ANALISA HARGA SATUAN
PROVINSI : ACEHKABUPATEN/KOTA : SABANGTAHUN ANGGARAN : 2014PAKET PEKERJAAN : RESERVOIR 200 M3LOKASI : PELABUHAN CT-3, KECAMATAN SUKAKARYA, SABANGNO. PEMBAYARAN : C.A.2
HARGAKONTRAK AWAL
No. URAIAN PEKERJAAN SATUANVOLUME
(Rp.)
I. PEKERJAAN PERSIAPANPengukuran 6,310.00 121.00 M2
II. PEKERJAAN TANAHGalian tanah 54,600.00 293.11 M3Pasangan Batu Kosong 261,820.00
Urugan Sirtu, t = 5 cm 295,709.30 5.41 M3
Urugan tanah 49,999.53 8.08 M3
III. PEKERJAAN BETONLantai kerja beton 1:3:6, t=5 cm 1,526,273.55 5.20 M3Plat beton bertulang 1:2:3, t=20 cm 5,278,573.20 7.04 M3Kolom beton bertulang 1:2:3 5,278,573.20 3.40 M3Dinding beton bertulang 1:2:3, t=15 5,278,573.20 16.85 M3Balok beton bertulang 1:2:3 5,278,573.20 14.00 M3Plat tutup beton bertulang 1:2:3, t=15 5,278,573.20 5.28 M3
IV. PEKERJAAN PASANGAN DAN PLESTERANPasangan batu bata 1: 4 159,962.28 84.60 M2Plesteran 1: 4, tebal 15 mm 23,285.50 169.20 M2Water proofing 80,000.00 200.00 M2pasangan batu pondasi 656,499.00 - M3
V. PEKERJAAN PENUTUP MANHOLE & KUNCIPenutup manhole 750,000.00 4.00 BhEngsel dan gembok 20,000.00 4.00 BhTangga Galvanis 175,000.00 1.00 Bh
VI. PEKERJAAN PIPA DAN ACCESSORIES1 PIPA INLET
Pengadaan & pemasangan pipa GIP Ø 200 mm 1,020,954.93 20.00 M'Pengadaan & pemasangan bend CI 90o Ø 200 mm 577,544.00 8.00 Bh
2 PIPA OUTLETPengadaan & pemasangan pipa GIP Ø 200 mm 1,020,954.93 25.00 M'Pengadaan & pemasangan gate valve CI Ø 200 mm 577,544.00 1.00 BhPengadaan & pemasangan flange GIP Ø 200 mm 600,633.80 2.00 Bh
3 PIPA OVERPLOW
Pengadaan & pemasangan pipa GIP Ø 200 mm 1,020,954.93 6.00 M'Pengadaan & pemasangan bend CI 90o Ø 200 mm 577,544.00 4.00 Bh
4 PIPA PENGURASPengadaan & pemasangan pipa GIP Ø 150 mm 500,000.00 6.00 M'Pengadaan & pemasangan gate valve CI Ø 150 mm 1,839,295.00 1.00 BhPengadaan & pemasangan flange GIP Ø 150 mm 152,000.00 2.00 Bh
5 PIPA OVERPLOWPengadaan & pemasangan pipa GIP Ø 200 mm 1,020,954.93 12.00 M'Pengadaan & pemasangan bend CI 90o Ø 200 mm 577,544.00 1.00 Bh
6 PIPA VENTILASIPengadaan & pemasangan pipa GIP Ø 50 mm 80,000.00 2.00 M'Pengadaan & pemasangan tee GIP Ø 50-50-50 mm 210,000.00 2.00 Bh
JUMLAH
ANALISA HARGA SATUAN
KONTRAK AWAL PERUBAHAN VOLUME BERKURANG VOLUME BERTAMBAH
JML HARGA VOLUME JML HARGA VOLUME JML HARGA VOLUME
763,510.00 121.00 M2 763,510.00
16,003,806.00 14.07 M3 768,399.89 279.04 M3 15,235,406.11
1,599,787.31 6.40 M3 1,893,477.51 0.99 M3
403,996.23 10.73 M3 536,415.99 2.65 M3
7,936,622.44 5.68 M3 8,674,133.08 0.48 M3 37,161,155.30 20.39 M3 107,630,740.88 13.35 M3 17,947,148.86 2.87 M3 15,170,619.36 0.53 M3 2,776,529.50 88,943,958.34 16.93 M3 89,376,906.92 0.08 M3 73,900,024.74 13.94 M3 73,604,424.64 0.06 M3 295,600.10 27,870,866.47 15.29 M3 80,723,055.66 10.01 M3
13,532,808.46 60.11 M2 9,614,772.48 24.49 M2 3,918,035.98 3,939,906.60 120.21 M2 2,799,219.81 48.99 M2 1,140,686.79 16,000,000.00 221.97 M2 17,757,344.00 21.97 M2
6.83 M3 4,484,001.09 6.83 M3
3,000,000.00 4.00 Bh 3,000,000.00
80,000.00 4.00 Bh 80,000.00
175,000.00 1.00 Bh 175,000.00
20,419,098.70 20.00 M' 20,419,098.70
4,620,352.00 8.00 Bh 4,620,352.00
25,523,873.37 25.00 M' 25,523,873.37
577,544.00 1.00 Bh 577,544.00
1,201,267.60 2.00 Bh 1,201,267.60
6,125,729.61 6.00 M' 6,125,729.61
2,310,176.00 4.00 Bh 2,310,176.00
3,000,000.00 6.00 M' 3,000,000.00
1,839,295.00 1.00 Bh 1,839,295.00
304,000.00 2.00 Bh 304,000.00
12,251,459.22 12.00 M' 12,251,459.22
577,544.00 1.00 Bh 577,544.00
160,000.00 2.00 M' 160,000.00
420,000.00 2.00 Bh 420,000.00
388,588,930.24 496,382,360.80 23,366,258.48
388,588,930.24
ANALISA HARGA SATUAN
VOLUME BERTAMBAH jumlah besi
JML HARGA Ø12 10,609.54 885.00 btg
Ø8 1,783.36 149.00 btg
D16 1,569.92 131.00 btg
293,690.20
132,419.76
737,510.64 70,469,585.59
432,948.57
52,852,189.19
1,757,344.00 4,484,001.09
131,159,689.04
Item Pekerjaan Keteran Panjang Lebar (m Tinggi (
I. PEKERJAAN PERSIAPANPengukuran
II. PEKERJAAN TANAHGalian tanah pondasi batu 0.27 37.9454
bak penguras 6.38 0.6
Pasangan Batu Kosong
Urugan Sirtu, t = 5 cm plat lantai 107.28 0.05permukaan balok 41.84 0.2
plat bak penguras 6.38 0.05bawah pondasi 37.9454 0.6 0.05
Urugan tanah 107.28 0.1
III. PEKERJAAN BETONLantai kerja beton 1:3:6, t=5 cm plat lantai 107.28 0.05
plat bak penguras 6.38 0.05
Plat beton bertulang 1:2:3, t=20 cm 101.9506 0.2
Kolom beton bertulang 1:2:3 0.04 2.850.04 3.45
Dinding beton bertulang 1:2:3, t=15 37.848 0.15 2.859.4 0.2 0.4
Balok beton bertulang 1:2:3 - balok 20 / 40 99.6 0.2 0.4 - balok 20 / 30 99.6 0.2 0.3
Plat tutup beton bertulang 1:2:3, t=15 101.9506 0.15
IV. PEKERJAAN PASANGAN DAN PLESTERANPasangan batu bata 1: 4 21.09 2.85
Plesteran 1: 4, tebal 15 mm
Water proofing 40.2454 3
Luas (m²)
101.2306
pasangan batu pondasi 0.18 37.9454
V. PEKERJAAN PENUTUP MANHOLE & KUNCIPenutup manholeEngsel dan gembokTangga Galvanis
VI. PEKERJAAN PIPA DAN ACCESSORIES1 PIPA INLET
Pengadaan & pemasangan pipa GIP Ø 200 mmPengadaan & pemasangan bend CI 90o Ø 200 mm
2 PIPA OUTLETPengadaan & pemasangan pipa GIP Ø 200 mmPengadaan & pemasangan gate valve CI Ø 200 mmPengadaan & pemasangan flange GIP Ø 200 mm
3 PIPA OVERPLOWPengadaan & pemasangan pipa GIP Ø 200 mmPengadaan & pemasangan bend CI 90o Ø 200 mm
4 PIPA PENGURASPengadaan & pemasangan pipa GIP Ø 150 mmPengadaan & pemasangan gate valve CI Ø 150 mmPengadaan & pemasangan flange GIP Ø 150 mm
5 PIPA OVERPLOWPengadaan & pemasangan pipa GIP Ø 200 mmPengadaan & pemasangan bend CI 90o Ø 200 mm
6 PIPA VENTILASIPengadaan & pemasangan pipa GIP Ø 50 mm
Pengadaan & pemasangan tee GIP Ø 50-50-50 mm
Jumlah volume sat
10.25 3.83 14.07
4.95 0.32 1.14 6.40
10.73
5.36 0.32 5.68
20.39
24 2.7361 0.138
2.874
16.180020.752
16.93202
7.9685.976
13.944
15.29259
60.1065
120.213
120.7362
101.2306221.96686.830172
4.00 4.00 4.00 4.00 1.00 1.00
20.00 20 8.00 8
25.00 25.00 1.00 1.00 2.00 2.00
6.00 6.00 4.00 4.00
6.00 6.00 1.00 1.00 2.00 2.00
12.00 12.00 1.00 1.00
2.00 2.00 2.00 2.00
BACKUP DATACALCULATION OF CONCRETE
Inspection Date & Time :
Structure : Retaining WallLocation : Relocation Road
Inspection Item : Concrete Type G
No Sket
1
Total
BACKUP DATACALCULATION OF CONCRETE
Unit Area Average Quantity Remarks
#REF! m3 Total Concrete
Prepared By
(the Contractor)
length (m)
1.30
0
1.40
0
2.8001.040
300
1.10
0
850 400
750
650
4.050
1
23
45
top related