  • 7/24/2019 Perencanaan Building Control

    1/5

    14/12/2015

    PERENCANAAN BUILDING CONTROL

    Job Information

    Engineer Checked Approved

    Name: Abduh

    Date: 13-Dec-15

    Structure Type SPACE FRAME

    Number of Nodes 88 Highest Node 88

    Number of Elements 145 Highest Beam 146

    Number of Basic Load Cases 5

    Number of Combination Load Cases 5

    Included in this printout are data for:All The Whole Structure

    Included in this printout are results for load cases:

    Type L/C Name

    Primary 1 DL SW

    Primary 2 DL TRAFO

    Primary 3 LLR

    Primary 4 WL 1

    Primary 5 LL

    Combination 6 DL

    Combination 7 (1.4) X DL

    Combination 8 (1.2) X DL + (1.6) X LL + (0.5) X LLR

    Combination 9 (1.2) X DL + (1) X LL + (1.6) X LLR

    Combination 10 (1.2) X DL + (1) X LL + (0.5) X LLR + (1) X WL1

    Section Properties

    Prop Section Area

    (cm2)Iyy

    (cm4)Izz

    (cm4)J

    (cm4) Material

    1 Rect 0.40x0.40 1.6E 3 213E 3 213E 3 360E 3 CONCRETE

    2 Rect 0.30x0.30 900.000 67.5E 3 67.5E 3 114E 3 CONCRETE

    3 Rect 0.50x0.30 1.5E 3 113E 3 313E 3 282E 3 CONCRETE

    4 Rect 0.40x0.30 1.2E 3 90E 3 160E 3 194E 3 CONCRETE

    5 H200X100X5.5 26.670 134.000 1.81E 3 4.478 STEEL

    6 H350X175X7 62.910 984.000 13.5E 3 19.404 STEEL

    Materials

    Mat Name E

    (kN/mm2)

    Density(kg/m3)

    (/C)

    3 STEEL 205.000 0.300 7.83E 3 12E -6

    4 STAINLESSSTEEL 197.930 0.300 7.83E 3 18E -6

    5 BETON 21.718 0.170 2.4E 3 10E -6

    6 ALUMINUM 68.948 0.330 2.71E 3 23E -6

    7 CONCRETE 21.718 0.170 2.4E 3 10E -6

  • 7/24/2019 Perencanaan Building Control

    2/5

    14/12/2015

    Primary Load Cases

    Number Name Type

    1 DL SW Dead

    2 DL TRAFO Dead

    3 LLR Live

    4 WL 1 Wind5 LL Live

    Combination Load Cases

    Comb. Combination L/C Name Primary Primary L/C Name

    6 DL 1 DL SW

    2 DL TRAFO

    7 (1.4) X DL 6 DL

    8 (1.2) X DL + (1.6) X LL + (0.5) X LLR 5 LL

    3 LLR

    6 DL

    9 (1.2) X DL + (1) X LL + (1.6) X LLR 5 LL3 LLR

    6 DL

    10 (1.2) X DL + (1) X LL + (0.5) X LLR + (1) X WL1 5 LL

    3 LLR

    4 WL 1

    6 DL

    Bending ZLoad 10 :

    X

    Y

    Z

    Whole Structure Mz 100kNm:1m 10 (1.2) X DL + (1) X LL + (0.5) X LLR + (1) X WL1 (Input data was modified after picture taken)

  • 7/24/2019 Perencanaan Building Control

    3/5

    14/12/2015

    Load 10

    X

    Y

    Z

    Whole Structure Loads 10.1972kg:1m 10 (1.2) X DL + (1) X LL + (0.5) X LLR + (1) X WL1 (Input data was modified after picturetaken)

    0.0372

    0.0576

    0.0617

    0.0218

    0.03390.0617

    0.0218

    0.04680.0576

    0.0218

    0.04590.0372

    0.0218

    0.0459

    0.0218

    0.0468

    0.0339

    Load 10

    X

    Y

    Z

    Whole Structure (Input data was modified after picture taken)

  • 7/24/2019 Perencanaan Building Control

    4/5

    14/12/2015

    Load 10

    X

    Y

    Z

    Whole Structure (Input data was modified after picture taken)

    Reaction Summary

    Horizontal Vertical Horizontal Moment

    Node L/C FX

    (kN)FY

    (kN)FZ

    (kN)MX

    (kNm)MY

    (kNm)MZ

    (kNm)

    Max FX 9 8:(1.2) X DL + (1.6)

    7.880 201.254 4.520 6.323 0.058 -9.808

    Min FX 18 8:(1.2) X DL + (1.6)

    -7.880 201.254 4.520 6.323 -0.058 9.808

    Max FY 22 8:(1.2) X DL + (1.6)

    0.954 352.208 7.360 9.989 0.034 -1.201

    Min FY 3 4:WL 1 -0.001 -8.896 -4.575 -7.963 0.003 0.002

    Max FZ 20 8:(1.2) X DL + (1.6)

    0.176 344.974 7.658 10.450 -0.004 -0.216

    Min FZ 12 10:(1.2) X DL + (1)

    0.061 200.190 -17.169 -21.783 -0.011 -0.076

    Max MX 20 8:(1.2) X DL + (1.6)

    0.176 344.974 7.658 10.450 -0.004 -0.216

    Min MX 12 10:(1.2) X DL + (1)

    0.061 200.190 -17.169 -21.783 -0.011 -0.076

    Max MY 6 9:(1.2) X DL + (1) X

    -5.078 113.730 2.000 3.105 0.173 6.331

    Min MY 1 9:(1.2) X DL + (1) X

    5.078 113.730 2.000 3.105 -0.173 -6.331

    Max MZ 18 8:(1.2) X DL + (1.6)

    -7.880 201.254 4.520 6.323 -0.058 9.808Min MZ 9 8:(1.2) X DL + (1.6)

    7.880 201.254 4.520 6.323 0.058 -9.808