konsultant 9-12-13

6
8. CIVIL & ARSITEK NO ITEM PEKERJAAN VOL SAT HARGA SAT (Rp) 8.2 PEKERJAAN DINDING, PARTISI ### 1 Dinding Sandwich Panel Command Center Room ### 420,000 Security Room ### 420,000 Toilet Pria ### 420,000 Toilet Wanita ### 420,000 Ruang Istirahat ### 420,000 Locker Room ### 420,000 Main Lobby ### 420,000 Lobby dan koridor ### 420,000 Ruang Panel ### 420,000 Data Center On Duty ### 420,000 Staging and Testing Room ### 420,000 N O C Room ### 420,000 Tape Media Storage room ### 420,000 Ruang Tabung ### 420,000 Ruang Power ### 420,000 Outdoor PAC Room ### 420,000 Server Room ### 420,000 TOTAL 2 Kaca, Pintu dan Jendela Pekerjaan Magic Glass ### 6,743,000 Automatic Vacuum Doormat ### Unit 65,000,000 Pekerjaan Partisi dinding Kaca Tempered 12 mm Frameless Type DP 1.1 ### 1,000,000 Type DP 1.2 ### 1,000,000 Type DP 2.1 ### 1,000,000 Type DP 2.2 ### 1,000,000 Type DP 2.3 ### 1,000,000 Type DP 3.1 ### 1,000,000 Type DP 3.2 ### 1,000,000 Type DP 3.3 ### 1,000,000 Type DP 4.1 ### 1,000,000 Type DP 4.2 ### 1,000,000 Type DP 4.3 ### 1,000,000 Type DP 5.1 ### 1,000,000 Type DP 5.2 ### 1,000,000 Type DP 5.3 ### 1,000,000 TOTAL Pekerjaan Pintu Kaca Tempered 12 mm Frameless Termasuk Fitting, Pull Handle 50 cm dan Lock Case Type 1 ### unit 9,000,000 Type 2 ### unit 9,000,000 Type 3 ### unit 9,000,000 Type 4 ### unit 9,000,000 TOTAL m 2 m 2 m 2 m 2 m 2 m 2 m 2 m 2 m 2 m 2 m 2 m 2 m 2 m 2 m 2 m 2 m 2 m 2 m 2 m 2 m 2 m 2 m 2 m 2 m 2 m 2 m 2 m 2 m 2 m 2 m 2 m 2 m 2

Upload: phyan-hyun

Post on 25-Dec-2015

226 views

Category:

Documents


2 download

DESCRIPTION

qq

TRANSCRIPT

Page 1: Konsultant 9-12-13

8. CIVIL & ARSITEK NO ITEM PEKERJAAN VOL SAT HARGA SAT (Rp) JUMLAH HARGA (Rp)

8.2 PEKERJAAN DINDING, PARTISI 1764.381 Dinding Sandwich Panel

Command Center Room 110.27 420,000 46,315,500

Security Room 43.28 420,000 18,175,500

Toilet Pria 107.31 420,000 45,070,200

Toilet Wanita 86.51 420,000 36,334,200

Ruang Istirahat 52.70 420,000 22,134,000

Locker Room 25.31 420,000 10,630,200

Main Lobby 70.00 420,000 29,400,000

Lobby dan koridor 342.00 420,000 143,640,000

Ruang Panel 60.40 420,000 25,368,000

Data Center On Duty 68.80 420,000 28,896,000

Staging and Testing Room 74.80 420,000 31,416,000

N O C Room 79.60 420,000 33,432,000

Tape Media Storage room 71.20 420,000 29,904,000

Ruang Tabung 40.80 420,000 17,136,000

Ruang Power 56.80 420,000 23,856,000

Outdoor PAC Room 104.40 420,000 43,848,000

Server Room 370.20 420,000 155,484,000

TOTAL 741,039,600

2 Kaca, Pintu dan Jendela

Pekerjaan Magic Glass 8.70 6,743,000 58,664,100 Automatic Vacuum Doormat 1.00 Unit 65,000,000 65,000,000 Pekerjaan Partisi dinding Kaca Tempered 12 mm Frameless

Type DP 1.1 8.80 1,000,000 8,800,000

Type DP 1.2 41.30 1,000,000 41,300,000

Type DP 2.1 18.20 1,000,000 18,200,000

Type DP 2.2 18.20 1,000,000 18,200,000

Type DP 2.3 7.70 1,000,000 7,700,000

Type DP 3.1 14.20 1,000,000 14,200,000

Type DP 3.2 6.90 1,000,000 6,900,000

Type DP 3.3 16.70 1,000,000 16,700,000

Type DP 4.1 15.80 1,000,000 15,800,000

Type DP 4.2 15.80 1,000,000 15,800,000

Type DP 4.3 14.70 1,000,000 14,700,000

Type DP 5.1 8.70 1,000,000 8,700,000

Type DP 5.2 8.70 1,000,000 8,700,000

Type DP 5.3 7.70 1,000,000 7,700,000

TOTAL 327,064,100

Pekerjaan Pintu Kaca Tempered 12 mm Frameless Termasuk Fitting, Pull Handle 50 cm dan Lock Case

Type 1 5.00 unit 9,000,000 45,000,000 Type 2 4.00 unit 9,000,000 36,000,000 Type 3 4.00 unit 9,000,000 36,000,000 Type 4 5.00 unit 9,000,000 45,000,000

TOTAL 162,000,000

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

Page 2: Konsultant 9-12-13

NO ITEM PEKERJAAN VOL SAT HARGA SAT (Rp) JUMLAH HARGA (Rp)

8.3 PEKERJAAN PLAFOND AKUSTIK PANEL

Lobby Area Lift 17.70 135,000 2,389,500

Command Center Room 42.00 135,000 5,670,000

Security Room 31.00 135,000 4,185,000

Lobby dan koridor 106.00 135,000 14,310,000

Ruang Panel 12.00 135,000 1,620,000

Data Center On Duty 18.00 135,000 2,430,000

Staging and Testing Room 15.00 135,000 2,025,000

N O C Room 24.00 135,000 3,240,000

Tape Media Storage room 11.00 135,000 1,485,000

Ruang Tabung 9.00 135,000 1,215,000

Ruang Power 13.00 135,000 1,755,000

Ramp 12.00 135,000 1,620,000

Toilet Pria 15.00 135,000 2,025,000

Toilet Wanita 11.00 135,000 1,485,000

Ruang Istirahat 12.00 135,000 1,620,000

Locker Room 3.00 135,000 405,000

Ramp 12.00 135,000 1,620,000

Total 49,099,500

8.4 PEKERJAAN INTERIOR1 Security Room

Showcase (bahan Plywood 18 mm Finishing duco) 1.00 7,350,000 7,350,000 Façade area Lobby Lift (Bahan ACP) 1.00 9,678,000 9,678,000 Fasade area Main Lobby 1.00 ls 9,678,000 9,678,000 showcase area Security 1.00 ls 4,280,000 4,280,000 Meja command center 2.00 unit 8,670,000 17,340,000

2 Ruang Data Center on DutyBackdrop 1.00 4,350,000 4,350,000

52,676,000

8.5 PEKERJAAN LIGHTING

Instalasi lampu by motion detect 1.00 Set 91,752,000 91,752,000 Instalasi Lampu Downlight 18 Watt ex Artolite 58.00 bh 125,000 7,250,000 Instalasi Lampu RMO 2 x 36 Watt ex Artolite 21.00 bh 738,000 15,498,000

114,500,000

8.6 PEKERJAAN V A C

AC Cassette R Command Center 2 PK 2.00 unit 15,180,000 30,360,000 AC Central 180000 btu/h 1.00 LS 52,920,000 52,920,000

Chiller/Condensing unit/Outdoor unitAHU (Air Handling Unit)Cooling TowerPompa Sirkulasi

Ducting 400x250 49.60 m1 239,000 11,854,400

95,134,400

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

Page 3: Konsultant 9-12-13

NO ITEM PEKERJAAN VOL SAT HARGA SAT (Rp) JUMLAH HARGA (Rp) 8.7 PEKERJAAN SANITAIR

1 Toilet priaCloset duduk ex-TOTO CW825J 2.00 bh 6,700,000 13,400,000 Shower set ex-TOTO TX449SI 2.00 bh 5,159,000 10,318,000 Urinoir with otomatic flush ex-TOTO type U57 K 3.00 bh 3,601,500 10,804,500 Partisi Urinal ex - TOTO type AW115J 2.00 bh 708,190 1,416,380 Wastafel ex-TOTO LW 641J/TX 119LI 2.00 bh 2,981,500 5,963,000 shower spray ex - TOTO type TB19CSMCR 2.00 bh 412,050 824,100 Toilet Paper Holder ex-TOTO TX703AI 2.00 bh 313,560 627,120 Soap Holder ex-TOTO TX2BV1B 2.00 bh 164,820 329,640 Hand Dryer ex-TOTO HD 3000S 2.00 bh 3,420,000 6,840,000 Cermin 1.00 bh 3,000,000 3,000,000 Floor Drain ex-TOTO TX1AV1 2.00 bh 184,920 369,840 Table top granit 1.00 bh 3,500,000 3,500,000

2 Toilet Wanita - Closet duduk ex-TOTO CW825J 2.00 bh 6,700,000 13,400,000 shower spray ex - TOTO type TB19CSMCR 2.00 bh 412,050 824,100 Shower set ex-TOTO TX449SI 2.00 bh 5,159,000 10,318,000 Wastafel ex-TOTO LW 641J/TX 119LI 2.00 bh 2,981,500 5,963,000 Toilet Paper Holder ex-TOTO TX703AI 2.00 bh 313,560 627,120 Soap Holder ex-TOTO TX2BV1B 2.00 bh 164,820 329,640 Hand Dryer ex-TOTO HD 3000S 2.00 bh 3,420,000 6,840,000 Cermin 1.00 bh 3,000,000 3,000,000 Floor Drain ex-TOTO TX1AV1 2.00 bh 184,920 369,840

` Table top granit 1.00 bh 3,500,000 3,500,000

TOTAL 102,564,280 TOTAL SEBELUM PPN 1,644,077,880

PPN 10% 164,407,788 TOTAL SETELAH PPN 1,808,485,668