dailytimelog v.2

47
Outstanding Work No Project Item 1 D682 Denah SB Area Circular Ramp 2 D682 RFI 60 Besi terlalu rapat di OF 1 (belt tr 3 D682 RFI 61 Desain Pondasi Pedestal Untuk CWT O 4 D682 RFI 62 Perkuatan Opening Shearwall WO1-6 5 D682 RFI 63 Detail Struktur Ramp Langham 6 D682 Tangga Office 1 7 D682 Tangga 1 dan Tangga 2 8 D682 Tangga Danayasa Dekat Shearwall Parking 9 D682 Tangga sebelah Office Danayasa 10 D682 Penyesuaian EOS AP3 11 D682 Penyesuaian PC Ballroom 12 D682 Liftinghook Danayasa 13 D682 Machine Room Low Zone 14 D682 RFI 068 GWT 15 D682 Checking Reaction For Facade Steel Structu 16 D682 Denah dan Detail Prestress

Upload: denissa-sari-darmawi-purba

Post on 17-Feb-2016

238 views

Category:

Documents


0 download

DESCRIPTION

betonbetonbetonbetonbetonbetonbetonbetonbetonbetonbetonbetonbetonbetonbetonbeton

TRANSCRIPT

Page 1: DailyTimeLog v.2

Outstanding WorkNo Project Item Due Date1 D682 Denah SB Area Circular Ramp2 D682 RFI 60 Besi terlalu rapat di OF 1 (belt truss)3 D682 RFI 61 Desain Pondasi Pedestal Untuk CWT OF14 D682 RFI 62 Perkuatan Opening Shearwall WO1-65 D682 RFI 63 Detail Struktur Ramp Langham6 D682 Tangga Office 17 D682 Tangga 1 dan Tangga 28 D682 Tangga Danayasa Dekat Shearwall Parking9 D682 Tangga sebelah Office Danayasa10 D682 Penyesuaian EOS AP311 D682 Penyesuaian PC Ballroom12 D682 Liftinghook Danayasa13 D682 Machine Room Low Zone14 D682 RFI 068 GWT 15 D682 Checking Reaction For Facade Steel Structure16 D682 Denah dan Detail Prestress

Page 2: DailyTimeLog v.2

Status Sent Date Status EngineerAnswered 23-Apr-2015 doneAnswered 15-Apr-2015 done

proses desainAnswered 15-Apr-2015 done

proses gambarAswered 24-Apr-2015 done

Andika

Answered 24-Apr-2015 doneproses desain Tommy

Aswered 24-Apr-2015

proses desain Puspus

Page 3: DailyTimeLog v.2

Name Dominicus Septian HenriNIP 4124

Work Log May

Activity Start End Duration

1 April 2015 Over Time D682 11:00:00 AM 08:30:00 PM 9 hours, 30 minutes

Page 4: DailyTimeLog v.2

Total Time Logged todayTotal time logged today: 9:30 hours

Activity Total DurationD682 0 hours, 00 minutesD761 0 hours, 00 minutesOver Time D682 9 hours, 30 minutesOver Time D761 0 hours, 00 minutesMeetings D682 0 hours, 00 minutesMeetings 761 0 hours, 00 minutes

Page 5: DailyTimeLog v.2

Activities listD682D761Over Time D682Over Time D761Meetings D682Meetings 761

Page 6: DailyTimeLog v.2

Detail Work Log

No Date Of EnTime StartTime Finis Project Problem, ATarget DatStatus Location o Result1 ### 14:00 15:00 D-682 Checking St### Chekced by Pak Tjarna

15:15 15:30 D-682 Question fr### Done16:00 17:00 D-761 Revisi Den ###

Over Time 18:00 19:30 D-682 Checking St### Perbaiki Gambar ke Pak Ito19:30 22:20 D-761 Desain Bou### Progress

Penipisan ### Behaviour OkeCek Gempa Selanjutnya

2 ### 8:30 8:45 D-682 Kirim RFI ### Sudah kirim ke Pak D Done9:00 21:00 D-682 Meeting @###21:00 21:00 D-682 Kirim Stai ### Sudah kirim ke Pak Dwinanto

3 ### 10:00 10:30 D-682 Revisi Den ### Gambarin ke P. Ito10:30 11:00 D-682 Cek Revisi ### Konfirmasi ke Pak Billy11:00 12:00 D-000 Time Sheet13:00 17:00 D-761 Cek dari a ###

4 ### 9:00 10:00 D-682 RFI 052 Pit### Gambarin ke P. Ito10:00 12:00 D-682 Persiapkan###

Kirim OUT_###13:00 20:30 D-682 Meeting @ SCGU Site Office20:30 23:30 D-761 Cek dari a ### Rebar precentage co Done

5 ### 10:00 11:00 D-682 Perubahan l### Kirim ke Pak Dwi11:00 11:15 D-761 DL TOT + L### Untuk Geotek Done11:15 12:00 D-682 Revisi Denah SB area ramp circular13:00 17:00 D-682 Revisi Denah SB area ramp circular13:50 13:50 D-682 OUT_277 20### P.S: kasih ke Pak Ito Done19:30 1:30 D-682 Cek Kolom Failed: PMM 8 Kolom Failed Done

6 ### 10:00 12:00 D-682 Cek Kolom Failed: PMM 8 Kolom Failed13:00 17:00 D-682 Rekomendas### Mba Tyas Sudah Kirim Done

ke Owner19:00 20:00 D-682 Run Etabs dengan kondisi kolom menggunakan FC yang tidak tercapai FC 32 Mpa20:00 21:00 D-761

7 ### 10:00 12:00 D-682 Pit Lift Office 313:00 15:00 D-682 Pit Lift Offi### Sudah kirim ke Pak D Done15:00 17:30 D-682 Desain Din### Skets ke Drafter besok pagi

8 ### Cuti

9 ### 9:30 9:30 D-682 Kirim OUT_### Sudah kirim ke Pak D done9:30 11:00 D-682 Desain Ret### Sudah kirim ke Pak D done11:00 12:00 D-682 Siapin materi meeting done

Page 7: DailyTimeLog v.2

13:00 20:00 D-682 Meeting @ SCGU Site Office20:00 20:45 D-682 Cek balok k### Sudah di Pak ito proses20:45 22:15 D-682 Desain Dud### Run Etabs proses

10 ### 9:30 9:45 D-682 Perbaiki ga###9:45 10:15 D-682 Cek gambar ### Sudah kirim ke Pak Done10:15 12:00 D-682 Penulangan###13:00 14:45 D-682 Penulangan### Cek ke Mba Tyas14:45 17:00 D-682 Desain Mac### Cek PenulaSystem (E:)\Domi Saputro\D682\Office 1\District8 @SCBD - Office 1 - 2015-04-14 Cek Reaksi Di Mesin Room.EDB18:00 22:30 D-682 Desain Dud### Cek PenulaSystem (E:)\Domi Saputro\D682\Office 1\District8 @SCBD - Office 1 - 2015-04-14 Dudukan Water Tank.EDB

11 ### 9:30 10:45 D-682 Kirim Gamb### Sudah kirim ke Pak Dwinanto OUT_28510:45 12:00 D-682 Desain Machine Room Lift Office 113:00 15:00 D-682 Desain Mac### Sudah kirim ke Pak Dwinanto OUT_28615:00 19:00 D-682 Jawab RFI ### Sudah kiri System (E:)\Domi Saputro\D682\Office 1\District8 @SCBD - Office 1 - 2015-04-15 Opening WO1-6 Office 1.EDB19:00 20:00 D-682 Cek Outstanding RFI

12 ### 9:30 10:45 D-682 Kirim Gamb### Sudah kirim ke Pak Dwinanto OUT_28510:45 12:00 D-682 Desain Machine Room Lift Office 113:00 15:00 D-682 Desain Mac### Sudah kirim ke Pak Dwinanto OUT_286

13 ### 9:30 12:00 D-682 Desain Machine Room LKonfirmasi Kone13:00 19:30 D-682 Perbaiakan### Tommy yangD:\Domisaputro\project - D682\Excel\kolom\kolom failed\2015-04-17 Report Kolom Failed

14 ### 10:00 12:00 D-682 Clean Water Tank OffiKonfirmasi Kone13:00 21:00 D-682 Meeting @ Air Mas Asri

15 ### 9:30 12:00 D-682 Desain Sla ### E:\Domi Saputro\D682\Semi Basement Area Circular Ramp\Petabs13:00 22:00 D-682 Desain Mac###

16 ### 9:30 20:30 D-682 Meeting @ SCGU Site Office E:\Domi Saputro\D682\Semi Basement Area Circular Ramp\Petabs

17 ### 9:30 11:00 D-682 Cek Tangga###11:00 16:00 D-763 Meeting @ Forza LandSudah kirim Pak Shahrul18:00 23:30 D-682 Revisi Denah SB area ramp circular

18 ### 9:30 11:00 D-682 Cek Tangga 1 dan Tangga 212:00 15:00 D-682 Hitung slab### Sudah konfirmasi ke Pak Tabah, tebal 200 mm15:00 17:30 D-682 Hitung Bal ### Kirim RFI 6OUT_290 Tanggapan RFI 067 dan Stair #2 #3

19 ### 9:00 11:00 D-682 Cek Email, Sortir Data Incoming, Kirim ulang OUT_290 11:00 12:00 D-682 Presentasi Etabs by Efan & Riki14:00 20:00 D-682 Clean Wate###15:15 15:15 D-682 Kirim gamb### Kirim ke Pak Gilang gambar penyesuaian EOS AP 319:00 20:30 D-682 Study Ball ###

20 ### 9:30 11:00 D-682 Study Ballroom

Page 8: DailyTimeLog v.2

13:00 17:00 D-682 Study Ballroom

21 ### 8:00 17:00 D-682 Meeting @ SCGU Site Office

22 ### 8:00 13:00 D-76 Meeting @ Forza Land One Azzure13:00 17:00 D-682 Study Ballroom

Page 9: DailyTimeLog v.2

Run Etabs dengan kondisi kolom menggunakan FC yang tidak tercapai FC 32 Mpa

Page 10: DailyTimeLog v.2

System (E:)\Domi Saputro\D682\Office 1\District8 @SCBD - Office 1 - 2015-04-14 Cek Reaksi Di Mesin Room.EDBSystem (E:)\Domi Saputro\D682\Office 1\District8 @SCBD - Office 1 - 2015-04-14 Dudukan Water Tank.EDB

Sudah kirim ke Pak Dwinanto OUT_285

Sudah kirim ke Pak Dwinanto OUT_286System (E:)\Domi Saputro\D682\Office 1\District8 @SCBD - Office 1 - 2015-04-15 Opening WO1-6 Office 1.EDB

Sudah kirim ke Pak Dwinanto OUT_285

Sudah kirim ke Pak Dwinanto OUT_286

D:\Domisaputro\project - D682\Excel\kolom\kolom failed\2015-04-17 Report Kolom Failed

E:\Domi Saputro\D682\Semi Basement Area Circular Ramp\Petabs

E:\Domi Saputro\D682\Semi Basement Area Circular Ramp\Petabs

Sudah konfirmasi ke Pak Tabah, tebal 200 mmOUT_290 Tanggapan RFI 067 dan Stair #2 #3

Cek Email, Sortir Data Incoming, Kirim ulang OUT_290

Kirim ke Pak Gilang gambar penyesuaian EOS AP 3

Page 11: DailyTimeLog v.2

Detail Work Log May

No Date Of Entry Time Start Time Finish Project1 3-May-2015 11:30 19:30 D-682

2 4-May-2015 8:00 9:30 D-682

9:30 12:00 D-68213:00 16:0016:00 17:00 D-68217:00 21:30 D-763

3 5-May-2015 8:00 9:309:30 13:00 D-68213:00 17:00 D-682

17:00 22:20 D-7634 6-May-2015 8:00 20:30 D-682

20:30 23:30 D-763

5 7-May-2015 8:00 17:00 D-76318:00 23:30 D-682

6 8-May-2015 9:00 17:00 D-682

7 10-May-2015 13:30 19:00 D-763

8 11-May-2015 8:00 12:00 D-68212:00 15:00 D-68215:00 16:00 D-68216:00 17:00 D-76317:00 23:00 D-763

9 12-May-2015 8:00 12:00 D-68212:00 15:00 D-76315:00 17:00 D-68218:00 22:00 D-763

10 13-May-2015 8:00 12:00 D-68212:00 15:00 D-682

Page 12: DailyTimeLog v.2

15:00 17:00 D-682

19:00 21:30 D-763

11 15-May-2015 8:00 17:00 D-682

12 18-May-2015 8:00 17:00 D-763

17:00 21:30

13 19-May-2015 8:00 17:00 D-752

17:00 22:00 D-682

14 20-May-2015 8:00 17:00 D-682

17:00 22:00 D-752

15 21-May-2015 8:30 9:00 D-682

16 22-May-2015 8:30 20:00 D-752

Page 13: DailyTimeLog v.2

Problem, Action, Event, or CommentDesign Machine Room Office 1 Low Zone

Download denah basement langham terbaruRevisi gambar groundfloor area danayasaDesign Machine Room Office 1 Low ZoneDesign Machine Room Office 1 Low ZoneFacade Danayasa dan Facade Ballrom akan diperbaiki oleh arsitekAsistensi Layout ke IBuIsi TimesheetDesign Machine Room Office 1 Low ZoneDesign Machine Room Office 1 Low Zone

Pembebanan One Velvet + Cek Denah StrukturMeeting D8 @ SCBDPersiapkan materi meetingPerbandingan Slab konvensional dan slab dengan metal deck

Meeting One Velvet @ Forza Land HOGambar denah pelat lantai low zone machine room

Desain Lifting Beam Mechine RoomKirim Revisi AP 3Kirim Plan dan Detail Balok PC Ballroom (For Info)Kirim denah Office 1, Office 2, dan Office 3 berkaitan dengan facade ke Arup

Pembebanan One Velvet

Gambar LMR Office 1Superimpose Sound Attenuator Semibasement dan B1Kirim denah GF dan detail RWT (Area circular ramp) ke Pak SahrulKonfirmasi Scoope of Work One Velvet untuk pekerjaan tanahCek gaya aksial kolom/shear wall one velvet

Gambar LMR Office 1Cek gaya aksial kolomGambar tangga office 3Cek gaya aksial kolom/shear wall one velvet

Meeting D8 @ SCBDMeeting D8 @ SCBD

Page 14: DailyTimeLog v.2

Hitung perkuatan shearwall AP2 WAP2-4 Lantai 30~31st

Buat schedule proyek One Azzure dan One Velvet

Denah Lantai 9 dan 10 AP 3

Buat schedule proyek One Azzure dan One Velvet

Study fondasi One Azzure

Daya dukung one azzure

Kirim gambar crown Apartemen 1 ke Owner

Meeting D8 @ SCBD

Fondasi One Azzure

Revisi Office 2 Plan terkait WO1-2

Kirim detail perkiraan pile

Page 15: DailyTimeLog v.2

Target Date Status4-May-2015

4-May-2015 INC_163 2015-05-04 Denah Langham Update4-May-2015 Gambar di Pak Ito4-May-2015 Desain sudah selesai; Asistensi ke Mba TYas

4-May-2015 Layout sudah, besok gambarin ke Agung

4-May-2015 Revisi ke Agung

10-May-2015 Masi digambar Pak Ito10-May-201510-May-201510-May-201511-May-2015 Hasil study akan ditanyakan ke Pak Wiratman

11-May-2015 Sudah Selesai10-May-201511-May-2015 Sudah Selesai10-May-2015

Sudah Selesai

Page 16: DailyTimeLog v.2

13-May-2015 Sudah SelesaiOUT_297 2015-05-13 Perkuatan Opening WAP2-4 Lantai 30th~31st

13-May-2015

15-May-2015 Sudah SelesaiOUT_298 2015-05-15 Denah Lantai 10 AP3 Rev thd ars baru

Done

Kirim reaksi ke Geotek

Sudah Selesai

Kirim reaksi ke Geotek

Piling Layout

Kirim ke Pak Dwi Revisi Plan OF 2

Kirim ke Pak Eriko dan Bu Fiona

Page 17: DailyTimeLog v.2

Location of DataE:\Domi Saputro\D682 - Outstanding Lapangan\Office 1\Machine Room Office 1\Etabs 8District8 @SCBD - Office 1 - 2015-05-03 model fix.EDB

\\tyas-8\tyas$\D682-DISTRICT8@SCBD\INCOMING DATA\ARS AIRMAS\DESIGN

idem

E:\Domi Saputro\D682 - Outstanding Lapangan\Office 1\Machine Room Office 1\Etabs 8E:\Domi Saputro\D682 - Outstanding Lapangan\Office 1\Machine Room Office 1\Etabs 8District8 @SCBD - Office 1 - 2015-05-05.EDBE:\Domi Saputro\D682 - Outstanding Lapangan\Office 1\Machine Room Office 1\Etabs 8\model safemodel slab 2015-05-05.FDB

E:\Domi Saputro\D682 - Outstanding Lapangan\Office 1\Machine Room Office 1\Etabs 8

OUT_292 2015-05-07 Denah Lantai 10 AP3 RevOUT_293 2015-05-08 PC BALLROOMbeam for canopy-facade support.pdf

Kirim dengan gmail sifatnya for information only.Kirim dengan gmail sifatnya for information only.

Page 18: DailyTimeLog v.2

E:\Domi Saputro\D682 - Outstanding Lapangan\Apartemen 1\Opening Shearwall AP1 Lantai 31D:\Domisaputro\project - D682 - District 8 @ SCBD\Excel\wall\AP 2

D:\Domisaputro\project - D763 - One Velvet\ScheduleOne Velvet Schedule - 2015-05-18 --> MS Project

D:\Domisaputro\project - D752 - One Azzure\Outgoing Data\GeotekOUT_01 2015-05-19 Reaksi Base

Kirim doghouse OF 3kirim langhamKirim reaksi ke Geotek Revisi

OUT_303 2015-05-20 Revisi Plan Office 2

OUT_FORZA_003 [15-05-22] - Detail Draft Pile

Page 19: DailyTimeLog v.2

Result

done

Page 20: DailyTimeLog v.2

ETATBSEXCEL

Page 21: DailyTimeLog v.2

Detail Work Log June

No Date Of Entry Time Start Time Finish Project1 1-Jun-2015 9:00 22:30 D-682

D-752

2 2-Jun-2015 11:45 17:50 D-763Overtime D-752

3 3-Jun-2015 9:13 22:40 D-752D-682

4 4-Jun-2015 8:50 18:35 D-752

5 5-Jun-2015 8:50 17:57 D-682

6 8-Jun-2015 9:00 9:30 D-682

10:00 10:30 D-68210:30 11:00 D-68211:00 12:00 D-68212:00 17:00 D-68217:00 17:30 D-682

Overtime 17:30 21:00 D-682

7 9-Jun-2015 9:00 11:00 D-68211:00 12:00 D-76313:00 17:00 D-76317:00 D-763

8 10-Jun-2015 10:00 12:00 D-76313:00 20:00 D-68220:00 22:30 D-763

9 11-Jun-2015 9:00 10:00 D-00010:00 16:00 D-76316:00 21:00 D-682

10 12-Jun-2015 10:00 12:00 D-76313:00 17:00 D-682

D-752

11 13-Jun-2015 13:00 18:30 D-763

Page 22: DailyTimeLog v.2

12 15-Jun-2015 9:00 21:00 D-76321:00 21:00 D-682

13 16-Jun-2015 10:00 12:00 D-75212:00 17:00 D-763

14 17-Jun-2015 10:00 12:00 D-682

15 18-Jun-2015 10:00 17:00 D-752

16 19-Jun-2015 9:00 17:00 D-763D-752D-682D-682

17 22-Jun-2015 9:00 12:00 D-75212:00 17:00 D-76317:00 18:00 D-76318:00 22:30 D-763

D-752

18 23-Jun-2015 9:00 17:00 D-76317:00 21:00 D-682

19 24-Jun-2015 9:00 21:00 D-682

20 25-Jun-2015 9:00 11:00 D-68215:00 16:00 D-752

15:00 17:00 D-752

21 26-Jun-2015 9:45 10:30 D-00010:30 12:00 D-68213:00 17:00 D-763

22 29-Jun-2015 9:00 12:00 D-00012:00 21:00 D-76321:00 22:00 D-682

23 30-Jun-2015 9:00 20:00 D-68220:00 21:00 D-763

Page 23: DailyTimeLog v.2

Problem, Action, Event, or CommentKirim Crown Ke ArupDesain Penulangan Bore PileUse pile tekan, test pile tekan, tes lateral

Cek Denah Struktur One Velvet + Kirim ke Pak Willy dan Bu KumalaCek Desain Galian

Persiapan Tender FondasiKirim Ulang CrownKirim Desain LMR

Meeting @ Forza Land

Study Tunnel

Download: Update Gambar Office 1; Download Revisi Lantai RefugeDownload: Update LandscapeDiscussion with infrastructure regarding support for excavation in area Office 3Checking story level refuge floor Office 1Revise tunnel Office 1LMR Office 2Send Exhaust Fan Office 1LMR Office 2

LMR Office 2Checking Etabs Model One VelvetChecking Etabs Model One VelvetConsult to Bu Fau regarding AMDAL One Velvet

Checking Etabs Model One VelvetMeeting @ Site OfficeCek Gempa MMPR dan cek model shell

Redudancy training by Pak Bambang BoedionoMeeting @ Forza LandCek balok dudukan facade dan Progress Langham

Cek Gempa MMPR dan cek model shellKirim Sket LMR Low Zone Office 2Kirim base shear reaksi baru

Hitung Gempa One Velvet

Page 24: DailyTimeLog v.2

Hitung Gempa One VelvetKirim tunnel exhaust office 3

Cek Spek Bore PileSchedule One Velvet

Preparation file for meeting

Meeting @ Forza Land

Schedule One VelvetSchedule One AzureKirim desain fondasi CWT Office 1, Office 2Kirim Balok GF Area Kanopi Office 3

Schedule One AzureCek Model Struktur AtasAsistensi Bu FauCek Model Struktur AtasRevisi Schedule One Azure

Cek update arsitekOutstanding District 8

Meeting @ Site Office

Cek Vault BankKonsultasi Bu Fau Final Piling Lay Out

Konsultasi Bu Fau Final Piling Lay Out

Isi time sheetCek Vault BankCek Ketidakberaturan

Meeting InternalCek Model Struktur Atas untuk skematikJawab RFI mengenai LMR Office 1

Jawab RFI mengenai LMR Office 1Cek Model Struktur Atas untuk skematik

Page 25: DailyTimeLog v.2

Target Date1-Jun-2015

2-Jun-20152-Jun-2015

8-Jun-20158-Jun-2015

8-Jun-2015

8-Jun-20159-Jun-2015

9-Jun-2015

9-Jun-2015

10-Jun-2015

Page 26: DailyTimeLog v.2

25-Jun-2015

29-Jun-2015

29-Jun-2015

Page 27: DailyTimeLog v.2

Status

Belum digambar (masih sketch)Sketch sudah di Wildan

Posisi tes lateral harus dipindah, acuan gambar piling layout tidak update

Still downloading at computer behind Mba AmbarNot yet download --> fowarded to [email protected] will send the reaction (forces) from their support (tie rod) design

Done. OUT_312 2015-06-08 Plan and Section Exhaust Fan Shaft

Sketch is done. Drawing on progress

OUT_314 2015-06-11 Balok Penopang Facade di GFOUT_313 2015-06-11 Basement Langham

Page 28: DailyTimeLog v.2

OUT_315 2015-06-15 Opening Exhaust OF3

OUT_321 2015-06-19 CWT Office 2; OUT_322 2015-06-19 CWT Office 1OUT_323 2015-06-19 Balok GF Area Kanopi Office 3

Waiting confirmation from Pak Arie; Architect will send the stair drawing soon after the confirmation

Page 29: DailyTimeLog v.2

Location of Data

folder one azzure forcon fondasi

D:\Domisaputro\project - D682 - District 8 @ SCBD\Etabs\OFF 2\2015\2015-06-08 Lift Machine RoomD-682 - District 8 @ SCBD - Tower 2 - 20150608 Lift Machine Room.EDB

Page 30: DailyTimeLog v.2

D:\Domisaputro\project - D682 - District 8 @ SCBD\Etabs\OFF 2\2015\2015-06-25 Cek Vault BankD-682 - District 8 @ SCBD - Tower 2 - 141014 add vault bank.EDBD:\Domisaputro\project - D682 - District 8 @ SCBD\Outstanding Task ForcontCek PMM Ratio Kolom.xlsx

Page 31: DailyTimeLog v.2

Result

Page 32: DailyTimeLog v.2
Page 33: DailyTimeLog v.2

Detail Work Log July

No Date Of Entry Time Start Time Finish Project1 1-Jul-2015 8:00 17:00 D-763

D-763

2 2-Jul-2015 8:00 17:00 D-763D-763

3 3-Jul-2015 8:00 17:00 D-763D-763

4 6-Jul-2015 8:00 17:00 D-763D-763

5 7-Jul-2015 8:00 17:00 D-763D-763

6 8-Jul-2015 8:00 17:00 D-763D-763

7 9-Jul-2015 8:00 17:00 D-763D-763

9 10-Jul-2015 9:00 20:00 D-763D-763

10 13-Jul-2015 7:00 10:00 D-76310:00 15:30 D-763

11 14-Jul-2015 7:00 15:30 D-763

12 15-Jul-2015

13 22-Jul-2015 8:00 12:00 D-76313:00 17:00 D-763

14 23-Jul-2015 8:00 17:00 D-763D-763

15 24-Jul-2015 8:00 17:00 D-763D-763

16 27-Jul-2015 8:00 17:00 D-763D-763

17 28-Jul-2015 8:00 17:00 D-752

Page 34: DailyTimeLog v.2

D-763

18 29-Jul-2015 8:00 12:00 D-7638:00 17:00 D-752

19 30-Jul-2015 8:00 17:00 D-7638:00 12:00 D-752

20 7/31/2015 8:00 14:00 D-752D-763

8:00 12:00 D-763

Page 35: DailyTimeLog v.2

Problem, Action, Event, or Comment Due DateCek Gambar Schematic DesainCek Lendutan pada Schematic Design

Cek Gambar Schematic DesainCek Balok Kolom pada Schematic Design

Cek Gambar Schematic DesainCek Balok Kolom pada Schematic Design

Cek Gambar Schematic DesainCek Balok Kolom pada Schematic Design

Cek Gambar Schematic DesainCek Balok Kolom pada Schematic Design

Cek Gambar Schematic DesainCek Balok Kolom pada Schematic DesignCek Gambar Schematic DesainCek Balok Kolom pada Schematic DesignCek Gambar Schematic DesainCek Balok Kolom pada Schematic Design

Cek Balok Kolom pada Schematic DesignMengganti bentuk tangga pada schematic design & Mengganti beban

Mengganti beban SIDL pada Schematic Design

Mengganti beban SIDL pada Schematic DesignMemberi Nama pada Shearwall

Merevisi model ETABS (beban, balok, dan pelat)Melakukan pengecekan pada kolom

Menulangi shear wallMelakukan pengecekan pada kolom

Melakukan pengecekan pada kolomMenulangi shear wall

Melakukan pengecekan pada kolom

Page 36: DailyTimeLog v.2

Menulangi shear wall

Mengerjakan penulangan shear wallMelakukan pengecekan pada kolom

Mengerjakan penulangan pelatMelakukan pengecekan pada kolom

Merevisi ukuran kolom sesuai dengan column planMerevisi ukuran kolom sesuai dengan column planMengerjakan penulangan pelat.

Page 37: DailyTimeLog v.2

Status

Done. (July 15th, 2015) D763 - ONE VELVET (KOLOM)-GEMPA.EDB

Done. (July 13th, 2015) D763 - ONE VELVET (KOLOM)-GEMPA v2.EDBDone. (July 22nd, 2015) D763 - ONE VELVET (KOLOM)-GEMPA v2.EDB

Done. (July 23rd, 2015) D763 - ONE VELVET (KOLOM)-GEMPA v2.EDB

Done. (July 24th, 2015) D763 - ONE VELVET (KOLOM)-GEMPA v2.EDB

Done.

Page 38: DailyTimeLog v.2

Done. (July 27th, 2015) D763 - ONE VELVET (KOLOM)-GEMPA v2.EDB

Done. D-752-STA-SC-TW-110615-ARS050615-CRACK-GEMPA NOMINAL-STUDI POTONG WALL.EDB

Done. D-752-STA-SC-TW-110615-ARS050615-CRACK-GEMPA NOMINAL-STUDI POTONG WALL.EDBDone. (July 31st, 2015) D763 - ONE VELVET (KOLOM)-GEMPA v2.EDBDone. D678 - Perhitungan Pelat

Page 39: DailyTimeLog v.2

Location of Data Result

Page 40: DailyTimeLog v.2

Done. D-752-STA-SC-TW-110615-ARS050615-CRACK-GEMPA NOMINAL-STUDI POTONG WALL.EDB

Done. D-752-STA-SC-TW-110615-ARS050615-CRACK-GEMPA NOMINAL-STUDI POTONG WALL.EDB