Outstanding WorkNo Project Item Due Date1 D682 Denah SB Area Circular Ramp2 D682 RFI 60 Besi terlalu rapat di OF 1 (belt truss)3 D682 RFI 61 Desain Pondasi Pedestal Untuk CWT OF14 D682 RFI 62 Perkuatan Opening Shearwall WO1-65 D682 RFI 63 Detail Struktur Ramp Langham6 D682 Tangga Office 17 D682 Tangga 1 dan Tangga 28 D682 Tangga Danayasa Dekat Shearwall Parking9 D682 Tangga sebelah Office Danayasa10 D682 Penyesuaian EOS AP311 D682 Penyesuaian PC Ballroom12 D682 Liftinghook Danayasa13 D682 Machine Room Low Zone14 D682 RFI 068 GWT 15 D682 Checking Reaction For Facade Steel Structure16 D682 Denah dan Detail Prestress
Status Sent Date Status EngineerAnswered 23-Apr-2015 doneAnswered 15-Apr-2015 done
proses desainAnswered 15-Apr-2015 done
proses gambarAswered 24-Apr-2015 done
Andika
Answered 24-Apr-2015 doneproses desain Tommy
Aswered 24-Apr-2015
proses desain Puspus
Name Dominicus Septian HenriNIP 4124
Work Log May
Activity Start End Duration
1 April 2015 Over Time D682 11:00:00 AM 08:30:00 PM 9 hours, 30 minutes
Total Time Logged todayTotal time logged today: 9:30 hours
Activity Total DurationD682 0 hours, 00 minutesD761 0 hours, 00 minutesOver Time D682 9 hours, 30 minutesOver Time D761 0 hours, 00 minutesMeetings D682 0 hours, 00 minutesMeetings 761 0 hours, 00 minutes
Activities listD682D761Over Time D682Over Time D761Meetings D682Meetings 761
Detail Work Log
No Date Of EnTime StartTime Finis Project Problem, ATarget DatStatus Location o Result1 ### 14:00 15:00 D-682 Checking St### Chekced by Pak Tjarna
15:15 15:30 D-682 Question fr### Done16:00 17:00 D-761 Revisi Den ###
Over Time 18:00 19:30 D-682 Checking St### Perbaiki Gambar ke Pak Ito19:30 22:20 D-761 Desain Bou### Progress
Penipisan ### Behaviour OkeCek Gempa Selanjutnya
2 ### 8:30 8:45 D-682 Kirim RFI ### Sudah kirim ke Pak D Done9:00 21:00 D-682 Meeting @###21:00 21:00 D-682 Kirim Stai ### Sudah kirim ke Pak Dwinanto
3 ### 10:00 10:30 D-682 Revisi Den ### Gambarin ke P. Ito10:30 11:00 D-682 Cek Revisi ### Konfirmasi ke Pak Billy11:00 12:00 D-000 Time Sheet13:00 17:00 D-761 Cek dari a ###
4 ### 9:00 10:00 D-682 RFI 052 Pit### Gambarin ke P. Ito10:00 12:00 D-682 Persiapkan###
Kirim OUT_###13:00 20:30 D-682 Meeting @ SCGU Site Office20:30 23:30 D-761 Cek dari a ### Rebar precentage co Done
5 ### 10:00 11:00 D-682 Perubahan l### Kirim ke Pak Dwi11:00 11:15 D-761 DL TOT + L### Untuk Geotek Done11:15 12:00 D-682 Revisi Denah SB area ramp circular13:00 17:00 D-682 Revisi Denah SB area ramp circular13:50 13:50 D-682 OUT_277 20### P.S: kasih ke Pak Ito Done19:30 1:30 D-682 Cek Kolom Failed: PMM 8 Kolom Failed Done
6 ### 10:00 12:00 D-682 Cek Kolom Failed: PMM 8 Kolom Failed13:00 17:00 D-682 Rekomendas### Mba Tyas Sudah Kirim Done
ke Owner19:00 20:00 D-682 Run Etabs dengan kondisi kolom menggunakan FC yang tidak tercapai FC 32 Mpa20:00 21:00 D-761
7 ### 10:00 12:00 D-682 Pit Lift Office 313:00 15:00 D-682 Pit Lift Offi### Sudah kirim ke Pak D Done15:00 17:30 D-682 Desain Din### Skets ke Drafter besok pagi
8 ### Cuti
9 ### 9:30 9:30 D-682 Kirim OUT_### Sudah kirim ke Pak D done9:30 11:00 D-682 Desain Ret### Sudah kirim ke Pak D done11:00 12:00 D-682 Siapin materi meeting done
13:00 20:00 D-682 Meeting @ SCGU Site Office20:00 20:45 D-682 Cek balok k### Sudah di Pak ito proses20:45 22:15 D-682 Desain Dud### Run Etabs proses
10 ### 9:30 9:45 D-682 Perbaiki ga###9:45 10:15 D-682 Cek gambar ### Sudah kirim ke Pak Done10:15 12:00 D-682 Penulangan###13:00 14:45 D-682 Penulangan### Cek ke Mba Tyas14:45 17:00 D-682 Desain Mac### Cek PenulaSystem (E:)\Domi Saputro\D682\Office 1\District8 @SCBD - Office 1 - 2015-04-14 Cek Reaksi Di Mesin Room.EDB18:00 22:30 D-682 Desain Dud### Cek PenulaSystem (E:)\Domi Saputro\D682\Office 1\District8 @SCBD - Office 1 - 2015-04-14 Dudukan Water Tank.EDB
11 ### 9:30 10:45 D-682 Kirim Gamb### Sudah kirim ke Pak Dwinanto OUT_28510:45 12:00 D-682 Desain Machine Room Lift Office 113:00 15:00 D-682 Desain Mac### Sudah kirim ke Pak Dwinanto OUT_28615:00 19:00 D-682 Jawab RFI ### Sudah kiri System (E:)\Domi Saputro\D682\Office 1\District8 @SCBD - Office 1 - 2015-04-15 Opening WO1-6 Office 1.EDB19:00 20:00 D-682 Cek Outstanding RFI
12 ### 9:30 10:45 D-682 Kirim Gamb### Sudah kirim ke Pak Dwinanto OUT_28510:45 12:00 D-682 Desain Machine Room Lift Office 113:00 15:00 D-682 Desain Mac### Sudah kirim ke Pak Dwinanto OUT_286
13 ### 9:30 12:00 D-682 Desain Machine Room LKonfirmasi Kone13:00 19:30 D-682 Perbaiakan### Tommy yangD:\Domisaputro\project - D682\Excel\kolom\kolom failed\2015-04-17 Report Kolom Failed
14 ### 10:00 12:00 D-682 Clean Water Tank OffiKonfirmasi Kone13:00 21:00 D-682 Meeting @ Air Mas Asri
15 ### 9:30 12:00 D-682 Desain Sla ### E:\Domi Saputro\D682\Semi Basement Area Circular Ramp\Petabs13:00 22:00 D-682 Desain Mac###
16 ### 9:30 20:30 D-682 Meeting @ SCGU Site Office E:\Domi Saputro\D682\Semi Basement Area Circular Ramp\Petabs
17 ### 9:30 11:00 D-682 Cek Tangga###11:00 16:00 D-763 Meeting @ Forza LandSudah kirim Pak Shahrul18:00 23:30 D-682 Revisi Denah SB area ramp circular
18 ### 9:30 11:00 D-682 Cek Tangga 1 dan Tangga 212:00 15:00 D-682 Hitung slab### Sudah konfirmasi ke Pak Tabah, tebal 200 mm15:00 17:30 D-682 Hitung Bal ### Kirim RFI 6OUT_290 Tanggapan RFI 067 dan Stair #2 #3
19 ### 9:00 11:00 D-682 Cek Email, Sortir Data Incoming, Kirim ulang OUT_290 11:00 12:00 D-682 Presentasi Etabs by Efan & Riki14:00 20:00 D-682 Clean Wate###15:15 15:15 D-682 Kirim gamb### Kirim ke Pak Gilang gambar penyesuaian EOS AP 319:00 20:30 D-682 Study Ball ###
20 ### 9:30 11:00 D-682 Study Ballroom
13:00 17:00 D-682 Study Ballroom
21 ### 8:00 17:00 D-682 Meeting @ SCGU Site Office
22 ### 8:00 13:00 D-76 Meeting @ Forza Land One Azzure13:00 17:00 D-682 Study Ballroom
Run Etabs dengan kondisi kolom menggunakan FC yang tidak tercapai FC 32 Mpa
System (E:)\Domi Saputro\D682\Office 1\District8 @SCBD - Office 1 - 2015-04-14 Cek Reaksi Di Mesin Room.EDBSystem (E:)\Domi Saputro\D682\Office 1\District8 @SCBD - Office 1 - 2015-04-14 Dudukan Water Tank.EDB
Sudah kirim ke Pak Dwinanto OUT_285
Sudah kirim ke Pak Dwinanto OUT_286System (E:)\Domi Saputro\D682\Office 1\District8 @SCBD - Office 1 - 2015-04-15 Opening WO1-6 Office 1.EDB
Sudah kirim ke Pak Dwinanto OUT_285
Sudah kirim ke Pak Dwinanto OUT_286
D:\Domisaputro\project - D682\Excel\kolom\kolom failed\2015-04-17 Report Kolom Failed
E:\Domi Saputro\D682\Semi Basement Area Circular Ramp\Petabs
E:\Domi Saputro\D682\Semi Basement Area Circular Ramp\Petabs
Sudah konfirmasi ke Pak Tabah, tebal 200 mmOUT_290 Tanggapan RFI 067 dan Stair #2 #3
Cek Email, Sortir Data Incoming, Kirim ulang OUT_290
Kirim ke Pak Gilang gambar penyesuaian EOS AP 3
Detail Work Log May
No Date Of Entry Time Start Time Finish Project1 3-May-2015 11:30 19:30 D-682
2 4-May-2015 8:00 9:30 D-682
9:30 12:00 D-68213:00 16:0016:00 17:00 D-68217:00 21:30 D-763
3 5-May-2015 8:00 9:309:30 13:00 D-68213:00 17:00 D-682
17:00 22:20 D-7634 6-May-2015 8:00 20:30 D-682
20:30 23:30 D-763
5 7-May-2015 8:00 17:00 D-76318:00 23:30 D-682
6 8-May-2015 9:00 17:00 D-682
7 10-May-2015 13:30 19:00 D-763
8 11-May-2015 8:00 12:00 D-68212:00 15:00 D-68215:00 16:00 D-68216:00 17:00 D-76317:00 23:00 D-763
9 12-May-2015 8:00 12:00 D-68212:00 15:00 D-76315:00 17:00 D-68218:00 22:00 D-763
10 13-May-2015 8:00 12:00 D-68212:00 15:00 D-682
15:00 17:00 D-682
19:00 21:30 D-763
11 15-May-2015 8:00 17:00 D-682
12 18-May-2015 8:00 17:00 D-763
17:00 21:30
13 19-May-2015 8:00 17:00 D-752
17:00 22:00 D-682
14 20-May-2015 8:00 17:00 D-682
17:00 22:00 D-752
15 21-May-2015 8:30 9:00 D-682
16 22-May-2015 8:30 20:00 D-752
Problem, Action, Event, or CommentDesign Machine Room Office 1 Low Zone
Download denah basement langham terbaruRevisi gambar groundfloor area danayasaDesign Machine Room Office 1 Low ZoneDesign Machine Room Office 1 Low ZoneFacade Danayasa dan Facade Ballrom akan diperbaiki oleh arsitekAsistensi Layout ke IBuIsi TimesheetDesign Machine Room Office 1 Low ZoneDesign Machine Room Office 1 Low Zone
Pembebanan One Velvet + Cek Denah StrukturMeeting D8 @ SCBDPersiapkan materi meetingPerbandingan Slab konvensional dan slab dengan metal deck
Meeting One Velvet @ Forza Land HOGambar denah pelat lantai low zone machine room
Desain Lifting Beam Mechine RoomKirim Revisi AP 3Kirim Plan dan Detail Balok PC Ballroom (For Info)Kirim denah Office 1, Office 2, dan Office 3 berkaitan dengan facade ke Arup
Pembebanan One Velvet
Gambar LMR Office 1Superimpose Sound Attenuator Semibasement dan B1Kirim denah GF dan detail RWT (Area circular ramp) ke Pak SahrulKonfirmasi Scoope of Work One Velvet untuk pekerjaan tanahCek gaya aksial kolom/shear wall one velvet
Gambar LMR Office 1Cek gaya aksial kolomGambar tangga office 3Cek gaya aksial kolom/shear wall one velvet
Meeting D8 @ SCBDMeeting D8 @ SCBD
Hitung perkuatan shearwall AP2 WAP2-4 Lantai 30~31st
Buat schedule proyek One Azzure dan One Velvet
Denah Lantai 9 dan 10 AP 3
Buat schedule proyek One Azzure dan One Velvet
Study fondasi One Azzure
Daya dukung one azzure
Kirim gambar crown Apartemen 1 ke Owner
Meeting D8 @ SCBD
Fondasi One Azzure
Revisi Office 2 Plan terkait WO1-2
Kirim detail perkiraan pile
Target Date Status4-May-2015
4-May-2015 INC_163 2015-05-04 Denah Langham Update4-May-2015 Gambar di Pak Ito4-May-2015 Desain sudah selesai; Asistensi ke Mba TYas
4-May-2015 Layout sudah, besok gambarin ke Agung
4-May-2015 Revisi ke Agung
10-May-2015 Masi digambar Pak Ito10-May-201510-May-201510-May-201511-May-2015 Hasil study akan ditanyakan ke Pak Wiratman
11-May-2015 Sudah Selesai10-May-201511-May-2015 Sudah Selesai10-May-2015
Sudah Selesai
13-May-2015 Sudah SelesaiOUT_297 2015-05-13 Perkuatan Opening WAP2-4 Lantai 30th~31st
13-May-2015
15-May-2015 Sudah SelesaiOUT_298 2015-05-15 Denah Lantai 10 AP3 Rev thd ars baru
Done
Kirim reaksi ke Geotek
Sudah Selesai
Kirim reaksi ke Geotek
Piling Layout
Kirim ke Pak Dwi Revisi Plan OF 2
Kirim ke Pak Eriko dan Bu Fiona
Location of DataE:\Domi Saputro\D682 - Outstanding Lapangan\Office 1\Machine Room Office 1\Etabs 8District8 @SCBD - Office 1 - 2015-05-03 model fix.EDB
\\tyas-8\tyas$\D682-DISTRICT8@SCBD\INCOMING DATA\ARS AIRMAS\DESIGN
idem
E:\Domi Saputro\D682 - Outstanding Lapangan\Office 1\Machine Room Office 1\Etabs 8E:\Domi Saputro\D682 - Outstanding Lapangan\Office 1\Machine Room Office 1\Etabs 8District8 @SCBD - Office 1 - 2015-05-05.EDBE:\Domi Saputro\D682 - Outstanding Lapangan\Office 1\Machine Room Office 1\Etabs 8\model safemodel slab 2015-05-05.FDB
E:\Domi Saputro\D682 - Outstanding Lapangan\Office 1\Machine Room Office 1\Etabs 8
OUT_292 2015-05-07 Denah Lantai 10 AP3 RevOUT_293 2015-05-08 PC BALLROOMbeam for canopy-facade support.pdf
Kirim dengan gmail sifatnya for information only.Kirim dengan gmail sifatnya for information only.
E:\Domi Saputro\D682 - Outstanding Lapangan\Apartemen 1\Opening Shearwall AP1 Lantai 31D:\Domisaputro\project - D682 - District 8 @ SCBD\Excel\wall\AP 2
D:\Domisaputro\project - D763 - One Velvet\ScheduleOne Velvet Schedule - 2015-05-18 --> MS Project
D:\Domisaputro\project - D752 - One Azzure\Outgoing Data\GeotekOUT_01 2015-05-19 Reaksi Base
Kirim doghouse OF 3kirim langhamKirim reaksi ke Geotek Revisi
OUT_303 2015-05-20 Revisi Plan Office 2
OUT_FORZA_003 [15-05-22] - Detail Draft Pile
Result
done
ETATBSEXCEL
Detail Work Log June
No Date Of Entry Time Start Time Finish Project1 1-Jun-2015 9:00 22:30 D-682
D-752
2 2-Jun-2015 11:45 17:50 D-763Overtime D-752
3 3-Jun-2015 9:13 22:40 D-752D-682
4 4-Jun-2015 8:50 18:35 D-752
5 5-Jun-2015 8:50 17:57 D-682
6 8-Jun-2015 9:00 9:30 D-682
10:00 10:30 D-68210:30 11:00 D-68211:00 12:00 D-68212:00 17:00 D-68217:00 17:30 D-682
Overtime 17:30 21:00 D-682
7 9-Jun-2015 9:00 11:00 D-68211:00 12:00 D-76313:00 17:00 D-76317:00 D-763
8 10-Jun-2015 10:00 12:00 D-76313:00 20:00 D-68220:00 22:30 D-763
9 11-Jun-2015 9:00 10:00 D-00010:00 16:00 D-76316:00 21:00 D-682
10 12-Jun-2015 10:00 12:00 D-76313:00 17:00 D-682
D-752
11 13-Jun-2015 13:00 18:30 D-763
12 15-Jun-2015 9:00 21:00 D-76321:00 21:00 D-682
13 16-Jun-2015 10:00 12:00 D-75212:00 17:00 D-763
14 17-Jun-2015 10:00 12:00 D-682
15 18-Jun-2015 10:00 17:00 D-752
16 19-Jun-2015 9:00 17:00 D-763D-752D-682D-682
17 22-Jun-2015 9:00 12:00 D-75212:00 17:00 D-76317:00 18:00 D-76318:00 22:30 D-763
D-752
18 23-Jun-2015 9:00 17:00 D-76317:00 21:00 D-682
19 24-Jun-2015 9:00 21:00 D-682
20 25-Jun-2015 9:00 11:00 D-68215:00 16:00 D-752
15:00 17:00 D-752
21 26-Jun-2015 9:45 10:30 D-00010:30 12:00 D-68213:00 17:00 D-763
22 29-Jun-2015 9:00 12:00 D-00012:00 21:00 D-76321:00 22:00 D-682
23 30-Jun-2015 9:00 20:00 D-68220:00 21:00 D-763
Problem, Action, Event, or CommentKirim Crown Ke ArupDesain Penulangan Bore PileUse pile tekan, test pile tekan, tes lateral
Cek Denah Struktur One Velvet + Kirim ke Pak Willy dan Bu KumalaCek Desain Galian
Persiapan Tender FondasiKirim Ulang CrownKirim Desain LMR
Meeting @ Forza Land
Study Tunnel
Download: Update Gambar Office 1; Download Revisi Lantai RefugeDownload: Update LandscapeDiscussion with infrastructure regarding support for excavation in area Office 3Checking story level refuge floor Office 1Revise tunnel Office 1LMR Office 2Send Exhaust Fan Office 1LMR Office 2
LMR Office 2Checking Etabs Model One VelvetChecking Etabs Model One VelvetConsult to Bu Fau regarding AMDAL One Velvet
Checking Etabs Model One VelvetMeeting @ Site OfficeCek Gempa MMPR dan cek model shell
Redudancy training by Pak Bambang BoedionoMeeting @ Forza LandCek balok dudukan facade dan Progress Langham
Cek Gempa MMPR dan cek model shellKirim Sket LMR Low Zone Office 2Kirim base shear reaksi baru
Hitung Gempa One Velvet
Hitung Gempa One VelvetKirim tunnel exhaust office 3
Cek Spek Bore PileSchedule One Velvet
Preparation file for meeting
Meeting @ Forza Land
Schedule One VelvetSchedule One AzureKirim desain fondasi CWT Office 1, Office 2Kirim Balok GF Area Kanopi Office 3
Schedule One AzureCek Model Struktur AtasAsistensi Bu FauCek Model Struktur AtasRevisi Schedule One Azure
Cek update arsitekOutstanding District 8
Meeting @ Site Office
Cek Vault BankKonsultasi Bu Fau Final Piling Lay Out
Konsultasi Bu Fau Final Piling Lay Out
Isi time sheetCek Vault BankCek Ketidakberaturan
Meeting InternalCek Model Struktur Atas untuk skematikJawab RFI mengenai LMR Office 1
Jawab RFI mengenai LMR Office 1Cek Model Struktur Atas untuk skematik
Target Date1-Jun-2015
2-Jun-20152-Jun-2015
8-Jun-20158-Jun-2015
8-Jun-2015
8-Jun-20159-Jun-2015
9-Jun-2015
9-Jun-2015
10-Jun-2015
25-Jun-2015
29-Jun-2015
29-Jun-2015
Status
Belum digambar (masih sketch)Sketch sudah di Wildan
Posisi tes lateral harus dipindah, acuan gambar piling layout tidak update
Still downloading at computer behind Mba AmbarNot yet download --> fowarded to [email protected] will send the reaction (forces) from their support (tie rod) design
Done. OUT_312 2015-06-08 Plan and Section Exhaust Fan Shaft
Sketch is done. Drawing on progress
OUT_314 2015-06-11 Balok Penopang Facade di GFOUT_313 2015-06-11 Basement Langham
OUT_315 2015-06-15 Opening Exhaust OF3
OUT_321 2015-06-19 CWT Office 2; OUT_322 2015-06-19 CWT Office 1OUT_323 2015-06-19 Balok GF Area Kanopi Office 3
Waiting confirmation from Pak Arie; Architect will send the stair drawing soon after the confirmation
Location of Data
folder one azzure forcon fondasi
D:\Domisaputro\project - D682 - District 8 @ SCBD\Etabs\OFF 2\2015\2015-06-08 Lift Machine RoomD-682 - District 8 @ SCBD - Tower 2 - 20150608 Lift Machine Room.EDB
D:\Domisaputro\project - D682 - District 8 @ SCBD\Etabs\OFF 2\2015\2015-06-25 Cek Vault BankD-682 - District 8 @ SCBD - Tower 2 - 141014 add vault bank.EDBD:\Domisaputro\project - D682 - District 8 @ SCBD\Outstanding Task ForcontCek PMM Ratio Kolom.xlsx
Result
Detail Work Log July
No Date Of Entry Time Start Time Finish Project1 1-Jul-2015 8:00 17:00 D-763
D-763
2 2-Jul-2015 8:00 17:00 D-763D-763
3 3-Jul-2015 8:00 17:00 D-763D-763
4 6-Jul-2015 8:00 17:00 D-763D-763
5 7-Jul-2015 8:00 17:00 D-763D-763
6 8-Jul-2015 8:00 17:00 D-763D-763
7 9-Jul-2015 8:00 17:00 D-763D-763
9 10-Jul-2015 9:00 20:00 D-763D-763
10 13-Jul-2015 7:00 10:00 D-76310:00 15:30 D-763
11 14-Jul-2015 7:00 15:30 D-763
12 15-Jul-2015
13 22-Jul-2015 8:00 12:00 D-76313:00 17:00 D-763
14 23-Jul-2015 8:00 17:00 D-763D-763
15 24-Jul-2015 8:00 17:00 D-763D-763
16 27-Jul-2015 8:00 17:00 D-763D-763
17 28-Jul-2015 8:00 17:00 D-752
D-763
18 29-Jul-2015 8:00 12:00 D-7638:00 17:00 D-752
19 30-Jul-2015 8:00 17:00 D-7638:00 12:00 D-752
20 7/31/2015 8:00 14:00 D-752D-763
8:00 12:00 D-763
Problem, Action, Event, or Comment Due DateCek Gambar Schematic DesainCek Lendutan pada Schematic Design
Cek Gambar Schematic DesainCek Balok Kolom pada Schematic Design
Cek Gambar Schematic DesainCek Balok Kolom pada Schematic Design
Cek Gambar Schematic DesainCek Balok Kolom pada Schematic Design
Cek Gambar Schematic DesainCek Balok Kolom pada Schematic Design
Cek Gambar Schematic DesainCek Balok Kolom pada Schematic DesignCek Gambar Schematic DesainCek Balok Kolom pada Schematic DesignCek Gambar Schematic DesainCek Balok Kolom pada Schematic Design
Cek Balok Kolom pada Schematic DesignMengganti bentuk tangga pada schematic design & Mengganti beban
Mengganti beban SIDL pada Schematic Design
Mengganti beban SIDL pada Schematic DesignMemberi Nama pada Shearwall
Merevisi model ETABS (beban, balok, dan pelat)Melakukan pengecekan pada kolom
Menulangi shear wallMelakukan pengecekan pada kolom
Melakukan pengecekan pada kolomMenulangi shear wall
Melakukan pengecekan pada kolom
Menulangi shear wall
Mengerjakan penulangan shear wallMelakukan pengecekan pada kolom
Mengerjakan penulangan pelatMelakukan pengecekan pada kolom
Merevisi ukuran kolom sesuai dengan column planMerevisi ukuran kolom sesuai dengan column planMengerjakan penulangan pelat.
Status
Done. (July 15th, 2015) D763 - ONE VELVET (KOLOM)-GEMPA.EDB
Done. (July 13th, 2015) D763 - ONE VELVET (KOLOM)-GEMPA v2.EDBDone. (July 22nd, 2015) D763 - ONE VELVET (KOLOM)-GEMPA v2.EDB
Done. (July 23rd, 2015) D763 - ONE VELVET (KOLOM)-GEMPA v2.EDB
Done. (July 24th, 2015) D763 - ONE VELVET (KOLOM)-GEMPA v2.EDB
Done.
Done. (July 27th, 2015) D763 - ONE VELVET (KOLOM)-GEMPA v2.EDB
Done. D-752-STA-SC-TW-110615-ARS050615-CRACK-GEMPA NOMINAL-STUDI POTONG WALL.EDB
Done. D-752-STA-SC-TW-110615-ARS050615-CRACK-GEMPA NOMINAL-STUDI POTONG WALL.EDBDone. (July 31st, 2015) D763 - ONE VELVET (KOLOM)-GEMPA v2.EDBDone. D678 - Perhitungan Pelat
Location of Data Result
Done. D-752-STA-SC-TW-110615-ARS050615-CRACK-GEMPA NOMINAL-STUDI POTONG WALL.EDB
Done. D-752-STA-SC-TW-110615-ARS050615-CRACK-GEMPA NOMINAL-STUDI POTONG WALL.EDB