menghitung rab

of 113 /113
DAFTAR HARGA MATERIAL DAN UPAH PADA AKHIR 2008 NO. URAIAN BAHAN SATUAN HARGA SATUAN (Rp) Bodetabek Yogyakarta Surabaya Medan A. DAFTAR HARGA MATERIAL 1 Ampelas ( kertas pasir ) Lbr 3,500.00 3,600.00 3,550.00 2,500.00 2 Akustik 600 x 1200 x 15 mm setara Amstrong Lbr 72,000.00 78,000.00 74,000.00 70,000.00 3 Aluminium color untuk kusen pintu dan jendela 4 M1 82,000.00 88,000.00 85,000.00 78,000.00 4 Aluminium color untuk daun pintu & jendela M1 79,000.00 83,000.00 82,000.00 75,600.00 5 Asbes plat 1 x 1 m tb. 3 mm Lbr 14,000.00 14,000.00 12,500.00 13,500.00 6 Asbes Gelombang 270CM X 105 CM tebal 4 mm Lbr 68,500.00 67,000.00 66,000.00 70,000.00 7 Asbes Gelombang 240CM X 105 CM tebal 4 mm Lbr 60,000.00 60,000.00 58,000.00 62,000.00 8 Asbes Gelombang 150CM X 102 CM tebal 5 mm Lbr 46,000.00 46,000.00 45,000.00 48,000.00 9 Asbes Gelombang 270CM X 102 CM tebal 5 mm Lbr 87,500.00 87,000.00 85,000.00 92,000.00 10 Asbes Gelombang 240CM X 102 CM tebal 5 mm Lbr 78,200.00 78,500.00 77,000.00 84,000.00 11 Bata Merah Bh 550.00 300.00 350.00 520.00 12 Batu tempel hitam M2 72,500.00 64,100.00 65,000.00 82,000.00 10 Bataco putih ( trass ) Bh 2,000.00 2,200.00 2,250.00 4,000.00 11 Bataco semen Bh 2,250.00 2,100.00 2,150.00 4,200.00 12 Bata ringan ( hebel/celcon ) Bh 2,500.00 2,550.00 2,550.00 3,500.00 13 Batu Belah M3 145,000.00 128,200.00 128,200.00 128,200.00 14 Batu alam / tempel M2 65,000.00 157,900.00 157,900.00 157,900.00 15 Batu Koral M3 165,000.00 164,800.00 164,800.00 164,800.00 16 Bendrat / Kawat Beton Kg 11,200.00 11,500.00 11,500.00 13,400.00 17 Besi Profil kg 9,800.00 10,000.00 10,000.00 12,000.00 18 Besi beton / Ulir Kg 8,900.00 9,400.00 9,300.00 11,000.00 19 Besi Beton U-24 Kg 8,500.00 8,500.00 8,600.00 8,900.00 20 Besi Beton U-39 Kg 8,700.00 8,800.00 8,800.00 9,000.00 21 Besi C ( lip channel ) / besi strip Kg 9,500.00 10,000.00 10,000.00 11,000.00 22 Besi Siku ( L ) Kg 9,400.00 9,500.00 9,600.00 11,000.00 23 Cat meni kualitas bagus Kg 16,000.00 16,500.00 16,500.00 19,000.00 24 Cat dasar ( material primer, zinc cromat, dll) Kg 39,000.00 38,500.00 38,500.00 41,000.00 25 Cat Besi kg 35,000.00 35,500.00 36,000.00 38,500.00 26 Cat tembok untuk interior kualitas baik Kg 44,000.00 45,000.00 45,000.00 46,000.00 27 Cat tembok Weathersield/exterior kualitas baik Kg 71,000.00 72,000.00 72,000.00 75,000.00 28 Cat tembok kualitas sedang Kg 15,000.00 16,000.00 16,000.00 17,000.00 29 Cat Kayu kualitas sedang Kg 27,500.00 27,000.00 27,500.00 28,000.00 30 Cat Kayu kualitas baik Kg 36,000.00 37,000.00 37,000.00 39,000.00 31 Compoun Kg 28,000.00 28,500.00 28,500.00 30,000.00 32 Conblock 8 x 20 x 40 Bh 3,800.00 2,200.00 2,500.00 3,200.00 33 Dempul besi Kg 24,000.00 23,000.00 22,500.00 25,000.00 34 Dempul halus Kg 23,100.00 22,000.00 20,000.00 24,000.00 35 Door closer Bh 348,000.00 350,000.00 325,000.00 380,000.00 36 Door stopper kualitas baik Bh 55,000.00 60,000.00 60,000.00 66,000.00 37 Door Holder Bh 45,000.00 50,000.00 45,000.00 50,000.00 38 Engsel pintu Bh 22,500.00 22,000.00 22,000.00 25,000.00 39 Engsel jendela Bh 21,000.00 20,000.00 20,000.00 22,000.00 40 Formika 120 x 240 t. 1.5 mm lbr 125,000.00 135,000.00 130,000.00 166,700.00 41 Genteng Sirap ( 80 bh/m2 ) Bh 900.00 1,000.00 1,000.00 1,100.00 42 Genteng Palentong ( 25 bh ) Bh 1,100.00 800.00 800.00 800.00 43 Genteng Keramik Glazur ( 14,5/m2 ) M2 72,000.00 70,000.00 60,000.00 80,000.00 44 Genteng keramik Natural ( 14,5/m2 ) M2 67,000.00 65,000.00 62,500.00 75,000.00 45 Genteng beton Warna M2 72,000.00 62,500.00 62,500.00 70,000.00 46 Genteng metal lapis M2 132,000.00 130,000.00 125,000.00 134,000.00 47 Gypsum board 120 x 240 tebal 9 mm Lbr 57,100.00 55,000.00 56,000.00 86,000.00 48 GRC tebal 5 mm Lbr 45,600.00 45,600.00 45,600.00 47,500.00 49 Glass Block Bh 17,500.00 18,000.00 17,000.00 21,500.00 49 Granit jenis dan warna standart M2 600,000.00 650,000.00 600,000.00 750,000.00 50 Hollow 4/4 Zincromate Btg 45,000.00 45,000.00 45,000.00 48,000.00 51 Hollow 2/4 Zincromate Btg 32,000.00 32,000.00 32,000.00 35,000.00 52 Injuk ikat 15,000.00 8,000.00 10,000.00 7,500.00 53 Kaca bening (polos) tebal 3 mm M2 48,000.00 48,000.00 45,000.00 61,000.00 54 Kaca bening (polos) tebal 5 mm M2 66,000.00 71,500.00 55,000.00 120,600.00 55 Kait angin untuk daun jendela Bh 10,900.00 11,000.00 10,000.00 12,000.00 56 Kawat Duri Rol 145,000.00 145,500.00 148,000.00 155,000.00 57 Kawat las M1 11,000.00 12,000.00 12,500.00 18,000.00 58 Kaca rayband tebal 5 mm M2 125,000.00 125,000.00 130,000.00 159,000.00 59 Balok dolken / Stoot dia 8 s/d 10 cm Btg 18,600.00 17,500.00 15,000.00 8,000.00 60 Balok kayu Borneo Super / Meranti M3 3,200,000.00 3,000,000.00 2,819,300.00 1,450,000.00 61 Papan kayu Borneo Super / Meranti M3 3,300,000.00 3,525,000.00 3,450,000.00 2,859,000.00 62 Balok kayu Kamper Samarinda/Damar M3 5,200,000.00 5,000,000.00 4,800,000.00 4,650,000.00 63 Papan kayu Kamper Samarinda/Damar M3 5,350,000.00 5,350,000.00 5,100,000.00 4,900,000.00 64 Balok kayu Kamper Medan M3 4,100,000.00 4,100,000.00 4,000,000.00 3,850,000.00 65 Papan kayu Kamper Medan M3 4,300,000.00 4,275,000.00 4,100,000.00 3,990,000.00 66 Pagar BRC lengkap tiang M2 130,000.00 135,000.00 130,000.00 152,000.00 67 Pegangan tangga profil kamper M1 73,000.00 72,000.00 71,000.00 62,000.00 68 Papan kayu terentang M3 2,300,000.00 1,750,000.00 1,700,000.00 1,448,200.00

Author: dhajalkhurap

Post on 26-Jun-2015

1.244 views

Category:

Documents


62 download

Embed Size (px)

TRANSCRIPT

DAFTAR HARGA MATERIAL DAN UPAH PADA AKHIR 2008HARGA SATUAN (Rp) Surabaya 3,550.00 74,000.00 85,000.00 82,000.00 12,500.00 66,000.00 58,000.00 45,000.00 85,000.00 77,000.00 350.00 65,000.00 2,250.00 2,150.00 2,550.00 128,200.00 157,900.00 164,800.00 11,500.00 10,000.00 9,300.00 8,600.00 8,800.00 10,000.00 9,600.00 16,500.00 38,500.00 36,000.00 45,000.00 72,000.00 16,000.00 27,500.00 37,000.00 28,500.00 2,500.00 22,500.00 20,000.00 325,000.00 60,000.00 45,000.00 22,000.00 20,000.00 130,000.00 1,000.00 800.00 60,000.00 62,500.00 62,500.00 125,000.00 56,000.00 45,600.00 17,000.00 600,000.00 45,000.00 32,000.00 10,000.00 45,000.00 55,000.00 10,000.00 148,000.00 12,500.00 130,000.00 15,000.00 2,819,300.00 3,450,000.00 4,800,000.00 5,100,000.00 4,000,000.00 4,100,000.00 130,000.00 71,000.00 1,700,000.00

NO. A. 1 2 3 4 5 6 7 8 9 10 11 12 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68

URAIAN BAHAN DAFTAR HARGA MATERIAL Ampelas ( kertas pasir ) Akustik 600 x 1200 x 15 mm setara Amstrong Aluminium color untuk kusen pintu dan jendela 4" Aluminium color untuk daun pintu & jendela Asbes plat 1 x 1 m tb. 3 mm Asbes Gelombang 270CM X 105 CM tebal 4 mm Asbes Gelombang 240CM X 105 CM tebal 4 mm Asbes Gelombang 150CM X 102 CM tebal 5 mm Asbes Gelombang 270CM X 102 CM tebal 5 mm Asbes Gelombang 240CM X 102 CM tebal 5 mm Bata Merah Batu tempel hitam Bataco putih ( trass ) Bataco semen Bata ringan ( hebel/celcon ) Batu Belah Batu alam / tempel Batu Koral Bendrat / Kawat Beton Besi Profil Besi beton / Ulir Besi Beton U-24 Besi Beton U-39 Besi C ( lip channel ) / besi strip Besi Siku ( L ) Cat meni kualitas bagus Cat dasar ( material primer, zinc cromat, dll) Cat Besi Cat tembok untuk interior kualitas baik Cat tembok Weathersield/exterior kualitas baik Cat tembok kualitas sedang Cat Kayu kualitas sedang Cat Kayu kualitas baik Compoun Conblock 8 x 20 x 40 Dempul besi Dempul halus Door closer Door stopper kualitas baik Door Holder Engsel pintu Engsel jendela Formika 120 x 240 t. 1.5 mm Genteng Sirap ( 80 bh/m2 ) Genteng Palentong ( 25 bh ) Genteng Keramik Glazur ( 14,5/m2 ) Genteng keramik Natural ( 14,5/m2 ) Genteng beton Warna Genteng metal lapis Gypsum board 120 x 240 tebal 9 mm GRC tebal 5 mm Glass Block Granit jenis dan warna standart Hollow 4/4 Zincromate Hollow 2/4 Zincromate Injuk Kaca bening (polos) tebal 3 mm Kaca bening (polos) tebal 5 mm Kait angin untuk daun jendela Kawat Duri Kawat las Kaca rayband tebal 5 mm Balok dolken / Stoot dia 8 s/d 10 cm Balok kayu Borneo Super / Meranti Papan kayu Borneo Super / Meranti Balok kayu Kamper Samarinda/Damar Papan kayu Kamper Samarinda/Damar Balok kayu Kamper Medan Papan kayu Kamper Medan Pagar BRC lengkap tiang Pegangan tangga profil kamper Papan kayu terentang

SATUAN Lbr Lbr M1 M1 Lbr Lbr Lbr Lbr Lbr Lbr Bh M2 Bh Bh Bh M3 M2 M3 Kg kg Kg Kg Kg Kg Kg Kg Kg kg Kg Kg Kg Kg Kg Kg Bh Kg Kg Bh Bh Bh Bh Bh lbr Bh Bh M2 M2 M2 M2 Lbr Lbr Bh M2 Btg Btg ikat M2 M2 Bh Rol M1 M2 Btg M3 M3 M3 M3 M3 M3 M2 M1 M3

Bodetabek 3,500.00 72,000.00 82,000.00 79,000.00 14,000.00 68,500.00 60,000.00 46,000.00 87,500.00 78,200.00 550.00 72,500.00 2,000.00 2,250.00 2,500.00 145,000.00 65,000.00 165,000.00 11,200.00 9,800.00 8,900.00 8,500.00 8,700.00 9,500.00 9,400.00 16,000.00 39,000.00 35,000.00 44,000.00 71,000.00 15,000.00 27,500.00 36,000.00 28,000.00 3,800.00 24,000.00 23,100.00 348,000.00 55,000.00 45,000.00 22,500.00 21,000.00 125,000.00 900.00 1,100.00 72,000.00 67,000.00 72,000.00 132,000.00 57,100.00 45,600.00 17,500.00 600,000.00 45,000.00 32,000.00 15,000.00 48,000.00 66,000.00 10,900.00 145,000.00 11,000.00 125,000.00 18,600.00 3,200,000.00 3,300,000.00 5,200,000.00 5,350,000.00 4,100,000.00 4,300,000.00 130,000.00 73,000.00 2,300,000.00

Yogyakarta 3,600.00 78,000.00 88,000.00 83,000.00 14,000.00 67,000.00 60,000.00 46,000.00 87,000.00 78,500.00 300.00 64,100.00 2,200.00 2,100.00 2,550.00 128,200.00 157,900.00 164,800.00 11,500.00 10,000.00 9,400.00 8,500.00 8,800.00 10,000.00 9,500.00 16,500.00 38,500.00 35,500.00 45,000.00 72,000.00 16,000.00 27,000.00 37,000.00 28,500.00 2,200.00 23,000.00 22,000.00 350,000.00 60,000.00 50,000.00 22,000.00 20,000.00 135,000.00 1,000.00 800.00 70,000.00 65,000.00 62,500.00 130,000.00 55,000.00 45,600.00 18,000.00 650,000.00 45,000.00 32,000.00 8,000.00 48,000.00 71,500.00 11,000.00 145,500.00 12,000.00 125,000.00 17,500.00 3,000,000.00 3,525,000.00 5,000,000.00 5,350,000.00 4,100,000.00 4,275,000.00 135,000.00 72,000.00 1,750,000.00

Medan 2,500.00 70,000.00 78,000.00 75,600.00 13,500.00 70,000.00 62,000.00 48,000.00 92,000.00 84,000.00 520.00 82,000.00 4,000.00 4,200.00 3,500.00 128,200.00 157,900.00 164,800.00 13,400.00 12,000.00 11,000.00 8,900.00 9,000.00 11,000.00 11,000.00 19,000.00 41,000.00 38,500.00 46,000.00 75,000.00 17,000.00 28,000.00 39,000.00 30,000.00 3,200.00 25,000.00 24,000.00 380,000.00 66,000.00 50,000.00 25,000.00 22,000.00 166,700.00 1,100.00 800.00 80,000.00 75,000.00 70,000.00 134,000.00 86,000.00 47,500.00 21,500.00 750,000.00 48,000.00 35,000.00 7,500.00 61,000.00 120,600.00 12,000.00 155,000.00 18,000.00 159,000.00 8,000.00 1,450,000.00 2,859,000.00 4,650,000.00 4,900,000.00 3,850,000.00 3,990,000.00 152,000.00 62,000.00 1,448,200.00

Makassar 2,500.00 78,000.00 86,000.00 80,000.00 13,500.00 72,000.00 65,000.00 48,000.00 90,000.00 81,000.00 400.00 86,000.00 4,200.00 4,300.00 3,800.00 72,000.00 78,000.00 99,500.00 13,000.00 12,000.00 11,500.00 8,800.00 9,000.00 11,000.00 10,500.00 19,000.00 40,000.00 38,500.00 47,000.00 78,000.00 17,500.00 28,250.00 40,000.00 32,000.00 3,000.00 25,000.00 24,500.00 412,000.00 65,000.00 50,000.00 25,000.00 22,000.00 150,000.00 600.00 800.00 72,500.00 70,000.00 65,000.00 129,800.00 78,000.00 47,500.00 20,000.00 750,000.00 48,000.00 35,000.00 6,000.00 60,600.00 75,000.00 12,000.00 166,000.00 18,000.00 155,000.00 8,500.00 1,378,000.00 1,660,000.00 5,766,800.00 5,000,000.00 3,950,000.00 3,800,000.00 148,000.00 65,000.00 1,220,000.00

NO. 69 70 71 72 73 74 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139

URAIAN BAHAN Keramik lantai 20 x 25 cm Keramik lantai 10 x 20 cm Keramik lantai 20 x 20 cm Keramik lantai polos 30 x 30 cm Keramik ukuran 40 x 40 cm granito polished Keramik ukuran 40 x 40 cm granito unpolished Keramik lantai 60x90 cm Standart Keramik lantai 60x60 cm Standart Keramik dinding polos 10 x 20 cm Keramik dinding motif 10 x 20 cm Keramik dinding motif 20 x 20 cm Keramik dinding polos 20 x 20 cm Keramik dinding motif 20 x 25 cm Keramik dinding polos 20 x 25 cm Keramik Essenza ukuran 60 x 60 cm polish Keramik Essenza ukuran 60 x 60 cm unpolih Keramik dinding polos 30 x 30 cm Keramik dinding motif 30 x 30 cm Kawat duri untuk pagar Kuas 2 " cat Kuas 3 " cat Kunci Pintu 2 slaag besar kualitas baik Kunci Pintu 2 slaag kualitas standar Kunci Pintu KM/WC putar bulat ( Alpha ) Kawat kasa 1 x 1 cm Kawat Harmonika 4 Lem Vinyl Lem Kayu List Kayu 1/4 List profil Gypsum List Profil kayu 5 x 5 cm Marmer setara Citatah / padalarang 60 x 60 Meni besi Meni kayu Minyak cat ( Tinner ) Minyak Pelumas begisting (oli/minyak bekas) Multiplex 9 mm 120 X 240 Multiplex 12 mm 120 X 240 Multiplex 16 mm 120 X 240 Nok genteng Keramik Glazur Nok genteng beton warna Nok genteng Metal Paku Paku sekrup 3,5" Parquet jati Pasir Pasang Pasir Beton Pasir Urug Panel Listrik standar untuk rumah Perancah kayu Pintu alluminium / pintu PVC Pipa Galvanis 1/2" klas medium Pipa Galvanis 3/4" klas medium Pipa Galvanis 1" klas medium Pipa Galvanis 1 1/2" klas medium Pipa PVC AW 1/2' setara Maspion Pipa PVC AW 3/4' Pipa PVC AW 1" Pipa PVC AW 2" Pipa PVC AW 4" Penyambung Pipa PVC (macam2) ukuran 1/2 " Penyambung Pipa PVC (macam2) ukuran 3/4 " Penyambung Pipa PVC (macam2) ukuran 2 " Penyambung Pipa PVC (macam2) ukuran 4 " Plamir tembok Plamir/dempul plitur (impra) Plamir kayu Triplek Tebal 3 mm ukr 120 x 240 cm Triplek Tebal 4 mm ukr 120 x 240 cm Plint Keramik ukuran 10 x 40 cm Plat Almunium 0,2 mm Politur jadi Polycarbonate

SATUAN M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 Kg Bh Bh Bh Bh Bh M2 M2 kg Ltr M1 M1 M M2 Kg Kg Ltr Ltr Lbr Lbr Lbr Bh Bh M1 Kg bh M2 M3 M3 M3 unit M3 bh M1 M1 M1 M1 M1 M1 M1 M1 M1 Bh Bh Bh Bh Kg Kg Kg Lbr Lbr Bh M1 Kg M2

Bodetabek 38,000.00 35,000.00 37,500.00 39,000.00 205,000.00 195,000.00 292,000.00 265,000.00 36,000.00 36,500.00 38,500.00 38,000.00 38,500.00 38,000.00 248,000.00 224,000.00 40,000.00 41,000.00 30,000.00 9,000.00 13,550.00 210,000.00 45,000.00 49,000.00 15,000.00 16,000.00 30,800.00 25,600.00 4,300.00 7,000.00 13,500.00 133,000.00 14,500.00 15,000.00 16,500.00 12,000.00 105,000.00 135,000.00 172,000.00 16,500.00 15,500.00 53,000.00 11,000.00 560.00 250,000.00 165,000.00 180,000.00 145,000.00 250,000.00 3,200,000.00 375,000.00 10,500.00 17,500.00 25,000.00 30,000.00 4,200.00 5,000.00 6,500.00 8,500.00 17,000.00 2,000.00 2,750.00 5,200.00 12,000.00 19,000.00 22,000.00 17,000.00 38,500.00 50,000.00 7,500.00 16,000.00 33,000.00 198,000.00

Yogyakarta 34,000.00 32,000.00 33,000.00 37,500.00 210,000.00 195,800.00 300,000.00 276,000.00 36,000.00 37,000.00 37,000.00 38,000.00 38,500.00 38,500.00 250,000.00 230,000.00 40,000.00 40,000.00 32,000.00 9,000.00 13,500.00 175,000.00 45,000.00 50,000.00 16,000.00 18,000.00 30,800.00 25,600.00 3,700.00 7,000.00 12,500.00 135,000.00 15,000.00 15,000.00 17,000.00 10,000.00 107,000.00 135,000.00 172,000.00 16,500.00 15,000.00 54,000.00 11,000.00 500.00 260,000.00 66,000.00 72,000.00 45,000.00 250,000.00 2,900,000.00 375,000.00 11,000.00 17,500.00 26,000.00 32,000.00 3,400.00 4,500.00 6,400.00 8,500.00 18,500.00 2,000.00 2,500.00 5,500.00 12,500.00 20,000.00 23,100.00 17,500.00 37,000.00 50,000.00 7,500.00 17,000.00 33,000.00 200,000.00

HARGA SATUAN (Rp) Surabaya 32,000.00 31,000.00 32,000.00 34,000.00 210,000.00 196,000.00 300,000.00 267,000.00 36,000.00 38,000.00 38,000.00 38,000.00 38,500.00 37,500.00 252,000.00 230,000.00 40,000.00 40,000.00 30,000.00 9,000.00 13,500.00 160,000.00 45,000.00 50,000.00 16,000.00 17,500.00 30,800.00 25,600.00 3,500.00 7,000.00 12,000.00 130,000.00 15,000.00 15,000.00 16,500.00 10,000.00 102,000.00 132,000.00 170,000.00 16,000.00 14,500.00 54,000.00 11,500.00 500.00 274,000.00 95,000.00 105,000.00 92,000.00 250,000.00 2,800,000.00 360,000.00 10,000.00 17,000.00 26,000.00 30,000.00 3,300.00 4,500.00 6,400.00 8,500.00 19,000.00 2,200.00 2,500.00 5,500.00 12,500.00 20,000.00 23,000.00 18,000.00 36,000.00 47,500.00 7,200.00 17,000.00 33,000.00 198,500.00

Medan 36,000.00 34,000.00 34,000.00 39,000.00 225,000.00 202,000.00 340,000.00 298,000.00 36,000.00 38,000.00 39,000.00 37,000.00 39,000.00 38,000.00 260,000.00 245,000.00 41,000.00 43,000.00 38,000.00 9,000.00 14,000.00 189,000.00 55,000.00 55,000.00 22,000.00 23,000.00 32,000.00 27,000.00 1,900.00 8,000.00 6,800.00 212,000.00 22,000.00 17,000.00 19,300.00 12,500.00 112,000.00 140,000.00 182,000.00 24,000.00 15,000.00 60,000.00 14,000.00 600.00 276,000.00 84,000.00 92,000.00 62,000.00 300,000.00 2,200,000.00 400,000.00 12,000.00 18,000.00 30,000.00 32,000.00 3,300.00 4,600.00 6,750.00 9,000.00 20,000.00 2,250.00 3,000.00 6,000.00 14,000.00 25,000.00 25,000.00 23,100.00 40,000.00 52,000.00 10,000.00 20,000.00 35,000.00 215,000.00

Makassar 36,000.00 32,000.00 33,000.00 38,500.00 246,000.00 205,000.00 336,000.00 290,000.00 34,000.00 38,000.00 38,000.00 38,000.00 39,000.00 38,000.00 255,000.00 238,000.00 40,000.00 41,000.00 41,000.00 9,200.00 14,000.00 175,000.00 55,000.00 55,000.00 20,000.00 22,000.00 35,000.00 28,000.00 1,925.00 8,200.00 7,700.00 200,000.00 20,000.00 16,000.00 20,000.00 10,000.00 105,000.00 135,000.00 172,000.00 26,500.00 16,000.00 58,000.00 14,700.00 750.00 278,000.00 68,000.00 72,000.00 66,000.00 300,000.00 2,000,000.00 400,000.00 11,000.00 18,500.00 30,250.00 33,000.00 3,400.00 4,675.00 6,700.00 9,000.00 19,500.00 2,250.00 3,000.00 6,000.00 14,000.00 27,000.00 26,000.00 22,500.00 35,000.00 51,000.00 9,000.00 18,000.00 35,000.00 222,000.00

NO. 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 B. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

URAIAN BAHAN Ramset / dina bolt / piser Ramin ( papan kayu ramin ) Residu atau ter Rooster bata merah 12 x 11,5 x 24 Roof light ( Fibreglass ) tebal 1 mm, lbr 1 m Rol cat Rolling door Semen PC (abu-abu) 50 kg Semen instant Semen warna/putih Seng plat 0,0400 x 0,9 m Seng Gelombang 180 x 90 x 0,03 Seng Gelombang 180 x 90 x 0,05 Sirtu ( pasir koral ) Sisalation / alluminium foil Slot / Grendel pintu 4 " Slot / Grendel jendela 3 " Saklar / Stop Kontak listrik standart Split 2/3 cm (batu pecah) Split 1/2 cm (batu pecah) Water Proofing membran Water Proofing Emulsion / coating / Floor Harderner Tangki Air Fiber Glass 1 m3 Teakwood 4 mm ukr 120 x 240 Teak oil Triplek tebal 4 mm Ukuran Pintu Ubin abu-abu 30 x 30 cm tebal 3 cm Ubin abu-abu 20 x 20 cm tebal 2 cm Melamik Impra Wallpaper Roof drain besi 3 " Bak mandi fibreglass 60 x 60 cm Bak cuci stainless steel Floor drain stailes steel Kitchen Zink stailessteel standar 1 lubang Kloset duduk warna standart setara TOTO Kloset jongkok porselen warna standart Kran Air 1/2" kualitas sedang Kran Air angsa 1/2" kualitas sedang Soap Holder ( Tempat Sabun) Shower lengkap dgn slang plastik Shower Set dinding Urinoir warna standart Wastafel Dinding / Gantung Wastafel Pedestal / kaki Water Pump ( Pompa Air 100 Watt ) Kabel NYA 1 x 1,5 mm ( 50 m ) Kabel NYM 2 x 1,5 mm ( 50 m ) Kabel NYA 2 x 2,5 mm ( 50 m ) Kabel NYM 3 x 2,5 mm ( 50 m ) Lampu SL / TL 36 watt Lampu Baret 30 cm + lampu 18 watt Lampu taman lengkap tiang ( standart ) Lampu Pijar 40 watt Cotton plaster Profil Alluminium "T" Pipa PVC type D 3 " Pipa PVC type D 4 " Soda api Tanah Urug Plint Keramik ukuran 10 x 30 cm Tarikan Jendela Septictank Jadi 1,5 m3 ( fiber semen ) Baja ringan untuk rangka atap ( Pabrikan) DAFTAR HARGA UPAH TUKANG DAN PEKERJA Pembantu tukang setengah terampil Pembantu tukang Terampil Tukang Gali Tukang kayu setengah terampil Tukang kayu Terampil Tukang batu setengah terampil Tukang batu Terampil Tukang besi Beton setengah terampil Tukang besi Beton Terampil Tukang cat/Pelitur Setengah Terampil Tukang Cat/Pelitur Terampil Tukang Besi Profil Setengah Terampil Tukang Besi Profil Terampil Tukang Ledeng/Pipa Tukang Listrik

SATUAN Bh m3 Ltr Bh M1 Bh M2 zak kg kg M1 Lbr Lbr M3 M2 Bh Bh Bh M3 M3 M2 Kg Bh Lbr Ltr Lbr M2 M2 Ltr M2 bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Set Roll Roll Roll Roll Bh Bh Bh Bh Bh M1 M1 M1 kg M3 Bh Bh Bh M2

Bodetabek 2,500.00 6,700,000.00 3,100.00 3,500.00 62,000.00 26,500.00 165,000.00 48,000.00 6,500.00 4,200.00 31,000.00 43,000.00 57,600.00 165,000.00 4,200.00 29,000.00 19,000.00 20,000.00 178,000.00 178,000.00 55,000.00 41,000.00 875,000.00 94,000.00 39,000.00 36,000.00 25,600.00 23,500.00 29,500.00 15,600.00 69,500.00 150,000.00 173,000.00 59,000.00 188,000.00 2,265,000.00 146,000.00 54,900.00 155,000.00 30,000.00 125,000.00 229,000.00 377,000.00 202,000.00 245,000.00 750,000.00 105,000.00 225,000.00 350,000.00 400,000.00 55,000.00 85,000.00 140,000.00 5,000.00 55,000.00 30,000.00 6,500.00 8,500.00 41,000.00 112,000.00 6,500.00 15,600.00 1,500,000.00 160,000.00

Yogyakarta 2,400.00 6,600,000.00 3,000.00 3,000.00 62,000.00 26,500.00 160,000.00 46,000.00 2,450.00 12,700.00 32,000.00 53,800.00 58,000.00 88,000.00 4,300.00 31,000.00 19,100.00 20,000.00 140,000.00 141,000.00 60,000.00 42,000.00 850,000.00 85,000.00 38,800.00 36,000.00 27,500.00 24,000.00 300,000.00 15,700.00 71,000.00 150,000.00 173,000.00 59,500.00 190,000.00 2,280,000.00 145,000.00 55,000.00 155,000.00 26,000.00 130,000.00 232,000.00 375,000.00 206,000.00 248,000.00 775,000.00 105,000.00 225,000.00 375,000.00 410,000.00 56,000.00 87,000.00 152,500.00 5,000.00 56,000.00 26,000.00 6,400.00 8,500.00 42,000.00 75,000.00 6,500.00 15,700.00 1,500,000.00 165,000.00

HARGA SATUAN (Rp) Surabaya 2,100.00 6,500,000.00 3,000.00 3,200.00 60,000.00 26,500.00 161,000.00 44,000.00 2,450.00 12,700.00 32,000.00 53,800.00 56,500.00 105,000.00 4,250.00 30,000.00 19,000.00 21,000.00 157,000.00 172,000.00 60,000.00 42,500.00 825,000.00 79,000.00 38,500.00 35,000.00 26,800.00 24,500.00 29,800.00 15,400.00 68,500.00 150,000.00 170,000.00 60,000.00 179,400.00 2,275,000.00 142,000.00 54,500.00 156,000.00 24,400.00 130,000.00 233,000.00 360,000.00 208,500.00 250,000.00 740,000.00 110,000.00 225,000.00 372,500.00 415,000.00 54,000.00 88,000.00 155,000.00 5,000.00 54,000.00 24,400.00 6,400.00 8,500.00 42,500.00 82,000.00 6,200.00 15,400.00 1,400,000.00 165,000.00

Medan 2,800.00 6,800,000.00 3,600.00 4,200.00 66,000.00 27,000.00 175,000.00 49,000.00 2,450.00 12,700.00 33,300.00 51,000.00 61,000.00 82,000.00 5,500.00 33,000.00 19,500.00 21,500.00 161,700.00 162,000.00 75,000.00 44,000.00 912,000.00 82,000.00 39,600.00 42,000.00 43,000.00 40,000.00 32,000.00 18,000.00 88,000.00 178,000.00 191,500.00 62,000.00 194,000.00 2,300,000.00 170,000.00 56,000.00 157,500.00 32,000.00 132,000.00 250,000.00 380,000.00 220,000.00 255,000.00 800,000.00 160,000.00 260,000.00 415,000.00 450,000.00 55,500.00 92,000.00 175,000.00 6,000.00 55,500.00 32,000.00 6,750.00 9,000.00 44,000.00 78,000.00 8,000.00 18,000.00 1,600,000.00 170,000.00

Makassar 2,200.00 5,500,000.00 3,400.00 4,100.00 68,000.00 27,400.00 180,000.00 42,000.00 2,450.00 12,700.00 33,000.00 53,800.00 60,600.00 102,000.00 5,600.00 32,500.00 19,500.00 21,200.00 132,000.00 133,000.00 70,000.00 45,000.00 905,000.00 76,000.00 40,000.00 33,000.00 41,000.00 38,000.00 32,200.00 17,600.00 85,000.00 182,000.00 192,000.00 63,000.00 198,000.00 2,350,000.00 173,000.00 56,000.00 155,500.00 33,000.00 145,000.00 245,000.00 400,000.00 215,000.00 260,000.00 925,000.00 165,000.00 278,000.00 425,000.00 445,000.00 58,000.00 90,000.00 186,000.00 6,000.00 58,000.00 33,000.00 6,700.00 9,000.00 45,000.00 70,000.00 7,500.00 17,600.00 1,550,000.00 170,000.00

hari hari hari hari hari hari hari hari hari hari hari hari hari hari hari

32,500.00 35,000.00 36,000.00 40,000.00 45,000.00 40,000.00 45,000.00 40,000.00 45,000.00 37,500.00 40,000.00 40,000.00 45,000.00 45,000.00 45,000.00

25,000.00 27,500.00 28,000.00 33,000.00 36,000.00 30,000.00 33,000.00 30,000.00 33,000.00 32,000.00 34,000.00 34,000.00 37,000.00 33,000.00 40,000.00

35,000.00 37,500.00 35,000.00 40,000.00 49,000.00 40,000.00 49,000.00 40,000.00 49,000.00 40,000.00 49,000.00 40,000.00 49,000.00 45,000.00 50,000.00

37,500.00 40,000.00 40,000.00 50,000.00 52,500.00 40,000.00 45,000.00 40,000.00 45,000.00 40,000.00 45,000.00 45,000.00 47,500.00 55,000.00 60,000.00

25,000.00 27,500.00 32,500.00 38,000.00 40,000.00 38,000.00 40,000.00 38,000.00 40,000.00 38,000.00 40,000.00 38,000.00 40,000.00 38,000.00 42,500.00

NO.

URAIAN BAHAN

SATUAN

Bodetabek

Yogyakarta

HARGA SATUAN (Rp) Surabaya

Medan

Makassar

ANALISA HARGA SATUAN PEKERJAAN Kota No. I 1 : Bodetabek URAIAN KOEFISIEN PEKERJAAN PERSIAPAN 1 M PAGAR SENG GELOMBANG TINGGI : 2 M a Tiang Kayu Borneo 4/6 0.05 b Semen PC (abu-abu) 0.05 c Seng Gelombang 1.20 d Pasir beton 0.01 e Splitz (batu pecah) 0.01 f Balok kayu borneo 4/6 0.05 g Paku 5 - 10 cm 0.06 h Meni Besi 0.45 i Tukang Kayu 0.20 j Pembantu Tukang 0.10 Jumlah Dibulatkan 1 M PAGAR KAWAT BERDURI TINGGI : 1,8 M a Tiang dari Kayu Borneo 4/6 0.05 b Semen PC (abu-abu) 0.04 c Kawat Duri 2.50 d Pasir beton 0.01 e Splitz (batu pecah) 0.01 f Paku 5 - 10 cm 0.06 g Tukang Kayu 0.20 h Pembantu Tukang 0.30 Jumlah Dibulatkan 1 M1 PENGUKURAN & PEMASANGAN BOWPLANK a Kayu kaso 5/7 borneo 0.02 b Paku 5 - 10 cm 0.02 c Papan Papan kayu terentang 2/20 0.00 d Tukang Kayu 0.10 e Pembantu Tukang 0.10 Jumlah Dibulatkan 1 m2 PEMBUATAN KANTOR DIREKSI a Kayu kaso 5/7 borneo 0.02 b Papan kayu terentang 0.18 c Paku semua ukuran 0.85 d Besi Strip 1.10 e Semen PC (abu-abu) 35.00 f Pasir Pasang 0.15 g Pasir beton 0.10 h Splitz (batu pecah) 0.15 i Bata Merah 30.00 j Seng Gelombang 180 x 90 x 0,05 cm 1.20 k Seng Plat BJLS 32 1.00 l Kawat harmonika 2.00 m Kaca Polos 3 mm 0.08 n Kunci Tanam standart 0.15 o Triplek 120 x 240 x 0,4 cm 0.06 p Tukang Kayu 2.00 q Tukang Batu 1.00 r Pembantu Tukang 2.00 Jumlah Dibulatkan SAT HARGA SATUAN

m3 sak lbr m3 m3 m3 kg kg org org

3,200,000.00 48,000.00 43,000.00 180,000.00 178,000.00 3,200,000.00 11,000.00 14,500.00 45,000.00 35,000.00

2

m3 sak kg m3 m3 kg org org

3,200,000.00 48,000.00 145,000.00 180,000.00 178,000.00 11,000.00 45,000.00 35,000.00

3

m3 kg m3 org org

3,200,000.00 11,000.00 2,300,000.00 45,000.00 35,000.00

4

m3 m3 kg kg kg m3 m3 m3 bh lbr m2 m2 m2 bh lbr org org org

3,200,000.00 2,300,000.00 11,000.00 9,500.00 48,000.00 165,000.00 180,000.00 178,000.00 550.00 57,600.00 31,000.00 16,000.00 48,000.00 45,000.00 50,000.00 45,000.00 45,000.00 35,000.00

No. 5

URAIAN KOEFISIEN 1 m2 PEMBUATAN GUDANG PROYEK a Kayu kaso 5/7 borneo 0.02 b Papan kayu terentang 0.10 c Paku 0.30 d Semen PC (abu-abu) 0.21 e Pasir Beton 0.03 f Splitz (batu pecah) 0.05 g Seng Gelombang 180 x 90 x 0,05 cm 1.20 h Tukang Kayu 1.00 i Pembantu Tukang 1.00 Jumlah Dibulatkan 6 1 m2 MEMBERSIHKAN LOKASI ROYEK a Pembantu Tukang 0.10 Jumlah Dibulatkan 7 1 m2 MEMBERSIHKAN PUING-PUING a Pembantu Tukang 0.20 Jumlah Dibulatkan 8 1 BH MEMBERSIHKAN TUNGGUL TANAMAN a Pembantu Tukang 2.00 Jumlah Dibulatkan 9 1m2 PEMBUATAN JALAN MASUK PROYEK a Batu Belah 15/20 0.10 b Koral 5/7 ( sirtu ) 0.05 c Pasir urug 0.01 d Pembantu Tukang 1.00 Jumlah Dibulatkan 10 1 m3 PEMBONGKARAN BETON a Pembantu Tukang 6.20 Jumlah Dibulatkan 11 1 m3 PEMBONGKARAN DINDING BATA a Pembantu Tukang 4.60 Jumlah Dibulatkan 12 1 M2 PEKERJAAN PAGAR PAPAN RANGKA BALOK a Papan kayu Borneo 0.02 b Balok kayu borneo 5/7 0.02 c Pasir Beton 0.08 d Splitz (batu pecah) 0.15 e Semen abu - abu 0.50 f Tukang Kayu 0.13 g Pembantu Tukang 0.38 Jumlah Dibulatkan

SAT m3 m3 kg sak m3 m3 lbr org org

HARGA SATUAN 3,200,000.00 2,300,000.00 11,000.00 48,000.00 180,000.00 178,000.00 57,600.00 45,000.00 35,000.00

org

35,000.00

org

35,000.00

org

35,000.00

m3 m3 m3 org

145,000.00 165,000.00 145,000.00 35,000.00

org

35,000.00

org

35,000.00

m3 m3 m3 m3 sak org org

3,300,000.00 3,200,000.00 180,000.00 178,000.00 48,000.00 45,000.00 35,000.00

No.

URAIAN

KOEFISIEN

SAT

HARGA SATUAN

II 1

2

3

4

5

6

7

8

9

PEKERJAAN TANAH 1 m3 GALIAN TANAH SEDALAM 1 M a Pembantu Tukang 0.40 b Tukang Gali 0.02 Jumlah Dibulatkan 1 m3 GALIAN TANAH SEDALAM 2 M a Pembantu Tukang 0.53 b Tukang Gali 0.02 Jumlah Dibulatkan 1 m3 GALIAN TANAH SEDALAM 3 M a Pembantu Tukang 0.74 b Tukang Gali 0.02 Jumlah Dibulatkan 1 m3 GALIAN TANAH KERAS SEDALAM 1 M a Pembantu Tukang 0.45 b Tukang Gali 0.02 Jumlah Dibulatkan 1 m2 PEKERJAAN PENGUPASAN TANAH SETEBAL 10 CM a Pembantu Tukang 0.05 b Tukang Gali 0.02 Jumlah Dibulatkan 1 m3 PEMBUANGAN TANAH SEJAUH 150 M a Pembantu Tukang 0.42 b Tukang Gali 0.02 Jumlah Dibulatkan 1 m3 URUGAN TANAH KEMBALI a Pembantu Tukang 0.19 b Tukang Gali 0.02 Jumlah Dibulatkan 1 m3 PEMADATAN TANAH a Pembantu Tukang 0.50 b Tukang Gali 0.02 Jumlah Dibulatkan 1 m3 URUGAN PASIR a Pasir Urug 1.20 b Pembantu Tukang 0.30

org org

35,000.00 36,000.00

org org

35,000.00 36,000.00

org org

35,000.00 36,000.00

org org

35,000.00 36,000.00

org org

35,000.00 36,000.00

org org

35,000.00 36,000.00

org org

35,000.00 36,000.00

org org

35,000.00 36,000.00

m3 org

145,000.00 35,000.00

No.

URAIAN c Tukang Gali Jumlah Dibulatkan 10 1 m3 URUGAN TANAH a Tanah Urug b Pembantu Tukang c Tukang Gali Jumlah Dibulatkan 11 1 m3 URUGAN SIRTU a Sirtu ( koral ) b Pembantu Tukang c Tukang Gali Jumlah Dibulatkan

KOEFISIEN 0.02

SAT org

HARGA SATUAN 36,000.00

1.20 0.30 0.02

m3 org org

112,000.00 35,000.00 36,000.00

1.20 0.25 0.02

m3 org org

165,000.00 35,000.00 36,000.00

III 1

2

3

4

5

PEKERJAAN PONDASI 1 m3 PASANG PONDASI BT KALI , 1 Pc : 3 Ps a Batu Belah 1.10 m3 b Semen PC (abu-abu) 4.04 sak c Pasir Pasang 0.49 m3 d Pembantu Tukang 1.50 org e Tukang Batu 0.60 org Jumlah Dibulatkan 1 m3 PASANG PONDASI BT KALI , 1 Pc : 4 Ps a Batu Belah 1.10 m3 b Semen PC (abu-abu) 3.26 sak c Pasir Pasang 0.52 m3 d Pembantu Tukang 1.50 org e Tukang Batu 0.60 org Jumlah Dibulatkan 1 m3 PASANG PONDASI BT KALI , 1 Pc : 5 Ps a Batu Belah 1.10 m3 b Semen PC (abu-abu) 2.72 sak c Pasir Pasang 0.54 m3 d Pembantu Tukang 1.50 org e Tukang Batu 0.60 org Jumlah Dibulatkan 1 m3 PASANG PONDASI BATU KOSONG ( AANSTAMPING ) a Batu Belah 1.20 m3 b Pasir Urug 0.30 m3 c Pembantu Tukang 0.78 org d Tukang Batu 0.39 org Jumlah Dibulatkan 1 m3 MEMBUAT BETON BERTULANG UNTUK PONDASI 1 Pc : 2 Ps : 3 Kr

145,000.00 48,000.00 165,000.00 35,000.00 45,000.00

145,000.00 48,000.00 165,000.00 35,000.00 45,000.00

145,000.00 48,000.00 165,000.00 35,000.00 45,000.00

145,000.00 145,000.00 35,000.00 45,000.00

No.

URAIAN KOEFISIEN SAT HARGA SATUAN Semen PC (abu-abu) 6.72 sak 48,000.00 Pasir Beton 0.54 m3 180,000.00 Splitz (batu pecah) 0.81 m3 178,000.00 Pembantu Tukang 2.00 org 35,000.00 Tukang Batu 0.35 org 45,000.00 Jumlah Dibulatkan 6 1 kg PENULANGAN BETON PONDASI a Besi Beton Polos 1.05 kg 8,500.00 b Kawat Beton 0.02 kg 11,200.00 c Pembantu Tukang 0.01 org 35,000.00 d Tukang Besi 0.01 org 45,000.00 Jumlah Dibulatkan 7 1 m2 PEKERJAAN BEKISTING UNTUK PONDASI a Papan kayu terentang 0.04 m3 2,300,000.00 b Paku 5 - 12 cm 0.30 kg 4,300.00 c Pelumas begisting (oli/minyak) 0.10 Ltr 12,000.00 d Pembantu Tukang 0.30 org 35,000.00 e Tukang Kayu 0.26 org 45,000.00 Jumlah Dibulatkan 8 1 m3 PASANG PONDASI CYCLOOP (60 %BETON : 40% BATU KALI) a Besi Beton Polos 50.00 kg 8,500.00 b Semen PC (abu-abu) 4.04 sak 48,000.00 c Pasir Beton 0.32 m3 180,000.00 d Splitz (batu pecah) 0.49 m3 178,000.00 e Kawat Beton 0.80 kg 11,200.00 f Batu Belah 0.40 m3 145,000.00 g Pembantu Tukang 2.00 org 35,000.00 h Tukang Batu 0.85 org 45,000.00 Jumlah Dibulatkan 9 1 m3 PASANG PONDASI SUMURAN DIAMETER 100 cm a Batu Belah 0.45 m3 145,000.00 b Semen PC (abu-abu) 5.60 sak 48,000.00 c Pasir Beton 0.45 m3 180,000.00 d Splitz (batu pecah) 0.67 m3 178,000.00 e Pembantu Tukang 2.38 org 35,000.00 f Tukang Batu 0.30 org 45,000.00 Jumlah Dibulatkan 10 1 M PEMBUATAN PONDASI TIANG BETON BERTULANG UKURAN 40 X 40 Cm a Pasir Beton 0.10 m3 180,000.00 b Splitz (batu pecah) 0.15 m3 178,000.00 c Semen PC (abu-abu) 1.21 sak 48,000.00 d Besi Beton Polos 45.00 kg 8,500.00 e Kawat Beton 0.90 kg 11,200.00 f Balok kayu borneo super 5/7 0.03 m3 3,200,000.00 g Papan kayu terentang 0.01 m3 3,300,000.00 h Paku 5 - 12 cm 0.12 kg 11,000.00 a b c d e

No.

URAIAN KOEFISIEN SAT HARGA SATUAN Pelumas begisting (oli/minyak) 0.09 Ltr 12,000.00 Plamir Tembok 0.24 kg 19,000.00 Pembantu Tukang 1.00 org 35,000.00 Tukang Batu 0.67 org 45,000.00 Jumlah Dibulatkan 11 1 M PEMBUATAN PONDASI TIANG BETON BERTULANG UKURAN 35 X 35 CM a Pasir Beton 0.08 m3 180,000.00 b Splitz (batu pecah) 0.13 m3 178,000.00 c Semen PC (abu-abu) 0.98 sak 48,000.00 d Besi Beton Polos 34.50 kg 8,500.00 e Kawat Beton 0.70 kg 11,200.00 f Balok kayu borneo super 5/7 0.03 m3 3,200,000.00 g Papan kayu terentang 0.01 m3 3,300,000.00 h Paku 5 - 12 cm 0.12 kg 11,000.00 i Pelumas begisting (oli/minyak) 0.09 Ltr 12,000.00 j Plamir Tembok 0.20 kg 19,000.00 k Pembantu Tukang 0.80 org 35,000.00 l Tukang Batu 0.50 org 45,000.00 Jumlah Dibulatkan 12 1 m3 MEMBUAT PONDASI TIANG PANCANG UKURAN 25 X 25 a Pasir Beton 0.06 m3 180,000.00 b Splitz (batu pecah) 0.11 m3 178,000.00 c Semen PC (abu-abu) 0.82 sak 48,000.00 d Besi Beton Polos 34.50 kg 8,500.00 e Kawat Beton 0.60 kg 11,200.00 f Balok kayu borneo super 5/7 0.03 m3 3,200,000.00 g Papan kayu terentang 0.01 m3 3,300,000.00 h Paku 5 - 12 cm 0.11 kg 11,000.00 i Pelumas begisting (oli/minyak) 0.08 Ltr 12,000.00 j Plamir Tembok 0.20 kg 19,000.00 k Pembantu Tukang 0.80 org 35,000.00 l Tukang Batu 0.50 org 45,000.00 Jumlah Dibulatkan 13 1 m3 MEMBUAT PONDASI PLAT BETON (PENULANGAN 125 kg + BEKISTING ) a Papan kayu terentang 0.20 m3 2,300,000.00 b Paku 5 - 12 cm 1.50 kg 11,000.00 c Pelumas begisting (oli/minyak) 0.40 Ltr 12,000.00 d Besi Beton Polos 125.00 kg 8,500.00 e Kawat Beton 2.25 kg 11,200.00 f Semen PC (abu-abu) 6.46 sak 48,000.00 g Pasir Beton 0.52 m3 180,000.00 h Splitz (batu pecah) 0.78 m3 178,000.00 i Pembantu Tukang 3.90 org 35,000.00 j Tukang Batu 0.35 org 45,000.00 k Tukang Kayu 1.04 org 45,000.00 l Tukang Besi 1.05 org 45,000.00 Jumlah Dibulatkan i j k l

No. URAIAN KOEFISIEN SAT HARGA SATUAN 14 1 m3 MEMBUAT PONDASI PLAT BETON (PENULANGAN 150 kg + BEKISTING ) a Papan kayu terentang 0.20 m3 2,300,000.00 b Paku 5 - 12 cm 1.50 kg 11,000.00 c Pelumas begisting (oli/minyak) 0.40 ltr 12,000.00 d Besi Beton Polos Polos 150.00 kg 8,500.00 e Kawat Beton 2.25 kg 11,200.00 f Semen PC (abu-abu) 6.46 sak 48,000.00 g Pasir Beton 0.52 m3 180,000.00 h Splitz (batu pecah) 0.78 m3 178,000.00 i Pembantu Tukang 4.00 org 35,000.00 j Tukang Batu 0.40 org 45,000.00 k Tukang Kayu 1.00 org 45,000.00 l Tukang Besi 1.00 org 45,000.00 Jumlah Dibulatkan 15 1 m3 MEMBUAT PONDASI BETON BOREPILE (PENULANGAN 125 kg + BEKISTING ) a Papan kayu terentang 0.20 m3 2,300,000.00 b Paku 5 - 12 cm 1.50 kg 11,000.00 c Pelumas begisting (oli/minyak) 0.40 ltr 12,000.00 d Besi Beton Polos Polos 125.00 kg 8,500.00 e Kawat Beton 2.10 kg 11,200.00 f Semen PC (abu-abu) 6.46 sak 48,000.00 g Pasir Beton 0.52 m3 180,000.00 h Splitz (batu pecah) 0.78 m3 178,000.00 i Pembantu Tukang 3.90 org 35,000.00 j Tukang Batu 0.40 org 45,000.00 k Tukang Kayu 1.00 org 45,000.00 l Tukang Besi 1.00 org 45,000.00 Jumlah Dibulatkan 16 1 m3 MEMBUAT PONDASI BETON BOREPILE (PENULANGAN 150 kg + BEKISTING ) a Papan kayu terentang 0.20 m3 2,300,000.00 b Paku 5 - 12 cm 1.50 kg 11,000.00 c Pelumas begisting (oli/minyak) 0.40 ltr 12,000.00 d Besi Beton Polos 150.00 kg 8,500.00 e Kawat Beton 2.25 kg 11,200.00 f Semen PC (abu-abu) 6.46 sak 48,000.00 g Pasir Beton 0.52 m3 180,000.00 h Splitz (batu pecah) 0.78 m3 178,000.00 i Pembantu Tukang 4.00 org 35,000.00 j Tukang Batu 0.40 org 45,000.00 k Tukang Kayu 1.00 org 45,000.00 l Tukang Besi 1.00 org 45,000.00 Jumlah Dibulatkan

No. URAIAN KOEFISIEN IV PEKERJAAN BETON NON STRUKTUR DAN BETON STRUKTUR A PEKERJAAN BETON 1 1 m3 MEMBUAT BETON NON STRUKTUR, 1 Pc : 3 Ps : 5 Splt a Semen PC (abu-abu) 4.36 b Pasir Beton 0.52 c Splitz (batu pecah) 0.87 d Pembantu Tukang 2.00 e Tukang Batu 0.35 Jumlah Dibulatkan 2 1 m3 MEMBUAT BETON STRUKTUR 1 Pc : 2 Ps : 4 Splt a Semen PC (abu-abu) 4.64 b Pasir Beton 0.52 c Splitz (batu pecah) 0.78 d Pembantu Tukang 2.00 e Tukang Batu 0.35 Jumlah Dibulatkan 3 1 m3 MEMBUAT BETON STRUKTUR 1 Pc : 2 Ps : 3 Splt a Semen PC (abu-abu) 6.72 b Pasir Beton 0.54 c Splitz (batu pecah) 0.81 d Pembantu Tukang 2.00 e Tukang Batu 0.35 Jumlah Dibulatkan 4 1 m3 MEMBUAT BETON STRUKTUR DENGAN MUTU K 225 a Semen PC (abu-abu) 7.76 b Pasir Beton 0.65 c Splitz (batu pecah) 0.65 d Pembantu Tukang 2.00 e Tukang Batu 0.35 Jumlah Dibulatkan 5 1 m3 MEMBUAT BETON STRUKTUR DENGAN MUTU K 275 a Semen PC (abu-abu) 8.00 b Pasir Beton 0.55 c Splitz (batu pecah) 0.70 d Pembantu Tukang 2.02 e Tukang Batu 0.40 Jumlah Dibulatkan B PEKERJAAN PEMBESIAN 1 1 kg PENULANGAN BETON/BESI BETON POLOS a Besi Beton Polos 1.05 b Kawat Beton 0.02 c Pembantu Tukang 0.01 d Tukang Besi 0.01 Jumlah Dibulatkan 2 1 kg PENULANGAN BETON/BESI BETON ULIR

SAT

HARGA SATUAN

sak m3 m3 org org

48,000.00 180,000.00 178,000.00 35,000.00 45,000.00

sak m3 m3 org org

48,000.00 180,000.00 178,000.00 35,000.00 45,000.00

sak m3 m3 org org

48,000.00 180,000.00 178,000.00 35,000.00 45,000.00

sak m3 m3 org org

48,000.00 180,000.00 178,000.00 35,000.00 45,000.00

sak m3 m3 org org

48,000.00 180,000.00 178,000.00 35,000.00 45,000.00

kg kg org org

8,500.00 11,200.00 35,000.00 45,000.00

No.

URAIAN KOEFISIEN Besi Beton Ulir 1.10 Kawat Beton 0.02 Pembantu Tukang 0.01 Tukang Besi 0.02 Jumlah Dibulatkan C PEKERJAAN BEGISTING 1 1 m2 PASANG BEKISTING UNTUK SLOOF a Papan kayu terentang 0.05 b Paku 5 - 12 cm 0.30 c Pelumas begisting (oli/minyak) 0.10 d Pembantu Tukang 0.30 e Tukang Kayu 0.26 Jumlah Dibulatkan 2 1 m2 PASANG BEKISTING UNTUK KOLOM a Papan kayu terentang 0.04 b Paku 5 - 12 cm 0.40 c Pelumas begisting (oli/minyak) 0.20 d Balok Kayu Borneo 0.04 e Multiplex 120 x 240 x 9 mm 0.35 f Pembantu Tukang 0.30 g Tukang Kayu 0.33 Jumlah Dibulatkan 3 1 m2 PASANG BEKISTING UNTUK BALOK a Papan kayu terentang 0.04 b Paku 5 - 12 cm 0.40 c Pelumas begisting (oli/minyak) 0.20 d Balok Kayu Borneo 0.04 e Multiplex 120 x 240 x 9 mm 0.35 f Pembantu Tukang 0.32 g Tukang Kayu 0.33 Jumlah Dibulatkan 4 1 m2 PASANG BEKISTING UNTUK PLAT LANTAI a Papan kayu terentang 0.04 b Paku 5 - 12 cm 0.40 c Pelumas begisting (oli/minyak) 0.20 d Balok Kayu Borneo 0.04 e Multiplex 120 x 240 x 9 mm 0.35 f Pembantu Tukang 0.32 g Tukang Kayu 0.33 Jumlah Dibulatkan 5 1 m2 PASANG BEKISTING UNTUK TANGGA a Papan kayu terentang 0.03 b Paku 5 - 12 cm 0.40 c Pelumas begisting (oli/minyak) 0.15 d Balok Kayu Borneo 0.02 e Multiplex 120 x 240 x 9 mm 0.35 f Pembantu Tukang 0.32 a b c d

SAT kg kg org org

HARGA SATUAN 8,900.00 11,200.00 35,000.00 45,000.00

m3 kg Ltr org org

2,300,000.00 11,000.00 12,000.00 35,000.00 45,000.00

m3 kg Ltr m3 lbr org org

2,300,000.00 11,000.00 12,000.00 3,200,000.00 105,000.00 35,000.00 45,000.00

m3 kg Ltr m3 lbr org org

2,300,000.00 11,000.00 12,000.00 3,200,000.00 105,000.00 35,000.00 45,000.00

m3 kg Ltr m3 lbr org org

2,300,000.00 11,000.00 12,000.00 3,200,000.00 105,000.00 35,000.00 45,000.00

m3 kg Ltr m3 lbr org

2,300,000.00 11,000.00 12,000.00 3,200,000.00 105,000.00 35,000.00

No.

URAIAN KOEFISIEN SAT HARGA SATUAN g Tukang Kayu 0.33 org 45,000.00 Jumlah Dibulatkan D PEKERJAAN BETON BERTULANG 1 1 m3 MEMBUAT SLOOF BETON BERTULANG ( 200 kg BESI + BEKISTING ) K225 a Papan kayu terentang 0.27 m3 2,300,000.00 b Paku 5 - 12 cm 2.00 kg 11,000.00 c Pelumas begisting (oli/minyak) 0.60 Ltr 12,000.00 d Besi Beton Polos 200.00 kg 8,500.00 e Kawat Beton 3.00 kg 11,200.00 f Semen PC (abu-abu) 8.00 sak 48,000.00 g Pasir Beton 0.52 m3 180,000.00 h Splitz (batu pecah) 0.78 m3 178,000.00 i Pembantu Tukang 4.50 org 35,000.00 j Tukang Batu 0.35 org 45,000.00 k Tukang Kayu 1.56 org 45,000.00 l Tukang Besi 1.40 org 45,000.00 Jumlah Dibulatkan 2 1 m3 MEMBUAT KOLOM BETON BERTULANG ( 125 kg BESI + BEKISTING ) a Papan kayu terentang 0.40 m3 2,300,000.00 b Paku 5 - 12 cm 4.00 kg 11,000.00 c Pelumas begisting (oli/minyak) 2.00 Ltr 12,000.00 d Besi Beton Polos 125.00 kg 8,500.00 e Kawat Beton 4.50 kg 11,200.00 f Semen PC (abu-abu) 6.45 sak 48,000.00 g Pasir Beton 0.52 m3 180,000.00 h Splitz (batu pecah) 0.78 m3 178,000.00 i Balok kayu Borneo Super 0.30 m3 3,200,000.00 j Multiplex 120 x 240 x 9 mm 3.50 lbr 105,000.00 k Pembantu Tukang 7.30 org 35,000.00 l Tukang Batu 0.35 org 45,000.00 m Tukang Kayu 3.30 org 45,000.00 n Tukang Besi 2.10 org 45,000.00 Jumlah Dibulatkan 3 1 m3 MEMBUAT KOLOM BETON BERTULANG ( 150 kg BESI + BEKISTING ) a Papan kayu terentang 0.40 m3 2,300,000.00 b Paku 5 - 12 cm 4.00 kg 11,000.00 c Pelumas begisting (oli/minyak) 2.00 Ltr 12,000.00 d Besi Beton Polos 150.00 kg 8,500.00 e Kawat Beton 4.50 kg 11,200.00 f Semen PC (abu-abu) 6.45 sak 48,000.00 g Pasir Beton 0.52 m3 180,000.00 h Splitz (batu pecah) 0.78 m3 178,000.00 i Balok kayu Borneo Super 0.30 m3 3,200,000.00 j Multiplex 120 x 240 x 9 mm 3.50 lbr 105,000.00 k Pembantu Tukang 7.30 org 35,000.00 l Tukang Batu 0.35 org 45,000.00 m Tukang Kayu 3.30 org 45,000.00 n Tukang Besi 2.10 org 45,000.00

No.

4

5

6

URAIAN KOEFISIEN SAT HARGA SATUAN Jumlah Dibulatkan 1 m3 MEMBUAT KOLOM BETON BERTULANG ( 160 kg BESI + BEKISTING ) a Papan kayu terentang 0.40 m3 2,300,000.00 b Paku 5 - 12 cm 4.00 kg 11,000.00 c Pelumas begisting (oli/minyak) 2.00 Ltr 12,000.00 d Besi Beton Polos 160.00 kg 8,500.00 e Kawat Beton 4.50 kg 11,200.00 f Semen PC (abu-abu) 6.45 sak 48,000.00 g Pasir Beton 0.52 m3 180,000.00 h Splitz (batu pecah) 0.78 m3 178,000.00 i Balok kayu Borneo Super 0.30 m3 3,200,000.00 j Multiplex 120 x 240 x 9 mm 3.50 lbr 105,000.00 k Pembantu Tukang 7.30 org 35,000.00 l Tukang Batu 0.35 org 45,000.00 m Tukang Kayu 3.30 org 45,000.00 n Tukang Besi 2.10 org 45,000.00 Jumlah Dibulatkan 1 m3 MEMBUAT KOLOM BETON BERTULANG ( 175 kg BESI + BEKISTING ) a Papan kayu terentang 0.40 m3 2,300,000.00 b Paku 5 - 12 cm 4.00 kg 11,000.00 c Pelumas begisting (oli/minyak) 2.00 Ltr 12,000.00 d Besi Beton Polos 175.00 kg 8,500.00 e Kawat Beton 4.50 kg 11,200.00 f Semen PC (abu-abu) 6.45 sak 48,000.00 g Pasir Beton 0.52 m3 180,000.00 h Splitz (batu pecah) 0.78 m3 178,000.00 i Balok kayu Borneo Super 0.30 m3 3,200,000.00 j Multiplex 120 x 240 x 9 mm 3.50 lbr 105,000.00 k Pembantu Tukang 7.30 org 35,000.00 l Tukang Batu 0.35 org 45,000.00 m Tukang Kayu 3.30 org 45,000.00 n Tukang Besi 2.10 org 45,000.00 Jumlah Dibulatkan 1 m3 MEMBUAT KOLOM BETON BERTULANG ( 200 kg BESI + BEKISTING ) a Papan kayu terentang 0.40 m3 2,300,000.00 b Paku 5 - 12 cm 4.00 kg 11,000.00 c Pelumas begisting (oli/minyak) 2.00 Ltr 12,000.00 d Besi Beton Polos 200.00 kg 8,500.00 e Kawat Beton 4.50 kg 11,200.00 f Semen PC (abu-abu) 6.45 sak 48,000.00 g Pasir Beton 0.52 m3 180,000.00 h Splitz (batu pecah) 0.78 m3 178,000.00 i Balok kayu Borneo Super 0.30 m3 3,200,000.00 j Multiplex 120 x 240 x 9 mm 3.50 lbr 105,000.00 k Pembantu Tukang 7.30 org 35,000.00 l Tukang Batu 0.35 org 45,000.00 m Tukang Kayu 3.30 org 45,000.00 n Tukang Besi 2.10 org 45,000.00 Jumlah Dibulatkan

No. 7

URAIAN KOEFISIEN SAT HARGA SATUAN 1 m3 MEMBUAT KOLOM BETON BERTULANG ( 250 kg BESI + BEKISTING ) a Papan kayu terentang 0.40 m3 2,300,000.00 b Paku 5 - 12 cm 4.00 kg 11,000.00 c Pelumas begisting (oli/minyak) 2.00 Ltr 12,000.00 d Besi Beton Polos 250.00 kg 8,500.00 e Kawat Beton 4.50 kg 11,200.00 f Semen PC (abu-abu) 6.45 sak 48,000.00 g Pasir Beton 0.52 m3 180,000.00 h Splitz (batu pecah) 0.78 m3 178,000.00 i Balok kayu Borneo Super 0.30 m3 3,200,000.00 j Multiplex 120 x 240 x 9 mm 3.50 lbr 105,000.00 k Pembantu Tukang 7.30 org 35,000.00 l Tukang Batu 0.35 org 45,000.00 m Tukang Kayu 3.30 org 45,000.00 n Tukang Besi 2.10 org 45,000.00 Jumlah Dibulatkan 8 1 m3 MEMBUAT KOLOM BETON BERTULANG ( 300 kg BESI + BEKISTING ) a Papan kayu terentang 0.40 m3 2,300,000.00 b Paku 5 - 12 cm 4.00 kg 11,000.00 c Pelumas begisting (oli/minyak) 2.00 Ltr 12,000.00 d Besi Beton Polos 300.00 kg 8,500.00 e Kawat Beton 4.50 kg 11,200.00 f Semen PC (abu-abu) 6.45 sak 48,000.00 g Pasir Beton 0.52 m3 180,000.00 h Splitz (batu pecah) 0.78 m3 178,000.00 i Balok kayu Borneo Super 0.30 m3 3,200,000.00 j Multiplex 120 x 240 x 9 mm 3.50 lbr 105,000.00 k Pembantu Tukang 7.30 org 35,000.00 l Tukang Batu 0.35 org 45,000.00 m Tukang Kayu 3.30 org 45,000.00 n Tukang Besi 2.10 org 45,000.00 Jumlah Dibulatkan 9 1 m3 MEMBUAT BALOK BETON BERTULANG ( 125 kg BESI + BEKISTING ) a Papan kayu terentang 0.32 m3 2,300,000.00 b Paku 5 - 12 cm 3.20 kg 11,000.00 c Pelumas begisting (oli/minyak) 1.60 Ltr 12,000.00 d Besi Beton Polos 125.00 kg 8,500.00 e Kawat Beton 2.25 kg 11,200.00 f Semen PC (abu-abu) 6.45 sak 48,000.00 g Pasir Beton 0.52 m3 180,000.00 h Splitz (batu pecah) 0.78 m3 178,000.00 i Balok kayu Borneo Super 0.12 m3 3,200,000.00 j Multiplex 120 x 240 x 9 mm 2.80 lbr 105,000.00 k Dolken -8 Cm atau kayu 4 x 6 cm / 4m 32.00 btg 18,600.00 l Pembantu Tukang 5.80 org 35,000.00 m Tukang Batu 0.35 org 45,000.00 n Tukang Kayu 2.80 org 45,000.00 o Tukang Besi 1.05 org 45,000.00 Jumlah Dibulatkan 10 1 m3 MEMBUAT BALOK BETON BERTULANG ( 150 kg BESI + BEKISTING ) a Papan kayu terentang 0.32 m3 2,300,000.00 b Paku 5 - 12 cm 3.20 kg 11,000.00 c Pelumas begisting (oli/minyak) 1.60 Ltr 12,000.00

No.

URAIAN KOEFISIEN SAT HARGA SATUAN Besi Beton Polos 150.00 kg 8,500.00 Kawat Beton 2.25 kg 11,200.00 Semen PC (abu-abu) 6.45 sak 48,000.00 Pasir Beton 0.52 m3 180,000.00 Splitz (batu pecah) 0.78 m3 178,000.00 Balok kayu Borneo Super 0.12 m3 3,200,000.00 Multiplex 120 x 240 x 9 mm 2.80 lbr 105,000.00 Dolken -8 Cm atau kayu 4 x 6 cm / 4m 32.00 btg 18,600.00 Pembantu Tukang 5.80 org 35,000.00 Tukang Batu 0.35 org 45,000.00 Tukang Kayu 2.80 org 45,000.00 Tukang Besi 1.05 org 45,000.00 Jumlah Dibulatkan 11 1 m3 MEMBUAT BALOK BETON BERTULANG ( 200 kg BESI + BEKISTING ) a Papan kayu terentang 0.32 m3 2,300,000.00 b Paku 5 - 12 cm 3.20 kg 11,000.00 c Pelumas begisting (oli/minyak) 1.60 Ltr 12,000.00 d Besi Beton Polos 200.00 kg 8,500.00 e Kawat Beton 3.00 kg 11,200.00 f Semen PC (abu-abu) 6.45 sak 48,000.00 g Pasir Beton 0.52 m3 180,000.00 h Splitz (batu pecah) 0.78 m3 #N/A d e f g h i j k l m n o

1

Multiplex 120 x 240 x 9 mm Dolken -8 Cm atau kayu 4 x 6 cm / 4m Pembantu Tukang Tukang Batu Tukang Kayu Tukang Besi Jumlah Dibulatkan 1 m3 MEMBUAT BALOK BETON BERTULANG ( 250 kg BESI + BEKISTING ) a Papan kayu terentang 0.32 m3 b Paku 5 - 12 cm 3.20 kg

j k l m n o

0.14 2.80 16.00 5.96 0.35 2.80 1.40

m3 lbr btg org org org org

3,200,000.00 105,000.00 18,600.00 35,000.00 45,000.00 45,000.00 45,000.00

2,300,000.00 11,000.00

No.

14

15

16

17

18

URAIAN KOEFISIEN SAT HARGA SATUAN Pelumas begisting (oli/minyak) 1.60 Ltr 12,000.00 Besi Beton Polos 250.00 kg 8,500.00 Kawat Beton 6.00 kg 11,200.00 Semen PC (abu-abu) 6.45 sak 48,000.00 Pasir Beton 0.52 m3 180,000.00 Splitz (batu pecah) 0.78 m3 178,000.00 Balok kayu Borneo Super 0.14 m3 3,200,000.00 Multiplex 120 x 240 x 9 mm 2.80 lbr 105,000.00 Dolken -8 Cm atau kayu 4 x 6 cm / 4m 16.00 btg 18,600.00 Pembantu Tukang 5.96 org 35,000.00 Tukang Batu 0.35 org 45,000.00 Tukang Kayu 2.80 org 45,000.00 Tukang Besi 1.40 org 45,000.00 Jumlah Dibulatkan 1 m3 MEMBUAT TANGGA BETON BERTULANG ( 200 kg BESI + BEKISTING ) a Papan kayu terentang 0.25 m3 2,300,000.00 b Paku 5 - 12 cm 3.00 kg 11,000.00 c Pelumas begisting (oli/minyak) 1.20 Ltr 12,000.00 d Besi Beton Polos 200.00 kg 8,500.00 e Kawat Beton 3.00 kg 11,200.00 f Semen PC (abu-abu) 6.45 sak 48,000.00 g Pasir Beton 0.52 m3 180,000.00 h Splitz (batu pecah) 0.78 m3 178,000.00 i Balok kayu Borneo Super 0.30 m3 3,200,000.00 j Multiplex 120 x 240 x 9 mm 2.50 lbr 105,000.00 k Pembantu Tukang 5.60 org 35,000.00 l Tukang Batu 0.35 org 45,000.00 m Tukang Kayu 2.30 org 45,000.00 n Tukang Besi 1.40 org 45,000.00 Jumlah Dibulatkan 1 m3 MEMBUAT PLAT LANTAI Tb. 10 Cm BETON BERTULANG ( 100 kg BESI + BEKISTING ) a Beton bertulang camp. 1Pc : 2 Ps : 3 Kr 1.00 m3 649,600.00 b Pasang Bekisting untuk lantai 10.00 m2 289,600.00 c Besi Beton rakit 100.00 kg 8,500.00 Jumlah Dibulatkan 1 m3 MEMBUAT PLAT LANTAI Tb. 12 Cm BETON BERTULANG ( 115 kg BESI + BEKISTING ) a Beton bertulang camp. 1Pc : 2 Ps : 3 Kr 1.00 m3 649,600.00 b Pasang Bekisting untuk lantai 8.33 m2 289,600.00 c Besi Beton rakit 115.00 kg 9,900.00 Jumlah Dibulatkan 1 m3 MEMBUAT PLAT LANTAI Tb. 12 Cm BETON BERTULANG ( 125 kg BESI + BEKISTING ) a Beton bertulang camp. 1Pc : 2 Ps : 3 Kr 1.00 m3 649,600.00 b Pasang Bekisting untuk lantai 8.33 m2 289,600.00 c Besi Beton rakit 125.00 kg 9,900.00 Jumlah Dibulatkan 1 m3 MEMBUAT PLAT LANTAI Tb. 15 Cm BETON BERTULANG ( 100 kg BESI + BEKISTING ) c d e f g h i j k l m n o

No.

URAIAN KOEFISIEN SAT HARGA SATUAN a Beton bertulang camp. 1Pc : 2 Ps : 3 Kr 1.00 m3 649,600.00 b Pasang Bekisting untuk lantai 6.67 m2 289,600.00 c Besi Beton rakit 100.00 kg 9,900.00 Jumlah Dibulatkan 19 1 m3 MEMBUAT PLAT LANTAI Tb. 20 Cm BETON BERTULANG ( 115 kg BESI + BEKISTING ) a Beton bertulang camp. 1Pc : 2 Ps : 3 Kr 1.00 m3 649,600.00 b Pasang Bekisting untuk lantai 7.50 m2 289,600.00 c Besi Beton rakit 115.00 kg 9,900.00 Jumlah Dibulatkan 20 1 m3 MEMBUAT RING BALK BETON BERTULANG ( 175 kg BESI + BEKISTING ) K225 a Papan kayu terentang 0.27 m3 2,300,000.00 b Paku 5 - 12 cm 2.00 kg 11,000.00 c Pelumas begisting (oli/minyak) 0.60 Ltr 12,000.00 d Besi Beton Polos 175.00 kg 8,500.00 e Kawat Beton 3.00 kg 11,200.00 f Semen PC (abu-abu) 8.00 sak 48,000.00 g Pasir Beton 0.52 m3 180,000.00 h Splitz (batu pecah) 0.78 m3 178,000.00 i Pembantu Tukang 4.85 org 35,000.00 j Tukang Batu 0.40 org 45,000.00 k Tukang Kayu 1.75 org 45,000.00 l Tukang Besi 1.45 org 45,000.00 Jumlah Dibulatkan

V 1

PEKERJAAN DINDING 1 m2 PASANGAN BATA MERAH TEBAL 1 BATA, CAMPURAN 1 Pc : 3 Ps a Bata Merah 140.00 bh b Semen PC (abu-abu) 0.65 sak

550.00 48,000.00

No.

2

3

4

5

6

7

URAIAN KOEFISIEN SAT HARGA SATUAN c Pasir Pasang 0.09 m3 165,000.00 d Pembantu Tukang 0.65 org 35,000.00 e Tukang Batu 0.20 org 45,000.00 Jumlah Dibulatkan 1 m2 PASANGAN BATA MERAH TEBAL 1 BATA, CAMPURAN 1 Pc : 4 Ps a Bata Merah 140.00 bh 550.00 b Semen PC (abu-abu) 0.55 sak 48,000.00 c Pasir Pasang 0.09 m3 165,000.00 d Pembantu Tukang 0.65 org 35,000.00 e Tukang Batu 0.20 org 45,000.00 Jumlah Dibulatkan 1 m2 PASANGAN BATA MERAH TEBAL 1 BATA, CAMPURAN 1 Pc : 5 Ps a Bata Merah 140.00 bh 550.00 b Semen PC (abu-abu) 0.45 sak 48,000.00 c Pasir Pasang 0.10 m3 165,000.00 d Pembantu Tukang 0.65 org 35,000.00 e Tukang Batu 0.20 org 45,000.00 Jumlah Dibulatkan 1 m2 PASANGAN BATA MERAH TEBAL BATA, CAMPURAN 1 Pc : 3 Ps a Bata Merah 70.00 bh 550.00 b Semen PC (abu-abu) 0.29 sak 48,000.00 c Pasir Pasang 0.04 m3 165,000.00 d Pembantu Tukang 0.32 org 35,000.00 e Tukang Batu 0.10 org 45,000.00 Jumlah Dibulatkan 1 m2 PASANGAN BATA MERAH TEBAL BATA, CAMPURAN 1 Pc : 4 Ps a Bata Merah 70.00 bh 550.00 b Semen PC (abu-abu) 0.25 sak 48,000.00 c Pasir Pasang 0.05 m3 165,000.00 d Pembantu Tukang 0.32 org 35,000.00 e Tukang Batu 0.10 org 45,000.00 Jumlah Dibulatkan 1 m2 PASANGAN BATA MERAH TEBAL BATA, CAMPURAN 1 Pc : 5 Ps a Bata Merah 70.00 bh 550.00 b Semen PC (abu-abu) 0.22 sak 48,000.00 c Pasir Pasang 0.05 m3 165,000.00 d Pembantu Tukang 0.32 org 35,000.00 e Tukang Batu 0.10 org 45,000.00 Jumlah Dibulatkan 1 m2 PASANG DINDING BATA ROOSTER / BATA TERAWANG a Rooster / Terawang ukuran 12 x 11 x 24 37.00 bh 3,500.00 b Semen PC (abu-abu) 0.27 sak 48,000.00 c Pasir Pasang 0.04 m3 165,000.00 d Pembantu Tukang 0.30 org 35,000.00 e Tukang Batu 0.10 org 45,000.00

No.

URAIAN KOEFISIEN SAT Jumlah Dibulatkan 8 1 m2 PASANG DINDING GLASSBLOCK a Glassblock ukuran 18 x 18 cm 30.00 bh b Semen Putih 0.27 sak c Pembantu Tukang 0.30 org d Tukang Batu 0.10 org Jumlah Dibulatkan 9 1 m2 PASANGAN BATACO PUTIH, CAMPURAN 1 Pc : 5 Ps a Bataco putih 15.00 bh b Semen PC (abu-abu) 0.25 sak c Pasir Pasang 0.03 m3 d Pembantu Tukang 0.30 org e Tukang Batu 0.15 org Jumlah Dibulatkan 10 1 m2 PASANGAN BATACO PRES SEMEN, CAMPURAN 1 Pc : 5 Ps a Bataco press semen 15.00 bh b Semen PC (abu-abu) 0.20 sak c Pasir Pasang 0.02 m3 d Pembantu Tukang 0.30 org e Tukang Batu 0.15 org Jumlah Dibulatkan 11 1 m2 PASANGAN BATA RINGAN ( HEBEL/CELCON ). a Bata Ringan ( hebel/celcon ) 8.00 bh b Semen Instan 11.45 kg c Pembantu Tukang 0.30 org d Tukang Batu 0.20 org Jumlah Dibulatkan

HARGA SATUAN

17,500.00 4,200.00 35,000.00 45,000.00

2,000.00 48,000.00 165,000.00 35,000.00 45,000.00

2,250.00 48,000.00 165,000.00 35,000.00 45,000.00

2,500.00 6,500.00 35,000.00 45,000.00

VI 1

PEKERJAAN PLESTERAN/ACCI 1 m2 PLESTERAN CAMPURAN 1 Pc : 2 Ps TEBAL 1,5 cm a Semen PC (abu-abu) 0.14 b Pasir Pasang 0.02 c Pembantu Tukang 0.20 d Tukang Batu 0.15

sak m3 org org

48,000.00 165,000.00 35,000.00 45,000.00

No.

2

3

4

5

6

7

8

URAIAN KOEFISIEN SAT Jumlah Dibulatkan 1 m2 PLESTERAN CAMPURAN 1 Pc : 3 Ps TEBAL 1,5 cm a Semen PC (abu-abu) 0.13 sak b Pasir Pasang 0.02 m3 c Pembantu Tukang 0.20 org d Tukang Batu 0.15 org Jumlah Dibulatkan 1 m2 PLESTERAN CAMPURAN 1 Pc : 4 Ps TEBAL 1,5 cm a Semen PC (abu-abu) 0.10 sak b Pasir Pasang 0.02 m3 c Pembantu Tukang 0.20 org d Tukang Batu 0.15 org Jumlah Dibulatkan 1 m2 PLESTERAN CAMPURAN 1 Pc : 5 Ps TEBAL 1,5 cm a Semen PC (abu-abu) 0.09 sak b Pasir Pasang 0.02 m3 c Pembantu Tukang 0.20 org d Tukang Batu 0.15 org Jumlah Dibulatkan 1 m2 PLESTERAN CAMPURAN 1 Pc : 4 Ps TEBAL 2,0 cm a Semen PC (abu-abu) 0.17 sak b Pasir Pasang 0.03 m3 c Pembantu Tukang 0.22 org d Tukang Batu 0.16 org Jumlah Dibulatkan 1 m2 PLESTERAN CAMPURAN 1 Pc : 5 Ps TEBAL 2,0 cm a Semen PC (abu-abu) 0.15 sak b Pasir Pasang 0.03 m3 c Pembantu Tukang 0.25 org d Tukang Batu 0.20 org Jumlah Dibulatkan 1 m2 BERAPEN CAMPURAN 1 Pc : 5 Ps TEBAL 1,5 cm a Semen PC (abu-abu) 0.11 sak b Pasir Pasang 0.03 m3 c Pembantu Tukang 0.15 org d Tukang Batu 0.07 org Jumlah Dibulatkan 1 m2 PLESTERAN BETON CAMPURAN 1 Pc : 2 Ps TEBAL 1,5 cm a Semen PC (abu-abu) 0.19 sak b Pasir Pasang 0.02 m3 c Pembantu Tukang 0.26 org d Tukang Batu 0.20 org Jumlah Dibulatkan

HARGA SATUAN

48,000.00 165,000.00 35,000.00 45,000.00

48,000.00 165,000.00 35,000.00 45,000.00

48,000.00 165,000.00 35,000.00 45,000.00

48,000.00 165,000.00 35,000.00 45,000.00

48,000.00 165,000.00 35,000.00 45,000.00

48,000.00 165,000.00 35,000.00 45,000.00

48,000.00 165,000.00 35,000.00 45,000.00

No. 9

URAIAN KOEFISIEN SAT 1 m2 PLESTERAN BETON CAMPURAN 1 Pc : 3 Ps TEBAL 1,5 cm a Semen PC (abu-abu) 0.15 sak b Pasir Pasang 0.02 m3 c Pembantu Tukang 0.26 org d Tukang Batu 0.20 org Jumlah Dibulatkan 10 1 m2 PLESTERAN SKONENG CAMPURAN 1 Pc : 2 Ps a Semen PC (abu-abu) 0.01 sak b Pasir Pasang 0.01 m3 c Pembantu Tukang 0.06 org d Tukang Batu 0.04 org Jumlah Dibulatkan 11 1 m2 ACCIAN PLESTERAN a Semen PC (abu-abu) 0.08 sak b Pembantu Tukang 0.14 org c Tukang batu 0.11 org Jumlah Dibulatkan 12 1 m2 PLESTERAN SIAR CAMPURAN 1 Pc : 2 Ps a Semen PC (abu-abu) 0.09 sak b Pasir Pasang 0.02 m3 c Pembantu Tukang 0.15 org d Tukang Batu 0.07 org Jumlah Dibulatkan

HARGA SATUAN 48,000.00 165,000.00 35,000.00 45,000.00

48,000.00 165,000.00 35,000.00 45,000.00

48,000.00 35,000.00 45,000.00

48,000.00 165,000.00 35,000.00 45,000.00

VII 1

PEKERJAAN PELAPIS LANTAI 1 m2 PASANG LANTAI KERAMIK UKURAN 40 x 40 cm POLISHED a Keramik ukuran 40 x 40 cm 1.00 m2 b Semen PC (abu-abu) 0.16 sak c Pasir pasang 0.02 m3 d Semen warna 0.02 kg e Pembantu Tukang 0.25 org f Tukang batu 0.12 org

205,000.00 48,000.00 165,000.00 4,200.00 35,000.00 45,000.00

No.

2

3

4

5

6

7

URAIAN KOEFISIEN SAT Jumlah Dibulatkan 1 m2 PASANG LANTAI KERAMIK UKURAN 40 x 40 cm UNPOLISH a Keramik ukuran 40 x 40 cm 1.00 m2 b Semen PC (abu-abu) 0.16 sak c Pasir pasang 0.02 m3 d Semen warna 0.02 kg e Pembantu Tukang 0.26 org f Tukang batu 0.13 org Jumlah Dibulatkan 1 m2 PASANG LANTAI KERAMIK UKURAN 60 x 60 cm a Keramik ukuran 60 x 60 cm 1.00 m2 b Semen PC (abu-abu) 0.18 sak c Pasir pasang 0.02 m3 d Semen warna 0.01 kg e Pembantu Tukang 0.25 org f Tukang batu 0.12 org Jumlah Dibulatkan 1 m2 PASANG LANTAI KERAMIK UKURAN 60 x 90 cm a Keramik ukuran 60 x 90 cm 1.00 m2 b Semen PC (abu-abu) 0.17 sak c Pasir pasang 0.02 m3 d Semen warna 0.02 kg e Pembantu Tukang 0.26 org f Tukang batu 0.14 org Jumlah Dibulatkan 1 m2 PASANG LANTAI KERAMIK 10 x 20 cm a Keramik lantai 10 x 20 cm 1.00 m2 b Semen PC ( abu-abu ) 0.18 sak c Pasir pasang 0.02 m3 d Semen warna 0.02 kg e Pembantu Tukang 0.22 org f Tukang batu 0.40 org Jumlah Dibulatkan 1 m2 PASANG LANTAI KERAMIK POLOS 20 x 20 cm a Keramik polos 20 x 20 cm 1.00 m2 b Semen PC (abu-abu) 0.17 sak c Pasir pasang 0.02 m3 d Semen warna 0.02 kg e Pembantu Tukang 0.30 org f Tukang batu 0.15 org Jumlah Dibulatkan 1 m2 PASANG LANTAI KERAMIK MOTIF 20 x 20 cm a Keramik motif 20 x 20 cm 1.00 m2 b Semen PC (abu-abu) 0.17 sak c Pasir pasang 0.02 m3

HARGA SATUAN

195,000.00 48,000.00 165,000.00 4,200.00 35,000.00 45,000.00

265,000.00 48,000.00 165,000.00 4,200.00 35,000.00 45,000.00

292,000.00 48,000.00 165,000.00 4,200.00 35,000.00 45,000.00

35,000.00 48,000.00 165,000.00 4,200.00 35,000.00 45,000.00

38,000.00 48,000.00 165,000.00 4,200.00 35,000.00 45,000.00

38,500.00 48,000.00 165,000.00

No.

URAIAN KOEFISIEN d Semen warna 0.02 e Pembantu Tukang 0.30 f Tukang batu 0.15 Jumlah Dibulatkan 8 1 m2 PASANG LANTAI KERAMIK POLOS 30 x 30 cm a Keramik polos 30 x 30 cm 1.00 b Semen PC (abu-abu) 0.16 c Pasir pasang 0.02 d Semen warna 0.02 e Pembantu Tukang 0.25 f Tukang batu 0.12 Jumlah Dibulatkan 9 1 m2 PASANG LANTAI KERAMIK MOTIF 30 x 30 cm a Keramik motif 30 x 30 cm 1.00 b Semen PC (abu-abu) 0.16 c Pasir pasang 0.02 d Semen warna 0.02 e Pembantu Tukang 0.25 f Tukang batu 0.12 Jumlah Dibulatkan 10 1 m2 PASANG LANTAI MARMER a Marmer standart 1.00 b Semen PC (abu-abu) 0.48 c Pasir pasang 0.10 d Semen warna 0.20 e Pembantu Tukang 0.62 f Tukang batu 0.35 Jumlah Dibulatkan 11 1 m2 PASANG LANTAI PARQUET JATI a Parquet jati 1.05 b Lem vinyl 0.60 c Pembantu Tukang 0.65 d Tukang 0.35 Jumlah Dibulatkan 12 1 m2 PASANG LANTAI GRANIT a Granit Standart 1.00 b Semen PC (abu-abu) 0.48 c Pasir pasang 0.08 d Semen warna 0.10 e Pembantu Tukang 0.60 f Tukang batu 0.48 Jumlah Dibulatkan

SAT kg org org

HARGA SATUAN 4,200.00 35,000.00 45,000.00

m2 sak m3 kg org org

39,000.00 48,000.00 165,000.00 4,200.00 35,000.00 45,000.00

m2 sak m3 kg org org

41,000.00 48,000.00 165,000.00 4,200.00 35,000.00 45,000.00

m2 sak m3 sak org org

133,000.00 48,000.00 165,000.00 4,200.00 35,000.00 45,000.00

m2 kg org org

250,000.00 30,800.00 35,000.00 45,000.00

m2 sak m3 sak org org

600,000.00 48,000.00 165,000.00 4,200.00 35,000.00 45,000.00

VIII

PEKERJAAN PELAPIS DINDING

No. 1

2

3

4

5

6

URAIAN KOEFISIEN 1 m2 PASANG DINDING KERAMIK MOTIF 10 x 20 cm a Keramik motif 10 x 20 cm 1.00 b Semen PC ( abu-abu ) 0.18 c Pasir pasang 0.02 d Semen warna 0.02 e Pembantu Tukang 0.22 f Tukang batu 0.40 Jumlah Dibulatkan 1 m2 PASANG DINDING KERAMIK POLOS 10 x 20 cm a Keramik polos 10 x 20 cm 1.00 b Semen PC ( abu-abu ) 0.18 c Pasir pasang 0.02 d Semen warna 0.02 e Pembantu Tukang 0.22 f Tukang batu 0.40 Jumlah Dibulatkan 1 m2 PASANG DINDING KERAMIK MOTIF 20 x 20 cm a Keramik motif 20 x 20 cm 1.00 b Semen PC ( abu-abu ) 0.17 c Pasir pasang 0.02 d Semen warna 0.02 e Pembantu Tukang 0.20 f Tukang batu 0.39 Jumlah Dibulatkan 1 m2 PASANG DINDING KERAMIK POLOS 20 x 20 cm a Keramik polos 20 x 20 cm 1.00 b Semen PC ( abu-abu ) 0.17 c Pasir pasang 0.02 d Semen warna 0.02 e Pembantu Tukang 0.20 f Tukang batu 0.39 Jumlah Dibulatkan 1 m2 PASANG DINDING KERAMIK POLOS 20 x 25 cm a Keramik polos 20 x 25 cm 1.00 b Semen PC ( abu-abu ) 0.16 c Pasir pasang 0.02 d Semen warna 0.01 e Pembantu Tukang 0.19 f Tukang batu 0.38 Jumlah Dibulatkan 1 m2 PASANG DINDING KERAMIK MOTIF 20 x 25 cm a Keramik motif 20 x 25 cm 1.00 b Semen PC ( abu-abu ) 0.16 c Pasir pasang 0.02 d Semen warna 0.01 e Pembantu Tukang 0.19

SAT m2 sak m3 kg org org

HARGA SATUAN 36,500.00 48,000.00 165,000.00 4,200.00 35,000.00 45,000.00

m2 sak m3 kg org org

36,000.00 48,000.00 165,000.00 4,200.00 35,000.00 45,000.00

m2 sak m3 kg org org

38,500.00 48,000.00 165,000.00 4,200.00 35,000.00 45,000.00

m2 sak m3 kg org org

38,000.00 48,000.00 165,000.00 4,200.00 35,000.00 45,000.00

m2 sak m3 kg org org

38,000.00 48,000.00 165,000.00 4,200.00 35,000.00 45,000.00

m2 sak m3 kg org

38,500.00 48,000.00 165,000.00 4,200.00 35,000.00

No.

URAIAN KOEFISIEN f Tukang batu 0.38 Jumlah Dibulatkan 7 1 m2 PASANG DINDING MARMER a Marmer Standart 1.00 b Paku sekrup 4.00 c Semen PC ( abu-abu ) 0.25 d Pasir pasang 0.03 e Semen warna 1.50 f Kawat ikat 0.03 g Paku 0.03 h Pembantu Tukang 0.72 i Tukang batu 0.65 Jumlah Dibulatkan 8 1 m2 PASANG DINDING GRANIT a Granit Standart 1.00 b Paku sekrup 2.00 c Semen PC ( abu-abu ) 0.25 d Pasir pasang 0.03 e Semen warna 1.50 f Kawat ikat 0.03 g Paku 0.03 h Pembantu Tukang 0.72 i Tukang batu 0.65 Jumlah Dibulatkan 9 1 m2 PASANG DINDING BATU TEMPEL HITAM a Batu tempel hitam 1.00 b Semen PC ( abu-abu ) 0.24 c Pasir pasang 0.04 d Pembantu Tukang 0.32 e Tukang batu 0.25 Jumlah Dibulatkan 10 1 m2 PASANG DINDING BATU ALAM a Batu alam 1.00 b Semen PC ( abu-abu ) 0.25 c Pasir pasang 0.04 d Pembantu Tukang 0.32 e Tukang batu 0.25 Jumlah Dibulatkan 11 1 m PASANG PLINT KERAMIK UKURAN 10 x 40 cm a Plint Keramik ukuran 10 x 40 cm 2.65 b Semen PC (abu-abu) 0.02 c Pasir pasang 0.01 d Semen warna 0.10 e Pembantu Tukang 0.06 f Tukang batu 0.03 Jumlah

SAT org

HARGA SATUAN 45,000.00

m2 bh sak m3 kg kg kg org org

133,000.00 560.00 48,000.00 165,000.00 4,200.00 11,200.00 11,000.00 35,000.00 45,000.00

m2 bh sak m3 kg kg kg org org

600,000.00 560.00 48,000.00 165,000.00 4,200.00 11,200.00 11,000.00 35,000.00 45,000.00

m2 sak m3 org org

72,500.00 48,000.00 165,000.00 35,000.00 45,000.00

m2 sak m3 org org

65,000.00 48,000.00 165,000.00 35,000.00 45,000.00

bh sak m3 kg org org

7,500.00 48,000.00 165,000.00 4,200.00 35,000.00 45,000.00

No.

URAIAN KOEFISIEN Dibulatkan 12 1 m PASANG PLINT KERAMIK UKURAN 10 x 30 cm a Plint Keramik ukuran 10 x 30 cm 3.30 b Semen PC (abu-abu) 0.02 c Pasir pasang 0.01 d Semen warna 0.12 e Pembantu Tukang 0.06 f Tukang batu 0.03 Jumlah Dibulatkan

SAT

HARGA SATUAN

bh sak m3 kg org org

6,500.00 48,000.00 165,000.00 4,200.00 35,000.00 45,000.00

IX 1

2

3

4

5

6

PEKERJAAN KUSEN, PINTU, JENDELA, PARTISI 1 m3 PASANG KUSEN PINTU & JENDELA KAYU KAMPER SAMARINDA a Balok kayu Kamper Samarinda 1.20 m3 b Pembantu Tukang 6.00 org c Tukang Kayu 15.00 org Jumlah Dibulatkan 1 m3 PASANG KUSEN PINTU & JENDELA KAYU KAMPER MEDAN / KRUING a Balok kayu Kamper Medan 1.20 m3 b Pembantu Tukang 6.00 org c Tukang Kayu 15.00 org Jumlah Dibulatkan 1 m3 PASANG KUSEN PINTU & JENDELA KAYU BORNEO SUPER a Kayu Balok Borneo Super 1.20 m3 b Pembantu Tukang 6.00 org c Tukang Kayu 15.00 org Jumlah Dibulatkan 1 m2 PASANG PINTU PANEL KAYU KAMPER SAMARINDA a Papan kayu Kamper Samarinda 0.04 m3 b Pembantu Tukang 1.00 org c Tukang Kayu 2.50 org Jumlah Dibulatkan 1 m2 PASANG PINTU PANEL KAYU KAMPER MEDAN / KRUING a Papan kayu Kamper Medan 0.04 m3 b Pembantu Tukang 1.00 org c Tukang Kayu 2.50 org Jumlah Dibulatkan 1 m2 PASANG PINTU DAN JENDELA KACA KAYU KAMPER MEDAN a Papan kayu Kamper Medan 0.04 m3 b Pembantu Tukang 0.80 org c Tukang Kayu 2.00 org Jumlah

5,200,000.00 35,000.00 45,000.00

4,100,000.00 35,000.00 45,000.00

3,200,000.00 35,000.00 45,000.00

5,350,000.00 35,000.00 45,000.00

4,300,000.00 35,000.00 45,000.00

4,300,000.00 35,000.00 45,000.00

No. 7

8

9

10

11

12

13

URAIAN KOEFISIEN SAT HARGA SATUAN Dibulatkan 1 m2 PASANG PINTU DAN JENDELA KACA KAYU BORNEO a Papan kayu Borneo Super 0.04 m3 3,300,000.00 b Pembantu Tukang 0.80 org 35,000.00 c Tukang Kayu 2.00 org 45,000.00 Jumlah Dibulatkan 1 m2 PASANG PINTU DAN JENDELA JALUSI KAYU KAMPER MEDAN a Papan kayu Kamper Medan 0.06 m3 4,300,000.00 b Pembantu Tukang 1.00 org 35,000.00 c Tukang Kayu 3.00 org 45,000.00 Jumlah Dibulatkan 1 m2 PASANG PINTU TRIPLEK RANGKAP , RANGKA KAYU KAMPER MEDAN a Papan kayu Kamper Medan 0.02 m3 4,300,000.00 b Paku 1 s/d 5 cm 0.03 kg 11,000.00 c Lem Kayu 0.30 Ltr 25,600.00 d Triplek 0,4 cm ukuran pintu 1.00 lbr 36,000.00 e Pembantu Tukang 0.60 org 35,000.00 f Tukang Kayu 2.00 org 45,000.00 Jumlah Dibulatkan 1 m2 PASANG JALUSI MATI KUSEN KAYU KAMPER MEDAN a Papan kayu Kamper Medan 0.06 m3 4,300,000.00 b Paku 1 s/d 5 cm 0.15 kg 11,000.00 c Pembantu Tukang 0.50 org 35,000.00 d Tukang Kayu 2.00 org 45,000.00 Jumlah Dibulatkan 1 m2 PASANG PINTU TRIPLEK RANGKAP , RANGKA KAYU BORNEO SUPER a Papan kayu Borneo Super 0.02 m3 3,300,000.00 b Paku 1 s/d 5 cm 0.03 kg 11,000.00 c Lem Kayu 0.30 Ltr 25,600.00 d Triplek 0,4 cm ukuran pintu 1.00 lbr 36,000.00 e Pembantu Tukang 0.60 org 35,000.00 f Tukang Kayu 2.00 org 45,000.00 Jumlah Dibulatkan 1 m2 PASANG PINTU TEAKWOOD RANGKAP , RANGKA KAYU KAMPER MEDAN a Papan kayu Kamper Medan 0.02 m3 4,300,000.00 b Paku 1 s/d 5 cm 0.30 kg 11,000.00 c Lem Kayu 0.30 Ltr 25,600.00 d Teakwood 120 x 240 x 0,4 cm 1.00 lbr 94,000.00 e Pembantu Tukang 0.60 org 35,000.00 f Tukang Kayu 2.00 org 45,000.00 Jumlah Dibulatkan 1 m2 PASANG PINTU TRIPLEK & FORMIKA RANGKA KAYU KAMPER MEDAN a Papan kayu Kamper Medan 0.02 m3 4,300,000.00 b Paku 1 s/d 5 cm 0.30 kg 11,000.00 c Lem Kayu 0.80 Ltr 25,600.00 d Triplek 0,4 cm ukuran pintu 1.00 lbr 36,000.00 e Formica 3" x 6" 0.50 lbr 125,000.00 f Pembantu Tukang 0.80 org 35,000.00 g Tukang Kayu 2.50 org 45,000.00

No.

14

15

16

17

18

19

URAIAN KOEFISIEN SAT HARGA SATUAN Jumlah Dibulatkan 1 m2 PASANG PINTU TEAKWOOD & FORMIKA RANGKA KAYU KAMPER MEDAN a Papan kayu Kamper Medan 0.02 m3 4,300,000.00 b Paku 1 s/d 5 cm 0.30 kg 11,000.00 c Lem Kayu 0.80 Ltr 25,600.00 d Teakwood 120 x 240 x 0,4 cm 0.50 lbr 94,000.00 e Vernis 0.50 Ltr 35,000.00 a Formica 4" x 8" 0.50 lbr 125,000.00 b Pembantu Tukang 0.80 org 35,000.00 c Tukang Kayu 2.50 org 45,000.00 Jumlah Dibulatkan 1 m2 PASANG DINDING PEMISAH DOUBLE TEAKWOOD, RANGKA KAYU KAMPER MEDAN a Balok kayu Kamper Medan 0.02 m3 4,100,000.00 b Papan kayu Kamper Medan 0.01 m3 4,300,000.00 c Paku 5 - 12 cm 0.10 kg 11,000.00 d Lem Kayu 0.56 Ltr 25,600.00 e Teakwood 120 x 240 x 0,4 cm 1.00 lbr 94,000.00 f Pembantu Tukang 0.15 org 35,000.00 g Tukang Kayu 0.45 org 45,000.00 Jumlah Dibulatkan 1 m2 PASANG DINDING PEMISAH DOUBLE GRC, RANGKA KAYU KAMPER MEDAN a Balok kayu Kamper Medan 0.02 m3 4,100,000.00 b Papan kayu Kamper Medan 0.01 m3 4,300,000.00 c Paku 5 - 12 cm 0.10 kg 11,000.00 d Lem Kayu 0.56 Ltr 25,600.00 e Triplek 0,4 cm ukuran pintu 1.00 lbr 36,000.00 f Pembantu Tukang 0.20 org 35,000.00 g Tukang Kayu 0.60 org 45,000.00 Jumlah Dibulatkan 1 Bh PASANG PINTU ALUMINIUM / PINTU PVC a Pintu Aluminium / Pintu PVC 1.00 bh 375,000.00 b Alat bantu 10 % harga material 1.00 ls 37,500.00 c Tukang Kayu 0.02 org 45,000.00 Jumlah Dibulatkan 1 m2 PASANG KUSEN PARTISI DOUBLE TRIPLEK a Balok kayu borneo super 0.11 m3 3,200,000.00 b Triplek 0,4 cm ukuran pintu 5.00 lbr 36,000.00 c Paku 1 s/d 3 cm 2.00 kg 11,000.00 d Ampelas 2.00 lbr 3,500.00 e Engsel 4.00 bh 22,500.00 f Grendel / Slot 4.00 bh 29,000.00 g Pembantu Tukang 0.30 org 35,000.00 h Tukang Kayu terampil 1.30 org 45,000.00 Jumlah Dibulatkan 1 m2 PASANG KUSEN PARTISI DOUBLE GYPSUM + RANGKA KAYU a Balok kayu borneo super 0.11 m3 3,200,000.00 b Gypsum board ( 120 x 240 x 9 ) mm 0.72 lbr 57,100.00

No.

URAIAN KOEFISIEN SAT HARGA SATUAN Paku 1 s/d 3 cm 2.00 kg 11,000.00 Ampelas 2.00 lbr 3,500.00 Engsel 4.00 bh 22,500.00 Grendel / Slot 4.00 bh 29,000.00 Pembantu Tukang 0.30 org 35,000.00 Tukang Kayu 1.30 org 45,000.00 Jumlah Dibulatkan 20 1 m2 PASANG DINDING PARTISI GYPSUM BOARD + RANGKA BESI HOLLOW a Hollow 4/4 Zincromate 0.42 btg 45,000.00 b Hollow 2/4 Zincromate 0.15 btg 32,000.00 c Gypsum board ( 120 x 240 x 9 ) mm 0.72 lbr 57,100.00 d Paku sekrup 25.00 bh 560.00 e Ramset / dina bolt 4.00 bh 2,500.00 f Cotton plaster 0.10 bh 55,000.00 g Compoun 0.13 kg 28,000.00 h Pembantu Tukang 0.10 org 35,000.00 i Tukang kayu 0.05 org 45,000.00 Jumlah Dibulatkan c d e f g h

X A 1

2

3

PEKERJAAN RANGKA ATAP DAN PENUTUP ATAP PEKERJAAN RANGKA ATAP 1 m3 PEKERJAAN KONSTRUKSI KUDA - KUDA KAYU KAMPER MEDAN a Balok kayu Kamper Medan 1.10 m3 4,100,000.00 b Besi Strip 15.00 kg 9,500.00 c Paku Ukuran besar 0.80 kg 11,000.00 d Meni kayu 0.40 kg 15,000.00 e Pembantu Tukang 4.00 org 35,000.00 f Tukang Kayu 12.00 org 45,000.00 Jumlah Dibulatkan 1 m3 PEKERJAAN KONSTRUKSI KUDA - KUDA KAYU BORNEO SUPER a Balok kayu Borneo super 1.10 m3 3,200,000.00 b Besi Strip 15.00 kg 9,500.00 c Paku Ukuran besar 0.80 kg 11,000.00 d Meni kayu 0.40 kg 15,000.00 e Pembantu Tukang 4.00 org 35,000.00 f Tukang Kayu 12.00 org 45,000.00 Jumlah Dibulatkan 1 m2 PASANG KASO + RENG GENTENG PLENTONG KAYU BORNEO SUPER a Balok kayu Borneo super 0.01 m3 3,200,000.00 b Paku 7 - 10 cm 0.15 kg 11,000.00 c Pembantu Tukang 0.10 org 35,000.00 d Tukang Kayu 0.10 org 45,000.00 Jumlah Dibulatkan

No. 4

5

6

7

B 1

2

3

4

URAIAN KOEFISIEN SAT HARGA SATUAN 1 m2 PASANG KASO + RENG GENTENG BETON KAYU BORNEO SUPER a Balok kayu Borneo super 0.01 m3 3,200,000.00 b Paku 7 - 10 cm 0.15 kg 11,000.00 c Pembantu Tukang 0.10 org 35,000.00 d Tukang Kayu 0.10 org 45,000.00 Jumlah Dibulatkan 1 M1 PASANG LISPLANG KAYU KAMPER MEDAN UKURAN 3 X 20 cm a Papan kayu Kamper Medan 0.01 m3 4,300,000.00 b Paku 7 - 10 cm 0.05 kg 11,000.00 c Pembantu Tukang 0.10 org 35,000.00 d Tukang Kayu 0.20 org 45,000.00 Jumlah Dibulatkan 1 m2 PASANG LISPLANG KAYU KAMPER MEDAN UKURAN 3 X 30 cm a Papan kayu Kamper Medan 0.01 m3 4,300,000.00 b Paku 7 - 10 cm 0.05 kg 11,000.00 c Pembantu Tukang 0.11 org 35,000.00 d Tukang Kayu 0.22 org 45,000.00 Jumlah Dibulatkan 1 m3 PEKERJAAN NOK/GORDING/JURAY KAYU BORNEO SUPER a Balok kayu Borneo super 1.05 m3 3,200,000.00 b Paku 10 - 15 cm 0.20 kg 11,000.00 c Pembantu Tukang 2.00 org 35,000.00 d Tukang Kayu 2.00 org 45,000.00 Jumlah Dibulatkan PEKERJAAN PENUTUP ATAP 1 m2 PASANG ATAP GENTENG PLENTONG a Genteng palentong 25.00 bh 1,100.00 b Pembantu Tukang 0.15 org 35,000.00 c Tukang kayu 0.08 org 45,000.00 Jumlah Dibulatkan 1 m2 PASANG NOK/BUBUNGAN GENTENG KERAMIK GLAZUR a Genteng nok/bubungan plentong 5.00 bh 16,500.00 b Semen PC (abu-abu) 0.16 sak 48,000.00 c Pasir pasang 0.03 m3 165,000.00 d Pembantu Tukang 0.30 org 35,000.00 e Tukang kayu 0.20 org 45,000.00 Jumlah Dibulatkan 1 m2 PASANG ATAP FIBREGLASS UKURAN 180 X 90 cm a Atap fibreglass 0.60 lbr 62,000.00 b Paku 2 - 5 cm 0.05 kg 11,000.00 c Pembantu Tukang 0.14 org 35,000.00 d Tukang kayu 0.07 org 45,000.00 Jumlah Dibulatkan 1 m2 PASANG ATAP ASBES GELOMBANG UKURAN 2,70 x 1,05 m TEBAL 4 mm

No.

URAIAN KOEFISIEN SAT HARGA SATUAN Asbes gelombang 0.35 lbr 68,500.00 Paku Payung 0.12 kg 11,000.00 Pembantu Tukang 0.14 org 35,000.00 Tukang kayu 0.07 org 45,000.00 Jumlah Dibulatkan 5 1 m2 PASANG ATAP ASBES GELOMBANG UKURAN 2,40 x 1,05 m TEBAL 4 mm a Asbes gelombang 0.42 lbr 60,000.00 b Paku Payung 0.12 kg 11,000.00 c Pembantu Tukang 0.14 org 35,000.00 d Tukang kayu 0.07 org 45,000.00 Jumlah Dibulatkan 6 1 m2 PASANG ATAP ASBES GELOMBANG UKURAN 2,70 x 1,02 m TEBAL 5 mm a Asbes gelombang 0.44 lbr 87,500.00 b Paku Payung 0.12 kg 11,000.00 c Pembantu Tukang 0.14 org 35,000.00 d Tukang kayu 0.07 org 45,000.00 Jumlah Dibulatkan 7 1 m2 PASANG ATAP ASBES GELOMBANG UKURAN 2,40 x 1,02 m TEBAL 5 mm a Asbes gelombang 0.51 lbr 78,200.00 b Paku Payung 0.12 kg 11,000.00 c Pembantu Tukang 0.14 org 35,000.00 d Tukang kayu 0.07 org 45,000.00 Jumlah Dibulatkan 8 1 m2 PASANG ATAP ASBES GELOMBANG ( 1,50 x 1,02 m ) x 5 mm a Asbes gelombang 0.80 lbr 46,000.00 b Paku Payung 0.12 kg 11,000.00 c Pembantu Tukang 0.14 org 35,000.00 d Tukang kayu 0.07 org 45,000.00 Jumlah Dibulatkan 9 1 m PASANG ATAP SIRAP a Genteng Sirap 80.00 bh 900.00 b Paku 0.20 kg 11,000.00 c Pembantu Tukang 0.10 org 35,000.00 d Tukang kayu 0.20 org 45,000.00 Jumlah Dibulatkan 10 1 m2 PASANG ATAP GENTENG BETON a Genteng beton 1.10 bh 72,000.00 b Paku 5 - 12 cm 0.03 kg 11,000.00 c Pembantu Tukang 0.20 org 35,000.00 d Tukang kayu 0.10 org 45,000.00 Jumlah Dibulatkan 11 1 m2 PASANG ATAP GENTENG METAL + C301 a Genteng metal 1.02 lbr 132,000.00 b Paku 5 - 12 cm 0.20 kg 11,000.00 a b c d

No.

12

13

14

15

16

17

URAIAN KOEFISIEN c Pembantu Tukang 0.20 d Tukang kayu 0.10 Jumlah Dibulatkan 1 m PASANG NOK GENTENG BETON a Nok genteng beton 3.50 b Paku 5 - 12 cm 0.05 c Semen PC (abu-abu) 0.22 d Pasir pasang 0.03 e Semen warna 1.00 f Pembantu Tukang 0.40 g Tukang kayu 0.20 Jumlah Dibulatkan 1 m PASANG NOK GENTENG METAL a Nok genteng metal 1.10 b Paku Payung 0.05 c Pembantu Tukang 0.25 d Tukang kayu 0.15 Jumlah Dibulatkan 1 m2 PASANG ATAP SENG GELOMBANG a Seng gelombang 0.70 b Paku Payung 0.02 c Pembantu Tukang 0.12 d Tukang kayu 0.06 Jumlah Dibulatkan 1 m2 PASANG NOK SENG UNTUK ATAP SENG GELOMBANG a Seng plat BJLS 1.05 b Paku Payung 0.04 c Pembantu Tukang 0.15 d Tukang kayu 0.07 Jumlah Dibulatkan 1 m2 PASANG ATAP POLYCARBONATE a Polycarbonate 1.05 b Besi Hollow 1.50 c Alat bantu 20 % harga material 1.00 d Pembantu Tukang 0.15 e Tukang kayu 0.05 Jumlah Dibulatkan 1 m2 PASANG ALUMINIUM FOIL a Aluminium foil 1.05 b Alat bantu 20 % harga material 1.00 c Pembantu Tukang 0.15 d Tukang kayu 0.05 Jumlah Dibulatkan

SAT org org

HARGA SATUAN 35,000.00 45,000.00

bh kg sak m3 kg org org

15,500.00 11,000.00 48,000.00 165,000.00 4,200.00 35,000.00 45,000.00

bh kg org org

53,000.00 11,000.00 35,000.00 45,000.00

lbr kg org org

43,000.00 11,000.00 35,000.00 45,000.00

M1 kg org org

31,000.00 11,000.00 35,000.00 45,000.00

m2 btg ls org org

198,000.00 45,000.00 41,580.00 35,000.00 45,000.00

m2 ls org org

4,200.00 882.00 35,000.00 45,000.00

No.

URAIAN

KOEFISIEN

SAT

HARGA SATUAN

XI 1

2

3

4

5

6

PEKERJAAN PENUTUP PLAFOND 1 m2 Pasang rangka plafond ( ukrn 0,50 x 1,00 ) m, Kayu Borneo Super a Balok kayu Borneo Super 4 x 6 cm 0.01 m3 b Paku 5 - 12 cm 0.10 kg c Pembantu Tukang 0.15 org d Tukang Kayu 0.25 org Jumlah Dibulatkan 1 m2 Plafond GRC ( 60 x 1,20 ) m, tebal 4 mm a Pelat GRC tebal 4 mm 1.10 lbr b Paku 1 cm 0.01 kg c Pembantu Tukang 0.03 org d Tukang kayu 0.07 org Jumlah Dibulatkan 1 m2 Plafond Asbes ( 1,00 x 1,00 ) m, tebal 5 mm a Pelat asbes tebal 5 mm 1.10 lbr b Paku 1 cm 0.01 kg c Pembantu Tukang 0.03 org d Tukang kayu 0.07 org Jumlah Dibulatkan 1 m2 Plafond Akustik ( 60 x 120 ) cm a Akustik 600 x 1200 x 15 mm 1.50 lbr b Paku 2 - 5 cm 0.05 kg c Pembantu Tukang 0.06 org d Tukang kayu 0.10 org Jumlah Dibulatkan 1 m2 Plafond Akustik ( 60 x 120 ) cm + Rangka Alluminium a Profil Alluminium "T" 3.60 M b Kawat seng polos 0.15 kg c Ramset / dina bolt 1.00 bh d Akustik 600 x 1200 x 15 mm 1.50 lbr e Pembantu Tukang 0.15 org f Tukang kayu 0.20 org Jumlah Dibulatkan 1 M List Plafond Profil kayu a List Profil kayu 1.10 M b Paku 2 cm 0.01 kg c Pembantu Tukang 0.05 org

3,200,000.00 11,000.00 35,000.00 45,000.00

45,600.00 11,000.00 35,000.00 45,000.00

14,000.00 11,000.00 35,000.00 45,000.00

72,000.00 11,000.00 35,000.00 45,000.00

30,000.00 11,200.00 2,500.00 72,000.00 35,000.00 45,000.00

13,500.00 11,000.00 35,000.00

No.

URAIAN KOEFISIEN SAT d Tukang kayu 0.05 org Jumlah Dibulatkan 7 1 M List Plafond kayu 1/4 a List kayu 1/4 1.10 M b Paku 2 cm 0.01 kg c Pembantu Tukang 0.05 org d Tukang kayu 0.05 org Jumlah Dibulatkan 8 1 m2 Plafond Triplek 4 mm + Rangka Kayu Borneo Super a Balok kayu Borneo Super 0.02 m3 b Paku 1- 12 cm 0.06 kg c Triplek 120 cm x 240 cm x 0,4 cm 0.39 lbr d Pembantu Tukang 0.27 org e Tukang kayu 0.40 org Jumlah Dibulatkan 9 1 m2 Plafond Teakwood 4 mm + Rangka Kayu Borneo Super a Balok kayu Borneo Super 0.02 m3 b Paku 1 - 12 cm 0.06 kg c Teakwood 120 cm x 240 cm x 0,4 cm 0.39 lbr d Pembantu Tukang 0.27 org e Tukang kayu 0.40 org Jumlah Dibulatkan 10 1 m2 Plafond Papan 10 cm, tebal 1 cm + Rangka Kayu Borneo Super a Balok kayu Borneo Super 0.02 m3 b Paku 2 - 12 cm 0.20 kg c Papan kayu kamper 0.02 m3 d Pembantu Tukang 0.35 org e Tukang kayu 0.50 org Jumlah Dibulatkan 11 1 m2 plafond Gypsum Board, tebal 9 mm + rangka besi hollow a Hollow 4/4 Zincromate 0.42 btg b Hollow 2/4 Zincromate 0.15 btg c Gypsum board ( 120 x 240 x 9 ) mm 0.36 lbr d Paku sekrup 25.00 bh e Ramset / dina bolt 4.00 bh f Cotton plaster 0.07 bh g Compoun 0.13 kg h Pembantu Tukang 0.10 org i Tukang kayu 0.05 org Jumlah Dibulatkan PEKERJAAN SANITAIR Memasang 1 buah kloset duduk / monoblok a Kloset duduk / monoblok b Perlengkapan ( 10% hrg kloset )

HARGA SATUAN 45,000.00

4,300.00 11,000.00 35,000.00 45,000.00

3,200,000.00 11,000.00 36,000.00 35,000.00 45,000.00

3,200,000.00 11,000.00 94,000.00 35,000.00 45,000.00

3,200,000.00 11,000.00 5,350,000.00 35,000.00 45,000.00

45,000.00 32,000.00 57,100.00 560.00 2,500.00 55,000.00 28,000.00 35,000.00 45,000.00

XII 1

1.00

bh

2,265,000.00 226,500.00

No.

2

3

4

5

6

7

8

URAIAN KOEFISIEN SAT HARGA SATUAN c Pembantu Tukang 3.30 org 35,000.00 d Tukang batu 1.10 org 45,000.00 Jumlah Dibulatkan Memasang 1 buah kloset jongkok porselen a Kloset jongkok porselen 1.00 bh 146,000.00 b Semen PC (abu-abu) 0.12 sak 48,000.00 c Pasir pasang 0.01 m3 165,000.00 d Pembantu Tukang 1.00 org 35,000.00 e Tukang batu 1.50 org 45,000.00 Jumlah Dibulatkan Memasang 1 buah urinoir a Urinoir 1.00 bh 377,000.00 b Perlengkapan ( 30% hrg urinoir ) 113,100.00 c Semen PC (abu-abu) 0.12 sak 48,000.00 d Pasir pasang 0.01 m3 165,000.00 e Pembantu Tukang 1.00 org 35,000.00 f Tukang batu 1.00 org 45,000.00 Jumlah Dibulatkan Memasang 1 buah wastafel dinding a Wastafel 1.00 bh 202,000.00 b Perlengkapan ( 12% hrg kloset ) 24,240.00 c Semen PC ( abu-abu ) 0.12 sak 48,000.00 d Pasir pasang 0.01 m3 165,000.00 e Pembantu Tukang 1.20 org 35,000.00 f Tukang batu 1.45 org 45,000.00 Jumlah Dibulatkan Memasang 1 buah wastafel kaki a Wastafel 1.00 bh 245,000.00 b Perlengkapan ( 12% hrg kloset ) 29,400.00 c Semen PC ( abu-abu ) 0.12 sak 48,000.00 d Pasir pasang 0.01 m3 165,000.00 e Pembantu Tukang 1.20 org 35,000.00 f Tukang batu 1.45 org 45,000.00 Jumlah Dibulatkan Memasang 1 bh shower dinding a Shower dinding 1.00 bh 125,000.00 b Pembantu Tukang 0.01 org 35,000.00 c Tukang batu 0.10 org 45,000.00 Jumlah Dibulatkan Memasang bak mandi Fiberglass ukuran sedang a Bak fibreglass 1.00 bh 150,000.00 b Perlengkapan ( 20% hrg bak ) 27,000.00 c Pembantu tukang 1.80 org 35,000.00 d Tukang batu 2.70 org 45,000.00 Jumlah Dibulatkan Memasang bak kontrol pasangan batu bata ukuran 30 x 30 cm, tinggi 35 cm a Batu bata 0.15 m3 550.00 b Semen PC (abu-abu) 0.88 sak 48,000.00 c Pasir pasang 0.07 m3 165,000.00

No.

9

10

11

12

13

URAIAN KOEFISIEN Batu kerikil 0.07 Besi beton 1.60 Pasir Beton 0.06 Pembantu Tukang 3.20 Tukang batu 1.02 Jumlah Dibulatkan Memasang Kichen Zink/bak cuci piring stainless steel a Bak cuci stainless steel 1.00 b Water Drain + Asesories 1.00 c Pembantu Tukang 0.03 d Tukang batu 0.30 Jumlah Dibulatkan Memasang 1 bh kran diameter 3/4 " atau 1/2 " a Kran air 1.00 b Perlengkapan ( 2% hrg kran ) 1.00 c Pembantu Tukang 0.01 d Tukang batu 0.10 Jumlah Dibulatkan Memasang 1 bh kran air angsa a Kran air angsa 1.00 b Perlengkapan ( 2% hrg kran ) 1.00 c Pembantu Tukang 0.01 d Tukang batu 0.10 Jumlah Dibulatkan Memasang 1 bh Floor drain a Floor drain 1.00 b Pembantu Tukang 0.01 c Tukang batu 0.10 Jumlah Dibulatkan Memasang 1 bh tempat sabun a Tempat Sabun 1.00 b Pembantu Tukang 0.01 c Tukang batu 0.10 Jumlah Dibulatkan d e f g h

SAT m3 kg m3 org org

HARGA SATUAN 65,000.00 8,900.00 180,000.00 35,000.00 45,000.00

bh Set org org

173,000.00 69,500.00 35,000.00 45,000.00

bh ls org org

54,900.00 1,098.00 35,000.00 45,000.00

bh ls org org

155,000.00 3,100.00 35,000.00 45,000.00

bh org org

59,000.00 35,000.00 45,000.00

bh org org

30,000.00 35,000.00 45,000.00

XIII PEKERJAAN PERPIPAAN DAN POMPA 1 Memasang 1 M pipa galvanis diameter " a Pipa galvanis dia 1/2" b Perlengkapan ( 30% harga pipa ) c Pembantu Tukang d Tukang pipa Jumlah Dibulatkan 2 Memasang 1 M pipa galvanis diameter "

1.10 0.05 0.09

M org org

10,500.00 3,150.00 35,000.00 45,000.00

No.

3

4

5

6

7

8

9

URAIAN Pipa galvanis Perlengkapan ( 30% harga pipa ) Pembantu Tukang Tukang pipa Jumlah Dibulatkan Memasang 1 M pipa galvanis diameter 1" a Pipa galvanis b Perlengkapan ( 30% harga pipa ) c Pembantu Tukang d Tukang pipa Jumlah Dibulatkan Memasang 1 M pipa galvanis diameter 1" a Pipa galvanis b Perlengkapan ( 30% harga pipa ) c Pembantu Tukang d Tukang pipa Jumlah Dibulatkan Memasang 1 M pipa PVC type D diameter 3" a Pipa PVC type D b Perlengkapan ( 30% harga pipa ) c Pembantu Tukang d Tukang pipa Jumlah Dibulatkan Memasang 1 M pipa PVC type D diameter 4" a Pipa PVC type D b Perlengkapan ( 30% harga pipa ) c Pembantu Tukang d Tukang pipa Jumlah Dibulatkan Memasang 1 M PVC tipe AW diameter " a Pipa PVC b Perlengkapan ( 30% harga pipa ) c Pembantu Tukang d Tukang pipa Jumlah Dibulatkan Memasang 1 M PVC tipe AW diameter " a Pipa PVC b Perlengkapan ( 30% harga pipa ) c Pembantu Tukang d Tukang pipa Jumlah Dibulatkan Memasang 1 M PVC tipe AW diameter 1" a Pipa PVC b Perlengkapan ( 30% harga pipa ) a b c d

KOEFISIEN 1.10 0.05 0.09

SAT M org org

HARGA SATUAN 17,500.00 5,250.00 35,000.00 45,000.00

1.10 0.05 0.09

M org org

25,000.00 7,500.00 35,000.00 45,000.00

1.10 0.11 0.18

M org org

30,000.00 9,000.00 35,000.00 45,000.00

1.10 0.10 0.18

M org org

6,500.00 1,950.00 35,000.00 45,000.00

1.10 0.13 0.22

M org org

8,500.00 2,550.00 35,000.00 45,000.00

1.10 0.04 0.06

M org org

4,200.00 1,260.00 35,000.00 45,000.00

1.10 0.03 0.06

M org org

5,000.00 1,500.00 35,000.00 45,000.00

1.10

M

6,500.00 1,950.00

No.

10

11

12

13

URAIAN KOEFISIEN c Pembantu Tukang 0.04 d Tukang pipa 0.06 Jumlah Dibulatkan Memasang 1 M PVC tipe AW diameter 2" a Pipa PVC 1.10 b Perlengkapan ( 30% harga pipa ) c Pembantu Tukang 0.05 d Tukang pipa 0.09 Jumlah Dibulatkan Memasang 1 M PVC tipe AW diameter 4" a Pipa PVC 1.10 b Perlengkapan ( 30% harga pipa ) c Pembantu Tukang 0.08 d Tukang pipa 0.14 Jumlah Dibulatkan Membuat 1 bh Septictank pasangan Batu Bata dan Rembesan Galian tanah Septictank & rembesan 7.5 Pasir urug 0.21 Lantai kerja 2.25 Pasang bata 1 Pc : 2 Psr 15.00 Pelat beton penutup dan balok 0.30 Pipa PVC 4 inci AW & perlengkapannya 5.40 Plesteran 1 Pc : 3 Psr 30.00 Pasangan ijuk 5.00 Urugan kerikil 3,5 cm 1.05 Pipa PVC 4 inci AW dilobang 9.00 Urugan kembali 1.13 Pembantu Tukang 4.00 Tukang batu 3.00 Jumlah Dibulatkan Memasang 1 bh Pompa Air a Pompa Air 100 Watt 1.00 b Perlengkapan ( 25% harga pompa ) c Pembantu Tukang 0.08 d Tukang Pipa 0.14 Jumlah Dibulatkan

SAT org org

HARGA SATUAN 35,000.00 45,000.00

M org org

8,500.00 2,550.00 35,000.00 45,000.00

M org org

17,000.00 5,100.00 35,000.00 45,000.00

M3 M3 M3 M2 M3 M1 M2 IKAT M3 M1 M3 org org

26,620.00 145,000.00 543,400.00 74,720.00 4,200,400.00 17,000.00 23,200.00 15,000.00 207,400.00 17,000.00 7,300.00 35,000.00 45,000.00

bh org org

750,000.00 187,500.00 35,000.00 45,000.00

XIV 1

PEKERJAAN PENUTUP BESI DAN BAJA 1 kg Pasang Rangka Atap Baja a Besi profil WF b Meni besi c Peralatan las ( 5 % material ) d Elektroda

1.10 0.08 1.00 0.20

kg kg ls ls

9,800.00 16,000.00 539.00 11,000.00

No.

2

3

4

5

6

7

8

URAIAN e Tukang besi f Pembantu Tukang Jumlah Dibulatkan 1 kg Pasang Rangka Atap besi siku a Besi Siku b Meni besi c Peralatan las ( 5 % material ) d Elektroda e Baud f Tukang besi g Pembantu Tukang Jumlah Dibulatkan 1 kg Pasang Gording besi C a Besi C b Meni besi c Peralatan las ( 5 % material ) d Elektroda e Baud f Tukang besi g Pembantu Tukang Jumlah Dibulatkan 1 m2 Pasang Pintu Rolling Door besi a Rolling door besi b Tukang besi c Pembantu Tukang Jumlah Dibulatkan 1 bh Pasang Pintu besi ukuran 0,8 x 2 m a Pintu besi jadi b Tukang besi c Pembantu Tukang Jumlah Dibulatkan 1 m2 Pasang Teralis Besi a Besi strip 2 mm x 3 cm b Tukang las c Pembantu Tukang Jumlah Dibulatkan 1 m2 Pasang Kawat Harmonika a Kawat harmonika b Paku 2 - 5 cm c Papan kayu kamper medan d Pembantu Tukang e Tukang kayu Jumlah Dibulatkan 1 M1 Pasang Talang Datar, Seng plat BJLS a Seng plat BJLS b Paku 2 - 5 cm

KOEFISIEN 0.04 0.06

SAT org org

HARGA SATUAN 45,000.00 35,000.00

1.10 0.10 1.00 0.15 0.20 0.04 0.06

kg kg ls ls kg org org

9,800.00 16,000.00 539.00 11,000.00 8,900.00 45,000.00 35,000.00

1.10 0.10 1.00 0.15 0.20 0.04 0.06

kg kg ls ls kg org org

9,500.00 16,000.00 522.50 11,000.00 8,900.00 45,000.00 35,000.00

1.00 1.50 1.05

m2 org org

165,000.00 45,000.00 35,000.00

1.00 1.05 1.05

bh org org

375,000.00 45,000.00 35,000.00

11.50 1.20 1.20

M org org

9,500.00 45,000.00 35,000.00

1.10 0.02 0.00 0.10 0.10

m2 kg m3 org org

11,000.00 11,000.00 4,300,000.00 35,000.00 45,000.00

1.00 0.02

M1 kg

31,000.00 11,000.00

No.

9

URAIAN Papan kayu borneo super Flincote / meni besi Pembantu Tukang Tukang kayu Jumlah Dibulatkan 1 M1 Pasang Talang Miring, Seng plat BJLS a Seng plat BJLS b Paku 2 - 5 cm c Papan kayu borneo super d Flincote / meni besi e Pembantu Tukang f Tukang kayu Jumlah Dibulatkan c d e f

KOEFISIEN 0.01 0.25 0.15 0.40

SAT m3 kg org org

HARGA SATUAN 3,300,000.00 14,500.00 35,000.00 45,000.00

0.50 0.02 0.02 0.30 0.04 0.40

M1 kg m3 kg org org

31,000.00 11,000.00 3,300,000.00 14,500.00 35,000.00 45,000.00

XV 1

2

3

4

PEKERJAAN ALUMINIUM 1 m2 Pasang Pintu Rolling Door aluminium a Rolling door aluminium 1.00 m2 165,000.00 b Tukang besi konstruksi 1.50 org 45,000.00 c Pembantu Tukang 1.05 org 35,000.00 Jumlah Dibulatkan 1 m2 Pasang Pintu Aluminium pabrikan a Pintu alluminium 1.00 bh 375,000.00 b Tukang batu 1.05 org 45,000.00 c Pembantu Tukang 1.05 org 35,000.00 Jumlah Dibulatkan 1 Unit Kusen Jendela Aluminium 2 lubang dgn 2 daun jendela ( ukuran 1,6 x 1,5 m ) a Profil aluminium 4" natural (+ spare 20 %) 9.24 M1 82,000.00 b Profil daun jendela alm.( + spare 20%) 11.04 M1 79,000.00 c Kaca polos 3 mm 2.40 m2 48,000.00 d Engsel jendela 4.00 ps 21,000.00 e Grendel jendela 2.00 bh 19,000.00 f Kait angin 2.00 bh 10,900.00 g Acesories ( 6 % harga bahan) 1.00 ls 104,702.40 h Upah pembuatan profil ( 20 % bahan ) 1.00 ls 151,536.00 i Upah pembuatan daun jendela (20 % bahan) 1.00 ls 174,432.00 Jumlah Dibulatkan 1 Unit Kusen Jendela Aluminium 3 lubang dgn 2 daun jendela dan 1 kaca mati (ukuran 2 x 1,5 m) a Profil aluminium 4" natural (+ spare 20 %) 12.00 M1 82,000.00 b Profil daun jendela alm.( + spare 20%) 11.04 M1 79,000.00 c Kaca polos 3 mm 3.00 m2 48,000.00 d Engsel jendela 4.00 ps 21,000.00 e Grendel jendela 2.00 bh 19,000.00

No.

5

6

7

8

URAIAN KOEFISIEN SAT HARGA SATUAN Kait angin 2.00 bh 10,900.00 Acesories ( 6 % harga bahan ) 1.00 ls 120,009.60 Upah pembuatan profil ( 20 % bahan ) 1.00 ls 196,800.00 Upah pembuatan daun jendela (20 % bahan) 1.00 ls 174,432.00 Jumlah Dibulatkan 1 Unit Kusen Pintu Jendela gendong Aluminium dgn 2 jndl dan 1 pnt teakwood (ukr 2,2 x 2,7 m) a Profil aluminium 4" natural (+ spare 20 %) 17.04 M1 82,000.00 b Profil daun jendela alm.( + spare 20%) 14.88 M1 79,000.00 c Kaca polos 3 mm 3.96 m2 48,000.00 d Daun pintu teakwood 1.80 m2 300,200.00 e Engsel jendela 4.00 ps 21,000.00 f Grendel jendela 2.00 bh 19,000.00 g Kait angin 4.00 bh 10,900.00 h Engsel pintu 3.00 ps 22,500.00 i Grendel pintu 1.00 bh 29,000.00 j Kunci tanam 1.00 bh 15,000.00 k Acesories ( 6 % harga bahan ) 1.00 ls 138,144.00 l Upah pembuatan profil ( 20 % bahan ) 1.00 ls 16,800.00 m Upah pembuatan daun jendela (20 % bahan) 1.00 ls 7,600.00 Jumlah Dibulatkan 1 Unit Kusen Pintu Aluminium ukr 0.9 x 2,7 m a Profil aluminium 4" natural (+ spare 20 %) 7.56 M1 82,000.00 b Kaca polos 3 mm untuk bovenlight 0.45 m2 48,000.00 c Daun pintu tekwood 1.68 m2 300,200.00 d Engsel pintu 3.00 ps 22,500.00 e Grendel pintu 1.00 bh 29,000.00 f Kunci tanam 1.00 bh 15,000.00 g Acesories ( 6 % ) 1.00 ls 38,491.20 h Upah pembuatan profil ( 20 % bahan ) 1.00 ls 123,984.00 Jumlah Dibulatkan 1 bh Bovenlight Almunium dengan kisi-kisi almunium plat (ukuran 0,5 x 1 m) a Profil Aluminium 4" natural + upah 20% 3.60 M1 48,000.00 b Plat Aluminium untuk Jalusi 5.00 M1 16,000.00 c Acesories ( 6 % ) 1.00 ls 10,368.00 d Upah pembuatan profil ( 20 % bahan ) 1.00 ls 24,796.80 Jumlah Dibulatkan 1 bh Bovenlight Almunium ukuran 0,5 x 1 m dengan bagian dalam kaca a Profil Aluminium 4" natural + upah 20% 3.60 M1 82,000.00 b Kaca Polos 3 mm 0.50 m2 48,000.00 c Acesories ( 6 % ) 1.00 ls 17,712.00 d Upah pembuatan profil ( 20 % bahan ) 1.00 ls 4,959.36 Jumlah Dibulatkan f g h i

No.

URAIAN

KOEFISIEN

SAT

HARGA SATUAN

XVI PEKERJAAN KACA & PENGGANTUNG 1 1 Buah Pasang Kunci Tanam besar a Kunci tanam besar b Pembantu Tukang c Tukang kayu Jumlah Dibulatkan 2 1 Buah Pasang Kunci Tanam sedang a Kunci tanam sedang b Pembantu Tukang c Tukang kayu Jumlah Dibulatkan 3 1 Buah Pasang Kunci bulat putar Kamar Mandi a Kunci bulat putar kamar mandi b Pembantu Tukang c Tukang kayu Jumlah Dibulatkan 4 1 Buah Pasang Engsel Pintu a Engsel pintu b Pembantu Tukang c Tukang kayu Jumlah Dibulatkan 5 1 Buah Pasang Engsel Jendela Kupu-kupu a Engsel jendela b Pembantu Tukang c Tukang kayu Jumlah Dibulatkan 6 1 Buah Pasang Kait Angin a Kait angin b Pembantu Tukang c Tukang kayu Jumlah Dibulatkan 7 1 Buah Pasang Door Closer a Door closer b Pembantu Tukang c Tukang kayu Jumlah Dibulatkan 8 1 Buah Pasang Pegangan Pintu / Door Holder a Door holder b Pembantu Tukang c Tukang kayu Jumlah Dibulatkan 9 1 Buah Pasang Penahan Pintu / Door stoper

1.00 0.06 0.60

bh org org

210,000.00 35,000.00 45,000.00

1.00 0.01 0.50

bh org org

45,000.00 35,000.00 45,000.00

1.00 0.01 0.50

bh org org

49,000.00 35,000.00 45,000.00

1.00 0.02 0.15

bh org org

22,500.00 35,000.00 45,000.00

1.00 0.01 0.10

bh org org

21,000.00 35,000.00 45,000.00

1.00 0.02 0.15

bh org org

10,900.00 35,000.00 45,000.00

1.00 0.05 0.50

bh org org

348,000.00 35,000.00 45,000.00

1.00 0.05 0.50

bh org org

45,000.00 35,000.00 45,000.00

No.

10

11

12

13

14

15

URAIAN a Door stoper b Pembantu Tukang c Tukang kayu Jumlah Dibulatkan 1 Buah Pasang Grendel / Sloot pintu a Grendel / sloot pintu b Pembantu Tukang c Tukang kayu Jumlah Dibulatkan 1 Buah Pasang Grendel / Sloot jendela a Grendel / sloot jendela b Pembantu Tukang c Tukang kayu Jumlah Dibulatkan 1 Buah Pasang tarikan jendela a Tarikan jendela b Pembantu Tukang c Tukang kayu Jumlah Dibulatkan 1 m2 Pasang Kaca polos, tebal 3 mm a Kaca polos b Pembantu Tukang c Tukang kayu Jumlah Dibulatkan 1 m2 Pasang Kaca polos, tebal 5 mm a Kaca polos b Pembantu Tukang c Tukang kayu Jumlah Dibulatkan 1 m2 Pasang Kaca Ray band, tebal 5 mm a Kaca b Pembantu Tukang c Tukang kayu Jumlah Dibulatkan

KOEFISIEN 1.00 0.05 0.50

SAT bh org org

HARGA SATUAN 55,000.00 35,000.00 45,000.00

1.00 0.05 0.50

bh org org

29,000.00 35,000.00 45,000.00

1.00 0.05 0.50

bh org org

19,000.00 35,000.00 45,000.00

1.00 0.05 0.50

bh org org

15,600.00 35,000.00 45,000.00

1.10 0.02 0.15

m2 org org

48,000.00 35,000.00 45,000.00

1.10 0.02 0.15

m2 org org

66,000.00 35,000.00 45,000.00

1.10 0.02 0.15

m2 org org

125,000.00 35,000.00 45,000.00

XVII PEKERJAAN PENGECATAN 1 1 m2 Mengikis / Mengerok / mengelupas Permukaan Cat Tembok Lama a Soda api 0.05 kg

41,000.00

No.

2

3

4

5

6

7

URAIAN b Pembantu Tukang c Tukang cat Jumlah Dibulatkan 1 m2 Mendempul Dan Menggosok Kayu a Dempul jadi b Minyak cat c Ampelas kasar d Pembantu Tukang e Tukang cat Jumlah Dibulatkan 1 m2 Pengecatan Kayu Lama a Cat meni b Plamir c Ampelas d Cat dasar e Cat penutup kwalitas baik f Pembantu Tukang g Tukang cat Jumlah Dibulatkan 1 m2 Pengecatan Kayu Baru a Cat meni b Plamir c Ampelas d Cat dasar e Cat penutup kwalitas baik f Pembantu Tukang g Tukang cat Jumlah Dibulatkan 1 m2 Pengecatan Kayu dengan Politur a Politur b Dempul jadi c Ampelas d Pembantu Tukang e Tukang cat Jumlah Dibulatkan 1 m2 Pengecatan Kayu dengan Melamik a Melamik b Dempul jadi c Ampelas d Pembantu Tukang e Tukang cat Jumlah Dibulatkan 1 m2 Pengecatan Kayu dengan Cat Residu/Ter a Residu atau ter b Pembantu Tukang

KOEFISIEN 0.05 0.02

SAT org org

HARGA SATUAN 35,000.00 40,000.00

0.10 0.03 0.30 0.04 0.05

kg kg lbr org org

23,100.00 16,500.00 3,500.00 35,000.00 40,000.00

0.25 0.15 1.00 0.15 0.60 0.05 0.15

kg kg lbr kg kg org org

16,000.00 17,000.00 3,500.00 39,000.00 36,000.00 35,000.00 40,000.00

0.50 0.15 1.00 0.15 0.35 0.05 0.15

kg kg lbr kg kg org org

16,000.00 17,000.00 3,500.00 39,000.00 36,000.00 35,000.00 40,000.00

0.15 0.25 2.00 0.05 0.15

Ltr kg lbr org org

33,000.00 23,100.00 3,500.00 35,000.00 40,000.00

0.15 0.25 2.00 0.05 0.15

Ltr kg lbr org org