    PERENCANAAN PONDASI

    Lpile

    Keterangan :Lebar Pondasi (B) = 2.50 mTebal Pondasi (T) = 0.40 m

    Kedalaman Pondasi (D) = 1.50 mPedestal (C) = 0.55 m

    F = 0.50 mH = 2.00 m

    L pile= 10.50 m

    1. BEBAN RENCANA :Gaya Tekan 68.26 TonGaya Uplift 59.50 Ton

    Gaya lateral 4.35 Ton

    2. DAYA DUKUNG PONDASI TIANG BOR:**** Daya Dukung Tekan Tiang Bor Tunggal:Qcult= (Nc*cu*Ab) + (ca*As)

    = (9*cu*Ab) + (a cu*As)

    Ket : cu = undrained shear strength pada ujung tiang bor = qc/15 (kg/cm2)

    ca = adhesi rata-rata sepanjang selimut tiang = acu (kg/cm2)

    a = koefisien adhesi

    cu = undrained shear strength rata-rata sepanjang selimut tiang (kg/cm2)

    D

    BT

    C

    F

    H

  • 8/12/2019 Pondasi 3 Bor Pile-terzagi

    2/23

    Dari data sondir :

    qc= 250 Kg/cm2 , Pada Elevasi - 12.00 (pada ujung tiang)cu = qc/15

    = 16.667 kg/cm2

    qc= 20.0 Kg/cm2 , (rata-rata qcsepanjang tiang)cu = qc/15 (undrained shear strength rata-rata sepanjang tiang)

    = 1.33 kg/cm2

    = 13.3 ton/m2 ( dari grafik aVS cudiperoleh a= 0.4 )Dipakai : Tiang borf30 cm

    Ab= 706.5 cm2

    pf= 94.2 cm , L pile= 10.50 m

    As= pfLpile

    = 98910 cm2

    Qcult= (9*cu*Ab) + (a cu*As)

    = 105975 + 52752

    = 158727 kg= 158.73 ton

    Qcall= Qc ult/SF

    = Qc ult/2.5

    = 63.491 ton (tekan)

    **** Daya Dukung Tarik Tiang Bor Tunggal:QTult= (ca*As)

    = (a cu*As)

    Ket : ca = adhesi rata-rata sepanjang selimut tiang = acu (kg/cm2)

    a = koefisien adhesi

    cu = undraine shear strength rata-rata sepanjang selimut tiang (kg/cm2)

    Dari data sondir :

    qc= 20.0 Kg/cm2

    (rata-rata qcsepanjang tiang)

    cu = qc/15 (undrained shear strength rata-rata sepanjang tiang)

    = 1.33 kg/cm2

    = 13.3 ton/m2 ( dari grafik aVS cudiperoleh a= 0.4 )

    Dipakai : Tiang borf40 cm

    Ab= 1256.0 cm2

    pf= 125.6 cm , L pile= 10.50 m

    As= pfLpile

    = 131880 cm2

    QTult= (a cu*As)

    = 70336 kg= 70.34 ton

    QTall= QT ult/SF

    = QT ult/3

    = 23.445 ton (tarik)

  • 8/12/2019 Pondasi 3 Bor Pile-terzagi

    3/23

    **** Daya Dukung Lateral Tiang Bor Tunggal:Hall= ( k.f.da) / b

    Ket : Ha = Daya dukung mendatar yang diijinkan (kg)

    k = Koefisien reaksi lapisan tanah di bawah permukaan dalam arah lateral (Kg

    f= Diameter tiang (cm)

    da = Besarnya pergeseran normal (cm)

    b =4 ( k.f )/4EI

    E = Modulus elastisitas bahan tiang (Kg/cm2)

    I = Momen Inersia penampang (cm4)

    I = 125600 cm4

    fc'= 189 kg/cm2

    Ec = 204328 kg/cm2

    k = 0.50 kg/cm3

    da = 1.00 cm

    b = 0.003736

    Hall= ( k.f. da) / b

    = 5353.2 Kg= 5.00 Ton (lateral)

    Daya Dukung Bored pile Group :Jumlah Tiang bor (s) = 3effisiensi group (x) = {16-(s-1)}/16 (Fled formula)

    = 0.88

    jarak antar tiang (m) = 1.50 mjarak ke tepi (n) = 0.50 mLebar Pondasi (B) = 2.50 m

    Qcompr.total= s (x*Qcomp.tunggal) = 166.66 TonQtension total= s (x*Qtension tunggal) = 61.54 TonHall total= s (x*Hall) = 13.13 Ton

    3. KEAMANAN TERHADAP UPLIFT/TARIK :Volume Beton (Vb) = {(m+2n)*B*T} - {(msin60)*0.5m*T} + {C*C*(H-T)}

    = 2.59 m3

    Berat Beton (Wb) = Vb * 2.4 t/m3= 6.23 Ton

    Volume Tanah (Vs) = (Berbentuk limas terpancung terbalik dengan sudut 300)

    = [{B+((D-T)/cos30)}2 * 1/3*{(Bcos30)+(D-T)}] - [B

    2* 1/3Bcos30] - [

    = 10.63 m3

    Berat tanah (Ws) = Vs * 1.6 t/m3= 17.00 Ton

    Qtension total= s (x*Qtension tunggal)

    = 61.54 Ton (daya dukung tarik bored pile total)

    Wtot= Wb + Ws + Qtension total= 84.77 Ton

    Gaya Uplift = 59.50 Ton < W Total= 84.77 Ton

    mm

    mn

    B

    n

  • 8/12/2019 Pondasi 3 Bor Pile-terzagi

    4/23

  • 8/12/2019 Pondasi 3 Bor Pile-terzagi

    5/23

    5. KEAMANAN TERHADAP SLIDING/GESER :d= Koefisien friksi = 0.45

    H all= 13.13 Ton (daya dukung lateral bored pile total)

    P = Gaya Tekan + Berat Beton (Wb)= 74.49 Ton

    Gaya Lateral = 4.35 Ton

    SF sliding= (P*d+ H all )/ Lateral= 10.72 > 1.5 (OK)

    6. PENULANGAN :Mutu Beton :

    fc' = 18.9 Mpa (K-225)

    Mutu Tulangan :

    fy= 400 Mpa (BJTD40) D > 13mm

    fys= 240 Mpa (BJTP24) f< 13mm

    A. PEDESTALfaktor beban = 1.3

    Ptot = Gaya Tekan + Berat Pedestal

    = 69.42 Ton Pu= 1.3* Ptot= 90.25 Ton

    Gaya Tarik = 59.50 Ton Tu= 1.3* tarik = 77.35 Ton

    Momen = Lateral*(H-T)= 6.96 Ton.m Mu= 1.3* Momen = 9.05 Ton.m

    Penulangan Utama:

    C

    - Akibat Tekan:

    Pu= 90.25 Ton

    Pu= f 0.8*(0.85fc'*(Ag-As) + As*fy)

    {Pu/(0.65*0.8)}-0.85fc'Ag

    C = 0.55 m As1 = -81.37 cm2

    Ag= C*C

    = 0.3025 m2 - Akibat Tarik:

    = 3025 cm2

    Tu= 77.35 Ton

    Tu= f As*fyAsmin= 1%* Ag (Tu/0.7)

    Asmin= 30.25 cm2

    fy

    As2= 27.63 cm2

    - Akibat Momen (bolak-balik):

    Mu= 9.05 Ton.m

    Mu=fAsfy(d-1/2a)

    Mu=0.8 Asfy(d-1/2a) , dimana a= Asfy/0.85fc'b

    Mu=0.8 Asfy(d-(Asfy/

    1.7fc'b))

    As= Mu /{0.8fy(d-(Asfy/

    1.7fc'b))}

    As=

    C

    fy- 0.85fc'As=

  • 8/12/2019 Pondasi 3 Bor Pile-terzagi

    6/23

    AsPerlu= Max( As min, As1, As2, As3)

    AsPerlu= 30.25 cm2 , digunakan besi : D 16( 16 D16 )

    Penulangan Sengkang:

    Gaya Lateral = 4.35 Ton Vu= 1.3* tekan = 5.66 Ton

    Vc= 1/6fc'1/2bd= 19.93 Ton

    Vs = Vu/f- Vc , f= 0.75

    = -12.39 Ton (Sengkang minimum)

    Dicoba : f10 mm Av = 2.1/4. p f

    2 = 1.57 cm2

    smin