CONSULTING SERVICES FOR ROAD REHABILITATION (SECTOR) PROJECT UNDER ADB LOAN NO

PAGE

BALAI BESAR PELAKSANAAN JALAN NASIONAL III

DIREKTORAT JENDERAL BINA MARGANo. Hlm: 16 dari 17

No. Urut: 04/Trnsp/07

Rev. : 00 Tgl: 27 Apr 07

No. Dokumen : BBPJN.III/ RM.000-000RENCANA MUTU KONTRAK LEVEL 3

Tgl Berlaku : Agustus 07 Revisi : 00

RENCANA MUTU KONTRAK

PENINGKATAN JALAN PRABUMULIH MA. ENIMKONTRAK NO. 138/SNVT-PEMB/PROP.SUMSEL/04/07

TGL 26 APRIL 2007PERSETUJUANORIGINATORMENYETUJUIMENGETAHUI

JABATANGENERAL SUPERINTENDANT

DIREKTUR

PT. SUPER BANGUNPEJABAT PEMBUAT KOMITMEN

TANDA TANGAN

NAMAIr. JoniIr. HoniIr. Polan

TANGGAL27-04-0727-04-0727-04-07

Daftar Distribusi Dokumen :

NoPenerimaTanda-tanganTanggal

1Wakil Manajemen BBPJN-III

2Kepala SNVT Pembangunan Prop Sumsel

3Project Officer

4

5

6

Riwayat Dokumen

NoTanggalRevisi keDisposisi PerubahanDiperiksaDisetujui

127-04-0700RMK diterbitkan perdana

PT. SUPER BANGUNC O N T R A C T O RJl. Samudra Indah No 23, PalembangTel (0711) 424535, Fax (0711) 424353, Email: [email protected]

1. DAFTAR ISI

JUDUL / LEMBAR PENGESAHAN / DISTRIBUSI dan RIWAYAT DOKUMEN121.DAFTAR ISI

32.KEBIJAKAN MUTU DAN SASARAN MUTU

43.INFORMASI PROYEK

54.PIHAK YANG TERLIBAT

65.STRUKTUR ORGANISASI PROYEK

76.TUGAS, TANGGUNGJAWAB DAN WEWENANG

97.BAGAN ALIR KEGIATAN POKOK

108.JADUAL PELAKSANAAN PEKERJAAN

119.JADUAL TENAGA KERJA

1210.JADUAL MATERIAL

1311.JADUAL PERALATAN

1412.JADUAL INSPEKSI UJI DAN TEST

1513.DAFTAR KEBERTERIMAAN

1614.DAFTAR PROSEDUR DAN INSTRUKSI KERJA

1715.DAFTAR SIMAK

2. KEBIJAKAN MUTU DAN SASARAN MUTU

KEBIJAKAN MUTU :

Manajemen dan Karyawan PT. Super Bangun memberdayakan sistem manajemen mutu dalam memenuhi tuntutan kontrak demi efisiensi dan efektivitas pekerjaan.SASARAN MUTU :

1. Menyelesaikan pekerjaan tepat waktu dalam 5,5 bulan 2. Menyelesaikan setiap keluhan Pengguna Jasa tanpa mengganggu target waktu3. Memenuhi persyaratan mutu yang ditetapkan dalam kontrak dan spesifikasi.3. INFORMASI PROYEK

1.Nama Proyek:Peningkatan Jalan Prabumulih Muara Enim2.Pemilik:SNVT Pembangunan Jalan dan Jembatan Propinsi Sumatera Selatan3.No. Kontrak:138/SNVT-PEMB/PROP.SUMSEL/04/07 tgl 26 April 20074.Nilai Kontrak:Rp. 12.323.452.0005.Sistem Kontrak:Fixed Unit Price6.Pembayaran:Angsuran / Termijn7.Lokasi Proyek:Sumatera Selatan8.Masa Pelaksanaan:5,5 bulan9.Uraian Lingkup Proyek:

Peningkatan Jalan Propinsi Ruas Jalan Prabumulih Muara Enim (12,00 km)

Lebar Perkerasan:6,00 m pelebaran 1 m (kiri) + 1 m (kanan)Bahu Jalan:1,00 m

Konstruksi:Laston Lapis Aus (AC-WC t=4 cm)

Lapis Antara AC-BC t=5 cm

Aggr. Klas A = 15cm

Aggr. Klas B = 20 cm

Bahu Jalan Aggr Kls B t = 10 cm

Marka Jalan

Patok Km, Damija, dll

Pengupasan Tebing batu

Saluran Drainase

Turap penahan timbunan (Pasangan Batu)10.Peta Lokasi Proyek: (terlampir)4. PIHAK YANG TERLIBAT

SKEMA ORGANISASI PROYEK

Pengguna Jasa :

SNVT Pembangunan Jalan dan Jembatan Prov. SumSel Ir. Junaidi, MTJl. . . .

Palembang

Tel . . . Fax . . . Email . . .

Pejabat Pembuat Komitmen (PPK)Ir. PolanJl. . . .

Palembang

Tel . . . Fax . . . Email . . .

Penyedia Jasa :

PT. SUPER BANGUN Contractor

Jl. Samudra Indah No 23, Palembang

Tel (0711) 424535, Fax (0711) 424353, Email: [email protected] :

PT. Arteri Cipta Rencana

Kebayoran Baru Mall B-26, Jl. Kebayoran Baru 9-10, Jakarta Selatan 12120

Tel (021) 739 5552, Fax (021) 720 2483 , Email : [email protected]

SNVT P2JJ Prop Sumsel

Ir. Marsudi, MTJl. RE Martadinata Komplek RBO Bina Marga 2 Ilir, Palembang - 30118Tel (0711) 712 768, 711 0135. STRUKTUR ORGANISASI PROYEK

6. TUGAS, TANGGUNGJAWAB DAN WEWENANG

GENERAL SUPERINTENDANT :Tugas :

Memimpin dan mengendalikan kegiatan proyek agar efisien dan efektif mencapai hasil optimal dari segi kualitas dan pencapaian laba

Memahami seluruh aspek teknik pekerjaan dan berperan aktif membina sumber daya sesuai dengan kebutuhan proyek

Membina keamanan dan menciptakan ketenangan kerja di lingkungan proyek dan masyarakat sekitarnya

Menganalisa kebutuhan material, tenaga kerja, peralatan dan overhead, serta menyusun jadwal kebutuhannya

Membuat Rencan Mutu Kontrak

Tanggungjawab :

Bertanggungjawab atas kelancaran kegiatan proyek saejak masa persiapan hingga penyerahan

Bertanggungjawab atas pelaksanaan tertib administrasi internal, data material, data peralatan, data keuangan termasuk pengihan dan data pendukungnya

Bertanggungjawab atas pengendalian mutu hasil pekerjaan di proyek

Wewenang :

Memutuskan strategi pelaksanaan proyek yang berkaitan dengan pengendalian mutu proyek

Menyetujui pengeluara-pengeluaran langsung yang diperlukan kegiatan Proyek.

SITE MANAGERTugas:

Mengatur dan mengawasi jadual kerja harian para pelaksana dan memonitor jadwal kedatangan material, memeriksa volume dan kualitas serta mengatur penempatannya

Memeriksa hasil pekerjaan para pelaksana agar dapat dimonitor bobot kemajuan dalam kaitannya dengan opname kemajuan pekerjaan, laporan upah dan mengesahkan kepada pengguna jasa

Membaca, memahami dan mengarahkan setiap kegiatan proyek yang dilaksanakan oleh mandor, tukang, dan pekerjaan yang telibat dengan mutu

Tanggungjawab:

Bertanggungjawab selaku koordinator pelaksanaan di lapangan sesuai dengan gambar kerja

Mengawasi teknis pelaksanaan semua pekerjaan di lapangan agar supaya memenuhi ketentuan-ketentuan teknis yang benar dan tidak menyimpang dari anggaran yang ditetapkan

Menggunakan material dengan kualitas dan volume yang benar

Menggunakan peralatan dan tenaga kerja secara efisien

Memenuhi jadual waktu yang telah ditetapkan

Wewenang:

Menyeleksi mandor yang direkomendasikan dapat bekerja dengan baik dan menerbitkan surat perintah kerja kepada mandor yang dipilih

Memeriksa dan mensyahkan opname hasil pekerjaan yang diajukan oleh mandor setelah diperiksa kesesuaiannya oleh pelaksana

Menyetujui pengeluaran-pengeluaran langsung yang diperlukan kegiatan proyek sebatas anggaran yang ditetapkan.

dst . . .7. BAGAN ALIR KEGIATAN POKOK

YA

8. JADUAL PELAKSANAAN PEKERJAAN

NoUraianSatVolBobot

(%)2007Ketr.

MeiJunJulAgsSepOkt

12345678910111213141516171819202122

1MobilisasiLS1,000,3610,0100,0200,0400,0800,0900,121

2Kantor & Fasl. LapanganLS1,000,4280,0210,0210,0210,0210,0210,0210,0220,0220,0220,0220,0220,0220,0220,0220,0210,0210,0210,0210,0210,021

3Drainase

Selokan DrainaseM32.745,000,7610,0510,0630,0630,0630,0630,0630,0630,0630,0630,0630,0630,063

Pasangan BatuM32,65710,9321,2001,2001,2281,2281,2201,2141,2141,2141,214

4Pekerjaan Tanah:

PembersihanM2421,890,0100,0050,005

GalianM315.100,004,9730,7000,7000,7200,7200,7100,7130,710

TimbunanM34.438,002,1960,3130,3140,3140,3140,3140,3140,313

Penyiapan Badan JalanM27.608,000,2310,0460,0460,0470,0460,046

5Bahu JalanM34.560,004,0960,5850,5850,5850,5860,5850,5850,585

6Perkerasan:

Lapis Pondasi Aggr AM3390,000,4110,1370,1370,137

Lapis Pondasi Aggr BM3520,000,4670,1550,1560,156

Pondasi Bawah (Semen)M33.040,0013,6861,2441,2441,2441,2441,2441,2441,2441,2441,2451,2451,244

7Perkerasan Aspal :

Prime CoatL1.300,000,0480,0040,0040,0040,0040,0040,0050,0050,0050,0050,0040,004

Tack CoatL28.305,001,2080,1510,1510,1510,1510,1510,1520,1510,151

LevellingTon5.011,0027,2013,4003,4003,4003,4003,4013,4003,4003,400

ATBM3524,006,5480,5950,5950,5950,5950,5950,5950,5950,5960,5960,5960,595

8Struktur :

Beton K-275M333,000,2630,0870,0880,088

Beton K-225M329,000,2080,0690,0700,069

Beton K-175M367,000,4410,0730,0730,0740,0740,0740,073

Tulangan Baja U32Kg5.220,000,8620,1230,1230,1230,1240,1230,1230,123

Pasangan BatuM35.219,0020,2311,4001,4001,4001,4001,4451,4901,4901,4901,4901,4461,4451,4451,4451,445

9Pekerjaan Rekondisi:

Pondasi Aggr Klas AM324,000,0250,0320,033

Pondasi Aggr Klas BM332,000,0290,0140,015

Aspal Pek. MinorM38,000,1000,100

Marka JalanM22.735,002,5500,9550,9540,641

Rambu JalanBh30,000,1380,138

Patok KM, Damija, dllBh777,001,0190,3500,3500,319

Lampu PeneranganBh4,000,4220,1350,1520,135

10 Pekerjaan harian :

MandorJam69,000,0040,0020,0010,001

Pekerja BiasaJam251,000,0110,0040,0040,003

Dump Truk 4-5 m3Jam28,000,0200,0080,0070,005

Wheel Loader 1-1.6 m3Jam28,000,0370,0100,0170,010

Pengujian DefleksiJam28,000,0330,033

Pengujian CBRjam28,000,0260,026

Jumlah Bobot1000,0100,0790,8173,4833.9335,5075,7736,3146.1055,1438,6928,1836.9266,9266,8657,4496,2025,1061,0952,0391,8311,522

Jumlah Kumulatif0,0100,0890,9064,3898.32213,82919,60225,91632,02137,16445,85654,03960,96567,89174,75682,20588,40793,51394,60896,64798,478100

9. JADUAL TENAGA KERJA

NoPosisiNama2007Ketr.

MeiJunJulAgsSepOkt

12345678910111213141516171819202122

ISTAFF

1General SuperintendantIr. Joni

2Site ManagerIr. Sunirno

3Kepala PelaksanaIganov

4Urusan TeknikDwipanto

5Urusan AdministrasiWarsiyo

6 PelaksanaJahadi

7 SurveyorTulimad

8Adminsitrasi TeknikHentris

9Logistik dan PeralatanGumara

10KeuanganSulono

11Umum dan PersonaliaRasta

IIPEKERJA PROYEK

1 Operator

2Mekanik

3 Mandor

4Tukang Batu

5Tukang Kayu

6Pekerja Harian

10. JADUAL MATERIAL

NoJenis MaterialSatVol2007Ketr.

MeiJunJulAgsSepOkt

12345678910111213141516171819202122

1BatuKaliM37.876

2SemenSak1.161

3PasirM37.926

4SplitM3129

5SirtuM33.169,4

6Besi BetonKg5.220

7Plywood BekistingLbr78

8 Kayu BekistingLbr142

9AspalTon300,66

10Aggregat AM3390

11Aggregat BM3245

11. JADUAL PERALATAN

NoJenis PeralatanSatVol2007Ketr.

MeiJunJulAgsSepOkt

12345678910111213141516171819202122

1ExcavatorUnit2

2Asphalt FinisherUnit1

3Asphalt SprayerUnit2

4CompressorUnit1

5Tandem RollerUnit2

6Tire RollerUnit2

7Concrete VibratorUnit2

8Motor GraderUnit1

9 Water TankUnit1

10Vibrator RollerUnit3

11Concrete MixerUnit8

12Core DrillUnit1

13Dump TruckUnit10

12. JADUAL INSPEKSI UJI DAN TEST

NoKodeJenis Pekerjaan2007Ketr.

MeiJunJulAgsSepOkt

12345678910111213141516171819202122

1Q1Inspeksi Rekayasa Lapangan

2Q2Mobilisasi

3Q3Request Kerja

4Q4Galian Tanah

5Q5Pasangan Batu

6Q6Pembesian

7Q7Pengecoran

8Q8Galian Tanah Dasar

9Q9Timbunan

10Q10CTSB

11Q11Prime Coat / Tack Coat

12Q12Hotmix

13. DAFTAR KEBERTERIMAAN

KODEURAIAN PEKERJAANKEBERTERIMAANMETODEPENANGGUNG JAWAB

Q1Rekayasa LapanganKelengkapan DataPerhitungan dan PengukuranSite Manager

Q2MobilisasiKelengkapan Peralatan dan PersonilvisualSite Manager

Q3Request PekerjaanGambar Kerja

Daftar Peralatan

Daftar Tenaga Kerja

Daftar Material

Kondisi CuacaVisualKepala Pelaksana

Q4Galian TanahGambar KerjaPengukuranSurveyor

Q5Pasangan BatuGambar KerjaSampel AdukanPengukuranUji Kuat TekanSurveyorQuality Control

Q6PembesianGambar KerjaVisualKepala Pelaksana

Q7PengecoranSlump Test

Sampel Beton

Concrete Mixer

Concrete VibratorHasil Uji

Hasil Uji

Inspeksi

InspeksiQuality Control

Quality Control

Mekanik

Mekanik

Q8Galian Tanah DasarGambar KerjaInspeksiKepala Pelaksana

Q9Timbunan TanahKepadatanUji Sand ConeQuality Control

Q10CTSBSlump Test

Sample Beton

Concrete Mixer

Concrete VibratorHasil Uji

Hasil Uji

Inspeksi

InspeksiQuality Control

Quality Control

Mekanik

Mekanik

Q11Prime Coat/Tack CoatWaktu PeresapanKetebalanVisualHasil UjiKepala Pelaksana

Q12HotmixSuhuKondisi Cuaca

KetebalanTestVisual

Core DrillKepala Pelaksana

14. DAFTAR PROSEDUR DAN INSTRUKSI KERJA

NO.KODENO. DOKUMENJUDUL DOKUMEN

1P1IK-SB/001/02 Instruksi Kerja Pengukuran

2P2PR-SB/001/01Prosedur Rekayasa Lapangan

3P3PR-SB/000/01Prosedur Mobilisasi/Demobilisasi

4P4IK-SB/001/01Instruksi Kerja Request Pekerjaan

5P5IK-SB/003/03Instruksi Kerja Pasangan Batu

6P6IK-SB/003/01Instruksi Kerja Galian Tanah

7P7IK-SB/003/02Instruksi Kerja Galian Tanah Dasar

8P8IK-SB/003/04Instruksi Kerja Timbunan

9P9IK-SB/012/01Instruksi Kerja Pembesian

10P10IK-SB/012/02Instruksi Kerja Pengecoran

11P11IK-SB/009/01Instruksi Kerja Prime Coat / Tack Coat

12P12IK-SB/009/02Instruksi Kerja Pekerjaan Hotmix

15. DAFTAR SIMAK

NONO DOKUMENJUDUL DOKUMEN

1SB/Pust/Eng/001 Peraturan Beton Bertulang Indonesia 1971

2SB/Pust/Eng/003 Peraturan Umum Bahan Bangunan 1955

3SB/Pust/Eng/016 AASTHO

4SB/Sumsel-A/001 Gambar-gambar Perencanaan

5IK-SB/001/02 001Daftar Simak Instruksi Kerja Pengukuran

6PR-SB/001/01 005Daftar Simak Prosedur Rekayasa Lapangan

7PR-SB/000/01 001Daftar Simak Prosedur Mobilisasi/Demobilisasi

8IK-SB/001/01 002Daftar Simak Instruksi Kerja Request Pekerjaan

9IK-SB/003/03 001Daftar Simak Instruksi Kerja Pasangan Batu

10IK-SB/003/01 002Daftar Simak Instruksi Kerja Galian Tanah

11IK-SB/003/02 002Daftar Simak Instruksi Kerja Galian Tanah Dasar

12IK-SB/003/04 001Daftar Simak Instruksi Kerja Timbunan

13IK-SB/012/01 018Daftar Simak Instruksi Kerja Pembesian

14IK-SB/012/02 009Daftar Simak Instruksi Kerja Pengecoran

15IK-SB/009/01 002Daftar Simak Instruksi Kerja Prime Coat / Tack Coat

16IK-SB/009/02 001Daftar Simak Instruksi Kerja Pekerjaan Hotmix

Q1

SELESAI

PPK

KONTRAKTOR

KONSULTAN PENGAWAS

General Superintendent

Ir. Joni

HOTMIX (ACL)

Site Manager

Ir. Sunirno

Urusan Teknik

Dwipanto

Kepala Pelaksana

Iganov

Pelaksana

Jahadi

P7

Keuangan

Sulono

PENGUKURAN

Q4

P2JJ Sumsel

Administrasi Teknik

Hentris

SNVT

MOBILISASI

TACK COAT

P12

Pengukuran

Tulimad

P1

REKAYASA LAPANGAN

MULAI

TIDAK

Logistik & Peralatan

Gumara

Umum & Personalia

Rasta

YA

YA

YA

HOTMIX (ATB)

REQUEST KERJA

GALIAN TNH DSR

GALIAN TANAH

TIDAK

Q3

YA

TIDAK

Q2

PASANGAN BATU

YA

TIDAK

Urusan Adminstrasi

Warsiyo

P2

P3

P4

P5

P6

YA

TIDAK

TIDAK

TIDAK

Q12

TIDAK

TIDAK

Q12

YA

Q5

TIDAK

Q8

YA

YA

Q9

TIDAK

Q5

Q11

TIDAK

Q10

TIDAK

Q6

P5

TIDAK

P10

P9

PASANGAN BATU

CTSB

PEMBESIAN

TIDAK

Q7

P8

P11

P10

TIMBUNAN BAHU

PRIME COAT

PENGECORAN

YA

YA

YA

Q11

YA

YA

P12

P11