URAIAN PEKERJAANJOB DESCRIPTION
:
PENGAWASSUPERVISOR
: PERSYARATAN PERSONILPERSONNEL REQUIREMENTS
:
ANALISA KESELAMATAN PEKERJAANJOB SAFETY ANALYSIS
No. Dokumen/ Document No. Rev.
0
Nomor Urut/SeqNo
LANGKAH-LANGKAH KERJA/JOB STEPS
(Urutan Kejadian/Sequence of Events)
BAHAYA YANG MUNGKIN TIMBUL/
POTENTIAL HAZARD
PENGENDALIAN BAHAYA/ HAZARD CONTROL
(Tes atau Prosedur/Test or Procedure)
PERALATAN PELINDUNG
DIRI/TOOLS/EQUIP P.P.E.
TINDAKAN OLEH SIAPA/ACTION BY
WHOM
1 PJSM, Clear the area of pressure test Miss communication Listen carefully and be at the right place, give the barrier line around the area of pressure test
Complete ppe All crew
2 Check all the level of fluid, make sure at enough level
Leakage, the cap was not at the place
After check,always put again at the place Complete ppe Mechanic
3Check all the connection hose Leakage, hose blew up, struck by
hammer. Hit, falling, drop object, pinch point
Make sure the connection union hose tight of, use whip check at every connection high pressure
Complete ppe Mechanic
4Check four way valve Hit by pressure, Equipment
damageMake sure the valve must be closed Complete ppe Mechanic
5Check switch motor air pump Hit by pressure, Equipment
damageMake sure the air pumpw was good running
Complete ppe Mechanic
6Start to pumping, look the pressure gauge, annular until 2000-3000psi,Choke manifold until 1500 psi, automatic stop
Blow off line due to High Pressure,
Clear the area Complete ppe Mechanic
7 Cek all the line if there is a leakage Leakage, hose blew up, struck by hammer. Hit, falling, drop object, pinch point
Always tight off the union connection, use whip check
Complete ppe Mechanic
8 Test finished, check everythink Leakage, hose blew up, struck by hammer. Hit, falling, drop object, pinch point, Hit by pressure, Equipment damage
Placed all the tools at the right place, check for all the hose, and bleed of the pressure
Complete ppe Mechanic
Supervisor HSE Rig Superintendent
ANALISA KESELAMATAN PEKERJAANJOB SAFETY ANALYSIS
No. Dokumen/ Document No. Rev.
0
Nomor Urut/SeqNo
LANGKAH-LANGKAH KERJA/JOB STEPS
(Urutan Kejadian/Sequence of Events)
BAHAYA YANG MUNGKIN TIMBUL/
POTENTIAL HAZARD
PENGENDALIAN BAHAYA/ HAZARD CONTROL
(Tes atau Prosedur/Test or Procedure)
PERALATAN PELINDUNG
DIRI/TOOLS/EQUIP P.P.E.
TINDAKAN OLEH SIAPA/ACTION BY
WHOM
SIGNED SUPERVISORTANDA TANGAN PENGAWAS
________________ _______________ ______________Supervisor HSE Rig Superintendent