REKAPITULASI Nama Satker/Kegiatan : Sungai dan Pantai I Papua Barat Paket/Pekerjaan : Lokasi : Kab. Teluk Wondama Sumber Dana : APBN Tahun Anggaran : 2016 No. JENIS PEKERJAAN JUMLAH BIAYA I. BIAYA LANGSUNG 1 PERSONIL 265,750,000.00 II. BIAYA TIDAK LANGSUNG 180,260,000.00 1 BIAYA PERJALANAN 24,800,000.00 2 PERALATAN DAN BAHAN 66,610,000.00 2.1. PERALATAN 57,675,000.00 2.2. B A H A N 8,935,000.00 3 SEWA KENDARAAN DAN TRANSPORTASI 50,000,000.00 4 K O M U N I K A S I 21,350,000.00 5 L A P O R A N 17,500,000.00 JUMLAH BIAYA 446,010,000.00 PPN 10 % 44,601,000.00 JUMLAH TOTAL 490,611,000.00 DIBULATKAN 490,000,000.00 TERBILANG : Empat ratus sembilan puluh juta rupiah Supervisi Konstruksi Pemb. Tanggul Banjir Sungai Sanduay dan Sungai Rado Jakarta, November 2015 Ka. SNVT Pelaksanaan Jaringan Sumber Air (PJSA) Prov. Papua Barat Ir. SIGIT PURNOMO, MT Nip. 19620807 199903 1 001

Upload: xp

Post on 26-Jan-2016

215 views

Category:

Documents


1 download

DESCRIPTION

hpse

TRANSCRIPT

Page 1: HPS Supervisi Sungai Sanduay Dan Rado - Copy

REKAPITULASI

Nama Satker/Kegiatan : Sungai dan Pantai I Papua BaratPaket/Pekerjaan :

Lokasi : Kab. Teluk WondamaSumber Dana : APBNTahun Anggaran : 2016

No. JENIS PEKERJAAN JUMLAH BIAYA

I. BIAYA LANGSUNG

1 PERSONIL 265,750,000.00

II. BIAYA TIDAK LANGSUNG 180,260,000.00

1 BIAYA PERJALANAN 24,800,000.00

2 PERALATAN DAN BAHAN 66,610,000.00

2.1. PERALATAN 57,675,000.00

2.2. B A H A N 8,935,000.00

3 SEWA KENDARAAN DAN TRANSPORTASI 50,000,000.00

4 K O M U N I K A S I 21,350,000.00

5 L A P O R A N 17,500,000.00

JUMLAH BIAYA 446,010,000.00

PPN 10 % 44,601,000.00

JUMLAH TOTAL 490,611,000.00

DIBULATKAN 490,000,000.00

TERBILANG : Empat ratus sembilan puluh juta rupiah

Supervisi Konstruksi Pemb. Tanggul Banjir Sungai Sanduay dan Sungai Rado

Jakarta, November 2015

Ka. SNVT Pelaksanaan Jaringan Sumber Air (PJSA)Prov. Papua Barat

Ir. SIGIT PURNOMO, MTNip. 19620807 199903 1 001

Page 2: HPS Supervisi Sungai Sanduay Dan Rado - Copy

DAFTAR KUANTITAS DAN HARGA

Nama Satker/Kegiatan : Sungai dan Pantai I Papua BaratPaket/Pekerjaan :

Lokasi : Kab. Teluk Wondama

Sumber Dana : APBN

Tahun Anggaran : 2016

I. BIAYA LANGSUNGPERSONIL

No. PERSONIL Satuan Volume Manmonth Billing Rate Jumlah Harga (Rp.)

A. PROFESIONAL STAFF1 Supervisior Engineer Orang 1.00 7.00 8,500,000.00 59,500,000.00 2 Quality & Quantity Eng Orang 1.00 7.00 7,500,000.00 52,500,000.00

B. SUB PROFESIONAL STAFF1 Inspektor Orang 2.00 7.00 4,000,000.00 56,000,000.00 2 Material dan Lab Technician Orang 1.00 6.00 4,000,000.00 24,000,000.00

C. PERSONIL PENDUKUNG1 Draftman Orang 1.00 6.00 2,500,000.00 15,000,000.00 2 Surveyor Orang 1.00 6.00 2,500,000.00 15,000,000.00 3 Operator Komputer Orang 1.00 7.00 2,250,000.00 15,750,000.00 4 Administrasi Orang 1.00 7.00 2,500,000.00 17,500,000.00 5 Office Boy Orang 1.00 7.00 1,500,000.00 10,500,000.00

265,750,000.00

II. BIAYA TIDAK LANGSUNG1 BIAYA PERJALANAN

No. PERSONIL Satuan Volume Orang / Hari Harga Satuan Jumlah Biaya (Rp.)

1 Supervisior Engineer Trip 1.00 28.00 500,000.00 14,000,000.00 2 Quality & Quantity Eng Trip 1.00 24.00 450,000.00 10,800,000.00

24,800,000.00

2 PERALATAN DAN BAHAN2.1. PERALATAN

No. JENIS ALAT Satuan Volume Lama Pakai Harga Satuan Jumlah Biaya (Rp.)

1 Sewa Kantor Buah 1.00 7.00 5,000,000.00 35,000,000.00 2 Meja Kursi Set 2.00 7.00 350,000.00 4,900,000.00 3 Komputer + Printer Buah 2.00 7.00 500,000.00 7,000,000.00 4 Waterpas Buah 1.00 2.00 850,000.00 1,700,000.00 5 Rollmeter Buah 1.00 7.00 50,000.00 350,000.00 6 Theodolite/Total Station Buah 1.00 3.00 2,500,000.00 7,500,000.00 7 Kamera Buah 1.00 7.00 175,000.00 1,225,000.00

57,675,000.00

Supervisi Konstruksi Pemb. Tanggul Banjir Sungai Sanduay dan Sungai Rado

Page 3: HPS Supervisi Sungai Sanduay Dan Rado - Copy

2.2. B A H A N

No. JENIS BAHAN Satuan Volume Harga Satuan Jumlah Biaya (Rp.)

1 Kertas HVS Rim 25.00 50,000.00 1,250,000.00 2 Tinta Printer Buah 5.00 450,000.00 2,250,000.00 3 Buku Ukur Buah 13.00 42,000.00 546,000.00 4 Kertas Kalkir Rol 6.00 150,000.00 900,000.00 5 Cutter Buah 6.00 20,000.00 120,000.00 6 Ballpoint Doos 6.00 75,000.00 450,000.00 7 Map Buah 100.00 2,500.00 250,000.00 8 Stabilo Doos 7.00 50,000.00 350,000.00 9 Paper Clip Doos 6.00 10,000.00 60,000.00

10 Staples Buah 6.00 70,000.00 420,000.00 11 Isi Steples Doos 6.00 6,500.00 39,000.00 12 Pensil Doos 5.00 30,000.00 150,000.00 13 Penghapus Buah 5.00 5,000.00 25,000.00 14 Tinta Rapido Buah 5.00 75,000.00 375,000.00 15 Film dan Cetak Rool 5.00 150,000.00 750,000.00 16 Perlengkapan Lapangan Set 1.00 1,000,000.00 1,000,000.00

8,935,000.00

3 SEWA KENDARAAN DAN TRANSPORTASI

No. JENIS KENDARAAN Satuan Volume Lama Pakai/ Harga Satuan Jumlah Biaya (Rp.)Jumlah Orng

1 Roda 4 dan BBM (Mini bus) Buah 1.00 3.00 5,000,000.00 15,000,000.00 2 Roda 2 dan BBM Buah 2.00 7.00 2,500,000.00 35,000,000.00

50,000,000.00

4 K O M U N I K A S I

No. JENIS Satuan Volume Harga Satuan Jumlah Biaya (Rp.)

1 Telepon Bulan 7.00 2,500,000.00 17,500,000.00 2 Internet Bulan 7.00 550,000.00 3,850,000.00

21,350,000.00

5 L A P O R A N

No. JENIS Satuan Volume Harga Satuan Jumlah Biaya (Rp.)

1 Laporan Bulanan (7 Bulan) Eks 35.00 350,000.00 12,250,000.00 2 Laporan Pendahuluan Eks 5.00 350,000.00 1,750,000.00 3 Laporan Akhir Eks 5.00 350,000.00 1,750,000.00 4 Laporan Triwulan Eks 5.00 350,000.00 1,750,000.00

17,500,000.00

Page 4: HPS Supervisi Sungai Sanduay Dan Rado - Copy

RINCIAN BEBAN BIAYA PERSONIL

No. Nama Personil Posisi / Jabatan

Gaji Dasar Beban BiayaBeban Biaya Sub Tunjangan Biaya Total Dibulatkan(GD)/ Sosial (BBS)/Umum (BBU)/ Jumlah Penugasan (T)/ Keuntungan Lain-LainBiaya Langsung

Basic Salary Social Cost Overhead Allowance (K)/ Fee (BL) Personil(Rp) (Rp) (Rp) (Rp.) (Rp) (Rp) (Rp) (Rp) (Rp.)

1 2 3 4 5 6 7 = 4 + 5 + 6 8 9 10 11 = 7 + 8 + 9 + 10 12

I PROFESIONAL STAFF1 To Be Name Supervision Engineer ### ### ### ### 850,000.00 850,000.00 170,000.00 ### ###

2 To Be Name Quality/Quantity Engineer ### ### ### ### 750,000.00 750,000.00 150,000.00 ### ###

II SUB PROFESIONAL STAFF 1 To Be Name Inspector ### 640,000.00 880,000.00 ### 400,000.00 400,000.00 80,000.00 ### ###

2 To Be Name Material & Lab. Tecnician ### 640,000.00 880,000.00 ### 400,000.00 400,000.00 80,000.00 ### ###

III PERSONIL PENDUKUNG 1 To Be Name Draftman ### 400,000.00 550,000.00 ### 250,000.00 250,000.00 50,000.00 ### ###

2 To Be Name Surveyor ### 400,000.00 550,000.00 ### 250,000.00 250,000.00 50,000.00 ### ###

3 To Be Name Operator Komputer 900,000.00 360,000.00 495,000.00 ### 225,000.00 225,000.00 45,000.00 ### ###

4 To Be Name Administrasi ### 400,000.00 550,000.00 ### 250,000.00 250,000.00 50,000.00 ### ###

Page 5: HPS Supervisi Sungai Sanduay Dan Rado - Copy

Sesuai Pedoman Acuan Biaya Langsung Personil (BLP)/ PERSONNEL REMUNERATION adal Supervision Engineer Quantity/Quality EngineerBLP = GD + BBS + BBU + T + K + BL ### 7,500,000.00

GD = 40 % Gaji Dasar 0.4 ### 0.4 3,000,000.00 BBS = 16 % Beban Biaya Sosial 0.16 ### 0.16 1,200,000.00 BBU = 22 % Beban Biaya Umum 0.22 ### 0.22 1,650,000.00

T = 10 % Tunjangan 0.1 850,000.00 0.1 750,000.00 K = 10 % Keuntungan 0.1 850,000.00 0.1 750,000.00

BL = 2 % Biaya Lain-lain 0.02 170,000.00 0.02 150,000.00 100

Inspektor Material & Lab. TecnicianDrafter ### 4,000,000.00

Gaji Dasar ### 0.4 ### 0.4 1,600,000.00 Beban Biaya Sosial 0.4 ### 0.16 640,000.00 0.16 640,000.00 Beban Biaya Umum 0.16 400,000.00 0.22 880,000.00 0.22 880,000.00 Tunjangan 0.22 550,000.00 0.1 400,000.00 0.1 400,000.00

Keuntungan 0.1 250,000.00 0.1 400,000.00 0.1 400,000.00

Biaya Lain-lain 0.1 250,000.00 0.02 80,000.00 0.02 80,000.00

0.02 50,000.00

Surveyor Operator Komputer Administrasi Office Boy

### ### ### 1,500,000.00

0.4 ### 0.4 900,000.00 0.4 ### 0.4 600,000.00 0.16 400,000.00 0.16 360,000.00 0.16 400,000.00 0.16 240,000.00 0.22 550,000.00 0.22 495,000.00 0.22 550,000.00 0.22 330,000.00

0.1 250,000.00 0.1 225,000.00 0.1 250,000.00 0.1 150,000.00 0.1 250,000.00 0.1 225,000.00 0.1 250,000.00 0.1 150,000.00

0.02 50,000.00 0.02 45,000.00 0.02 50,000.00 0.02 30,000.00