Galian tanah 12.72 0.05 152.4 96.9264 3.75 0.75 152.4 428.625 Total 525.551 Timbunan pasir 12.72 0.05 152.4 96.9264 3.75 0.75 152.4 Kerb tipe A1nh 152.4 152.4 Kolom beton bertulang termasuk 12.72 0.3 36.2857 138.466 Pasangan batu 12.72 0.5 152.4 969.264 3.75 0.7 152.4 400.05 1.5 0.3 152.4 68.58 0.5 0.5 152.4 38.1 Total 1475.99 Plesteran 1.65 152.4 251.46 0.5 152.4 Total 251.46 Pipa suling-suling dipasang tiap ja 152.4 242.316 Siaran 12.72 152.4 1938.53

Upload: faratha

Post on 31-Jan-2016

214 views

Category:

Documents


0 download

DESCRIPTION

buk

TRANSCRIPT

Page 1: buk

Galian tanah 12.72 0.05 152.4 96.9264 m3 T.063.75 0.75 152.4 428.625

Total 525.5514 Timbunan pasir 12.72 0.05 152.4 96.9264 m3 T.14c

3.75 0.75 152.4 Kerb tipe A1nh 152.4 152.4 m P.02d Kolom beton bertulang termasuk bekisti 12.72 0.3 36.28571 138.4663 m3 B.15 Pasangan batu 12.72 0.5 152.4 969.264 m3 P.01

3.75 0.7 152.4 400.051.5 0.3 152.4 68.580.5 0.5 152.4 38.1

Total 1475.994 Plesteran 1.65 152.4 251.46 m2 m2

0.5 152.4Total 251.46

Pipa suling-suling dipasang tiap jarak 152.4 242.316 m P.16 Siaran 12.72 152.4 1938.528 m2 P.03

Page 2: buk

24142.25 1.3E+07

134295 1.3E+07

163622.8 2.5E+072557556 3.5E+08

487712.5 7.2E+08

45311.64 1.1E+07

11718 283945935565.2 6.9E+07