kg 4.5000 900.00 4,050.00 3 Pasir Pasang M002 m3 0.0500 60,000.00 3,000.00 4 Kapur M041 m3 0.0150 1,300,000.00 19,500.00

JUMLAH HARGA BAHAN 44,050.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 65,450.00

ANALISA HARGA SATUAN

KODE ANALISA : D.014JENIS PEKERJAAN : Pasangan bata merah tebal 1/2 bata, 1 Kp : 1 Sm : 1 PsSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.3000 45,000.00 13,500.00 2 Tukang Batu L07 Org/hr 0.1000 60,000.00 6,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0100 70,000.00 700.00 4 Mandor L01 Org/hr 0.0150 80,000.00 1,200.00

JUMLAH HARGA TENAGA 21,400.00

B BAHAN

1 Bata Merah M022 bh 70.0000 250.00 17,500.00 2 Semen Merah M043 m3 0.0180 165,000.00 2,970.00 3 Pasir Pasang M002 m3 0.0180 60,000.00 1,080.00 4 Kapur M041 m3 0.0180 1,300,000.00 23,400.00

JUMLAH HARGA BAHAN 44,950.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 66,350.00

Page 80: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : D.015JENIS PEKERJAAN : Pasangan bata merah tebal 1/2 bata, 1 Kp : 1 Sm : 2 PsSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.3000 45,000.00 13,500.00 2 Tukang Batu L07 Org/hr 0.1000 60,000.00 6,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0100 70,000.00 700.00 4 Mandor L01 Org/hr 0.0150 80,000.00 1,200.00

JUMLAH HARGA TENAGA 21,400.00

B BAHAN

1 Bata Merah M022 bh 70.0000 250.00 17,500.00 2 Semen Merah M043 m3 0.0140 165,000.00 2,310.00 3 Pasir Pasang M002 m3 0.0280 60,000.00 1,680.00 4 Kapur M041 m3 0.0140 1,300,000.00 18,200.00

JUMLAH HARGA BAHAN 39,690.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 61,090.00

ANALISA HARGA SATUAN

KODE ANALISA : D.016JENIS PEKERJAAN : Pasangan dinding hollowblock (HB. 20), Spesi 1 PC : 3 PsSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.3000 45,000.00 13,500.00 2 Tukang Batu L07 Org/hr 0.1500 60,000.00 9,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0150 70,000.00 1,050.00 4 Mandor L01 Org/hr 0.0150 80,000.00 1,200.00

JUMLAH HARGA TENAGA 24,750.00

B BAHAN

1 Hollow Block (HB. 20) M030 bh 12.5000 Err:509 Err:5092 Portland Cement (PC) M037 kg 30.3200 900.00 27,288.00 3 Pasir Pasang M002 m3 0.0728 60,000.00 4,368.00 4 Besi Beton Polos M112 kg 0.2800 8,500.00 2,380.00

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

Page 81: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : D.021JENIS PEKERJAAN : Pasangan dinding hollowblock (HB. 10), Spesi 1 PC : 4 PsSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.3000 45,000.00 13,500.00 2 Tukang Batu L07 Org/hr 0.1000 60,000.00 6,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0100 70,000.00 700.00 4 Mandor L01 Org/hr 0.0150 80,000.00 1,200.00

JUMLAH HARGA TENAGA 21,400.00

B BAHAN

1 Hollow Block (HB. 10) M032 bh 12.5000 Err:509 Err:5092 Portland Cement (PC) M037 kg 12.1300 900.00 10,917.00 3 Pasir Pasang M002 m3 0.0388 60,000.00 2,328.00 4 Besi Beton Polos M112 kg 0.2800 8,500.00 2,380.00

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

ANALISA HARGA SATUAN

KODE ANALISA : D.022JENIS PEKERJAAN : Pasangan dinding roster/terawang (12 x 11 x 24) cm, Spesi 1 PC : 3 PsSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.3000 45,000.00 13,500.00 2 Tukang Batu L07 Org/hr 0.1000 60,000.00 6,000.00 4 Kepala Tukang Batu L02 Org/hr 0.0100 70,000.00 700.00 5 Mandor L01 Org/hr 0.0150 80,000.00 1,200.00

JUMLAH HARGA TENAGA 21,400.00

B BAHAN

1 Rooster M025 bh 30.0000 8,650.00 259,500.00 2 Portland Cement (PC) M037 kg 14.0000 900.00 12,600.00 3 Pasir Pasang M002 m3 0.0320 60,000.00 1,920.00

JUMLAH HARGA BAHAN 274,020.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 295,420.00

Page 82: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : D.025JENIS PEKERJAAN : Pasang Batu Bata Tahan ApiSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.3000 45,000.00 13,500.00 2 Tukang Batu L07 Org/hr 0.1000 60,000.00 6,000.00 4 Kepala Tukang Batu L02 Org/hr 0.0100 70,000.00 700.00 5 Mandor L01 Org/hr 0.0150 80,000.00 1,200.00

JUMLAH HARGA TENAGA 21,400.00

B BAHAN

1 Batu Bata Tahan Api M022.a bh 70.0000 Err:509 Err:5092 Portland Cement (PC) Tahan Api M037.a kg 11.5000 Err:509 Err:5093 Pasir Pasang M002 m3 0.0430 60,000.00 2,580.00

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

Page 83: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : D.017JENIS PEKERJAAN : Pasangan dinding hollowblock (HB. 20), Spesi 1 PC : 4 PsSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.3000 45,000.00 13,500.00 2 Tukang Batu L07 Org/hr 0.1500 60,000.00 9,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0150 70,000.00 1,050.00 4 Mandor L01 Org/hr 0.0150 80,000.00 1,200.00

JUMLAH HARGA TENAGA 24,750.00

B BAHAN

1 Hollow Block (HB. 20) M030 bh 12.5000 Err:509 Err:5092 Portland Cement (PC) M037 kg 24.2600 900.00 21,834.00 3 Pasir Pasang M002 m3 0.0772 60,000.00 4,632.00 4 Besi Beton Polos M112 kg 0.2800 8,500.00 2,380.00

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

ANALISA HARGA SATUAN

KODE ANALISA : D.018JENIS PEKERJAAN : Pasangan dinding hollowblock (HB. 15), spesi 1 PC : 3 PsSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.3600 45,000.00 16,200.00 2 Tukang Batu L07 Org/hr 0.1200 60,000.00 7,200.00 3 Kepala Tukang Batu L02 Org/hr 0.0120 70,000.00 840.00 4 Mandor L01 Org/hr 0.0180 80,000.00 1,440.00

JUMLAH HARGA TENAGA 25,680.00

B BAHAN

1 Hollow Block (HB. 15) M031 bh 12.5000 Err:509 Err:5092 Portland Cement (PC) M037 kg 22.7400 900.00 20,466.00 3 Pasir Pasang M002 m3 0.0550 60,000.00 3,300.00 4 Besi Beton Polos M112 kg 0.2800 8,500.00 2,380.00

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

Page 84: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : D.019JENIS PEKERJAAN : Pasangan dinding hollowblock (HB. 15), spesi 1 PC : 4 PsSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.3600 45,000.00 16,200.00 2 Tukang Batu L07 Org/hr 0.1200 60,000.00 7,200.00 3 Kepala Tukang Batu L02 Org/hr 0.0120 70,000.00 840.00 4 Mandor L01 Org/hr 0.0180 80,000.00 1,440.00

JUMLAH HARGA TENAGA 25,680.00

B BAHAN

1 Hollow Block (HB. 15) M031 bh 12.5000 Err:509 Err:5092 Portland Cement (PC) M037 kg 18.2000 900.00 16,380.00 3 Pasir Pasang M002 m3 0.0582 60,000.00 3,492.00 4 Besi Beton Polos M112 kg 0.2800 8,500.00 2,380.00

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

ANALISA HARGA SATUAN

KODE ANALISA : D.020JENIS PEKERJAAN : Pasangan dinding hollowblock (HB. 10), Spesi 1 PC : 3 PsSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.3000 45,000.00 13,500.00 2 Tukang Batu L07 Org/hr 0.1000 60,000.00 6,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0100 70,000.00 700.00 4 Mandor L01 Org/hr 0.0150 80,000.00 1,200.00

JUMLAH HARGA TENAGA 21,400.00

B BAHAN

1 Hollow Block (HB. 10) M032 bh 12.5000 Err:509 Err:5092 Portland Cement (PC) M037 kg 15.1600 900.00 13,644.00 3 Pasir Pasang M002 m3 0.0364 60,000.00 2,184.00 4 Besi Beton Polos M112 kg 0.2800 8,500.00 2,380.00

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

Page 85: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : D.023JENIS PEKERJAAN : Pasangan dinding roster/terawang (12 x 11 x 24) cm, Spesi 1 PC : 4 PsSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.3000 45,000.00 13,500.00 2 Tukang Batu L07 Org/hr 0.1000 60,000.00 6,000.00 4 Kepala Tukang Batu L02 Org/hr 0.0100 70,000.00 700.00 5 Mandor L01 Org/hr 0.0150 80,000.00 1,200.00

JUMLAH HARGA TENAGA 21,400.00

B BAHAN

1 Rooster M025 bh 30.0000 8,650.00 259,500.00 2 Portland Cement (PC) M037 kg 11.0000 900.00 9,900.00 3 Pasir Pasang M002 m3 0.0350 60,000.00 2,100.00

JUMLAH HARGA BAHAN 271,500.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 292,900.00

ANALISA HARGA SATUAN

KODE ANALISA : D.024JENIS PEKERJAAN : Pasang bata berongga (5 x 11 x 24) cm, Spesi 1PC:3PsSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.3000 45,000.00 13,500.00 2 Tukang Batu L07 Org/hr 0.1500 60,000.00 9,000.00 4 Kepala Tukang Batu L02 Org/hr 0.0150 70,000.00 1,050.00 5 Mandor L01 Org/hr 0.0150 80,000.00 1,200.00

JUMLAH HARGA TENAGA 24,750.00

B BAHAN

1 Bata Berongga M023 bh 70.0000 Err:509 Err:5092 Portland Cement (PC) M037 kg 14.0000 900.00 12,600.00 3 Pasir Pasang M002 m3 0.0320 60,000.00 1,920.00

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

Page 86: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : E.001JENIS PEKERJAAN : Plesteran 1 Pc : 1 Ps, tebal 15 mmSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.2000 45,000.00 9,000.00 2 Tukang Batu L07 Org/hr 0.1500 60,000.00 9,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0150 70,000.00 1,050.00 4 Mandor L01 Org/hr 0.0100 80,000.00 800.00

JUMLAH HARGA TENAGA 19,850.00

B BAHAN

1 Portland Cement (PC) M037 kg 15.5040 900.00 13,953.60 2 Pasir Pasang M002 m3 0.0160 60,000.00 960.00

JUMLAH HARGA BAHAN 14,913.60

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 34,763.60

ANALISA HARGA SATUAN

KODE ANALISA : E.002JENIS PEKERJAAN : Plesteran 1 Pc : 2 Ps, tebal 15 mmSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.2000 45,000.00 9,000.00 2 Tukang Batu L07 Org/hr 0.1500 60,000.00 9,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0150 70,000.00 1,050.00 4 Mandor L01 Org/hr 0.0100 80,000.00 800.00

JUMLAH HARGA TENAGA 19,850.00

B BAHAN

1 Portland Cement (PC) M037 kg 10.2240 900.00 9,201.60 2 Pasir Pasang M002 m3 0.0200 60,000.00 1,200.00

JUMLAH HARGA BAHAN 10,401.60

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 30,251.60

Page 87: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : E.003JENIS PEKERJAAN : Plesteran 1 Pc : 3 Ps, tebal 15 mmSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.2000 45,000.00 9,000.00 2 Tukang Batu L07 Org/hr 0.1500 60,000.00 9,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0150 70,000.00 1,050.00 4 Mandor L01 Org/hr 0.0100 80,000.00 800.00

JUMLAH HARGA TENAGA 19,850.00

B BAHAN

1 Portland Cement (PC) M037 kg 7.7760 900.00 6,998.40 2 Pasir Pasang M002 m3 0.0230 60,000.00 1,380.00

JUMLAH HARGA BAHAN 8,378.40

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 28,228.40

ANALISA HARGA SATUAN

KODE ANALISA : E.004JENIS PEKERJAAN : Plesteran 1 Pc : 4 Ps, tebal 15 mmSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.2000 45,000.00 9,000.00 2 Tukang Batu L07 Org/hr 0.1500 60,000.00 9,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0150 70,000.00 1,050.00 4 Mandor L01 Org/hr 0.0100 80,000.00 800.00

JUMLAH HARGA TENAGA 19,850.00

B BAHAN

1 Portland Cement (PC) M037 kg 6.2400 900.00 5,616.00 2 Pasir Pasang M002 m3 0.0240 60,000.00 1,440.00

JUMLAH HARGA BAHAN 7,056.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 26,906.00

Page 88: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : E.005JENIS PEKERJAAN : Plesteran 1 Pc : 5 Ps, tebal 15 mmSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.2000 45,000.00 9,000.00 2 Tukang Batu L07 Org/hr 0.1500 60,000.00 9,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0150 70,000.00 1,050.00 4 Mandor L01 Org/hr 0.0100 80,000.00 800.00

JUMLAH HARGA TENAGA 19,850.00

B BAHAN

1 Portland Cement (PC) M037 kg 5.1840 900.00 4,665.60 2 Pasir Pasang M002 m3 0.0260 60,000.00 1,560.00

JUMLAH HARGA BAHAN 6,225.60

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 26,075.60

ANALISA HARGA SATUAN

KODE ANALISA : E.006JENIS PEKERJAAN : Plesteran 1 Pc : 6 Ps, tebal 15 mmSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.2000 45,000.00 9,000.00 2 Tukang Batu L07 Org/hr 0.1500 60,000.00 9,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0150 70,000.00 1,050.00 4 Mandor L01 Org/hr 0.0100 80,000.00 800.00

JUMLAH HARGA TENAGA 19,850.00

B BAHAN

1 Portland Cement (PC) M037 kg 4.4160 900.00 3,974.40 2 Pasir Pasang M002 m3 0.0270 60,000.00 1,620.00

JUMLAH HARGA BAHAN 5,594.40

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 25,444.40

Page 89: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : E.011JENIS PEKERJAAN : Plesteran 1 Kp : 1 Sm : 1 Ps, tebal 15 mmSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.2200 45,000.00 9,900.00 2 Tukang Batu L07 Org/hr 0.1200 60,000.00 7,200.00 3 Kepala Tukang Batu L02 Org/hr 0.0120 70,000.00 840.00 4 Mandor L01 Org/hr 0.0110 80,000.00 880.00

JUMLAH HARGA TENAGA 18,820.00

B BAHAN

1 Semen Merah M043 m3 0.0090 165,000.00 1,485.00 2 Kapur M041 m3 0.0090 1,300,000.00 11,700.00 3 Pasir Pasang M002 m3 0.0090 60,000.00 540.00

JUMLAH HARGA BAHAN 13,725.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 32,545.00

ANALISA HARGA SATUAN

KODE ANALISA : E.012JENIS PEKERJAAN : Plesteran 1 Kp : 1 Sm : 2 Ps, tebal 15 mmSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.2200 45,000.00 9,900.00 2 Tukang Batu L07 Org/hr 0.1200 60,000.00 7,200.00 3 Kepala Tukang Batu L02 Org/hr 0.0120 70,000.00 840.00 4 Mandor L01 Org/hr 0.0110 80,000.00 880.00

JUMLAH HARGA TENAGA 18,820.00

B BAHAN

1 Semen Merah M043 m3 0.0070 165,000.00 1,155.00 2 Kapur M041 m3 0.0070 1,300,000.00 9,100.00 3 Pasir Pasang M002 m3 0.0150 60,000.00 900.00

JUMLAH HARGA BAHAN 11,155.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 29,975.00

Page 90: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : E.013JENIS PEKERJAAN : Plesteran 1 Pc : 2 Ps, tebal 20 mmSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.2600 45,000.00 11,700.00 2 Tukang Batu L07 Org/hr 0.2000 60,000.00 12,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0200 70,000.00 1,400.00 4 Mandor L01 Org/hr 0.0130 80,000.00 1,040.00

JUMLAH HARGA TENAGA 26,140.00

B BAHAN

1 Portland Cement (PC) M037 kg 13.6320 900.00 12,268.80 2 Pasir Pasang M002 m3 0.0270 60,000.00 1,620.00

JUMLAH HARGA BAHAN 13,888.80

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 40,028.80

ANALISA HARGA SATUAN

KODE ANALISA : E.014JENIS PEKERJAAN : Plesteran 1 Pc : 3 Ps, tebal 20 mmSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.2600 45,000.00 11,700.00 2 Tukang Batu L07 Org/hr 0.2000 60,000.00 12,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0200 70,000.00 1,400.00 4 Mandor L01 Org/hr 0.0130 80,000.00 1,040.00

JUMLAH HARGA TENAGA 26,140.00

B BAHAN

1 Portland Cement (PC) M037 kg 10.3680 900.00 9,331.20 2 Pasir Pasang M002 m3 0.0310 60,000.00 1,860.00

JUMLAH HARGA BAHAN 11,191.20

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 37,331.20

Page 91: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : E.015JENIS PEKERJAAN : Plesteran 1 Pc : 4 Ps, tebal 20 mmSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.2600 45,000.00 11,700.00 2 Tukang Batu L07 Org/hr 0.2000 60,000.00 12,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0200 70,000.00 1,400.00 4 Mandor L01 Org/hr 0.0130 80,000.00 1,040.00

JUMLAH HARGA TENAGA 26,140.00

B BAHAN

1 Portland Cement (PC) M037 kg 8.3200 900.00 7,488.00 2 Pasir Pasang M002 m3 0.0320 60,000.00 1,920.00

JUMLAH HARGA BAHAN 9,408.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 35,548.00

ANALISA HARGA SATUAN

KODE ANALISA : E.016JENIS PEKERJAAN : Plesteran 1 Pc : 5 Ps, tebal 20 mmSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.2600 45,000.00 11,700.00 2 Tukang Batu L07 Org/hr 0.2000 60,000.00 12,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0200 70,000.00 1,400.00 4 Mandor L01 Org/hr 0.0130 80,000.00 1,040.00

JUMLAH HARGA TENAGA 26,140.00

B BAHAN

1 Portland Cement (PC) M037 kg 6.9120 900.00 6,220.80 2 Pasir Pasang M002 m3 0.0350 60,000.00 2,100.00

JUMLAH HARGA BAHAN 8,320.80

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 34,460.80

Page 92: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : E.017JENIS PEKERJAAN : Plesteran 1 Pc : 6 Ps, tebal 20 mmSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.2600 45,000.00 11,700.00 2 Tukang Batu L07 Org/hr 0.2000 60,000.00 12,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0200 70,000.00 1,400.00 4 Mandor L01 Org/hr 0.0130 80,000.00 1,040.00

JUMLAH HARGA TENAGA 26,140.00

B BAHAN

1 Portland Cement (PC) M037 kg 5.8880 900.00 5,299.20 2 Pasir Pasang M002 m3 0.0360 60,000.00 2,160.00

JUMLAH HARGA BAHAN 7,459.20

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 33,599.20

ANALISA HARGA SATUAN

KODE ANALISA : E.018JENIS PEKERJAAN : Plesteran 1 Kp : 1 Sm : 2 Ps, tebal 20 mmSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.2860 45,000.00 12,870.00 2 Tukang Batu L07 Org/hr 0.2200 60,000.00 13,200.00 3 Kepala Tukang Batu L02 Org/hr 0.0220 70,000.00 1,540.00 4 Mandor L01 Org/hr 0.0140 80,000.00 1,120.00

JUMLAH HARGA TENAGA 28,730.00

B BAHAN

1 Semen Merah M043 m3 0.0090 165,000.00 1,485.00 2 Kapur M041 m3 0.0090 1,300,000.00 11,700.00 3 Pasir Pasang M002 m3 0.0180 60,000.00 1,080.00

JUMLAH HARGA BAHAN 14,265.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 42,995.00

Page 93: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : E.019JENIS PEKERJAAN : Berapen 1 Pc : 5 Ps, tebal 15 mmSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1500 45,000.00 6,750.00 2 Tukang Batu L07 Org/hr 0.0700 60,000.00 4,200.00 3 Kepala Tukang Batu L02 Org/hr 0.0070 70,000.00 490.00 4 Mandor L01 Org/hr 0.0080 80,000.00 640.00

JUMLAH HARGA TENAGA 12,080.00

B BAHAN

1 Portland Cement (PC) M037 kg 5.1840 900.00 4,665.60 2 Pasir Pasang M002 m3 0.0260 60,000.00 1,560.00

JUMLAH HARGA BAHAN 6,225.60

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 18,305.60

ANALISA HARGA SATUAN

KODE ANALISA : E.020JENIS PEKERJAAN : Plesteran skoning 1 Pc : 2 Ps, Lebar 10 mmSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0570 45,000.00 2,565.00 2 Tukang Batu L07 Org/hr 0.3800 60,000.00 22,800.00 3 Kepala Tukang Batu L02 Org/hr 0.0380 70,000.00 2,660.00 4 Mandor L01 Org/hr 0.0030 80,000.00 240.00

JUMLAH HARGA TENAGA 28,265.00

B BAHAN

1 Portland Cement (PC) M037 kg 0.5000 900.00 450.00 2 Pasir Pasang M002 m3 0.0130 60,000.00 780.00

JUMLAH HARGA BAHAN 1,230.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 29,495.00

Page 94: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : E.021JENIS PEKERJAAN : Plesteran granito 1 Pc warna : 2 granito, tebal 10 mmSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.4500 45,000.00 20,250.00 2 Tukang Batu L07 Org/hr 0.2000 60,000.00 12,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0200 70,000.00 1,400.00 4 Mandor L01 Org/hr 0.0250 80,000.00 2,000.00

JUMLAH HARGA TENAGA 35,650.00

B BAHAN

1 Portland Cement (PC) Warna M039 kg 10.0000 6,500.00 65,000.00 2 Batu Granito M026 kg 15.0000 Err:509 Err:509

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

ANALISA HARGA SATUAN

KODE ANALISA : E.022JENIS PEKERJAAN : Plesteran Teraso, 1 Pc Warna : 2 Batu Teraso, tebal 10 mmSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.4500 45,000.00 20,250.00 2 Tukang Batu L07 Org/hr 0.2000 60,000.00 12,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0200 70,000.00 1,400.00 4 Mandor L01 Org/hr 0.0250 80,000.00 2,000.00

JUMLAH HARGA TENAGA 35,650.00

B BAHAN

1 Portland Cement (PC) Warna M039 kg 10.0000 6,500.00 65,000.00 2 Batu Teraso M027 kg 15.0000 Err:509 Err:509

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

Page 95: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : E.023JENIS PEKERJAAN : Plesteran Ciprat 1 Pc : 2 Ps,SATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.2500 45,000.00 11,250.00 2 Tukang Batu L07 Org/hr 0.1000 60,000.00 6,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0100 70,000.00 700.00 4 Mandor L01 Org/hr 0.0130 80,000.00 1,040.00

JUMLAH HARGA TENAGA 18,990.00

B BAHAN

1 Portland Cement (PC) M037 kg 4.3200 900.00 3,888.00 2 Pasir Pasang M002 m3 0.0060 60,000.00 360.00

JUMLAH HARGA BAHAN 4,248.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 23,238.00

ANALISA HARGA SATUAN

KODE ANALISA : E.024JENIS PEKERJAAN : Plesteran siar pasangan batu kali adukan 1 Pc : 2 PsSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.3000 45,000.00 13,500.00 2 Tukang Batu L07 Org/hr 0.1400 60,000.00 8,400.00 3 Kepala Tukang Batu L02 Org/hr 0.0140 70,000.00 980.00 4 Mandor L01 Org/hr 0.0150 80,000.00 1,200.00

JUMLAH HARGA TENAGA 24,080.00

B BAHAN

1 Portland Cement (PC) M037 kg 6.3400 900.00 5,706.00 2 Pasir Pasang M002 m3 0.0120 60,000.00 720.00

JUMLAH HARGA BAHAN 6,426.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 30,506.00

Page 96: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : E.007JENIS PEKERJAAN : Plesteran 1 Pc : 7 Ps, tebal 15 mmSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.2000 45,000.00 9,000.00 2 Tukang Batu L07 Org/hr 0.1500 60,000.00 9,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0150 70,000.00 1,050.00 4 Mandor L01 Org/hr 0.0100 80,000.00 800.00

JUMLAH HARGA TENAGA 19,850.00

B BAHAN

1 Portland Cement (PC) M037 kg 3.9360 900.00 3,542.40 2 Pasir Pasang M002 m3 0.0280 60,000.00 1,680.00

JUMLAH HARGA BAHAN 5,222.40

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 25,072.40

ANALISA HARGA SATUAN

KODE ANALISA : E.008JENIS PEKERJAAN : Plesteran 1 Pc : 8 Ps, tebal 15 mmSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.2000 45,000.00 9,000.00 2 Tukang Batu L07 Org/hr 0.1500 60,000.00 9,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0150 70,000.00 1,050.00 4 Mandor L01 Org/hr 0.0100 80,000.00 800.00

JUMLAH HARGA TENAGA 19,850.00

B BAHAN

1 Portland Cement (PC) M037 kg 3.4560 900.00 3,110.40 2 Pasir Pasang M002 m3 0.0290 60,000.00 1,740.00

JUMLAH HARGA BAHAN 4,850.40

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 24,700.40

Page 97: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : E.009JENIS PEKERJAAN : Plesteran 1 Pc : 0.5 Kp : 3 Ps, tebal 15 mmSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.2200 45,000.00 9,900.00 2 Tukang Batu L07 Org/hr 0.1200 60,000.00 7,200.00 3 Kepala Tukang Batu L02 Org/hr 0.0120 70,000.00 840.00 4 Mandor L01 Org/hr 0.0110 80,000.00 880.00

JUMLAH HARGA TENAGA 18,820.00

B BAHAN

1 Portland Cement (PC) M037 kg 5.7600 900.00 5,184.00 2 Kapur M041 m3 0.0030 1,300,000.00 3,900.00 3 Pasir Pasang M002 m3 0.0130 60,000.00 780.00

JUMLAH HARGA BAHAN 9,864.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 28,684.00

ANALISA HARGA SATUAN

KODE ANALISA : E.010JENIS PEKERJAAN : Plesteran 1 Pc : 2 Kp : 8 Ps, tebal 15 mmSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.2200 45,000.00 9,900.00 2 Tukang Batu L07 Org/hr 0.1200 60,000.00 7,200.00 3 Kepala Tukang Batu L02 Org/hr 0.0120 70,000.00 840.00 4 Mandor L01 Org/hr 0.0110 80,000.00 880.00

JUMLAH HARGA TENAGA 18,820.00

B BAHAN

1 Portland Cement (PC) M037 kg 3.0000 900.00 2,700.00 2 Kapur M041 m3 0.0030 1,300,000.00 3,900.00 3 Pasir Pasang M002 m3 0.0130 60,000.00 780.00

JUMLAH HARGA BAHAN 7,380.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 26,200.00

Page 98: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : E.025JENIS PEKERJAAN : BenanganSATUAN PEMBAYARAN : m1

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr - 45,000.00 - 2 Tukang Batu L07 Org/hr 0.1200 60,000.00 7,200.00 3 Kepala Tukang Batu L02 Org/hr - 70,000.00 - 4 Mandor L01 Org/hr - 80,000.00 -

JUMLAH HARGA TENAGA 7,200.00

B BAHAN

1 Portland Cement (PC) M037 kg 6.5000 900.00 5,850.00 2 Pasir Pasang M002 m3 0.0210 60,000.00 1,260.00

JUMLAH HARGA BAHAN 7,110.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 14,310.00

ANALISA HARGA SATUAN

KODE ANALISA : E.026JENIS PEKERJAAN : AcianSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1500 45,000.00 6,750.00 2 Tukang Batu L07 Org/hr 0.1000 60,000.00 6,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0100 70,000.00 700.00 4 Mandor L01 Org/hr 0.0080 80,000.00 640.00

JUMLAH HARGA TENAGA 14,090.00

B BAHAN

1 Portland Cement (PC) M037 kg 3.2500 900.00 2,925.00

JUMLAH HARGA BAHAN 2,925.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 17,015.00

Page 99: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : F.001JENIS PEKERJAAN : Pasang kusen pintu dan jendela kayu jati (kelas I)SATUAN PEMBAYARAN : m3

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 6.0000 45,000.00 270,000.00 2 Tukang Kayu L08 Org/hr 20.0000 60,000.00 1,200,000.00 3 Kepala Tukang Kayu L03 Org/hr 2.0000 47,000.00 94,000.00 4 Mandor L01 Org/hr 0.3000 80,000.00 24,000.00

JUMLAH HARGA TENAGA 1,588,000.00

B BAHAN

1 Balok M096 m3 1.1000 Err:509 Err:5092 Paku Kayu Segala Ukuran M140 kg 1.2500 17,500.00 21,875.00 3 Lem Kayu M422 Ltr 1.0000 25,040.00 25,040.00

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

ANALISA HARGA SATUAN

KODE ANALISA : F.002JENIS PEKERJAAN : Pasang kusen pintu dan jendela kayu kamperSATUAN PEMBAYARAN : m3

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 6.0000 45,000.00 270,000.00 2 Tukang Kayu L08 Org/hr 18.0000 60,000.00 1,080,000.00 3 Kepala Tukang Kayu L03 Org/hr 2.0000 47,000.00 94,000.00 4 Mandor L01 Org/hr 0.3000 80,000.00 24,000.00

JUMLAH HARGA TENAGA 1,468,000.00

B BAHAN

1 Balok M080 m3 1.2000 9,000,000.00 10,800,000.00 2 Paku Kayu Segala Ukuran M140 kg 1.2500 17,500.00 21,875.00 3 Lem Kayu M422 Ltr 1.0000 25,040.00 25,040.00

JUMLAH HARGA BAHAN 10,846,915.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 12,314,915.00

Page 100: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : F.003JENIS PEKERJAAN : Pasang kusen pintu dan jendela kayu borneoSATUAN PEMBAYARAN : m3

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 6.0000 45,000.00 270,000.00 2 Tukang Kayu L08 Org/hr 18.0000 60,000.00 1,080,000.00 3 Kepala Tukang Kayu L03 Org/hr 2.0000 47,000.00 94,000.00 4 Mandor L01 Org/hr 0.3000 80,000.00 24,000.00

JUMLAH HARGA TENAGA 1,468,000.00

B BAHAN

1 Balok M056 m3 1.2000 Err:509 Err:5092 Paku Kayu Segala Ukuran M140 kg 1.2500 17,500.00 21,875.00 3 Lem Kayu M422 Ltr 1.0000 25,040.00 25,040.00

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

ANALISA HARGA SATUAN

KODE ANALISA : F.004JENIS PEKERJAAN : Pasang kusen pintu dan jendela kayu merantiSATUAN PEMBAYARAN : m3

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 6.0000 45,000.00 270,000.00 2 Tukang Kayu L08 Org/hr 18.0000 60,000.00 1,080,000.00 3 Kepala Tukang Kayu L03 Org/hr 2.0000 47,000.00 94,000.00 4 Mandor L01 Org/hr 0.3000 80,000.00 24,000.00

JUMLAH HARGA TENAGA 1,468,000.00

B BAHAN

1 Balok M062 m3 1.2000 5,040,000.00 6,048,000.00 2 Paku Kayu Segala Ukuran M140 kg 1.2500 17,500.00 21,875.00 3 Lem Kayu M422 Ltr 1.0000 25,040.00 25,040.00

JUMLAH HARGA BAHAN 6,094,915.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 7,562,915.00

Page 101: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : F.005JENIS PEKERJAAN : Pasang pintu klamp kayu jatiSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.3500 45,000.00 15,750.00 2 Tukang Kayu L08 Org/hr 1.0500 60,000.00 63,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.1050 47,000.00 4,935.00 4 Mandor L01 Org/hr 0.0180 80,000.00 1,440.00

JUMLAH HARGA TENAGA 85,125.00

B BAHAN

1 Papan (3x30) cm M099 m3 0.0400 Err:509 Err:5092 Paku Kayu Segala Ukuran M140 kg 0.0500 17,500.00 875.00

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

ANALISA HARGA SATUAN

KODE ANALISA : F.006JENIS PEKERJAAN : Pasang pintu klamp kayu kamperSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.3500 45,000.00 15,750.00 2 Tukang Kayu L08 Org/hr 1.0500 60,000.00 63,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.1050 47,000.00 4,935.00 4 Mandor L01 Org/hr 0.0180 80,000.00 1,440.00

JUMLAH HARGA TENAGA 85,125.00

B BAHAN

1 Papan (3x30) cm M083 m3 0.0400 10,800,000.00 432,000.00 2 Paku Kayu Segala Ukuran M140 kg 0.0500 17,500.00 875.00

JUMLAH HARGA BAHAN 432,875.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 518,000.00

Page 102: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : F.007JENIS PEKERJAAN : Pasang pintu klamp kayu borneoSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.3500 45,000.00 15,750.00 2 Tukang Kayu L08 Org/hr 1.0500 60,000.00 63,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.1050 47,000.00 4,935.00 4 Mandor L01 Org/hr 0.0180 80,000.00 1,440.00

JUMLAH HARGA TENAGA 85,125.00

B BAHAN

1 Papan (3x30) cm M059 m3 0.0400 Err:509 Err:5092 Paku Kayu Segala Ukuran M140 kg 0.0500 17,500.00 875.00

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

ANALISA HARGA SATUAN

KODE ANALISA : F.008JENIS PEKERJAAN : Pasang pintu klamp kayu merantiSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.3500 45,000.00 15,750.00 2 Tukang Kayu L08 Org/hr 1.0500 60,000.00 63,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.1050 47,000.00 4,935.00 4 Mandor L01 Org/hr 0.0180 80,000.00 1,440.00

JUMLAH HARGA TENAGA 85,125.00

B BAHAN

1 Papan (3x30) cm M065 m3 0.0400 6,030,000.00 241,200.00 2 Paku Kayu Segala Ukuran M140 kg 0.0500 17,500.00 875.00

JUMLAH HARGA BAHAN 242,075.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 327,200.00

Page 103: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : F.009JENIS PEKERJAAN : Pasang pintu panel kayu jatiSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 1.0000 45,000.00 45,000.00 2 Tukang Kayu L08 Org/hr 2.5000 60,000.00 150,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.2500 47,000.00 11,750.00 4 Mandor L01 Org/hr 0.0500 80,000.00 4,000.00

JUMLAH HARGA TENAGA 210,750.00

B BAHAN

1 Papan (3x30) cm M099 m3 0.0400 Err:509 Err:5092 Lem Kayu M422 Ltr 0.5000 25,040.00 12,520.00

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

ANALISA HARGA SATUAN

KODE ANALISA : F.010JENIS PEKERJAAN : Pasang pintu panel kayu kamperSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 1.0000 45,000.00 45,000.00 2 Tukang Kayu L08 Org/hr 2.5000 60,000.00 150,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.2500 47,000.00 11,750.00 4 Mandor L01 Org/hr 0.0500 80,000.00 4,000.00

JUMLAH HARGA TENAGA 210,750.00

B BAHAN

1 Papan (3x30) cm M083 m3 0.0400 10,800,000.00 432,000.00 2 Lem Kayu M422 Ltr 0.5000 25,040.00 12,520.00

JUMLAH HARGA BAHAN 444,520.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 655,270.00

Page 104: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : F.011JENIS PEKERJAAN : Pasang pintu panel kayu borneoSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 1.0000 45,000.00 45,000.00 2 Tukang Kayu L08 Org/hr 2.5000 60,000.00 150,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.2500 47,000.00 11,750.00 4 Mandor L01 Org/hr 0.0500 80,000.00 4,000.00

JUMLAH HARGA TENAGA 210,750.00

B BAHAN

1 Papan (3x30) cm M059 m3 0.0400 Err:509 Err:5092 Lem Kayu M422 Ltr 0.5000 25,040.00 12,520.00

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

ANALISA HARGA SATUAN

KODE ANALISA : F.012JENIS PEKERJAAN : Pasang pintu panel kayu merantiSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 1.0000 45,000.00 45,000.00 2 Tukang Kayu L08 Org/hr 2.5000 60,000.00 150,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.2500 47,000.00 11,750.00 4 Mandor L01 Org/hr 0.0500 80,000.00 4,000.00

JUMLAH HARGA TENAGA 210,750.00

B BAHAN

1 Papan (3x30) cm M065 m3 0.0400 6,030,000.00 241,200.00 2 Lem Kayu M422 Ltr 0.5000 25,040.00 12,520.00

JUMLAH HARGA BAHAN 253,720.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 464,470.00

Page 105: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : F.013JENIS PEKERJAAN : Pasang pintu dan jendela kaca kayu jatiSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.8000 45,000.00 36,000.00 2 Tukang Kayu L08 Org/hr 2.0000 60,000.00 120,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.2000 47,000.00 9,400.00 4 Mandor L01 Org/hr 0.0400 80,000.00 3,200.00

JUMLAH HARGA TENAGA 168,600.00

B BAHAN

1 Papan (3x30) cm M099 m3 0.0240 Err:509 Err:5092 Lem Kayu M422 Ltr 0.3000 25,040.00 7,512.00

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

ANALISA HARGA SATUAN

KODE ANALISA : F.014JENIS PEKERJAAN : Pasang pintu dan jendela kaca kayu kamperSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.8000 45,000.00 36,000.00 2 Tukang Kayu L08 Org/hr 2.0000 60,000.00 120,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.2000 47,000.00 9,400.00 4 Mandor L01 Org/hr 0.0400 80,000.00 3,200.00

JUMLAH HARGA TENAGA 168,600.00

B BAHAN

1 Papan (3x30) cm M083 m3 0.0240 10,800,000.00 259,200.00 2 Lem Kayu M422 Ltr 0.3000 25,040.00 7,512.00

JUMLAH HARGA BAHAN 266,712.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 435,312.00

Page 106: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : F.015JENIS PEKERJAAN : Pasang pintu dan jendela kaca kayu borneoSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.8000 45,000.00 36,000.00 2 Tukang Kayu L08 Org/hr 2.0000 60,000.00 120,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.2000 47,000.00 9,400.00 4 Mandor L01 Org/hr 0.0400 80,000.00 3,200.00

JUMLAH HARGA TENAGA 168,600.00

B BAHAN

1 Papan (3x30) cm M059 m3 0.0240 Err:509 Err:5092 Lem Kayu M422 Ltr 0.3000 25,040.00 7,512.00

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

ANALISA HARGA SATUAN

KODE ANALISA : F.016JENIS PEKERJAAN : Pasang pintu dan jendela kaca kayu merantiSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.8000 45,000.00 36,000.00 2 Tukang Kayu L08 Org/hr 2.0000 60,000.00 120,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.2000 47,000.00 9,400.00 4 Mandor L01 Org/hr 0.0400 80,000.00 3,200.00

JUMLAH HARGA TENAGA 168,600.00

B BAHAN

1 Papan (3x30) cm M065 m3 0.0240 6,030,000.00 144,720.000 2 Lem Kayu M422 Ltr 0.3000 25,040.00 7,512.00

JUMLAH HARGA BAHAN 152,232.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 320,832.00

Page 107: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : F.017JENIS PEKERJAAN : Pasang pintu dan jendela jalusi kayu jatiSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 1.0000 45,000.00 45,000.00 2 Tukang Kayu L08 Org/hr 3.0000 60,000.00 180,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.3000 47,000.00 14,100.00 4 Mandor L01 Org/hr 0.0500 80,000.00 4,000.00

JUMLAH HARGA TENAGA 243,100.00

B BAHAN

1 Papan (3x30) cm M099 m3 0.0640 Err:509 Err:5092 Lem Kayu M422 Ltr 0.5000 25,040.00 12,520.00

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

ANALISA HARGA SATUAN

KODE ANALISA : F.018JENIS PEKERJAAN : Pasang pintu dan jendela jalusi kayu kamperSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 1.0000 45,000.00 45,000.00 2 Tukang Kayu L08 Org/hr 3.0000 60,000.00 180,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.3000 47,000.00 14,100.00 4 Mandor L01 Org/hr 0.0500 80,000.00 4,000.00

JUMLAH HARGA TENAGA 243,100.00

B BAHAN

1 Papan (3x30) cm M083 m3 0.0640 10,800,000.00 691,200.000 2 Lem Kayu M422 Ltr 0.5000 25,040.00 12,520.00

JUMLAH HARGA BAHAN 703,720.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 946,820.00

Page 108: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : F.019JENIS PEKERJAAN : Pasang pintu dan jendela jalusi kayu borneoSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 1.0000 45,000.00 45,000.00 2 Tukang Kayu L08 Org/hr 3.0000 60,000.00 180,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.3000 47,000.00 14,100.00 4 Mandor L01 Org/hr 0.0500 80,000.00 4,000.00

JUMLAH HARGA TENAGA 243,100.00

B BAHAN

1 Papan (3x30) cm M059 m3 0.0640 Err:509 Err:5092 Lem Kayu M422 Ltr 0.5000 25,040.00 12,520.00

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

ANALISA HARGA SATUAN

KODE ANALISA : F.020JENIS PEKERJAAN : Pasang pintu dan jendela jalusi kayu merantiSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 1.0000 45,000.00 45,000.00 2 Tukang Kayu L08 Org/hr 3.0000 60,000.00 180,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.3000 47,000.00 14,100.00 4 Mandor L01 Org/hr 0.0500 80,000.00 4,000.00

JUMLAH HARGA TENAGA 243,100.00

B BAHAN

1 Papan (3x30) cm M065 m3 0.0640 6,030,000.00 385,920.000 2 Lem Kayu M422 Ltr 0.5000 25,040.00 12,520.00

JUMLAH HARGA BAHAN 398,440.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 641,540.00

Page 109: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : F.021JENIS PEKERJAAN : Pasang pintu plywood rangkap, rangka kayu jatiSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.6000 45,000.00 27,000.00 2 Tukang Kayu L08 Org/hr 2.0000 60,000.00 120,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.2000 47,000.00 9,400.00 4 Mandor L01 Org/hr 0.0300 80,000.00 2,400.00

JUMLAH HARGA TENAGA 158,800.00

B BAHAN

1 Papan (3x30) cm M099 m3 0.0250 Err:509 Err:5092 Paku Kayu Segala Ukuran M140 kg 0.0300 17,500.00 525.00 3 Lem Kayu M422 Ltr 0.5000 25,040.00 12,520.00 4 Plywood (120 x 240) cm x 4 mm M226 lbr 1.0000 85,000.00 85,000.00

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

ANALISA HARGA SATUAN

KODE ANALISA : F.022JENIS PEKERJAAN : Pasang pintu plywood rangkap, rangka kayu kamperSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.6000 45,000.00 27,000.00 2 Tukang Kayu L08 Org/hr 2.0000 60,000.00 120,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.2000 47,000.00 9,400.00 4 Mandor L01 Org/hr 0.0300 80,000.00 2,400.00

JUMLAH HARGA TENAGA 158,800.00

B BAHAN

1 Papan (3x30) cm M083 m3 0.0250 10,800,000.00 270,000.00 2 Paku Kayu Segala Ukuran M140 kg 0.0300 17,500.00 525.00 3 Lem Kayu M422 Ltr 0.5000 25,040.00 12,520.00 4 Plywood (120 x 240) cm x 4 mm M226 lbr 1.0000 85,000.00 85,000.00

JUMLAH HARGA BAHAN 368,045.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 526,845.00

Page 110: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : F.023JENIS PEKERJAAN : Pasang pintu plywood rangkap, rangka kayu borneoSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.6000 45,000.00 27,000.00 2 Tukang Kayu L08 Org/hr 2.0000 60,000.00 120,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.2000 47,000.00 9,400.00 4 Mandor L01 Org/hr 0.0300 80,000.00 2,400.00

JUMLAH HARGA TENAGA 158,800.00

B BAHAN

1 Papan (3x30) cm M059 m3 0.0250 Err:509 Err:5092 Paku Kayu Segala Ukuran M140 kg 0.0300 17,500.00 525.00 3 Lem Kayu M422 Ltr 0.5000 25,040.00 12,520.00 4 Plywood (120 x 240) cm x 4 mm M226 lbr 1.0000 85,000.00 85,000.00

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

ANALISA HARGA SATUAN

KODE ANALISA : F.024JENIS PEKERJAAN : Pasang pintu plywood rangkap, rangka kayu merantiSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.6000 45,000.00 27,000.00 2 Tukang Kayu L08 Org/hr 2.0000 60,000.00 120,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.2000 47,000.00 9,400.00 4 Mandor L01 Org/hr 0.0300 80,000.00 2,400.00

JUMLAH HARGA TENAGA 158,800.00

B BAHAN

1 Papan (3x30) cm M065 m3 0.0250 6,030,000.00 150,750.00 2 Paku Kayu Segala Ukuran M140 kg 0.0300 17,500.00 525.00 3 Lem Kayu M422 Ltr 0.5000 25,040.00 12,520.00 4 Plywood (120 x 240) cm x 4 mm M226 lbr 1.0000 85,000.00 85,000.00

JUMLAH HARGA BAHAN 248,795.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 407,595.00

Page 111: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : F.025JENIS PEKERJAAN : Pasang jalusi mati kusen kayu jatiSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.8000 45,000.00 36,000.00 2 Tukang Kayu L08 Org/hr 2.0000 60,000.00 120,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.2000 47,000.00 9,400.00 4 Mandor L01 Org/hr 0.0250 80,000.00 2,000.00

JUMLAH HARGA TENAGA 167,400.00

B BAHAN

1 Papan (3x30) cm M099 m3 0.0600 Err:509 Err:5092 Paku Kayu Segala Ukuran M140 kg 0.1500 17,500.00 2,625.00

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

ANALISA HARGA SATUAN

KODE ANALISA : F.026JENIS PEKERJAAN : Pasang jalusi mati kusen kayu kamperSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.5000 45,000.00 22,500.00 2 Tukang Kayu L08 Org/hr 2.0000 60,000.00 120,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.2000 47,000.00 9,400.00 4 Mandor L01 Org/hr 0.0250 80,000.00 2,000.00

JUMLAH HARGA TENAGA 153,900.00

B BAHAN

1 Papan (3x30) cm M083 m3 0.0600 10,800,000.00 648,000.00 2 Paku Kayu Segala Ukuran M140 kg 0.1500 17,500.00 2,625.00

JUMLAH HARGA BAHAN 650,625.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 804,525.00

Page 112: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : F.027JENIS PEKERJAAN : Pasang jalusi mati kusen kayu borneoSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.5000 45,000.00 22,500.00 2 Tukang Kayu L08 Org/hr 2.0000 60,000.00 120,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.2000 47,000.00 9,400.00 4 Mandor L01 Org/hr 0.0250 80,000.00 2,000.00

JUMLAH HARGA TENAGA 153,900.00

B BAHAN

1 Papan (3x30) cm M059 m3 0.0600 Err:509 Err:5092 Paku Kayu Segala Ukuran M140 kg 0.1500 17,500.00 2,625.00

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

ANALISA HARGA SATUAN

KODE ANALISA : F.028JENIS PEKERJAAN : Pasang jalusi mati kusen kayu merantiSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.5000 45,000.00 22,500.00 2 Tukang Kayu L08 Org/hr 2.0000 60,000.00 120,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.2000 47,000.00 9,400.00 4 Mandor L01 Org/hr 0.0250 80,000.00 2,000.00

JUMLAH HARGA TENAGA 153,900.00

B BAHAN

1 Papan (3x30) cm M065 m3 0.0600 6,030,000.00 361,800.00 2 Paku Kayu Segala Ukuran M140 kg 0.1500 17,500.00 2,625.00

JUMLAH HARGA BAHAN 364,425.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 518,325.00

Page 113: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : F.029JENIS PEKERJAAN : Pasang pintu teakwood rangkap, rangka kayu jatiSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.8000 45,000.00 36,000.00 2 Tukang Kayu L08 Org/hr 2.0000 60,000.00 120,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.2000 47,000.00 9,400.00 4 Mandor L01 Org/hr 0.0400 80,000.00 3,200.00

JUMLAH HARGA TENAGA 168,600.00

B BAHAN

1 Papan (3x30) cm M099 m3 0.0250 Err:509 Err:5092 Paku Kayu Segala Ukuran M140 kg 0.0300 17,500.00 525.00 3 Lem Kayu M422 Ltr 0.3000 25,040.00 7,512.00 4 Teakwood (120 x 240) cm x 4 mm M229 lbr 1.0000 82,610.00 82,610.00

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

ANALISA HARGA SATUAN

KODE ANALISA : F.030JENIS PEKERJAAN : Pasang pintu teakwood rangkap, rangka kayu kamperSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.8000 45,000.00 36,000.00 2 Tukang Kayu L08 Org/hr 2.0000 60,000.00 120,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.2000 47,000.00 9,400.00 4 Mandor L01 Org/hr 0.0400 80,000.00 3,200.00

JUMLAH HARGA TENAGA 168,600.00

B BAHAN

1 Papan (3x30) cm M083 m3 0.0250 10,800,000.00 270,000.00 2 Paku Kayu Segala Ukuran M140 kg 0.0300 17,500.00 525.00 3 Lem Kayu M422 Ltr 0.3000 25,040.00 7,512.00 4 Teakwood (120 x 240) cm x 4 mm M229 lbr 1.0000 82,610.00 82,610.00

JUMLAH HARGA BAHAN 360,647.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 529,247.00

Page 114: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : F.031JENIS PEKERJAAN : Pasang pintu teakwood rangkap, rangka kayu borneoSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.8000 45,000.00 36,000.00 2 Tukang Kayu L08 Org/hr 2.0000 60,000.00 120,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.2000 47,000.00 9,400.00 4 Mandor L01 Org/hr 0.0400 80,000.00 3,200.00

JUMLAH HARGA TENAGA 168,600.00

B BAHAN

1 Papan (3x30) cm M059 m3 0.0250 Err:509 Err:5092 Paku Kayu Segala Ukuran M140 kg 0.0300 17,500.00 525.00 3 Lem Kayu M422 Ltr 0.3000 25,040.00 7,512.00 4 Teakwood (120 x 240) cm x 4 mm M229 lbr 1.0000 82,610.00 82,610.00

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

ANALISA HARGA SATUAN

KODE ANALISA : F.032JENIS PEKERJAAN : Pasang pintu teakwood rangkap, rangka kayu merantiSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.8000 45,000.00 36,000.00 2 Tukang Kayu L08 Org/hr 2.0000 60,000.00 120,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.2000 47,000.00 9,400.00 4 Mandor L01 Org/hr 0.0400 80,000.00 3,200.00

JUMLAH HARGA TENAGA 168,600.00

B BAHAN

1 Papan (3x30) cm M065 m3 0.0250 6,030,000.00 150,750.00 2 Paku Kayu Segala Ukuran M140 kg 0.0300 17,500.00 525.00 3 Lem Kayu M422 Ltr 0.3000 25,040.00 7,512.00 4 Teakwood (120 x 240) cm x 4 mm M229 lbr 1.0000 82,610.00 82,610.00

JUMLAH HARGA BAHAN 241,397.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 409,997.00

Page 115: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : F.033JENIS PEKERJAAN : Pasang pintu plywood & formika, rangka kayu jatiSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.8000 45,000.00 36,000.00 2 Tukang Kayu L08 Org/hr 2.5000 60,000.00 150,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.2500 47,000.00 11,750.00 4 Mandor L01 Org/hr 0.0400 80,000.00 3,200.00

JUMLAH HARGA TENAGA 200,950.00

B BAHAN

1 Papan (3x30) cm M099 m3 0.0250 Err:509 Err:5092 Paku Kayu Segala Ukuran M140 kg 0.0300 17,500.00 525.00 3 Lem Kayu M422 Ltr 0.8000 25,040.00 20,032.00 4 Plywood (120 x 240) cm x 4 mm M226 lbr 1.0000 85,000.00 85,000.00 5 Formika (90 x 120) cm M475 lbr 0.5000 53,810.00 26,905.00

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

ANALISA HARGA SATUAN

KODE ANALISA : F.034JENIS PEKERJAAN : Pasang pintu plywood & formika, rangka kayu kamperSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.8000 45,000.00 36,000.00 2 Tukang Kayu L08 Org/hr 2.5000 60,000.00 150,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.2500 47,000.00 11,750.00 4 Mandor L01 Org/hr 0.0400 80,000.00 3,200.00

JUMLAH HARGA TENAGA 200,950.00

B BAHAN

1 Papan (3x30) cm M083 m3 0.0250 10,800,000.00 270,000.00 2 Paku Kayu Segala Ukuran M140 kg 0.0300 17,500.00 525.00 3 Lem Kayu M422 Ltr 0.8000 25,040.00 20,032.00 4 Plywood (120 x 240) cm x 4 mm M226 lbr 1.0000 85,000.00 85,000.00 5 Formika (90 x 120) cm M475 lbr 0.5000 53,810.00 26,905.00

JUMLAH HARGA BAHAN 402,462.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 603,412.00

Page 116: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : F.035JENIS PEKERJAAN : Pasang pintu plywood & formika, rangka kayu borneoSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.8000 45,000.00 36,000.00 2 Tukang Kayu L08 Org/hr 2.5000 60,000.00 150,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.2500 47,000.00 11,750.00 4 Mandor L01 Org/hr 0.0400 80,000.00 3,200.00

JUMLAH HARGA TENAGA 200,950.00

B BAHAN

1 Papan (3x30) cm M059 m3 0.0250 Err:509 Err:5092 Paku Kayu Segala Ukuran M140 kg 0.0300 17,500.00 525.00 3 Lem Kayu M422 Ltr 0.8000 25,040.00 20,032.00 4 Plywood (120 x 240) cm x 4 mm M226 lbr 1.0000 85,000.00 85,000.00 5 Formika (90 x 120) cm M475 lbr 0.5000 53,810.00 26,905.00

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

ANALISA HARGA SATUAN

KODE ANALISA : F.036JENIS PEKERJAAN : Pasang pintu plywood & formika, rangka kayu merantiSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.8000 45,000.00 36,000.00 2 Tukang Kayu L08 Org/hr 2.5000 60,000.00 150,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.2500 47,000.00 11,750.00 4 Mandor L01 Org/hr 0.0400 80,000.00 3,200.00

JUMLAH HARGA TENAGA 200,950.00

B BAHAN

1 Papan (3x30) cm M065 m3 0.0250 6,030,000.00 150,750.00 2 Paku Kayu Segala Ukuran M140 kg 0.0300 17,500.00 525.00 3 Lem Kayu M422 Ltr 0.8000 25,040.00 20,032.00 4 Plywood (120 x 240) cm x 4 mm M226 lbr 1.0000 85,000.00 85,000.00 5 Formika (90 x 120) cm M475 lbr 0.5000 53,810.00 26,905.00

JUMLAH HARGA BAHAN 283,212.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 484,162.00

Page 117: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : F.037JENIS PEKERJAAN : Pasang pintu teakwood & formika, rangka kayu jatiSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.8000 45,000.00 36,000.00 2 Tukang Kayu L08 Org/hr 2.5000 60,000.00 150,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.2500 47,000.00 11,750.00 4 Mandor L01 Org/hr 0.0400 80,000.00 3,200.00

JUMLAH HARGA TENAGA 200,950.00

B BAHAN

1 Papan (3x30) cm M099 m3 0.0250 Err:509 Err:5092 Paku Kayu Segala Ukuran M140 kg 0.0300 17,500.00 525.00 3 Lem Kayu M422 Ltr 0.8000 25,040.00 20,032.00 4 Teakwood (120 x 240) cm x 4 mm M229 lbr 1.0000 82,610.00 82,610.00 5 Formika (90 x 120) cm M475 lbr 0.5000 53,810.00 26,905.00

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

ANALISA HARGA SATUAN

KODE ANALISA : F.038JENIS PEKERJAAN : Pasang pintu teakwood & formika, rangka kayu borneo (divernis)SATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.8000 45,000.00 36,000.00 2 Tukang Kayu L08 Org/hr 2.5000 60,000.00 150,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.2500 47,000.00 11,750.00 4 Mandor L01 Org/hr 0.0400 80,000.00 3,200.00

JUMLAH HARGA TENAGA 200,950.00

B BAHAN

1 Papan (3x30) cm M059 m3 0.0250 Err:509 Err:5092 Paku Kayu Segala Ukuran M140 kg 0.0300 17,500.00 525.00 3 Lem Kayu M422 Ltr 0.8000 25,040.00 20,032.00 4 Teakwood (120 x 240) cm x 4 mm M229 lbr 1.0000 82,610.00 82,610.00 5 Vernis M419 Ltr 0.5000 28,700.00 14,350.00 6 Formika (90 x 120) cm M475 lbr 0.5000 53,810.00 26,905.00

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

Page 118: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : F.039JENIS PEKERJAAN : Pasang pintu teakwood & formika, rangka kayu meranti (divernis)SATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.8000 45,000.00 36,000.00 2 Tukang Kayu L08 Org/hr 2.5000 60,000.00 150,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.2500 47,000.00 11,750.00 4 Mandor L01 Org/hr 0.0400 80,000.00 3,200.00

JUMLAH HARGA TENAGA 200,950.00

B BAHAN

1 Papan (3x30) cm M065 m3 0.0250 6,030,000.00 150,750.00 2 Paku Kayu Segala Ukuran M140 kg 0.0300 17,500.00 525.00 3 Lem Kayu M422 Ltr 0.8000 25,040.00 20,032.00 4 Teakwood (120 x 240) cm x 4 mm M229 lbr 1.0000 82,610.00 82,610.00 5 Vernis M419 Ltr 0.5000 28,700.00 14,350.00 6 Formika (90 x 120) cm M475 lbr 0.5000 53,810.00 26,905.00

JUMLAH HARGA BAHAN 295,172.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 496,122.00

ANALISA HARGA SATUAN

KODE ANALISA : F.040JENIS PEKERJAAN : Pasang konstruksi kuda-kuda kayu jatiSATUAN PEMBAYARAN : m3

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 4.0000 45,000.00 180,000.00 2 Tukang Kayu L08 Org/hr 12.0000 60,000.00 720,000.00 3 Kepala Tukang Kayu L03 Org/hr 1.2000 47,000.00 56,400.00 4 Mandor L01 Org/hr 0.2000 80,000.00 16,000.00

JUMLAH HARGA TENAGA 972,400.00

B BAHAN

1 Balok M096 m3 1.1000 Err:509 Err:5092 Besi Strip M114 kg 15.0000 8,500.00 127,500.00 3 Paku Kayu Segala Ukuran M140 kg 5.6000 17,500.00 98,000.00

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

Page 119: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : F.041JENIS PEKERJAAN : Pasang konstruksi kuda-kuda kayu kamperSATUAN PEMBAYARAN : m3

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 4.0000 45,000.00 180,000.00 2 Tukang Kayu L08 Org/hr 12.0000 60,000.00 720,000.00 3 Kepala Tukang Kayu L03 Org/hr 1.2000 47,000.00 56,400.00 4 Mandor L01 Org/hr 0.2000 80,000.00 16,000.00

JUMLAH HARGA TENAGA 972,400.00

B BAHAN

1 Balok M080 m3 1.1000 9,000,000.00 9,900,000.00 2 Besi Strip M114 kg 15.0000 8,500.00 127,500.00 3 Paku Kayu Segala Ukuran M140 kg 5.6000 17,500.00 98,000.00

JUMLAH HARGA BAHAN 10,125,500.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 11,097,900.00

ANALISA HARGA SATUAN

KODE ANALISA : F.042JENIS PEKERJAAN : Pasang konstruksi kuda-kuda kayu borneoSATUAN PEMBAYARAN : m3

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 4.0000 45,000.00 180,000.00 2 Tukang Kayu L08 Org/hr 12.0000 60,000.00 720,000.00 3 Kepala Tukang Kayu L03 Org/hr 1.2000 47,000.00 56,400.00 4 Mandor L01 Org/hr 0.2000 80,000.00 16,000.00

JUMLAH HARGA TENAGA 972,400.00

B BAHAN

1 Balok M056 m3 1.1000 Err:509 Err:5092 Besi Strip M114 kg 15.0000 8,500.00 127,500.00 3 Paku Kayu Segala Ukuran M140 kg 5.6000 17,500.00 98,000.00

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

Page 120: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : F.043JENIS PEKERJAAN : Pasang konstruksi kuda-kuda kayu bengkiraiSATUAN PEMBAYARAN : m3

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 4.0000 45,000.00 180,000.00 2 Tukang Kayu L08 Org/hr 12.0000 60,000.00 720,000.00 3 Kepala Tukang Kayu L03 Org/hr 1.2000 47,000.00 56,400.00 4 Mandor L01 Org/hr 0.2000 80,000.00 16,000.00

JUMLAH HARGA TENAGA 972,400.00

B BAHAN

1 Balok M074 m3 1.1000 Err:509 Err:5092 Besi Strip M114 kg 15.0000 8,500.00 127,500.00 3 Paku Kayu Segala Ukuran M140 kg 5.6000 17,500.00 98,000.00

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

ANALISA HARGA SATUAN

KODE ANALISA : F.044JENIS PEKERJAAN : Pasang konstruksi kuda-kuda kayu kruingSATUAN PEMBAYARAN : m3

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 4.0000 45,000.00 180,000.00 2 Tukang Kayu L08 Org/hr 12.0000 60,000.00 720,000.00 3 Kepala Tukang Kayu L03 Org/hr 1.2000 47,000.00 56,400.00 4 Mandor L01 Org/hr 0.2000 80,000.00 16,000.00

JUMLAH HARGA TENAGA 972,400.00

B BAHAN

1 Balok M068 m3 1.1000 5,400,000.00 5,940,000.00 2 Besi Strip M114 kg 15.0000 8,500.00 127,500.00 3 Paku Kayu Segala Ukuran M140 kg 5.6000 17,500.00 98,000.00

JUMLAH HARGA BAHAN 6,165,500.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 7,137,900.00

Page 121: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : F.051JENIS PEKERJAAN : Pasang kaso + reng genteng biasa kayu kamperSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1000 45,000.00 4,500.00 2 Tukang Kayu L08 Org/hr 0.1000 60,000.00 6,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0100 47,000.00 470.00 4 Mandor L01 Org/hr 0.0050 80,000.00 400.00

JUMLAH HARGA TENAGA 11,370.00

B BAHAN

1 Usuk : 5/7 M079 m3 0.0140 1,450,000.00 20,300.00 2 Paku Kayu Segala Ukuran M140 kg 0.2500 17,500.00 4,375.00 3 Reng : 2/3, 3/5 M078 m3 0.0360 1,450,000.00 52,200.00

JUMLAH HARGA BAHAN 76,875.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 88,245.00

ANALISA HARGA SATUAN

KODE ANALISA : F.052JENIS PEKERJAAN : Pasang kaso + reng genteng biasa kayu borneoSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1000 45,000.00 4,500.00 2 Tukang Kayu L08 Org/hr 0.1000 60,000.00 6,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0100 47,000.00 470.00 4 Mandor L01 Org/hr 0.0050 80,000.00 400.00

JUMLAH HARGA TENAGA 11,370.00

B BAHAN

1 Usuk : 5/7 M055 m3 0.0140 Err:509 Err:5092 Paku Kayu Segala Ukuran M140 kg 0.2500 17,500.00 4,375.00 3 Reng : 2/3, 3/5 M054 m3 0.0360 Err:509 Err:509

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

Page 122: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : F.053JENIS PEKERJAAN : Pasang kaso + reng genteng biasa kayu bengkiraiSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1000 45,000.00 4,500.00 2 Tukang Kayu L08 Org/hr 0.1000 60,000.00 6,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0100 47,000.00 470.00 4 Mandor L01 Org/hr 0.0050 80,000.00 400.00

JUMLAH HARGA TENAGA 11,370.00

B BAHAN

1 Usuk : 5/7 M073 m3 0.0140 Err:509 Err:5092 Paku Kayu Segala Ukuran M140 kg 0.2500 17,500.00 4,375.00 3 Reng : 2/3, 3/5 M072 m3 0.0360 Err:509 Err:509

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

ANALISA HARGA SATUAN

KODE ANALISA : F.054JENIS PEKERJAAN : Pasang kaso + reng genteng biasa kayu kruingSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1000 45,000.00 4,500.00 2 Tukang Kayu L08 Org/hr 0.1000 60,000.00 6,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0100 47,000.00 470.00 4 Mandor L01 Org/hr 0.0050 80,000.00 400.00

JUMLAH HARGA TENAGA 11,370.00

B BAHAN

1 Usuk : 5/7 M067 m3 0.0140 5,400,000.00 75,600.00 2 Paku Kayu Segala Ukuran M140 kg 0.2500 17,500.00 4,375.00 3 Reng : 2/3, 3/5 M066 m3 0.0360 5,400,000.00 194,400.00

JUMLAH HARGA BAHAN 274,375.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 285,745.00

Page 123: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : F.055JENIS PEKERJAAN : Pasang kaso + reng genteng biasa kayu merantiSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1000 45,000.00 4,500.00 2 Tukang Kayu L08 Org/hr 0.1000 60,000.00 6,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0100 47,000.00 470.00 4 Mandor L01 Org/hr 0.0050 80,000.00 400.00

JUMLAH HARGA TENAGA 11,370.00

B BAHAN

1 Usuk : 5/7 M061 m3 0.0140 4,500,000.00 63,000.00 2 Paku Kayu Segala Ukuran M140 kg 0.2500 17,500.00 4,375.00 3 Reng : 2/3, 3/5 M060 m3 0.0360 4,500,000.00 162,000.00

JUMLAH HARGA BAHAN 229,375.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 240,745.00

ANALISA HARGA SATUAN

KODE ANALISA : F.056JENIS PEKERJAAN : Pasang kaso + reng genteng karangpilang kayu jatiSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1000 45,000.00 4,500.00 2 Tukang Kayu L08 Org/hr 0.1000 60,000.00 6,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0100 47,000.00 470.00 4 Mandor L01 Org/hr 0.0050 80,000.00 400.00

JUMLAH HARGA TENAGA 11,370.00

B BAHAN

1 Usuk : 5/7 M095 m3 0.0140 Err:509 Err:5092 Paku Kayu Segala Ukuran M140 kg 0.2500 17,500.00 4,375.00 3 Reng : 2/3, 3/5 M094 m3 0.0360 Err:509 Err:509

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

Page 124: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : F.057JENIS PEKERJAAN : Pasang kaso + reng genteng karangpilang kayu kamperSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1000 45,000.00 4,500.00 2 Tukang Kayu L08 Org/hr 0.1000 60,000.00 6,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0100 47,000.00 470.00 4 Mandor L01 Org/hr 0.0050 80,000.00 400.00

JUMLAH HARGA TENAGA 11,370.00

B BAHAN

1 Usuk : 5/7 M079 m3 0.0140 1,450,000.00 20,300.00 2 Paku Kayu Segala Ukuran M140 kg 0.2500 17,500.00 4,375.00 3 Reng : 2/3, 3/5 M078 m3 0.0360 1,450,000.00 52,200.00

JUMLAH HARGA BAHAN 76,875.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 88,245.00

ANALISA HARGA SATUAN

KODE ANALISA : F.058JENIS PEKERJAAN : Pasang kaso + reng genteng karangpilang kayu borneoSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1000 45,000.00 4,500.00 2 Tukang Kayu L08 Org/hr 0.1000 60,000.00 6,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0100 47,000.00 470.00 4 Mandor L01 Org/hr 0.0050 80,000.00 400.00

JUMLAH HARGA TENAGA 11,370.00

B BAHAN

1 Usuk : 5/7 M055 m3 0.0140 Err:509 Err:5092 Paku Kayu Segala Ukuran M140 kg 0.2500 17,500.00 4,375.00 3 Reng : 2/3, 3/5 M054 m3 0.0360 Err:509 Err:509

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

Page 125: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : F.059JENIS PEKERJAAN : Pasang kaso + reng genteng karangpilang kayu bengkiraiSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1000 45,000.00 4,500.00 2 Tukang Kayu L08 Org/hr 0.1000 60,000.00 6,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0100 47,000.00 470.00 4 Mandor L01 Org/hr 0.0050 80,000.00 400.00

JUMLAH HARGA TENAGA 11,370.00

B BAHAN

1 Usuk : 5/7 M073 m3 0.0140 Err:509 Err:5092 Paku Kayu Segala Ukuran M140 kg 0.2500 17,500.00 4,375.00 3 Reng : 2/3, 3/5 M072 m3 0.0360 Err:509 Err:509

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

ANALISA HARGA SATUAN

KODE ANALISA : F.060JENIS PEKERJAAN : Pasang kaso + reng genteng karangpilang kayu kruingSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1000 45,000.00 4,500.00 2 Tukang Kayu L08 Org/hr 0.1000 60,000.00 6,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0100 47,000.00 470.00 4 Mandor L01 Org/hr 0.0050 80,000.00 400.00

JUMLAH HARGA TENAGA 11,370.00

B BAHAN

1 Usuk : 5/7 M067 m3 0.0140 5,400,000.00 75,600.00 2 Paku Kayu Segala Ukuran M140 kg 0.2500 17,500.00 4,375.00 3 Reng : 2/3, 3/5 M066 m3 0.0360 5,400,000.00 194,400.00

JUMLAH HARGA BAHAN 274,375.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 285,745.00

Page 126: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : F.061JENIS PEKERJAAN : Pasang kaso + reng genteng karangpilang kayu merantiSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1000 45,000.00 4,500.00 2 Tukang Kayu L08 Org/hr 0.1000 60,000.00 6,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0100 47,000.00 470.00 4 Mandor L01 Org/hr 0.0050 80,000.00 400.00

JUMLAH HARGA TENAGA 11,370.00

B BAHAN

1 Usuk : 5/7 M061 m3 0.0140 4,500,000.00 63,000.00 2 Paku Kayu Segala Ukuran M140 kg 0.2500 17,500.00 4,375.00 3 Reng : 2/3, 3/5 M060 m3 0.0360 4,500,000.00 162,000.00

JUMLAH HARGA BAHAN 229,375.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 240,745.00

ANALISA HARGA SATUAN

KODE ANALISA : F.062JENIS PEKERJAAN : Pasang kaso + reng genteng beton kayu jatiSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1000 45,000.00 4,500.00 2 Tukang Kayu L08 Org/hr 0.1000 60,000.00 6,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0100 47,000.00 470.00 4 Mandor L01 Org/hr 0.0050 80,000.00 400.00

JUMLAH HARGA TENAGA 11,370.00

B BAHAN

1 Usuk : 5/7 M095 m3 0.0140 Err:509 Err:5092 Paku Kayu Segala Ukuran M140 kg 0.2500 17,500.00 4,375.00 3 Reng : 2/3, 3/5 M094 m3 0.0570 Err:509 Err:509

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

Page 127: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : F.063JENIS PEKERJAAN : Pasang kaso + reng genteng beton kayu kamperSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1000 45,000.00 4,500.00 2 Tukang Kayu L08 Org/hr 0.1000 60,000.00 6,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0100 47,000.00 470.00 4 Mandor L01 Org/hr 0.0050 80,000.00 400.00

JUMLAH HARGA TENAGA 11,370.00

B BAHAN

1 Usuk : 5/7 M079 m3 0.0140 1,450,000.00 20,300.00 2 Paku Kayu Segala Ukuran M140 kg 0.2500 17,500.00 4,375.00 3 Reng : 2/3, 3/5 M078 m3 0.0570 1,450,000.00 82,650.00

JUMLAH HARGA BAHAN 107,325.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 118,695.00

ANALISA HARGA SATUAN

KODE ANALISA : F.064JENIS PEKERJAAN : Pasang kaso + reng genteng beton kayu borneoSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1000 45,000.00 4,500.00 2 Tukang Kayu L08 Org/hr 0.1000 60,000.00 6,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0100 47,000.00 470.00 4 Mandor L01 Org/hr 0.0050 80,000.00 400.00

JUMLAH HARGA TENAGA 11,370.00

B BAHAN

1 Usuk : 5/7 M055 m3 0.0140 Err:509 Err:5092 Paku Kayu Segala Ukuran M140 kg 0.2500 17,500.00 4,375.00 3 Reng : 2/3, 3/5 M054 m3 0.0570 Err:509 Err:509

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

Page 128: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : F.065JENIS PEKERJAAN : Pasang kaso + reng genteng beton kayu bengkiraiSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1000 45,000.00 4,500.00 2 Tukang Kayu L08 Org/hr 0.1000 60,000.00 6,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0100 47,000.00 470.00 4 Mandor L01 Org/hr 0.0050 80,000.00 400.00

JUMLAH HARGA TENAGA 11,370.00

B BAHAN

1 Usuk : 5/7 M073 m3 0.0140 Err:509 Err:5092 Paku Kayu Segala Ukuran M140 kg 0.2500 17,500.00 4,375.00 3 Reng : 2/3, 3/5 M072 m3 0.0570 Err:509 Err:509

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

ANALISA HARGA SATUAN

KODE ANALISA : F.066JENIS PEKERJAAN : Pasang kaso + reng genteng beton kayu kruingSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1000 45,000.00 4,500.00 2 Tukang Kayu L08 Org/hr 0.1000 60,000.00 6,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0100 47,000.00 470.00 4 Mandor L01 Org/hr 0.0050 80,000.00 400.00

JUMLAH HARGA TENAGA 11,370.00

B BAHAN

1 Usuk : 5/7 M067 m3 0.0140 5,400,000.00 75,600.00 2 Paku Kayu Segala Ukuran M140 kg 0.2500 17,500.00 4,375.00 3 Reng : 2/3, 3/5 M066 m3 0.0570 5,400,000.00 307,800.00

JUMLAH HARGA BAHAN 387,775.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 399,145.00

Page 129: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : F.067JENIS PEKERJAAN : Pasang kaso + reng genteng beton kayu merantiSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1000 45,000.00 4,500.00 2 Tukang Kayu L08 Org/hr 0.1000 60,000.00 6,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0100 47,000.00 470.00 4 Mandor L01 Org/hr 0.0050 80,000.00 400.00

JUMLAH HARGA TENAGA 11,370.00

B BAHAN

1 Usuk : 5/7 M061 m3 0.0140 4,500,000.00 63,000.00 2 Paku Kayu Segala Ukuran M140 kg 0.2500 17,500.00 4,375.00 3 Reng : 2/3, 3/5 M060 m3 0.0570 4,500,000.00 256,500.00

JUMLAH HARGA BAHAN 323,875.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 335,245.00

ANALISA HARGA SATUAN

KODE ANALISA : F.068JENIS PEKERJAAN : Pasang kaso + reng atap sirap kayu jatiSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1200 45,000.00 5,400.00 2 Tukang Kayu L08 Org/hr 0.1200 60,000.00 7,200.00 3 Kepala Tukang Kayu L03 Org/hr 0.0120 47,000.00 564.00 4 Mandor L01 Org/hr 0.0060 80,000.00 480.00

JUMLAH HARGA TENAGA 13,644.00

B BAHAN

1 Usuk : 5/7 M095 m3 0.0165 Err:509 Err:5092 Paku Kayu Segala Ukuran M140 kg 0.2000 17,500.00 3,500.00

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

Page 130: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : F.069JENIS PEKERJAAN : Pasang kaso + reng atap sirap kayu kamperSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1200 45,000.00 5,400.00 2 Tukang Kayu L08 Org/hr 0.1200 60,000.00 7,200.00 3 Kepala Tukang Kayu L03 Org/hr 0.0120 47,000.00 564.00 4 Mandor L01 Org/hr 0.0060 80,000.00 480.00

JUMLAH HARGA TENAGA 13,644.00

B BAHAN

1 Usuk : 5/7 M079 m3 0.0165 1,450,000.00 23,925.00 2 Paku Kayu Segala Ukuran M140 kg 0.2000 17,500.00 3,500.00

JUMLAH HARGA BAHAN 27,425.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 41,069.00

ANALISA HARGA SATUAN

KODE ANALISA : F.070JENIS PEKERJAAN : Pasang kaso + reng atap sirap kayu borneoSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1200 45,000.00 5,400.00 2 Tukang Kayu L08 Org/hr 0.1200 60,000.00 7,200.00 3 Kepala Tukang Kayu L03 Org/hr 0.0120 47,000.00 564.00 4 Mandor L01 Org/hr 0.0060 80,000.00 480.00

JUMLAH HARGA TENAGA 13,644.00

B BAHAN

1 Usuk : 5/7 M055 m3 0.0165 Err:509 Err:5092 Paku Kayu Segala Ukuran M140 kg 0.2000 17,500.00 3,500.00

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

Page 131: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : F.071JENIS PEKERJAAN : Pasang kaso + reng atap sirap kayu bengkiraiSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1200 45,000.00 5,400.00 2 Tukang Kayu L08 Org/hr 0.1200 60,000.00 7,200.00 3 Kepala Tukang Kayu L03 Org/hr 0.0120 47,000.00 564.00 4 Mandor L01 Org/hr 0.0060 80,000.00 480.00

JUMLAH HARGA TENAGA 13,644.00

B BAHAN

1 Usuk : 5/7 M073 m3 0.0165 Err:509 Err:5092 Paku Kayu Segala Ukuran M140 kg 0.2000 17,500.00 3,500.00

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

ANALISA HARGA SATUAN

KODE ANALISA : F.072JENIS PEKERJAAN : Pasang kaso + reng atap sirap kayu kruingSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1200 45,000.00 5,400.00 2 Tukang Kayu L08 Org/hr 0.1200 60,000.00 7,200.00 3 Kepala Tukang Kayu L03 Org/hr 0.0120 47,000.00 564.00 4 Mandor L01 Org/hr 0.0060 80,000.00 480.00

JUMLAH HARGA TENAGA 13,644.00

B BAHAN

1 Usuk : 5/7 M067 m3 0.0165 5,400,000.00 89,100.00 2 Paku Kayu Segala Ukuran M140 kg 0.2000 17,500.00 3,500.00

JUMLAH HARGA BAHAN 92,600.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 106,244.00

Page 132: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : F.081JENIS PEKERJAAN : Pasang lisplang ukuran (3 x 20) cm, kayu kamperSATUAN PEMBAYARAN : m1

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1000 45,000.00 4,500.00 2 Tukang Kayu L08 Org/hr 0.2000 60,000.00 12,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0250 47,000.00 1,175.00 4 Mandor L01 Org/hr 0.0050 80,000.00 400.00

JUMLAH HARGA TENAGA 18,075.00

B BAHAN

1 Papan (3x20) cm M082 m3 0.0108 10,800,000.00 116,640.00 2 Paku Kayu Segala Ukuran M140 kg 0.1000 17,500.00 1,750.00

JUMLAH HARGA BAHAN 118,390.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 136,465.00

ANALISA HARGA SATUAN

KODE ANALISA : F.082JENIS PEKERJAAN : Pasang lisplang ukuran (3 x 20) cm, kayu borneoSATUAN PEMBAYARAN : m1

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1000 45,000.00 4,500.00 2 Tukang Kayu L08 Org/hr 0.2000 60,000.00 12,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0250 47,000.00 1,175.00 4 Mandor L01 Org/hr 0.0050 80,000.00 400.00

JUMLAH HARGA TENAGA 18,075.00

B BAHAN

1 Papan (3x20) cm M058 m3 0.0108 Err:509 Err:5092 Paku Kayu Segala Ukuran M140 kg 0.1000 17,500.00 1,750.00

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

Page 133: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : F.083JENIS PEKERJAAN : Pasang lisplang ukuran (3 x 20) cm, kayu bengkiraiSATUAN PEMBAYARAN : m1

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1000 45,000.00 4,500.00 2 Tukang Kayu L08 Org/hr 0.2000 60,000.00 12,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0250 47,000.00 1,175.00 4 Mandor L01 Org/hr 0.0050 80,000.00 400.00

JUMLAH HARGA TENAGA 18,075.00

B BAHAN

1 Papan (3x20) cm M076 m3 0.0108 Err:509 Err:5092 Paku Kayu Segala Ukuran M140 kg 0.1000 17,500.00 1,750.00

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

ANALISA HARGA SATUAN

KODE ANALISA : F.084JENIS PEKERJAAN : Pasang lisplang ukuran (3 x 20) cm, kayu kruingSATUAN PEMBAYARAN : m1

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1000 45,000.00 4,500.00 2 Tukang Kayu L08 Org/hr 0.2000 60,000.00 12,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0250 47,000.00 1,175.00 4 Mandor L01 Org/hr 0.0050 80,000.00 400.00

JUMLAH HARGA TENAGA 18,075.00

B BAHAN

1 Papan (3x20) cm M070 m3 0.0108 6,120,000.00 66,096.00 2 Paku Kayu Segala Ukuran M140 kg 0.1000 17,500.00 1,750.00

JUMLAH HARGA BAHAN 67,846.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 85,921.00

Page 134: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : F.085JENIS PEKERJAAN : Pasang lisplang ukuran (3 x 20) cm, kayu merantiSATUAN PEMBAYARAN : m1

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1000 45,000.00 4,500.00 2 Tukang Kayu L08 Org/hr 0.2000 60,000.00 12,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0250 47,000.00 1,175.00 4 Mandor L01 Org/hr 0.0050 80,000.00 400.00

JUMLAH HARGA TENAGA 18,075.00

B BAHAN

1 Papan (3x20) cm M064 m3 0.0108 6,030,000.00 65,124.00 2 Paku Kayu Segala Ukuran M140 kg 0.1000 17,500.00 1,750.00

JUMLAH HARGA BAHAN 66,874.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 84,949.00

ANALISA HARGA SATUAN

KODE ANALISA : F.086JENIS PEKERJAAN : Pasang lisplang ukuran (3 x 30) cm, kayu jatiSATUAN PEMBAYARAN : m1

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1000 45,000.00 4,500.00 2 Tukang Kayu L08 Org/hr 0.2000 60,000.00 12,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0200 47,000.00 940.00 4 Mandor L01 Org/hr 0.0050 80,000.00 400.00

JUMLAH HARGA TENAGA 17,840.00

B BAHAN

1 Papan (3x30) cm M099 m3 0.0110 Err:509 Err:5092 Paku Kayu Segala Ukuran M140 kg 0.0500 17,500.00 875.00

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

Page 135: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : F.087JENIS PEKERJAAN : Pasang lisplang ukuran (3 x 30) cm, kayu kamperSATUAN PEMBAYARAN : m1

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1000 45,000.00 4,500.00 2 Tukang Kayu L08 Org/hr 0.2000 60,000.00 12,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0200 47,000.00 940.00 4 Mandor L01 Org/hr 0.0050 80,000.00 400.00

JUMLAH HARGA TENAGA 17,840.00

B BAHAN

1 Papan (3x30) cm M083 m3 0.0110 10,800,000.00 118,800.00 2 Paku Kayu Segala Ukuran M140 kg 0.0500 17,500.00 875.00

JUMLAH HARGA BAHAN 119,675.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 137,515.00

ANALISA HARGA SATUAN

KODE ANALISA : F.088JENIS PEKERJAAN : Pasang lisplang ukuran (3 x 30) cm, kayu borneoSATUAN PEMBAYARAN : m1

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1000 45,000.00 4,500.00 2 Tukang Kayu L08 Org/hr 0.2000 60,000.00 12,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0200 47,000.00 940.00 4 Mandor L01 Org/hr 0.0050 80,000.00 400.00

JUMLAH HARGA TENAGA 17,840.00

B BAHAN

1 Papan (3x30) cm M059 m3 0.0110 Err:509 Err:5092 Paku Kayu Segala Ukuran M140 kg 0.0500 17,500.00 875.00

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

Page 136: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : F.089JENIS PEKERJAAN : Pasang lisplang ukuran (3 x 30) cm, kayu bengkiraiSATUAN PEMBAYARAN : m1

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1000 45,000.00 4,500.00 2 Tukang Kayu L08 Org/hr 0.2000 60,000.00 12,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0200 47,000.00 940.00 4 Mandor L01 Org/hr 0.0050 80,000.00 400.00

JUMLAH HARGA TENAGA 17,840.00

B BAHAN

1 Papan (3x30) cm M077 m3 0.0110 Err:509 Err:5092 Paku Kayu Segala Ukuran M140 kg 0.0500 17,500.00 875.00

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

ANALISA HARGA SATUAN

KODE ANALISA : F.090JENIS PEKERJAAN : Pasang lisplang ukuran (3 x 30) cm, kayu kruingSATUAN PEMBAYARAN : m1

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1000 45,000.00 4,500.00 2 Tukang Kayu L08 Org/hr 0.2000 60,000.00 12,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0200 47,000.00 940.00 4 Mandor L01 Org/hr 0.0050 80,000.00 400.00

JUMLAH HARGA TENAGA 17,840.00

B BAHAN

1 Papan (3x30) cm M071 m3 0.0110 6,120,000.00 67,320.00 2 Paku Kayu Segala Ukuran M140 kg 0.0500 17,500.00 875.00

JUMLAH HARGA BAHAN 68,195.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 86,035.00

Page 137: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : F.091JENIS PEKERJAAN : Pasang lisplang ukuran (3 x 30) cm, kayu merantiSATUAN PEMBAYARAN : m1

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1000 45,000.00 4,500.00 2 Tukang Kayu L08 Org/hr 0.2000 60,000.00 12,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0200 47,000.00 940.00 4 Mandor L01 Org/hr 0.0050 80,000.00 400.00

JUMLAH HARGA TENAGA 17,840.00

B BAHAN

1 Papan (3x30) cm M065 m3 0.0110 6,030,000.00 66,330.00 2 Paku Kayu Segala Ukuran M140 kg 0.0500 17,500.00 875.00

JUMLAH HARGA BAHAN 67,205.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 85,045.00

ANALISA HARGA SATUAN

KODE ANALISA : F.092JENIS PEKERJAAN : Pasang rangka dinding pemisah kayu jatiSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1500 45,000.00 6,750.00 2 Tukang Kayu L08 Org/hr 0.4500 60,000.00 27,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0450 47,000.00 2,115.00 4 Mandor L01 Org/hr 0.0080 80,000.00 640.00

JUMLAH HARGA TENAGA 36,505.00

B BAHAN

1 Balok M096 m3 0.0280 Err:509 Err:5093 Paku Kayu Segala Ukuran M140 kg 0.1500 17,500.00 2,625.00

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

Page 138: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : F.093JENIS PEKERJAAN : Pasang rangka dinding pemisah kayu kamperSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1500 45,000.00 6,750.00 2 Tukang Kayu L08 Org/hr 0.4500 60,000.00 27,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0450 47,000.00 2,115.00 4 Mandor L01 Org/hr 0.0080 80,000.00 640.00

JUMLAH HARGA TENAGA 36,505.00

B BAHAN

1 Balok M080 m3 0.0280 9,000,000.00 252,000.00 3 Paku Kayu Segala Ukuran M140 kg 0.1500 17,500.00 2,625.00

JUMLAH HARGA BAHAN 254,625.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 291,130.00

ANALISA HARGA SATUAN

KODE ANALISA : F.094JENIS PEKERJAAN : Pasang rangka dinding pemisah kayu borneoSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1500 45,000.00 6,750.00 2 Tukang Kayu L08 Org/hr 0.4500 60,000.00 27,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0450 47,000.00 2,115.00 4 Mandor L01 Org/hr 0.0080 80,000.00 640.00

JUMLAH HARGA TENAGA 36,505.00

B BAHAN

1 Balok M056 m3 0.0280 Err:509 Err:5093 Paku Kayu Segala Ukuran M140 kg 0.1500 17,500.00 2,625.00

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

Page 139: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : F.095JENIS PEKERJAAN : Pasang rangka dinding pemisah kayu merantiSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1500 45,000.00 6,750.00 2 Tukang Kayu L08 Org/hr 0.4500 60,000.00 27,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0450 47,000.00 2,115.00 4 Mandor L01 Org/hr 0.0080 80,000.00 640.00

JUMLAH HARGA TENAGA 36,505.00

B BAHAN

1 Balok M062 m3 0.0280 5,040,000.00 141,120.00 3 Paku Kayu Segala Ukuran M140 kg 0.1500 17,500.00 2,625.00

JUMLAH HARGA BAHAN 143,745.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 180,250.00

ANALISA HARGA SATUAN

KODE ANALISA : F.096JENIS PEKERJAAN : Pasang rangka dinding pemisah teakwood rangkap, rangka kayu jatiSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1500 45,000.00 6,750.00 2 Tukang Kayu L08 Org/hr 0.4500 60,000.00 27,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0450 47,000.00 2,115.00 4 Mandor L01 Org/hr 0.0080 80,000.00 640.00

JUMLAH HARGA TENAGA 36,505.00

B BAHAN

1 Balok M096 m3 0.0280 Err:509 Err:5093 Paku Kayu Segala Ukuran M140 kg 0.1500 17,500.00 2,625.00 4 Lem Kayu M422 bh 0.5600 25,040.00 14,022.40 5 Teakwood (120 x 240) cm x 4 mm M229 lbr 0.8600 82,610.00 71,044.60

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

Page 140: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : F.097JENIS PEKERJAAN : Pasang rangka dinding pemisah teakwood rangkap, rangka kayu kamperSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1500 45,000.00 6,750.00 2 Tukang Kayu L08 Org/hr 0.4500 60,000.00 27,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0450 47,000.00 2,115.00 4 Mandor L01 Org/hr 0.0080 80,000.00 640.00

JUMLAH HARGA TENAGA 36,505.00

B BAHAN

1 Balok M080 m3 0.0280 9,000,000.00 252,000.00 3 Paku Kayu Segala Ukuran M140 kg 0.1500 17,500.00 2,625.00 4 Lem Kayu M422 bh 0.5600 25,040.00 14,022.40 5 Teakwood (120 x 240) cm x 4 mm M229 lbr 0.8600 82,610.00 71,044.60

JUMLAH HARGA BAHAN 339,692.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 376,197.00

ANALISA HARGA SATUAN

KODE ANALISA : F.098JENIS PEKERJAAN : Pasang rangka dinding pemisah teakwood rangkap, rangka kayu borneoSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1500 45,000.00 6,750.00 2 Tukang Kayu L08 Org/hr 0.4500 60,000.00 27,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0450 47,000.00 2,115.00 4 Mandor L01 Org/hr 0.0080 80,000.00 640.00

JUMLAH HARGA TENAGA 36,505.00

B BAHAN

1 Balok M056 m3 0.0280 Err:509 Err:5093 Paku Kayu Segala Ukuran M140 kg 0.1500 17,500.00 2,625.00 4 Lem Kayu M422 bh 0.5600 25,040.00 14,022.40 5 Teakwood (120 x 240) cm x 4 mm M229 lbr 0.8600 82,610.00 71,044.60

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

Page 141: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : F.099JENIS PEKERJAAN : Pasang rangka dinding pemisah teakwood rangkap, rangka kayu merantiSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1500 45,000.00 6,750.00 2 Tukang Kayu L08 Org/hr 0.4500 60,000.00 27,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0450 47,000.00 2,115.00 4 Mandor L01 Org/hr 0.0080 80,000.00 640.00

JUMLAH HARGA TENAGA 36,505.00

B BAHAN

1 Balok M062 m3 0.0280 5,040,000.00 141,120.00 3 Paku Kayu Segala Ukuran M140 kg 0.1500 17,500.00 2,625.00 4 Lem Kayu M422 bh 0.5600 25,040.00 14,022.40 5 Teakwood (120 x 240) cm x 4 mm M229 lbr 0.8600 82,610.00 71,044.60

JUMLAH HARGA BAHAN 228,812.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 265,317.00

ANALISA HARGA SATUAN

KODE ANALISA : F.100JENIS PEKERJAAN : Pasang rangka dinding pemisah plywood rangkap, rangka kayu jatiSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.2000 45,000.00 9,000.00 2 Tukang Kayu L08 Org/hr 0.6000 60,000.00 36,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0600 47,000.00 2,820.00 4 Mandor L01 Org/hr 0.0100 80,000.00 800.00

JUMLAH HARGA TENAGA 48,620.00

B BAHAN

1 Balok M096 m3 0.0280 Err:509 Err:5093 Paku Kayu Segala Ukuran M140 kg 0.1500 17,500.00 2,625.00 4 Lem Kayu M422 bh 0.5600 25,040.00 14,022.40 5 Plywood (120 x 240) cm x 4 mm M226 lbr 0.8600 85,000.00 73,100.00

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

Page 142: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : F.101JENIS PEKERJAAN : Pasang rangka dinding pemisah plywood rangkap, rangka kayu kamperSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.2000 45,000.00 9,000.00 2 Tukang Kayu L08 Org/hr 0.6000 60,000.00 36,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0600 47,000.00 2,820.00 4 Mandor L01 Org/hr 0.0100 80,000.00 800.00

JUMLAH HARGA TENAGA 48,620.00

B BAHAN

1 Balok M080 m3 0.0280 9,000,000.00 252,000.00 3 Paku Kayu Segala Ukuran M140 kg 0.1500 17,500.00 2,625.00 4 Lem Kayu M422 bh 0.5600 25,040.00 14,022.40 5 Plywood (120 x 240) cm x 4 mm M226 lbr 0.8600 85,000.00 73,100.00

JUMLAH HARGA BAHAN 341,747.40

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 390,367.40

ANALISA HARGA SATUAN

KODE ANALISA : F.102JENIS PEKERJAAN : Pasang rangka dinding pemisah plywood rangkap, rangka kayu borneoSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.2000 45,000.00 9,000.00 2 Tukang Kayu L08 Org/hr 0.6000 60,000.00 36,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0600 47,000.00 2,820.00 4 Mandor L01 Org/hr 0.0100 80,000.00 800.00

JUMLAH HARGA TENAGA 48,620.00

B BAHAN

1 Balok M056 m3 0.0280 Err:509 Err:5093 Paku Kayu Segala Ukuran M140 kg 0.1500 17,500.00 2,625.00 4 Lem Kayu M422 bh 0.5600 25,040.00 14,022.40 5 Plywood (120 x 240) cm x 4 mm M226 lbr 0.8600 85,000.00 73,100.00

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

Page 143: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : F.103JENIS PEKERJAAN : Pasang rangka dinding pemisah plywood rangkap, rangka kayu merantiSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.2000 45,000.00 9,000.00 2 Tukang Kayu L08 Org/hr 0.6000 60,000.00 36,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0600 47,000.00 2,820.00 4 Mandor L01 Org/hr 0.0100 80,000.00 800.00

JUMLAH HARGA TENAGA 48,620.00

B BAHAN

1 Balok M062 m3 0.0280 5,040,000.00 141,120.00 3 Paku Kayu Segala Ukuran M140 kg 0.1500 17,500.00 2,625.00 4 Lem Kayu M422 bh 0.5600 25,040.00 14,022.40 5 Plywood (120 x 240) cm x 4 mm M226 lbr 0.8600 85,000.00 73,100.00

JUMLAH HARGA BAHAN 230,867.40

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 279,487.40

ANALISA HARGA SATUAN

KODE ANALISA : F.104JENIS PEKERJAAN : Pasang dinding lambriziring dari papan jatiSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.6000 45,000.00 27,000.00 2 Tukang Kayu L08 Org/hr 1.8000 60,000.00 108,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.1800 47,000.00 8,460.00 4 Mandor L01 Org/hr 0.0300 80,000.00 2,400.00

JUMLAH HARGA TENAGA 145,860.00

B BAHAN

1 Papan (3x30) cm M099 m3 0.0070 Err:509 Err:5092 Paku Kayu Segala Ukuran M140 kg 0.1000 17,500.00 1,750.00 3 Sekrup Segala Ukuran M145 bh 10.0000 410.00 4,100.00

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

Page 144: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : F.073JENIS PEKERJAAN : Pasang kaso + reng atap sirap kayu merantiSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1200 45,000.00 5,400.00 2 Tukang Kayu L08 Org/hr 0.1200 60,000.00 7,200.00 3 Kepala Tukang Kayu L03 Org/hr 0.0120 47,000.00 564.00 4 Mandor L01 Org/hr 0.0060 80,000.00 480.00

JUMLAH HARGA TENAGA 13,644.00

B BAHAN

1 Usuk : 5/7 M061 m3 0.0165 4,500,000.00 74,250.00 2 Paku Kayu Segala Ukuran M140 kg 0.2000 17,500.00 3,500.00

JUMLAH HARGA BAHAN 77,750.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 91,394.00

ANALISA HARGA SATUAN

KODE ANALISA : F.074JENIS PEKERJAAN : Pasang rangka langit-langit (0.5 x 1.0) m, kayu jatiSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1500 45,000.00 6,750.00 2 Tukang Kayu L08 Org/hr 0.2500 60,000.00 15,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0250 47,000.00 1,175.00 4 Mandor L01 Org/hr 0.0750 80,000.00 6,000.00

JUMLAH HARGA TENAGA 28,925.00

B BAHAN

1 Usuk : 5/7 M095 m3 0.0154 Err:509 Err:5092 Paku Kayu Segala Ukuran M140 kg 0.2000 17,500.00 3,500.00

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

Page 145: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : F.075JENIS PEKERJAAN : Pasang rangka langit-langit (0.5 x 1.0) m, kayu kamperSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1500 45,000.00 6,750.00 2 Tukang Kayu L08 Org/hr 0.2500 60,000.00 15,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0250 47,000.00 1,175.00 4 Mandor L01 Org/hr 0.0750 80,000.00 6,000.00

JUMLAH HARGA TENAGA 28,925.00

B BAHAN

1 Usuk : 5/7 M079 m3 0.0154 1,450,000.00 22,330.00 2 Paku Kayu Segala Ukuran M140 kg 0.2000 17,500.00 3,500.00

JUMLAH HARGA BAHAN 25,830.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 54,755.00

ANALISA HARGA SATUAN

KODE ANALISA : F.076JENIS PEKERJAAN : Pasang rangka langit-langit (0.5 x 1.0) m, kayu borneoSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1500 45,000.00 6,750.00 2 Tukang Kayu L08 Org/hr 0.2500 60,000.00 15,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0250 47,000.00 1,175.00 4 Mandor L01 Org/hr 0.0750 80,000.00 6,000.00

JUMLAH HARGA TENAGA 28,925.00

B BAHAN

1 Usuk : 5/7 M055 m3 0.0154 Err:509 Err:5092 Paku Kayu Segala Ukuran M140 kg 0.2000 17,500.00 3,500.00

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

Page 146: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : F.077JENIS PEKERJAAN : Pasang rangka langit-langit (0.5 x 1.0) m, kayu bengkiraiSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1500 45,000.00 6,750.00 2 Tukang Kayu L08 Org/hr 0.2500 60,000.00 15,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0250 47,000.00 1,175.00 4 Mandor L01 Org/hr 0.0750 80,000.00 6,000.00

JUMLAH HARGA TENAGA 28,925.00

B BAHAN

1 Usuk : 5/7 M073 m3 0.0154 Err:509 Err:5092 Paku Kayu Segala Ukuran M140 kg 0.2000 17,500.00 3,500.00

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

ANALISA HARGA SATUAN

KODE ANALISA : F.078JENIS PEKERJAAN : Pasang rangka langit-langit (0.5 x 1.0) m, kayu kruingSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1500 45,000.00 6,750.00 2 Tukang Kayu L08 Org/hr 0.2500 60,000.00 15,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0250 47,000.00 1,175.00 4 Mandor L01 Org/hr 0.0750 80,000.00 6,000.00

JUMLAH HARGA TENAGA 28,925.00

B BAHAN

1 Usuk : 5/7 M067 m3 0.0154 5,400,000.00 83,160.00 2 Paku Kayu Segala Ukuran M140 kg 0.2000 17,500.00 3,500.00

JUMLAH HARGA BAHAN 86,660.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 115,585.00

Page 147: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : F.079JENIS PEKERJAAN : Pasang rangka langit-langit (0.5 x 1.0) m, kayu merantiSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1500 45,000.00 6,750.00 2 Tukang Kayu L08 Org/hr 0.2500 60,000.00 15,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0250 47,000.00 1,175.00 4 Mandor L01 Org/hr 0.0750 80,000.00 6,000.00

JUMLAH HARGA TENAGA 28,925.00

B BAHAN

1 Usuk : 5/7 M061 m3 0.0154 4,500,000.00 69,300.00 2 Paku Kayu Segala Ukuran M140 kg 0.2000 17,500.00 3,500.00

JUMLAH HARGA BAHAN 72,800.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 101,725.00

ANALISA HARGA SATUAN

KODE ANALISA : F.080JENIS PEKERJAAN : Pasang lisplang ukuran (3 x 20) cm, kayu jatiSATUAN PEMBAYARAN : m1

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1000 45,000.00 4,500.00 2 Tukang Kayu L08 Org/hr 0.2000 60,000.00 12,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0250 47,000.00 1,175.00 4 Mandor L01 Org/hr 0.0050 80,000.00 400.00

JUMLAH HARGA TENAGA 18,075.00

B BAHAN

1 Papan (3x20) cm M098 m3 0.0108 Err:509 Err:5092 Paku Kayu Segala Ukuran M140 kg 0.1000 17,500.00 1,750.00

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

Page 148: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : F.045JENIS PEKERJAAN : Pasang konstruksi kuda-kuda kayu merantiSATUAN PEMBAYARAN : m3

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 4.0000 45,000.00 180,000.00 2 Tukang Kayu L08 Org/hr 12.0000 60,000.00 720,000.00 3 Kepala Tukang Kayu L03 Org/hr 1.2000 47,000.00 56,400.00 4 Mandor L01 Org/hr 0.2000 80,000.00 16,000.00

JUMLAH HARGA TENAGA 972,400.00

B BAHAN

1 Balok M062 m3 1.1000 5,040,000.00 5,544,000.00 2 Besi Strip M114 kg 15.0000 8,500.00 127,500.00 3 Paku Kayu Segala Ukuran M140 kg 5.6000 17,500.00 98,000.00

JUMLAH HARGA BAHAN 5,769,500.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 6,741,900.00

ANALISA HARGA SATUAN

KODE ANALISA : F.046JENIS PEKERJAAN : Pasang konstruksi kuda-kuda ekspose kayu jatiSATUAN PEMBAYARAN : m3

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 6.0000 45,000.00 270,000.00 2 Tukang Kayu L08 Org/hr 20.0000 60,000.00 1,200,000.00 3 Kepala Tukang Kayu L03 Org/hr 2.0000 47,000.00 94,000.00 4 Mandor L01 Org/hr 0.3000 80,000.00 24,000.00

JUMLAH HARGA TENAGA 1,588,000.00

B BAHAN

1 Balok M096 m3 1.2000 Err:509 Err:5092 Besi Strip M114 kg 15.0000 8,500.00 127,500.00 3 Paku Kayu Segala Ukuran M140 kg 5.6000 17,500.00 98,000.00

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

Page 149: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : F.047JENIS PEKERJAAN : Pasang konstruksi kuda-kuda ekspose kayu kamperSATUAN PEMBAYARAN : m3

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 6.0000 45,000.00 270,000.00 2 Tukang Kayu L08 Org/hr 20.0000 60,000.00 1,200,000.00 3 Kepala Tukang Kayu L03 Org/hr 2.0000 47,000.00 94,000.00 4 Mandor L01 Org/hr 0.3000 80,000.00 24,000.00

JUMLAH HARGA TENAGA 1,588,000.00

B BAHAN

1 Balok M080 m3 1.2000 9,000,000.00 10,800,000.00 2 Besi Strip M114 kg 15.0000 8,500.00 127,500.00 3 Paku Kayu Segala Ukuran M140 kg 5.6000 17,500.00 98,000.00

JUMLAH HARGA BAHAN 11,025,500.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 12,613,500.00

ANALISA HARGA SATUAN

KODE ANALISA : F.048JENIS PEKERJAAN : Pasang konstruksi gording kayu kamperSATUAN PEMBAYARAN : m3

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 2.4000 45,000.00 108,000.00 2 Tukang Kayu L08 Org/hr 7.2000 60,000.00 432,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.7200 47,000.00 33,840.00 4 Mandor L01 Org/hr 0.1200 80,000.00 9,600.00

JUMLAH HARGA TENAGA 583,440.00

B BAHAN

1 Balok M080 m3 1.1000 9,000,000.00 9,900,000.00 2 Besi Strip M114 kg 15.0000 8,500.00 127,500.00 3 Paku Kayu Segala Ukuran M140 kg 3.0000 17,500.00 52,500.00

JUMLAH HARGA BAHAN 10,080,000.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 10,663,440.00

Page 150: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : F.049JENIS PEKERJAAN : Pasang konstruksi gording kayu merantiSATUAN PEMBAYARAN : m3

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 2.4000 45,000.00 108,000.00 2 Tukang Kayu L08 Org/hr 7.2000 60,000.00 432,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.7200 47,000.00 33,840.00 4 Mandor L01 Org/hr 0.1200 80,000.00 9,600.00

JUMLAH HARGA TENAGA 583,440.00

B BAHAN

1 Balok M062 m3 1.1000 5,040,000.00 5,544,000.00 2 Besi Strip M114 kg 15.0000 8,500.00 127,500.00 3 Paku Kayu Segala Ukuran M140 kg 3.0000 17,500.00 52,500.00

JUMLAH HARGA BAHAN 5,724,000.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 6,307,440.00

ANALISA HARGA SATUAN

KODE ANALISA : F.050JENIS PEKERJAAN : Pasang kaso + reng genteng biasa kayu jatiSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1000 45,000.00 4,500.00 2 Tukang Kayu L08 Org/hr 0.1000 60,000.00 6,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0100 47,000.00 470.00 4 Mandor L01 Org/hr 0.0050 80,000.00 400.00

JUMLAH HARGA TENAGA 11,370.00

B BAHAN

1 Usuk : 5/7 M095 m3 0.0140 Err:509 Err:5092 Paku Kayu Segala Ukuran M140 kg 0.2500 17,500.00 4,375.00 3 Reng : 2/3, 3/5 M094 m3 0.0360 Err:509 Err:509

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

Page 151: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : F.105JENIS PEKERJAAN : Pasang dinding lambriziring dari papan kamperSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.6000 45,000.00 27,000.00 2 Tukang Kayu L08 Org/hr 1.8000 60,000.00 108,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.1800 47,000.00 8,460.00 4 Mandor L01 Org/hr 0.0300 80,000.00 2,400.00

JUMLAH HARGA TENAGA 145,860.00

B BAHAN

1 Papan (3x30) cm M083 m3 0.0070 10,800,000.00 75,600.00 2 Paku Kayu Segala Ukuran M140 kg 0.1000 17,500.00 1,750.00 3 Sekrup Segala Ukuran M145 bh 10.0000 410.00 4,100.00

JUMLAH HARGA BAHAN 81,450.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 227,310.00

Page 152: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : G.001JENIS PEKERJAAN SATUAN PEMBAYARAN : m3

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 1.6500 45,000.00 74,250.00 2 Tukang Batu L07 Org/hr 0.2750 60,000.00 16,500.00 3 Kepala Tukang Batu L02 Org/hr 0.0280 70,000.00 1,960.00 4 Mandor L01 Org/hr 0.0830 80,000.00 6,640.00

JUMLAH HARGA TENAGA 99,350.00

B BAHAN

1 Portland Cement (PC) M037 kg 247.0000 900.00 222,300.00 2 Pasir Cor M004 m3 0.6207 110,000.00 68,278.57 3 Batu pecah mesin 2/3 M019 m3 0.7400 100,000.00 74,000.00 4 Air Bersih M486 ltr 215.000 25.00 5,375.00

JUMLAH HARGA BAHAN 369,953.57

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 469,303.57

ANALISA HARGA SATUAN

KODE ANALISA : G.002JENIS PEKERJAAN SATUAN PEMBAYARAN : m3

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 1.6500 45,000.00 74,250.00 2 Tukang Batu L07 Org/hr 0.2750 60,000.00 16,500.00 3 Kepala Tukang Batu L02 Org/hr 0.0280 70,000.00 1,960.00 4 Mandor L01 Org/hr 0.0830 80,000.00 6,640.00

JUMLAH HARGA TENAGA 99,350.00

B BAHAN

1 Portland Cement (PC) M037 kg 276.0000 900.00 248,400.00 2 Pasir Cor M004 m3 0.5914 110,000.00 65,057.14 3 Batu pecah mesin 2/3 M019 m3 0.7496 100,000.00 74,962.96 4 Air Bersih M486 ltr 215.000 25.00 5,375.00

JUMLAH HARGA BAHAN 393,795.11

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 493,145.11

: Beton mutu fc'=7,4 Mpa (K100) slump (12 ± 2) cm, w/c = 0,87

: Beton mutu fc'=9,8 Mpa (K125) slump (12 ± 2) cm, w/c = 0,78

Page 153: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : G.003JENIS PEKERJAAN SATUAN PEMBAYARAN : m3

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 1.6500 45,000.00 74,250.00 2 Tukang Batu L07 Org/hr 0.2750 60,000.00 16,500.00 3 Kepala Tukang Batu L02 Org/hr 0.0280 70,000.00 1,960.00 4 Mandor L01 Org/hr 0.0830 80,000.00 6,640.00

JUMLAH HARGA TENAGA 99,350.00

B BAHAN

1 Portland Cement (PC) M037 kg 299.0000 900.00 269,100.00 2 Pasir Cor M004 m3 0.5707 110,000.00 62,778.57 3 Batu pecah mesin 2/3 M019 m3 0.7533 100,000.00 75,333.33 4 Air Bersih M486 ltr 215.000 25.00 5,375.00

JUMLAH HARGA BAHAN 412,586.90

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 511,936.90

ANALISA HARGA SATUAN

KODE ANALISA : G.004JENIS PEKERJAAN SATUAN PEMBAYARAN : m3

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 1.2000 45,000.00 54,000.00 2 Tukang Batu L07 Org/hr 0.2000 60,000.00 12,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0200 70,000.00 1,400.00 4 Mandor L01 Org/hr 0.0600 80,000.00 4,800.00

JUMLAH HARGA TENAGA 72,200.00

B BAHAN

1 Portland Cement (PC) M037 kg 230.0000 900.00 207,000.00 2 Pasir Cor M004 m3 0.6379 110,000.00 70,164.29 3 Batu pecah mesin 2/3 M019 m3 0.7607 100,000.00 76,074.07 4 Air Bersih M486 ltr 215.000 25.00 5,375.00

JUMLAH HARGA BAHAN 358,613.36

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 430,813.36

: Beton mutu fc'=12,2 Mpa (K150) slump (12 ± 2) cm, w/c = 0,72

: Lantai kerja beton mutu fc'=7,4 Mpa (K100) slump (3 - 6) cm, w/c = 0,87

Page 154: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : G.005JENIS PEKERJAAN SATUAN PEMBAYARAN : m3

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 1.6500 45,000.00 74,250.00 2 Tukang Batu L07 Org/hr 0.2750 60,000.00 16,500.00 3 Kepala Tukang Batu L02 Org/hr 0.0280 70,000.00 1,960.00 4 Mandor L01 Org/hr 0.0830 80,000.00 6,640.00

JUMLAH HARGA TENAGA 99,350.00

B BAHAN

1 Portland Cement (PC) M037 kg 326.0000 900.00 293,400.00 2 Pasir Cor M004 m3 0.5429 110,000.00 59,714.29 3 Batu pecah mesin 2/3 M019 m3 0.7622 100,000.00 76,222.22 4 Air Bersih M486 ltr 215.000 25.00 5,375.00

JUMLAH HARGA BAHAN 434,711.51

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 534,061.51

ANALISA HARGA SATUAN

KODE ANALISA : G.006JENIS PEKERJAAN SATUAN PEMBAYARAN : m3

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 1.6500 45,000.00 74,250.00 2 Tukang Batu L07 Org/hr 0.2750 60,000.00 16,500.00 3 Kepala Tukang Batu L02 Org/hr 0.0280 70,000.00 1,960.00 4 Mandor L01 Org/hr 0.0830 80,000.00 6,640.00

JUMLAH HARGA TENAGA 99,350.00

B BAHAN

1 Portland Cement (PC) M037 kg 352.0000 900.00 316,800.00 2 Pasir Cor M004 m3 0.5221 110,000.00 57,435.71 3 Batu pecah mesin 2/3 M019 m3 0.7637 100,000.00 76,370.37 4 Air Bersih M486 ltr 215.000 25.00 5,375.00

JUMLAH HARGA BAHAN 455,981.08

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 555,331.08

: Beton mutu fc'=14,5 Mpa (K175) slump (12 ± 2) cm, w/c = 0,66

: Beton mutu fc'=16,9 Mpa (K200) slump (12 ± 2) cm, w/c = 0,61

Page 155: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : G.007JENIS PEKERJAAN SATUAN PEMBAYARAN : m3

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 1.6500 45,000.00 74,250.00 2 Tukang Batu L07 Org/hr 0.2750 60,000.00 16,500.00 3 Kepala Tukang Batu L02 Org/hr 0.0280 70,000.00 1,960.00 4 Mandor L01 Org/hr 0.0830 80,000.00 6,640.00

JUMLAH HARGA TENAGA 99,350.00

B BAHAN

1 Portland Cement (PC) M037 kg 371.0000 900.00 333,900.00 2 Pasir Cor M004 m3 0.4986 110,000.00 54,842.86 3 Batu pecah mesin 2/3 M019 m3 0.7756 100,000.00 77,555.56 4 Air Bersih M486 ltr 215.000 25.00 5,375.00

JUMLAH HARGA BAHAN 471,673.41

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 571,023.41

ANALISA HARGA SATUAN

KODE ANALISA : G.008JENIS PEKERJAAN SATUAN PEMBAYARAN : m3

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 1.6500 45,000.00 74,250.00 2 Tukang Batu L07 Org/hr 0.2750 60,000.00 16,500.00 3 Kepala Tukang Batu L02 Org/hr 0.0280 70,000.00 1,960.00 4 Mandor L01 Org/hr 0.0830 80,000.00 6,640.00

JUMLAH HARGA TENAGA 99,350.00

B BAHAN

1 Portland Cement (PC) M037 kg 406.0000 900.00 365,400.00 2 Pasir Cor M004 m3 0.4886 110,000.00 53,742.86 3 Batu pecah mesin 2/3 M019 m3 0.7600 100,000.00 76,000.00 4 Air Bersih M486 ltr 215.000 25.00 5,375.00

JUMLAH HARGA BAHAN 500,517.86

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 599,867.86

: Beton mutu fc'=19,3 Mpa (K225) slump (12 ± 2) cm, w/c = 0,58

: Beton mutu fc'=24,0 Mpa (K275) slump (12 ± 2) cm, w/c = 0,53

Page 156: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : G.009JENIS PEKERJAAN SATUAN PEMBAYARAN : m3

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 1.6500 45,000.00 74,250.00 2 Tukang Batu L07 Org/hr 0.2750 60,000.00 16,500.00 3 Kepala Tukang Batu L02 Org/hr 0.0280 70,000.00 1,960.00 4 Mandor L01 Org/hr 0.0830 80,000.00 6,640.00

JUMLAH HARGA TENAGA 99,350.00

B BAHAN

1 Portland Cement (PC) M037 kg 384.0000 900.00 345,600.00 2 Pasir Cor M004 m3 0.4943 110,000.00 54,371.43 3 Batu pecah mesin 2/3 M019 m3 0.7696 100,000.00 76,962.96 4 Air Bersih M486 ltr 215.000 25.00 5,375.00

JUMLAH HARGA BAHAN 482,309.39

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 581,659.39

ANALISA HARGA SATUAN

KODE ANALISA : G.010JENIS PEKERJAAN SATUAN PEMBAYARAN : m3

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 1.6500 45,000.00 74,250.00 2 Tukang Batu L07 Org/hr 0.2750 60,000.00 16,500.00 3 Kepala Tukang Batu L02 Org/hr 0.0280 70,000.00 1,960.00 4 Mandor L01 Org/hr 0.0830 80,000.00 6,640.00

JUMLAH HARGA TENAGA 99,350.00

B BAHAN

1 Portland Cement (PC) M037 kg 413.0000 900.00 371,700.00 2 Pasir Cor M004 m3 0.4864 110,000.00 53,507.14 3 Batu pecah mesin 2/3 M019 m3 0.7563 100,000.00 75,629.63 4 Air Bersih M486 ltr 215.000 25.00 5,375.00

JUMLAH HARGA BAHAN 506,211.77

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 605,561.77

: Beton mutu fc'=21,7 Mpa (K250) slump (12 ± 2) cm, w/c = 0,56

: Beton mutu fc'=26,4 Mpa (K300) slump (12 ± 2) cm, w/c = 0,52

Page 157: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : G.011JENIS PEKERJAAN SATUAN PEMBAYARAN : m3

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 2.1000 45,000.00 94,500.00 2 Tukang Batu L07 Org/hr 0.3500 60,000.00 21,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0350 70,000.00 2,450.00 4 Mandor L01 Org/hr 0.1050 80,000.00 8,400.00

JUMLAH HARGA TENAGA 126,350.00

B BAHAN

1 Portland Cement (PC) M037 kg 439.0000 900.00 395,100.00 2 Pasir Cor M004 m3 0.4786 110,000.00 52,642.86 3 Batu pecah mesin 2/3 M019 m3 0.7452 100,000.00 74,518.52 4 Air Bersih M486 ltr 215.000 25.00 5,375.00

JUMLAH HARGA BAHAN 527,636.38

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 653,986.38

ANALISA HARGA SATUAN

KODE ANALISA : G.012JENIS PEKERJAAN SATUAN PEMBAYARAN : m3

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 2.1000 45,000.00 94,500.00 2 Tukang Batu L07 Org/hr 0.3500 60,000.00 21,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0350 70,000.00 2,450.00 4 Mandor L01 Org/hr 0.1050 80,000.00 8,400.00

JUMLAH HARGA TENAGA 126,350.00

B BAHAN

1 Portland Cement (PC) M037 kg 448.0000 900.00 403,200.00 2 Pasir Cor M004 m3 0.4764 110,000.00 52,407.14 3 Batu pecah mesin 2/3 M019 m3 0.7407 100,000.00 74,074.07 4 Air Bersih M486 ltr 215.000 25.00 5,375.00

JUMLAH HARGA BAHAN 535,056.22

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 661,406.22

: Beton mutu fc'=28,8 Mpa (K325) slump (12 ± 2) cm, w/c = 0,49

: Beton mutu fc'=31,2 Mpa (K350) slump (12 ± 2) cm, w/c = 0,48

Page 158: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : G.013JENIS PEKERJAAN : Beton kedap air dengan strorox - 100SATUAN PEMBAYARAN : m3

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 2.1000 45,000.00 94,500.00 2 Tukang Batu L07 Org/hr 0.3500 60,000.00 21,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0350 70,000.00 2,450.00 4 Mandor L01 Org/hr 0.1050 80,000.00 8,400.00

JUMLAH HARGA TENAGA 126,350.00

B BAHAN

1 Portland Cement (PC) M037 kg 400.0000 900.00 360,000.00 2 Pasir Cor M004 m3 0.4800 110,000.00 52,800.00 3 Batu pecah mesin 2/3 M019 m3 0.8000 100,000.00 80,000.00 4 Strorox 100 M476 kg 1.2000 69,950.00 83,940.00

JUMLAH HARGA BAHAN 576,740.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 703,090.00

ANALISA HARGA SATUAN

KODE ANALISA : G.014JENIS PEKERJAAN : Pasang PVC Waterstop lebar 150 mmSATUAN PEMBAYARAN : m1

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0600 45,000.00 2,700.00 2 Tukang Batu L07 Org/hr 0.0300 60,000.00 1,800.00 3 Kepala Tukang Batu L02 Org/hr 0.0030 70,000.00 210.00 4 Mandor L01 Org/hr 0.0030 80,000.00 240.00

JUMLAH HARGA TENAGA 4,950.00

B BAHAN

1 Waterstop Lebar 150 mm M467 m' 1.0500 26,900.00 28,245.00

JUMLAH HARGA BAHAN 28,245.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 33,195.00

Page 159: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : G.015JENIS PEKERJAAN : Pasang PVC Waterstop lebar 200 mmSATUAN PEMBAYARAN : m1

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0700 45,000.00 3,150.00 2 Tukang Batu L07 Org/hr 0.0350 60,000.00 2,100.00 3 Kepala Tukang Batu L02 Org/hr 0.0040 70,000.00 280.00 4 Mandor L01 Org/hr 0.0070 80,000.00 560.00

JUMLAH HARGA TENAGA 6,090.00

B BAHAN

1 Waterstop Lebar 200 mm M468 m' 1.0500 48,430.00 50,851.50

JUMLAH HARGA BAHAN 50,851.50

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 56,941.50

ANALISA HARGA SATUAN

KODE ANALISA : G.016JENIS PEKERJAAN : Pasang PVC Waterstop lebar 230 mm - 320 mmSATUAN PEMBAYARAN : m1

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0800 45,000.00 3,600.00 2 Tukang Batu L07 Org/hr 0.0400 60,000.00 2,400.00 3 Kepala Tukang Batu L02 Org/hr 0.0040 70,000.00 280.00 4 Mandor L01 Org/hr 0.0040 80,000.00 320.00

JUMLAH HARGA TENAGA 6,600.00

B BAHAN

1 Waterstop Lebar 230 mm M469 m' 1.0500 56,500.00 59,325.00

JUMLAH HARGA BAHAN 59,325.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 65,925.00

Page 160: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : G.017JENIS PEKERJAAN : Pembesian dengan besi polos SATUAN PEMBAYARAN : kg

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0070 45,000.00 315.00 2 Tukang Batu L07 Org/hr 0.0070 60,000.00 420.00 3 Kepala Tukang Batu L02 Org/hr 0.0007 70,000.00 49.00 4 Mandor L01 Org/hr 0.0004 80,000.00 32.00

JUMLAH HARGA TENAGA 816.00

B BAHAN

1 Besi Beton Polos M112 kg 1.0500 8,500.00 8,925.00 2 Kawat Beton/Bendrat RRT M135 kg 0.0150 7,500.00 112.50

JUMLAH HARGA BAHAN 9,037.50

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 9,853.50

ANALISA HARGA SATUAN

KODE ANALISA : G.018JENIS PEKERJAAN : Pembesian dengan besi ulirSATUAN PEMBAYARAN : kg

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0070 45,000.00 315.00 2 Tukang Batu L07 Org/hr 0.0070 60,000.00 420.00 3 Kepala Tukang Batu L02 Org/hr 0.0007 70,000.00 49.00 4 Mandor L01 Org/hr 0.0004 80,000.00 32.00

JUMLAH HARGA TENAGA 816.00

B BAHAN

1 Besi Beton Ulir M113 kg 1.0500 17,085.00 17,939.25 2 Kawat Beton/Bendrat RRT M135 kg 0.0150 7,500.00 112.50

JUMLAH HARGA BAHAN 18,051.75

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 18,867.75

Page 161: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : G.019JENIS PEKERJAAN : Kabel prestressed polos/strandsSATUAN PEMBAYARAN : kg

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0050 45,000.00 225.00 2 Tukang Besi/Baja L09 Org/hr 0.0050 60,000.00 300.00 3 Kepala Tukang Batu L02 Org/hr 0.0005 70,000.00 35.00 4 Mandor L01 Org/hr 0.0003 80,000.00 24.00

JUMLAH HARGA TENAGA 584.00

B BAHAN

1 Kabel prestressed M118 kg 1.0500 26,000.00 27,300.00 2 Kawat Beton/Bendrat RRT M135 kg 0.0100 7,500.00 75.00

JUMLAH HARGA BAHAN 27,375.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 27,959.00

ANALISA HARGA SATUAN

KODE ANALISA : G.020JENIS PEKERJAAN : Memasang 1 kg jaring kawat baja / wire meshSATUAN PEMBAYARAN : kg

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0025 45,000.00 112.50 2 Tukang Besi/Baja L09 Org/hr 0.0025 60,000.00 150.00 3 Kepala Tukang Batu L02 Org/hr 0.0025 70,000.00 175.00 4 Mandor L01 Org/hr 0.0001 80,000.00 8.00

JUMLAH HARGA TENAGA 445.50

B BAHAN

1 Wire Mesh M148.a kg 1.0200 15,000.00 15,300.00 2 Kawat Beton/Bendrat RRT M135 kg 0.0050 7,500.00 37.50

JUMLAH HARGA BAHAN 15,337.50

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 15,783.00

Page 162: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : G.021JENIS PEKERJAAN : Pasang bekisting untuk pondasiSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.5200 45,000.00 23,400.00 2 Tukang Kayu L08 Org/hr 0.2600 60,000.00 15,600.00 3 Kepala Tukang Kayu L03 Org/hr 0.0260 47,000.00 1,222.00 4 Mandor L01 Org/hr 0.0260 80,000.00 2,080.00

JUMLAH HARGA TENAGA 42,302.00

B BAHAN

1 Papan Kayu kelas III M085 m3 0.0400 1,100,000.00 44,000.000 2 Paku Kayu Segala Ukuran M140 kg 0.3000 17,500.00 5,250.000 3 Minyak bekisting M474 ltr 0.1000 2,690.00 269.000

JUMLAH HARGA BAHAN 49,519.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 91,821.00

ANALISA HARGA SATUAN

KODE ANALISA : G.022JENIS PEKERJAAN : Pasang bekisting untuk sloofSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.5200 45,000.00 23,400.00 2 Tukang Kayu L08 Org/hr 0.2600 60,000.00 15,600.00 3 Kepala Tukang Kayu L03 Org/hr 0.0260 47,000.00 1,222.00 4 Mandor L01 Org/hr 0.0260 80,000.00 2,080.00

JUMLAH HARGA TENAGA 42,302.00

B BAHAN

1 Papan Kayu kelas III M085 m3 0.0450 1,100,000.00 49,500.00 2 Paku Kayu Segala Ukuran M140 kg 0.3000 17,500.00 5,250.00 3 Minyak bekisting M474 ltr 0.1000 2,690.00 269.00

JUMLAH HARGA BAHAN 55,019.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 97,321.00

Page 163: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : G.023JENIS PEKERJAAN : Pasang bekisting untuk kolomSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.6600 45,000.00 29,700.00 2 Tukang Kayu L08 Org/hr 0.3300 60,000.00 19,800.00 3 Kepala Tukang Kayu L03 Org/hr 0.0330 47,000.00 1,551.00 4 Mandor L01 Org/hr 0.0330 80,000.00 2,640.00

JUMLAH HARGA TENAGA 53,691.00

B BAHAN

1 Papan Kayu kelas III M085 m3 0.0400 1,100,000.00 44,000.00 2 Paku Kayu Segala Ukuran M140 kg 0.4000 17,500.00 7,000.00 3 Minyak bekisting M474 ltr 0.2000 2,690.00 538.00 4 Balok Kayu Kelas III M084 m3 0.0150 3,000,000.00 45,000.00 5 Multiplek 9 mm M217 m2 0.3500 117,260.00 41,041.00 6 Dolken Kayu Dia 8 cm M089 btg 2.0000 25,000.00 50,000.00

JUMLAH HARGA BAHAN 187,579.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 241,270.00

ANALISA HARGA SATUAN

KODE ANALISA : G.024JENIS PEKERJAAN : Pasang bekisting untuk balokSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.6600 45,000.00 29,700.00 2 Tukang Kayu L08 Org/hr 0.3300 60,000.00 19,800.00 3 Kepala Tukang Kayu L03 Org/hr 0.0330 47,000.00 1,551.00 4 Mandor L01 Org/hr 0.0330 80,000.00 2,640.00

JUMLAH HARGA TENAGA 53,691.00

B BAHAN

1 Papan Kayu kelas III M085 m3 0.0400 1,100,000.00 44,000.00 2 Paku Kayu Segala Ukuran M140 kg 0.4000 17,500.00 7,000.00 3 Minyak bekisting M474 ltr 0.2000 2,690.00 538.00 4 Balok Kayu Kelas III M084 m3 0.0180 3,000,000.00 54,000.00 5 Multiplek 9 mm M217 m2 0.3500 117,260.00 41,041.00 6 Dolken Kayu Dia 8 cm M089 btg 2.0000 25,000.00 50,000.00

JUMLAH HARGA BAHAN 196,579.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 250,270.00

Page 164: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : G.025JENIS PEKERJAAN : Pasang bekisting untuk plat lantaiSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.6600 45,000.00 29,700.00 2 Tukang Kayu L08 Org/hr 0.3300 60,000.00 19,800.00 3 Kepala Tukang Kayu L03 Org/hr 0.0330 47,000.00 1,551.00 4 Mandor L01 Org/hr 0.0330 80,000.00 2,640.00

JUMLAH HARGA TENAGA 53,691.00

B BAHAN

1 Papan Kayu kelas III M085 m3 0.0400 1,100,000.00 44,000.00 2 Paku Kayu Segala Ukuran M140 kg 0.4000 17,500.00 7,000.00 3 Minyak bekisting M474 ltr 0.2000 2,690.00 538.00 4 Balok Kayu Kelas III M084 m3 0.0150 3,000,000.00 45,000.00 5 Multiplek 9 mm M217 m2 0.3500 117,260.00 41,041.00 6 Dolken Kayu Dia 8 cm M089 btg 6.0000 25,000.00 150,000.00

JUMLAH HARGA BAHAN 287,579.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 341,270.00

ANALISA HARGA SATUAN

KODE ANALISA : G.026JENIS PEKERJAAN : Pasang bekisting untuk dindingSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.6600 45,000.00 29,700.00 2 Tukang Kayu L08 Org/hr 0.3300 60,000.00 19,800.00 3 Kepala Tukang Kayu L03 Org/hr 0.0330 47,000.00 1,551.00 4 Mandor L01 Org/hr 0.0330 80,000.00 2,640.00

JUMLAH HARGA TENAGA 53,691.00

B BAHAN

1 Papan Kayu kelas III M085 m3 0.0300 1,100,000.00 33,000.00 2 Paku Kayu Segala Ukuran M140 kg 0.4000 17,500.00 7,000.00 3 Minyak bekisting M474 ltr 0.2000 2,690.00 538.00 4 Balok Kayu Kelas III M084 m3 0.0200 3,000,000.00 60,000.00 5 Multiplek 9 mm M217 m2 0.3500 117,260.00 41,041.00 6 Dolken Kayu Dia 8 cm M089 btg 3.0000 25,000.00 75,000.00 7 Formtie M477 bh 4.0000 5,910.00 23,640.00

JUMLAH HARGA BAHAN 240,219.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 293,910.00

Page 165: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : G.027JENIS PEKERJAAN : Pasang bekisting untuk tanggaSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.6600 45,000.00 29,700.00 2 Tukang Kayu L08 Org/hr 0.3300 60,000.00 19,800.00 3 Kepala Tukang Kayu L03 Org/hr 0.0330 47,000.00 1,551.00 4 Mandor L01 Org/hr 0.0330 80,000.00 2,640.00

JUMLAH HARGA TENAGA 53,691.00

B BAHAN

1 Papan Kayu kelas III M085 m3 0.0300 1,100,000.00 33,000.00 2 Paku Kayu Segala Ukuran M140 kg 0.4000 17,500.00 7,000.00 3 Minyak bekisting M474 ltr 0.1500 2,690.00 403.50 4 Balok Kayu Kelas III M084 m3 0.0150 3,000,000.00 45,000.00 5 Multiplek 9 mm M217 m2 0.3500 117,260.00 41,041.00 6 Dolken Kayu Dia 8 cm M089 btg 2.0000 25,000.00 50,000.00

JUMLAH HARGA BAHAN 176,444.50

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 230,135.50

ANALISA HARGA SATUAN

KODE ANALISA : G.028JENIS PEKERJAAN : Pasang jembatan untuk pengecoranSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1500 45,000.00 6,750.00 2 Tukang Batu L07 Org/hr 0.0500 60,000.00 3,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0050 70,000.00 350.00 4 Mandor L01 Org/hr 0.0080 80,000.00 640.00

JUMLAH HARGA TENAGA 10,740.00

B BAHAN

1 Balok Kayu Kelas III M084 m3 0.0264 3,000,000.00 79,200.00 2 Paku Kayu Segala Ukuran M140 kg 0.6000 17,500.00 10,500.00 3 Dolken Kayu Dia 8 cm M089 btg 0.5000 25,000.00 12,500.00

JUMLAH HARGA BAHAN 102,200.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 112,940.00

Page 166: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : G.029JENIS PEKERJAAN : Pondasi beton bertulang (150 kg besi + bekisting)SATUAN PEMBAYARAN : m3

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 5.3000 45,000.00 238,500.00 2 Tukang Batu L07 Org/hr 0.2750 60,000.00 16,500.00 3 Tukang Kayu L08 Org/hr 1.3000 60,000.00 78,000.00 4 Tukang Besi/Baja L09 Org/hr 1.0500 60,000.00 63,000.00 5 Kepala Tukang Batu L02 Org/hr 0.2620 70,000.00 18,340.00 6 Mandor L01 Org/hr 0.2650 80,000.00 21,200.00

JUMLAH HARGA TENAGA 435,540.00

B BAHAN

1 Balok Kayu Kelas III M084 m3 0.2000 3,000,000.00 600,000.00 2 Paku Kayu Segala Ukuran M140 kg 1.5000 17,500.00 26,250.00 3 Minyak bekisting M474 ltr 0.4000 2,690.00 1,076.00 4 Besi Beton Polos M112 kg 157.5000 8,500.00 1,338,750.00 5 Kawat Beton/Bendrat RRT M135 kg 2.2500 7,500.00 16,875.00 6 Portland Cement (PC) M037 kg 336.0000 900.00 302,400.00 7 Pasir Cor M004 m3 0.5400 110,000.00 59,400.00 8 Batu pecah mesin 2/3 M019 m3 0.8100 100,000.00 81,000.00

JUMLAH HARGA BAHAN 2,425,751.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 2,861,291.00

Page 167: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : G.030JENIS PEKERJAAN : Sloof beton bertulang (200 kg besi + bekisting)SATUAN PEMBAYARAN : m3

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 5.6500 45,000.00 254,250.00 2 Tukang Batu L07 Org/hr 0.2750 60,000.00 16,500.00 3 Tukang Kayu L08 Org/hr 1.5600 60,000.00 93,600.00 4 Tukang Besi/Baja L09 Org/hr 1.4000 60,000.00 84,000.00 5 Kepala Tukang Batu L02 Org/hr 0.3230 70,000.00 22,610.00 6 Mandor L01 Org/hr 0.2830 80,000.00 22,640.00

JUMLAH HARGA TENAGA 493,600.00

B BAHAN

1 Papan Kayu kelas III M085 m3 0.2700 1,100,000.00 297,000.00 2 Paku Kayu Segala Ukuran M140 kg 2.0000 17,500.00 35,000.00 3 Minyak bekisting M474 ltr 0.6000 2,690.00 1,614.00 4 Besi Beton Polos M112 kg 210.0000 8,500.00 1,785,000.00 5 Kawat Beton/Bendrat RRT M135 kg 3.0000 7,500.00 22,500.00 6 Portland Cement (PC) M037 kg 336.0000 900.00 302,400.00 7 Pasir Cor M004 m3 0.5400 110,000.00 59,400.00 8 Batu pecah mesin 2/3 M019 m3 0.8100 100,000.00 81,000.00

JUMLAH HARGA BAHAN 2,583,914.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 3,077,514.00

Page 168: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : G.031JENIS PEKERJAAN : Kolom beton bertulang (150 kg besi + bekisting)SATUAN PEMBAYARAN : m3

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 5.3000 45,000.00 238,500.00 2 Tukang Batu L07 Org/hr 0.2750 60,000.00 16,500.00 3 Tukang Kayu L08 Org/hr 1.3000 60,000.00 78,000.00 4 Tukang Besi/Baja L09 Org/hr 1.0500 60,000.00 63,000.00 5 Kepala Tukang Batu L02 Org/hr 0.2650 70,000.00 18,550.00 6 Mandor L01 Org/hr 0.2650 80,000.00 21,200.00

JUMLAH HARGA TENAGA 435,750.00

B BAHAN

1 Papan Kayu kelas III M085 m3 0.3200 1,100,000.00 352,000.00 2 Paku Kayu Segala Ukuran M140 kg 3.2000 17,500.00 56,000.00 3 Minyak bekisting M474 ltr 1.6000 2,690.00 4,304.00 4 Besi Beton Polos M112 kg 157.5000 8,500.00 1,338,750.00 5 Kawat Beton/Bendrat RRT M135 kg 2.2500 7,500.00 16,875.00 6 Portland Cement (PC) M037 kg 336.0000 900.00 302,400.00 7 Pasir Cor M004 m3 0.5400 110,000.00 59,400.00 8 Batu pecah mesin 2/3 M019 m3 0.8100 100,000.00 81,000.00 9 Balok Kayu Kelas III M084 m3 0.1200 3,000,000.00 360,000.00

10 Multiplek 9 mm M217 m2 2.8000 117,260.00 328,328.00 11 Dolken Kayu Dia 8 cm M089 btg 32.0000 25,000.00 800,000.00

JUMLAH HARGA BAHAN 3,699,057.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 4,134,807.00

Page 169: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : G.032JENIS PEKERJAAN : Kolom beton bertulang (300 kg besi + bekisting)SATUAN PEMBAYARAN : m3

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 7.0500 45,000.00 317,250.00 2 Tukang Batu L07 Org/hr 0.2750 60,000.00 16,500.00 3 Tukang Kayu L08 Org/hr 1.6500 60,000.00 99,000.00 4 Tukang Besi/Baja L09 Org/hr 2.1000 60,000.00 126,000.00 5 Kepala Tukang Batu L02 Org/hr 0.4030 70,000.00 28,210.00 6 Mandor L01 Org/hr 0.3530 80,000.00 28,240.00

JUMLAH HARGA TENAGA 615,200.00

B BAHAN

1 Papan Kayu kelas III M085 m3 0.4000 1,100,000.00 440,000.00 2 Paku Kayu Segala Ukuran M140 kg 4.0000 17,500.00 70,000.00 3 Minyak bekisting M474 ltr 2.0000 2,690.00 5,380.00 4 Besi Beton Polos M112 kg 315.0000 8,500.00 2,677,500.00 5 Kawat Beton/Bendrat RRT M135 kg 4.5000 7,500.00 33,750.00 6 Portland Cement (PC) M037 kg 336.0000 900.00 302,400.00 7 Pasir Cor M004 m3 0.5400 110,000.00 59,400.00 8 Batu pecah mesin 2/3 M019 m3 0.8100 100,000.00 81,000.00 9 Balok Kayu Kelas III M084 m3 0.1500 3,000,000.00 450,000.00

10 Multiplek 9 mm M217 m2 3.5000 117,260.00 410,410.00 11 Dolken Kayu Dia 8 cm M089 btg 20.0000 25,000.00 500,000.00

JUMLAH HARGA BAHAN 5,029,840.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 5,645,040.00

Page 170: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : G.033JENIS PEKERJAAN : Balok beton bertulang (200 kg besi + bekisting)SATUAN PEMBAYARAN : m3

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 6.3500 45,000.00 285,750.00 2 Tukang Batu L07 Org/hr 0.2750 60,000.00 16,500.00 3 Tukang Kayu L08 Org/hr 1.6500 60,000.00 99,000.00 4 Tukang Besi/Baja L09 Org/hr 1.4000 60,000.00 84,000.00 5 Kepala Tukang Batu L02 Org/hr 0.3330 70,000.00 23,310.00 6 Mandor L01 Org/hr 0.3180 80,000.00 25,440.00

JUMLAH HARGA TENAGA 534,000.00

B BAHAN

1 Papan Kayu kelas III M085 m3 0.3200 1,100,000.00 352,000.00 2 Paku Kayu Segala Ukuran M140 kg 3.2000 17,500.00 56,000.00 3 Minyak bekisting M474 ltr 1.6000 2,690.00 4,304.00 4 Besi Beton Polos M112 kg 210.0000 8,500.00 1,785,000.00 5 Kawat Beton/Bendrat RRT M135 kg 3.0000 7,500.00 22,500.00 6 Portland Cement (PC) M037 kg 336.0000 900.00 302,400.00 7 Pasir Cor M004 m3 0.5400 110,000.00 59,400.00 8 Batu pecah mesin 2/3 M019 m3 0.8100 100,000.00 81,000.00 9 Balok Kayu Kelas III M084 m3 0.1400 3,000,000.00 420,000.00

10 Multiplek 9 mm M217 m2 2.8000 117,260.00 328,328.00 11 Dolken Kayu Dia 8 cm M089 btg 16.0000 25,000.00 400,000.00

JUMLAH HARGA BAHAN 3,810,932.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 4,344,932.00

Page 171: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : G.034JENIS PEKERJAAN : Dinding beton bertulang (150 kg besi + bekisting)SATUAN PEMBAYARAN : m3

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 5.3000 45,000.00 238,500.00 2 Tukang Batu L07 Org/hr 0.2750 60,000.00 16,500.00 3 Tukang Kayu L08 Org/hr 1.3000 60,000.00 78,000.00 4 Tukang Besi/Baja L09 Org/hr 1.0500 60,000.00 63,000.00 5 Kepala Tukang Batu L02 Org/hr 0.2620 70,000.00 18,340.00 6 Mandor L01 Org/hr 0.2650 80,000.00 21,200.00

JUMLAH HARGA TENAGA 435,540.00

B BAHAN

1 Papan Kayu kelas III M085 m3 0.2400 1,100,000.00 264,000.00 2 Paku Kayu Segala Ukuran M140 kg 3.2000 17,500.00 56,000.00 3 Minyak bekisting M474 ltr 1.6000 2,690.00 4,304.00 4 Besi Beton Polos M112 kg 157.5000 8,500.00 1,338,750.00 5 Kawat Beton/Bendrat RRT M135 kg 2.2500 7,500.00 16,875.00 6 Portland Cement (PC) M037 kg 336.0000 900.00 302,400.00 7 Pasir Cor M004 m3 0.5400 110,000.00 59,400.00 8 Batu pecah mesin 2/3 M019 m3 0.8100 100,000.00 81,000.00 9 Balok Kayu Kelas III M084 m3 0.1600 3,000,000.00 480,000.00

10 Multiplek 9 mm M217 m2 2.8000 117,260.00 328,328.00 11 Dolken Kayu Dia 8 cm M089 btg 24.0000 25,000.00 600,000.00

JUMLAH HARGA BAHAN 3,531,057.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 3,966,597.00

Page 172: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : G.035JENIS PEKERJAAN : Dinding beton bertulang (200 kg besi + bekisting)SATUAN PEMBAYARAN : m3

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 5.6500 45,000.00 254,250.00 2 Tukang Batu L07 Org/hr 0.2750 60,000.00 16,500.00 3 Tukang Kayu L08 Org/hr 1.5600 60,000.00 93,600.00 4 Tukang Besi/Baja L09 Org/hr 1.4000 60,000.00 84,000.00 5 Kepala Tukang Batu L02 Org/hr 0.3230 70,000.00 22,610.00 6 Mandor L01 Org/hr 0.2830 80,000.00 22,640.00

JUMLAH HARGA TENAGA 493,600.00

B BAHAN

1 Papan Kayu kelas III M085 m3 0.2500 1,100,000.00 275,000.00 2 Paku Kayu Segala Ukuran M140 kg 3.0000 17,500.00 52,500.00 3 Minyak bekisting M474 ltr 1.2000 2,690.00 3,228.00 4 Besi Beton Polos M112 kg 210.0000 8,500.00 1,785,000.00 5 Kawat Beton/Bendrat RRT M135 kg 3.0000 7,500.00 22,500.00 6 Portland Cement (PC) M037 kg 336.0000 900.00 302,400.00 7 Pasir Cor M004 m3 0.5400 110,000.00 59,400.00 8 Batu pecah mesin 2/3 M019 m3 0.8100 100,000.00 81,000.00 9 Balok Kayu Kelas III M084 m3 0.1600 3,000,000.00 480,000.00

10 Multiplek 9 mm M217 m2 2.5000 117,260.00 293,150.00 11 Dolken Kayu Dia 8 cm M089 btg 14.0000 25,000.00 350,000.00

JUMLAH HARGA BAHAN 3,704,178.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 4,197,778.00

Page 173: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : G.036JENIS PEKERJAAN : Kolom penguat beton bertulang (11 x 11) cmSATUAN PEMBAYARAN : m1

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1800 45,000.00 8,100.00 2 Tukang Batu L07 Org/hr 0.0200 60,000.00 1,200.00 3 Tukang Kayu L08 Org/hr 0.0200 60,000.00 1,200.00 4 Tukang Besi/Baja L09 Org/hr 0.0200 60,000.00 1,200.00 5 Kepala Tukang Batu L02 Org/hr 0.0060 70,000.00 420.00 6 Mandor L01 Org/hr 0.0090 80,000.00 720.00

JUMLAH HARGA TENAGA 12,840.00

B BAHAN

1 Papan Kayu kelas III M085 m3 0.0020 1,100,000.00 2,200.00 2 Paku Kayu Segala Ukuran M140 kg 0.0100 17,500.00 175.00 3 Besi Beton Polos M112 kg 3.0000 8,500.00 25,500.00 4 Kawat Beton/Bendrat RRT M135 kg 0.4500 7,500.00 3,375.00 5 Portland Cement (PC) M037 kg 4.0000 900.00 3,600.00 6 Pasir Cor M004 m3 0.0060 110,000.00 660.00 7 Batu pecah mesin 2/3 M019 m3 0.0090 100,000.00 900.00

JUMLAH HARGA BAHAN 36,410.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 49,250.00

Page 174: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : G.037JENIS PEKERJAAN : Ring balok beton bertulang (10 x 15) cmSATUAN PEMBAYARAN : m1

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.297 45,000.00 13,365.00 2 Tukang Batu L07 Org/hr 0.033 60,000.00 1,980.00 3 Tukang Kayu L08 Org/hr 0.033 60,000.00 1,980.00 4 Tukang Besi/Baja L09 Org/hr 0.033 60,000.00 1,980.00 5 Kepala Tukang Batu L02 Org/hr 0.010 70,000.00 700.00 6 Mandor L01 Org/hr 0.015 80,000.00 1,200.00

JUMLAH HARGA TENAGA 21,205.00

B BAHAN

1 Papan Kayu kelas III M085 m3 0.0030 1,100,000.00 3,300.00 2 Paku Kayu Segala Ukuran M140 kg 0.0200 17,500.00 350.00 3 Besi Beton Polos M112 kg 3.6000 8,500.00 30,600.00 4 Kawat Beton/Bendrat RRT M135 kg 0.0500 7,500.00 375.00 5 Portland Cement (PC) M037 kg 5.5000 900.00 4,950.00 6 Pasir Cor M004 m3 0.0090 110,000.00 990.00 7 Batu pecah mesin 2/3 M019 m3 0.0150 100,000.00 1,500.00

JUMLAH HARGA BAHAN 42,065.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 63,270.00

Page 175: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : G.038JENIS PEKERJAAN : Sloof beton bertulang (10 x 15) cmSATUAN PEMBAYARAN : m1

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.275 45,000.00 12,375.00 2 Tukang Batu L07 Org/hr 0.033 60,000.00 1,980.00 3 Tukang Kayu L08 Org/hr 0.033 60,000.00 1,980.00 4 Tukang Besi/Baja L09 Org/hr 0.033 60,000.00 1,980.00 5 Kepala Tukang Batu L02 Org/hr 0.010 70,000.00 700.00 6 Mandor L01 Org/hr 0.015 80,000.00 1,200.00

JUMLAH HARGA TENAGA 20,215.00

B BAHAN

1 Papan Kayu kelas III M085 m3 0.0030 1,100,000.00 3,300.00 2 Paku Kayu Segala Ukuran M140 kg 0.0200 17,500.00 350.00 3 Besi Beton Polos M112 kg 3.6000 8,500.00 30,600.00 4 Kawat Beton/Bendrat RRT M135 kg 0.0500 7,500.00 375.00 5 Portland Cement (PC) M037 kg 5.5000 900.00 4,950.00 6 Pasir Cor M004 m3 0.0090 110,000.00 990.00 7 Batu pecah mesin 2/3 M019 m3 0.0150 100,000.00 1,500.00

JUMLAH HARGA BAHAN 42,065.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 62,280.00

Page 176: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : H.001JENIS PEKERJAAN : Pasang atap genteng biasa ex. MalangSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1500 45,000.00 6,750.00 2 Tukang Kayu L08 Org/hr 0.0750 60,000.00 4,500.00 3 Kepala Tukang Kayu L03 Org/hr 0.0080 47,000.00 376.00 4 Mandor L01 Org/hr 0.0080 80,000.00 640.00

JUMLAH HARGA TENAGA 12,266.00

B BAHAN

1 Genteng Biasa ex. Malang M149 bh 25.0000 850.00 21,250.00

JUMLAH HARGA BAHAN 21,250.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 33,516.00

ANALISA HARGA SATUAN

KODE ANALISA : H.002JENIS PEKERJAAN : Pasang atap genteng press ex.TrenggalekSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1500 45,000.00 6,750.00 2 Tukang Kayu L08 Org/hr 0.0750 60,000.00 4,500.00 3 Kepala Tukang Kayu L03 Org/hr 0.0080 47,000.00 376.00 4 Mandor L01 Org/hr 0.0080 80,000.00 640.00

JUMLAH HARGA TENAGA 12,266.00

B BAHAN

1 Genteng Press ex. Trenggalek M150 bh 25.0000 990.00 24,750.00

JUMLAH HARGA BAHAN 24,750.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 37,016.00

: m2

: m2

Page 177: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : H.003JENIS PEKERJAAN : Pasang atap genteng karangpilang ex. MalangSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1500 45,000.00 6,750.00 2 Tukang Kayu L08 Org/hr 0.0750 60,000.00 4,500.00 3 Kepala Tukang Kayu L03 Org/hr 0.0080 47,000.00 376.00 4 Mandor L01 Org/hr 0.0080 80,000.00 640.00

JUMLAH HARGA TENAGA 12,266.00

B BAHAN

1 Genteng Karang Pilang ex. Malang M151 bh 25.0000 1,140.00 28,500.00

JUMLAH HARGA BAHAN 28,500.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN D 40,766.00

ANALISA HARGA SATUAN

KODE ANALISA : H.004JENIS PEKERJAAN : Pasang atap genteng karangpilang ex. TrenggalekSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1500 45,000.00 6,750.00 2 Tukang Kayu L08 Org/hr 0.0750 60,000.00 4,500.00 3 Kepala Tukang Kayu L03 Org/hr 0.0080 47,000.00 376.00 4 Mandor L01 Org/hr 0.0080 80,000.00 640.00

JUMLAH HARGA TENAGA 12,266.00

B BAHAN

1 M152 bh 25.0000 400.00 10,000.00

JUMLAH HARGA BAHAN 10,000.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN D 22,266.00

: m2

: m2

Genteng Karang Pilang ex. Trenggalek

Page 178: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : H.005JENIS PEKERJAAN : Pasang atap genteng karangpilang ex. SurabayaSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1500 45,000.00 6,750.00 2 Tukang Kayu L08 Org/hr 0.0750 60,000.00 4,500.00 3 Kepala Tukang Kayu L03 Org/hr 0.0080 47,000.00 376.00 4 Mandor L01 Org/hr 0.0080 80,000.00 640.00

JUMLAH HARGA TENAGA 12,266.00

B BAHAN

1 M153 bh 25.0000 1,410.00 35,250.00

JUMLAH HARGA BAHAN 35,250.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 47,516.00

ANALISA HARGA SATUAN

KODE ANALISA : H.006JENIS PEKERJAAN : Pasang bubung genteng biasa ex. MalangSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.4000 45,000.00 18,000.00 2 Tukang Kayu L08 Org/hr 0.2000 60,000.00 12,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0200 47,000.00 940.00 4 Mandor L01 Org/hr 0.0020 80,000.00 160.00

JUMLAH HARGA TENAGA 31,100.00

B BAHAN

1 Bubung Genteng Biasa ex. Malang M156 bh 5.0000 1,870.00 9,350.00 2 Portland Cement (PC) M037 kg 8.0000 900.00 7,200.00 3 Pasir Pasang M002 m3 0.0320 60,000.00 1,920.00

JUMLAH HARGA BAHAN 18,470.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 49,570.00

: m2

Genteng Karang Pilang ex. Surabaya

: m1

Page 179: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : H.007JENIS PEKERJAAN : Pasang bubung genteng press ex. TrenggalekSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.4000 45,000.00 18,000.00 2 Tukang Kayu L08 Org/hr 0.2000 60,000.00 12,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0200 47,000.00 940.00 4 Mandor L01 Org/hr 0.0020 80,000.00 160.00

JUMLAH HARGA TENAGA 31,100.00

B BAHAN

1 M157 bh 5.0000 2,240.00 11,200.00

2 Portland Cement (PC) M037 kg 8.0000 900.00 7,200.00 3 Pasir Pasang M002 m3 0.0320 60,000.00 1,920.00

JUMLAH HARGA BAHAN 20,320.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 51,420.00

ANALISA HARGA SATUAN

KODE ANALISA : H.008JENIS PEKERJAAN : Pasang bubung genteng karangpilang ex. MalangSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.4000 45,000.00 18,000.00 2 Tukang Kayu L08 Org/hr 0.2000 60,000.00 12,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0200 47,000.00 940.00 4 Mandor L01 Org/hr 0.0020 80,000.00 160.00

JUMLAH HARGA TENAGA 31,100.00

B BAHAN

1 M158 bh 5.0000 4,030.00 20,150.00

2 Portland Cement (PC) M037 kg 8.0000 900.00 7,200.00 3 Pasir Pasang M002 m3 0.0320 60,000.00 1,920.00

JUMLAH HARGA BAHAN 29,270.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 60,370.00

: m1

Bubung Genteng Press ex. Trenggalek

: m1

Bubung Genteng Karang Pilang ex. Malang

Page 180: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : H.009JENIS PEKERJAAN : Pasang bubung genteng karangpilang ex. TrenggalekSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.4000 45,000.00 18,000.00 2 Tukang Kayu L08 Org/hr 0.2000 60,000.00 12,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0200 47,000.00 940.00 4 Mandor L01 Org/hr 0.0020 80,000.00 160.00

JUMLAH HARGA TENAGA 31,100.00

B BAHAN

1 M159 bh 5.0000 4,430.00 22,150.00

2 Portland Cement (PC) M037 kg 8.0000 900.00 7,200.00 3 Pasir Pasang M002 m3 0.0320 60,000.00 1,920.00

JUMLAH HARGA BAHAN 31,270.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 62,370.00

ANALISA HARGA SATUAN

KODE ANALISA : H.010JENIS PEKERJAAN : Pasang bubung genteng karangpilang ex. SurabayaSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.4000 45,000.00 18,000.00 2 Tukang Kayu L08 Org/hr 0.2000 60,000.00 12,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0200 47,000.00 940.00 4 Mandor L01 Org/hr 0.0020 80,000.00 160.00

JUMLAH HARGA TENAGA 31,100.00

B BAHAN

1 M160 bh 5.0000 4,880.00 24,400.00

2 Portland Cement (PC) M037 kg 8.0000 900.00 7,200.00 3 Pasir Pasang M002 m3 0.0320 60,000.00 1,920.00

JUMLAH HARGA BAHAN 33,520.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 64,620.00

: m1

Bubung Genteng Karang Pilang ex. Trenggalek

: m1

Bubung Genteng Karang Pilang ex. Surabaya

Page 181: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : H.011JENIS PEKERJAAN : Pasang atap genteng palentong kecilSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1500 45,000.00 6,750.00 2 Tukang Kayu L08 Org/hr 0.0750 60,000.00 4,500.00 3 Kepala Tukang Kayu L03 Org/hr 0.0080 47,000.00 376.00 4 Mandor L01 Org/hr 0.0080 80,000.00 640.00

JUMLAH HARGA TENAGA 12,266.00

B BAHAN

1 Genteng Palentong Kecil M162 bh 25.000 Err:509 Err:509

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

ANALISA HARGA SATUAN

KODE ANALISA : H.012JENIS PEKERJAAN : Pasang atap genteng kodok glazuurSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1500 45,000.00 6,750.00 2 Tukang Kayu L08 Org/hr 0.0750 60,000.00 4,500.00 3 Kepala Tukang Kayu L03 Org/hr 0.0080 47,000.00 376.00 4 Mandor L01 Org/hr 0.0080 80,000.00 640.00

JUMLAH HARGA TENAGA 12,266.00

B BAHAN

1 Genteng Kodok Glazuur M163 bh 25.0000 Err:509 Err:509

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

: m2

: m2

Page 182: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : H.013JENIS PEKERJAAN : Pasang atap genteng palentong super / besarSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1500 45,000.00 6,750.00 2 Tukang Kayu L08 Org/hr 0.0600 60,000.00 3,600.00 3 Kepala Tukang Kayu L03 Org/hr 0.0060 47,000.00 282.00 4 Mandor L01 Org/hr 0.0060 80,000.00 480.00

JUMLAH HARGA TENAGA 11,112.00

B BAHAN

1 Genteng Palentong Super/Besar M164 bh 12.0000 Err:509 Err:509

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

ANALISA HARGA SATUAN

KODE ANALISA : H.014JENIS PEKERJAAN : Pasang atap genteng betonSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.2000 45,000.00 9,000.00 2 Tukang Kayu L08 Org/hr 0.1000 60,000.00 6,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0100 47,000.00 470.00 4 Mandor L01 Org/hr 0.0100 80,000.00 800.00

JUMLAH HARGA TENAGA 16,270.00

B BAHAN

1 Genteng Beton M154 bh 11.0000 3,370.00 37,070.00 2 Paku Kayu Segala Ukuran M140 kg 0.0300 17,500.00 525.00

JUMLAH HARGA BAHAN 37,595.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 53,865.00

: m2

: m2

Page 183: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : H.015JENIS PEKERJAAN : Pasang atap genteng aspalSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.2000 45,000.00 9,000.00 2 Tukang Kayu L08 Org/hr 0.3000 60,000.00 18,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0030 47,000.00 141.00 4 Mandor L01 Org/hr 0.0100 80,000.00 800.00

JUMLAH HARGA TENAGA 27,941.00

B BAHAN

1 Genteng Aspal M168 lbr 6.9000 Err:509 Err:5092 Multiplek 6 mm M216 m2 0.3500 76,670.00 26,834.50 3 Paku Kayu Segala Ukuran M140 kg 0.0300 17,500.00 525.00 4 Plastik Aerator M173.a bh 0.5000 Err:509 Err:509

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

ANALISA HARGA SATUAN

KODE ANALISA : H.016JENIS PEKERJAAN : Pasang atap genteng metalSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.2000 45,000.00 9,000.00 2 Tukang Kayu L08 Org/hr 0.1000 60,000.00 6,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0100 47,000.00 470.00 4 Mandor L01 Org/hr 0.0010 80,000.00 80.00

JUMLAH HARGA TENAGA 15,550.00

B BAHAN

1 Genteng Metal M169 lbr 1.0200 Err:509 Err:5092 Paku Kayu Segala Ukuran M140 kg 0.2000 17,500.00 3,500.00

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

: m2

: m2

Page 184: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : H.017JENIS PEKERJAAN : Pasang atap sirapSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1660 45,000.00 7,470.00 2 Tukang Kayu L08 Org/hr 0.2500 60,000.00 15,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0250 47,000.00 1,175.00 4 Mandor L01 Org/hr 0.0080 80,000.00 640.00

JUMLAH HARGA TENAGA 24,285.00

B BAHAN

1 Atap Sirap M170 bh 60.0000 Err:509 Err:5092 Paku Kayu Segala Ukuran M140 kg 0.2000 17,500.00 3,500.00

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

ANALISA HARGA SATUAN

KODE ANALISA : H.018JENIS PEKERJAAN : Pasang bubung genteng palentong kecil SATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.4000 45,000.00 18,000.00 2 Tukang Kayu L08 Org/hr 0.2000 60,000.00 12,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0200 47,000.00 940.00 4 Mandor L01 Org/hr 0.0020 80,000.00 160.00

JUMLAH HARGA TENAGA 31,100.00

B BAHAN

1 Bubung Genteng Palentong Kecil M165 bh 5.0000 Err:509 Err:5092 Portland Cement (PC) M037 kg 8.0000 900.00 7,200.00 3 Pasir Pasang M002 m3 0.0320 60,000.00 1,920.00

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

: m2

: m1

Page 185: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : H.019JENIS PEKERJAAN : Pasang bubung genteng kodok / glazuurSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.4000 45,000.00 18,000.00 2 Tukang Kayu L08 Org/hr 0.2000 60,000.00 12,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0200 47,000.00 940.00 4 Mandor L01 Org/hr 0.0020 80,000.00 160.00

JUMLAH HARGA TENAGA 31,100.00

B BAHAN

1 Bubung Genteng Kodok Glazuur M166 bh 5.0000 Err:509 Err:5092 Portland Cement (PC) M037 kg 8.0000 900.00 7,200.00 3 Pasir Pasang M002 m3 0.0320 60,000.00 1,920.00

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

ANALISA HARGA SATUAN

KODE ANALISA : H.020JENIS PEKERJAAN : Pasang bubung genteng palentong super / besarSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.4000 45,000.00 18,000.00 2 Tukang Kayu L08 Org/hr 0.2000 60,000.00 12,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0200 47,000.00 940.00 4 Mandor L01 Org/hr 0.0020 80,000.00 160.00

JUMLAH HARGA TENAGA 31,100.00

B BAHAN

1 M167 bh 4.0000 Err:509 Err:509

2 Portland Cement (PC) M037 kg 8.0000 900.00 7,200.000 3 Pasir Pasang M002 m3 0.0320 60,000.00 1,920.000

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

: m1

: m1

Bubung Genteng Palentong Super/Besar

Page 186: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : H.021JENIS PEKERJAAN : Pasang bubung genteng betonSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.4000 45,000.00 18,000.00 2 Tukang Kayu L08 Org/hr 0.2000 60,000.00 12,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0200 47,000.00 940.00 4 Mandor L01 Org/hr 0.0020 80,000.00 160.00

JUMLAH HARGA TENAGA 31,100.00

B BAHAN

1 Bubung Genteng Beton M161 bh 3.5000 6,760.00 23,660.00 2 Paku Kayu Segala Ukuran M140 kg 0.0500 17,500.00 875.00 3 Portland Cement (PC) M037 kg 10.8000 900.00 9,720.00 4 Pasir Pasang M002 m3 0.0320 60,000.00 1,920.00 5 Portland Cement (PC) Warna M039 kg 1.0000 6,500.00 6,500.00

JUMLAH HARGA BAHAN 42,675.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 73,775.00

ANALISA HARGA SATUAN

KODE ANALISA : H.022JENIS PEKERJAAN : Pasang bubung genteng aspalSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1250 45,000.00 5,625.00 2 Tukang Kayu L08 Org/hr 0.2500 60,000.00 15,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0250 47,000.00 1,175.00 4 Mandor L01 Org/hr 0.0060 80,000.00 480.00

JUMLAH HARGA TENAGA 22,280.00

B BAHAN

1 Bubung Genteng Aspal M171 bh 2.0000 Err:509 Err:5092 Paku Kayu Segala Ukuran M140 kg 0.0500 17,500.00 875.00 3 Balok M056 m3 0.0035 Err:509 Err:509

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

: m1

: m1

Page 187: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : H.023JENIS PEKERJAAN : Pasang bubung genteng metalSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.2500 45,000.00 11,250.00 2 Tukang Kayu L08 Org/hr 0.1500 60,000.00 9,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0150 47,000.00 705.00 4 Mandor L01 Org/hr 0.0130 80,000.00 1,040.00

JUMLAH HARGA TENAGA 21,995.00

B BAHAN

1 Bubung Genteng Metal M172 bh 1.1000 Err:509 Err:5092 Paku Kayu Segala Ukuran M140 kg 0.0500 17,500.00 875.00

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

ANALISA HARGA SATUAN

KODE ANALISA : H.024JENIS PEKERJAAN : Pasang bubung atap sirapSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1250 45,000.00 5,625.00 2 Tukang Kayu L08 Org/hr 0.2500 60,000.00 15,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0250 47,000.00 1,175.00 4 Mandor L01 Org/hr 0.0060 80,000.00 480.00

JUMLAH HARGA TENAGA 22,280.00

B BAHAN

1 Seng plat BJLS 28 (90 x 180) cm M177 lbr 0.4000 Err:509 Err:5092 Paku Kayu Segala Ukuran M140 kg 0.1100 17,500.00 1,925.00 3 Papan (3x30) cm M065 m3 0.0040 6,030,000.00 24,120.00

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

: m1

: m1

Page 188: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : H.025JENIS PEKERJAAN : Pasang atap asbes gelombang (3,00 x 1,05) m x 4 mmSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1400 45,000.00 6,300.00 2 Tukang Kayu L08 Org/hr 0.0700 60,000.00 4,200.00 3 Kepala Tukang Kayu L03 Org/hr 0.0070 47,000.00 329.00 4 Mandor L01 Org/hr 0.0070 80,000.00 560.00

JUMLAH HARGA TENAGA 11,389.00

B BAHAN

1 M182 lbr 0.3500 99,700.00 34,895.00

2 Paku Seng Segala Ukuran M141 kg 0.1200 20,000.00 2,400.00

JUMLAH HARGA BAHAN 37,295.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 48,684.00

ANALISA HARGA SATUAN

KODE ANALISA : H.026JENIS PEKERJAAN : Pasang atap asbes gelombang (2,70 x 1,05) m x 4 mmSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1400 45,000.00 6,300.00 2 Tukang Kayu L08 Org/hr 0.0700 60,000.00 4,200.00 3 Kepala Tukang Kayu L03 Org/hr 0.0070 47,000.00 329.00 4 Mandor L01 Org/hr 0.0070 80,000.00 560.00

JUMLAH HARGA TENAGA 11,389.00

B BAHAN

1 M183 lbr 0.4200 92,000.00 38,640.00

2 Paku Seng Segala Ukuran M141 kg 0.1200 20,000.00 2,400.00

JUMLAH HARGA BAHAN 41,040.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 52,429.00

: m2

Asbes Gelombang (3.00 x 1.05) m x 4 mm

: m2

Asbes Gelombang (2.70 x 1.05) m x 4 mm

Page 189: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : H.027JENIS PEKERJAAN : Pasang atap asbes gelombang (2,40 x 1,05) m x 4 mmSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1400 45,000.00 6,300.00 2 Tukang Kayu L08 Org/hr 0.0670 60,000.00 4,020.00 3 Kepala Tukang Kayu L03 Org/hr 0.0070 47,000.00 329.00 4 Mandor L01 Org/hr 0.0070 80,000.00 560.00

JUMLAH HARGA TENAGA 11,209.00

B BAHAN

1 M184 lbr 0.4400 79,700.00 35,068.00

2 Paku Seng Segala Ukuran M141 kg 0.1200 20,000.00 2,400.00

JUMLAH HARGA BAHAN 37,468.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 48,677.00

ANALISA HARGA SATUAN

KODE ANALISA : H.028JENIS PEKERJAAN : Pasang atap asbes gelombang (2,10 x 1,05) m x 4 mmSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1400 45,000.00 6,300.00 2 Tukang Kayu L08 Org/hr 0.0670 60,000.00 4,020.00 3 Kepala Tukang Kayu L03 Org/hr 0.0070 47,000.00 329.00 4 Mandor L01 Org/hr 0.0070 80,000.00 560.00

JUMLAH HARGA TENAGA 11,209.00

B BAHAN

1 M185 lbr 0.5100 70,500.00 35,955.00

2 Paku Seng Segala Ukuran M141 kg 0.1200 20,000.00 2,400.00

JUMLAH HARGA BAHAN 38,355.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 49,564.00

: m2

Asbes Gelombang (2.40 x 1.05) m x 4 mm

: m2

Asbes Gelombang (2.10 x 1.05) m x 4 mm

Page 190: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : H.029JENIS PEKERJAAN : Pasang atap asbes gelombang (1,50 x 1,05) m x 4 mmSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1400 45,000.00 6,300.00 2 Tukang Kayu L08 Org/hr 0.0670 60,000.00 4,020.00 3 Kepala Tukang Kayu L03 Org/hr 0.0070 47,000.00 329.00 4 Mandor L01 Org/hr 0.0070 80,000.00 560.00

JUMLAH HARGA TENAGA 11,209.00

B BAHAN

1 M186 lbr 0.6500 53,600.00 34,840.00

2 Paku Seng Segala Ukuran M141 kg 0.1200 20,000.00 2,400.00

JUMLAH HARGA BAHAN 37,240.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 48,449.00

ANALISA HARGA SATUAN

KODE ANALISA : H.030JENIS PEKERJAAN : Pasang atap asbes gelombang (2,50 x 0,92) m x 5 mmSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1400 45,000.00 6,300.00 2 Tukang Kayu L08 Org/hr 0.0750 60,000.00 4,500.00 3 Kepala Tukang Kayu L03 Org/hr 0.0080 47,000.00 376.00 4 Mandor L01 Org/hr 0.0080 80,000.00 640.00

JUMLAH HARGA TENAGA 11,816.00

B BAHAN

1 M187 lbr 0.5000 101,200.00 50,600.00

2 Paku Seng Segala Ukuran M141 kg 0.1200 20,000.00 2,400.00

JUMLAH HARGA BAHAN 53,000.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 64,816.00

: m2

Asbes Gelombang (1.50 x 1.05) m x 4 mm

: m2

Asbes Gelombang (2.50 x 0.92) m x 5 mm

Page 191: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : H.031JENIS PEKERJAAN : Pasang atap asbes gelombang (2,25 x 0,92) m x 5 mmSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1400 45,000.00 6,300.00 2 Tukang Kayu L08 Org/hr 0.0750 60,000.00 4,500.00 3 Kepala Tukang Kayu L03 Org/hr 0.0080 47,000.00 376.00 4 Mandor L01 Org/hr 0.0080 80,000.00 640.00

JUMLAH HARGA TENAGA 11,816.00

B BAHAN

1 M188 lbr 0.6000 87,600.00 52,560.00

2 Paku Seng Segala Ukuran M141 kg 0.1200 20,000.00 2,400.00

JUMLAH HARGA BAHAN 54,960.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 66,776.00

ANALISA HARGA SATUAN

KODE ANALISA : H.032JENIS PEKERJAAN : Pasang atap asbes gelombang (2,00 x 0,92) m x 5 mmSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1400 45,000.00 6,300.00 2 Tukang Kayu L08 Org/hr 0.0700 60,000.00 4,200.00 3 Kepala Tukang Kayu L03 Org/hr 0.0070 47,000.00 329.00 4 Mandor L01 Org/hr 0.0070 80,000.00 560.00

JUMLAH HARGA TENAGA 11,389.00

B BAHAN

1 M189 lbr 0.6000 77,600.00 46,560.00

2 Paku Seng Segala Ukuran M141 kg 0.1200 20,000.00 2,400.00

JUMLAH HARGA BAHAN 48,960.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 60,349.00

: m2

Asbes Gelombang (2.25 x 0.92) m x 5 mm

: m2

Asbes Gelombang (2.00 x 0.92) m x 5 mm

Page 192: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : H.033JENIS PEKERJAAN : Pasang atap asbes gelombang (1,80 x 0,92) m x 5 mmSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1400 45,000.00 6,300.00 2 Tukang Kayu L08 Org/hr 0.0700 60,000.00 4,200.00 3 Kepala Tukang Kayu L03 Org/hr 0.0070 47,000.00 329.00 4 Mandor L01 Org/hr 0.0070 80,000.00 560.00

JUMLAH HARGA TENAGA 11,389.00

B BAHAN

1 M190 lbr 0.7500 59,000.00 44,250.00

2 Paku Seng Segala Ukuran M141 kg 0.1200 20,000.00 2,400.00

JUMLAH HARGA BAHAN 46,650.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 58,039.00

ANALISA HARGA SATUAN

KODE ANALISA : H.034JENIS PEKERJAAN : Pasang atap asbes gelombang (3,00 x 1,08) m x 6 mmSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1400 45,000.00 6,300.00 2 Tukang Kayu L08 Org/hr 0.0670 60,000.00 4,020.00 3 Kepala Tukang Kayu L03 Org/hr 0.0070 47,000.00 329.00 4 Mandor L01 Org/hr 0.0070 80,000.00 560.00

JUMLAH HARGA TENAGA 11,209.00

B BAHAN

1 M191 lbr 0.7000 119,600.00 83,720.00

2 Paku Seng Segala Ukuran M141 kg 0.1200 20,000.00 2,400.00

JUMLAH HARGA BAHAN 86,120.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 97,329.00

: m2

Asbes Gelombang (1.80 x 0.92) m x 5 mm

: m2

Asbes Gelombang (3.00 x 1.08) m x 6 mm

Page 193: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : H.035JENIS PEKERJAAN : Pasang atap asbes gelombang (2,70 x 1,08) m x 6 mmSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1400 45,000.00 6,300.00 2 Tukang Kayu L08 Org/hr 0.0670 60,000.00 4,020.00 3 Kepala Tukang Kayu L03 Org/hr 0.0070 47,000.00 329.00 4 Mandor L01 Org/hr 0.0070 80,000.00 560.00

JUMLAH HARGA TENAGA 11,209.00

B BAHAN

1 M192 lbr 0.3800 110,400.00 41,952.00

2 Paku Seng Segala Ukuran M141 kg 0.1200 20,000.00 2,400.00

JUMLAH HARGA BAHAN 44,352.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 55,561.00

ANALISA HARGA SATUAN

KODE ANALISA : H.036JENIS PEKERJAAN : Pasang atap asbes gelombang (2,10 x 1,08) m x 6 mmSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1400 45,000.00 6,300.00 2 Tukang Kayu L08 Org/hr 0.0670 60,000.00 4,020.00 3 Kepala Tukang Kayu L03 Org/hr 0.0070 47,000.00 329.00 4 Mandor L01 Org/hr 0.0070 80,000.00 560.00

JUMLAH HARGA TENAGA 11,209.00

B BAHAN

1 M193 lbr 0.4900 84,700.00 41,503.00

2 Paku Seng Segala Ukuran M141 kg 0.1200 20,000.00 2,400.00

JUMLAH HARGA BAHAN 43,903.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 55,112.00

: m2

Asbes Gelombang (2.70 x 1.08) m x 6 mm

: m2

Asbes Gelombang (2.10 x 1.08) m x 6 mm

Page 194: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : H.037JENIS PEKERJAAN : Pasang atap asbes gelombang (1.80 x 1,08) m x 6 mmSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1400 45,000.00 6,300.00 2 Tukang Kayu L08 Org/hr 0.0670 60,000.00 4,020.00 3 Kepala Tukang Kayu L03 Org/hr 0.0070 47,000.00 329.00 4 Mandor L01 Org/hr 0.0070 80,000.00 560.00

JUMLAH HARGA TENAGA 11,209.00

B BAHAN

1 M194 lbr 0.5700 64,400.00 36,708.00

2 Paku Seng Segala Ukuran M141 kg 0.1200 20,000.00 2,400.00

JUMLAH HARGA BAHAN 39,108.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 50,317.00

ANALISA HARGA SATUAN

KODE ANALISA : H.038JENIS PEKERJAAN : Pasang bubung stel gelombang 0,92 mSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0840 45,000.00 3,780.00 2 Tukang Kayu L08 Org/hr 0.1250 60,000.00 7,500.00 3 Kepala Tukang Kayu L03 Org/hr 0.0130 47,000.00 611.00 4 Mandor L01 Org/hr 0.0040 80,000.00 320.00

JUMLAH HARGA TENAGA 12,211.00

B BAHAN

1 Bubung Stel Gelombang 0.92 m M195 lbr 2.4000 40,000.00 96,000.00 2 Sekrup Segala Ukuran M145 bh 6.0000 410.00 2,460.00

JUMLAH HARGA BAHAN 98,460.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 110,671.00

: m2

Asbes Gelombang (1.80 x 1.08) m x 6 mm

: m1

Page 195: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : H.039JENIS PEKERJAAN : Pasang bubung stel gelombang 1,05 mSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0840 45,000.00 3,780.00 2 Tukang Kayu L08 Org/hr 0.1250 60,000.00 7,500.00 3 Kepala Tukang Kayu L03 Org/hr 0.0130 47,000.00 611.00 4 Mandor L01 Org/hr 0.0040 80,000.00 320.00

JUMLAH HARGA TENAGA 12,211.00

B BAHAN

1 Bubung Stel Gelombang 1.05 m M196 lbr 2.1000 44,000.00 92,400.00 2 Sekrup Segala Ukuran M145 bh 6.0000 410.00 2,460.00

JUMLAH HARGA BAHAN 94,860.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 107,071.00

ANALISA HARGA SATUAN

KODE ANALISA : H.040JENIS PEKERJAAN : Pasang bubung stel gelombang 1,08 mSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0840 45,000.00 3,780.00 2 Tukang Kayu L08 Org/hr 0.1250 60,000.00 7,500.00 3 Kepala Tukang Kayu L03 Org/hr 0.0130 47,000.00 611.00 4 Mandor L01 Org/hr 0.0040 80,000.00 320.00

JUMLAH HARGA TENAGA 12,211.00

B BAHAN

1 Bubung Stel Gelombang 1.08 m M197 lbr 2.0500 42,840.00 87,822.00 2 Sekrup Segala Ukuran M145 bh 6.0000 410.00 2,460.00

JUMLAH HARGA BAHAN 90,282.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 102,493.00

: m1

: m1

Page 196: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : H.041JENIS PEKERJAAN : Pasang nok paten 0,92 mSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0840 45,000.00 3,780.00 2 Tukang Kayu L08 Org/hr 0.1250 60,000.00 7,500.00 3 Kepala Tukang Kayu L03 Org/hr 0.0130 47,000.00 611.00 4 Mandor L01 Org/hr 0.0040 80,000.00 320.00

JUMLAH HARGA TENAGA 12,211.00

B BAHAN

1 Bubung Paten 0.92 m M198 lbr 1.2000 41,000.00 49,200.00 2 Sekrup Segala Ukuran M145 bh 6.0000 410.00 2,460.00

JUMLAH HARGA BAHAN 51,660.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 63,871.00

ANALISA HARGA SATUAN

KODE ANALISA : H.042JENIS PEKERJAAN : Pasang nok paten 1,05 mSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0840 45,000.00 3,780.00 2 Tukang Kayu L08 Org/hr 0.1250 60,000.00 7,500.00 3 Kepala Tukang Kayu L03 Org/hr 0.0130 47,000.00 611.00 4 Mandor L01 Org/hr 0.0040 80,000.00 320.00

JUMLAH HARGA TENAGA 12,211.00

B BAHAN

1 Bubung Paten 1.05 m M199 lbr 1.2000 37,310.00 44,772.00 2 Sekrup Segala Ukuran M145 bh 6.0000 410.00 2,460.00

JUMLAH HARGA BAHAN 47,232.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 59,443.00

: m1

: m1

Page 197: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : H.043JENIS PEKERJAAN : Pasang nok paten 1,08 mSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0840 45,000.00 3,780.00 2 Tukang Kayu L08 Org/hr 0.1250 60,000.00 7,500.00 3 Kepala Tukang Kayu L03 Org/hr 0.0130 47,000.00 611.00 4 Mandor L01 Org/hr 0.0040 80,000.00 320.00

JUMLAH HARGA TENAGA 12,211.00

B BAHAN

1 Bubung Paten 1.08 m M200 lbr 1.2000 40,180.00 48,216.00 2 Sekrup Segala Ukuran M145 bh 6.0000 410.00 2,460.00

JUMLAH HARGA BAHAN 50,676.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 62,887.00

ANALISA HARGA SATUAN

KODE ANALISA : H.044JENIS PEKERJAAN : Pasang nok stel rata 0,92 mSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0840 45,000.00 3,780.00 2 Tukang Kayu L08 Org/hr 0.1250 60,000.00 7,500.00 3 Kepala Tukang Kayu L03 Org/hr 0.0130 47,000.00 611.00 4 Mandor L01 Org/hr 0.0040 80,000.00 320.00

JUMLAH HARGA TENAGA 12,211.00

B BAHAN

1 Bubung Stel Rata 0.92 m M201 lbr 1.1000 40,000.00 44,000.00 2 Sekrup Segala Ukuran M145 bh 6.0000 410.00 2,460.00

JUMLAH HARGA BAHAN 46,460.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 58,671.00

: m1

: m1

Page 198: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : H.045JENIS PEKERJAAN : Pasang nok stel rata 1,05 mSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0840 45,000.00 3,780.00 2 Tukang Kayu L08 Org/hr 0.1250 60,000.00 7,500.00 3 Kepala Tukang Kayu L03 Org/hr 0.0130 47,000.00 611.00 4 Mandor L01 Org/hr 0.0040 80,000.00 320.00

JUMLAH HARGA TENAGA 12,211.00

B BAHAN

1 Bubung Stel Rata 1.05 m M202 lbr 1.1000 34,640.00 38,104.00 2 Sekrup Segala Ukuran M145 bh 6.0000 410.00 2,460.00

JUMLAH HARGA BAHAN 40,564.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 52,775.00

ANALISA HARGA SATUAN

KODE ANALISA : H.046JENIS PEKERJAAN : Pasang atap seng gelombang SATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1200 45,000.00 5,400.00 2 Tukang Kayu L08 Org/hr 0.0600 60,000.00 3,600.00 3 Kepala Tukang Kayu L03 Org/hr 0.0060 47,000.00 282.00 4 Mandor L01 Org/hr 0.0060 80,000.00 480.00

JUMLAH HARGA TENAGA 9,762.00

B BAHAN

1 Atap Seng Gelombang M178 lbr 0.7000 71,950.00 50,365.000 2 Paku Seng Segala Ukuran M141 kg 0.0200 20,000.00 400.000

JUMLAH HARGA BAHAN 50,765.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 60,527.00

: m1

: m2

Page 199: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : H.047JENIS PEKERJAAN : Pasang bubung seng gelombang SATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1500 45,000.00 6,750.00 2 Tukang Kayu L08 Org/hr 0.0700 60,000.00 4,200.00 3 Kepala Tukang Kayu L03 Org/hr 0.0080 47,000.00 376.00 4 Mandor L01 Org/hr 0.0060 80,000.00 480.00

JUMLAH HARGA TENAGA 11,806.00

B BAHAN

1 Bubung Seng Gelombang M179 lbr 0.3000 66,010.00 19,803.000 2 Paku Seng Segala Ukuran M141 kg 0.0400 20,000.00 800.000

JUMLAH HARGA BAHAN 20,603.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 32,409.00

ANALISA HARGA SATUAN

KODE ANALISA : H.048JENIS PEKERJAAN : Pasang atap aluminiumSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1500 45,000.00 6,750.00 2 Tukang Kayu L08 Org/hr 0.7500 60,000.00 45,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0080 47,000.00 376.00 4 Mandor L01 Org/hr 0.0060 80,000.00 480.00

JUMLAH HARGA TENAGA 52,606.00

B BAHAN

1 Atap Aluminium M129 m2 1.0500 88,150.00 92,557.50 2 Paku Seng Segala Ukuran M141 kg 0.0200 20,000.00 400.00

JUMLAH HARGA BAHAN 92,957.50

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 145,563.50

: m1

: m2

Page 200: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : H.049JENIS PEKERJAAN : Pasang bubung atap aluminiumSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1000 45,000.00 4,500.00 2 Tukang Kayu L08 Org/hr 1.0000 60,000.00 60,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0100 47,000.00 470.00 4 Mandor L01 Org/hr 0.0100 80,000.00 800.00

JUMLAH HARGA TENAGA 65,770.00

B BAHAN

1 Bubung Atap Aluminium M130 m2 1.2000 86,100.00 103,320.00 2 Paku Seng Segala Ukuran M141 kg 0.0400 20,000.00 800.00

JUMLAH HARGA BAHAN 104,120.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 169,890.00

ANALISA HARGA SATUAN

KODE ANALISA : H.050JENIS PEKERJAAN : Pasang lapisan aluminium foil / sesalationSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1500 45,000.00 6,750.00 2 Tukang Kayu L08 Org/hr 0.0500 60,000.00 3,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0050 47,000.00 235.00 4 Mandor L01 Org/hr 0.0080 80,000.00 640.00

JUMLAH HARGA TENAGA 10,625.00

B BAHAN

1 Aluminium Foil/Sesalation M131 m2 1.0500 26,900.00 28,245.00

JUMLAH HARGA BAHAN 28,245.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 38,870.00

: m2

: m2

Page 201: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : H.051JENIS PEKERJAAN : Pasang roof light fibreglassSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1400 45,000.00 6,300.00 2 Tukang Kayu L08 Org/hr 0.0670 60,000.00 4,020.00 3 Kepala Tukang Kayu L03 Org/hr 0.0070 47,000.00 329.00 4 Mandor L01 Org/hr 0.0070 80,000.00 560.00

JUMLAH HARGA TENAGA 11,209.00

B BAHAN

1 Roof Light Fibreglass M180 m2 1.100 69,290.00 76,219.000 2 Paku Seng Segala Ukuran M141 kg 0.050 20,000.00 1,000.000

JUMLAH HARGA BAHAN 77,219.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 88,428.00

ANALISA HARGA SATUAN

KODE ANALISA : H.052JENIS PEKERJAAN : Pasang atap polycarbonatSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1400 45,000.00 6,300.00 2 Tukang Kayu L08 Org/hr 0.0670 60,000.00 4,020.00 3 Kepala Tukang Kayu L03 Org/hr 0.0070 47,000.00 329.00 4 Mandor L01 Org/hr 0.0070 80,000.00 560.00

JUMLAH HARGA TENAGA 11,209.00

B BAHAN

1 Atap Polycarbonat M181 m2 1.100 101,270.00 111,397.000 2 Paku Sumbat Segala Ukuran M143 bh 10.000 710.00 7,100.000

JUMLAH HARGA BAHAN 118,497.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 129,706.00

: m2

: m2

Page 202: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : H.053JENIS PEKERJAAN : Pasang atap seng galvalumSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1500 45,000.00 6,750.00 2 Tukang Kayu L08 Org/hr 0.7500 60,000.00 45,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0080 47,000.00 376.00 4 Mandor L01 Org/hr 0.0060 80,000.00 480.00

JUMLAH HARGA TENAGA 52,606.00

B BAHAN

1 Atap Seng Galvalum M148.f m2 1.0500 99,550.00 104,527.50 2 Paku Seng Segala Ukuran M141 kg 0.0200 20,000.00 400.00

JUMLAH HARGA BAHAN 104,927.50

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 157,533.50

ANALISA HARGA SATUAN

KODE ANALISA : H.054JENIS PEKERJAAN : Pasang bubung atap seng galvalumSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1000 45,000.00 4,500.00 2 Tukang Kayu L08 Org/hr 1.0000 60,000.00 60,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0100 47,000.00 470.00 4 Mandor L01 Org/hr 0.0100 80,000.00 800.00

JUMLAH HARGA TENAGA 65,770.00

B BAHAN

1 Bubung Atap Seng Galvalum M148.g m2 1.2000 96,860.00 116,232.00 2 Paku Seng Segala Ukuran M141 kg 0.0400 20,000.00 800.00

JUMLAH HARGA BAHAN 117,032.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 182,802.00

: m2

: m2

Page 203: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : I.001JENIS PEKERJAAN : Langit-langit asbes (1,0 x 1,0) m, tebal 6 mmSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0300 45,000.00 1,350.00 2 Tukang Kayu L08 Org/hr 0.0700 60,000.00 4,200.00 3 Kepala Tukang Kayu L03 Org/hr 0.0070 47,000.00 329.00 4 Mandor L01 Org/hr 0.0020 80,000.00 160.00

JUMLAH HARGA TENAGA 6,039.00

B BAHAN

1 Asbes (1,00 x 1,00) m x 6 mm M203 lbr 1.1000 16,500.00 18,150.00 2 Paku Kayu Segala Ukuran M140 kg 0.0100 17,500.00 175.00

JUMLAH HARGA BAHAN 18,325.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 24,364.00

ANALISA HARGA SATUAN

KODE ANALISA : I.002JENIS PEKERJAAN : Langit-langit asbes (1,0 x 1,0) m, tebal 5 mmSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0300 45,000.00 1,350.00 2 Tukang Kayu L08 Org/hr 0.0700 60,000.00 4,200.00 3 Kepala Tukang Kayu L03 Org/hr 0.0070 47,000.00 329.00 4 Mandor L01 Org/hr 0.0020 80,000.00 160.00

JUMLAH HARGA TENAGA 6,039.00

B BAHAN

1 Asbes (1,00 x 1,00) m x 5 mm M204 lbr 1.1000 15,600.00 17,160.00 2 Paku Kayu Segala Ukuran M140 kg 0.0100 17,500.00 175.00

JUMLAH HARGA BAHAN 17,335.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 23,374.00

: m2

: m2

Page 204: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : I.003JENIS PEKERJAAN : Langit-langit asbes (1,0 x 1,0) m, tebal 4 mmSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0300 45,000.00 1,350.00 2 Tukang Kayu L08 Org/hr 0.0700 60,000.00 4,200.00 3 Kepala Tukang Kayu L03 Org/hr 0.0070 47,000.00 329.00 4 Mandor L01 Org/hr 0.0020 80,000.00 160.00

JUMLAH HARGA TENAGA 6,039.00

B BAHAN

1 Asbes (1,00 x 1,00) m x 4 mm M205 lbr 1.1000 15,000.00 16,500.00 2 Paku Kayu Segala Ukuran M140 kg 0.0100 17,500.00 175.00

JUMLAH HARGA BAHAN 16,675.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 22,714.00

ANALISA HARGA SATUAN

KODE ANALISA : I.004JENIS PEKERJAAN : Langit-langit asbes (1,0 x 1,0) m, tebal 3,50 mmSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0300 45,000.00 1,350.00 2 Tukang Kayu L08 Org/hr 0.0700 60,000.00 4,200.00 3 Kepala Tukang Kayu L03 Org/hr 0.0070 47,000.00 329.00 4 Mandor L01 Org/hr 0.0020 80,000.00 160.00

JUMLAH HARGA TENAGA 6,039.00

B BAHAN

1 Asbes (1,00 x 1,00) m x 3,5 mm M206 lbr 1.1000 14,400.00 15,840.00 2 Paku Kayu Segala Ukuran M140 kg 0.0100 17,500.00 175.00

JUMLAH HARGA BAHAN 16,015.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 22,054.00

: m2

: m2

Page 205: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : I.005JENIS PEKERJAAN : Langit-langit akustik (30 x 30) cmSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0600 45,000.00 2,700.00 2 Tukang Kayu L08 Org/hr 0.1200 60,000.00 7,200.00 3 Kepala Tukang Kayu L03 Org/hr 0.0120 47,000.00 564.00 4 Mandor L01 Org/hr 0.0030 80,000.00 240.00

JUMLAH HARGA TENAGA 10,704.00

B BAHAN

1 Akustik (30 x 30) cm M207 lbr 12.0000 Err:509 Err:5092 Paku Kayu Segala Ukuran M140 kg 0.0500 17,500.00 875.00

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

ANALISA HARGA SATUAN

KODE ANALISA : I.006JENIS PEKERJAAN : Langit-langit akustik (30 x 60) cmSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0600 45,000.00 2,700.00 2 Tukang Kayu L08 Org/hr 0.1000 60,000.00 6,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0100 47,000.00 470.00 4 Mandor L01 Org/hr 0.0030 80,000.00 240.00

JUMLAH HARGA TENAGA 9,410.00

B BAHAN

1 Akustik (30 x 60) cm M208 lbr 5.8000 Err:509 Err:5092 Paku Kayu Segala Ukuran M140 kg 0.0500 17,500.00 875.00

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

: m2

: m2

Page 206: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : I.007JENIS PEKERJAAN : Langit-langit akustik (60 x 120) cmSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0600 45,000.00 2,700.00 2 Tukang Kayu L08 Org/hr 0.1000 60,000.00 6,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0100 47,000.00 470.00 4 Mandor L01 Org/hr 0.0030 80,000.00 240.00

JUMLAH HARGA TENAGA 9,410.00

B BAHAN

1 Akustik (60 x 120) cm M209 lbr 1.5000 Err:509 Err:5092 Paku Kayu Segala Ukuran M140 kg 0.0500 17,500.00 875.00

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

ANALISA HARGA SATUAN

KODE ANALISA : I.008JENIS PEKERJAAN : Langit-langit plywood (30 x 60) cm, tebal 4 mmSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0700 45,000.00 3,150.00 2 Tukang Kayu L08 Org/hr 0.1000 60,000.00 6,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0100 47,000.00 470.00 4 Mandor L01 Org/hr 0.0035 80,000.00 280.00

JUMLAH HARGA TENAGA 9,900.00

B BAHAN

1 Plywood (30 x 60) cm x 4 mm M222 lbr 0.3600 6,350.00 2,286.00 2 Paku Kayu Segala Ukuran M140 kg 0.0300 17,500.00 525.00

JUMLAH HARGA BAHAN 2,811.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 12,711.00

: m2

: m2

Page 207: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : I.009JENIS PEKERJAAN : Langit-langit plywood (30 x 60) cm, tebal 6 mmSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0600 45,000.00 2,700.00 2 Tukang Kayu L08 Org/hr 0.1000 60,000.00 6,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0100 47,000.00 470.00 4 Mandor L01 Org/hr 0.0030 80,000.00 240.00

JUMLAH HARGA TENAGA 9,410.00

B BAHAN

1 Plywood (30 x 60) cm x 6 mm M223 lbr 0.3600 9,020.00 3,247.20 2 Paku Kayu Segala Ukuran M140 kg 0.0300 17,500.00 525.00

JUMLAH HARGA BAHAN 3,772.20

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 13,182.20

ANALISA HARGA SATUAN

KODE ANALISA : I.010JENIS PEKERJAAN : Langit-langit plywood (60 x 120) cm, tebal 4 mmSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0700 45,000.00 3,150.00 2 Tukang Kayu L08 Org/hr 0.1000 60,000.00 6,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0100 47,000.00 470.00 4 Mandor L01 Org/hr 0.0035 80,000.00 280.00

JUMLAH HARGA TENAGA 9,900.00

B BAHAN

1 Plywood (60 x 120) cm x 4 mm M224 lbr 0.3750 21,010.00 7,878.75 2 Paku Kayu Segala Ukuran M140 kg 0.0300 17,500.00 525.00

JUMLAH HARGA BAHAN 8,403.75

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 18,303.75

: m2

: m2

Page 208: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : I.011JENIS PEKERJAAN : Langit-langit plywood (60 x 120) cm, tebal 6 mmSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0700 45,000.00 3,150.00 2 Tukang Kayu L08 Org/hr 0.1000 60,000.00 6,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0100 47,000.00 470.00 4 Mandor L01 Org/hr 0.0035 80,000.00 280.00

JUMLAH HARGA TENAGA 9,900.00

B BAHAN

1 Plywood (60 x 120) cm x 6 mm M225 lbr 0.3750 25,010.00 9,378.75 2 Paku Kayu Segala Ukuran M140 kg 0.0300 17,500.00 525.00

JUMLAH HARGA BAHAN 9,903.75

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 19,803.75

ANALISA HARGA SATUAN

KODE ANALISA : I.012JENIS PEKERJAAN : Langit-langit teakwood (30 x 60) cm, tebal 4 mmSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0700 45,000.00 3,150.00 2 Tukang Kayu L08 Org/hr 0.1000 60,000.00 6,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0100 47,000.00 470.00 4 Mandor L01 Org/hr 0.0035 80,000.00 280.00

JUMLAH HARGA TENAGA 9,900.00

B BAHAN

1 Teakwood (30 x 60) cm x 4 mm M227 lbr 0.3600 6,860.00 2,469.60 2 Paku Kayu Segala Ukuran M140 kg 0.0300 17,500.00 525.00

JUMLAH HARGA BAHAN 2,994.60

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 12,894.60

: m2

: m2

Page 209: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : I.013JENIS PEKERJAAN : Langit-langit teakwood (60 x 120) cm, tebal 4 mmSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0700 45,000.00 3,150.00 2 Tukang Kayu L08 Org/hr 0.1000 60,000.00 6,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0100 47,000.00 470.00 4 Mandor L01 Org/hr 0.0035 80,000.00 280.00

JUMLAH HARGA TENAGA 9,900.00

B BAHAN

1 Teakwood (60 x 120) cm x 4 mm M228 lbr 0.3750 24,490.00 9,183.75 2 Paku Kayu Segala Ukuran M140 kg 0.0300 17,500.00 525.00

JUMLAH HARGA BAHAN 9,708.75

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 19,608.75

ANALISA HARGA SATUAN

KODE ANALISA : I.014JENIS PEKERJAAN : Langit-langit lat kayu jatiSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.2000 45,000.00 9,000.00 2 Tukang Kayu L08 Org/hr 0.6000 60,000.00 36,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0600 47,000.00 2,820.00 4 Mandor L01 Org/hr 0.0100 80,000.00 800.00

JUMLAH HARGA TENAGA 48,620.00

B BAHAN

1 Papan (2x20) cm M097 m3 0.0240 Err:509 Err:5092 Paku Kayu Segala Ukuran M140 kg 0.0100 17,500.00 175.00 3 Sekrup Segala Ukuran M145 bh 12.0000 410.00 4,920.00

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

: m2

: m2

Page 210: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : I.015JENIS PEKERJAAN : Langit-langit lat kayu raminSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.2000 45,000.00 9,000.00 2 Tukang Kayu L08 Org/hr 0.6000 60,000.00 36,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0600 47,000.00 2,820.00 4 Mandor L01 Org/hr 0.0100 80,000.00 800.00

JUMLAH HARGA TENAGA 48,620.00

B BAHAN

1 Kayu Ramin M087 m3 0.0240 Err:509 Err:5092 Paku Kayu Segala Ukuran M140 kg 0.0100 17,500.00 175.00 2 Sekrup Segala Ukuran M145 bh 12.0000 410.00 4,920.00

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

ANALISA HARGA SATUAN

KODE ANALISA : I.016JENIS PEKERJAAN : Langit-langit lat kayu kamperSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.2000 45,000.00 9,000.00 2 Tukang Kayu L08 Org/hr 0.6000 60,000.00 36,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0600 47,000.00 2,820.00 4 Mandor L01 Org/hr 0.0100 80,000.00 800.00

JUMLAH HARGA TENAGA 48,620.00

B BAHAN

1 Papan (2x20) cm M081 m3 0.0240 10,800,000.00 259,200.00 2 Paku Kayu Segala Ukuran M140 kg 0.0100 17,500.00 175.00 2 Sekrup Segala Ukuran M145 bh 12.0000 410.00 4,920.00

JUMLAH HARGA BAHAN 264,295.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 312,915.00

: m2

: m2

Page 211: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : I.017JENIS PEKERJAAN : Langit-langit soft boardSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.6000 45,000.00 27,000.00 2 Tukang Kayu L08 Org/hr 0.1000 60,000.00 6,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0100 47,000.00 470.00 4 Mandor L01 Org/hr 0.0030 80,000.00 240.00

JUMLAH HARGA TENAGA 33,710.00

B BAHAN

1 Soft Board M212 lbr 0.3500 Err:509 Err:5092 Paku Kayu Segala Ukuran M140 kg 0.0300 17,500.00 525.00

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

ANALISA HARGA SATUAN

KODE ANALISA : I.018JENIS PEKERJAAN : Langit-langit akustik (60 x 120) cm + rangka aluminiumSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1500 45,000.00 6,750.00 2 Tukang Kayu L08 Org/hr 0.5000 60,000.00 30,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0500 47,000.00 2,350.00 4 Mandor L01 Org/hr 0.0080 80,000.00 640.00

JUMLAH HARGA TENAGA 39,740.00

B BAHAN

1 Baja Ringan M132 kg 3.6000 35,175.00 126,630.00 2 Kawat Beton/Bendrat RRT M135 kg 0.1500 7,500.00 1,125.00 3 Paku Keling M147 bh 1.0500 2,660.00 4 Akustik (60 x 120) cm M209 lbr 1.5000 Err:509 Err:509

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

: m2

: m2

Page 212: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : I.019JENIS PEKERJAAN : Langit-langit asbes (1,00 x 1,00) m x 3,5 mm + rangka kayu jatiSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1800 45,000.00 8,100.00 2 Tukang Kayu L08 Org/hr 0.3200 60,000.00 19,200.00 3 Kepala Tukang Kayu L03 Org/hr 0.0320 47,000.00 1,504.00 4 Mandor L01 Org/hr 0.0090 80,000.00 720.00

JUMLAH HARGA TENAGA 29,524.00

B BAHAN

1 Usuk : 5/7 M095 m3 0.0120 Err:509 Err:5092 Paku Kayu Segala Ukuran M140 kg 0.0600 17,500.00 1,050.00 3 Asbes (1,00 x 1,00) m x 3,5 mm M206 lbr 1.1000 14,400.00 15,840.00

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

ANALISA HARGA SATUAN

KODE ANALISA : I.020JENIS PEKERJAAN : Langit-langit asbes (1,00 x 1,00) m x 3,5 mm + rangka kayu kamperSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1800 45,000.00 8,100.00 2 Tukang Kayu L08 Org/hr 0.3200 60,000.00 19,200.00 3 Kepala Tukang Kayu L03 Org/hr 0.0320 47,000.00 1,504.00 4 Mandor L01 Org/hr 0.0090 80,000.00 720.00

JUMLAH HARGA TENAGA 29,524.00

B BAHAN

1 Usuk : 5/7 M079 m3 0.0120 1,450,000.00 17,400.00 2 Paku Kayu Segala Ukuran M140 kg 0.0600 17,500.00 1,050.00 3 Asbes (1,00 x 1,00) m x 3,5 mm M206 lbr 1.1000 14,400.00 15,840.00

JUMLAH HARGA BAHAN 34,290.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 63,814.00

: m2

: m2

Page 213: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : I.021JENIS PEKERJAAN : Langit-langit asbes (1,00 x 1,00) m x 3,5 mm + rangka kayu borneoSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1800 45,000.00 8,100.00 2 Tukang Kayu L08 Org/hr 0.3200 60,000.00 19,200.00 3 Kepala Tukang Kayu L03 Org/hr 0.0320 47,000.00 1,504.00 4 Mandor L01 Org/hr 0.0090 80,000.00 720.00

JUMLAH HARGA TENAGA 29,524.00

B BAHAN

1 Usuk : 5/7 M055 m3 0.0120 Err:509 Err:5092 Paku Kayu Segala Ukuran M140 kg 0.0600 17,500.00 1,050.00 3 Asbes (1,00 x 1,00) m x 3,5 mm M206 lbr 1.1000 14,400.00 15,840.00

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

ANALISA HARGA SATUAN

KODE ANALISA : I.022JENIS PEKERJAAN : Langit-langit asbes (1,00 x 1,00) m x 3,5 mm + rangka kayu bengkiraiSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1800 45,000.00 8,100.00 2 Tukang Kayu L08 Org/hr 0.3200 60,000.00 19,200.00 3 Kepala Tukang Kayu L03 Org/hr 0.0320 47,000.00 1,504.00 4 Mandor L01 Org/hr 0.0090 80,000.00 720.00

JUMLAH HARGA TENAGA 29,524.00

B BAHAN

1 Usuk : 5/7 M073 m3 0.0120 Err:509 Err:5092 Paku Kayu Segala Ukuran M140 kg 0.0600 17,500.00 1,050.00 3 Asbes (1,00 x 1,00) m x 3,5 mm M206 lbr 1.1000 14,400.00 15,840.00

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

: m2

: m2

Page 214: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : I.023JENIS PEKERJAAN : Langit-langit asbes (1,00 x 1,00) m x 3,5 mm + rangka kayu kruingSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1800 45,000.00 8,100.00 2 Tukang Kayu L08 Org/hr 0.3200 60,000.00 19,200.00 3 Kepala Tukang Kayu L03 Org/hr 0.0320 47,000.00 1,504.00 4 Mandor L01 Org/hr 0.0090 80,000.00 720.00

JUMLAH HARGA TENAGA 29,524.00

B BAHAN

1 Usuk : 5/7 M067 m3 0.0120 5,400,000.00 64,800.00 2 Paku Kayu Segala Ukuran M140 kg 0.0600 17,500.00 1,050.00 3 Asbes (1,00 x 1,00) m x 3,5 mm M206 lbr 1.1000 14,400.00 15,840.00

JUMLAH HARGA BAHAN 81,690.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 111,214.00

ANALISA HARGA SATUAN

KODE ANALISA : I.024JENIS PEKERJAAN : Langit-langit asbes (1,00 x 1,00) m x 3,5 mm + rangka kayu merantiSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1800 45,000.00 8,100.00 2 Tukang Kayu L08 Org/hr 0.3200 60,000.00 19,200.00 3 Kepala Tukang Kayu L03 Org/hr 0.0320 47,000.00 1,504.00 4 Mandor L01 Org/hr 0.0090 80,000.00 720.00

JUMLAH HARGA TENAGA 29,524.00

B BAHAN

1 Usuk : 5/7 M061 m3 0.0120 4,500,000.00 54,000.00 2 Paku Kayu Segala Ukuran M140 kg 0.0600 17,500.00 1,050.00 3 Asbes (1,00 x 1,00) m x 3,5 mm M206 lbr 1.1000 14,400.00 15,840.00

JUMLAH HARGA BAHAN 70,890.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 100,414.00

: m2

: m2

Page 215: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : I.025JENIS PEKERJAAN : Langit-langit plywood 4 mm + rangka kayu jatiSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.2700 45,000.00 12,150.00 2 Tukang Kayu L08 Org/hr 0.4000 60,000.00 24,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0400 47,000.00 1,880.00 4 Mandor L01 Org/hr 0.0135 80,000.00 1,080.00

JUMLAH HARGA TENAGA 39,110.00

B BAHAN

1 Usuk : 5/7 M095 m3 0.0230 Err:509 Err:5092 Paku Kayu Segala Ukuran M140 kg 0.0600 17,500.00 1,050.00 3 Plywood (120 x 240) cm x 4 mm M226 lbr 0.3900 85,000.00 33,150.00

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

ANALISA HARGA SATUAN

KODE ANALISA : I.026JENIS PEKERJAAN : Langit-langit plywood 4 mm + rangka kayu kamperSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.2700 45,000.00 12,150.00 2 Tukang Kayu L08 Org/hr 0.4000 60,000.00 24,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0400 47,000.00 1,880.00 4 Mandor L01 Org/hr 0.0135 80,000.00 1,080.00

JUMLAH HARGA TENAGA 39,110.00

B BAHAN

1 Usuk : 5/7 M079 m3 0.0230 1,450,000.00 33,350.00 2 Paku Kayu Segala Ukuran M140 kg 0.0600 17,500.00 1,050.00 3 Plywood (120 x 240) cm x 4 mm M226 lbr 0.3900 85,000.00 33,150.00

JUMLAH HARGA BAHAN 67,550.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 106,660.00

: m2

: m2

Page 216: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : I.027JENIS PEKERJAAN : Langit-langit plywood 4 mm + rangka kayu borneoSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.2700 45,000.00 12,150.00 2 Tukang Kayu L08 Org/hr 0.4000 60,000.00 24,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0400 47,000.00 1,880.00 4 Mandor L01 Org/hr 0.0135 80,000.00 1,080.00

JUMLAH HARGA TENAGA 39,110.00

B BAHAN

1 Usuk : 5/7 M055 m3 0.0230 Err:509 Err:5092 Paku Kayu Segala Ukuran M140 kg 0.0600 17,500.00 1,050.00 3 Plywood (120 x 240) cm x 4 mm M226 lbr 0.3900 85,000.00 33,150.00

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

ANALISA HARGA SATUAN

KODE ANALISA : I.028JENIS PEKERJAAN : Langit-langit plywood 4 mm + rangka kayu bengkiraiSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.2700 45,000.00 12,150.00 2 Tukang Kayu L08 Org/hr 0.4000 60,000.00 24,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0400 47,000.00 1,880.00 4 Mandor L01 Org/hr 0.0135 80,000.00 1,080.00

JUMLAH HARGA TENAGA 39,110.00

B BAHAN

1 Usuk : 5/7 M073 m3 0.0230 Err:509 Err:5092 Paku Kayu Segala Ukuran M140 kg 0.0600 17,500.00 1,050.00 3 Plywood (120 x 240) cm x 4 mm M226 lbr 0.3900 85,000.00 33,150.00

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

: m2

: m2

Page 217: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : I.029JENIS PEKERJAAN : Langit-langit plywood 4 mm + rangka kayu kruingSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.2700 45,000.00 12,150.00 2 Tukang Kayu L08 Org/hr 0.4000 60,000.00 24,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0400 47,000.00 1,880.00 4 Mandor L01 Org/hr 0.0135 80,000.00 1,080.00

JUMLAH HARGA TENAGA 39,110.00

B BAHAN

1 Usuk : 5/7 M067 m3 0.0230 5,400,000.00 124,200.00 2 Paku Kayu Segala Ukuran M140 kg 0.0600 17,500.00 1,050.00 3 Plywood (120 x 240) cm x 4 mm M226 lbr 0.3900 85,000.00 33,150.00

JUMLAH HARGA BAHAN 158,400.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 197,510.00

ANALISA HARGA SATUAN

KODE ANALISA : I.030JENIS PEKERJAAN : Langit-langit plywood 4 mm + rangka kayu merantiSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.2700 45,000.00 12,150.00 2 Tukang Kayu L08 Org/hr 0.4000 60,000.00 24,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0400 47,000.00 1,880.00 4 Mandor L01 Org/hr 0.0135 80,000.00 1,080.00

JUMLAH HARGA TENAGA 39,110.00

B BAHAN

1 Usuk : 5/7 M061 m3 0.0230 4,500,000.00 103,500.00 2 Paku Kayu Segala Ukuran M140 kg 0.0600 17,500.00 1,050.00 2 Plywood (120 x 240) cm x 4 mm M226 lbr 0.3900 85,000.00 33,150.00

JUMLAH HARGA BAHAN 137,700.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 176,810.00

: m2

: m2

Page 218: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : I.031JENIS PEKERJAAN : Langit-langit akustik (30 x 60) cm + rangka kayu jatiSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.2600 45,000.00 11,700.00 2 Tukang Kayu L08 Org/hr 0.4000 60,000.00 24,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0400 47,000.00 1,880.00 4 Mandor L01 Org/hr 0.0130 80,000.00 1,040.00

JUMLAH HARGA TENAGA 38,620.00

B BAHAN

1 Usuk : 5/7 M095 m3 0.0230 Err:509 Err:5092 Paku Kayu Segala Ukuran M140 kg 0.0600 17,500.00 1,050.000 3 Akustik (30 x 60) cm M208 lbr 5.8000 Err:509 Err:509

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

ANALISA HARGA SATUAN

KODE ANALISA : I.032JENIS PEKERJAAN : Langit-langit akustik (30 x 60) cm + rangka kayu kamperSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.2600 45,000.00 11,700.00 2 Tukang Kayu L08 Org/hr 0.4000 60,000.00 24,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0400 47,000.00 1,880.00 4 Mandor L01 Org/hr 0.0130 80,000.00 1,040.00

JUMLAH HARGA TENAGA 38,620.00

B BAHAN

1 Usuk : 5/7 M079 m3 0.0230 1,450,000.00 33,350.00 2 Paku Kayu Segala Ukuran M140 kg 0.0600 17,500.00 1,050.00 3 Akustik (30 x 60) cm M208 lbr 5.8000 Err:509 Err:509

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

: m2

: m2

Page 219: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : I.033JENIS PEKERJAAN : Langit-langit akustik (30 x 60) cm + rangka kayu borneoSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.2600 45,000.00 11,700.00 2 Tukang Kayu L08 Org/hr 0.4000 60,000.00 24,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0400 47,000.00 1,880.00 4 Mandor L01 Org/hr 0.0130 80,000.00 1,040.00

JUMLAH HARGA TENAGA 38,620.00

B BAHAN

1 Usuk : 5/7 M055 m3 0.0230 Err:509 Err:5092 Paku Kayu Segala Ukuran M140 kg 0.0600 17,500.00 1,050.000 3 Akustik (30 x 60) cm M208 lbr 5.8000 Err:509 Err:509

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

ANALISA HARGA SATUAN

KODE ANALISA : I.034JENIS PEKERJAAN : Langit-langit akustik (30 x 60) cm + rangka kayu bengkiraiSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.2600 45,000.00 11,700.00 2 Tukang Kayu L08 Org/hr 0.4000 60,000.00 24,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0400 47,000.00 1,880.00 4 Mandor L01 Org/hr 0.0130 80,000.00 1,040.00

JUMLAH HARGA TENAGA 38,620.00

B BAHAN

1 Usuk : 5/7 M073 m3 0.0230 Err:509 Err:5092 Paku Kayu Segala Ukuran M140 kg 0.0600 17,500.00 1,050.000 3 Akustik (30 x 60) cm M208 lbr 5.8000 Err:509 Err:509

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

: m2

: m2

Page 220: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : I.035JENIS PEKERJAAN : Langit-langit akustik (30 x 60) cm + rangka kayu kruingSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.2600 45,000.00 11,700.00 2 Tukang Kayu L08 Org/hr 0.4000 60,000.00 24,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0400 47,000.00 1,880.00 4 Mandor L01 Org/hr 0.0130 80,000.00 1,040.00

JUMLAH HARGA TENAGA 38,620.00

B BAHAN

1 Usuk : 5/7 M067 m3 0.0230 5,400,000.00 124,200.000 2 Paku Kayu Segala Ukuran M140 kg 0.0600 17,500.00 1,050.000 3 Akustik (30 x 60) cm M208 lbr 5.8000 Err:509 Err:509

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

ANALISA HARGA SATUAN

KODE ANALISA : I.036JENIS PEKERJAAN : Langit-langit akustik (30 x 60) cm + rangka kayu merantiSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.2600 45,000.00 11,700.00 2 Tukang Kayu L08 Org/hr 0.4000 60,000.00 24,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0400 47,000.00 1,880.00 4 Mandor L01 Org/hr 0.0130 80,000.00 1,040.00

JUMLAH HARGA TENAGA 38,620.00

B BAHAN

1 Usuk : 5/7 M061 m3 0.0230 4,500,000.00 103,500.00 2 Paku Kayu Segala Ukuran M140 kg 0.0600 17,500.00 1,050.00 3 Akustik (30 x 60) cm M208 lbr 5.8000 Err:509 Err:509

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

: m2

: m2

Page 221: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : I.037JENIS PEKERJAAN : Langit-langit akustik (30 x 30) cm + rangka kayu jatiSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.3100 45,000.00 13,950.00 2 Tukang Kayu L08 Org/hr 0.4700 60,000.00 28,200.00 3 Kepala Tukang Kayu L03 Org/hr 0.0470 47,000.00 2,209.00 4 Mandor L01 Org/hr 0.0155 80,000.00 1,240.00

JUMLAH HARGA TENAGA 45,599.00

B BAHAN

1 Usuk : 5/7 M095 m3 0.0270 Err:509 Err:5092 Paku Kayu Segala Ukuran M140 kg 0.0600 17,500.00 1,050.00 3 Akustik (30 x 30) cm M207 lbr 11.5000 Err:509 Err:509

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

ANALISA HARGA SATUAN

KODE ANALISA : I.038JENIS PEKERJAAN : Langit-langit akustik (30 x 30) cm + rangka kayu kamperSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.3100 45,000.00 13,950.00 2 Tukang Kayu L08 Org/hr 0.4700 60,000.00 28,200.00 3 Kepala Tukang Kayu L03 Org/hr 0.0470 47,000.00 2,209.00 4 Mandor L01 Org/hr 0.0155 80,000.00 1,240.00

JUMLAH HARGA TENAGA 45,599.00

B BAHAN

1 Usuk : 5/7 M079 m3 0.0270 1,450,000.00 39,150.00 2 Paku Kayu Segala Ukuran M140 kg 0.0600 17,500.00 1,050.00 2 Akustik (30 x 30) cm M207 lbr 11.5000 Err:509 Err:509

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

: m2

: m2

Page 222: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : I.039JENIS PEKERJAAN : Langit-langit akustik (30 x 30) cm + rangka kayu borneoSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.3100 45,000.00 13,950.00 2 Tukang Kayu L08 Org/hr 0.4700 60,000.00 28,200.00 3 Kepala Tukang Kayu L03 Org/hr 0.0470 47,000.00 2,209.00 4 Mandor L01 Org/hr 0.0155 80,000.00 1,240.00

JUMLAH HARGA TENAGA 45,599.00

B BAHAN

1 Usuk : 5/7 M055 m3 0.0270 Err:509 Err:5092 Paku Kayu Segala Ukuran M140 kg 0.0600 17,500.00 1,050.00 3 Akustik (30 x 30) cm M207 lbr 11.5000 Err:509 Err:509

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

ANALISA HARGA SATUAN

KODE ANALISA : I.040JENIS PEKERJAAN : Langit-langit akustik (30 x 30) cm + rangka kayu bengkiraiSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.3100 45,000.00 13,950.00 2 Tukang Kayu L08 Org/hr 0.4700 60,000.00 28,200.00 3 Kepala Tukang Kayu L03 Org/hr 0.0470 47,000.00 2,209.00 4 Mandor L01 Org/hr 0.0155 80,000.00 1,240.00

JUMLAH HARGA TENAGA 45,599.00

B BAHAN

1 Usuk : 5/7 M073 m3 0.0270 Err:509 Err:5092 Paku Kayu Segala Ukuran M140 kg 0.0600 17,500.00 1,050.00 3 Akustik (30 x 30) cm M207 lbr 11.5000 Err:509 Err:509

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

: m2

: m2

Page 223: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : I.041JENIS PEKERJAAN : Langit-langit akustik (30 x 30) cm + rangka kayu kruingSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.3100 45,000.00 13,950.00 2 Tukang Kayu L08 Org/hr 0.4700 60,000.00 28,200.00 3 Kepala Tukang Kayu L03 Org/hr 0.0470 47,000.00 2,209.00 4 Mandor L01 Org/hr 0.0155 80,000.00 1,240.00

JUMLAH HARGA TENAGA 45,599.00

B BAHAN

1 Usuk : 5/7 M067 m3 0.0270 5,400,000.00 145,800.00 2 Paku Kayu Segala Ukuran M140 kg 0.0600 17,500.00 1,050.00 3 Akustik (30 x 30) cm M207 lbr 11.5000 Err:509 Err:509

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

ANALISA HARGA SATUAN

KODE ANALISA : I.042JENIS PEKERJAAN : Langit-langit akustik (30 x 30) cm + rangka kayu merantiSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.3100 45,000.00 13,950.00 2 Tukang Kayu L08 Org/hr 0.4700 60,000.00 28,200.00 3 Kepala Tukang Kayu L03 Org/hr 0.0470 47,000.00 2,209.00 4 Mandor L01 Org/hr 0.0155 80,000.00 1,240.00

JUMLAH HARGA TENAGA 45,599.00

B BAHAN

1 Usuk : 5/7 M055 m3 0.0270 Err:509 Err:5092 Paku Kayu Segala Ukuran M140 kg 0.0600 17,500.00 1,050.00 2 Akustik (30 x 30) cm M207 lbr 11.5000 Err:509 Err:509

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

: m2

: m2

Page 224: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : I.043JENIS PEKERJAAN : Langit-langit gypsum board (120x240x9) mm, tebal 9 mmSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1000 45,000.00 4,500.00 2 Tukang Kayu L08 Org/hr 0.0500 60,000.00 3,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0050 47,000.00 235.00 4 Mandor L01 Org/hr 0.0050 80,000.00 400.00

JUMLAH HARGA TENAGA 8,135.00

B BAHAN

1 Gypsum Board M213 lbr 0.3640 58,630.00 21,341.320 2 Sekrup Segala Ukuran M145 bh 9.0000 410.00 3,690.000

JUMLAH HARGA BAHAN 25,031.32

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 33,166.32

ANALISA HARGA SATUAN

KODE ANALISA : I.044JENIS PEKERJAAN : List langit-langit kayu profilSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0500 45,000.00 2,250.00 2 Tukang Kayu L08 Org/hr 0.0500 60,000.00 3,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0050 47,000.00 235.00 4 Mandor L01 Org/hr 0.0030 80,000.00 240.00

JUMLAH HARGA TENAGA 5,725.00

B BAHAN

1 List Kayu Profil M090 m1 1.0500 6,900.00 7,245.00 2 Paku Kayu Segala Ukuran M140 kg 0.0100 17,500.00 175.00

JUMLAH HARGA BAHAN 7,420.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 13,145.00

: m2

: m1

Page 225: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : I.045JENIS PEKERJAAN : List langit-langit gypsumSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0500 45,000.00 2,250.00 2 Tukang Kayu L08 Org/hr 0.0500 60,000.00 3,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0050 47,000.00 235.00 4 Mandor L01 Org/hr 0.0030 80,000.00 240.00

JUMLAH HARGA TENAGA 5,725.00

B BAHAN

1 List Gypsum M211 m' 1.1000 18,040.00 19,844.00 2 Lem Kayu M422 Ltr 0.0500 25,040.00 1,252.00

JUMLAH HARGA BAHAN 21,096.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 26,821.00

: m1

Page 226: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : J.001JENIS PEKERJAAN : Pasang kloset jongkok terasoSATUAN PEMBAYARAN : bh

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 1.0000 45,000.00 45,000.00 2 Tukang Batu L07 Org/hr 1.5000 60,000.00 90,000.00 3 Kepala Tukang Batu L02 Org/hr 0.3000 70,000.00 21,000.00 4 Mandor L01 Org/hr 0.1100 80,000.00 8,800.00

JUMLAH HARGA TENAGA 164,800.00

B BAHAN

1 Kloset Jongkok Teraso M234 bh 1.0000 53,300.00 53,300.00 2 Bata Merah M022 bh 7.0000 250.00 1,750.00 3 Portland Cement (PC) M037 kg 6.0000 900.00 5,400.00 4 Pasir Pasang M002 m3 0.0100 60,000.00 600.00

JUMLAH HARGA BAHAN 61,050.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 225,850.00

ANALISA HARGA SATUAN

KODE ANALISA : J.002JENIS PEKERJAAN : Pasang kloset jongkok porselin kw. ASATUAN PEMBAYARAN : bh

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 1.0000 45,000.00 45,000.00 2 Tukang Batu L07 Org/hr 1.5000 60,000.00 90,000.00 3 Kepala Tukang Batu L02 Org/hr 1.5000 70,000.00 105,000.00 4 Mandor L01 Org/hr 0.1600 80,000.00 12,800.00

JUMLAH HARGA TENAGA 252,800.00

B BAHAN

1 Kloset Jongkok Porselin Kw. A M230 Unit 1.0000 133,250.00 133,250.00 2 Portland Cement (PC) M037 kg 6.0000 900.00 5,400.00 3 Pasir Pasang M002 m3 0.0100 60,000.00 600.00

JUMLAH HARGA BAHAN 139,250.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 392,050.00

Page 227: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : J.003JENIS PEKERJAAN : Pasang kloset jongkok luxSATUAN PEMBAYARAN : bh

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 1.0000 45,000.00 45,000.00 2 Tukang Batu L07 Org/hr 1.5000 60,000.00 90,000.00 3 Kepala Tukang Batu L02 Org/hr 1.5000 70,000.00 105,000.00 4 Mandor L01 Org/hr 0.1600 80,000.00 12,800.00

JUMLAH HARGA TENAGA 252,800.00

B BAHAN

1 Kloset Jongkok Lux M232 Unit 1.0000 266,500.00 266,500.00 2 Portland Cement (PC) M037 kg 6.0000 900.00 5,400.00 3 Pasir Pasang M002 m3 0.0100 60,000.00 600.00

JUMLAH HARGA BAHAN 272,500.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 525,300.00

ANALISA HARGA SATUAN

KODE ANALISA : J.004JENIS PEKERJAAN : Pasang kloset duduk porselin kw. ASATUAN PEMBAYARAN : bh

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 3.3000 45,000.00 148,500.00 2 Tukang Batu L07 Org/hr 1.1000 60,000.00 66,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0010 70,000.00 70.00 4 Mandor L01 Org/hr 0.1600 80,000.00 12,800.00

JUMLAH HARGA TENAGA 227,370.00

B BAHAN

1 Kloset Duduk Porselin Kw. A M231 Unit 1.0000 1,332,500.00 1,332,500.00 2 Perlengkapan 0.0600 79,950.00 4,797.00

JUMLAH HARGA BAHAN 1,337,297.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 1,564,667.00

Page 228: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : J.005JENIS PEKERJAAN : Pasang kloset duduk luxSATUAN PEMBAYARAN : bh

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 3.3000 45,000.00 148,500.00 2 Tukang Batu L07 Org/hr 1.1000 60,000.00 66,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0010 70,000.00 70.00 4 Mandor L01 Org/hr 0.1600 80,000.00 12,800.00

JUMLAH HARGA TENAGA 227,370.00

B BAHAN

1 Kloset Duduk Lux M233 Unit 1.0000 1,385,800.00 1,385,800.00 2 Perlengkapan 0.0600 83,148.00 4,988.88

JUMLAH HARGA BAHAN 1,390,788.88

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 1,618,158.88

ANALISA HARGA SATUAN

KODE ANALISA : J.006JENIS PEKERJAAN : Pasang urinoirSATUAN PEMBAYARAN : bh

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 1.0000 45,000.00 45,000.00 2 Tukang Batu L07 Org/hr 1.0000 60,000.00 60,000.00 3 Kepala Tukang Batu L02 Org/hr 0.1000 70,000.00 7,000.00 4 Mandor L01 Org/hr 0.1000 80,000.00 8,000.00

JUMLAH HARGA TENAGA 120,000.00

B BAHAN

1 Urinoir Keramik M246 bh 1.0000 959,400.00 959,400.00 2 Perlengkapan 0.3000 287,820.00 86,346.00 3 Portland Cement (PC) M037 kg 6.0000 900.00 5,400.00 4 Pasir Pasang M002 m3 0.0100 60,000.00 600.00

JUMLAH HARGA BAHAN 1,051,746.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 1,171,746.00

Page 229: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : J.007JENIS PEKERJAAN : Pasang wastafel kw. ASATUAN PEMBAYARAN : bh

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 1.2000 45,000.00 54,000.00 2 Tukang Batu L07 Org/hr 1.4500 60,000.00 87,000.00 3 Kepala Tukang Batu L02 Org/hr 0.1500 70,000.00 10,500.00 4 Mandor L01 Org/hr 0.1000 80,000.00 8,000.00

JUMLAH HARGA TENAGA 159,500.00

B BAHAN

1 Wastafel Komplit (Kran + Sipon ) Kw. M248 Unit 1.0000 387,450.00 387,450.00 2 Perlengkapan 0.1200 46,494.00 5,579.28 3 Portland Cement (PC) M037 kg 6.0000 900.00 5,400.00 4 Pasir Pasang M002 m3 0.0100 60,000.00 600.00

JUMLAH HARGA BAHAN 399,029.28

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 558,529.28

ANALISA HARGA SATUAN

KODE ANALISA : J.008JENIS PEKERJAAN : Pasang wastafel luxSATUAN PEMBAYARAN : bh

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 1.2000 45,000.00 54,000.00 2 Tukang Batu L07 Org/hr 1.4500 60,000.00 87,000.00 3 Kepala Tukang Batu L02 Org/hr 0.1500 70,000.00 10,500.00 4 Mandor L01 Org/hr 0.1000 80,000.00 8,000.00

JUMLAH HARGA TENAGA 159,500.00

B BAHAN

1 Wastafel Komplit (Kran + Sipon ) Lux M247 Unit 1.0000 1,172,600.00 1,172,600.00 2 Perlengkapan 0.1200 140,712.00 16,885.44 3 Portland Cement (PC) M037 kg 6.0000 900.00 5,400.00 4 Pasir Pasang M002 m3 0.0100 60,000.00 600.00

JUMLAH HARGA BAHAN 1,195,485.44

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 1,354,985.44

Page 230: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : J.009JENIS PEKERJAAN : Pasang tempat sabun keramikSATUAN PEMBAYARAN : bh

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0100 45,000.00 450.00 2 Tukang Batu L07 Org/hr 0.1000 60,000.00 6,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0100 70,000.00 700.00 4 Mandor L01 Org/hr 0.0050 80,000.00 400.00

JUMLAH HARGA TENAGA 7,550.00

B BAHAN

1 Tempat Sabun Keramik M249 bh 1.0000 26,650.00 26,650.00

JUMLAH HARGA BAHAN 26,650.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 34,200.00

ANALISA HARGA SATUAN

KODE ANALISA : J.010JENIS PEKERJAAN : Pasang bak mandi teraso volume 0.3 m3SATUAN PEMBAYARAN : bh

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 2.1000 45,000.00 94,500.00 2 Tukang Batu L07 Org/hr 0.7500 60,000.00 45,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0700 70,000.00 4,900.00 4 Mandor L01 Org/hr 0.1100 80,000.00 8,800.00

JUMLAH HARGA TENAGA 153,200.00

B BAHAN

1 Bak Mandi Teraso M237 bh 1.0000 120,820.00 120,820.00 2 Portland Cement (PC) M037 kg 6.0000 900.00 5,400.00 3 Pasir Pasang M002 m3 0.0100 60,000.00 600.00

JUMLAH HARGA BAHAN 126,820.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 280,020.00

Page 231: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : J.011JENIS PEKERJAAN : Pasang bak mandi fibreglass volume 0.3 m3SATUAN PEMBAYARAN : bh

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 1.8000 45,000.00 81,000.00 2 Tukang Batu L07 Org/hr 2.7000 60,000.00 162,000.00 3 Kepala Tukang Batu L02 Org/hr 0.5400 70,000.00 37,800.00 4 Mandor L01 Org/hr 0.1100 80,000.00 8,800.00

JUMLAH HARGA TENAGA 289,600.00

B BAHAN

1 Bak Mandi Fibre M238 bh 1.0000 293,150.00 293,150.00 2 Perlengkapan 0.1800 52,767.00 9,498.06

JUMLAH HARGA BAHAN 302,648.06

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 592,248.06

ANALISA HARGA SATUAN

KODE ANALISA : J.012JENIS PEKERJAAN : Pasang bak mandi batu bata volume 0.3 m3SATUAN PEMBAYARAN : bh

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 6.0000 45,000.00 270,000.00 2 Tukang Batu L07 Org/hr 3.0000 60,000.00 180,000.00 3 Kepala Tukang Batu L02 Org/hr 0.3000 70,000.00 21,000.00 4 Mandor L01 Org/hr 0.3000 80,000.00 24,000.00

JUMLAH HARGA TENAGA 495,000.00

B BAHAN

1 Bata Merah M022 bh 0.4000 250.00 100.00 2 Portland Cement (PC) M037 kg 120.0000 900.00 108,000.00 3 Pasir Pasang M002 m3 0.3000 60,000.00 18,000.00 4 Porselin 10 x 20 cm warna M331 bh 220.0000 870.00 191,400.00 5 Portland Cement (PC) Warna M039 kg 6.0000 6,500.00 39,000.00

JUMLAH HARGA BAHAN 356,500.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 851,500.00

Page 232: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : J.013JENIS PEKERJAAN : Pasang badkip porselenSATUAN PEMBAYARAN : bh

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr - 45,000.00 - 2 Tukang Batu L07 Org/hr 0.0750 60,000.00 4,500.00 3 Kepala Tukang Batu L02 Org/hr 0.7500 70,000.00 52,500.00 4 Mandor L01 Org/hr 0.2500 80,000.00 20,000.00

JUMLAH HARGA TENAGA 77,000.00

B BAHAN

1 Badkip Porselen M244 bh 1.0000 799,500.00 799,500.00

JUMLAH HARGA BAHAN 799,500.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 876,500.00

ANALISA HARGA SATUAN

KODE ANALISA : J.014JENIS PEKERJAAN : Pasang bak beton volume 1.0 m3, head 2.5 m SATUAN PEMBAYARAN : bh

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 3.5000 45,000.00 157,500.00 2 Tukang Batu L07 Org/hr 4.5000 60,000.00 270,000.00 3 Kepala Tukang Batu L02 Org/hr 0.9000 70,000.00 63,000.00 4 Mandor L01 Org/hr 0.9000 80,000.00 72,000.00

JUMLAH HARGA TENAGA 562,500.00

B BAHAN

1 Beton bertulang 1 pc : 1.5 ps : 2.5 kr 0.9000 - - 2 Besi Beton Polos M112 kg 180.0000 8,500.00 1,530,000.00 3 Papan (2x20) cm M057 m3 0.8000 Err:509 Err:5094 Porselin 10 x 20 cm warna M331 bh 250.0000 820.00 205,000.00 5 Perlengkapan 0.1000 Err:509 Err:509

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

m3

Page 233: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : J.015JENIS PEKERJAAN : Pasang pipa penyalur air limbah jenis pipa tanah, diameter 15 cmSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0600 45,000.00 2,700.00 2 Tukang Batu L07 Org/hr 0.0300 60,000.00 1,800.00 3 Kepala Tukang Batu L02 Org/hr 0.0030 70,000.00 210.00 4 Mandor L01 Org/hr 0.0025 80,000.00 200.00

JUMLAH HARGA TENAGA 4,910.00

B BAHAN

1 Pipa PVC tipe AW Dia 6 " M342 Ljr 0.2667 472,780.00 126,074.67 2 Portland Cement (PC) M037 kg 0.6800 900.00 612.00 3 Pasir Pasang M002 m3 0.0130 60,000.00 780.00 4 Pasir Urug M001 m3 0.0110 96,600.00 1,062.60

JUMLAH HARGA BAHAN 128,529.27

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 133,439.27

ANALISA HARGA SATUAN

KODE ANALISA : J.016JENIS PEKERJAAN : Pasang pipa penyalur air limbah jenis pipa tanah, diameter 20 cmSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0800 45,000.00 3,600.00 2 Tukang Batu L07 Org/hr 0.0400 60,000.00 2,400.00 3 Kepala Tukang Batu L02 Org/hr 0.0040 70,000.00 280.00 4 Mandor L01 Org/hr 0.0070 80,000.00 560.00

JUMLAH HARGA TENAGA 6,840.00

B BAHAN

1 Pipa PVC tipe AW Dia 8 " M343 Ljr 0.2667 722,436.00 192,649.60 2 Portland Cement (PC) M037 kg 0.8700 900.00 783.00 3 Pasir Pasang M002 m3 0.0140 60,000.00 840.00 4 Pasir Urug M001 m3 0.0140 96,600.00 1,352.40

JUMLAH HARGA BAHAN 195,625.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 202,465.00

: m1

: m1

Page 234: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : J.017JENIS PEKERJAAN : Pasang pipa beton, diameter 20 cmSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1400 45,000.00 6,300.00 2 Tukang Batu L07 Org/hr 0.0700 60,000.00 4,200.00 3 Kepala Tukang Batu L02 Org/hr 0.0070 70,000.00 490.00 4 Mandor L01 Org/hr 0.0070 80,000.00 560.00

JUMLAH HARGA TENAGA 11,550.00

B BAHAN

1 Buis Beton Dia 0.20 m M044 bh 1.1000 32,500.00 35,750.00 2 Bata Merah M022 bh 12.1500 250.00 3,037.50 3 Portland Cement (PC) M037 kg 3.9200 900.00 3,528.00 4 Pasir Pasang M002 m3 0.0560 60,000.00 3,360.00 5 Pasir Urug M001 m3 0.0240 96,600.00 2,318.40

JUMLAH HARGA BAHAN 47,993.90

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 59,543.90

ANALISA HARGA SATUAN

KODE ANALISA : J.018JENIS PEKERJAAN : Pasang pipa beton, diameter 30 cmSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.3800 45,000.00 17,100.00 2 Tukang Batu L07 Org/hr 0.1900 60,000.00 11,400.00 3 Kepala Tukang Batu L02 Org/hr 0.0190 70,000.00 1,330.00 4 Mandor L01 Org/hr 0.0190 80,000.00 1,520.00

JUMLAH HARGA TENAGA 31,350.00

B BAHAN

1 Buis Beton Dia 0.30 m M045 bh 1.100 40,890.00 44,979.000 2 Bata Merah M022 bh 74.250 250.00 18,562.500 3 Portland Cement (PC) M037 kg 3.090 900.00 2,781.000 4 Pasir Pasang M002 m3 0.018 60,000.00 1,098.000 5 Pasir Urug M001 m3 0.021 96,600.00 1,999.620

JUMLAH HARGA BAHAN 69,420.12

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 100,770.12

: m1

: m1

Page 235: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : J.019JENIS PEKERJAAN : Pasang pipa beton, diameter 40 cm SATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.3800 45,000.00 17,100.00 2 Tukang Batu L07 Org/hr 0.1900 60,000.00 11,400.00 3 Kepala Tukang Batu L02 Org/hr 0.0190 70,000.00 1,330.00 4 Mandor L01 Org/hr 0.0190 80,000.00 1,520.00

JUMLAH HARGA TENAGA 31,350.00

B BAHAN

1 Buis Beton Dia 0.40 m M046 bh 1.100 51,000.00 56,100.000 2 Bata Merah M022 bh 99.000 250.00 24,750.000 3 Portland Cement (PC) M037 kg 4.120 900.00 3,708.000 4 Pasir Pasang M002 m3 0.024 60,000.00 1,464.000 5 Pasir Urug M001 m3 0.028 96,600.00 2,666.160

JUMLAH HARGA BAHAN 88,688.16

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 120,038.16

ANALISA HARGA SATUAN

KODE ANALISA : J.020JENIS PEKERJAAN : Pasang pipa beton, diameter 50 cm SATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.3800 45,000.00 17,100.00 2 Tukang Batu L07 Org/hr 0.1900 60,000.00 11,400.00 3 Kepala Tukang Batu L02 Org/hr 0.0190 70,000.00 1,330.00 4 Mandor L01 Org/hr 0.0190 80,000.00 1,520.00

JUMLAH HARGA TENAGA 31,350.00

B BAHAN

1 Buis Beton Dia 0.50 m M047 bh 1.100 67,500.00 74,250.000 2 Bata Merah M022 bh 123.750 250.00 30,937.500 3 Portland Cement (PC) M037 kg 5.150 900.00 4,635.000 4 Pasir Pasang M002 m3 0.031 60,000.00 1,830.000 5 Pasir Urug M001 m3 0.035 96,600.00 3,332.700

JUMLAH HARGA BAHAN 114,985.20

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 146,335.20

: m1

: m1

Page 236: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : J.021JENIS PEKERJAAN : Pasang pipa beton, diameter 60 cm SATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.3800 45,000.00 17,100.00 2 Tukang Batu L07 Org/hr 0.1900 60,000.00 11,400.00 3 Kepala Tukang Batu L02 Org/hr 0.0190 70,000.00 1,330.00 4 Mandor L01 Org/hr 0.0190 80,000.00 1,520.00

JUMLAH HARGA TENAGA 31,350.00

B BAHAN

1 Buis Beton Dia 0.60 m M048 bh 1.100 91,840.00 101,024.000 2 Bata Merah M022 bh 148.500 250.00 37,125.000 3 Portland Cement (PC) M037 kg 6.180 900.00 5,562.000 4 Pasir Pasang M002 m3 0.037 60,000.00 2,196.000 5 Pasir Urug M001 m3 0.041 96,600.00 3,999.240

JUMLAH HARGA BAHAN 149,906.24

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 181,256.24

ANALISA HARGA SATUAN

KODE ANALISA : J.022JENIS PEKERJAAN : Pasang pipa beton, diameter 80 cmSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.3800 45,000.00 17,100.00 2 Tukang Batu L07 Org/hr 0.1900 60,000.00 11,400.00 3 Kepala Tukang Batu L02 Org/hr 0.0190 70,000.00 1,330.00 4 Mandor L01 Org/hr 0.0190 80,000.00 1,520.00

JUMLAH HARGA TENAGA 31,350.00

B BAHAN

1 Buis Beton Dia 0.80 m M049 bh 1.100 157,540.00 173,294.000 2 Bata Merah M022 bh 198.000 250.00 49,500.000 3 Portland Cement (PC) M037 kg 8.240 900.00 7,416.000 4 Pasir Pasang M002 m3 0.049 60,000.00 2,928.000 5 Pasir Urug M001 m3 0.055 96,600.00 5,332.320

JUMLAH HARGA BAHAN 238,470.32

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 269,820.32

: m1

: m1

Page 237: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : J.023JENIS PEKERJAAN : Pasang pipa beton, diameter 90 cm SATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.3800 45,000.00 17,100.00 2 Tukang Batu L07 Org/hr 0.1900 60,000.00 11,400.00 3 Kepala Tukang Batu L02 Org/hr 0.0190 70,000.00 1,330.00 4 Mandor L01 Org/hr 0.0190 80,000.00 1,520.00

JUMLAH HARGA TENAGA 31,350.00

B BAHAN

1 Buis Beton Dia 0.90 m M050 bh 1.100 183,780.00 202,158.000 2 Bata Merah M022 bh 222.750 250.00 55,687.500 3 Portland Cement (PC) M037 kg 9.270 900.00 8,343.000 4 Pasir Pasang M002 m3 0.055 60,000.00 3,294.000 5 Pasir Urug M001 m3 0.062 96,600.00 5,998.860

JUMLAH HARGA BAHAN 275,481.36

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 306,831.36

ANALISA HARGA SATUAN

KODE ANALISA : J.024JENIS PEKERJAAN : Pasang pipa beton, diameter 100 cm SATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.3800 45,000.00 17,100.00 2 Tukang Batu L07 Org/hr 0.1900 60,000.00 11,400.00 3 Kepala Tukang Batu L02 Org/hr 0.0190 70,000.00 1,330.00 4 Mandor L01 Org/hr 0.0190 80,000.00 1,520.00

JUMLAH HARGA TENAGA 31,350.00

B BAHAN

1 Buis Beton Dia 1.00 m M051 bh 1.100 207,460.00 228,206.000 2 Bata Merah M022 bh 247.500 250.00 61,875.000 3 Portland Cement (PC) M037 kg 10.300 900.00 9,270.000 4 Pasir Pasang M002 m3 0.061 60,000.00 3,660.000 5 Pasir Urug M001 m3 0.069 96,600.00 6,665.400

JUMLAH HARGA BAHAN 309,676.40

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 341,026.40

: m1

: m1

Page 238: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : J.025JENIS PEKERJAAN : Pasang pipa beton U, diameter 20SATUAN PEMBAYARAN : m1

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1400 45,000.00 6,300.00 2 Tukang Batu L07 Org/hr 0.0700 60,000.00 4,200.00 3 Kepala Tukang Batu L02 Org/hr 0.0070 70,000.00 490.00 4 Mandor L01 Org/hr 0.0070 80,000.00 560.00

JUMLAH HARGA TENAGA 11,550.00

B BAHAN

1 Buis Beton U Dia 0.20 m M052 bh 1.1000 30,000.00 33,000.00 2 Bata Merah M022 bh 12.1500 250.00 3,037.50 3 Portland Cement (PC) M037 kg 3.9200 900.00 3,528.00 4 Pasir Pasang M002 m3 0.0560 60,000.00 3,360.00 5 Pasir Urug M001 m3 0.0240 96,600.00 2,318.40

JUMLAH HARGA BAHAN 45,243.90

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 56,793.90

ANALISA HARGA SATUAN

KODE ANALISA : J.026JENIS PEKERJAAN : Pasang pipa beton U, diameter 30SATUAN PEMBAYARAN : m1

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.3800 45,000.00 17,100.00 2 Tukang Batu L07 Org/hr 0.1900 60,000.00 11,400.00 3 Kepala Tukang Batu L02 Org/hr 0.0190 70,000.00 1,330.00 4 Mandor L01 Org/hr 0.0190 80,000.00 1,520.00

JUMLAH HARGA TENAGA 31,350.00

B BAHAN

1 Buis Beton U Dia 0.30 m M053 bh 1.1000 35,000.00 38,500.00 2 Bata Merah M022 bh 123.7500 250.00 30,937.50 3 Portland Cement (PC) M037 kg 5.1500 900.00 4,635.00 4 Pasir Pasang M002 m3 0.0305 60,000.00 1,830.00 5 Pasir Urug M001 m3 0.0345 96,600.00 3,332.70

JUMLAH HARGA BAHAN 79,235.20

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 110,585.20

Page 239: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : J.027JENIS PEKERJAAN : Pasang bak kontrol pasangan batu bata

ukuran (30 x 30) tinggi 35 cm SATUAN PEMBAYARAN : bh

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 1.2200 45,000.00 54,900.00 2 Tukang Batu L07 Org/hr 0.2730 60,000.00 16,380.00 3 Kepala Tukang Batu L02 Org/hr 0.0270 70,000.00 1,890.00 4 Mandor L01 Org/hr 0.0405 80,000.00 3,240.00

JUMLAH HARGA TENAGA 76,410.00

B BAHAN

1 Bata Merah M022 bh 65.2500 250.00 16,312.50 2 Portland Cement (PC) M037 kg 44.0000 900.00 39,600.00 3 Pasir Pasang M002 m3 0.0700 60,000.00 4,200.00 4 Stenslah/batu pecah tangan 2/3 M014 m3 0.0700 156,975.00 10,988.25 5 Besi Beton Polos M112 kg 1.6000 8,500.00 13,600.00 6 Pasir Cor M004 m3 0.0600 110,000.00 6,600.00

JUMLAH HARGA BAHAN 91,300.75

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 167,710.75

ANALISA HARGA SATUAN

KODE ANALISA : J.028JENIS PEKERJAAN : Pasang bak kontrol pasangan batu bata

ukuran (45 x 45) tinggi 50 cm SATUAN PEMBAYARAN : bh

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 1.4200 45,000.00 63,900.00 2 Tukang Batu L07 Org/hr 0.4730 60,000.00 28,380.00 3 Kepala Tukang Batu L02 Org/hr 0.0470 70,000.00 3,290.00 4 Mandor L01 Org/hr 0.0710 80,000.00 5,680.00

JUMLAH HARGA TENAGA 101,250.00

B BAHAN

1 Bata Merah M022 bh 112.5000 250.00 28,125.00 2 Portland Cement (PC) M037 kg 77.0000 900.00 69,300.00 3 Pasir Pasang M002 m3 0.1300 60,000.00 7,800.00 4 Stenslah/batu pecah tangan 2/3 M014 m3 0.0200 156,975.00 3,139.50 5 Besi Beton Polos M112 kg 2.6000 8,500.00 22,100.00 6 Pasir Cor M004 m3 0.0900 110,000.00 9,900.00

JUMLAH HARGA BAHAN 140,364.50

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 241,614.50

Page 240: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : J.029JENIS PEKERJAAN : Pasang bak kontrol pasangan batu bata

ukuran (60 x 60) tinggi 65 cm SATUAN PEMBAYARAN : bh

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 2.1600 45,000.00 97,200.00 2 Tukang Batu L07 Org/hr 0.7200 60,000.00 43,200.00 3 Kepala Tukang Batu L02 Org/hr 0.0720 70,000.00 5,040.00 4 Mandor L01 Org/hr 0.1080 80,000.00 8,640.00

JUMLAH HARGA TENAGA 154,080.00

B BAHAN

1 Bata Merah M022 bh 166.9500 250.00 41,737.50 2 Portland Cement (PC) M037 kg 114.0000 900.00 102,600.00 3 Pasir Pasang M002 m3 0.1840 60,000.00 11,040.00 4 Stenslah/batu pecah tangan 2/3 M014 m3 0.0330 156,975.00 5,180.18 5 Besi Beton Polos M112 kg 4.8500 8,500.00 41,225.00 6 Pasir Cor M004 m3 0.1200 110,000.00 13,200.00

JUMLAH HARGA BAHAN 214,982.68

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 369,062.68

ANALISA HARGA SATUAN

KODE ANALISA : J.030JENIS PEKERJAAN : Pasang pipa galvanis, diameter 1/2"SATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0540 45,000.00 2,430.00 2 Tukang Batu L07 Org/hr 0.0900 60,000.00 5,400.00 3 Kepala Tukang Batu L02 Org/hr 0.0090 70,000.00 630.00 4 Mandor L01 Org/hr 0.0270 80,000.00 2,160.00

JUMLAH HARGA TENAGA 10,620.00

B BAHAN

1 Pipa Galvanis Ø 1/2 ", tebal 1.8 mm M376 Ljr 0.3000 127,500.00 38,250.00 2 Perlengkapan 0.3500 44,625.00 15,618.75

JUMLAH HARGA BAHAN 53,868.75

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 64,488.75

: m1

Page 241: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : J.031JENIS PEKERJAAN : Pasang pipa galvanis, diameter 3/4"SATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0540 45,000.00 2,430.00 2 Tukang Batu L07 Org/hr 0.0900 60,000.00 5,400.00 3 Kepala Tukang Batu L02 Org/hr 0.0090 70,000.00 630.00 4 Mandor L01 Org/hr 0.0270 80,000.00 2,160.00

JUMLAH HARGA TENAGA 10,620.00

B BAHAN

1 Pipa Galvanis Ø 3/4 ", tebal 1.8 mm M377 Ljr 0.300 165,000.00 49,500.00 2 Perlengkapan 0.350 57,750.00 20,212.50

JUMLAH HARGA BAHAN 69,712.50

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 80,332.50

ANALISA HARGA SATUAN

KODE ANALISA : J.032JENIS PEKERJAAN : Pasang pipa galvanis, diameter 1"SATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0540 45,000.00 2,430.00 2 Tukang Batu L07 Org/hr 0.0900 60,000.00 5,400.00 3 Kepala Tukang Batu L02 Org/hr 0.0090 70,000.00 630.00 4 Mandor L01 Org/hr 0.0270 80,000.00 2,160.00

JUMLAH HARGA TENAGA 10,620.00

B BAHAN

1 Pipa Galvanis Ø 1", tebal 2 mm M378 Ljr 0.300 225,000.00 67,500.00 2 Perlengkapan 0.350 78,750.00 27,562.50

JUMLAH HARGA BAHAN 95,062.50

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 105,682.50

: m1

: m1

Page 242: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : J.033JENIS PEKERJAAN : Pasang pipa galvanis, diameter 1 1/2"SATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1080 45,000.00 4,860.00 2 Tukang Batu L07 Org/hr 0.1800 60,000.00 10,800.00 3 Kepala Tukang Batu L02 Org/hr 0.0180 70,000.00 1,260.00 4 Mandor L01 Org/hr 0.0054 80,000.00 432.00

JUMLAH HARGA TENAGA 17,352.00

B BAHAN

1 Pipa Galvanis Ø 1.5 ", tebal 2 mm M379 Ljr 0.3000 330,000.00 99,000.00 2 Perlengkapan 0.3500 115,500.00 40,425.000

JUMLAH HARGA BAHAN 139,425.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 156,777.00

ANALISA HARGA SATUAN

KODE ANALISA : J.034JENIS PEKERJAAN : Pasang pipa galvanis, diameter 2"SATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1080 45,000.00 4,860.00 2 Tukang Batu L07 Org/hr 0.1800 60,000.00 10,800.00 3 Kepala Tukang Batu L02 Org/hr 0.0180 70,000.00 1,260.00 4 Mandor L01 Org/hr 0.0054 80,000.00 432.00

JUMLAH HARGA TENAGA 17,352.00

B BAHAN

1 Pipa Galvanis Ø 2 ", tebal 2.3 mm M380 Ljr 0.3000 472,500.00 141,750.00 2 Perlengkapan 0.3500 165,375.00 57,881.25

JUMLAH HARGA BAHAN 199,631.25

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 216,983.25

: m1

: m1

Page 243: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : J.035JENIS PEKERJAAN : Pasang pipa galvanis, diameter 2 1/2"SATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1080 45,000.00 4,860.00 2 Tukang Batu L07 Org/hr 0.1800 60,000.00 10,800.00 3 Kepala Tukang Batu L02 Org/hr 0.0180 70,000.00 1,260.00 4 Mandor L01 Org/hr 0.0054 80,000.00 432.00

JUMLAH HARGA TENAGA 17,352.00

B BAHAN

1 Pipa Galvanis Ø 2.5 ", tebal 2.5 mm M381 Ljr 0.300 660,000.00 198,000.00 2 Perlengkapan 0.350 231,000.00 80,850.00

JUMLAH HARGA BAHAN 278,850.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 296,202.00

ANALISA HARGA SATUAN

KODE ANALISA : J.036JENIS PEKERJAAN : Pasang pipa galvanis, diameter 3"SATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1080 45,000.00 4,860.00 2 Tukang Batu L07 Org/hr 0.1800 60,000.00 10,800.00 3 Kepala Tukang Batu L02 Org/hr 0.0180 70,000.00 1,260.00 4 Mandor L01 Org/hr 0.0054 80,000.00 432.00

JUMLAH HARGA TENAGA 17,352.00

B BAHAN

1 Pipa Galvanis Ø 3 ", tebal 2.5 mm M382 Ljr 0.3000 750,000.00 225,000.00 2 Perlengkapan 0.3500 262,500.00 91,875.00

JUMLAH HARGA BAHAN 316,875.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 334,227.00

: m1

: m1

Page 244: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : J.037JENIS PEKERJAAN : Pasang pipa galvanis, diameter 4"SATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1350 45,000.00 6,075.00 2 Tukang Batu L07 Org/hr 0.2250 60,000.00 13,500.00 3 Kepala Tukang Batu L02 Org/hr 0.0225 70,000.00 1,575.00 4 Mandor L01 Org/hr 0.0068 80,000.00 544.00

JUMLAH HARGA TENAGA 21,694.00

B BAHAN

1 Pipa Galvanis Ø 4 ", tebal 2.8 mm M383 Ljr 0.3000 1,102,500.00 330,750.00 2 Perlengkapan 0.3500 385,875.00 135,056.25

JUMLAH HARGA BAHAN 465,806.25

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 487,500.25

ANALISA HARGA SATUAN

KODE ANALISA : J.038JENIS PEKERJAAN : Pasang pipa PVC tipe AW, diameter 1/2"SATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0360 45,000.00 1,620.00 2 Tukang Batu L07 Org/hr 0.0600 60,000.00 3,600.00 3 Kepala Tukang Batu L02 Org/hr 0.0060 70,000.00 420.00 4 Mandor L01 Org/hr 0.0018 80,000.00 144.00

JUMLAH HARGA TENAGA 5,784.00

B BAHAN

1 Pipa PVC tipe AW Dia 1/2 " M334 Ljr 0.3000 28,700.00 8,610.00 2 Perlengkapan 0.3500 10,045.00 3,515.75

JUMLAH HARGA BAHAN 12,125.75

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 17,909.75

: m1

: m1

Page 245: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : J.039JENIS PEKERJAAN : Pasang pipa PVC tipe AW, diameter 3/4"SATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0360 45,000.00 1,620.00 2 Tukang Batu L07 Org/hr 0.0600 60,000.00 3,600.00 3 Kepala Tukang Batu L02 Org/hr 0.0060 70,000.00 420.00 4 Mandor L01 Org/hr 0.0018 80,000.00 144.00

JUMLAH HARGA TENAGA 5,784.00

B BAHAN

1 Pipa PVC tipe AW Dia 3/4 " M335 Ljr 0.3000 42,790.00 12,837.00 2 Perlengkapan 0.3500 14,976.50 5,241.77

JUMLAH HARGA BAHAN 18,078.77

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 23,862.77

ANALISA HARGA SATUAN

KODE ANALISA : J.040JENIS PEKERJAAN : Pasang pipa PVC tipe AW, diameter 1"SATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0360 45,000.00 1,620.00 2 Tukang Batu L07 Org/hr 0.0600 60,000.00 3,600.00 3 Kepala Tukang Batu L02 Org/hr 0.0060 70,000.00 420.00 4 Mandor L01 Org/hr 0.0018 80,000.00 144.00

JUMLAH HARGA TENAGA 5,784.00

B BAHAN

1 Pipa PVC tipe AW Dia 1" M336 Ljr 0.300 56,110.00 16,833.00 2 Perlengkapan 0.350 19,638.50 6,873.47

JUMLAH HARGA BAHAN 23,706.48

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 29,490.48

: m1

: m1

Page 246: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : J.041JENIS PEKERJAAN : Pasang pipa PVC tipe AW, diameter 1 1/2"SATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0360 45,000.00 1,620.00 2 Tukang Batu L07 Org/hr 0.0600 60,000.00 3,600.00 3 Kepala Tukang Batu L02 Org/hr 0.0060 70,000.00 420.00 4 Mandor L01 Org/hr 0.0018 80,000.00 144.00

JUMLAH HARGA TENAGA 5,784.00

B BAHAN

1 Pipa PVC tipe AW Dia 1.5 " M337 Ljr 0.3000 75,330.00 22,599.00 2 Perlengkapan 0.3500 26,365.50 9,227.93

JUMLAH HARGA BAHAN 31,826.93

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 37,610.93

ANALISA HARGA SATUAN

KODE ANALISA : J.042JENIS PEKERJAAN : Pasang pipa PVC tipe AW, diameter 2"SATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0540 45,000.00 2,430.00 2 Tukang Batu L07 Org/hr 0.0900 60,000.00 5,400.00 3 Kepala Tukang Batu L02 Org/hr 0.0090 70,000.00 630.00 4 Mandor L01 Org/hr 0.0027 80,000.00 216.00

JUMLAH HARGA TENAGA 8,676.00

B BAHAN

1 Pipa PVC tipe AW Dia 2 " M338 Ljr 0.3000 95,830.00 28,749.00 2 Perlengkapan 0.3500 33,540.50 11,739.18

JUMLAH HARGA BAHAN 40,488.18

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 49,164.18

: m1

: m1

Page 247: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : J.043JENIS PEKERJAAN : Pasang pipa PVC tipe AW, diameter 2.5"SATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0540 45,000.00 2,430.00 2 Tukang Batu L07 Org/hr 0.0900 60,000.00 5,400.00 3 Kepala Tukang Batu L02 Org/hr 0.0090 70,000.00 630.00 4 Mandor L01 Org/hr 0.0027 80,000.00 216.00

JUMLAH HARGA TENAGA 8,676.00

B BAHAN

1 Pipa PVC tipe AW Dia 2.5 " M339 Ljr 0.3000 123,000.00 36,900.00 2 Perlengkapan 0.3500 43,050.00 15,067.50

JUMLAH HARGA BAHAN 51,967.50

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 60,643.50

ANALISA HARGA SATUAN

KODE ANALISA : J.044JENIS PEKERJAAN : Pasang pipa PVC tipe AW, diameter 3"SATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0810 45,000.00 3,645.00 2 Tukang Batu L07 Org/hr 0.1350 60,000.00 8,100.00 3 Kepala Tukang Batu L02 Org/hr 0.0135 70,000.00 945.00 4 Mandor L01 Org/hr 0.0041 80,000.00 328.00

JUMLAH HARGA TENAGA 13,018.00

B BAHAN

1 Pipa PVC tipe AW Dia 3 " M340 Ljr 0.3000 173,730.00 52,119.00 2 Perlengkapan 0.3500 60,805.50 21,281.92

JUMLAH HARGA BAHAN 73,400.92

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 86,418.92

: m1

: m1

Page 248: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : J.045JENIS PEKERJAAN : Pasang pipa PVC tipe AW, diameter 4"SATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0810 45,000.00 3,645.00 2 Tukang Batu L07 Org/hr 0.1350 60,000.00 8,100.00 3 Kepala Tukang Batu L02 Org/hr 0.0135 70,000.00 945.00 4 Mandor L01 Org/hr 0.0041 80,000.00 328.00

JUMLAH HARGA TENAGA 13,018.00

B BAHAN

1 Pipa PVC tipe AW Dia 4 " M341 Ljr 0.3000 271,360.00 81,408.00 2 Perlengkapan 0.3500 94,976.00 33,241.60

JUMLAH HARGA BAHAN 114,649.60

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 127,667.60

ANALISA HARGA SATUAN

KODE ANALISA : J.046JENIS PEKERJAAN : Pasang pipa PVC tipe AW, diameter 6"SATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1215 45,000.00 5,467.50 2 Tukang Batu L07 Org/hr 0.2025 60,000.00 12,150.00 3 Kepala Tukang Batu L02 Org/hr 0.0203 70,000.00 1,421.00 4 Mandor L01 Org/hr 0.0062 80,000.00 492.00

JUMLAH HARGA TENAGA 19,530.50

B BAHAN

1 Pipa PVC tipe AW Dia 6 " M342 Ljr 0.3000 472,780.00 141,834.00 2 Perlengkapan 0.3500 165,473.00 57,915.55

JUMLAH HARGA BAHAN 199,749.55

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 219,280.05

: m1

: m1

Page 249: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : J.047JENIS PEKERJAAN : Pasang pipa PVC tipe AW, diameter 8"SATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1823 45,000.00 8,201.25 2 Tukang Batu L07 Org/hr 0.3038 60,000.00 18,225.00 3 Kepala Tukang Batu L02 Org/hr 0.0304 70,000.00 2,128.00 4 Mandor L01 Org/hr 0.0092 80,000.00 738.00

JUMLAH HARGA TENAGA 29,292.25

B BAHAN

1 Pipa PVC tipe AW Dia 8 " M343 Ljr 0.3000 722,436.00 216,730.80 2 Perlengkapan 0.3500 252,852.60 88,498.41

JUMLAH HARGA BAHAN 305,229.21

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 334,521.46

ANALISA HARGA SATUAN

KODE ANALISA : J.048JENIS PEKERJAAN : Pasang pipa PVC tipe D, diameter 1/2"SATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0360 45,000.00 1,620.00 2 Tukang Batu L07 Org/hr 0.0600 60,000.00 3,600.00 3 Kepala Tukang Batu L02 Org/hr 0.0060 70,000.00 420.00 4 Mandor L01 Org/hr 0.0018 80,000.00 144.00

JUMLAH HARGA TENAGA 5,784.00

B BAHAN

1 Pipa PVC tipe D Dia 1/2 " M344 Ljr 0.3000 14,350.00 4,305.00 2 Perlengkapan 0.3500 5,022.50 1,757.88

JUMLAH HARGA BAHAN 6,062.88

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 11,846.88

: m1

: m1

Page 250: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : J.049JENIS PEKERJAAN : Pasang pipa PVC tipe D, diameter 3/4"SATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0360 45,000.00 1,620.00 2 Tukang Batu L07 Org/hr 0.0600 60,000.00 3,600.00 3 Kepala Tukang Batu L02 Org/hr 0.0060 70,000.00 420.00 4 Mandor L01 Org/hr 0.0018 80,000.00 144.00

JUMLAH HARGA TENAGA 5,784.00

B BAHAN

1 Pipa PVC tipe D Dia 3/4 " M345 Ljr 0.3000 21,520.00 6,456.00 2 Perlengkapan 0.3500 7,532.00 2,636.20

JUMLAH HARGA BAHAN 9,092.20

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 14,876.20

ANALISA HARGA SATUAN

KODE ANALISA : J.050JENIS PEKERJAAN : Pasang pipa PVC tipe D, diameter 1"SATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0360 45,000.00 1,620.00 2 Tukang Batu L07 Org/hr 0.0600 60,000.00 3,600.00 3 Kepala Tukang Batu L02 Org/hr 0.0060 70,000.00 420.00 4 Mandor L01 Org/hr 0.0018 80,000.00 144.00

JUMLAH HARGA TENAGA 5,784.00

B BAHAN

1 Pipa PVC tipe D Dia 1" M346 Ljr 0.300 28,180.00 8,454.00 2 Perlengkapan 0.350 9,863.00 3,452.05

JUMLAH HARGA BAHAN 11,906.05

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 17,690.05

: m1

: m1

Page 251: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : J.051JENIS PEKERJAAN : Pasang pipa PVC tipe D, diameter 1 1/2"SATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0360 45,000.00 1,620.00 2 Tukang Batu L07 Org/hr 0.0600 60,000.00 3,600.00 3 Kepala Tukang Batu L02 Org/hr 0.0060 70,000.00 420.00 4 Mandor L01 Org/hr 0.0018 80,000.00 144.00

JUMLAH HARGA TENAGA 5,784.00

B BAHAN

1 Pipa PVC tipe D Dia 1.5 " M347 Ljr 0.3000 37,660.00 11,298.00 2 Perlengkapan 0.3500 13,181.00 4,613.35

JUMLAH HARGA BAHAN 15,911.35

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 21,695.35

ANALISA HARGA SATUAN

KODE ANALISA : J.052JENIS PEKERJAAN : Pasang pipa PVC tipe D, diameter 2"SATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0540 45,000.00 2,430.00 2 Tukang Batu L07 Org/hr 0.0900 60,000.00 5,400.00 3 Kepala Tukang Batu L02 Org/hr 0.0090 70,000.00 630.00 4 Mandor L01 Org/hr 0.0027 80,000.00 216.00

JUMLAH HARGA TENAGA 8,676.00

B BAHAN

1 Pipa PVC tipe D Dia 2 " M348 Ljr 0.3000 46,120.00 13,836.00 2 Perlengkapan 0.3500 16,142.00 5,649.70

JUMLAH HARGA BAHAN 19,485.70

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 28,161.70

: m1

: m1

Page 252: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : J.053JENIS PEKERJAAN : Pasang pipa PVC tipe D, diameter 2.5"SATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0540 45,000.00 2,430.00 2 Tukang Batu L07 Org/hr 0.0900 60,000.00 5,400.00 3 Kepala Tukang Batu L02 Org/hr 0.0090 70,000.00 630.00 4 Mandor L01 Org/hr 0.0027 80,000.00 216.00

JUMLAH HARGA TENAGA 8,676.00

B BAHAN

1 Pipa PVC tipe D Dia 2.5 " M349 Ljr 0.3000 67,130.00 20,139.00 2 Perlengkapan 0.3500 23,495.50 8,223.43

JUMLAH HARGA BAHAN 28,362.43

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 37,038.43

ANALISA HARGA SATUAN

KODE ANALISA : J.054JENIS PEKERJAAN : Pasang pipa PVC tipe D, diameter 3"SATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0810 45,000.00 3,645.00 2 Tukang Batu L07 Org/hr 0.1350 60,000.00 8,100.00 3 Kepala Tukang Batu L02 Org/hr 0.0135 70,000.00 945.00 4 Mandor L01 Org/hr 0.0041 80,000.00 328.00

JUMLAH HARGA TENAGA 13,018.00

B BAHAN

1 Pipa PVC tipe D Dia 3 " M350 Ljr 0.3000 97,370.00 29,211.00 2 Perlengkapan 0.3500 34,079.50 11,927.82

JUMLAH HARGA BAHAN 41,138.83

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 54,156.83

: m1

: m1

Page 253: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : J.055JENIS PEKERJAAN : Pasang pipa PVC tipe D, diameter 4"SATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0810 45,000.00 3,645.00 2 Tukang Batu L07 Org/hr 0.1350 60,000.00 8,100.00 3 Kepala Tukang Batu L02 Org/hr 0.0135 70,000.00 945.00 4 Mandor L01 Org/hr 0.0041 80,000.00 328.00

JUMLAH HARGA TENAGA 13,018.00

B BAHAN

1 Pipa PVC tipe D Dia 4 " M351 Ljr 0.3000 137,090.00 41,127.00 2 Perlengkapan 0.3500 47,981.50 16,793.52

JUMLAH HARGA BAHAN 57,920.52

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 70,938.53

ANALISA HARGA SATUAN

KODE ANALISA : J.056JENIS PEKERJAAN : Pasang pipa PVC tipe C, diameter 1/2"SATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0360 45,000.00 1,620.00 2 Tukang Batu L07 Org/hr 0.0600 60,000.00 3,600.00 3 Kepala Tukang Batu L02 Org/hr 0.0060 70,000.00 420.00 4 Mandor L01 Org/hr 0.0018 80,000.00 144.00

JUMLAH HARGA TENAGA 5,784.00

B BAHAN

1 Pipa PVC tipe C Dia 1/2 " M352 Ljr 0.3000 10,860.00 3,258.00 2 Perlengkapan 0.3500 3,801.00 1,330.35

JUMLAH HARGA BAHAN 4,588.35

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 10,372.35

: m1

: m1

Page 254: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : J.057JENIS PEKERJAAN : Pasang pipa PVC tipe C, diameter 3/4"SATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0360 45,000.00 1,620.00 2 Tukang Batu L07 Org/hr 0.0600 60,000.00 3,600.00 3 Kepala Tukang Batu L02 Org/hr 0.0060 70,000.00 420.00 4 Mandor L01 Org/hr 0.0018 80,000.00 144.00

JUMLAH HARGA TENAGA 5,784.00

B BAHAN

1 Pipa PVC tipe C Dia 3/4 " M353 Ljr 0.3000 16,090.00 4,827.00 2 Perlengkapan 0.3500 5,631.50 1,971.02

JUMLAH HARGA BAHAN 6,798.03

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 12,582.03

ANALISA HARGA SATUAN

KODE ANALISA : J.058JENIS PEKERJAAN : Pasang pipa PVC tipe C, diameter 1"SATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0360 45,000.00 1,620.00 2 Tukang Batu L07 Org/hr 0.0600 60,000.00 3,600.00 3 Kepala Tukang Batu L02 Org/hr 0.0060 70,000.00 420.00 4 Mandor L01 Org/hr 0.0018 80,000.00 144.00

JUMLAH HARGA TENAGA 5,784.00

B BAHAN

1 Pipa PVC tipe C Dia 1" M354 Ljr 0.300 21,110.00 6,333.00 2 Perlengkapan 0.350 7,388.50 2,585.97

JUMLAH HARGA BAHAN 8,918.97

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 14,702.97

: m1

: m1

Page 255: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : J.059JENIS PEKERJAAN : Pasang pipa PVC tipe C, diameter 1 1/2"SATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0360 45,000.00 1,620.00 2 Tukang Batu L07 Org/hr 0.0600 60,000.00 3,600.00 3 Kepala Tukang Batu L02 Org/hr 0.0060 70,000.00 420.00 4 Mandor L01 Org/hr 0.0018 80,000.00 144.00

JUMLAH HARGA TENAGA 5,784.00

B BAHAN

1 Pipa PVC tipe C Dia 1.5 " M355 Ljr 0.3000 28,290.00 8,487.00 2 Perlengkapan 0.3500 9,901.50 3,465.52

JUMLAH HARGA BAHAN 11,952.53

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 17,736.53

ANALISA HARGA SATUAN

KODE ANALISA : J.060JENIS PEKERJAAN : Pasang pipa PVC tipe C, diameter 2"SATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0540 45,000.00 2,430.00 2 Tukang Batu L07 Org/hr 0.0900 60,000.00 5,400.00 3 Kepala Tukang Batu L02 Org/hr 0.0090 70,000.00 630.00 4 Mandor L01 Org/hr 0.0027 80,000.00 216.00

JUMLAH HARGA TENAGA 8,676.00

B BAHAN

1 Pipa PVC tipe C Dia 2 " M356 Ljr 0.3000 38,130.00 11,439.00 2 Perlengkapan 0.3500 13,345.50 4,670.92

JUMLAH HARGA BAHAN 16,109.93

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 24,785.93

: m1

: m1

Page 256: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : J.061JENIS PEKERJAAN : Pasang pipa PVC tipe C, diameter 2.5"SATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0540 45,000.00 2,430.00 2 Tukang Batu L07 Org/hr 0.0900 60,000.00 5,400.00 3 Kepala Tukang Batu L02 Org/hr 0.0090 70,000.00 630.00 4 Mandor L01 Org/hr 0.0027 80,000.00 216.00

JUMLAH HARGA TENAGA 8,676.00

B BAHAN

1 Pipa PVC tipe C Dia 2.5 " M357 Ljr 0.3000 48,480.00 14,544.00 2 Perlengkapan 0.3500 16,968.00 5,938.80

JUMLAH HARGA BAHAN 20,482.80

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 29,158.80

ANALISA HARGA SATUAN

KODE ANALISA : J.062JENIS PEKERJAAN : Pasang pipa PVC tipe C, diameter 3"SATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0810 45,000.00 3,645.00 2 Tukang Batu L07 Org/hr 0.1350 60,000.00 8,100.00 3 Kepala Tukang Batu L02 Org/hr 0.0135 70,000.00 945.00 4 Mandor L01 Org/hr 0.0041 80,000.00 328.00

JUMLAH HARGA TENAGA 13,018.00

B BAHAN

1 Pipa PVC tipe C Dia 3 " M358 Ljr 0.3000 57,290.00 17,187.00 2 Perlengkapan 0.3500 20,051.50 7,018.03

JUMLAH HARGA BAHAN 24,205.03

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 37,223.03

: m1

: m1

Page 257: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : J.063JENIS PEKERJAAN : Pasang pipa PVC tipe C, diameter 4"SATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0810 45,000.00 3,645.00 2 Tukang Batu L07 Org/hr 0.1350 60,000.00 8,100.00 3 Kepala Tukang Batu L02 Org/hr 0.0135 70,000.00 945.00 4 Mandor L01 Org/hr 0.0041 80,000.00 328.00

JUMLAH HARGA TENAGA 13,018.00

B BAHAN

1 Pipa PVC tipe C Dia 4 " M359 Ljr 0.3000 72,980.00 21,894.00 2 Perlengkapan 0.3500 25,543.00 8,940.05

JUMLAH HARGA BAHAN 30,834.05

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 43,852.05

ANALISA HARGA SATUAN

KODE ANALISA : J.064JENIS PEKERJAAN : Pasang bak cuci piring stainles steelSATUAN PEMBAYARAN : bh

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0300 45,000.00 1,350.00 2 Tukang Batu L07 Org/hr 0.3000 60,000.00 18,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0300 70,000.00 2,100.00 4 Mandor L01 Org/hr 0.0015 80,000.00 120.00

JUMLAH HARGA TENAGA 21,570.00

B BAHAN

1 Bak Cuci Piring Stainless M243 bh 1.0000 265,800.00 265,800.00

JUMLAH HARGA BAHAN 265,800.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 287,370.00

: m1

Page 258: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : J.065JENIS PEKERJAAN : Pasang bak cuci piring terasoSATUAN PEMBAYARAN : bh

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0500 45,000.00 2,250.00 2 Tukang Batu L07 Org/hr 0.5000 60,000.00 30,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0500 70,000.00 3,500.00 4 Mandor L01 Org/hr 0.0025 80,000.00 200.00

JUMLAH HARGA TENAGA 35,950.00

B BAHAN

1 Bak Cuci Piring Teraso M242 bh 1.0000 186,550.00 186,550.00

JUMLAH HARGA BAHAN 186,550.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 222,500.00

ANALISA HARGA SATUAN

KODE ANALISA : J.066JENIS PEKERJAAN : Pasang kran diameter 1/2"SATUAN PEMBAYARAN : bh

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0100 45,000.00 450.00 2 Tukang Batu L07 Org/hr 0.1000 60,000.00 6,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0100 70,000.00 700.00 4 Mandor L01 Org/hr 0.0050 80,000.00 400.00

JUMLAH HARGA TENAGA 7,550.00

B BAHAN

1 Kran Air 1/2 " M235 bh 1.0000 33,470.00 33,470.00 2 Seal Tape / TBA M481 bh 0.0250 2,150.00 53.75

JUMLAH HARGA BAHAN 33,523.75

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 41,073.75

Page 259: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : J.067JENIS PEKERJAAN : Pasang kran diameter 3/4"SATUAN PEMBAYARAN : bh

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0100 45,000.00 450.00 2 Tukang Batu L07 Org/hr 0.1000 60,000.00 6,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0100 70,000.00 700.00 4 Mandor L01 Org/hr 0.0050 80,000.00 400.00

JUMLAH HARGA TENAGA 7,550.00

B BAHAN

1 Kran Air 3/4 " M236 bh 1.0000 37,310.00 37,310.00 2 Seal Tape / TBA M481 bh 0.0250 2,150.00 53.75

JUMLAH HARGA BAHAN 37,363.75

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 44,913.75

ANALISA HARGA SATUAN

KODE ANALISA : J.068JENIS PEKERJAAN : Pasang Afor Stainless SteelSATUAN PEMBAYARAN : bh

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0100 45,000.00 450.00 2 Tukang Batu L07 Org/hr 0.1000 60,000.00 6,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0100 70,000.00 700.00 4 Mandor L01 Org/hr 0.0050 80,000.00 400.00

JUMLAH HARGA TENAGA 7,550.00

B BAHAN

1 Afor Stainless M250 bh 1.0000 45,300.00 45,300.00

JUMLAH HARGA BAHAN 45,300.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 52,850.00

Page 260: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : J.069JENIS PEKERJAAN : Pasang Afor PlastikSATUAN PEMBAYARAN : bh

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0100 45,000.00 450.00 2 Tukang Batu L07 Org/hr 0.1000 60,000.00 6,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0100 70,000.00 700.00 4 Mandor L01 Org/hr 0.0050 80,000.00 400.00

JUMLAH HARGA TENAGA 7,550.00

B BAHAN

1 Afor Plastic M251 bh 1.0000 13,320.00 13,320.00

JUMLAH HARGA BAHAN 13,320.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 20,870.00

ANALISA HARGA SATUAN

KODE ANALISA : J.070JENIS PEKERJAAN : Pasang kaca wastafelSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0150 45,000.00 675.00 2 Tukang Batu L07 Org/hr 0.1500 60,000.00 9,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0150 70,000.00 1,050.00 4 Mandor L01 Org/hr 0.0008 80,000.00 60.00

JUMLAH HARGA TENAGA 10,785.00

B BAHAN

1 Kaca Cermin tebal 5 mm M278 m2 1.0000 123,760.00 123,760.00 2 Perlengkapan 0.1000 123,760.00 12,376.00

JUMLAH HARGA BAHAN 136,136.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 146,921.00

: m2

Page 261: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : J.071JENIS PEKERJAAN : Pasang pipa screen PVC tipe AW, diameter 3"SATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1620 45,000.00 7,290.00 2 Tukang Batu L07 Org/hr 0.2025 60,000.00 12,150.00 3 Kepala Tukang Batu L02 Org/hr 0.0169 70,000.00 1,181.25 4 Mandor L01 Org/hr 0.0041 80,000.00 328.00

JUMLAH HARGA TENAGA 20,949.25

B BAHAN

1 Pipa PVC tipe AW Dia 3 " M340 Ljr 0.3000 173,730.00 52,119.00 2 Perlengkapan 0.3500 60,805.50 21,281.92

JUMLAH HARGA BAHAN 73,400.92

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 94,350.17

ANALISA HARGA SATUAN

KODE ANALISA : J.072JENIS PEKERJAAN : Pasang pipa screen PVC tipe AW, diameter 4"SATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1620 45,000.00 7,290.00 2 Tukang Batu L07 Org/hr 0.2025 60,000.00 12,150.00 3 Kepala Tukang Batu L02 Org/hr 0.0169 70,000.00 1,181.25 4 Mandor L01 Org/hr 0.0041 80,000.00 328.00

JUMLAH HARGA TENAGA 20,949.25

B BAHAN

1 Pipa PVC tipe AW Dia 4 " M341 Ljr 0.3000 271,360.00 81,408.00 2 Perlengkapan 0.3500 94,976.00 33,241.60

JUMLAH HARGA BAHAN 114,649.60

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 135,598.85

: m1

: m1

Page 262: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : K.001JENIS PEKERJAAN : Pasang besi profilSATUAN PEMBAYARAN : kg

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0600 45,000.00 2,700.00 2 Tukang Besi/Baja L09 Org/hr 0.0060 60,000.00 360.00 3 Kepala Tukang Besi L04 Org/hr 0.0060 47,000.00 282.00 4 Mandor L01 Org/hr 0.0003 80,000.00 24.00

JUMLAH HARGA TENAGA 3,366.00

B BAHAN

1 Baja Profil M116 kg 1.1500 18,750.00 21,562.50 2 Elektroda M473 kg 0.0220 75,000.00 1,650.00

JUMLAH HARGA BAHAN 23,212.50

C PERALATAN

1 Sewa Mesin Las E05 hari 0.0220 400,000.00 8,800.00

JUMLAH HARGA PERALATAN 8,800.00

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 35,378.50

ANALISA HARGA SATUAN

KODE ANALISA : K.002JENIS PEKERJAAN : Pasang rangka kuda-kuda baja WFSATUAN PEMBAYARAN : kg

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0600 45,000.00 2,700.00 2 Tukang Besi/Baja L09 Org/hr 0.0060 60,000.00 360.00 3 Kepala Tukang Besi L04 Org/hr 0.0060 47,000.00 282.00 4 Mandor L01 Org/hr 0.0003 80,000.00 24.00

JUMLAH HARGA TENAGA 3,366.00

B BAHAN

1 Baja Profil M116 kg 1.1500 18,750.00 21,562.50 2 Elektroda M473 kg 0.0220 75,000.00 1,650.00

JUMLAH HARGA BAHAN 23,212.50

C PERALATAN

1 Sewa Mesin Las E05 hari 0.0220 400,000.00 8,800.00

JUMLAH HARGA PERALATAN 8,800.00

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 35,378.50

Page 263: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : K.003JENIS PEKERJAAN : Pemasangan baut anker bajaSATUAN PEMBAYARAN : kg

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0200 45,000.00 900.00 2 Tukang Besi/Baja L09 Org/hr 0.0300 60,000.00 1,800.00 3 Kepala Tukang Besi L04 Org/hr 47,000.00 - 4 Mandor L01 Org/hr 80,000.00 -

JUMLAH HARGA TENAGA 2,700.00

B BAHAN

1 Angker Bar M117 kg 1.0500 15,000.00 15,750.00

JUMLAH HARGA BAHAN 15,750.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 18,450.00

ANALISA HARGA SATUAN

KODE ANALISA : K.004JENIS PEKERJAAN : Ikatan angin/TrekstangSATUAN PEMBAYARAN : kg

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0600 45,000.00 2,700.00 2 Tukang Besi/Baja L09 Org/hr 0.0060 60,000.00 360.00 3 Kepala Tukang Besi L04 Org/hr 0.0060 47,000.00 282.00 4 Mandor L01 Org/hr 0.0003 80,000.00 24.00

JUMLAH HARGA TENAGA 3,366.00

B BAHAN

1 Besi Beton Polos M112 kg 1.0500 8,500.00 8,925.00 2 Elektroda M473 kg 0.0220 75,000.00 1,650.00

JUMLAH HARGA BAHAN 10,575.00

C PERALATAN

1 Sewa Mesin Las E05 hari 0.0220 400,000.00 8,800.00

JUMLAH HARGA PERALATAN 8,800.00

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 22,741.00

Page 264: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : K.005JENIS PEKERJAAN : PlendesSATUAN PEMBAYARAN : kg

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0600 45,000.00 2,700.00 2 Tukang Besi/Baja L09 Org/hr 0.0060 60,000.00 360.00 3 Kepala Tukang Besi L04 Org/hr 0.0060 47,000.00 282.00 4 Mandor L01 Org/hr 0.0003 80,000.00 24.00

JUMLAH HARGA TENAGA 3,366.00

B BAHAN

1 Baja Profil M116 kg 1.1500 18,750.00 21,562.50 2 Elektroda M473 kg 0.0220 75,000.00 1,650.00

JUMLAH HARGA BAHAN 23,212.50

C PERALATAN

1 Sewa Mesin Las E05 hari 0.0220 400,000.00 8,800.00

JUMLAH HARGA PERALATAN 8,800.00

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 35,378.50

ANALISA HARGA SATUAN

KODE ANALISA : K.006JENIS PEKERJAAN : Pasang pintu plat baja tebal 2 mm rangkap, rangka baja sikuSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 1.0500 45,000.00 47,250.00 2 Tukang Besi/Baja L09 Org/hr 1.0500 60,000.00 63,000.00 3 Kepala Tukang Besi L04 Org/hr 0.1050 47,000.00 4,935.00 4 Mandor L01 Org/hr 0.0520 80,000.00 4,160.00

JUMLAH HARGA TENAGA 119,345.00

B BAHAN

1 Baja Profil M116 kg 15.0000 18,750.00 281,250.00 2 Plat Baja M116.a kg 32.8000 18,750.00 615,000.00 3 Elektroda M473 kg 0.0500 75,000.00 3,750.00

JUMLAH HARGA BAHAN 900,000.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 1,019,345.00

Page 265: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : K.007JENIS PEKERJAAN : pengelasan dengan las listrikSATUAN PEMBAYARAN : cm

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0040 45,000.00 180.00 2 Tukang Besi/Baja L09 Org/hr 0.0020 60,000.00 120.00 3 Kepala Tukang Besi L04 Org/hr 0.0002 47,000.00 9.40 4 Mandor L01 Org/hr 0.0002 80,000.00 16.00

JUMLAH HARGA TENAGA 325.40

B BAHAN

1 Elektroda M473 kg 0.0400 75,000.00 3,000.00 2 Solar M483 ltr 0.0300 5,151.00 154.53 3 Minyak Pelumas M484 ltr 0.0400 35,000.00 1,400.00

JUMLAH HARGA BAHAN 4,554.53

C PERALATAN

1 Sewa Mesin Las E05 hari 0.0170 400,000.00 6,800.00

JUMLAH HARGA PERALATAN 6,800.00

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 11,679.93

ANALISA HARGA SATUAN

KODE ANALISA : K.008JENIS PEKERJAAN : Pasang pintu gulung besi (rolling door)SATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 1.2000 45,000.00 54,000.00 2 Tukang Batu L07 Org/hr 1.2000 60,000.00 72,000.00 3 Kepala Tukang Batu L02 Org/hr 0.1200 70,000.00 8,400.00 4 Mandor L01 Org/hr 0.0060 80,000.00 480.00

JUMLAH HARGA TENAGA 134,880.00

B BAHAN

1 Pintu Gulung Besi M120 m2 1.0000 1,775,810.00 1,775,810.00

JUMLAH HARGA BAHAN 1,775,810.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 1,910,690.00

: m2

Page 266: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : K.009JENIS PEKERJAAN : Pasang pintu lipat (folding door)SATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 1.2000 45,000.00 54,000.00 2 Tukang Batu L07 Org/hr 1.2000 60,000.00 72,000.00 3 Kepala Tukang Batu L02 Org/hr 0.1200 70,000.00 8,400.00 4 Mandor L01 Org/hr 0.0060 80,000.00 480.00

JUMLAH HARGA TENAGA 134,880.00

B BAHAN

1 Pintu Lipat M121 m2 1.0000 1,452,930.00 1,452,930.00

JUMLAH HARGA BAHAN 1,452,930.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 1,587,810.00

ANALISA HARGA SATUAN

KODE ANALISA : K.010JENIS PEKERJAAN : Pasang sunscream alluminiumSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0800 45,000.00 3,600.00 2 Tukang Besi/Baja L09 Org/hr 0.8000 60,000.00 48,000.00 3 Kepala Tukang Besi L04 Org/hr 0.0800 47,000.00 3,760.00 4 Mandor L01 Org/hr 0.0040 80,000.00 320.00

JUMLAH HARGA TENAGA 55,680.00

B BAHAN

1 Sunscream Aluminium M127 m2 1.0000 269,060.00 269,060.00

JUMLAH HARGA BAHAN 269,060.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 324,740.00

: m2

: m2

Page 267: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : K.011JENIS PEKERJAAN : Pasang Rolling door AluminiumSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 1.0000 45,000.00 45,000.00 2 Tukang Besi/Baja L09 Org/hr 1.0000 60,000.00 60,000.00 3 Kepala Tukang Besi L04 Org/hr 0.1000 47,000.00 4,700.00 4 Mandor L01 Org/hr 0.0500 80,000.00 4,000.00

JUMLAH HARGA TENAGA 113,700.00

B BAHAN

1 Rolling Door M122 m2 1.0000 1,076,250.00 1,076,250.00

JUMLAH HARGA BAHAN 1,076,250.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 1,189,950.00

ANALISA HARGA SATUAN

KODE ANALISA : K.012JENIS PEKERJAAN : Pasang Kusen Alluminium CoklatSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0430 45,000.00 1,935.00 2 Tukang Besi/Baja L09 Org/hr 0.0430 60,000.00 2,580.00 3 Kepala Tukang Besi L04 Org/hr 0.0043 47,000.00 202.10 4 Mandor L01 Org/hr 0.0021 80,000.00 168.00

JUMLAH HARGA TENAGA 4,885.10

B BAHAN

1 Profil Aluminium Coklat M126 m1 1.1000 93,670.00 103,037.00 2 Sekrup Segala Ukuran M145 bh 2.0000 410.00 820.00 3 Sealant M148.b tube 0.0600 25,000.00 1,500.00

JUMLAH HARGA BAHAN 105,357.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 110,242.10

: m2

: m1

Page 268: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : K.013JENIS PEKERJAAN : Pasang pintu Alluminium coklat strip lebar 8 cmSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0850 45,000.00 3,825.00 2 Tukang Besi/Baja L09 Org/hr 0.0850 60,000.00 5,100.00 3 Kepala Tukang Besi L04 Org/hr 0.0085 47,000.00 399.50 4 Mandor L01 Org/hr 0.0042 80,000.00 336.00

JUMLAH HARGA TENAGA 9,660.50

B BAHAN

1 Profil Aluminium Coklat M126 m1 4.4000 93,670.00 412,148.00 2 Aluminium Strip M148.c m1 14.6000 15,000.00 219,000.00

JUMLAH HARGA BAHAN 631,148.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 640,808.50

ANALISA HARGA SATUAN

KODE ANALISA : K.014JENIS PEKERJAAN : Pasang Pintu Kaca Rangka Aluminium CoklatSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0850 45,000.00 3,825.00 2 Tukang Besi/Baja L09 Org/hr 0.0850 60,000.00 5,100.00 3 Kepala Tukang Besi L04 Org/hr 0.0080 47,000.00 376.00 4 Mandor L01 Org/hr 0.0040 80,000.00 320.00

JUMLAH HARGA TENAGA 9,621.00

B BAHAN

1 Profil Aluminium Coklat M126 m1 4.4000 93,670.00 412,148.00 2 Profil Kaca M148.d m1 4.5000 10,000.00 45,000.00 3 Sealant M148.b tube 0.2700 25,000.00 6,750.00

JUMLAH HARGA BAHAN 463,898.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 473,519.00

: m2

: m2

Page 269: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : K.015JENIS PEKERJAAN : Pasang venetion blinds dan vertical blinds (tirai)SATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.3500 45,000.00 15,750.00 2 Tukang Besi/Baja L09 Org/hr 0.3500 60,000.00 21,000.00 3 Kepala Tukang Besi L04 Org/hr 0.0350 47,000.00 1,645.00 4 Mandor L01 Org/hr 0.0180 80,000.00 1,440.00

JUMLAH HARGA TENAGA 39,835.00

B BAHAN

1 M148.e m2 1.0000 500,000.00 500,000.00

JUMLAH HARGA BAHAN 500,000.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 539,835.00

ANALISA HARGA SATUAN

KODE ANALISA : K.016JENIS PEKERJAAN : Pasang teralis besi (2 x 3) mmSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 1.6700 45,000.00 75,150.00 2 Tukang Batu L07 Org/hr 1.6700 60,000.00 100,200.00 3 Kepala Tukang Batu L02 Org/hr 0.1670 70,000.00 11,690.00 4 Mandor L01 Org/hr 0.0830 80,000.00 6,640.00

JUMLAH HARGA TENAGA 193,680.00

B BAHAN

1 Besi Strip M114 kg 6.1770 8,500.00 52,504.50 2 Elektroda M473 kg 0.3000 75,000.00 22,500.00

JUMLAH HARGA BAHAN 75,004.50

C PERALATAN

1 Sewa Mesin Las E05 hari 0.5000 400,000.00 200,000.00

JUMLAH HARGA PERALATAN 200,000.00

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 468,684.50

: m2

Venetion blinds dan vertical blinds (tirai)

: m2

Page 270: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : K.017JENIS PEKERJAAN : Pasang kawat nyamukSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1000 45,000.00 4,500.00 2 Tukang Batu L07 Org/hr 0.1000 60,000.00 6,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0100 70,000.00 700.00 4 Mandor L01 Org/hr 0.0050 80,000.00 400.00

JUMLAH HARGA TENAGA 11,600.00

B BAHAN

1 Kawat Nyamuk M138 m2 1.1000 15,660.00 17,226.00 2 Pengelasan dengan las listrik cm 11.1100 11,679.93 129,764.02 3 Besi Strip M114 kg 1.7160 8,500.00 14,586.00

JUMLAH HARGA BAHAN 161,576.02

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 173,176.02

ANALISA HARGA SATUAN

KODE ANALISA : K.018JENIS PEKERJAAN : Pasang jendela nako & trailsSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.2000 45,000.00 9,000.00 2 Tukang Batu L07 Org/hr 0.2000 60,000.00 12,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0200 70,000.00 1,400.00 4 Mandor L01 Org/hr 0.0010 80,000.00 80.00

JUMLAH HARGA TENAGA 22,480.00

B BAHAN

1 Jendela Nako + accessories M285 m2 1.1000 210,450.00 231,495.00 2 Sekrup Segala Ukuran M145 bh 10.0000 410.00 4,100.00 3 Besi Strip M114 kg 7.0000 8,500.00 59,500.00

JUMLAH HARGA BAHAN 295,095.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 317,575.00

: m2

: m2

Page 271: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : K.019JENIS PEKERJAAN : Pasang pintu fiber KMSATUAN PEMBAYARAN : Unit

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.5250 45,000.00 23,625.00 2 Tukang Batu L07 Org/hr 0.5250 60,000.00 31,500.00 3 Kepala Tukang Batu L02 Org/hr 0.0525 70,000.00 3,675.00 4 Mandor L01 Org/hr 0.0260 80,000.00 2,080.00

JUMLAH HARGA TENAGA 60,880.00

B BAHAN

1 Pintu Fiber KM M128 Unit 1.0000 300,000.00 300,000.00

JUMLAH HARGA BAHAN 300,000.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 360,880.00

ANALISA HARGA SATUAN

KODE ANALISA : K.020JENIS PEKERJAAN : Pasang talang datar, seng bjls 30 L = 0.60 mSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.2000 45,000.00 9,000.00 2 Tukang Batu L07 Org/hr 0.4000 60,000.00 24,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0250 70,000.00 1,750.00 4 Mandor L01 Org/hr 0.0010 80,000.00 80.00

JUMLAH HARGA TENAGA 34,830.00

B BAHAN

1 Seng plat BJLS 30 L = 0.60 M M175 m' 1.0500 34,300.00 36,015.00 2 Paku Kayu Segala Ukuran M140 kg 0.0150 17,500.00 262.50 3 Papan (2x20) cm M063 m3 0.0190 6,030,000.00 114,570.00

JUMLAH HARGA BAHAN 150,847.50

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 185,677.50

: m1

Page 272: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : K.021JENIS PEKERJAAN : Pasang talang datar, seng bjls 30 L = 0.90 mSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.2000 45,000.00 9,000.00 2 Tukang Batu L07 Org/hr 0.4000 60,000.00 24,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0250 70,000.00 1,750.00 4 Mandor L01 Org/hr 0.0010 80,000.00 80.00

JUMLAH HARGA TENAGA 34,830.00

B BAHAN

1 Seng plat BJLS 30 L = 0.90 M M176 m' 1.0500 43,100.00 45,255.00 2 Paku Kayu Segala Ukuran M140 kg 0.0150 17,500.00 262.50 3 Papan (2x20) cm M063 m3 0.0190 6,030,000.00 114,570.00

JUMLAH HARGA BAHAN 160,087.50

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 194,917.50

ANALISA HARGA SATUAN

KODE ANALISA : K.022JENIS PEKERJAAN : Pasang talang miring, seng bjls 30 L = 0.60 mSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.2000 45,000.00 9,000.00 2 Tukang Batu L07 Org/hr 0.4000 60,000.00 24,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0250 70,000.00 1,750.00 4 Mandor L01 Org/hr 0.0010 80,000.00 80.00

JUMLAH HARGA TENAGA 34,830.00

B BAHAN

1 Seng plat BJLS 30 L = 0.60 M M175 m' 1.0500 34,300.00 36,015.00 2 Paku Kayu Segala Ukuran M140 kg 0.0150 17,500.00 262.50 3 Papan (2x20) cm M063 m3 0.0190 6,030,000.00 114,570.00

JUMLAH HARGA BAHAN 150,847.50

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 185,677.50

: m1

: m1

Page 273: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : K.023JENIS PEKERJAAN : Pasang talang miring, seng bjls 30 L = 0.90 mSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.2000 45,000.00 9,000.00 2 Tukang Batu L07 Org/hr 0.4000 60,000.00 24,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0250 70,000.00 1,750.00 4 Mandor L01 Org/hr 0.0010 80,000.00 80.00

JUMLAH HARGA TENAGA 34,830.00

B BAHAN

1 Seng plat BJLS 30 L = 0.90 M M176 m' 1.0500 43,100.00 45,255.00 2 Paku Kayu Segala Ukuran M140 kg 0.0150 17,500.00 262.50 3 Papan (2x20) cm M063 m3 0.0190 6,030,000.00 114,570.00

JUMLAH HARGA BAHAN 160,087.50

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 194,917.50

ANALISA HARGA SATUAN

KODE ANALISA : K.024JENIS PEKERJAAN SATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1200 45,000.00 5,400.00 2 Tukang Batu L07 Org/hr 0.2000 60,000.00 12,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0200 70,000.00 1,400.00 4 Mandor L01 Org/hr 0.0010 80,000.00 80.00

JUMLAH HARGA TENAGA 18,880.00

B BAHAN

1 Pipa PVC tipe D Dia 3 " M350 Ljr 0.2500 97,370.00 24,342.50 2 Lem Pipa PVC M423 kg 0.1000 28,700.00 2,870.00 3 Knee PVC Dia 3 " M374 bh 0.2500 12,810.00 3,202.50 4 Shock PVC Dia 3 " M366 bh 0.2500 11,530.00 2,882.50

JUMLAH HARGA BAHAN 33,297.50

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 52,177.50

: m1

: Pasang talang tegak pipa PVC f 3": m1

Page 274: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : K.025JENIS PEKERJAAN SATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1200 45,000.00 5,400.00 2 Tukang Batu L07 Org/hr 0.2000 60,000.00 12,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0200 70,000.00 1,400.00 4 Mandor L01 Org/hr 0.0010 80,000.00 80.00

JUMLAH HARGA TENAGA 18,880.00

B BAHAN

1 Pipa PVC tipe D Dia 4 " M351 Ljr 0.2500 137,090.00 34,272.50 2 Lem Pipa PVC M423 kg 0.1000 28,700.00 2,870.00 3 Knee PVC Dia 4 " M375 bh 0.2500 16,140.00 4,035.00 4 Shock PVC Dia 4 " M367 bh 0.2500 14,090.00 3,522.50

JUMLAH HARGA BAHAN 44,700.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 63,580.00

ANALISA HARGA SATUAN

KODE ANALISA : K.026JENIS PEKERJAAN : Pasang talang 1/2 lingkaran D-15 cm bjls 30, L = 45 cmSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1500 45,000.00 6,750.00 2 Tukang Batu L07 Org/hr 0.3000 60,000.00 18,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0300 70,000.00 2,100.00 4 Mandor L01 Org/hr 0.0070 80,000.00 560.00

JUMLAH HARGA TENAGA 27,410.00

B BAHAN

1 Seng plat BJLS 30 L = 0.45 M M174 m' 1.0500 30,100.00 31,605.000 2 Paku Kayu Segala Ukuran M140 kg 0.0100 17,500.00 175.000 3 Besi Strip M114 kg 0.5000 8,500.00 4,250.000

JUMLAH HARGA BAHAN 36,030.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 63,440.00

: Pasang talang tegak pipa PVC f 4": m1

: m1

Page 275: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : K.027JENIS PEKERJAAN : Pasang pagar BRC tinggi 1 mSATUAN PEMBAYARAN : m1

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.2500 45,000.00 11,250.00 2 Tukang Besi/Baja L09 Org/hr 0.0630 60,000.00 3,780.00 3 Kepala Tukang Besi L04 Org/hr 0.0063 47,000.00 296.10 4 Mandor L01 Org/hr 0.0063 80,000.00 504.00

JUMLAH HARGA TENAGA 15,830.10

B BAHAN

1 Pagar Model BRC tinggi 1 m M124.a m2 1.0000 282,510.00 282,510.00

JUMLAH HARGA BAHAN 282,510.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 298,340.10

ANALISA HARGA SATUAN

KODE ANALISA : K.028JENIS PEKERJAAN : Pasang tiang pagar BRC Dia 2" tinggi 1 mSATUAN PEMBAYARAN : bh

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.2500 45,000.00 11,250.00 2 Tukang Besi/Baja L09 Org/hr 0.0630 60,000.00 3,780.00 3 Kepala Tukang Besi L04 Org/hr 0.0063 47,000.00 296.10 4 Mandor L01 Org/hr 0.0063 80,000.00 504.00

JUMLAH HARGA TENAGA 15,830.10

B BAHAN

1 Pipa Galvanis Ø 2 ", tebal 2.3 mm M380 Ljr 0.3750 472,500.00 177,187.50

JUMLAH HARGA BAHAN 177,187.50

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 193,017.60

Page 276: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : K.029JENIS PEKERJAAN : Pasang pintu pagar BRC tinggi 1 mSATUAN PEMBAYARAN : m1

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.2780 45,000.00 12,510.00 2 Tukang Batu L07 Org/hr 0.0690 60,000.00 4,140.00 3 Tukang Besi/Baja L09 Org/hr 0.0170 60,000.00 1,020.00 4 Kepala Tukang Besi L04 Org/hr 0.0086 47,000.00 404.20 5 Mandor L01 Org/hr 0.0086 80,000.00 688.00

JUMLAH HARGA TENAGA 18,762.20

B BAHAN

1 Pintu Pagar Model BRC tinggi 1 m M124.b m1 1.0000 361,616.00 361,616.00 2 Baja Profil M116 kg 7.8000 18,750.00 146,250.00

JUMLAH HARGA BAHAN 507,866.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 526,628.20

ANALISA HARGA SATUAN

KODE ANALISA : K.030JENIS PEKERJAAN : Pasang pagar besiSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.7500 45,000.00 33,750.00 2 Tukang Besi/Baja L09 Org/hr 0.5000 60,000.00 30,000.00 3 Kepala Tukang Besi L04 Org/hr 0.0500 47,000.00 2,350.00 4 Mandor L01 Org/hr 0.0500 80,000.00 4,000.00

JUMLAH HARGA TENAGA 70,100.00

B BAHAN

1 Baja Profil M116 kg 10.1907 18,750.00 191,075.63 2 Pipa Galvanis Ø 2 ", tebal 2.3 mm M380 Ljr 0.3000 472,500.00 141,750.00

JUMLAH HARGA BAHAN 332,825.63

C PERALATAN

1 Sewa Mesin Las E05 hari 0.5000 400,000.00 200,000.00

JUMLAH HARGA PERALATAN 200,000.00

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 602,925.63

Page 277: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : K.031JENIS PEKERJAAN : Pasang pintu pagar besiSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.8500 45,000.00 38,250.00 2 Tukang Besi/Baja L09 Org/hr 0.5500 60,000.00 33,000.00 3 Kepala Tukang Besi L04 Org/hr 0.0550 47,000.00 2,585.00 4 Mandor L01 Org/hr 0.0550 80,000.00 4,400.00

JUMLAH HARGA TENAGA 78,235.00

B BAHAN

1 Baja Profil M116 kg 28.5262 18,750.00 534,866.04

JUMLAH HARGA BAHAN 534,866.04

C PERALATAN

1 Sewa Mesin Las E05 hari 0.5000 400,000.00 200,000.00

JUMLAH HARGA PERALATAN 200,000.00

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 813,101.04

ANALISA HARGA SATUAN

KODE ANALISA : K.032JENIS PEKERJAAN : Pasang Atap Baja Ringan untuk Penutup Atap GentengSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.7500 45,000.00 33,750.00 2 Tukang Besi/Baja L09 Org/hr 0.5000 60,000.00 30,000.00 3 Kepala Tukang Besi L04 Org/hr 0.0500 47,000.00 2,350.00 4 Mandor L01 Org/hr 0.0500 80,000.00 4,000.00

JUMLAH HARGA TENAGA 70,100.00

B BAHAN

1 Baja Ringan M132 kg 5.4912 35,175.00 193,152.96 2 Besi Strip / Plat Plendes M114 kg 0.4212 8,500.00 3,580.20 3 Baut Segala Ukuran M146 kg 0.2521 16,750.00 4,221.87 4 Angker Bar / Dynabolt M117 kg 0.1411 15,000.00 2,116.11

JUMLAH HARGA BAHAN 203,071.14

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 273,171.14

Page 278: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : K.033JENIS PEKERJAAN : Pasang Atap Baja Ringan untuk Penutup Atap Asbes GelombangSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.7500 45,000.00 33,750.00 2 Tukang Besi/Baja L09 Org/hr 0.5000 60,000.00 30,000.00 3 Kepala Tukang Besi L04 Org/hr 0.0500 47,000.00 2,350.00 4 Mandor L01 Org/hr 0.0500 80,000.00 4,000.00

JUMLAH HARGA TENAGA 70,100.00

B BAHAN

1 Baja Ringan M132 kg 4.7303 35,175.00 166,389.57 2 Besi Strip / Plat Plendes M114 kg 0.4212 8,500.00 3,580.20 3 Baut Segala Ukuran M146 kg 0.2521 16,750.00 4,221.87 4 Angker Bar / Dynabolt M117 kg 0.1411 15,000.00 2,116.11

JUMLAH HARGA BAHAN 176,307.75

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 246,407.75

Page 279: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : L.001JENIS PEKERJAAN : Pasang kunci tanam antikSATUAN PEMBAYARAN : bh

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0600 45,000.00 2,700.00 2 Tukang Kayu L08 Org/hr 0.6000 60,000.00 36,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0600 47,000.00 2,820.00 4 Mandor L01 Org/hr 0.0030 80,000.00 240.00

JUMLAH HARGA TENAGA 41,760.00

B BAHAN

1 Kunci Tanam Antik M253 bh 1.0000 80,710.00 80,710.00

JUMLAH HARGA BAHAN 80,710.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 122,470.00

ANALISA HARGA SATUAN

KODE ANALISA : L.002JENIS PEKERJAAN : Pasang kunci tanam biasaSATUAN PEMBAYARAN : bh

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0100 45,000.00 450.00 2 Tukang Kayu L08 Org/hr 0.5000 60,000.00 30,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0100 47,000.00 470.00 4 Mandor L01 Org/hr 0.0050 80,000.00 400.00

JUMLAH HARGA TENAGA 31,320.00

B BAHAN

1 Kunci Tanam M254 bh 1.0000 97,900.00 97,900.00

JUMLAH HARGA BAHAN 97,900.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 129,220.00

Page 280: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : L.003JENIS PEKERJAAN : Pasang kunci tanam kamar mandiSATUAN PEMBAYARAN : bh

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0050 45,000.00 225.00 2 Tukang Kayu L08 Org/hr 0.5000 60,000.00 30,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0050 47,000.00 235.00 4 Mandor L01 Org/hr 0.0025 80,000.00 200.00

JUMLAH HARGA TENAGA 30,660.00

B BAHAN

1 Kunci Pintu Kamar Mandi M255 bh 1.0000 78,410.00 78,410.00

JUMLAH HARGA BAHAN 78,410.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 109,070.00

ANALISA HARGA SATUAN

KODE ANALISA : L.004JENIS PEKERJAAN : Pasang kunci silinderSATUAN PEMBAYARAN : bh

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0050 45,000.00 225.00 2 Tukang Kayu L08 Org/hr 0.5000 60,000.00 30,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0050 47,000.00 235.00 4 Mandor L01 Org/hr 0.0003 80,000.00 20.00

JUMLAH HARGA TENAGA 30,480.00

B BAHAN

1 Kunci Silinder M256 bh 1.0000 129,150.00 129,150.00

JUMLAH HARGA BAHAN 129,150.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 159,630.00

Page 281: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : L.005JENIS PEKERJAAN : Pasang kunci selotSATUAN PEMBAYARAN : bh

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0200 45,000.00 900.00 2 Tukang Kayu L08 Org/hr 0.2000 60,000.00 12,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0200 47,000.00 940.00 4 Mandor L01 Org/hr 0.0010 80,000.00 80.00

JUMLAH HARGA TENAGA 13,920.00

B BAHAN

1 Slot/Kunci Pintu M265 bh 1.0000 118,400.00 118,400.00

JUMLAH HARGA BAHAN 118,400.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 132,320.00

ANALISA HARGA SATUAN

KODE ANALISA : L.006JENIS PEKERJAAN : Pasang kunci lemariSATUAN PEMBAYARAN : bh

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0250 45,000.00 1,125.00 2 Tukang Kayu L08 Org/hr 0.2500 60,000.00 15,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0250 47,000.00 1,175.00 4 Mandor L01 Org/hr 0.0013 80,000.00 100.00

JUMLAH HARGA TENAGA 17,400.00

B BAHAN

1 Kunci Lemari M269 bh 1.0000 10,250.00 10,250.00

JUMLAH HARGA BAHAN 10,250.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 27,650.00

Page 282: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : L.007JENIS PEKERJAAN : Pasang engsel pintuSATUAN PEMBAYARAN : bh

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0150 45,000.00 675.00 2 Tukang Kayu L08 Org/hr 0.1500 60,000.00 9,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0150 47,000.00 705.00 4 Mandor L01 Org/hr 0.0008 80,000.00 60.00

JUMLAH HARGA TENAGA 10,440.00

B BAHAN

1 Engsel Pintu M257 bh 1.0000 27,160.00 27,160.00

JUMLAH HARGA BAHAN 27,160.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 37,600.00

ANALISA HARGA SATUAN

KODE ANALISA : L.008JENIS PEKERJAAN : Pasang engsel jendelaSATUAN PEMBAYARAN : bh

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0100 45,000.00 450.00 2 Tukang Kayu L08 Org/hr 0.1000 60,000.00 6,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0100 47,000.00 470.00 4 Mandor L01 Org/hr 0.0005 80,000.00 40.00

JUMLAH HARGA TENAGA 6,960.00

B BAHAN

1 Engsel Jendela M258 bh 1.0000 21,210.00 21,210.00

JUMLAH HARGA BAHAN 21,210.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 28,170.00

Page 283: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : L.009JENIS PEKERJAAN : Pasang grendel pintuSATUAN PEMBAYARAN : bh

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0150 45,000.00 675.00 2 Tukang Kayu L08 Org/hr 0.1500 60,000.00 9,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0150 47,000.00 705.00 4 Mandor L01 Org/hr 0.0008 80,000.00 60.00

JUMLAH HARGA TENAGA 10,440.00

B BAHAN

1 Grendel Pintu M262 bh 1.0000 18,960.00 18,960.00

JUMLAH HARGA BAHAN 18,960.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 29,400.00

ANALISA HARGA SATUAN

KODE ANALISA : L.010JENIS PEKERJAAN : Pasang grendel jendelaSATUAN PEMBAYARAN : bh

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0100 45,000.00 450.00 2 Tukang Kayu L08 Org/hr 0.1000 60,000.00 6,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0100 47,000.00 470.00 4 Mandor L01 Org/hr 0.0005 80,000.00 40.00

JUMLAH HARGA TENAGA 6,960.00

B BAHAN

1 Grendel Jendela M263 bh 1.0000 10,600.00 10,600.00

JUMLAH HARGA BAHAN 10,600.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 17,560.00

Page 284: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : L.011JENIS PEKERJAAN : Pasang hak anginSATUAN PEMBAYARAN : bh

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0200 45,000.00 900.00 2 Tukang Kayu L08 Org/hr 0.2000 60,000.00 12,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0200 47,000.00 940.00 4 Mandor L01 Org/hr 0.0100 80,000.00 800.00

JUMLAH HARGA TENAGA 14,640.00

B BAHAN

1 Hak Angin M259 bh 1.0000 16,790.00 16,790.00

JUMLAH HARGA BAHAN 16,790.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 31,430.00

ANALISA HARGA SATUAN

KODE ANALISA : L.012JENIS PEKERJAAN : Pasang spring knipSATUAN PEMBAYARAN : bh

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0150 45,000.00 675.00 2 Tukang Kayu L08 Org/hr 0.1500 60,000.00 9,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0150 47,000.00 705.00 4 Mandor L01 Org/hr 0.0008 80,000.00 60.00

JUMLAH HARGA TENAGA 10,440.00

B BAHAN

1 Spring Knip M260 - 1.0000 10,600.00 10,600.00

JUMLAH HARGA BAHAN 10,600.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 21,040.00

Page 285: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : L.013JENIS PEKERJAAN : Pasang kait anginSATUAN PEMBAYARAN : bh

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0100 45,000.00 450.00 2 Tukang Kayu L08 Org/hr 0.1000 60,000.00 6,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0100 47,000.00 470.00 4 Mandor L01 Org/hr 0.0005 80,000.00 40.00

JUMLAH HARGA TENAGA 6,960.00

B BAHAN

1 Kait Angin M261 bh 1.0000 8,200.00 8,200.00

JUMLAH HARGA BAHAN 8,200.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 15,160.00

ANALISA HARGA SATUAN

KODE ANALISA : L.014JENIS PEKERJAAN : Pasang door closerSATUAN PEMBAYARAN : bh

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0500 45,000.00 2,250.00 2 Tukang Kayu L08 Org/hr 0.5000 60,000.00 30,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0500 47,000.00 2,350.00 4 Mandor L01 Org/hr 0.0025 80,000.00 200.00

JUMLAH HARGA TENAGA 34,800.00

B BAHAN

1 Door Closer M264 bh 1.0000 150,670.00 150,670.00

JUMLAH HARGA BAHAN 150,670.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 185,470.00

Page 286: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : L.015JENIS PEKERJAAN : Pasang pegangan pintu/door holderSATUAN PEMBAYARAN : bh

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0500 45,000.00 2,250.00 2 Tukang Kayu L08 Org/hr 0.5000 60,000.00 30,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0500 47,000.00 2,350.00 4 Mandor L01 Org/hr 0.0025 80,000.00 200.00

JUMLAH HARGA TENAGA 34,800.00

B BAHAN

1 Door Holder M266 bh 1.0000 107,650.00 107,650.00

JUMLAH HARGA BAHAN 107,650.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 142,450.00

ANALISA HARGA SATUAN

KODE ANALISA : L.016JENIS PEKERJAAN : Pasang door stopSATUAN PEMBAYARAN : bh

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0100 45,000.00 450.00 2 Tukang Kayu L08 Org/hr 0.1000 60,000.00 6,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0100 47,000.00 470.00 4 Mandor L01 Org/hr 0.0005 80,000.00 40.00

JUMLAH HARGA TENAGA 6,960.00

B BAHAN

1 Door Stop M267 bh 1.0000 31,850.00 31,850.00

JUMLAH HARGA BAHAN 31,850.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 38,810.00

Page 287: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : L.017JENIS PEKERJAAN : Pasang rel pintu dorongSATUAN PEMBAYARAN : bh

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0600 45,000.00 2,700.00 2 Tukang Kayu L08 Org/hr 0.6000 60,000.00 36,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0600 47,000.00 2,820.00 4 Mandor L01 Org/hr 0.0030 80,000.00 240.00

JUMLAH HARGA TENAGA 41,760.00

B BAHAN

1 Rel Pintu Dorong M268 bh 1.0000 116,250.00 116,250.00

JUMLAH HARGA BAHAN 116,250.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 158,010.00

ANALISA HARGA SATUAN

KODE ANALISA : L.018JENIS PEKERJAAN : Pasang kaca polos, tebal 3 mmSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0150 45,000.00 675.00 2 Tukang Kayu L08 Org/hr 0.1500 60,000.00 9,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0150 47,000.00 705.00 4 Mandor L01 Org/hr 0.0008 80,000.00 60.00

JUMLAH HARGA TENAGA 10,440.00

B BAHAN

1 Kaca Polos tebal 3 mm M270 m2 1.1000 61,500.00 67,650.00

JUMLAH HARGA BAHAN 67,650.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 78,090.00

Page 288: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : L.019JENIS PEKERJAAN : Pasang kaca polos, tebal 5 mmSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0150 45,000.00 675.00 2 Tukang Kayu L08 Org/hr 0.1500 60,000.00 9,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0150 47,000.00 705.00 4 Mandor L01 Org/hr 0.0008 80,000.00 60.00

JUMLAH HARGA TENAGA 10,440.00

B BAHAN

1 Kaca Polos tebal 5 mm M271 m2 1.1000 101,470.00 111,617.00

JUMLAH HARGA BAHAN 111,617.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 122,057.00

ANALISA HARGA SATUAN

KODE ANALISA : L.020JENIS PEKERJAAN : Pasang kaca polos, tebal 8 mmSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0150 45,000.00 675.00 2 Tukang Kayu L08 Org/hr 0.1500 60,000.00 9,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0150 47,000.00 705.00 4 Mandor L01 Org/hr 0.0008 80,000.00 60.00

JUMLAH HARGA TENAGA 10,440.00

B BAHAN

1 Kaca Polos tebal 8 mm M272 m2 1.1000 145,550.00 160,105.00

JUMLAH HARGA BAHAN 160,105.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 170,545.00

Page 289: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : L.021JENIS PEKERJAAN : Pasang kaca polos, tebal 12 mmSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0150 45,000.00 675.00 2 Tukang Kayu L08 Org/hr 0.1500 60,000.00 9,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0150 47,000.00 705.00 4 Mandor L01 Org/hr 0.0008 80,000.00 60.00

JUMLAH HARGA TENAGA 10,440.00

B BAHAN

1 Kaca Polos tebal 12 mm M273 m2 1.1000 201,660.00 221,826.00

JUMLAH HARGA BAHAN 221,826.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 232,266.00

ANALISA HARGA SATUAN

KODE ANALISA : L.022JENIS PEKERJAAN : Pasang kaca buram, tebal 3 mmSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0250 45,000.00 1,125.00 2 Tukang Kayu L08 Org/hr 0.2500 60,000.00 15,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0250 47,000.00 1,175.00 4 Mandor L01 Org/hr 0.0013 80,000.00 100.00

JUMLAH HARGA TENAGA 17,400.00

B BAHAN

1 Kaca Buram tebal 3 mm M274 m2 1.1000 75,330.00 82,863.00

JUMLAH HARGA BAHAN 82,863.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 100,263.00

Page 290: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : L.023JENIS PEKERJAAN : Pasang kaca buram, tebal 5 mmSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0250 45,000.00 1,125.00 2 Tukang Kayu L08 Org/hr 0.2500 60,000.00 15,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0250 47,000.00 1,175.00 4 Mandor L01 Org/hr 0.0013 80,000.00 100.00

JUMLAH HARGA TENAGA 17,400.00

B BAHAN

1 Kaca Buram tebal 5 mm M275 m2 1.1000 119,920.00 131,912.00

JUMLAH HARGA BAHAN 131,912.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 149,312.00

ANALISA HARGA SATUAN

KODE ANALISA : L.024JENIS PEKERJAAN : Pasang kaca buram, tebal 8 mmSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0265 45,000.00 1,192.50 2 Tukang Kayu L08 Org/hr 0.2650 60,000.00 15,900.00 3 Kepala Tukang Kayu L03 Org/hr 0.0265 47,000.00 1,245.50 4 Mandor L01 Org/hr 0.0014 80,000.00 112.00

JUMLAH HARGA TENAGA 18,450.00

B BAHAN

1 Kaca Buram tebal 8 mm M276 m2 1.1000 177,320.00 195,052.00

JUMLAH HARGA BAHAN 195,052.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 213,502.00

Page 291: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : L.025JENIS PEKERJAAN : Pasang kaca buram, tebal 12 mmSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0265 45,000.00 1,192.50 2 Tukang Kayu L08 Org/hr 0.2650 60,000.00 15,900.00 3 Kepala Tukang Kayu L03 Org/hr 0.0265 47,000.00 1,245.50 4 Mandor L01 Org/hr 0.0014 80,000.00 112.00

JUMLAH HARGA TENAGA 18,450.00

B BAHAN

1 Kaca Buram tebal 12 mm M277 m2 1.1000 241,900.00 266,090.00

JUMLAH HARGA BAHAN 266,090.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 284,540.00

ANALISA HARGA SATUAN

KODE ANALISA : L.026JENIS PEKERJAAN : Pasang kaca cermin, tebal 5 mmSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0150 45,000.00 675.00 2 Tukang Kayu L08 Org/hr 0.1500 60,000.00 9,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0150 47,000.00 705.00 4 Mandor L01 Org/hr 0.0008 80,000.00 60.00

JUMLAH HARGA TENAGA 10,440.00

B BAHAN

1 Kaca Cermin tebal 5 mm M278 m2 1.1000 123,760.00 136,136.00

JUMLAH HARGA BAHAN 136,136.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 146,576.00

Page 292: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : L.027JENIS PEKERJAAN : Pasang kaca cermin, tebal 6 mmSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0150 45,000.00 675.00 2 Tukang Kayu L08 Org/hr 0.1500 60,000.00 9,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0150 47,000.00 705.00 4 Mandor L01 Org/hr 0.0008 80,000.00 60.00

JUMLAH HARGA TENAGA 10,440.00

B BAHAN

1 Kaca Cermin tebal 6 mm M279 m2 1.1000 145,290.00 159,819.00

JUMLAH HARGA BAHAN 159,819.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 170,259.00

ANALISA HARGA SATUAN

KODE ANALISA : L.028JENIS PEKERJAAN : Pasang kaca cermin, tebal 8 mmSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0165 45,000.00 742.50 2 Tukang Kayu L08 Org/hr 0.1650 60,000.00 9,900.00 3 Kepala Tukang Kayu L03 Org/hr 0.0165 47,000.00 775.50 4 Mandor L01 Org/hr 0.0008 80,000.00 64.00

JUMLAH HARGA TENAGA 11,482.00

B BAHAN

1 Kaca Cermin tebal 8 mm M280 m2 1.1000 193,720.00 213,092.00

JUMLAH HARGA BAHAN 213,092.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 224,574.00

Page 293: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : L.029JENIS PEKERJAAN : Pasang kaca rayben, tebal 3 mmSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0150 45,000.00 675.00 2 Tukang Kayu L08 Org/hr 0.1500 60,000.00 9,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0150 47,000.00 705.00 4 Mandor L01 Org/hr 0.0008 80,000.00 60.00

JUMLAH HARGA TENAGA 10,440.00

B BAHAN

1 Kaca Rayben tebal 3 mm M281 m2 1.1000 111,020.00 122,122.00

JUMLAH HARGA BAHAN 122,122.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 132,562.00

ANALISA HARGA SATUAN

KODE ANALISA : L.030JENIS PEKERJAAN : Pasang kaca rayben, tebal 5 mmSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0150 45,000.00 675.00 2 Tukang Kayu L08 Org/hr 0.1500 60,000.00 9,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0150 47,000.00 705.00 4 Mandor L01 Org/hr 0.0008 80,000.00 60.00

JUMLAH HARGA TENAGA 10,440.00

B BAHAN

1 Kaca Rayben tebal 5 mm M282 m2 1.100 150,670.00 165,737.00

JUMLAH HARGA BAHAN 165,737.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 176,177.00

Page 294: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : L.031JENIS PEKERJAAN : Pasang kaca rayben, tebal 8 mmSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0165 45,000.00 742.50 2 Tukang Kayu L08 Org/hr 0.1650 60,000.00 9,900.00 3 Kepala Tukang Kayu L03 Org/hr 0.0165 47,000.00 775.50 4 Mandor L01 Org/hr 0.0008 80,000.00 64.00

JUMLAH HARGA TENAGA 11,482.00

B BAHAN

1 Kaca Rayben tebal 8 mm M283 m2 1.1000 177,320.00 195,052.00

JUMLAH HARGA BAHAN 195,052.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 206,534.00

ANALISA HARGA SATUAN

KODE ANALISA : L.032JENIS PEKERJAAN : Pasang kaca rayben, tebal 12 mmSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0165 45,000.00 742.50 2 Tukang Kayu L08 Org/hr 0.1650 60,000.00 9,900.00 3 Kepala Tukang Kayu L03 Org/hr 0.0165 47,000.00 775.50 4 Mandor L01 Org/hr 0.0008 80,000.00 64.00

JUMLAH HARGA TENAGA 11,482.00

B BAHAN

1 Kaca Rayben tebal 12 mm M284 m2 1.1000 226,520.00 249,172.00

JUMLAH HARGA BAHAN 249,172.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 260,654.00

Page 295: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : L.033JENIS PEKERJAAN : Pasang kaca " wireglass", tebal 5 mmSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0150 45,000.00 675.00 2 Tukang Kayu L08 Org/hr 0.1500 60,000.00 9,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0150 47,000.00 705.00 4 Mandor L01 Org/hr 0.0008 80,000.00 60.00

JUMLAH HARGA TENAGA 10,440.00

B BAHAN

1 Kaca "Wireglass" 5 mm M288 m2 1.1000 538,120.00 591,932.00

JUMLAH HARGA BAHAN 591,932.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 602,372.00

ANALISA HARGA SATUAN

KODE ANALISA : L.034JENIS PEKERJAAN : Pasang kaca patri, tebal 5 mmSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0150 45,000.00 675.00 2 Tukang Kayu L08 Org/hr 0.1500 60,000.00 9,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0150 47,000.00 705.00 4 Mandor L01 Org/hr 0.0008 80,000.00 60.00

JUMLAH HARGA TENAGA 10,440.00

B BAHAN

1 Kaca Patri 5 mm M289 m2 1.1000 807,180.00 887,898.00

JUMLAH HARGA BAHAN 887,898.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 898,338.00

Page 296: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : L.035JENIS PEKERJAAN : Pasang glass blockSATUAN PEMBAYARAN : bh

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0150 45,000.00 675.00 2 Tukang Kayu L08 Org/hr 0.1500 60,000.00 9,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0150 47,000.00 705.00 4 Mandor L01 Org/hr 0.0008 80,000.00 60.00

JUMLAH HARGA TENAGA 10,440.00

B BAHAN

1 Glass Block M286 biji 1.1000 19,440.00 21,384.00

JUMLAH HARGA BAHAN 21,384.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 31,824.00

ANALISA HARGA SATUAN

KODE ANALISA : L.036JENIS PEKERJAAN : Pasang kaca painting glassSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0150 45,000.00 675.00 2 Tukang Kayu L08 Org/hr 0.1500 60,000.00 9,000.00 3 Kepala Tukang Kayu L03 Org/hr 0.0150 47,000.00 705.00 4 Mandor L01 Org/hr 0.0008 80,000.00 60.00

JUMLAH HARGA TENAGA 10,440.00

B BAHAN

1 Painting Glass M287 m2 1.1000 376,680.00 414,348.00

JUMLAH HARGA BAHAN 414,348.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 424,788.00

Page 297: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : M.001JENIS PEKERJAAN : Pasang lantai ubin pc abu-abu ukuran 40 x 40 cmSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.2500 45,000.00 11,250.00 2 Tukang Batu L07 Org/hr 0.1200 60,000.00 7,200.00 3 Kepala Tukang Batu L02 Org/hr 0.0120 70,000.00 840.00 4 Mandor L01 Org/hr 0.0130 80,000.00 1,040.00

JUMLAH HARGA TENAGA 20,330.00

B BAHAN

1 Ubin pc abu-abu 40 x 40 cm M290 bh 6.6300 Err:509 Err:5092 Portland Cement (PC) M037 kg 9.8000 900.00 8,820.00 3 Pasir Pasang M002 m3 0.0450 60,000.00 2,700.00

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

ANALISA HARGA SATUAN

KODE ANALISA : M.002JENIS PEKERJAAN : Pasang lantai ubin pc abu-abu ukuran 30 x 30 cmSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.2600 45,000.00 11,700.00 2 Tukang Batu L07 Org/hr 0.1250 60,000.00 7,500.00 3 Kepala Tukang Batu L02 Org/hr 0.0130 70,000.00 910.00 4 Mandor L01 Org/hr 0.0130 80,000.00 1,040.00

JUMLAH HARGA TENAGA 21,150.00

B BAHAN

1 Ubin pc abu-abu 30 x 30 cm M291 bh 11.8700 Err:509 Err:5092 Portland Cement (PC) M037 kg 10.0000 900.00 9,000.00 3 Pasir Pasang M002 m3 0.0450 60,000.00 2,700.00

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

: m2

: m2

Page 298: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : M.003JENIS PEKERJAAN : Pasang lantai ubin pc abu-abu ukuran 20 x 20 cmSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.2700 45,000.00 12,150.00 2 Tukang Batu L07 Org/hr 0.1300 60,000.00 7,800.00 3 Kepala Tukang Batu L02 Org/hr 0.0130 70,000.00 910.00 4 Mandor L01 Org/hr 0.0140 80,000.00 1,120.00

JUMLAH HARGA TENAGA 21,980.00

B BAHAN

1 Ubin pc abu-abu 20 x 20 cm M292 bh 26.5000 Err:509 Err:5092 Portland Cement (PC) M037 kg 10.4000 900.00 9,360.00 3 Pasir Pasang M002 m3 0.0450 60,000.00 2,700.00

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

ANALISA HARGA SATUAN

KODE ANALISA : M.004JENIS PEKERJAAN : Pasang lantai ubin pc warna ukuran 40 x 40 cmSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.2500 45,000.00 11,250.00 2 Tukang Batu L07 Org/hr 0.1200 60,000.00 7,200.00 3 Kepala Tukang Batu L02 Org/hr 0.0120 70,000.00 840.00 4 Mandor L01 Org/hr 0.0130 80,000.00 1,040.00

JUMLAH HARGA TENAGA 20,330.00

B BAHAN

1 Ubin pc warna 40 x 40 cm M293 bh 6.6300 Err:509 Err:5092 Portland Cement (PC) M037 kg 9.8000 900.00 8,820.00 3 Pasir Pasang M002 m3 0.0450 60,000.00 2,700.00 4 Portland Cement (PC) Warna M039 kg 1.3000 6,500.00 8,450.00

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

: m2

: m2

Page 299: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : M.005JENIS PEKERJAAN : Pasang lantai ubin pc warna ukuran 30 x 30 cmSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.2600 45,000.00 11,700.00 2 Tukang Batu L07 Org/hr 0.1250 60,000.00 7,500.00 3 Kepala Tukang Batu L02 Org/hr 0.0130 70,000.00 910.00 4 Mandor L01 Org/hr 0.0130 80,000.00 1,040.00

JUMLAH HARGA TENAGA 21,150.00

B BAHAN

1 Ubin pc warna 30 x 30 cm M294 bh 11.8700 Err:509 Err:5092 Portland Cement (PC) M037 kg 10.0000 900.00 9,000.00 3 Pasir Pasang M002 m3 0.0450 60,000.00 2,700.00 4 Portland Cement (PC) Warna M039 kg 1.5000 6,500.00 9,750.00

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

ANALISA HARGA SATUAN

KODE ANALISA : M.006JENIS PEKERJAAN : Pasang lantai ubin pc warna ukuran 20 x 20 cmSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.2700 45,000.00 12,150.00 2 Tukang Batu L07 Org/hr 0.1300 60,000.00 7,800.00 3 Kepala Tukang Batu L02 Org/hr 0.0130 70,000.00 910.00 4 Mandor L01 Org/hr 0.0140 80,000.00 1,120.00

JUMLAH HARGA TENAGA 21,980.00

B BAHAN

1 Ubin pc warna 20 x 20 cm M295 bh 26.5000 Err:509 Err:5092 Portland Cement (PC) M037 kg 10.4000 900.00 9,360.00 3 Pasir Pasang M002 m3 0.0450 60,000.00 2,700.00 4 Portland Cement (PC) Warna M039 kg 1.6200 6,500.00 10,530.00

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

: m2

: m2

Page 300: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : M.007JENIS PEKERJAAN : Pasang lantai ubin teraso ukuran 40 x 40 cmSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.2500 45,000.00 11,250.00 2 Tukang Batu L07 Org/hr 0.1200 60,000.00 7,200.00 3 Kepala Tukang Batu L02 Org/hr 0.0120 70,000.00 840.00 4 Mandor L01 Org/hr 0.0130 80,000.00 1,040.00

JUMLAH HARGA TENAGA 20,330.00

B BAHAN

1 Ubin Terasso 40 x 40 cm M296 bh 6.6300 Err:509 Err:5092 Portland Cement (PC) M037 kg 9.8000 900.00 8,820.00 3 Pasir Pasang M002 m3 0.0450 60,000.00 2,700.00 4 Portland Cement (PC) Warna M039 kg 1.3000 6,500.00 8,450.00

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

ANALISA HARGA SATUAN

KODE ANALISA : M.008JENIS PEKERJAAN : Pasang lantai ubin teraso ukuran 30 x 30 cmSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.2600 45,000.00 11,700.00 2 Tukang Batu L07 Org/hr 0.1250 60,000.00 7,500.00 3 Kepala Tukang Batu L02 Org/hr 0.0130 70,000.00 910.00 4 Mandor L01 Org/hr 0.0130 80,000.00 1,040.00

JUMLAH HARGA TENAGA 21,150.00

B BAHAN

1 Ubin Terasso 30 x 30 cm M297 bh 11.8700 Err:509 Err:5092 Portland Cement (PC) M037 kg 10.0000 900.00 9,000.00 3 Pasir Pasang M002 m3 0.0450 60,000.00 2,700.00 4 Portland Cement (PC) Warna M039 kg 1.5000 6,500.00 9,750.00

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

: m2

: m2

Page 301: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : M.009JENIS PEKERJAAN : Pasang lantai ubin granito ukuran 40 x 40 cmSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.2500 45,000.00 11,250.00 2 Tukang Batu L07 Org/hr 0.1200 60,000.00 7,200.00 3 Kepala Tukang Batu L02 Org/hr 0.0120 70,000.00 840.00 4 Mandor L01 Org/hr 0.0130 80,000.00 1,040.00

JUMLAH HARGA TENAGA 20,330.00

B BAHAN

1 Ubin Granito 40 x 40 cm M298 bh 6.6300 Err:509 Err:5092 Portland Cement (PC) M037 kg 9.8000 900.00 8,820.00 3 Pasir Pasang M002 m3 0.0450 60,000.00 2,700.00 4 Portland Cement (PC) Warna M039 kg 1.3000 6,500.00 8,450.00

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

ANALISA HARGA SATUAN

KODE ANALISA : M.010JENIS PEKERJAAN : Pasang lantai ubin granito ukuran 30 x 30 cmSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.2600 45,000.00 11,700.00 2 Tukang Batu L07 Org/hr 0.1250 60,000.00 7,500.00 3 Kepala Tukang Batu L02 Org/hr 0.0130 70,000.00 910.00 4 Mandor L01 Org/hr 0.0130 80,000.00 1,040.00

JUMLAH HARGA TENAGA 21,150.00

B BAHAN

1 Ubin Granito 30 x 30 cm M299 bh 11.8700 Err:509 Err:5092 Portland Cement (PC) M037 kg 10.0000 900.00 9,000.00 3 Pasir Pasang M002 m3 0.0450 60,000.00 2,700.00 4 Portland Cement (PC) Warna M039 kg 1.5000 6,500.00 9,750.00

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

: m2

: m2

Page 302: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : M.011JENIS PEKERJAAN : Pasang lantai ubin teralux kerang ukuran 40 x 40 cmSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.2500 45,000.00 11,250.00 2 Tukang Batu L07 Org/hr 0.1250 60,000.00 7,500.00 3 Kepala Tukang Batu L02 Org/hr 0.0130 70,000.00 910.00 4 Mandor L01 Org/hr 0.0130 80,000.00 1,040.00

JUMLAH HARGA TENAGA 20,700.00

B BAHAN

1 Ubin Teralux kerang 40 x 40 cm M299A bh 6.6300 35,000.00 232,050.00 2 Portland Cement (PC) M037 kg 9.8000 900.00 8,820.00 3 Pasir Pasang M002 m3 0.0450 60,000.00 2,700.00 4 Portland Cement (PC) Warna M039 kg 1.3000 6,500.00 8,450.00

JUMLAH HARGA BAHAN 252,020.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 272,720.00

ANALISA HARGA SATUAN

KODE ANALISA : M.012JENIS PEKERJAAN : Pasang lantai ubin teralux kerang ukuran 30 x 30 cmSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.2600 45,000.00 11,700.00 2 Tukang Batu L07 Org/hr 0.1250 60,000.00 7,500.00 3 Kepala Tukang Batu L02 Org/hr 0.0130 70,000.00 910.00 4 Mandor L01 Org/hr 0.0130 80,000.00 1,040.00

JUMLAH HARGA TENAGA 21,150.00

B BAHAN

1 Ubin Teralux kerang30 x 30 cm M299B bh 11.8700 30,000.00 356,100.00 2 Portland Cement (PC) M037 kg 10.0000 900.00 9,000.00 3 Pasir Pasang M002 m3 0.0450 60,000.00 2,700.00 4 Portland Cement (PC) Warna M039 kg 1.5000 6,500.00 9,750.00

JUMLAH HARGA BAHAN 377,550.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 398,700.00

: m2

: m2

Page 303: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : M.013JENIS PEKERJAAN : Pasang lantai ubin teralux marmer ukuran 60 x 60 cmSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.2500 45,000.00 11,250.00 2 Tukang Batu L07 Org/hr 0.1200 60,000.00 7,200.00 3 Kepala Tukang Batu L02 Org/hr 0.0120 70,000.00 840.00 4 Mandor L01 Org/hr 0.0130 80,000.00 1,040.00

JUMLAH HARGA TENAGA 20,330.00

B BAHAN

1 Ubin Teralux marmer 60 x 60 cm M299C bh 3.1000 60,000.00 186,000.00 2 Portland Cement (PC) M037 kg 9.6000 900.00 8,640.00 3 Pasir Pasang M002 m3 0.0450 60,000.00 2,700.00 4 Portland Cement (PC) Warna M039 kg 1.5000 6,500.00 9,750.00

JUMLAH HARGA BAHAN 207,090.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 227,420.00

ANALISA HARGA SATUAN

KODE ANALISA : M.014JENIS PEKERJAAN : Pasang lantai ubin teralux marmer ukuran 40 x 40 cmSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.2500 45,000.00 11,250.00 2 Tukang Batu L07 Org/hr 0.1200 60,000.00 7,200.00 3 Kepala Tukang Batu L02 Org/hr 0.0120 70,000.00 840.00 4 Mandor L01 Org/hr 0.0130 80,000.00 1,040.00

JUMLAH HARGA TENAGA 20,330.00

B BAHAN

1 Ubin Teralux marmer 40 x 40 cm M299D bh 6.6300 45,000.00 298,350.00 2 Portland Cement (PC) M037 kg 9.6000 900.00 8,640.00 3 Pasir Pasang M002 m3 0.0450 60,000.00 2,700.00 4 Portland Cement (PC) Warna M039 kg 1.3000 6,500.00 8,450.00

JUMLAH HARGA BAHAN 318,140.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 338,470.00

: m2

: m2

Page 304: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : M.015JENIS PEKERJAAN : Pasang lantai ubin teralux marmer ukuran 30 x 30 cmSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.2600 45,000.00 11,700.00 2 Tukang Batu L07 Org/hr 0.1250 60,000.00 7,500.00 3 Kepala Tukang Batu L02 Org/hr 0.0130 70,000.00 910.00 4 Mandor L01 Org/hr 0.0130 80,000.00 1,040.00

JUMLAH HARGA TENAGA 21,150.00

B BAHAN

1 Ubin Teralux marmer 40 x 40 cm M299D bh 11.8700 45,000.00 534,150.00 2 Portland Cement (PC) M037 kg 10.0000 900.00 9,000.00 3 Pasir Pasang M002 m3 0.0450 60,000.00 2,700.00 4 Portland Cement (PC) Warna M039 kg 1.5000 6,500.00 9,750.00

JUMLAH HARGA BAHAN 555,600.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 576,750.00

ANALISA HARGA SATUAN

KODE ANALISA : M.016JENIS PEKERJAAN : Pasang plint ubin pc abu-abu ukuran 15 x 20 cmSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0900 45,000.00 4,050.00 2 Tukang Batu L07 Org/hr 0.0900 60,000.00 5,400.00 3 Kepala Tukang Batu L02 Org/hr 0.0090 70,000.00 630.00 4 Mandor L01 Org/hr 0.0070 80,000.00 560.00

JUMLAH HARGA TENAGA 10,640.00

B BAHAN

1 Plint ubin pc abu-abu 15 x 20 cm M300 bh 5.3000 Err:509 Err:5092 Portland Cement (PC) M037 kg 1.6500 900.00 1,485.00 3 Pasir Pasang M002 m3 0.0040 60,000.00 240.00

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

: m2

: m1

Page 305: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : M.017JENIS PEKERJAAN : Pasang plint ubin pc abu-abu ukuran 10 x 30 cmSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0900 45,000.00 4,050.00 2 Tukang Batu L07 Org/hr 0.0900 60,000.00 5,400.00 3 Kepala Tukang Batu L02 Org/hr 0.0090 70,000.00 630.00 4 Mandor L01 Org/hr 0.0050 80,000.00 400.00

JUMLAH HARGA TENAGA 10,480.00

B BAHAN

1 Plint ubin pc abu-abu 10 x 30 cm M301 bh 3.5300 Err:509 Err:5092 Portland Cement (PC) M037 kg 1.2400 900.00 1,116.00 3 Pasir Pasang M002 m3 0.0030 60,000.00 180.00

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

ANALISA HARGA SATUAN

KODE ANALISA : M.018JENIS PEKERJAAN : Pasang plint ubin pc abu-abu ukuran 10 x 40 cmSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0900 45,000.00 4,050.00 2 Tukang Batu L07 Org/hr 0.0900 60,000.00 5,400.00 3 Kepala Tukang Batu L02 Org/hr 0.0090 70,000.00 630.00 4 Mandor L01 Org/hr 0.0050 80,000.00 400.00

JUMLAH HARGA TENAGA 10,480.00

B BAHAN

1 Plint ubin pc abu-abu 10 x 40 cm M302 bh 2.6500 Err:509 Err:5092 Portland Cement (PC) M037 kg 1.2400 900.00 1,116.00 3 Pasir Pasang M002 m3 0.0030 60,000.00 180.00

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

: m1

: m1

Page 306: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : M.019JENIS PEKERJAAN : Pasang plint ubin pc warna ukuran 10 x 20 cmSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0900 45,000.00 4,050.00 2 Tukang Batu L07 Org/hr 0.0900 60,000.00 5,400.00 3 Kepala Tukang Batu L02 Org/hr 0.0090 70,000.00 630.00 4 Mandor L01 Org/hr 0.0050 80,000.00 400.00

JUMLAH HARGA TENAGA 10,480.00

B BAHAN

1 Plint ubin pc warna 10 x 20 cm M303 bh 5.3000 Err:509 Err:5092 Portland Cement (PC) M037 kg 1.1400 900.00 1,026.00 3 Pasir Pasang M002 m3 0.0030 60,000.00 180.00 4 Portland Cement (PC) Warna M039 kg 0.1000 6,500.00 650.00

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

ANALISA HARGA SATUAN

KODE ANALISA : M.020JENIS PEKERJAAN : Pasang plint ubin pc warna ukuran 10 x 30 cmSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0900 45,000.00 4,050.00 2 Tukang Batu L07 Org/hr 0.0900 60,000.00 5,400.00 3 Kepala Tukang Batu L02 Org/hr 0.0090 70,000.00 630.00 4 Mandor L01 Org/hr 0.0050 80,000.00 400.00

JUMLAH HARGA TENAGA 10,480.00

B BAHAN

1 Plint ubin pc warna 10 x 30 cm M304 bh 3.5300 Err:509 Err:5092 Portland Cement (PC) M037 kg 1.1400 900.00 1,026.00 3 Pasir Pasang M002 m3 0.0030 60,000.00 180.00 4 Portland Cement (PC) Warna M039 kg 0.1000 6,500.00 650.00

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

: m1

: m1

Page 307: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : M.021JENIS PEKERJAAN : Pasang plint ubin pc warna ukuran 10 x 40 cmSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0900 45,000.00 4,050.00 2 Tukang Batu L07 Org/hr 0.0900 60,000.00 5,400.00 3 Kepala Tukang Batu L02 Org/hr 0.0090 70,000.00 630.00 4 Mandor L01 Org/hr 0.0050 80,000.00 400.00

JUMLAH HARGA TENAGA 10,480.00

B BAHAN

1 Plint ubin pc warna 10 x 40 cm M305 bh 2.6500 Err:509 Err:5092 Portland Cement (PC) M037 kg 1.1400 900.00 1,026.00 3 Pasir Pasang M002 m3 0.0030 60,000.00 180.00 4 Portland Cement (PC) Warna M039 kg 0.1000 6,500.00 650.00

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

ANALISA HARGA SATUAN

KODE ANALISA : M.022JENIS PEKERJAAN : Pasang plint ubin teraso ukuran 10 x 30 cmSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0900 45,000.00 4,050.00 2 Tukang Batu L07 Org/hr 0.0900 60,000.00 5,400.00 3 Kepala Tukang Batu L02 Org/hr 0.0090 70,000.00 630.00 4 Mandor L01 Org/hr 0.0050 80,000.00 400.00

JUMLAH HARGA TENAGA 10,480.00

B BAHAN

1 Plint Ubin Terasso 10 x 30 cm M306 bh 3.5300 Err:509 Err:5092 Portland Cement (PC) M037 kg 1.1400 900.00 1,026.00 3 Pasir Pasang M002 m3 0.0030 60,000.00 180.00 3 Portland Cement (PC) Warna M039 kg 0.1000 6,500.00 650.00

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

: m1

: m1

Page 308: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : M.023JENIS PEKERJAAN : Pasang plint ubin teraso ukuran 10 x 40 cmSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0900 45,000.00 4,050.00 2 Tukang Batu L07 Org/hr 0.0900 60,000.00 5,400.00 3 Kepala Tukang Batu L02 Org/hr 0.0090 70,000.00 630.00 4 Mandor L01 Org/hr 0.0050 80,000.00 400.00

JUMLAH HARGA TENAGA 10,480.00

B BAHAN

1 Plint Ubin Terasso 10 x 40 cm M307 bh 2.6500 Err:509 Err:5092 Portland Cement (PC) M037 kg 1.1400 900.00 1,026.00 3 Pasir Pasang M002 m3 0.0030 60,000.00 180.00 3 Portland Cement (PC) Warna M039 kg 0.1000 6,500.00 650.00

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

ANALISA HARGA SATUAN

KODE ANALISA : M.024JENIS PEKERJAAN : Pasang plint ubin granito ukuran 10 x 40 cmSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0900 45,000.00 4,050.00 2 Tukang Batu L07 Org/hr 0.0900 60,000.00 5,400.00 3 Kepala Tukang Batu L02 Org/hr 0.0090 70,000.00 630.00 4 Mandor L01 Org/hr 0.0050 80,000.00 400.00

JUMLAH HARGA TENAGA 10,480.00

B BAHAN

1 Plint Ubin Granito 10 x 40 cm M308 bh 2.6500 Err:509 Err:5092 Portland Cement (PC) M037 kg 1.1400 900.00 1,026.00 3 Pasir Pasang M002 m3 0.0030 60,000.00 180.00 4 Portland Cement (PC) Warna M039 kg 0.1000 6,500.00 650.00

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

: m1

: m1

Page 309: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : M.025JENIS PEKERJAAN : Pasang plint ubin granito ukuran 10 x 30 cmSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0900 45,000.00 4,050.00 2 Tukang Batu L07 Org/hr 0.0900 60,000.00 5,400.00 3 Kepala Tukang Batu L02 Org/hr 0.0090 70,000.00 630.00 4 Mandor L01 Org/hr 0.0050 80,000.00 400.00

JUMLAH HARGA TENAGA 10,480.00

B BAHAN

1 Plint Ubin Granito 10 x 30 cm M309 bh 3.5300 Err:509 Err:5092 Portland Cement (PC) M037 kg 1.1400 900.00 1,026.00 3 Pasir Pasang M002 m3 0.0030 60,000.00 180.00 4 Portland Cement (PC) Warna M039 kg 0.1000 6,500.00 650.00

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

ANALISA HARGA SATUAN

KODE ANALISA : M.026JENIS PEKERJAAN : Pasang teraso cor di tempat, tebal 3 cmSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.3600 45,000.00 16,200.00 2 Tukang Batu L07 Org/hr 0.1800 60,000.00 10,800.00 3 Kepala Tukang Batu L02 Org/hr 0.0180 70,000.00 1,260.00 4 Mandor L01 Org/hr 0.0180 80,000.00 1,440.00

JUMLAH HARGA TENAGA 29,700.00

B BAHAN

1 Bahan Teraso Cor M316.a m3 0.0360 Err:509 Err:509

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

: m1

: m2

Page 310: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : M.027JENIS PEKERJAAN : Pasang lantai keramik artistik 10 x 20 cmSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.6200 45,000.00 27,900.00 2 Tukang Batu L07 Org/hr 0.3500 60,000.00 21,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0350 70,000.00 2,450.00 4 Mandor L01 Org/hr 0.0300 80,000.00 2,400.00

JUMLAH HARGA TENAGA 53,750.00

B BAHAN

1 Lantai keramik artistik 10 x 20 M310 bh 50.0000 Err:509 Err:5092 Portland Cement (PC) M037 kg 8.1900 900.00 7,371.00 3 Pasir Pasang M002 m3 0.0450 60,000.00 2,700.00 4 Portland Cement (PC) Warna M039 kg 2.7500 6,500.00 17,875.00

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

ANALISA HARGA SATUAN

KODE ANALISA : M.028JENIS PEKERJAAN : Pasang lantai keramik artistik 10 x 10 cm SATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.6200 45,000.00 27,900.00 2 Tukang Batu L07 Org/hr 0.3500 60,000.00 21,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0350 70,000.00 2,450.00 4 Mandor L01 Org/hr 0.0300 80,000.00 2,400.00

JUMLAH HARGA TENAGA 53,750.00

B BAHAN

1 Lantai keramik artistik 10 x 10 M311 bh 106.0000 Err:509 Err:5092 Portland Cement (PC) M037 kg 8.1900 900.00 7,371.00 3 Pasir Pasang M002 m3 0.0450 60,000.00 2,700.00 4 Portland Cement (PC) Warna M039 kg 3.2000 6,500.00 20,800.00

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

: m2

: m2

Page 311: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : M.029JENIS PEKERJAAN : Pasang lantai keramik artistik 5 x 20 cmSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.6200 45,000.00 27,900.00 2 Tukang Batu L07 Org/hr 0.3500 60,000.00 21,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0350 70,000.00 2,450.00 4 Mandor L01 Org/hr 0.0300 80,000.00 2,400.00

JUMLAH HARGA TENAGA 53,750.00

B BAHAN

1 Lantai keramik artistik 5 x 20 M312 bh 106.0000 Err:509 Err:5092 Portland Cement (PC) M037 kg 8.1900 900.00 7,371.00 3 Pasir Pasang M002 m3 0.0450 60,000.00 2,700.00 4 Portland Cement (PC) Warna M039 kg 3.2000 6,500.00 20,800.00

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

ANALISA HARGA SATUAN

KODE ANALISA : M.030JENIS PEKERJAAN : Pasang dinding keramik artistik 10 x 20 cmSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.6000 45,000.00 27,000.00 2 Tukang Batu L07 Org/hr 0.4500 60,000.00 27,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0450 70,000.00 3,150.00 4 Mandor L01 Org/hr 0.0300 80,000.00 2,400.00

JUMLAH HARGA TENAGA 59,550.00

B BAHAN

1 Lantai keramik artistik 10 x 20 M310 bh 53.0000 Err:509 Err:5092 Portland Cement (PC) M037 kg 9.3000 900.00 8,370.00 3 Pasir Pasang M002 m3 0.0180 60,000.00 1,080.00 4 Portland Cement (PC) Warna M039 kg 2.7500 6,500.00 17,875.00

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

: m2

: m2

Page 312: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : M.031JENIS PEKERJAAN : Pasang dinding keramik artistik 5 x 20 cmSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.6000 45,000.00 27,000.00 2 Tukang Batu L07 Org/hr 0.4500 60,000.00 27,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0450 70,000.00 3,150.00 4 Mandor L01 Org/hr 0.0300 80,000.00 2,400.00

JUMLAH HARGA TENAGA 59,550.00

B BAHAN

1 Lantai keramik artistik 5 x 20 M312 bh 106.0000 Err:509 Err:5092 Portland Cement (PC) M037 kg 9.3000 900.00 8,370.00 3 Pasir Pasang M002 m3 0.0180 60,000.00 1,080.00 4 Portland Cement (PC) Warna M039 kg 2.9000 6,500.00 18,850.00

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

ANALISA HARGA SATUAN

KODE ANALISA : M.032JENIS PEKERJAAN : Pasang plint keramik artistik 10 x 20 cmSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0900 45,000.00 4,050.00 2 Tukang Batu L07 Org/hr 0.0900 60,000.00 5,400.00 3 Kepala Tukang Batu L02 Org/hr 0.0090 70,000.00 630.00 4 Mandor L01 Org/hr 0.0045 80,000.00 360.00

JUMLAH HARGA TENAGA 10,440.00

B BAHAN

1 Plint keramik artistik 10 x 20 M313 bh 5.0000 Err:509 Err:5092 Portland Cement (PC) M037 kg 1.6500 900.00 1,485.00 3 Pasir Pasang M002 m3 0.0032 60,000.00 192.00 4 Portland Cement (PC) Warna M039 kg 0.1000 6,500.00 650.00

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

: m2

: m1

Page 313: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : M.033JENIS PEKERJAAN : Pasang plint keramik artistik 10 x 10 cmSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0900 45,000.00 4,050.00 2 Tukang Batu L07 Org/hr 0.0900 60,000.00 5,400.00 3 Kepala Tukang Batu L02 Org/hr 0.0090 70,000.00 630.00 4 Mandor L01 Org/hr 0.0045 80,000.00 360.00

JUMLAH HARGA TENAGA 10,440.00

B BAHAN

1 Plint keramik artistik 10 x 10 M314 bh 10.0000 Err:509 Err:5092 Portland Cement (PC) M037 kg 1.6500 900.00 1,485.00 3 Pasir Pasang M002 m3 0.0032 60,000.00 192.00 4 Portland Cement (PC) Warna M039 kg 0.1200 6,500.00 780.00

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

ANALISA HARGA SATUAN

KODE ANALISA : M.034JENIS PEKERJAAN : Pasang plint keramik artistik 5 x 20 cmSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0900 45,000.00 4,050.00 2 Tukang Batu L07 Org/hr 0.0900 60,000.00 5,400.00 3 Kepala Tukang Batu L02 Org/hr 0.0090 70,000.00 630.00 4 Mandor L01 Org/hr 0.0045 80,000.00 360.00

JUMLAH HARGA TENAGA 10,440.00

B BAHAN

1 Plint keramik artistik 5 x 20 M315 bh 5.0000 Err:509 Err:5092 Portland Cement (PC) M037 kg 0.8500 900.00 765.00 3 Pasir Pasang M002 m3 0.0022 60,000.00 132.00 4 Portland Cement (PC) Warna M039 kg 0.0800 6,500.00 520.00

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

: m1

: m1

Page 314: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : M.035JENIS PEKERJAAN : Pasang internal cove artistik (5 x 5 x 20) cmSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.7500 45,000.00 33,750.00 2 Tukang Batu L07 Org/hr 0.4500 60,000.00 27,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0450 70,000.00 3,150.00 4 Mandor L01 Org/hr 0.0380 80,000.00 3,040.00

JUMLAH HARGA TENAGA 66,940.00

B BAHAN

1 Internal cove 5 x 5 x 20 cm M316 bh 5.3000 Err:509 Err:5092 Portland Cement (PC) M037 kg 1.1400 900.00 1,026.00 3 Pasir Pasang M002 m3 0.0030 60,000.00 180.00 4 Portland Cement (PC) Warna M039 kg 0.1000 6,500.00 650.00

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

ANALISA HARGA SATUAN

KODE ANALISA : M.036JENIS PEKERJAAN : Pasang gymflourSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.6500 45,000.00 29,250.00 2 Tukang Batu L07 Org/hr 0.3500 60,000.00 21,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0350 70,000.00 2,450.00 4 Mandor L01 Org/hr 0.0330 80,000.00 2,640.00

JUMLAH HARGA TENAGA 55,340.00

B BAHAN

1 Gymflour M333 m2 1.0500 205,000.00 215,250.00 2 Lem vinyl M424 kg 0.6000 50,220.00 30,132.00

JUMLAH HARGA BAHAN 245,382.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 300,722.00

: m2

: m2

Page 315: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : M.037JENIS PEKERJAAN : Pasang lantai parquetSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.6500 45,000.00 29,250.00 2 Tukang Batu L07 Org/hr 0.3500 60,000.00 21,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0350 70,000.00 2,450.00 4 Mandor L01 Org/hr 0.0330 80,000.00 2,640.00

JUMLAH HARGA TENAGA 55,340.00

B BAHAN

1 Wall Paper M333A m2 1.0500 Err:509 Err:5092 Lem vinyl M424 kg 0.6000 50,220.00 30,132.00

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

ANALISA HARGA SATUAN

KODE ANALISA : M.038JENIS PEKERJAAN : Pasang lantai karpetSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1700 45,000.00 7,650.00 2 Tukang Batu L07 Org/hr 0.1700 60,000.00 10,200.00 3 Kepala Tukang Batu L02 Org/hr 0.0170 70,000.00 1,190.00 4 Mandor L01 Org/hr 0.0090 80,000.00 720.00

JUMLAH HARGA TENAGA 19,760.00

B BAHAN

1 Wall Paper M333B m2 1.0500 Err:509 Err:5092 Lem vinyl M424 kg 0.3500 50,220.00 17,577.00

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

: m2

: m2

Page 316: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : M.039JENIS PEKERJAAN : Pasang lantai keramik ukuran 20 x 20 cm putihSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.6200 45,000.00 27,900.00 2 Tukang Batu L07 Org/hr 0.3500 60,000.00 21,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0350 70,000.00 2,450.00 4 Mandor L01 Org/hr 0.0300 80,000.00 2,400.00

JUMLAH HARGA TENAGA 53,750.00

B BAHAN

1 Keramik Lantai 20 x 20 cm putih M321 bh 26.5000 1,380.00 36,570.00 2 Portland Cement (PC) M037 kg 10.4000 900.00 9,360.00 3 Pasir Pasang M002 m3 0.0450 60,000.00 2,700.00 4 Portland Cement (PC) Warna M039 kg 1.6200 6,500.00 10,530.00

JUMLAH HARGA BAHAN 59,160.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 112,910.00

ANALISA HARGA SATUAN

KODE ANALISA : M.040JENIS PEKERJAAN : Pasang lantai keramik ukuran 20 x 20 cm warna/motifSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.6200 45,000.00 27,900.00 2 Tukang Batu L07 Org/hr 0.3500 60,000.00 21,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0350 70,000.00 2,450.00 4 Mandor L01 Org/hr 0.0300 80,000.00 2,400.00

JUMLAH HARGA TENAGA 53,750.00

B BAHAN

1 Keramik Lantai 20 x 20 cm warna/motiM322 bh 26.5000 1,530.00 40,545.00 2 Portland Cement (PC) M037 kg 10.4000 900.00 9,360.00 3 Pasir Pasang M002 m3 0.0450 60,000.00 2,700.00 4 Portland Cement (PC) Warna M039 kg 1.6200 6,500.00 10,530.00

JUMLAH HARGA BAHAN 63,135.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 116,885.00

: m2

: m2

Page 317: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : M.041JENIS PEKERJAAN : Pasang lantai keramik KM ukuran 20 x 20 cmSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.6200 45,000.00 27,900.00 2 Tukang Batu L07 Org/hr 0.3500 60,000.00 21,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0350 70,000.00 2,450.00 4 Mandor L01 Org/hr 0.0300 80,000.00 2,400.00

JUMLAH HARGA TENAGA 53,750.00

B BAHAN

1 Keramik Lantai KM 20 x 20 cm M323 bh 25.0000 1,790.00 44,750.00 2 Portland Cement (PC) M037 kg 11.3800 900.00 10,242.00 3 Pasir Pasang M002 m3 0.0420 60,000.00 2,520.00 4 Portland Cement (PC) Warna M039 kg 1.5000 6,500.00 9,750.00

JUMLAH HARGA BAHAN 67,262.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 121,012.00

ANALISA HARGA SATUAN

KODE ANALISA : M.042JENIS PEKERJAAN : Pasang lantai keramik ukuran 30 x 30 cm putihSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.6200 45,000.00 27,900.00 2 Tukang Batu L07 Org/hr 0.3500 60,000.00 21,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0350 70,000.00 2,450.00 4 Mandor L01 Org/hr 0.0300 80,000.00 2,400.00

JUMLAH HARGA TENAGA 53,750.00

B BAHAN

1 Keramik Lantai 30 x 30 cm putih M319 bh 11.8700 4,610.00 54,720.70 2 Portland Cement (PC) M037 kg 10.0000 900.00 9,000.00 3 Pasir Pasang M002 m3 0.0450 60,000.00 2,700.00 4 Portland Cement (PC) Warna M039 kg 1.6200 6,500.00 10,530.00

JUMLAH HARGA BAHAN 76,950.70

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 130,700.70

: m2

: m2

Page 318: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : M.043JENIS PEKERJAAN : Pasang lantai keramik ukuran 30 x 30 cm warna/motifSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.6200 45,000.00 27,900.00 2 Tukang Batu L07 Org/hr 0.3500 60,000.00 21,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0350 70,000.00 2,450.00 4 Mandor L01 Org/hr 0.0300 80,000.00 2,400.00

JUMLAH HARGA TENAGA 53,750.00

B BAHAN

1 Keramik Lantai 30 x 30 cm warna/motiM320 bh 11.8700 5,120.00 60,774.40 2 Portland Cement (PC) M037 kg 10.0000 900.00 9,000.00 3 Pasir Pasang M002 m3 0.0450 60,000.00 2,700.00 4 Portland Cement (PC) Warna M039 kg 1.6200 6,500.00 10,530.00

JUMLAH HARGA BAHAN 83,004.40

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 136,754.40

ANALISA HARGA SATUAN

KODE ANALISA : M.044JENIS PEKERJAAN : Pasang lantai keramik ukuran 40 x 40 cm putihSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.6000 45,000.00 27,000.00 2 Tukang Batu L07 Org/hr 0.3000 60,000.00 18,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0300 70,000.00 2,100.00 4 Mandor L01 Org/hr 0.0300 80,000.00 2,400.00

JUMLAH HARGA TENAGA 49,500.00

B BAHAN

1 Keramik Lantai 40 x 40 cm putih M317 bh 6.9300 11,270.00 78,101.10 2 Portland Cement (PC) M037 kg 9.8000 900.00 8,820.00 3 Pasir Pasang M002 m3 0.0215 60,000.00 1,290.00 4 Portland Cement (PC) Warna M039 kg 1.3000 6,500.00 8,450.00

JUMLAH HARGA BAHAN 96,661.10

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 146,161.10

: m2

: m2

Page 319: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : M.045JENIS PEKERJAAN : Pasang lantai keramik ukuran 40 x 40 cm warna/motifSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.6000 45,000.00 27,000.00 2 Tukang Batu L07 Org/hr 0.3000 60,000.00 18,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0300 70,000.00 2,100.00 4 Mandor L01 Org/hr 0.0300 80,000.00 2,400.00

JUMLAH HARGA TENAGA 49,500.00

B BAHAN

1 Keramik Lantai 40 x 40 cm warna/motiM318 bh 6.9300 12,300.00 85,239.00 2 Portland Cement (PC) M037 kg 9.8000 900.00 8,820.00 3 Pasir Pasang M002 m3 0.0215 60,000.00 1,290.00 4 Portland Cement (PC) Warna M039 kg 1.3000 6,500.00 8,450.00

JUMLAH HARGA BAHAN 103,799.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 153,299.00

ANALISA HARGA SATUAN

KODE ANALISA : M.046JENIS PEKERJAAN : Pasang lantai marmer ukuran 100 x 100 cm SATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.6200 45,000.00 27,900.00 2 Tukang Batu L07 Org/hr 0.3500 60,000.00 21,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0350 70,000.00 2,450.00 4 Mandor L01 Org/hr 0.0300 80,000.00 2,400.00

JUMLAH HARGA TENAGA 53,750.00

B BAHAN

1 Wall Paper M333C m2 1.0600 Err:509 Err:5092 Portland Cement (PC) M037 kg 8.1900 900.00 7,371.00 3 Pasir Pasang M002 m3 0.0450 60,000.00 2,700.00 4 Portland Cement (PC) Warna M039 kg 0.6500 6,500.00 4,225.00

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

: m2

: m2

Page 320: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : M.047JENIS PEKERJAAN : Pasang plint keramik lantai ukuran 10 x 20 cmSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0900 45,000.00 4,050.00 2 Tukang Batu L07 Org/hr 0.0900 60,000.00 5,400.00 3 Kepala Tukang Batu L02 Org/hr 0.0090 70,000.00 630.00 4 Mandor L01 Org/hr 0.0050 80,000.00 400.00

JUMLAH HARGA TENAGA 10,480.00

B BAHAN

1 Plint Keramik Lantai 10 x 20 cm M324 bh 5.3000 4,100.00 21,730.00 2 Portland Cement (PC) M037 kg 1.1400 900.00 1,026.00 3 Pasir Pasang M002 m3 0.0030 60,000.00 180.00 4 Portland Cement (PC) Warna M039 kg 0.0250 6,500.00 162.50

JUMLAH HARGA BAHAN 23,098.50

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 33,578.50

ANALISA HARGA SATUAN

KODE ANALISA : M.048JENIS PEKERJAAN : Pasang plint keramik lantai ukuran 10 x 30 cmSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.9000 45,000.00 40,500.00 2 Tukang Batu L07 Org/hr 0.0900 60,000.00 5,400.00 3 Kepala Tukang Batu L02 Org/hr 0.0090 70,000.00 630.00 4 Mandor L01 Org/hr 0.0045 80,000.00 360.00

JUMLAH HARGA TENAGA 46,890.00

B BAHAN

1 Plint Keramik Lantai 10 x 30 cm M325 bh 3.3300 7,680.00 25,574.40 2 Portland Cement (PC) M037 kg 1.6500 900.00 1,485.00 3 Pasir Pasang M002 m3 0.0032 60,000.00 192.00 4 Portland Cement (PC) Warna M039 kg 0.1000 6,500.00 650.00

JUMLAH HARGA BAHAN 27,901.40

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 74,791.40

: m1

: m1

Page 321: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : M.049JENIS PEKERJAAN : Pasang plint keramik lantai ukuran 10 x 40 cmSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.9000 45,000.00 40,500.00 2 Tukang Batu L07 Org/hr 0.0900 60,000.00 5,400.00 3 Kepala Tukang Batu L02 Org/hr 0.0090 70,000.00 630.00 4 Mandor L01 Org/hr 0.0045 80,000.00 360.00

JUMLAH HARGA TENAGA 46,890.00

B BAHAN

1 Plint Keramik Lantai 10 x 40 cm M326 bh 2.5000 14,350.00 35,875.00 2 Portland Cement (PC) M037 kg 1.6500 900.00 1,485.00 3 Pasir Pasang M002 m3 0.0032 60,000.00 192.00 4 Portland Cement (PC) Warna M039 kg 0.1000 6,500.00 650.00

JUMLAH HARGA BAHAN 38,202.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 85,092.00

ANALISA HARGA SATUAN

KODE ANALISA : M.050JENIS PEKERJAAN : Pasang dinding porselin ukuran 15 x 15 cm, putihSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.6000 45,000.00 27,000.00 2 Tukang Batu L07 Org/hr 0.4500 60,000.00 27,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0450 70,000.00 3,150.00 4 Mandor L01 Org/hr 0.0300 80,000.00 2,400.00

JUMLAH HARGA TENAGA 59,550.00

B BAHAN

1 Porselin 15 x 15 cm putih M329 bh 45.0000 820.00 36,900.00 2 Portland Cement (PC) M037 kg 9.3000 900.00 8,370.00 3 Pasir Pasang M002 m3 0.0180 60,000.00 1,080.00 4 Portland Cement (PC) Warna M039 kg 1.5000 6,500.00 9,750.00

JUMLAH HARGA BAHAN 56,100.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 115,650.00

: m1

: m2

Page 322: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : M.051JENIS PEKERJAAN : Pasang dinding porselin ukuran 11 x 11 cm, putihSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.6200 45,000.00 27,900.00 2 Tukang Batu L07 Org/hr 0.5000 60,000.00 30,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0500 70,000.00 3,500.00 4 Mandor L01 Org/hr 0.0300 80,000.00 2,400.00

JUMLAH HARGA TENAGA 63,800.00

B BAHAN

1 Porselin 11 x 11 cm putih M333.d m2 86.0000 750.00 64,500.00 2 Portland Cement (PC) M037 kg 9.3000 900.00 8,370.00 3 Pasir Pasang M002 m3 0.0180 60,000.00 1,080.00 4 Portland Cement (PC) Warna M039 kg 1.5000 6,500.00 9,750.00

JUMLAH HARGA BAHAN 83,700.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 147,500.00

ANALISA HARGA SATUAN

KODE ANALISA : M.052JENIS PEKERJAAN : Pasang dinding porselin ukuran 11 x 11 cm, warnaSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.6200 45,000.00 27,900.00 2 Tukang Batu L07 Org/hr 0.5000 60,000.00 30,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0500 70,000.00 3,500.00 4 Mandor L01 Org/hr 0.0300 80,000.00 2,400.00

JUMLAH HARGA TENAGA 63,800.00

B BAHAN

1 Porselin 11x 11 cm warna M333.e m2 86.0000 850.00 73,100.00 2 Portland Cement (PC) M037 kg 9.3000 900.00 8,370.00 3 Pasir Pasang M002 m3 0.0180 60,000.00 1,080.00 4 Portland Cement (PC) Warna M039 kg 1.5000 6,500.00 9,750.00

JUMLAH HARGA BAHAN 92,300.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 156,100.00

: m2

: m2

Page 323: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : M.053JENIS PEKERJAAN : Pasang dinding porselin ukuran 15 x 15 cm, warnaSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.6000 45,000.00 27,000.00 2 Tukang Batu L07 Org/hr 0.4500 60,000.00 27,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0450 70,000.00 3,150.00 4 Mandor L01 Org/hr 0.0300 80,000.00 2,400.00

JUMLAH HARGA TENAGA 59,550.00

B BAHAN

1 Porselin 15 x 15 cm warna M330 bh 45.0000 920.00 41,400.00 2 Portland Cement (PC) M037 kg 9.3000 900.00 8,370.00 3 Pasir Pasang M002 m3 0.0180 60,000.00 1,080.00 4 Portland Cement (PC) Warna M039 kg 1.5000 6,500.00 9,750.00

JUMLAH HARGA BAHAN 60,600.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 120,150.00

ANALISA HARGA SATUAN

KODE ANALISA : M.054JENIS PEKERJAAN : Pasang dinding porselin ukuran 10 x 20 cm, warnaSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.6000 45,000.00 27,000.00 2 Tukang Batu L07 Org/hr 0.4500 60,000.00 27,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0450 70,000.00 3,150.00 4 Mandor L01 Org/hr 0.0300 80,000.00 2,400.00

JUMLAH HARGA TENAGA 59,550.00

B BAHAN

1 Porselin 10 x 20 cm warna M331 bh 53.0000 870.00 46,110.00 2 Portland Cement (PC) M037 kg 9.3000 900.00 8,370.00 3 Pasir Pasang M002 m3 0.0180 60,000.00 1,080.00 4 Portland Cement (PC) Warna M039 kg 2.7500 6,500.00 17,875.00

JUMLAH HARGA BAHAN 73,435.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 132,985.00

: m2

: m2

Page 324: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : M.055JENIS PEKERJAAN : Pasang dinding porselin ukuran 20 x 20 cm, warnaSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.6000 45,000.00 27,000.00 2 Tukang Batu L07 Org/hr 0.4500 60,000.00 27,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0450 70,000.00 3,150.00 4 Mandor L01 Org/hr 0.0300 80,000.00 2,400.00

JUMLAH HARGA TENAGA 59,550.00

B BAHAN

1 Porselin 20 x 20 cm warna M332 bh 26.5000 1,790.00 47,435.00 2 Portland Cement (PC) M037 kg 9.3000 900.00 8,370.00 3 Pasir Pasang M002 m3 0.0180 60,000.00 1,080.00 4 Portland Cement (PC) Warna M039 kg 1.9400 6,500.00 12,610.00

JUMLAH HARGA BAHAN 69,495.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 129,045.00

ANALISA HARGA SATUAN

KODE ANALISA : M.056JENIS PEKERJAAN : Pasang dinding keramik ukuran 20 x 20 cmSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.6000 45,000.00 27,000.00 2 Tukang Batu L07 Org/hr 0.4500 60,000.00 27,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0450 70,000.00 3,150.00 4 Mandor L01 Org/hr 0.0300 80,000.00 2,400.00

JUMLAH HARGA TENAGA 59,550.00

B BAHAN

1 Keramik Dinding 20 x 20 cm M328 bh 26.5000 2,560.00 67,840.00 2 Portland Cement (PC) M037 kg 9.3000 900.00 8,370.00 3 Pasir Pasang M002 m3 0.0180 60,000.00 1,080.00 4 Portland Cement (PC) Warna M039 kg 1.9400 6,500.00 12,610.00

JUMLAH HARGA BAHAN 89,900.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 149,450.00

: m2

: m2

Page 325: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : M.057JENIS PEKERJAAN : Pasang dinding keramik ukuran 20 x 25 cmSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.6000 45,000.00 27,000.00 2 Tukang Batu L07 Org/hr 0.1000 60,000.00 6,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0450 70,000.00 3,150.00 4 Mandor L01 Org/hr 0.0300 80,000.00 2,400.00

JUMLAH HARGA TENAGA 38,550.00

B BAHAN

1 Keramik Dinding 20 x 25 cm M327 bh 20.0000 3,580.00 71,600.00 2 Portland Cement (PC) M037 kg 9.3000 900.00 8,370.00 3 Pasir Pasang M002 m3 0.0180 60,000.00 1,080.00 4 Portland Cement (PC) Warna M039 kg 1.5000 6,500.00 9,750.00

JUMLAH HARGA BAHAN 90,800.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 129,350.00

ANALISA HARGA SATUAN

KODE ANALISA : M.058JENIS PEKERJAAN : Pasang dinding batu tempel hitamSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.6200 45,000.00 27,900.00 2 Tukang Batu L07 Org/hr 0.3500 60,000.00 21,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0350 70,000.00 2,450.00 4 Mandor L01 Org/hr 0.0300 80,000.00 2,400.00

JUMLAH HARGA TENAGA 53,750.00

B BAHAN

1 Batu Tempel Hitam M029 m2 1.1000 67,500.00 74,250.00 2 Portland Cement (PC) M037 kg 11.7500 900.00 10,575.00 3 Pasir Pasang M002 m3 0.0350 60,000.00 2,100.00

JUMLAH HARGA BAHAN 86,925.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 140,675.00

: m2

: m2

Page 326: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : M.059JENIS PEKERJAAN : Pasang lantai vinyl ukuran (30x30)cm KL ISATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1500 45,000.00 6,750.00 2 Tukang Batu L07 Org/hr 0.1500 60,000.00 9,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0150 70,000.00 1,050.00 4 Mandor L01 Org/hr 0.0080 80,000.00 640.00

JUMLAH HARGA TENAGA 17,440.00

B BAHAN

1 Vinyl (30x30)cm M430.a kg 1.1000 Err:509 Err:5092 Lem vinyl M424 kg 11.7500 50,220.00 590,085.00

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

ANALISA HARGA SATUAN

KODE ANALISA : M.060JENIS PEKERJAAN : Pasang wallpaper, lebar 50 cmSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.7500 45,000.00 33,750.00 2 Tukang Batu L07 Org/hr 0.1700 60,000.00 10,200.00 3 Kepala Tukang Batu L02 Org/hr 0.0170 70,000.00 1,190.00 4 Mandor L01 Org/hr 0.0040 80,000.00 320.00

JUMLAH HARGA TENAGA 45,460.00

B BAHAN

1 Wall Paper M333.f m2 1.1000 Err:509 Err:5092 Lem vinyl M424 kg 0.2500 50,220.00 12,555.00

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

: m2

: m2

Page 327: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : M.061JENIS PEKERJAAN : Pasang dinding batu palimananSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.6200 45,000.00 27,900.00 2 Tukang Batu L07 Org/hr 0.3500 60,000.00 21,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0350 70,000.00 2,450.00 4 Mandor L01 Org/hr 0.0300 80,000.00 2,400.00

JUMLAH HARGA TENAGA 53,750.00

B BAHAN

1 Batu Palimanan M028 m2 1.0500 71,650.00 75,232.50 2 Portland Cement (PC) M037 kg 11.7500 900.00 10,575.00 3 Pasir Pasang M002 m3 0.0350 60,000.00 2,100.00

JUMLAH HARGA BAHAN 87,907.50

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 141,657.50

ANALISA HARGA SATUAN

KODE ANALISA : M.062JENIS PEKERJAAN : Pasang dinding granitoSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.6200 45,000.00 27,900.00 2 Tukang Batu L07 Org/hr 0.3500 60,000.00 21,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0350 70,000.00 2,450.00 4 Mandor L01 Org/hr 0.0300 80,000.00 2,400.00

JUMLAH HARGA TENAGA 53,750.00

B BAHAN

1 Ubin Granito 30 x 30 cm M299 bh 1.0500 Err:509 Err:5092 Portland Cement (PC) M037 kg 11.7500 900.00 10,575.00 3 Pasir Pasang M002 m3 0.0350 60,000.00 2,100.00

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

: m2

: m2

Page 328: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : M.063JENIS PEKERJAAN : Pasang dinding marmer ukuran 100 x 100 cmSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.7200 45,000.00 32,400.00 2 Tukang Batu L07 Org/hr 0.6500 60,000.00 39,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0650 70,000.00 4,550.00 4 Mandor L01 Org/hr 0.0350 80,000.00 2,800.00

JUMLAH HARGA TENAGA 78,750.00

B BAHAN

1 Wall Paper M333C m2 1.0200 Err:509 Err:5092 Portland Cement (PC) M037 kg 12.4400 900.00 11,196.00 3 Pasir Pasang M002 m3 0.0250 60,000.00 1,500.00

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

ANALISA HARGA SATUAN

KODE ANALISA : M.064JENIS PEKERJAAN : Pasang dinding terasoSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.6200 45,000.00 27,900.00 2 Tukang Batu L07 Org/hr 0.3500 60,000.00 21,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0350 70,000.00 2,450.00 4 Mandor L01 Org/hr 0.0300 80,000.00 2,400.00

JUMLAH HARGA TENAGA 53,750.00

B BAHAN

1 Ubin Terasso 30 x 30 cm M297 bh 1.0500 Err:509 Err:5092 Portland Cement (PC) M037 kg 11.7500 900.00 10,575.00 3 Pasir Pasang M002 m3 0.0350 60,000.00 2,100.00

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

: m2

: m2

Page 329: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : M.065JENIS PEKERJAAN : Pasang paving stone (blok) segi empat biasaSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.5000 45,000.00 22,500.00 2 Tukang Batu L07 Org/hr 0.2500 60,000.00 15,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0250 70,000.00 1,750.00 4 Mandor L01 Org/hr 0.0250 80,000.00 2,000.00

JUMLAH HARGA TENAGA 41,250.00

B BAHAN

1 Paving Block Segi Empat biasa M033 bh 45.0000 895.00 40,275.00 2 Pasir Pasang M002 m3 0.0350 60,000.00 2,100.00

JUMLAH HARGA BAHAN 42,375.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 83,625.00

ANALISA HARGA SATUAN

KODE ANALISA : M.066JENIS PEKERJAAN : Pasang paving stone (blok) segi empat warnaSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.5000 45,000.00 22,500.00 2 Tukang Batu L07 Org/hr 0.2500 60,000.00 15,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0250 70,000.00 1,750.00 4 Mandor L01 Org/hr 0.0250 80,000.00 2,000.00

JUMLAH HARGA TENAGA 41,250.00

B BAHAN

1 Paving Block Segi Empat warna M034 bh 45.0000 1,075.00 48,375.00 2 Pasir Pasang M002 m3 0.0350 60,000.00 2,100.00

JUMLAH HARGA BAHAN 50,475.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 91,725.00

: m2

: m2

Page 330: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : M.067JENIS PEKERJAAN : Pasang paving stone (blok) Segi Enam biasaSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.5000 45,000.00 22,500.00 2 Tukang Batu L07 Org/hr 0.2500 60,000.00 15,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0250 70,000.00 1,750.00 4 Mandor L01 Org/hr 0.0250 80,000.00 2,000.00

JUMLAH HARGA TENAGA 41,250.00

B BAHAN

1 Paving Block Segi Enam biasa M035 bh 28.0000 1,450.00 40,600.00 2 Pasir Pasang M002 m3 0.0350 60,000.00 2,100.00

JUMLAH HARGA BAHAN 42,700.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 83,950.00

ANALISA HARGA SATUAN

KODE ANALISA : M.068JENIS PEKERJAAN : Pasang paving stone (blok) Segi Enam WarnaSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.5000 45,000.00 22,500.00 2 Tukang Batu L07 Org/hr 0.2500 60,000.00 15,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0250 70,000.00 1,750.00 4 Mandor L01 Org/hr 0.0250 80,000.00 2,000.00

JUMLAH HARGA TENAGA 41,250.00

B BAHAN

1 Paving Block Segi Enam warna M036.a bh 28.0000 1,700.00 47,600.00 2 Pasir Pasang M002 m3 0.0350 60,000.00 2,100.00

JUMLAH HARGA BAHAN 49,700.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 90,950.00

: m2

: m2

Page 331: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : M.069JENIS PEKERJAAN : Pasang paving stone (blok) Tiga Berlian biasaSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.5000 45,000.00 22,500.00 2 Tukang Batu L07 Org/hr 0.2500 60,000.00 15,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0250 70,000.00 1,750.00 4 Mandor L01 Org/hr 0.0250 80,000.00 2,000.00

JUMLAH HARGA TENAGA 41,250.00

B BAHAN

1 Paving Block Tiga Berlian biasa M036.b bh 33.0000 1,225.00 40,425.00 2 Pasir Pasang M002 m3 0.0350 60,000.00 2,100.00

JUMLAH HARGA BAHAN 42,525.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 83,775.00

ANALISA HARGA SATUAN

KODE ANALISA : M.070JENIS PEKERJAAN : Pasang paving stone (blok) Tiga Berlian warnaSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.5000 45,000.00 22,500.00 2 Tukang Batu L07 Org/hr 0.2500 60,000.00 15,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0250 70,000.00 1,750.00 4 Mandor L01 Org/hr 0.0250 80,000.00 2,000.00

JUMLAH HARGA TENAGA 41,250.00

B BAHAN

1 Paving Block Tiga Berlian warna M036.c bh 33.0000 1,450.00 47,850.00 2 Pasir Pasang M002 m3 0.0350 60,000.00 2,100.00

JUMLAH HARGA BAHAN 49,950.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 91,200.00

: m2

: m2

Page 332: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : N.001JENIS PEKERJAAN : Mengikis/mengerok permukaan cat lamaSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1500 45,000.00 6,750.00 2 Tukang Cat L10 Org/hr - 60,000.00 - 3 Kepala Tukang Cat L05 Org/hr - 47,000.00 - 4 Mandor L01 Org/hr 0.0025 80,000.00 200.00

JUMLAH HARGA TENAGA 6,950.00

B BAHAN

1 Soda api M429 kg 0.0500 21,520.00 1,076.00

JUMLAH HARGA BAHAN 1,076.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 8,026.00

ANALISA HARGA SATUAN

KODE ANALISA : N.002JENIS PEKERJAAN : Mencuci bidang permukaan cat tembok lamaSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1500 45,000.00 6,750.00 2 Tukang Cat L10 Org/hr - 60,000.00 - 3 Kepala Tukang Cat L05 Org/hr - 47,000.00 - 4 Mandor L01 Org/hr 0.0025 80,000.00 200.00

JUMLAH HARGA TENAGA 6,950.00

B BAHAN

1 Sabun M430 kg 0.0500 28,700.00 1,435.00

JUMLAH HARGA BAHAN 1,435.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 8,385.00

Page 333: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : N.003JENIS PEKERJAAN : mengerok karat cat lama permukaan baja dengan cara manualSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1500 45,000.00 6,750.00 2 Tukang Cat L10 Org/hr - 60,000.00 - 3 Kepala Tukang Cat L05 Org/hr - 47,000.00 - 4 Mandor L01 Org/hr 0.0025 80,000.00 200.00

JUMLAH HARGA TENAGA 6,950.00

B BAHAN

1 Sabun M430 kg 0.0500 28,700.00 1,435.00

JUMLAH HARGA BAHAN 1,435.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 8,385.00

ANALISA HARGA SATUAN

KODE ANALISA : N.004JENIS PEKERJAAN : menyabun permukaan tembok lamaSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1500 45,000.00 6,750.00 2 Tukang Cat L10 Org/hr - 60,000.00 - 3 Kepala Tukang Cat L05 Org/hr - 47,000.00 - 4 Mandor L01 Org/hr 0.0025 80,000.00 200.00

JUMLAH HARGA TENAGA 6,950.00

B BAHAN

1 Sabun M430 kg 0.0500 28,700.00 1,435.00

JUMLAH HARGA BAHAN 1,435.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 8,385.00

Page 334: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : N.005JENIS PEKERJAAN : mengerok karat/cat lama permukaan baja dengan pancar pasir

(sandblasting) dengan tingkat kebersihan Sa 2,5SATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 1.6000 45,000.00 72,000.00 2 Tukang Cat L10 Org/hr 1.6000 60,000.00 96,000.00 3 Kepala Tukang Cat L05 Org/hr 0.8000 47,000.00 37,600.00 4 Mandor L01 Org/hr 0.5000 80,000.00 40,000.00

JUMLAH HARGA TENAGA 245,600.00

B BAHAN

1 Pasir Silika M005 m3 40.0000 Err:509 Err:5092 Bensin M482 ltr 10.0000 5,421.00 54,210.00

JUMLAH HARGA BAHAN Err:509

C PERALATAN

1 Air Bersih M494 ltr 1.0000 25.00 25.00

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

ANALISA HARGA SATUAN

KODE ANALISA : N.006JENIS PEKERJAAN : Mendempul dan menggosok kayuSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0400 45,000.00 1,800.00 2 Tukang Cat L10 Org/hr 0.0400 60,000.00 2,400.00 3 Kepala Tukang Cat L05 Org/hr 0.0040 47,000.00 188.00 4 Mandor L01 Org/hr 0.0025 80,000.00 200.00

JUMLAH HARGA TENAGA 4,588.00

B BAHAN

1 Dempul Jadi M405 kg 0.0800 28,700.00 2,296.00 2 Minyak Cat M406 Ltr 0.0200 16,100.00 322.00 3 Batu Apung M430.b kg 0.0100 Err:509 Err:509

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

Page 335: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : N.007JENIS PEKERJAAN : Pengecatan kayu lamaSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0700 45,000.00 3,150.00 2 Tukang Cat L10 Org/hr 0.0750 60,000.00 4,500.00 3 Kepala Tukang Cat L05 Org/hr 0.0075 47,000.00 352.50 4 Mandor L01 Org/hr 0.0025 80,000.00 200.00

JUMLAH HARGA TENAGA 8,202.50

B BAHAN

1 Plamir Kayu M402 kg 0.1500 16,760.00 2,514.00 2 Cat Dasar Kayu M411 kg 0.1700 28,700.00 4,879.00 3 Cat Kayu M414 kg 0.1700 64,570.00 10,976.90

JUMLAH HARGA BAHAN 18,369.90

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 26,572.40

ANALISA HARGA SATUAN

KODE ANALISA : N.008JENIS PEKERJAAN : Pengecatan kayu baru (1 lapis plamir, 1 lapis cat dasar,

2 lapis cat penutup)SATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0700 45,000.00 3,150.00 2 Tukang Cat L10 Org/hr 0.0090 60,000.00 540.00 3 Kepala Tukang Cat L05 Org/hr 0.0060 47,000.00 282.00 4 Mandor L01 Org/hr 0.0025 80,000.00 200.00

JUMLAH HARGA TENAGA 4,172.00

B BAHAN

1 Cat meni kayu M409 kg 0.2000 20,840.00 4,168.00 2 Plamir Kayu M402 kg 0.1500 16,760.00 2,514.00 3 Cat Dasar Kayu M411 kg 0.1700 28,700.00 4,879.00 4 Cat Kayu M414 kg 0.2600 64,570.00 16,788.20

JUMLAH HARGA BAHAN 28,349.20

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 32,521.20

Page 336: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : N.009JENIS PEKERJAAN : Pengecatan kayu baru (1 lapis plamir, 1 lapis cat dasar,

3 lapis cat penutup)SATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0700 45,000.00 3,150.00 2 Tukang Cat L10 Org/hr 0.1050 60,000.00 6,300.00 3 Kepala Tukang Cat L05 Org/hr 0.0040 47,000.00 188.00 4 Mandor L01 Org/hr 0.0025 80,000.00 200.00

JUMLAH HARGA TENAGA 9,838.00

B BAHAN

1 Cat meni kayu M409 kg 0.2000 20,840.00 4,168.00 2 Plamir Kayu M402 kg 0.1500 16,760.00 2,514.00 3 Cat Dasar Kayu M411 kg 0.1700 28,700.00 4,879.00 4 Cat Kayu M414 kg 0.3500 64,570.00 22,599.50

JUMLAH HARGA BAHAN 34,160.50

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 43,998.50

ANALISA HARGA SATUAN

KODE ANALISA : N.010JENIS PEKERJAAN : Pelaburan kayu dengan teak oilSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0400 45,000.00 1,800.00 2 Tukang Cat L10 Org/hr 0.0630 60,000.00 3,780.00 3 Kepala Tukang Cat L05 Org/hr 0.0630 47,000.00 2,961.00 4 Mandor L01 Org/hr 0.0050 80,000.00 400.00

JUMLAH HARGA TENAGA 8,941.00

B BAHAN

1 Teak oli M426 Ltr 0.3600 1,790.00 644.40

JUMLAH HARGA BAHAN 644.40

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 9,585.40

Page 337: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : N.011JENIS PEKERJAAN : Pelaburan kayu dengan politurSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr - 45,000.00 - 2 Tukang Cat L10 Org/hr 0.0600 60,000.00 3,600.00 3 Kepala Tukang Cat L05 Org/hr 0.0160 47,000.00 752.00 4 Mandor L01 Org/hr 0.0025 80,000.00 200.00

JUMLAH HARGA TENAGA 4,552.00

B BAHAN

1 Politur Jadi M420 Ltr 0.5500 64,570.00 35,513.50 2 Kertas Gosok M401 Lbr 2.0000 10,000.00 20,000.00

JUMLAH HARGA BAHAN 55,513.50

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 60,065.50

ANALISA HARGA SATUAN

KODE ANALISA : N.012JENIS PEKERJAAN : Pelaburan kayu dengan cat residu dan terSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1000 45,000.00 4,500.00 2 Tukang Cat L10 Org/hr - 60,000.00 - 3 Kepala Tukang Cat L05 Org/hr - 47,000.00 - 4 Mandor L01 Org/hr 0.0060 80,000.00 480.00

JUMLAH HARGA TENAGA 4,980.00

B BAHAN

1 Residu atau Teer M425 Ltr 0.3500 24,600.00 8,610.00

JUMLAH HARGA BAHAN 8,610.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 13,590.00

Page 338: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : N.013JENIS PEKERJAAN : Pelaburan kayu dengan vernisSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1600 45,000.00 7,200.00 2 Tukang Cat L10 Org/hr 0.1600 60,000.00 9,600.00 3 Kepala Tukang Cat L05 Org/hr 0.0160 47,000.00 752.00 4 Mandor L01 Org/hr 0.0025 80,000.00 200.00

JUMLAH HARGA TENAGA 17,752.00

B BAHAN

1 Vernis M419 Ltr 0.1500 28,700.00 4,305.00 2 Dempul Jadi M405 kg 0.0500 28,700.00 1,435.00 3 Kertas Gosok M401 Lbr 0.1000 10,000.00 1,000.00 4 Kuas M421 bh 0.0100 10,760.00 107.60

JUMLAH HARGA BAHAN 6,847.60

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 24,599.60

ANALISA HARGA SATUAN

KODE ANALISA : N.014JENIS PEKERJAAN : Pengecatan tembok baru (1 lapis plamir, 1 lapis cat dasar,

2 lapis cat penutup)SATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0200 45,000.00 900.00 2 Tukang Cat L10 Org/hr 0.0630 60,000.00 3,780.00 3 Kepala Tukang Cat L05 Org/hr 0.0063 47,000.00 296.10 4 Mandor L01 Org/hr 0.0025 80,000.00 200.00

JUMLAH HARGA TENAGA 5,176.10

B BAHAN

1 Plamir Tembok M403 kg 0.1000 45,000.00 4,500.00 2 Cat Dasar Tembok M412 kg 0.1000 4,190.00 419.00 3 Cat Tembok M415 kg 0.2600 17,500.00 4,550.00

JUMLAH HARGA BAHAN 9,469.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 14,645.10

Page 339: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : N.015JENIS PEKERJAAN : Pengecatan tembok lama (1 lapis cat dasar, 2 lapis cat penutup)SATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0280 45,000.00 1,260.00 2 Tukang Cat L10 Org/hr 0.0420 60,000.00 2,520.00 3 Kepala Tukang Cat L05 Org/hr 0.0042 47,000.00 197.40 4 Mandor L01 Org/hr 0.0025 80,000.00 200.00

JUMLAH HARGA TENAGA 4,177.40

B BAHAN

1 Cat Dasar Tembok M412 kg 0.1200 4,190.00 502.80 2 Cat Tembok M415 kg 0.1800 17,500.00 3,150.00

JUMLAH HARGA BAHAN 3,652.80

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 7,830.20

ANALISA HARGA SATUAN

KODE ANALISA : N.016JENIS PEKERJAAN : Melabur tembok dengan kalkariumSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0280 45,000.00 1,260.00 2 Tukang Cat L10 Org/hr 0.0420 60,000.00 2,520.00 3 Kepala Tukang Cat L05 Org/hr 0.0042 47,000.00 197.40 4 Mandor L01 Org/hr 0.0025 80,000.00 200.00

JUMLAH HARGA TENAGA 4,177.40

B BAHAN

1 Kalkarium M427 kg 0.1000 7,170.00 717.00

JUMLAH HARGA BAHAN 717.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 4,894.40

Page 340: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : N.017JENIS PEKERJAAN : Melabur tembok dengan kapur sirihSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1000 45,000.00 4,500.00 2 Tukang Cat L10 Org/hr 0.0010 60,000.00 60.00 3 Kepala Tukang Cat L05 Org/hr 0.0001 47,000.00 4.70 4 Mandor L01 Org/hr 0.0025 80,000.00 200.00

JUMLAH HARGA TENAGA 4,764.70

B BAHAN

1 Kertas Gosok M401 Lbr 0.1000 10,000.00 1,000.00 2 Alang-Alang M430.c ikat 0.2500 Err:509 Err:5093 Usuk : 5/7 M061 m3 0.0020 4,500,000.00 9,000.00 4 Kapur Sirih M428 kg 0.1500 3,920.00 588.00

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

ANALISA HARGA SATUAN

KODE ANALISA : N.018JENIS PEKERJAAN : Melabur tembok lama dengan kapur sirih (untuk pemeliharaan)SATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0400 45,000.00 1,800.00 2 Tukang Cat L10 Org/hr 0.0050 60,000.00 300.00 3 Kepala Tukang Cat L05 Org/hr 0.0005 47,000.00 23.50 4 Mandor L01 Org/hr 0.0025 80,000.00 200.00

JUMLAH HARGA TENAGA 2,323.50

B BAHAN

1 Usuk : 5/7 M061 m3 0.0020 4,500,000.00 9,000.00 2 Kapur Sirih M428 kg 0.3000 3,920.00 1,176.00

JUMLAH HARGA BAHAN 10,176.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 12,499.50

Page 341: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : N.019JENIS PEKERJAAN : Pengecatan plafon (1 lapis plamir, 1 lapis cat dasar,

2 lapis cat penutup)SATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0200 45,000.00 900.00 2 Tukang Cat L10 Org/hr 0.0630 60,000.00 3,780.00 3 Kepala Tukang Cat L05 Org/hr 0.0063 47,000.00 296.10 4 Mandor L01 Org/hr 0.0025 80,000.00 200.00

JUMLAH HARGA TENAGA 5,176.10

B BAHAN

1 Plamir Tembok M403 kg 0.1000 45,000.00 4,500.00 2 Cat Dasar Tembok M412 kg 0.1000 4,190.00 419.00 3 Cat Tembok M415 kg 0.2600 17,500.00 4,550.00

JUMLAH HARGA BAHAN 9,469.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 14,645.10

ANALISA HARGA SATUAN

KODE ANALISA : N.020JENIS PEKERJAAN : Pengecatan permukaan baja dengan meni besiSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0200 45,000.00 900.00 2 Tukang Cat L10 Org/hr 0.2000 60,000.00 12,000.00 3 Kepala Tukang Cat L05 Org/hr 0.0200 47,000.00 940.00 4 Mandor L01 Org/hr 0.0100 80,000.00 800.00

JUMLAH HARGA TENAGA 14,640.00

B BAHAN

1 Cat meni besi M410 kg 0.1000 27,920.00 2,792.00 2 Kuas M421 bh 0.0100 10,760.00 107.60

JUMLAH HARGA BAHAN 2,899.60

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 17,539.60

Page 342: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : N.021JENIS PEKERJAAN : Pengecatan permukaan baja dengan meni besi dan perancahSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.2500 45,000.00 11,250.00 2 Tukang Cat L10 Org/hr 0.2250 60,000.00 13,500.00 3 Kepala Tukang Cat L05 Org/hr 0.0225 47,000.00 1,057.50 4 Mandor L01 Org/hr 0.0075 80,000.00 600.00

JUMLAH HARGA TENAGA 26,407.50

B BAHAN

1 Cat meni besi M410 kg 0.1000 27,920.00 2,792.00 2 Kuas M421 bh 0.0100 10,760.00 107.60 3 Usuk : 5/7 M055 m3 0.0020 Err:509 Err:509

JUMLAH HARGA BAHAN Err:509

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) Err:509

ANALISA HARGA SATUAN

KODE ANALISA : N.022JENIS PEKERJAAN : Pengecatan permukaan baja lapis seng (galbani) secara manual

sistem 1 lapis cat mutakhir tebal 0.20 mmSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0060 45,000.00 270.00 2 Tukang Cat L10 Org/hr 0.0600 60,000.00 3,600.00 3 Kepala Tukang Cat L05 Org/hr 0.0120 47,000.00 564.00 4 Mandor L01 Org/hr 0.0060 80,000.00 480.00

JUMLAH HARGA TENAGA 4,914.00

B BAHAN

1 Cat Besi M416 kg 0.3000 68,160.00 20,448.00

JUMLAH HARGA BAHAN 20,448.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 25,362.00

Page 343: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : N.023JENIS PEKERJAAN : Pengecatan permukaan baja lapis seng (galbani) secara manual

sistem 3 lapis cat konvensional tebal 0.20 mmSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.5000 45,000.00 22,500.00 2 Tukang Cat L10 Org/hr 0.8000 60,000.00 48,000.00 3 Kepala Tukang Cat L05 Org/hr 0.3000 47,000.00 14,100.00 4 Mandor L01 Org/hr 0.2000 80,000.00 16,000.00

JUMLAH HARGA TENAGA 100,600.00

B BAHAN

1 Cat meni besi M410 kg 0.1100 27,920.00 3,071.20 2 Cat Dasar Besi M413 kg 0.1700 33,880.00 5,759.60 3 Cat Besi M416 kg 0.0800 68,160.00 5,452.80

JUMLAH HARGA BAHAN 14,283.60

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 114,883.60

ANALISA HARGA SATUAN

KODE ANALISA : N.024JENIS PEKERJAAN : Pengecatan permukaan baja lapis seng (galbani) secara semprot

(airless spray) sistem 1 lapis cat mutakhir tebal 0.20 mmSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.4000 45,000.00 18,000.00 2 Tukang Cat L10 Org/hr 0.7000 60,000.00 42,000.00 3 Kepala Tukang Cat L05 Org/hr 0.2000 47,000.00 9,400.00 4 Mandor L01 Org/hr 0.2000 80,000.00 16,000.00

JUMLAH HARGA TENAGA 85,400.00

B BAHAN

1 Cat Dasar Besi M413 kg 0.3000 33,880.00 10,164.00

JUMLAH HARGA BAHAN 10,164.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 95,564.00

Page 344: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : N.025JENIS PEKERJAAN : Pekerjaan waterproofingSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0200 45,000.00 900.00 2 Tukang Cat L10 Org/hr 0.0630 60,000.00 3,780.00 3 Kepala Tukang Cat L05 Org/hr 0.0063 47,000.00 296.10 4 Mandor L01 Org/hr 0.0025 80,000.00 200.00

JUMLAH HARGA TENAGA 5,176.10

B BAHAN

1 Waterproofing M418 kg 0.3600 128,890.00 46,400.40

JUMLAH HARGA BAHAN 46,400.40

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 51,576.50

Page 345: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : P.001JENIS PEKERJAAN : Pemasangan stop kontakSATUAN PEMBAYARAN : Titik

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.5000 45,000.00 22,500.00 2 Tukang Listrik L11 Org/hr 0.5000 60,000.00 30,000.00 3 Kepala Tukang Listrik L06 Org/hr 0.0500 47,000.00 2,350.00 4 Mandor L01 Org/hr 0.0500 80,000.00 4,000.00

JUMLAH HARGA TENAGA 58,850.00

B BAHAN

1 Kabel NYA 2.5 mm M437 m1 10.0000 3,650.00 36,500.00 2 Stop Kontak M439 bh 1.0000 23,060.00 23,060.00 3 T dos PVC M443 bh 1.0000 700.00 700.00 4 Pipa PVC 5/8" M444 Ljr 0.6500 7,360.00 4,784.00 5 Las doof M441 bh 3.0000 400.00 1,200.00

JUMLAH HARGA BAHAN 66,244.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 125,094.00

ANALISA HARGA SATUAN

KODE ANALISA : P.002JENIS PEKERJAAN : Pemasangan saklar tunggal SATUAN PEMBAYARAN : Titik

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.5000 45,000.00 22,500.00 2 Tukang Listrik L11 Org/hr 0.5000 60,000.00 30,000.00 3 Kepala Tukang Listrik L06 Org/hr 0.0500 47,000.00 2,350.00 4 Mandor L01 Org/hr 0.0500 80,000.00 4,000.00

JUMLAH HARGA TENAGA 58,850.00

B BAHAN

1 Kabel NYA 2.5 mm M437 m1 6.0000 3,650.00 21,900.00 2 Saklar Broco Tunggal M440 bh 1.0000 28,180.00 28,180.00 3 T dos PVC M443 bh 1.0000 700.00 700.00 4 Pipa PVC 5/8" M444 Ljr 0.6500 7,360.00 4,784.00 5 Las doof M441 bh 2.0000 400.00 800.00

JUMLAH HARGA BAHAN 56,364.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 115,214.00

Page 346: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : P.003JENIS PEKERJAAN : Pemasangan saklar gandaSATUAN PEMBAYARAN : Titik

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.5000 45,000.00 22,500.00 2 Tukang Listrik L11 Org/hr 0.5000 60,000.00 30,000.00 3 Kepala Tukang Listrik L06 Org/hr 0.0500 47,000.00 2,350.00 4 Mandor L01 Org/hr 0.0500 80,000.00 4,000.00

JUMLAH HARGA TENAGA 58,850.00

B BAHAN

1 Kabel NYA 2.5 mm M437 m1 10.0000 3,650.00 36,500.00 2 Saklar Broco Ganda M440.a bh 1.0000 32,280.00 32,280.00 3 T dos PVC M443 bh 1.0000 700.00 700.00 4 Pipa PVC 5/8" M444 Ljr 0.6500 7,360.00 4,784.00 5 Las doof M441 bh 3.0000 400.00 1,200.00

JUMLAH HARGA BAHAN 75,464.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 134,314.00

ANALISA HARGA SATUAN

KODE ANALISA : P.004JENIS PEKERJAAN : Pemasangan titik lampu pijar 5 - 40 wattSATUAN PEMBAYARAN : Titik

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.2500 45,000.00 11,250.00 2 Tukang Listrik L11 Org/hr 0.2500 60,000.00 15,000.00 3 Kepala Tukang Listrik L06 Org/hr 0.0250 47,000.00 1,175.00 4 Mandor L01 Org/hr 0.0250 80,000.00 2,000.00

JUMLAH HARGA TENAGA 29,425.00

B BAHAN

1 Lampu Pijar 5 - 40 Watt M456 bh 1.0000 15,370.00 15,370.00 2 Kabel NYA 2.5 mm M437 m1 10.0000 3,650.00 36,500.00 3 Isolator M442 m1 4.0000 550.00 2,200.00 4 Fiting Flafond M445 bh 1.0000 7,680.00 7,680.00 5 Las doof M441 bh 2.0000 400.00 800.00

JUMLAH HARGA BAHAN 62,550.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 91,975.00

Page 347: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : P.005JENIS PEKERJAAN : Pemasangan titik lampu pijar 50 - 100 wattSATUAN PEMBAYARAN : Titik

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.2500 45,000.00 11,250.00 2 Tukang Listrik L11 Org/hr 0.2500 60,000.00 15,000.00 3 Kepala Tukang Listrik L06 Org/hr 0.0250 47,000.00 1,175.00 4 Mandor L01 Org/hr 0.0250 80,000.00 2,000.00

JUMLAH HARGA TENAGA 29,425.00

B BAHAN

1 Lampu Pijar 50 - 100 Watt M457 bh 1.0000 25,620.00 25,620.00 2 Kabel NYA 2.5 mm M437 m1 10.0000 3,650.00 36,500.00 3 Isolator M442 m1 4.0000 550.00 2,200.00 4 Fiting Flafond M445 bh 1.0000 7,680.00 7,680.00 5 Las doof M441 bh 2.0000 400.00 800.00

JUMLAH HARGA BAHAN 72,800.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 102,225.00

ANALISA HARGA SATUAN

KODE ANALISA : P.006JENIS PEKERJAAN : Pemasangan titik lampu TL 20 Watt (komplit)SATUAN PEMBAYARAN : Titik

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.2500 45,000.00 11,250.00 2 Tukang Listrik L11 Org/hr 0.2500 60,000.00 15,000.00 3 Kepala Tukang Listrik L06 Org/hr 0.0250 47,000.00 1,175.00 4 Mandor L01 Org/hr 0.0250 80,000.00 2,000.00

JUMLAH HARGA TENAGA 29,425.00

B BAHAN

1 Lampu TL Komplit 20 Watt M449 Ljr 1.0000 53,810.00 53,810.00 2 Kabel NYA 2.5 mm M437 Ljr 10.0000 3,650.00 36,500.00 3 Isolator M442 Ljr 4.0000 550.00 2,200.00 4 Las doof M441 bh 2.0000 400.00 800.00

JUMLAH HARGA BAHAN 93,310.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 122,735.00

Page 348: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : P.007JENIS PEKERJAAN : Pemasangan titik lampu TL 40 Watt (komplit) + saklarSATUAN PEMBAYARAN : Titik

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.2500 45,000.00 11,250.00 2 Tukang Listrik L11 Org/hr 0.2500 60,000.00 15,000.00 3 Kepala Tukang Listrik L06 Org/hr 0.0250 47,000.00 1,175.00 4 Mandor L01 Org/hr 0.0250 80,000.00 2,000.00

JUMLAH HARGA TENAGA 29,425.00

B BAHAN

1 Lampu TL Komplit 40 Watt M450 Ljr 1.0000 79,690.00 79,690.00 2 Kabel NYA 2.5 mm M437 Ljr 10.0000 3,650.00 36,500.00 3 Isolator M442 Ljr 4.0000 550.00 2,200.00 4 Las doof M441 bh 2.0000 400.00 800.00

JUMLAH HARGA BAHAN 119,190.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 148,615.00

ANALISA HARGA SATUAN

KODE ANALISA : P.008JENIS PEKERJAAN : Pemasangan titik lampu XL 5 WattSATUAN PEMBAYARAN : Titik

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.2500 45,000.00 11,250.00 2 Tukang Listrik L11 Org/hr 0.2500 60,000.00 15,000.00 3 Kepala Tukang Listrik L06 Org/hr 0.0250 47,000.00 1,175.00 4 Mandor L01 Org/hr 0.0250 80,000.00 2,000.00

JUMLAH HARGA TENAGA 29,425.00

B BAHAN

1 Lampu XL (Lilin) 5 Watt M451 bh 1.0000 24,080.00 24,080.00 2 Kabel NYA 2.5 mm M437 m1 10.0000 3,650.00 36,500.00 3 Isolator M442 m1 4.0000 550.00 2,200.00 4 Fiting Flafond M445 bh 1.0000 7,680.00 7,680.00 5 Las doof M441 bh 2.0000 400.00 800.00

JUMLAH HARGA BAHAN 71,260.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 100,685.00

Page 349: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : P.009JENIS PEKERJAAN : Pemasangan titik lampu XL 8 Watt + saklarSATUAN PEMBAYARAN : Titik

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.2500 45,000.00 11,250.00 2 Tukang Listrik L11 Org/hr 0.2500 60,000.00 15,000.00 3 Kepala Tukang Listrik L06 Org/hr 0.0250 47,000.00 1,175.00 4 Mandor L01 Org/hr 0.0250 80,000.00 2,000.00

JUMLAH HARGA TENAGA 29,425.00

B BAHAN

1 Lampu XL (Lilin) 8 Watt M452 bh 1.0000 24,080.00 24,080.00 2 Kabel NYA 2.5 mm M437 m1 10.0000 3,650.00 36,500.00 3 Isolator M442 m1 4.0000 550.00 2,200.00 4 Fiting Flafond M445 bh 1.0000 7,680.00 7,680.00 5 Las doof M441 bh 2.0000 400.00 800.00

JUMLAH HARGA BAHAN 71,260.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 100,685.00

ANALISA HARGA SATUAN

KODE ANALISA : P.010JENIS PEKERJAAN : Pemasangan titik lampu XL 14 Watt + saklarSATUAN PEMBAYARAN : Titik

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.2500 45,000.00 11,250.00 2 Tukang Listrik L11 Org/hr 0.2500 60,000.00 15,000.00 3 Kepala Tukang Listrik L06 Org/hr 0.0250 47,000.00 1,175.00 4 Mandor L01 Org/hr 0.0250 80,000.00 2,000.00

JUMLAH HARGA TENAGA 29,425.00

B BAHAN

1 Lampu XL (Lilin) 14 Watt M453 bh 1.0000 26,650.00 26,650.00 2 Kabel NYA 2.5 mm M437 m1 10.0000 3,650.00 36,500.00 3 Isolator M442 m1 4.0000 550.00 2,200.00 4 Fiting Flafond M445 bh 1.0000 7,680.00 7,680.00 5 Las doof M441 bh 2.0000 400.00 800.00

JUMLAH HARGA BAHAN 73,830.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 103,255.00

Page 350: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : P.011JENIS PEKERJAAN : Pemasangan titik lampu XL 18 Watt + saklarSATUAN PEMBAYARAN : Titik

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.2500 45,000.00 11,250.00 2 Tukang Listrik L11 Org/hr 0.2500 60,000.00 15,000.00 3 Kepala Tukang Listrik L06 Org/hr 0.0250 47,000.00 1,175.00 4 Mandor L01 Org/hr 0.0250 80,000.00 2,000.00

JUMLAH HARGA TENAGA 29,425.00

B BAHAN

1 Lampu XL (Lilin) 18 Watt M454 bh 1.0000 29,210.00 29,210.00 2 Kabel NYA 2.5 mm M437 m1 10.0000 3,650.00 36,500.00 3 Isolator M442 m1 4.0000 550.00 2,200.00 4 Fiting Flafond M445 bh 1.0000 7,680.00 7,680.00 5 Las doof M441 bh 2.0000 400.00 800.00

JUMLAH HARGA BAHAN 76,390.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 105,815.00

ANALISA HARGA SATUAN

KODE ANALISA : P.012JENIS PEKERJAAN : Pemasangan titik lampu XL 23 Watt + saklarSATUAN PEMBAYARAN : Titik

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.2500 45,000.00 11,250.00 2 Tukang Listrik L11 Org/hr 0.2500 60,000.00 15,000.00 3 Kepala Tukang Listrik L06 Org/hr 0.0250 47,000.00 1,175.00 4 Mandor L01 Org/hr 0.0250 80,000.00 2,000.00

JUMLAH HARGA TENAGA 29,425.00

B BAHAN

1 Lampu XL (Lilin) 23 Watt M455 bh 1.0000 30,230.00 30,230.00 2 Kabel NYA 2.5 mm M437 m1 10.0000 3,650.00 36,500.00 3 Isolator M442 m1 4.0000 550.00 2,200.00 4 Fiting Flafond M445 bh 1.0000 7,680.00 7,680.00 5 Las doof M441 bh 2.0000 400.00 800.00

JUMLAH HARGA BAHAN 77,410.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 106,835.00

Page 351: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : P.013JENIS PEKERJAAN : Pemasangan sekering 1 groupSATUAN PEMBAYARAN : Unit

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.6200 45,000.00 27,900.00 2 Tukang Listrik L11 Org/hr 0.0620 60,000.00 3,720.00 3 Kepala Tukang Listrik L06 Org/hr 0.0060 47,000.00 282.00 4 Mandor L01 Org/hr 0.0060 80,000.00 480.00

JUMLAH HARGA TENAGA 32,382.00

B BAHAN

1 Zekering Kast Lokal 1 Group M446 Unit 1.0000 56,370.00 56,370.00 2 Kabel NYA 4.0 mm M438 m1 4.0000 6,175.00 24,700.00 3 Pipa PVC 5/8" M444 Ljr 1.0000 7,360.00 7,360.00

JUMLAH HARGA BAHAN 88,430.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 120,812.00

ANALISA HARGA SATUAN

KODE ANALISA : P.014JENIS PEKERJAAN : Pemasangan sekering 2 groupSATUAN PEMBAYARAN : Unit

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.9500 45,000.00 42,750.00 2 Tukang Listrik L11 Org/hr 0.0950 60,000.00 5,700.00 3 Kepala Tukang Listrik L06 Org/hr 0.0095 47,000.00 446.50 4 Mandor L01 Org/hr 0.0095 80,000.00 760.00

JUMLAH HARGA TENAGA 49,656.50

B BAHAN

1 Zekering Kast Lokal 2 Group M447 Unit 1.0000 82,000.00 82,000.00 2 Kabel NYA 4.0 mm M438 m1 8.0000 6,175.00 49,400.00 3 Pipa PVC 5/8" M444 Ljr 2.0000 7,360.00 14,720.00

JUMLAH HARGA BAHAN 146,120.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 195,776.50

Page 352: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : P.015JENIS PEKERJAAN : Pemasangan sekering 3 groupSATUAN PEMBAYARAN : Unit

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 1.2800 45,000.00 57,600.00 2 Tukang Listrik L11 Org/hr 0.1280 60,000.00 7,680.00 3 Kepala Tukang Listrik L06 Org/hr 0.0125 47,000.00 587.50 4 Mandor L01 Org/hr 0.0125 80,000.00 1,000.00

JUMLAH HARGA TENAGA 66,867.50

B BAHAN

1 Zekering Kast Lokal 3 Group M448 Unit 1.0000 112,750.00 112,750.00 2 Kabel NYA 4.0 mm M438 m1 12.0000 6,175.00 74,100.00 3 Pipa PVC 5/8" M444 Ljr 3.0000 7,360.00 22,080.00

JUMLAH HARGA BAHAN 208,930.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 275,797.50

ANALISA HARGA SATUAN

KODE ANALISA : P.016JENIS PEKERJAAN : Pemasangan penangkal petirSATUAN PEMBAYARAN : Unit

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 2.0000 45,000.00 90,000.00 2 Tukang Listrik L11 Org/hr 0.5000 60,000.00 30,000.00 3 Kepala Tukang Listrik L06 Org/hr 0.0500 47,000.00 2,350.00 4 Mandor L01 Org/hr 0.0500 80,000.00 4,000.00

JUMLAH HARGA TENAGA 126,350.00

B BAHAN

1 Pipa Arde M460 m' 6.0000 92,250.00 553,500.00 2 Pipa PVC tipe AW Dia 1/2 " M334 Ljr 10.0000 28,700.00 287,000.00 3 Shock Galvanis Dia 1/2 " M384 bh 1.0000 3,500.00 3,500.00 4 Pipa Galvanis Ø 1", tebal 2 mm M378 Ljr 0.2500 225,000.00 56,250.00 4 Splits Dia 1 " M460.a bh 1.0000 64,570.00 64,570.00 5 Timah M460.b kg 0.5000 365,920.00 182,960.00 6 Kawat BC M460.c m1 40.0000 37,660.00 1,506,400.00

JUMLAH HARGA BAHAN 2,654,180.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 2,780,530.00

Page 353: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : Q.001JENIS PEKERJAAN : Penyetelan mesin bor dan buat bak sirkulasiSATUAN PEMBAYARAN : Unit

A. Biaya Pemasangan Balok Landasan

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

JUMLAH HARGA TENAGA -

B BAHAN

1 Kayu untuk landasan Ls 1.0000 1,100,000.00 1,100,000.00 2 Kayu untuk dinding spul bak sirkulasi Ls 1.0000 350,000.00 350,000.00

JUMLAH HARGA BAHAN 1,450,000.00

C PERALATAN

JUMLAH HARGA PERALATAN

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 1,450,000.00

B. Biaya Penyetelan Mesin

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

JUMLAH HARGA TENAGA -

B BAHAN

1 Pembuatan bak sirkulasi Ls 1.0000 900,000.00 900,000.00 2 Pembersihan lokasi Ls 1.0000 250,000.00 250,000.00 3 Pengerasan jalan masuk Ls 1.0000 700,000.00 700,000.00

JUMLAH HARGA BAHAN 1,850,000.00

C PERALATAN

JUMLAH HARGA PERALATAN

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 1,850,000.00

E JUMLAH HARGA TOTAL (A + B) 3,300,000.00

Page 354: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : Q.002JENIS PEKERJAAN : GeolistrikSATUAN PEMBAYARAN : Ls

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Engineer dan Crew L26 Ls 1.0000 450,000.00 450,000.00 2 Tenaga Ahli Geolistrik L27 Org/hr 1.0000 575,000.00 575,000.00

JUMLAH HARGA TENAGA 1,025,000.00

B BAHAN

JUMLAH HARGA BAHAN -

C PERALATAN1 Sewa Alat Geolistrik E06 hari 1.0000 1,750,000.00 1,750,000.00 2 Transportasi Alat dan Personil Ls 1.0000 500,000.00 500,000.00 3 Biaya Pembuatan Laporan Ls 1.0000 200,000.00 200,000.00

JUMLAH HARGA PERALATAN 2,450,000.00

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 3,475,000.00

ANALISA HARGA SATUAN

KODE ANALISA : Q.003JENIS PEKERJAAN : Pemboran pilot hole Ø 8 3/4" kedalaman 0 - 25 m

kecepatan pemboran 15 m'/hrSATUAN PEMBAYARAN : m1

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Engineer dan Crew L26 Ls 1.0000 450,000.00 450,000.00

JUMLAH HARGA TENAGA 450,000.00

B BAHAN

1 Solar M483 ltr 75.0000 5,151.00 386,325.00 2 Minyak Pelumas M484 ltr 5.0000 35,000.00 175,000.00 3 Grease M485 kg 1.0000 13,450.00 13,450.00

JUMLAH HARGA BAHAN 574,775.00

C PERALATAN

1 Sewa Mesin Bor E01 hari 1.0000 1,350,000.00 1,350,000.00 2 Penyusutan Mata Bor Ls 0.2500 8,000,000.00 2,000,000.00

JUMLAH HARGA PERALATAN 3,350,000.00

DJUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

4,374,775.00 KEDALAMAN 0 - 25 m

E JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) TIAP 1 m 291,651.67

Page 355: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : Q.004JENIS PEKERJAAN : Pemboran pilot hole Ø 8 3/4" kedalaman 25 - 50 m

kecepatan pemboran 12 m'/hrSATUAN PEMBAYARAN : m1

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Engineer dan Crew L26 Ls 1.0000 450,000.00 450,000.00

JUMLAH HARGA TENAGA 450,000.00

B BAHAN

1 Solar M483 ltr 75.0000 5,151.00 386,325.00 2 Minyak Pelumas M484 ltr 5.0000 35,000.00 175,000.00 3 Grease M485 kg 1.0000 13,450.00 13,450.00

JUMLAH HARGA BAHAN 574,775.00

C PERALATAN

1 Sewa Mesin Bor E01 hari 1.0000 1,350,000.00 1,350,000.00 2 Penyusutan Mata Bor Ls 0.2500 8,000,000.00 2,000,000.00

JUMLAH HARGA PERALATAN 3,350,000.00

DJUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

4,374,775.00 KEDALAMAN 25 - 50 m

E JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) TIAP 1 m 364,564.58

ANALISA HARGA SATUAN

KODE ANALISA : Q.005JENIS PEKERJAAN : Pemboran pilot hole Ø 8 3/4" kedalaman 50 - 75 m

kecepatan pemboran 10 m'/hrSATUAN PEMBAYARAN : m1

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Engineer dan Crew L26 Ls 1.0000 450,000.00 450,000.00

JUMLAH HARGA TENAGA 450,000.00

B BAHAN

1 Solar M483 ltr 75.0000 5,151.00 386,325.00 2 Minyak Pelumas M484 ltr 5.0000 35,000.00 175,000.00 3 Grease M485 kg 1.0000 13,450.00 13,450.00

JUMLAH HARGA BAHAN 574,775.00

C PERALATAN

1 Sewa Mesin Bor E01 hari 1.0000 1,350,000.00 1,350,000.00 2 Penyusutan Mata Bor Ls 0.2500 8,000,000.00 2,000,000.00

JUMLAH HARGA PERALATAN 3,350,000.00

DJUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

4,374,775.00 KEDALAMAN 50 - 75 m

E JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) TIAP 1 m 437,477.50

Page 356: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : Q.006JENIS PEKERJAAN : Pemboran pilot hole Ø 8 3/4" kedalaman 75 - 100 m

kecepatan pemboran 8 m'/hrSATUAN PEMBAYARAN : m1

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Engineer dan Crew L26 Ls 1.0000 450,000.00 450,000.00

JUMLAH HARGA TENAGA 450,000.00

B BAHAN

1 Solar M483 ltr 75.0000 5,151.00 386,325.00 2 Minyak Pelumas M484 ltr 5.0000 35,000.00 175,000.00 3 Grease M485 kg 1.0000 13,450.00 13,450.00

JUMLAH HARGA BAHAN 574,775.00

C PERALATAN

1 Sewa Mesin Bor E01 hari 1.0000 1,350,000.00 1,350,000.00 2 Penyusutan Mata Bor Ls 0.2500 8,000,000.00 2,000,000.00

JUMLAH HARGA PERALATAN 3,350,000.00

DJUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

4,374,775.00 KEDALAMAN 75 - 100 m

E JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) TIAP 1 m 546,846.88

ANALISA HARGA SATUAN

KODE ANALISA : Q.007JENIS PEKERJAAN : Pemboran pilot hole Ø 8 3/4" kedalaman 100 - 125 m

kecepatan pemboran 6 m'/hrSATUAN PEMBAYARAN : m1

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Engineer dan Crew L26 Ls 1.0000 450,000.00 450,000.00

JUMLAH HARGA TENAGA 450,000.00

B BAHAN

1 Solar M483 ltr 75.0000 5,151.00 386,325.00 2 Minyak Pelumas M484 ltr 5.0000 35,000.00 175,000.00 3 Grease M485 kg 1.0000 13,450.00 13,450.00

JUMLAH HARGA BAHAN 574,775.00

C PERALATAN

1 Sewa Mesin Bor E01 hari 1.0000 1,350,000.00 1,350,000.00 2 Penyusutan Mata Bor Ls 0.2500 8,000,000.00 2,000,000.00

JUMLAH HARGA PERALATAN 3,350,000.00

DJUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

4,374,775.00 KEDALAMAN 100 - 125 m

E JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) TIAP 1 m 729,129.17

Page 357: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : Q.008JENIS PEKERJAAN : Pemboran pilot hole Ø 8 3/4" kedalaman 125 - 175 m

kecepatan pemboran 4 m'/hrSATUAN PEMBAYARAN : m1

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Engineer dan Crew L26 Ls 1.0000 450,000.00 450,000.00

JUMLAH HARGA TENAGA 450,000.00

B BAHAN

1 Solar M483 ltr 75.0000 5,151.00 386,325.00 2 Minyak Pelumas M484 ltr 5.0000 35,000.00 175,000.00 3 Grease M485 kg 1.0000 13,450.00 13,450.00

JUMLAH HARGA BAHAN 574,775.00

C PERALATAN

1 Sewa Mesin Bor E01 hari 1.0000 1,350,000.00 1,350,000.00 2 Penyusutan Mata Bor Ls 0.2500 8,000,000.00 2,000,000.00

JUMLAH HARGA PERALATAN 3,350,000.00

DJUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

4,374,775.00 KEDALAMAN 125 - 175 m

E JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) TIAP 1 m 1,093,693.75

ANALISA HARGA SATUAN

KODE ANALISA : Q.009JENIS PEKERJAAN : Pemboran pilot hole Ø 8 3/4" kedalaman 175 - 225 m

kecepatan pemboran 3 m'/hrSATUAN PEMBAYARAN : m1

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Engineer dan Crew L26 Ls 1.0000 450,000.00 450,000.00

JUMLAH HARGA TENAGA 450,000.00

B BAHAN

1 Solar M483 ltr 75.0000 5,151.00 386,325.00 2 Minyak Pelumas M484 ltr 5.0000 35,000.00 175,000.00 3 Grease M485 kg 1.0000 13,450.00 13,450.00

JUMLAH HARGA BAHAN 574,775.00

C PERALATAN

1 Sewa Mesin Bor E01 hari 1.0000 1,350,000.00 1,350,000.00 2 Penyusutan Mata Bor Ls 0.2500 8,000,000.00 2,000,000.00

JUMLAH HARGA PERALATAN 3,350,000.00

DJUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

4,374,775.00 KEDALAMAN 175 - 225 m

E JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) TIAP 1 m 1,458,258.33

Page 358: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : Q.010JENIS PEKERJAAN : Pemboran pilot hole Ø 8 3/4" kedalaman 225 - 275 m

kecepatan pemboran 2 m'/hrSATUAN PEMBAYARAN : m1

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Engineer dan Crew L26 Ls 1.0000 450,000.00 450,000.00

JUMLAH HARGA TENAGA 450,000.00

B BAHAN

1 Solar M483 ltr 75.0000 5,151.00 386,325.00 2 Minyak Pelumas M484 ltr 5.0000 35,000.00 175,000.00 3 Grease M485 kg 1.0000 13,450.00 13,450.00

JUMLAH HARGA BAHAN 574,775.00

C PERALATAN

1 Sewa Mesin Bor E01 hari 1.0000 1,350,000.00 1,350,000.00 2 Penyusutan Mata Bor Ls 0.2500 8,000,000.00 2,000,000.00

JUMLAH HARGA PERALATAN 3,350,000.00

DJUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

4,374,775.00 KEDALAMAN 225 - 275 m

E JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) TIAP 1 m 2,187,387.50

ANALISA HARGA SATUAN

KODE ANALISA : Q.011JENIS PEKERJAAN : Geofisikal, Elektrikal, Logging SATUAN PEMBAYARAN : m1

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Tenaga Ahli Geofisika L28 Org/hr 4.0000 475,000.00 1,900,000.00

JUMLAH HARGA TENAGA 1,900,000.00

B BAHAN

JUMLAH HARGA BAHAN -

C PERALATAN

1 E07 hari 1.0000 1,750,000.00 1,750,000.00

2 Transportasi Alat dan Personil Ls 1.0000 500,000.00 500,000.00 3 Pengadaan barang habis pakai Ls 1.0000 200,000.00 200,000.00

JUMLAH HARGA PERALATAN 2,450,000.00

DJUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

4,350,000.00 KEDALAMAN 275 m

E JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) TIAP 1 m 15,818.18

Sewa Alat Geofisikal, Elektrikal, Logging

Page 359: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : Q.012JENIS PEKERJAAN : Pumping test open holeSATUAN PEMBAYARAN : Ls

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Engineer dan Crew L26 Ls 1.0000 450,000.00 450,000.00

JUMLAH HARGA TENAGA 450,000.00

B BAHAN

1 Solar M483 ltr 70.0000 5,151.00 360,570.00 2 Minyak Pelumas M484 ltr 2.0000 35,000.00 70,000.00

JUMLAH HARGA BAHAN 430,570.00

C PERALATAN

1 Sewa Pompa Tes E04 hari 1.0000 4,000,000.00 4,000,000.00 2 Sewa Mesin Bor E01 hari 1.0000 1,350,000.00 1,350,000.00 3 Sewa Genset E03 hari 1.0000 1,000,000.00 1,000,000.00

JUMLAH HARGA PERALATAN 6,350,000.00

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 7,230,570.00

ANALISA HARGA SATUAN

KODE ANALISA : Q.013JENIS PEKERJAAN : Pembesaran lubang (Reaming) lubang bor Ø 8 3/4" - Ø 12"

kedalaman 0 - 25 m kecepatan pemboran 18 m'/hrSATUAN PEMBAYARAN : m1

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Engineer dan Crew L26 Ls 1.0000 450,000.00 450,000.00

JUMLAH HARGA TENAGA 450,000.00

B BAHAN

1 Solar M483 ltr 75.0000 5,151.00 386,325.00 2 Minyak Pelumas M484 ltr 5.0000 35,000.00 175,000.00 3 Grease M485 kg 1.0000 13,450.00 13,450.00

JUMLAH HARGA BAHAN 574,775.00

C PERALATAN

1 Sewa Mesin Bor E01 hari 1.0000 1,350,000.00 1,350,000.00 2 Penyusutan Mata Bor Ls 0.2500 6,000,000.00 1,500,000.00

JUMLAH HARGA PERALATAN 2,850,000.00

DJUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

3,874,775.00 KEDALAMAN 0 - 25 m

E JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) TIAP 1 m 215,265.28

Page 360: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : Q.014JENIS PEKERJAAN : Pembesaran lubang (Reaming) lubang bor Ø 8 3/4" - Ø 12"

kedalaman 25 - 50 m kecepatan pemboran 15 m'/hrSATUAN PEMBAYARAN : m1

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Engineer dan Crew L26 Ls 1.0000 450,000.00 450,000.00

JUMLAH HARGA TENAGA 450,000.00

B BAHAN

1 Solar M483 ltr 75.0000 5,151.00 386,325.00 2 Minyak Pelumas M484 ltr 5.0000 35,000.00 175,000.00 3 Grease M485 kg 1.0000 13,450.00 13,450.00

JUMLAH HARGA BAHAN 574,775.00

C PERALATAN

1 Sewa Mesin Bor E01 hari 1.0000 1,350,000.00 1,350,000.00 2 Penyusutan Mata Bor Ls 0.2500 6,000,000.00 1,500,000.00

JUMLAH HARGA PERALATAN 2,850,000.00

DJUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

3,874,775.00 KEDALAMAN 25 - 50 m

E JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) TIAP 1 m 258,318.33

ANALISA HARGA SATUAN

KODE ANALISA : Q.015JENIS PEKERJAAN : Pembesaran lubang (Reaming) lubang bor Ø 8 3/4" - Ø 12"

kedalaman 50 - 75 m kecepatan pemboran 12 m'/hrSATUAN PEMBAYARAN : m1

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Engineer dan Crew L26 Ls 1.0000 450,000.00 450,000.00

JUMLAH HARGA TENAGA 450,000.00

B BAHAN

1 Solar M483 ltr 75.0000 5,151.00 386,325.00 2 Minyak Pelumas M484 ltr 5.0000 35,000.00 175,000.00 3 Grease M485 kg 1.0000 13,450.00 13,450.00

JUMLAH HARGA BAHAN 574,775.00

C PERALATAN

1 Sewa Mesin Bor E01 hari 1.0000 1,350,000.00 1,350,000.00 2 Penyusutan Mata Bor Ls 0.2500 6,000,000.00 1,500,000.00

JUMLAH HARGA PERALATAN 2,850,000.00

DJUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

3,874,775.00 KEDALAMAN 50 - 75 m

E JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) TIAP 1 m 322,897.92

Page 361: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : Q.016JENIS PEKERJAAN : Pembesaran lubang (Reaming) lubang bor Ø 8 3/4" - Ø 12"

kedalaman 75 - 100 m kecepatan pemboran 9 m'/hrSATUAN PEMBAYARAN : m1

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Engineer dan Crew L26 Ls 1.0000 450,000.00 450,000.00

JUMLAH HARGA TENAGA 450,000.00

B BAHAN

1 Solar M483 ltr 75.0000 5,151.00 386,325.00 2 Minyak Pelumas M484 ltr 5.0000 35,000.00 175,000.00 3 Grease M485 kg 1.0000 13,450.00 13,450.00

JUMLAH HARGA BAHAN 574,775.00

C PERALATAN

1 Sewa Mesin Bor E01 hari 1.0000 1,350,000.00 1,350,000.00 2 Penyusutan Mata Bor Ls 0.2500 6,000,000.00 1,500,000.00

JUMLAH HARGA PERALATAN 2,850,000.00

DJUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

3,874,775.00 KEDALAMAN 75 - 100 m

E JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) TIAP 1 m 430,530.56

ANALISA HARGA SATUAN

KODE ANALISA : Q.017JENIS PEKERJAAN : Pembesaran lubang (Reaming) lubang bor Ø 8 3/4" - Ø 12"

kedalaman 100 - 125 m kecepatan pemboran 7 m'/hrSATUAN PEMBAYARAN : m1

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Engineer dan Crew L26 Ls 1.0000 450,000.00 450,000.00

JUMLAH HARGA TENAGA 450,000.00

B BAHAN

1 Solar M483 ltr 75.0000 5,151.00 386,325.00 2 Minyak Pelumas M484 ltr 5.0000 35,000.00 175,000.00 3 Grease M485 kg 1.0000 13,450.00 13,450.00

JUMLAH HARGA BAHAN 574,775.00

C PERALATAN

1 Sewa Mesin Bor E01 hari 1.0000 1,350,000.00 1,350,000.00 2 Penyusutan Mata Bor Ls 0.2500 6,000,000.00 1,500,000.00

JUMLAH HARGA PERALATAN 2,850,000.00

DJUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

3,874,775.00 KEDALAMAN 100 - 125 m

E JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) TIAP 1 m 553,539.29

Page 362: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : Q.018JENIS PEKERJAAN : Pembesaran lubang (Reaming) lubang bor Ø 8 3/4" - Ø 12"

kedalaman 125 - 175 m kecepatan pemboran 5 m'/hrSATUAN PEMBAYARAN : m1

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Engineer dan Crew L26 Ls 1.0000 450,000.00 450,000.00

JUMLAH HARGA TENAGA 450,000.00

B BAHAN

1 Solar M483 ltr 75.0000 5,151.00 386,325.00 2 Minyak Pelumas M484 ltr 5.0000 35,000.00 175,000.00 3 Grease M485 kg 1.0000 13,450.00 13,450.00

JUMLAH HARGA BAHAN 574,775.00

C PERALATAN

1 Sewa Mesin Bor E01 hari 1.0000 1,350,000.00 1,350,000.00 2 Penyusutan Mata Bor Ls 0.2500 6,000,000.00 1,500,000.00

JUMLAH HARGA PERALATAN 2,850,000.00

DJUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

3,874,775.00 KEDALAMAN 125 - 175 m

E JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) TIAP 1 m 774,955.00

ANALISA HARGA SATUAN

KODE ANALISA : Q.019JENIS PEKERJAAN : Pembesaran lubang (Reaming) lubang bor Ø 8 3/4" - Ø 12"

kedalaman 175 - 225 m kecepatan pemboran 3 m'/hrSATUAN PEMBAYARAN : m1

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Engineer dan Crew L26 Ls 1.0000 450,000.00 450,000.00

JUMLAH HARGA TENAGA 450,000.00

B BAHAN

1 Solar M483 ltr 75.0000 5,151.00 386,325.00 2 Minyak Pelumas M484 ltr 5.0000 35,000.00 175,000.00 3 Grease M485 kg 1.0000 13,450.00 13,450.00

JUMLAH HARGA BAHAN 574,775.00

C PERALATAN

1 Sewa Mesin Bor E01 hari 1.0000 1,350,000.00 1,350,000.00 2 Penyusutan Mata Bor Ls 0.2500 6,000,000.00 1,500,000.00

JUMLAH HARGA PERALATAN 2,850,000.00

DJUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

3,874,775.00 KEDALAMAN 175 - 225 m

E JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) TIAP 1 m 1,291,591.67

Page 363: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : Q.020JENIS PEKERJAAN SATUAN PEMBAYARAN : m1

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 3.0000 45,000.00 135,000.00 2 Tukang Pipa L12 Org/hr 1.0000 60,000.00 60,000.00

JUMLAH HARGA TENAGA 195,000.00

B BAHAN

1 Pipa PVC tipe AW Dia 6 " M342 Ljr 0.2500 472,780.00 118,195.00

JUMLAH HARGA BAHAN 118,195.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 313,195.00

ANALISA HARGA SATUAN

KODE ANALISA : Q.021JENIS PEKERJAAN SATUAN PEMBAYARAN : m1

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 3.0000 45,000.00 135,000.00 2 Tukang Pipa L12 Org/hr 1.0000 60,000.00 60,000.00

JUMLAH HARGA TENAGA 195,000.00

B BAHAN

1 Pipa PVC tipe AW Dia 6 " M342 Ljr 0.2500 472,780.00 118,195.00

JUMLAH HARGA BAHAN 118,195.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 313,195.00

: Pengadaan dan pemasangan pipa jambang PVC-AW Ø 150 mm

: Pengadaan dan pemasangan pipa buta PVC-AW Ø 150 mm

Page 364: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : Q.022JENIS PEKERJAAN SATUAN PEMBAYARAN : m1

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 3.0000 45,000.00 135,000.00 2 Tukang Pipa L12 Org/hr 1.0000 60,000.00 60,000.00

JUMLAH HARGA TENAGA 195,000.00

B BAHAN

1 Pipa Screen PVC tipe AW Dia 6 " M400 ljr 0.2500 577,840.00 144,460.00

JUMLAH HARGA BAHAN 144,460.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 339,460.00

ANALISA HARGA SATUAN

KODE ANALISA : Q.023JENIS PEKERJAAN SATUAN PEMBAYARAN : m1

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 2.8000 45,000.00 126,000.00 2 Tukang Pipa L12 Org/hr 0.8000 60,000.00 48,000.00

JUMLAH HARGA TENAGA 174,000.00

B BAHAN

1 Pipa PVC tipe AW Ø 5 " M400.a Ljr 0.2500 372,840.00 93,210.00

JUMLAH HARGA BAHAN 93,210.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 267,210.00

: Pengadaan dan pemasangan pipa screen PVC-AW Ø 150 mm

: Pengadaan dan pemasangan pipa jambang PVC-AW Ø 125 mm

Page 365: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : Q.024JENIS PEKERJAAN SATUAN PEMBAYARAN : m1

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 2.8000 45,000.00 126,000.00 2 Tukang Pipa L12 Org/hr 0.8000 60,000.00 48,000.00

JUMLAH HARGA TENAGA 174,000.00

B BAHAN

1 Pipa PVC tipe AW Ø 5 " M400.a Ljr 0.2500 372,840.00 93,210.00

JUMLAH HARGA BAHAN 93,210.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 267,210.00

ANALISA HARGA SATUAN

KODE ANALISA : Q.025JENIS PEKERJAAN SATUAN PEMBAYARAN : m1

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 2.8000 45,000.00 126,000.00 2 Tukang Pipa L12 Org/hr 0.8000 60,000.00 48,000.00

JUMLAH HARGA TENAGA 174,000.00

B BAHAN

1 Pipa Screen PVC tipe AW Ø 5 " M400.b Ljr 0.2500 476,110.00 119,027.50

JUMLAH HARGA BAHAN 119,027.50

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 293,027.50

: Pengadaan dan pemasangan pipa buta PVC-AW Ø 125 mm

: Pengadaan dan pemasangan pipa screen PVC-AW Ø 125 mm

Page 366: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : Q.026JENIS PEKERJAAN SATUAN PEMBAYARAN : m1

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.2000 45,000.00 9,000.00 2 Tukang Pipa L12 Org/hr 0.1000 60,000.00 6,000.00

JUMLAH HARGA TENAGA 15,000.00

B BAHAN

1 Pipa PVC tipe AW Dia 2.5 " M339 Ljr 0.2500 123,000.00 30,750.00

JUMLAH HARGA BAHAN 30,750.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 45,750.00

ANALISA HARGA SATUAN

KODE ANALISA : Q.027JENIS PEKERJAAN : Pengadaan dan pemasangan pipa sounding SWL PVC-AW Ø 1"SATUAN PEMBAYARAN : m1

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.2000 45,000.00 9,000.00 2 Tukang Pipa L12 Org/hr 0.1000 60,000.00 6,000.00

JUMLAH HARGA TENAGA 15,000.00

B BAHAN

1 Pipa PVC tipe AW Dia 1" M336 Ljr 0.2500 56,110.00 14,027.50

JUMLAH HARGA BAHAN 14,027.50

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 29,027.50

: Pengadaan dan pemasangan pipa sounding PVC-AW Ø 2.50"

Page 367: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : Q.028JENIS PEKERJAAN : Pengisian gravel pack Dia 5 mm - 10 mmSATUAN PEMBAYARAN : m3

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 2.2500 45,000.00 101,250.00 2 Tukang Pipa L12 Org/hr 0.7500 60,000.00 45,000.00

JUMLAH HARGA TENAGA 146,250.00

B BAHAN

1 Batu pecah mesin 1/1 M017 m3 1.1000 207,900.00 228,690.00

JUMLAH HARGA BAHAN 228,690.00

C PERALATAN

1 Sewa Mud Pump E08 Jam 1.6000 60,000.00 96,000.00

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 374,940.00

ANALISA HARGA SATUAN

KODE ANALISA : Q.029JENIS PEKERJAAN : Beton Mortar 1 pc : 1 psSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 2.1000 45,000.00 94,500.00 2 Tukang Batu L07 Org/hr 0.3500 60,000.00 21,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0350 70,000.00 2,450.00 4 Mandor L01 Org/hr 0.1050 80,000.00 8,400.00

JUMLAH HARGA TENAGA 126,350.00

B BAHAN

1 Portland Cement (PC) M037 kg 448.0000 900.00 403,200.00 2 Pasir Cor M004 m3 0.4764 110,000.00 52,407.14 2 Air Bersih M486 ltr 215.0000 25.00 5,375.00

JUMLAH HARGA BAHAN 460,982.14

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 587,332.14

: m3

Page 368: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : Q.030JENIS PEKERJAAN : Pencucian sumur bor dengan kedalaman < 200 mSATUAN PEMBAYARAN : Titik

A. Pencucian sumur bor dengan Water Jetting

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Engineer dan Crew L26 Ls 1.0000 450,000.00 450,000.00

JUMLAH HARGA TENAGA 450,000.00

B BAHAN

1 Solar M483 ltr 150.0000 5,151.00 772,650.00 2 Minyak Pelumas M484 ltr 2.7857 35,000.00 97,500.00 3 Grease M485 kg 0.5000 13,450.00 6,725.00

JUMLAH HARGA BAHAN 876,875.00

C PERALATAN

1 Sewa Mesin Bor E01 hari 1.0000 1,350,000.00 1,350,000.00

JUMLAH HARGA PERALATAN 1,350,000.00

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 2,676,875.00

B. Pencucian sumur bor dengan Air Jetting

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Engineer dan Crew L26 Ls 1.0000 450,000.00 450,000.00

JUMLAH HARGA TENAGA 450,000.00

B BAHAN

1 Solar M483 ltr 150.0000 5,151.00 772,650.00 2 Minyak Pelumas M484 ltr 2.7857 35,000.00 97,500.00 3 Grease M485 kg 0.5000 13,450.00 6,725.00

JUMLAH HARGA BAHAN 876,875.00

C PERALATAN

1 Sewa Mesin Bor E01 hari 1.0000 1,350,000.00 1,350,000.00 2 Sewa Kompresor E02 hari 1.2500 2,400,000.00 3,000,000.00

JUMLAH HARGA PERALATAN 4,350,000.00

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 5,676,875.00

E JUMLAH HARGA TOTAL (A + B) 8,353,750.00

Page 369: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : Q.031JENIS PEKERJAAN : Pencucian sumur bor dengan kedalaman > 200 mSATUAN PEMBAYARAN : Titik

A. Pencucian sumur bor dengan Water Jetting

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Engineer dan Crew L26 Ls 1.0000 450,000.00 450,000.00

JUMLAH HARGA TENAGA 450,000.00

B BAHAN

1 Solar M483 ltr 300.0000 5,151.00 1,545,300.00 2 Minyak Pelumas M484 ltr 5.5714 35,000.00 195,000.00 3 Grease M485 kg 1.0000 13,450.00 13,450.00

JUMLAH HARGA BAHAN 1,753,750.00

C PERALATAN

1 Sewa Mesin Bor E01 hari 1.0000 1,350,000.00 1,350,000.00

JUMLAH HARGA PERALATAN 1,350,000.00

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 3,553,750.00

B. Pencucian sumur bor dengan Air Jetting

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Engineer dan Crew L26 Ls 1.0000 450,000.00 450,000.00

JUMLAH HARGA TENAGA 450,000.00

B BAHAN

1 Solar M483 ltr 300.0000 5,151.00 1,545,300.00 2 Minyak Pelumas M484 ltr 5.5714 35,000.00 195,000.00 3 Grease M485 kg 1.0000 13,450.00 13,450.00

JUMLAH HARGA BAHAN 1,753,750.00

C PERALATAN

1 Sewa Mesin Bor E01 hari 1.0000 1,350,000.00 1,350,000.00 2 Sewa Kompresor E02 hari 2.5000 2,400,000.00 6,000,000.00

JUMLAH HARGA PERALATAN 7,350,000.00

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 9,553,750.00

E JUMLAH HARGA TOTAL (A + B) 13,107,500.00

Page 370: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : Q.032JENIS PEKERJAAN : Pumping test dan test nonstop 24 jamSATUAN PEMBAYARAN : Jam

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Engineer dan Crew L26 Ls 0.0417 450,000.00 18,750.00

JUMLAH HARGA TENAGA 18,750.00

B BAHAN

1 Solar M483 ltr 4.7500 5,151.00 24,467.25 2 Minyak Pelumas M484 ltr 0.0474 35,000.00 1,658.33

JUMLAH HARGA BAHAN 26,125.58

C PERALATAN

1 Sewa Pompa Tes E04 hari 0.0417 4,000,000.00 166,666.67 2 Sewa Mesin Bor E01 hari 0.0417 1,350,000.00 56,250.00 3 Sewa Genset E03 hari 0.0417 1,000,000.00 41,666.67

JUMLAH HARGA PERALATAN 264,583.33

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 309,458.91

ANALISA HARGA SATUAN

KODE ANALISA : Q.033JENIS PEKERJAAN : Pasang pipa PVC RRJ 6 m S-10 Ø 2"SATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0540 45,000.00 2,430.00 2 Tukang Batu L07 Org/hr 0.0900 60,000.00 5,400.00 3 Kepala Tukang Batu L02 Org/hr 0.0090 70,000.00 630.00 4 Mandor L01 Org/hr 0.0027 80,000.00 216.00

JUMLAH HARGA TENAGA 8,676.00

B BAHAN

1 Pipa PVC RRJ 6 m S - 10 Ø 2" M400.c Ljr 0.2000 145,320.00 29,064.00 2 Perlengkapan 0.3500 50,862.00 17,801.70

JUMLAH HARGA BAHAN 46,865.70

C PERALATAN

JUMLAH HARGA PERALATAN

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 55,541.70

: m1

Page 371: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : Q.034JENIS PEKERJAAN : Pasang pipa PVC RRJ 6 m S-10 Ø 2.5"SATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0540 45,000.00 2,430.00 2 Tukang Batu L07 Org/hr 0.0900 60,000.00 5,400.00 3 Kepala Tukang Batu L02 Org/hr 0.0090 70,000.00 630.00 4 Mandor L01 Org/hr 0.0027 80,000.00 216.00

JUMLAH HARGA TENAGA 8,676.00

B BAHAN

1 Pipa PVC RRJ 6 m S - 10 Ø 2,5" M400.d Ljr 0.2000 187,840.00 37,568.00 2 Perlengkapan 0.3500 65,744.00 23,010.40

JUMLAH HARGA BAHAN 60,578.40

C PERALATAN

JUMLAH HARGA PERALATAN

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 69,254.40

ANALISA HARGA SATUAN

KODE ANALISA : Q.035JENIS PEKERJAAN : Pasang pipa PVC RRJ 6 m S-10 Ø 3"SATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0810 45,000.00 3,645.00 2 Tukang Batu L07 Org/hr 0.1350 60,000.00 8,100.00 3 Kepala Tukang Batu L02 Org/hr 0.0135 70,000.00 945.00 4 Mandor L01 Org/hr 0.0041 80,000.00 328.00

JUMLAH HARGA TENAGA 13,018.00

B BAHAN

1 Pipa PVC RRJ 6 m S - 10 Ø 3" M400.e Ljr 0.2000 262,420.00 52,484.00 2 Perlengkapan 0.3500 91,847.00 32,146.45

JUMLAH HARGA BAHAN 84,630.45

C PERALATAN

JUMLAH HARGA PERALATAN

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 97,648.45

: m1

: m1

Page 372: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : Q.036JENIS PEKERJAAN : Pasang pipa PVC RRJ 6 m S-10 Ø 4"SATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0810 45,000.00 3,645.00 2 Tukang Batu L07 Org/hr 0.1350 60,000.00 8,100.00 3 Kepala Tukang Batu L02 Org/hr 0.0135 70,000.00 945.00 4 Mandor L01 Org/hr 0.0041 80,000.00 328.00

JUMLAH HARGA TENAGA 13,018.00

B BAHAN

1 Pipa PVC RRJ 6 m S - 10 Ø 4" M400.f Ljr 0.2000 391,530.00 78,306.00 2 Perlengkapan 0.3500 137,035.50 47,962.42

JUMLAH HARGA BAHAN 126,268.42

C PERALATAN

JUMLAH HARGA PERALATAN

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 139,286.43

ANALISA HARGA SATUAN

KODE ANALISA : Q.037JENIS PEKERJAAN : Pasang pipa PVC RRJ 6 m S-10 Ø 6"SATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1215 45,000.00 5,467.50 2 Tukang Batu L07 Org/hr 0.2025 60,000.00 12,150.00 3 Kepala Tukang Batu L02 Org/hr 0.0203 70,000.00 1,421.00 4 Mandor L01 Org/hr 0.0062 80,000.00 492.00

JUMLAH HARGA TENAGA 19,530.50

B BAHAN

1 Pipa PVC RRJ 6 m S - 10 Ø 6" M400.g Ljr 0.2000 813,050.00 162,610.00 2 Perlengkapan 0.3500 284,567.50 99,598.63

JUMLAH HARGA BAHAN 262,208.63

C PERALATAN

JUMLAH HARGA PERALATAN

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 281,739.13

: m1

: m1

Page 373: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : Q.038JENIS PEKERJAAN : Pasang pipa PVC RRJ 6 m S-10 Ø 8"SATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1823 45,000.00 8,201.25 2 Tukang Batu L07 Org/hr 0.3038 60,000.00 18,225.00 3 Kepala Tukang Batu L02 Org/hr 0.0304 70,000.00 2,128.00 4 Mandor L01 Org/hr 0.0092 80,000.00 738.00

JUMLAH HARGA TENAGA 29,292.25

B BAHAN

1 Pipa PVC RRJ 6 m S - 10 Ø 8" M400.h Ljr 0.2000 1,322,730.00 264,546.00 2 Perlengkapan 0.3500 462,955.50 162,034.42

JUMLAH HARGA BAHAN 426,580.42

C PERALATAN

JUMLAH HARGA PERALATAN

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 455,872.67

ANALISA HARGA SATUAN

KODE ANALISA : Q.039JENIS PEKERJAAN SATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.7895 45,000.00 35,527.50 2 Tukang Batu L07 Org/hr 0.0900 60,000.00 5,400.00 3 Kepala Tukang Batu L02 Org/hr 0.0090 70,000.00 630.00 4 Mandor L01 Org/hr 0.0763 80,000.00 6,100.00

JUMLAH HARGA TENAGA 47,657.50

B BAHAN

1 Pipa PVC RRJ 6 m S - 10 Ø 2" M400.c Ljr 0.2000 145,320.00 29,064.00 2 Perlengkapan 0.3500 50,862.00 17,801.70 3 Pasir Cor M004 m3 0.0033 110,000.00 363.00 4 Batu pecah mesin 1/2 M018 m3 0.0477 182,160.00 8,681.02 5 Aspal kg 1.9855 8,709.68 17,292.67

JUMLAH HARGA BAHAN 73,202.39

C PERALATAN

1 Stamper E37 Unit/hr 0.0357 160,000.00 5,712.00

JUMLAH HARGA PERALATAN 5,712.00

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 126,571.89

: m1

: Pasang pipa RRJ S-10 Ø 2" lintas jalan: m1

Page 374: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : Q.040JENIS PEKERJAAN SATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.7895 45,000.00 35,527.50 2 Tukang Batu L07 Org/hr 0.0900 60,000.00 5,400.00 3 Kepala Tukang Batu L02 Org/hr 0.0090 70,000.00 630.00 4 Mandor L01 Org/hr 0.0763 80,000.00 6,100.00

JUMLAH HARGA TENAGA 47,657.50

B BAHAN

1 Pipa PVC RRJ 6 m S - 10 Ø 3" M400.e Ljr 0.2000 262,420.00 52,484.00 2 Perlengkapan 0.3500 91,847.00 32,146.45 3 Pasir Cor M004 m3 0.0033 110,000.00 363.00 4 Batu pecah mesin 1/2 M018 m3 0.0477 182,160.00 8,681.02 5 Aspal kg 1.9855 8,709.68 17,292.67

JUMLAH HARGA BAHAN 110,967.14

C PERALATAN

1 Stamper E37 Unit/hr 0.0357 160,000.00 5,712.00

JUMLAH HARGA PERALATAN 5,712.00

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 164,336.64

ANALISA HARGA SATUAN

KODE ANALISA : Q.041JENIS PEKERJAAN SATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.7895 45,000.00 35,527.50 2 Tukang Batu L07 Org/hr 0.0900 60,000.00 5,400.00 3 Kepala Tukang Batu L02 Org/hr 0.0090 70,000.00 630.00 4 Mandor L01 Org/hr 0.0763 80,000.00 6,100.00

JUMLAH HARGA TENAGA 47,657.50

B BAHAN

1 Pipa PVC RRJ 6 m S - 10 Ø 4" M400.f Ljr 0.2000 391,530.00 78,306.00 2 Perlengkapan 0.3500 137,035.50 47,962.42 3 Pasir Cor M004 m3 0.0033 110,000.00 363.00 4 Batu pecah mesin 1/2 M018 m3 0.0477 182,160.00 8,681.02 5 Aspal kg 1.9855 8,709.68 17,292.67

JUMLAH HARGA BAHAN 152,605.11

C PERALATAN

1 Stamper E37 Unit/hr 0.0357 160,000.00 5,712.00

JUMLAH HARGA PERALATAN 5,712.00

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 205,974.61

: Pasang pipa RRJ S-10 Ø 3" lintas jalan: m1

: Pasang pipa RRJ S-10 Ø 4" lintas jalan: m1

Page 375: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : Q.042JENIS PEKERJAAN : Pasang pipa PVC moof 6 m S-12,5 Ø 2"SATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0540 45,000.00 2,430.00 2 Tukang Pipa L12 Org/hr 0.0900 60,000.00 5,400.00 3 Kepala Tukang Batu L02 Org/hr 0.0090 70,000.00 630.00 4 Mandor L01 Org/hr 0.0027 80,000.00 216.00

JUMLAH HARGA TENAGA 8,676.00

B BAHAN

1 Pipa PVC moof 6 m S - 12,5 Ø 2" M400.i Ljr 0.2000 108,500.00 21,700.00 2 Perlengkapan 0.3500 37,975.00 13,291.25

JUMLAH HARGA BAHAN 34,991.25

C PERALATAN

JUMLAH HARGA PERALATAN

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 43,667.25

ANALISA HARGA SATUAN

KODE ANALISA : Q.043JENIS PEKERJAAN : Pasang pipa PVC moof 6 m S-12,5 Ø 2.5"SATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0540 45,000.00 2,430.00 2 Tukang Pipa L12 Org/hr 0.0900 60,000.00 5,400.00 3 Kepala Tukang Batu L02 Org/hr 0.0090 70,000.00 630.00 4 Mandor L01 Org/hr 0.0027 80,000.00 216.00

JUMLAH HARGA TENAGA 8,676.00

B BAHAN

1 Pipa PVC moof 6 m S - 12,5 Ø 2,5"M400.j Ljr 0.2000 151,200.00 30,240.00 2 Perlengkapan 0.3500 52,920.00 18,522.00

JUMLAH HARGA BAHAN 48,762.00

C PERALATAN

JUMLAH HARGA PERALATAN

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 57,438.00

: m1

: m1

Page 376: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : Q.044JENIS PEKERJAAN : Pasang pipa PVC moof 6 m S-12,5 Ø 3"SATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0810 45,000.00 3,645.00 2 Tukang Pipa L12 Org/hr 0.1350 60,000.00 8,100.00 3 Kepala Tukang Batu L02 Org/hr 0.0135 70,000.00 945.00 4 Mandor L01 Org/hr 0.0041 80,000.00 328.00

JUMLAH HARGA TENAGA 13,018.00

B BAHAN

1 Pipa PVC moof 6 m S - 12,5 Ø 3" M400.k Ljr 0.2000 225,300.00 45,060.00 2 Perlengkapan 0.3500 78,855.00 27,599.25

JUMLAH HARGA BAHAN 72,659.25

C PERALATAN

JUMLAH HARGA PERALATAN

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 85,677.25

ANALISA HARGA SATUAN

KODE ANALISA : Q.045JENIS PEKERJAAN : Pasang pipa PVC moof 6 m S-12,5 Ø 4"SATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0810 45,000.00 3,645.00 2 Tukang Pipa L12 Org/hr 0.1350 60,000.00 8,100.00 3 Kepala Tukang Batu L02 Org/hr 0.0135 70,000.00 945.00 4 Mandor L01 Org/hr 0.0041 80,000.00 328.00

JUMLAH HARGA TENAGA 13,018.00

B BAHAN

1 Pipa PVC moof 6 m S - 12,5 Ø 4" M400.l Ljr 0.2000 330,700.00 66,140.00 2 Perlengkapan 0.3500 115,745.00 40,510.75

JUMLAH HARGA BAHAN 106,650.75

C PERALATAN

JUMLAH HARGA PERALATAN

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 119,668.75

: m1

: m1

Page 377: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : Q.046JENIS PEKERJAAN : Pasang pipa PVC moof 6 m S-12,5 Ø 6"SATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1215 45,000.00 5,467.50 2 Tukang Pipa L12 Org/hr 0.2025 60,000.00 12,150.00 3 Kepala Tukang Batu L02 Org/hr 0.0203 70,000.00 1,421.00 4 Mandor L01 Org/hr 0.0062 80,000.00 492.00

JUMLAH HARGA TENAGA 19,530.50

B BAHAN

1 Pipa PVC moof 6 m S - 12,5 Ø 6" M400.m Ljr 0.2000 714,500.00 142,900.00 2 Perlengkapan 0.3500 250,075.00 87,526.25

JUMLAH HARGA BAHAN 230,426.25

C PERALATAN

JUMLAH HARGA PERALATAN

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 249,956.75

ANALISA HARGA SATUAN

KODE ANALISA : Q.047JENIS PEKERJAAN : Pasang pipa PVC moof 6 m S-12,5 Ø 8"SATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1823 45,000.00 8,201.25 2 Tukang Pipa L12 Org/hr 0.3038 60,000.00 18,225.00 3 Kepala Tukang Batu L02 Org/hr 0.0304 70,000.00 2,128.00 4 Mandor L01 Org/hr 0.0092 80,000.00 738.00

JUMLAH HARGA TENAGA 29,292.25

B BAHAN

1 Pipa PVC moof 6 m S - 12,5 Ø 8" M400.n Ljr 0.2000 1,157,100.00 231,420.00 2 Perlengkapan 0.3500 404,985.00 141,744.75

JUMLAH HARGA BAHAN 373,164.75

C PERALATAN

JUMLAH HARGA PERALATAN

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 402,457.00

: m1

: m1

Page 378: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : Q.048JENIS PEKERJAAN SATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.7895 45,000.00 35,527.50 2 Tukang Pipa L12 Org/hr 0.0900 60,000.00 5,400.00 3 Kepala Tukang Batu L02 Org/hr 0.0090 70,000.00 630.00 4 Mandor L01 Org/hr 0.0763 80,000.00 6,100.00

JUMLAH HARGA TENAGA 47,657.50

B BAHAN

1 Pipa PVC moof 6 m S - 12,5 Ø 2" M400.i Ljr 0.2000 108,500.00 21,700.00 2 Perlengkapan 0.3500 37,975.00 13,291.25 3 Pasir Cor M004 m3 0.0033 110,000.00 363.00 4 Batu pecah mesin 1/2 M018 m3 0.0477 182,160.00 8,681.02 5 Aspal kg 1.9855 8,709.68 17,292.67

JUMLAH HARGA BAHAN 61,327.94

C PERALATAN

1 Stamper E37 Unit/hr 0.0357 160,000.00 5,712.00

JUMLAH HARGA PERALATAN 5,712.00

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 114,697.44

ANALISA HARGA SATUAN

KODE ANALISA : Q.049JENIS PEKERJAAN SATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.7895 45,000.00 35,527.50 2 Tukang Pipa L12 Org/hr 0.0900 60,000.00 5,400.00 3 Kepala Tukang Batu L02 Org/hr 0.0090 70,000.00 630.00 4 Mandor L01 Org/hr 0.0763 80,000.00 6,100.00

JUMLAH HARGA TENAGA 47,657.50

B BAHAN

1 Pipa PVC moof 6 m S - 12,5 Ø 3" M400.k Ljr 0.2000 225,300.00 45,060.00 2 Perlengkapan 0.3500 78,855.00 27,599.25 3 Pasir Cor M004 m3 0.0033 110,000.00 363.00 4 Batu pecah mesin 1/2 M018 m3 0.0477 182,160.00 8,681.02 5 Aspal kg 1.9855 8,709.68 17,292.67

JUMLAH HARGA BAHAN 98,995.94

C PERALATAN

1 Stamper E37 Unit/hr 0.0357 160,000.00 5,712.00

JUMLAH HARGA PERALATAN 5,712.00

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 152,365.44

: Pasang pipa PVC moof S-12,5 Ø 2" lintas jalan: m1

: Pasang pipa PVC moof S-12,5 Ø 3" lintas jalan: m1

Page 379: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : Q.050JENIS PEKERJAAN SATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.7895 45,000.00 35,527.50 2 Tukang Pipa L12 Org/hr 0.0900 60,000.00 5,400.00 3 Kepala Tukang Batu L02 Org/hr 0.0090 70,000.00 630.00 4 Mandor L01 Org/hr 0.0763 80,000.00 6,100.00

JUMLAH HARGA TENAGA 47,657.50

B BAHAN

1 Pipa PVC moof 6 m S - 12,5 Ø 4" M400.l Ljr 0.2000 330,700.00 66,140.00 2 Perlengkapan 0.3500 115,745.00 40,510.75 3 Pasir Cor M004 m3 0.0033 110,000.00 363.00 4 Batu pecah mesin 1/2 M018 m3 0.0477 182,160.00 8,681.02 5 Aspal kg 1.9855 8,709.68 17,292.67

JUMLAH HARGA BAHAN 132,987.44

C PERALATAN

1 Stamper E37 Unit/hr 0.0357 160,000.00 5,712.00

JUMLAH HARGA PERALATAN 5,712.00

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 186,356.94

ANALISA HARGA SATUAN

KODE ANALISA : Q.051JENIS PEKERJAAN : Pasang pompa airSATUAN PEMBAYARAN : Unit

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0100 45,000.00 450.00 2 Tukang Batu L07 Org/hr 0.1000 60,000.00 6,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0100 70,000.00 700.00 4 Mandor L01 Org/hr 0.0050 80,000.00 400.00

JUMLAH HARGA TENAGA 7,550.00

B BAHAN

1 Pompa Air M436 Unit 1.0000 661,120.00 661,120.00 2 Perlengkapan 0.1500 661,120.00 99,168.00

JUMLAH HARGA BAHAN 760,288.00

C PERALATAN

JUMLAH HARGA PERALATAN

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 767,838.00

: Pasang pipa PVC moof S-12,5 Ø 4" lintas jalan: m1

Page 380: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : Q.052JENIS PEKERJAAN SATUAN PEMBAYARAN : Unit

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.2000 45,000.00 9,000.00 2 Tukang Pipa L12 Org/hr 0.2000 60,000.00 12,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0100 70,000.00 700.00 4 Mandor L01 Org/hr 0.0100 80,000.00 800.00

JUMLAH HARGA TENAGA 22,500.00

B BAHAN

1 Tandon Air PVC V = 0.5 m3 M431 bh 1.0000 500,000.00 500,000.00 2 Perlengkapan 0.1500 500,000.00 75,000.00

JUMLAH HARGA BAHAN 575,000.00

C PERALATAN

JUMLAH HARGA PERALATAN

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 597,500.00

ANALISA HARGA SATUAN

KODE ANALISA : Q.053JENIS PEKERJAAN SATUAN PEMBAYARAN : Unit

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.3000 45,000.00 13,500.00 2 Tukang Pipa L12 Org/hr 0.3000 60,000.00 18,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0150 70,000.00 1,050.00 4 Mandor L01 Org/hr 0.0150 80,000.00 1,200.00

JUMLAH HARGA TENAGA 33,750.00

B BAHAN

1 Tandon Air PVC V = 1.0 m3 M432 bh 1.0000 1,000,000.00 1,000,000.00 2 Perlengkapan 0.1500 1,000,000.00 150,000.00

JUMLAH HARGA BAHAN 1,150,000.00

C PERALATAN

JUMLAH HARGA PERALATAN

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 1,183,750.00

: Pasang tandon air PVC V = 0.50 m3

: Pasang tandon air PVC V = 1.0 m3

Page 381: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : Q.054JENIS PEKERJAAN SATUAN PEMBAYARAN : Unit

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.2500 45,000.00 11,250.00 2 Tukang Pipa L12 Org/hr 0.2500 60,000.00 15,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0125 70,000.00 875.00 4 Mandor L01 Org/hr 0.0125 80,000.00 1,000.00

JUMLAH HARGA TENAGA 28,125.00

B BAHAN

1 Tandon Air Stainless V = 0.5 m3 M433 bh 1.0000 1,500,000.00 1,500,000.00 2 Perlengkapan 0.1500 1,500,000.00 225,000.00

JUMLAH HARGA BAHAN 1,725,000.00

C PERALATAN

JUMLAH HARGA PERALATAN

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 1,753,125.00

ANALISA HARGA SATUAN

KODE ANALISA : Q.055JENIS PEKERJAAN SATUAN PEMBAYARAN : Unit

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.4000 45,000.00 18,000.00 2 Tukang Pipa L12 Org/hr 0.4000 60,000.00 24,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0200 70,000.00 1,400.00 4 Mandor L01 Org/hr 0.0200 80,000.00 1,600.00

JUMLAH HARGA TENAGA 45,000.00

B BAHAN

1 Tandon Air Stainless V = 1.0 m3 M434 bh 1.0000 2,500,000.00 2,500,000.00 2 Perlengkapan 0.1500 2,500,000.00 375,000.00

JUMLAH HARGA BAHAN 2,875,000.00

C PERALATAN

JUMLAH HARGA PERALATAN

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 2,920,000.00

: Pasang tandon air stainless V = 0.5 m3

: Pasang tandon air stainless V = 1.0 m3

Page 382: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : R.001JENIS PEKERJAAN : Pengukuran bendung untuk MCSATUAN PEMBAYARAN : bh

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Juru Ukur L25 Org/hr 1.5000 135,000.00 202,500.00 2 Pekerja Biasa L17 Org/hr 4.5000 45,000.00 202,500.00

JUMLAH HARGA TENAGA 405,000.00

B BAHAN

1 Cat meni kayu M409 kg 0.1200 20,840.00 2,500.80 2 Paku Kayu Segala Ukuran M140 kg 0.0500 17,500.00 875.00 3 Usuk : 5/7 M061 m3 0.0120 4,500,000.00 54,000.00

JUMLAH HARGA BAHAN 57,375.80

C PERALATAN

1 Pesawat ukur E15 Unit/hr 1.0000 100,000.00 100,000.00 2 Meteran E16 bh 0.0450 100,000.00 4,500.00 3 Palu E17 bh 0.0900 25,000.00 2,250.00

JUMLAH HARGA PERALATAN 106,750.00

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 569,125.80

ANALISA HARGA SATUAN

KODE ANALISA : R.002JENIS PEKERJAAN : Pengukuran saluran untuk MCSATUAN PEMBAYARAN : km1

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Juru Ukur L25 Org/hr 2.0000 135,000.00 270,000.00 2 Pekerja Biasa L17 Org/hr 6.0000 45,000.00 270,000.00

JUMLAH HARGA TENAGA 540,000.00

B BAHAN

1 Cat meni kayu M409 kg 0.1200 20,840.00 2,500.80 2 Paku Kayu Segala Ukuran M140 kg 0.0500 17,500.00 875.00 3 Usuk : 5/7 M061 m3 0.0120 4,500,000.00 54,000.00

JUMLAH HARGA BAHAN 57,375.80

C PERALATAN

1 Pesawat ukur E15 Unit/hr 2.0000 100,000.00 200,000.00 2 Meteran E16 bh 0.0450 100,000.00 4,500.00 3 Palu E17 bh 0.0900 25,000.00 2,250.00

JUMLAH HARGA PERALATAN 206,750.00

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 804,125.80

Page 383: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : R.003JENIS PEKERJAAN : Pengukuran bangunan untuk MCSATUAN PEMBAYARAN : bh

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Juru Ukur L25 Org/hr 0.2500 135,000.00 33,750.00 2 Pekerja Biasa L17 Org/hr 0.7500 45,000.00 33,750.00

JUMLAH HARGA TENAGA 67,500.00

B BAHAN

1 Cat meni kayu M409 kg 0.0200 20,840.00 416.80 2 Paku Kayu Segala Ukuran M140 kg 0.0100 17,500.00 175.00 3 Usuk : 5/7 M061 m3 0.0020 4,500,000.00 9,000.00

JUMLAH HARGA BAHAN 9,591.80

C PERALATAN

1 Pesawat ukur E15 Unit/hr 0.2500 100,000.00 25,000.00 2 Meteran E16 bh 0.0200 100,000.00 2,000.00 3 Palu E17 bh 0.0300 25,000.00 750.00

JUMLAH HARGA PERALATAN 27,750.00

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 104,841.80

ANALISA HARGA SATUAN

KODE ANALISA : R.004JENIS PEKERJAAN : Pendongkelan rumpun bambuSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 1.3270 45,000.00 59,715.00 2 Mandor L01 Org/hr 0.0450 80,000.00 3,600.00

JUMLAH HARGA TENAGA 63,315.00

B BAHAN

JUMLAH HARGA BAHAN -

C PERALATAN

1 Keranjang E18 bh 0.2250 10,000.00 2,250.00 2 Ganco E19 bh 0.0500 75,000.00 3,750.00

JUMLAH HARGA PERALATAN 6,000.00

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 69,315.00

Page 384: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : R.005JENIS PEKERJAAN : Pembuatan dan pembongkaran kisdam > 1 mSATUAN PEMBAYARAN : m3

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 1.0370 45,000.00 46,665.00 2 Tukang Batu L07 Org/hr 0.0460 60,000.00 2,760.00 3 Kepala Tukang Batu L02 Org/hr 0.0050 70,000.00 350.00 4 Mandor L01 Org/hr 0.0380 80,000.00 3,040.00

JUMLAH HARGA TENAGA 52,815.00

B BAHAN

1 Gedeg (2.00 x 3.00) m M092 lbr 0.4000 34,500.00 13,800.00 2 Bambu Dia 10 cm M088 btg 1.6000 20,700.00 33,120.00 3 Kawat Galvanis 3 mm M134 kg 0.3700 62,420.00 23,095.40

JUMLAH HARGA BAHAN 70,015.40

C PERALATAN

1 Keranjang E18 bh 0.0800 10,000.00 800.00 2 Alat pelancip/pisau besar E20 bh 0.0300 25,000.00 750.00 3 Palu besar/bodem E21 bh 0.0400 100,000.00 4,000.00

JUMLAH HARGA PERALATAN 5,550.00

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 128,380.40

ANALISA HARGA SATUAN

KODE ANALISA : R.006JENIS PEKERJAAN : Galian tanah biasa diangkut > 1 m dibuangSATUAN PEMBAYARAN : m3

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.9500 45,000.00 42,750.00 2 Mandor L01 Org/hr 0.0350 80,000.00 2,800.00

JUMLAH HARGA TENAGA 45,550.00

B BAHAN

JUMLAH HARGA BAHAN -

C PERALATAN

1 Keranjang E18 bh 0.0500 10,000.00 500.00

JUMLAH HARGA PERALATAN 500.00

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 46,050.00

Page 385: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : R.007JENIS PEKERJAAN : Galian tanah biasa diangkut > 50 m dibuangSATUAN PEMBAYARAN : m3

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 1.0440 45,000.00 46,980.00 2 Mandor L01 Org/hr 0.0340 80,000.00 2,720.00

JUMLAH HARGA TENAGA 49,700.00

B BAHAN

JUMLAH HARGA BAHAN -

C PERALATAN

1 Keranjang E18 bh 0.0500 10,000.00 500.00 2 Kereta Dorong E23 Unit 0.0560 100,000.00 5,600.00

JUMLAH HARGA PERALATAN 6,100.00

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 55,800.00

ANALISA HARGA SATUAN

KODE ANALISA : R.008JENIS PEKERJAAN : Galian tanah berbatu diangkut > 1 m dibuangSATUAN PEMBAYARAN : m3

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 1.5840 45,000.00 71,280.00 2 Mandor L01 Org/hr 0.0460 80,000.00 3,680.00

JUMLAH HARGA TENAGA 74,960.00

B BAHAN

JUMLAH HARGA BAHAN -

C PERALATAN

1 Keranjang E18 bh 0.0500 10,000.00 500.00 2 Kereta Dorong E23 Unit 0.1000 100,000.00 10,000.00

JUMLAH HARGA PERALATAN 10,500.00

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 85,460.00

Page 386: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : R.009JENIS PEKERJAAN : Galian tanah berbatu diangkut > 50 m dibuangSATUAN PEMBAYARAN : m3

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 1.5650 45,000.00 70,425.00 2 Mandor L01 Org/hr 0.0580 80,000.00 4,640.00

JUMLAH HARGA TENAGA 75,065.00

B BAHAN

JUMLAH HARGA BAHAN -

C PERALATAN

1 Keranjang E18 bh 0.0500 10,000.00 500.00 2 Kereta Dorong E23 Unit 0.1000 100,000.00 10,000.00

JUMLAH HARGA PERALATAN 10,500.00

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 85,565.00

ANALISA HARGA SATUAN

KODE ANALISA : R.010JENIS PEKERJAAN : Galian tanah keras/cadas diangkut > 1 m dibuangSATUAN PEMBAYARAN : m3

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 1.3200 45,000.00 59,400.00 2 Mandor L01 Org/hr 0.0590 80,000.00 4,720.00

JUMLAH HARGA TENAGA 64,120.00

B BAHAN

JUMLAH HARGA BAHAN -

C PERALATAN

1 Keranjang E18 bh 0.0500 10,000.00 500.00 2 Kereta Dorong E23 Unit 0.1110 100,000.00 11,100.00 3 Jack Hammer E24 bh 0.0240 100,000.00 2,400.00

JUMLAH HARGA PERALATAN 14,000.00

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 78,120.00

Page 387: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : R.011JENIS PEKERJAAN : Galian tanah keras/cadas diangkut > 50 m dibuangSATUAN PEMBAYARAN : m3

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 1.4640 45,000.00 65,880.00 2 Mandor L01 Org/hr 0.0610 80,000.00 4,880.00

JUMLAH HARGA TENAGA 70,760.00

B BAHAN

JUMLAH HARGA BAHAN -

C PERALATAN

1 Keranjang E18 bh 0.0500 10,000.00 500.00 2 Kereta Dorong E23 Unit 0.1110 100,000.00 11,100.00 3 Jack Hammer E24 bh 0.0240 100,000.00 2,400.00

JUMLAH HARGA PERALATAN 14,000.00

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 84,760.00

ANALISA HARGA SATUAN

KODE ANALISA : R.012JENIS PEKERJAAN : Galian tanah biasa langsung untuk timbunan / dibuangSATUAN PEMBAYARAN : m3

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.7200 45,000.00 32,400.00 2 Mandor L01 Org/hr 0.0240 80,000.00 1,920.00

JUMLAH HARGA TENAGA 34,320.00

B BAHAN

JUMLAH HARGA BAHAN -

C PERALATAN

1 Keranjang E18 bh 0.0500 10,000.00 500.00

JUMLAH HARGA PERALATAN 500.00

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 34,820.00

Page 388: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : R.013JENIS PEKERJAAN : Pemadatan tanah timbunan & dirapikanSATUAN PEMBAYARAN : m3

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.2110 45,000.00 9,495.00 2 Mandor L01 Org/hr 0.0090 80,000.00 720.00

JUMLAH HARGA TENAGA 10,215.00

B BAHAN

JUMLAH HARGA BAHAN -

C PERALATAN

1 Timbris E22 Unit 0.1670 30,000.00 5,010.00

JUMLAH HARGA PERALATAN 5,010.00

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 15,225.00

ANALISA HARGA SATUAN

KODE ANALISA : R.014JENIS PEKERJAAN : Timbunan tanah kembali dipadatkan dan dirapikan (manual)SATUAN PEMBAYARAN : m3

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.6380 45,000.00 28,710.00 2 Mandor L01 Org/hr 0.0230 80,000.00 1,840.00

JUMLAH HARGA TENAGA 30,550.00

B BAHAN

JUMLAH HARGA BAHAN -

C PERALATAN

1 Timbris E22 Unit 0.1670 30,000.00 5,010.00 2 Keranjang E18 bh 0.1250 10,000.00 1,250.00

JUMLAH HARGA PERALATAN 6,260.00

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 36,810.00

Page 389: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : R.015JENIS PEKERJAAN : Timbunan tanah dari luar dipadatkan dan dirapikan (manual)SATUAN PEMBAYARAN : m3

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.3250 45,000.00 14,625.00 2 Tukang Kayu L08 Org/hr - 60,000.00 - 3 Kepala Tukang Kayu L03 Org/hr - 47,000.00 - 4 Mandor L01 Org/hr 0.0120 80,000.00 960.00

JUMLAH HARGA TENAGA 15,585.00

B BAHAN

1 Tanah Urug M006 m3 1.2000 50,000.00 60,000.00

JUMLAH HARGA BAHAN 60,000.00

C PERALATAN

1 Timbris E22 Unit 0.1500 30,000.00 4,500.00 2 Keranjang E18 bh 0.1100 10,000.00 1,100.00 3 Kereta Dorong E23 Unit 0.0540 100,000.00 5,400.00

JUMLAH HARGA PERALATAN 11,000.00

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 86,585.00

ANALISA HARGA SATUAN

KODE ANALISA : R.016JENIS PEKERJAAN : Bongkaran pasangan batu kaliSATUAN PEMBAYARAN : m3

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 2.0480 45,000.00 92,160.00 2 Mandor L01 Org/hr 0.2050 80,000.00 16,400.00

JUMLAH HARGA TENAGA 108,560.00

B BAHAN

JUMLAH HARGA BAHAN -

C PERALATAN

1 Keranjang E18 bh 0.0830 10,000.00 830.00 2 Palu besar/bodem E21 bh 0.0100 100,000.00 1,000.00

JUMLAH HARGA PERALATAN 1,830.00

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 110,390.00

Page 390: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : R.017JENIS PEKERJAAN : Pasangan batu kali dengan spesi 1 pc ; 4 psSATUAN PEMBAYARAN : m3

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 1.5000 45,000.00 67,500.00 2 Tukang Batu L07 Org/hr 0.6000 60,000.00 36,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0600 70,000.00 4,200.00 4 Mandor L01 Org/hr 0.0750 80,000.00 6,000.00

JUMLAH HARGA TENAGA 113,700.00

B BAHAN

1 Batu Belah Kali M011 m3 1.2000 115,700.00 138,840.00 2 Portland Cement (PC) M037 kg 163.0000 900.00 146,700.00 3 Pasir Pasang M002 m3 0.5200 60,000.00 31,200.00

JUMLAH HARGA BAHAN 316,740.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 430,440.00

ANALISA HARGA SATUAN

KODE ANALISA : R.018JENIS PEKERJAAN : Siaran dengan spesi 1 pc ; 2 psSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.3000 45,000.00 13,500.00 2 Tukang Batu L07 Org/hr 0.1400 60,000.00 8,400.00 3 Kepala Tukang Batu L02 Org/hr 0.0140 70,000.00 980.00 4 Mandor L01 Org/hr 0.0150 80,000.00 1,200.00

JUMLAH HARGA TENAGA 24,080.00

B BAHAN

1 Portland Cement (PC) M037 kg 6.3400 900.00 5,706.00 2 Pasir Pasang M002 m3 0.0120 60,000.00 720.00

JUMLAH HARGA BAHAN 6,426.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 30,506.00

Page 391: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : R.019JENIS PEKERJAAN : Plesteran tebal 1,5 cm dengan spesi 1 pc ; 3 psSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.2000 45,000.00 9,000.00 2 Tukang Batu L07 Org/hr 0.1500 60,000.00 9,000.00 3 Kepala Tukang Batu L02 Org/hr 0.0150 70,000.00 1,050.00 4 Mandor L01 Org/hr 0.0100 80,000.00 800.00

JUMLAH HARGA TENAGA 19,850.00

B BAHAN

1 Portland Cement (PC) M037 kg 7.7760 900.00 6,998.40 2 Pasir Pasang M002 m3 0.0230 60,000.00 1,380.00

JUMLAH HARGA BAHAN 8,378.40

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 28,228.40

ANALISA HARGA SATUAN

KODE ANALISA : R.020JENIS PEKERJAAN : Bronjong kawat galvanis d = 4 mm (0.50 x 1.00 x 2.00)SATUAN PEMBAYARAN : m3

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Penganyam L17 Org/hr 0.5760 45,000.00 25,920.00 2 Pekerja Pengisi L17 Org/hr 1.3820 45,000.00 62,190.00 3 Tukang Penganyam L07 Org/hr 0.7040 60,000.00 42,240.00 4 Mandor Penganyam L01 Org/hr 0.0260 80,000.00 2,080.00 5 Mandor Pengisi L01 Org/hr 0.0240 80,000.00 1,920.00

JUMLAH HARGA TENAGA 134,350.00

B BAHAN

1 Batu Belah Kali M011 m3 1.0000 115,700.00 115,700.00 2 Kawat Galvanis 2 mm M133 kg 19.0000 37,660.00 715,540.00

JUMLAH HARGA BAHAN 831,240.00

C PERALATAN

1 Tang Pemotong Kawat E31 bh 0.0100 50,000.00 500.00 2 Palu besar/bodem E21 bh 0.0100 100,000.00 1,000.00

JUMLAH HARGA PERALATAN 1,500.00

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 967,090.00

Page 392: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : R.021JENIS PEKERJAAN : Beton K-125SATUAN PEMBAYARAN : m3

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 1.6500 45,000.00 74,250.00 2 Tukang Kayu L08 Org/hr 0.2750 60,000.00 16,500.00 3 Kepala Tukang Kayu L03 Org/hr 0.0280 47,000.00 1,316.00 4 Mandor L01 Org/hr 0.0830 80,000.00 6,640.00

JUMLAH HARGA TENAGA 98,706.00

B BAHAN

1 Portland Cement (PC) M037 kg 276.0000 900.00 248,400.00 2 Pasir Cor M004 m3 0.5914 110,000.00 65,057.14 3 Batu pecah mesin 2/3 M019 m3 0.7496 100,000.00 74,962.96 4 Air Bersih M486 ltr 215.000 25.00 5,375.00

JUMLAH HARGA BAHAN 393,795.11

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 492,501.11

ANALISA HARGA SATUAN

KODE ANALISA : R.022JENIS PEKERJAAN : Beton K-175SATUAN PEMBAYARAN : m3

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 1.6500 45,000.00 74,250.00 2 Tukang Batu L07 Org/hr 0.2750 60,000.00 16,500.00 3 Kepala Tukang Batu L02 Org/hr 0.0280 70,000.00 1,960.00 4 Mandor L01 Org/hr 0.0830 80,000.00 6,640.00

JUMLAH HARGA TENAGA 99,350.00

B BAHAN

1 Portland Cement (PC) M037 kg 326.0000 900.00 293,400.00 2 Pasir Cor M004 m3 0.5429 110,000.00 59,714.29 3 Batu pecah mesin 2/3 M019 m3 0.7622 100,000.00 76,222.22 4 Air Bersih M486 ltr 215.000 25.00 5,375.00

JUMLAH HARGA BAHAN 434,711.51

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 534,061.51

Page 393: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : R.023JENIS PEKERJAAN : Bekisting kayu termasuk pembongkaranSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.6600 45,000.00 29,700.00 2 Tukang Kayu L08 Org/hr 0.3300 60,000.00 19,800.00 3 Kepala Tukang Kayu L03 Org/hr 0.0330 47,000.00 1,551.00 4 Mandor L01 Org/hr 0.0330 80,000.00 2,640.00

JUMLAH HARGA TENAGA 53,691.00

B BAHAN

1 Papan Kayu kelas III M085 m3 0.0550 1,100,000.00 60,500.00 2 Paku Kayu Segala Ukuran M140 kg 0.4000 17,500.00 7,000.00

JUMLAH HARGA BAHAN 67,500.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 121,191.00

ANALISA HARGA SATUAN

KODE ANALISA : R.024JENIS PEKERJAAN : Besi Tulangan UlirSATUAN PEMBAYARAN : kg

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0070 45,000.00 315.00 2 Tukang Batu L07 Org/hr 0.0070 60,000.00 420.00 3 Kepala Tukang Batu L02 Org/hr 0.0007 70,000.00 49.00 4 Mandor L01 Org/hr 0.0004 80,000.00 32.00

JUMLAH HARGA TENAGA 816.00

B BAHAN

1 Besi Beton Ulir M113 kg 1.0500 17,085.00 17,939.25 2 Kawat Beton/Bendrat RRT M135 kg 0.0150 7,500.00 112.50

JUMLAH HARGA BAHAN 18,051.75

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 18,867.75

Page 394: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : R.025JENIS PEKERJAAN : Besi Tulangan PolosSATUAN PEMBAYARAN : kg

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.0070 45,000.00 315.00 2 Tukang Batu L07 Org/hr 0.0070 60,000.00 420.00 3 Kepala Tukang Batu L02 Org/hr 0.0007 70,000.00 49.00 4 Mandor L01 Org/hr 0.0004 80,000.00 32.00

JUMLAH HARGA TENAGA 816.00

B BAHAN

1 Besi Beton Polos M112 kg 1.0500 8,500.00 8,925.00 2 Kawat Beton/Bendrat RRT M135 kg 0.0150 7,500.00 112.50

JUMLAH HARGA BAHAN 9,037.50

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 9,853.50

ANALISA HARGA SATUAN

KODE ANALISA : R.026JENIS PEKERJAAN : Kisi-Kisi SATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.1100 45,000.00 4,950.00 2 Tukang Besi/Baja L09 Org/hr 0.1100 60,000.00 6,600.00 3 Mandor L01 Org/hr 0.0200 80,000.00 1,600.00

JUMLAH HARGA TENAGA 13,150.00

B BAHAN

1 Besi Beton Polos M112 kg 24.1500 8,500.00 205,275.00 2 Baja Profil M116 kg 18.0147 18,750.00 337,775.74

JUMLAH HARGA BAHAN 543,050.74

C PERALATAN

1 Tang Pemotong Kawat E31 bh 0.0100 50,000.00 500.00 2 Kunci pembengkok tulangan E36 bh 0.4400 25,000.00 11,000.00

JUMLAH HARGA PERALATAN 11,500.00

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 567,700.74

Page 395: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : R.027 B = 2.000 mmURAIAN PEKERJAAN : Pintu Air Type A Plat H = 1.900 mmSATUAN MATA PEMBAYARAN : Buah H' = 4.200 mm

PERKIRAAN HARGA JUMLAH NO. MACAM PEKERJAAN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

I. BAHAN

1 Bahan konstruksi - Besi siku kg 22.95 18,750.00 430,312.50 - Besi kanal kg 905.80 18,750.00 16,983,750.00 - Plat Bronz kg 24.64 18,750.00 462,000.00 - Besi plate kg 541.61 18,750.00 10,155,187.50 - Besi plate strip kg 195.78 18,750.00 3,670,875.00 - Besi beton kg 57.92 8,500.00 492,320.00 - pipa kg 9,250.00 -

32,194,445.00

2 Bahan bantu konstruksi % 0.10 32,194,445.00 3,219,444.50

3 Bahan bantu konstruksi - Besi bulat st 60 kg 217.11 8,500.00 1,845,435.00 - Bronze kg 96.00 41,250.00 3,960,000.00 - Besi cor kg 186.00 8,500.00 1,581,000.00 - Roda Gigi Ps 3.00 1,850,000.00 5,550,000.00

12,936,435.00

4 Bahan - bahan lain - Mur baut 1/2", 5/8" , 7/8" kg 20.00 12,900.00 258,000.00 - Spei bh 7.00 17,500.00 122,500.00 - Seal Karet m 6.67 30,000.00 200,100.00 - Nipple bh 6.00 3,000.00 18,000.00 - Splite pen bh 1.00 31,300.00 31,300.00 - Gembok bh 1.00 12,900.00 12,900.00 - Drucklager kecil/besar bh 4.00 423,500.00 1,694,000.00

2,336,800.00

II. ONGKOS KERJA - Ongkos kerja konst. kg 1,748.70 1,300.00 2,273,310.00 - Ongkos kerja mesin kg 499.11 6,400.00 3,194,304.00 - Sandblasting dan cat m2 51.76 57,000.00 2,950,320.00

8,417,934.00

III. PEMASANGAN kg 2,247.81 1,100.00 2,472,591.00

IV. PEMBONGKARAN kg

V. TRANSPORT kg 2,247.81 600.00 1,348,686.00 3,821,277.00

Sub Total 62,926,335.50

VI. Biaya Tidak Langsung (Overhead) % 10VII. Jumlah Harga 62,926,335.50

VIII. Harga satuan pekerjaan per - Buah 62,926,000.00

Page 396: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : R.028 B = 1.000 mmURAIAN PEKERJAAN : Pintu Air Type C - 2 H = 1.100 mmSATUAN MATA PEMBAYARAN : Buah H' = 2.100 mm

PERKIRAAN HARGA JUMLAH NO. MACAM PEKERJAAN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

I. BAHAN

1 Bahan konstruksi - Besi siku kg 226.00 18,750.00 4,237,500.00 - Besi plate kg 50.00 18,750.00 937,500.00 - Besi plate strip kg 34.00 18,750.00 637,500.00 - Besi beton kg 12.00 8,500.00 102,000.00 - pipa kg 1.00 9,250.00 9,250.00

5,923,750.00

2 Bahan bantu konstruksi % 0.10 5,923,750.00 592,375.00

3 Bahan bantu konstruksi - Besi bulat st 60 kg 28.00 8,500.00 238,000.00 - Bronze kg 16.00 41,250.00 660,000.00 - Besi cor kg 36.00 8,500.00 306,000.00

1,204,000.00

4 Bahan - bahan lain - Mur baut 1/2", 5/8" , 7/8" kg 5.00 12,900.00 64,500.00 - Paku keling 3/4", 5/8" , 7/8" kg 11.00 9,800.00 107,800.00 - Nipple bh 1.00 3,000.00 3,000.00 - Splite pen bh 2.00 31,300.00 62,600.00 - Gembok bh 2.00 12,900.00 25,800.00 - Drucklager kecil/besar bh 1.00 423,500.00 423,500.00 - Na F + ring bh 1.00 110,000.00 110,000.00

797,200.00

II. ONGKOS KERJA - Ongkos kerja konst. kg 322.00 1,300.00 418,600.00 - Ongkos kerja mesin kg 107.00 6,400.00 684,800.00 - Sandblasting dan cat m2 10.58 57,000.00 603,060.00

1,706,460.00

III. PEMASANGAN kg 429.00 1,100.00 471,900.00

IV. PEMBONGKARAN kg

V. TRANSPORT kg 429.00 600.00 257,400.00 729,300.00

Sub Total 10,953,085.00

VI. Biaya Tidak Langsung (Overhead) % 10VII. Jumlah Harga 10,953,085.00

VIII. Harga satuan pekerjaan per - Buah 10,953,000.00

Page 397: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : R.029 B = 600 mmURAIAN PEKERJAAN : Pintu Air Type C - 3 H = 550 mmSATUAN MATA PEMBAYARAN : Buah H' = 850 mm

PERKIRAAN HARGA JUMLAH NO. MACAM PEKERJAAN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

I. BAHAN

1 Bahan konstruksi - Besi siku kg 115.00 18,750.00 2,156,250.00 - Besi plate kg 39.00 18,750.00 731,250.00 - Besi plate strip kg 26.00 18,750.00 487,500.00 - Besi beton kg 6.00 8,500.00 51,000.00 - pipa kg 1.00 9,250.00 9,250.00

3,435,250.00

2 Bahan bantu konstruksi % 0.10 3,435,250.00 343,525.00

3 Bahan bantu konstruksi - Besi bulat st 42 kg 22.00 8,500.00 187,000.00 - Bronze kg 16.00 41,250.00 660,000.00 - Besi cor kg 36.00 8,500.00 306,000.00

1,153,000.00

4 Bahan - bahan lain - Mur baut 1/2", 5/8" , 7/8" kg 5.00 12,900.00 64,500.00 - Paku keling 3/4", 5/8" , 7/8" kg 11.00 9,800.00 107,800.00 - Nipple bh 1.00 3,000.00 3,000.00 - Splite pen bh 2.00 31,300.00 62,600.00 - Gembok bh 2.00 12,900.00 25,800.00 - Drucklager kecil/besar bh 1.00 423,500.00 423,500.00 - Na F + ring bh 1.00 110,000.00 110,000.00

797,200.00

II. ONGKOS KERJA - Ongkos kerja konst. kg 186.00 1,300.00 241,800.00 - Ongkos kerja mesin kg 74.00 6,400.00 473,600.00 - Sandblasting dan cat m2 5.00 57,000.00 285,000.00

1,000,400.00

III. PEMASANGAN kg 237.00 1,100.00 260,700.00

IV. PEMBONGKARAN kg

V. TRANSPORT kg 237.00 600.00 142,200.00 402,900.00

Sub Total 7,132,275.00

VI. Biaya Tidak Langsung (Overhead) % 10VII. Jumlah Harga 7,132,275.00

VIII. Harga satuan pekerjaan per - Buah 7,132,000.00

Page 398: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : R.030 B = 600 mmURAIAN PEKERJAAN : Pintu Air Type C - 3 H = 450 mmSATUAN MATA PEMBAYARAN : Buah H' = 1400 mm

PERKIRAAN HARGA JUMLAH NO. MACAM PEKERJAAN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

I. BAHAN

1 Bahan konstruksi - Besi siku kg 138.00 18,750.00 2,587,500.00 - Besi plate kg 21.00 18,750.00 393,750.00 - Besi plate strip kg 31.00 18,750.00 581,250.00 - Besi beton kg 9.00 8,500.00 76,500.00 - pipa kg 1.00 9,250.00 9,250.00

3,648,250.00

2 Bahan bantu konstruksi % 0.10 3,648,250.00 364,825.00

3 Bahan bantu konstruksi - Besi bulat st 60 kg 33.00 8,500.00 280,500.00 - Bronze kg 16.00 41,250.00 660,000.00 - Besi cor kg 36.00 8,500.00 306,000.00

1,246,500.00

4 Bahan - bahan lain - Mur baut 1/2", 5/8" , 7/8" kg 5.00 12,900.00 64,500.00 - Paku keling 3/4", 5/8" , 7/8" kg 11.00 9,800.00 107,800.00 - Nipple bh 1.00 3,000.00 3,000.00 - Splite pen bh 2.00 31,300.00 62,600.00 - Gembok bh 2.00 12,900.00 25,800.00 - Drucklager kecil/besar bh 1.00 423,500.00 423,500.00 - Na F + ring bh 1.00 110,000.00 110,000.00

797,200.00

II. ONGKOS KERJA - Ongkos kerja konst. kg 200.00 1,300.00 260,000.00 - Ongkos kerja mesin kg 85.00 6,400.00 544,000.00 - Sandblasting dan cat m2 5.00 57,000.00 285,000.00

1,089,000.00

III. PEMASANGAN kg 259.00 1,100.00 284,900.00

IV. PEMBONGKARAN kg

V. TRANSPORT kg 259.00 600.00 155,400.00 440,300.00

Sub Total 7,586,075.00

VI. Biaya Tidak Langsung (Overhead) % 10VII. Jumlah Harga 7,586,075.00

VIII. Harga satuan pekerjaan per - Buah 7,586,000.00

Page 399: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : R.031 B = 550 mmURAIAN PEKERJAAN : Pintu Air Type C - 3 H = 1.450 mmSATUAN MATA PEMBAYARAN : Buah H' = 2.000 mm

PERKIRAAN HARGA JUMLAH NO. MACAM PEKERJAAN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

I. BAHAN

1 Bahan konstruksi - Besi siku kg 161.00 18,750.00 3,018,750.00 - Besi plate kg 62.00 18,750.00 1,162,500.00 - Besi plate strip kg 36.00 18,750.00 675,000.00 - Besi beton kg 12.00 8,500.00 102,000.00 - pipa kg 1.00 9,250.00 9,250.00

4,967,500.00

2 Bahan bantu konstruksi % 0.10 4,967,500.00 496,750.00

3 Bahan bantu konstruksi - Besi bulat st 60 kg 34.00 8,500.00 289,000.00 - Bronze kg 16.00 41,250.00 660,000.00 - Besi cor kg 36.00 8,500.00 306,000.00

1,255,000.00

4 Bahan - bahan lain - Mur baut 1/2", 5/8" , 7/8" kg 5.00 12,900.00 64,500.00 - Paku keling 3/4", 5/8" , 7/8" kg 11.00 9,800.00 107,800.00 - Nipple bh 1.00 3,000.00 3,000.00 - Splite pen bh 2.00 31,300.00 62,600.00 - Gembok bh 2.00 12,900.00 25,800.00 - Drucklager kecil/besar bh 1.00 423,500.00 423,500.00 - Na F + ring bh 1.00 110,000.00 110,000.00

797,200.00

II. ONGKOS KERJA - Ongkos kerja konst. kg 272.00 1,300.00 353,600.00 - Ongkos kerja mesin kg 86.00 6,400.00 550,400.00 - Sandblasting dan cat m2 7.00 57,000.00 399,000.00

1,303,000.00

III. PEMASANGAN kg 325.00 1,100.00 357,500.00

IV. PEMBONGKARAN kg

V. TRANSPORT kg 325.00 600.00 195,000.00 552,500.00

Sub Total 9,371,950.00

VI. Biaya Tidak Langsung (Overhead) % 10VII. Jumlah Harga 9,371,950.00

VIII. Harga satuan pekerjaan per - Buah 9,372,000.00

Page 400: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : R.032 B = 550 mmURAIAN PEKERJAAN : Pintu Air Type C - 5 H = 1.450 mmSATUAN MATA PEMBAYARAN : Buah H' = 2.000 mm

PERKIRAAN HARGA JUMLAH NO. MACAM PEKERJAAN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

I. BAHAN

1 Bahan konstruksi - Besi siku kg 161.00 18,750.00 3,018,750.00 - Besi plate kg 62.00 18,750.00 1,162,500.00 - Besi plate strip kg 36.00 18,750.00 675,000.00 - Besi beton kg 12.00 8,500.00 102,000.00 - pipa kg 1.00 9,250.00 9,250.00

4,967,500.00

2 Bahan bantu konstruksi % 0.10 4,967,500.00 496,750.00

3 Bahan bantu konstruksi - Besi bulat st 60 kg 34.00 8,500.00 289,000.00 - Bronze kg 16.00 41,250.00 660,000.00 - Besi cor kg 36.00 8,500.00 306,000.00

1,255,000.00

4 Bahan - bahan lain - Mur baut 1/2", 5/8" , 7/8" kg 5.00 12,900.00 64,500.00 - Paku keling 3/4", 5/8" , 7/8" kg 11.00 9,800.00 107,800.00 - Nipple bh 1.00 3,000.00 3,000.00 - Splite pen bh 2.00 31,300.00 62,600.00 - Gembok bh 2.00 12,900.00 25,800.00 - Drucklager kecil/besar bh 1.00 423,500.00 423,500.00 - Na F + ring bh 1.00 110,000.00 110,000.00

797,200.00

II. ONGKOS KERJA - Ongkos kerja konst. kg 272.00 1,300.00 353,600.00 - Ongkos kerja mesin kg 86.00 6,400.00 550,400.00 - Sandblasting dan cat m2 7.00 57,000.00 399,000.00

1,303,000.00

III. PEMASANGAN kg 325.00 1,100.00 357,500.00

IV. PEMBONGKARAN kg

V. TRANSPORT kg 325.00 600.00 195,000.00 552,500.00

Sub Total 9,371,950.00

VI. Biaya Tidak Langsung (Overhead) % 10VII. Jumlah Harga 9,371,950.00

VIII. Harga satuan pekerjaan per - Buah 9,372,000.00

Page 401: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : S.001JENIS PEKERJAAN : Menanam rumput lamurSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr - 45,000.00 - 2 Tukang Taman L14 Org/hr 0.1500 60,000.00 9,000.00 3 Mandor L01 Org/hr 0.0100 80,000.00 800.00

JUMLAH HARGA TENAGA 9,800.00

B BAHAN

1 Rumput Lamur M461 m2 1.0000 18,830.00 18,830.00

JUMLAH HARGA BAHAN 18,830.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 28,630.00

ANALISA HARGA SATUAN

KODE ANALISA : S.002JENIS PEKERJAAN : Menanam rumput manilaSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr - 45,000.00 - 2 Tukang Taman L14 Org/hr 0.1500 60,000.00 9,000.00 3 Mandor L01 Org/hr 0.0100 80,000.00 800.00

JUMLAH HARGA TENAGA 9,800.00

B BAHAN

1 Rumput Manila M462 m2 1.0000 16,140.00 16,140.00

JUMLAH HARGA BAHAN 16,140.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 25,940.00

Page 402: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : S.003JENIS PEKERJAAN : Menanam semak hiasSATUAN PEMBAYARAN : m2

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr - 45,000.00 - 2 Tukang Taman L14 Org/hr 0.3300 60,000.00 19,800.00 3 Mandor L01 Org/hr 0.0100 80,000.00 800.00

JUMLAH HARGA TENAGA 20,600.00

B BAHAN

1 Semak Hias M463 m2 1.0000 10,760.00 10,760.00

JUMLAH HARGA BAHAN 10,760.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 31,360.00

ANALISA HARGA SATUAN

KODE ANALISA : S.004JENIS PEKERJAAN : Menanam pohon pelindungSATUAN PEMBAYARAN : btg

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr - 45,000.00 - 2 Tukang Taman L14 Org/hr 0.4000 60,000.00 24,000.00 3 Mandor L01 Org/hr 0.0200 80,000.00 1,600.00

JUMLAH HARGA TENAGA 25,600.00

B BAHAN

1 Pohon Pelindung M464 btg 1.0000 161,430.00 161,430.00

JUMLAH HARGA BAHAN 161,430.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 187,030.00

Page 403: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : S.005JENIS PEKERJAAN : Pengisian koral sumur resapanSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.2000 45,000.00 9,000.00 2 Tukang Batu L07 Org/hr 0.0200 60,000.00 1,200.00 3 Kepala Tukang Batu L02 Org/hr 0.0020 70,000.00 140.00 3 Mandor L01 Org/hr 0.0060 80,000.00 480.00

JUMLAH HARGA TENAGA 10,820.00

B BAHAN

1 Stenslah/batu pecah tangan 2/3 M014 m3 1.0000 156,975.00 156,975.00

JUMLAH HARGA BAHAN 156,975.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 167,795.00

ANALISA HARGA SATUAN

KODE ANALISA : S.006JENIS PEKERJAAN : Menanam gebalan rumputSATUAN PEMBAYARAN

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 0.2000 45,000.00 9,000.00 2 Tukang Batu L07 Org/hr - 60,000.00 - 3 Kepala Tukang Batu L02 Org/hr - 70,000.00 - 3 Mandor L01 Org/hr 0.0200 80,000.00 1,600.00

JUMLAH HARGA TENAGA 10,600.00

B BAHAN

1 Gebalan rumput M464.a m2 1.0000 16,140.00 16,140.00

JUMLAH HARGA BAHAN 16,140.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 26,740.00

: m3

: m3

Page 404: Analisa PDAM 2010

ANALISA HARGA SATUAN

KODE ANALISA : S.007JENIS PEKERJAAN : Pasang papan kayu jembatan gantung, kayu kamper SATUAN PEMBAYARAN : m3

PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. TENAGA

1 Pekerja Biasa L17 Org/hr 4.0000 45,000.00 180,000.00 2 Tukang Kayu L08 Org/hr 12.0000 60,000.00 720,000.00 3 Kepala Tukang Kayu L03 Org/hr 1.2000 47,000.00 56,400.00 4 Mandor L01 Org/hr 0.2000 80,000.00 16,000.00

JUMLAH HARGA TENAGA 972,400.00

B BAHAN

1 Papan (3x30) cm M083 m3 1.1000 10,800,000.00 11,880,000.00 2 Besi Strip M114 kg 15.0000 8,500.00 127,500.00 3 Paku Kayu Segala Ukuran M140 kg 0.8000 17,500.00 14,000.00

JUMLAH HARGA BAHAN 12,021,500.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 12,993,900.00

Page 405: Analisa PDAM 2010

A.001 Pagar sementara dari kayu, tinggi 2 meter 402,892.78

A.002 Pagar sementara dari seng gelombang, tinggi 2 meter 491,956.78

A.003 Pagar sementara dari kawat duri, tinggi 1.8 meter 482,852.78

A.004 Pasang pagar kawat jaring galvanis, tinggi 1 m 14,108.00

A.005 Pengukuran dan pemasangan bouwplank 107,930.00

A.006 Pembuatan kantor sementara 1,491,325.00

A.007 Pembuatan gudang semen dan alat-alat 1,528,734.25

A.008 Pembuatan rumah jaga/konstruksi kayu 1,364,093.75

A.009 Membersihkan lapangan dan perataan 8,500.00

A.010 Pembuatan bedeng buruh 1,544,518.00

A.011 Pembuatan bak adukan, ukuran (40x50x20) cm bh 304,100.00

A.012 Pembuatan jalan sementara 78,598.75

A.013 Bongkar pasang kayu kuda-kuda / kusen / loteng 573,000.00

A.014 Bongkaran beton bertulang 326,655.00

A.015 Bongkaran tembok bata merah 302,655.00

A.016 Bongkaran atap 53,500.00

A.017 Bongkaran lantai 9,800.00

A.018 Bongkaran plafon 13,682.00

B.001 Galian tanah biasa sedalam 1 m 35,750.00

B.002 Galian tanah biasa sedalam 2 m 44,100.00

B.003 Galian tanah biasa sedalam 3 m 52,610.00

B.004 Galian tanah keras sedalam 1 m 47,560.00

B.005 Galian tanah cadas sedalam 1 m 72,300.00

B.006 Galian tanah lumpur sedalam 1 m 57,600.00

B.007 Pekerjaan striping setinggi 1 m 2,650.00

B.008 Pembuangan tanah sejauh 150 m 15,650.00

B.009 Urugan kembali 14,700.00

B.010 Pemadatan tanah 26,500.00

B.011 Urugan pasir 130,220.00

B.012 Lapisan Pudel Campuran 1 Kp : 3 Ps : 7 TL 326,000.00

B.013 Lapisan Pudel Campuran 1 Kp : 5 TL 447,400.00

B.014 Pasangan lapisan ijuk 782,850.00

B.015 Urugan sirtu 137,330.00

B.016 Cut and fill 114,070.00

B.017 Galian tanah keras sedalam > 5 m 92,697.33

B.018 Galian tanah keras sedalam > 10 m 230,660.62

C.001 Pasang pondasi batu kali 1 Pc : 1 Ps Err:509

C.002 Pasang pondasi batu kali 1 Pc : 2 Ps Err:509

C.003 Pasang pondasi batu kali 1 Pc : 2.5 Ps Err:509

C.004 Pasang pondasi batu kali 1 Pc : 3 Ps 463,440.00

C.005 Pasang pondasi batu kali 1 Pc : 4 Ps 430,440.00

C.006 Pasang pondasi batu kali 1 Pc : 5 Ps 407,580.00

C.007 Pasang pondasi batu kali 1 Pc : 6 Ps 391,500.00

C.008 Pasang pondasi batu kali 1 Pc : 8 Ps 369,480.00

C.009 Pasang pondasi batu kali 1 Kp : 1 Sm : 1 Ps Err:509

C.010 Pasang pondasi batu kali 1 Kp : 1 Sm : 2 Ps 521,990.00

C.011 Pasang pondasi batu kali 1 Pc : 1/4 Kp : 4 Ps Err:509

C.012 Pasang pondasi batu kali 1 Pc : 3 Kp : 10 Ps 528,060.00

C.013 Pasang pondasi batu kali 1/4 Pc : 1 Kp : 4 Ps 491,120.00

C.014 Pasang pondasi batu kosong 244,921.20

C.015 Pasang pondasi siklop, 40% batu kali 1,599,706.00

C.016 Pasang pondasi sumuran, diameter 100 cm 441,385.00

C.017 Pembuatan tiang pancang (40 cm x 40 cm) beton bertulang Err:509

C.018 Pembuatan tiang pancang (35 cm x 35 cm) beton bertulang Err:509

D.001 Pasangan bata merah tebal 1 bata, 1 Pc : 1 Ps Err:509

D.002 Pasangan bata merah tebal 1 bata, 1 Pc : 2 Ps 121,750.00

D.003 Pasangan bata merah tebal 1 bata, 1 Pc : 3 Ps 112,915.00

D.004 Pasangan bata merah tebal 1 bata, 1 Pc : 4 Ps 107,275.00

D.005 Pasangan bata merah tebal 1 bata, 1 Pc : 5 Ps 103,900.00

D.006 Pasangan bata merah tebal 1 bata, 1 Pc : 6 Ps 101,770.00

D.007 Pasangan bata merah tebal 1 bata, 1 Pc : 3 Kp : 10 Ps 128,172.00

D.008 Pasangan bata merah tebal 1/2 bata, 1 Pc : 1 Ps Err:509

D.009 Pasangan bata merah tebal 1/2 bata, 1 Pc : 2 Ps 58,235.00

D.010 Pasangan bata merah tebal 1/2 bata, 1 Pc : 3 Ps 54,233.00

D.011 Pasangan bata merah tebal 1/2 bata, 1 Pc : 4 Ps 51,830.00

D.012 Pasangan bata merah tebal 1/2 bata, 1 Pc : 5 Ps 50,312.00

D.013 Pasangan bata merah tebal 1/2 bata, 1 Pc : 6 Ps 49,328.00

D.014 Pasangan bata merah tebal 1/2 bata, 1 Pc : 8 Ps 47,750.00

D.015 Pasangan bata merah tebal 1/2 bata, 1 Pc : 3 Kp : 10 Ps 65,450.00

D.016 Pasangan bata merah tebal 1/2 bata, 1 Kp : 1 Sm : 1 Ps 66,350.00

D.017 Pasangan bata merah tebal 1/2 bata, 1 Kp : 1 Sm : 2 Ps 61,090.00

D.018 Pasangan dinding hollowblock (HB) 20 Err:509

D.019 Pasangan dinding hollowblock (HB) 15 Err:509

D.020 Pasangan dinding hollowblock (HB) 10 Err:509

D.021 Pasangan dinding conblock (CB) 20 Err:509

m1

m1

m1

m1

m1

m2

m2

m2

m2

m2

m2

m3

m3

m3

m2

m2

m2

m3

m3

m3

m3

m3

m3

m2

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m1

m1

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

MENU UTAMA

Page 406: Analisa PDAM 2010

D.022 Pasangan dinding conblock (CB) 15 Err:509

D.023 Pasangan dinding conblock (CB) 10 Err:509

D.024 Pasang dinding latai Err:509

D.025 Pasang dinding roster/terawang (12 x 11 x 24) cm 295,420.00

D.026 Pasangan dinding batako Err:509

D.027 Pasang bata berongga (5 x 11 x 24) cm Err:509

D.028 Pasang dinding anyaman bambu, rangka kayu Err:509

E.001 Plesteran 1 Pc : 1 Ps tebal 15 mm 34,763.60

E.002 Plesteran 1 Pc : 2 Ps tebal 15 mm 30,251.60

E.003 Plesteran 1 Pc : 3 Ps tebal 15 mm 28,228.40

E.004 Plesteran 1 Pc : 4 Ps tebal 15 mm 26,906.00

E.005 Plesteran 1 Pc : 5 Ps tebal 15 mm 26,075.60

E.006 Plesteran 1 Pc : 6 Ps tebal 15 mm 25,444.40

E.007 Plesteran 1 Pc : 8 Ps tebal 15 mm 24,700.40

E.008 Plesteran 1 Pc : 0.5 Kp : 3 Ps tebal 15 mm 28,684.00

E.009 Plesteran 1 Pc : 3 Kp : 10 Ps tebal 15 mm Err:509

E.010 Plesteran 0.5 Pc : 3 Kp : 4 Ps tebal 15 mm Err:509

E.011 Plesteran 1 Kp : 1 Sm : 1 Ps tebal 15 mm 32,545.00

E.012 Plesteran 1 Kp : 1 Sm : 2 Ps tebal 15 mm 29,975.00

E.013 Plesteran 1 Pc : 2 Ps tebal 20 mm 40,028.80

E.014 Plesteran 1 Pc : 3 Ps tebal 20 mm 37,331.20

E.015 Plesteran 1 Pc : 4 Ps tebal 20 mm 35,548.00

E.016 Plesteran 1 Pc : 5 Ps tebal 20 mm 34,460.80

E.017 Plesteran 1 Pc : 6 Ps tebal 20 mm 33,599.20

E.018 Plesteran 1 Kp : 1 Sm : 2 Ps tebal 20 mm 42,995.00

E.019 Plesteran 1 Pc : 2 Ps tebal 25 mm Err:509

E.020 Plesteran 1 Pc : 3 Ps tebal 25 mm Err:509

E.021 Plesteran 1 Pc : 4 Ps tebal 25 mm Err:509

E.022 Plesteran 1 Pc : 5 Ps tebal 25 mm Err:509

E.023 Plesteran 1 Pc : 2 Ps tebal 30 mm Err:509

E.024 Plesteran 1 Pc : 3 Ps tebal 30 mm Err:509

E.025 Plesteran 1 Pc : 4 Ps tebal 30 mm Err:509

E.026 Plesteran 1 Pc : 5 Ps tebal 30 mm Err:509

E.027 Berapen 1 Pc : 3 Ps, tebal 30 mm Err:509

E.028 Berapen 1 Pc : 5 Ps, tebal 15 mm 18,305.60

E.029 Plesteran beton 1 Pc : 2 Ps tebal 15 mm Err:509

E.030 Plesteran beton 1 Pc : 3 Ps tebal 15 mm Err:509

E.031 Plesteran skoning 1 Pc : 2 Ps 29,495.00

E.032 Plesteran granito 1 Pc warna : 2 granito tebal 10 mm Err:509

E.033 Plesteran teraso 1 Pc warna : 2 batu teraso, tebal 10 mm Err:509

E.034 Plesteran ciprat 1 Pc : 2 Ps 23,238.00

E.035 Plesteran siar adukan 1 Pc : 2 Ps 30,506.00

E.036 Plesteran waterproof batacote 3 lapis Err:509

E.037 Benangan 14,310.00

F.001 Pasang kusen pintu dan jendela kayu jati Err:509

F.002 Pasang kusen pintu dan jendela kayu kamper 12,314,915.00

F.003 Pasang kusen pintu dan jendela kayu borneo Err:509

F.004 Pasang kusen pintu dan jendela kayu meranti 7,562,915.00

F.005 Pasang pintu klamp kayu jati Err:509

F.006 Pasang pintu klamp kayu kamper 518,000.00

F.007 Pasang pintu klamp kayu borneo Err:509

F.008 Pasang pintu klamp kayu meranti 327,200.00

F.009 Pasang pintu panel kayu jati Err:509

F.010 Pasang pintu panel kayu kamper 655,270.00

F.011 Pasang pintu panel kayu borneo Err:509

F.012 Pasang pintu panel kayu meranti 464,470.00

F.013 Pasang pintu dan jendela kaca kayu jati Err:509

F.014 Pasang pintu dan jendela kaca kayu kamper 435,312.00

F.015 Pasang pintu dan jendela kaca kayu borneo Err:509

F.016 Pasang pintu dan jendela kaca kayu meranti 320,832.00

F.017 Pasang pintu dan jendela jalusi kayu jati Err:509

F.018 Pasang pintu dan jendela jalusi kayu kamper 946,820.00

F.019 Pasang pintu dan jendela jalusi kayu borneo Err:509

F.020 Pasang pintu dan jendela jalusi kayu meranti 641,540.00

F.021 Pasang pintu plywood rangkap, rangka kayu jati Err:509

F.022 Pasang pintu plywood rangkap, rangka kayu kamper 526,845.00

F.023 Pasang pintu plywood rangkap, rangka kayu borneo Err:509

F.024 Pasang pintu plywood rangkap, rangka kayu meranti 407,595.00

F.025 Pasang jalusi mati kusen kayu jati Err:509

F.026 Pasang jalusi mati kusen kayu kamper 804,525.00

F.027 Pasang jalusi mati kusen kayu borneo Err:509

F.028 Pasang jalusi mati kusen kayu meranti 518,325.00

F.029 Pasang pintu teakwood rangkap, rangka kayu jati Err:509

F.030 Pasang pintu teakwood rangkap, rangka kayu kamper 529,247.00

F.031 Pasang pintu teakwood rangkap, rangka kayu borneo Err:509

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m1

m3

m3

m3

m3

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

Page 407: Analisa PDAM 2010

F.032 Pasang pintu teakwood rangkap, rangka kayu meranti 409,997.00

F.033 Pasang pintu plywood dan formika, rangka kayu jati Err:509

F.034 Pasang pintu plywood dan formika, rangka kayu kamper 603,412.00

F.035 Pasang pintu plywood dan formika, rangka kayu borneo Err:509

F.036 Pasang pintu plywood dan formika, rangka kayu meranti 484,162.00

F.037 Pasang pintu teakwood dan formika, rangka kayu jati Err:509

F.038 Pasang pintu teakwood dan formika, rangka kayu kamper (divernis) Err:509

F.039 Pasang pintu teakwood dan formika, rangka kayu borneo (divernis) Err:509

F.040 Pasang pintu teakwood dan formika, rangka kayu meranti (divernis) 496,122.00

F.041 Pasang pintu formika double, rangka kayu jati Err:509

F.042 Pasang pintu formika double, rangka kayu kamper Err:509

F.043 Pasang pintu formika double, rangka kayu borneo Err:509

F.044 Pasang pintu formika double, rangka kayu meranti Err:509

F.045 Pasang konstruksi kuda-kuda kayu jati Err:509

F.046 Pasang konstruksi kuda-kuda kayu kamper 11,097,900.00

F.047 Pasang konstruksi kuda-kuda kayu borneo Err:509

F.048 Pasang konstruksi kuda-kuda kayu bengkirai Err:509

F.049 Pasang konstruksi kuda-kuda kayu kruing 7,137,900.00

F.050 Pasang konstruksi kuda-kuda kayu meranti 6,741,900.00

F.051 Pasang kaso 5/7 + reng 3/5 genteng biasa kayu jati Err:509

F.052 Pasang kaso 5/7 + reng 3/5 genteng biasa kayu kamper 88,245.00

F.053 Pasang kaso 5/7 + reng 3/5 genteng biasa kayu borneo Err:509

F.054 Pasang kaso 5/7 + reng 3/5 genteng biasa kayu bengkirai Err:509

F.055 Pasang kaso 5/7 + reng 3/5 genteng biasa kayu kruing 285,745.00

F.056 Pasang kaso 5/7 + reng 3/5 genteng biasa kayu meranti 240,745.00

F.057 Pasang kaso 5/7 + reng 3/5 genteng karangpilang kayu jati Err:509

F.058 Pasang kaso 5/7 + reng 3/5 genteng karangpilang kayu kamper 88,245.00

F.059 Pasang kaso 5/7 + reng 3/5 genteng karangpilang kayu borneo Err:509

F.060 Pasang kaso 5/7 + reng 3/5 genteng karangpilang kayu bengkirai Err:509

F.061 Pasang kaso 5/7 + reng 3/5 genteng karangpilang kayu kruing 285,745.00

F.062 Pasang kaso 5/7 + reng 3/5 genteng karangpilang kayu meranti 240,745.00

F.063 Pasang kaso 5/7 + reng 3/5 genteng beton kayu jati Err:509

F.064 Pasang kaso 5/7 + reng 3/5 genteng beton kayu kamper 118,695.00

F.065 Pasang kaso 5/7 + reng 3/5 genteng beton kayu borneo Err:509

F.066 Pasang kaso 5/7 + reng 3/5 genteng beton kayu bengkirai Err:509

F.067 Pasang kaso 5/7 + reng 3/5 genteng beton kayu kruing 399,145.00

F.068 Pasang kaso 5/7 + reng 3/5 genteng beton kayu meranti 335,245.00

F.069 Pasang kaso 5/7 + reng 3/5 genteng palentong kecil kayu jati Err:509

F.070 Pasang kaso 5/7 + reng 3/5 genteng palentong kecil kayu kamper Err:509

F.071 Pasang kaso 5/7 + reng 3/5 genteng palentong kecil kayu borneo Err:509

F.072 Pasang kaso 5/7 + reng 3/5 genteng palentong kecil kayu bengkirai Err:509

F.073 Pasang kaso 5/7 + reng 3/5 genteng palentong kecil kayu kruing Err:509

F.074 Pasang kaso 5/7 + reng 3/5 genteng palentong kecil kayu meranti Err:509

F.075 Pasang kaso 5/7 + reng 3/5 genteng kodok glazuur kayu jati Err:509

F.076 Pasang kaso 5/7 + reng 3/5 genteng kodok glazuur kayu kamper Err:509

F.077 Pasang kaso 5/7 + reng 3/5 genteng kodok glazuur kayu borneo Err:509

F.078 Pasang kaso 5/7 + reng 3/5 genteng kodok glazuur kayu bengkirai Err:509

F.079 Pasang kaso 5/7 + reng 3/5 genteng kodok glazuur kayu kruing Err:509

F.080 Pasang kaso 5/7 + reng 3/5 genteng kodok glazuur kayu meranti Err:509

F.081 Pasang kaso 5/7 + reng 3/5 genteng palentong super/besar kayu jati Err:509

F.082 Pasang kaso 5/7 + reng 3/5 genteng palentong super/besar kayu kamper Err:509

F.083 Pasang kaso 5/7 + reng 3/5 genteng palentong super/besar kayu borneo Err:509

F.084 Pasang kaso 5/7 + reng 3/5 genteng palentong super/besar kayu bengkirai Err:509

F.085 Pasang kaso 5/7 + reng 3/5 genteng palentong super/besar kayu kruing Err:509

F.086 Pasang kaso 5/7 + reng 3/5 genteng palentong super/besar kayu meranti Err:509

F.087 Pasang kaso 5/7 + reng 3/5 genteng aspal kayu jati Err:509

F.088 Pasang kaso 5/7 + reng 3/5 genteng aspal kayu kamper Err:509

F.089 Pasang kaso 5/7 + reng 3/5 genteng aspal kayu borneo Err:509

F.090 Pasang kaso 5/7 + reng 3/5 genteng aspal kayu bengkirai Err:509

F.091 Pasang kaso 5/7 + reng 3/5 genteng aspal kayu kruing Err:509

F.092 Pasang kaso 5/7 + reng 3/5 genteng aspal kayu meranti Err:509

F.093 Pasang kaso 5/7 + reng 3/5 genteng metal kayu jati Err:509

F.094 Pasang kaso 5/7 + reng 3/5 genteng metal kayu kamper Err:509

F.095 Pasang kaso 5/7 + reng 3/5 genteng metal kayu borneo Err:509

F.096 Pasang kaso 5/7 + reng 3/5 genteng metal kayu bengkirai Err:509

F.097 Pasang kaso 5/7 + reng 3/5 genteng metal kayu kruing Err:509

F.098 Pasang kaso 5/7 + reng 3/5 genteng metal kayu meranti Err:509

F.099 Pasang kaso 5/7 + reng 3/5 atap sirap kayu jati Err:509

F.100 Pasang kaso 5/7 + reng 3/5 atap sirap kayu kamper 41,069.00

F.101 Pasang kaso 5/7 + reng 3/5 atap sirap kayu borneo Err:509

F.102 Pasang kaso 5/7 + reng 3/5 atap sirap kayu bengkirai Err:509

F.103 Pasang kaso 5/7 + reng 3/5 atap sirap kayu kruing 106,244.00

F.104 Pasang kaso 5/7 + reng 3/5 atap sirap kayu meranti 91,394.00

F.105 Pasang rangka langit-langit (1.0 x 1.0) m, kayu jati Err:509

F.106 Pasang rangka langit-langit (1.0 x 1.0) m, kayu kamper Err:509

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m3

m3

m3

m3

m3

m3

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

Page 408: Analisa PDAM 2010

F.107 Pasang rangka langit-langit (1.0 x 1.0) m, kayu borneo Err:509

F.108 Pasang rangka langit-langit (1.0 x 1.0) m, kayu bengkirai Err:509

F.109 Pasang rangka langit-langit (1.0 x 1.0) m, kayu kruing Err:509

F.110 Pasang rangka langit-langit (1.0 x 1.0) m, kayu meranti Err:509

F.111 Pasang rangka langit-langit (30 x 60) cm, kayu jati Err:509

F.112 Pasang rangka langit-langit (30 x 60) cm, kayu kamper Err:509

F.113 Pasang rangka langit-langit (30 x 60) cm, kayu borneo Err:509

F.114 Pasang rangka langit-langit (30 x 60) cm, kayu bengkirai Err:509

F.115 Pasang rangka langit-langit (30 x 60) cm, kayu kruing Err:509

F.116 Pasang rangka langit-langit (30 x 60) cm, kayu meranti Err:509

F.117 Pasang rangka langit-langit (30 x 30) cm, kayu jati Err:509

F.118 Pasang rangka langit-langit (30 x 30) cm, kayu kamper Err:509

F.119 Pasang rangka langit-langit (30 x 30) cm, kayu borneo Err:509

F.120 Pasang rangka langit-langit (30 x 30) cm, kayu bengkirai Err:509

F.121 Pasang rangka langit-langit (30 x 30) cm, kayu kruing Err:509

F.122 Pasang rangka langit-langit (30 x 30) cm, kayu meranti Err:509

F.123 Pasang lisplang ukuran (3 x 20) cm, kayu jati Err:509

F.124 Pasang lisplang ukuran (3 x 20) cm, kayu kamper 136,465.00

F.125 Pasang lisplang ukuran (3 x 20) cm, kayu borneo Err:509

F.126 Pasang lisplang ukuran (3 x 20) cm, kayu bengkirai Err:509

F.127 Pasang lisplang ukuran (3 x 20) cm, kayu kruing 85,921.00

F.128 Pasang lisplang ukuran (3 x 20) cm, kayu meranti 84,949.00

F.129 Pasang lisplang ukuran (3 x 30) cm, kayu jati Err:509

F.130 Pasang lisplang ukuran (3 x 30) cm, kayu kamper 137,515.00

F.131 Pasang lisplang ukuran (3 x 30) cm, kayu borneo Err:509

F.132 Pasang lisplang ukuran (3 x 30) cm, kayu bengkirai Err:509

F.133 Pasang lisplang ukuran (3 x 30) cm, kayu kruing 86,035.00

F.134 Pasang lisplang ukuran (3 x 30) cm, kayu meranti 85,045.00

F.135 Pasang lisplang ukuran 2 x (3 x 20) cm, kayu jati Err:509

F.136 Pasang lisplang ukuran 2 x (3 x 20) cm, kayu kamper Err:509

F.137 Pasang lisplang ukuran 2 x (3 x 20) cm, kayu borneo Err:509

F.138 Pasang lisplang ukuran 2 x (3 x 20) cm, kayu bengkirai Err:509

F.139 Pasang lisplang ukuran 2 x (3 x 20) cm, kayu kruing Err:509

F.140 Pasang lisplang ukuran 2 x (3 x 20) cm, kayu meranti Err:509

F.141 Pasang lisplang ukuran 2 x (2 x 20) cm, kayu jati Err:509

F.142 Pasang lisplang ukuran 2 x (2 x 20) cm, kayu kamper Err:509

F.143 Pasang lisplang ukuran 2 x (2 x 20) cm, kayu borneo Err:509

F.144 Pasang lisplang ukuran 2 x (2 x 20) cm, kayu bengkirai Err:509

F.145 Pasang lisplang ukuran 2 x (2 x 20) cm, kayu kruing Err:509

F.146 Pasang lisplang ukuran 2 x (2 x 20) cm, kayu meranti Err:509

F.147 Pasang rangka dinding pemisah kayu jati Err:509

F.148 Pasang rangka dinding pemisah kayu kamper 291,130.00

F.149 Pasang rangka dinding pemisah kayu borneo Err:509

F.150 Pasang rangka dinding pemisah kayu meranti 180,250.00

F.151 Pasang rangka dinding pemisah teakwood rangkap, rangka kayu jati Err:509

F.152 Pasang rangka dinding pemisah teakwood rangkap, rangka kayu kamper 376,197.00

F.153 Pasang rangka dinding pemisah teakwood rangkap, rangka kayu borneo Err:509

F.154 Pasang rangka dinding pemisah teakwood rangkap, rangka kayu meranti 265,317.00

F.155 Pasang rangka dinding pemisah plywood rangkap, rangka kayu jati Err:509

F.156 Pasang rangka dinding pemisah plywood rangkap, rangka kayu kamper 390,367.40

F.157 Pasang rangka dinding pemisah plywood rangkap, rangka kayu borneo Err:509

F.158 Pasang rangka dinding pemisah plywood rangkap, rangka kayu meranti 279,487.40

F.159 Pasang dinding lambriziring dari papan jati Err:509

F.160 Pasang dinding lambriziring dari papan kamper 227,310.00

F.161 Pasang plywood tebal 4 mm, untuk dinding Err:509

F.162 Pasang list plafon, kayu profil Err:509

G.001 Beton tumbuk 1 Pc : 3 Ps : 5 Kr -

G.002 Beton tumbuk 1 Pc : 3 Ps : 6 Kr 493,145.11

G.003 Beton tumbuk 1 Pc : 4 Ps : 6 Kr -

G.004 Lantai kerja beton tumbuk 1 Pc : 3 Ps : 5 Kr, tebal 5 cm -

G.005 Tiang pancang prestressed beton -

G.006 Beton dengan puzzdith - 100 XR -

G.007 Beton campuran 1 Pc : 2 Ps : 3 Kr -

G.008 Beton campuran 1 Pc : 2 Ps : 4 Kr -

G.009 Beton campuran 1 Pc : 1.5 Ps : 3 Kr -

G.010 Beton campuran 1 Pc : 1.5 Ps : 2.5 Kr -

G.011 Beton campuran 1 Pc : 1 Ps : 1 Kr -

G.012 Beton kedap air dengan strorox - 100 703,090.00

G.013 Pasang PVC Waterstop lebar 150 mm 33,195.00

G.014 Pasang PVC Waterstop lebar 200 mm 56,941.50

G.015 Pasang PVC Waterstop lebar 230 mm 65,925.00

G.016 Pasang PVC Waterstop lebar 250 mm Err:509

G.017 Pasang PVC Waterstop lebar 300 mm Err:509

G.018 Pasang PVC Waterstop lebar 320 mm Err:509

G.019 Pembesian dengan besi polos kg 9,853.50

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m1

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m1

m1

m1

m1

m1

m1

Page 409: Analisa PDAM 2010

G.020 Pembesian dengan besi ulir kg 18,867.75

G.021 Kabel prestressed polos/strands kg 27,959.00

G.022 Pasang bekisting untuk pondasi 91,821.00

G.023 Pasang bekisting untuk sloof 97,321.00

G.024 Pasang bekisting untuk kolom 241,270.00

G.025 Pasang bekisting untuk balok 250,270.00

G.026 Pasang bekisting untuk plat lantai 341,270.00

G.027 Pasang bekisting untuk dinding 293,910.00

G.028 Pasang bekisting untuk tangga 230,135.50

G.029 Beton dengan mutu K 225 Err:509

G.030 Beton dengan mutu K 275 Err:509

G.031 Pasang jembatan cor / Talang Cor 112,940.00

G.032 Pondasi beton bertulang (150 kg besi + bekisting) 2,861,291.00

G.033 Sloof beton bertulang (150 kg besi + bekisting) Err:509

G.034 Sloof beton bertulang (200 kg besi + bekisting) 3,077,514.00

G.035 Kolom beton bertulang (150 kg besi + bekisting) 4,134,807.00

G.036 Kolom beton bertulang (200 kg besi + bekisting) Err:509

G.037 Kolom beton bertulang (250 kg besi + bekisting) Err:509

G.038 Kolom beton bertulang (300 kg besi + bekisting) 5,645,040.00

G.039 Balok beton bertulang (150 kg besi + bekisting) Err:509

G.040 Balok beton bertulang (200 kg besi + bekisting) 4,344,932.00

G.041 Balok beton bertulang (250 kg besi + bekisting) Err:509

G.042 Balok beton bertulang (300 kg besi + bekisting) Err:509

G.043 Dinding beton bertulang (150 kg besi + bekisting) 3,966,597.00

G.044 Tangga beton bertulang (200 kg besi + bekisting) Err:509

G.045 Kolom penguat beton bertulang (11 x 11) cm 49,250.00

G.046 Ring balok beton bertulang (10 x 15) cm 63,270.00

G.047 Sloof beton bertulang (10 x 15) cm 62,280.00

H.001 Pasang atap genteng biasa ex. Malang 33,516.00

H.002 Pasang atap genteng press ex.Trenggalek 37,016.00

H.003 Pasang atap genteng karangpilang ex. Malang 40,766.00

H.004 Pasang atap genteng karangpilang ex. Trenggalek 22,266.00

H.005 Pasang atap genteng karangpilang ex. Surabaya 47,516.00

H.006 Pasang bubung genteng biasa ex. Malang 49,570.00

H.007 Pasang bubung genteng press ex. Trenggalek 51,420.00

H.008 Pasang bubung genteng karangpilang ex. Malang 60,370.00

H.009 Pasang bubung genteng karangpilang ex. Trenggalek 62,370.00

H.010 Pasang bubung genteng karangpilang ex. Surabaya 64,620.00

H.011 Pasang atap genteng palentong kecil Err:509

H.012 Pasang atap genteng kodok glazuur Err:509

H.013 Pasang atap genteng palentong super / besar Err:509

H.014 Pasang atap genteng beton 53,865.00

H.015 Pasang atap genteng aspal Err:509

H.016 Pasang atap genteng metal Err:509

H.017 Pasang atap sirap Err:509

H.018 Pasang bubung genteng palentong kecil Err:509

H.019 Pasang bubung genteng kodok glazuur Err:509

H.020 Pasang bubung genteng palentong super / besar Err:509

H.021 Pasang bubung genteng beton 73,775.00

H.022 Pasang bubung genteng aspal Err:509

H.023 Pasang bubung genteng metal Err:509

H.024 Pasang bubung atap sirap Err:509

H.025 Pasang atap asbes gelombang (3.00 x 1.05 m) x 4 mm 48,684.00

H.026 Pasang atap asbes gelombang (2.70 x 1.05 m) x 4 mm 52,429.00

H.027 Pasang atap asbes gelombang (2.40 x 1.05 m) x 4 mm 48,677.00

H.028 Pasang atap asbes gelombang (2.10 x 1.05 m) x 4 mm 49,564.00

H.029 Pasang atap asbes gelombang (1.50 x 1.05 m) x 4 mm 48,449.00

H.030 Pasang atap asbes gelombang (2.50 x 0.92 m) x 5 mm 64,816.00

H.031 Pasang atap asbes gelombang (2.25 x 0.92 m) x 5 mm 66,776.00

H.032 Pasang atap asbes gelombang (2.00 x 0.92 m) x 5 mm 60,349.00

H.033 Pasang atap asbes gelombang (1.80 x 0.92 m) x 5 mm 58,039.00

H.034 Pasang atap asbes gelombang (3.00 x 1.08 m) x 6 mm 97,329.00

H.035 Pasang atap asbes gelombang (2.70 x 1.08 m) x 6 mm 55,561.00

H.036 Pasang atap asbes gelombang (2.10 x 1.08 m) x 6 mm 55,112.00

H.037 Pasang atap asbes gelombang (1.80 x 1.08 m) x 6 mm 50,317.00

H.038 Pasang nok stel gelombang 0.92 m 110,671.00

H.039 Pasang nok stel gelombang 1.05 m 107,071.00

H.040 Pasang nok stel gelombang 1.08 m 102,493.00

H.041 Pasang nok paten 0.92 m 63,871.00

H.042 Pasang nok paten 1.05 m 59,443.00

H.043 Pasang nok paten 1.08 m 62,887.00

H.044 Pasang nok stel rata 0.92 m 58,671.00

H.045 Pasang nok stel rata 1.05 m 52,775.00

H.046 Pasang atap seng gelombang 60,527.00

H.047 Pasang bubung seng gelombang 32,409.00

m2

m2

m2

m2

m2

m2

m2

m3

m3

m2

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m1

m1

m1

m2

m2

m2

m2

m2

m1

m1

m1

m1

m1

m2

m2

m2

m2

m2

m2

m2

m1

m1

m1

m1

m1

m1

m1

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m1

m1

m1

m1

m1

m1

m1

m1

m2

m1

Page 410: Analisa PDAM 2010

H.048 Pasang Atap Aluminium 145,563.50

H.049 Pasang Bubung Atap Aluminium 169,890.00

H.050 Pasang Lapisan Aluminium Foil/Sesalation 38,870.00

H.051 Pasang roof light fibreglass 88,428.00

H.052 Pasang atap polycarbonat 129,706.00

H.053 Pasang Atap Seng Galvalum 157,533.50

H.054 Pasang Bubung Atap Seng Galvalum 182,802.00

I.001 Langit-langit asbes (1,0 x 1,0) m, tebal 6 mm 24,364.00

I.002 Langit-langit asbes (1,0 x 1,0) m, tebal 5 mm 23,374.00

I.003 Langit-langit asbes (1,0 x 1,0) m, tebal 4 mm 22,714.00

I.004 Langit-langit asbes (1,0 x 1,0) m, tebal 3.50 mm 22,054.00

I.005 Langit-langit akustik (30 x 30) cm Err:509

I.006 Langit-langit akustik (30 x 60) cm Err:509

I.007 Langit-langit akustik (60 x 120) cm Err:509

I.008 Langit-langit plywood (30 x 60) cm, tebal 4 mm 12,711.00

I.009 Langit-langit plywood (30 x 60) cm, tebal 6 mm 13,182.20

I.010 Langit-langit plywood (60 x 120) cm, tebal 4 mm 18,303.75

I.011 Langit-langit plywood (60 x 120) cm, tebal 6 mm 19,803.75

I.012 Langit-langit teakwood (30 x 60) cm, tebal 4 mm 12,894.60

I.013 Langit-langit teakwood (60 x 120) cm, tebal 4 mm 19,608.75

I.014 Langit-langit lat kayu jati Err:509

I.015 Langit-langit lat kayu ramin Err:509

I.016 Langit-langit lat kayu kamper 312,915.00

I.017 Langit-langit soft board Err:509

I.018 Langit-langit akustik (60 x 120) cm + rangka aluminium Err:509

I.019 Langit-langit asbes (1,00 x 1,00) m x 3,5 mm + rangka kayu jati Err:509

I.020 Langit-langit asbes (1,00 x 1,00) m x 3,5 mm + rangka kayu kamper 63,814.00

I.021 Langit-langit asbes (1,00 x 1,00) m x 3,5 mm + rangka kayu borneo Err:509

I.022 Langit-langit asbes (1,00 x 1,00) m x 3,5 mm + rangka kayu bengkirai Err:509

I.023 Langit-langit asbes (1,00 x 1,00) m x 3,5 mm + rangka kayu kruing 111,214.00

I.024 Langit-langit asbes (1,00 x 1,00) m x 3,5 mm + rangka kayu meranti 100,414.00

I.025 Langit-langit plywood 4 mm + rangka kayu jati Err:509

I.026 Langit-langit plywood 4 mm + rangka kayu kamper 106,660.00

I.027 Langit-langit plywood 4 mm + rangka kayu borneo Err:509

I.028 Langit-langit plywood 4 mm + rangka kayu bengkirai Err:509

I.029 Langit-langit plywood 4 mm + rangka kayu kruing 197,510.00

I.030 Langit-langit plywood 4 mm + rangka kayu meranti 176,810.00

I.031 Langit-langit akustik (30 x 60) cm + rangka kayu jati Err:509

I.032 Langit-langit akustik (30 x 60) cm + rangka kayu kamper Err:509

I.033 Langit-langit akustik (30 x 60) cm + rangka kayu borneo Err:509

I.034 Langit-langit akustik (30 x 60) cm + rangka kayu bengkirai Err:509

I.035 Langit-langit akustik (30 x 60) cm + rangka kayu kruing Err:509

I.036 Langit-langit akustik (30 x 60) cm + rangka kayu meranti Err:509

I.037 Langit-langit akustik (30 x 30) cm + rangka kayu jati Err:509

I.038 Langit-langit akustik (30 x 30) cm + rangka kayu kamper Err:509

I.039 Langit-langit akustik (30 x 30) cm + rangka kayu borneo Err:509

I.040 Langit-langit akustik (30 x 30) cm + rangka kayu bengkirai Err:509

I.041 Langit-langit akustik (30 x 30) cm + rangka kayu kruing Err:509

I.042 Langit-langit akustik (30 x 30) cm + rangka kayu meranti Err:509

I.043 Langit-langit gypsum board, tebal 9 mm 33,166.32

I.044 List langit-langit kayu profil 13,145.00

I.045 List langit-langit gypsum 26,821.00

J.001 Pasang kloset jongkok teraso bh 225,850.00

J.002 Pasang kloset jongkok porselin kw. A bh 392,050.00

J.003 Pasang kloset jongkok lux bh 525,300.00

J.004 Pasang kloset duduk porselin kw. A bh 1,564,667.00

J.005 Pasang kloset duduk lux bh 1,618,158.88

J.006 Pasang buah urinoir bh 1,171,746.00

J.007 Pasang wastafel kw. A bh 558,529.28

J.008 Pasang wastafel lux bh 1,354,985.44

J.009 Pasang tempat sabun keramik bh 34,200.00

J.010 Pasang bak mandi teraso volume 0.3 m3 bh 280,020.00

J.011 Pasang bak mandi fibreglass volume 0.3 m3 bh 592,248.06

J.012 Pasang bak mandi batu bata volume 0.3 m3 bh 851,500.00

J.013 Pasang badkip porselen bh 876,500.00

J.014 Pasang bak beton volume 1.0 m3 bh Err:509

J.015 Pasang pipa penyalur air limbah jenis pipa tanah, diameter 15 cm 133,439.27

J.016 Pasang pipa penyalur air limbah jenis pipa tanah, diameter 20 cm 202,465.00

J.017 Pasang pipa beton Ø 20 cm 59,543.90

J.018 Pasang pipa beton Ø 30 cm 100,770.12

J.019 Pasang pipa beton Ø 40 cm 120,038.16

J.020 Pasang pipa beton Ø 50 cm 146,335.20

J.021 Pasang pipa beton Ø 60 cm 181,256.24

J.022 Pasang pipa beton Ø 80 cm 269,820.32

J.023 Pasang pipa beton Ø 90 cm 306,831.36

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

Page 411: Analisa PDAM 2010

J.024 Pasang pipa beton Ø 100 cm 341,026.40

J.025 Pasang pipa beton U Ø 20 cm 56,793.90

J.026 Pasang pipa beton U Ø 30 cm 110,585.20

J.027 Pasang bak kontrol pasangan batu bata (30 x 30 x 35) cm bh 167,710.75

J.028 Pasang bak kontrol pasangan batu bata (45 x 45 x 60) cm bh 241,614.50

J.029 Pasang bak kontrol pasangan batu bata (60 x 60 x 65) cm bh 369,062.68

J.030 64,488.75

J.031 80,332.50

J.032 105,682.50

J.033 156,777.00

J.034 216,983.25

J.035 296,202.00

J.036 334,227.00

J.037 487,500.25

J.038 Pasang pipa PVC tipe AW Ø 1/2" 17,909.75

J.039 Pasang pipa PVC tipe AW Ø 3/4" 23,862.77

J.040 Pasang pipa PVC tipe AW Ø 1" 29,490.48

J.041 Pasang pipa PVC tipe AW Ø 1 1/2" 37,610.93

J.042 Pasang pipa PVC tipe AW Ø 2" 49,164.18

J.043 Pasang pipa PVC tipe AW Ø 2.5" 60,643.50

J.044 Pasang pipa PVC tipe AW Ø 3" 86,418.92

J.045 Pasang pipa PVC tipe AW Ø 4" 127,667.60

J.046 Pasang pipa PVC tipe AW Ø 6" 219,280.05

J.047 Pasang pipa PVC tipe AW Ø 8" 334,521.46

J.048 Pasang pipa PVC tipe D Ø 1/2" 11,846.88

J.049 Pasang pipa PVC tipe D Ø 3/4" 14,876.20

J.050 Pasang pipa PVC tipe D Ø 1" 17,690.05

J.051 Pasang pipa PVC tipe D Ø 1 1/2" 21,695.35

J.052 Pasang pipa PVC tipe D Ø 2" 28,161.70

J.053 Pasang pipa PVC tipe D Ø 2.5" 37,038.43

J.054 Pasang pipa PVC tipe D Ø 3" 54,156.83

J.055 Pasang pipa PVC tipe D Ø 4" 70,938.53

J.056 Pasang pipa PVC tipe C Ø 1/2" 10,372.35

J.057 Pasang pipa PVC tipe C Ø 3/4" 12,582.03

J.058 Pasang pipa PVC tipe C Ø 1" 14,702.97

J.059 Pasang pipa PVC tipe C Ø 1 1/2" 17,736.53

J.060 Pasang pipa PVC tipe C Ø 2" 24,785.93

J.061 Pasang pipa PVC tipe C Ø 2.5" 29,158.80

J.062 Pasang pipa PVC tipe C Ø 3" 37,223.03

J.063 Pasang pipa PVC tipe C Ø 4" 43,852.05

J.064 Pasang bak cuci piring stainles steel bh 287,370.00

J.065 Pasang bak cuci piring teraso bh 222,500.00

J.066 Pasang kran Ø 1/2" bh 41,073.75

J.067 Pasang kran Ø 3/4" bh 44,913.75

J.068 Pasang Afor Stainless Steel bh 52,850.00

J.069 Pasang Afor Plastik bh 20,870.00

J.070 Pasang Kaca Wastafel 146,921.00

J.071 Pasang pipa screen PVC tipe AW Ø 3" 94,350.17

J.072 Pasang pipa screen PVC tipe AW Ø 4" 135,598.85

K.001 Pasang rangka atap baja kg Err:509

K.002 Pasang pintu besi baja Err:509

K.003 Pasang pintu gulung besi 1,910,690.00

K.004 Pasang pintu lipat 1,587,810.00

K.005 Pasang sunscream aluminium 324,740.00

K.006 Pasang rolling door 1,189,950.00

K.007 Pasang pintu Alluminium Err:509

K.008 Pasang kusen alluminium putih Err:509

K.009 Pasang kusen alluminium coklat Err:509

K.010 Pasang jendela aluminium putih Err:509

K.011 Pasang jendela aluminium coklat Err:509

K.012 Pasang pintu fiber KM 360,880.00

K.013 Pasang venetion blinds Err:509

K.014 Pasang vertikal blinds Err:509

K.015 Pasang teralis besi Err:509

K.016 Pasang kawat harmonika Err:509

K.017 Pasang kawat nyamuk/kassa besi Err:509

K.018 Pasang kawat nyamuk/kassa plastik Err:509

K.019 Pasang kawat burung Err:509

K.020 Pasang jendela nako & tralis Err:509

K.021 Pasang talang datar, seng bjls 30 L = 0.45 m Err:509

K.022 Pasang talang datar, seng bjls 30 L = 0.60 m 185,677.50

K.023 Pasang talang datar, seng bjls 30 L = 0.90 m 194,917.50

K.024 Pasang talang miring, seng bjls 30 L = 0.45 m Err:509

K.025 Pasang talang miring, seng bjls 30 L = 0.60 m 185,677.50

K.026 Pasang talang miring, seng bjls 30 L = 0.90 m 194,917.50

m1

m1

m1

Pasang pipa galvanis Ø 1/2" m1

Pasang pipa galvanis Ø 3/4" m1

Pasang pipa galvanis Ø 1" m1

Pasang pipa galvanis Ø 1 1/2" m1

Pasang pipa galvanis Ø 2" m1

Pasang pipa galvanis Ø 2 1/2" m1

Pasang pipa galvanis Ø 3" m1

Pasang pipa galvanis Ø 4" m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m2

m1

m1

m2

m2

m2

m2

m2

m2

m1

m1

m1

m1

m2

m2

m2

m2

m2

m2

m2

m2

m2

m1

m1

m1

m1

m1

m1

Page 412: Analisa PDAM 2010

K.027 Pasang talang tegak seng, diameter 3" Err:509

K.028 Pasang talang tegak seng, diameter 4" Err:509

K.029 Pasang talang tegak pipa PVC, diameter 3" 52,177.50

K.030 Pasang talang tegak pipa PVC, diameter 4" 63,580.00

K.031 Pasang talang 1/2 lingkaran D-10 cm bjls 28 63,440.00

K.032 Pasang talang 1/2 lingkaran D-10 cm bjls 24 Err:509

K.033 Pasang pagar BRC tinggi 1 m 298,340.10

K.034 Pasang tiang pagar BRC Dia 2" tinggi 1 m bh 193,017.60

K.035 Pasang pintu pagar BRC tinggi 1 m 526,628.20

K.036 Pasang pagar besi 602,925.63

K.037 Pasang pintu pagar besi 813,101.04

K.038 Pasang atap baja ringan 273,171.14

L.001 Pasang kunci tanam antik bh 122,470.00

L.002 Pasang kunci tanam biasa bh 129,220.00

L.003 Pasang kunci tanam kamar mandi bh 109,070.00

L.004 Pasang kunci silinder bh 159,630.00

L.005 Pasang kunci selot bh 132,320.00

L.006 Pasang kunci lemari bh 27,650.00

L.007 Pasang engsel pintu bh 37,600.00

L.008 Pasang engsel jendela bh 28,170.00

L.009 Pasang grendel pintu bh 29,400.00

L.010 Pasang grendel jendela bh 17,560.00

L.011 Pasang hak angin bh 31,430.00

L.012 Pasang spring knip bh 21,040.00

L.013 Pasang kait angin bh 15,160.00

L.014 Pasang door closer bh 185,470.00

L.015 Pasang pegangan pintu/door holder bh 142,450.00

L.016 Pasang door stop bh 137,515.00

L.017 Pasang rel pintu dorong bh 158,010.00

L.018 Pasang kaca polos, tebal 3 mm 78,090.00

L.019 Pasang kaca polos, tebal 5 mm 122,057.00

L.020 Pasang kaca polos, tebal 8 mm 170,545.00

L.021 Pasang kaca polos, tebal 12 mm 232,266.00

L.022 Pasang kaca buram, tebal 3 mm 100,263.00

L.023 Pasang kaca buram, tebal 5 mm 149,312.00

L.024 Pasang kaca buram, tebal 8 mm 213,502.00

L.025 Pasang kaca buram, tebal 12 mm 284,540.00

L.026 Pasang kaca cermin, tebal 5 mm 146,576.00

L.027 Pasang kaca cermin, tebal 6 mm 170,259.00

L.028 Pasang kaca cermin, tebal 8 mm 224,574.00

L.029 Pasang kaca rayben, tebal 3 mm 132,562.00

L.030 Pasang kaca rayben, tebal 5 mm 176,177.00

L.031 Pasang kaca rayben, tebal 8 mm 206,534.00

L.032 Pasang kaca rayben, tebal 12 mm 260,654.00

L.033 Pasang kaca " wireglass", tebal 5 mm 602,372.00

L.034 Pasang kaca patri, tebal 5 mm 898,338.00

L.035 Pasang glass block bh 31,824.00

L.036 Pasang kaca painting glass 424,788.00

M.001 Pasang lantai ubin pc abu-abu ukuran 40 x 40 cm Err:509

M.002 Pasang lantai ubin pc abu-abu ukuran 30 x 30 cm Err:509

M.003 Pasang lantai ubin pc abu-abu ukuran 20 x 20 cm Err:509

M.004 Pasang lantai ubin pc warna ukuran 40 x 40 cm Err:509

M.005 Pasang lantai ubin pc warna ukuran 30 x 30 cm Err:509

M.006 Pasang lantai ubin pc warna ukuran 20 x 20 cm Err:509

M.007 Pasang lantai ubin teraso ukuran 40 x 40 cm Err:509

M.008 Pasang lantai ubin teraso ukuran 30 x 30 cm Err:509

M.009 Pasang lantai ubin granito ukuran 40 x 40 cm Err:509

M.010 Pasang lantai ubin granito ukuran 30 x 30 cm Err:509

M.011 Pasang plint ubin pc abu-abu ukuran 15 x 20 cm Err:509

M.012 Pasang plint ubin pc abu-abu ukuran 10 x 30 cm Err:509

M.013 Pasang plint ubin pc abu-abu ukuran 10 x 40 cm Err:509

M.014 Pasang plint ubin pc warna ukuran 10 x 20 cm Err:509

M.015 Pasang plint ubin pc warna ukuran 10 x 30 cm Err:509

M.016 Pasang plint ubin pc warna ukuran 10 x 40 cm Err:509

M.017 Pasang plint ubin teraso ukuran 10 x 30 cm Err:509

M.018 Pasang plint ubin teraso ukuran 10 x 40 cm Err:509

M.019 Pasang plint ubin granito ukuran 10 x 40 cm Err:509

M.020 Pasang plint ubin granito ukuran 10 x 30 cm Err:509

M.021 Pasang teraso cor di tempat Err:509

M.022 Pasang lantai keramik artistik 10 x 20 cm Err:509

M.023 Pasang lantai keramik artistik 10 x 10 cm Err:509

M.024 Pasang lantai keramik artistik 5 x 20 cm Err:509

M.025 Pasang plint keramik artistik 10 x 20 cm Err:509

M.026 Pasang plint keramik artistik 10 x 10 cm Err:509

M.027 Pasang plint keramik artistik 5 x 20 cm Err:509

m1

m1

m1

m1

m1

m1

m1

m1

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m2

m2

m2

m2

m1

m1

m1

Page 413: Analisa PDAM 2010

M.028 Pasang internal cove artistik (5 x 5 x 20) cm Err:509

M.029 Pasang gymflour 300,722.00

M.030 Pasang lantai keramik ukuran 20 x 20 cm putih 112,910.00

M.031 Pasang lantai keramik ukuran 20 x 20 cm warna/motif 116,885.00

M.032 Pasang lantai keramik KM ukuran 20 x 20 cm 121,012.00

M.033 Pasang lantai keramik ukuran 30 x 30 cm putih 130,700.70

M.034 Pasang lantai keramik ukuran 30 x 30 cm warna/motif 136,754.40

M.035 Pasang lantai keramik ukuran 40 x 40 cm putih 146,161.10

M.036 Pasang lantai keramik ukuran 40 x 40 cm warna/motif 153,299.00

M.037 Pasang plint ubin keramik lantai ukuran 10 x 20 cm 33,578.50

M.038 Pasang plint ubin keramik lantai ukuran 10 x 30 cm 74,791.40

M.039 Pasang plint ubin keramik lantai ukuran 10 x 40 cm 85,092.00

M.040 Pasang dinding porselin ukuran 15 x 15 cm, putih 115,650.00

M.041 Pasang dinding porselin ukuran 15 x 15 cm, warna 120,150.00

M.042 Pasang dinding porselin ukuran 10 x 20 cm, warna 132,985.00

M.043 Pasang dinding porselin ukuran 20 x 20 cm, warna 129,045.00

M.044 Pasang dinding keramik ukuran 20 x 20 cm 149,450.00

M.045 Pasang dinding keramik ukuran 20 x 25 cm 129,350.00

M.046 Pasang dinding batu tempel hitam 140,675.00

M.047 Pasang dinding batu palimanan 141,657.50

M.048 Pasang dinding batu granito Err:509

M.049 Pasang dinding batu teraso Err:509

M.050 Pasang paving stone (blok) segi empat biasa 83,625.00

M.051 Pasang paving stone (blok) segi empat warna 91,725.00

M.052 Pasang paving stone (blok) segi enam biasa 83,950.00

M.053 Pasang paving stone (blok) segi enam warna 90,950.00

M.054 Pasang paving stone (blok) tiga berlian berlian biasa 83,775.00

M.055 Pasang paving stone (blok) tiga berlian berlian warna 91,200.00

N.001 Mengikis/mengerok permukaan cat lama 8,026.00

N.002 Mencuci bidang permukaan cat tembok lama 8,385.00

N.003 Mengerok karat cat lama permukaan baja dengan cara manual 8,385.00

N.004 Menyabun permukaan tembok lama 8,385.00

N.005 Mengerok karat/cat lama permukaan baja dengan pancar pasir Err:509

N.006 Mendempul dan menggosok kayu Err:509

N.007 Pengecatan kayu lama 26,572.40

N.008 Pengecatan kayu baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup) 32,521.20

N.009 Pengecatan kayu baru (1 lapis plamir, 1 lapis cat dasar, 3 lapis cat penutup) 43,998.50

N.010 Pelaburan kayu dengan teak oil 9,585.40

N.011 Pelaburan kayu dengan politur 60,065.50

N.012 Pelaburan kayu dengan cat residu dan ter 13,590.00

N.013 Pelaburan kayu dengan vernis 24,599.60

N.014 Pengecatan tembok baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup) 14,645.10

N.015 Pengecatan tembok lama (1 lapis cat dasar, 2 lapis cat penutup) 7,830.20

N.016 Melabur tembok dengan kalkarium 4,894.40

N.017 Melabur tembok dengan kapur sirih Err:509

N.018 Melabur tembok lama dengan kapur sirih (untuk pemeliharaan) 12,499.50

N.019 Pengecatan plafon (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup) 14,645.10

N.020 Pasang wall paper Err:509

N.021 Pengecatan permukaan baja dengan meni besi 17,539.60

N.022 Pengecatan permukaan baja dengan meni besi dan perancah Err:509

N.023 Pengecatan permukaan baja lapis seng (galbani) secara manual, 1 lapis 25,362.00

N.024 Pengecatan permukaan baja lapis seng (galbani) secara manual, 3 lapis 114,883.60

N.025 Pengecatan permukaan baja lapis seng (galbani) secara semprot, 1 lapis 95,564.00

N.026 Pekerjaan Waterproofing 51,576.50

O.001 Pemasangan Baja Profil kg #REF!

O.002 Pemasangan Baja Canal C kg #REF!

O.003 Pemasangan Baut Anker Baja kg #REF!

O.004 Ikatan Angin/Trekstang kg #REF!

O.005 Plendes kg #REF!

P.001 Pemasangan Stop Kontak Titik 125,094.00

P.002 Pemasangan Saklar Tunggal Titik 115,214.00

P.003 Pemasangan Saklar Ganda Titik 134,314.00

P.004 Pemasangan titik lampu pijar 5 - 40 watt Titik 91,975.00

P.005 Pemasangan titik lampu pijar 50 - 100 watt Titik 102,225.00

P.006 Pemasangan titik lampu TL 20 Watt (komplit) Titik 122,735.00

P.007 Pemasangan titik lampu TL 40 Watt (komplit) Titik 148,615.00

P.008 Pemasangan titik lampu XL 5 Watt Titik 100,685.00

P.009 Pemasangan titik lampu XL 8 Watt Titik 100,685.00

P.010 Pemasangan titik lampu XL 14 Watt Titik 103,255.00

m2

m2

m2

m2

m2

m2

m2

m2

m2

m1

m1

m1

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

Page 414: Analisa PDAM 2010

P.011 Pemasangan titik lampu XL 18 Watt Titik 105,815.00

P.012 Pemasangan titik lampu XL 23 Watt Titik 106,835.00

P.013 Pemasangan Sekering 1 Group Unit 120,812.00

P.014 Pemasangan Sekering 2 Group Unit 195,776.50

P.015 Pemasangan Sekering 3 Group Unit 275,797.50

P.016 Pemasangan Penangkal Petir Unit 2,780,530.00

Q.001 Penyetelan mesin bor dan buat bak sirkulasi Unit 3,300,000.00

Q.002 Geolistrik Ls -

Q.003 Pemboran pilot hole Ø 8 3/4" kedalaman 0 - 25 m -

Q.004 Pemboran pilot hole Ø 8 3/4" kedalaman 25 - 50 m -

Q.005 Pemboran pilot hole Ø 8 3/4" kedalaman 50 - 75 m -

Q.006 Pemboran pilot hole Ø 8 3/4" kedalaman 75 - 100 m -

Q.007 Pemboran pilot hole Ø 8 3/4" kedalaman 100 - 125 m -

Q.008 Pemboran pilot hole Ø 8 3/4" kedalaman 125 - 175 m -

Q.009 Pemboran pilot hole Ø 8 3/4" kedalaman 175 - 225 m -

Q.010 Pemboran pilot hole Ø 8 3/4" kedalaman 225 - 275 m -

Q.011 Geofisikal, Elektrikal, Logging -

Q.012 Pumping test open hole Ls -

Q.013 Pembesaran lubang bor Ø 8 3/4" - Ø 12" kedalaman 0 - 25 m -

Q.014 Pembesaran lubang bor Ø 8 3/4" - Ø 12" kedalaman 25 - 50 m -

Q.015 Pembesaran lubang bor Ø 8 3/4" - Ø 12" kedalaman 50 - 75 m -

Q.016 Pembesaran lubang bor Ø 8 3/4" - Ø 12" kedalaman 75 - 100 m -

Q.017 Pembesaran lubang bor Dia 8 3/4" - Ø 12" kedalaman 100 - 125 m -

Q.018 Pembesaran lubang bor Ø 8 3/4" - Ø 12" kedalaman 125 - 175 m -

Q.019 Pembesaran lubang bor Ø 8 3/4" - Ø 12" kedalaman 175 - 225 m -

Q.020 Pemasangan pipa jambang PVC-AW Ø 150 mm -

Q.021 Pemasangan pipa buta PVC-AW Ø 150 mm -

Q.022 Pemasangan pipa screen PVC-AW Ø 150 mm -

Q.023 Pengadaan pipa jambang PVC-AW Ø 150 mm -

Q.024 Pengadaan pipa buta PVC-AW Ø 150 mm -

Q.025 Pengadaan pipa screen PVC-AW Ø 150 mm -

Q.026 Pemasangan pipa jambang PVC-AW Ø 125 mm -

Q.027 Pemasangan pipa screen PVC-AW Ø 125 mm -

Q.028 Pemasangan pipa buta PVC-AW Ø 125 mm -

Q.029 Pengadaan pipa jambang PVC-AW Ø 125 mm -

Q.030 Pengadaan pipa buta PVC-AW Ø 125 mm -

Q.031 Pengadaan pipa screen PVC-AW Ø 125 mm 5,676,875.00

Q.032 Pemasangan pipa sounding PVC-AW Ø 2.50" -

Q.033 Pemasangan pipa sounding SWL PVC-AW Ø 1" 1,350,000.00

Q.034 Pengisian gravel pack Ø 5 mm - 10 mm 1,658.33

Q.035 Grouting cor -

Q.036 Pencucian sumur bor Titik 8,100.00

Q.037 Pumping test dan test nonstop 24 jam Jam 8,100.00

Q.038 Pasang pipa PVC RRJ 6 m S-10 Ø 2" 12,150.00

Q.039 Pasang pipa PVC RRJ 6 m S-10 Ø 2,5" 18,225.00

Q.040 Pasang pipa PVC RRJ 6 m S-10 Ø 3" 630.00

Q.041 Pasang pipa PVC RRJ 6 m S-10 Ø 4" -

Q.042 Pasang pipa PVC RRJ 6 m S-10 Ø 6" -

Q.043 Pasang pipa PVC RRJ 6 m S-10 Ø 8" -

Q.044 -

Q.045 -

Q.046 66,140.00

Q.047 Pasang pompa air Unit 142,900.00

Q.048 Unit -

Q.049 Unit -

Q.050 Unit -

Q.051 Unit 6,100.00

R.001 Pengukuran saluran untuk MC 569,125.80

R.002 Pembuatan dan pembongkaran kisdam > 1 m -

R.003 Galian tanah biasa diangkut > 1 m dibuang 104,841.80

R.004 Galian tanah biasa langsung untuk timbunan / dibuang -

R.005 Timbunan tanah dari luar dipadatkan dan dirapikan (manual) 5,550.00

R.006 Bongkaran pasangan batu kali -

R.007 Pasangan batu kali dengan spesi 1 pc ; 4 ps -

R.008 Siaran dengan spesi 1 pc ; 2 ps -

R.009 Plesteran tebal 1,5 cm dengan spesi 1 pc ; 3 ps 59,400.00

R.010 Beton K-175 -

R.011 Bekisting kayu termasuk pembongkaran -

R.012 Besi Tulangan kg 5,010.00

R.013 Pintu Air Type C - 2 bh 15,585.00

S.001 Menanam rumput lamur 28,630.00

S.002 Menanam rumput manila 25,940.00

S.003 Menanam semak hias 31,360.00

S.004 Menanam pohon pelindung btg 187,030.00

S.005 Pengisian koral sumur resapan 167,795.00

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m3

m1

m1

m1

m1

m1

m1

m1

Pasang pipa RRJ S-10 Ø 2" lintas jalan m1

Pasang pipa RRJ S-10 Ø 3" lintas jalan m1

Pasang pipa RRJ S-10 Ø 4" lintas jalan m1

Pasang tandon air PVC V = 0.5 m3

Pasang tandon air PVC V = 1.0 m3

Pasang tandon air stainless V = 0.5 m3

Pasang tandon air stainless V = 1.0 m3

Km1

m3

m3

m3

m3

m3

m3

m2

m2

m3

m2

m2

m2

m2

m3

Page 415: Analisa PDAM 2010

S.006 Menanam gebalan rumput 26,740.00

S.007 Pasang papan kayu jembatan gantung, kayu kamper 12,993,900.00

m2

m3