    Dalam Dalam dibulatkan

    NO SAT Berat Haspel (kg) (Ton) x 1.1

    (kg) (TON)

    1 2 3 5 6=(4+5) 7 8

    A. MATERIAL

    I TOLOK UKUR GD

    1 Trafo dist. 160 kVA 3 phasa 220/380 V B2,20 kV Type OD Unit 1,216 1,216.00 1.216 1.338

    2 Trafo dist. 100 kVA 3 phasa 220/380 V B2,20 kV Type OD Unit 910 910.00 0.910 1.001

    4 Trafo dist. 50 kVA 3 phasa 220/380 V B2,20 kV Type OD Unit 512 512.00 0.512 0.563

    4 Trafo dist. 25 kVA 3 phasa 220/380 V B2,20 kV Type OD Unit 425 425.00 0.425 0.468

    5 Trafo dist. 25 kVA 1 phasa 220/380 V B2,20 kV Type OD Unit 265 265.00 0.265 0.292

    6 Lighning Arester 10 kA, 24 kV buah 4.10 4.10 0.004 0.005

    7 Fuse Cut Out 20 kV buah 4.10 4.10 0.004 0.005

    - - -

    1 Tiang besi 11 M, 156 daN btg 185.00 185.00 0.185 0.204

    2 Tiang besi 9 M, 100 daN btg 162.00 162.00 0.162 0.178

    - -

    1 Isolator Tumpu 20 kV (Type Pin Post Insulator) buah 10.0 10.00 0.010 0.0112 Isolator Asfpan 20 kV (Type Strain Rod Insulator) buah 9.4 9.40 0.009 0.010

    - -

    1 Kawat AAAC 150 mm2 km 434 88 522.00 0.522 -

    2 Kawat AAAC 70 mm2 km 208 88 296.00 0.296 -

    3 Kawat AAAC 35 mm2 km 94 88 182.00 0.182 -

    - - -

    1 Kabel LVTC 3 x 70 + 50 mm2 km 988 110 1,098.00 1.098 -

    2 Kabel LVTC 3 x 35 + 25 mm2 km 546 110 656.00 0.656 -

    3 Kabel LVTC 2 x 35 + 25 mm2 km 340 110 450.00 0.450 -

    Catatan Data tersebut di salin dari Brosur / speckt Teknik Material tersebut.

    Angka yg diambil sebagai Volume HPS

    URAIAN KEGIATAN

    BERAT MATERIAL UTAMA

  • 7/24/2019 Rab Polman-II Revisi

    2/12

    HARGA SATUAN JLH HRGA

    MDU REKANAN SATUAN (Rp) (Rp)

    JARINGAN TEGANGAN MENENGAH

    1 Penarikan kawat JTM 3 phasa 1 kms

    a.Penyediaan

    - Kawat HIC 70 mm2 1,150 0 mtr - -

    - Comprension tension joint 70/70 mm2 0 3 bh - -

    b. Pemasangan

    - Pemasangan/ penarikan 0 1 kms - -

    c. Angkutan 0 #REF! ton.km - #REF!

    J u m l a h #REF!

    2Penarikan kawat JTM 3 phasa 1 kms dengan kawat AAAC 150 mm2

    a.Penyediaan

    - Kawat AAA3C 150 mm2 1,150 0 mtr - -

    - Comprension tension joint 150/150 mm2 0 3 bh - -

    b. Pemasangan -

    - Pemasangan/ penarikan 0 1 kms - -

    c. Angkutan 0 #REF! ton.km - #REF!

    J u m l a h #REF!

    3Penarikan JTM 3 phs 1 kms dengan kawat AAAC 70 mm2

    a.Penyediaan

    - Kawat AAAC 70 mm2 1,090 0 mtr - -

    - Comprension tension joint 70/70 mm2 0 3 bh - -

    b. Pemasangan -- Pemasangan/ penarikan 0 1 kms - -

    c. Angkutan 0 #REF! ton.km - #REF!

    J u m l a h #REF!

    4 Pemasangan LBS 20 kV

    a.Penyediaan Load Break Switch 20 kV, 630 Amp (LBS) 0 1.00 set - -

    - Pole mounted LBS 20 kV 630 Amp 0 1.00 set - -

    - Pipa galvanis 1"x 1000 mm 0 1.00 btg - -

    - Unimax clamp 50 mm/Split bolt line tap for B-27 0 1.00 buah - -

    - Kabel NYA 1x50 mm2 0 15.00 mtr - -

    - Kabel schoen 50 mm2 0 1.00 bh - -

    - Staindles stell stript 0 2.00 mtr - -

    - Youke for staindles stell stript 0 2.00 buah - -

    - link 0 2.00 buah - -

    b. Pemasangan 0 1 unit - -

    c. Angkutan 0 1.00 ton km - -

    J u m l a h -

    5Pemasangan pembesian dan isolator tumpu tgl 20 KV 3 ph UNP 10 pd tiang beton

    a.Penyediaan

    - Pin post insulator 20 KV 3 0 bh - -

    - Binding wire 0 3 mtr - -

    - Travers tp TM 3 pole UNP 10 x 50x2000mm2 0 1 set - -

    - Tanda bahaya pada tiang 0 1 bh - -

    - Staindless steel stript 0 1 mtr - -

    - Yoke for staindles steel stript/ stoping bukle 0 2 bh - -

    b. Pemasangan 0 1 set - -

    c. Angkutan 0 #REF! ton.km - #REF!

    J u m l a h #REF!

    6 Pemasangan pembesian dan isolator tumpu gd 20 KV 3 ph UNP 10 pd tiang beton

    a.Penyediaan

    - Pin post insulator 20 KV 6 0 bh - -

    - Binding wire 0 6 mtr - -

    - Travers tp TM 3 pole UNP 10 x 50x2000mm2 0 2 set - -

    - Tanda bahaya pada tiang 0 1 bh - -

    - Staindless steel stript 0 1 mtr - -

    - Yoke for staindles steel stript/ stoping bukle 0 2 bh - -

    b. Pemasangan 0 1 set - -

    c. Angkutan 0 #REF! ton.km - #REF!

    J u m l a h #REF!

    7 Pemasangan pembesian dan isolator afspan tgl 20 KV 3 ph UNP 10 pd tiang beton

    a.Penyediaan

    - Isolator tarik 20 KV lengkap assesories type suspention 3 0 set - -

    - Nut eye/ cross arm clevis 3 0 bh - -

    - Strain clamp 70-150 mm2 3 0 set - -

    - Comprention non tention joint 150/150 mm2 0 3 bh - -

    - Travers afspan TM 3 pole UNP 10 x 50x2000 mm2 lengkap 0 1 set - -

    - Tanda bahaya pada tiang 0 1 bh - -

    - Staindless steel stript 0 1 mtr - -

    - Yoke for staindles steel stript/ stoping bukle 0 2 bh - -

    b. Pemasangan 0 1 set - -

    c. Angkutan 0 #REF! ton.km - #REF!

    J u m l a h #REF!

    8 Pemasangan pembesian dan isolator Afspan ganda 20 KV 3 ph UNP 10 pd tiang betona.Penyediaan

    - Isolator tarik 20 KV lengkap assesories type suspention 6 0 set - -

    - Nut eye/ cross arm clevis 6 0 bh - -

    No URAIAN KEGIATAN

    ANALISA BIAYA JASA PEMBANGUNAN JTM, JTR DAN GD

    BELUM TERMASUK HARGA MATERIAL UTAMA MDU)

    DI PT. PLN PERSERO) SULAWESI BARAT

    DIPA TAHUN 2013

    VOLUME PENGADAAN

  • 7/24/2019 Rab Polman-II Revisi

    3/12

    HARGA SATUAN JLH HRGA

    MDU REKANAN SATUAN (Rp) (Rp)No URAIAN KEGIATAN

    ANALISA BIAYA JASA PEMBANGUNAN JTM, JTR DAN GD

    BELUM TERMASUK HARGA MATERIAL UTAMA MDU)

    DI PT. PLN PERSERO) SULAWESI BARAT

    DIPA TAHUN 2013

    VOLUME PENGADAAN

    - Comprention non tention joint 150/150 mm2 0 6 bh - -

    - Travers afspan TM 3 pole UNP 10 x 50x2000 mm2 0 2 set - -

    - Tanda bahaya pada tiang 0 1 bh - -

    - Staindless steel stript 0 1 mtr - -

    - Yoke for staindles steel stript/ stoping bukle 0 2 bh - -

    b. Pemasangan 0 1 set - -

    c. Angkutan 0 #REF! ton.km - #REF!

    J u m l a h #REF!

    9 Pems.pembesian isolator afspan typy ujung 20KV 3PH UNP 10 T. Beton

    a.Penyediaan

    - Isolator tarik 20 KV lengkap accessories type suspension 6 0 set - -

    - Nut eye / Eye Bolt 6 0 bh - -

    - Strain clamp 70 - 150 mm. 6 0 set - -

    - Pin post insulator 20 KV 1 0 bh - -

    - binding wire 0 1 mtr - -

    - Compression Non tension joint 150 / 150 mm 0 3 bh - -

    - Travers afspan TM 3pole UNP 10x50x2000mm2 0 1 set - -

    - Tanda bahaya pada tiang 0 1 bh - -

    - Stainless steel strip 0 1 mtr - -

    - Yoke for stainless steel strip/stopping buckle 0 2 bh - -

    b. Pemasangan 0 1 set - -

    c. Angkutan 0 #REF! ton.km - #REF!J u m l a h #REF!

    10Pems.pembesian isolator afspan Tgl 20KV 3PH UNP 10 t.ujung T. Beton

    a.Penyediaan

    - Isolator tarik 20 KV lengkap accessories type suspension 3 0 set - -

    - Nut eye / Eye Bolt 3 0 bh - -

    - Strain clamp 70 - 150 mm. 3 0 set - -

    - Pin post insulator 20 KV 1 0 bh - -

    - binding wire 0 1 mtr - -

    - Compression Non tension joint 150 / 150 mm 0 3 bh - -

    - Travers afspan TM 3pole UNP 10 x 50x2000 mm2 0 1 set - -

    - Tanda bahaya pada tiang 0 1 bh - -

    - Stainless steel strip 0 1 mtr - -

    - Yoke for stainless steel strip/stopping buckle 0 2 bh - -

    b. Pemasangan 0 1 set - -

    c. Angkutan 0 #REF! tom.km - #REF!

    J u m l a h #REF!

    11 Pems.pembesian isolator afspan gd Type H 20KV 3PH UNP 10. T. Beton

    a.Penyediaan

    - Isolator tarik 20 KV lengkap accessories type suspension 6 0 set - -

    - Nut eye / Eye Bolt 6 0 bh - -

    - Strain clamp 70 - 150 mm. 6 0 set - -

    - Pin post insulator 20 KV 1 0 bh - -

    - binding wire 0 1 mtr - -

    - Compression Non tension joint 150 / 150 mm 0 3 bh - -

    - Travers afspan TM 3pole UNP 10x50x 2000 mm2 0 2 set - -

    - Tanda bahaya pada tiang 0 2 bh - -

    - Stainless steel strip 0 2 mtr - -

    - Yoke for stainless steel strip/stopping buckle 0 2 bh - -

    b. Pemasangan 0 1 set - -

    c. Angkutan 0 #REF! ton.km - #REF!

    J u m l a h #REF!

    12Pemasangan pembesian dan isolator tumpu tgl 20 KV 3 ph UNP 10 pd tiang besi

    a.Penyediaan

    - Pin Post insulator 20 KV 3 0 bh - -

    - binding wire 0 3 mtr - -

    - Travers Tumpu TM 3 pole UNP 10 x 50x2000 mm2 0 1 set - -

    - Tanda bahaya pada tiang 0 1 bh - -

    - Staindless steel stript 0 1 mtr - -

    - Yoke for staindles steel stript/ stoping bukle 0 2 bh - -

    b. Pemasangan 0 1 set - -

    c. Angkutan 0 #REF! ton.km - #REF!

    J u m l a h #REF!

    13Pemasangan pembesian dan isolator tumpu gd 20 KV 3 ph UNP 10 pd tiang besi

    a.Penyediaan

    - Pin Post insulator 20 KV 3 0 bh - -

    - binding wire 0 3 mtr - -

    - Travers Tumpu TM 3 pole UNP 10 x 50x2000 mm2 0 2 set - -

    - Tanda bahaya pada tiang 0 1 bh - -

    - Staindless steel stript 0 1 mtr - -

    - Yoke for staindles steel stript/ stoping bukle 0 2 bh - -

    b. Pemasangan 0 1 set - -

    c. Angkutan 0 #REF! ton.km - #REF!J u m l a h #REF!

    14 Pemasangan pembesian dan isolator Afspan tgl(type Ujung) 20 KV 3 ph UNP 10 pd tiang besi

    a.Penyediaan

  • 7/24/2019 Rab Polman-II Revisi

    4/12

    HARGA SATUAN JLH HRGA

    MDU REKANAN SATUAN (Rp) (Rp)No URAIAN KEGIATAN

    ANALISA BIAYA JASA PEMBANGUNAN JTM, JTR DAN GD

    BELUM TERMASUK HARGA MATERIAL UTAMA MDU)

    DI PT. PLN PERSERO) SULAWESI BARAT

    DIPA TAHUN 2013

    VOLUME PENGADAAN

    - Compression Non tension Joing 150 / 150 mm2 3 0 bh - -

    - Travers asfpan TM 3 pole UNP 10 x50x 2000 mm2 0 1 set - -

    - Tanda bahaya pada tiang 0 1 bh - -

    - Staindless steel stript 0 1 mtr - -

    - Yoke for staindles steel stript/ stoping bukle 0 2 bh - -

    b. Pemasangan 0 1 set - -

    c. Angkutan 0 #REF! ton.km - #REF!

    J u m l a h #REF!

    15 Pemasangan pembesian dan isolator Afspan gd 20 KV 3 ph UNP 10 pd tiang besi

    a.Penyediaan

    - Isolator tarik 20 KV lengkap accessories type suspension 6 0 set - -

    - Nut eye/eros arm clevis 6 0 bh - -

    - Strain clamp 35 - 70 mm2 6 0 set - -

    - Pin Post insulator 20 KV 1 0 bh - -

    - binding wire 0 1 mtr - -

    - Travers asfpan TM 3 pole UNP 10 x50x 2000 mm2 0 2 set - -

    - Compression Non tension Joing 150 / 150 mm2 0 3 bh - -

    - Tanda bahaya pada tiang 0 1 bh - -

    - Staindless steel stript 0 1 mtr - -

    - Yoke for staindles steel stript/ stoping bukle 0 2 bh - -

    b. Pemasangan 0 1 set - -

    c. Angkutan 0 #REF! ton.km - #REF!J u m l a h 0 #REF!

    16Pemasangan pembesian dan isolator Afspan gd Type ujung 20 KV 3 ph UNP 10 pd tiang besi

    a.Penyediaan

    - Isolator tarik 20 KV lengkap accessories type suspension 6 0 set - -

    - Nut eye/eros arm clevis 6 0 bh - -

    - Strain clamp 35 - 70 mm2 6 0 set - -

    - Pin Post insulator 20 KV 1 0 bh - -

    - binding wire 0 1 mtr - -

    - Compression Non tension Joing 150 / 150 mm2 0 6 bh - -

    - Travers asfpan TM 3 pole UNP 10 x 50x2000 mm2 0 2 set - -

    - Tanda bahaya pada tiang 0 1 bh - -

    - Staindless steel stript 0 1 mtr - -

    - Yoke for staindles steel stript/ stoping bukle 0 2 bh - -

    b. Pemasangan 0 1 set - -

    c. Angkutan 0 #REF! ton.km - #REF!

    J u m l a h #REF!

    17 Pemancangan tiang besi 11 meter

    a. Penyediaan

    - Tiang besi 11 meter 200 daN 0 1 btg - -

    - Galian/pembuatan lubang 0 1 btg - -

    b. Pemasangan

    - Memantel tiang (penggonian + selubung beton type C) + bahan 0 1 btg - -

    - Pemancangan dan pengecatan + bahan 0 1 btg - -

    c. Angkutan 0 #REF! ton.km - #REF!

    J u m l a h #REF!

    18Pemancangan tiang besi 9 meter

    a. Penyediaan

    - Tiang besi 9 meter 156 daN 0 1 btg - -

    - Galian/pembuatan lubang 0 1 btg - -

    b. Pemasangan

    - Memantel tiang (penggonian + selubung beton type C) + bahan 0 1 btg - -

    - Pemancangan dan pengecatan + bahan 0 1 btg - -

    c. Angkutan 0 #REF! ton.km - #REF!

    J u m l a h #REF!

    19 Pemasangan tupang tarik tiang beton.

    a. Penyediaan

    - Strain insulator for guy 12 KV / Isolator Guy 0 1 bh - -

    - Double beugel/ Mour Baut Mata / Eye Bolt 0 1 bh - -

    - Spanscroef 5/8" / Trun Buckle TM 0 1 bh - -

    - Plat beton 40 x 40 x 10 cm 0 1 bh - -

    - Angker rod + klem penyambung + mur baut 0 1 set - -

    - U klem 0 8 bh - -

    - Kaos baja / Thimble TM 0 2 bh - -

    - Steel wire D 7 0 15 mtr - -

    b. Pemasangan 0 1 set - -

    c. Angkutan 0 0 ton.km - -

    J u m l a h -

    20 Pemasangan tupang tarik tiang besi.

    a. Penyediaan

    - Strain insulator for guy 12 KV / Isolator Guy 0 1 bh - -

    - Double beugel/ Mour Baut Mata / Eye Bolt 0 1 bh - -

    - Spanscroef 5/8" / Trun Buckle TM 0 1 bh - -- Plat beton 40 x 40 x 10 cm 0 1 bh - -

    - Angker rod + klem penyambung + mur baut 0 1 set - -

    - U klem 0 8 bh - -

  • 7/24/2019 Rab Polman-II Revisi

    5/12

    HARGA SATUAN JLH HRGA

    MDU REKANAN SATUAN (Rp) (Rp)No URAIAN KEGIATAN

    ANALISA BIAYA JASA PEMBANGUNAN JTM, JTR DAN GD

    BELUM TERMASUK HARGA MATERIAL UTAMA MDU)

    DI PT. PLN PERSERO) SULAWESI BARAT

    DIPA TAHUN 2013

    VOLUME PENGADAAN

    c. Angkutan 0 0 ton.km - -

    J u m l a h -

    21 Pemasangaan tupang tarik khusus pada tiang beton

    a. Penyediaan

    - Strain insulator for guy 12 KV / Isolator Guy 0 1 bh #REF! #REF!

    - Double beugel/ Mour Baut Mata / Eye Bolt 0 1 bh #REF! #REF!

    - Spanscroef 5/8" / Trun Buckle TM 0 1 bh #REF! #REF!

    - Plat beton 40 x 40 x 10 cm 0 1 bh #REF! #REF!

    - Angker rod + klem penyambung + mur baut 0 1 set #REF! #REF!

    - U klem 0 1 bh #REF! #REF!

    - Kaos baja / Thimble TM 0 1 bh #REF! #REF!

    - Steel wire 50 mm2 0 30 mtr #REF! #REF!

    b. Pemasangan 0 1 set #REF! #REF!

    c. Angkutan 0 0 ton.km - -

    J u m l a h #REF!

    22 Pemasangan tupang tarik dengan tiang bantu tiang beton.

    a. Penyediaan

    - Tiang beton 1 0 btg - -

    - Strain insulator for guy 12 KV / Isolator Guy 0 1 bh - -

    - Double beugel/ Mour Baut Mata / Eye Bolt 0 1 bh - -

    - Spanscroef 5/8" / Trun Buckle TM 0 1 bh - -

    - Plat beton 40 x 40 x 10 cm 0 1 bh - -- Angker rod + klem penyambung + mur baut 0 1 set - -

    - U klem 0 1 bh - -

    - Kaos baja / Thimble TM 0 1 bh - -

    - Steel wire 50 mm2 0 25 mtr - -

    b. Pemasangan 0 1 set - -

    c. Angkutan 0 0 ton.km - -

    J u m l a h -

    23 Pemasangan tupang tarik dengan tiang bantu tiang besi.

    a. Penyediaan

    - Tiang besi 9 mtr 156 daN 0 1 btg - -

    - Galian/pembuatan lubang 0 1 btg - -

    - Strain insulator for guy 12 KV / Isolator Guy 0 1 bh - -

    - Double beugel/ Mour Baut Mata / Eye Bolt 0 3 set - -

    - Spanscroef 5/8" / Trun Buckle TM 0 1 bh - -

    - Plat beton 40 x 40 x 10cm 0 1 bh - -

    - Angker rod + klem penyambung + mur baut 0 1 set - -

    - U klem 0 12 bh - -

    - Kaos baja / Thimble TM 0 4 bh - -

    - Steel wire 50 mm2 0 25 mtr - -

    b. Pemasangan

    - Memantel tiang (penggonian + selubung beton type C) + bahan 0 1 btg - -

    - Pemasangan, pemancangan dan pengecatan tiang + bahan 0 1 btg - -

    c. Angkutan 0 #REF! ton.km - #REF!

    J u m l a h #REF!

    24 Pemasangan tupang tekan

    a. Penyediaan

    - Tiang besi 11 meter 156 daN 0 1 btg - -

    - Double beugel / Clam Beugel 0 1 bh - -

    - Beugel 0 1 bh - -

    - Sangga tupang tekan 0 1 bh - -

    - Plat beton 40 x 40 x 10 cm 0 1 bh - -

    b. Pemasangan

    - Memantel tiang (penggonian + selubung beton type C) + bahan 0 1 btg - -

    - Pemasangan, pemancangan dan pengecatan tiang + bahan 0 1 btg - -

    c. Angkutan 0 #REF! ton.km - #REF!

    J u m l a h #REF!

    GARDU DISTRIBUSI :

    25Pembangunan gardu tiang 3 phasa 20 kV (1 tiang) pd tiang beton

    a. Penyediaan

    - Tiang 1 0 btg - -

    - Trafo 3 phasa (25 atau 50 kVA) 20 kV 400/ 230 Volt 1 0 bh - -

    - Konstruksi dudukan trafo 3 phasa type cantol lengkap 0 1 set - -

    - BC draad 50 mm / NYY 1x50 0 15 mtr - -

    - Kabel NYA 1 x 35 mm 0 6 mtr - -

    - Terminal lugs 50 mm CU / Sepatu Cbale CU 50 0 2 bh - -

    - Terminal lugs 35 mm CU / Sepatu Cbale CU 35 0 6 bh - -

    - Tap connector / Bimetal paralel clamp 35 - 70 mm2 Al/ CU 0 3 bh - -

    - Fuse cut out 20 kV 100 Amp + fuse link 8 Amp. 0 3 bh - -

    - 24 kV lightning arrester 10 kA. 0 3 bh - -

    - Travers dudukan fuse cut out/Arrester UNP 10 x 1.200 mm 0 2 bh - -

    - Beugel + mur baut. 0 4 set - -- Tanda bahaya 0 1 bh - -

    - Earthing Rod 0 3 set - -

    - Split bolt line tap to fit. 0 3 bh - -

  • 7/24/2019 Rab Polman-II Revisi

    6/12

    HARGA SATUAN JLH HRGA

    MDU REKANAN SATUAN (Rp) (Rp)No URAIAN KEGIATAN

    ANALISA BIAYA JASA PEMBANGUNAN JTM, JTR DAN GD

    BELUM TERMASUK HARGA MATERIAL UTAMA MDU)

    DI PT. PLN PERSERO) SULAWESI BARAT

    DIPA TAHUN 2013

    VOLUME PENGADAAN

    * Dudukan rel tembaga - - - - -

    * NT fuse zise 1, minimal 100 amp. = 6 set - - - - -

    * NH Fuse Holder size 250 Amp = 6 set - - - - -

    * Lampu kontrol - - - - -

    * MCB 2 Amp = 1 buah - - - - -

    * Bola lampu 40 W = 1 bh - - - - -

    * Stop kontak arde = 1 bh - - - - -

    * Saklar engkel outbow = 1 bh - - - - -

    * Kabel NYAF 1 x 2,5 mm = 3 mtr - - - - -

    * Kunci panel seragam/master - - - - -

    * LBS minimal 400 Amp - - - - -

    - Travers dudukan lemari bagi 1 phasa lengkap (UNP 6,5 x 600 mm)+mur baut 0 2 set - -

    c. Pemasangan :

    - Konstruksi gardu tiang 3 phasa (konstruksi dudukan trafo, cut 0 1 set - -

    out, lightning arrester, pentanahan, lemari bagi, trafo).

    d. Angkutan 0 #REF! ton.km - #REF!

    J u m l a h #REF!

    26 Pembangunan gardu tiang 3 phasa 20 kV (1 tiang) pd tiang besi

    a. Penyediaan

    - Tiang besi 11 mtr 200 daN 0 1 btg - -

    - Trafo 3 phasa ( 25 atau 50 kVA) 20 kV 400/ 230 Volt 1 0 btg - -

    - Konstruksi dudukan trafo 3 phasa type cantol lengkap 0 1 set - -- BC draad 50 mm / NYY 1x50 0 15 mtr - -

    - Kabel NYA 1 x 35 mm 0 6 mtr - -

    - Terminal lugs 50 mm CU / Sepatu Cbale CU 50 0 4 bh - -

    - Terminal lugs 35 mm CU / Sepatu Cbale CU 35 0 6 bh - -

    - Tap connector / Bimetal paralel clamp 35 - 70 mm2 Al/ CU 0 2 bh - -

    - Fuse cut out 20 kV 100 Amp + fuse link 8 Amp. 0 3 bh - -

    - 24 kV lightning arrester 10 kA. 0 3 set - -

    - Travers dudukan fuse cut out/Arrester UNP 10 x 1.2000 mm 0 2 set - -

    - Beugel + mur baut. 0 2 set - -

    - Tanda bahaya 0 1 bh - -

    - Earthing Rod 0 3 set - -

    - Split bolt line tap to fit. 0 3 set - -

    - Lemari bagi TR 3 phasa lengkap: 2 JURUSAN 0 1 set - -

    *-Kotak lemari bagi 3 phasa 2 jurusan UK 1000x700x400 mm tebl 2mm - - - - -

    * Rel tembaga 40 x 5 mm - - - - -

    * Dudukan rel tembaga - - - - -

    * NT fuse zise 1, minimal 100 amp. = 6 set - - - - -

    * NH Fuse Holder size 250 Amp = 6 set - - - - -

    * Lampu kontrol - - - - -

    * MCB 2 Amp = 1 buah - - - - -

    * Bola lampu 40 W = 1 bh - - - - -

    * Stop kontak arde = 1 bh - - - - -

    * Saklar engkel outbow = 1 bh - - - - -

    * Kabel NYAF 1 x 2,5 mm = 3 mtr - - - - -

    * Kunci panel seragam - - - - -

    * LBS minimal 400 Amp - - - - -

    - Travers dudukan lemari bagi 1 phasa lengkap (UNP 6,5 x 600 mm)+mur baut 0 1 set - -

    c. Pemasangan :

    - Konstruksi gardu tiang 3 phasa (konstruksi dudukan trafo, cut 0 1 set - -

    out, lightning arrester, pentanahan, lemari bagi, trafo).

    d. Angkutan 0 #REF! ton.km - #REF!

    J u m l a h #REF!

    27 Pembangunan gardu tiang 3 phasa 20 kV (2 tiang) pd tiang beton/besi

    1.Penyediaan :

    - Tiang 2 0 btg - -- Trafo 3 phasa 20 kV B2 100 kVA 1 0 bh - -

    - Konstruksi dudukan trafo 3 phasa type portal (2tiang) 0 1 set - -

    - BC draad 50 mm / NYY 1x50 mm 0 15 mtr - -

    - Kabel NYA 1 x 35 mm2 0 6 mtr - -

    - Terminal lugs 50 mm CU / Sepatu Cbale CU 50 0 4 bh - -

    - Terminal lugs 35 mm CU / Sepatu Cbale CU 35 0 6 bh - -

    - Tap connector / Bimetal paralel clamp 70 / 35 mm2 Al/CU 0 2 bh - -

    - Double beugel + spanscroef 5/8" / Clam Schoer 0 2 bh - -

    - Tanda bahaya 0 1 bh - -

    - Fuse cut out 20 kV 100 Amp + fuse link 8 Amp. 0 3 bh - -

    - Lightning arrester 24 KV 10 kA. 0 3 bh - -

    - Travers d udukan fuse cut out / Arrester UNP 10 x 2.400 mm+beuge&murbaut 0 2 set - -

    - Earthing Rod 0 3 set - -

    - Split bolt line tap to fit. 0 3 set - -

    - Lemari bagi TR 3 phasa lengkap: 0 1 set - -

    *-Kotak lemari bagi 3 phasa 2 jurusan UK 1000x700x400 mm tebl 2mm - - - -

    * Rel tembaga 40 x 5 mm - - - -

    * Dudukan rel tembaga - - - -

    * NT fuse zise 1, minimal 100 amp. = 6 set - - - -

    * NH Fuse Holder size 250 Amp = 6 set - - - -

    * L k t l

  • 7/24/2019 Rab Polman-II Revisi

    7/12

    HARGA SATUAN JLH HRGA

    MDU REKANAN SATUAN (Rp) (Rp)No URAIAN KEGIATAN

    ANALISA BIAYA JASA PEMBANGUNAN JTM, JTR DAN GD

    BELUM TERMASUK HARGA MATERIAL UTAMA MDU)

    DI PT. PLN PERSERO) SULAWESI BARAT

    DIPA TAHUN 2013

    VOLUME PENGADAAN

    * Saklar engkel outbow = 1 bh - - - -

    * Kabel NYAF 1 x 2,5 mm = 3 mtr - - - -

    * Kunci panel seragam - - - -

    * LBS minimal 400 Amp - - - -

    - Travers dudukan lemari bagi 1 phasa lengkap (UNP 6,5 x 600 mm)+beugel&murbaut 0 1 set - -

    2. Pemasangan :

    - Konstruksi gardu tiang 3 phasa (pemasangan lemari bagi, 0 1 set - -

    konstruksi dudukan trafo, cut out, lightning arrester,

    pentanahan dan pemasangan trafo).

    3. Angkutan 0 #REF! ton.km - #REF!

    J u m l a h #REF!

    28 Pembangunan gardu tiang 3 phasa 20 kV (2 tiang) pd tiang beton :

    1.Penyediaan :

    - Tiang 2 0 btg - -

    - Trafo 3 phasa 20 kV B2 100 kVA 1 0 bh - -

    - Konstruksi dudukan trafo 3 phasa type portal (2tiang) 0 1 set - -

    - BC draad 50 mm / NYY 1x50 mm 0 15 mtr - -

    - Kabel NYA 1 x 35 mm2 0 6 mtr - -

    - Terminal lugs 50 mm CU / Sepatu Cbale CU 50 0 4 bh - -

    - Terminal lugs 35 mm CU / Sepatu Cbale CU 35 0 6 bh - -

    - Tap connector / Bimetal paralel clamp 70 / 35 mm2 Al/CU 0 2 bh - -

    - Double beugel + spanscroef 5/8" / Clam Schoer 0 2 bh - -- Tanda bahaya 0 1 bh - -

    - Fuse cut out 20 kV 100 Amp + fuse link 8 Amp. 0 3 bh - -

    - Lightning arrester 24 KV 10 kA. 0 3 bh - -

    - Travers dudukan fuse cut out / Arrester UNP 10 x 2.400 mm+ beugel &murbaut 0 2 set - -

    - Earthing Rod 0 3 set - -

    - Split bolt line tap to fit. 0 3 set - -

    - Lemari bagi TR 3 phasa lengkap: 0 1 set - -

    *-Kotak lemari bagi 3 phasa 2 jurusan UK 1000x700x400 mm tebl 2mm - - - - -

    * Rel tembaga 40 x 5 mm - - - - -

    * Dudukan rel tembaga - - - - -

    * NT fuse zise 1, minimal 100 amp. = 6 set - - - - -

    * NH Fuse Holder size 250 Amp = 6 set - - - - -

    * Lampu kontrol - - - - -

    * MCB 2 Amp = 1 buah - - - - -

    * Bola lampu 40 W = 1 bh - - - - -

    * Stop kontak arde = 1 bh - - - - -

    * Saklar engkel outbow = 1 bh - - - - -

    * Kabel NYAF 1 x 2,5 mm = 3 mtr - - - - -

    * Kunci panel seragam - - - - -

    * LBS minimal 400 Amp - - - - -

    - Travers dudukan lemari bagi 1 phasa lengkap (UNP 6,5 x 600 mm)+beugel&murbaut 0 1 set - -

    2. Pemasangan :

    - Konstruksi gardu tiang 3 phasa (pemasangan lemari bagi, 0 1 set - -

    konstruksi dudukan trafo, cut out, lightning arrester,

    pentanahan dan pemasangan trafo).

    3. Angkutan 0 #REF! ton.km - #REF!

    J u m l a h #REF!

    29 Pengadaan / pemasangan kabel naik dan turun di gardu 3 phasa 2 jurusan type cantol (1 tiang)

    a. Penyediaan

    - Kabel NYY 1 x 50 mm2 CU 0 120 mtr - -

    - Bimetal compression joint 35 - 70 mm (Al / Cu) 0 8 bh - -

    - Terminal lugs 50 mm CU / Sepatu Cbale CU 50 0 16 bh - -

    - Pipa galvanized 3" x 6.000 mm 0 3 btg - -

    - Pipa galvanized 1" x 5.000 mm 0 2 btg - -

    - Pipa galvanized 1" x 1.000 mm 0 1 btg - -- Beugel khusus 3" x tiga mata + mur baut untuk pipa 0 2 set - -

    - UNP 6,5 x 500 mm2 + beugel plat dan mour baut 2 bh 0 2 set - -

    - L boch Plastik type panjang 3" 0 3 bh - -

    b. Pemasangan

    - Kabel naik / turun 0 3 set - -

    c. Angkutan 0 #REF! ton.km - #REF!

    J u m l a h #REF!

    30Pengadaan / pemasangan kabel naik/turun di gardu 3 phasa 2 jurusan type portal (2 tiang)

    a. Penyediaan

    - Kabel NYY 1 x 70 mm2 CU 0 48 mtr - -

    - Kabel NYY 1 x 50 mm2 CU 0 96 mtr - -

    - Bimetal compression joint 35 - 70 mm (Al / Cu) 0 8 bh - -

    - Terminal lugs 70 mm CU / Sepatu Cbale CU 70 0 8 bh - -

    - Terminal lugs 50 mm CU / Sepatu Cbale CU 50 0 8 bh - -

    - Pipa galvanized 3" x 4.000 mm 0 3 btg - -

    - Pipa galvanized 1" x 5.000 mm 0 2 btg - -

    - Pipa galvanized 1" x 1.000 mm 0 1 btg - -

    - UNP 6,5 x 2400 mm2 + beugel plat dan mour baut 4 bh 0 1 set - -

    - L boch Plastik 3" T ype panjang untuk ujung pipa 0 3 bh - -

    b. Pemasangan

    0 3

  • 7/24/2019 Rab Polman-II Revisi

    8/12

    HARGA SATUAN JLH HRGA

    MDU REKANAN SATUAN (Rp) (Rp)No URAIAN KEGIATAN

    ANALISA BIAYA JASA PEMBANGUNAN JTM, JTR DAN GD

    BELUM TERMASUK HARGA MATERIAL UTAMA MDU)

    DI PT. PLN PERSERO) SULAWESI BARAT

    DIPA TAHUN 2013

    VOLUME PENGADAAN

    JARINGAN TEGANGAN RENDAH

    31 Pemasangan LVTC 3x35+25mm sepanjang 1 kms

    a. Penyediaan dan pemasangan

    - Bundle conductor (LVTC) 3x35+25 mm 1,050.0 0 mtr - -

    - Insulated tension joint 0 4 bh - -

    - Penarikan LVTC 3 phasa. 0 1 kms - -

    b. Angkutan 0 #REF! ton.km - #REF!

    J u m l a h #REF!

    32 Pemasangan LVTC 3x70+50mm sepanjang 1 kms

    a. Penyediaan dan Pemasangan

    - Penyediaan Bundle conductor (LVTC) 3x70+50 mm 1,050.00 0 mtr - -

    - Insulated tension joint 0 4 bh - -

    - Penarikan LVTC 3 phasa. 0 1 kms - -

    b. Angkutan #REF! ton.km - #REF!

    J u m l a h #REF!

    33 Pemasangan suspension / small angle assembly

    a. Penyediaan dan pemasangan 0 1 set - -

    - Suspension/small angle assembly 0 1 bh - -

    - Penarikan dan pemasangan - - -

    - Yoke for stainless steel strip / stopping buckle = 2.0 BH - 2 bh -

    b.. Angkutan #REF! ton.km - #REF!

    J u m l a h #REF!34 Pemasangan large angle assembly

    a. Penyediaan dan pemasanagn 0 1 set - -

    - Large angle assembly - 1 set -

    - Stainless steel strip = 1.5 Mtr - 1.5 mtr -

    - Yoke for stainless steel strip / stopping buckle = 2.0 BH - 2 bh -

    - Protective plastik for stainless steel strip = 0.33 Mtr - 0.33 mtr -

    b. Angkutan #REF! ton.km - #REF!

    J u m l a h #REF!

    35 Pemasangan dead and assembly

    a. Penyediaan dan pemasangan 0 1 set - -

    - Dead and assembly = 1 bh 1 bh

    - Stainless steel strip = 1.5 Mtr 1.5 mtr

    - Yoke for stainless steel strip / stopping buckle = 2.0 BH 2 bh

    b. Angkutan 0 #REF! ton.km - #REF!

    J u m l a h #REF!

    36 Pemasangan pentanahan ujung JTR pd tiang beton biasa/tiang besi

    a. Penyediaan - Unimax clamp 50 mm / split bolt line tap 0 1 set -

    - BC draad 50 mm / kabel NYY 1 x 50 mm 0 12 mtr - -

    - Pipa aarde 1,5" x 3.000 mm lengkap./ Earthing Rod 0 1 set - -

    - Pipa galvanized 1" x 3.000 mm 0 1 btg -

    - Bundle end protection set 0 1 set -

    - Insulated non tension connector 0 1 bh -

    - Stainless steel strip 0 1.5 mtr - -

    - Yoke for stainless steel strip / stopping buckle 0 4 bh - -

    b. Pemasangan bundled end protection set + pentanahan. 0 1 set -

    c. Angkutan 0 #REF! ton.km - #REF!

    J u m l a h #REF!

    37 Pemasangan pentanahan ujung JTR pd tiang beton type E

    a. Penyediaan

    - Tap connector 35 / 70 mm2 CU 0 1 bh -

    - BC draad 50 mm / kabel NYY 1 x 50 mm 0 2 mtr - -

    - Pipa aarde 1,5" x 3.000 mm lengkap./ Earthing Rod 0 1 set - -

    b. Pemasangan bundled end protection set + pentanahan. 0 1 set -

    c. Angkutan 0 ton.km - -

    -

    Catatan :

    - Semua material pembesian yang di suplay rekanan, harus melalui proses hot Dip Galvanized

    kecuali lemari bagi hanya di dico sesuai dengan warna standar sdh mengikuti warna gardu

    PLN area Mamuju

    - Tiang besi di cat almium dan hitam

    - Cat yang dipergunakan adalah cat ICI atau cat yang sama mutunya

    - Pembesian yang tidak dicamtumkan ukurannya disesuaikan dengan tiang yang akan dipasang

    - Spesifkasi material lihat gambar Konstruksi. JTM,JTR gardu edisi thn 2010

    Manager UPK /PPKSULBAR

    SYAMSUDDIN

  • 7/24/2019 Rab Polman-II Revisi

    9/12

    PT. PLN (PERSERO)

    SATKER LISTRIK PERDESAAN

    SULAWESI BARAT

    Pekerjaan : Pembangunan Jaringan Tegangan Menengah (JTM), Jaringan tegangan rendah (JTR), dan Gardu Distribusi (GD). = .DP/LISDES-SULBAR/2013

    = USAHA KECIL/NON KECIL

    Lokasi : A Dsn.Talepo,Palembongan,Batupanga daala, Siratuang Ds.Batupanga, Kec.Luyo, Polman = 120 (Seratus Dua Puluh) hari kalender

    = APBN Tahun Anggaran 2013

    HARGA JUMLAH

    NO SAT A B C D E JMH SATUAN HARGA

    (Rp) (Rp)

    A Jaringan Tegangan Menengah (JTM)

    1 Penarikan kawat JTM 3 Ph. AAAC 70 mm2 kms 15.95 0 0 0 0 15.95 #REF! #REF!

    2 Penarikan kawat JTM 3 Ph. AAAC 150 mm2 kms 0 0 0 0 0 0.00 #REF! #REF!3 Pemas. Pembesian & isolator afspan 3 Ph. UNP 10 type ujung pada tiang beton set 8 0 0 0 0 8.00 #REF! #REF!

    4 Pemas. Pembesian & isolator afspan tgl 3 Ph. UNP 10 pada tiang beton set 0 0 0 0 0 0.00 #REF! #REF!

    5 Pemasangan pembesian dan isolator tumpu tgl 20 KV 3 ph UNP 10 pd tiang beton set 218 0 0 0 0 218.00 #REF! #REF!

    6 Pemasangan pembesian dan isolator tumpu gd 20 KV 3 ph UNP 10 pd tiang beton set 129 0 0 0 0 129.00 #REF! #REF!

    7 Pemasangan pembesian dan isolator Afspan gd 20 KV 3 ph UNP 10 pd tiang beton set 9 0 0 0 0 9.00 #REF! #REF!

    8 P emasangan pembesian dan isolator Afspan gd type H, 20 KV 3 ph UNP 10 pd tiang beton set 0 0 0 0 0 0.00 #REF! #REF!

    9 Pemasangan pembesian dan isolator Afspan Type ujung 20 KV 3 ph UNP 10 pd tiang besi set 0 0 0 0 0 0.00 #REF! #REF!

    10 Pengadaan dan pemancangan tiang besi 11 meter 200 daN btg 0 0 0 0 0 0.00 #REF! #REF!

    11 Pemasangan LBS 20 KV 630 Ampere set 0 0 0 0 0 0.00 - -

    12 Pemasangan pembesian dan isolator Afspan gd 20 KV 3 ph UNP 10 pd tiang besi set 0 0 0 0 0 0.00 #REF! #REF!

    13 Pemas. Tupang tarik pada tiang beton set 71 0 0 0 0 71.00 - -

    14 Pemasangan Tupang Tarik Tiang bantu tiang beton set 1 0 0 0 0 1.00 - -

    15 Pemas. Tupang tarik pada tiang besi set 0 0 0 0 0 0.00 - -

    16 Pemasangan Tupang Tekan set 0 0 0 0 0 0.00 #REF! #REF!

    17 Pemas. Tupang tarik khusus set 0 0 0 0 0 0.00 #REF! #REF!

    Jumlah JTM (A) kms 15.95 - - 15.95 - #REF!

    B Jaringan Tegangan Rendah (JTR)

    1 Pemancangan tiang besi 9 meter btg 0 0 0 0 0 0.00 #REF! #REF!

    2 Penar ikan JTR 3 Phasa LVTC 3x35+25 mm2 kms 9.2 0 0 0 0 9.20 #REF! #REF!

    3 Penari kan J TR 3 Phasa LVTC 3x70+50 mm2 kms 0 0 0 0 0 0.00 #REF! #REF!

    4 Pemas Suspension Angle Assembly set 133 0 0 0 0 133.00 #REF! #REF!

    5 Pemas Large angle assembly set 64 0 0 0 0 64.00 #REF! #REF!

    6 Pemas Dead End assembly set 35 0 0 0 0 35.00 #REF! #REF!

    7 Pemas. pentanahan ujung TR pada tiang beton type E set 3 0 0 0 0 3.00 - -

    8 Pemasangan pentanahan ujung pd tiang biasa (beton&besi) set 18 0 0 0 0 18.00 #REF! #REF!

    9 Pemasangan Tupang Tarik Tiang bantu tiang beton set 1 0 0 0 0 1.00 - -

    10 Pemas. Tupang tarik pada tiang beton set 2 0 0 0 0 2.00 - -

    Jumlah JTR (B) kms 9.2 0 0 0 0 9.20 - #REF!

    C Gardu Distribusi (GD)

    1 Pembangunan GD tiang 3 Ph. 1 tiang 2 Jurusan (Untuk Trafo 25 kVA) set 7 0 0 0 0 7.00 #REF! #REF!

    2 Pembangunan GD tiang 3 Ph. 1 tiang 2 Jurusan (Untuk Trafo 50 kVA) set 3 0 0 0 0 3.00 #REF! #REF!

    3 Pembangunan GD tiang 3 Ph. 2 tiang 2 Jurusan (Untuk Trafo 100 kVA) set 0 0 0 0 0 0.00 #REF! #REF!

    4 Pengadaan/ Pemasangan kabel naik/turun di gardu 3 ph type cantol (1 tiang) set 30 0 0 0 0 30.00 #REF! #REF!

    5 Pengadaan/ Pemasangan kabel naik/turun di gardu 3 ph type portal (2 tiang) set 0 0 0 0 0 0.00 #REF! #REF!

    Jumlah GD ( C ) Set 10 0 0 0 0 10.00 -

    Harga Dasar dibulatkan (Rp) PPN 10 % Jumlah

    A JTM = 15.95 kms #REF! #REF! #REF! #REF!

    B JTR = 9.20 kms #REF! #REF! #REF! #REF! -

    C GD = 10.00 buah #VALUE! #VALUE! #VALUE!

    #REF! #REF! #REF! 795,443,000

    Terbilang :

    Mamuju, Januari 2013

    Direktur

    Jumlah (Rp).

    URAIAN PEKERJAAN

    RENCANA ANGGARAN BIAYA (RAB)

    PEKERJAAN PEMBANGUNAN JARING DISTRIBUSI (JTM,JTR, DAN GD (SUPPLY ERECT)

    DI PT (PLN) Persero) AREA MAMUJU PAKET POLMAN II

    TAHUN ANGGARAN 2013

    NO. DOKUMEN

    KUALIFIKASI

    JANGKA WAKTU

    SUMBER DANA

  • 7/24/2019 Rab Polman-II Revisi

    10/12

    PT. PLN (PERSERO)

    SATKER LISTRIK PERDESAAN

    SULAWESI BARAT

    okasi Desa : No. Dok. =

    A Dsn.Talepo,Palembongan,Batupanga daala, Siratuang Ds.Batupanga, Kec.Luyo, Polman KUALIFIKASI = USAHA KECIL/NON KECIL

    JANGKA WAKTU = 120 (Seratus Dua Puluh) hari kalender

    SUMBER DANA = APBN Tahun Anggaran 2013

    HARGA JUMLAH DIBULATKAN PPN TOTAL

    NO SAT VOL DASAR HARGA PULUHAN 10% HARGA

    (Rp) (Rp) RIBU (Rp) (Rp)

    1 23 4 5 6=(4x5) 7=(6/10000)x10000 8=(7x10/100) 9=(7+8)

    A MATERIAL JTM

    1 Kawat AAAC 70 mm2 km 49.29 - - - - -

    2 Kawat AAAC 150 mm2 km 0.00 - - - - -

    3 Isolator Tumpu 20 kV bh 1,428 - - - - -

    4 Isolator Tarik / Afspan 20 kV Lengkap Accessories set 78 - - - - -

    - - - -

    B MATERIAL JTR

    1 LVTC 3 x 35 + 25 mm2 km 9.66 - - - - -

    2 LVTC 3 x 70 + 50 mm2 km 0.00 - - - - -

    - - - -

    C GARDU DISTRIBUSI (GD)

    1 Trafo distribusi 3 phasa 100 kVA B2 20 kV type D.3 Unit 0.00 - - - - -

    2 Trafo distribusi 3 phasa 50 kVA B2 20 kV type D.3 Unit 3.00 - - - - -

    3 Trafo distribusi 3 phasa 25 kVA B2 20 kV type D.3 Unit 7.00 - - - - -

    4 Fuse Cut Out 100 A 20 kV + Fuse link 8 Amper buah 30.00 - - - - -

    5 Lightining Arrester 10 kA, 24 kV buah 30.00 - - - - -

    - - - -

    - Rp. -

    Direktur

    JUMLAH (JTM) Rp.

    JUMLAH (JTR) Rp.

    JUMLAH (GD) Rp.

    TOTAL (JTM + JTR + GD)

    Mamuju, Januari 2013

    URAIAN PEKERJAAN

    RENCANA ANGGARAN BIAYA (RAB)

    PENGADAAN MATERIAL UTAMA (MDU)

    PEKERJAAN PEMBANGUNAN JARINGAN DISTRIBUSI JTM, JTR, DAN GD

    DI PT PLN (Persero) AREA MAMUJU PAKET POLMAN II TA. 2013

    .DP/LISDES-SULBAR/2013

  • 7/24/2019 Rab Polman-II Revisi

    11/12

    PT. PLN (PERSERO)

    SATKER LISTRIK PERDESAAN

    SULAWESI BARAT

    No. Dok. =

    A Dsn.Talepo,Palembongan,Batupanga daala, Siratuang Ds.Batupanga, Kec.Luyo, Polman KUALIFIKASI = USAHA KECIL/NON KECIL

    JANGKA WAKTU = 120 (Seratus Dua Puluh) hari kalender SUMBER DANA = APBN Tahun Anggaran 2013

    HARGA HARGA PPN JUMLAH

    NO SAT VOL DASAR DIBULATKAN 10% HARGA

    (Rp) (Rp) (Rp) (Rp)

    1 2 3 4 5 6 7 8

    A MATERIAL JTM

    I PENGADAAN MATERIAL UTAMA

    1 Kawat AAAC 70 mm2 km 49.29 - - - -

    2 Kawat AAAC 150 mm2 km 0.00 - - - -

    3 Isolator Tumpu 20 kV Buah 1,428 - - - -

    4 Isolator Tarik / Afspan 20 kV Lengkap Accessories Set 78 - - - -

    - - -

    II JASA PEMASANGAN

    1 Pemas./Penarikan Kawat AAAC 70 mm2 kms 15.95

    2 Pemas./Penarikan Kawat AAAC 150 mm2 kms 0.00

    #REF! #REF! #REF!

    Rp. #REF!

    B MATERIAL JTR

    I PENGADAAN MATERIAL UTAMA

    1 LVTC 3 x 35 + 25 mm2 km 9.66 - - - -

    2 LVTC 3 x 70 + 50 mm2 km 0.00 - - - -

    - - -

    II JASA PEMASANGAN

    1 Pemas./Penarikan LVTC 3 x 70+50 mm2 km 0.00

    2 Pemas./Penarikan LVTC 3 x 35 + 25 mm2 km 9.20

    #REF! #REF! #REF!

    Rp. #REF!

    C GARDU DISTRIBUSI (GD)

    I PENGADAAN MATERIAL UTAMA

    1 Trafo distribusi 3 phasa 25 kVA B2 20 kV type D.3 Unit 7 - - - -

    2 Trafo distribusi 3 phasa 50 kVA B2 20 kV type D.3 Unit 3 - - - -

    3 Trafo distribusi 3 phasa 100 kVA B2 20 kV type D.3 Unit 0 - - - -

    4 Fuse Cut Out 100 A 20 kV + Fuse link 8 Amper buah 30 - - - -

    5 Lightining Arrester 10 kA, 24 kV buah 30 - - - -

    - - -

    II JASA PEMASANGAN

    1 Pemas. Trafo dist. 3 ph 25 kVA B2 20 kV type D.3 (1 Tiang) Set 7.00

    2 Pemas. Trafo dist. 3 ph 50 kVA B2 20 kV type D.3 (1 Tiang) Set 3.00

    3 Pemas. Trafo dist. 3 ph 100 kVA B2 20 kV type D.3 (2 Tiang) Set -

    #VALUE! #VALUE! #VALUE!

    Rp. #VALUE!

    Rp. 2,668,149,000

    Terbilang :

    JASA PASANG MATERIAL JUMLAH

    JTM 15.95 Km #REF! - #REF!

    JTR 9.20 Km #REF! - #REF!

    GD 10.00 Set #VALUE! - #VALUE!

    Rp. #REF! - 2,668,149,000

    U R A I A N

    T O T A L

    Mamuju, Januari 2013

    Direktur

    K E S I M P U L A N

    JUMLAH JASA (JTM) Rp.

    TOTAL (JTM)

    JUMLAH MDU (JTR) Rp.

    JUMLAH JASA (JTR) Rp.

    TOTAL (JTR)

    JUMLAH MDU (GD) Rp.

    JUMLAH JASA (GJ) Rp.

    TOTAL GD

    TOTAL (JTM + JTR + GD)

    DUA MILYAR, ENAM RATUS ENAM PULUH DELAPAN JUTA, SERATUS EMPAT PLH SEMBILAN RIBU RUPIAH,-

    JUMLAH MDU (JTM) Rp.

    REKAPITULASIRENCANA ANGGARAN BIAYA (RAB)

    DAN PENGADAAN MATERIAL UTAMA (MDU)

    PEKERJAAN PEMBANGUNAN JARINGAN DISTRIBUSI JTM, JTR DAN GD

    DI PT PLN (Persero) AREA MAMUJU, PAKET POLMAN II

    TAHUN ANGGARAN 2013

    Lokasi Desa : .DP/LISDES-SULBAR/2013

    URAIAN PEKERJAAN

  • 7/24/2019 Rab Polman-II Revisi

    12/12

    HARGA JUMLAH

    No. U R A I A N KEGIATAN SAT VOLUME SATUAN HARGA

    Rp. Rp.

    1 2 3 4 5 6

    A MATERIAL UTAMA JTM

    A 1 -1 Kawat AAAC 150 mm2 km 1.00 - -

    A 1 -2 Angkutan material T/M3 0.52200 - -

    -

    A 2 -1 Kawat AAAC 70 mm2 km 1.00 - -

    A 2 -2 Angkutan material T/M3 0.29600 - -

    -

    A 3 -1 Isolator Tumpu 20 kV buah 1.00 - -

    A 3 -2 Angkutan material T/M3 0.01100 - -

    -

    A 4 -1 Isolator Tarik (Type Suspension/Starin Rod) Set 1.00 - -

    a. Jika Isolator Strain Rod + Acc

    - Cross Arm Clevis

    - Strain clamp 70-150 mm2

    b. Jika Isolator Suspension 20 kV + Acc

    - Cross Arm clevice

    - Ball Clevice

    - Socket eyes

    - Strain clamp 70 -150 mm2A 4 -2 Angkutan material T/M3 0.01034 - -

    -

    A 5 -1 Tiang besi 11 meter 200 daN btg 1.00 - -

    A 5 -2 Angkutan material T/M3 0.19 - -

    -

    A 6 -1 Tiang besi 9 meter 100 daN btg 1.00 - -

    A 6 -2 Angkutan material T/M3 0.11 - -

    -

    B MATERIAL UTAMA JTR

    B. 1 -1 LVTC 3 x 70 + 50 mm2 km 1.00 - -

    B. 1 -2 Angkutan material T/M3 1.09800 - -

    -

    B. 2 -1 LVTC 3 x 35 + 25 mm2 km 1.00 - -

    B. 2 -2 Angkutan material T/M3 0.65600 - -

    -

    C MATERIAL UTAMA GD

    C. 1 -1 Trafo distribusi 3 phasa 25 kVA B2 20 kV, D3 Unit 1.00 - -

    C. 1 -2 Angkutan Material T/M3 0.46750 - -

    -

    C. 2 -1 Trafo distribusi 3 phasa 50 kVA B2 20 kV, D3 Unit 1.00 - -

    C. 2 -2 Angkutan Material T/M3 0.56320 - -

    -

    C. 3 -1 Trafo distribusi 3 phasa 100 kVA B2 20 kV, D3 Unit 1.00 - -

    C. 3 -2 Angkutan Material T/M3 1.00100 - -

    -

    C. 4 -1 Fuse Cut Out 100 A 20 kV + Fuse Link 8 Amper buah 1.00 - -

    C. 4 -2 Angkutan material T/M3 0.00451 - -

    -

    C. 5 -1 Lightning Arrester 10 kA, 20 kV buah 1.00 - -

    C. 5 -2 Angkutan material T/M3 0.00451 - -

    -

    Direktur

    Jumlah Rp.

    Jumlah Rp.

    Jumlah Rp.

    Jumlah Rp.

    Mamuju, Januari 2013

    Jumlah Rp.

    ANALISA HARGA SATUAN

    PENGADAAN MATERIAL UTAMA (MDU)

    PEMBANGUNAN JARINGAN DIST. JTM, JTR, DAN GD (SUPLY ERECT)

    Jumlah Rp.

    Jumlah Rp.

    Jumlah Rp.

    Jumlah Rp.

    Jumlah Rp.

    Jumlah Rp.

    Jumlah Rp.

    Jumlah Rp.