RINGKASAN JUMLAH MATERIAL , VOLUME, UPAH KERJA DAN BIAYA BAGIAN SIPIL GUDANG UKURAN 25 X 54 MBOUWPLANK Barang Gelam 8 / 10 Papan 25 x 2,5 x 4 m Paku (Ls) Upah kerja Volume Harga per m3 TAPAKAN (150 X 150 X 40 CM) Barang 12 KSTI Semen Pasir Koral Kawat ikat Upah Solar + Oli 10 hari Volume Harga per m3 GALIAN PONDASI 185 328 26.2 39.3 4 9 42.53 Rp 172 Jumlah Batang sak m m3 3

Jumlah 30 2 0.5 2 170 Rp Batang m3

Harga Rp Rp 2 Hari Rp Rp Total 6,000 Rp 800,000 Rp 280,000 Rp 50,000 Rp Rp Rp

Total harga 180,000 1,600,000 140,000 200,000 2,120,000 12,471

Dus Tukang m 2,120,000

:

170

Harga Rp Rp Rp Rp Rp Rp Total 76,000 Rp 50,000 Rp 60,000 Rp 220,000 Rp 280,000 Rp Rp 100,000 Rp Rp Rp Rp 30,000 Rp

Total harga 14,060,000 16,400,000 1,572,000 8,646,000 1,120,000 10,500,000 900,000 53,198,000 1,250,835 5,160,000

Rol Hari m3

53,198,000 m3

:

42.5

URUGAN DAN PEMADATAN KEMBALI TANAH PONDASI Barang Jumlah 3 Urugan kembali tanah 121 m Pemadatan tanah KOLOM TAPAKAN (40 X 40 X 300 CM) Barang 12 KSTI 8 TM Semen Pasir Koral Kawat Ikat Upah Plywood 18 mm Hek 7 x 2,5 Paku (Ls) Solar + Oli 9 hari Volume Harga per m3 121 m3

Harga Rp Rp 10,000 Rp 10,000 Rp

Total harga 1,210,000 1,210,000

168 112 109 8.69 13.04 3 25 80 2

Jumlah Batang Batang Sak m3 m Rol Keping Batang Dus 9 Hari3

Harga Rp Rp Rp Rp Rp Rp

Total harga 76,000 Rp 12,768,000 20,000 Rp 2,240,000 50,000 Rp 5,450,000 60,000 Rp 521,400 2,868,800 840,000 12,600,000 4,625,000 400,000 560,000 900,000 43,773,200 3,104,482

220,000 Rp 280,000 Rp Rp Rp 185,000 Rp Rp 5,000 Rp Rp 280,000 Rp Rp 100,000 Rp Total Rp Rp

14.1 Rp

m3 43,773,200 : 14.1

SLOOF UTAMA (40 X 50 CM) Barang 12 KSTI 8 TM Semen Pasir Koral Kawat Ikat Upah Plywood 18 mm Hek 7 x 2,5 Paku (Ls) Solar + Oli 11 hari Volume Harga per m3 SLOOF TAMBAHAN (30 X 40 CM) Barang 12 KSTI 8 TM Semen Pasir Koral Kawat Ikat Upah Plywood 18 mm Hek 7 x 2,5 Paku (Ls) Solar + Oli 2 hari Volume Harga per m3

297 302 444 35.5 53.2 10 40 100 2

Jumlah Batang Batang Sak m3 m Rol Keping Batang Dus 11 Hari3

Harga Rp Rp Rp Rp Rp Rp

Total harga 76,000 Rp 22,572,000 20,000 Rp 6,040,000 50,000 Rp 22,200,000 60,000 Rp 2,130,000 11,704,000 2,800,000 14,300,000 7,400,000 500,000 560,000 1,100,000 91,306,000 1,729,280

220,000 Rp 280,000 Rp Rp Rp 185,000 Rp Rp 5,000 Rp Rp 280,000 Rp Rp 100,000 Rp Total Rp Rp

52.8 Rp

m3 91,306,000 : 52.8

42 51 52 4.11 6.17 1 6 20 0.5

Jumlah Batang Batang Sak m3 m Rol Keping Batang Dus 2 Hari3

Harga Rp Rp Rp Rp Rp Rp

76,000 Rp 20,000 Rp 50,000 Rp 60,000 Rp

Total harga 3,192,000 1,020,000 2,600,000 246,600 1,357,400 280,000 2,764,000 1,110,000 100,000 140,000 200,000 13,010,000 2,125,817

220,000 Rp 280,000 Rp Rp Rp 185,000 Rp Rp 5,000 Rp Rp 280,000 Rp Rp 100,000 Rp Total Rp Rp

6.12 Rp

m3 13,010,000 : 6.12

PONDASI MENERUS PASANGAN BATU LANTAI 1 Barang Jumlah Bata Press Beton 3,696 Batang Semen 34 sak Pasir Upah Volume Harga per m3 SLOOF KECIL 10 x 10 cm (4 8 KS) Barang 8 KS 8 TM Semen Pasir Koral Kawat ikat Upah Papan 25 x 2,5 x 4m 5.5 m3

Harga Rp Rp Rp Total

Total harga 500 Rp 1,848,000 50,000 Rp 1,700,000 60,000 Rp Rp Rp Rp 330,000 672,000 4,550,000 40,625

112 Rp

m

3

4,550,000

:

112

41 19 9 0.69 1.03 0.5 1

Jumlah Batang Batang sak m3 m Rol m33

Harga Rp Rp Rp Rp Rp Rp Rp

Total harga 35,000 Rp 1,435,000 20,000 Rp 380,000 50,000 Rp 450,000 60,000 Rp 220,000 Rp 280,000 Rp Rp 800,000 Rp 41,400 226,600 140,000 672,000 800,000

Paku (Ls) Volume Harga per m3 TANGGA Barang 10 KSTI Semen Pasir Koral Kawat ikat Upah Papan 25 x 2,5 x 4m Plywood 18 mm Paku (Ls)

1/2 112 Rp

Dus m 4,285,000 : 112

Rp 280,000 Rp Total Rp Rp

140,000 4,285,000 38,259

15 24 1.85 2.77 0.5 0.5 5 1/2

Jumlah Batang sak m3 m Rol m keping Dus3 3

Harga Rp Rp Rp Rp Rp

53,000 Rp 50,000 Rp 60,000 Rp 220,000 Rp 280,000 Rp Rp

Total harga 795,000 1,200,000 111,000 609,400 140,000 600,000 400,000 925,000 140,000 4,920,400

Rp 800,000 Rp Rp 185,000 Rp Rp 280,000 Rp Total Rp

PLAT LANTAI LT 1 Barang Wiremesh 8 Cor K 225 Batu pengganjal (Ls) Upah kerja Sewa mobil pompa Volume Harga per m3 TIMBUNAN LANTAI PEMADATAN TANAH UNTUK COR LANTAI Barang Pemadatan tanah

138 213 1,000

Jumlah Keping m3 Bh 2 Hari

Harga Rp Rp Rp

Total harga 500,000 Rp 69,000,000 132,060,000 500,000 2,500,000 2,000,000 206,060,000 1,015,074 4,060,000

620,000 Rp 500 Rp Rp Rp 1,000,000 Rp Total Rp Rp Rp 20,000 Rp

203 Rp

m3 : 203

206,060,000 m3

203

Jumlah m3

Harga Rp 2,500 Rp

Total harga 3,375,000

1350

KOLOM LANTAI 1A (40 X 40 CM TINGGI 3 M) Barang 12 KSTI 54 8 TM 48 Semen 56 Pasir Koral Kawat Ikat Upah Plywood 18 mm Hek 7 x 2,5 Paku (Ls) Solar + Oli 4 hari Volume Harga per m3 4.44 6.65 2 16 24 1

Jumlah Batang Batang Sak m3 m Rol Keping Batang Dus 4 Hari3

Harga Rp Rp Rp Rp Rp Rp

Total harga 76,000 Rp 4,104,000 20,000 Rp 960,000 50,000 Rp 2,800,000 60,000 Rp 266,400 1,463,000 560,000 5,400,000 2,960,000 120,000 280,000 400,000 19,313,400 2,682,417

220,000 Rp 280,000 Rp Rp Rp 185,000 Rp Rp 5,000 Rp Rp 280,000 Rp Rp 100,000 Rp Total Rp Rp

7.2 Rp

m3 19,313,400 : 7.2

KOLOM LANTAI 1B (40 X 40 CM TINGGI 4 M) Barang 12 KSTI 32 8 TM 29 Semen 35 Pasir Koral Kawat Ikat Upah Plywood 18 mm Hek 7 x 2,5 Paku (Ls) Solar + Oli 2 hari Volume Harga per m3 2.77 4.26 1 13 11 1

Jumlah Batang Batang Sak m3 m Rol Keping Batang Dus 2 Hari3

Harga Rp Rp Rp Rp Rp Rp

Total harga 76,000 Rp 2,432,000 20,000 Rp 580,000 50,000 Rp 1,750,000 60,000 Rp 166,200 958,500 280,000 2,400,000 2,405,000 55,000 280,000 200,000 11,506,700 2,557,044

225,000 Rp 280,000 Rp Rp Rp 185,000 Rp Rp 5,000 Rp Rp 280,000 Rp Rp 100,000 Rp Total Rp Rp

4.5 Rp

m3 11,506,700 : 4.5

BALOK TARIK UTAMA + KONSUL (UKURAN 30 X 50 CM) Barang Jumlah 12 KSTI 214 Batang 8 TM 214 Batang 3 Cor K 225 28.25 m Kawat Ikat 5 Rol Upah Plywood 18 mm 59 Keping Hek 7 x 2,5 180 Batang Paku (Ls) 3 Dus Volume Harga per m3 BALOK ANAK (25 X 30 CM) Barang 12 KSTI 10 KSTI 8 TM Cor K 225 Kawat Ikat Upah Plywood 18 mm Hek 7 x 2,5 Paku (Ls) Volume 3 Harga per m PLAT LANTAI 2 + PERANCAH Barang 8 KS 10 KS Cor K 225 Kawat Ikat Upah Plywood 18 mm Hek 7 x 2,5 25.68 Rp m3 57,039,000 : 25.7

Harga Rp Rp Rp Rp

Total harga 76,000 Rp 16,264,000 20,000 Rp 4,280,000 17,515,000 1,400,000 4,925,000 10,915,000 900,000 840,000 57,039,000 2,221,145

620,000 Rp 280,000 Rp Rp Rp 185,000 Rp Rp 5,000 Rp Rp 280,000 Rp Total Rp Rp

46 46 64 6.16 1 23 100 1 5.6 Rp

Jumlah Batang Batang Batang m Rol Keping Batang Dus m3 18,918,200 : 5.63

Harga Rp Rp Rp Rp Rp

Total harga 76,000 Rp 3,496,000 53,000 Rp 2,438,000 20,000 Rp 1,280,000 3,819,200 280,000 2,570,000 4,255,000 500,000 280,000 18,918,200 3,378,250

620,000 Rp 280,000 Rp Rp Rp 185,000 Rp Rp 5,000 Rp Rp 280,000 Rp Total Rp Rp

895 450 56.6 10 180 1000

Jumlah Batang Batang m3 Rol Keping Batang

Harga Rp Rp Rp Rp Rp Rp

Total harga 35,000 Rp 31,325,000 53,000 Rp 23,850,000 620,000 Rp 280,000 Rp Rp 185,000 Rp 5,000 Rp 35,092,000 2,800,000 22,000,000 33,300,000 5,000,000

Papan 25 x 2,5 x 4m Paku (Ls) Volume Harga per m3

8 5 53.9 Rp

m3 Dus m3 : 53.9

Rp 800,000 Rp Rp 280,000 Rp Total Rp Rp

6,400,000 1,400,000 161,167,000 2,990,111

161,167,000

KOLOM LANTAI 2 (20 X 20 CM TINGGI 3 M) Barang 12 KSTI 8 8 TM 12 Semen 8 Pasir Koral Kawat Ikat Upah Plywood 18 mm Hek 7 x 2,5 Paku (Ls) Solar + Oli 1 hari Volume 3 Harga per m KOLOM TEBENG LAYAR (30 X 30 CM) Barang 12 KSTI 8 TM Semen Pasir Koral Kawat Ikat Upah Plywood 18 mm Hek 7 x 2,5 Papan 25 x 2,5 x 4m Paku Solar + Oli 4 hari Volume 3 Harga per m 0.6 0.9 0.5 6 10 0.5

Jumlah Batang Batang Sak m3 3

Harga Rp Rp Rp Rp Rp Rp

Total harga 76,000 Rp 608,000 20,000 Rp 240,000 50,000 Rp 400,000 60,000 Rp 36,000 198,000 140,000 1,350,000 1,110,000 50,000 140,000 100,000 4,372,000 4,554,167

m Rol Keping Batang Dus 1 Hari

220,000 Rp 280,000 Rp Rp Rp 185,000 Rp Rp 5,000 Rp Rp 280,000 Rp Rp 100,000 Rp Total Rp Rp

0.96 Rp

m

3

4,372,000

:

0.96

32 39 34 2.66 4.09 1 15 30 1 1

Jumlah Batang Batang Sak m3 m Rol Keping Batang m3 Dus 4 Hari3

Harga Rp Rp Rp Rp Rp Rp Rp Rp

76,000 Rp 20,000 Rp 50,000 Rp 60,000 Rp 220,000 Rp 280,000 Rp Rp 185,000 Rp 5,000 Rp

Total harga 2,432,000 780,000 1,700,000 159,600 899,800 280,000 4,800,000 2,775,000 150,000 800,000 280,000 400,000 15,456,400 3,577,870

Rp 800,000 Rp Rp 280,000 Rp Rp 100,000 Rp Total Rp Rp

4.32 Rp

m3 15,456,400 : 4.32

BALOK TARIK TEBENG LAYAR (30 X 30 CM) Barang 12 KSTI 40 8 TM 34 Semen 34.65 Pasir Koral Kawat Ikat Upah Plywood 18 mm Hek 7 x 2,5 Paku 2.77 4.16 1 10 50 1

Jumlah Batang Batang Sak m3 m Rol Keping Batang Dus3

Harga Rp Rp Rp Rp Rp Rp Rp Rp Rp

Total harga 76,000 Rp 3,040,000 20,000 Rp 680,000 50,000 Rp 1,732,500 60,000 Rp 220,000 Rp 280,000 Rp Rp 185,000 Rp 5,000 Rp 280,000 Rp 166,200 915,200 280,000 4,300,000 1,850,000 250,000 280,000

Solar + Oli 2 hari Volume Harga per m3 4.5 Rp m3 13,693,900

2 Hari

Rp 100,000 Rp Total Rp Rp

200,000 13,693,900 3,043,089

:

4.5

KOLOM DAN BALOK PRAKTIS (DIMENSI 10X 10 CM) 4 8 KS Barang Jumlah 8 KS 450 Batang 8 TM 175 Batang Semen 80 Sak m3 Pasir 7 Koral Kawat Ikat Upah Hek 7 x 2,5 Papan 25 x 2,5 x 4m Paku Volume 3 Harga per m BESI STIK 8 KS Besi 8 KS (Ls) 10 5 100 2 1 m Rol Batang m Dus3 3

Harga Rp Rp Rp Rp Rp Rp Rp

Total harga 35,000 Rp 15,750,000 20,000 Rp 3,500,000 50,000 Rp 4,000,000 60,000 Rp 225,000 Rp 280,000 Rp Rp 5,000 Rp 420,000 2,250,000 1,400,000 11,750,000 500,000 1,600,000 280,000 41,450,000 34,542

Rp 800,000 Rp Rp 280,000 Rp Total Rp : 1200 Rp

1200.0 m' Rp 41,450,000

100

Batang

Rp

35,000 Rp

3,500,000

PASANGAN BATU (1/2 BATU) DAN PLESTER DINDING Barang Jumlah Batu press beton 110000 Batu Semen 900 Sak Pasir Papan 25 x 2,5 (Ls) Paku (Ls) Upah kerja Volume Harga per m3 CAT DINDING Barang Cat Vinotex putih Upah kerja Volume Harga per m3 41 Jumlah Pail 144 5 2 m3 m Dus3

Harga Rp Rp Rp Rp Rp

Total harga 500 Rp 55,000,000 50,000 Rp 45,000,000 60,000 Rp 8,640,000 4,000,000 560,000 50,000,000 163,200,000 82,989

800,000 Rp 280,000 Rp Rp Total Rp : 2022 Rp

2022 Rp

m2

167,803,350

Harga Rp

165,000 Rp Rp Total Rp : 4044 Rp

Total harga 6,765,000 20,220,000 26,985,000 6,673

4044 Rp

m

3

26,985,000

KAKI LIMA (LEBAR 0,5 M) DAN SELOKAN (UKURAN 30 X 40 DALAM) Barang Jumlah Bata Press Beton 18,000 Bh Semen 160 sak Pasir Koral Solar + Oli 2 hari Upah 23 7 m3 m3

Harga Rp Rp Rp Rp Rp

Total harga 500 Rp 9,000,000 50,000 Rp 8,000,000 60,000 Rp 1,380,000 1,575,000 200,000 7,764,000 27,919,000

2 Hari

225,000 Rp 100,000 Rp Rp Total Rp

Volume 3 Harga per m TIMBUNAN SELOKAN PLAFOND GYPSUM LANTAI 2 Barang Borongan plafond gypsum

114 Rp 52.65

m' 27,919,000 m3

:

114 Rp

Rp 20,000 Rp

244,904 1,053,000

Jumlah 7 m 51 m

Harga Rp

Total harga 125,000 Rp 44,625,000

KUSEN PINTU DAN DAUN PINTU LANTAI 2 Barang 1 set + daun pintu Rp KUSEN JENDELA LANTAI 2 Barang 1 set SEPTICTANK Barang 1 set PINTU FIBER KAMAR MANDI Barang 1 set INSTALASI LISTRIK LANTAI 1 Barang Instalasi + Kabel INSTALASI LISTRIK LANTAI 2 Barang Instalasi + Kabel INSTALASI LISTRIK GUDANG Barang Instalasi + Kabel Rp

Jumlah 1,000,000 18 Set

Harga

Total harga Rp 18,000,000

Rp

Jumlah 400,000 15 Set

Harga

Total harga Rp 6,000,000

Jumlah 1,500,000

Harga 6 Set

Total harga Rp 9,000,000

Rp

Jumlah 200,000

Harga 6 Set

Total harga Rp 1,200,000

Rp

Jumlah 200,000

Harga 9 Titik Rp

Total harga 1,800,000

Rp

Jumlah 200,000 24 Titik

Harga Rp

Total harga 4,800,000

Rp

Jumlah 300,000

Harga 8 Titik

Total harga Rp 2,400,000

RANGKA BAJAKUDA - KUDA Barang IWF 350.125.6.9 (Castellated) Baut + Mur 5/8 x 2" Reng Plat 5/8" Reng Per 5/8" Upah kerja Jumlah 878.12 Kg 10 Set 360 Bh 720 Bh 360 Bh 878.12 Kg 10 Set Harga Rp Rp Rp Rp Rp Total 8,500 2,500 300 300 3,000 Rp Rp Rp Rp Rp Rp Total harga 74,640,200 900,000 216,000 108,000 26,343,600 102,207,800

KUDA - KUDA ANAK Barang INP 100 Upah kerja

50.5 50.5

Jumlah Kg Kg

7 Btg 7 Btg

Harga Rp Rp Total

Total harga 9,000 Rp 3,181,500 3,500 Rp 1,237,250 Rp 4,418,750

TUPAI - TUPAI BARU (ATAP ONDULINE) DENGAN KUDA - KUDA ANAK Barang Jumlah Plat 4 mm (tupai & skoor tupai) 93.3 Kg 3 Kpg Upah kerja 93.3 Kg 3 Kpg

Harga Total harga Rp 800,000 Rp 2,400,000 Rp 3,500 Rp 979,650 Total Rp 3,379,650

KOLOM Barang IWF 300.150.7.9 IWF 200.100.6.8 Plat 12 mm Base Plat Plat 8 mm Top + Stifner Angkur Behel 19 mm pjg. 0,75 m Mur 3/4" Reng Plat 3/4" Upah kerja 440.4 255.6 280 187 80 80 80 4433 Jumlah Kg Kg Kg Kg Bh Bh Bh Kg 8 2 1 1 Btg Btg Kpg Kpg Harga Rp 9,000 Rp 9,000 Rp 2,350,000 Rp 1,600,000 Rp 20,000 Rp 2,000 Rp 650 Rp 3,500 Total Rp Rp Rp Rp Rp Rp Rp Rp Rp Total harga 31,708,800 4,600,800 2,350,000 1,600,000 1,600,000 160,000 52,000 15,515,500 57,587,100

GORDING (ATAP ONDULINE WARNA MERAH) DENGAN KUDA - KUDA ANAK Barang Jumlah Harga Cnp 100.50.20.2 mm 21.36 Kg 503 Btg Rp Baut + Mur 7/16 x 1" 1856 Bh Rp Reng Plat 7/16" 1856 Bh Rp Reng Per 7/16" 1856 Bh Rp Onduline warna merah 1156 Kpg Rp Nok Atap Onduline warna merah 79 Kpg Rp Drilling Onduline 37050 Bh Rp Upah Kerja Atap 1665 m' Rp Upah Kerja Nok 60 m' Rp Upah kerja baja 10744.1 Kg Rp Total SAGROD / TREKSTANG & LINTOL / SKOOR KOLOM (ATAP ONDULINE) Barang Jumlah Sagrod (trekstang) behel 12 KSTI 51 Btg Mur 7/16" 1872 Bh Reng Plat 7/16" 1872 Bh Bracing behel 12 KSTI 32 Btg Jarum Keras dia. 22 mm 24 Bh Skoor Kolom (Lintol) Siku 50.50.5 36 Btg Skoor Kolom behel 12 KSTI 45 Btg Upah kerja baja 2181.7 Kg

9,000 800 100 200 88,000 53,000 750 5,000 10,000 3,500

Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp

Total harga 96,696,720 1,484,800 185,600 371,200 101,728,000 4,187,000 27,787,500 8,325,000 600,000 37,604,280 278,970,100

Harga Total harga Rp 76,000 Rp 3,876,000 Rp 550 Rp 1,029,600 Rp 200 Rp 374,400 Rp 76,000 Rp 2,432,000 Rp 48,000 Rp 1,152,000 Rp 138,000 Rp 4,968,000 Rp 76,000 Rp 3,420,000 Rp 3,500 Rp 7,635,950 Total Rp 24,887,950

TALANG Barang Talang Siku 40.40.4 Talang Aluminium 0,55 mm Pipa Wavin 4" Elbow 4" Corong Aluminum 0,55 mm Lem PVC (Ls) Paku keling (Ls) Lem Silicon (Ls) Upah kerja Talang Upah kerja baja Jumlah 43 Btg 119 m' 60 Btg 60 Btg 60 Kpg 5 Klg 4000 Bh 10 tube 119 m' 612.74 Kg Harga Total harga Rp 80,000 Rp 3,440,000 Rp 85,000 Rp 10,115,000 Rp 165,000 Rp 9,900,000 Rp 7,500 Rp 450,000 Rp 25,000 Rp 1,500,000 Rp 37,000 Rp 185,000 Rp 500 Rp 2,000,000 Rp 22,500 Rp 225,000 Rp 12,000 Rp 1,428,000 Rp 3,500 Rp 2,144,590 Total Rp 31,387,590

PET ATAS PINTU UKURAN 5 X 6 M DENGAN ATAP ONDULINE Barang Jumlah Rangka Besi Pipa 2" x 4 mm 12 Btg Cnp 100.50.20 21.36 Kg 20 Btg Plat 4 mm Tupai & Skoor tupai 1 Kpg Atap Onduline warna merah 42 Kpg Drilling (Ls) 1260 Bh Sagrod (Trekstang) Behel 12 KSTI 2 Btg Upah kerja Atap 61 m' Upah kerja baja 1104.26 Kg

Harga Total harga Rp 480,000 Rp 5,760,000 Rp 9,000 Rp 3,844,800 Rp 800,000 Rp 800,000 Rp 88,000 Rp 3,696,000 Rp 750 Rp 945,000 Rp 76,000 Rp 152,000 Rp 5,000 Rp 305,000 Rp 3,500 Rp 3,864,910 Total Rp 19,367,710

PET DEPAN MESS UKURAN 2 X 36 M DENGAN ATAP ONDULINE Barang Jumlah Rangka Besi Pipa 2" x 4 mm 7 Btg Cnp 100.50.20 21.36 Kg 28 Btg Atap Onduline warna merah 45 Kpg Drilling (Ls) 1350 Bh Sagrod (Trekstang) Behel 12 KSTI 2 Btg Upah kerja Atap 65 m' Upah kerja baja 1026.15 Kg

Harga Total harga Rp 480,000 Rp 3,360,000 Rp 9,000 Rp 5,382,720 Rp 88,000 Rp 3,960,000 Rp 750 Rp 1,012,500 Rp 76,000 Rp 152,000 Rp 5,000 Rp 325,000 Rp 3,500 Rp 3,591,525 Total Rp 17,783,745

DIREKSI KEET DAN GUDANG (15 M x 3,8 M x tinggi 6 M) LS Barang Jumlah Papan 25 x 2,5 x 4 m (Ls) Seng 10 feet (Ls) Seng 7 feet (Ls) Nok seng polos lebar 50 cm (Ls) Paku seng (Ls) Paku 2 (Ls) Gelam 10 / 12 (Ls) Gelam 8 / 10 (Ls) Upah kerja 9 16 16 16 10 1 20 50 5 m Kpg Kpg m3 Kg Dus Btg Btg Tukang3

Harga Rp 800,000 Rp Rp 60,000 Rp Rp 45,000 Rp Rp 20,000 Rp Rp 20,000 Rp Rp 280,000 Rp Rp 9,000 Rp Rp 7,000 Rp Rp 50,000 Rp Total Rp

Total harga 7,200,000 960,000 720,000 320,000 200,000 280,000 180,000 350,000 1,250,000 11,460,000

5 Hari

BIAYA- BIAYA LAIN YANG TIDAK TERMASUK DALAM HITUNGAN VOLUME Barang Jumlah Harga Total harga Lori kaleng 10 Buah Rp 325,000 Rp 3,250,000 Sekop lancip 6 Buah Rp 48,000 Rp 288,000 Cangkul 8 Buah Rp 70,000 Rp 560,000 Gelam 8/10 untuk steger (Ls) 3000 Batang Rp 6,000 Rp 18,000,000 Kepala Tukang 5 Bln 26 Hari Rp 80,000 Rp 10,400,000 Pengawas 5 Bln 26 Hari Rp 80,000 Rp 10,400,000 Mobilisasi dan Demobilisasi (Ls) Rp 5,000,000 Pembersihan Akhir (Ls) Rp 1,000,000 Biaya Gambar (Ls) Rp 2,000,000 Total Rp 50,898,000 Overhead (Ls) Pondasi merupakan asumsi bila terjadi perubahan maka harga juga berubah Belum termasuk keramik dan pemasangannya Tidak termasuk IMB Tidak termasuk pintu dan jendela lantai 1 dan gudang Tidak termasuk tanah timbunan TOTAL 5%

Rp

1,693,984,595

RINGKASAN JUMLAH MATERIAL , VOLUME, UPAH KERJA DAN BIAYA BAGIAN SIPIL GUDANG UKURAN 25 X 54 MBOUWPLANK Barang Gelam 8 / 10 Papan 25 x 2,5 x 4 m Paku (Ls) Upah kerja Volume 3 Harga per m TAPAKAN (150 X 150 X 40 CM) Barang 12 KSTI Semen Pasir Koral Kawat ikat Upah Solar + Oli 10 hari Volume Harga per m3 GALIAN PONDASI 124 219 17.5 26.2 3 6 Jumlah Batang sak m m3 3

Jumlah 30 2 0.5 2 170 Rp Batang m3

Harga Rp Rp 2 Hari Rp Rp Total 6,000 Rp 800,000 Rp 280,000 Rp 50,000 Rp Rp Rp

Total harga 180,000 1,600,000 140,000 200,000 2,120,000 12,471

Dus Tukang m 2,120,000

:

170

Harga Rp Rp Rp Rp Rp Rp Total 76,000 Rp 50,000 Rp 60,000 Rp 220,000 Rp 280,000 Rp Rp 100,000 Rp Rp Rp Rp 30,000 Rp

Total harga 9,424,000 10,950,000 1,050,000 5,764,000 840,000 7,000,000 600,000 35,628,000 1,256,720 3,450,000

Rol Hari3

28.35 m

Rp 35,628,000 115 m3

:

28.4

URUGAN DAN PEMADATAN KEMBALI TANAH PONDASI Barang Jumlah m3 Urugan kembali tanah 80 Pemadatan tanah KOLOM TAPAKAN (40 X 40 X 300 CM) Barang 12 KSTI 8 TM Semen Pasir Koral 80 m3

Harga Rp Rp 10,000 Rp 10,000 Rp

Total harga 800,000 800,000

112 75 73 5.8 8.7

Jumlah Batang Batang Sak m3 m3

Harga Rp Rp Rp Rp Rp

76,000 Rp 20,000 Rp 50,000 Rp 60,000 Rp 220,000 Rp

Total harga 8,512,000 1,500,000 3,650,000 348,000 1,914,000

Kawat Ikat Upah Plywood 18 mm Hek 7 x 2,5 Paku (Ls) Solar + Oli 9 hari Volume Harga per m3 SLOOF UTAMA (40 X 50 CM) Barang 12 KSTI 8 TM Semen Pasir Koral Kawat Ikat Upah Plywood 18 mm Hek 7 x 2,5 Paku (Ls) Solar + Oli 11 hari Volume 3 Harga per m PLAT LANTAI LT 1 Barang Wiremesh 8 Cor K 225 Batu pengganjal (Ls) Upah kerja Sewa mobil pompa Volume Harga per m3 TIMBUNAN LANTAI PEMADATAN TANAH UNTUK COR LANTAI Barang Pemadatan tanah

3 23 75 1

Rol Keping Batang Dus 6 Hari

Rp

280,000 Rp Rp Rp 185,000 Rp Rp 5,000 Rp Rp 280,000 Rp Rp 100,000 Rp Total Rp Rp

840,000 8,400,000 4,255,000 375,000 280,000 600,000 30,674,000 3,259,724

9.41

m3 : 9.41

Rp 30,674,000

158 181 244 19.5 29.2 8 33 83 2

Jumlah Batang Batang Sak 3 m m Rol Keping Batang Dus 7 Hari3

Harga Rp Rp Rp Rp Rp Rp

76,000 Rp 20,000 Rp 50,000 Rp 60,000 Rp

Total harga 12,008,000 3,620,000 12,200,000 1,170,000 6,424,000 2,240,000 8,575,000 6,105,000 415,000 560,000 700,000 54,017,000 1,709,399

220,000 Rp 280,000 Rp Rp Rp 185,000 Rp Rp 5,000 Rp Rp 280,000 Rp Rp 100,000 Rp Total Rp Rp

31.6

m

3

Rp 54,017,000

:

31.6

Jumlah 138 Keping 3 213 m 1,000 Bh 2 Hari 203 m3 : 203

Harga Rp Rp Rp

Total harga 500,000 Rp 69,000,000 132,060,000 500,000 2,500,000 2,000,000 206,060,000 1,015,074 4,060,000

620,000 Rp 500 Rp Rp Rp 1,000,000 Rp Total Rp Rp Rp 20,000 Rp

Rp 206,060,000 203 m3

Jumlah m3

Harga Rp 2,500 Rp

Total harga 3,375,000

1350

KOLOM TEBENG LAYAR (30 X 30 CM) Barang 12 KSTI 8 TM Semen Pasir Koral Kawat Ikat Upah Plywood 18 mm Hek 7 x 2,5 Papan 25 x 2,5 x 4m Paku Solar + Oli 4 hari Volume 3 Harga per m

64 77 67 5.32 7.98 2 16 30 1 1

Jumlah Batang Batang Sak m3 m Rol Keping Batang m3 Dus 8 Hari3

Harga Rp Rp Rp Rp Rp Rp Rp Rp

Total harga 76,000 Rp 4,864,000 20,000 Rp 1,540,000 50,000 Rp 3,350,000 60,000 Rp 220,000 Rp 280,000 Rp Rp 185,000 Rp 5,000 Rp 319,200 1,755,600 560,000 9,600,000 2,960,000 150,000 800,000 280,000 800,000 26,978,800 6,245,093

Rp 800,000 Rp Rp 280,000 Rp Rp 100,000 Rp Total Rp Rp

4.32

m

3

Rp 26,978,800

:

4.32

BALOK TARIK TEBENG LAYAR (30 X 30 CM) Barang Jumlah 12 KSTI 40 Batang 8 TM 34 Batang Semen 34.65 Sak 3 Pasir 2.77 m Koral Kawat Ikat Upah Plywood 18 mm Hek 7 x 2,5 Paku Solar + Oli 2 hari Volume Harga per m3 4.16 1 10 50 1 m Rol Keping Batang Dus 2 Hari 4.5 m3 : 4.53

Harga Rp Rp Rp Rp Rp Rp

Total harga 76,000 Rp 3,040,000 20,000 Rp 680,000 50,000 Rp 1,732,500 60,000 Rp 166,200 915,200 280,000 4,300,000 1,850,000 250,000 280,000 200,000 13,693,900 3,043,089

220,000 Rp 280,000 Rp Rp Rp 185,000 Rp Rp 5,000 Rp Rp 280,000 Rp Rp 100,000 Rp Total Rp Rp

Rp 13,693,900

KOLOM DAN BALOK PRAKTIS (DIMENSI 10X 10 CM) 4 8 KS Barang Jumlah 8 KS 300 Batang 8 TM 120 Batang Semen 80 Sak m3 Pasir 7 Koral Kawat Ikat Upah Hek 7 x 2,5 10 2 50 m Rol Batang3

Harga Rp Rp Rp Rp Rp Rp Rp

35,000 Rp 20,000 Rp 50,000 Rp 60,000 Rp 225,000 Rp 280,000 Rp Rp 5,000 Rp

Total harga 10,500,000 2,400,000 4,000,000 420,000 2,250,000 560,000 11,750,000 250,000

Papan 25 x 2,5 x 4m Paku Volume Harga per m3 BESI STIK 8 KS Besi 8 KS (Ls)

1 1

m Dus

3

Rp 800,000 Rp Rp 280,000 Rp Total Rp : 1200 Rp

800,000 280,000 33,210,000 27,675

1200.0 m' Rp 33,210,000

75

Batang

Rp

35,000 Rp

2,625,000

PASANGAN BATU (1/2 BATU) DAN PLESTER DINDING Barang Jumlah Batu press beton 67584 Batu Semen 591 Sak Pasir Papan 25 x 2,5 (Ls) Paku (Ls) Upah kerja Volume Harga per m3 CAT DINDING Barang Cat Vinotex putih Upah kerja Volume Harga per m3 24 Jumlah Pail3 189.1 m

Harga Rp Rp Rp Rp Rp

Total harga 500 Rp 33,792,000 50,000 Rp 29,550,000 60,000 Rp 11,346,000 4,000,000 560,000 50,000,000 129,248,000 82,989

5 2

m Dus

3

800,000 Rp 280,000 Rp Rp Total Rp : 2022 Rp

2022

m2

Rp 167,803,350

Harga Rp

165,000 Rp Rp Total Rp : 4044 Rp

Total harga 3,960,000 11,820,000 15,780,000 3,902

4044

m3

Rp 15,780,000

KAKI LIMA (LEBAR 0,5 M) DAN SELOKAN (UKURAN 30 X 40 DALAM) Barang Jumlah Harga Bata Press Beton 18,000 Bh Rp Semen 160 sak Rp Pasir Koral Solar + Oli 2 hari Upah Volume Harga per m3 TIMBUNAN SELOKAN INSTALASI LISTRIK GUDANG 23 7 m3 m3

500 Rp 50,000 Rp 60,000 Rp

Total harga 9,000,000 8,000,000 1,380,000 1,575,000 200,000 7,764,000 27,919,000 244,904 1,053,000

Rp 2 Hari Rp Rp

225,000 Rp 100,000 Rp Rp Total Rp Rp

114

m' : 114 Rp

Rp 27,919,0003 52.65 m

20,000 Rp

Barang Instalasi + Kabel

Rp

Jumlah 300,000 8 Titik

Harga

Total harga Rp 2,400,000

RANGKA BAJAKUDA - KUDA Barang IWF 350.125.6.9 (Castellated) Baut + Mur 5/8 x 2" Reng Plat 5/8" Reng Per 5/8" Upah kerja Jumlah 878.12 Kg 10 Set 360 Bh 720 Bh 360 Bh 878.12 Kg 10 Set Harga Rp Rp Rp Rp Rp Total 9,000 2,500 300 300 3,000 Rp Rp Rp Rp Rp Rp Total harga 79,030,800 900,000 216,000 108,000 26,343,600 106,598,400

KUDA - KUDA ANAK Barang INP 100 Upah kerja

50.5 50.5

Jumlah Kg 7 Btg Kg 7 Btg

Harga Rp Rp Total

Total harga 9,000 Rp 3,181,500 4,000 Rp 1,414,000 Rp 4,595,500

TUPAI - TUPAI BARU (ATAP ONDULINE) DENGAN KUDA - KUDA ANAK Barang Jumlah Harga Total harga Plat 4 mm (tupai & skoor tupai) 93.3 Kg 3 Kpg Rp 800,000 Rp 2,400,000 Upah kerja 93.3 Kg 3 Kpg Rp 4,000 Rp 1,119,600 Total Rp 3,519,600 KOLOM Barang IWF 300.150.7.9 IWF 200.100.6.8 Plat 12 mm Base Plat Plat 8 mm Top + Stifner Angkur Behel 19 mm pjg. 0,75 m Mur 3/4" Reng Plat 3/4" Upah kerja Jumlah 440.4 Kg 255.6 Kg 280 Kg 187 Kg 80 Bh 80 Bh 80 Bh 5313.8 Kg 10 2 1 1 Btg Btg Kpg Kpg Harga Rp 9,000 Rp 9,000 Rp 2,350,000 Rp 1,600,000 Rp 20,000 Rp 2,000 Rp 650 Rp 4,000 Total Rp Rp Rp Rp Rp Rp Rp Rp Rp Total harga 39,636,000 4,600,800 2,350,000 1,600,000 1,600,000 160,000 52,000 21,255,200 71,254,000

GORDING (ATAP ONDULINE WARNA MERAH) DENGAN KUDA - KUDA ANAK Barang Jumlah Harga Cnp 100.50.20.2 mm 21.36 Kg 503 Btg Rp Baut + Mur 7/16 x 1" 1856 Bh Rp Reng Plat 7/16" 1856 Bh Rp Reng Per 7/16" 1856 Bh Rp Onduline warna merah 1156 Kpg Rp

9,000 800 100 200 88,000

Rp Rp Rp Rp Rp

Total harga 96,696,720 1,484,800 185,600 371,200 101,728,000

Nok Atap Onduline warna merah Drilling Onduline Upah Kerja Atap Upah Kerja Nok Upah kerja baja

79 37050 1665 60 10744.1

Kpg Bh m' m' Kg

Rp Rp Rp Rp Rp Total

53,000 750 5,000 10,000 4,000

Rp Rp Rp Rp Rp Rp

4,187,000 27,787,500 8,325,000 600,000 42,976,320 284,342,140

SAGROD / TREKSTANG & LINTOL / SKOOR KOLOM (ATAP ONDULINE) Barang Jumlah Harga Total harga Sagrod (trekstang) behel 12 KSTI 51 Btg Rp 76,000 Rp 3,876,000 Mur 7/16" 1872 Bh Rp 550 Rp 1,029,600 Reng Plat 7/16" 1872 Bh Rp 200 Rp 374,400 Bracing behel 12 KSTI 32 Btg Rp 76,000 Rp 2,432,000 Jarum Keras dia. 22 mm 24 Bh Rp 48,000 Rp 1,152,000 Skoor Kolom (Lintol) Siku 50.50.5 36 Btg Rp 138,000 Rp 4,968,000 Skoor Kolom behel 12 KSTI 45 Btg Rp 76,000 Rp 3,420,000 Upah kerja baja 2181.7 Kg Rp 4,000 Rp 8,726,800 Total Rp 25,978,800 TALANG Barang Talang Siku 40.40.4 Talang Aluminium 0,55 mm Pipa Wavin 4" Elbow 4" Corong Aluminum 0,55 mm Lem PVC (Ls) Paku keling (Ls) Lem Silicon (Ls) Upah kerja Talang Upah kerja baja Jumlah 43 Btg 119 m' 60 Btg 60 Btg 60 Kpg 5 Klg 4000 Bh 10 tube 119 m' 612.74 Kg Harga Total harga Rp 80,000 Rp 3,440,000 Rp 85,000 Rp 10,115,000 Rp 165,000 Rp 9,900,000 Rp 7,500 Rp 450,000 Rp 25,000 Rp 1,500,000 Rp 37,000 Rp 185,000 Rp 500 Rp 2,000,000 Rp 22,500 Rp 225,000 Rp 12,000 Rp 1,428,000 Rp 4,000 Rp 2,450,960 Total Rp 31,693,960

PET ATAS PINTU UKURAN 5 X 6 M DENGAN ATAP ONDULINE Barang Jumlah Rangka Besi Pipa 2" x 4 mm 12 Btg Cnp 100.50.20 21.36 Kg 20 Btg Plat 4 mm Tupai & Skoor tupai 1 Kpg Atap Onduline warna merah 42 Kpg Drilling (Ls) 1260 Bh Sagrod (Trekstang) Behel 12 KSTI 2 Btg Upah kerja Atap 61 m' Upah kerja baja 1104.26 Kg

Harga Total harga Rp 480,000 Rp 5,760,000 Rp 9,000 Rp 3,844,800 Rp 800,000 Rp 800,000 Rp 88,000 Rp 3,696,000 Rp 750 Rp 945,000 Rp 76,000 Rp 152,000 Rp 5,000 Rp 305,000 Rp 4,000 Rp 4,417,040 Total Rp 19,919,840

DIREKSI KEET DAN GUDANG (15 M x 3,8 M x tinggi 6 M) LS

Barang Papan 25 x 2,5 x 4 m (Ls) Seng 10 feet (Ls) Seng 7 feet (Ls) Nok seng polos lebar 50 cm (Ls) Paku seng (Ls) Paku 2 (Ls) Gelam 10 / 12 (Ls) Gelam 8 / 10 (Ls) Upah kerja 9 16 16 16 10 1 20 50 5

Jumlah m Kpg Kpg m3 Kg Dus Btg Btg Tukang3

Harga Rp 800,000 Rp Rp 60,000 Rp Rp 45,000 Rp Rp 20,000 Rp Rp 20,000 Rp Rp 280,000 Rp Rp 9,000 Rp Rp 7,000 Rp Rp 50,000 Rp Total Rp

Total harga 7,200,000 960,000 720,000 320,000 200,000 280,000 180,000 350,000 1,250,000 11,460,000

5 Hari

BIAYA- BIAYA LAIN YANG TIDAK TERMASUK DALAM HITUNGAN VOLUME Barang Jumlah Harga Total harga Lori kaleng 10 Buah Rp 325,000 Rp 3,250,000 Sekop lancip 6 Buah Rp 48,000 Rp 288,000 Cangkul 8 Buah Rp 70,000 Rp 560,000 Gelam 8/10 untuk steger (Ls) 3000 Batang Rp 6,000 Rp 18,000,000 Kepala Tukang 5 Bln 26 Hari Rp 80,000 Rp 10,400,000 Pengawas 5 Bln 26 Hari Rp 80,000 Rp 10,400,000 Mobilisasi dan Demobilisasi (Ls) Rp 5,000,000 Pembersihan Akhir (Ls) Rp 1,000,000 Biaya Gambar (Ls) Rp 2,000,000 Total Rp 50,898,000 Overhead (Ls) Pondasi merupakan asumsi bila terjadi perubahan maka harga juga berubah Belum termasuk keramik dan pemasangannya Tidak termasuk IMB Tidak termasuk pintu dan jendela lantai 1 dan gudang Tidak termasuk tanah timbunan 5%

TOTAL

Rp

1,204,151,940

Project LocationNO Uraian

: :

Pembangunan Workshop Omega Sukarno Hatta Palembang, Sumatera SelatanMaterial Dms Vol/Bh Vol Sat Vol/Kg Har-Sat

A PEKERJAAN BAJA + MATERIAL A1 BAJA EX. 1 KudaKuda, Support Kuda-Kuda Stifner A2 BAJA BARU 2 3 4 5 6 7 8 9 Kuda - Kuda Anak Tupai -Tupai dan Skoor Tupai Base Plat Kolom Angkur Stifner Kolom Pet Konsul Gording INP 100.50.5.7 Plat 4 mm Plat 12 mm IWF 300.150.7.9 Behel Dia. 19 mm Plat 8 mm IWF 200.100.6.8 CNP 100.50.20 Behel dia. 12 mm Behel dia. 12 mm Siku 50.50.5 Behel dia. 12 mm Siku 40.40.4 Pipa 2" Plat 4 mm Behel dia. 12 mm CNP 100.50.20 Pipa 2" Behel dia. 12 mm CNP 100.50.20 Behel Dia. 8 mm Aluminium 0,55 mm 6.00 2.88 2.88 12.00 12.00 2.88 12.00 6.00 12.00 12.00 6.00 12.00 6.00 6.00 2.88 12.00 6.00 6.00 12.00 6.00 12.00 50.50 93.30 280.00 440.40 26.76 187.00 255.60 21.36 10.66 10.66 22.68 10.66 14.52 33.42 93.30 10.66 21.36 33.42 10.66 21.36 4.74 42.00 8.64 2.88 96.00 80.00 2.88 24.00 3,018.00 612.00 384.00 36.00 540.00 258.00 72.00 2.88 24.00 120.00 42.00 24.00 168.00 1,200.00 119.00 60.00 60.00 60.00 5.00 4,000.00 m m2 m2 m m m2 m m m m m m m m m2 m m m m m m m' btg bh bh klg bh 353.50 279.90 280.00 3,523.20 178.40 187.00 511.20 10,744.08 543.66 341.12 136.08 479.70 624.36 401.04 93.30 21.32 427.20 233.94 21.32 598.08 474.00 12,500 12,500 12,500 12,500 12,500 12,500 12,500 12,500 12,500 12,500 12,500 12,500 12,500 12,500 12,500 12,500 12,500 12,500 12,500 12,500 12,500 97,000 165,000 7,500 25,000 37,000 500 22,500 2,000 700 2,500 300 300 800 200 100 600 200 48,000 29,233.6 Total (Rp) A IWF 350.125.6.9 (Castellated) 12.73 439.06 254.60 m 8,781.20 11,500

10 Sagrod (Trekstang) 11 Bracing Kuda - Kuda 12 Skoor Kolom (Lintol) 13 Skoor Kolom (Lintol) 14 Talang 15 Rangka Pet Atas Pintu (2 unit) 16 Tupai dan Skoor Pet 17 Sagrod (Trekstang) Pet 18 Gording Pet atas Pintu 19 Rangka Pet depan mess 20 Sagrod (Trekstang) Pet mess 21 Gording Pet depan mess 22 Besi Stik Dinding dan Praktis 23 Talang 24 Pipa PVC 4" 25 Elbow 4" 26 Corong Zincalume 0,5 mm 27 Lem PVC 28 Paku Keling 29 Lem Silicon 30 Mur 3/4" Angkur 31 Reng Plat 3/4 " Angkur 32 Baut + Mur 5/8 x 2" Kuda -Kuda 33 Reng Plat 5/8 " Kuda -Kuda 34 Reng Per 5/8 " Kuda - Kuda 35 Baut + Mur 7/16 x 1" Gording 36 Reng Plat 7/16 " Gording 37 Reng Per 7/16 " Gording 38 Mur 7/16 " Sagrod (Trekstang) 39 Reng Plat 7/16 " Sagrod (Trekstang) 40 Jarum Keras Dia. 22 mm

10.00 tube 80.00 80.00 360.00 720.00 360.00 1,856.00 1,856.00 1,856.00 1,872.00 1,872.00 24.00 Total (kg) A bh bh bh bh bh bh bh bh bh bh bh

Project LocationNOB 1 2 3

: :

Pembangunan Workshop Omega Sukarno Hatta Palembang, Sumatera SelatanMaterial Dms Vol/Bh Vol Sat Vol/Kg Har-Sat

UraianPEKERJAAN ATAP + MATERIAL Onduline Warna Merah Nok Warna Merah Drilling

1,243.00 79.00 39,660.00 Total (kg) B

kpg kpg bh

92,000 67,000 750 Total (Rp) B

C 1 2 3 4 5 6 7 8 9

PEKERJAAN SIPIL + MATERIAL Pengukuran & Pasang Bowplank Galian Tanah Pondasi Urugan Kembali Tanah Pondasi Pemadatan Tanah Pondasi Pondasi Tapakan 150 x 150 x 40 K. 175 Kolom Tapakan 40/40 K. 175 Sloof Utama 40/50 K. 175 Sloof Tambahan 30/40 K. 175 Pondasi Batu Menerus ( Pondasi & Sloof ) 170.00 172.00 121.00 121.00 42.53 14.10 52.80 6.12 112.00 112.00 1.00 203.00 1,350.00 (wiremesh dia. 8 mm) (T = 3 m) (T = 4 m) 203.00 7.20 4.50 25.68 5.60 53.90 3,000.00 (T = 3 m) 0.96 4.32 4.50 1,200.00 2,022.00 4,044.00 52.65 114.00 357.00 18.00 15.00 6.00 6.00 9.00 24.00 8.00 1.00 m' m3 m3 m3 m3 m3 m3 m3 m' m' Ls m3 m2 m3 m3 m3 m3 m3 m3 btg m3 m3 m3 m' m2 m2 m3 m' m2 set set unit set titik titik titik Ls 15,000 30,000 10,000 10,000 1,500,000 3,200,000 1,800,000 2,200,000 45,000 40,000 5,000,000 20,000 5,000 1,050,000 2,700,000 2,700,000 2,300,000 3,400,000 3,000,000 6,200 4,500,000 3,600,000 3,100,000 35,000 85,000 7,000 20,000 250,000 125,000 1,000,000 400,000 1,500,000 200,000 200,000 200,000 300,000 12,000,000

10 Sloof 10/10 K. 175 11 Tangga 12 Timbunan Tanah Lantai 13 Pemadatan Tanah Lantai 14 Plat Lt. 1 Beton K. 225 t = 15 cm 15 Kolom 40/40 K. 175 16 Kolom 40/40 K. 175 17 Balok Lt. 2 40/50 K. 175 18 Balok Anak Plat Lantai 20/20 K. 175 19 Plat Lt. 2 Beton K. 225 t = 10 cm 20 Steger dan Perancah 21 Kolom Lantai 2 25/25 K. 175 22 Kolom Tebeng Layar 30/30 K. 175 23 Balok Tarik Tebeng Layar 30/30 K. 175 24 Kolom Dan Balok Praktis 10/10 K. 175 25 Pasangan dinding 1/2 batu dan Plester 26 Cat Dinding Putih 27 Galian Tanah Selokan 28 Teras dan Selokan 29 Plafond Gypsum 9 mm Lantai 2 30 Kusen dan Daun Pintu Lantai 2 31 Kusen Jendela Lantai 2 32 Septictank 33 Pintu Fiber Kamar mandi 34 Instalasi Listrik Lantai 1 35 Instalasi Listrik Lantai 2 36 Instalasi Listrik Gudang 37 Direksi Keet dan Gudang Material

Project LocationNO Uraian

: :

Pembangunan Workshop Omega Sukarno Hatta Palembang, Sumatera SelatanMaterial Dms Vol/Bh Vol1.00 1.00

SatLs Ls

Vol/Kg

Har-Sat1,000,000 5,000,000 Total (Rp) C

38 Pembersihan Akhir 39 Mobilisasi dan Demobilisasi

Sub Total (Rp)

Overhead

5%

Total (Rp) Pembulatan Terbilang : satu milyar tujuh ratus sembilan puluh juta rupiah KETERANGAN : SPESIFIKASI PONDASI TAPAKAN MERUPAKAN ASUMSI SESUAI KONDISI TANAH YANG ADA, APABILA SPESIFIKASI BERUBAH MAKA HARGA AKAN DISESUAIKAN HARGA TIDAK TERMASUK TANAH TIMBUNAN HARGA TIDAK TERMASUK INSTALASI PLAFOND LANTAI 1 (BILA ADA) HARGA TIDAK TERMASUK PINTU DAN JENDELA LANTAI 1 (DITENTUKAN KEMUDIAN) HARGA TIDAK TERMASUK KERAMIK DAN PEMASANGANNYA HARGA TIDAK TERMASUK IMB

1 2 3 5 4 5

Jumlah

Rp

100,983,800

Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp

4,418,750 3,498,750 3,500,000 44,040,000 2,230,000 2,337,500 6,390,000 134,301,000 6,795,750 4,264,000 1,701,000 5,996,250 7,804,500 5,013,000 1,166,250 266,500 5,340,000 2,924,250 266,500 7,476,000 5,925,000 11,543,000 9,900,000 450,000 1,500,000 185,000 2,000,000 225,000 160,000 56,000 900,000 216,000 108,000 1,484,800 371,200 185,600 1,123,200 374,400 1,152,000 388,573,000

Jumlah

Rp Rp Rp Rp

114,356,000 5,293,000 29,745,000 149,394,000

2,550,000 5,160,000 1,210,000 1,210,000 63,795,000 45,120,000 95,040,000 13,464,000 5,040,000 4,480,000 5,000,000 4,060,000 6,750,000 213,150,000 19,440,000 12,150,000 59,064,000 19,040,000 161,700,000 18,600,000 4,320,000 15,552,000 13,950,000 42,000,000 171,870,000 28,308,000 1,053,000 28,500,000 44,625,000 18,000,000 6,000,000 9,000,000 1,200,000 1,800,000 4,800,000 2,400,000 12,000,000

Jumlah1,000,000 5,000,000 Rp 1,167,401,000

Rp 1,705,368,000

Rp

85,268,400

Rp 1,790,636,400 Rp 1,790,000,000

AH MAKA

PERHITUNGAN BAHAN-BAHAN YANG DIPERLUKAN UNTUK PENGAMBILAN DP WORKSHOP OMEGA

NO 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

MATERIAL 12 KSTI Semen 8 Polos Plywood 18 mm 8 KS 10 KSTI Wiremesh 8 IWF 350.125.6.9 (Castellated) IWF 300.150.7.9 IWF 200.100.6.8 Cnp 100.50.20.2 mm INP 100 Onduline warna merah Nok Onduline warna merah Drilling Onduline Genset 115 KVA efektif 92 KVA travo las 350 A

JMLH 1,167 2,308 1,099 398 1,486 511 138 20 8 2 551 7 1,243 79 39,660 1 4

SAT PJG SAT BERAT/KG SAT DIPESAN SAT HARGA SAT btg 800 btg Rp 76,000 sak 1,500 sak Rp 50,000 btg 800 btg Rp 20,000 kpg 250 kpg Rp 185,000 btg 1,000 btg Rp 35,000 btg 400 btg Rp 53,000 kpg 100 kpg Rp 500,000 btg 12.76 m 29.00 kg 20 btg Rp 8,500 btg 12.00 m 36.70 kg 8 btg Rp 9,000 btg 12.00 m 20.90 kg 2 btg Rp 9,000 btg 6.00 m 3.25 kg 500 btg Rp 9,000 btg 6.00 m 8.42 kg 7 btg Rp 9,000 kpg 1,000 kpg Rp 88,000 kpg 70 kpg Rp 53,000 bh 30,000 bh Rp 750 unit 1 unit Rp 375,000,000 unit 4 unit Rp 4,799,740 TOTAL

TOTAL HARGA Rp 60,800,000 Rp 75,000,000 Rp 16,000,000 Rp 46,250,000 Rp 35,000,000 Rp 21,200,000 Rp 50,000,000 Rp 62,906,800 Rp 31,708,800 Rp 4,514,400 Rp 87,750,000 Rp 3,182,760 Rp 88,000,000 Rp 3,710,000 Rp 22,500,000 Rp 375,000,000 Rp 19,198,960 Rp 1,002,721,720