perhitungan kontruksi dan schedule waktu pelaksanaan ciomas

41
Daftar Harga Bahan No Uraian Harga Satuan 1 Batu Belah 230,000 M3 2 Semen 1,400 Kg 3 Pasir Pasang 265,000 M3 4 Pipa Gip Medium 1,250,000 M1 5 Blok Anker 350,000 Bh 6 Suddel Support 250,000 Bh 7 Ekspansion Joint 750,000 Bh 8 Pasir Cor 250,000 M3 9 Sewa Molen 150,000 Unit 10 Air 25 Liter 11 Kerikil 270,000 M3

Upload: eko-kiswoyo

Post on 17-Jan-2016

23 views

Category:

Documents


1 download

DESCRIPTION

ghgfhgjgcjvhjhjhkhkcfbcfvhhghgchcghghghgvjvhjhjxnyit7ifoi8yo8yo8dod 52drhtydbtrhusrytrduyuntyiudtnidtuidfmuimdtuimutdxim tium

TRANSCRIPT

Page 1: Perhitungan Kontruksi Dan Schedule Waktu Pelaksanaan Ciomas

Daftar Harga Bahan

No Uraian Harga Satuan

1 Batu Belah 230,000 M3

2 Semen 1,400 Kg

3 Pasir Pasang 265,000 M3

4 Pipa Gip Medium 1,250,000 M1

5 Blok Anker 350,000 Bh

6 Suddel Support 250,000 Bh

7 Ekspansion Joint 750,000 Bh

8 Pasir Cor 250,000 M3

9 Sewa Molen 150,000 Unit

10 Air 25 Liter

11 Kerikil 270,000 M3

Page 2: Perhitungan Kontruksi Dan Schedule Waktu Pelaksanaan Ciomas

Daftar Upah

No Uraian Upah1 Mandor 150,000 2 Kepala Tukang 135,000 3 Tukang Pipa 120,000 4 Pekerja 100,000

Page 3: Perhitungan Kontruksi Dan Schedule Waktu Pelaksanaan Ciomas

JADWAL WAKTU PELAKSANAAN

Provinsi : BANTENKabupaten /Kota : TANGERANG CIOMAS

NO URAIAN PEKERJAAN SATUAN VOL

BULAN JANUARI S/D JUNI 2015

KETERANGANJANUARI PEBRUARI MARET APRIL MEI JUNI

Mgg 1 Mgg 2 Mgg 3 Mgg 4 Mgg 1 Mgg 2 Mgg 3 Mgg 4 Mgg 1 Mgg 2 Mgg 3 Mgg 4 Mgg 1 Mgg 2 Mgg 3 Mgg 4 Mgg 1 Mgg 2 Mgg 3 Mgg 4 Mgg 1 Mgg 2 Mgg 3 Mgg 4

I PEKERJAAN PERSIAPAN

1 Papan Nama Proyek ls 1 300,000 300,000 0.007 0.01

2 Pengukuran Patok ls 1 750,000 750,000 0.017 0.01 0.01

3 Rambu Rambu Peringatan dan K3 ls 1 1,200,000 1,200,000 0.027 0.01 0.01 0.01 0.01

4 Barak Kerja dan Gudang ls 1 22,000,000 22,000,000 0.486 0.12 0.12 0.12 0.12

5 Dokumentasi dan Alat Komunikasi HT ls 1 7,500,000 7,500,000 0.166 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01

5 Mobilisasi dan Demobilisasi ls 1 15,000,000 15,000,000 0.332 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01

II PERIJINAN

1 Perijinan Pendirian Perusahaan Ls 1 8,500,000 8,500,000 0.188 0.05 0.05 0.05 0.05

III PERALATAN MESIN DAN EQUIPMENT

1 Mesin Press 300 T bh 1 900,000,000 900,000,000 19.899 2.49 2.49 2.49 2.49 2.49 2.49 2.49 2.49

2 Mesin Press 110 T bh 1 350,000,000 350,000,000 7.739 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97

3 Mesin Bending bh 1 500,000,000 500,000,000 11.055 1.38 1.38 1.38 1.38 1.38 1.38 1.38 1.38

4 Mesin Las bh 1 20,000,000 20,000,000 0.442 0.11 0.11 0.11 0.11

5 Mesin Bor bh 1 5,000,000 5,000,000 0.111 0.06 0.06

6 Mesin Press bh 1 200,000,000 200,000,000 4.422 0.55 0.55 0.55 0.55 0.55 0.55 0.55 0.55

7 Mesin Bubut bh 1 150,000,000 150,000,000 3.317 0.41 0.41 0.41 0.41 0.41 0.41 0.41 0.41

8 Mesin Gerinda bh 2 700,000 1,400,000 0.031 0.03

9 Manual Gas Cutting bh 1 7,000,000 7,000,000 0.155 0.04 0.04 0.04 0.04

10 Jig Welding bh 1 30,000,000 30,000,000 0.663 0.17 0.17 0.17 0.17

11 Manual Punch Machine bh 1 6,000,000 6,000,000 0.133 0.03 0.03 0.03 0.03

12 Crane 3 Ton bh 1 300,000,000 300,000,000 6.633 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83

IV PERALATAN NON PRODUKSI

1 Komputer bh 4 3,500,000 14,000,000 0.310 0.08 0.08 0.08 0.08

2 Laptop bh 2 5,000,000 10,000,000 0.221 0.06 0.06 0.06 0.06

3 Meja dan Kursi bh 6 5,000,000 30,000,000 0.663 0.17 0.17 0.17 0.17

4 Telepon bh 1 1,000,000 1,000,000 0.022 0.01 0.01 0.01 0.01

5 Fax dan Printer bh 1 900,000 900,000 0.020 0.00 0.00 0.00 0.00

6 Server bh 1 5,000,000 5,000,000 0.111 0.03 0.03 0.03 0.03

V INFRASTRUKTUR

1 Gedung Ls 1 1,500,000,000 1,500,000,000 33.165 1.51 1.51 1.51 1.51 1.51 1.51 1.51 1.51 1.51 1.51 1.51 1.51 1.51 1.51 1.51 1.51 1.51 1.51 1.51 1.51 1.51 1.51

2 Pendukung Infrastruktur Ls 1 20,000,000 20,000,000 0.442 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03

VI PREPAID EXPENSES

1 Asuransi Ls 1 50,000,000 50,000,000 1.106 0.28 0.28 0.28 0.28

2 Iklan Ls 1 9,000,000 9,000,000 0.199 0.05 0.05 0.05 0.05

3 Legal Fees (10 thn) Ls 1 4,000,000 4,000,000 0.088 0.02 0.02 0.02 0.02

VII PEKERJAAN SIPIL -

1 Pekerjaan Bendungan Ls 1 80,989,530 80,989,530 1.791 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09

2 Pekerjaan Intake Ls 1 2,120,678 2,120,678 0.047 0.01 0.01 0.01 0.01

3 Pekerjaan Bak Penenang Ls 1 27,005,123 27,005,123 0.597 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07

4 Pekerjaan Saluran Hantar Ls 1 96,451,177 96,451,177 2.133 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11

5 Pekerjaan Pipa Pesat Ls 1 97,663,250 97,663,250 2.159 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18

6 Pekerjaan Gedung Central Ls 1 50,000,000 50,000,000 1.106 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14

Jumlah Nilai Pekerjaan 4,522,779,758 100.00

Progress Rencana (%) 0.21 0.20 1.70 1.70 8.79 8.76 8.71 8.71 8.36 8.36 8.39 8.57 1.94 1.94 1.94 1.94 2.49 2.49 2.49 2.49 2.51 2.51 2.51 2.33

Kumulatif Rencana (%) -

0

.21

0

.42

2

.12

3

.82

1

2.61

2

1.38

3

0.08

3

8.79

4

7.14

5

5.50

6

3.89

7

2.46

7

4.40

7

6.33

7

8.27

8

0.20

8

2.69

8

5.17

8

7.66

9

0.15

9

2.65

9

5.16

9

7.67

1

00.0

0

JAKARTA, DESEMBER 2014PT MICROPOWER TURBIN INOVATION

SUGENG HARYONO Direktur Utama

HARGA SATUAN (Rp)

JUMLAH HARGA (Rp)

BOBOT (%)

Page 4: Perhitungan Kontruksi Dan Schedule Waktu Pelaksanaan Ciomas

Pekerjaan PersiapanPEKERJAAN : PT MICROPOWER TURBIN INOVATION

LOKASI : CIOMAS TANGERANG BANTEN

No Uraian Satuan Volume

(1) (2) (3) (4) (5)

A. Papan Nama Proyek Ls 1 300,000

B. Pengukuran Patok Ls 1 750,000

C. Rambu Rambu Peringatan dan K3 Ls 1 1,200,000

D. Barak Kerja dan Gudang Ls 1 22,000,000

E. Dokumentasi dan Alat Komunikasi Ls 1 7,500,000

F. Mobilisasi dan Demobilisasi LS 1 15,000,000

Total Pekerjaan Persiapan

Harga Satuan Dasar (Rp)

Page 5: Perhitungan Kontruksi Dan Schedule Waktu Pelaksanaan Ciomas

Pekerjaan Persiapan

(6)

300,000

750,000

1,200,000

22,000,000

7,500,000

15,000,000

46,750,000

Harga (Rp)

Page 6: Perhitungan Kontruksi Dan Schedule Waktu Pelaksanaan Ciomas

Pemasangan Batu Kali Intake (Sumber AHSP PU 2013)A. PEMASANGAN 1 M3 PONDASI BATU BELAH

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

A TENAGAPekerja L.01 Oh 1.5 100,000 150,000 Tukang Batu L.02 OH 0.75 120,000 90,000 Kepala Tukang L.03 OH 0.075 135,000 10,125 Mandor L.04 OH 0.075 150,000 11,250

Jumlah Tenaga 261,375 B BAHAN

Batu Belah M3 1.2 230,000 276,000 Semen Portlan Kg 163 1,400 228,200 Pasir Pasang M3 0.52 265,000 137,800

Jumlah Bahan 642,000 C PERALATAN

D Jumlah (A+B+C) 903,375 E Profit (10%) 90,338 F Harga Satuan Pekerjaan 993,713

B Pemasangan 1 m2 Plesteran Tebal 20 mm

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

A TENAGA

Page 7: Perhitungan Kontruksi Dan Schedule Waktu Pelaksanaan Ciomas

Pekerja L.01 Oh 0.4 100,000 40,000 Tukang Batu L.02 OH 0.2 120,000 24,000 Kepala Tukang L.03 OH 0.02 135,000 2,700 Mandor L.04 OH 0.02 150,000 3,000

Jumlah Tenaga 69,700 B BAHAN

Semen Portlan Kg 8.32 1,400 11,648 Pasir Pasang M3 0.032 265,000 8,480

Jumlah Bahan 20,128 C PERALATAN

D Jumlah (A+B+C) 89,828 E Profit (10%) 8,983 F Harga Satuan Pekerjaan 98,811

C Total Volume Pasangan Batu Kali C1 Pondasi Bendungan

= 0.5 m x 0.5 m x 42 m= 10.5 m3

C2 Pasangan Dinding bendungan= ((0.5+0.3)/2 x 1.5 x 40 + 20 + 20 = 0.6 m2 x 80 m = 48 m3

C3 Pintu Besi 2 UnitBiaya Pembuatan Pintu Besi = 7, 500,000 x 2 unit = 7, 500,000 per Unit = 5, 500,000 per Unit x 2 = Rp 11,000,000

Page 8: Perhitungan Kontruksi Dan Schedule Waktu Pelaksanaan Ciomas

Maka total pasangan batu kali = 10.5 + 48 = 58.5 m3 maka biaya pasangan batu kali = 58.5 m3 x 993,713 ' = Rp 58, 132 , 210

D Plesteran Luas Plesteran = 1.5 m x 80 m ' = 120 M2Maka Biaya Plester , = 98,811 x 120 ' = Rp 11,857,320

Maka Total Biaya Bendungan = Rp 80,989,530

Page 9: Perhitungan Kontruksi Dan Schedule Waktu Pelaksanaan Ciomas

Pemasangan Batu Kali Intake (Sumber AHSP PU 2013)A. PEMASANGAN 1 M3 PONDASI BATU BELAH

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

A TENAGAPekerja L.01 Oh 1.5 100,000 150,000 Tukang Batu L.02 OH 0.75 120,000 90,000 Kepala Tukang L.03 OH 0.075 135,000 10,125 Mandor L.04 OH 0.075 150,000 11,250

Jumlah Tenaga 261,375 B BAHAN

Batu Belah M3 1.2 230,000 276,000 Semen Portlan Kg 163 1,400 228,200 Pasir Pasang M3 0.52 265,000 137,800

Jumlah Bahan 642,000 C PERALATAN

D Jumlah (A+B+C) 903,375 E Profit (10%) 90,338 F Harga Satuan Pekerjaan 993,713

B Pemasangan 1 m2 Plesteran Tebal 20 mm

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

A TENAGA

Page 10: Perhitungan Kontruksi Dan Schedule Waktu Pelaksanaan Ciomas

Pekerja L.01 Oh 0.4 100,000 40,000 Tukang Batu L.02 OH 0.2 120,000 24,000 Kepala Tukang L.03 OH 0.02 135,000 2,700 Mandor L.04 OH 0.02 150,000 3,000

Jumlah Tenaga 69,700 B BAHAN

Semen Portlan Kg 8.32 1,400 11,648 Pasir Pasang M3 0.032 265,000 8,480

Jumlah Bahan 20,128 C PERALATAN

D Jumlah (A+B+C) 89,828 E Profit (10%) 8,983 F Harga Satuan Pekerjaan 98,811

C Total Volume Pasangan Batu Kali C1 Pondasi Intake

= 0.5 x 0.5x (1.4) x 2= 0.5 x 0.5 x 1.4 x 2= 0.7 m3

C2 Pasangan Dinding = ((0.5+0.3)/2 x 1 x 1.4) + (0.44 x 0.44x 1.4 ) = 0.56 + 0.27 m3 = 0.83 m3

Maka total pasangan batu kali = 0.7+0.83 = 1.53 m3 maka biaya pasangan batu kali = 1.53 m3 x 993,713= Rp 1,520,380

Page 11: Perhitungan Kontruksi Dan Schedule Waktu Pelaksanaan Ciomas

D Plesteran Luas Plesteran = 1.+0.3+0.44+0.44+0.44+0.44 +1 x 1.4 ' = 3.9x 1.4 = 5.46 M2Maka Biaya Plester , = 98,811 x 5.46 ' = Rp 539,508

Lantai Kerja Menggunakan Molen No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

A TENAGA KERJAPekerja L.01 Oh 1.323 100,000 132,300 Tukang Batu L.02 OH 0.189 120,000 22,680 Kepala Tukang L.03 OH 0.019 135,000 2,565 Mandor L.04 OH 0.132 150,000 19,800

Jumlah Tenaga 177,345 B BAHAN

Semen Portlan Kg 247 1,400 345,800 Pasir Beton M3 0.621 250,000 155,250 Kerikil M3 0.74 270,000 199,800 Air L 215 25 5,375

Jumlah Bahan 706,225 C PERALATAN

Molen 0.35 m3 0.25 150,000 37,500

D Jumlah (A+B+C) 921,070 E Profit (10%) 92,107 F Harga Satuan Pekerjaan 1,013,177

Page 12: Perhitungan Kontruksi Dan Schedule Waktu Pelaksanaan Ciomas

Maka Biaya lantai Kerja untuk Tebal 10 cm = 0.06 M3 = 0.06 x 1,013,177 = 60,790

Maka Total Biaya Intake = 1,520,380 + 539,508 + 60,790 = Rp 2,120,678

Page 13: Perhitungan Kontruksi Dan Schedule Waktu Pelaksanaan Ciomas

Pemasangan Batu Kali Bak Penenang (Sumber AHSP PU 2013)A. PEMASANGAN 1 M3 PONDASI BATU BELAH

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

A TENAGAPekerja L.01 Oh 1.5 100,000 150,000 Tukang Batu L.02 OH 0.75 120,000 90,000 Kepala Tukang L.03 OH 0.075 135,000 10,125 Mandor L.04 OH 0.075 150,000 11,250

Jumlah Tenaga 261,375 B BAHAN

Batu Belah M3 1.2 230,000 276,000 Semen Portlan Kg 163 1,400 228,200 Pasir Pasang M3 0.52 265,000 137,800

Jumlah Bahan 642,000 C PERALATAN

D Jumlah (A+B+C) 903,375 E Profit (10%) 90,338 F Harga Satuan Pekerjaan 993,713

B Pemasangan 1 m2 Plesteran Tebal 20 mm

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

A TENAGA

Page 14: Perhitungan Kontruksi Dan Schedule Waktu Pelaksanaan Ciomas

Pekerja L.01 Oh 0.4 100,000 40,000 Tukang Batu L.02 OH 0.2 120,000 24,000 Kepala Tukang L.03 OH 0.02 135,000 2,700 Mandor L.04 OH 0.02 150,000 3,000

Jumlah Tenaga 69,700 B BAHAN

Semen Portlan Kg 8.32 1,400 11,648 Pasir Pasang M3 0.032 265,000 8,480

Jumlah Bahan 20,128 C PERALATAN

D Jumlah (A+B+C) 89,828 E Profit (10%) 8,983 F Harga Satuan Pekerjaan 98,811

C Total Volume Pasangan Batu Kali C1 Pondasi Bak Penenang

= 0.5 x 0.5x (8.4+4.2+8.4)= 0.5 x 0.5 x (21)= 5.25 m3

C2 Pasangan Dinding = (0.5+0.3)/2 x 1.46 x 21 = 12.26 m3

Maka total pasangan batu kali = 5.25+12.26 = 17.51 m3 maka biaya pasangan batu kali = 17.51 m3 x 993,713= Rp 17,399,914

D Plesteran

Page 15: Perhitungan Kontruksi Dan Schedule Waktu Pelaksanaan Ciomas

Luas Plesteran = 1.46 x 21x 2 ' = 61. 32 M2Maka Biaya Plester , = 98,811 x 61.32 ' = Rp 6,059,090

Lantai Kerja Menggunakan MolenNo Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

A TENAGA KERJAPekerja L.01 Oh 1.323 100,000 132,300 Tukang Batu L.02 OH 0.189 120,000 22,680 Kepala Tukang L.03 OH 0.019 135,000 2,565 Mandor L.04 OH 0.132 150,000 19,800

Jumlah Tenaga 177,345 B BAHAN

Semen Portlan Kg 247 1,400 345,800 Pasir Beton M3 0.621 250,000 155,250 Kerikil M3 0.74 270,000 199,800 Air L 215 25 5,375

Jumlah Bahan 706,225 C PERALATAN

Molen 0.35 m3 0.25 150,000 37,500

D Jumlah (A+B+C) 921,070 E Profit (10%) 92,107 F Harga Satuan Pekerjaan 1,013,177

Page 16: Perhitungan Kontruksi Dan Schedule Waktu Pelaksanaan Ciomas

Maka Biaya lantai Kerja untuk Tebal 10 cm = 3.5 M3 = 3.5 x 1,013,177 = 3,546,119

Maka Total Biaya Bak Penenang = 17,399,914 + 6,059,090+3,546,119 = Rp 27,005,123

Page 17: Perhitungan Kontruksi Dan Schedule Waktu Pelaksanaan Ciomas

Pemasangan Batu Kali Intake (Sumber AHSP PU 2013)A. PEMASANGAN 1 M3 PONDASI BATU BELAH

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

A TENAGAPekerja L.01 Oh 1.5 100,000 150,000 Tukang Batu L.02 OH 0.75 120,000 90,000 Kepala Tukang L.03 OH 0.075 135,000 10,125 Mandor L.04 OH 0.075 150,000 11,250

Jumlah Tenaga 261,375 B BAHAN

Batu Belah M3 1.2 230,000 276,000 Semen Portlan Kg 163 1,400 228,200 Pasir Pasang M3 0.52 265,000 137,800

Jumlah Bahan 642,000 C PERALATAN

D Jumlah (A+B+C) 903,375 E Profit (10%) 90,338 F Harga Satuan Pekerjaan 993,713

B Pemasangan 1 m2 Plesteran Tebal 20 mm

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

A TENAGA

Page 18: Perhitungan Kontruksi Dan Schedule Waktu Pelaksanaan Ciomas

Pekerja L.01 Oh 0.4 100,000 40,000 Tukang Batu L.02 OH 0.2 120,000 24,000 Kepala Tukang L.03 OH 0.02 135,000 2,700 Mandor L.04 OH 0.02 150,000 3,000

Jumlah Tenaga 69,700 B BAHAN

Semen Portlan Kg 8.32 1,400 11,648 Pasir Pasang M3 0.032 265,000 8,480

Jumlah Bahan 20,128 C PERALATAN

D Jumlah (A+B+C) 89,828 E Profit (10%) 8,983 F Harga Satuan Pekerjaan 98,811

C Total Volume Pasangan Batu Kali C1 Pondasi Saluran Hantar

= 0.5 x 0.5x 40 = 0.5 x 0.5 x 40 x 2= 20 m3

C2 Pasangan Dinding = ((0.5+0.3)/2x 1.5 x 40 x 2 = 48 m3

Maka total pasangan batu kali = 20+48 = 68 m3 maka biaya pasangan batu kali = 68 m3 x 993,713= Rp 67,572,484

Page 19: Perhitungan Kontruksi Dan Schedule Waktu Pelaksanaan Ciomas

D Plesteran Luas Plesteran = 1.5 x 40 x 2 ' = 120 M2Maka Biaya Plester , = 98,811 x 120 ' = Rp 11,857,320

Lantai Kerja Menggunakan MolenNo Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

A TENAGA KERJAPekerja L.01 Oh 1.323 100,000 132,300 Tukang Batu L.02 OH 0.189 120,000 22,680 Kepala Tukang L.03 OH 0.019 135,000 2,565 Mandor L.04 OH 0.132 150,000 19,800

Jumlah Tenaga 177,345 B BAHAN

Semen Portlan Kg 247 1,400 345,800 Pasir Beton M3 0.621 250,000 155,250 Kerikil M3 0.74 270,000 199,800 Air L 215 25 5,375

Jumlah Bahan 706,225 C PERALATAN

Molen 0.35 m3 0.25 150,000 37,500

D Jumlah (A+B+C) 921,070 E Profit (10%) 92,107 F Harga Satuan Pekerjaan 1,013,177

Page 20: Perhitungan Kontruksi Dan Schedule Waktu Pelaksanaan Ciomas

Maka Biaya lantai Kerja untuk Tebal 10 cm = 16.8 M3 = 16.8 x 1,013,177 = 17,021,373

Maka Total Biaya Saluran Hantar = 67,572,484 + 11,857,320+17,021,373 = Rp 96,451,177

Page 21: Perhitungan Kontruksi Dan Schedule Waktu Pelaksanaan Ciomas

Pemasangan 1 m Pipa GIP dia 500 mm (Sumber AHSP PU 2013)A. Pipa dia 500 mm

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

A TENAGAPekerja L.01 Oh 1.469 100,000 146,900 Tukang Pipa L.02 OH 0.735 120,000 88,200 Mandor L.04 OH 0.147 150,000 22,050

Jumlah Tenaga 257,150 B BAHAN

Pipa Gip dia 500 mm Mtr 1 1,250,000 1,250,000

C PERALATAN

Hari 0

D Jumlah (A+B+C) 1,507,150 E Profit (10%) 150,715 F Harga Satuan Pekerjaan 1,657,865

B Blok Anker, Tumpuan Sadel (Suddel Support ) dan Ekpansion Join

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

A TENAGAPekerja L.01 Oh 1.469 - - Tukang Pipa L.02 OH 0.735 - -

Sewa Triport/Tackel & Handel Crane 2 Ton

Page 22: Perhitungan Kontruksi Dan Schedule Waktu Pelaksanaan Ciomas

Mandor L.04 OH 0.147 - - Jumlah Tenaga -

B BAHAN untuk 50 Meter1 Blok Anker Bh 2 350,000 700,000 2 Suddel Support Bh 10 250,000 2,500,000 3 Ekspansion Joint Bh 10 750,000 7,500,000

Total Bahan 10,700,000

C PERALATAN

D Jumlah (A+B+C) 10,700,000 E Profit (10%) 1,070,000 F Harga Satuan Pekerjaan 11,770,000

C Jadi Biaya Pipa Pesat (Penstock) untuk 50 Meter adalah = ' biaya Pemasangan 1 Meter Pipa x 50 meter + Acc '= 1,657,865 * 50 + (11,770000), = Rp 97,663,250

Page 23: Perhitungan Kontruksi Dan Schedule Waktu Pelaksanaan Ciomas

Pemasangan Batu Kali Intake (Sumber AHSP PU 2013)A. PEMASANGAN 1 M3 PONDASI BATU BELAH

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

A TENAGAPekerja L.01 Oh 1.5 100,000 150,000 Tukang Batu L.02 OH 0.75 120,000 90,000 Kepala Tukang L.03 OH 0.075 135,000 10,125 Mandor L.04 OH 0.075 150,000 11,250

Jumlah Tenaga 261,375 B BAHAN

Batu Belah M3 1.2 230,000 276,000 Semen Portlan Kg 163 1,400 228,200 Pasir Pasang M3 0.52 265,000 137,800

Jumlah Bahan 642,000 C PERALATAN

D Jumlah (A+B+C) 903,375 E Profit (10%) 90,338 F Harga Satuan Pekerjaan 993,713

B Pemasangan 1 m2 Plesteran Tebal 20 mm

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

A TENAGA

Page 24: Perhitungan Kontruksi Dan Schedule Waktu Pelaksanaan Ciomas

Pekerja L.01 Oh 0.4 100,000 40,000 Tukang Batu L.02 OH 0.2 120,000 24,000 Kepala Tukang L.03 OH 0.02 135,000 2,700 Mandor L.04 OH 0.02 150,000 3,000

Jumlah Tenaga 69,700 B BAHAN

Semen Portlan Kg 8.32 1,400 11,648 Pasir Pasang M3 0.032 265,000 8,480

Jumlah Bahan 20,128 C PERALATAN

D Jumlah (A+B+C) 89,828 E Profit (10%) 8,983 F Harga Satuan Pekerjaan 98,811

C Gedung Central ukuran 5m x 5m Pondasi Batu kali Dinding Bata MerahAtap Rangka BajaMaka Harganya = per m2 = 2,000,000maka untuk luas 25 m2 maka biayanya = 25 x 2,000,000 = 50,000,000

Page 25: Perhitungan Kontruksi Dan Schedule Waktu Pelaksanaan Ciomas

Summery

1 Persiapan 46,750,000 2 Bendungan 80,989,5303 Intake 2,120,6784 Bak Penenang 27,005,1235 Saluran hantar 96,451,1776 Pipa Pesat 97,663,2507 Gedung Sentral 50,000,000

Total 400,979,758