HARGA PERKIRAAN SENDIRI ( HPS ) KEGIATAN : PENINGKATAN PEMBANGUNAN PASAR PEDESAAN DI KECAMATAN MERBAU PEKERJAAN : PEMBANGUNAN MCK UNTUK PASAR PEDESAAN DI KEC. MERBAU 2 UNIT LOKASI : KECAMATAN MERBAU - KABUPATEN KEPULAUAN MERANTI TAHUN : 2011 HARGA SATUAN JUMLAH HARGA ( Rp ) ( Rp ) A B C D E A. PEKERJAAN PENDAHULUAN 1 Pek. Pembersihan lokasi 1.00 Ls 200,000.00 200,000.00 2 Pek. Pengukuran dan pas. bowplank 1.00 Ls 300,000.00 300,000.00 -------------------------------- Sub Jumlah 500,000.00 B. PEKERJAAN TANAH DAN PONDASI 1 Pek. Galian tanah pondasi 6.00 M3 29,400.00 176,400.00 2 Pek. Pas cerocok kayu 96.00 Btg 22,000.00 2,112,000.00 3 Pek. Urugan pasir, tebal 5 cm 0.60 M3 332,350.00 199,410.00 4 Pek. Cor lantai kerja 1 : 3 : 5, tebal 5 cm 0.60 M3 960,720.00 576,432.00 5 Pek. Cor pondasi setempat 0.44 M3 3,113,750.00 1,370,050.00 6 Pek. Cor sloof 12/20 cm 0.58 M3 3,297,790.00 1,912,718.20 7 Pek. Pas pondasi 1 bata 1 : 4 7.68 M2 431,290.00 3,312,307.20 8 Pek. Raben pondasi 15.36 M2 32,970.00 506,419.20 9 Pek. Urugan kembali bekas galian ( tanah timbun ) 2.44 M3 344,350.00 840,214.00 -------------------------------- Sub Jumlah 11,005,950.60 C. PEKERJAAN STRUKTUR 1 Pek. Cor kolom 12/12 cm 0.35 M3 4,727,650.00 1,654,677.50 2 Pek. Cor ring balok 15/15 cm 0.54 M3 4,097,360.00 2,212,574.40 3 Pek. Cor ring balok 10/15 cm ( pagar selasar / teras ) 0.09 M3 4,097,360.00 368,762.40 -------------------------------- Sub Jumlah 4,236,014.30 D. PEKERJAAN DINDING 1 Pek. Pas dinding 1/2 bata 1 : 4 32.02 M2 213,140.00 6,824,742.80 2 Pek. Plesteran dinding 1 : 4 64.04 M2 55,150.00 3,531,806.00 3 Pek. Pas dinding batu kerawang 6.08 M2 102,780.00 624,902.40 4 Pek. Pas kosen dan pintu fiber, lengkap 2.00 Bh 300,000.00 600,000.00 -------------------------------- Sub Jumlah 11,581,451.20 E. PEKERJAAN LANTAI 1 Pek. Pas lantai keramik 20/20 cm 10.82 M2 168,820.00 1,826,632.40 2 Pek. Pas bon bon keramik 5.40 M1 15,000.00 81,000.00 3 Pek. Cor lantai kerja 1 : 3 : 5, tebal 5 cm 0.60 M3 960,720.00 576,432.00 4 Pek. Urugan pasir, tebal 5 cm 0.60 M3 332,350.00 199,410.00 5 Pek. Urugan tanah dibawah lantai 2.25 M3 344,350.00 774,787.50 6 Pek. Cor rabat beton 1 : 3 : 5, tebal 5 cm 0.36 M3 960,720.00 345,859.20 -------------------------------- Sub Jumlah 3,804,121.10 F. PEKERJAAN KAP / ATAP 1 Pek. Pas atap genteng metal 30.16 M2 74,990.00 2,261,698.40 2 Pek. Pas parabung atap 5.80 M1 72,530.00 420,674.00 3 Pek. Pas bola bola atap 62.40 M1 44,980.00 2,806,752.00 4 Pek. Pas rangka atap ( kasau + reng ) 30.16 M2 41,145.00 1,240,933.20 5 Pek. Pas gording, kayu 5/10 cm 0.17 M3 3,161,500.00 537,455.00 6 Pek. Pas kuda kuda kayu 5/10 cm 0.11 M3 3,818,000.00 419,980.00 7 Pek. Pas balok angin, kayu 5/7 cm 0.03 M3 3,161,500.00 94,845.00 8 Pek. Pas listplank papan 2 x 3/20 cm 32.40 M1 39,480.00 1,279,152.00 -------------------------------- Sub Jumlah 9,061,489.60 VOLUME NO URAIAN PEKERJAAN

Upload: doddy-asmond

Post on 19-Jul-2016

169 views

Category:

Documents


18 download

DESCRIPTION

RAB

TRANSCRIPT

Page 1: RAB WC

HARGA PERKIRAAN SENDIRI ( HPS )

KEGIATAN : PENINGKATAN PEMBANGUNAN PASAR PEDESAAN DI KECAMATAN MERBAU

PEKERJAAN : PEMBANGUNAN MCK UNTUK PASAR PEDESAAN DI KEC. MERBAU 2 UNIT

LOKASI : KECAMATAN MERBAU - KABUPATEN KEPULAUAN MERANTI

TAHUN : 2011

HARGA SATUAN JUMLAH HARGA

( Rp ) ( Rp )

A B C D E

A. PEKERJAAN PENDAHULUAN

1 Pek. Pembersihan lokasi 1.00 Ls 200,000.00 200,000.00

2 Pek. Pengukuran dan pas. bowplank 1.00 Ls 300,000.00 300,000.00

--------------------------------

Sub Jumlah 500,000.00

B. PEKERJAAN TANAH DAN PONDASI

1 Pek. Galian tanah pondasi 6.00 M3 29,400.00 176,400.00

2 Pek. Pas cerocok kayu 96.00 Btg 22,000.00 2,112,000.00

3 Pek. Urugan pasir, tebal 5 cm 0.60 M3 332,350.00 199,410.00

4 Pek. Cor lantai kerja 1 : 3 : 5, tebal 5 cm 0.60 M3 960,720.00 576,432.00

5 Pek. Cor pondasi setempat 0.44 M3 3,113,750.00 1,370,050.00

6 Pek. Cor sloof 12/20 cm 0.58 M3 3,297,790.00 1,912,718.20

7 Pek. Pas pondasi 1 bata 1 : 4 7.68 M2 431,290.00 3,312,307.20

8 Pek. Raben pondasi 15.36 M2 32,970.00 506,419.20

9 Pek. Urugan kembali bekas galian ( tanah timbun ) 2.44 M3 344,350.00 840,214.00

--------------------------------

Sub Jumlah 11,005,950.60

C. PEKERJAAN STRUKTUR

1 Pek. Cor kolom 12/12 cm 0.35 M3 4,727,650.00 1,654,677.50

2 Pek. Cor ring balok 15/15 cm 0.54 M3 4,097,360.00 2,212,574.40

3 Pek. Cor ring balok 10/15 cm ( pagar selasar / teras ) 0.09 M3 4,097,360.00 368,762.40

--------------------------------

Sub Jumlah 4,236,014.30

D. PEKERJAAN DINDING

1 Pek. Pas dinding 1/2 bata 1 : 4 32.02 M2 213,140.00 6,824,742.80

2 Pek. Plesteran dinding 1 : 4 64.04 M2 55,150.00 3,531,806.00

3 Pek. Pas dinding batu kerawang 6.08 M2 102,780.00 624,902.40

4 Pek. Pas kosen dan pintu fiber, lengkap 2.00 Bh 300,000.00 600,000.00

--------------------------------

Sub Jumlah 11,581,451.20

E. PEKERJAAN LANTAI

1 Pek. Pas lantai keramik 20/20 cm 10.82 M2 168,820.00 1,826,632.40

2 Pek. Pas bon bon keramik 5.40 M1 15,000.00 81,000.00

3 Pek. Cor lantai kerja 1 : 3 : 5, tebal 5 cm 0.60 M3 960,720.00 576,432.00

4 Pek. Urugan pasir, tebal 5 cm 0.60 M3 332,350.00 199,410.00

5 Pek. Urugan tanah dibawah lantai 2.25 M3 344,350.00 774,787.50

6 Pek. Cor rabat beton 1 : 3 : 5, tebal 5 cm 0.36 M3 960,720.00 345,859.20

--------------------------------

Sub Jumlah 3,804,121.10

F. PEKERJAAN KAP / ATAP

1 Pek. Pas atap genteng metal 30.16 M2 74,990.00 2,261,698.40

2 Pek. Pas parabung atap 5.80 M1 72,530.00 420,674.00

3 Pek. Pas bola bola atap 62.40 M1 44,980.00 2,806,752.00

4 Pek. Pas rangka atap ( kasau + reng ) 30.16 M2 41,145.00 1,240,933.20

5 Pek. Pas gording, kayu 5/10 cm 0.17 M3 3,161,500.00 537,455.00

6 Pek. Pas kuda kuda kayu 5/10 cm 0.11 M3 3,818,000.00 419,980.00

7 Pek. Pas balok angin, kayu 5/7 cm 0.03 M3 3,161,500.00 94,845.00

8 Pek. Pas listplank papan 2 x 3/20 cm 32.40 M1 39,480.00 1,279,152.00

--------------------------------

Sub Jumlah 9,061,489.60

VOLUMENO URAIAN PEKERJAAN

Page 2: RAB WC

A B C D E

G. PEKERJAAN PLAFOND

1 Pek. Pas rangka plafond ( kayu ) 18.65 M2 65,100.00 1,214,115.00

2 Pek. Pas plafond triplek 18.65 M2 31,640.00 590,086.00

3 Pek. Pas list plafond 33.20 M2 10,850.00 360,220.00

--------------------------------

Sub Jumlah 2,164,421.00

H. PEKERJAAN INSTALASI LISTRIK

1 Pek. Pas lampu XL 18 watt 6.00 Bh 45,000.00 270,000.00

2 Pek. Pas stop kontak 1.00 Bh 50,000.00 50,000.00

3 Pek. Pas saklar tiga 2.00 Bh 60,000.00 120,000.00

4 Pek. Pas sikring khas ( 1 NCB ) 1.00 Bh 50,000.00 50,000.00

5 Pek. Pas instalasi listrik 10.00 Ttk 190,000.00 1,900,000.00

--------------------------------

Sub Jumlah 2,390,000.00

I. PEKERJAAN SANITASI

1 Pek. Pas kloset jongkok 2.00 Bh 395,750.00 791,500.00

2 Pek. Pas bak air fiber 2.00 Bh 396,800.00 793,600.00

3 Pek. Pas floordrain 2.00 Bh 24,420.00 48,840.00

4 Pek. Pas kran air 3.00 Bh 65,170.00 195,510.00

5 Pek. Pas kosen dan pintu fiber, lengkap 2.00 Bh 300,000.00 600,000.00

6 Pek. Pas septicktank + peresapan 1.00 Unt 3,000,000.00 3,000,000.00

7 Pek. Pas pipa saluran air bersih, PVC 3/4 " 36.00 M1 18,350.00 660,600.00

8 Pek. Pas pipa saluran air kotor, PVC 3 " 6.00 M1 55,630.00 333,780.00

9 Pek. Pas pipa saluran limbah padat dari kloset, PVC 4 " 18.00 M1 55,630.00 1,001,340.00

--------------------------------

Sub Jumlah 7,425,170.00

J. PEKERJAAN PENGECATAN

1 Pek. Cat air untuk dinding 71.16 M2 10,470.00 745,045.20

2 Pek. Cat air untuk plafond 18.65 M2 10,470.00 195,265.50

3 Pek. Cat minyak untuk listplank papan & cat list plafond 11.05 M2 27,060.00 299,013.00

--------------------------------

Sub Jumlah 1,239,323.70

K. PEKERJAAN LAIN LAIN

1 Pek. Pembersihan akhir 1.00 Ls 138,000.00 138,000.00

--------------------------------

Sub Jumlah 138,000.00

Page 3: RAB WC

REKAPITULASI - HPS

KEGIATAN : PENINGKATAN PEMBANGUNAN PASAR PEDESAAN DI KECAMATAN MERBAU

PEKERJAAN : PEMBANGUNAN MCK UNTUK PASAR PEDESAAN DI KEC. MERBAU 2 UNIT

LOKASI : KECAMATAN MERBAU - KABUPATEN KEPULAUAN MERANTI

TAHUN : 2011

NO. URAIAN KEGIATAN

A PEKERJAAN PENDAHULUAN Rp. 500,000.00

B PEKERJAAN TANAH DAN PONDASI Rp. 11,005,950.60

C PEKERJAAN STRUKTUR Rp. 4,236,014.30

D PEKERJAAN DINDING Rp. 11,581,451.20

E PEKERJAAN LANTAI Rp. 3,804,121.10

F PEKERJAAN KAP / ATAP Rp. 9,061,489.60

G PEKERJAAN PLAFOND Rp. 2,164,421.00

H PEKERJAAN INSTALASI LISTRIK Rp. 2,390,000.00

I PEKERJAAN SANITASI Rp. 7,425,170.00

J PEKERJAAN PENGECATAN Rp. 1,239,323.70

K PEKERJAAN LAIN LAIN Rp. 138,000.00

JUMLAH Rp. 53,545,941.50

PPN 10% Rp. 5,354,594.15

TOTAL Rp. 58,900,535.65

DIBULATKAN Rp. 58,900,000.00

TERBILANG : LIMA PULUH DELAPAN JUTA SEMBILAN RATUS RIBU RUPIAH.

Selatpanjang, November 2011

Dibuat Oleh :

PEJABAT PELAKSANA TEKNIS KEGIATAN

( PPTK )

Z A U J A R, S.Sos

NIP. 19601110 198503 1 010

JUMLAH HARGA

Disetujui Oleh :

PENGGUNA ANGGARAN

DINAS PASAR, KEBERSIHAN DAN PERTAMANAN

KAB. KEPULAUAN MERANTI

JONIZAR, SH, M.Si

NIP. 19611030 198510 1 001

Page 4: RAB WC

PEMERINTAH KABUPATEN KEPULAUAN MERANTI

DINAS PASAR, KEBERSIHAN DAN PERTAMANAN

JLN. TANJUNG HARAPAN - SELATPANJANG

HARGA PERKIRAAAN SENDIRI ( HPS )

Kegiatan

PENINGKATAN PEMBANGUNAN PASAR PEDESAAN DI KECAMATAN MERBAU

Pekerjaan :

PEMBANGUNAN MCK UNTUK PASAR PEDESAAN DI KEC. MERBAU 2 UNIT

Lokasi :

KECAMATAN MERBAU - KABUPATEN KEPULAUAN MERANTI

Page 5: RAB WC

HARGA PERKIRAAN SENDIRI ( HPS )

KEGIATAN : PENINGKATAN PEMBANGUNAN PASAR PEDESAAN DI KECAMATAN MERBAU

PEKERJAAN : PEMBANGUNAN MCK UNTUK PASAR PEDESAAN DI KEC. MERBAU 2 UNIT

LOKASI : KECAMATAN MERBAU - KABUPATEN KEPULAUAN MERANTI

TAHUN : 2011

HARGA SATUAN JUMLAH HARGA

( Rp ) ( Rp )

A B C D E

A. PEKERJAAN PENDAHULUAN

1 Pek. Pembersihan lokasi 1.00 Ls 400,500.00 400,500.00

2 Pek. Pengukuran dan pas. bowplank 1.00 Ls 1,700,000.00 1,700,000.00

--------------------------------

Sub Jumlah 2,100,500.00

B. PEKERJAAN TANAH DAN PONDASI

1 Pek. Galian tanah pondasi 6.00 M3 29,400.00 176,400.00

2 Pek. Pas cerocok kayu 96.00 Btg 22,000.00 2,112,000.00

3 Pek. Urugan pasir, tebal 5 cm 0.60 M3 332,350.00 199,410.00

4 Pek. Cor lantai kerja 1 : 3 : 5, tebal 5 cm 0.60 M3 960,720.00 576,432.00

5 Pek. Cor pondasi setempat 0.44 M3 3,113,750.00 1,370,050.00

6 Pek. Cor sloof 12/20 cm 0.58 M3 3,297,790.00 1,912,718.20

7 Pek. Pas pondasi 1 bata 1 : 4 9.60 M2 431,290.00 4,140,384.00

8 Pek. Raben pondasi 19.20 M2 32,970.00 633,024.00

9 Pek. Urugan kembali bekas galian ( tanah timbun ) 2.44 M3 344,350.00 840,214.00

--------------------------------

Sub Jumlah 11,960,632.20

C. PEKERJAAN STRUKTUR

1 Pek. Cor kolom 12/12 cm 0.35 M3 4,727,650.00 1,654,677.50

2 Pek. Cor ring balok 15/15 cm 0.54 M3 4,097,360.00 2,212,574.40

3 Pek. Cor ring balok 10/15 cm ( pagar selasar / teras ) 0.09 M3 4,097,360.00 368,762.40

--------------------------------

Sub Jumlah 4,236,014.30

D. PEKERJAAN DINDING

1 Pek. Pas dinding 1/2 bata 1 : 4 35.58 M2 213,140.00 7,583,521.20

2 Pek. Plesteran dinding 1 : 4 71.16 M2 55,150.00 3,924,474.00

3 Pek. Pas dinding batu kerawang 6.08 M2 102,780.00 624,902.40

4 Pek. Pas kosen dan pintu fiber, lengkap 2.00 Bh 300,000.00 600,000.00

--------------------------------

Sub Jumlah 12,732,897.60

E. PEKERJAAN LANTAI

1 Pek. Pas lantai keramik 20/20 cm 10.82 M2 168,820.00 1,826,632.40

2 Pek. Pas bon bon keramik 5.40 M1 15,000.00 81,000.00

3 Pek. Cor lantai kerja 1 : 3 : 5, tebal 5 cm 0.60 M3 960,720.00 576,432.00

4 Pek. Urugan pasir, tebal 5 cm 0.60 M3 332,350.00 199,410.00

5 Pek. Urugan tanah dibawah lantai 2.25 M3 344,350.00 774,787.50

6 Pek. Cor rabat beton 1 : 3 : 5, tebal 5 cm 0.36 M3 960,720.00 345,859.20

--------------------------------

Sub Jumlah 3,804,121.10

F. PEKERJAAN KAP / ATAP

1 Pek. Pas atap genteng metal 30.16 M2 74,990.00 2,261,698.40

2 Pek. Pas parabung atap 5.80 M1 72,530.00 420,674.00

3 Pek. Pas bola bola atap 62.40 M1 44,980.00 2,806,752.00

4 Pek. Pas rangka atap ( kasau + reng ) 30.16 M2 41,145.00 1,240,933.20

5 Pek. Pas gording, kayu 5/10 cm 0.17 M3 3,161,500.00 537,455.00

6 Pek. Pas kuda kuda kayu 5/10 cm 0.11 M3 3,818,000.00 419,980.00

7 Pek. Pas balok angin, kayu 5/7 cm 0.03 M3 3,161,500.00 94,845.00

8 Pek. Pas listplank papan 2 x 3/20 cm 32.40 M1 39,480.00 1,279,152.00

--------------------------------

Sub Jumlah 9,061,489.60

NO URAIAN PEKERJAAN VOLUME

Page 6: RAB WC

A B C D E

G. PEKERJAAN PLAFOND

1 Pek. Pas rangka plafond ( kayu ) 18.65 M2 65,100.00 1,214,115.00

2 Pek. Pas plafond triplek 18.65 M2 31,640.00 590,086.00

3 Pek. Pas list plafond 33.20 M2 10,850.00 360,220.00

--------------------------------

Sub Jumlah 2,164,421.00

H. PEKERJAAN INSTALASI LISTRIK

1 Pek. Pas lampu XL 18 watt 6.00 Bh 45,000.00 270,000.00

2 Pek. Pas stop kontak 1.00 Bh 50,000.00 50,000.00

3 Pek. Pas saklar tiga 2.00 Bh 60,000.00 120,000.00

4 Pek. Pas sikring khas ( 1 NCB ) 1.00 Bh 50,000.00 50,000.00

5 Pek. Pas instalasi listrik 10.00 Ttk 190,000.00 1,900,000.00

--------------------------------

Sub Jumlah 2,390,000.00

I. PEKERJAAN SANITASI

1 Pek. Pas kloset jongkok 2.00 Bh 395,750.00 791,500.00

2 Pek. Pas bak air fiber 2.00 Bh 396,800.00 793,600.00

3 Pek. Pas floordrain 2.00 Bh 24,420.00 48,840.00

4 Pek. Pas kran air 3.00 Bh 65,170.00 195,510.00

5 Pek. Pas kosen dan pintu fiber, lengkap 2.00 Bh 300,000.00 600,000.00

6 Pek. Pas tangki air fiber, kap. 1000 lt 2.00 Bh 950,000.00 1,900,000.00

7 Pek. Pas septicktank + peresapan 1.00 Unt 3,500,000.00 3,500,000.00

8 Pek. Pas pipa saluran air bersih, PVC 3/4 " 36.00 M1 18,350.00 660,600.00

9 Pek. Pas pipa saluran air kotor, PVC 3 " 6.00 M1 55,630.00 333,780.00

10 Pek. Pas pipa saluran limbah padat dari kloset, PVC 4 " 18.00 M1 55,630.00 1,001,340.00

11 Pek. Sumur bor 1.00 Unt 3,000,000.00 3,000,000.00

--------------------------------

Sub Jumlah 12,825,170.00

J. PEKERJAAN PENGECATAN

1 Pek. Cat air untuk dinding 71.16 M2 10,470.00 745,045.20

2 Pek. Cat air untuk plafond 18.65 M2 10,470.00 195,265.50

3 Pek. Cat minyak untuk listplank papan & cat list plafond 11.05 M2 27,060.00 299,013.00

--------------------------------

Sub Jumlah 1,239,323.70

K. PEKERJAAN TOWER BETON

1 Pek. Galian tanah pondasi 1.15 M3 29,400.00 33,810.00

2 Pek. Pas cerocok kayu 36.00 Btg 22,000.00 792,000.00

3 Pek. Urugan pasir, tebal 5 cm 0.07 M3 332,350.00 23,264.50

4 Pek. Cor lantai kerja 1 : 3 : 5, tebal 5 cm 0.07 M3 960,720.00 67,250.40

5 Pek. Cor pondasi tapak 0.86 M3 3,113,750.00 2,677,825.00

6 Pek. Cor tiang beton 20/20 cm 0.34 M3 4,727,650.00 1,607,401.00

7 Pek. Cor balok skor 18/18 cm 0.17 M3 4,285,350.00 728,509.50

8 Pek. Cor balok lantai 20/40 cm 0.34 M3 4,285,350.00 1,457,019.00

9 Pek. Cor plat lantai beton, tebal 12 cm 0.50 M3 4,237,360.00 2,118,680.00

10 Pek. Urugan kembali bekas galian ( tanah timbun ) 0.14 M3 344,350.00 48,209.00

--------------------------------

Sub Jumlah 9,553,968.40

L. PEKERJAAN LAIN LAIN

1 Pek. Pembuatan parit 14.00 M1 240,000.00 3,360,000.00

2 Pek. Pembersihan akhir 1.00 Ls 1,000,000.00 2,500,000.00

--------------------------------

Sub Jumlah 5,860,000.00

Page 7: RAB WC

REKAPITULASI - HPS

KEGIATAN : PENINGKATAN PEMBANGUNAN PASAR PEDESAAN DI KECAMATAN MERBAU

PEKERJAAN : PEMBANGUNAN MCK UNTUK PASAR PEDESAAN DI KEC. MERBAU 2 UNIT

LOKASI : KECAMATAN MERBAU - KABUPATEN KEPULAUAN MERANTI

TAHUN : 2011

NO. URAIAN KEGIATAN

A PEKERJAAN PENDAHULUAN Rp. 2,100,500.00

B PEKERJAAN TANAH DAN PONDASI Rp. 11,960,632.20

C PEKERJAAN STRUKTUR Rp. 4,236,014.30

D PEKERJAAN DINDING Rp. 12,732,897.60

E PEKERJAAN LANTAI Rp. 3,804,121.10

F PEKERJAAN KAP / ATAP Rp. 9,061,489.60

G PEKERJAAN PLAFOND Rp. 2,164,421.00

H PEKERJAAN INSTALASI LISTRIK Rp. 2,390,000.00

I PEKERJAAN SANITASI Rp. 12,825,170.00

J PEKERJAAN PENGECATAN Rp. 9,553,968.40

K PEKERJAAN TOWER BETON Rp. 9,553,968.40

L PEKERJAAN LAIN LAIN Rp. 5,860,000.00

JUMLAH Rp. 86,243,182.60

PPN 10% Rp. 8,624,318.26

TOTAL Rp. 94,867,500.86

DIBULATKAN Rp. 94,867,000.00

TERBILANG : SERATUS JUTA RUPIAH.

Selatpanjang, November 2011

Dibuat Oleh :

PEJABAT PELAKSANA TEKNIS KEGIATAN

( PPTK )

Z A U J A R, S.Sos

NIP. 19601110 198503 1 010

KAB. KEPULAUAN MERANTI

JONIZAR, SH, M.Si

NIP. 19611030 198510 1 001

JUMLAH HARGA

Disetujui Oleh :

PENGGUNA ANGGARAN

DINAS PASAR, KEBERSIHAN DAN PERTAMANAN

Page 8: RAB WC

KEGIATAN : PENINGKATAN PEMBANGUNAN PASAR PEDESAAN DI KECAMATAN MERBAU

PEKERJAAN : PEMBANGUNAN MCK UNTUK PASAR PEDESAAN DI KEC. MERBAU 2 UNIT

LOKASI : KECAMATAN MERBAU - KABUPATEN KEPULAUAN MERANTI

TAHUN : 2011

1 3 4 5

I TENAGA KERJA

1 MANDOR ORANG / HARI 85,000.00

2 KEPALA TUKANG ORANG / HARI 85,000.00

3 TUKANG ORANG / HARI 75,000.00

4 PEKERJA ORANG / HARI 65,000.00

II BAHAN

A BAHAN PASANGAN

1 PASIR URUG M3. 260,000.00

2 PASIR PASANG M3. 290,000.00

3 PASIR BETON / COR M3. 290,000.00

4 TANAH URUG / TIMBUN M3. 270,000.00

5 TANAH HITAM M3. 180,000.00

6 KERIKIL / KORAL BETON M3. 400,000.00

7 BATU KALI M3. 400,000.00

8 BATU BATA BH. 1,500.00

9 BATU KERAWANG BH. 2,300.00

10 PORTLAND CEMENT / SEMEN PADANG TYPE I KG. 1,500.00

11 PORTLAND CEMENT WARNA KG. 2,500.00

12 PAVING BLOK TEBAL 6 CM BH. 2,500.00

13 TIANG PANCANG BETON 20/20 CM M' 120,000.00

B BAHAN KAYU

1 KAYU KELAS I (KULIM, TEMBUSU/ SEJENISNYA) M3. 5,800,000.00

2 KAYU MERANTI M3. 2,200,000.00

3 KAYU LAMBERZIRING (JELUTUNG) M3. 2,300,000.00

4 PAPAN/KAYU SURIAN M3. 2,300,000.00

5 KAYU KELAS III M3. 2,000,000.00

6 KAYU CEROCOK / KAYU MAHANG BTG. 14,000.00

7 KAYU CEROCOK / KAYU UBAR BTG. 19,000.00

8 KAYU DOLKEN DIA. 8 - 10 CM PANJANG 400 CM BTG. 10,000.00

9 KAYU PERANCAH / BEKISTING DALAM M3. 2,000,000.00

10 PAPAN LISPLANK UKIR (LEBAH BERGAYUT) M' 110,000.00

11 PAPAN SINGAP UKIR (GRC) M2. 450,000.00

12 SELEMBAYUNG UKIR ( GRC ) BH 350,000.00

C BAHAN BESI

1 BESI BETON KG. 13,000.00

2 KAWAT IKAT BETON (BANDRAT) KG. 17,000.00

3 RANGKA PLAFOND METAL FURING M' 8,000.00

D BAHAN PENUTUP LANTAI DAN DINDING

1 KERAMIK UKURAN 40X40 CM BH. 10,850.00

2 KERAMIK UKURAN 30X30 CM BH. 5,950.00

3 KERAMIK UKURAN 20X25 CM BH. 3,250.00

4 KERAMIK UKURAN 20X20 CM BH. 2,600.00

5 PLIN KERAMIK 10X30 CM BH. 2,000.00

6 PLIN KERAMIK 10X40 CM BH. 2,750.00

7 BATU ANDESIT HITAM 15X20 CM M2. 350,000.00

E BAHAN ATAP

1 SENG PLAT LBR. 50,000.00

2 SENG GELOMBANG LBR. 45,000.00

3 ATAP GENTENG METAL 0,25 MM M2. 48,000.00

4 PERABUNG GENTENG METAL BULAT LBR. 38,000.00

5 BOLA - BOLA ATAP GENTENG LBR. 35,000.00

6 PLASTIK GOT M' 30,000.00

F BAHAN LANGIT - LANGIT DAN LAP. DINDING

1 PLYWOOD 4 MM LBR. 57,000.00

2 PLYWOOD 9 MM LBR. 120,000.00

3 GYPSUM 9 MM LBR. 115,000.00

4 GRC BOARD 9 MM LBR. 120,000.00

5 LIST PROFIL KAYU K1 M' 6,000.00

6 LIST PROFIL GYPSUM h = 15 CM M' 25,000.00

2

DAFTAR HARGA SATUAN UPAH DAN BAHAN

NO. JENIS BAHAN SATUAN HARGA SATUAN KETERANGAN

Page 8

Page 9: RAB WC

1 3 4 52

NO. JENIS BAHAN SATUAN HARGA SATUAN KETERANGAN

G BAHAN PIPA

1 STOPKRAN DIA. 3/4 " BH. 45,000.00

2 KRAN AIR DIA. 1/2 " BH. 55,000.00

3 KRAN AIR DIA. 3/4 " BH. 55,000.00

4 PIPA PVC AW 1/2 " M' 6,000.00

5 PIPA PVC AW 3/4 " M' 7,000.00

6 PIPA PVC AW 3 " M' 16,000.00

7 PIPA PVC AW 4 " M' 25,000.00

8 SEAL TAPE BH. 30,000.00

H BAHAN SANITAIR

1 KLOSET JONGKOK PORSELIN BH. 180,000.00

2 KLOSET DUDUK MONOBLOK BH. 1,450,000.00

3 WASTAFEL BH. 1,250,000.00

4 FLOOR DRAIN SETARA SUN EI BH. 15,000.00

5 BAK FIBERGLASS BH. 160,000.00

6 TANGKI FIBER, Kap. 1000 Ltr BH. 950,000.00

7 MESIN POMPA AIR MERK SANYO / NASIONAL UNIT 1,000,000.00

8 KRAN AIR DIA. 3/4" , 1/2" BH. 30,000.00

9 SEAL TAPE BH. 3,500.00

10 PINTU FIBER + KOSEN FIBER, KOMPLIT BH. 300,000.00

11 STOP KRAN DIA. 3/4" UNIT 35,000.00

I BAHAN PAKU

1 PAKU ATAP GENTENG METAL KG. 23,000.00

2 PAKU KAYU KG. 17,000.00

3 PAKU SERI KG. 22,000.00

4 PAKU 2" - 5" KG. 17,000.00

5 PAKU GYPSUM KG. 22,000.00

6 PAKU SKRUP KG. 23,000.00

J BAHAN PINTU DAN PENGGANTUNG / KUNCI

1 PINTU BESI FOLDING GATE + PEMASANGAN M2. 850,000.00

2 KUNCI TANAM BIASA BH. 200,000.00

3 GRENDEL PINTU 4 " BH. 12,000.00

4 ENGSEL PINTU 4 " BH. 15,000.00

5 ENGSEL JENDELA 3 " BH. 14,000.00

6 GRENDEL JENDELA 2 " BH. 15,000.00

7 HAK ANGIN JENDELA BH. 20,000.00

8 HANDLE JENDELA BH. 20,000.00

K BAHAN KACA

1 KACA BENING 3 MM M2. 85,000.00

2 KACA BENING 5 MM M2. 125,000.00

3 KACA BURAM 5 MM M2. 135,000.00

L BAHAN LISTRIK

1 INSTALASI TITIK LAMPU (KABEL INSTALASI STANDAR PLN) TTK. 190,000.00

2 STOP KONTAK BH. 50,000.00

3 PANEL BOX BH. 2,500,000.00

4 SAKLAR TIGA BH. 60,000.00

5 SAKLAR GANDA BH. 50,000.00

6 SAKLAR TUNGGAL BH. 40,000.00

7 LAMPU XL 18 WATT BH. 45,000.00

8 BOX NCB KOMPLIT BH. 50,000.00

M BAHAN FINISHING

1 CAT MINYAK SETARA PLATON KG. 34,000.00

2 CAT TEMBOK SETARA PLATON KG. 7,500.00

3 CAT VERNISH KG. 55,000.00

4 CAT KAYU DASAR / MENI KG. 25,000.00

5 MINYAK CAT LTR. 21,000.00

6 THINEER LTR. 21,000.00

7 RESIDU KG. 8,000.00

8 DEMPUL KG. 9,000.00

9 PLAMIR RJ KG. 10,000.00

10 KERTAS PASIR / AMPLAS LBR. 3,500.00

11 TEPUNG PENGISI NAT KERAMIK KG. 12,000.00

12 KUAS 3" BH. 12,000.00

13 MINYAK BEKISTING LTR. 4,000.00

14 CAT IMPRA KG. 35,000.00

15 CAT VERNIS LTR. 34,000.00

Page 9

Page 10: RAB WC

1 3 4 52

NO. JENIS BAHAN SATUAN HARGA SATUAN KETERANGAN

N BAJA RINGAN1 PROFIL C.85.40.7 KG. 15,000.00

2 PROFIL U.41.33.5 KG. 15,000.00

3 WTEKS 12-14 x 20 HWFS CLASS II PC. 750.00

4 CSP 10-16 x 16 HWFS CLASS II PC. 500.00

5 SG 10 MULTIPLATE PC. 3,000.00

O MOBILISASI1 TRONTON JAM 170,000.00

2 CRANE JAM 190,000.00

3 HAMMER JAM 60,000.00

Page 10

Page 11: RAB WC

KEGIATAN : PENINGKATAN PEMBANGUNAN PASAR PEDESAAN DI KECAMATAN MERBAU

PEKERJAAN : PEMBANGUNAN MCK UNTUK PASAR PEDESAAN DI KEC. MERBAU 2 UNIT

LOKASI : KECAMATAN MERBAU - KABUPATEN KEPULAUAN MERANTI

#REF!

TAHUN : 2011

UPAH BAHAN

1 4 5 6

1 M' PENGUKURAN DAN PEMASANGAN BOWPLANK

TENAGA

Pekerja 0.1000 OH 65,000.00 6,500.00

Tukang Kayu 0.1000 OH 75,000.00 7,500.00

Kepala Tukang 0.0100 OH 85,000.00 850.00

Mandor 0.0050 OH 85,000.00 425.00

BAHAN

Kayu 5/7 0.0120 M3 2,200,000.00 26,400.00

Paku Biasa 2'-5' 0.0200 Kg 17,000.00 340.00

Kayu Papan 3/20 0.0070 Kg 2,300,000.00 16,100.00

SUB TOTAL 15,275.00 42,840.00

JUMLAH 58,115.00

DIBULATKAN 58,110.00

1 M2 MEMBERSIHKAN LAPANGAN DAN PERALATAN

TENAGA

Pekerja 0.1000 OH 65,000.00 6,500.00

Mandor 0.0500 OH 85,000.00 4,250.00

SUB TOTAL 10,750.00 -

JUMLAH 10,750.00

DIBULATKAN 10,750.00

1 M3 GALIAN TANAH BIASA SEDALAM 1 M

TENAGA

Pekerja 0.4000 OH 65,000.00 26,000.00

Tukang - OH - -

Kepala Tukang - OH - -

Mandor 0.0400 OH 85,000.00 3,400.00

SUB TOTAL 29,400.00 -

JUMLAH 29,400.00

DIBULATKAN 29,400.00

1 M3 URUGAN KEMBALI

TENAGA

Pekerja 0.1920 OH 65,000.00 12,480.00

Mandor 0.0190 OH 85,000.00 1,615.00

SUB TOTAL 14,095.00 -

JUMLAH 14,095.00

DIBULATKAN 14,095.00

1 M3 URUGAN PASIR

TENAGA

Pekerja 0.3000 OH 65,000.00 19,500.00

Tukang - OH - -

Kepala Tukang - OH - -

Mandor 0.0100 OH 85,000.00 850.00

BAHAN

Pasir urug 1.2000 M3 260,000.00 312,000.00

SUB TOTAL 20,350.00 312,000.00

JUMLAH 332,350.00

DIBULATKAN 332,350.00

DAFTAR ANALISA HARGA SATUAN PEKERJAAN

NO URAIAN PEKERJAAN VOLUME HARGA SATUAN JUMLAH

2 3

ANALISA BIAYA KONSTRUKSI PEKERJAAN PERSIAPAN

ANALISA BIAYA KONSTRUKSI PEKERJAAN TANAH

Page 11 of 22

Page 12: RAB WC

UPAH BAHAN

1 4 5 6

NO URAIAN PEKERJAAN VOLUME HARGA SATUAN JUMLAH

2 3

1 M3 URUGAN TANAH

TENAGA

Pekerja 0.3000 OH 65,000.00 19,500.00

Tukang - OH - -

Kepala Tukang - OH - -

Mandor 0.0100 OH 85,000.00 850.00

BAHAN

Tanah 1.2000 M3 270,000.00 324,000.00

SUB TOTAL 20,350.00 324,000.00

JUMLAH 344,350.00

DIBULATKAN 344,350.00

1 M3 URUGAN TANAH HITAM/HUMUS

TENAGA

Pekerja 0.3000 OH 65,000.00 19,500.00

Tukang - OH - -

Kepala Tukang - OH - -

Mandor 0.0100 OH 85,000.00 850.00

BAHAN

Tanah Hitam / Humus 1.2000 M3 180,000.00 216,000.00

SUB TOTAL 20,350.00 216,000.00

JUMLAH 236,350.00

DIBULATKAN 236,350.00

1 M2 PASANGAN BATA MERAH TEBAL 1 BATA (1:4)

TENAGA

Pekerja 0.6500 OH 65,000.00 42,250.00

Tukang 0.2000 OH 75,000.00 15,000.00

Kepala Tukang 0.0200 OH 85,000.00 1,700.00

Mandor 0.0300 OH 85,000.00 2,550.00

BAHAN

Batu Bata 202.0000 Bh 1,500.00 303,000.00

Semen Portland 26.5500 Kg 1,500.00 39,825.00

Pasir Pasang 0.0930 M3 290,000.00 26,970.00

SUB TOTAL 61,500.00 369,795.00

JUMLAH 431,295.00

DIBULATKAN 431,290.00

1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA (1:2)

TENAGA

Pekerja 0.3200 OH 65,000.00 20,800.00

Tukang 0.1000 OH 75,000.00 7,500.00

Kepala Tukang 0.0100 OH 85,000.00 850.00

Mandor 0.0150 OH 85,000.00 1,275.00

BAHAN

Batu Bata 102.0000 Bh 1,500.00 153,000.00

Semen Portland 18.9500 Kg 1,500.00 28,425.00

Pasir Pasang 0.0380 M3 290,000.00 11,020.00

SUB TOTAL 30,425.00 192,445.00

JUMLAH 222,870.00

DIBULATKAN 222,870.00

1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA (1:4)

TENAGA

Pekerja 0.3200 OH 65,000.00 20,800.00

Tukang 0.1000 OH 75,000.00 7,500.00

Kepala Tukang 0.0100 OH 85,000.00 850.00

Mandor 0.0150 OH 85,000.00 1,275.00

BAHAN

Batu Bata 102.0000 Bh 1,500.00 153,000.00

Semen Portland 11.5000 Kg 1,500.00 17,250.00

Pasir Pasang 0.0430 M3 290,000.00 12,470.00

SUB TOTAL 30,425.00 182,720.00

JUMLAH 213,145.00

DIBULATKAN 213,140.00

ANALISA BIAYA KONSTRUKSI PEKERJAAN DINDING

Page 12 of 22

Page 13: RAB WC

UPAH BAHAN

1 4 5 6

NO URAIAN PEKERJAAN VOLUME HARGA SATUAN JUMLAH

2 3

1 M2 PASANGAN BATU KERAWANG (1:4)

TENAGA

Pekerja 0.3200 OH 65,000.00 20,800.00

Tukang 0.1000 OH 75,000.00 7,500.00

Kepala Tukang 0.0100 OH 85,000.00 850.00

Mandor 0.0150 OH 85,000.00 1,275.00

BAHAN

Batu Kerawang 25.0000 Bh 2,300.00 57,500.00

Semen Portland 5.7500 Kg 1,500.00 8,625.00

Pasir Pasang 0.0215 M3 290,000.00 6,235.00

SUB TOTAL 30,425.00 72,360.00

JUMLAH 102,785.00

DIBULATKAN 102,780.00

1 M2 PLESTERAN 1:2, TEBAL 20 MM

TENAGA

Pekerja 0.2500 OH 65,000.00 16,250.00

Tukang batu 0.2000 OH 75,000.00 15,000.00

Kepala Tukang 0.0200 OH 85,000.00 1,700.00

Mandor 0.0125 OH 85,000.00 1,062.50

BAHAN

Semen Portland 14.2800 Kg 1,500.00 21,420.00

Pasir Pasang 0.0230 M3 290,000.00 6,670.00

SUB TOTAL 34,012.50 28,090.00

JUMLAH 62,102.50

DIBULATKAN 62,100.00

1 M2 PLESTERAN 1:4, TEBAL 20 MM

TENAGA

Pekerja 0.2500 OH 65,000.00 16,250.00

Tukang batu 0.2000 OH 75,000.00 15,000.00

Kepala Tukang 0.0200 OH 85,000.00 1,700.00

Mandor 0.0125 OH 85,000.00 1,062.50

BAHAN

Semen Portland 8.6800 Kg 1,500.00 13,020.00

Pasir Pasang 0.0280 M3 290,000.00 8,120.00

SUB TOTAL 34,012.50 21,140.00

JUMLAH 55,152.50

DIBULATKAN 55,150.00

1 M2 PLESTERAN MERABEN 1:3, TEBAL 30 MM

TENAGA

Pekerja 0.1500 OH 65,000.00 9,750.00

Tukang batu 0.0700 OH 75,000.00 5,250.00

Kepala Tukang 0.0070 OH 85,000.00 595.00

Mandor 0.0080 OH 85,000.00 680.00

BAHAN

Semen Portland 7.0700 Kg 1,500.00 10,605.00

Pasir Pasang 0.0210 M3 290,000.00 6,090.00

SUB TOTAL 16,275.00 16,695.00

JUMLAH 32,970.00

DIBULATKAN 32,970.00

1 M2 PLESTERAN BETON 1:3, TEBAL 10 MM

TENAGA

Pekerja 0.2000 OH 65,000.00 13,000.00

Tukang batu 0.2000 OH 75,000.00 15,000.00

Kepala Tukang 0.0180 OH 85,000.00 1,530.00

Mandor 0.0100 OH 85,000.00 850.00

BAHAN

Semen Portland 2.3400 Kg 1,500.00 3,510.00

Pasir Pasang 0.0070 M3 290,000.00 2,030.00

SUB TOTAL 30,380.00 5,540.00

JUMLAH 35,920.00

DIBULATKAN 35,920.00

ANALISA BIAYA KONSTRUKSI PEKERJAAN PLESTERAN

Page 13 of 22

Page 14: RAB WC

UPAH BAHAN

1 4 5 6

NO URAIAN PEKERJAAN VOLUME HARGA SATUAN JUMLAH

2 3

1 M2 PASANG ATAP GENTENG METAL

TENAGA

Pekerja 0.2000 OH 65,000.00 13,000.00

Tukang Kayu 0.1000 OH 75,000.00 7,500.00

Kepala Tukang 0.0100 OH 85,000.00 850.00

Mandor 0.0010 OH 85,000.00 85.00

BAHAN

Atap Genteng metal 1.0200 M2 48,000.00 48,960.00

Paku atap genteng metal 0.2000 Kg 23,000.00 4,600.00

SUB TOTAL 21,435.00 53,560.00

JUMLAH 74,995.00

DIBULATKAN 74,990.00

1 M' PASANG PARABUNG GENTENG METAL

TENAGA

Pekerja 0.2500 OH 65,000.00 16,250.00

Tukang Kayu 0.1500 OH 75,000.00 11,250.00

Kepala Tukang 0.0150 OH 85,000.00 1,275.00

Mandor 0.0130 OH 85,000.00 1,105.00

BAHAN

Parabung genteng metal 1.1000 Lbr 38,000.00 41,800.00

Paku biasa 2'-5' 0.0500 Kg 17,000.00 850.00

SUB TOTAL 29,880.00 42,650.00

JUMLAH 72,530.00

DIBULATKAN 72,530.00

1 M' PASANG JURAI DALAM

TENAGA

Pekerja 0.2000 OH 65,000.00 13,000.00

Tukang Kayu 0.1500 OH 75,000.00 11,250.00

Kepala Tukang 0.0150 OH 85,000.00 1,275.00

Mandor 0.0130 OH 85,000.00 1,105.00

BAHAN

Seng Plat 0.2500 m2 50,000.00 12,500.00

Plastik Got 0.3000 M' 30,000.00 9,000.00

Paku biasa 2'-5' 0.0500 Kg 17,000.00 850.00

SUB TOTAL 26,630.00 22,350.00

JUMLAH 48,980.00

DIBULATKAN 48,980.00

1 M' PASANG BOLA - BOLA ATAP

TENAGA

Pekerja 0.2000 OH 65,000.00 13,000.00

Tukang Kayu 0.1500 OH 75,000.00 11,250.00

Kepala Tukang 0.0150 OH 85,000.00 1,275.00

Mandor 0.0130 OH 85,000.00 1,105.00

BAHAN

Bola - Bola Genteng 0.5000 Lbr 35,000.00 17,500.00

Paku biasa 2'-5' 0.0500 Kg 17,000.00 850.00

SUB TOTAL 26,630.00 18,350.00

JUMLAH 44,980.00

DIBULATKAN 44,980.00

1 M3 PASANG KUDA - KUDA KAYU KELAS II

TENAGA

Pekerja 4.0000 OH 65,000.00 260,000.00

Tukang kayu 12.0000 OH 75,000.00 900,000.00

Kepala Tukang 1.2000 OH 85,000.00 102,000.00

Mandor 0.2000 OH 85,000.00 17,000.00

BAHAN

Kayu Kelas II Balok 1.1000 M3 2,200,000.00 2,420,000.00

Paku Biasa 2" - 5" 7.0000 Kg 17,000.00 119,000.00

SUB TOTAL 1,279,000.00 2,539,000.00

JUMLAH 3,818,000.00

DIBULATKAN 3,818,000.00

ANALISA BIAYA KONSTRUKSI PEKERJAAN PENUTUP ATAP

Page 14 of 22

Page 15: RAB WC

UPAH BAHAN

1 4 5 6

NO URAIAN PEKERJAAN VOLUME HARGA SATUAN JUMLAH

2 3

1 M3 PASANG GORDING KAYU KELAS II

TENAGA

Pekerja 2.0000 OH 65,000.00 130,000.00

Tukang kayu 6.0000 OH 75,000.00 450,000.00

Kepala Tukang 0.6000 OH 85,000.00 51,000.00

Mandor 0.1000 OH 85,000.00 8,500.00

BAHAN

Kayu Kelas II Balok 1.1000 M3 2,200,000.00 2,420,000.00

Paku Biasa 2" - 5" 6.0000 Kg 17,000.00 102,000.00

SUB TOTAL 639,500.00 2,522,000.00

JUMLAH 3,161,500.00

DIBULATKAN 3,161,500.00

1 M2 PASANG RANGKA ATAP (KASAU+RENG) KAYU KELAS II

TENAGA

Pekerja 0.1000 OH 65,000.00 6,500.00

Tukang kayu 0.1000 OH 75,000.00 7,500.00

Kepala Tukang 0.0100 OH 85,000.00 850.00

Mandor 0.0050 OH 85,000.00 425.00

BAHAN

Kayu Kelas II Balok 0.0106 M3 2,200,000.00 23,320.00

Paku Biasa 2" - 5" 0.1500 Kg 17,000.00 2,550.00

SUB TOTAL 15,275.00 25,870.00

JUMLAH 41,145.00

DIBULATKAN 41,145.00

1 M' PASANG LISPLANG UKURAN 2 X3/20

TENAGA

Pekerja 0.1000 OH 65,000.00 6,500.00

Tukang kayu 0.1000 OH 75,000.00 7,500.00

Kepala Tukang 0.0100 OH 85,000.00 850.00

Mandor 0.0500 OH 85,000.00 4,250.00

BAHAN

Kayu / papan Meranti 0.0088 M3 2,200,000.00 19,360.00

Paku biasa 0.0600 Kg 17,000.00 1,020.00

SUB TOTAL 19,100.00 20,380.00

JUMLAH 39,480.00

DIBULATKAN 39,480.00

1 M2 PASANG PLAFOND TRIPLEK 4 MM

TENAGA

Pekerja 0.0250 OH 65,000.00 1,625.00

Tukang Kayu 0.0750 OH 75,000.00 5,625.00

Kepala Tukang 0.0075 OH 85,000.00 637.50

Mandor 0.0013 OH 85,000.00 110.50

BAHAN

Plywood 4 mm 0.4000 Lbr 57,000.00 22,800.00

Paku biasa 0.0500 Kg 17,000.00 850.00

SUB TOTAL 7,998.00 23,650.00

JUMLAH 31,648.00

DIBULATKAN 31,640.00

1 M2 PASANG RANGKA PLAFOND (RANGKA KAYU)

TENAGA

Pekerja 0.1500 OH 65,000.00 9,750.00

Tukang kayu 0.2500 OH 75,000.00 18,750.00

Kepala Tukang 0.0250 OH 85,000.00 2,125.00

Mandor 0.0750 OH 85,000.00 6,375.00

BAHAN

Kayu Meranti 0.0120 M3 2,200,000.00 26,400.00

Paku biasa 0.1000 Kg 17,000.00 1,700.00

SUB TOTAL 37,000.00 28,100.00

JUMLAH 65,100.00

DIBULATKAN 65,100.00

ANALISA BIAYA KONSTRUKSI PEKERJAAN LANGIT-LANGIT

Page 15 of 22

Page 16: RAB WC

UPAH BAHAN

1 4 5 6

NO URAIAN PEKERJAAN VOLUME HARGA SATUAN JUMLAH

2 3

1 M' LIST PLAFOND PROFIL KAYU

TENAGA

Pekerja 0.0500 OH 65,000.00 3,250.00

Tukang Kayu 0.0500 OH 75,000.00 3,750.00

Kepala Tukang 0.0050 OH 85,000.00 425.00

Mandor 0.0030 OH 85,000.00 255.00

BAHAN

List Kayu Profil 0.5000 Lbr 6,000.00 3,000.00

Paku biasa 0.0100 Kg 17,000.00 170.00

SUB TOTAL 7,680.00 3,170.00

JUMLAH 10,850.00

DIBULATKAN 10,850.00

1 M3 MEMBUAT BETON 1:3:5

TENAGA

Pekerja 1.6500 OH 65,000.00 107,250.00

Tukang batu 0.2500 OH 75,000.00 18,750.00

Kepala Tukang 0.0250 OH 85,000.00 2,125.00

Mandor 0.0800 OH 85,000.00 6,800.00

BAHAN

Semen Portland 218.0000 Kg 1,500.00 327,000.00

Pasir Beton 0.5200 M3 290,000.00 150,800.00

Koral Beton 0.8700 M3 400,000.00 348,000.00

SUB TOTAL 134,925.00 825,800.00

JUMLAH 960,725.00

DIBULATKAN 960,720.00

1 M3 MEMBUAT BETON BERTULANG K 225 + BEKISTING

TENAGA

Pekerja 2.0000 OH 65,000.00 130,000.00

Tukang Kayu 0.1000 OH 75,000.00 7,500.00

Tukang batu 0.3500 OH 75,000.00 26,250.00

Kepala Tukang 0.0350 OH 85,000.00 2,975.00

Mandor 1.0000 OH 85,000.00 85,000.00

BAHAN

Kayu Meranti 0.1300 M3 2,200,000.00 286,000.00

Paku 1.0000 Kg 17,000.00 17,000.00

Semen Portland 371.0000 Kg 1,500.00 556,500.00

Pasir Beton 0.4986 M3 290,000.00 144,585.71

Koral Beton 0.7756 M3 400,000.00 310,222.22

SUB TOTAL 251,725.00 1,314,307.94

JUMLAH 1,566,032.94

DIBULATKAN 1,566,032.00

1 M3 MEMBUAT BETON BERTULANG K 225

TENAGA

Pekerja 1.6500 OH 65,000.00 107,250.00

Tukang batu 0.2750 OH 75,000.00 20,625.00

Kepala Tukang 0.0280 OH 85,000.00 2,380.00

Mandor 0.0830 OH 85,000.00 7,055.00

BAHAN

Semen Portland 371.0000 Kg 1,500.00 556,500.00

Pasir Beton 0.4986 M3 290,000.00 144,585.71

Koral Beton 0.7756 M3 400,000.00 310,222.22

SUB TOTAL 137,310.00 1,011,307.94

JUMLAH 1,148,617.94

DIBULATKAN 1,148,617.00

ANALISA BIAYA KONSTRUKSI PEKERJAAN BETON

Page 16 of 22

Page 17: RAB WC

UPAH BAHAN

1 4 5 6

NO URAIAN PEKERJAAN VOLUME HARGA SATUAN JUMLAH

2 3

1 M3 MEMBUAT PONDASI /POER BETON BERTULANG (90 KG+BEKISTING)

TENAGA

Pekerja 3.9000 OH 65,000.00 253,500.00

Tukang batu 0.3500 OH 75,000.00 26,250.00

Tukang Kayu 1.0400 OH 75,000.00 78,000.00

Tukang Besi 1.0500 OH 75,000.00 78,750.00

Kepala Tukang 0.2450 OH 85,000.00 20,825.00

Mandor 0.1650 OH 85,000.00 14,025.00

BAHAN

Kayu 0.2000 M3 2,000,000.00 400,000.00

Paku Biasa 1.5000 Kg 17,000.00 25,500.00

Minyak bekisting 0.4000 Ltr 4,000.00 1,600.00

Besi beton polos 90.0000 Kg 13,000.00 1,170,000.00

Kawat beton 2.0000 Kg 17,000.00 34,000.00

Semen Portland 371.0000 Kg 1,500.00 556,500.00

Pasir Beton 0.4986 M3 290,000.00 144,585.71

Koral Beton 0.7756 M3 400,000.00 310,222.22

SUB TOTAL 471,350.00 2,642,407.94

JUMLAH 3,113,757.94

DIBULATKAN 3,113,750.00

1 M3 MEMBUAT SLOOF BETON BERTULANG 90 KG+BEKISTING)

TENAGA

Pekerja 4.8500 OH 65,000.00 315,250.00

Tukang batu 0.3500 OH 75,000.00 26,250.00

Tukang Kayu 1.5600 OH 75,000.00 117,000.00

Tukang Besi 1.4000 OH 75,000.00 105,000.00

Kepala Tukang 0.3310 OH 85,000.00 28,135.00

Mandor 0.1700 OH 85,000.00 14,450.00

BAHAN

Kayu 0.2200 M3 2,000,000.00 440,000.00

Paku Biasa 2.0000 Kg 17,000.00 34,000.00

Minyak bekisting 0.6000 Ltr 4,000.00 2,400.00

Besi beton polos 90.0000 Kg 13,000.00 1,170,000.00

Kawat beton 2.0000 Kg 17,000.00 34,000.00

Semen Portland 371.0000 Kg 1,500.00 556,500.00

Pasir Beton 0.4986 M3 290,000.00 144,585.71

Koral Beton 0.7756 M3 400,000.00 310,222.22

SUB TOTAL 606,085.00 2,691,707.94

JUMLAH 3,297,792.94

DIBULATKAN 3,297,790.00

1 M3 MEMBUAT KOLOM BETON BERTULANG (90 KG+BEKISTING)

TENAGA

Pekerja 5.9600 OH 65,000.00 387,400.00

Tukang batu 0.3500 OH 75,000.00 26,250.00

Tukang Kayu 3.3000 OH 75,000.00 247,500.00

Tukang Besi 2.1000 OH 75,000.00 157,500.00

Kepala Tukang 0.5700 OH 85,000.00 48,450.00

Mandor 0.2500 OH 85,000.00 21,250.00

BAHAN

Kayu 0.4000 M3 2,000,000.00 800,000.00

Paku Biasa 4.0000 Kg 17,000.00 68,000.00

Minyak bekisting 2.0000 Ltr 4,000.00 8,000.00

Besi beton polos 90.0000 Kg 13,000.00 1,170,000.00

Kawat beton 2.5000 Kg 17,000.00 42,500.00

Semen Portland 371.0000 Kg 1,500.00 556,500.00

Pasir Beton 0.4986 M3 290,000.00 144,585.71

Koral Beton 0.7756 M3 400,000.00 310,222.22

Kayu balok 0.1500 M3 2,000,000.00 300,000.00

Plywood 3.5000 Lbr 57,000.00 199,500.00

Dolken 24.0000 Btg 10,000.00 240,000.00

SUB TOTAL 888,350.00 3,839,307.94

JUMLAH 4,727,657.94

DIBULATKAN 4,727,650.00

Page 17 of 22

Page 18: RAB WC

UPAH BAHAN

1 4 5 6

NO URAIAN PEKERJAAN VOLUME HARGA SATUAN JUMLAH

2 3

1 M3 MEMBUAT PLAT LANTAI BETON BERTULANG (90 KG+BEKISTING)

TENAGA

Pekerja 5.6000 OH 65,000.00 364,000.00

Tukang batu 0.3500 OH 75,000.00 26,250.00

Tukang Kayu 2.6400 OH 75,000.00 198,000.00

Tukang Besi 1.0500 OH 75,000.00 78,750.00

Kepala Tukang 0.4000 OH 85,000.00 34,000.00

Mandor 0.1930 OH 85,000.00 16,405.00

BAHAN

Kayu 0.2400 M3 2,000,000.00 480,000.00

Paku Biasa 3.2000 Kg 17,000.00 54,400.00

Minyak bekisting 1.6000 Ltr 4,000.00 6,400.00

Besi beton polos 90.0000 Kg 13,000.00 1,170,000.00

Kawat beton 2.2500 Kg 17,000.00 38,250.00

Semen Portland 371.0000 Kg 1,500.00 556,500.00

Pasir Beton 0.4986 M3 290,000.00 144,585.71

Koral Beton 0.7756 M3 400,000.00 310,222.22

Kayu balok 0.1500 M3 2,000,000.00 300,000.00

Plywood 4 mm 2.8000 Lbr 57,000.00 159,600.00

Dolken 30.0000 Btg 10,000.00 300,000.00

SUB TOTAL 717,405.00 3,519,957.94

JUMLAH 4,237,362.94

DIBULATKAN 4,237,360.00

1 M3 MEMBUAT RENG BALOK BETON BERTULANG (90 KG+BEKISTING)

TENAGA

Pekerja 5.6000 OH 65,000.00 364,000.00

Tukang batu 0.3500 OH 75,000.00 26,250.00

Tukang Kayu 2.6400 OH 75,000.00 198,000.00

Tukang Besi 1.0500 OH 75,000.00 78,750.00

Kepala Tukang 0.4000 OH 85,000.00 34,000.00

Mandor 0.1930 OH 85,000.00 16,405.00

BAHAN

Kayu 0.2500 M3 2,000,000.00 500,000.00

Paku Biasa 3.2000 Kg 17,000.00 54,400.00

Minyak bekisting 1.6000 Ltr 4,000.00 6,400.00

Besi beton polos 90.0000 Kg 13,000.00 1,170,000.00

Kawat beton 2.2500 Kg 17,000.00 38,250.00

Semen Portland 371.0000 Kg 1,500.00 556,500.00

Pasir Beton 0.4986 M3 290,000.00 144,585.71

Koral Beton 0.7756 M3 400,000.00 310,222.22

Kayu balok 0.1400 M3 2,000,000.00 280,000.00

Plywood 4 mm 2.8000 Lbr 57,000.00 159,600.00

Dolken 16.0000 Btg 10,000.00 160,000.00

SUB TOTAL 717,405.00 3,379,957.94

JUMLAH 4,097,362.94

DIBULATKAN 4,097,360.00

1 M3 MEMBUAT BALOK BETON BERTULANG (90 KG+BEKISTING)

TENAGA

Pekerja 5.6000 OH 65,000.00 364,000.00

Tukang batu 0.3500 OH 75,000.00 26,250.00

Tukang Kayu 2.6400 OH 75,000.00 198,000.00

Tukang Besi 1.0500 OH 75,000.00 78,750.00

Kepala Tukang 0.4000 OH 85,000.00 34,000.00

Mandor 0.1930 OH 85,000.00 16,405.00

BAHAN

Kayu 0.3200 M3 2,000,000.00 640,000.00

Paku Biasa 3.2000 Kg 17,000.00 54,400.00

Minyak bekisting 1.6000 Ltr 4,000.00 6,400.00

Besi beton polos 90.0000 Kg 13,000.00 1,170,000.00

Kawat beton 2.2500 Kg 17,000.00 38,250.00

Semen Portland 371.0000 Kg 1,500.00 556,500.00

Pasir Beton 0.5200 M3 290,000.00 150,800.00

Koral Beton 0.7800 M3 400,000.00 312,000.00

Kayu balok 0.1600 M3 2,000,000.00 320,000.00

Plywood 4 mm 2.8000 Lbr 57,000.00 159,600.00

Dolken 16.0000 Btg 10,000.00 160,000.00

SUB TOTAL 717,405.00 3,567,950.00

JUMLAH 4,285,355.00

DIBULATKAN 4,285,350.00

Page 18 of 22

Page 19: RAB WC

UPAH BAHAN

1 4 5 6

NO URAIAN PEKERJAAN VOLUME HARGA SATUAN JUMLAH

2 3

1 M1 MEMBUAT KOLOM PRAKTIS BETON BERTULANG ( 10 x 10 CM + BEKISTING)

TENAGA

Pekerja 0.0600 OH 65,000.00 3,900.00

Tukang batu 0.0200 OH 75,000.00 1,500.00

Tukang Kayu 0.0200 OH 75,000.00 1,500.00

Tukang Besi 0.0200 OH 75,000.00 1,500.00

Kepala Tukang 0.0060 OH 85,000.00 510.00

Mandor 0.0030 OH 85,000.00 255.00

BAHAN

Kayu 0.0020 M3 2,000,000.00 4,000.00

Paku Biasa 0.0100 Kg 17,000.00 170.00

Besi beton polos 3.0000 Kg 13,000.00 39,000.00

Kawat beton 0.4500 Kg 17,000.00 7,650.00

Semen Portland 4.0000 Kg 1,500.00 6,000.00

Pasir Beton 0.0060 M3 290,000.00 1,740.00

Koral Beton 0.0090 M3 400,000.00 3,600.00

SUB TOTAL 9,165.00 62,160.00

JUMLAH 71,325.00

DIBULATKAN 71,320.00

1 M2 PASANG LANTAI KERAMIK 20x25

TENAGA

Pekerja 0.6200 OH 65,000.00 40,300.00

Tukang Batu 0.3500 OH 75,000.00 26,250.00

Kepala Tukang 0.0350 OH 85,000.00 2,975.00

Mandor 0.0300 OH 85,000.00 2,550.00

BAHAN

Keramik 20x25 cm 20.0000 Bh 3,250.00 65,000.00

Semen Portland 11.3800 Kg 1,500.00 17,070.00

Pasir Pasang 0.0420 M3 290,000.00 12,180.00

Semen warna 1.0000 Kg 12,000.00 12,000.00

SUB TOTAL 72,075.00 106,250.00

JUMLAH 178,325.00

DIBULATKAN 178,320.00

1 M2 PASANG LANTAI KERAMIK 20x20

TENAGA

Pekerja 0.6200 OH 65,000.00 40,300.00

Tukang Batu 0.3500 OH 75,000.00 26,250.00

Kepala Tukang 0.0350 OH 85,000.00 2,975.00

Mandor 0.0300 OH 85,000.00 2,550.00

BAHAN

Keramik 20x20 cm 25.0000 Bh 2,600.00 65,000.00

Semen Portland 11.3800 Kg 1,500.00 17,070.00

Pasir Pasang 0.0420 M3 290,000.00 12,180.00

Semen warna 1.0000 Kg 2,500.00 2,500.00

SUB TOTAL 72,075.00 96,750.00

JUMLAH 168,825.00

DIBULATKAN 168,820.00

1 SET MEMASANG 1 BUAH KLOSET JONGKOK STANDART

TENAGA

Pekerja 1.0000 OH 65,000.00 65,000.00

Tukang Batu 1.5000 OH 75,000.00 112,500.00

Kepala Tukang 0.1500 OH 85,000.00 12,750.00

Mandor 0.1600 OH 85,000.00 13,600.00

BAHAN

Kloset Jongkok 1.0000 Bh 180,000.00 180,000.00

Semen Portland 6.0000 Kg 1,500.00 9,000.00

Pasir pasang 0.0100 M3 290,000.00 2,900.00

SUB TOTAL 203,850.00 191,900.00

JUMLAH 395,750.00

DIBULATKAN 395,750.00

ANALISA BIAYA KONSTRUKSI PEKERJAAN SANITASI

ANALISA BIAYA KONSTRUKSI PEKERJAAN LANTAI & DINDING

Page 19 of 22

Page 20: RAB WC

UPAH BAHAN

1 4 5 6

NO URAIAN PEKERJAAN VOLUME HARGA SATUAN JUMLAH

2 3

1 SET MEMASANG 1 BUAH KLOSET DUDUK MONOBLOK

TENAGA

Pekerja 3.3000 OH 65,000.00 214,500.00

Tukang Batu 1.1000 OH 75,000.00 82,500.00

Kepala Tukang 0.0010 OH 85,000.00 85.00

Mandor 0.1600 OH 85,000.00 13,600.00

BAHAN

Kloset Duduk/monoblok 1.0000 Bh 1,450,000.00 1,450,000.00

Perlengkapan (6% dari harga kloset) 1.0000 Ls 87,000.00 87,000.00

SUB TOTAL 310,685.00 1,537,000.00

JUMLAH 1,847,685.00

DIBULATKAN 1,847,680.00

1 SET MEMASANG 1 BUAH WASTAFEL

TENAGA

Pekerja 1.2000 OH 65,000.00 78,000.00

Tukang Batu 1.4500 OH 75,000.00 108,750.00

Kepala Tukang 0.1500 OH 85,000.00 12,750.00

Mandor 0.1000 OH 85,000.00 8,500.00

BAHAN

Wastafel 1.0000 Bh 1,250,000.00 1,250,000.00

Perlengkapan (12% dari harga Wastafel) 1.0000 Ls 150,000.00 150,000.00

Semen Portland 6.0000 Kg 1,500.00 9,000.00

Pasir pasang 0.0100 M3 290,000.00 2,900.00

SUB TOTAL 208,000.00 1,411,900.00

JUMLAH 1,619,900.00

DIBULATKAN 1,619,900.00

1 SET MEMASANG 1 BUAH BAK MANDI FIBERGLASS KAPASITAS 0.5 M3

TENAGA

Pekerja 1.2000 OH 65,000.00 78,000.00

Tukang Batu 1.4500 OH 75,000.00 108,750.00

Kepala Tukang 0.1500 OH 85,000.00 12,750.00

Mandor 0.1000 OH 85,000.00 8,500.00

BAHAN

Bak fiberglass 1.0000 Bh 160,000.00 160,000.00

Perlengkapan (18% dari harga bak fiberglass) 1.0000 Ls 28,800.00 28,800.00

SUB TOTAL 208,000.00 188,800.00

JUMLAH 396,800.00

DIBULATKAN 396,800.00

1 BH MEMASANG 1 BUAH BAK KONTROL PAS.BATU BATA (45 x 45) TINGGI 50 CM

TENAGA

Pekerja 1.4200 OH 65,000.00 92,300.00

Tukang Batu 0.4730 OH 75,000.00 35,475.00

Kepala Tukang 0.0470 OH 85,000.00 3,995.00

Mandor 0.0710 OH 85,000.00 6,035.00

BAHAN

Batu bata 250.0000 Bh 1,500.00 375,000.00

Semen portland 77.0000 Kg 1,500.00 115,500.00

Pasir Pasang 0.1300 M3 290,000.00 37,700.00

Batu Kerikil 0.0200 M3 400,000.00 8,000.00

Besi Beton 2.6000 Kg 13,000.00 33,800.00

Pasir beton 0.0900 M3 290,000.00 26,100.00

SUB TOTAL 137,805.00 596,100.00

JUMLAH 733,905.00

DIBULATKAN 733,900.00

1 M' MEMASANG PIPA PVC TYPE AW DIA. 1/2"

TENAGA

Pekerja 0.0360 OH 65,000.00 2,340.00

Tukang Batu 0.0600 OH 75,000.00 4,500.00

Kepala Tukang 0.0060 OH 85,000.00 510.00

Mandor 0.0018 OH 85,000.00 153.00

BAHAN

Pipa PVC 1.2000 M' 6,000.00 7,200.00

Perlengkapan (35%) 1.0000 Ls 2,100.00 2,100.00

SUB TOTAL 7,503.00 9,300.00

JUMLAH 16,803.00

DIBULATKAN 16,800.00

Page 20 of 22

Page 21: RAB WC

UPAH BAHAN

1 4 5 6

NO URAIAN PEKERJAAN VOLUME HARGA SATUAN JUMLAH

2 3

1 M' MEMASANG PIPA PVC TYPE AW DIA. 3/4"

TENAGA

Pekerja 0.0360 OH 65,000.00 2,340.00

Tukang Batu 0.0600 OH 75,000.00 4,500.00

Kepala Tukang 0.0060 OH 85,000.00 510.00

Mandor 0.0018 OH 85,000.00 153.00

BAHAN

Pipa PVC 1.2000 M' 7,000.00 8,400.00

Perlengkapan (35%) 1.0000 Ls 2,450.00 2,450.00

SUB TOTAL 7,503.00 10,850.00

JUMLAH 18,353.00

DIBULATKAN 18,350.00

1 M' MEMASANG PIPA PVC TYPE AW DIA. 3"

TENAGA

Pekerja 0.0810 OH 65,000.00 5,265.00

Tukang Batu 0.1350 OH 75,000.00 10,125.00

Kepala Tukang 0.0135 OH 85,000.00 1,147.50

Mandor 0.0041 OH 85,000.00 348.50

BAHAN

Pipa PVC 1.2000 M' 25,000.00 30,000.00

Perlengkapan (35%) 1.0000 Ls 8,750.00 8,750.00

SUB TOTAL 16,886.00 38,750.00

JUMLAH 55,636.00

DIBULATKAN 55,630.00

1 M' MEMASANG PIPA PVC TYPE AW DIA. 4"

TENAGA

Pekerja 0.0810 OH 65,000.00 5,265.00

Tukang Batu 0.1350 OH 75,000.00 10,125.00

Kepala Tukang 0.0135 OH 85,000.00 1,147.50

Mandor 0.0041 OH 85,000.00 348.50

BAHAN

Pipa PVC 1.2000 M' 25,000.00 30,000.00

Perlengkapan (35%) 1.0000 Ls 8,750.00 8,750.00

SUB TOTAL 16,886.00 38,750.00

JUMLAH 55,636.00

DIBULATKAN 55,630.00

1 BH MEMASANG KRAN DIA. 1/2" ATAU 3/4"

TENAGA

Pekerja 0.0100 OH 65,000.00 650.00

Tukang Batu 0.1000 OH 75,000.00 7,500.00

Kepala Tukang 0.0100 OH 85,000.00 850.00

Mandor 0.0050 OH 85,000.00 425.00

BAHAN

Kran air 1.0000 Bh 55,000.00 55,000.00

Seal Tape 0.0250 Bh 30,000.00 750.00

SUB TOTAL 9,425.00 55,750.00

JUMLAH 65,175.00

DIBULATKAN 65,170.00

1 BH MEMASANG FLOOR DRAIN

TENAGA

Pekerja 0.0100 OH 65,000.00 650.00

Tukang Batu 0.1000 OH 75,000.00 7,500.00

Kepala Tukang 0.0100 OH 85,000.00 850.00

Mandor 0.0050 OH 85,000.00 425.00

BAHAN

floordrain 1.0000 Bh 15,000.00 15,000.00

SUB TOTAL 9,425.00 15,000.00

JUMLAH 24,425.00

DIBULATKAN 24,420.00

Page 21 of 22

Page 22: RAB WC

UPAH BAHAN

1 4 5 6

NO URAIAN PEKERJAAN VOLUME HARGA SATUAN JUMLAH

2 3

1 M2 PENGECATAN BIDANG KAYU BARU (1 PLAMIR : 1 CAT DASAR : 2 CAT PENUTUP)

TENAGA

Pekerja 0.0700 OH 65,000.00 4,550.00

Tukang Cat 0.0090 OH 75,000.00 675.00

Kepala Tukang 0.0060 OH 85,000.00 510.00

Mandor 0.0025 OH 85,000.00 212.50

BAHAN

Cat meni 0.2000 Kg 25,000.00 5,000.00

Plamir 0.1500 Kg 10,000.00 1,500.00

Cat dasar 0.1700 Kg 34,000.00 5,780.00

Cat penutup 2X 0.2600 Kg 34,000.00 8,840.00

SUB TOTAL 5,947.50 21,120.00

JUMLAH 27,067.50

DIBULATKAN 27,060.00

1 M2 PENGECATAN BIDANG TEMBOK BARU BAG LUAR(1 PLAMIR : 1 CAT DASAR : 2 CAT PENUTUP)

TENAGA

Pekerja 0.0200 OH 65,000.00 1,300.00

Tukang Cat 0.0630 OH 75,000.00 4,725.00

Kepala Tukang 0.0063 OH 85,000.00 535.50

Mandor 0.0025 OH 85,000.00 212.50

BAHAN

Plamir 0.1000 Kg 10,000.00 1,000.00

Cat dasar 0.1000 Kg 7,500.00 750.00

Cat penutup 2X 0.2600 Kg 7,500.00 1,950.00

SUB TOTAL 6,773.00 3,700.00

JUMLAH 10,473.00

DIBULATKAN 10,470.00

ANALISA BIAYA KONSTRUKSI PEKERJAAN PENGECATAN

Page 22 of 22