BEBAN BANGUNAN
BEBAN BANGUNAN
LANTAI 1
Beban Struktur
KOLOMBALOK
Kolom 60/60, t = 3.5 m, jumlah kolom 20 bh
Muatan kolom beton bertulang = 2400 kg/m3 (Peraturan Muatan Beton Bertulang Indonesia)
Berat kolom = vol. Kolom x muatan
Vol. Kolom = 0.6 x 0.6 x 3.5 = 1.26 m3
Berat kolom = 1.26 x 2400 = 3024 kg
= 3.024 ton x 20
= 60.48 tonBalok 30/40, bentang = 14 m, jumlah 5 bh
Muatan balok beton bertulang = 2400 kg/m3
(Peraturan Muatan Beton Bertulang Indonesia)
Berat Balok = vol. Balok x muatan
Vol. Balok = 0.3 x 0.4 x 14 = 1.68 m3
Berat balok = 1.68 x 2400 = 4032 kg
= 4.032 ton x 5
= 20.16 ton
CORE 1
(TANGGA DARURAT)CORE 2
(LIFT, SHAFT)
CORE
Volume = 4 m x 0.3 m x 3.5 m
= 4.2 m3
Muatan Beton Bertulang = 2400 kg/m3
(Peraturan Muatan Beton Bertulang Indonesia)
Berat = vol x muatan
= 4.2 x 2400
= 10080 kg
= 10 ton
TANGGA DARURAT
Jumlah anak tangga = 20
Vol. Anak tangga = 0.9 x 0.3 x 0.175
= 0.04725 m3 x 20
= 0.945 m3 x 1000 kg
= 945 kg = 1 ton
Plat Bordes
Vol. Plat bordes = 2 m x 1 m x 0.175 m
= 0,35 m3 x 1000 kg
= 350 kg = 0.35 ton
Keramik Anak Tangga (30 cm x 30 cm)
Tebal = 1 cm, / dus = 10 biji = 10 kg
Berat = Luas tangga : ukuran keramik x
berat/dus x spesi ( 30 kg/m2 )
= 3.8 : 0.9 m2 x 10 kg x 30 kg/m2
= 1266.66 kg = 1.3 ton
Total Berat Core
Core + Tangga = 10 + 2.65
= 12.65 tonCORE
Volume = 4 m x 0.3 m x 3.5 m
= 4.2 m3
Muatan Beton Bertulang = 2400 kg/m3
(Peraturan Muatan Beton Bertulang Indonesia)
Berat = vol x muatan
= 4.2 x 2400
= 10080 kg
= 10 ton
BEBAN BAHAN BANGUNAN
LANTAIDINDING
Niro Granite 50/50, tebal = 1.5 cm, /dus = 4 bh
Berat /dus = 16 kg
Berat lantai = ( luas lantai : uk. Bahan
bangunan ) : isi/dus x berat/dus x
spesi (30 kg/m2)
= (336 : 0.25) : 4 x 16 x 30 kg/m2
= (1344 : 4) x 480
= 161280 kg = 161 tonDinding AAC Hebel, blok jumbo AAC-B2
Pj. = 60 cm, tinggi = 40 cm, tebal = 7.5 cm
Berat/m2 = 84.86 kg/m2 (finished)
Berat dinding = luas dinding x berat/m2
= 364 x 84.86
= 30889.04 kg
= 31 ton
PLAFONFURNITURE
Panel plafon Jof Metal 60/60, tebal = 0.5 cm
Berat/unit = 5 kg (termasuk rangka)
Berat plafond = (luas langit2 : uk. Panel plafon)
x berat/unit
= (336 : 0.36) x 5 kg
= 4666.6 kg = 5 ton2 set furniture lobby
2 meja (2 x 15 kg) = 30 kg
8 kursi (8 x 10 kg) = 80 kg
3 set furniture kantor
3 meja (3 x 15 kg) = 45 kg
6 kursi (6 x 10 kg) = 60 kg
10 set furniture restorant
10 meja (10 x 15 kg) = 150 kg
40 kursi (40 x 10 kg) = 400 kg +
Total beban furnt. = 765 kg
Total Beban Mati = 60,48 + 20,16 + 12.65 + 10 + 161 + 31 + 5 + 0.765
= 301,055 ton
= 301 ton
Beban hidup (400 kg/m2)
Beban hidup = luas lantai x 400 kg/m2
= 336 x 400
= 134400 kg = 134.5 ton
Lantai 2
Beban Struktur
KOLOMBALOK
Kolom 60/60, t = 3.5 m, jumlah kolom 20 bh
Muatan kolom beton bertulang = 2400 kg/m3 (Peraturan Muatan Beton Bertulang Indonesia)
Berat kolom = vol. Kolom x muatan
Vol. Kolom = 0.6@@`\l@@f\j@z@b\dl@f@@z@b\dl@@dh``@z@f`dh@@@@@@@@@@@@@@@@@@@@@z@f\`dh@@@d`@@@@@@@@@@@@@@@@@@@@z@l`\hp@@f`^h`X@@z@bh@X@@j@@@@@z@dh``@^f@P@@@@R@@z@\@@@\@@@@z@`\f@@`\h@@bh@z@b\lp@f@@z@b\lp@@dh``@z@h`fd@@@@@@@@@@@@@@@@@@@@z@h\`fd@@@j@@@@@@@@@@@@@@@@@@@z@d`\bl@@@
@bP@R@dPX@R
@z@h@@@`\f@@ 3.5 m
= 4.2 m3
Muatan Beton Bertulang = 2400 kg/m3
(Peraturan Muatan Beton Bertulang Indonesia)
Berat = vol x muatan
= 4.2 x 2400
= 10080 kg
= 10 ton
TANGGA DARURAT
Jumlah anak tangga = 20
Vol. Anak tangga = 0.9 x 0.3 x 0.175
= 0.04725 m3 x 20
= 0.945 m3 x 1000 kg
= 945 kg = 1 ton
Plat Bordes
Vol. Plat bordes = 2 m x 1 m x 0.175 m
= 0,35 m3 x 1000 kg
= 350 kg = 0.35 ton
Keramik Anak Tangga (30 cm x 30 cm)
Tebal = 1 cm, / dus = 10 biji = 10 kg
Berat = Luas tangga : ukuran keramik x
berat/dus x spesi ( 30 kg/m2 )
= 3.8 : 0.9 m2 x 10 kg x 30 kg/m2
= 1266.66 kg = 1.3 ton
Total Berat Core
Core + Tangga = 10 + 2.65
= 12.65 tonCORE
Volume = 4 m x 0.3 m x 3.5 m
= 4.2 m3
Muatan Beton Bertulang = 2400 kg/m3
(Peraturan Muatan Beton Bertulang Indonesia)
Berat = vol x muatan
= 4.2 x 2400
= 10080 kg
= 10 ton
BEBAN BAHAN BANGUNAN
PLAT LANTAILANTAI
Plat lantai AAC Hebel
Panel lantai AAC R4.4 (pj. = 6m, lb. = 0.6 m, tebal = 0.2 m, berat lapangan = 725 kg/m3
Vol. Plat lantai = 6 x 0.6 x 0.2 = 0.72 m3
Vol. Lantai = 24 x 14 x 0.2 = 67.2 m3
Berat plat lantai = vol. Lantai x berat bahan/m3
= 67.2 x 725
= 48720 kg = 49 tonMulia ceramic50/50, tebal = 1 cm, 1 dus = 6 bh
Berat/dus = 12 kg, spesi = 30 kg/m2
Berat lantai = (luas lantai : uk. Bahan
bangunan) : isi/dus x berat/dus x
spesi
= (336 : 0.25) : 6 x 12 x 30
= (1344 : 6) x 360
= 80640 kg = 81 ton
DINDINGPLAFON
Dinding AAC Hebel, blok jumbo AAC-B2
Pj. = 60 cm, tinggi = 40 cm, tebal = 7.5 cm
Berat/m2 = 84.86 kg/m2 (finished)
Berat dinding = luas dinding x berat/m2
= 364 x 84.86
= 30889.04 kg
= 31 tonPanel plafon Jof Metal 60/60, tebal = 0.5 cm
Berat/unit = 5 kg (termasuk rangka)
Berat plafond = (luas langit2 : uk. Panel plafon)
x berat/unit
= (336 : 0.36) x 5 kg
= 4666.6 kg = 5 ton
FURNITUREKARPET
8 Set furniture K. Standar
3 bed single = 3 x 50 kg = 150 kg
5 bed double = 5 x 75 kg = 375 kg
8 meja kamar = 8 x 8 kg = 64 kg
16 kursi kamar = 16 x 10 kg = 160 kg
8 lemari = 8 x 50 kg = 400 kg +
Total beban furnt. = 1149 kg
= 1.15 ton Herculon Carpet
1 rol = 30 m, lb. = 2 m, tebal = 0.5 cm
1 rol = luas 60 m2
berat = 40 kg
berat karpet Lt. 2 = (luas lantai : luas karpet) x
berat karpet
= (336 : 60) x 40 kg
= 224 kg = 0.25 ton
Total beban Mati = 60.48 + 20.16 + 12.65 + 10 + 49 + 81 + 31 + 5 + 1.15 + 0.25
= 270,69 ton = 271 ton
Beban hidup (400 kg/m2)
Beban hidup = luas lantai x 400 kg/m2
= 336 x 400
= 134400 kg = 134.5 ton
Lantai 3, 4 = Lantai 2
LANTAI 5 = LANTAI 2 + ATAP DAK BETON
ATAP DAK BETON BERTULANG
Luas atap = (luas lantai + atap core) x tebal plat atap
= (336 + 32) x 0.12 cm
= 44,16 m3
Berat = 44.16 x 1500 = 66240 kg = 66.5 ton
Total beban mati Lt. 5 = 270.69 + 66.5
= 337,19 ton = 337.5 ton
TOTAL BEBAN BANGUNAN
LANTAIBEBAN MATI (TON)BEBAN HIDUP (TON)TOTAL/LANTAI (TON)
1301134.5435,5
2271134.5405,5
3271134.5405,5
4271134.5405,5
5337.5134.5472
T o t a l B e b a n2124
PEPRHITUNGAN PONDASI ( ( tanah = 0.35 )
1 kN = 100 kg/m21 kg = 9.79 N
1 N= + 0.1 kg
Jumlah titik = 20 bh
Beban tiap titik = total beban
Jumlah titik
= 2124 ton
20
= 106,2 ton
= 106200 kg
Alternatif pemilihan pondasi dalam :
Pondasi Sumuran
Pondasi Tiang Pancang
- Beton bertulang
- Kayu
- Beton cor di tempat
- Tiang Bor
Panjang tiang kayu( Tiang kayuKekuatan tiang kayu
4.00 m20 cm-
6.00 m20-25 cm280 kN
10.00 m25-35 cm330 kN
15.00 m35-45 cm400 kN
Panjang tiang beton bertulang( Tiang pancangKekuatan tiang beton bertulang
4.00 m20 cm-
Lebih dari 5 m30/30 cm400 kN
35/35 cm480 kN
40/40 cm550 kN
PONDASI
Pondasi yang dipilih adalah Pondasi Mini Pile ( 32/32 panjang = 6 m