KEGIATAN : REVITALISASI INFRASTRUKTUR SARANA DAN PRASARANA PENYELENGGARAAN PEKAN OLAHRAGA DAERAH ( PORDA ) JAWA BARAT PEKERJAAN : REVITALISASI INFRASTRUKTUR SARANA PRASARANA OLAH RAGA SOR TAMAN MALUKU LOKASI : JL. MALUKU KOTA BANDUNG TAHUN : 2010 HARGA SAT. PEKERJAAN (Rp) 1 3 4 5 6 = 4 X 5 II A PEKERJAAN PERSIAPAN - 1 Pek Papan Nama 0.960 8,250.00 7,920.00 2 Pek Dokumentasi dan Prijinan ls 1.000 750,000.00 750,000.00 3 Pek Pengadaan air dan listrik kerja ls 1.000 750,000.00 750,000.00 2 Pek. Pengukuran Leveling Lantai 424.000 1,749.00 741,576.00 3 Pek. Bongkaran Lapisan Beton Lap. Tenis 361.760 173,243.00 62,672,387.68 64,921,883.68 B PEKERJAAN LANTAI KONSTUKSI BETON - 1 LAPISAN DASAR KE - 1 - a Pek lapisan 1 Beton 258.400 1,100.00 284,240.00 Spec. Kain Kasa L = 16 cm, Aquaproof, Lemkra D. 105 - - 2 LAPISAN DASAR KE - 2 - a Pembesian / Penulangan kg 13,625.280 9,075.00 123,649,416.00 Spec, BRC/Wiremesh M7 1 lapis 72 Lembar - - 3 LAPISAN DASAR KE - 3 - a Peninggian Lantai, Pengaturan Elevasi 361.760 247,615.00 89,577,202.40 Cor Lantai Beton, Finish Plesteran - Spec : - - Tebal Beton Rata-rata 14.27 cm - - Kemiringan Lantai 0.87 % - - Beton Ready Mix, K. 275 - - 213,510,858.40 C PEKERJAAN FINISHING - 1 LAPISAN FINISHING KE - 1 - a Asphalt Dasar 1 / Hotmix Screening T = 2 cm 2,584.000 12,309.00 31,806,456.00 b Asphalt Dasar 1 / Hotmix Sand Sheet T = 1 cm 2,584.000 8,426.00 21,772,784.00 c Pemadatan Lapisan Hotmix dengan Wales ( 4 - 6 ton ) 2,584.000 550.00 1,421,200.00 - 2 LAPISAN FINISHING KE - 2 - a Pek. Lapisan Acrylic Filler Coat ACRONAL 2,584.000 11,750.00 30,362,000.00 Spec : - - Acronal Latex Sintesis - - Pasir Silika - - 3 LAPISAN FINISHING KE - 3 - a Top Coat Playing Surface Sekw. Rebound Ace 2,584.000 16,500.00 42,636,000.00 - Areal Permainan Warna Hijau - - Areal Luar Permainan Warna Merah - b Acrylic Line Marking 30.120 15,710.00 473,185.20 Spec : - - Coat Warna Putih lebar garis 5 cm - - Pasir Silika - - 128,471,625.20 D PEKERJAAN LAIN-LAIN - 1 Pembersihan Area Pekerjaan ls 1.000 1,500,000.00 1,500,000.00 2 Pek. Perbaikan Saluran Drainase 25 % m' 14.761 36,511.00 538,929.74 3 Pas. Grill Besi Penutup Saluran m' 14.761 3,085.00 45,536.91 4 Pek. Pengecatan Grill Besi 25.979 18,370.00 477,232.76 5 Pek. Perbaikan Rangka Tower Lampu kg 284.690 4,281.00 1,218,757.89 6 Pek. Pengecatan Besi Tower Lampu 136.430 18,370.00 2,506,219.10 - 6,286,676.41 413,191,043.69 RENCANA ANGGARAN BIAYA ( RAB ) ( BQ ) NO URAIAN PEKERJAAN SAT. VOL. JUMLAH 2 PERBAIKAN LAPANGAN TENIS Sub. Jumlah II.A Sub. Jumlah II.B Sub. Jumlah II.C Sub. Jumlah II.D JUMLAH II ( PEKERJAAN PERBAIKAN LAPANGAN TENIS )

Upload: herau2

Post on 03-Jan-2016

742 views

Category:

Documents


148 download

DESCRIPTION

bq lap tenis pusrehab

TRANSCRIPT

Page 1: BQ Lapangan Tenis

KEGIATAN : REVITALISASI INFRASTRUKTUR SARANA DAN PRASARANA PENYELENGGARAAN PEKAN OLAHRAGA DAERAH ( PORDA ) JAWA BARATPEKERJAAN : REVITALISASI INFRASTRUKTUR SARANA PRASARANA OLAH RAGA SOR TAMAN MALUKU LOKASI : JL. MALUKU KOTA BANDUNGTAHUN : 2010

HARGA SAT.PEKERJAAN (Rp)

1 3 4 5 6 = 4 X 5IIA PEKERJAAN PERSIAPAN -

1 Pek Papan Nama m² 0.960 8,250.00 7,920.00

2 Pek Dokumentasi dan Prijinan ls 1.000 750,000.00 750,000.00

3 Pek Pengadaan air dan listrik kerja ls 1.000 750,000.00 750,000.00

2 Pek. Pengukuran Leveling Lantai m² 424.000 1,749.00 741,576.00

3 Pek. Bongkaran Lapisan Beton Lap. Tenis m³ 361.760 173,243.00 62,672,387.68

64,921,883.68 B PEKERJAAN LANTAI KONSTUKSI BETON -

1 LAPISAN DASAR KE - 1 - a Pek lapisan 1 Beton m² 258.400 1,100.00 284,240.00

Spec. Kain Kasa L = 16 cm, Aquaproof, Lemkra D. 105 -

-

2 LAPISAN DASAR KE - 2 - a Pembesian / Penulangan kg 13,625.280 9,075.00 123,649,416.00

Spec, BRC/Wiremesh M7 1 lapis 72 Lembar -

-

3 LAPISAN DASAR KE - 3 - a Peninggian Lantai, Pengaturan Elevasi m³ 361.760 247,615.00 89,577,202.40

Cor Lantai Beton, Finish Plesteran -

Spec : -

- Tebal Beton Rata-rata 14.27 cm -

- Kemiringan Lantai 0.87 % -

- Beton Ready Mix, K. 275 -

-

213,510,858.40 C PEKERJAAN FINISHING -

1 LAPISAN FINISHING KE - 1 - a Asphalt Dasar 1 / Hotmix Screening T = 2 cm m² 2,584.000 12,309.00 31,806,456.00

b Asphalt Dasar 1 / Hotmix Sand Sheet T = 1 cm m² 2,584.000 8,426.00 21,772,784.00

c Pemadatan Lapisan Hotmix dengan Wales ( 4 - 6 ton ) m² 2,584.000 550.00 1,421,200.00

-

2 LAPISAN FINISHING KE - 2 - a Pek. Lapisan Acrylic Filler Coat ACRONAL m² 2,584.000 11,750.00 30,362,000.00

Spec : -

- Acronal Latex Sintesis -

- Pasir Silika -

-

3 LAPISAN FINISHING KE - 3 - a Top Coat Playing Surface Sekw. Rebound Ace m² 2,584.000 16,500.00 42,636,000.00

- Areal Permainan Warna Hijau -

- Areal Luar Permainan Warna Merah -

b Acrylic Line Marking m² 30.120 15,710.00 473,185.20

Spec : -

- Coat Warna Putih lebar garis 5 cm -

- Pasir Silika -

-

128,471,625.20 D PEKERJAAN LAIN-LAIN -

1 Pembersihan Area Pekerjaan ls 1.000 1,500,000.00 1,500,000.00

2 Pek. Perbaikan Saluran Drainase 25 % m' 14.761 36,511.00 538,929.74

3 Pas. Grill Besi Penutup Saluran m' 14.761 3,085.00 45,536.91

4 Pek. Pengecatan Grill Besi m² 25.979 18,370.00 477,232.76

5 Pek. Perbaikan Rangka Tower Lampu kg 284.690 4,281.00 1,218,757.89

6 Pek. Pengecatan Besi Tower Lampu m² 136.430 18,370.00 2,506,219.10

-

6,286,676.41 413,191,043.69

RENCANA ANGGARAN BIAYA ( RAB ) ( BQ )

NO URAIAN PEKERJAAN SAT. VOL. JUMLAH

2PERBAIKAN LAPANGAN TENIS

Sub. Jumlah II.A

Sub. Jumlah II.B

Sub. Jumlah II.C

Sub. Jumlah II.D

JUMLAH II ( PEKERJAAN PERBAIKAN LAPANGAN TENIS )