lpg filling pump
TRANSCRIPT
DATA SHEET
Nomor Dokumen LPG FILLING PUMP
P-001/002/003/004/005/006
Rev. : 2
TPK-DS-20-005-A4 Nomor Halaman
1 dari 5
PEMBERI KERJA : PT PERTAMINA (PERSERO)
KONTRAKTOR : PT WIJAYA KARYA (PERSERO) TBK
NAMA PROYEK : RELOKASI DEPOT LPG TANJUNG PRIOK
BERIKUT SARFAS PENUNJANGNYA
LOKASI : DEPOT LPG – TANJUNG PRIOK
NOMOR KONTRAK : 53 / F30000 / 2010 – S5
2 10 / 06/ 11 5 IFA RMN DDK NVD
1 18 / 02/ 11 5 IFA RMN DDK NVD
0 11/01/11 5 IFR/IFA RMN DDK NVD
REV TGL HAL URAIAN DIBUAT OLEH DIPERIKSA OLEH
DISETUJUI
OLEH
PT. WIJAYA KARYA (PERSERO) Tbk
DATA SHEET
Nomor Dokumen LPG FILLING PUMP
P-001/002/003/004/005/006
Rev. : 2
TPK-DS-20-005-A4 Nomor Halaman
2 dari 5
REVISION SHEET
No. Rev.
Date
Description
0 11/01/11 IFR / IFA
1 18 / 02 / 11 IFA
-Perubahan QA and Inspection Testing (Hal 5):
-Hydrotest Non WIT
-Retest on seal leakage deleted
-Soud Level test WIT
2 10 / 06 / 11 IFA
-Perubahan QA and Inspection Testing (Hal 5):
-Inspection required for casting
-Perubahan material pompa (Hal 3)
3
1 Client: PT. PERTAMINA (PERSERO) Project: Relokasi Depot LPG Tj.PRIOK Berikut Sarfas Penunjangnya Item
2 Service: LPG FILLING PUMP Location: TANJUNG PRIOK JAKARTA No.
3 No. of units : Main driven by Manufacturer :
4 Spare driven by Pump serial No.
5
6 Capacity : Min m3/hr Liquid Name
7 Normal m3/hr
8 Suction pressure : min / max kg/cm2-A Pumping Temp (min / nor /max ) (°C)
9 Suction pressure : operating kg/cm2-A Vapour Pressure (kg/cm
2-A)
10 Discharge press. at Nozzle kg/cm2-A Spesific Gravity
11 Differential pressure kg/cm2-G Viscosity (cP) (cP)
12 Differential head m Spesific Heat (kJ/kg.K)
13 Hydraulic power kW (mg/kg)
14 NPSHA m (mol fraction)
15 Process Variation Corrosive / abresive agent
16 Starting Condition
17 Srevice : Annex H class
18 Min design temperatur
19 Reduced-hardness material required
20 Barrel / case
21 Location Impeller
22 Case / impeller wear ringss
23 Electrical Area Classification : Shaft
24 Class 1(one) GR D Zone 1 (one) Diffusers
25
26 Site Data Altitute (m) Proposal curve no
27 Barometer (max) 1,25 (Kg/cm2-A) RPM (rpm)
28 Range of ambient temp : min / max Impeller diameter : Rated (mm)
29 : 23 / 35 °C Max (mm)
30 Relative Humidity : min / max Min (mm)
31 : 75 / 100 % Impeller Type
32 Unusual Condition Rated Power (kW)
33 Efficiency %
34 Type Minimum Continuous Flow : Thermal (m3/h)
35 Stable (m3/h)
36 Prefered Operation region (m3/h) to
37 Allowable Operation region (m3/h) to
38 Motor supplied by Max Head @ rated impeller (m)
39 Manufacture Max power @ rated impeller (kW)
40 kW NPSHR at Rated flow (m)
41 RPM Max suction spesific speed (Nss)
42 Type Max sound press level (dBA)
43 Frame Est. soundpressure level (dBA)
44 Enclosure
45 Cooling methode
46 Volts / Phase/ Hertz Electricity Voltage Phase Hertz
47 Insulation Drivers 400 3 50
48 Temperatur rise Heating
49 Full Load Amps System voltage dip
50 Loked Rotor Amps Steam Max Temp
51 Starting Method Drivers
52 Bearings (Type/Number) Heating
53 / Cooling water
54 / Supply temp / Max return temp (°C)
55 UP (N) Nor. Press / Design temp (kg/cm2-A)
56 Down (N) Min. Ret. Press / Max allow. D.P. (kg/cm2-A)
57 Chloride concentration (ppm)
58
LIQUID
OF 5
PAGES :
REV : 2
DATA SHEET
LPG FILLING PUMP
P-001/002/003/004/005/006
**
* *
SITE DATA
OPERATING CONDITIONS
Yes, by ethyl-merchaptant
DOCUMENT NO.
TPK-DS-20-005-A4
RE
VIS
ION
* *
83,50
167
6,1538 / 7,0628
12,0072
121
6,2422
*
2,6
0,56
0,15
VSD
11000
UTILITY CONDITION
Max. Press Min Press Min Temp
*
*
*
*
85 @ 1m
Closed
*
*
*
*
*
S5
MATERIAL
*
PERFORMANCE
*
*
*
*
*
*
Class F
Class B
*
*
*
*
*
*
6(six) Motor *
*
LPG mix (propane 50% : butane 50%)
20 / 30 / 38
6,0555
*
6,4387
29,29
Open Valve
MOTOR DRIVER
*
Mfr's
Model
*
DRIVER TYPE *
Pump manufacture
Squirel cage motor
Horisontal
IP55
TEFC
400 / 3 / 50
*
Auto Start-Stop
Intermittent
Paralel Op. req'd
OutdoorIndoor Under roof-
Open shelterHeated Unheated
Winterization Tropicalization
Dust Fumes Others
Induction Motor Steam Turbin
Gear Others
Thrust
Vertical Thrust Capacity
Hazardous Flamable Others
H2S concentration
Chloride concentration
Radial
2
4 OF 5
1 Client: PT. PERTAMINA (PERSERO) Project: Relokasi Depot LPG Tj.PRIOK Berikut Sarfas Penunjangnya Item
2 Service: LPG FILLING PUMP Location: TANJUNG PRIOK JAKARTA No.
3 No. of units : Main driven by Manufacturer : Mfr's
4 Spare driven by Pump serial No. Model
5
6 Rotation :
7 Pump Type : Pumps :
8
9 Casing Mounting :
10
11 Casing Type : Baseplate :
12
13 Case Pressure rating :
14 (kg/cm2-A) @ * (°C)
15 (kg/cm2-A) Shipment :
16
17
18 Piping Pump
19 Suction 10 * Spare rotor assembly packege for :
20 Discharge 6 *
21 Pressure Casing Aux. Connection :
22 Size (in)
23 Drain *
24 Vent *
25 Warm-up
26 Balance / leak-off C.W piping :
27
28 C.W Piping Material
29 Rotor :
30 Cooling water requirement
31 Coupling : (m3/h)
32 (m3/h)
33 Steam Piping
34 * (mm)
35
36 Bearings (Type/Number) :
37 /
38 /
39 Lubrication :
40
41 Mechanical Seal :
42 Standard
43 Manufacture
44 Model
45 Size
46 API Plan :
47 Flush
48 Auxilliary
49 Base Plates :
50
51
52 Pump
53 Driver
54 Gear
55 BasePlate
56 Total
57
MASSES (KG)
RE
VIS
ION
CONSTRUCTION SURFACE PREPARATION AND PAINT
6(six) Motor
See Note 5.9
*
*
*
*
*
BEARINGS AND LUBRICATION
Flange rating Facing
*
See Note 5.9
See Note 5.9
See Note 5.9
See Note 5.9
See Note 5.9
*
API 682
# 300
RF# 300
Size (in)Flange rating Facing Position
*
*
Antifriction bearing
Antifriction bearing
RF Top
RFSee Note 5.7
Metaflex or Eq
HEATING AND COOLING
*
*
*
N/A
*
*
*
*
*
INSTRUMENTATION
DOCUMENT NO.
TPK-DS-20-005-A4
DATA SHEET
LPG FILLING PUMP
P-001/002/003/004/005/006
REV : 2
PAGES :
*
*
See Note 5.7 RF
1,5
Non lubricated
End
Flexible spacer
CW CCW
OH2
Others
OH3 OH6
Inline
Others
Centerline
Single Volute Multiple Volute Diffuser
Max all. working press.
Hydrotest Pressure
Nozzle Connection
Machiined and studded connection
Cylindrical threads required
Component balance to iso 1940 G1.0
Coupling balanced to iso 1940-1 G.6.3
Coupling Per ISO 14691
Non-Spark Coupling guard
Coupling Guard Standard Per
Manufacture
Rating (kw per 100r/min)
Spacer Lenght
Model
Lube type
Service Factor
Coupling Per ISO 10441
Coupling Per API 671
Manufacture Standard Others
Finish Coat
Pump Surface Preparation
Primer
Finish Coat
Baseplate Surface Preparation
Primer
Domestic
Export boxing required
Export
Outdoor storage more than 6 month
Horisontal Storage Vertical Storage
Type of shipping preparation
Heating Jacket required Cooling required
Cooling water piping plan
Pipe Tubing Fittings
S. Steel C. Steel Galvanized
Bearing Housing
Heat Exchanger
Tubing Pipe
Radial
Thrust
Grease
Oil flooded
Constant level oiler preference
Oil Visc Iso grade
Purge Oil Mist
Pure oil mist
Accelerometer
Provision for mounting only
Pressure gauge type
Flat surface required
Api baseplate number
Non grout construction
Others
5 OF 5
1 Client: PT. PERTAMINA (PERSERO) Project: Relokasi Depot LPG Tj.PRIOK Berikut Sarfas Penunjangnya Item
2 Service: LPG FILLING PUMP Location: TANJUNG PRIOK JAKARTA No.
3 No. of units : Main driven by Manufacturer : Mfr's
4 Spare driven by Pump serial No. Model
5
6 Non WIT WIT Observe
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21 Manifold piping to single connection
22
23
24
25 Connection Bolting
26
27
28
29
30
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48 For
50 Method
51
52 Unless otherwise specified, API-610 10th Edition shall govern.
53 * = Vendor to Advise
54 5.1. Electric motor shall have minimum enclosure Eex de, TEFC and min. IP 55 enclosure with winding insulation of class F and have +/- 10% voltage
55 variation and applicable for VVVF application.
56 5.2. Electric motor shall be refer to Electrical Specification LV Induction Motor TPK-SP-30-004-A4
57 5.3. NPSH test shall be conducted in case of margin NPSH less than 1 meter
58 5.4. Anti condensation heaters shall be provided for motors rated 3.7 KW or above and be suitable for 230V AC, 50Hz, single phase power supply
59 5.5. Constant level oiler shall be provided by vendor
60 5.6. Drain piping connection shall be end on edge of baseplate
61 5.7. Vendor shall be provide flange to attach the pumps on piping connection comply with ASME B 16.5, ANSI 300# WNRF except for flange 1"
62 and below shall be 800#
63 5.8. The pump shall be design and tested as per API-610 latest eddition
64 5.9. Painting shall refer to Painting Spesification TPK-SP-20-001-A4
65 5.10. Motor RPM shall be 1500 RPM or 3000 RPM
66
PIPING AND APPURTENANCES
REMARKS
*
OTHER PURCHASER REQUIREMENT
QA INSPECTION AND TESTING
RE
VIS
ION
SPARE PART QA INSPECTION AND TESTING
6(six)
DOCUMENT NO.
TPK-DS-20-005-A4
DATA SHEET
LPG FILLING PUMP
P-001/002/003/004/005/006
PAGES :
Motor *
*
REV : 2
Torsional analysis required
Torsional analysis report
Progess report
Shop Inspection
Perf. Curve approval
NPSH
Performance
Retest on seal leakage
Sound level test
Nozzle load test
4 h mech run test
Resonance Test
Impact Testing
Vendor submit test procedures
Vendor submit test data within 24 h
Casing
Others
Inspection required for connection welds
Mag. Particle
radiographic
Start-Up
Specify
Normal Maintenance
Maximum discharge pressure to include
Coordination meeting required
Max Dia. Impeller and/or mo of stage
Max. relative density
Operation to trip speed
Connection design approval
Additional data requiring 20 year retention
Outline of procedure for optional test
Flanges req'd in place off socket weld unions
Mount Seal reservoir off baseplate
Vent Cooling water
Painted SS
PTFE Coating ASTM A153 Galvanized
Installation List in proposal
Test with substitute seals
Hydrostatic
Complete unit test
Cleanliness prior final assembly
Mechanical run until oil temp. stable
True Peak velocity data
Auxillary equipment test
Vendor keep repair and HT record
Include plotted vibration spectra
Submit inspection check list
Material certification required
Impeller Shaft
Casting repair procedure approval required
Liquid penetrant
Ultrasonic
Inspection required for casting
Mag. Particle
radiographic
Liquid penetrant
Ultrasonic
Additional subsurface examination
Hardness test required
Recomended 2 year spare part
Drain
Check for co-planar mounting pad
Mechanical run after oil temp. stable
1
1
1
2