1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN KOREKSI ARITMATIK Kegiatan : SEMENISASI JALAN LINGKUNGAN DAN PEMBANGUNAN DERMAGA Paket : 27 (DUA PULUH TUJUH) Pekerjaan : PEMBANGUNAN SEMENISASI JALAN PARIT MELUR KEL. TELUK DALAM T = 17.5 CM L = 1 M KEC. KUALA KAMPAR Kualifikasi : USAHA KECIL Nilai HPS : 193,419,550.74 Rp 80 % X HPS : 154,735,640.59 Rp No. HARGA PENAWARAN TERKOREKSI PERSENTASE TERHADAP HPS (%) BESARNYA NILAI JAMINAN PELAKSANAAN URUTAN BERDASARKAN PERINGKAT KETERANGAN 1 2 3 4 5 6 7 1 CV. PURINA AYUNING 173,292,876.48 89.59 8,664,643.82 Rp I (Satu) 8,664,643.82 Rp 2 CV. FITRIA 177,623,007.58 91.83 8,881,150.38 Rp II (Dua) 8,881,150.38 Rp 3 CV. EMBUN SURI 188,779,442.85 97.60 9,438,972.14 Rp III (Tiga) 9,438,972.14 Rp 1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN KOREKSI ARITMATIK Kegiatan : SEMENISASI JALAN LINGKUNGAN DAN PEMBANGUNAN DERMAGA Paket : 29 (DUA PULUH SEMBILAN) Pekerjaan : PEMBANGUNAN SEMENISASI JALAN LINGKUNGAN DESA KUALA PANDUK Kualifikasi : USAHA KECIL Nilai HPS : 1,702,062,611.11 Rp 80 % X HPS : 1,361,650,088.89 Rp No. HARGA PENAWARAN TERKOREKSI PERSENTASE TERHADAP HPS (%) BESARNYA NILAI JAMINAN PELAKSANAAN URUTAN BERDASARKAN PERINGKAT KETERANGAN 1 2 3 4 5 6 7 1 CV. REZKI PERDANA MANDIRI 1,275,648,151.48 74.95 85,103,130.56 Rp I (Satu) 2 CV. TUNAS JAYA MANIKAM 1,316,091,773.22 77.32 85,103,130.56 Rp II (Dua) 3 CV. TANAGAN PUTIH 1,323,376,399.21 77.75 85,103,130.56 Rp III (Tiga) 4 CV. NUGRAHA CHANDRA MURNI 1,324,854,518.88 77.84 85,103,130.56 Rp IV (Empat) 5 CV. BINA MARGA CONTRACTOR 1,333,507,512.54 78.35 85,103,130.56 Rp V (Lima) 6 CV. ABDI JAYA 1,339,683,889.16 78.71 85,103,130.56 Rp VI (Enam) 7 CV. CAHAYA ABADI 1,361,582,509.67 80.00 85,103,130.56 Rp VII (Tujuh) 8 CV. BANGUN RIAU CEMERLANG 1,361,887,829.81 80.01 68,094,391.49 Rp VIII (Delapan) 9 CV. BINTANG PERDANA 1,363,446,752.43 80.11 68,172,337.62 Rp IX (Sembilan) 10 CV. KARYA MULIA ABADI 1,442,747,451.15 84.76 72,137,372.56 Rp X (Sepuluh) 11 CV. TUAH ANDIKO 1,450,272,996.45 85.21 72,513,649.82 Rp XI (Sebelas) 12 CV. LAUTAN GADING 1,452,908,378.27 85.36 72,645,418.91 Rp XII (Dua Belas) 13 CV. GAMANA PRATAMA 1,456,201,855.38 85.56 72,810,092.77 Rp XIII (Tiga Belas) 14 CV. AURA SARDIKA 1,468,877,765.53 86.30 73,443,888.28 Rp XIV (Empat Belas) EVALUASI DOKUMEN PENAWARAN TERHADAP ARIMATIK PERUSAHAAN PERUSAHAAN

Upload: dodiep

Post on 28-Jul-2019

240 views

Category:

Documents


0 download

TRANSCRIPT

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN KOREKSI ARITMATIK

Kegiatan : SEMENISASI JALAN LINGKUNGAN DAN PEMBANGUNAN DERMAGA

Paket : 27 (DUA PULUH TUJUH)

Pekerjaan : PEMBANGUNAN SEMENISASI JALAN PARIT MELUR KEL. TELUK DALAM T = 17.5 CM L = 1 M KEC. KUALA KAMPAR

Kualifikasi : USAHA KECIL

Nilai HPS : 193,419,550.74Rp

80 % X HPS : 154,735,640.59Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 2 3 4 5 6 7

1 CV. PURINA AYUNING 173,292,876.48 89.59 8,664,643.82Rp I (Satu) 8,664,643.82Rp

2 CV. FITRIA 177,623,007.58 91.83 8,881,150.38Rp II (Dua) 8,881,150.38Rp

3 CV. EMBUN SURI 188,779,442.85 97.60 9,438,972.14Rp III (Tiga) 9,438,972.14Rp

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN KOREKSI ARITMATIK

Kegiatan : SEMENISASI JALAN LINGKUNGAN DAN PEMBANGUNAN DERMAGA

Paket : 29 (DUA PULUH SEMBILAN)

Pekerjaan : PEMBANGUNAN SEMENISASI JALAN LINGKUNGAN DESA KUALA PANDUK

Kualifikasi : USAHA KECIL

Nilai HPS : 1,702,062,611.11Rp

80 % X HPS : 1,361,650,088.89Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 2 3 4 5 6 7

1 CV. REZKI PERDANA MANDIRI 1,275,648,151.48 74.95 85,103,130.56Rp I (Satu)

2 CV. TUNAS JAYA MANIKAM 1,316,091,773.22 77.32 85,103,130.56Rp II (Dua)

3 CV. TANAGAN PUTIH 1,323,376,399.21 77.75 85,103,130.56Rp III (Tiga)

4 CV. NUGRAHA CHANDRA MURNI 1,324,854,518.88 77.84 85,103,130.56Rp IV (Empat)

5 CV. BINA MARGA CONTRACTOR 1,333,507,512.54 78.35 85,103,130.56Rp V (Lima)

6 CV. ABDI JAYA 1,339,683,889.16 78.71 85,103,130.56Rp VI (Enam)

7 CV. CAHAYA ABADI 1,361,582,509.67 80.00 85,103,130.56Rp VII (Tujuh)

8 CV. BANGUN RIAU CEMERLANG 1,361,887,829.81 80.01 68,094,391.49Rp VIII (Delapan)

9 CV. BINTANG PERDANA 1,363,446,752.43 80.11 68,172,337.62Rp IX (Sembilan)

10 CV. KARYA MULIA ABADI 1,442,747,451.15 84.76 72,137,372.56Rp X (Sepuluh)

11 CV. TUAH ANDIKO 1,450,272,996.45 85.21 72,513,649.82Rp XI (Sebelas)

12 CV. LAUTAN GADING 1,452,908,378.27 85.36 72,645,418.91Rp XII (Dua Belas)

13 CV. GAMANA PRATAMA 1,456,201,855.38 85.56 72,810,092.77Rp XIII (Tiga Belas)

14 CV. AURA SARDIKA 1,468,877,765.53 86.30 73,443,888.28Rp XIV (Empat Belas)

EVALUASI DOKUMEN PENAWARAN TERHADAP ARIMATIK

PERUSAHAAN

PERUSAHAAN

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN KOREKSI ARITMATIK

Kegiatan : SEMENISASI JALAN LINGKUNGAN DAN PEMBANGUNAN DERMAGA

Paket : 30 (TIGA PULUH)

Pekerjaan : PEMBANGUNAN SEMENISASI JALAN Tj. SELUKUP - GAPURA BATAS DESA DI TELUK BAKAU

Kualifikasi : USAHA KECIL

Nilai HPS : 543,376,372.93Rp

80 % X HPS : 434,701,098.34Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

1 CV. TIRTA EMBUN PAGI 434,675,178.73 80.00 27,168,818.65Rp I (Satu)

2 CV. JAYA BERSAMA PRATAMA 434,755,439.26 80.01 21,737,771.96Rp II (Dua)

3 CV. MAHKOTA KERINCI 435,251,462.18 80.10 21,762,573.11Rp III (Tiga)

4 CV. PURI RAYA EKATAMA 437,043,718.51 80.43 21,852,185.93Rp IV (Empat)

5 CV. HAZRA 439,766,698.99 80.93 21,988,334.95Rp V (Lima)

6 CV. NUGRAHA CHANDRA MURNI 445,423,759.64 81.97 22,271,187.98Rp VI (Enam)

7 CV. RADITYA KARYA 446,740,729.18 82.22 22,337,036.46Rp VII (Tujuh)

8 CV. FITRIA 450,099,817.81 82.83 22,504,990.89Rp VIII (Delapan)

9 CV. MITRA BANGUN PERSADA 450,767,993.86 82.96 22,538,399.69Rp IX (Sebelas)

10 CV. TUAH PERKASA 453,001,431.53 83.37 22,650,071.58Rp X (Sepuluh)

11 CV. TARUNA BISNIS ANDALAN 466,994,698.33 85.94 23,349,734.92Rp XI (Sebelas)

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN KOREKSI ARITMATIK

Kegiatan : SEMENISASI JALAN LINGKUNGAN DAN PEMBANGUNAN DERMAGA

Paket : 31 (TIGA PULUH SATU)

Pekerjaan : PEMBANGUNAN SEMENISASI JALAN BATAS DESA TELUK KEPARIT PANJANG DI DESA TELUK BAKAU

Kualifikasi : USAHA KECIL

Nilai HPS : 724,559,465.17Rp

80 % X HPS : 579,647,572.14Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

1 CV. RADITYA KARYA 567,996,086.37 78.39 36,227,973.26Rp I (Satu)

2 CV. JAYA BERSAMA PRATAMA 572,401,949.28 79.00 36,227,973.26Rp II (Dua)

3 CV. MUSTAQIM 575,771,004.52 79.46 36,227,973.26Rp III (Tiga)

4 CV. TIRTA EMBUN PAGI 579,643,248.40 80.00 36,227,973.26Rp IV (Empat)

5 CV. JALANUSA TABEXINDO 579,708,953.85 80.01 28,985,447.69Rp V (Lima)

6 CV. BINTANG PERDANA 579,979,373.39 80.05 28,998,968.67Rp VI (Enam)

7 CV. TRI TUNGGAL JAYA LESTARI 580,030,688.05 80.05 29,001,534.40Rp VII (Tujuh)

8 CV. MAHKOTA KERINCI 581,820,667.21 80.30 29,091,033.36Rp VIII (Delapan)

9 CV. PURI RAYA EKATAMA 583,118,701.01 80.48 29,155,935.05Rp IX (Sebelas)

10 CV. ARITA MAJU 586,831,896.49 80.99 29,341,594.82Rp X (Sepuluh)

11 CV. NUGRAHA CHANDRA MURNI 591,210,324.77 81.60 29,560,516.24Rp XI (Sebelas)

12 CV. PILIANG RIAU 594,517,001.35 82.05 29,725,850.07Rp XII (Dua Belas)

13 CV. TUAH PERKASA 607,170,089.93 83.80 30,358,504.50Rp XIII (Tiga Belas)

14 CV. WAHYU MANDIRI SEJAHTERA 614,270,808.95 84.78 30,713,540.45Rp XIV (Empat Belas)

15 CV. TARUNA BISNIS ANDALAN 621,048,376.65 85.71 31,052,418.83Rp XV (Lima Belas)

16 CV. KARYA LESTARI 637,719,298.66 88.01 31,885,964.93Rp XVI (Enam Belas)

17 CV. SEJAHTERA LESTARI 656,880,640.86 90.66 32,844,032.04Rp XVII (Tujuh Belas)

PERUSAHAAN

2

PERUSAHAAN

2

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN KOREKSI ARITMATIK

Kegiatan : SEMENISASI JALAN LINGKUNGAN DAN PEMBANGUNAN DERMAGA

Paket : 32 (TIGA PULUH DUA)

Pekerjaan : PEMBANGUNAN SEMENISASI JALAN SEI SOLOK - SEI CINA DI DESA SEI SOLOK

Kualifikasi : USAHA KECIL

Nilai HPS : 810,613,734.27Rp

80 % X HPS : 648,490,987.42Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

1 CV. JAYA BERSAMA PRATAMA 632,278,595.59 78.00 40,530,686.71Rp I (Satu)

2 CV. KEMBAR JAYA UTAMA 648,481,842.25 80.00 40,530,686.71Rp II (Dua)

3 CV. KAMPE ANDALAN MANDIRI PERKASA 656,720,968.07 81.02 32,836,048.40Rp III (Tiga)

4 CV. NORIKA 663,649,321.55 81.87 33,182,466.08Rp IV (Empat)

5 CV. BAHTERA ZAMRUD SEJAHTERA 664,435,945.49 81.97 33,221,797.27Rp V (Lima)

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN KOREKSI ARITMATIK

Kegiatan : SEMENISASI JALAN LINGKUNGAN DAN PEMBANGUNAN DERMAGA

Paket : 33 (TIGA PULUH TIGA)

Pekerjaan : PEMBANGUNAN SEMENISASI JALAN SEI UPIH - SEI CINA DI DESA SEI UPIH

Kualifikasi : USAHA KECIL

Nilai HPS : 815,730,362.97Rp

80 % X HPS : 652,584,290.38Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

1 CV. MUSTAQIM 643,480,103.89 78.88 40,786,518.15Rp I (Satu)

2 CV. JAYA BERSAMA PRATAMA 644,426,985.60 79.00 40,786,518.15Rp II (Dua)

3 CV. TRI TUNGGAL JAYA LESTARI 652,613,558.70 80.00 32,630,677.94Rp III (Tiga)

4 CV. PUTRA SEJAHTERA 655,343,830.33 80.34 32,767,191.52Rp IV (Empat)

5 CV. ANDI BERSAUDARA 657,520,307.40 80.61 32,876,015.37Rp V (Lima)

6 CV. FAHRUL SIDIK 673,782,798.59 82.60 33,689,139.93Rp VI (Enam)

7 CV. SATYA MITRA PERKASA 701,310,754.48 85.97 35,065,537.72Rp VII (Tujuh)

8 CV. KARYA LESTARI 717,863,803.61 88.00 35,893,190.18Rp VIII (Delapan)

9 CV. SIAK LESTARI 741,818,134.17 90.94 37,090,906.71Rp IX (Sembilan)

PERUSAHAAN

2

PERUSAHAAN

2

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN KOREKSI ARITMATIK

Kegiatan : SEMENISASI JALAN LINGKUNGAN DAN PEMBANGUNAN DERMAGA

Paket : 34 (TIGA PULUH EMPAT)

Pekerjaan : PEMBANGUNAN SEMENISASI JALAN SEI UPIH - BATAS TELUK BERINGIN DI DESA SEI UPIH

Kualifikasi : USAHA KECIL

Nilai HPS : 709,602,950.90Rp

80 % X HPS : 567,682,360.72Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

1 CV. PUTRA SEJAHTERA 577,082,689.92 81.32 28,854,134.50Rp I (Satu)

2 CV. ANIZAR 578,887,398.28 81.58 28,944,369.91Rp II (Dua) Tidak Mendaftar

3 CV. JAYA BERSAMA PRATAMA 581,890,842.85 82.00 29,094,542.14Rp III (Tiga)

4 CV. NUGRAHA CHANDRA MURNI 593,596,401.16 83.65 29,679,820.06Rp IV (Empat)

5 CV. TUAH PERKASA 607,489,763.01 85.61 30,374,488.15Rp V (Lima)

6 CV. TARUNA BISNIS ANDALAN 622,334,299.03 87.70 31,116,714.95Rp VI (Enam)

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN KOREKSI ARITMATIK

Kegiatan : SEMENISASI JALAN LINGKUNGAN DAN PEMBANGUNAN DERMAGA

Paket : 35 (TIGA PULUH LMA)

Pekerjaan : PEMBANGUNAN SEMENISASI JALAN TELUK BERINGIN - BATAS SEI UPIH DI DESA TELUK BERINGIN

Kualifikasi ` USAHA KECIL

Nilai HPS : 583,505,254.20Rp

80 % X HPS : 466,804,203.36Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

1 CV. JAYA BERSAMA PRATAMA 468,232,458.46Rp 80.24 23,411,622.92Rp I (Satu)

2 CV. PUTRA SEJAHTERA 469,799,924.74Rp 80.51 23,489,996.24Rp II (Dua)

3 CV. MAHKOTA KERINCI 475,409,397.22Rp 81.47 23,770,469.86Rp III (Tiga)

4 CV. ANIZAR 485,289,957.38Rp 83.17 24,264,497.87Rp IV (Empat) Tidak Mendaftar

5 CV. SEJAHTERA LESTARI 513,536,756.69Rp 88.01 25,676,837.83Rp V (Lima)

6 CV. SIAK LESTARI 530,785,725.02Rp 90.97 26,539,286.25Rp VI (Enam)

7 CV. FITRIA 575,442,095.87Rp 98.62 28,772,104.79Rp VII (Tujuh)

PERUSAHAAN

2

PERUSAHAAN

2

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN KOREKSI ARITMATIK

Kegiatan : SEMENISASI JALAN LINGKUNGAN DAN PEMBANGUNAN DERMAGA

Paket : 36 (TIGA PULUH ENAM)

Pekerjaan : PEMBANGUNAN SEMENISASI JALAN PARIT MELATI - KP. JAWA DI KELURAHAAN TELUK DALAM

Kualifikasi : USAHA KECIL

Nilai HPS : 362,251,682.25Rp

80 % X HPS : 289,801,345.80Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

1 CV. PUTRA SEJAHTERA 279,140,150.13Rp 77.06 18,112,584.11Rp I (Satu)

2 CV. KAMPE ANDALAN MANDIRI PERKASA 293,550,594.66Rp 81.03 14,677,529.73Rp II (Dua)

3 CV. NORIKA 296,436,384.24Rp 81.83 14,821,819.21Rp III (Tiga)

4 CV. JAYA BERSAMA PRATAMA 298,505,722.06Rp 82.40 14,925,286.10Rp IV (Empat)

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN KOREKSI ARITMATIK

Kegiatan : SEMENISASI JALAN LINGKUNGAN DAN PEMBANGUNAN DERMAGA

Paket : 37 (TIGA PULUH TUJUH)

Pekerjaan : PEMBANGUNAN JEMBATAN KAYU SEI KELAWAR KEL. TELUK DALAM P=15 M

Kualifikasi : USAHA KECIL

Nilai HPS : 117,860,312.45Rp

80 % X HPS : 94,288,249.96Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

1 CV. SIAK LESTARI 94,304,505.17Rp 80.01 4,715,225.26Rp I (Satu)

2 CV. SEJAHTERA LESTARI 95,875,671.31Rp 81.35 4,793,783.57Rp II (Dua)

3 CV. MEDIA NUSANTARA INDONESIA 96,804,074.71Rp 82.13 4,840,203.74Rp III (Tiga)

4 CV. KARYA LESTARI 96,867,131.30Rp 82.19 4,843,356.56Rp IV (Empat)

2

PERUSAHAAN

PERUSAHAAN

2

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN KOREKSI ARITMATIK

Kegiatan : SEMENISASI JALAN LINGKUNGAN DAN PEMBANGUNAN DERMAGA

Paket : 38 (TIGA PULUH DELAPAN)

Pekerjaan : PEMBANGUNAN JEMBATAN KAYU RW 9 TELUK KELAPA KEL. TELUK DALAM P=15 M

Kualifikasi : USAHA KECIL

Nilai HPS : 118,414,710.94Rp

80 % X HPS : 94,731,768.75Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

1 CV. KARYA LESTARI 94,746,539.32Rp 80.01 4,737,326.97Rp I (Satu)

2 CV. SEJAHTERA LESTARI 96,700,952.77Rp 81.66 4,835,047.64Rp II (Dua)

3 CV. SIAK LESTARI 97,552,931.65Rp 82.38 4,877,646.58Rp III (Tiga)

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN KOREKSI ARITMATIK

Kegiatan : SEMENISASI JALAN LINGKUNGAN DAN PEMBANGUNAN DERMAGA

Paket : 39 (TIGA PULUH SEMBILAN)

Pekerjaan : PEMBANGUNAN JEMBATAN KAYU RW 10 TELUK AIR KEL. TELUK DALAM P=15 M

Kualifikasi : USAHA KECIL

Nilai HPS : 127,422,700.50Rp

80 % X HPS : 101,938,160.40Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

1 CV. SEJAHTERA LESTARI 101,953,692.08Rp 80.01 5,097,684.60Rp I (Satu)

2 CV. SIAK LESTARI 103,527,239.33Rp 81.25 5,176,361.97Rp II (Dua)

3 CV. KARYA LESTARI 105,219,488.95Rp 82.58 5,260,974.45Rp III (Tiga)

4 CV. DEWI CITRA MANDIRI 114,545,727.51Rp 89.89 5,727,286.38Rp IV (Empat) Tidak Mendaftar

5 CV. KURNIA BARU 115,935,686.08Rp 90.99 5,796,784.30Rp V ( Iima ) Tidak Mendaftar

6 CV. KICIDAN MANDIRI 117,164,152.33Rp 91.95 5,858,207.62Rp VI (Enam) Tidak Mendaftar

7 CV. MUDA MANDIRI SAKTI 118,271,964.53Rp 92.82 5,913,598.23Rp VII (Tujuh) Tidak Mendaftar

PERUSAHAAN

2

PERUSAHAAN

2

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN KOREKSI ARITMATIK

Kegiatan : SEMENISASI JALAN LINGKUNGAN DAN PEMBANGUNAN DERMAGA

Paket : 43 (EMPAT PULUH TIGA)

Pekerjaan : PEMBANGUNAN SEMENISASI JALAN LINGKUNGAN MASJID RW 01 - RW 02 KEL. LANGGAM

Kualifikasi : USAHA KECIL

Nilai HPS : 981,310,282.50Rp

80 % X HPS : 785,048,226.00Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

1 CV. HELSIS RENATA PUTRI 775,221,517.00Rp 79.00 49,065,514.13Rp I (Satu)

2 CV. SHERLY ARLYAN SHELLA 780,146,908.69Rp 79.50 49,065,514.13Rp II (Dua)

3 CV. RAHMAN PUTRA PERDANA 785,086,586.08Rp 80.00 39,254,329.30Rp III (Tiga)

4 CV. TIARA ANDALAN 785,107,768.85Rp 80.01 39,255,388.44Rp IV (Empat)

5 CV. AURA SARDIKA 785,386,286.70Rp 80.03 39,269,314.33Rp V ( Iima )

6 CV. WAHYUDA KONTRAKTOR 794,859,368.21Rp 81.00 39,742,968.41Rp VI (Enam)

7 CV. KAMPAR JAYA 804,659,999.37Rp 82.00 40,232,999.97Rp VII (Tujuh)

8 CV. TEKAD MANDIRI 815,007,487.95Rp 83.05 40,750,374.40Rp VIII (Delapan)

9 CV. UTAMA JAYA KONTRAKTOR 824,196,789.52Rp 83.99 41,209,839.48Rp IX (Sembilan)

10 CV. WAHYU MANDIRI SEJAHTERA 835,656,564.39Rp 85.16 41,782,828.22Rp X (Sepuluh)

11 CV. DATUK ENGKU RAJO LELO PUTRA 910,340,532.87Rp 92.77 45,517,026.64Rp XI (Sebelas)

12 CV. ANGGUN BERSAUDARA 916,129,492.87Rp 93.36 45,806,474.64Rp XII (Dua belas)

13 CV. JHONI BERSAUDARA 921,805,006.83Rp 93.94 46,090,250.34Rp XIII (Tiga belas)

14 CV. ANDRE SEJAHTERA PERKASA 927,480,514.72Rp 94.51 46,374,025.74Rp XIV (Empat belas)

15 CV. ANIZAR 937,015,333.33Rp 95.49 46,850,766.67Rp XV (Lima belas)

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN KOREKSI ARITMATIK

Kegiatan : SEMENISASI JALAN LINGKUNGAN DAN PEMBANGUNAN DERMAGA

Paket : 44 (EMPAT PULUH EMPAT)

Pekerjaan : PEMBANGUNAN SEMENISASI SAMBUNGAN JALAN LINGKUNGAN SP 1 DI DESA BUKIT LEMBAH SUBUR KEC. KERUMUTAN

Kualifikasi : USAHA KECIL

Nilai HPS : 628,653,468.34Rp

80 % X HPS : 502,922,774.67Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

1 CV. RIAU PRIMA 476,723,712.47Rp 75.83 31,432,673.42Rp I (Satu)

2 CV. BINTANG TIMUR 477,197,551.25Rp 75.91 31,432,673.42Rp II (Dua)

3 CV. ABDI JAYA 481,279,900.02Rp 76.56 31,432,673.42Rp III (Tiga)

4 CV. WAHYU MANDIRI SEJAHTERA 489,645,296.37Rp 77.89 31,432,673.42Rp IV (Empat)

5 CV. KICIDAN MANDIRI 492,222,961.51Rp 78.30 31,432,673.42Rp V ( Iima )

6 CV. KAMPAR JAYA 492,970,121.79Rp 78.42 31,432,673.42Rp VI (Enam)

7 CV. KURNIA BARU 493,557,783.46Rp 78.51 31,432,673.42Rp VII (Tujuh)

8 CV. DEWI CITRA MANDIRI 494,002,724.11Rp 78.58 31,432,673.42Rp VIII (Delapan)

9 CV. MUDA MANDIRI SAKTI 494,447,664.76Rp 78.65 31,432,673.42Rp IX (Sembilan)

10 CV. NESHA BANGUN PRATAMA 502,549,097.26Rp 79.94 31,432,673.42Rp X (Sepuluh)

11 CV. BINA MARGA CONTRACTOR 502,648,756.41Rp 79.96 31,432,673.42Rp XI (Sebelas)

12 CV. PANGKALAN LESUNG PERKASA 502,923,054.98Rp 80.00 25,146,152.75Rp XII (Dua belas)

13 CV. RIZKI TEHNIK 502,989,240.80Rp 80.01 25,149,462.04Rp XIII (Tiga belas)

14 CV. ANTARA 506,352,993.97Rp 80.55 25,317,649.70Rp XIV (Empat belas)

15 CV. MAHKOTA TERUSAN 533,970,682.27Rp 84.94 26,698,534.11Rp XV (Lima belas)

16 CV. BULAN PURNAMA 543,038,456.16Rp 86.38 27,151,922.81Rp XVI (Enam belas)

PERUSAHAAN

2

PERUSAHAAN

2

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN KOREKSI ARITMATIK

Kegiatan : PENINGKATAN PEMBANGUNAN SARANA DAN PRASARANA OLAHRAGA

Paket : 5 (LIMA)

Pekerjaan : PEMBANGUNAN PARKIR TAMBAHAN DAN MUSHOLLA GOR PKL. KERINCI

Kualifikasi : USAHA KECIL

Nilai HPS : 1,668,385,730.38Rp

80 % X HPS : 1,334,708,584.30Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

1 CV. NUGRAHA CHANDRA MURNI 1,251,133,000.00Rp 74.99 83,419,286.52Rp I (Satu)

2 CV. ABDI JAYA 1,264,199,000.00Rp 75.77 83,419,286.52Rp II (Dua)

3 CV. REZKI PERDANA MANDIRI 1,286,621,000.00Rp 77.12 83,419,286.52Rp III (Tiga)

4 CV. BINA MARGA CONTRACTOR 1,334,870,000.00Rp 80.01 66,743,500.00Rp IV (Empat)

5 CV. KARYA PRATAMA 1,339,275,000.00Rp 80.27 66,963,750.00Rp V ( Iima )

6 CV. RENGAT CAHAYA PERMATA 1,339,327,000.00Rp 80.28 66,966,350.00Rp VI (Enam) Tidak Mendaftar

7 CV. TUNAS JAYA MANIKAM 1,351,999,000.00Rp 81.04 67,599,950.00Rp VII (Tujuh)

8 CV. AYU INDAH GEMILANG 1,354,067,000.00Rp 81.16 67,703,350.00Rp VIII (Delapan)

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN KOREKSI ARITMATIK

Kegiatan : PEMBANGUNAN GEDUNG KANTOR

Paket : 6 (ENAM)

Pekerjaan : PEMBUATAN DAN PERBAIKAN PELATARAN JALAN MASUK KANTOR CAMAT PELALAWAN DAN RUMAH DINAS CAMAT PELALAWAN

Kualifikasi : USAHA KECIL

Nilai HPS : 201,206,408.17Rp

80 % X HPS : 160,965,126.54Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

1 CV. WAHANA JAYA CIPTA 156,425,879.22Rp 77.74 10,060,320.41Rp I (Satu)

2 CV. PELALAWAN JAYA SATU 158,943,508.65Rp 79.00 10,060,320.41Rp II (Dua)

3 CV. MITRA ADI SENTOSA 160,032,581.74Rp 79.54 10,060,320.41Rp III (Tiga)

4 CV. AISYAH KERINCI 160,867,361.25Rp 79.95 10,060,320.41Rp IV (Empat)

5 CV. EKIE SEJAHTERA MANDIRI 160,898,702.00Rp 79.97 10,060,320.41Rp V ( Iima )

6 CV. HARAPAN JAYA 160,900,608.42Rp 79.97 10,060,320.41Rp VI (Enam)

7 CV. PELALAWAN PERKASA 160,973,048.83Rp 80.00 8,048,652.44Rp VII (Tujuh)

8 CV. PUTRA BUNGSU MANDIRI 161,758,022.00Rp 80.39 8,087,901.10Rp VIII (Delapan)

9 CV. ARITA MAJU 164,854,000.00Rp 81.93 8,242,700.00Rp IX (Sembilan)

10 CV. SURYA MAULANA 166,863,000.00Rp 82.93 8,343,150.00Rp X (Sepuluh)

11 CV. RADIAN FITRI 170,000,000.00Rp 84.49 8,500,000.00Rp XI (Sebelas)

12 CV. JAYA TEKNIK GYPSINDO 173,815,004.00Rp 86.39 8,690,750.20Rp XII (Dua belas)

13 CV. SAJADAH PUSAKA 180,180,000.00Rp 89.55 9,009,000.00Rp XIII (Tiga belas)

2

PERUSAHAAN

PERUSAHAAN

2

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN KOREKSI ARITMATIK

Kegiatan : PEMBANGUNAN SALURAN DRAINASE / GORONG - GORONG

Paket : 14 (EMPAT BELAS)

Pekerjaan : PEMBANGUNAN SALURAN DRAINASE PRIMER I BELAKANG MALL RAMAYANA KEC. PKL. KERINCI

Kualifikasi : USAHA KECIL

Nilai HPS : 1,887,193,000.00Rp

80 % X HPS : 1,509,754,400.00Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

1 CV. CAHAYA PERDANA 1,345,676,560.00Rp 71.31 94,359,650.00Rp I (Satu)

2 CV. TRI TUNGGAL JAYA LESTARI 1,397,007,007.00Rp 74.03 94,359,650.00Rp II (Dua)

3 CV. BEST LANGKER 1,415,310,987.15Rp 75.00 94,359,650.00Rp III (Tiga)

4 CV. PUTRA SEJAHTERA 1,451,379,000.00Rp 76.91 94,359,650.00Rp IV (Empat)

5 CV. SONA GROUP 1,477,789,777.00Rp 78.31 94,359,650.00Rp V ( Iima )

6 CV. JASA KONTRAKTOR 1,483,435,000.00Rp 78.61 94,359,650.00Rp VI (Enam)

7 CV. RIAU PRIMA 1,489,613,000.00Rp 78.93 94,359,650.00Rp VII (Tujuh)

8 CV. HADE SATRIA 1,507,506,000.00Rp 79.88 94,359,650.00Rp VIII (Delapan)

9 CV. KARYA MULIA ABADI 1,509,806,266.81Rp 80.00 75,490,313.34Rp IX (Sembilan)

10 CV. AYU INDAH GEMILANG 1,509,875,000.00Rp 80.01 75,493,750.00Rp X (Sepuluh)

11 CV. RIZKI TEHNIK 1,511,084,900.00Rp 80.07 75,554,245.00Rp XI (Sebelas)

12 CV. MAHKOTA BUMI BERTUAH 1,515,151,515.00Rp 80.29 75,757,575.75Rp XII (Dua belas)

13 CV. RENGAT CAHAYA PERMATA 1,523,389,000.00Rp 80.72 76,169,450.00Rp XIII (Tiga belas) Tidak Mendaftar

14 CV. FAHRUL SIDIK 1,527,110,000.00Rp 80.92 76,355,500.00Rp XIV (Empat belas)

15 CV. WAHYU MANDIRI SEJAHTERA 1,527,765,000.00Rp 80.95 76,388,250.00Rp XV (Lima belas)

16 CV. KERINCI JAYA 1,532,233,000.00Rp 81.19 76,611,650.00Rp XVI (Enam belas)

17 CV. ADIK DAS 1,533,330,000.00Rp 81.25 76,666,500.00Rp XVII (Tujuh belas)

18 CV. ANDI BERSAUDARA 1,559,638,000.00Rp 82.64 77,981,900.00Rp XVIII (Delapan belas)

19 CV. INDAH PESONA KARYA 1,569,047,000.00Rp 83.14 78,452,350.00Rp XIX (Sembilan belas)

20 CV. DUTA CIPTA PERSADA 1,569,763,207.50Rp 83.18 78,488,160.37Rp XX (Dua puluh)

21 CV. SURYA MAULANA 1,569,915,000.00Rp 83.19 78,495,750.00Rp XXI (Dua puluh satu)

22 CV. SABILLA 1,571,614,000.00Rp 83.28 78,580,700.00Rp XXII (Dua puluh dua)

23 CV. KARYA PRATAMA 1,599,285,000.00Rp 84.74 79,964,250.00Rp XXIII (Dua puluh dua)

24 PT. AUREL JAYA ABADI 1,602,386,000.00Rp 84.91 80,119,300.00Rp XXIV (Dua puluh empat)

25 PT. MORANG SOSOR TALA 1,692,603,000.00Rp 89.69 84,630,150.00Rp XXV (Dua puluh lima)

2

PERUSAHAAN

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN KOREKSI ARITMATIK

Kegiatan : PEMBANGUNAN SALURAN DRAINASE/ GORONG - GORONG

Paket : 15 (LIMA BELAS)

Pekerjaan : PEMBANGUNAN SALURAN DRAINASE PRIMER II BELAKANG MALL RAMAYANA KEC. PKL. KERINCI

Kualifikasi : USAHA KECIL

Nilai HPS : 1,080,442,000.00Rp

80 % X HPS : 864,353,600.00Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

1 CV. TRI TUNGGAL JAYA LESTARI 864,545,468.00Rp 80.02 43,227,273.40Rp I (Satu)

2 CV. ANDI BERSAUDARA 865,765,000.00Rp 80.13 43,288,250.00Rp II (Dua)

3 CV. BEST LANGKER 871,598,755.12Rp 80.67 43,579,937.76Rp III (Tiga)

4 CV. INDAH PESONA KARYA 885,992,000.00Rp 82.00 44,299,600.00Rp IV (Empat)

5 CV. MAHKOTA BUMI BERTUAH 888,888,888.00Rp 82.27 44,444,444.40Rp V ( Iima )

6 CV. PUTRA SEJAHTERA 896,161,000.00Rp 82.94 44,808,050.00Rp VI (Enam)

7 CV. FAHRUL SIDIK 896,300,000.00Rp 82.96 44,815,000.00Rp VII (Tujuh)

8 CV. ADIK DAS 907,390,000.00Rp 83.98 45,369,500.00Rp VIII (Delapan)

9 CV. KARI UTAMA MANDIRI 914,092,000.00Rp 84.60 45,704,600.00Rp IX (Sembilan)

10 PT. AUREL JAYA ABADI 917,987,000.00Rp 84.96 45,899,350.00Rp X (Sepuluh)

11 CV. RIAU PRIMA 918,420,000.00Rp 85.00 45,921,000.00Rp XI (Sebelas)

12 CV. WAHYU MANDIRI SEJAHTERA 940,021,000.00Rp 87.00 47,001,050.00Rp XII (Dua belas)

13 CV. KARYA PRATAMA 967,327,000.00Rp 89.53 48,366,350.00Rp XIII (Tiga belas)

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN KOREKSI ARITMATIK

Kegiatan : PEMBANGUNAN SALURAN DRAINASE / GORONG - GORONG

Paket : 16 (ENAM BELAS)

Pekerjaan : PEMBANGUNAN SALURAN DRAINASE PRIMER JALUR RT. 04 RW. 01 TERUSAN BARU KEL. PKL KERINCI BARAT

Kualifikasi : USAHA KECIL

Nilai HPS : 897,382,000.00Rp

80 % X HPS : 717,905,600.00Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

1 CV. BINA MARGA CONTRACTOR 672,921,000.00Rp 74.99 44,869,100.00Rp I (Satu)

2 CV. LANSANI KERINCI 690,000,000.00Rp 76.89 44,869,100.00Rp II (Dua)

3 CV. HARIMAU MUDA BERTUAH 696,115,000.00Rp 77.57 44,869,100.00Rp III (Tiga)

4 CV. RIAU NIAGA GROUP 699,957,000.00Rp 78.00 44,869,100.00Rp IV (Empat) Tidak Mendaftar

5 CV. PELALAWAN INDAH LESTARI 708,261,000.00Rp 78.93 44,869,100.00Rp V ( Iima )

6 CV. GUMANTAN ALAM 708,400,000.00Rp 78.94 44,869,100.00Rp VI (Enam)

7 CV. ASSALAM 712,784,000.00Rp 79.43 44,869,100.00Rp VII (Tujuh)

8 CV. KARYA MANDIRI UTAMA 717,375,000.00Rp 79.94 44,869,100.00Rp VIII (Delapan)

9 CV. KESUMA ANDALAN 717,788,756.89Rp 79.99 44,869,100.00Rp IX (Sembilan)

10 CV. CAHAYA ABADI 717,922,000.00Rp 80.00 35,896,100.00Rp X (Sepuluh)

11 CV. TUAH PERKASA 717,959,000.00Rp 80.01 35,897,950.00Rp XI (Sebelas)

12 CV. MEKAR JAYA 717,983,000.00Rp 80.01 35,899,150.00Rp XII (Dua belas)

13 CV. MENARA MAS 780,000,000.00Rp 86.92 39,000,000.00Rp XIII (Tiga belas)

14 CV. KARI UTAMA MANDIRI 781,808,000.00Rp 87.12 39,090,400.00Rp XIV (Empat belas)

15 CV. ALFYAN S KONTRAKTOR 805,226,000.00Rp 89.73 40,261,300.00Rp XV (Lima belas)

16 CV. DUTA CIPTA PERSADA 808,904,027.53Rp 90.14 40,445,201.38Rp XVI (Enam belas)

17 CV. HELSIS RENATA PUTRI 809,460,100.00Rp 90.20 40,473,005.00Rp XVII (Tujuh belas) Tidak Mendaftar

18 CV. KARYA MULIA ABADI 814,230,273.14Rp 90.73 40,711,513.66Rp XVIII (Delapan belas)

PERUSAHAAN

2

PERUSAHAAN

2

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN KOREKSI ARITMATIK

Kegiatan : PEMBANGUNAN SALURAN DRAINASE / GORONG - GORONG

Paket : 17 (TUJUH BELAS)

Pekerjaan : PEMBANGUNAN DRAINASE SUNGAI NAGA MELINGKAR PELALAWAN ( L= 4 D= 2 TB= 0.15)

Kualifikasi : USAHA KECIL

Nilai HPS : 780,822,801.38Rp

80 % X HPS : 624,658,241.10Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

1 CV. LANSANI KERINCI 600,000,000.00Rp 76.84 39,041,140.07Rp I (Satu)

2 CV.ALFIKA PELALAWAN 601,231,294.65Rp 77.00 39,041,140.07Rp II (Dua)

3 CV. MEKAR JAYA 608,487,000.00Rp 77.93 39,041,140.07Rp III (Tiga)

4 CV. TIARA INDAH 608,500,000.00Rp 77.93 39,041,140.07Rp IV (Empat)

5 CV. WAHANA JAYA CIPTA 608,766,090.78Rp 77.96 39,041,140.07Rp V ( Iima )

6 CV.ARFAH 609,016,809.90Rp 78.00 39,041,140.07Rp VI (Enam)

7 CV. NESHA BANGUN PRATAMA 622,628,841.71Rp 79.74 39,041,140.07Rp VII (Tujuh)

8 CV. JALANUSA TABEXINDO 624,641,000.00Rp 80.00 39,041,140.07Rp VIII (Delapan)

9 CV. BIMA PERKASA 624,907,000.00Rp 80.03 31,245,350.00Rp IX (Sembilan)

10 CV. MITRA BANGUN PERSADA 626,061,778.31Rp 80.18 31,303,088.92Rp X (Sepuluh) Tidak Mendaftar

11 CV. LUMBA - LUMBA AMANAH 630,162,000.00Rp 80.70 31,508,100.00Rp XI (Sebelas)

12 CV. PILIANG RIAU 640,255,000.00Rp 82.00 32,012,750.00Rp XII (Dua belas)

13 CV. TUAKAL 640,555,555.00Rp 82.04 32,027,777.75Rp XIII (Tiga belas)

14 CV. MUTIARA AZMI PRATAMA 640,640,640.00Rp 82.05 32,032,032.00Rp XIV (Empat belas)

15 CV. KARI UTAMA MANDIRI 709,665,000.00Rp 90.89 35,483,250.00Rp XV (Lima belas)

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN KOREKSI ARITMATIK

Kegiatan : PEMBANGUNAN GEDUNG LAINNYA

Paket : 6 ( ENAM )

Pekerjaan : PEMBANGUNAN GEDUNG SERBAGUNA KEC. LANGGAM

Kualifikasi : USAHA KECIL

Nilai HPS : 1,499,885,000.00Rp

80 % X HPS : 1,199,908,000.00Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

1 CV. SUCI KARYA ABADI 590,072,484.49 39.34 74,994,250.00Rp I (Satu)

2 CV. AURA SARDIKA 1,495,384,985.60 99.70 74,769,249.28Rp II (Dua)

3 CV. HADE SATRIA 1,496,135,339.60 99.75 74,806,766.98Rp III (Tiga)

4 CV. DATUK ENGKU RAJO LELO PUTRA 1,496,385,039.60 99.77 74,819,251.98Rp IV (Empat)

5 CV. TUAH ANDIKO 1,497,785,401.20 99.86 74,889,270.06Rp V ( Iima )

6 CV. ANDRE SEJAHTERA PERKASA 1,498,885,206.50 99.93 74,944,260.33Rp VI (Enam)

2

2

PERUSAHAAN

PERUSAHAAN

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN KOREKSI ARITMATIK

Kegiatan : PEMBANGUNAN GEDUNG LAINNYA

Paket : 7 ( TUJUH )

Pekerjaan : PEMBANGUNAN RUMAH LAYAK HUNI KEC. LANGGAM

Kualifikasi : USAHA NON KECIL

Nilai HPS : 3,497,235,976.01Rp

80 % X HPS : 2,797,788,780.81Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

1 PT. ABDUL SENTOSA PRIMA 2,613,866,764.60Rp 74.74 174,861,798.80Rp I (Satu)

2 PT. BUNDA 2,719,066,501.74Rp 77.75 174,861,798.80Rp II (Dua)

3 PT. AUREL JAYA ABADI 3,148,280,608.25Rp 90.02 157,414,030.41Rp III (Tiga)

4 PT. QINTHARA CEMERLANG 3,168,058,082.49Rp 90.59 158,402,904.12Rp IV (Empat)

5 PT. RIAU MAKMUR 3,170,346,599.68Rp 90.65 158,517,329.98Rp V ( Iima )

6 PT. REKAYASA SUMBER REZQI 3,171,335,891.94Rp 90.68 158,566,794.60Rp VI (Enam)

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN PERINGKAT PENAWARAN

Kegiatan : PEMBANGUNAN GEDUNG LAINNYA

Paket : 8 ( DELAPAN )

Pekerjaan : PEMBANGUNAN RUMAH LAYAK HUNI KEC. KERUMUTAN

Kualifikasi : USAHA NON KECIL

Nilai HPS : 3,497,235,976.01Rp

80 % X HPS : 2,797,788,780.81Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

1 PT. QINTHARA CEMERLANG 2,543,557,640.20Rp 72.73 174,861,798.80Rp I (Satu)

2 PT. ABDUL SENTOSA PRIMA 2,606,584,848.28Rp 74.53 174,861,798.80Rp II (Dua)

3 PT. TUNAS MEKAR HARAPAN 2,632,682,491.60Rp 75.28 174,861,798.80Rp III (Tiga)

4 PT. RIAU MAKMUR 2,702,263,936.96Rp 77.27 174,861,798.80Rp IV (Empat)

5 PT. FAJAR RIAU KONTRAKTOR 2,760,596,443.72Rp 78.94 174,861,798.80Rp V ( Iima )

6 PT. BUNDA 2,782,244,829.49Rp 79.56 174,861,798.80Rp VI (Enam)

7 PT. PUTRA HARI MANDIRI 2,849,277,061.16Rp 81.47 142,463,853.06Rp VII (Tujuh)

8 PT. REKAYASA SUMBER REZQI 2,861,348,069.53Rp 81.82 143,067,403.48Rp VIII (Delapan)

9 PT. CITRA MANDIRI CIPTA 2,968,468,750.09Rp 84.88 148,423,437.50Rp IX (Sembilan)

2

PERUSAHAAN

2

PERUSAHAAN

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN KOREKSI ARITMATIK

Kegiatan : PEMBANGUNAN GEDUNG LAINNYA

Paket : 9 ( SEMBILAN )

Pekerjaan : PEMBANGUNAN CUBLUK DAN PENGADAAN TOWER+TANGKI AIR RUMAH LAYAK HUNI KEC. KERUMUTAN

Kualifikasi : USAHA KECIL

Nilai HPS : 499,145,217.37Rp

80 % X HPS : 399,316,173.90Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

1 CV. MUTIARA MELAYU 354,346,834.98 70.99 24,957,260.87Rp I (Satu)

2 CV. KICIDAN MANDIRI 396,975,907.21 79.53 24,957,260.87Rp II (Dua)

3 CV. ANGGUN BERSAUDARA 399,101,343.57 79.96 24,957,260.87Rp III (Tiga)

4 CV. KAMPAR JAYA 399,333,700.00 80.00 19,966,685.00Rp IV (Empat)

5 CV. LUMBA-LUMBA AMANAH 399,353,562.04 80.01 19,967,678.10Rp V ( Iima )

6 CV. MUDA MANDIRI SAKTI 399,766,687.21 80.09 19,988,334.36Rp VI (Enam)

7 CV. BULAN PURNAMA 401,294,924.36 80.40 20,064,746.22Rp VII (Tujuh)

8 CV. KURNIA BARU 401,780,908.33 80.49 20,089,045.42Rp VIII (Delapan)

9 CV. DEWI CITRA MANDIRI 404,050,208.33 80.95 20,202,510.42Rp IX (Sembilan)

10 CV. PANGKALAN LESUNG PERKASA 404,281,200.00 80.99 20,214,060.00Rp X (Sepuluh)

11 CV. BINTANG TIMUR 407,441,550.00 81.63 20,372,077.50Rp XI (Sebelas)

12 CV. LIA KONTRAKTOR 413,781,947.77 82.90 20,689,097.39Rp XII (Dua Belas)

13 CV. PONGKAI SARANA 419,101,343.57 83.96 20,955,067.18Rp XIII (Tiga Belas)

14 CV. JAYA TEKNIK GYPSINDO 444,894,500.00 89.13 22,244,725.00Rp XIV (Empat Belas)

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN KOREKSI ARITMATIK

Kegiatan : PEMBANGUNAN GEDUNG LAINNYA

Paket : 10 ( SEPULUH )

Pekerjaan : PEMBANGUNAN CUBLUK DAN PENGADAAN TOWER+TANGKI AIR RUMAH LAYAK HUNI KEC. LANGGAM

Kualifikasi : USAHA KECIL

Nilai HPS : 499,145,217.37Rp

80 % X HPS : 399,316,173.90Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

1 CV. PONGKAI SARANA 399,101,343.57 79.96 24,957,260.87Rp I (Satu)

2 CV. JHONI BERSAUDARA 399,344,272.15 80.01 19,967,213.61Rp II (Dua)

3 CV. ANGGUN BERSAUDARA 419,101,343.57 83.96 20,955,067.18Rp III (Tiga)

4 CV. JAYA TEKNIK GYPSINDO 444,894,500.00 89.13 22,244,725.00Rp IV (Empat)

5 CV. THALIA 486,647,266.44 97.50 24,332,363.32Rp V ( Iima )

6 CV. PUTRA SEGALANG 487,187,956.43 97.60 24,359,397.82Rp VI (Enam)

7 CV. SAJADAH PUSAKA 488,074,518.41 97.78 24,403,725.92Rp VII (Tujuh)

8 CV. DIMAS ANDALAS 488,584,033.84 97.88 24,429,201.69Rp VIII (Delapan)

PERUSAHAAN

2

PERUSAHAAN

2

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN KOREKSI ARITMATIK

Kegiatan : PEMBANGUNAN GEDUNG LAINNYA

Paket : 12 ( DUA BELAS )

Pekerjaan : PEMBANGUNAN PAGAR PESANTREN MAN BAUL MA'ARIF KEC. LANGGAM

Kualifikasi : USAHA KECIL

Nilai HPS : 523,138,000.00Rp

80 % X HPS : 418,510,400.00Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

0 CV. CIPTA MITRA ABADI 438,679,199.24 83.86 21,933,959.96Rp I (Satu)

0 CV. JAYA TEKNIK GYPSINDO 454,815,773.05 86.94 22,740,788.65Rp II (Dua)

0 CV. ANDRE SEJAHTERA PERKASA 497,097,112.08 95.02 24,854,855.60Rp III (Tiga)

0 CV. DATUK ENGKU RAJO LELO PUTRA 499,105,483.64 95.41 24,955,274.18Rp IV (Empat)

0 CV. SEI KIJANG PERKASA 500,997,854.97 95.77 25,049,892.75Rp V ( Iima )

0 CV. JHONI BERSAUDARA 502,277,945.79 96.01 25,113,897.29Rp VI (Enam)

0 CV. FATMA DELA 510,539,348.66 97.59 25,526,967.43Rp VII (Tujuh)

0 CV. PUTRA SEGALANG 515,651,569.40 98.57 25,782,578.47Rp VIII (Delapan)

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN KOREKSI ARITMATIK

Kegiatan : Pembangunan / Peningkatan Infrastruktur

Paket : 7 (Tujuh)

Pekerjaan : Pembangunan Semenisasi Jalan Lingkungan di Jalan Sawit Bumi Lago Permai T = 20 cm, Kec. Pkl. Kerinci

Kabupaten Pelalawan.

Kualifikasi : USAHA KECIL

Nilai HPS : 550,131,824.71Rp

80 % X HPS : 440,105,459.77Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

1 CV. HARIMAU MUDA BERTUAH 423,333,492.98Rp 76.95 27,506,591.24Rp I (Satu)

2 CV. BIMA PERKASA 428,757,590.11Rp 77.94 27,506,591.24Rp II (Dua)

3 CV. MITRA SEJATI 429,468,002.87Rp 78.07 27,506,591.24Rp III (Tiga)

4 CV. PELALAWAN INDAH LESTARI 431,908,636.56Rp 78.51 27,506,591.24Rp IV (Empat)

5 CV. GUMANTAN ALAM 433,500,171.60Rp 78.80 27,506,591.24Rp V (Lima)

6 CV. GEMURUH INDAH PERKASA 438,187,827.42Rp 79.65 27,506,591.24Rp VI (Enam)

7 CV. PELALAWAN SAKTI KENCANA 440,112,516.79Rp 80.00 22,005,625.84Rp VII (Tujuh)

8 CV. CITRA PUTRA INDONESIA 440,209,927.51Rp 80.02 22,010,496.38Rp VIII (Delapan)

9 CV. TIARA INDAH 440,345,707.56Rp 80.04 22,017,285.38Rp IX (Sembilan)

10 CV. ANTARA 451,180,547.22Rp 82.01 22,559,027.36Rp X (Sepuluh) Tidak Mendaftar

11 CV. PELALAWAN INDAH PRATAMA 453,350,545.30Rp 82.41 22,667,527.26Rp XI (Sebelas)

12 CV. TUAH ANDIKO 462,110,983.03Rp 84.00 23,105,549.15Rp XII (Dua Belas)

13 CV. ALMUGHNI JAYA 463,278,546.23Rp 84.21 23,163,927.31Rp XII (Tiga belas)

14 CV. ELWINSON MANDIRI PERKASA 463,488,212.22Rp 84.25 23,174,410.61Rp XIV (Empat belas)

15 CV. AURA SARDIKA 476,414,091.30Rp 86.60 23,820,704.57Rp XV (Lima belas)

16 CV. GAMANA PRATAMA 482,876,116.28Rp 87.77 24,143,805.81Rp XVI (Enam belas)

17 CV. KAMPAR JAYA 495,134,270.45Rp 90.00 24,756,713.52Rp XVII ( Tujuh belas)

18 CV. PANGKALAN LESUNG PERKASA 497,757,550.70Rp 90.48 24,887,877.54Rp XVIII ( Delapan belas)

19 CV. BINTANG TIMUR 500,331,359.63Rp 90.95 25,016,567.98Rp IXX (Sembilan belas)

2

PERUSAHAAN

2

PERUSAHAAN

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN KOREKSI ARITMATIK

Kegiatan : Pembangunan / Peningkatan Infrastruktutr

Paket : 8 ( Delapan )

Pekerjaan : Pembangunan Semenisasi Jalan Lingkungan di Jalan Sirsak Raya Bumi Lago Permai Kec. Pkl. Kerinci

Lokasi : Kabupaten Pelalawan

Kualifikasi : USAHA KECIL

Nilai HPS : 500,370,161.75Rp

80 % X HPS : 400,296,129.40Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

1 CV. MITRA SEJATI 385,005,661.96Rp 76.94 25,018,508.09Rp I (Satu)

2 CV. ABDI JAYA 394,195,465.05Rp 78.78 25,018,508.09Rp II (Dua)

3 CV. GUMANTAN ALAM 395,254,912.35Rp 78.99 25,018,508.09Rp III (Tiga)

4 CV. RAHMAN PUTRA PERDANA 395,285,899.45Rp 79.00 25,018,508.09Rp IV (Empat)

5 CV. ASSALAM 398,843,572.28Rp 79.71 25,018,508.09Rp V (Lima)

6 CV. PULAU BARU 400,290,303.12Rp 80.00 25,018,508.09Rp VI (Enam)

7 CV. CAHAYA ABADI 400,633,287.43Rp 80.07 20,031,664.37Rp VII (Tujuh)

8 CV. KUTANG BAGHENDO GROUP 402,643,023.52Rp 80.47 20,132,151.18Rp VIII (Delapan)

9 CV. PELALAWAN INDAH PRATAMA 410,123,270.48Rp 81.96 20,506,163.52Rp IX (Sembilan)

10 CV. PUTRA ALNIE PRATAMA 415,000,560.35Rp 82.94 20,750,028.02Rp X (Sepuluh)

11 CV. PELALAWAN SAKTI KENCANA 415,758,450.09Rp 83.09 20,787,922.50Rp XI (Sebelas) Tidak Mendaftar

12 CV. ALMUGHNI JAYA 415,787,790.99Rp 83.10 20,789,389.55Rp XII (Dua Belas)

13 CV. ANTARA 416,331,516.78Rp 83.20 20,816,575.84Rp XII (Tiga belas)

14 CV. TUAH ANDIKO 420,811,328.01Rp 84.10 21,040,566.40Rp XIV (Empat belas)

15 CV. ELWINSON MANDIRI PERKASA 422,715,197.36Rp 84.48 21,135,759.87Rp XV (Lima belas)

16 CV. GAMANA PRATAMA 430,970,781.55Rp 86.13 21,548,539.08Rp XVI (Enam belas)

17 CV. AURA SARDIKA 432,820,338.29Rp 86.50 21,641,016.91Rp XVII ( Tujuh belas)

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN KOREKSI ARITMATIK

Kegiatan : Pembangunan / Peningkatan Infrastruktutr

Paket : 9 (Sembilan)

Pekerjaan : Pembangunan Semenisasi Jalan Lingkungan di Jalan Delima Bumi Lago Permai Kec. Pkl.Kerinci

Kabupaten Pelalawan

Kualifikasi : USAHA KECIL

Nilai HPS : 494,264,365.50Rp

80 % X HPS : 395,411,492.40Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

1 CV. ANAK TERUSAN 385,527,243.59Rp 78.00 24,713,218.28Rp I (Satu)

2 CV. PULAU BARU 395,382,836.14Rp 79.99 24,713,218.28Rp II (Dua)

3 CV. KUTANG BAGHENDO GROUP 397,550,756.21Rp 80.43 19,877,537.81Rp III (Tiga)

4 CV. PELALAWAN INDAH PRATAMA 405,123,212.13Rp 81.96 20,256,160.61Rp IV (Empat)

5 CV. ALMUGHNI JAYA 407,222,293.62Rp 82.39 20,361,114.68Rp V (Lima)

6 CV. PUTRA ALNIE PRATAMA 415,000,626.39Rp 83.96 20,750,031.32Rp VI (Enam)

7 CV. GEMURUH INDAH PERKASA 415,016,164.71Rp 83.97 20,750,808.24Rp VII (Tujuh)

8 CV. ELWINSON MANDIRI PERKASA 419,894,949.54Rp 84.95 20,994,747.48Rp VIII (Delapan)

9 CV. GADA JAYA 435,966,736.14Rp 88.21 21,798,336.81Rp IX (Sembilan)

PERUSAHAAN

2

PERUSAHAAN

2

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN KOREKSI ARITMATIK

Kegiatan : Pembangunan / Peningkatan Infrastruktur

Paket : 10 (Sepuluh)

Pekerjaan : Pembangunan Semenisasi Jalan Masuk Mushalla Nurul Ikhwan Perumahan Serikat Riau Andalan Kec. Pkl. Kerinci

Lokasi : Kabupaten Pelalawan

Kualifikasi : USAHA KECIL

Nilai HPS : 507,830,561.39Rp

80 % X HPS : 406,264,449.11Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

1 CV. ARY PERDANA 381,265,655.56Rp 75.08 25,391,528.07Rp I (Satu)

2 CV. BIMA PERKASA 382,632,760.55Rp 75.35 25,391,528.07Rp II (Dua)

3 CV. ANAK TERUSAN 384,400,048.49Rp 75.69 25,391,528.07Rp III (Tiga)

4 CV.AZZA BERSAUDARA 389,115,784.75Rp 76.62 25,391,528.07Rp IV (Empat)

5 CV. GUMANTAM ALAM 392,724,626.95Rp 77.33 25,391,528.07Rp V (Lima)

6 CV. TUAH PERKASA 393,824,109.63Rp 77.55 25,391,528.07Rp VI (Enam)

7 CV. PULAU BARU 393,912,567.28Rp 77.57 25,391,528.07Rp VII (Tujuh)

8 CV. ENAM BERSAUDARA 396,061,440.30Rp 77.99 25,391,528.07Rp VIII (Delapan)

9 CV. DIMAS ANDALAS 397,271,357.83Rp 78.23 25,391,528.07Rp IX (Sembilan)

10 CV. TIARA INDAH 398,153,215.36Rp 78.40 25,391,528.07Rp X (Sepuluh)

11 CV. PUTRA ALNIE PRATAMA 399,864,914.51Rp 78.74 25,391,528.07Rp XI (Sebelas)

12 CV. MAHKOTA TERUSAN 402,301,040.95Rp 79.22 25,391,528.07Rp XII (Dua Belas)

13 CV. MENARA MAS 419,611,353.95Rp 82.63 20,980,567.70Rp XII (Tiga belas)

14 CV. GAMANA PRATAMA 420,020,235.58Rp 82.71 21,001,011.78Rp XIV (Empat belas)

15 CV. ELWINSON MANDIRI PERKASA 422,019,363.95Rp 83.10 21,100,968.20Rp XV (Lima belas)

16 CV. KRIDARIA ANUGRAH 473,261,616.60Rp 93.19 23,663,080.83Rp XVI (Enam belas)

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN KOREKSI ARITMATIK

Kegiatan : Pembangunan / Peningkatan Infrastruktur

Paket : 11 (Sebelas)

Pekerjaan : Pembangunan Semenisasi Jalan Lingkungan di Jalan Istiqomah I, Gg.Berkah dan Gg. Nurul Salam Kec.Pkl. Kerinci

Kabupaten Pelalawan

Kualifikasi : USAHA KECIL

Nilai HPS : 499,707,291.35Rp

80 % X HPS : 399,765,833.08Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

1 CV. ARY PERDANA 381,086,057.81Rp 76.26 24,985,364.57Rp I (Satu)

2 CV. PUTRA TUNGGAL 389,749,633.70Rp 78.00 24,985,364.57Rp II (Dua)

3 CV. SHERLY ARLYAN SHELLA 392,290,912.07Rp 78.50 24,985,364.57Rp III (Tiga)

4 CV. PULAU BARU 392,907,933.91Rp 78.63 24,985,364.57Rp IV (Empat)

5 CV. REZKI PERDANA MANDIRI 394,560,773.49Rp 78.96 24,985,364.57Rp V (Lima)

6 CV. ANISA 394,710,137.90Rp 78.99 24,985,364.57Rp VI (Enam)

7 CV. TUNAS JAYA MANIKAM 396,398,762.91Rp 79.33 24,985,364.57Rp VII (Tujuh)

8 CV. PUTRA BUNGSU MANDIRI 397,884,111.26Rp 79.62 24,985,364.57Rp VIII (Delapan)

9 CV. EKIE SEJAHTERAH MANDIRI 398,861,073.54Rp 79.82 24,985,364.57Rp IX (Sembilan)

10 CV. NESHA BANGUN PRATAMA 408,587,942.49Rp 81.77 20,429,397.12Rp X (Sepuluh)

11 CV. ALMUGHNI JAYA 411,733,772.50Rp 82.39 20,586,688.63Rp XI (Sebelas)

12 CV. JAYA PERKASA 424,155,167.69Rp 84.88 21,207,758.38Rp XII (Dua Belas)

13 CV. WAHYU MANDIRI SEJATI 471,322,753.81Rp 94.32 23,566,137.69Rp XII (Tiga belas)

2

PERUSAHAAN

2

PERUSAHAAN

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN KOREKSI ARITMATIK

Kegiatan : Pembangunan / Peningkatan Infrastruktur

Paket : 12 (Dua belas)

Pekerjaan : Pembangunan Semenisasi Jalan Lingkungan di Jalan Istiqomah II Kec. Pkl. Kerinci

Kabupaten Pelalawan

Kualifikasi : USAHA KECIL

Nilai HPS : 499,705,425.65Rp

80 % X HPS : 399,764,340.52Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

1 CV. AZZA BERSAUDARA 379,857,620.91Rp 76.02 24,985,271.28Rp I (Satu)

2 CV. ARY PERDANA 380,551,103.13Rp 76.16 24,985,271.28Rp II (Dua)

3 CV. ANISA 387,766,227.88Rp 77.60 24,985,271.28Rp III (Tiga)

4 CV. PUTRA TUNGGAL 388,491,075.03Rp 77.74 24,985,271.28Rp IV (Empat)

5 CV. ANAK TERUSAN 390,174,339.87Rp 78.08 24,985,271.28Rp V (Lima)

6 CV. TUNAS JAYA MANIKAM 391,765,235.44Rp 78.40 24,985,271.28Rp VI (Enam)

7 CV. ALMUGHNI JAYA 394,316,983.58Rp 78.91 24,985,271.28Rp VII (Tujuh)

8 CV. REZKI PERDANA MANDIRI 394,347,593.05Rp 78.92 24,985,271.28Rp VIII (Delapan)

9 CV. PUTRA BUNGSU MANDIRI 395,181,131.14Rp 79.08 24,985,271.28Rp IX (Sembilan)

10 CV. EKIE SEJAHTERA MANDIRI 395,607,391.15Rp 79.17 24,985,271.28Rp X (Sepuluh)

11 CV. KUTANG BAGHENDO GROUP 397,764,247.26Rp 79.60 24,985,271.28Rp XI (Sebelas)

12 CV. DIMAS ANDALAS 397,850,400.63Rp 79.62 24,985,271.28Rp XII (Dua Belas)

13 CV. BAHTERA ZAMRUD SEJAHTERA 399,233,157.44Rp 79.89 24,985,271.28Rp XII (Tiga belas)

14 CV. PELALAWAN JAYA SATU 411,644,063.31Rp 82.38 20,582,203.17Rp XIV (Empat belas)

15 CV. ELWINSON MANDIRI PERKASA 420,882,823.85Rp 84.23 21,044,141.19Rp XV (Lima belas)

16 CV. JAYA PERKASA 421,275,139.85Rp 84.30 21,063,756.99Rp XVI (Enam belas)

17 CV. WAHYU MANDIRI SEJAHTERA 467,290,596.38Rp 93.51 23,364,529.82Rp XVII ( Tujuh belas)

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN KOREKSI ARITMATIK

Kegiatan : Pembangunan / Peningkatan Infrastruktur

Paket : 13 (Tiga belas)

Pekerjaan : Pembangunan Semenisasi Jalan di Jalan BTN Lama Kec. Pkl. Kerinci

Lokasi : Kabupaten pelalawan

Kualifikasi : USAHA KECIL

Nilai HPS : 291,643,549.18Rp

80 % X HPS : 233,314,839.34Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

1 CV. TUAH PERKASA 224,779,062.21Rp 77.07 14,582,177.46Rp I (Satu)

2 CV. BAHTERA ZAMRUD SEJAHTERA 225,075,697.39Rp 77.17 14,582,177.46Rp II (Dua)

3 CV. PULAU BARU 226,297,320.15Rp 77.59 14,582,177.46Rp III (Tiga)

4 CV. ASSALAM 228,366,221.47Rp 78.30 14,582,177.46Rp IV (Empat)

5 CV. MEGA PRIMA 230,115,156.99Rp 78.90 14,582,177.46Rp V (Lima)

6 CV. ALMUGHNI JAYA 231,543,608.35Rp 79.39 14,582,177.46Rp VI (Enam)

7 CV. RADITYA KARYA 233,322,271.00Rp 80.0 11,666,113.55Rp VII (Tujuh)

8 CV. KERINCI JAYA 233,854,029.70Rp 80.18 11,692,701.49Rp VIII (Delapan)

9 CV. GADA JAYA 234,067,996.37Rp 80.26 11,703,399.82Rp IX (Sembilan)

10 CV. ANIZAR 237,118,525.85Rp 81.30 11,855,926.29Rp X (Sepuluh)

2

PERUSAHAAN

PERUSAHAAN

2

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN KOREKSI ARITMATIK

Kegiatan : Pembangunan / Peningkatan Infrastruktur

Paket : 14 (Empat belas)

Pekerjaan : Pembangunan Semenisasi Jalan Lingkungan di Jalan BTN Surya Sungkai Kec. Pkl. Kerinci

Kabupaten Pelalawan

Kualifikasi : USAHA KECIL

Nilai HPS : 286,396,147.97Rp

80 % X HPS : 229,116,918.38Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

1 CV. NESHA BANGUN PRATAMA 216,219,759.57Rp 75.50 14,319,807.40Rp I (Satu)

2 CV. ALMUGNI JAYA 223,603,249.72Rp 78.07 14,319,807.40Rp II (Dua)

3 CV. ASSALAM 227,328,401.14Rp 79.38 14,319,807.40Rp III (Tiga)

4 CV. BAHTERA ZAMRUD SEJAHTERA 227,348,480.54Rp 79.38 14,319,807.40Rp IV (Empat)

5 CV. MEGA PRIMA 227,371,893.35Rp 79.39 14,319,807.40Rp V (Lima)

6 CV. KAMPAR JAYA 227,510,486.50Rp 79.44 14,319,807.40Rp VI (Enam)

7 CV. TUAH PERKASA 227,574,969.73Rp 79.46 14,319,807.40Rp VII (Tujuh)

8 CV. RADITYA KARYA 230,248,493.04Rp 80.40 11,512,424.65Rp VIII (Delapan)

9 CV. KERINCI JAYA 231,331,834.78Rp 80.77 11,566,591.74Rp IX (Sembilan)

10 CV. PULAU BARU 231,651,633.72Rp 80.89 11,582,581.69Rp X (Sepuluh)

11 CV. ANIZAR 234,153,342.01Rp 81.76 11,707,667.10Rp XI (Sebelas)

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN KOREKSI ARITMATIK

Kegiatan : PEMBANGUNAN / PENINGKATAN INFRASTRUKTUR

Paket : 15 (LIMA BELAS)

Pekerjaan : PEMBANGUNAN TURAP KELILING JALAN RAYA ANGGUR DAN JALAN SEKOLAH BUMI LAGO PERMAI KEC. PKL KERINCI

Kualifikasi : USAHA KECIL

Nilai HPS : 1,399,719,752.48Rp

80 % X HPS : 1,119,775,801.98Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

1 CV. ANDRY MULTI KARYA 1,084,581,000.00Rp 77.49 69,985,987.62Rp I (Satu)

2 CV. LANSANI KERINCI 1,119,975,000.00Rp 80.01 55,998,750.00Rp II (Dua)

3 CV. TUAKAL 1,119,999,999.00Rp 80.02 55,999,999.95Rp III (Tiga)

4 CV. PRIMA KARYASINDO 1,121,940,000.00Rp 80.15 56,097,000.00Rp IV (Empat)

5 CV. DHENNI UTAMA 1,133,580,000.00Rp 80.99 56,679,000.00Rp V (Lima)

6 CV. MUTIARA AZMI PRATAMA 1,137,666,666.00Rp 81.28 56,883,333.30Rp VI (Enam)

7 CV. PUTRA MELAYU 1,151,757,000.00Rp 82.28 57,587,850.00Rp VII (Tujuh)

8 PT. AUREL JAYA ABADI 1,188,886,000.00Rp 84.94 59,444,300.00Rp VIII (Delapan)

9 PT. MORANG SOSOR TALA 1,223,316,000.00Rp 87.40 61,165,800.00Rp IX (Sembilan)

PERUSAHAAN

2

PERUSAHAAN

2

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN KOREKSI ARITMATIK

Kegiatan : PEMBANGUNAN /PENINGKATAN INFRASTRUKTUR

Paket : 16 (ENAM BELAS)

Pekerjaan : PEMBANGUNAN TURAP PERUMAHAN JALAN SEPAKAT KEC. PKL. KERINCI

Kualifikasi : USAHA KECIL

Nilai HPS : 237,628,362.11Rp

80 % X HPS : 190,102,689.69Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

1 CV. RAFLY BERSAUDARA 187,718,450.85Rp 79.00 11,881,418.11Rp I (Satu)

2 CV. TUAKAL 190,123,456.00Rp 80.01 9,506,172.80Rp II (Dua)

3 CV. DHENNI UTAMA 192,060,000.00Rp 80.82 9,603,000.00Rp III (Tiga)

4 CV. MUTIARA AZMI PRATAMA 192,222,222.00Rp 80.89 9,611,111.10Rp IV (Empat)

5 CV. PRIMA KARYASINDO 197,170,000.00Rp 82.97 9,858,500.00Rp V (Lima)

1.2. DAFTAR PERINGKAT PENAWARAN BERDASARKAN KOREKSI ARITMATIK

Kegiatan : KINERJA PETUGAS PENGELOLAAN SAMPAH

Paket : 1 (SATU)

Pekerjaan : PENGADAAN BIN KONTAINER

Kualifikasi : USAHA KECIL

Nilai HPS : 134,970,000.00Rp

80 % X HPS : 107,976,000.00Rp

No.HARGA PENAWARAN

TERKOREKSI

PERSENTASE

TERHADAP HPS

(%)

BESARNYA NILAI

JAMINAN

PELAKSANAAN

URUTAN BERDASARKAN

PERINGKATKETERANGAN

1 3 4 5 6 7

1 CV. DHENNI UTAMA 99,412,000.00Rp 73.65 6,748,500.00Rp I (Satu)

2 CV. PRIMA KARYA SINDO 113,932,000.00Rp 84.41 5,696,600.00Rp II (Dua)

3 CV. REZEKI ALIANSYAH BERTUAH 130,350,000.00Rp 96.58 6,517,500.00Rp III (Tiga)

4 CV. TEKAD MANDIRI 132,957,000.00Rp 98.51 6,647,850.00Rp

Pangkalan Kerinci, 19 Agustus 2011

Panitia Pengadaan Barang / Jasa

1. AZWARDI, ST 1. . 3. RIZAL DAIRI ALI, Amd 3. .

Ketua Anggota

2. ERWINSYAH 2. . 4. SIGIT YASIEN, ST 4. .

Sekretaris Anggota

5. SYAHRIAL 5. .

Anggota

PERUSAHAAN

2

2

PERUSAHAAN