  • 7/25/2019 Mekanisme Penghitungan Anggaran Dan Realisasi Lifting Dalam PSC - Edit 1 Solo

    1/37

    PRIVATE AND CONFIDENTIAL

    SATUAN KERJA KHUSUS

    PELAKSANA KEGIATAN USAHA HULU MINYAK DAN GAS BUMI

    (SKKMIGAS)

    PRIVATE AND CONFIDENTIAL

    Mekanisme Penghitungan Anggaran dan Realisasi

    Lifting dalam

    Production Sharing Contract

    Solo, 20-22 Agustus 2015

  • 7/25/2019 Mekanisme Penghitungan Anggaran Dan Realisasi Lifting Dalam PSC - Edit 1 Solo

    2/37

    2013SKKMIGAS

    Allrightsreserved

    AGENDA 1. Production Sharing Contract (PSC)

    2. Skema PSC

    3. Perhitungan Lifting dan Pelaporan

  • 7/25/2019 Mekanisme Penghitungan Anggaran Dan Realisasi Lifting Dalam PSC - Edit 1 Solo

    3/37

    2013SKKMIGAS

    Allrightsreserved

    AGENDA 1. Production Sharing Contract

  • 7/25/2019 Mekanisme Penghitungan Anggaran Dan Realisasi Lifting Dalam PSC - Edit 1 Solo

    4/37

    PRIVATE AND CONFIDENTIALPRIVATE AND CONFIDENTIAL

    Klasifikasi Kontrak Industri Hulu Migas

    Sistem

    Kontrak Migas

    Kontrak

    Kontrak Jasa

    Kontrak JasaMurni

    Kontrak JasaBeresiko

    ProductionSharingContract

    Konsesi

  • 7/25/2019 Mekanisme Penghitungan Anggaran Dan Realisasi Lifting Dalam PSC - Edit 1 Solo

    5/37PRIVATE AND CONFIDENTIALPRIVATE AND CONFIDENTIAL

    Mekanisme Pembagian Kontrak Hulu Migas

  • 7/25/2019 Mekanisme Penghitungan Anggaran Dan Realisasi Lifting Dalam PSC - Edit 1 Solo

    6/37PRIVATE AND CONFIDENTIALPRIVATE AND CONFIDENTIAL

    Sejarah Production Sharing Contract Indonesia

    Era Kolonial Belanda Era Awal Kemerdekaan Era Industri MigasModern

    Penemuan Minyak diTelaga Said, Langkat(1890) oleh Royal Shell -Belanda

    Pemberian Hak KonsesipadaStanvac (1925) danCaltex (1936)

    UU No. 44 Tahun 1960 tentangPertambangan Minyak dan GasBumi : Perusahaan asing tidaksebagai pemegang konsesi, tapisebagai kontraktor

    Penandatanganan Kontrak Karyadengan Pan American Oil tahun1963.

    Dalam pelaksanaan, pemerintahmasih memliki keterbatasan

    pengawasan dan tidak jelasnyaaspek kepemilikan

    Berbagi hasil penjualan, bukanproduksi.

    Pemerintah inginberbagi hasil produksi

    PenandatangananPSCpertama di dunia, dengaIndependece IndonesianAmerican Oil Company(IIAPCO) tahun 1966

    UU No. 8 /1971 tentang

    Pertamina sebagai dasarhukum PSC

  • 7/25/2019 Mekanisme Penghitungan Anggaran Dan Realisasi Lifting Dalam PSC - Edit 1 Solo

    7/37PRIVATE AND CONFIDENTIALPRIVATE AND CONFIDENTIAL

    Karakter Bisnis Migas

    Karakter Bisnis Migas

    HighInvestment

    High RiskHigh

    Technology

  • 7/25/2019 Mekanisme Penghitungan Anggaran Dan Realisasi Lifting Dalam PSC - Edit 1 Solo

    8/37PRIVATE AND CONFIDENTIALPRIVATE AND CONFIDENTIAL

    Mengapa PSC?

    Penguasaan Sumber Daya Alam tetap berada

    pada Pemerintah

    Pemerintah tidak akan menanggung resikoatas tidak ditemukannya cadangan migas

    Pemerintah tidak menghadapi kesulitan dana, dana selalu tersediakapan saja dan dalam jumlah yang tidak terbatas karena operasiperminyakan menghadapi banyak ketidakpastian

    Mengapa PSC ?

  • 7/25/2019 Mekanisme Penghitungan Anggaran Dan Realisasi Lifting Dalam PSC - Edit 1 Solo

    9/37

  • 7/25/2019 Mekanisme Penghitungan Anggaran Dan Realisasi Lifting Dalam PSC - Edit 1 Solo

    10/37PRIVATE AND CONFIDENTIALPRIVATE AND CONFIDENTIAL

    Ketentuan Umum PSC (1)

    PSC merupakan Kontrak Bisnisantara Pemerintah(yang diwakili oleh SKK

    Migas) dengan KontraktorKontrak Kerjasama;

    Manajemen berada ditangan SKK Migas sesuai dengan UU no. 22/2001, PP

    no. 42/2002, dll;

    Masa ekplorasi 6 tahun(sejak ditandatanganinya kontrak)boleh

    diperpanjang untuk masa 4 tahun. Bila hingga masa 10 tahun ternyata

    tidak diperoleh cadangan/cadangan yang ditemukan tidak ekonomis untuk

    diproduksi maka secara otomatis. Resiko finansial ditanggung kontraktor;

    Kontraktor mempunyai kemampuan dalam penyediaan dana (financialability), teknologi/keahlian serta menanggung resiko finansial;

  • 7/25/2019 Mekanisme Penghitungan Anggaran Dan Realisasi Lifting Dalam PSC - Edit 1 Solo

    11/37PRIVATE AND CONFIDENTIALPRIVATE AND CONFIDENTIAL

    Ketentuan Umum PSC (2)

    Kontraktor berkewajiban menyerahkan migas bagiannya untuk kebutuhandalam negeri (DMO);

    Kontraktor mempunyai kewajiban untuk membiayai operasi usaha yang

    dapat direcover dari hasil produksinya (Cost Recovery).

    Pembagian berdasarkan produksi minyak dan gas bumi.

    Perhitungan pembagian hak Pemerintah dan Kontraktor berdasarkan tahun

    kalender.

    Pemeriksaan/Audit pembukuan dilaksanakan oleh SKK Migas dan Auditor

    Pemerintah.

  • 7/25/2019 Mekanisme Penghitungan Anggaran Dan Realisasi Lifting Dalam PSC - Edit 1 Solo

    12/37PRIVATE AND CONFIDENTIALPRIVATE AND CONFIDENTIAL

    Incld.

    Exploration

    Period

    Operation/Activities Flow

    Exploration (6+4) Exploitation/Production (30)

    WP&B AFE FQR WP&B AFE FQRCurrent

    Audit

    Ops.

    Control

    Siesmic

    G&G

    Study Expl.

    Drilling Production

    & Operation

    Support

    Business &

    Commercial Analysis

    Well Dev.

    Exploration

    Audit

    Tender

    WKP Spending Commitment

    Financial Flow

    POD

    Proses Bisnis Industri Migas

  • 7/25/2019 Mekanisme Penghitungan Anggaran Dan Realisasi Lifting Dalam PSC - Edit 1 Solo

    13/37

    PRIVATE AND CONFIDENTIALPRIVATE AND CONFIDENTIALSumber : http://www.skkmigas.go.id/12-kkks-asing-rugi-rp19-triliun-cari-cadangan-migas-di-laut-dalam-indonesia

    Kegagalan Penemuan Cadangan Ekonomis 2009-2013

  • 7/25/2019 Mekanisme Penghitungan Anggaran Dan Realisasi Lifting Dalam PSC - Edit 1 Solo

    14/37

    PRIVATE AND CONFIDENTIAL

    2013SKKMIGASAllrightsreserved

    AGENDA 2. Skema PSC

  • 7/25/2019 Mekanisme Penghitungan Anggaran Dan Realisasi Lifting Dalam PSC - Edit 1 Solo

    15/37

    PRIVATE AND CONFIDENTIALPRIVATE AND CONFIDENTIAL

    Alur Perhitungan PSC Indonesia

    288

    2,861

    ContractorEntitlement

    361

    SKK MigasEntitlement

    2,139

    DMO

    KK Migas Share Contractor Share721

    Cost Recovery

    2,500

    1,500Equity to be Split

    1,000

    5,000

    Total Lifting

    FTP - 20%

    712

    1,779

    Assumes

    Lifting 5.000 bbl, ICP $40/bbl

    Operating costs $100.000, DMO new oil

    2.500

    288

    433-361

    2.861

    Contractor Entitlement :

    1. Rec. Operating Cost - $100.000/$40

    2. FTP Share 28.8462%x1.000 bbl

    3. Equity Share -28.8462%x1.500 bbl4. (-)DMO -28.8462%x25%x5.000 bbl

    5. Total Entitlement

    SKK Migas Entitlement :

    1. FTP Share 71.1538%x1.000 bbl

    2. Equity Share -71.1538%x1.500 bbl

    3. (-)DMO -28.8462%x25%x5.000 bbl

    4. Total Entitlement

    712

    1.067

    361

    2.139

    Asumsi:

    Split 85/15

    Tax 48%

  • 7/25/2019 Mekanisme Penghitungan Anggaran Dan Realisasi Lifting Dalam PSC - Edit 1 Solo

    16/37

    PRIVATE AND CONFIDENTIALPRIVATE AND CONFIDENTIAL

    FTP (First Tranche Petroleum)

    288

    2,861

    ContractorEntitlement

    361

    SKK MigasEntitlement

    2,139

    DMO

    SKK Migas Share Contractor Share721

    Cost Recovery

    2,500

    1,500Equity to be Split

    1,000

    5,000

    Total Lifting

    FTP - 20%

    712

    1,779

    FTP adalah pemotonganpertama dari revenue untuk

    menjamin adanya bagian

    SKK Migas.

    Besarnya antara 15% - 20%

    dan dibagi antara SKKMigas dan Kontraktor.

    PSC terbaru menggunakan

    split 10% tetapi seluruhnya

    untuk Pemerintah

  • 7/25/2019 Mekanisme Penghitungan Anggaran Dan Realisasi Lifting Dalam PSC - Edit 1 Solo

    17/37

    PRIVATE AND CONFIDENTIALPRIVATE AND CONFIDENTIAL

    Domestic Market Obligation (DMO)

    After commercial production commence, full fill its

    obligation toward supply of domestic market in

    Indonesia. Contractor agrees to sell and deliver to GOI a

    portion of the share of the petroleum to which

    contractor is entitled pursuant clauses 6.1.3, 6.2.2 and

    6.3.1

  • 7/25/2019 Mekanisme Penghitungan Anggaran Dan Realisasi Lifting Dalam PSC - Edit 1 Solo

    18/37

    PRIVATE AND CONFIDENTIALPRIVATE AND CONFIDENTIAL

    Domest ic Market Obl igat ion (DMO)

    288

    2,861

    ContractorEntitlement

    361

    SKK MigasEntitlement

    2,139

    DMO

    KK Migas Share Contractor Share721

    Cost Recovery

    2,500

    1,500Equity to be Split

    1,000

    5,000Total Lifting

    FTP - 20%

    712

    1,779

    Domestic Market Obligation adalah

    kewajiban kontraktor untuk

    menyerahkan 25% dari

    entitlementnya untuk kebutuhan

    kilang dalam negeri.

    Pemerintah melalui Kemenkeumembayar kontraktor atas

    penyerahan tersebut.

    Untuk 60 bulan atau 5 tahun pertama

    (new field) pemerintah akanmembayar senilai ICP dan

    selanjutnya harga 20% ICP, 15% ICP

    atau 20 Cent (sesuai PSC).

  • 7/25/2019 Mekanisme Penghitungan Anggaran Dan Realisasi Lifting Dalam PSC - Edit 1 Solo

    19/37

    PRIVATE AND CONFIDENTIALPRIVATE AND CONFIDENTIAL

    Cost Recovery

    Dalam PSC tidak ada istilahcostrecovery, yang ada adalahoperatingcost.

    Semua pengeluaran dan kewajibanyang terjadi untuk melaksanakanoperasi perminyakan (PSC Section I,paragraph 1.2.16 dan Exhibit C).

    288

    2,861

    ContractorEntitlement

    361

    SKK MigasEntitlement

    2,139

    DMO

    KK Migas Share Contractor Share721

    Cost Recovery

    2,500

    1,500Equity to be Split

    1,000

    5,000

    Total Lifting

    FTP - 20%

    712

    1,779

  • 7/25/2019 Mekanisme Penghitungan Anggaran Dan Realisasi Lifting Dalam PSC - Edit 1 Solo

    20/37

    PRIVATE AND CONFIDENTIALPRIVATE AND CONFIDENTIAL

    Cost Recovery

    Pengembalian biaya operasi (Operating Cost) yang dikeluarkan olehKontraktor KKS dari hasil produksi migas, setelah kontraktor berhasilmenemukan migas secara komersil

    Diberikan dalam bentuk inkind

    Operating Cost adalah semua pengeluaran untuk membiayai kegiatan operasihulu migas meliputi kegiatan eksplorasi, pengembangan lapangan, kegiatanproduksi, dan biaya administrasi. Jadi, Operating Cost, ada biaya investasi(eksplorasi dan pengembangan lapangan) dan ada biaya operasi danadministrasi (termasuk untuk membiayai kegiatan penunjang)

    Cost Recovery merupakan konsekuensi dari prinsip Pemerintah tidak bolehmengeluarkan investasi dan menanggung resiko (UU No. 22 Tahuan 2001

    Pasal 6 (2)c, PP No. 35 Pasal 26 (1), (2), dan PSC)

  • 7/25/2019 Mekanisme Penghitungan Anggaran Dan Realisasi Lifting Dalam PSC - Edit 1 Solo

    21/37

    PRIVATE AND CONFIDENTIALPRIVATE AND CONFIDENTIAL

    Cost Recovery

    Mulai tahun produksi komersial, biaya operasi yang di-recover pada suatutahun terdiri dari: (PSC, Exhibit C,paragraphII-2.1.)

    1. Current year Non-Capital : biaya yang dapat diperoleh kembali darihasil produksi tahun berjalan

    2. Current years depreciation for Capital Costs :penyusutan biaya capitalyang dapat diperoleh kembali dari hasil produksi tahun berjalan

    3. Unrecovered Cost Prior Periode: Biaya operasi tahun yang belumterkembalikan sebagai cost recovery (jika ada)

  • 7/25/2019 Mekanisme Penghitungan Anggaran Dan Realisasi Lifting Dalam PSC - Edit 1 Solo

    22/37

    PRIVATE AND CONFIDENTIALPRIVATE AND CONFIDENTIAL

    Cost Recovery

    Cost Recovery

    Exploration Stage (6+4)

    Exploitation/Production Stage (the rest of period until 30 year)

    Seismic, G&G cost, Explorati on

    Dr il li ng Cost, Support Cost

    Exploi tation/Production: Devlp.

    Dri ll ing, Production & Operation

    Cost, Equipment, Suppor t Cost ,I nterest Cost Recovery

    Current Year Expl orati on Cost:

    Seismic, G&G cost, Explorati on

    Dr il li ng Cost, Support Cost

    Curr ent Year - Non

    Capital

    Capital

    Depreciation

    I nvestment Credit

    (Recoverable/Taxable)

    Unrecovered Cost

    Prior Per iod

    d f k

  • 7/25/2019 Mekanisme Penghitungan Anggaran Dan Realisasi Lifting Dalam PSC - Edit 1 Solo

    23/37

    PRIVATE AND CONFIDENTIALPRIVATE AND CONFIDENTIAL

    Identifikasi Biaya

    0-10 th

    Tahap Eksplorasi

    0-5 th

    Tahap Dev

    Sisa Tahun Kontrak

    Tahap Production

    Geological & Geophysical

    Seismics

    Exploratory Drilling

    Other Facilities

    Overhead

    Development Drilling

    Reservoir Studies

    Production Facilities

    Other Facilities

    Overhead

    Production Operations

    Production Supports

    Overhead

    Exploration

    Development

    EXPLORATION EXPLOITATION

    0 30 Th

    Dev

    First Drop

    k i b li C R

  • 7/25/2019 Mekanisme Penghitungan Anggaran Dan Realisasi Lifting Dalam PSC - Edit 1 Solo

    24/37

    PRIVATE AND CONFIDENTIALPRIVATE AND CONFIDENTIAL

    Mekanisme PengembalianCost Recovery

    Besaran pengembalian biaya operasi mengacu kepada pada estimasi dalamWP&B yang direaliasasikan dalam tahun berjalan

    Kontraktor mendapat migas bagiannya berdasarkan persentase hak kontraktorsementara (provisional entitlement) yang dihitung dari produksi yang dijual(lifting) untuk periode tertentu dan dibukukan secara periodik oleh kontraktor

    Di dalam migas bagian kontraktor terdapat unsur pengembalian biaya operasi

    Persentase hak kontraktor sementara (provisional entitlement) di-updatedengan munculnya figur aktual setiap bulannya.

    Hak Pemerintah dan hak Kontraktor yang aktual diketahui pada akhir tahun,dan perbedaan antara hak aktual dan hak sementara diselesaikan oleh para

    pihak

    K P b li C R

  • 7/25/2019 Mekanisme Penghitungan Anggaran Dan Realisasi Lifting Dalam PSC - Edit 1 Solo

    25/37

    PRIVATE AND CONFIDENTIALPRIVATE AND CONFIDENTIAL

    Kapan PengembalianCost Recovery

    Setelah adanya produksi komersial

    Setelah SKK Migas mengambil lebih dahulu persentase tertentu dari hasilproduksi (FTP)

    Sebelum hasil produksi dibagi antara SKK Migas dan Kontraktor sesuai splityang ditetapkan di dalam KKS

    Kontraktor memperoleh kembali biaya operasi TIDAK dalam bentuk tunaitetapi dalam bentuk inkind

    Jumlah inkind yang diperoleh oleh Kontraktor dihitung berdasarkan besaranbiaya operasi yang akan dikembalikan pada tahun tersebut, dibagi harga minyak(berpatokan pada ICP) atau harga jual rata-rata gas

    R k

  • 7/25/2019 Mekanisme Penghitungan Anggaran Dan Realisasi Lifting Dalam PSC - Edit 1 Solo

    26/37

    PRIVATE AND CONFIDENTIALPRIVATE AND CONFIDENTIAL

    Rangkuman

    Kontraktor (KKKS) SKK Migas

    1. FTP 28.8462%

    2. Operating Cost 100%

    3. DMO Fee

    4. Kontraktor Share 28.8462%

    Pengurang :

    1. DMO at ICP

    2. Corporate & Dividen Tax

    1. FTP 71.1538%

    2. Govt Share 71.1538%

    3. DMO at ICP

    4. Corporate & Dividend Tax

    Pengurang :

    1. Operating Cost 100%

    2. DMO Fee

    Asumsi:Split 85/15

    Tax 48%

  • 7/25/2019 Mekanisme Penghitungan Anggaran Dan Realisasi Lifting Dalam PSC - Edit 1 Solo

    27/37

    PRIVATE AND CONFIDENTIAL

    2013SKKMIGAS

    Allrightsreserved

    AGENDA 3. Mekanisme Perhitungan Lifting & Pelaporan

    Hulu Hilir Migas

  • 7/25/2019 Mekanisme Penghitungan Anggaran Dan Realisasi Lifting Dalam PSC - Edit 1 Solo

    28/37

    PRIVATE AND CONFIDENTIALPRIVATE AND CONFIDENTIAL

    PEMBORAN SEISMIK

    DINAMIT

    UNIT ALAT PEREKAMAN

    LAPISAN BATUAN

    MINYAKBUMI

    PEMBORAN SEISMIK

    DINAMIT

    UNIT ALAT PEREKAMAN

    LAPISAN BATUAN

    MINYAKBUMI

    Produksi

    Lifting lewat pipa

    Lifting dg Kapal Tujuan Export

    Eksplorasi

    Refinery

    Lifting dg Kapal Tujuan Domestik

    Ekploitasi

    Lifting

    Lifting

    Hulu Hilir Migas

    Perhitungan Lifting

    http://images.google.com/imgres?imgurl=www.mncgnw.com/photos/coastal%2520tanker.jpg&imgrefurl=http://www.mncgnw.com/photos/coastaltanker.htm&h=480&w=640&prev=/images%3Fq%3Dtanker%26svnum%3D10%26hl%3Den%26lr%3D%26ie%3DUTF-8%26oe%3DUTF-8%26sa%3DNhttp://images.google.com/imgres?imgurl=www.mncgnw.com/photos/coastal%2520tanker.jpg&imgrefurl=http://www.mncgnw.com/photos/coastaltanker.htm&h=480&w=640&prev=/images%3Fq%3Dtanker%26svnum%3D10%26hl%3Den%26lr%3D%26ie%3DUTF-8%26oe%3DUTF-8%26sa%3DNhttp://images.google.com/imgres?imgurl=www.mncgnw.com/photos/coastal%2520tanker.jpg&imgrefurl=http://www.mncgnw.com/photos/coastaltanker.htm&h=480&w=640&prev=/images%3Fq%3Dtanker%26svnum%3D10%26hl%3Den%26lr%3D%26ie%3DUTF-8%26oe%3DUTF-8%26sa%3DNhttp://images.google.com/imgres?imgurl=www.mncgnw.com/photos/coastal%2520tanker.jpg&imgrefurl=http://www.mncgnw.com/photos/coastaltanker.htm&h=480&w=640&prev=/images%3Fq%3Dtanker%26svnum%3D10%26hl%3Den%26lr%3D%26ie%3DUTF-8%26oe%3DUTF-8%26sa%3DNhttp://images.google.com/imgres?imgurl=www.mncgnw.com/photos/coastal%2520tanker.jpg&imgrefurl=http://www.mncgnw.com/photos/coastaltanker.htm&h=480&w=640&prev=/images%3Fq%3Dtanker%26svnum%3D10%26hl%3Den%26lr%3D%26ie%3DUTF-8%26oe%3DUTF-8%26sa%3DNhttp://images.google.com/imgres?imgurl=www.algor.com/news_pub/cust_app/enterg/images/tank.jpg&imgrefurl=http://www.algor.com/news_pub/cust_app/enterg/entergy.asp&h=252&w=378&prev=/images%3Fq%3DSTORAGE%2BTANK%26start%3D20%26svnum%3D10%26hl%3Den%26lr%3D%26ie%3DUTF-8%26oe%3DUTF-8%26sa%3DN
  • 7/25/2019 Mekanisme Penghitungan Anggaran Dan Realisasi Lifting Dalam PSC - Edit 1 Solo

    29/37

    PRIVATE AND CONFIDENTIALPRIVATE AND CONFIDENTIAL

    Perhitungan Lifting

    Dasar perhitungan lifting adalah :

    Total Lifting = Price x Quantity Price

    Menggunakan Indonesia Crude Oil Price yang dikeluarkan setiap

    bulannya oleh Ditjen Migas dalam mata uang Dollar Amerika.

    QuantityTotal produksi yang terjual (lifting) dimana dasar pembagiannya

    berdasarkan perhitungan entitlement yang sudah

    diperhitungkan didalamnya FTP, DMO, Share Parties, Cost

    recovery

    Indonesia Crude Price

  • 7/25/2019 Mekanisme Penghitungan Anggaran Dan Realisasi Lifting Dalam PSC - Edit 1 Solo

    30/37

    PRIVATE AND CONFIDENTIALPRIVATE AND CONFIDENTIAL

    Indonesia Crude Price

    Dokumen Lifting

  • 7/25/2019 Mekanisme Penghitungan Anggaran Dan Realisasi Lifting Dalam PSC - Edit 1 Solo

    31/37

    PRIVATE AND CONFIDENTIALPRIVATE AND CONFIDENTIAL

    Dokumen Lifting

    Lifting & Entitlement

  • 7/25/2019 Mekanisme Penghitungan Anggaran Dan Realisasi Lifting Dalam PSC - Edit 1 Solo

    32/37

    PRIVATE AND CONFIDENTIALPRIVATE AND CONFIDENTIAL

    Lifting & Entitlement

    ENTITLEMENT

    - Hak SKK Migas/Kontraktor atas produksi yang terjual.

    - Periode PerhitunganEntitlementper WKP/PSC adalah JanuariDesember, sehingga

    Actual Entitlementbaru dapat diketahui setelah lewat akhir tahun.

    LIFTING

    Realisasi penjualan produksi dilakukan bisa dengan cara:

    Joint Lifting: Lifting dilakukan bersama-sama (SKK Migas & Kontraktor) dan hasilpenjualannya dibagi berdasarkan provisional (estimasi) entitlement masing-masing.

    Individual Lifting: masing-masing pihak melakukan lifting berdasarkan provisional(estimasi) entitlement masing-masing.

    D P i i l E titl t

  • 7/25/2019 Mekanisme Penghitungan Anggaran Dan Realisasi Lifting Dalam PSC - Edit 1 Solo

    33/37

    PRIVATE AND CONFIDENTIALPRIVATE AND CONFIDENTIAL

    Dasar Provisional Entitlement

    1. LIFTING : SHIPCORD, QAS & BS.16 WP&B

    2. HARGA : ICP

    3. COST RECOVERABLES : CURRENT OUTLOOK (QAS) / WP&B

    4. ENTITLEMENT PERCENTAGES : PSC

    PSC Section VII.5:

    During any given Calendar Year, the handling of production and the proceed thereof shall be

    provisionally dealt with on the basis of the relevant Work Program and Budget of Operating

    Costs based upon estimates of quantities of petroleum to be produced, of internal

    consumption in Indonesia, of marketing possibilities, of prices and other sale conditions as

    well as of any other relevant factor.

    Parameter Utama dalam Perhitungan:

    Provisional Entitlement

  • 7/25/2019 Mekanisme Penghitungan Anggaran Dan Realisasi Lifting Dalam PSC - Edit 1 Solo

    34/37

    PRIVATE AND CONFIDENTIALPRIVATE AND CONFIDENTIAL

    Provisional Entitlement

  • 7/25/2019 Mekanisme Penghitungan Anggaran Dan Realisasi Lifting Dalam PSC - Edit 1 Solo

    35/37

    PRIVATE AND CONFIDENTIALPRIVATE AND CONFIDENTIAL

    Jan-06 Feb-06Estimate

    Mar-Dec

    Estimate

    Jan-Dec

    Price (WAP) US$/Bbl 52.0 52.0 52.0 52.0

    Lifting mbbl 540,000 520,000 4,990,000 6,050,000

    Cost Recovery MUS$ 5,260 5,260 52,600 63,120

    FINANCIAL DATA

    KKKS SKK Migas

    Tax Rate 48% 28.8462% 71.1538%

    Equity Split FTP 1,210 20.0000% 5.7692% 14.2308%SKK Migas 85% DMO 436 7.2115% -7.2115% 7.2115%

    Contractor 15% Cost Recovery 1,214 20.0636% 20.0636%

    FTP 20% Equity 3,190 52.7249% 15.2091% 44.7273%

    DMO 25% Total Lifting 6,050 100.0000% 33.8304% 66.1696%

    MONITORING OVER/UNDER LIFTING

    DESCRIPTION Act. Lifting O/U Lifting% BBL BBL BBL

    Current Month

    SKK Migas 66.1696% 701,398 540,000 (161,398)

    Contractor 33.8304% 358,602 520,000 161,398

    Prov. Ent

    % AllocationTotal Bbl

    PROV. ENTITLEMENT CULCULATION

    Pelaporan & Penagihan Lifting Migas

  • 7/25/2019 Mekanisme Penghitungan Anggaran Dan Realisasi Lifting Dalam PSC - Edit 1 Solo

    36/37

    PRIVATE AND CONFIDENTIALPRIVATE AND CONFIDENTIAL

    INPUT

    - Tagihan KKKS

    - Lifting Document

    - Commercial Documents- Dokumen Shipcoord.

    Pelaporan & Penagihan Lifting Migas

    PROSES

    - Evaluasi

    - Verifikasi

    - Monitoring

    1. OUTPUT

    - Laporan Lifting Ekspor Oil (A01)- Laporan Lifting Domestik Oil (A02)

    - Laporan Ekspor Gas (A03)

    - Laporan Lifting Domestik Gas (A04)

    - Laporan DMO (A05)

    2. OUTPUT

    Surat Tagihan kepada:- Pertamina- Penjual yang ditunjuk- KKKSdengan perintah pembayaran ke

    rekening pemerintah600.000411980- Instruction- Prov Entt.

    - TPAA

    SATUAN KERJA KHUSUS

    PELAKSANA KEGIATAN USAHA HULU MINYAK DAN GAS BUMI

  • 7/25/2019 Mekanisme Penghitungan Anggaran Dan Realisasi Lifting Dalam PSC - Edit 1 Solo

    37/37

    PRIVATE AND CONFIDENTIAL

    PELAKSANA KEGIATAN USAHA HULU MINYAK DAN GAS BUMI(SKK Migas)

    KANTOR PUSAT

    Wisma Mulia Lantai LG, 21, 22, 23, 27, 28, 29, 30, 31, 33, 35, 36, 37, 38, 39, 40

    Jalan Jenderal Gatot Subroto No. 42, Jakarta 12710, INDONESIA

    PO BOX 477

    Telepon : +62 21 2924 160Faksimile : +62 21 2924 999