1 KEMENTERIAN PEKERJAAN UMUM DIREKTORAT JENDERAL BINA MARGA BALAI BESAR PELAKSANAAN JALAN NASIONAL II SATUAN KERJA NON VERTIKAL PRESERVASI JALAN DAN JEMBATAN PROPINSI LAMPUNG Alamat : Jalan Wolter Monginsidi No. 220 Tel/Fac. (0721) E-mail pemeliharaanlampung@yahoocom LARAP STUDY (Land Acquisition and Resettlement Action Plan) PRESERVASI JALAN BIHA-KRUI KABUPATEN LAMPUNG BARAT PROPINSI LAMPUNG MARET 2011 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

Upload: truongminh

Post on 26-Feb-2018

244 views

Category:

Documents


6 download

TRANSCRIPT

 

 

KEMENTERIAN PEKERJAAN UMUM DIREKTORAT JENDERAL BINA MARGA BALAI BESAR PELAKSANAAN JALAN NASIONAL II SATUAN KERJA NON VERTIKAL PRESERVASI JALAN DAN JEMBATAN PROPINSI LAMPUNG Alamat : Jalan Wolter Monginsidi No. 220 Tel/Fac. (0721) E-mail pemeliharaanlampung@yahoocom

LARAP STUDY

(Land Acquisition and Resettlement Action Plan)

PRESERVASI JALAN BIHA-KRUI

KABUPATEN LAMPUNG BARAT

PROPINSI LAMPUNG MARET 2011

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

wb231615
Typewritten Text
RP1040v12
wb231615
Typewritten Text
wb231615
Typewritten Text
wb231615
Typewritten Text

 

DAFTAR ISI

ContentsI.   DISKRIPSI PROYEK ............................................................................................................... 1 

II.   SOSIAL EKONOMI SURVEY DAN INVENTARISASI ASET ............................................. 2 

III.   KEBIJAKAN PEMBEBASAN LAHAN DAN PEMUKIMAN KEMBALI ............................ 3 

IV.   KONSULTASI DENGAN MASYARAKAT ........................................................................... 4 

V.   TANGGUNG JAWAB KELEMBAGAAN DAN PROSEDUR PENANGANAN KELUHAN ……………………………………………………………………………………………………………………………………...5 

VI.  MONITORING DAN PELAPORAN ........................................................................................ 6 

VII.  JADWAL IMPLEMENTASI DAN PEMBIAYAAN ............................................................... 7 

Lampiran 1: RENCANA KERJA PENGADAAN TANAH, PEMUKIMAN KEMBALI ..................... 8 

Lampiran 2: PETA LOKASI ................................................................................................................ 14 

Lampiran 3: DATA MASYARAKAT YANG TERKENA – WARGA DAN ASET YANG TERKENA ............................................................................................................................................ 15 

Lampiran 4: INFORMASI PROYEK DAN JUMLAH KOMPENSASI .............................................. 24 

Lampiran 5: SURAT PEMBENTUKAN TIM PENILAH HARGA TANAH ......................................... 28 

Lampiran 6: HASIL PENILAIAN HARGA TANAH DARI TIM PENILAI HARGA TANAH ............ 31 

Lampiran 7: PENETAPAN HARGA TANAMAN OLEH DINAS PERTANIAN ............................. 33 

Lampiran 8: HARGA PEMINDAHAN / PENGGANTIAN KONSTRUKSI BANGUNAN OLEH DINAS PU……………………………………………………………………………………………………………………………………………………35 

Lampiran 9 : SOSIALISASI / WORKSHOP DI PEMERINTAHAN ..................................................... 37 

Lampiran 10 : BERITA ACARA SOSIALISASI DI KECAMATAN .................................................... 40 

Lampiran 11 : BAGAN ALIR MEKANISME PENYAMPAIAN KELUHAN DAN KOMPLAIN ... 44 

Lampiran 12: FORMULIR BERITA ACARA PERTEMUAN ............................................................ 45 

Lampiran 13: FORMULIR MONITORING BULANAN PELAKSANAAN LARAP ........................ 46 

Lampiran 14 : SURAT PERINTAH PEMASANGAN PENGUMUMAN DAFTAR WARGA terkena PROYEK.. ............................................................................................................................................ 47

 

 

I. DISKRIPSI PROYEK

1. Latar Belakang. Preservasi jalan Biha – Krui ini merupakan sub proyek dari Western Indonesia National Road Improvement Project (WINRIP). Biha-Krui Proyek (dalam laporan ini disebut sebagai “Proyek”) terletak di kabupaten Lampung Barat, Provinsi Lampung. Peta lokasi dapat dilihat di Lampiran 2. Dimana panjang proyek ini adalah 25,040 km yang merupakan jalan Nasional yang menghubungkan 3 (tiga) kecamatan, yakni Kecamatan Pesisir Tengah, Kecamatan Krui Selatan dan Kecamatan Pesisir Selatan. Detail informasi dari kecamatan-kecamatan ini terdapat dalam Table 1.1. Sedangkan rangkuman dari informasi dari kegiatan yang direncanakan selama proyek ini pada Tabel 1.2

Tabel 1.1 Kecamatan dan Desa dalam Preservasi Jalan Biha – Krui No Nama Kecamatan Nama Desa / Kelurahan I

Pesisir Tengah

Kelurahan Pasar Krui Pekon Kampung Barat Pekon Serai Pekon Way Redak

II

Krui Selatan

Pekon Pemerihan Pekon Sukajadi Pekon Lintik Pekon Padang Haluan Pekon Way Napal Pekon Padang Raya Pekon Way Suluh Pekon Mandiri Sejati Pekon Balai Kencana

III

Pesisir Selatan

Pekon Tulung Bamban Pekon Ratu Negri Tenembang Pekon Sukarame Pekon Pelita Jaya Pekon Sumur Jaya Pekon Pagar Dalam Pekon Tanjung Setia Pekon Biha

Tabel 1.2 Uraian rencana kegiatan peningkatan jalan Biha – Krui

Uraian Eksisting Rencana Kegiatan Panjang Ruas 25,040 km 25,040 km Lebar Perkerasan 4 – 6 m 7 m RUMIJA 7,0 – 12,0 11,000 – 13,000

2. Berdasarkan dokumen kesepakatan peminjangan yang ditandatangani oleh World Bank dan pemerintah Indonesia, dalan setiap peningkatan jalan yang memerlukan tambahan pembebasan lahan, Land Acquisition and Resettlement Plan (LARAP) harus disiapkan berdasarkan peraturan World Bank. Tujuan dari LARAP adalah:

Mengumpulkan informasi dari kondisi sosial dan ekonomi dari Warga Terkena Proyek (WTP) yang dimana lahan atau asetnya terkena oleh proyek, dan untuk mengumpulkan aspirasi dari masyarakat lokal mengenai proyek tersebut, dan juga kompensasi yang mereka inginkan atas aset yang terkena oleh proyek tersebut;

Menyiapkan alternatif kebijakan untuk pembebasan lahan dan pemukiman kembali para WTP;

Menyiapkan rencana kerja untuk pembebasan lahan dan pemukiman kembali sesuai dengan aturan dan aktifitas yang direncanakan untuk proses pembebasan lahan dan pemukiman kembali para WTP.

 

II. SOSIAL EKONOMI SURVEY DAN INVENTARISASI ASET

3. Indentifikasi atas Warga Terkena Proyek dan Aset. Survey sensus telah dilaksanakan dari 12 sampai 16 Januari 2011. Ini merupakan tanggal yang paling treakhir dari data mengenai WTP yang berhak atas kompensasi, bantuan pemukinam kembali dan bantuan mengembalikan kehidupan sehari-hari. Pada kasus dimana terdapat jeda waktu antara persetujuan LARAP dan implementasi WINRIP proyek/sub-proyek dibawah WINRIP, Panitia Pengadaan Tanah akan melakukan verifikasi dari situasi terkini berdasarkan list dari warga yang terkena dan asset dari survey. Detail rangkuman dari penduduk local dan asset yang terkena proyek terdapat dalam Table 2.1. Dari 156 plot total tanah yang terkena, rata rata luas terkena 3,2% dimana sebagian besar tanah tersebut merupakan tanah perkarangan yang tidak produktif. Dari total tanah yang terkena, 35 plot merupakan tanah sawah dengan luas rata rata terkena 2,83%. Terdapat beberapa rumah yang terkena kurang dari 10% dari luas bangunan yang sekarang, dan kebanyakan dari area yang terkena adalah area yang tidak produktif, contohnya pekarangan depan yang menghadap jalan. Dari 156 yang terkena, 111 memiliki sertifikat, 20 yang tradisional (Tipe C), dan 25 tidak bersertifikat.

Tabel 2.1 Rangkuman dari Warga dan Aset yang Terkena Proyek No Uraian Satuan

A Jumlah WTP 155 KK B Tanah yang akan dibebaskan : 1 Luas tanah 6.345,17 m2 2 Bidang tanah yg akan di bebaskan ; 156 plot a. Milik Perseorangan 144 plot b. Milik Negara / Umum 12 plot 3 Jumlah Pemilik tanah yg tanahnya : a. Di bebaskan seluruhnya 0 b. Dibebaskan sebagian 156 plot C Bangunan yang terkena : 15 unit (70,3 m2) a. Seluruhnya 0 b. Sebagian 15 unit 1. Kepemilikan bangunan Perseorangan 15 unit (56,3 m2) a. Permanen 11 unit (46,71 m2) b. Semi permanen 1 unit (2,5 m2) c. Non Permanen / Darurat 3 unit (7,09 m2) d. Pagar Permanen / Tembok 39 unit (422,7 m2) e. Pagar Semi Permanen 1 unit (4,98 m2) f. Pagar Non Permanen / Kayu 3 unit (37,4 m2) 2. Kepemilikan bangunan Institusi / Umum - a. Pagar Permanen / Tembok 12 unit (480 m2) 3. Tanaman

a. Jambu Air b. Pisang c. Sirsak d. Belimbing e. Alpukat f. Lengkeng g. Mangga h Kelapa i. Tanaman Padi

10 pohon 2 rumpun 2 pohon 8 pohon 3 pohon 1 pohon 4 pohon 1 pohon 6.711 rumpun

4. Dari 15 unit bangunan yang terkena, 7 unit merupakan bangunan tempat tinggal (rumah sebagai tempat tinggal) dengan luas terkena rata rata 4,84%. 4 Unit bangunan yang terkena digunakan untuk tempat usaha (berupa warung makanan kecil dan bengkel), dari ke 4 unit tersebut 2 unit berbentuk bangunan permanen, 1 unit bangunan semi permanen dan 1 unit bangunan tidak permanen,

 

dengan luas terkena rata rata 9,72%. Bangunan yang digunakan sebagai tempat tinggal dan usaha (digunakan usaha bengkel,kios buku dan lain lain) sebanyak 4 unit dengan rata rata terkena 2,90%. Sisa bangunan terkena masih bisa digunakan untuk melakukan kegiatan ekonomi karena luasnya masih layak sehingga tidak harus pindah. Dari total bangunan yang terkena, 3 merupakan bangunan non permanen (bangunan yang terbuat dari kayu dan kondisinya sudah reot), 1 unit merupakan bangunan semi permanen (sebagian berupa kayu dan sebagian berupa bata) dan sisanya merupakan bangunan permanen (terbuat dari tembok/bata). Semua bangunan yang terkena diatas merupakan milik perorangan

5. Asset lain milik perorangan yang terkena, berupa pagar dan tanaman (mangga, padi, jambu, sirsak, dan lain lain). Asset milik institusi/umum yang terkena (kantor pemerintah, rumah ibadah, sekolah dan lain lain) berupa pagar. Aset lain yang terkena adalah tiang listrik dengan jumlah 20 buah dan harus dipindahkan. Deatil data warga dan aset terkena dapat dilihat pada lampiran 3.

III. KEBIJAKAN PEMBEBASAN LAHAN DAN PEMUKIMAN KEMBALI

6. Penyusunan LARAP ini berdasarkan kebijakan yang telah disepakati bersama oleh pemerintah Indonesia dan World Bank mengenai pembebasan lahan dan pemukiman kembali yang ditetapkan dalam Petunjuk untuk Environmental and Social Management Framework (ESMF).

7. Panitia Pengadaan Tanah (PPT) kabupaten Lampung Barat menawarkan berbagai alternative kompensasi kepada warga yang terkena proyek, yaitu uang tunai, tanah pengganti dengan kavling siap bangun dan bangunan pengganti. Atau bentuk lain yang sesuai dengan keinginan warga yang terkena proyek. Ketika dilaksanakan survey sensus seluruh warga menginginkan penggantian berupa uang tunai.

8. Besaran kompensasi yang ditawarkan pada warga oleh Panitia Pembebasan Tanah adalah :

Sesuai dengan kesepakatan Pemerintah dengan bank Dunia, yakni besaran kompensasi untuk tanah terkena diganti berdasarkan harga pasar. Sesuai dengan Perpres 36/2005, Perpres 65/2006 dan aturan Kepala BPN No. 3/2007, Penentuan harga pasar ini akan dilakukan dengan menggunakan harga pasar dari Tim Penilai Harga Tanah yang dibentuk oleh Bupati Lampung Barat (surat pembentukan lihat lampiran 5). Penilaian harga tanah dari Tim Penilai Harga tanah akan menjadi basis dalam melakukan negosiasi/musyawarah antara pemerintah dan warga terkena proyek (hasil penilaian harga tanah lihat lampiran 6). Biaya-biaya registrasi dan biaya transfer akan dibayarkkan oleh pemerintah

Untuk tanah yang berupa sawah, kompensasi tidak hanya diberikan untuk tanah terkena tetapi juga rumpun padi yang terkena dengan nilai Rp 5.000,-- per rumpun (berdasarkan Surat Dinas Pertanian Kabupaten Lampung Barat, lihat lampiran 7). Penghitungan rumpun padi yang terkena berdasarkan luas sawah yang terkena dikalikan 16 (angka 16 adalah jumlah rumpun per m2,1 m2 = 16 rumpun).

Kompensasi terhadap bangunan diberikan sesuai dengan kondisi bangunan dan sesuai harga pasar material bangunan, meliputi antara lain bangunan rumah tinggal, bangunan usaha, pagar yang pembuatannya memerlukan biaya dan investasi. Penghitungan tersebut dilakukan tanpa menghitung nilai depresiasi bangunan. Setiap bangunan yang terkena pembebasan akan dibongkar setelah dilakukan pembayaran kompensasi selesai dibayarkan serta sisa pembongkaran merupakan hak dari Warga Terkena Proyek untuk mengambilnya. Penilaian kondisi bangunan/pagar permanen (bangunan/pagar yang seluruhnya terbuat dari beton), bangunan/pagar semi permanen (bangunan/pagar yang sebagian terbuat dari beton dan sebagian dari kayu) dan bangunan/pagar non permanen

 

(semua terbuat dari kayu) berdasarkan Surat Dari Dinas Pekerjaan Umum Kabupaten Lampung Barat (lihat lampiran 8)

Kompensasi untuk tanaman yang terkena berdasarkan jenis tanaman yang terkena yang dikeluarkan oleh Dinas Pertanian Lampung Barat (lampiran 7).

Untuk asset pemerintah seperti : tiang listrik yang terkena 20 unit dengan biaya pemindahan sebesar Rp 5 juta / unit

Pemerintah akan menanggung biaya spitzing atau sertifikasi tanah sisa yang dimiliki oleh Warga yang Terkena Proyek, dengan biaya per plot tanah Rp 750.000,--

IV. KONSULTASI DENGAN MASYARAKAT

9. Pada hari Jum’at, 17 Desember 2010 telah dilakukan sosialisasi dalam bentuk pengadaan Workshop mengenai LARPF (Land Acquisition and Resettlement Policy Framework) dalam rangka proses persiapan WINRIP di Kabupaten Lampung Barat yang dihadiri oleh Sekretaris Daerah Lampung Barat, Dinas dinas terkait di Lampung barat, para Camat yang ada di sepanjang ruas Jalan Biha – Krui (berita acara terdapat dalam lampiran 9).

10. Pemerintah Daerah Kabupaten Lampung Barat juga telah melakukan sosialisasi pada tanggal 13 Januari 2011 di 3 kecamatan yang dilalui oleh ruas Jalan Biha – Krui yang dihadiri oleh para Lurah/kepala desa (pratin) memberikan pengarahan dan bantuannya dalam pelaksanaan pembangunan Preservasi Jalan Biha – Krui (berita acara terdapat dalam lampiran 10)

11. Ketika melakukan survey, konsultan pemerintah juga mensosialisasikan tentang rencana pembangunan jalan Biha – Krui dan berkonsultasi secara selintas tentang jenis kompensasi yang diinginkan WTP.

12. Pemda dalam sosialisasi nanti akan menjelaskan dampak positif dan negative dari pembangunan proyek ini dan bagaimana penanganan dampak negative yang ada, termasuk memberikan informasi tujuan proyek ini dilakukan. Proses sosialisasi dan konsultasi akan diatur dan menyakup semua kategori dari WTP, tidak hanya pemilik lahan. Pemda akan menyiapkan alternatif kompensasi dan akan diinformasikan kepada WTP pada saat konsultasi masyarakat (sosialisasi dan musyawarah) yang dilaksanakan sebelum proses pengadaan tanah. Pada konsultasi ini, WTP diberi penjelasan bahwa mereka berhak untuk memilih bentuk kompensasi yang diinginkan dan berhak mendapatkan kompensasi yang layak.

13. Pemerintah daerah akan melakukan konsultasi lanjutan tentang rencana pengadaan tanah, jadwal pengadaan tanah, cara perhitungan kompensasi dan cara pembayaran, mencari kesepakatan dengan WTP tentang jadwal pelaksanaan pengukuran dan perhitungan asset di lapangan. Pemerintah juga akan melakukan musyawarah lanjutan kepada WTP bila belum ditemukan kesepakatan harga dan akan dilakukan sampai beberapa kali sampai ditemukan kesepakatan. Pemda akan mensosialisasikan juga mekanisme penyampaian keluhan dan complain berdasarkan bagan alir yang ada

14. Semua kegiatan sosialisai, konsultasi dan musyawarah akan didokumentasikan menggunakan form yang ada. Form sederhana di lampiran 12 yang memuat catatan di Pemerintah tentang , Lokasi pertemuan, tujuan pertemuan, para pendukung proyek yang hadir, dari kelompok masyarakat mana yang hadir, siapa pemimpin kelompoknya, jumlahnya, isu apa yang di munculkan oleh mereka dan tindakan apa yang mereka sepakati.

 

15. Di keluarkan Surat Perintah Pemasangan Pengumuman oleh Pemda Pemerintah Lampung Barat di kantor – kantor kecamatan yang warganya terkena proyek dan telah dilakukan pemasangan (lampiran 14)

V. TANGGUNG JAWAB KELEMBAGAAN DAN PROSEDUR PENANGANAN KELUHAN

16. Panitia Pengadaan tanah (PPT), Bappeda dan Satuan Kerja Non Vertikal Tertentu (SNVT) untuk Preservasii jalan Biha – Krui Provinsi Lampung akan bertanggung jawab dalam pelaksanaan setiap kegiatan yang terdapat dalam rencana pengadaan tanah, pemukiman kembali dan pemberdayaan. Serta terlibatnya dinas-dinas lain di lingkungan Pemerintah Kabupaten Lampung Barat.

17. Dalam pelaksanaan ini Bupati Lampung Barat sebagai penanggung jawab program akan memfungsionalisasikan Panitia Pengadaan tanah (PPT) yang telah terbentuk untuk suatu proyek pada tahapan pengadaan tanah. Dalam kegiatan ini unsur unsur yang terlibat meliputi : Sekretaris Daerah Kabupaten Lampung Barat, Asisten Bidang Pemeintahan Setdakab Lampung Barat, Dinas Pekerjaan Umum Kabupaten Lampung Barat, Dinas Pertanian Kabupaten Lampung Barat, Bagian Hukum dan Organisasi Setdakab Lampung Barat, Bagian Pemerintahan Umum Setdakab Lampung Barat, Camat yang dilewati preservasi jalan Biha – Krui, pratin atau lurah sepanjang jalan Biha – Krui.

18. Tugas Panitia Pengadaan Tanah (PPT) yakni:

Melaksanakan sosialisasi kepada Warga Terkena Proyek (WTP) mengenai rencana, tujuan manfaat dan berbagai kemungkinan dampak negative yang timbul akibat proyek yang akan dilaksanakan;

Mengadakan penelitian status hukum tanah, bangunan dan asset lain yang terkena proyek;

Melaksanakan pengukuran dan pematokan atas asset yang terkena;

Melakukan penghitungan/inventarisasi asset warga yang akan diberi kompensasi;

Mengumumkan hasil penelitian dan inventarisasi asset bagi warga yang terkena proyek;

Menerima hasil penilian harga tanah dan/atau bangunan dan atau tanaman dan atau asset lain yang terkena dari Tim Penilai Harga Tanah dan pejabat yang bertanggung jawab menilai bangunan dan/atau tanaman dan/atau benda-benda lain yang berkaitan dengan tanah;

Melaksanakan musyawarah agar tercapai kesepakatan dengan WTP mengenai bentuk dan besaran kompensasi;

Menetapkan besarnya ganti rugi atas tanah yang haknya akan dilepaskan atau diserahkan;

Melaksanakan pembayaran kompensasi kepada WTP;

Memfasilitasi pelaksanaan kegiatan perubahan status hukum atas tanah dan bangunan terkena proyek;

Menampung setiap keluhan, keberatan dan usulan dari WTP untuk kemudian di musyawarahkan upaya pemecahannya serta hasilnya di publikasikan;

 

Membuat laporan pelaksanaan RK-PTPKP setiap bulan selama rentang masa kerjanya;

Menyerahkan laporan pelaksanaan RK-PTPKP kepada Bupati Lampung Barat, Tim Monitoring dan Pelaporan, dan WINRIP;

19. WTP yang tidak puas atas pelaksanaan kegiatan pengadaan tanah dan pemukiman kembali maka dapat mengajukan keluhan, keberatan atau usulan kepada Pemerintah Kabupaten Lampung Barat sebagai penanggung jawab program.

20. Keluhan, keberatan dan usulan tersebut dapat disampaikan langsung atau melalui surat menyurat ke alamat Bappeda, ke PPT dan Bagian Perlengkapan Sekretariat Daerah di Kantor Bupati lampung Barat, Jalan Raden Intan II No. 1 Way Mengaku, Liwa 34811, telp/fax : (0728)21147 serta kepada Kepala Satuan Kerja Non Vertikal (SNVT) Pembangunan Jalan dan Jembatan Provinsi Lampung, Jalan Wolter Mongonsidi No. 220. Telp/Fax: (0721) 487102, Email: [email protected].

21. Mekanisme penanganan keluhan, keberatan ataupun usulan terhadap pelaksanaan LARAP diproses melalui tahapan sebagai berikut (lihat Lampiran 11):

a. Berdasarkan keluhan, keberatan dan usulan yang disampaikan WTP, maka Pemerintah Daerah dan WINRIP melalui Ketua Bappeda, Kepala SNVT pembangunan Jalan dan jembatan Provinsi Lampung dan Tim Monitoring dan Pelaporan untuk melakukan penelitian. Hasil penelitian dan investigasi tersebut akan di informasikan kepada warga Terkena Proyek (WTP) paling lambat dalam jangka waktu 12 hari untuk kemudian di musyawarahkan dengan WTP untuk diupayakan pemecahannya berdasarkan prinsip saling menguntungkan.

b. Penyelesaian masalah atau penanganan atas keluhan, keberatan dan usulan akan didokumentasikan dan dapat di akses secara terbuka oleh masyarakat. Untuk memudahkan masyarakat umum, khususnya WTP dalam meng akses informasi tersebut maka hasilnya akan di sebar luaskan melalui ruang public yang tersedia, seperti papan pengumuman di kantor proyek, kantor Pemda dan kantor pekon (desa)/kelurahan. Proses ini dapat dilihat di Lampiran 11.

22. Jika ada permasalahan tidak terpecahkan yang lebih dari 1 tahun antara WTP dan Pemerintah daerah maka sub-proyek akan dikeluarkan dari program WINRIP atau sub-proyek akan mencari alternative lain untuk menanganinya.

VI. MONITORING DAN PELAPORAN

23. Tim Monitoring dan Pelaporan, dibentuk oleh pemerintah Kabupaten Lampung Barat pada saat akan dimulainya pelaksanaan Rencana kerja (work plan) Pengadaan Tanah. Tim ini beranggotakan dari unsur Pemerintah Kabupaten Lampung Barat (BAPPEDA), unsur Perguruan Tinggi atau Lembaga Swadaya Masyarakat (LSM) dan unsur masyarakat (WTP).

24. Kegiatan Monitoring dan Pelaporan dilakukan dengan tujuan untuk mengawasi pelaksanaan program pengadaan tanah agar dilakukan sesuai dengan rencana, tujuan dan keluaran yang diharapkan.

25. Deskripsi tugas Tim Monitoring dan Pelaporan :

Tim Monitoring dan Pelaporan akan melakukan kegiatan pengawasan pe laksanaan program sebagaimana yang tercantum dalam rencana kerja (work plan) yang meliputi kegiatan sosialisasi dan konsultasi masyarakat dan pengadaan tanah;

 

Tim Monitoring dan Pelaporan akan melakukan koordinasi setiap bulan dengan Panitia Pengadaan Tanah (PPT), bappeda dan Proyek, untuk mendiskusikan permasalahan dan kendala yang dihadapi beserta upaya penanggulangannya, khususnya yang terkait dengan penyelesaian keluhan / keberatan dari WTP;

Membuat laporan bulanan (gunakan lampiran 13) kemajuan pelaksanaan program setiap bulan dengan menggunakan formulir pelaporan yang dikirimkan kepada WINRIP dengan tembusan kepada Bappeda dan Satuan Kerja Non Vertikal (SNVT) Pembangunan Jalan dan Jembatan Provinsi Lampung dan Unit Social Safeguard bank Dunia. Kegiatan monitoring akan terus berlanjut sampai semua RAP selesai, termasuk sertifikasi.

VII. JADWAL IMPLEMENTASI DAN PEMBIAYAAN

26. Kegiatan pengadaan tanah dimulai bulan Maret 2011 sampai dengan Oktober 2011. Jumlah keseluruhan biaya untuk pembebasan ini Rp 2.701.649.799,--. Estimasi biaya pengadaan tanah dihitung dengan menggunakan harga pasar yang dibuat oleh Tim Penilai Harga Tanah di Kabupaten Lampung Barat, untuk penentuan nilai harga bangunan dan pagar yang dikeluarkan oleh Dinas Pekerjaan Umum Kabupaten Lampung Barat, untuk penilaian harga tanaman adalah harga yang dikeluarkan oleh Dinas Pertanian Kabupaten Lampung Barat. Pembiayaan sepenuhnya berasal dari Pemerintah daerah Kabupaten lampung Barat. Lebih jelasnya dapat dilihat pada matriks Rencana Kerja (work plan) pada Lampiran 1.

14 

 

Lampiran 2: PETA LOKASI

15 

 

Lampiran 3: DATA MASYARAKAT YANG TERKENA – WARGA DAN ASET YANG TERKENA  

       Tanah (m2)    Bangunan (m2)   Pagar (m2) 

                %   Harga/       Ter ‐       %   Hrg/                   

NO NAMA WTP Sblm  Terkena  Sisa  Ter  m2  Fungsi  Sblm  kena  Sisa  Terkena  m2  Kondisi  Fungsi  Terkena  Kondisi Harga/m

2  Jumlah 

                kena  (Rp000)             (Rp000

)       (Rp000

)  (Rp000) 

A KEC. PESISIR TENGAH                                                    

  Kelurahan Pasar Krui :                                                    

1  SMP Negeri 1 *  2000  16.065 1983.93

5  0.8%      600   TT                       17.85  P  1,284.7         22,932  

2  Akmal  150  3.99  146.01  2.7%      600   TT  150  3.99  146.01  2.7%     1,326.5   NP    TT   ‐  ‐       

3  Muzakir  200  6.375  193.625  3.2%      600   TT  200 6.37

5  193.625  3.2%        2,653    P     TT   ‐  ‐       

4  Iskandar Batubara  732  34.77  697.23  4.8%      600   TT  150 14.2

5  135.75  9.5%        2,653    P     TT              

5  Kejaksaan Negri*  700  5.8  694.2  0.8%      600   TK                       21.75  P  1,284.7         27,942  

6  Matbarazi  150  2.08  147.92  1.4%      600  TT &TU  150  1.6  148.4  1.1% 

    1,326.5   NP  

TT & TU              

7  Anwar Yahya  230  12.32  217.68  5.4%      600   TT                       23.1  P  1,284.7         29,677  

8  Siti / Tanjung Ahsan  120  8.47  111.53  7.1%      600   TT  120  8.47  111.53  7.1%        2,653    P    TT              

9  H Riprin Buhsir  400  14  386  3.5%      600   TT                                  

10  H Johan  154.5  18.54  135.96 12.0

%      600   TT                                  

11  Drs H Rosidi  93  5.58  87.42  6.0%      600   TT                                  

12  Subartini  90  3.24  86.76  3.6%      600   TT                                  

13  Sutoyo  132.5  23.1875 109.312

5 17.5

%      600   TT                       7.4  P  1,284.7           9,507  

14  H Yahya  90  2.7  87.3  3.0%      600   TT                                  

15  Hendra Turing  63  6.72  56.28 10.7

%      600   TT                                  

16 

 

16 UPT Dinas Pendidikan*  245  6.25  238.75  2.6%      600   TK                       12.5  P  1,284.7         16,059  

17  H Dahlan  400  3.1  396.9  0.8%      600   TT                       6  P  1,284.7           7,708  

18  Yulita Ningsih  300  4.8  295.2  1.6%      600   TT                       6  P  1,284.7           7,708  

19  Aria Lukita Budiman  350  8.8  341.2  2.5%      600   TT                                  

20  Nusirwan  450  12  438  2.7%      600  TT & TU  30  2.76  27.24  9.2% 

       2,653    P    TU              

21  Ali Muhtar  300  18.75  281.25  6.3%      600   TT                       12.5  P  1,284.7         16,059  

   Total        7,350.0          217.5  

     7,132.5   3.0%       

    800.0  

  37.4        762.6   4.7%             107.1           137,591.4  

  Pekon Kampung Jawa                                                    

22  Kasdik  210  12.6  197.4  6.0%      300   TT                       4.98  SP  906.29            4,513  

23  Palepi  684  11.7  672.3  1.7%      300   TT                                  

24  Patomi  200  5.2  194.8  2.6%      300   TT  90  2.6  87.4  2.9%        2,653    P    TT              

25  Nasrunawan  119  7.73  111.27  6.5%      300   TT                                  

26  Siti  160  10.4  149.6  6.5%      300   TT                                  

27  Janati  100  6.5  93.5  6.5%      300   TT                                  

28  Sarjono  150  6.5  143.5  4.3%      300   TT                       4.5  P  1,284.7           5,781  

29  Cici Sofiah  147  6.37  140.63  4.3%      300   TT                       14.7  NP  647.35            9,516  

30  Alip Padli  147  6.37  140.63  4.3%      300   TT                       17.7  NP  647.35          11,458  

31  Pahrowi  135  10.8  124.2  8.0%      300   TT                                  

32  Fauzan  153  12.24  140.76  8.0%      300   TT                                  

33  Firli  151  6.06  144.94  4.0%      300   TT                       15.15  P  1,284.7         19,463  

34  Wahid  120  9.6  110.4  8.0%      300   TT                                  

35  Agus Waluyo  123  9.84  113.16  8.0%      300   TT  85  5.52  79.48  6.5%        2,653    P    TT              

36  Syukur Yakub  172  10.32  161.68  6.0%      300   TT                       12.9  P  1,284.7         16,573  

17 

 

37  Nurmal  262  15.72  246.28  6.0%      300   TT                       12.9  P  1,284.7         16,573  

38  H Nizar (Alpha Mart)  414  16.56  397.44  4.0%      300   TU                                  

39  Abdul Sani  157.5  10.5  147  6.7%      300   TT                                  

40  H Junaedi  234  11.7  222.3  5.0%      300   TT                                  

41  Hasan  Bakri  250  5  245  2.0%      300   TT                       15  P  1,284.7         19,271  

42  Palian  720  12  708  1.7%      300   TT                                  

43  H Yarni  700  22.4  677.6  3.2%      300   TT                       16.8  P  1,284.7         21,583  

44  H Muhlis  200  5.5  194.5  2.8%      300   TT                       16.8  P  1,284.7         21,583  

45  Hasan Daulai  150  4.2  145.8  2.8%      300   TT                       1.65  P  1,284.7           2,120  

46  belpan  236  40.85  195.15 17.3

%      300   TT                       40.85  P  1,284.7         52,480  

47  Rudi Halmin  300  23.25  276.75  7.8%      300   TT                       3.75  P  1,284.7           4,818  

48  Stahaba Sutaryo  250  20.74  229.26  8.3%      300   TT                                  

49  Akwaludin  250  4.1  245.9  1.6%      300   TT                                  

50  Perijadi  360  8  352  2.2%      300   TT                       8  P  1,284.7         10,278  

51  iskandar Lazim  350  8  342  2.3%      300   TT                       8  P  1,284.7         10,278  

52  Syarif Ridwan  300  11.7  288.3  3.9%      300   TT                                  

53  Syamsu Hilal  140  8.55  131.45  6.1%      300   TT                                  

54  Majida  150  12.45  137.55  8.3%      300   TT                                  

55  Suheri  250  5.95  244.05  2.4%      300   TT                       17.85  P  1,284.7         22,932  

56  Iskandar Anas  200  13.05  186.95  6.5%      300   TT                                  

57  Junot  200  9.75  190.25  4.9%      300   TT                                  

58  Masjid Asobiriah*  1000  11.25  988.75  1.1%      300   TT                       33.75  P  1,284.7         43,359  

59  Supoyo  300  8.5  291.5  2.8%      300   TT                       25.5  P  1,284.7         32,760  

60  Ikrom  250  3.75  246.25  1.5%      300   TT                       3.75  P  1,284.7           4,818  

18 

 

61  Hendrik  230  5  225  2.2%      300  TT & TU  7.5  2.5  5  33.3% 

       1,867    SP    TU              

62  Kamiso  200  2.75  197.25  1.4%      300   TT                                  

63  Badraini  300  5.1  294.9  1.7%      300   TT                                  

64  Sudirman H  150  5.15  144.85  3.4%      300   TT                                  

65  Baharudin  150  3.75  146.25  2.5%      300   TT                                  

66  Fahrul Rozi  210  4.25  205.75  2.0%      300   TT                       8.5  P  1,284.7         10,920  

67  Azmil  200  6  194  3.0%      300  TT & TU  8  0.6  7.4  7.5% 

       2,653    P  

TT & TU              

68  Ridwan  175  2.1  172.9  1.2%      300   TT                                  

69  Nurul Ahmad  150  3  147  2.0%      300   TT                                  

70  Thamrin  150  3  147  2.0%      300   TT                                  

71  Muzakir  220  5  215  2.3%      300   TT                       10.5  P  1,284.7         13,489  

72  Amirudin  200  3.75  196.25  1.9%      300   TT                       9.5  P  1,284.7         12,205  

73  M Barza  225  4  221  1.8%      300   TT                       8.0  P  1,284.7         10,278  

   Total      12,954.5          478.6  

   12,476.0  3.7%       

    190.5  

  11.2        179.3   5.9%             311.0           377,045.6  

   Pekon Seray :                                                    

74  Tri Heri  210  1.47  208.53  0.7%      250   TT  75  0.92  74.08  1.2%        2,653    P    TT              

75  H Asrul Sani  200  12  188  6.0%      250   TT                       12.0  P  1,284.7         15,416  

76  Jauhari  240  12  228  5.0%      250   TT                                  

77  Surawan  336  47.04  288.96 14.0

%      250   TT                                  

78  Katimum  160  22.4  137.6 14.0

%      250   TT                                  

79  Bilhusni  208  29.12  178.88 14.0

%      250   TT                                  

80  Mat   260  32.5  227.5 12.5

%      250   TT                                  

81  Ruslan  175  25  150 14.3

%      250   TT                                  

82  Wahidin  140  20  120  14.3     250   TT                                  

19 

 

%

83  Abdul Syukur  780  32.5  747.5  4.2%      250   TT                                  

84  Masri Efendi  135  22.5  112.5 16.7

%      250   TT                       13.5  P  1,284.7         17,343  

85  Anazir  170  21.25  148.75 12.5

%      250   TT                                  

86  Abdul Syukur  237.5  23.75  213.75 10.0

%      250   TT                                  

87  Riswar  135  9  126  6.7%      250   TT                                  

88  Rasnun   157.5  10.5  147  6.7%      250   TT                                  

89  Sukandar Jaya  140  7  133  5.0%      250   TT                                  

90  Fahroni  106  5.3  100.7  5.0%      250   TT                                  

91  H Firdaus  260  57.75  202.25 22.2

%      250  TT & TU  20.8  2.04  18.76  9.8% 

       2,653    P  

TT & TU              

92  Muprin  200  30.1  169.9 15.1

%      250   TT                                  

93  H Nurdin  225  42  183 18.7

%      250  TT & TU  24  1.64  22.36  6.8% 

       2,653    P  

TT & TU              

94 Masjid Oniaturahman*  175  20.8  154.2 

11.9%      250   TI                       16.0  P  1,284.7         20,555  

95  H Asrul Sani  255  66  189 25.9

%      250   TT                                  

96  H Azuiardi  219  54  165 24.7

%      250   TT                                  

97  Nazri  180  28.5  151.5 15.8

%      250   TT                                  

98  Tambat Ihwan  350  28.5  321.5  8.1%      250   TT                                  

99  Harmain  215  27  188 12.6

%      250   TT                                  

100  Hasan Nuralip  400  53.4  346.6 13.4

%      250   TT                                  

   Total        6,269.0          741.4  

     5,527.6  

11.8%       

    119.8  

    4.6        115.2   3.8%               41.5             53,315.1  

   Total Kecamatan     26,573.5       1,437.5  

   25,136.0  5.4%       

 1,110.3  

   53.3     1,057.0   4.8%             459.6           567,952.0  

   KEC. KRUI SELATAN                                                    

   Pekon Pemerihan                                                    

20 

 

101  Suwardi          5,250            73.1  

        5,177   1.4%      150   SWH                                  

102  Zulfikar          4,500          210.7  

        4,289   4.7%      150   SWH                                  

103  Zulfikar          5,400            55.9  

        5,344   1.0%      150   SWH                                  

104  Zezali          4,950          120.0  

        4,830   2.4%      150   SWH                                  

105  H Bustaman          5,250          105.0  

        5,145   2.0%      150   SWH                                  

106  H Rudin          4,780          122.5  

        4,658   2.6%      150   SWH                                  

107  Thamrin           4,000          122.5  

        3,878   3.1%      150   SWH                                  

108  Yub Bahar          3,500          119.0  

        3,381   3.4%      150   SWH                                  

109  Syafi'i          4,200          119.0  

        4,081   2.8%      150   SWH                                  

110  H Husni          3,300            67.5  

        3,233   2.0%      150   SWH                                  

   Total        45,130          1,115  

      44,015   2.5%       

           ‐  

        ‐                ‐                         ‐                          ‐  

  Pekon Mandiri Sejati                                                        

111  M Razi          5,250          246.0  

        5,004   4.7%      150   SWH                                  

112  Edi Sumaryadi          3,200          150.0  

        3,050   4.7%      150   SWH                                  

113  Sarpan AR          5,000            51.0  

        4,949   1.0%      150   SWH                                  

114  Amar Hakim          5,400          111.0  

        5,289   2.1%      150   SWH                                  

115  Fatimah          4,900            45.0  

        4,855   0.9%      150   SWH                                  

116  M Bakri          3,500          240.0  

        3,260   6.9%      150   SWH                                  

117  H Sidik          4,850          357.0  

        4,493   7.4%      150   SWH                                  

118  Sajumrat          5,600            48.0  

        5,552   0.9%      150   SWH                                  

119  Syarifudin          4,500            96.0  

        4,404   2.1%      150   SWH                                  

120  Nurmal          4,750                       1.7%      150   SWH                                  

21 

 

81.0   4,669 

121  M Puani          5,200          132.0  

        5,068   2.5%      150   SWH                                  

122  Sudirmansyah          3,500          123.0  

        3,377   3.5%      150   SWH                                  

123  Fuani          3,800            54.0  

        3,746   1.4%      150   SWH                                  

124  M Zaili          3,950            30.0  

        3,920   0.8%      150   SWH                                  

125  Zumrah          4,150            84.0  

        4,066   2.0%      150   SWH                                  

126  Iskandarsyah          3,500          210.0  

        3,290   6.0%      150   SWH                                  

   Total        71,050          2,058  

      68,992   2.9%       

           ‐  

        ‐                ‐                         ‐                          ‐  

   Pekon Padang Raya                                                    

127  Mesjid Athohiriah*  1568  24.5         1,544   1.6%      150   TI     0                 73.5  P  1,284.7         94,425  

   Total  1568  24.5  1543.5  1.6%                             73.5          94,425.45  

   Pekon Way Suluh                                                    

128 SD Negri Way Suluh*  1800  45.0 

        1,755   2.5%      150   TI                       90.0  P  1,284.7       115,623  

   Total  1800  45.0  1755  2.5%           0                 90             115,623  

   Total Kecamatan      119,548          3,243  

    116,305   2.7%       

           ‐  

        ‐                       164              210,048  

  KEC.PESISIR SELATAN                                                    

  Pekon Tulung Banban                                                    

129  Parni          4,300   105.0         4,195   2.4%        90   SWH                                  

130  Ali Akbar          5,200   37.5         5,163   0.7%        90   SWH                                  

131  H baidal          4,150   165.0         3,985   4.0%        90   SWH                                  

132  Joni          3,850   142.5         3,708   3.7%        90   SWH                                  

133  Widawati          4,250   33.0         4,217   0.8%        90   SWH                                  

134  Masjid Al Amal*             750   20.0              2.7%        90   TI                       45.0  P           57,812  

22 

 

730  1,284.7 

   Total        22,500             503  

      21,997   2.2%          

        ‐                         45                57,812  

  Pekon NR Tenembang                                                    

135  M Razi HR          5,600          240.0  

        5,360   4.3%      100   SWH                                  

136  Rahman hakim          4,500          240.0  

        4,260   5.3%      100   SWH                                  

137  Al Qodri          4,750          150.0  

        4,600   3.2%      100   SWH                                  

138  Masjid Nurul Iman*          1,200            20.0  

        1,180   1.7%      100   TI                       60.0  P  1,284.7         77,082  

   Total        16,050             650  

      15,400   4.0%          

        ‐                         60                77,082  

   Pekon Pelita Jaya                                                    

139  Iskandar Hasan          3,750          150.0  

        3,600   4.0%        75   SWH                                  

140  Mesjid Nurul*          1,400            35.0  

        1,365   2.5%        75   TI                       105.0  P  1,284.7       134,894  

   Total          5,150             185  

        4,965   3.6%          

        ‐                       105              134,894  

   Pekon Sumur Jaya                                                    

141  Mesjid Al Manar*  1250  25.0         1,225   2.0%      100   TI                       75.0  P  1,284.7         96,353  

   Total  1250  25.0         1,225   2.0%           0                 75            96,352.5  

   Pekon Pagar Dalam                                                    

142  mesjid Ar Rohman*  700  7.0            693   1.0%      100   TI                       21.0  P  1,284.7         26,979  

   Total  700  7.0  693  1.0%           0                 21            26,978.7  

   Pekon Biha                                                    

143  Jasmi             250            25.0  

           225  

10.0%      125   TT                                  

144  Surya             225            22.5  

           203  

10.0%      125   TT                                  

145  Ihsan             375            25.0  

           350   6.7%      125   TT                                  

146  Iskandar             525            33.8  

           491   6.4%      125   TT                                  

23 

 

147  Rizal             150              8.0  

           142   5.3%      125   TT                                  

148  Sumantri             150            10.0  

           140   6.7%      125   TT                                  

149  Syamsu Munir             120              6.0  

           114   5.0%      125  

TT &TU 

      25.0  

    1.5             24   6.0% 

       2,653    P    TU   6.0  P  1,284.7           7,708  

150  M Nur             500            21.3  

           479   4.3%      125   TT                                  

151  Ismail Nawawi             350            17.5  

           333   5.0%      125   TT                                  

152  Mut             200            30.0  

           170  

15.0%      125   TT                                  

153  Aswandi             135              9.0  

           126   6.7%      125   TT                                  

154  Syarif Hidayat             450            42.0  

           408   9.3%      125  

TT & TU 

      22.5  

    1.5             21   6.7% 

       1,327    NP    TU   5.0  NP 

 647.35            3,237  

155  Mat Nur             450            30.0  

           420   6.7%      125   TT                                  

156  Nurul Sanusi             300            15.0  

           285   5.0%      125   TT                                  

   Total          4,180             295  

        3,885   7.1%       

    47.50  

  3.00        44.50   6.3%             11.00           10,944.95  

   Total Kecamatan        49,830          1,665  

      48,165   3.3%       

    47.50  

  3.00        44.50   6.3%             317.0           404,063.2  

   Total Seluruh      195,952     6,345.17  

 189,606.3   3.2%       

 1,157.8  

   56.3     1,101.5   4.9%             940.1           1,182,064  

Keterangan   

TT = Tempat Tinggal 

TU = Tempat Usaha 

TI = Tempat Ibadah 

SWH = Sawah 

24 

 

Lampiran 4: INFORMASI PROYEK DAN JUMLAH KOMPENSASI

ASSET TANAMAN WARGA TERKENA PROYEK PROYEK PRESERVASI JALAN BIHA ‐ KRUI 

KABUPATEN LAMPUNG BARAT       Asset Tanaman Yang Terkena Proyek 

NO  NAMA WTP  Tanaman       Jenis  Jumlah  Harga   Jumlah             Satuan  (Rp)    KEC. PESISIR TENGAH                Pekon Kampung Jawa             

1  Syarif Ridwan  Pohon mangga  1            100,000                               100,000  

2  Junot  Pohon Belimbing  1              50,000                                 50,000  

3  Ikrom  Pohon Jambu  1              75,000                                 75,000  

4  Badraini  Pohon Belimbing  2              50,000                               100,000  

5  Sudirman H  Pohon Belimbing  2              50,000                               100,000  

6  Ridwan  Pohon Belimbing  1              50,000                                 50,000  

   Total                                        475,000     Pekon Seray :             

7  Ruslan  Pohon Jambu Air  1              75,000                                 75,000  

8  Wahidin  Pohon Jambu Air  1              75,000                                 75,000  

9  Abdul Syukur  Pohon Pisang  1              50,000                                 50,000  

      Pohon Sirsak   1              25,000                                 25,000  

10  Anazir  Pohon Belimbing   1              50,000                                 50,000  

      Pohon Alpukat   1            100,000                               100,000  

25 

 

      Pohon jambu   1              75,000                                 75,000  

11  Abdul Syukur  Pohon Alpukat   1            100,000                               100,000  

12  Riswar  Pohon Lengken   1              75,000                                 75,000  

      Pohon Pisang   1              50,000                                 50,000  

13  Rasnun   Pohon Belimbing   1              50,000                                 50,000  

14  Sukandar Jaya  Pohon Jambu   1              75,000                                 75,000  

      Pohon Mangga   1            100,000                               100,000  

15  Fahroni  Pohon Alpukat  1            100,000                               100,000  

16  H Nurdin  Pohon Belimbing   1              50,000                                 50,000  

      Pohon jambu   1              75,000                                 75,000  

17  Nazri  Pohon Jambu  1              75,000                                 75,000  

      Pohon Kelapa  1            150,000                               150,000  

18  Hasan Nuralip  Pohon Sirsak  1              25,000                                 25,000  

      Pohon Jambu  1              75,000                                 75,000  

   Total                                    1,450,000     Total Kecamatan                                   1,925,000     KECAMATAN KRUI SELATAN             

   Pekon Pemerihan             

19  Suwardi  Rumpun Padi  1170                5,000                           5,850,000  

20  Zulfikar  Rumpun Padi  3371                5,000                         16,855,000  

21  Zulfikar  Rumpun Padi  894                5,000                           4,470,000  

22  Zezali  Rumpun Padi  1440                5,000                           7,200,000  

23  H Bustaman  Rumpun Padi  1200                5,000                           6,000,000  

24  H Rudin  Rumpun Padi  1400                5,000                           7,000,000  

25  Thamrin   Rumpun Padi  1400                5,000                           7,000,000  

26  Yub Bahar  Rumpun Padi  1360                5,000                           6,800,000  

27  Syafi'i  Rumpun Padi  1360                5,000                           6,800,000  

28  H Husni  Rumpun Padi  1080                5,000                           5,400,000  

26 

 

   Total                                 73,375,000     Pekon Mandiri Sejati             

29  M Razi  Rumpun Padi  3936                5,000                         19,680,000  

30  Edi Sumaryadi  Rumpun Padi  2400                5,000                         12,000,000  

31  Sarpan AR  Rumpun Padi  816                5,000                           4,080,000  

32  Amar Hakim  Rumpun Padi  1776                5,000                           8,880,000  

33  Fatimah  Rumpun Padi  720                5,000                           3,600,000  

34  M Bakri  Rumpun Padi  3840                5,000                         19,200,000  

35  H Sidik  Rumpun Padi  5712                5,000                         28,560,000  

36  Sajumrat  Rumpun Padi  768                5,000                           3,840,000  

37  Syarifudin  Rumpun Padi  1536                5,000                           7,680,000  

38  Nurmal  Rumpun Padi  1296                5,000                           6,480,000  

39  M Puani  Rumpun Padi  2112                5,000                         10,560,000  

40  Sudirmansyah  Rumpun Padi  1968                5,000                           9,840,000  

41  Fuani  Rumpun Padi  864                5,000                           4,320,000  

42  M Zaili  Rumpun Padi  480                5,000                           2,400,000  

43  Zumrah  Rumpun Padi  1344                5,000                           6,720,000  

44  Iskandarsyah  Rumpun Padi  3360                5,000                         16,800,000  

   Total                               164,640,000     Total Kecamatan                               238,015,000     KECAMATAN PESISIR SELATAN             

   Pekon Tulung Banban             

45  Parni  Rumpun Padi  1680                5,000                           8,400,000  

46  Ali Akbar  Rumpun Padi  600                5,000                           3,000,000  

47  H baidal  Rumpun Padi  2640                5,000                         13,200,000  

48  Joni  Rumpun Padi  2280                5,000                         11,400,000  

49  Widawati  Rumpun Padi  528                5,000                           2,640,000  

   Total                                 38,640,000  

27 

 

   Pekon Negri R Tenembang             

50  M Razi HR  Rumpun Padi  3840                5,000                         19,200,000  

51  Rahman hakim  Rumpun Padi  3840                5,000                         19,200,000  

52  Al Qodri  Rumpun Padi  2400                5,000                         12,000,000  

   Total                                 50,400,000     Pekon Pelita Jaya             

53  Iskandar Hasan  Rumpun Padi  2400                5,000                         12,000,000  

   Total                                 12,000,000     Pekon Biha             

54  Rizal  Jambu  1              75,000                                 75,000  

55  Syamsu Munir  Belimbing   1              50,000                                 50,000  

56  M Nur  Mangga  1            100,000                               100,000  

57  Ismail Nawawi  Mangga  1            100,000                               100,000  

      Jambu  1              75,000                                 75,000  

   Total                                       400,000     Total Kecamatan                               101,440,000      Total Kebutuhan Seluruh                               341,380,000  

28 

 

Lampiran 5: SURAT PEMBENTUKAN TIM PENILAH HARGA TANAH

29 

 

30 

 

31 

 

Lampiran 6: HASIL PENILAIAN HARGA TANAH DARI TIM PENILAI HARGA TANAH

32 

 

33 

 

Lampiran 7: PENETAPAN HARGA TANAMAN OLEH DINAS PERTANIAN

34 

 

35 

 

Lampiran 8: HARGA PEMINDAHAN / PENGGANTIAN KONSTRUKSI BANGUNAN OLEH DINAS PU

36 

 

37 

 

Lampiran 9 : SOSIALISASI / WORKSHOP DI PEMERINTAHAN

38 

 

39 

 

40 

 

Lampiran 10 : BERITA ACARA SOSIALISASI DI KECAMATAN

41 

 

42 

 

43 

 

44 

 

Lampiran 11 : BAGAN ALIR MEKANISME PENYAMPAIAN KELUHAN DAN KOMPLAIN

Mekanisme Penanganan Keluhan terhadap Pelaksanaan LARAP

Proses

Dalam 12 hari kerja

WTP M O N I T O R I N G  

PMU WINRIP 

- Bappeda - Pimpinan Satker P2JJ (pimpinan Sub‐Proyek) 

- Panitia Pengadaan Tanah - Tim Monitoring 

Investigasi oleh Bapedda dan 

Satker  

Konsultasi 

dengan WTP 

Publikasi 

Persetujuan dengan WTP 

Pelaksanaan

45 

 

Lampiran 12: FORMULIR BERITA ACARA PERTEMUAN

No  Keterangan  Penjelasan 

A.  Lokasi Pertemuan   

B  Tujuan Pertemuan 

C  Yang hadir dari pihak proyek (pemrakarsa) 

D  Masyarakat yg hadir : 

Pemimpin masyarakat yg hadir  Warga  Jumlah yang hadir 

E Isu yang muncul  (bisa setiap pertanyaan atau apapun)  

 

 

 

 

 

F  Tindak lanjut yang disepakati 

 

 

 

46 

 

Lampiran 13: FORMULIR MONITORING BULANAN PELAKSANAAN LARAP

FORMULIR MONITORING BULANAN PELAKSANAAN LARAP UNTUK Kabupaten/Kota: ……………… Sub-project: …………………… Periode pelaporan: …………….

Aktivitas Rencana Kerja

Dari LARAP

Laporan Kemajuan1 Catatan

Tanggal Target Kemajuan/ status di lapangan

Masalah & rencana tindak lanjut

KONSULTASI

Kompensasi2

Lampirkan: kopi notulensi kesepakatan

IMPLEMENTASI

1. Pembayaran kompensasi /santunan/pesangon termasuk biaya pindah

Lampirkan: kopi tanda terima

2. Persiapan lokasi relokasi untuk :

- Jumlah rumah

- Jumlah kios/Warung

                                                            1 Jika kolom tidak mencukupi, silahkan digunakan lembar kertas tambahan. 2 Konsultasi untuk kompensasi adalah mengenai (i) harga pasar, (ii) jadwal untuk pembayaran kompensasi, dan (iii) kepemilikan aset, besaran dan bentuk kom

47 

 

Lampiran14:SuratPerintahPemasanganPengumumanDaftarWargaTerkenaProyek

48 

 

49 

 

50 

 

51 

 

52 

 

53 

 

54