PUBLIC EXPOSE Presentation Jakarta, 06 November 2019 GRAHA CIMB NIAGA, 28 th FLOOR Financial Club PT RESOURCE ALAM INDONESIA Tbk [ Kode Saham : KKGI ]

Upload: others

Post on 04-Nov-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PUBLIC EXPOSE - Resource Alam Indonesia Tbk PT · PLN berkapasitas 6,4 MW, di Cicatih Jawa Barat. ... UPAYA MENINGKATKAN KINERJA KE DEPAN: PINJAM PAKAI ›Ketersediaan alat berat

PUBLIC EXPOSEPresentation

Jakarta, 06 November 2019

GRAHA CIMB NIAGA, 28th FLOOR

Financial Club

PT RESOURCE ALAM INDONESIA Tbk

[ Kode Saham : KKGI ]

Page 2: PUBLIC EXPOSE - Resource Alam Indonesia Tbk PT · PLN berkapasitas 6,4 MW, di Cicatih Jawa Barat. ... UPAYA MENINGKATKAN KINERJA KE DEPAN: PINJAM PAKAI ›Ketersediaan alat berat

PT RESOURCE ALAM INDONESIA Tbk

SEKILAS PERSEROANPT. Resource Alam Indonesia Tbk (IDX: KKGI)

Merupakan Holding Company dengan anak perusahaan di bidang

pertambangan batubara dan Pembangkit Listrik Mini Hydro, yang berada di

beberapa lokasi di Indonesia, sebagai berikut :

› PT. Insani Baraperkasa : PKP2B Generasi III, Kalimantan Timur, Area konsesi 24,477,6 Ha. Tahap

Produksi. Total cadangan terkira dan terbukti 165.8 juta MT.

› PT. Loa Haur : IUP Operasi Produksi, Kalimantan Tengah, Area Konsesi 5.000 Ha. CadanganTerbukti ± 12 juta MT, CV 4650-6191 (gar).

› PT. Kaltim Mineral : IUP Eksplorasi, Kalimantan Timur, Total Area Konsesi: 10.000 Ha. Cadangan

Terbukti 34 juta MT, CV 4329-4560 (gar).

› PT. Khatulistiwa Hidro Energi : Pemilik 99% dari PT. Bias Petrasia Persada : sudah tanda tangan

PPA dengan pihak PT. PLN berkapasitas 6,4 MW, di Cicatih Jawa Barat.

PKP2B = Perjanjian Karya Pengusahaan Pertambangan Batubara; IUP = Izin Usaha Pertambangan

2

Page 3: PUBLIC EXPOSE - Resource Alam Indonesia Tbk PT · PLN berkapasitas 6,4 MW, di Cicatih Jawa Barat. ... UPAYA MENINGKATKAN KINERJA KE DEPAN: PINJAM PAKAI ›Ketersediaan alat berat

PT RESOURCE ALAM INDONESIA Tbk

DATA CADANGAN TERBARU

PT Resource Alam Indonesia Tbk melalui anak perusahaannya PT Insani Baraperkasa “Insani” telah

mendapatkan Laporan Pra-Kelayakan dan Pernyataan Cadangan Batubara yang sesuai dengan

Kode Etik Australasia dalam hal Pelaporan Sumber Daya Mineral dan Cadangan Batubara (JORC

Code, 2012) dari Britmindo Singapore Pte Ltd per Oktober 2018 (“Laporan JORC”). Laporan JORC

mencakup sebagian kecil dari total área penambangan Insani seluas 24.477,6 Ha.

3

Cadangan per

September 2019

JORC 2018

(Juta MT)

(A)

Internal

Eksplorasi

Non JORC

(Juta MT)

(B)

Total Cadangan

(A+B)

Terbukti 65.5 13.4 78.9

Terkira 22.8 64.1 86.9

Total Cadangan 88.3 77.5 165.8

Page 4: PUBLIC EXPOSE - Resource Alam Indonesia Tbk PT · PLN berkapasitas 6,4 MW, di Cicatih Jawa Barat. ... UPAYA MENINGKATKAN KINERJA KE DEPAN: PINJAM PAKAI ›Ketersediaan alat berat

PT RESOURCE ALAM INDONESIA Tbk

STRUKTUR KORPORASI 30 SEPT 2019

UBS AG

SINGAPORE S/A

ENERGY COLLIER

PT. SEJAHTERA

JAYA CITAUBS AG SPORE

Public

(<5%)

PT. RESOURCE ALAM INDONESIA TBK

(KKGI)

PT. Insani

BaraperkasaPT. Kaltim Mineral PT. Loa Haur

PT. Khatulistiwa

Hidro Energi

LG INTERNATIONAL

SINGAPORE

PTE,LTD

Buy Back

4

Page 5: PUBLIC EXPOSE - Resource Alam Indonesia Tbk PT · PLN berkapasitas 6,4 MW, di Cicatih Jawa Barat. ... UPAYA MENINGKATKAN KINERJA KE DEPAN: PINJAM PAKAI ›Ketersediaan alat berat

PT RESOURCE ALAM INDONESIA Tbk

PETA LOKASI TAMBANG

5

Page 6: PUBLIC EXPOSE - Resource Alam Indonesia Tbk PT · PLN berkapasitas 6,4 MW, di Cicatih Jawa Barat. ... UPAYA MENINGKATKAN KINERJA KE DEPAN: PINJAM PAKAI ›Ketersediaan alat berat

PT RESOURCE ALAM INDONESIA Tbk

PETA LOKASI TAMBANGINSANI BARAPERKASA

6

Page 7: PUBLIC EXPOSE - Resource Alam Indonesia Tbk PT · PLN berkapasitas 6,4 MW, di Cicatih Jawa Barat. ... UPAYA MENINGKATKAN KINERJA KE DEPAN: PINJAM PAKAI ›Ketersediaan alat berat

PT RESOURCE ALAM INDONESIA Tbk

PT INSANI BARAPERKASA

› Perseroan sebagai pemilik konsesi tambang batubara yang sudah berproduksi dan merupakan

pemegang PKP2B Generasi III.

› Area konsesi 24.477,6 Ha, areal penambangan hingga kini ± 2.197 Ha

› Umur konsesi sampai dengan tahun 2036 (30 tahun terhitung dari ijin produksi tahun 2006).

Perpanjangan 2 kali @ 10 tahun.

› Lokasi tambang sangat strategis dengan jarak hauling 10 – 22 KM, biaya produksi relatif

rendah.

KONSESI TAMBANG

7

Page 8: PUBLIC EXPOSE - Resource Alam Indonesia Tbk PT · PLN berkapasitas 6,4 MW, di Cicatih Jawa Barat. ... UPAYA MENINGKATKAN KINERJA KE DEPAN: PINJAM PAKAI ›Ketersediaan alat berat

PT RESOURCE ALAM INDONESIA Tbk

KAPASITAS INFRASTRUKTUR 2019ASAL

BATUBARA

JARAK

(KM) PELABUHANKAPASITAS CRUSHER KAPASITAS LOADING

Purwajaya13

Loa Duri1.000 MT/Jam

800 MT/Jam

Purwajaya

Selatan10

Manunggal Jaya 19

Tani Bakti 14

Handil Bakti 22

Handil Bakti 11 PSM 300 MT/Jam 500 MT/Jam

Embalut 28 SHS 300 MT/Jam 500 MT/Jam

TOTAL/ Jam 1.600 MT/ Jam 1.800 MT/ Jam

• Setahun 360 hari,

sehari 18 jam 8

Page 9: PUBLIC EXPOSE - Resource Alam Indonesia Tbk PT · PLN berkapasitas 6,4 MW, di Cicatih Jawa Barat. ... UPAYA MENINGKATKAN KINERJA KE DEPAN: PINJAM PAKAI ›Ketersediaan alat berat

PT RESOURCE ALAM INDONESIA Tbk

VOLUME PRODUKSI TAHUN 2007 - 2019

178

773 1,008

2,249

4,222 4,186 4,158

3,418 3,167 3,182

1,830 1,611

3,517

2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019

PRODUKSI BATUBARA

9

Page 10: PUBLIC EXPOSE - Resource Alam Indonesia Tbk PT · PLN berkapasitas 6,4 MW, di Cicatih Jawa Barat. ... UPAYA MENINGKATKAN KINERJA KE DEPAN: PINJAM PAKAI ›Ketersediaan alat berat

PT RESOURCE ALAM INDONESIA Tbk

NEGARA TUJUAN EXPORT / DOMESTIK

17.1%

44.9%

11.2%

3.9%

3.4%

10.0%

3.2%

2.0%

0.6%

0.2%

3.5%

0.1%

KOREA

INDIA

CHINA

PAKISTAN

MALAYSIA

THAILAND

KALTIM

JATIM

NTT

VIETNAM

SULAWESI

KALBAR

10

Page 11: PUBLIC EXPOSE - Resource Alam Indonesia Tbk PT · PLN berkapasitas 6,4 MW, di Cicatih Jawa Barat. ... UPAYA MENINGKATKAN KINERJA KE DEPAN: PINJAM PAKAI ›Ketersediaan alat berat

PT RESOURCE ALAM INDONESIA Tbk

VOLUME PRODUKSI & PENJUALAN

524,849

361,556 391,484

722,111

243,673 139,348

441,968

610,023 663,157

961,202 988,940

896,700

1Q17 2Q17 3Q17 4Q17 1Q18 2Q18 3Q18 4Q18 1Q19 2Q19 3Q19 4Q19

Volume Penjualan Per Kwartal (MT)

11

(Proyeksi)

(Proyeksi)

397,662 324,304

562,011

716,024

213,694 182,741

558,981 656,033 691,183

853,304

1,183,297

782,200

1Q17 2Q17 3Q17 4Q17 1Q18 2Q18 3Q18 4Q18 1Q19 2Q19 3Q19 4Q19

Volume Produksi Per Kwartal (MT)

(Proyeksi)

Page 12: PUBLIC EXPOSE - Resource Alam Indonesia Tbk PT · PLN berkapasitas 6,4 MW, di Cicatih Jawa Barat. ... UPAYA MENINGKATKAN KINERJA KE DEPAN: PINJAM PAKAI ›Ketersediaan alat berat

PT RESOURCE ALAM INDONESIA Tbk

RATA-RATA HARGA JUAL (US$/MT), FOB Vessel

37.23 33.40

46.63

42.07

35.03

FY15 FY16 FY17 FY18 9M19

ASP PER KUARTAL

12

Page 13: PUBLIC EXPOSE - Resource Alam Indonesia Tbk PT · PLN berkapasitas 6,4 MW, di Cicatih Jawa Barat. ... UPAYA MENINGKATKAN KINERJA KE DEPAN: PINJAM PAKAI ›Ketersediaan alat berat

PT RESOURCE ALAM INDONESIA Tbk

TREND HARGA BATUBARA INDONESIA COAL INDEX2017 – Sept 2019

88.75 89.09 88.84 87.74

79.59 80.31

85.24

92.9597.06 97.50 95.80 96.46

99.78 103.31

97.45

90.93

98.86 101.64

104.26 101.13

98.23 97.81 94.28 94.28

97.05 96.87 94.85

85.42 83.51

75.73 74.60

69.00 67.76

73.09 73.75 74.44 74.17

69.27 70.06 72.91

75.7277.78 79.20 78.08 78.97

81.96 86.06

81.97

74.71 78.53

80.40 80.64

73.74 70.52 70.24

66.81 65.50 66.61 69.31 70.01

67.34 67.32 64.09 63.69

60.32 58.62 57.84 60.82 62.33 62.33

56.75 55.80 57.72

61.5664.66

67.52 66.08 66.20 68.86

72.38 68.82

62.35 65.26 66.80 65.75

57.95 53.82 52.84

48.62 46.70

49.01

54.09 56.08

52.98 52.84 49.62 49.32

46.95 46.97

38.79

43.46 45.40

42.91

37.05 40.34 41.46 42.56

44.80 46.51 44.78 45.76 48.19

50.28 46.06

41.39 45.85

47.83 46.95

39.59 38.41 38.19

32.34 30.21 31.77

35.31 38.62 37.89 38.78

36.09 35.89 31.45 32.28

28.78 31.41 32.79 31.70

27.93 28.47 28.65 26.61 26.41 27.67 26.85 26.98 28.48

30.38 28.49

25.86 27.72 28.76 28.23

25.65 24.13 23.66 21.08

19.12 19.77 21.39 22.33 22.19 23.00 21.80 21.46 19.45 20.02

(20.00)

-

20.00

40.00

60.00

80.00

100.00

120.00

JAN

FEB

MR

T

AP

RL

MEI

JUN

I

JULI

AG

TS

SEPT

Okt

No

p

Des

JAN

FEB

MR

T

AP

RIL

MEI

JUN

JUL

AU

G

SEP

OC

T

NO

V

DEC

JAN

FEB

MA

R

AP

R

MA

Y

JUN

JULY

AU

GU

ST

SEPT

2017 2018 2019

6500

5800

5000

4200

3400

6500

13

Page 14: PUBLIC EXPOSE - Resource Alam Indonesia Tbk PT · PLN berkapasitas 6,4 MW, di Cicatih Jawa Barat. ... UPAYA MENINGKATKAN KINERJA KE DEPAN: PINJAM PAKAI ›Ketersediaan alat berat

PT RESOURCE ALAM INDONESIA Tbk

RINGKASAN RUGI LABA

9M 2019 (US$/Juta)

9M 2018(US$/Juta) (%)

Pendapatan 80.94 36.24 +123.34%

Laba Kotor 10.51 11.07 -5.06%

Laba Operasional 4.13 5.31 -22.22%

Laba Bersih Setelah

Pajak4.16 2.11 +97.16%

14

Page 15: PUBLIC EXPOSE - Resource Alam Indonesia Tbk PT · PLN berkapasitas 6,4 MW, di Cicatih Jawa Barat. ... UPAYA MENINGKATKAN KINERJA KE DEPAN: PINJAM PAKAI ›Ketersediaan alat berat

PT RESOURCE ALAM INDONESIA Tbk

RINGKASAN POSISI KEUANGAN

SEP 2019(US$/Juta)

DES 2018(US$/Juta) (%)

Total Aset 124.56 117.26 +6.23%

Total Liabilitas 33.09 30.55 +8.31%

Total Ekuitas 91.49 86.70 +5.52%

Hutang1 8.43 7.83 +7.66%

1 Leasing + Bank Loan

15

Page 16: PUBLIC EXPOSE - Resource Alam Indonesia Tbk PT · PLN berkapasitas 6,4 MW, di Cicatih Jawa Barat. ... UPAYA MENINGKATKAN KINERJA KE DEPAN: PINJAM PAKAI ›Ketersediaan alat berat

PT RESOURCE ALAM INDONESIA Tbk

RASIO KEUANGAN

RASIO 9M 2019 9M 2018

Laba Kotor 12.98% 30.55%

Laba Operasional 5.10% 14.66%

Laba Bersih 5.14% 5.81%

ROA (pertahun) 4.45% 2.58%

ROE (pertahun) 6.06% 3.23%

Debt1 to Equity 9.23% 7.91%1 Leasing + Bank Loan

16

Page 17: PUBLIC EXPOSE - Resource Alam Indonesia Tbk PT · PLN berkapasitas 6,4 MW, di Cicatih Jawa Barat. ... UPAYA MENINGKATKAN KINERJA KE DEPAN: PINJAM PAKAI ›Ketersediaan alat berat

PT RESOURCE ALAM INDONESIA Tbk

UPAYA MENINGKATKAN KINERJA KE DEPAN: PINJAM PAKAI

› Ketersediaan alat berat dan fasilitas penunjang yang memadai untuk mendukung operasional

tambang

› Perseroan melakukan control ketat terhadap Striping Ratio (SR) disesuaikan dengan harga jual

batubara.

› Perseroan tetap menjaga design mega pit dalam penambangan di blok Loajanan dan Tani Bakti

untuk jangka panjang.

› Perseroan berupaya menyelesaikan proses pinjam pakai kawasan hutan, di blok Separi dan blok

Maukiri tahun depan di lokasi konsesi PT Loa Haur serta Jetty khusus untuk dapat menampung

produksi batubara dari tambang PT. Loa Haur.

› Meningkatkan motivasi dan semangat kerja karyawan melalui program pelatihan khusus.

17

Page 18: PUBLIC EXPOSE - Resource Alam Indonesia Tbk PT · PLN berkapasitas 6,4 MW, di Cicatih Jawa Barat. ... UPAYA MENINGKATKAN KINERJA KE DEPAN: PINJAM PAKAI ›Ketersediaan alat berat

PT RESOURCE ALAM INDONESIA Tbk

PROYEKSI 2020

• Perseroan memproyeksikan produksi sampaidengan akhir tahun 2019 sekitar 3.51 juta ton.

• Dengan harapan pada tahun 2020 harga batubaraakan membaik, maka Perseroan menargetkanproduksi sebesar 4.5 juta MT termasuk penjualanDMO 25% dari total produksi.

• Target produksi yang direncanakan bisa tercapaimengingat:

a. Kapasitas alat berat dan keseluruhan infrastrukturyang sudah lengkap dan memadai.

b. Tambahan produksi baru dari beberapa blok.

c. Menyesuaikan kembali stripping ratio sesuaidengan kondisi pasar.

d. Tambahan penjualan ke pasar domestik. -

0.50

1.00

1.50

2.00

2.50

3.00

3.50

4.00

4.50

5.00

12 13 14 15 16 17 18 19 20

18

Page 19: PUBLIC EXPOSE - Resource Alam Indonesia Tbk PT · PLN berkapasitas 6,4 MW, di Cicatih Jawa Barat. ... UPAYA MENINGKATKAN KINERJA KE DEPAN: PINJAM PAKAI ›Ketersediaan alat berat

PT RESOURCE ALAM INDONESIA Tbk

FOKUS KE DEPAN

1. Memastikan target produksi dan penjualan tahun ini dan 2020 dapat tercapai dengan baik

sesuai dengan kondisi pasar.

2. Meningkatkan produktifitas dan efisiensi operasional Perseroan agar tetap menghasilkan

Return on Equity yang signifikan.

3. Terus meningkatkan level Good Corporate Governance perseroan.

4. Terus mempertahankan good mining practice dan pengelolaan K3 dan lingkungan sesuai

peraturan yang berlaku serta tetap melaksanakan program CSR dan Program Pemberdayaan

Masyarakat (PPM/Comdev).

19

Page 20: PUBLIC EXPOSE - Resource Alam Indonesia Tbk PT · PLN berkapasitas 6,4 MW, di Cicatih Jawa Barat. ... UPAYA MENINGKATKAN KINERJA KE DEPAN: PINJAM PAKAI ›Ketersediaan alat berat

PT RESOURCE ALAM INDONESIA Tbk

INFORMASI TERKINI PERSEROAN

1. Mempertahankan sertifikasi Quality Management System ISO 9001:2015 dan

Environtmental Management System ISO 14001 : 2015 dengan scope “ Provision

of Coal Mining”, anak Perseroan Insani Baraperkasa ( IBP).

2. Telah mendapatkan ijin operasi (COD) Pembangkit Listrik Tenaga Mini Hidro pada

25 Oktober 2019.

3. Penandatanganan nota kesepahaman antara Insani dengan Universitas

Mulawarman Samarinda dalam rangka kerjasama dalam hal Pendidikan,

Penelitian, Pelatihan, Jasa Konsultasi dan Pemberdayaan Masyarakat yang didasari

oleh aturan yang berlaku.

20

Page 21: PUBLIC EXPOSE - Resource Alam Indonesia Tbk PT · PLN berkapasitas 6,4 MW, di Cicatih Jawa Barat. ... UPAYA MENINGKATKAN KINERJA KE DEPAN: PINJAM PAKAI ›Ketersediaan alat berat

PT RESOURCE ALAM INDONESIA Tbk

SERTIFIKATPERINGKAT HIJAU

21

Page 22: PUBLIC EXPOSE - Resource Alam Indonesia Tbk PT · PLN berkapasitas 6,4 MW, di Cicatih Jawa Barat. ... UPAYA MENINGKATKAN KINERJA KE DEPAN: PINJAM PAKAI ›Ketersediaan alat berat

PT RESOURCE ALAM INDONESIA Tbk

SERTIFIKAT PENGHARGAANKECELAKAAN NIHIL

22

Page 23: PUBLIC EXPOSE - Resource Alam Indonesia Tbk PT · PLN berkapasitas 6,4 MW, di Cicatih Jawa Barat. ... UPAYA MENINGKATKAN KINERJA KE DEPAN: PINJAM PAKAI ›Ketersediaan alat berat

PT RESOURCE ALAM INDONESIA Tbk

FASILITAS LOADING LOAJANAN

23

Page 24: PUBLIC EXPOSE - Resource Alam Indonesia Tbk PT · PLN berkapasitas 6,4 MW, di Cicatih Jawa Barat. ... UPAYA MENINGKATKAN KINERJA KE DEPAN: PINJAM PAKAI ›Ketersediaan alat berat

PT RESOURCE ALAM INDONESIA Tbk

PENGANGKUTAN VESSEL

24

Page 25: PUBLIC EXPOSE - Resource Alam Indonesia Tbk PT · PLN berkapasitas 6,4 MW, di Cicatih Jawa Barat. ... UPAYA MENINGKATKAN KINERJA KE DEPAN: PINJAM PAKAI ›Ketersediaan alat berat

PT RESOURCE ALAM INDONESIA Tbk

HARI LINGKUNGAN HIDUP SEDUNIA & PROGRAM PENUTUPAN VOID

HARI LINGKUNGAN HIDUP SEDUNIA

5 JUNI 2019DAN

PROGRAM PENUTUPAN VOID

25

Page 26: PUBLIC EXPOSE - Resource Alam Indonesia Tbk PT · PLN berkapasitas 6,4 MW, di Cicatih Jawa Barat. ... UPAYA MENINGKATKAN KINERJA KE DEPAN: PINJAM PAKAI ›Ketersediaan alat berat

PT RESOURCE ALAM INDONESIA Tbk

HARI LINGKUNGAN HIDUP SEDUNIA & PROGRAM PENUTUPAN VOID

26

Page 27: PUBLIC EXPOSE - Resource Alam Indonesia Tbk PT · PLN berkapasitas 6,4 MW, di Cicatih Jawa Barat. ... UPAYA MENINGKATKAN KINERJA KE DEPAN: PINJAM PAKAI ›Ketersediaan alat berat

PT RESOURCE ALAM INDONESIA Tbk

HARI LINGKUNGAN HIDUP SEDUNIA & PROGRAM PENUTUPAN VOID

27

Page 28: PUBLIC EXPOSE - Resource Alam Indonesia Tbk PT · PLN berkapasitas 6,4 MW, di Cicatih Jawa Barat. ... UPAYA MENINGKATKAN KINERJA KE DEPAN: PINJAM PAKAI ›Ketersediaan alat berat

PT RESOURCE ALAM INDONESIA Tbk

HARI LINGKUNGAN HIDUP SEDUNIA & PROGRAM PENUTUPAN VOID

28

Page 29: PUBLIC EXPOSE - Resource Alam Indonesia Tbk PT · PLN berkapasitas 6,4 MW, di Cicatih Jawa Barat. ... UPAYA MENINGKATKAN KINERJA KE DEPAN: PINJAM PAKAI ›Ketersediaan alat berat

PT RESOURCE ALAM INDONESIA Tbk

HARI LINGKUNGAN HIDUP SEDUNIA & PROGRAM PENUTUPAN VOID

29

Page 30: PUBLIC EXPOSE - Resource Alam Indonesia Tbk PT · PLN berkapasitas 6,4 MW, di Cicatih Jawa Barat. ... UPAYA MENINGKATKAN KINERJA KE DEPAN: PINJAM PAKAI ›Ketersediaan alat berat

PT RESOURCE ALAM INDONESIA Tbk

HARI LINGKUNGAN HIDUP SEDUNIA & PROGRAM PENUTUPAN VOID

30

Page 31: PUBLIC EXPOSE - Resource Alam Indonesia Tbk PT · PLN berkapasitas 6,4 MW, di Cicatih Jawa Barat. ... UPAYA MENINGKATKAN KINERJA KE DEPAN: PINJAM PAKAI ›Ketersediaan alat berat

PT RESOURCE ALAM INDONESIA Tbk

HARI LINGKUNGAN HIDUP SEDUNIA & PROGRAM PENUTUPAN VOID

31

Page 32: PUBLIC EXPOSE - Resource Alam Indonesia Tbk PT · PLN berkapasitas 6,4 MW, di Cicatih Jawa Barat. ... UPAYA MENINGKATKAN KINERJA KE DEPAN: PINJAM PAKAI ›Ketersediaan alat berat

PT RESOURCE ALAM INDONESIA Tbk

HARI LINGKUNGAN HIDUP SEDUNIA & PROGRAM PENUTUPAN VOID

32

Page 33: PUBLIC EXPOSE - Resource Alam Indonesia Tbk PT · PLN berkapasitas 6,4 MW, di Cicatih Jawa Barat. ... UPAYA MENINGKATKAN KINERJA KE DEPAN: PINJAM PAKAI ›Ketersediaan alat berat

PT RESOURCE ALAM INDONESIA Tbk

HARI LINGKUNGAN HIDUP SEDUNIA & PROGRAM PENUTUPAN VOID

33

Page 34: PUBLIC EXPOSE - Resource Alam Indonesia Tbk PT · PLN berkapasitas 6,4 MW, di Cicatih Jawa Barat. ... UPAYA MENINGKATKAN KINERJA KE DEPAN: PINJAM PAKAI ›Ketersediaan alat berat

PT RESOURCE ALAM INDONESIA Tbk

HARI LINGKUNGAN HIDUP SEDUNIA & PROGRAM PENUTUPAN VOID

34

Page 35: PUBLIC EXPOSE - Resource Alam Indonesia Tbk PT · PLN berkapasitas 6,4 MW, di Cicatih Jawa Barat. ... UPAYA MENINGKATKAN KINERJA KE DEPAN: PINJAM PAKAI ›Ketersediaan alat berat

PT RESOURCE ALAM INDONESIA Tbk

HARI LINGKUAN HIDUP SEDUNIA & PROGRAM PENUTUPAN VOID

35

Page 36: PUBLIC EXPOSE - Resource Alam Indonesia Tbk PT · PLN berkapasitas 6,4 MW, di Cicatih Jawa Barat. ... UPAYA MENINGKATKAN KINERJA KE DEPAN: PINJAM PAKAI ›Ketersediaan alat berat

PT RESOURCE ALAM INDONESIA Tbk

NOTA KESEPAHAMAN KERJA SAMA DENGAN

UNIVERSITAS MULAWARMAN

Nota Kesepahaman ini sepakat mengadakan kerjasama dalam hal Pendidikan, Penelitian,Pelatihan, Jasa Konsultasi dan Pemberdayaan Masyarakat yang didasari oleh aturan yang berlaku.

Nota Kesepahaman berlaku untuk jangka waktu 5 tahun sejak naskah ditanda tangani dan dapatdiperbaharui dengan persetujuan kedua belah pihak.

36

Pada tanggal 7 Agustus 2019, PT Resource Alam Indonesia Tbk yang diwakili oleh Direktur

Utama Bp. Pintarso Adijanto, melakukan penanda tanganan Nota Kesepahaman dengan

Universitas Mulawarman, Kalimantan dan diwakili oleh Ibu Ir. Sukartiningsih, SC,Ph.D.

Page 37: PUBLIC EXPOSE - Resource Alam Indonesia Tbk PT · PLN berkapasitas 6,4 MW, di Cicatih Jawa Barat. ... UPAYA MENINGKATKAN KINERJA KE DEPAN: PINJAM PAKAI ›Ketersediaan alat berat

PT RESOURCE ALAM INDONESIA Tbk

PENANDATANGANAN NOTA KESEPAHAMAN KERJA SAMA

37

Page 38: PUBLIC EXPOSE - Resource Alam Indonesia Tbk PT · PLN berkapasitas 6,4 MW, di Cicatih Jawa Barat. ... UPAYA MENINGKATKAN KINERJA KE DEPAN: PINJAM PAKAI ›Ketersediaan alat berat

PT RESOURCE ALAM INDONESIA Tbk

PENANDATANGANAN NOTA KESEPAHAMAN KERJA SAMA

38

Page 39: PUBLIC EXPOSE - Resource Alam Indonesia Tbk PT · PLN berkapasitas 6,4 MW, di Cicatih Jawa Barat. ... UPAYA MENINGKATKAN KINERJA KE DEPAN: PINJAM PAKAI ›Ketersediaan alat berat

PT RESOURCE ALAM INDONESIA Tbk

PENANDATANGANAN NOTA KESEPAHAMAN KERJA SAMA

39

Page 40: PUBLIC EXPOSE - Resource Alam Indonesia Tbk PT · PLN berkapasitas 6,4 MW, di Cicatih Jawa Barat. ... UPAYA MENINGKATKAN KINERJA KE DEPAN: PINJAM PAKAI ›Ketersediaan alat berat

PT RESOURCE ALAM INDONESIA Tbk

PENANDATANGANAN NOTA KESEPAHAMAN KERJA SAMA

40

Page 41: PUBLIC EXPOSE - Resource Alam Indonesia Tbk PT · PLN berkapasitas 6,4 MW, di Cicatih Jawa Barat. ... UPAYA MENINGKATKAN KINERJA KE DEPAN: PINJAM PAKAI ›Ketersediaan alat berat

PT RESOURCE ALAM INDONESIA Tbk

TANGGUNG JAWAB TERHADAP MASYARAKAT [CSR]

41

Page 42: PUBLIC EXPOSE - Resource Alam Indonesia Tbk PT · PLN berkapasitas 6,4 MW, di Cicatih Jawa Barat. ... UPAYA MENINGKATKAN KINERJA KE DEPAN: PINJAM PAKAI ›Ketersediaan alat berat

PT RESOURCE ALAM INDONESIA Tbk

TANGGUNG JAWAB TERHADAP MASYARAKAT [CSR]

42

Page 43: PUBLIC EXPOSE - Resource Alam Indonesia Tbk PT · PLN berkapasitas 6,4 MW, di Cicatih Jawa Barat. ... UPAYA MENINGKATKAN KINERJA KE DEPAN: PINJAM PAKAI ›Ketersediaan alat berat

PT RESOURCE ALAM INDONESIA Tbk

TANGGUNG JAWAB TERHADAP MASYARAKAT [CSR]

43

Page 44: PUBLIC EXPOSE - Resource Alam Indonesia Tbk PT · PLN berkapasitas 6,4 MW, di Cicatih Jawa Barat. ... UPAYA MENINGKATKAN KINERJA KE DEPAN: PINJAM PAKAI ›Ketersediaan alat berat

PT RESOURCE ALAM INDONESIA Tbk

REKLAMASI INSANI TAHUN 2015 - 2019

44

Page 45: PUBLIC EXPOSE - Resource Alam Indonesia Tbk PT · PLN berkapasitas 6,4 MW, di Cicatih Jawa Barat. ... UPAYA MENINGKATKAN KINERJA KE DEPAN: PINJAM PAKAI ›Ketersediaan alat berat

PT RESOURCE ALAM INDONESIA Tbk

REKLAMASI INSANI TAHUN 2015 - 2019

45

Page 46: PUBLIC EXPOSE - Resource Alam Indonesia Tbk PT · PLN berkapasitas 6,4 MW, di Cicatih Jawa Barat. ... UPAYA MENINGKATKAN KINERJA KE DEPAN: PINJAM PAKAI ›Ketersediaan alat berat

PROYEK PLTM CICATIHLAPORAN PROGRESS 2 MINGGUAN

46

Page 47: PUBLIC EXPOSE - Resource Alam Indonesia Tbk PT · PLN berkapasitas 6,4 MW, di Cicatih Jawa Barat. ... UPAYA MENINGKATKAN KINERJA KE DEPAN: PINJAM PAKAI ›Ketersediaan alat berat

Penanda tanganan persetujuan tahap Commercial Operating Date( COD ) denganPLN pada tanggal 25 Oktober 2019, yang ditanda tangani oleh kedua belah Pihakyaitu dari PT Bias Petrasia Persada, anak usaha dari PT Khatulistiwa Hidro Energidiwakili oleh Bapak Pintarso Adijanto dan pihak PT PLN ( Persero ) Unit IndukDistribusi Jawa Barat, diwakili oleh General Manager PT PLN Bapak Iwan Purnama

47

PENANDATANGANAN COD DENGAN PT PLN ( PERSERO ) UNIT DISTRIBUSI JAWA BARAT

Page 48: PUBLIC EXPOSE - Resource Alam Indonesia Tbk PT · PLN berkapasitas 6,4 MW, di Cicatih Jawa Barat. ... UPAYA MENINGKATKAN KINERJA KE DEPAN: PINJAM PAKAI ›Ketersediaan alat berat

PENANDATANGANAN COD DENGANPT PLN ( PERSERO ) UNIT DISTRIBUSI JAWA BARAT

48

Page 49: PUBLIC EXPOSE - Resource Alam Indonesia Tbk PT · PLN berkapasitas 6,4 MW, di Cicatih Jawa Barat. ... UPAYA MENINGKATKAN KINERJA KE DEPAN: PINJAM PAKAI ›Ketersediaan alat berat

PROGRESS PEK. SIPILBENDUNG & INTAKE

Bendung PLTM Cicatih

Mechanical trash cleaner Trashlog

Pintu Intake

49

Page 50: PUBLIC EXPOSE - Resource Alam Indonesia Tbk PT · PLN berkapasitas 6,4 MW, di Cicatih Jawa Barat. ... UPAYA MENINGKATKAN KINERJA KE DEPAN: PINJAM PAKAI ›Ketersediaan alat berat

PROGRESS PEK. SIPILSALURAN HANTAR

Saluran hantar

Saluran hantar Saluran hantar

Saluran hantar

50

Page 51: PUBLIC EXPOSE - Resource Alam Indonesia Tbk PT · PLN berkapasitas 6,4 MW, di Cicatih Jawa Barat. ... UPAYA MENINGKATKAN KINERJA KE DEPAN: PINJAM PAKAI ›Ketersediaan alat berat

PROGRESS PEK. SIPILKOLAM PENENANG

Ujicoba pengisian air di head pond

Ujicoba pengisian air di head pond

Air melimpas di spillway

Ujicoba pengisian air di head pond

51

Page 52: PUBLIC EXPOSE - Resource Alam Indonesia Tbk PT · PLN berkapasitas 6,4 MW, di Cicatih Jawa Barat. ... UPAYA MENINGKATKAN KINERJA KE DEPAN: PINJAM PAKAI ›Ketersediaan alat berat

PROGRESS PEK. M&ETURBIN & GENERATOR

Turbin & generator unit 1 & 2 Turbin & generator unit-1

Turbin & generator unit-2

52

Page 53: PUBLIC EXPOSE - Resource Alam Indonesia Tbk PT · PLN berkapasitas 6,4 MW, di Cicatih Jawa Barat. ... UPAYA MENINGKATKAN KINERJA KE DEPAN: PINJAM PAKAI ›Ketersediaan alat berat

PROGRESS PEK. M&E KONTROL ROOM

Travo pembangkit 4600 kVA unit-2

Back up genset 180 kVAPanel kontrol Turbin & Generator

Medium Voltage Switchgear

53

Page 54: PUBLIC EXPOSE - Resource Alam Indonesia Tbk PT · PLN berkapasitas 6,4 MW, di Cicatih Jawa Barat. ... UPAYA MENINGKATKAN KINERJA KE DEPAN: PINJAM PAKAI ›Ketersediaan alat berat

JTM 20 kV & INTERKONEKSI PLN

Pemasangan JTM & JTR selesai 100%

Panel interkoneksi PLN selesai 100% Rectifier di GH PLN sdh terpasang

54

Page 55: PUBLIC EXPOSE - Resource Alam Indonesia Tbk PT · PLN berkapasitas 6,4 MW, di Cicatih Jawa Barat. ... UPAYA MENINGKATKAN KINERJA KE DEPAN: PINJAM PAKAI ›Ketersediaan alat berat

SCHEDULE TESTING & COMM GLOBAL HYDRO

55

Page 56: PUBLIC EXPOSE - Resource Alam Indonesia Tbk PT · PLN berkapasitas 6,4 MW, di Cicatih Jawa Barat. ... UPAYA MENINGKATKAN KINERJA KE DEPAN: PINJAM PAKAI ›Ketersediaan alat berat

https://drive.google.com/file/d/1BJM-RAIG32r-tsptBZ4U2VaIlIJ_qBcK/view?usp=sharing

56

Video PLTM Citatih :

Page 57: PUBLIC EXPOSE - Resource Alam Indonesia Tbk PT · PLN berkapasitas 6,4 MW, di Cicatih Jawa Barat. ... UPAYA MENINGKATKAN KINERJA KE DEPAN: PINJAM PAKAI ›Ketersediaan alat berat

PT RESOURCE ALAM INDONESIA Tbk

DISCLAIMER

These materials have been prepared by PT Resource Alam Indonesia Tbk (the “Company”) and have not been independentlyverified. No representation or warranty, expressed or implied, is made and no reliance should be placed on the accuracy,fairness or completeness of the information presented or contained in these materials.

The Company or any of its affiliates, advisers or representatives accepts no liability whatsoever for any loss howsoever arisingfrom any information presented or contained in these materials. The information presented or contained in these materials issubject to change without notice and its accuracy is not guaranteed.

These materials contain statements that constitute forward-looking statements. These statements include descriptionsregarding the intent, belief or current expectations of the Company or its officers with respect to the consolidated results ofoperations and financial condition of the Company. These statements can be recognized by the use of words such as“expects,” “plan,” “will,” “estimates,” “projects,” “intends,” or words of similar meaning. Such forward-looking statements arenot guarantees of future performance and involve risks and uncertainties, and actual results may differ from those in theforward-looking statements as a result of various factors and assumptions. The Company has no obligation and does notundertake to revise forward-looking statements to reflect future events or circumstances.

These materials are for information purposes only and do not constitute or form part of an offer, solicitation or invitation ofany offer to buy or subscribe for any securities of the Company, in any jurisdiction, nor should it or any part of it form thebasis of, or be relied upon in any connection with, any contract, commitment or investment decision whatsoever. Any decisionto purchase or subscribe for any securities of the Company should be made after seeking appropriate professional advice.

57

Page 58: PUBLIC EXPOSE - Resource Alam Indonesia Tbk PT · PLN berkapasitas 6,4 MW, di Cicatih Jawa Barat. ... UPAYA MENINGKATKAN KINERJA KE DEPAN: PINJAM PAKAI ›Ketersediaan alat berat

Thank You