latihan mock

3
Perhitungan Debit Bulanan Metode F.J MOCK Luas DAS 119 km 2 K = 0.6 Tahun 1999 i 0.4 31 28 31 I Data Meteorologi 1 Hujan Bulanan Rata-Rata (P) mm/bulan 331.00 90.00 240.00 2 Hari Hujan Rata-Rata (n) hari 7.00 5.00 14.00 II Evapotranspirasi Potensial (Eto) mm/hari 4.27 5.29 4.98 mm/bulan 132.37 148.12 154.38 III Limit Evapotranspirasi 3 Exposed Surface (M) % 20% 20% 20% 4 E / ETo = (M / 20) x (18 - n) % 11% 13% 4% 5 E = Eto (M / 20) x (18 - n) mm/bulan 14.56 19.26 6.18 6 Evapotrans Aktual ( E1 = Eto - E ) mm/bulan 117.81 128.86 148.20 IV Water Balance 3.80 4.60 4.78 7 Water Surplus (P - E1) mm/bulan 213.19 -38.86 91.80 V Run Off & Ground Water Storage 8 Infiltrasi (i = 40%) 85.28 0.00 36.72 9 0,5 (1 + K)i K = 0,6 68.22 0.00 29.37 10 K (Vn - 1); 1st step 17.21 51.26 30.75 11 Vn = k(Vn - 1) + 0,5 (1 + k)i; 1st step 85.43 51.26 60.13 12 K (Vn - 1); 2nd step 53.23 83.20 80.67 13 Vn = k (Vn - 1) + 0,5 (1 + k); 2nd step 138.66 134.45 140.80 14 K (Vn - 1); 3rd step 121.02 123.87 105.08 15 Vn = k (Vn - 1) + 0,5 (1 + k)i; 3rd step 206.45 175.13 165.20 16 K (Vn - 1); 4th step 121.17 123.96 105.13 17 Vn = k (Vn - 1) + 0,5 (1 + k)i; 4th step 206.60 175.21 165.26 18 Volume air tanah (Vn) mm/bulan 206.60 175.21 165.26 19 Vn' = Vn - (Vn - 1) mm/bulan 4.65 -31.38 -9.96 20 Base Flow = i - Vn' 80.63 31.38 46.68 21 Direct Run Off mm/bulan 127.91 0.00 55.08 22 Run Off mm 208.54 31.38 101.75 23 Debit Bulanan Rata - Rata ltr/dt 9265 1544 4521 No. Keterangan Unit Jan Feb Mar

Upload: rianggarlina

Post on 24-Nov-2015

10 views

Category:

Documents


2 download

DESCRIPTION

BUAT LATIHAN

TRANSCRIPT

  • Perhitungan Debit Bulanan Metode F.J MOCK

    Luas DAS 119 km2

    K = 0.6

    Tahun 1999 i 0.4

    31 28 31

    I Data Meteorologi

    1 Hujan Bulanan Rata-Rata (P) mm/bulan 331.00 90.00 240.00

    2 Hari Hujan Rata-Rata (n) hari 7.00 5.00 14.00

    II Evapotranspirasi Potensial (Eto) mm/hari 4.27 5.29 4.98

    mm/bulan 132.37 148.12 154.38

    III Limit Evapotranspirasi

    3 Exposed Surface (M) % 20% 20% 20%

    4 E / ETo = (M / 20) x (18 - n) % 11% 13% 4%

    5 E = Eto (M / 20) x (18 - n) mm/bulan 14.56 19.26 6.18

    6 Evapotrans Aktual ( E1 = Eto - E ) mm/bulan 117.81 128.86 148.20

    IV Water Balance 3.80 4.60 4.78

    7 Water Surplus (P - E1) mm/bulan 213.19 -38.86 91.80

    V Run Off & Ground Water Storage

    8 Infiltrasi (i = 40%) 85.28 0.00 36.72

    9 0,5 (1 + K)i K = 0,6 68.22 0.00 29.37

    10 K (Vn - 1); 1st step 17.21 51.26 30.75

    11 Vn = k(Vn - 1) + 0,5 (1 + k)i; 1st step 85.43 51.26 60.13

    12 K (Vn - 1); 2nd step 53.23 83.20 80.67

    13 Vn = k (Vn - 1) + 0,5 (1 + k); 2nd step 138.66 134.45 140.80

    14 K (Vn - 1); 3rd step 121.02 123.87 105.08

    15 Vn = k (Vn - 1) + 0,5 (1 + k)i; 3rd step 206.45 175.13 165.20

    16 K (Vn - 1); 4th step 121.17 123.96 105.13

    17 Vn = k (Vn - 1) + 0,5 (1 + k)i; 4th step 206.60 175.21 165.26

    18 Volume air tanah (Vn) mm/bulan 206.60 175.21 165.26

    19 Vn' = Vn - (Vn - 1) mm/bulan 4.65 -31.38 -9.96

    20 Base Flow = i - Vn' 80.63 31.38 46.68

    21 Direct Run Off mm/bulan 127.91 0.00 55.08

    22 Run Off mm 208.54 31.38 101.75

    23 Debit Bulanan Rata - Rata ltr/dt 9265 1544 4521

    No. Keterangan Unit Jan Feb Mar

  • 30 31 30 31 31 30 31 30 31

    177.00 271.00 112.00 161.00 117.00 135.00 432.00 251.00 228.00

    9.00 6.00 4.00 7.00 3.00 7.00 15.00 11.00 11.00

    5.03 4.67 3.94 4.12 4.74 4.99 5.03 4.49 4.80

    150.90 144.77 118.20 127.72 146.94 149.70 155.93 134.70 148.80

    20% 20% 20% 20% 20% 20% 20% 20% 20%

    9% 12% 14% 11% 15% 11% 3% 7% 7%

    13.58 17.37 16.55 14.05 22.04 16.47 4.68 9.43 10.42

    137.32 127.40 101.65 113.67 124.90 133.23 151.25 125.27 138.38

    4.58 4.11 3.39 3.67 4.03 4.44 4.88 4.18 4.46

    39.68 143.60 10.35 47.33 -7.90 1.77 280.75 125.73 89.62

    15.87 57.44 4.14 18.93 0.00 0.71 112.30 50.29 35.85

    12.70 45.95 3.31 15.15 0.00 0.57 89.84 40.23 28.68

    36.08 29.26 45.13 29.07 26.53 15.92 9.89 59.84 60.04

    48.77 75.22 48.44 44.21 26.53 16.48 99.73 100.07 88.72

    84.48 79.95 93.10 84.93 77.48 62.41 47.33 88.24 112.98

    133.25 155.17 141.54 129.14 104.01 78.89 147.06 188.31 201.70

    99.12 88.74 98.37 88.09 79.38 63.54 48.01 88.65 113.23

    147.90 163.96 146.82 132.30 105.91 80.02 147.74 188.72 201.95

    99.15 88.76 98.39 88.10 79.38 63.55 48.02 88.65 113.23

    147.93 163.98 146.83 132.31 105.91 80.03 147.74 188.72 201.95

    147.93 163.98 146.83 132.31 105.91 80.03 147.74 188.72 201.95

    -17.33 16.05 -17.15 -14.52 -26.40 -25.88 67.72 40.97 13.23

    33.20 41.39 21.29 33.45 26.40 26.59 44.58 9.32 22.61

    23.81 86.16 6.21 28.40 0.00 1.06 168.45 75.44 53.77

    57.01 127.56 27.50 61.85 26.40 27.65 213.03 84.76 76.38

    2617 5667 1262 2748 1173 1269 9465 3891 3394

    Okt Nov DesApr Mei Jun Jul Agt Sep

  • Data CH Wilayah

    Data CH Wilayah

    Prhit. Eto

    Data

    ((3) / 20) * (18 - (2))

    (4) * (II)

    (II) - (5)

    (1) - (6)

    i * (7)

    0.5*(1+K)*(8)

    K * (9D)dst

    (9) + (10)

    K * (11D) dst

    (11) + (12)

    K * (13D) dst

    (11) + (14)

    K * (15D) dst

    (11) + (16)

    (18) = (17)

    (30J) - (30D) dst

    (8) - (19)

    (18) - (20)

    (20) + (21)

    (22) x CA / T

    Ket.