PERHITUNGAN ANIS POLITEKNIK No JENIS PEKERJAAN Voluma/Satuan Harga Satuan Jumlah Harga 1 Pasang Batako LT. 1 1,340 m2 15,000 20,100,000 2 Pasang Batako LT. 2 1,260 m2 15,000 18,900,000 3 Pasang Batako Pagar Teras 48 m2 17,500 840,000 4 Pasang Tangga Depan + Samping 1 Ls 1,250,000 1,250,000 5 Cor Late 10/20 371 m' 25,000 9,275,000 6 Cor Ring Balak 15/20 175 m' 25,000 4,375,000 7 Cor Kolom Praktis 116 bh 25,000 2,900,000 8 Cor Can Cren 320 m' 50,000 16,000,000 9 Cor Meja + Pasang Keramik 1 Ls 750,000 750,000 10 Urugan 1 Ls 3,750,000 3,750,000 11 Cor Rabat 1,302 m2 15,000 19,530,000 12 Gali Bekas Tanah Galian 5 orang 360,000 1,800,000 13 Plester Acian Tembok LT.1 2,796 m2 15,000 41,940,000 14 Plester Acian Tembok LT.2 2,520 m2 15,000 37,800,000 15 Plester Acian Pagar Teras 96 m2 20,000 1,920,000 16 Plester Acian Kolom Tangga 8 bh 40,000 320,000 17 Plester Acian Balok Tangga 8 bh 50,000 400,000 18 Plester Acian Kolom 40 x 40 116 bh 125,000 14,500,000 19 Plester Acian Lesplan 165 m' 60,000 9,912,000 20 Pasang Kamar Mandi 9 bh 750,000 6,750,000 21 Pasang Keramik Dinding 20/25 153 m2 40,000 6,132,000 22 Pasang keramik LT.1 1,311 m2 20,000 26,220,000 23 Pasang Keramik LT. 2 1,230 m' 20,000 24,600,000 24 Pasang Plint LT.1 + LT.2 1,430 m' 15,000 21,450,000 25 Pasang Keramik Tangga Depan 2 bh 1,500,000 3,000,000 26 Pasang Keramik Tangga Samping 1 bh 250,000 250,000 27 Pasang Keramik Tangga 4 bh 2,500,000 10,000,000 28 Pasang Atap Multiroof 2,181 m2 40,000 87,256,000 29 Pasang Lesplan + Cat 191 m' 20,000 3,820,000 30 Plamir + Cat Tembok 6,866 m2 3,500 24,031,000 Jumlah ### ### ###

Upload: sola-cyber

Post on 08-Aug-2015

325 views

Category:

Documents


16 download

DESCRIPTION

Excel

TRANSCRIPT

Page 1: Cara Menghitung RAB Gedung

PERHITUNGAN ANIS POLITEKNIK

No JENIS PEKERJAAN Voluma/Satuan Harga Satuan Jumlah Harga

1 Pasang Batako LT. 1 1,340 m2 15,000 20,100,000

2 Pasang Batako LT. 2 1,260 m2 15,000 18,900,000

3 Pasang Batako Pagar Teras 48 m2 17,500 840,000

4 Pasang Tangga Depan + Samping 1 Ls 1,250,000 1,250,000

5 Cor Late 10/20 371 m' 25,000 9,275,000

6 Cor Ring Balak 15/20 175 m' 25,000 4,375,000

7 Cor Kolom Praktis 116 bh 25,000 2,900,000

8 Cor Can Cren 320 m' 50,000 16,000,000

9 Cor Meja + Pasang Keramik 1 Ls 750,000 750,000

10 Urugan 1 Ls 3,750,000 3,750,000

11 Cor Rabat 1,302 m2 15,000 19,530,000

12 Gali Bekas Tanah Galian 5 orang 360,000 1,800,000

13 Plester Acian Tembok LT.1 2,796 m2 15,000 41,940,000

14 Plester Acian Tembok LT.2 2,520 m2 15,000 37,800,000

15 Plester Acian Pagar Teras 96 m2 20,000 1,920,000

16 Plester Acian Kolom Tangga 8 bh 40,000 320,000

17 Plester Acian Balok Tangga 8 bh 50,000 400,000

18 Plester Acian Kolom 40 x 40 116 bh 125,000 14,500,000

19 Plester Acian Lesplan 165 m' 60,000 9,912,000

20 Pasang Kamar Mandi 9 bh 750,000 6,750,000

21 Pasang Keramik Dinding 20/25 153 m2 40,000 6,132,000

22 Pasang keramik LT.1 1,311 m2 20,000 26,220,000

23 Pasang Keramik LT. 2 1,230 m' 20,000 24,600,000

24 Pasang Plint LT.1 + LT.2 1,430 m' 15,000 21,450,000

25 Pasang Keramik Tangga Depan 2 bh 1,500,000 3,000,000

26 Pasang Keramik Tangga Samping 1 bh 250,000 250,000

27 Pasang Keramik Tangga 4 bh 2,500,000 10,000,000

28 Pasang Atap Multiroof 2,181 m2 40,000 87,256,000

29 Pasang Lesplan + Cat 191 m' 20,000 3,820,000

30 Plamir + Cat Tembok 6,866 m2 3,500 24,031,000

Jumlah 419,771,000

129,979,260 549,750,260

Page 2: Cara Menghitung RAB Gedung

389,000,000 109,000,000 498,000,000

51,750,260 Bayar Lunas 55,000,000

Page 3: Cara Menghitung RAB Gedung

PERHITUNGAN ANIS RUMAH GENSET

No Jenis Pekerjaan Voluma/Satuan Harga Satuan Jumlah Harga

1 Galian Pasang Pondasi 11 m' 25,000 275,000

2 Cor Slof 15/20 11 m' 25,000 275,000

3 Cor Ring Balak 15/20 11 m' 25,000 275,000

4 Pasang Batako 26.5 m2 15,000 397,500

5 Plester acian 58.5 m2 15,000 877,500

6 Plamir + Cat Tembok 58.5 m2 3,500 204,750

7 Pasang Plafond 18.86 m2 25,000 471,500

8 Cor Lantai 10 m2 20,000 200,000

9 Cat Plafon 18.86 m2 3,500 66,010

10 Pasang Atap Multiroof 30 m2 60,000 1,800,000

JUMLAH 4,842,260

Page 4: Cara Menghitung RAB Gedung

PERHITUNGAN ANIS TDM LAMA

No Jenis Pekerjaan Voluma/Satuan Harga Satuan Jumlah Harga

1 Galaian Foot Plat 16 bh 200,000 3,200,000 2 Galian Pasangan Pondasi 91 mtr 30,000 2,730,000 3 Cor Fotplat 16 bh 150,000 2,400,000 4 Cor Slof 20/30 91 mtr 30,000 2,730,000 5 Cor Kolom 35/35 16 bh 200,000 3,200,000 6 Galian Psg cor peresepan 1 ls 750,000 750,000 7 Pembongkaran 1 ls 500,000 500,000 8 Urungan 1 ls 1,000,000 1,000,000 9 Begesting Cor plat Lti I 200 m2 200 mtr 150,000 30,000,000

Jumlah 46,510,000 Per. Pagar + Kamar tidur

1 Galian Pasang Pondasi 178.5 m' 30,000 5,355,000 2 Cor Slof 15/20 136.5 m' 20,000 2,730,000 3 Cor Kolom 15/20 22 bh 100,000 2,200,000 4 Cor Kolom Praktis 15 bh 20,000 300,000 5 Cor Ring Balak 192 mtr 20,000 3,840,000 6 Pasang Batako 480 m2 15,000 7,200,000 7 Plester Acian 968 m2 15,000 14,520,000 8 Plester Kolom 15/20 22 bh 50,000 1,100,000 9 Urugan 1 Ls 1,000,000 1,000,000

10 Cor Lantai 82.5 m2 15,000 1,237,500 11 Atap 90 m2 30,000 2,700,000 12 Pondasi Garasi 12.5 m' 25,000 312,500

Jumlah 42,495,000

JUMLAH 89,005,000

PERHITUNGAN ANIS TDM BARU

No Jenis Pekerjaan Voluma/Satuan Harga Satuan Jumlah Harga

1 Bongkar Kap Atap Lama 1 Ls 1,000,000 1,000,000

2 Bongkar Pahat Ring Bangunan Lama 1 Ls 500,000 500,000

3 Bagesting Cor Plat Lantai 230.88 150,000 34,632,000

JUMLAH 36,132,000

PERHITUNGAN ANIS RUMAH GENSET

No Jenis Pekerjaan Voluma/Satuan Harga Satuan Jumlah Harga

1 Galian Pasang Pondasi 11 m' 25,000 275,000 2 Cor Slof 15/20 11 m' 25,000 275,000 3 Cor Ring Balak 15/20 11 m' 25,000 275,000 4 Pasang Batako 26.5 m2 15,000 397,500 5 Plester acian 58.5 m2 15,000 877,500

Page 5: Cara Menghitung RAB Gedung

6 Plamir + Cat Tembok 58.5 m2 3,500 204,750 7 Pasang Plafond 18.86 m2 25,000 471,500 8 Cor Lantai 10 m2 20,000 200,000 9 Cat Plafon 18.86 m2 3,500 66,010

10 Pasang Atap Multiroof 30 m2 60,000 1,800,000

JUMLAH 4,842,260

129,979,260

Page 6: Cara Menghitung RAB Gedung

PONDASI PROYEK KWU ( GORIS )

No Panjang (cm) Lebar (cm) Tinggi (cm) Jumlah ( M3)

A1 3.3 0.4 1.3 2

A2 2.1 0.4 1.3 1

A3 2.1 0.4 1.3 1

A4 0.9 0.4 1.3 0

A5 2.1 0.4 1.3 1

A6 0.9 0.4 1.3 0

A7 3.3 0.4 1.3 2

A8 3.3 0.4 1.3 2

A9 3.3 0.4 1.3 2

A10 0.9 0.4 1.3 0

A11 3.3 0.4 1.3 2

A12 2.1 0.4 1.3 1

A13 2.1 0.4 1.3 1

A14 0.9 0.4 1.3 0

A15 0.9 0.4 1.3 0

A16 3.3 0.4 1.3 2

A17 3.1 0.4 1.3 2

A18 3.1 0.4 1.3 2

A19 3.1 0.4 1.3 2

A20 3.1 0.4 1.3 2

A21 3.1 0.4 1.3 2

A22 3.1 0.4 1.3 2

A23 3.1 0.4 1.3 2

A24 3.1 0.4 1.3 2

A25 3.1 0.4 1.3 2

A26 3.1 0.4 1.3 2

A27 3.1 0.4 1.3 2

A28 3.1 0.4 1.3 2

A29 3.1 0.4 1.3 2

A30 3.1 0.4 1.3 2

A31 3.1 0.4 1.3 2

A32 3.1 0.4 1.3 2

A33 3.1 0.4 1.3 2

Jumlah 46

Page 7: Cara Menghitung RAB Gedung

No Panjang (cm) Lebar (cm) Tinggi (cm) Jumlah ( M3)

C1 3.4 0.4 1.3 2

C2 3.4 0.4 1.3 2

C3 4.4 0.4 1.3 2

C4 2.9 0.4 1.3 2

C5 3.3 0.4 1.3 2

C6 3.3 0.4 1.3 2

C7 3.3 0.4 1.3 2

C8 1.2 0.4 1.3 1

C9 3.6 0.4 1.3 2

Jumlah 15

Jumlah A 46

Jumlah B 95

Jumlah C 15

Jumlah Seluruhnya 155

12,411,360

Page 8: Cara Menghitung RAB Gedung

PONDASI PROYEK KWU ( GORIS )

No Panjang (cm) Lebar (cm) Tinggi (cm) Jumlah ( M3)

B1 3.3 0.4 1.3 2

B2 3.3 0.4 1.3 2

B3 3.3 0.4 1.3 2

B4 3.3 0.4 1.3 2

B5 3.3 0.4 1.3 2

B6 3.3 0.4 1.3 2

B7 1.6 0.4 1.3 1

B8 3.3 0.4 1.3 2

B9 3.3 0.4 1.3 2

B10 2.1 0.4 1.3 1

B11 3.3 0.4 1.3 2

B12 2.1 0.4 1.3 1

B13 3.3 0.4 1.3 2

B14 2.1 0.4 1.3 1

B15 3.4 0.4 1.3 2

B16 3.3 0.4 1.3 2

B17 3.3 0.4 1.3 2

B18 3.3 0.4 1.3 2

B19 2.9 0.4 1.3 2

B20 2.9 0.4 1.3 2

B21 4.4 0.4 1.3 2

B22 4.4 0.4 1.3 2

B23 10.3 0.4 1.3 5

B24 10.3 0.4 1.3 5

B25 4.4 0.4 1.3 2

B26 3.1 0.4 1.3 2

B27 3.1 0.4 1.3 2

B28 3.1 0.4 1.3 2

B29 3.1 0.4 1.3 2

B30 2.9 0.4 1.3 2

B31 3.1 0.4 1.3 2

B32 2.9 0.4 1.3 2

B33 3.3 0.4 1.3 2

B34 0.6 0.4 1.3 0

B35 3.1 0.4 1.3 2

Page 9: Cara Menghitung RAB Gedung

B36 3.1 0.4 1.3 2

B37 4.4 0.4 1.3 2

B38 4.4 0.4 1.3 2

B39 4.4 0.4 1.3 2

B40 3.3 0.4 1.3 2

B41 2.1 0.4 1.3 1

B42 1.2 0.4 1.3 1

B43 2.7 0.4 1.3 1

B44 3.8 0.4 1.3 2

B45 1.75 0.4 1.3 1

B46 2.5 0.4 1.3 1

B47 2.9 0.4 1.3 2

B48 3.4 0.4 1.3 2

B49 3.3 0.4 1.3 2

B50 3.3 0.4 1.3 2

B51 2.8 0.4 1.3 1

B52 2.9 0.4 1.3 2

B53 3.3 0.4 1.3 2

B54 3.3 0.4 1.3 2

B55 1.1 0.4 1.3 1

Jumlah 95

Page 10: Cara Menghitung RAB Gedung

Jumlah ( M3)

Page 11: Cara Menghitung RAB Gedung

PONDASI PROYEK KWU ( GORIS )

No Panjang (cm) Lebar (cm) Tinggi (cm) Jumlah ( M3)

A1 330 0.4 157 20,724

A2 210 0.4 155 13,020

A3 210 0.4 150 12,600

A4 90 0.4 140 5,040

A5 210 0.4 155 13,020

A6 90 0.4 150 5,400

A7 330 0.4 155 20,460

A8 330 0.4 150 19,800

A9 330 0.4 155 20,460

A10 90 0.4 150 5,400

A11 330 0.4 160 21,120

A12 210 0.4 155 13,020

A13 210 0.4 150 12,600

A14 90 0.4 150 5,400

A15 90 0.4 150 5,400

A16 330 0.4 150 19,800

A17 310 0.4 145 17,980

A18 310 0.4 145 17,980

A19 310 0.4 140 17,360

A20 310 0.4 165 20,460

A21 310 0.4 145 17,980

A22 310 0.4 155 19,220

A23 310 0.4 140 17,360

A24 310 0.4 155 19,220

A25 310 0.4 135 16,740

A26 310 0.4 150 18,600

A27 310 0.4 155 19,220

A28 310 0.4 180 22,320

A29 310 0.4 175 21,700

A30 310 0.4 170 21,080

A31 310 0.4 135 16,740

A32 310 0.4 135 16,740

A33 310 0.4 125 15,500

Jumlah 529,464

Page 12: Cara Menghitung RAB Gedung

No Panjang (cm) Lebar (cm) Tinggi (cm) Jumlah ( M3)

C1 340 0.4 50 6,800

C2 340 0.4 50 6,800

C3 440 0.4 60 10,560

C4 290 0.4 140 16,240

C5 330 0.4 140 18,480

C6 330 0.4 50 6,600

C7 330 0.4 50 6,600

C8 120 0.4 140 6,720

C9 360 0.4 140 20,160

Jumlah 98,960

Jumlah A 529,464

Jumlah B 634,694

Jumlah C 98,960

Jumlah Seluruhnya 1,263,118

97 126,311,840,000

Page 13: Cara Menghitung RAB Gedung

PONDASI PROYEK KWU ( GORIS )

No Panjang (cm) Lebar (cm) Tinggi (cm)

B1 330 0.4 160

B2 330 0.4 160

B3 330 0.4 160

B4 330 0.4 160

B5 330 0.4 160

B6 330 0.4 160

B7 160 0.4 90

B8 330 0.4 150

B9 330 0.4 160

B10 210 0.4 130

B11 330 0.4 90

B12 210 0.4 90

B13 330 0.4 130

B14 210 0.4 120

B15 340 0.4 150

B16 330 0.4 150

B17 330 0.4 150

B18 330 0.4 150

B19 290 0.4 150

B20 290 0.4 150

B21 440 0.4 60

B22 440 0.4 60

B23 10.3 0.4 60

B24 10.3 0.4 60

B25 440 0.4 60

B26 310 0.4 120

B27 310 0.4 120

B28 310 0.4 120

B29 310 0.4 120

B30 290 0.4 50

B31 310 0.4 50

B32 290 0.4 60

B33 330 0.4 60

B34 60 0.4 50

B35 310 0.4 50

Page 14: Cara Menghitung RAB Gedung

B36 310 0.4 50

B37 440 0.4 60

B38 440 0.4 60

B39 440 0.4 60

B40 330 0.4 60

B41 210 0.4 40

B42 120 0.4 40

B43 270 0.4 40

B44 380 0.4 40

B45 175 0.4 40

B46 235 0.4 40

B47 290 0.4 120

B48 340 0.4 120

B49 330 0.4 110

B50 330 0.4 110

B51 280 0.4 90

B52 290 0.4 70

B53 330 0.4 60

B54 330 0.4 60

B55 110 0.4 40

Jumlah

Page 15: Cara Menghitung RAB Gedung

PONDASI PROYEK KWU ( GORIS )

Jumlah ( M3)

21,120

21,120

21,120

21,120

21,120

21,120

5,760

19,800

21,120

10,920

11,880

7,560

17,160

10,080

20,400

19,800

19,800

19,800

17,400

17,400

10,560

10,560

247

247

10,560

14,880

14,880

14,880

14,880

5,800

6,200

6,960

7,920

1,200

6,200

Page 16: Cara Menghitung RAB Gedung

6,200

10,560

10,560

10,560

7,920

3,360

1,920

4,320

6,080

2,800

3,760

13,920

16,320

14,520

14,520

10,080

8,120

7,920

7,920

1,760

634,694

Page 17: Cara Menghitung RAB Gedung

PEKERJAAN STANLESTEL PROYEK TEKNIK LISTRIK ( SIAS )

Reling Pagar Atas

Panjang (m1) Buah Jumlah (m1)

1.5 24 36

1.85 2 3.7

1.7 1 1.7

2.8 11 30.8

2.9 1 2.9

2.85 1 2.85

JUMLAH 1 77.95

Tangga Samping Kanan - Muka Belakang

Panjang (m1) Buah Jumlah (m1)

16.6 16.8 33.4

Tangga Samping Kiri - Muka Belakang

Panjang (m1) Buah Jumlah (m1)

16.6 16.8 33.4

Jumlah 1 77.95

Jumlah 2 31.65

Jumlah Tangga Samping Kanan 33.40

Jumlah Tangga Samping Kiri 33.40

Jumlah Tangga Muka Kanan - Kiri 5.20

Jumlah Tangga Muka Los 1.80

Jumlah Seluruhnya 183.40

Page 18: Cara Menghitung RAB Gedung

PEKERJAAN STANLESTEL PROYEK TEKNIK LISTRIK ( SIAS )

Reling Pagar Bawah

Panjang (m1) Buah Jumlah (m1)

1.85 1 1.85

1.9 2 3.8

2.9 7 20.3

2.85 2 5.7

JUMLAH 2 31.65

Tangga Muka Samping Kanan - Kiri

Panjang (m1) Buah Jumlah (m1)

2.45 2.75 5.2

Tangga Samping Di Muka Los

Panjang (m1) Buah Jumlah (m1)

1.8 1 1.8

Page 19: Cara Menghitung RAB Gedung

NO URAIAN PEKERJAAN VOL SATUAN HARGA SATUAN

1 Pemasangan Lampu downlight 269 Titik 30,000

2 Pemasangan Stop Kontak 40 Titik 30,000

3 Pemasangan MCB 50 Titik 30,000

4 Pemasangan Penangkal Petir 12 Pucuk 150,000

5 Pemasangan Arde Instalasi 1 Unit 75,000

6 Pemasangan Panel Induk 1 Unit 250,000

7 Pemasangan Sub Panel 15 Unit 75,000

8 1 Meter 500,000

JUMLAH

PANJAR

SISA

Penarikan SR 3 Phase + Rakit Meter + KS Tipe 36 3 PhaseLUNAS

Page 20: Cara Menghitung RAB Gedung

JUMLAH

8,070,000

1,200,000

1,500,000

1,800,000

75,000

250,000

1,125,000

500,000

14,520,000

2,750,000

11,770,000

LUNAS