8. CIVIL & ARSITEK NO ITEM PEKERJAAN VOL SAT HARGA SAT (Rp) JUMLAH HARGA (Rp)
8.2 PEKERJAAN DINDING, PARTISI 1764.381 Dinding Sandwich Panel
Command Center Room 110.27 420,000 46,315,500
Security Room 43.28 420,000 18,175,500
Toilet Pria 107.31 420,000 45,070,200
Toilet Wanita 86.51 420,000 36,334,200
Ruang Istirahat 52.70 420,000 22,134,000
Locker Room 25.31 420,000 10,630,200
Main Lobby 70.00 420,000 29,400,000
Lobby dan koridor 342.00 420,000 143,640,000
Ruang Panel 60.40 420,000 25,368,000
Data Center On Duty 68.80 420,000 28,896,000
Staging and Testing Room 74.80 420,000 31,416,000
N O C Room 79.60 420,000 33,432,000
Tape Media Storage room 71.20 420,000 29,904,000
Ruang Tabung 40.80 420,000 17,136,000
Ruang Power 56.80 420,000 23,856,000
Outdoor PAC Room 104.40 420,000 43,848,000
Server Room 370.20 420,000 155,484,000
TOTAL 741,039,600
2 Kaca, Pintu dan Jendela
Pekerjaan Magic Glass 8.70 6,743,000 58,664,100 Automatic Vacuum Doormat 1.00 Unit 65,000,000 65,000,000 Pekerjaan Partisi dinding Kaca Tempered 12 mm Frameless
Type DP 1.1 8.80 1,000,000 8,800,000
Type DP 1.2 41.30 1,000,000 41,300,000
Type DP 2.1 18.20 1,000,000 18,200,000
Type DP 2.2 18.20 1,000,000 18,200,000
Type DP 2.3 7.70 1,000,000 7,700,000
Type DP 3.1 14.20 1,000,000 14,200,000
Type DP 3.2 6.90 1,000,000 6,900,000
Type DP 3.3 16.70 1,000,000 16,700,000
Type DP 4.1 15.80 1,000,000 15,800,000
Type DP 4.2 15.80 1,000,000 15,800,000
Type DP 4.3 14.70 1,000,000 14,700,000
Type DP 5.1 8.70 1,000,000 8,700,000
Type DP 5.2 8.70 1,000,000 8,700,000
Type DP 5.3 7.70 1,000,000 7,700,000
TOTAL 327,064,100
Pekerjaan Pintu Kaca Tempered 12 mm Frameless Termasuk Fitting, Pull Handle 50 cm dan Lock Case
Type 1 5.00 unit 9,000,000 45,000,000 Type 2 4.00 unit 9,000,000 36,000,000 Type 3 4.00 unit 9,000,000 36,000,000 Type 4 5.00 unit 9,000,000 45,000,000
TOTAL 162,000,000
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
NO ITEM PEKERJAAN VOL SAT HARGA SAT (Rp) JUMLAH HARGA (Rp)
8.3 PEKERJAAN PLAFOND AKUSTIK PANEL
Lobby Area Lift 17.70 135,000 2,389,500
Command Center Room 42.00 135,000 5,670,000
Security Room 31.00 135,000 4,185,000
Lobby dan koridor 106.00 135,000 14,310,000
Ruang Panel 12.00 135,000 1,620,000
Data Center On Duty 18.00 135,000 2,430,000
Staging and Testing Room 15.00 135,000 2,025,000
N O C Room 24.00 135,000 3,240,000
Tape Media Storage room 11.00 135,000 1,485,000
Ruang Tabung 9.00 135,000 1,215,000
Ruang Power 13.00 135,000 1,755,000
Ramp 12.00 135,000 1,620,000
Toilet Pria 15.00 135,000 2,025,000
Toilet Wanita 11.00 135,000 1,485,000
Ruang Istirahat 12.00 135,000 1,620,000
Locker Room 3.00 135,000 405,000
Ramp 12.00 135,000 1,620,000
Total 49,099,500
8.4 PEKERJAAN INTERIOR1 Security Room
Showcase (bahan Plywood 18 mm Finishing duco) 1.00 7,350,000 7,350,000 Façade area Lobby Lift (Bahan ACP) 1.00 9,678,000 9,678,000 Fasade area Main Lobby 1.00 ls 9,678,000 9,678,000 showcase area Security 1.00 ls 4,280,000 4,280,000 Meja command center 2.00 unit 8,670,000 17,340,000
2 Ruang Data Center on DutyBackdrop 1.00 4,350,000 4,350,000
52,676,000
8.5 PEKERJAAN LIGHTING
Instalasi lampu by motion detect 1.00 Set 91,752,000 91,752,000 Instalasi Lampu Downlight 18 Watt ex Artolite 58.00 bh 125,000 7,250,000 Instalasi Lampu RMO 2 x 36 Watt ex Artolite 21.00 bh 738,000 15,498,000
114,500,000
8.6 PEKERJAAN V A C
AC Cassette R Command Center 2 PK 2.00 unit 15,180,000 30,360,000 AC Central 180000 btu/h 1.00 LS 52,920,000 52,920,000
Chiller/Condensing unit/Outdoor unitAHU (Air Handling Unit)Cooling TowerPompa Sirkulasi
Ducting 400x250 49.60 m1 239,000 11,854,400
95,134,400
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
NO ITEM PEKERJAAN VOL SAT HARGA SAT (Rp) JUMLAH HARGA (Rp) 8.7 PEKERJAAN SANITAIR
1 Toilet priaCloset duduk ex-TOTO CW825J 2.00 bh 6,700,000 13,400,000 Shower set ex-TOTO TX449SI 2.00 bh 5,159,000 10,318,000 Urinoir with otomatic flush ex-TOTO type U57 K 3.00 bh 3,601,500 10,804,500 Partisi Urinal ex - TOTO type AW115J 2.00 bh 708,190 1,416,380 Wastafel ex-TOTO LW 641J/TX 119LI 2.00 bh 2,981,500 5,963,000 shower spray ex - TOTO type TB19CSMCR 2.00 bh 412,050 824,100 Toilet Paper Holder ex-TOTO TX703AI 2.00 bh 313,560 627,120 Soap Holder ex-TOTO TX2BV1B 2.00 bh 164,820 329,640 Hand Dryer ex-TOTO HD 3000S 2.00 bh 3,420,000 6,840,000 Cermin 1.00 bh 3,000,000 3,000,000 Floor Drain ex-TOTO TX1AV1 2.00 bh 184,920 369,840 Table top granit 1.00 bh 3,500,000 3,500,000
2 Toilet Wanita - Closet duduk ex-TOTO CW825J 2.00 bh 6,700,000 13,400,000 shower spray ex - TOTO type TB19CSMCR 2.00 bh 412,050 824,100 Shower set ex-TOTO TX449SI 2.00 bh 5,159,000 10,318,000 Wastafel ex-TOTO LW 641J/TX 119LI 2.00 bh 2,981,500 5,963,000 Toilet Paper Holder ex-TOTO TX703AI 2.00 bh 313,560 627,120 Soap Holder ex-TOTO TX2BV1B 2.00 bh 164,820 329,640 Hand Dryer ex-TOTO HD 3000S 2.00 bh 3,420,000 6,840,000 Cermin 1.00 bh 3,000,000 3,000,000 Floor Drain ex-TOTO TX1AV1 2.00 bh 184,920 369,840
` Table top granit 1.00 bh 3,500,000 3,500,000
TOTAL 102,564,280 TOTAL SEBELUM PPN 1,644,077,880