form untuk submittal p3

2
CONTRACTOR'S NAME PROJECT'S NAME PT. PEMBANGUNAN PERUMAHA N (PP) - ITOCHU HASANUDDIN UNIVERSI TY ENGINEERIN G Joint Operation FACULTY DEVELOPMENT PROJECT JBIC LOAN IP-541 P 3 S M I S 0 0 1 0 ISSUEER AND ADDRES SEE(S) OF THE REQUEST From : PP- ITOCHU Joint Operation To : Oriental Consultants Co.,Ltd. Name : I Nyoman Karmana Signature : Name : Nobutaka Komai (Project Manager) Date : CONTRACT NO : 15375/H.4/LK.13/2011 TRANSMITTAL OF : DAILY REPORT EQUIPMENT DATA METHODE OF STATEMENT WEEKLY REPORT BUILDING EQUIPMENT DATA TEST RESULT MONTHLY REPORT BROCHURE OF MATERIAL CHANGE ORDER SCHEDULE MANUFACTURING'S CERTIFICATE VARIATION ORDER OF COMPLIENCE OTHERS DESCRIPTION OF ITEM SUBMITTED 1 Volume of Cut & Fill for Package-3 2 REVIEW / APPROVAL POSITION : NAME : APPROVED APPR WITH COMMENT (see below/attached) REJECTED (with details below/attached) DATE: SIGNATURE : Comments: …………………………………………………………………………………………………………………………………………………… 6 MISCELLANEOUS APPROVAL REQUEST 26-Sep-11 ITEM NO DESCRIPTION OF ITEM SUBMITED (Type, size, model number etc) NO. OF COPIES CONTRACT REFERENCE DOCUMENT VARIATION FOR ENGINEER USE CODE S PE C. PARA NO. DRAWING SHEET NO. 1 2 3 4 5 26-Sep-11 PP-ITOCHU Joint Operation Consultants Engineer Sit e Eng ine er Manager Pro jec t Manager G al ang Basti ono I Nyoman Karmana 26-Sep-11

Upload: dhuhita-atitami

Post on 07-Apr-2018

218 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Form untuk submittal P3

8/4/2019 Form untuk submittal P3

http://slidepdf.com/reader/full/form-untuk-submittal-p3 1/1

CONTRACTOR'S NAME PROJECT'S NAME

PT. PEMBANGUNAN PERUMAHAN (PP) - ITOCHU HASANUDDIN UNIVERSITY ENGINEERING

Joint Operation FACULTY DEVELOPMENT PROJECT

JBIC LOAN IP-541

P 3 S M I S 0 0 1 0

ISSUEER AND ADDRESSEE(S) OF THE REQUEST

From : PP- ITOCHU Joint Operation To : Oriental Consultants Co.,Ltd.

Name : I Nyoman Karmana Signature : Name : Nobutaka Komai

(Project Manager)

Date :

CONTRACT NO : 15375/H.4/LK.13/2011

TRANSMITTAL OF :DAILY REPORT EQUIPMENT DATA METHODE OF STATEMENT

WEEKLY REPORT BUILDING EQUIPMENT DATA TEST RESULT

MONTHLY REPORT BROCHURE OF MATERIAL CHANGE ORDER

SCHEDULE MANUFACTURING'S CERTIFICATE VARIATION ORDEROF COMPLIENCE

OTHERS

DESCRIPTION OF ITEM SUBMITTED

1 Volume of Cut & Fill for Package-3 2

REVIEW / APPROVAL

POSITION :

NAME :

APPROVED

APPR WITH COMMENT

(see below/attached)

REJECTED(with details below/attached)

DATE:

SIGNATURE :

Comments: ……………………………………………………………………………………………………………………………………………………

6

MISCELLANEOUS APPROVAL REQUEST

26-Sep-11

ITEM

NO

DESCRIPTION OF ITEM SUBMITED

(Type, size, model number etc)NO. OF COPIES

CONTRACT REFERENCE DOCUMENTVARIATION

FOR ENGINEER

USE CODESPEC. PARA NO. DRAWING SHEET NO.

1 2 3 4 5

26-Sep-11

PP-ITOCHU Joint Operation Consultants Engineer

Site Engineer Manager Project Manager

Galang Bastiono I Nyoman Karmana

26-Sep-11