Ve ss el Na me : TB A UDA H
April 2015 DATE MONTH YEARS Symbol S : Scheduled Maintenance
Date Last Overhoul April 2012 30 4 2015 C : Completed Maintenance
Months Hours Jan-15 Feb-15 Mar-15 Apr-15 May-15 Jun-15 Jul-15 Aug-15 Sep-15 Oct-15 Nov-15 Dec-15
La st M on th Tot al Runn in g H ou rs La st M ont h Tot al Runn in g H our s
This Month Running Hours This Month Running Hours
Current Total Running Hours Current Total Running Hours 0
6.1 BILGES & GS PUMP POMPA BILGE DAN GS
6.1.1 MOTOR MOTOR
6.1.1A Check wire terminal and gland tightness. Periksa kabel terminal dan kekencanganna 10/Apr/15 0 2 9-Jun-15 C S
6.1.1B Cl ean fan impell er and prot ect ive guard venti lati on passage. Bersi hkan kipas dan rumah pel indung sal uran udara. 10/Apr/ 15 0 2 9-Jun-15 C S
6.1.1C Cleaning the greasing and re greasing Bersihkan greas lama dan tambahkan greas baru 10/Apr/15 0 6 7-Oct-15 C S
6.1.1D Replace bearing Ganti baru bearing 15/Apr/14 12 60 20-Mar-19
6.1.1E Merger test Laksanakan merger test 6/Feb/15 2 6 5-Aug-15 C S
6.1.1F Cleaning motor Laksanakan cleaning motor 15/Apr/14 12 36 30-Mar-17
6.1.2 PUMP POMPA
6.1.2A Check for big noise Periksa pompa dari suara yang terlalu bising / tidak biasa 14/Apr/15 0 1 14-May-15 C S
6.1.2B Check leakage from the pump casing Periksa kebocoran dari badan pompa 14/Apr/15 0 1 14-May-15 C S
6.1.2C Make sure no abnormal vibration pastikan tidak ada getaran yang tidak normal 14/Apr/15 0 1 14-May-15 C S
6.1.2D Overhaul Pump Laksanakan overhaul pompa 15/Apr/14 12 36 30-Mar-17
6.2 SEA WATER COOLING PUMP POMPA PENDINGIN AIR LAUT
6.2.1 PUMP POMPA
6.2.1A Check for big noise Periksa pompa dari suara yang terlalu bising / tidak biasa 14/Apr/15 0 1 14-May-15 C S
6.2.1B Check leakage from the pump casing Periksa kebocoran dari badan pompa 14/Apr/15 0 1 14-May-15 C S
6.2.1C Make sure no abnormal vibration pastikan tidak ada getaran yang tidak normal 14/Apr/15 0 1 14-May-15 C S
6.2.1D Overhaul Pump Laksanakan overhaul pompa 15/Apr/14 12 36 30-Mar-17
6.3 FUEL OIL PUMP POMPA BAHAN BAKAR
6.3.1 MOTOR MOTOR
6.3.1A Check wire terminal and gland tightness. Periksa kabel terminal dan kekencanganna 10/Apr/15 0 2 9-Jun-15 C S
6.3.1B Cl ean fan impell er and prot ect ive guard venti lati on passage. Bersi hkan kipas dan rumah pel indung sal uran udara. 10/Apr/ 15 0 2 9-Jun-15 C S
6.3.1C Cleaning the greasing and re greasing Bersihkan greas lama dan tambahkan greas baru 10/Apr/15 0 6 7-Oct-15 C S
6.3.1D Replace bearing Ganti baru bearing 15/Apr/14 12 60 20-Mar-19
6.3.1E Merger test Laksanakan merger test 11/Mar/15 1 3 9-Jun-15 C S
6.3.1F Cleaning motor Laksanakan cleaning motor 15/Apr/14 12 36 30-Mar-17
6.3.2 PUMP POMPA
6.3.2A Check for big noise Periksa pompa dari suara yang terlalu bising / tidak biasa 10/Apr/15 0 1 10-May-15 C S
6.3.2B Check leakage from the pump casing Periksa kebocoran dari badan pompa 10/Apr/15 0 1 10-May-15 C S
6.3.2C Make sure no abnormal vibration pastikan tidak ada getaran yang tidak normal 10/Apr/15 0 1 10-May-15 C S
6.3.2D Overhaul Pump Laksanakan overhaul pompa 15/Apr/14 12 36 30-Mar-17
6.4 AUXILIARY AIR COMPRESSOR AIR COMPRESSOR
6.4.1ec and cean coo ing fins of compressor and prime
mover.P er ik sa da n b er si hk an su du -s ud u p en di ngi n comp re ss or. 1 4/ Ju l/ 14 9 3 12-Oct-14
6.4.2 Check Lub oil and fuel of prime mover. Periksa minyak lumas dan bahan bakar 15/Apr/14 12 3 14-Jul-14
6.4.3 Funct ioning tes t of com pressor . (Note charging time). Jalankan com pressor (catat be rapa lamap waktu pengisian) 15/Apr/14 12 3 14-Jul-14
6.5 OILY WATER SEPARATOR OILY WATER SEPERATOR
6.5.1 Vis ual ly inspect oil y wat er separator casi ng for corrosi on. Peri ksa rumah oil y wat er separator dari karat an. 30/Apr/ 15 0 3 30-Jul-15 C S
6.5.2 Check all piping for leaks Periksa semua pipa dari kebocoran 30/Apr/15 0 3 30-Jul-15 C S
6.5.3 Clean oil sensing probe. Bersihkan oil sensing probe 30/Apr/15 0 3 30-Jul-15 C S
6.5.4 Operation test of solenoid valve. Tes solenoid valve 30/Apr/15 0 3 30-Jul-15 C S
6.5.5 Check sl udge pump fan bel ts. Peri ksa fan bel t dari pompa s ludge 30/Apr/15 0 3 30-Jul-15 C S
6.5.6 Check all wire connections. Periksa hubungan kabel-kabel 30/Apr/15 0 3 30-Jul-15 C S
6.6 HYDRAULIC POWER PACK AND CONTROL HYDRAULIC POWER PACK DAN KONTROL
6.6.1 Check all hoses and piping for deterioration. Periksa semua selang dan pipa dari keusangan 15/Feb/15 2 3 15-May-15 C S
6.6.2Check hydraulic oil condition, clean or renew oil filter if
necessary.
Periksa kondisi minyak hydrolik, bersihkan atau ganti
saringan jika perlu.30/Apr/15 0 3 30-Jul-15 C S
6.6.3Check all control valves and ensure t hey are free, clean and
lubricate all joints.
Periksa semua konrtol valves, pastikan bebas, bersihkan dan
lumasi semua penghubung.30/Apr/15 0 3 30-Jul-15 C S
Est. Next Due
LF- E 036
Revision
Page 1 Of 6
PMS No. Unit / System
AUXILARY MACHINE
Form
Unit / System2014
PERIOD OF PMS REPORT
P I C
Last Maint. Date Running HoursInterval
7/24/2019 AUX MACH
http://slidepdf.com/reader/full/aux-mach 2/3
6.6.4 C he ck pu mp s a li gn me nt an d c ou pl in g. P er ik sa al ig nm en t p om pa da n k op li ng 30/Apr/15 0 3 30-Jul-15 C S
6.6.5 C heck for abnorma l noise and vibra tion. Per iksa dar i suara yang t idak norm al/ge ta ran 30/Apr/15 0 3 30-Jul-15 C S
6.6.6 E ns ur e a ll p re ss ur e g au ge s a nd t he rm ome te r a re f un ct io ni ng . P as ti ak n s emu a p en gu ku r t ek an an d an t er mo me te r b er fu ng si . 3 0/ Ap r/ 15 0 3 30-Jul-15 C S
6.6.7 Cl ean cooler and renew zi nc anodes if necessary. Bersi hkan cool er dan perbaharui zi nc anodenya j ika perl u. 30/Apr/ 15 0 3 30-Jul-15 C S
6.6.8 Check all air control line for leakage. Rectify all defects.Periksa semua pipa kontrol udara dari kebocoran, perbaiki
semua kerusakan.30/Apr/15 0 3 30-Jul-15 C S
6.6.9 Check and adjust pressure regulating valves if necessary. Periksa dan atur “regulting Valve” jika perlu. 30/Apr/15 0 3 30-Jul-15 C S
WARNING: PERINGATAN:
Main breaker to the assigned equipment to be in "OFF"position. Tape breaker and display signboard.
Main Breaker dalm posisi “OFF” pada peralatan yangakan di kerjakan. Dan beri tanda di panelnya.
6.7 STEERING GEAR MESIN KEMUDI
6.7.1 Check all joints and glands for leakage. Periksa semua Joints dan Glands dari kebocoran. 30/Apr/15 0 3 30-Jul-15 C S
6.7.2 Check hydraulic pump for noise and vibration.Periksa pompa hydraulic dari suara yang tidak bi asa dan
getaran30/Apr/15 0 3 30-Jul-15 C S
6.7.3 Check pump coupling for wear and damage. Periksa coupling pompa dari keausan dan kerusakan. 30/Apr/15 0 3 30-Jul-15 C S
6.7.4 Check and lubricate linkage. Periksa dan lumasi linkage. 30/Apr/15 0 3 30-Jul-15 C S
6.7.5Test auxiliary or emergency steering. (Record in engine and
deck log)Tes mesin kemudi darurat(catat di Log Book) 30/Apr/15 0 3 30-Jul-15 C S
6.8 BATTERY STARTING SYSTEM BATTERY STARTING SYSTEM C/E
6.8.1 Check All battery electrolyte specific gravity. Periksa berat jenis electrolyte pada semua battery 30/Mar/15 1 2 30-May-15 C S
6.8.2 Top up All bat tery with dist i lled wa te r i f necessary. Tam bah a ir pada semua bat tery dist i lla teya jika dipe rlukan 30/Mar/15 1 2 30-May-15 C S
6.8.3 C heck tightness of al l ba ttery termina l. Per iksa kekencangan te rm inal pada semua bat tery 30/Mar/15 1 2 30-May-15 C S
6.8.4 E ns ur e al l b at ter y cl ean li ne ss . P as ti ka n k eb er si han p ad a s emu a b at ter y 30/Mar/15 1 2 30-May-15 C S
6.8.5 Check wire connection all battery to starter. Periksa kabel penghubung pada semua battery ke starter 30/Mar/15 1 2 30-May-15 C S
6 .9 E NG IN E R OO M G EN ER AL MA IN TE NA NC E P ER AW AT AN UM UM KA MA R M ES IN
6.9.1Bulkheads, long., web frames, other members in good
condition.No heavy corrosion, wastage, holes or cracks.
Bulkheads, longitudinal bulkhead, web frames, dan bagian
lain dalam kondisi yang baik , tidak ada korosi yg parah
berlubang atau crack/retak.
30/Apr/15 0 3 30-Jul-15 C S
6.9.2
Engine room Bilges, should be kept clean and dry, free from
corrosion, wastage and oil. Particular care should be taken to
prevent the escape of hydrocarbon liquids or vapour int o the
engine room.
Bilge/got kamar mesin, harus bersih dan kering, bebas darikarat, endapan lumpur dan minyak. Dan benda2 yang
menutup saluran/lubang pada dasar sekat harus dibersihkan
2/Apr/15 0 1 2-May-15 C S
6.9.3Bulkhead penetrations should be routinely checked to ensure
the effectiveness of seals.
Penetrasi2 pada bulkhead diperiksa rutin untuk memastikan
tidak ada seal yang bocor2/Apr/15 0 1 2-May-15 C S
6.9.4
Emergency escape routes should be checked regularly to
ensure that they are free any object, include emergency
escape dors easy to operated and can l ock it from inside and
properly marked and clear of obstructions.
Jalur / daerah sekit ar untuk rute Emergency escape dicek
secara regular untuk memastikan bebas dari benda2 yang
menghalangi, termasuk pintu unt uk emergency escape mudah
dioperasikan dan bisa dikunci dari dalam dan diberi tanda
(emergency escape) secara jelas.
2/Apr/15 0 1 2-May-15 C S
6.9.5 All lights in good order.Semua lampu2 di kamar mesin termasuk covernya dalam
kondisi baik dan berfungsi2/Apr/15 0 1 2-May-15 C S
6.9.6Safety functional test prior the release of CO2/ Foam at
regular intervalsTest fungsional safety release CO2 secara reguler 30/Apr/15 0 3 30-Jul-15 C S
NOTE: CATATAN
Ensure that during hosing down or cleaning operation,
no water is allowed to settle on electrical machinery. The
compartment should look clean and tidy after this
operation. This is one of the criteria that indicates the
performance of the Chief Engineer and his subordinates.
Pastikan bahawa saat penyemprotan atau pembersihan,
jangan sampai air terkena peralatan listrik. Ruangan
harus nampak bersih dan rapih sesuadh itu. Ini adalah
suatu kriteria yang menunjukkan kepribadian KKM dan
anak buahnya
6.10. SEACHEST AND ACESSORIS SEACHEST DAN PERLENGKAPANNYA C/E
6.10.1 Cleaning filter strainer seachest Bersihkan filter strainer seachest 30/Apr/15 0 3 30-Jul-15 C S
6.10.2
open and close all s eachest valve, ensure all valve easy and
ready for operate, add grease at valve stem and change gland
packing if necessary
buka dan tutup semua valve seachest, pastikan semua valve
mudah dan siap untuk dioperasikan, tambahkan grease pada
valve stem dan ganti gland packing jika diperlukan
30/Apr/15 0 3 30-Jul-15 C S
6.10.3Check and Ensure, zinch anode still , replace new zinch
anode if necessary
Pastikan zinch anode untuk seachest masih ada, ganti jika
zinch anode sudah habis30/Apr/15 0 3 30-Jul-15 C S
6.11 SPARE AND INVENTORY SUKU CADANG DAN INVENTARIS
6.11.1
Besides the routine checking of spares and updating of
inventory, a thorough check must be carried out t o ensure
that spares are properly secured and preserved.
Disamping pemeriksaan rutin pada suku cadang dan
pencatatan daftar barang, juga di lakukan untuk meyakinkan
bahwa suku cadang tersebut aman dan bi sa digunakan.
2/Mar/15 1 3 2-Jun-15 C S
6.11.2
The Chief Engineer must be able to produce an up-to-date
Inventory List indicating machinery, part numbers, stock
quantity and position of the stores upon request of the Shore
Auditor.
KKM harus mampu membuat daftar terbaru permesinan,
nomor suku cadang, jumlah yang tersedia dan posisi pada
tempat penyimpanan jika ada permintaan dari audit or.
30/Apr/15 0 3 30-Jul-15 C S
ITEM MAINTENANCE FOR
7/24/2019 AUX MACH
http://slidepdf.com/reader/full/aux-mach 3/3
Summary of Overdue Maintenance
PMS No.6,4
FREDERIKUS
Chief Engineer
Date :
AUXILARY AIR COMPRESSOR
April-15
Item Maintenance Reason Remarks
LF- C 051/DES 2012 Written by :INA Approved by : VP / DPA Retention Period : 1 Year
Technical Superintendent
Date :
ITEM OVERDUE FOR
3PMS MAIN PROPULSION
PORTSIDE FOR THIS MONTH EXCELLENTApril-15