water resources and irrigation sector management project ... · rencana/ relisasi pengadaan ta 2010...

15
RENCANA/ RELISASI PENGADAAN TA 2009 * Unit Kerja No Kode Nama Paket Estimasi Biaya (Rp) Estimasi Biaya eqv(US$) Metode Pengadaan 1 2 3 4 5 6 I KEGIATAN YANG DIBIAYAI LOAN & GOI/ PENDAMPING Water Resources and Irrigation Sector Management Project (WISMP) APL I Komponen B & C Civil Works (Category 1) Goods (Category 2) Consulting Services (Category 3) Training, Workshop (Category 4) RIM A (Category 5) RIM B (Category 6) Sub Prject A1 (Category 7) Sub Prject A2 (Category 8) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

Upload: vandieu

Post on 08-Mar-2019

218 views

Category:

Documents


0 download

TRANSCRIPT

RENCANA/ RELISASI PENGADAAN TA 2009 *

Unit Kerja

No Kode Nama PaketEstimasi

Biaya (Rp)

Estimasi Biaya

eqv(US$)

Metode Pengadaan

1 2 3 4 5 6

I KEGIATAN YANG DIBIAYAI LOAN & GOI/ PENDAMPING

Water Resources and Irrigation Sector Management Project (WISMP) APL IKomponen B & C

Civil Works (Category 1)

Goods (Category 2)

Consulting Services (Category 3)

Training, Workshop (Category 4)

RIM A (Category 5)

RIM B (Category 6)

Sub Prject A1 (Category 7)

Sub Prject A2 (Category 8)

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

II KEGIATAN YANG DIBIAYAI GOI (PARALEL FINANCING/APBD)

Sub Total Keg Cat 3 (Loan + Pend) - -Sub Total Keg Selain Cat 3 (Loan) - -TOTAL KEGIATAN I (Loan + Pend) - -

TOTAL KEGIATAN II (GOI-PF/APBD) - 0

KETERANGAN : 1 US$ = Rp. 8.500 PETUNJUK PENGISIANI. Kegiatan yang dibiayai (Loan + GOI pendamping/APBN)

1. Force Account (FA) untuk pekerjaan Rim - B < Rp. 127,500,0002. Comm. Driven Development (CDD) untuk pek Irigasi < Rp. 425,000,0003. Small Works (SW) < Rp. 212,500,0004. National Competitive Bidding (NCB) < Rp. 4,250,000,000

Category 3: Estimasi biaya (Loan + GOI pendamping/APBN) > dalam Rp2. Pengadaan Barang (Goods) :

1. National Shopping (NS) < Rp. 212,500,000 Category 3: Estimasi biaya (Loan + GOI pendamping/APBN) > eqv. US$ 2. National Competitive Bidding (NCB) < Rp. 1,700,000,000

3. Pengadaan Konsultan (Consulting Services) :1. Consultant Qualification Selection (CQS) < Rp. 850,000,0002. Quality and Cost Based Selection (QCBS) < Rp. 3,400,000,0003. Quality Based Selection (QBS) < Rp. 3,400,000,0004. Individual Consultant (IC) < Rp. 425,000,000 Bila sudah terkontrak, agar diisi

* dilaporkan setiap triwulan oleh para PIU / KPIU ke NPMU melalui PPMU/KPMU

** Untuk Prior Review Kontrak I: dipilih salah satu paket untuk minta persetujuan NOL Bank Dunia, Bila sudah terkontrak, agar diisi paket lainnya cukup Post Review, & dilaksanakan setelah paket yang pertama mendapat NOLII. Kegiatan yang dibiayai GOI (Paralel Financing/APBD)(termasuk paket kontrak I pekerjaan sejenis sudah mendapat NOL pada TA sebelumnya).

Categary yang tidak ada tidak perlu ditulis

1. Pekerjaan Konstruksi (Civil Works) :

Sub Prject B1/B2 (Category 9)

Status : Januari 2009

Post/ Prior Review

Pengumuman

Pengadaan

Pemasukan

PenawaranEval/ Nego

Penandata-nganan Kontrak

Jangka Waktu

Kontrak

Keterangan: Permasalahan/

7 8 9 10 11 12 13

PETUNJUK PENGISIANI. Kegiatan yang dibiayai (Loan + GOI pendamping/APBN)

Kolom 1 : Nomor UrutKolom 2: Kode pengadaan, mis. barang : Gd 1, Gd 2, konstruksi : CW 1, CW 2, konsultan : CS 1, dstKolom 3: Nama paket pekerjaan, agar ditulis setiap paketKolom 4: Selain Category 3: Estimasi biaya (Loan 100%) > dalam Rp

Category 3: Estimasi biaya (Loan + GOI pendamping/APBN) > dalam RpKolom 5: Selain Category 3: Estimasi biaya (Loan 100%) > eqv. US$

Category 3: Estimasi biaya (Loan + GOI pendamping/APBN) > eqv. US$ Kolom 6: Metoda Pengadaan, mis NS, DC, NCB, ICB, SW, CDD, CQS, QCBS, SSS, QBS, ICKolom 7: Post Review, Prior Review Kontrak I **, Prior ReviewKolom 8: Rencana pengumuman (status triwulan I: bln/ tahun, bila sdh terealisasi tgl/ bln/ thn)Kolom 9: Rencana pemasukan penawaran (status triwulan I: bln/ tahun, bila sdh terealisasi tgl/ bln/ thn)Kolom 10: Rencana evaluasi/negosiasi (status triwulan I: bln/ tahun, bila sdh terealisasi tgl/ bln/ thn)Kolom 11: Rencana penandatanganan kontrak (status triwulan I: bln/ tahun, bila sdh terealisasi tgl/ bln/ thn)

Bila sudah terkontrak, agar diisi Tgl & No. KontrakKolom 12: Hari/Bulan Kalender

Kolom 13: Penjelasan yang perlu, atau bila ada permasalahan, mis. TOR atau NOL belum disetujui BD

Bila sudah terkontrak, agar diisi Nilai Kontrak & Nama Rekanan

II. Kegiatan yang dibiayai GOI (Paralel Financing/APBD)Kolom : 1, 2, 8, 9, 10, 11, 12, 13 > cara pengisian sama dg kegiatan I

Kolom 3: Nama paket pekerjaan, agar ditulis setiap paketKolom 4: Estimasi biaya, dalam RpKolom 5 : diisi (0) Kolom 6: Metoda Pengadaan sesuai Keppres 80/2003Kolom 7 : diisi (–)

RENCANA/ RELISASI PENGADAAN TA 2010 *

Unit Kerja : Dinas PSDA Prov. Jawa Barat Status : Maret 2010

No Kode Nama PaketEstimasi Biaya

(Rp)

Estimasi Biaya

eqv(US$)

Metode Pengadaan

Post/ Prior Review

Pengumuman Pengadaan

Pemasukan Penawaran

Eval/ NegoPenandata-

nganan Kontrak

Jangka Waktu

Kontrak

Keterangan: Permasalahan/

1 2 3 4 5 6 7 8 9 10 11 12 13

I KEGIATAN YANG DIBIAYAI LOAN & GOI/ PENDAMPING

Pelaksanaan Desain Partisipatif : 94,035,000 D. I Sasak Kab. Bogor (1088 ha )D.I Cihoe Cikumpeni kab Bogor (1486 ha0

Pelaksanaan Rehab Partisipatif : 505,890,000 D.I Cihelang Kab Cianjur (1512 ha)D.I Cibalgung Kab. Cianjur ( 1106 ha)D.I Cipadang/Cibeleng Kab. Cianjur (1823 ha)

II KEGIATAN YANG DIBIAYAI GOI (PARALEL FINANCING/APBD)Pelaksanaan Desain Partisipatif : 45,100,000 D. I Sasak Kab. Bogor (1088 ha )D.I Cihoe Cikumpeni kab Bogor (1486 ha0

Sub Total Keg Cat 3 (Loan + Pend) - -Sub Total Keg Selain Cat 3 (Loan) 599,925,000 -TOTAL KEGIATAN I (Loan + Pend) 599,925,000 -

TOTAL KEGIATAN II (GOI-PF/APBD) 45,100,000 0

Water Resources and Irrigation Sector Management Project (WISMP) APL IKomponen B & C

Sub Prject B1/B2 (Category 9)

RENCANA/ RELISASI PENGADAAN TA 2010 *

Unit Kerja Dinas Bina Marga & Pengairan Kab. Bekasi Status : Maret 2010

No Kode Nama PaketEstimasi

Biaya (Rp)

Estimasi Biaya

eqv(US$)

Metode Pengadaan

Post/ Prior Review

Pengumuman

Pengadaan

Pemasukan Penawaran

Eval/ NegoPenandata-

nganan Kontrak

Jangka Waktu

Kontrak

Keterangan: Permasalahan/

1 2 3 4 5 6 7 8 9 10 11 12 13

Tidak Ada Kegiatan Pengadaan

II KEGIATAN YANG DIBIAYAI GOI (PARALEL FINANCING/APBD)1

Sub Total Keg Cat 3 (Loan + Pend) - -Sub Total Keg Selain Cat 3 (Loan) - -TOTAL KEGIATAN I (Loan + Pend) - -

TOTAL KEGIATAN II (GOI-PF/APBD) - -

Water Resources and Irrigation Sector Management Project (WISMP) APL IKomponen B & C

Sub Prject A2 (Category 8)

RENCANA/ RELISASI PENGADAAN TA 2010 *

Unit Kerja Dinas PU Kab. Karawang Status : Maret 2010

No Kode Nama PaketEstimasi

Biaya (Rp)

Estimasi Biaya

eqv(US$)

Metode Pengadaan

Post/ Prior Review

Pengumuman Pengadaan

Pemasukan Penawaran

Eval/ NegoPenandata-

nganan Kontrak

Jangka Waktu Kontrak

Keterangan: Permasalahan/

1 2 3 4 5 6 7 8 9 10 11 12 13

I KEGIATAN YANG DIBIAYAI LOAN & GOI/ PENDAMPING

Pelaksanaan Desain partisipatif :1 CW 1 D.I Cigunung Bubut (60 ha) 20,000,000 2,353 CDD2 CW 2 D.I Tonjong (424 ha) 20,000,000 2,353 CDD3 CW 3 D.I Waru I/Pangkalan I-6 (421 ha) 20,000,000 2,353 CDD4 CW 4 D.I Waru II/Pangkalan 7-16 (490 ha) 20,000,000 2,353 CDD5 CW 5 D.I Parakan Badak (175 ha) 20,000,000 2,353 CDD

Pelaksanaan Rehab Partisipatif :6 CW 6 D.I Lio (60 ha) ######### 11,765 CDD7 CW 7 D.I Cigunung Bubut (60 ha) ######### 19,412 CDD8 CW 8 D.I Tonjong (424 ha) ######### 18,235 CDD9 CW 9 D.I Waru II/Pangkalan 7-16 (490 ha) ######### 18,235 CDD

II KEGIATAN YANG DIBIAYAI GOI (PARALEL FINANCING/APBD)1 D.I Cibayat (105 ha) 75,000,000

2 D.I Ciomas 75,000,000

3 D.I Waru I/Pangkalan I-6 (421 ha) 50,000,000

Sub Total Keg Cat 3 (Loan + Pend) - -Sub Total Keg Selain Cat 3 (Loan) ######## 79,412TOTAL KEGIATAN I (Loan + Pend) ######## 79,412

TOTAL KEGIATAN II (GOI-PF/APBD) ######## -

Water Resources and Irrigation Sector Management Project (WISMP) APL IKomponen B & C

Sub Prject A2 (Category 8)

RENCANA/ RELISASI PENGADAAN TA 2010 *

Unit Kerja Dinas PU Kab. Purwakarta Status : Maret 2010

No Kode Nama Paket Estimasi Biaya (Rp) Estimasi

Biaya eqv(US$)

Metode Pengadaan

Post/ Prior Review

Pengumuman Pengadaan

Pemasukan Penawaran

Eval/ NegoPenandata-nganan

Kontrak Jangka Waktu

KontrakKeterangan:

Permasalahan/

1 2 3 4 5 6 7 8 9 10 11 12 13

I KEGIATAN YANG DIBIAYAI LOAN & GOI/ PENDAMPING

1 Gd 1

Pelaksanaan Rehab Partisipatif :

1 CW 1 D.I Nangerang (250 ha) 60,000,000 7,059 CDD

2 CW 2 D.I Tanjung Sari (205 ha) 55,000,000 6,471 CDD

3 CW 3 D.I Cigalumpit (100 ha) 35,000,000 4,118 CDD

II KEGIATAN YANG DIBIAYAI GOI (PARALEL FINANCING/APBD)D.I Cijamban (250 ha) 58,000,000 D.I Ciburial (118 ha) 50,000,000 D.I Ciburial (118 ha) 55,000,000 D.I Cibulakan (150 ha) 50,000,000

Sub Total Keg Cat 3 (Loan + Pend) - -Sub Total Keg Selain Cat 3 (Loan) 150,000,000 17,647TOTAL KEGIATAN I (Loan + Pend) 150,000,000 17,647

TOTAL KEGIATAN II (GOI-PF/APBD) 213,000,000 -

Water Resources and Irrigation Sector Management Project (WISMP) APL IKomponen B & C

Goods (Category 2)

Sub Prject A2 (Category 8)

RENCANA/ RELISASI PENGADAAN TA 2010 *

Unit Kerja Dinas PSDA & Pertambangan Kab. Cianjur Status : Maret 2010

No Kode Nama PaketEstimasi Biaya

(Rp) Estimasi Biaya

eqv(US$) Metode

PengadaanPost/ Prior

ReviewPengumuman

PengadaanPemasukan Penawaran

Eval/ NegoPenandata-

nganan Kontrak

Jangka Waktu

Kontrak

Keterangan: Permasalahan/

1 2 3 4 5 6 7 8 9 10 11 12 13

I KEGIATAN YANG DIBIAYAI LOAN & GOI/ PENDAMPING

1 CW Pelaksanaan Rehab Partisipatif 300,000,000 35,294

II KEGIATAN YANG DIBIAYAI GOI (PARALEL FINANCING/APBD)1 Pelaksanaan Rehab Partisipatif 60,000,000 2

Sub Total Keg Cat 3 (Loan + Pend) - -Sub Total Keg Selain Cat 3 (Loan) 300,000,000 35,294TOTAL KEGIATAN I (Loan + Pend) 300,000,000 35,294

TOTAL KEGIATAN II (GOI-PF/APBD) 60,000,000 -

Water Resources and Irrigation Sector Management Project (WISMP) APL IKomponen B & C

Sub Prject A2 (Category 8)

Sub Prject B1/B2 (Category 9)

RENCANA/ RELISASI PENGADAAN TA 2010 *

Unit Kerja Dinas Bina Marga & Pengairan Kabupaten Bogor Status : Maret 2010

No Kode Nama PaketEstimasi Biaya

(Rp) Estimasi Biaya

eqv(US$) Metode

PengadaanPost/ Prior

Review

Pengumuman

Pengadaan

Pemasukan Penawaran

Eval/ NegoPenandata-nganan

Kontrak

Jangka Waktu

Kontrak

Keterangan: Permasalahan/

1 2 3 4 5 6 7 8 9 10 11 12 13

I KEGIATAN YANG DIBIAYAI LOAN & GOI/ PENDAMPING

Desain :1 CS 2 DI Cibeet Cikumpeni 800 ha (200 ha) 100,000,000 11,765 CDD2 CS 7 DI Cigamea 475 ha (275 ha) 100,000,000 11,765 CDD3 CS 8 DI Situ Bala 695 ha (200 ha) 100,000,000 11,765 CDD

II KEGIATAN YANG DIBIAYAI GOI (PARALEL FINANCING/APBD)

Sub Total Keg Cat 3 (Loan + Pend) - -Sub Total Keg Selain Cat 3 (Loan) 300,000,000 35,294TOTAL KEGIATAN I (Loan + Pend) 300,000,000 35,294

TOTAL KEGIATAN II (GOI-PF/APBD) - -

Water Resources and Irrigation Sector Management Project (WISMP) APL IKomponen B & C

Sub Prject A2 (Category 8)

RENCANA/ RELISASI PENGADAAN TA 2010 *

Unit Kerja : Dinas Bina Marga & Pengairan Kab. Subang Status : Maret 2010

No Kode Nama PaketEstimasi Biaya

(Rp)

Estimasi Biaya

eqv(US$)

Metode Pengadaan

Post/ Prior Review

Pengumuman Pengadaan

Pemasukan Penawaran

Eval/ NegoPenandata-nganan

Kontrak

Jangka Waktu

Kontrak

Keterangan: Permasalahan/

1 2 3 4 5 6 7 8 9 10 11 12 13

I KEGIATAN YANG DIBIAYAI LOAN & GOI/ PENDAMPING

Pelaksanaan Rehab Partisipatif

1 CW 1 D.I Cipadararingan (152 ha) 60,000,000 7,059 CDD/SKKS

2 CW 2 D.I Leuwi Tunggak (126 ha) 60,000,000 7,059 CDD/SKKS3 CW 3 D.I Cikaliwuluh (159 ha) 60,000,000 7,059 CDD/SKKS

4 CW 4 D.I Sado (53 ha) 60,000,000 7,059 CDD/SKKS

5 CW 5 D.I Ciasem (24 ha) 60,000,000 7,059 CDD/SKKS

II KEGIATAN YANG DIBIAYAI GOI (PARALEL FINANCING/APBD)1 Pelaksanaan Rehab Partisipatif :

D.I Cirenggong (52 ha) 60,000,000 Karangtomang (74 ha) 7,000,000 Cirelek (63 ha) 6,000,000 Cibulakan (67 ha) 7,000,000

Cibaregbeg (59 ha) 6,000,000

Citapen (56 ha) 6,000,000 Sub Total Keg Cat 3 (Loan + Pend) - -Sub Total Keg Selain Cat 3 (Loan) 300,000,000 35,294TOTAL KEGIATAN I (Loan + Pend) 300,000,000 35,294

TOTAL KEGIATAN II (GOI-PF/APBD) 92,000,000 0

Water Resources and Irrigation Sector Management Project (WISMP) APL IKomponen B & C

Sub Prject A2 (Category 8)

RELISASI PENGADAAN TA 2010 *

Unit Kerja : Dinas Pengairan Kabupaten Sukabumi Status : Februari 2010

No Kode Nama Paket Estimasi Biaya (Rp) Estimasi

Biaya eqv(US$)

Metode Pengadaan

Post/ Prior Review

Pengumuman Pengadaan

Pemasukan Penawaran

Eval/ NegoPenandata-

nganan Kontrak

Jangka Waktu

KontrakNomor Kontrak

Keterangan: Permasalahan/

1 2 3 4 5 6 7 8 9 10 11 12 13

I KEGIATAN YANG DIBIAYAI LOAN & GOI/ PENDAMPING

1 CW 1 Rehabilitasi Jringan Irigasi D.I Cimuncang 40,075,000 4,714.71 CDD/SKKS Post Review CDD/SKKS 09 August 2010 13 Sept 2010 13 Sept 2010 45 hr 40,075,000Rp P3A Karya Tani Mandiri

2 CW 2 Rehabilitasi Jringan Irigasi D.I Gegerbitung 38,500,000 4,529.41 CDD/SKKS Post Review CDD/SKKS 09 August 2010 13 Sept 2010 13 Sept 2010 45 hr Rp 38,500,000 - - - P3A Putra Mandiri

3 CW 3 Rehabilitasi Jringan Irigasi D.I Muara Cibodas 37,000,000 4,352.94 CDD/SKKS Post Review CDD/SKKS 09 August 2010 13 Sept 2010 13 Sept 2010 45 hr 37,000,000Rp P3A Gempar

4 CW 4 Rehabilitasi Jringan Irigasi D.I Cipeundeuy 40,750,000 4,794.12 CDD/SKKS Post Review CDD/SKKS 09 August 2010 13 Sept 2010 13 Sept 2010 45 hr 40,750,000Rp P3A Mustika Tani

5 CW 5 Rehabilitasi Jaringan irgasi DI. Cisarua Bojong 33,750,000 3,970.59 CDD/SKKS Post Review CDD/SKKS 09 August 2010 14 Sept 2010 14 Sept 2010 45 hr 33,750,000Rp P3A Super

6 CW 6 Rehabilitasi Jaringan irgasi D.I Cicatih Nyalindung 36,675,000 4,314.71 CDD/SKKS Post Review CDD/SKKS 09 August 2010 14 Sept 2010 14 Sept 2010 45 hr 36,675,000Rp P3A Harapan

7 CW 7 Rehabilitasi Jaringan irgasi D.I Tarisi 39,750,000 4,676.47 CDD/SKKS Post Review CDD/SKKS 09 August 2010 15 Sept 2010 15 Apr 2010 45 hr 39,750,000Rp P3A Tunas Mekar

8 CW 8 Rehabilitasi Jaringan irgasi D.I Cikurutug 38,500,000 4,529.41 CDD/SKKS Post Review CDD/SKKS 09 August 2010 15 Sept 2010 15 Sept 2010 45 hr 38,500,000Rp P3A Harapan Maju

9 CW 9 Rehabilitasi Jaringan irgasi D.I Cipuspa 36,450,000 4,288.24 CDD/SKKS Post Review CDD/SKKS 09 August 2010 15 Sept 2010 15 Sept 2010 45 hr 36,450,000Rp P3A Bangun Jaya

10 CW 10 Rehabilitasi Jaringan irgasi D.I Cipanumbangan 33,500,000 3,941.18 CDD/SKKS Post Review CDD/SKKS 09 August 2010 15 Sept 2010 15 Sept 2010 45 hr 33,500,000Rp P3A Guna Mekar

11 CW 111 Rehabilitasi Jaringan irgasi D.I Cikalong 38,070,000 4,478.82 CDD/SKKS Post Review CDD/SKKS 09 August 2010 14 Sept 2010 14 Sept 2010 45 hr 38,070,000Rp P3A Sakti Mekar

12 CW 12 Rehabilitasi Jaringan irgasi D.I Warujajar 39,500,000 4,647.06 CDD/SKKS Post Review CDD/SKKS 09 August 2010 14 Sept 2010 14 Sept 2010 45 hr 39,500,000Rp P3A Giri Raharja

13 CW 13 Rehabilitasi Jaringan irgasi D.I Ciasih 38,420,000 4,520.00 CDD/SKKS Post Review CDD/SKKS 09 August 2010 14 Sept 2010 14 Sept 2010 45 hr 38,420,000Rp P3A Mulya Asih

14 CW.14 Rehabilitasi Jaringan irgasi D.I Ciwirana 36,660,000 4,312.94 CDD/SKKS Post Review CDD/SKKS 09 August 2010 14 Sept 2010 14 Sept 2010 45 hr 36,660,000Rp P3A Sabilulungan

II KEGIATAN YANG DIBIAYAI GOI (PARALEL FINANCING/APBD)1 Rehabiliasi Jaringan Irigasi DI Pangkalan 50,397,000 PML 27 Mei 2010 8 Juli 2010 8 Juli 2010 28 Juli 2010 60 hr2 Rehabiliasi Jaringan Irigasi DI Cikakak 81,505,000 PL 27 Mei 2010 8 Juli 2010 8 Juli 2010 28 Juli 2010 61 hr

3Pengadaan Jasa Konsultan Perencanaan dan Supervisi Desain irigasi Partisipatif 163,158,000 27 Mei 2010 8 Juli 2010 8 Juli 2010 28 Juli 2010 90 hr

Sub Total Keg Cat 3 (Loan + Pend) - -Sub Total Keg Selain Cat 3 (Loan) 527,600,000.00 62,070.59TOTAL KEGIATAN I (Loan + Pend) 527,600,000.00 62,070.59

TOTAL KEGIATAN II (GOI-PF/APBD) 295,060,000.00

Water Resources and Irrigation Sector Management Project (WISMP) APL IKomponen B

Sub Prject A2 (Category 8)

RELISASI PENGADAAN TA 2010 *

Unit Kerja : Dinas Pengairan Kabupaten Sukabumi Status : Agustus 2010

No Kode Nama Paket Estimasi Biaya (Rp) Estimasi

Biaya eqv(US$)

Metode Pengadaan

Post/ Prior Review

Pengumuman Pengadaan

Pemasukan Penawaran

Eval/ NegoPenandata-

nganan Kontrak

Jangka Waktu

KontrakNomor Kontrak

Keterangan: Permasalahan/

1 2 3 4 5 6 7 8 9 10 11 12 13

I KEGIATAN YANG DIBIAYAI LOAN & GOI/ PENDAMPING

1 CW 1 Rehabilitasi Jringan Irigasi D.I Cimuncang 40,075,000 4,714.71 CDD/SKKS Post Review CDD/SKKS 09 August 2010 13 Sept 2010 13 Sept 2010 45 hr 40,075,000Rp P3A Karya Tani Mandiri

2 CW 2 Rehabilitasi Jringan Irigasi D.I Gegerbitung 38,500,000 4,529.41 CDD/SKKS Post Review CDD/SKKS 09 August 2010 13 Sept 2010 13 Sept 2010 45 hr Rp 38,500,000 - - - P3A Putra Mandiri

3 CW 3 Rehabilitasi Jringan Irigasi D.I Muara Cibodas 37,000,000 4,352.94 CDD/SKKS Post Review CDD/SKKS 09 August 2010 13 Sept 2010 13 Sept 2010 45 hr 37,000,000Rp P3A Gempar

4 CW 4 Rehabilitasi Jringan Irigasi D.I Cipeundeuy 40,750,000 4,794.12 CDD/SKKS Post Review CDD/SKKS 09 August 2010 13 Sept 2010 13 Sept 2010 45 hr 40,750,000Rp P3A Mustika Tani

5 CW 5 Rehabilitasi Jaringan irgasi DI. Cisarua Bojong 33,750,000 3,970.59 CDD/SKKS Post Review CDD/SKKS 09 August 2010 14 Sept 2010 14 Sept 2010 45 hr 33,750,000Rp P3A Super

6 CW 6 Rehabilitasi Jaringan irgasi D.I Cicatih Nyalindung 36,675,000 4,314.71 CDD/SKKS Post Review CDD/SKKS 09 August 2010 14 Sept 2010 14 Sept 2010 45 hr 36,675,000Rp P3A Harapan

7 CW 7 Rehabilitasi Jaringan irgasi D.I Tarisi 39,750,000 4,676.47 CDD/SKKS Post Review CDD/SKKS 09 August 2010 15 Sept 2010 15 Apr 2010 45 hr 39,750,000Rp P3A Tunas Mekar

8 CW 8 Rehabilitasi Jaringan irgasi D.I Cikurutug 38,500,000 4,529.41 CDD/SKKS Post Review CDD/SKKS 09 August 2010 15 Sept 2010 15 Sept 2010 45 hr 38,500,000Rp P3A Harapan Maju

9 CW 9 Rehabilitasi Jaringan irgasi D.I Cipuspa 36,450,000 4,288.24 CDD/SKKS Post Review CDD/SKKS 09 August 2010 15 Sept 2010 15 Sept 2010 45 hr 36,450,000Rp P3A Bangun Jaya

10 CW 10 Rehabilitasi Jaringan irgasi D.I Cipanumbangan 33,500,000 3,941.18 CDD/SKKS Post Review CDD/SKKS 09 August 2010 15 Sept 2010 15 Sept 2010 45 hr 33,500,000Rp P3A Guna Mekar

11 CW 111 Rehabilitasi Jaringan irgasi D.I Cikalong 38,070,000 4,478.82 CDD/SKKS Post Review CDD/SKKS 09 August 2010 14 Sept 2010 14 Sept 2010 45 hr 38,070,000Rp P3A Sakti Mekar

12 CW 12 Rehabilitasi Jaringan irgasi D.I Warujajar 39,500,000 4,647.06 CDD/SKKS Post Review CDD/SKKS 09 August 2010 14 Sept 2010 14 Sept 2010 45 hr 39,500,000Rp P3A Giri Raharja

13 CW 13 Rehabilitasi Jaringan irgasi D.I Ciasih 38,420,000 4,520.00 CDD/SKKS Post Review CDD/SKKS 09 August 2010 14 Sept 2010 14 Sept 2010 45 hr 38,420,000Rp P3A Mulya Asih

14 CW.14 Rehabilitasi Jaringan irgasi D.I Ciwirana 36,660,000 4,312.94 CDD/SKKS Post Review CDD/SKKS 09 August 2010 14 Sept 2010 14 Sept 2010 45 hr 36,660,000Rp P3A Sabilulungan

II KEGIATAN YANG DIBIAYAI GOI (PARALEL FINANCING/APBD)1 Rehabiliasi Jaringan Irigasi DI Pangkalan 50,397,000 PML 27 Mei 2010 8 Juli 2010 8 Juli 2010 28 Juli 2010 60 hr2 Rehabiliasi Jaringan Irigasi DI Cikakak 81,505,000 PL 27 Mei 2010 8 Juli 2010 8 Juli 2010 28 Juli 2010 61 hr

3Pengadaan Jasa Konsultan Perencanaan dan Supervisi Desain irigasi Partisipatif 163,158,000 27 Mei 2010 8 Juli 2010 8 Juli 2010 28 Juli 2010 90 hr

Sub Total Keg Cat 3 (Loan + Pend) - -Sub Total Keg Selain Cat 3 (Loan) 527,600,000.00 62,070.59TOTAL KEGIATAN I (Loan + Pend) 527,600,000.00 62,070.59

TOTAL KEGIATAN II (GOI-PF/APBD) 295,060,000.00

Water Resources and Irrigation Sector Management Project (WISMP) APL IKomponen B

Sub Prject A2 (Category 8)

RENCANA/ RELISASI PENGADAAN TA 2010 *

Unit Kerja : Dinas PU Kab. Bandung Status : Maret 2010

No Kode Nama PaketEstimasi Biaya

(Rp)

Estimasi Biaya

eqv(US$)

Metode Pengadaan

Post/ Prior Review

Pengumuman

Pengadaan

Pemasukan Penawaran

Eval/ Nego

Penandata-nganan Kontrak

Jangka Waktu

Kontrak

Keterangan: Permasalahan/

1 2 3 4 5 6 7 8 9 10 11 12 13

I KEGIATAN YANG DIBIAYAI LOAN & GOI/ PENDAMPING

Pelaksanaan Rehab Partisipatif 1 CW 1 D.I Citarik (200 ha) 150,000,000 17,647 2 CW 2 D.I Cikalong (150 ha) 110,000,000 12,941 3 CW 3 D.I Gunung Karung (150 ha) 115,000,000 13,529

II KEGIATAN YANG DIBIAYAI GOI (PARALEL FINANCING/APBD)Pelaksanaan Rehab Partisipatif D.I Cibodas Ciwidey 100,000,000 D.i Ciranjang 100,000,000

Sub Total Keg Cat 3 (Loan + Pend) - -Sub Total Keg Selain Cat 3 (Loan) 375,000,000 44,118TOTAL KEGIATAN I (Loan + Pend) 375,000,000 44,118

TOTAL KEGIATAN II (GOI-PF/APBD) 200,000,000 0

Water Resources and Irrigation Sector Management Project (WISMP) APL IKomponen B & C

Sub Prject A2 (Category 8)

Sub Prject B1/B2 (Category 9)

RENCANA/ RELISASI PENGADAAN TA 2010 *

Unit Kerja : Dinas PU Kab. Bandung Barat Status : Maret 2010

No Kode Nama PaketEstimasi Biaya

(Rp)

Estimasi Biaya

eqv(US$)

Metode Pengadaan

Post/ Prior Review

Pengumuman

Pengadaan

Pemasukan Penawaran

Eval/ NegoPenandata-

nganan Kontrak

Jangka Waktu

Kontrak

Keterangan: Permasalahan/

1 2 3 4 5 6 7 8 9 10 11 12 13

I KEGIATAN YANG DIBIAYAI LOAN & GOI/ PENDAMPING

1 Gd 1

II KEGIATAN YANG DIBIAYAI GOI (PARALEL FINANCING/APBD)1 Pelaksanaan Desain Partisipatif 50,000,000

Sub Total Keg Cat 3 (Loan + Pend) - -Sub Total Keg Selain Cat 3 (Loan) - -TOTAL KEGIATAN I (Loan + Pend) - -

TOTAL KEGIATAN II (GOI-PF/APBD) 50,000,000 0

Water Resources and Irrigation Sector Management Project (WISMP) APL IKomponen B & C

Goods (Category 2)